Loading...
Resolution 2008-11 aDOS -11 Illinois Department Resolution for Maintenance of of Transportabon Streets and Highways by Municipality Under the Illinois Highway Code BE IT RESOLVED, by the Mayor and City Council of the (Council or President and Board of Trustees) United City of Yorkville , Illinois, that there is hereby (City, Town or Village) (Name) appropriated the sum of $112,520.00 of Motor Fuel Tax funds for the purpose of maintaining streets and highways under the applicable provisions of the Illinois Highway Code from May 1, 2008 (Date) to April 30, 2009 (Date) BE IT FURTHER RESOLVED, that only those streets, highways, and operations as listed and described on the approved Municipal Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this resolution, are eligible for maintenance with Motor Fuel Tax funds during the period as specified above. BE IT FURTHER RESOLVED, that the Clerk shall, as soon a practicable after the close of the period as given above, submit to the Department of Transportation, on forms furnished by said Department, a certified statement showing expenditures from and balances remaining in the account(s) for this period; and BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this resolution to the district office of the Department of Transportation, at Ottawa , Illinois. I, Jackie Milschewski Clerk in and for the United City (City, Town or Village) of Yorkville County of Kendall hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the Mayor and City Council at a meeting on (Council or President and Board of Trustees) Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this day of M C , (SEAL) City Clerk (City, Town or Village) Approved A / Date W ep ent of Transpo on Re ' naI Engineer V Printed 2/25/2008 BLR 14230 (Rev. 11/06) I Illinois Department Municipal Estimate of of Transportation Maintenance Costs Section Number 08 - 00000 - 00 - GM Period from 05/01/2008 to 04/30/2009 Municipality Yorkville Estimated Cost of Maintenance Operations Maintenance For GrouD I. II, or III (Material. Equipment or Labor) Operation Group (No. — Description Unit Op eratio n III III I p n Item I Unit I Quantity I Price I Cost Cost Bituminous Patchinq 1 II Bituminous Cold Patch I TON I 40 1 93.00 1 $3,720.00 3,720.00 Surface Hot Mix j TON I 150 1 55.00 1 $8,250.00 8,250.00 Signs, Posts & Hardware j II Various Signs I EA I 150 1 40.00 1 $6,000.00 6,000.00 j I Sign Posts j EA I 150 1 27.00 1 $4,050.00 4,050.00 1 Brackets & Hardware j EA I 150 1 30.00 1 $4,500.00 4,500.00 Snow Removal i II Bulk Rock Salt j TON I 2000 1 43.00 1 $86,000.00 86,000.00 I I bulk rock salt purchased j 1 I through State CMS I I I I 1 + I I I I 1 1 i I 1 I 1 l i I I I i I I I Total Day Labor Costs 1 $112,520.00 Total Estimated Maintenance Operation Cost $112,520.00' Preliminary Engineering Engineering Inspection Material Testing Total Estimated Engineering Cost Total Estimated Maintenance Cost $112,520.00 Submitted: _� Approved: 2 BY• .( Date dry /bate �Mfficial ,���GT42 0�' ��� O Title P_ Re bnal Engineer Submit Four (4) Copies to Regional Engineer (� Page 1 of 1 Printed on 3/7/2008 10:34:28 AM BLR 14231 (Rev. 2/23/06) Illinois Department of Transportation Special Provisions The following Special Provisions supplement the "Standard Specifications for Road and Bridge Construction ", Adopted January 1, 2007 , the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways ", and the "Manual of Test Procedures of Materials" in effect on the date of invitation of bids, and the Supplemental Specifications and Recurring Special Provisions indicated on the Check Sheet included here in which apply to and govern the construction of 08- 00000 -00 -GM , and in case of conflict with any part, or parts, of said Specifications, the said Special Provisions shall take precedence and shall govern. Bituminous Patching - The United City of Yorkville will use a N -30 or N -50 surface course mix on all patches throughout the City. All patches will be performed in accordance with Section 406 of the Standard Specifications for Road and Bridge Construction Adopted January 1, 2007. Page 1 of 1 BLR 11310 (Rev. 7/05) Printed on 3/7/2008 10:35:15 AM LR 1013 I Page 1 of 1 State of Illinois DEPARTMENT OF TRANSPORTATION Bureau of Local Roads and Streets SPECIAL PROVISION FOR ROCK SALT Effective August 1, 1969 Revised January 1, 2002 All references to Sections or Articles in this specification shall be construed to mean a specific Section or Article of the Standard Specifications for Road and Bridge Construction, adopted by the Department of Transportation. Description. This item shall consist of furnishing rock salt (sodium chloride) in bins or stockpiles at location designated in the Proposal. Materials. Material shall meet the requirements of Article 1013.02 except that the gradation shall be as follows: Passing 12.5 mm (1/2 inch) sieve 100% Passing 9.5 mm (3/8 inch) sieve 95- 100% Passing 4.75 mm (No. 4) sieve ______ 20- 90% Passing 2.36 mm (No. 8) sieve 10- 60% Passing 600 µm (No. 30) sieve 0- 10% The Department reserves the right to reject any shipments of rock salt which are delivered in a frozen or caked condition or which contain free water. The Department reserves the right to accept delivery of Rock Salt which, according to analysis by the Department, has a sodium chloride (NaCI) content of less than 96.0 %, but is not less than 90.0 %. Material with less than 90.0 % sodium chloride will be rejected. When such exceptions are allowed, payment will be adjusted. Method of Measurement. Rock salt will be measured by the metric ton (ton). Basis of Pavment. This work will be paid for at the contract unit price per metric ton (ton) for I furnishing and transporting ROCK SALT based on the sodium chloride content. Payment will be in accordance with the following schedule: NaCl Content 96.0% to 100.0% Net Bid price per ton. NaCl Content 95.0% to 95.9% Bid price less $0.50 per metric ton (ton). NaCl Content 94.0% to 94.9% Bid price less $2.00 per metric ton (ton). NaCl Content 90.0% to 93.9% Bid price less $4.00 per metric ton (ton). LR 442 STATE OF ILLINOIS Page 1 of 2 DEPARTEIVIENT OF TRANSPORTION DIVISION OF HIGHWAYS LOCAL ROADS AND STREETS BITUMINOUS PATCHING MIXTURES FOR MAINTENANCE USE Effective: January 1, 2004 Revised: February 1, 2007 This special provision covers course graded and fine graded bituminous mixtures for use in maintaining small areas on flexible and rigid type pavement. Materials. The materials, control, quality, sampling, testing, inspection and storage of material shall conform to the specific requirements of the Standard Specifications for Road and Bridge Construction adopted by the Department of Transportation. Bituminous Patching Mixtures. The material supplier or contractor may furnish any of the following Bituminous Patching Mixtures listed in the individual Group for which the award was made. Group I — Bituminous Patching Mixtures Serial No. M- 17 -02: Bituminous Mixture for Maintenance Use, Emulsified Asphalt Type I Serial No. M- 19 -02a: Bituminous Mixture for Maintenance Use, Liquid Asphalt Type Serial No. M- 20 -02: Bituminous -Sand Mixture for Maintenance Use Serial No. M- 48 -02: Bituminous Premix for Maintenance Use, Inverted Emulsified Asphalt CBAE -2 Serial No. M- 126 -95: Bituminous Mixes for Maintenance Use, Reinforced Fiber Mixture Bituminous Patching Mixture (HMA): This mixture shall conform to the material requirements of Section 1030. The mixture shall be a High ESAL IL -12.5 N50, High ESAL IL -9.5 N50, or Low ESAL IL -9.5 N30 mix. The bituminous material shall be limited to asphalt PG 58 -28 or PG 52 -28. Group II — Bituminous Patching Mixture (Proprietary) Serial No. M- 120 -00: Bituminous Premix for Maintenance Use - Optimix, Sylcrete, UPM, QPR -2000, EZ Street - Proprietary Sources Serial No. M- 133 -96: Bituminous Premix for Maintenance Use, Instant Road Repair - Proprietary Serial No. M- 134 -02: Bituminous Premix for Maintenance Use, SMP -Proprietary Placing of Bituminous Patching Mixture. All holes and depressions in the existing surfa ce y removal of all loose and defective material and which exceed 3 /" in depth shall be repaired b replaced with the specified Bituminous Patching Mixture. The material shall be compacted to produce a tight surface conforming to the adjacent area. Method of Measurement. Bituminous patching mixture will be measured for payment in metric tons (tons). LR 442 Basis of Payment. This work will be paid for at the contract unit price per metric ton (ton) of 2 o BITUMINOUS PATCHING MIXTURE (GROUP 1); BITUMINOUS (GROUP II); PATCHING MIXTURE When bids are taken F.O.B. trucks at the mixing plant a hauling differential of $o. per ton -mile haul ul from mixing la used to determine the low bid. Round 'rip distance shall be used to calc late differential will be g to be used to compare p re bids. Bidders are required to fill in the location of the plant from where they propose to supply the patching mixture, on the material proposal form. State of Illinois Department of Transportation Division of Highways Springfield SPECIFICATIONS FOR BITUMINOUS PREMIX FOR MAINTENANCE USE OPTIMIX, SYLCRETE, UPM, CPR -2000, EZ STREET, SMP - PROPRIETARY Serial Number: M 120 -07 1. DESCRIPTION. The patching material shall be composed of a mineral aggregate, plant -mixed with a liquid asphalt and chemical additives from the suppliers of the proprietary mixtures. The bituminous material shall be capable of coating wet aggregates without stripping, and shall be available in various grades so that one such grade will enable a stockpile to remain pliable and workable at a temperature of -26 °C ( -15 °F). The patching material shall be capable of maintaining adhesive qualities in patched areas which are damp or wet at time of application, and also after remaining in an uncovered stockpile for up to twelve (12) months. 2. MATERIALS. Control of the materials shall be in accordance with the general requirements of Section 106 of the current Standard Specifications for Road and Bridge Construction. A five kilogram (ten - pound) sample of the mineral aggregate and one -liter (one - quart) sample of the liquid asphalt shall be submitted to the Bureau of Materials and Physical Research, 126 East Ash Street, Springfield, Illinois, for performing the tests specified herein. (a) Aggregate All Coarse Aggregate used in the proprietary mixtures shall consist of crushed stone of Class B quality or better as defined in Article 1004.01(a) & (b) of the above cited Standard Specifications. (b) Bituminous Materials The bituminous material shall be a formulation of the liquid asphalt blend prepared under the supervision of the proprietary mix supplier. It shall meet the requirements of ASTM D 2026 or ASTM 2027, whichever applies, modified as follows: Serial Number M 120 -07 ASTM D 92 OPTIMIX IOPR -2000 SYLCRETE - SYLCRETE UPM I EV V EZ SMP I A I STRE I ET I Flash point (COC) 94 (200) 94 (200) 94 (200) 94 (200) 94 (200) 94 (200) 94 (200)_ °C ( °F) - minimum ASTM D 2170 Kinematic Viscosity 60 °C (140 °F) 350 -3000 300.4000 300 -4000 mm /s (cSt) 300 -4000 400 -2500 280-40D 300-4000 (CPS) ASTM D 95 Water % - maximum 0.2 0.2 0.2 0.2 I 0.2 I -- I 0.2 ASTM D 402 Distillate % by Volume of Original Sample Temperature Distillate to 225 OC (437 OF) 0 0 0 0 Distillate to 260 C (500 F) 0 -5 0 -5 0 0 0 Distillate to 315 °C (600 °F) 0 -21 0-25 0-5 0 -5 0-5 0 -5 0 -25 0 -25 0 -5 Residue from distillation 0 -18 8 -50 0 -25 to 360 °C (680 °F) % Volume by Difference 70 -94 72 -95 " -- -- 73 -95 70 -95 72 -95 Residue Tests: ASTM D 2171 Absolute Viscosity 60 ° C(140 °F) 11.5 -44.0 12.5 -42.5 12.5 -42.5 12.5 -42.5 12.5 -42.5 12.0 -42.5 12.5 -42.5 Pascal Seconds (Poises) (115 -440) (125 -425) (125 -425) (125 -425) (125 -425) (120 -425) (125 -425) ASTM D 5 Penetration 25 °C (77 °F) - 200 __ 100 g, 5s - minimum - - -- 200 ASTM D 5 Penetration, - modified with cone, 25 °C (77 °F) 200 - 180 180 150 g, 5s - minimum 180 180 ASTM D 113 Ductility 21 °C (70 °F) 1cm /min. - -- - -- 100 100 cm - minimum -- 100 ASTM D 113 Ductility 4 °C (39 °F) 1 cm /min, 85 100 cm - minimum --- 100 100 100 ASTM D 2042 Solubility in Trichloroethylene 99.0 99.0 99.0 99.0 % - minimum 99.0 99.0 99.0 (c) Stripping Tests The combined UPM and liquid asphalt shall meet the following stripping tests: (1) Stripping Tests: Dry Aggregate. Two - hundred grams of the air -dried aggregate passing the 12.5 mm (% -inch) sieve and retained on the 4.75 mm (No. 4) sieve shall be combined with 6.3 percent, by weight, UPM liquid asphalt and mixed in a hemispherical 2 Serial Number M 120 -07 metal dish with a stiff spatula for three to five minutes or until a uniform coating is obtained. Twenty -five grams of this material shall be immediately place in 'an oven at 60 °C ± 3 °C (140 OF ± 5 °F), for eighteen to twenty -four hours, after which it shall be thoroughly mixed and allowed to cool to room temperature. The sample shall then be immersed in water at a temperature of 49 °C ± 3 °C (120 OF ± 5 °F), and maintained at this temperature for twenty -four hours. At the end of this period, the area of the aggregate remaining coated shall be determined visually while the sample is still immersed in water. Surface coating of at least 90 percent must be retained on the aggregate. A test similar to the above using MC -250 shall be made for comparison. (2) Stripping Test: Wet Aggregate. Two - hundred grams of the aggregate passing the 12.5 mm (Y2-inch) sieve and retained on the 4.75 mm (No. 4) sieve shall be immersed in water for twenty -four hours and the excess water drained off, leaving the aggregate surface wet. This aggregate shall be combined with 6.3 percent, by weight, UPM liquid asphalt and mixed in a hemispherical metal dish with a stiff liquid spatula for three to five minutes or until a uniform coating is obtained. Twenty -five grams of this material shall be immediately place in an oven at 60 °C ± 3 °C (140 OF ± 5 °F), for eighteen to twenty -four hours, after which it shall be thoroughly mixed and allowed to cool to room temperature. The sample shall then be immersed in water at a temperature of 49 °C ± 3 °C (120 OF ± 5 °F), and maintained at this temperature for twenty -four hours. At the end of this period, the area of the aggregate remaining coated shall be determined visually while the sample is still immersed in water. Surface coating of at least 90 percent must be retained on the aggregate. A test similar to the above using MC -250 shall be made for comparison. In estimating the percentage of area remaining coated, any thin or translucent area shall not be considered as being coated Proprietary mixes, Sylcrete EV, Sylcrete VA, Optimix, OPR -2000, EZ Street, and SMP shall meet the following stripping tests. (1) Place 50 grams of cold mix into a beaker containing 400 ml of boiling distilled water. Bring back to boiling and boil for 3 minutes with constant stirring at 1 revolution per second. At the end of 3 minutes, remove the beaker from the heat source and immediately decant the water. Empty the wet mix onto a paper towel and examine. The retained coating shall not be less than 95 percent. (2) AASHTO T 182 Coating and Stripping of Bitumen - Aggregate Mixtures. 3. INSPECTION. The Engineer or his authorized representative shall have access at any time to all parts of the plant in order to verify weights or proportions and quality of materials used in the preparation of the mixture. The manufacturer shall afford such facilities as may be required for making inspection at the plant and for collecting and forwarding samples of the ingredient materials and bituminous mixture to the Department. 4. PLANT AND EQUIPMENT. Storage facilities and all equipment used in the preparation of the mixture shall be approved by the Department. An approved drier shall be available for surface drying the aggregate when needed. The materials for individual batches shall be measured accurately, either by volume or weight, by approved methods and equipment. A batch type mixer of approved design and capacity shall be used in mixing the ingredient materials. However, approval for the use of a continuous mixer will be given if it can be. shown that satisfactory results will be obtained. 5. PREPARATION OF MIXTURE. The aggregate and Optimix, or CPR- 2000, or Sylcrete, or UPM, or EZ Street, or SMP liquid asphalt shall be proportioned into the mixer and mixed for at least 30 seconds or until a uniformly coated mixture is obtained. The liquid asphalt shall be heated 3 Serial Number M 120 -07 to a temperature of 93 °C ± 28 °C (200° F ± 50° F), at the time of mixing, and in accordance with the instructions of proprietary mix supplier. When necessary to heat the aggregates, the aggregates should not be heated to more than 68 °C (155 °F). 6. COMPOSITION OF MIXTURE. The ingredients shall be combined to produce a mixture meeting the approval of the Department and conforming to the following composition limits, by weight, as determined by tests of the prepared mixture: Gradation of Extracted Aggregate (% Passing)" SIEVE SIZE. OPTIMIX . ,:. - .. .,,.....;.. QPR llPM. .: EU.AND VA EZ STREET SM - :.,; _ MIK #1`_` MIX #1. MIX #2` MIX #1;' MIX # # 1 MIX 2 12:5 mm (1/2 ") I ' 100 � :. I { I �.; ;,.• -... �:..I• ,�. ,. • I • . _....I ` I I i 1 100 1 100 1 100 1 100 1 100 1 100 I 100 100 I I I I I 100 � 9.5 mm (3/8 ") 1 90 -100 1 100 1 90 -100 9o_1 00 90 1 -100 1 100 1 90 -100 1 95 -100 I I I I I I I i I 100 1 so - 10o � I i 4.75 mm (No. 4) 1 20 -55 1 85 -1 OD 1 20 -55 1 20 -55 1 15 -55 1 70 -100 1 20 -55 1 80 -100 1 85 -100 I - I 1 I 1 20 55 i 2.36 mm (No. 8) 1 5 -30 1 10 -40 1 5 -30 1 5 -30 I I I i 1 1 5 -30 1 0 -10 1 10 -40 1 5 -30 J .I 1 1.18 mm (No. 16) 1 0 -10 1 0 -10 1 0 -10 ' 0 -10 1 0 -10 1 0 -10 1 0 -10 1 D -10 1 0 -10 1 0 -10 J I 1 600 P (No. 30) 1 1 0 -7 1 0 -7 1 1 I I 1 0 -10 I I 1 I I I I I I I I I I I 1 300 um (No. 50) 1 0 -5 1 0 -5 I 0 -5 0 -5 1 I 1 0 -5 1 0-1 0 1 0 -5 l 0 - I 75 p (No. 200) 1 0 -2 1 0 -2.5 1 0 -2.5 1 0 -2 1 0-4 I 0- I 0 -3 1 1.5 -3.5 1 p� 1 0 4 I I I 1 1 I I I 1 l� I Residual Bitumen ° i 3 -6.5 13 -6.5 13 -6.5 13 -7.0 13.5 -6.5 13.5 -6.5 3 -7 1 3 -7 I I 13.5 -7.0 13.5 -7.0 I 'Based on percent of total aggregate weight. ti Based on percent of total mixture weight. 7. LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC. The laws to be observed; permits and licenses; patented devices; materials, and processes; and responsibility for damage claims, shall be in accordance with the requirements of Section 107 of the above cited Standard Specifications. Effective February 1, 2007 I This specification supersedes Serial Number M 120 -07, effective January 15, 2007. I R WH /M 120 -07 4 200-300 7 F- �Ei) 75 min. (3) 450 min. C �� 'n A too 0 C: 0 @ E C, / r l3 03 E 0 :T 0 3 100-150 ( - 100-150 (4-6) 0 -F Orange Oran CONE REFLECTORIZED CONE FLEXIBLE DELINEATOR VERTICAL PANEL DRUM_ POST MOUNTED 300 150 Q 76-F A y 00 150 C, E Co 600 min. 0 Ij (24) Al 600 min. 1.2 m min. -1 0 (24) (2 TYPE I BARRICADE TYPE 11 BARRICADE TYPE III BARRICADE DIRECTION INDICATOR VERTICAL BARRICADE BARRICADE Warning lights (if required) GENERAL NOTES All heights shown shall be measured above the pavement surface. All dimensions are In millimeters (Inches) unless otherwise shown. DATE REVISIONS 111Tnols D­t—f of 1-1-08 Renumbered Standard for ndard TRAFFIC CONTROL 702001 _06. Rev. OPRMD temp. signs on Sheet 2. DEVICES (Sheet I of 3) xurxux u. 4-1-06 Revised vert. barricade. post mounted signs, and signs an temp. supports. STANDARD 701901 --IR IN- ... IN I 70�y�� Type A monadirectlonal flashing light 450x450 (18x18) Orange flags 1.Bm -3.6m (6' - 12'1 ROAD U C I __ NEXT CONSTRU L_ Metal or a wood post 600 -3.0 m G20 -1(0) -6036 G20-20(0) -6024 y , 1.5 m(5')min. rural Edge of (24 - 10') E 0 1.2 m (41) rural 2.1 m (7') min. urban pavement o = SIGN This signing Is required for all projects 0 1.8 m (6') urban or face (IF SPECIFIED) 3200 m (2 miles) or more In length. 0 of curb 'a 1 E m ROAD CONSTRUCTION NEXT X MILES sign shall be placed 150 m (5001 in advance of pro- ject limits. II `� Elevation of edge 1 Elevotion of edge �I II of pavement of pavement END CONSTRUCTION sign shall be erected of the end of the job unless another Job is within 3200 m (2 miles) . 1.5 m (5') min. SIGNS ON TEMPORARY SUPPORTS embedment Dual sign displays shall be utilized on multi- ! lane highways. POST MOUNTED SIGNS four days. this d mension shall HIGH LEVEL WARNING DEVICE WORK LIMIT SIGNING be 1.5 m (5') min. if located a� When curb or paved shoulder are present behind other devices. the height this dimension shall be 600 (24) to the shall be sufficient to be seen by face of curb or 1.8 m (61 to the outside motorists. edge of the paved shoulder. 600 (24) 1. 125 _ 175 o tiff Federal seri\ 7>Earo\ 1 _ (2 13 ~ 400 I (l6) }} �1-7 IS \ T ' ( '%2) I E c-+ All dimensions are In millimeters (Inches) FRONT SIDE REVERSE SIDE unless otherwise shown. ® 1- - t Of "D .— tit" TRAFFIC CONTROL APPROVED ���.•�. .�„ FLAGGER TRAFFIC CONTROL SIGN DEVICES ENL LN OF d�■w.r�ox�`s s (Sheet 2 of 3) APPROVED u�y �. 2009 �_ ENG-FR D� DES I N O ( STANDARD 701901 600 ± ri A (24) ' _ 2.4 m min. - - - - O _ 1.5 mmin. I (8) 1.2 mmin, I (5') - I '— �-• --- ------ E E n - Weep holes I E - - - - - - - - - - 8 m b 8 m p •- - - - - - -- 8 m SO, E ° .. - Construction N O (25'1 f25') f25'1 advance �6.m± E60 m_ 6 Omti warning signs I ®I� (200') (200') E ia PI I� E E E= E V 4A ni III +III1� N 'III' VIII PLAN e m A —WU IIW __IIW IIW ! IIW IWI 45 1 1.5 m r- 125') Face may be (5'1 TYPE A TYPE B TYPE C Q'Y4) stepped or smooth �— T_ T _T —� —� ROOF ROOF OR TRAILER TRAILER I Traffic MOUNTED MOUNTED MOUNTED u G� U V Epoxy channels + Q 0 Q Q 0 ARROW BOARDS I- 90 *- (3/2) SECTION A -A TYPICAL INSTALLATION TEMPORARY RUMBLE STRIPS u U u U u d z 300m1n. ]5 �I 15 E E I (12) Type A I 150 max he ` flasr (6) (6) � RII - ...... \. v .C.... v. "71 CROAD L �' E E .�...... \ �'.�1LL. �,; i�,..�..�.... 1 �, LOSED F Edge of _ shoulder .Pavement1 300 min. _____"""111 I f 121 Type A R11 -4 ROAD CLOSED TO ALL TRAFFIC flasher Reflectorized striping may be omitted - - on the back side of the barricades. ROAD OLOSED ROAD LLOSED If a T TO TO Ty III barricade w ith an attached THRU TRAFFIC THRU TRAFFIC sign panel which ch me meets NCHRP 350 is not � 1 .�. �,�.,..... „, available. the sign may be mounted on an L....- _ NCHRP 350 temporary sign support directly In front of the barricade. ( "���• All dimensions ore in millimeters (inches) I .•..!...�::.; ;.':� - '...-':. +.\ Pavement unless otherwise shown. ROAD CLOSED TO THRU TRAFFIC ® ImDDISDRDCrtm,t,t T­ ...... 11D Reflectorized striping shall appear on TRAFFIC CONTROL APPROVED a Type TYPICAL APPLICATIONS OF both s II[ ide borricade with s of the borrican ott ched aces. If a en�w. +- „- a DEVICES - ?�6P o TYPE III BARRICADES CLOSING A ROAD sign panel which meets NCHRP 350 Is (Sheet 3 of 3) tN W 2DO WEER DF DPER.f+Dns not available, the signs may be mounted APPROVED , yam.• + zoos - on NCHRP 350 temporary sign supports FNIIKER OE ESGN AM ENY OHVEx, directly In front of the barricade. STANDARD 701901 ROAD W21- 4(0) -48 woRA 4XEAD W20 - 48 Or FLAGGER WE LAN Ron ROAD 'Ron ROAD AHEAD AHEAD Q ® W20- 4(0) -48 W20- 1(0)-48 30 m min. One way one lane o eration -► a — — _ Type I or TypoCVeT /II /BTarricades / / /.� /i Y operation Cam— — — — — — — — — I ° a ° ° a I �j� / / / / / / /�/ _ � 7 / / / / / / / �/ / 14' Type I or T — — — — — a o ype II barricades CD (D �m � 30 m mox. J ® ROAD J r Type III barricades I I (100•) CLOSED E o RIl -2 p Roao RU AO NE LAN O.OSED WORN ROAD FLAGGER AHEAD AHEAD W21- 4(0) -48 AHEAD W20- 4(0) -4B W20-3(0) -48 Or For maintenance W20-1101 -48 - — and utility ROAD protects RDAD floeD DNSTRDCTID DNSTRUCIIO AHEAD ANEAO WORN W20- 1(0) -48 W20- 1(0) -48 Or aHE,Ao For W21- 4(0) -48 contract construction projects SIGN SPACING [ Speed Sign Spacing SYMBOLS 55 164 m (500 I 50 -45 115 m (350') ® Work area m Refer to SIGN SPACING TABLE I <45 60 m (2001 for distances. GENERAL NOTES O Cone. drum or barricade m For approved sideroad closures. This Standard is used where at any - (not required for moving operations) time, day or night. any vehicle, equip- (3) Cones at B m (251 centers for 75 m ment. workers or their activities Sign on portable or permanent support (250'). Additional cones may be placed encroach on the pavement requiring at 15 m (501 centers. When drums or the closure of one traffic lone In an Type I or Type Il barricades are urban area. Flogger with traffic control sign used. the interval between devices may be doubled. All dimensions ore in millimeters (Inches) Barricade or drum with flashing light unless otherwise shown. Q Cones, drums or barricades of 6 m (20') centers. DATE REVISIONS ® Ininot. D.00rrma,r of rr°n.R°rrRri°n Type II[ barricade with flashing lights I 1 -1 -08 Added note o URBAN LANE CLOSURE. APPR OVED I 2L, 2W. UNDIVIDED EN O ER OF OPERATIONS APPR OVED ' APPRDVED Janvary 1. , ° °° - I 1 -1 -05 IOele+ed FLAGGER SYMBOL ENGINEER OF nCS'sN�NO�ExwROxuExT I Isign and repositioned STANDARD 701501 -04 Iflaggers. i i RECEIVkI.� ' 03 LOCAL ROADS MAR 3 i 'te .,.. . CR T Of cF.: ;?'_ I., AUUITO SECRETARY FILE r` OTHER -..__, j .....