Public Works Packet 2011 03-15-11 0 o United City of Yorkville
Q A. '" 800 Game Farm Road
EST. 1836 Yorkville, Illinois 60560
Telephone: 630-553-4350
� p Fax: 630-553-7575
cuuMV `�'
AGENDA
PUBLIC WORKS COMMITTEE MEETING
Tuesday, March 15, 2011
6:30 p.m.
City Hall Conference Room
Citizen Comments:
Minutes for Correction/Approval: February 15, 2011
Items Recommended for Consent Agenda:
1. PW 2011-13 Water Department Report for January 2011
2. PW 2011-14 Water Department Report for February 2011
New Business:
1. PW 2011-15 Traffic Signal Master Agreement
2. PW 2011-16 Fox Hill and Sunflower SSA Mowing and Maintenance RFP
3. PW 2011-17 MFT General Maintenance Appropriation Resolution for FY 11-12
4. PW 2011-18 Hampton Inn—Final Approval/Acceptance & Bond Reduction
5. PW 2011-19 8660 Kennedy Road—Purchase of Right-of Way
6. PW 2011-20 Route 126 Relocation at Route 71 — MFT Appropriation Resolution
7. PW 2011-21 Creating a Stormwater Utility—Discussion
Old Business:
1. PW 2011-05 Verizon Wireless —Water Tower Lease Agreement
2. PW 2011-12 802 S. Bridge Street—Proposed Highway Authority Agreement
Additional Business:
2010/2011 City Council Goals
Public Works Committee
Goal Elected Officials Staff
Rob Fredrickson/
Infrastructure planning. Sutcliff/Plocher Joe Wywrot/Eric Dhuse/
Kryst Barksdale-Noble
Trail planning and pedestrian (with Park Board.) Werderich/Golinski Laura Schraw/Bart Olson/
Joe W wrot
Development slow-down issues. Teeling/Gilson Krysti Barksdale-Noble/
Joe Wywrot
UNITED CITY OF YORKVILLE
WORKSHEET
PUBLIC WORKS COMMITTEE
Tuesday, March 15, 2011
6:30 PM
CITY HALL CONFERENCE ROOM
---------------------------------------------------------------------------------------------------------------------------------------
CITIZEN COMMENTS:
---------------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------------
MINUTES FOR CORRECTION/APPROVAL:
---------------------------------------------------------------------------------------------------------------------------------------
1. January 18, 2011
❑ Approved
❑ As presented
❑ With corrections
---------------------------------------------------------------------------------------------------------------------------------------
ITEMS RECOMMENDED FOR CONSENT AGENDA:
---------------------------------------------------------------------------------------------------------------------------------------
1. PW 2011-13 Water Department Report for January 2011
❑ Moved forward to CC consent agenda? Y N
❑ Approved by Committee
❑ Bring back to Committee
❑ Informational Item
❑ Notes
---------------------------------------------------------------------------------------------------------------------------------------
2. PW 2011-14 Water Department Report for February 2011
❑ Moved forward to CC consent agenda? Y N
❑ Approved by Committee
❑ Bring back to Committee
❑ Informational Item
❑ Notes
---------------------------------------------------------------------------------------------------------------------------------------
NEW BUSINESS:
---------------------------------------------------------------------------------------------------------------------------------------
l. PW 2011-15 Traffic Signal Master Agreement
❑ Moved forward to CC consent agenda? Y N
❑ Approved by Committee
❑ Bring back to Committee
❑ Informational Item
❑ Notes
---------------------------------------------------------------------------------------------------------------------------------------
2. PW 2011-16 Fox Hill and Sunflower SSA Mowing and Maintenance MFT
❑ Moved forward to CC consent agenda? Y N
❑ Approved by Committee
❑ Bring back to Committee
❑ Informational Item
❑ Notes
---------------------------------------------------------------------------------------------------------------------------------------
3. PW 2011-17 MFT General Maintenance Appropriation for FY 11-12
❑ Moved forward to CC consent agenda? Y N
❑ Approved by Committee
❑ Bring back to Committee
❑ Informational Item
❑ Notes
---------------------------------------------------------------------------------------------------------------------------------------
4. PW 2011-18 Hampton Inn—Final Approval/Acceptance &Bond Reduction
❑ Moved forward to CC consent agenda? Y N
❑ Approved by Committee
❑ Bring back to Committee
❑ Informational Item
❑ Notes
---------------------------------------------------------------------------------------------------------------------------------------
5. PW 2011-19 8660 Kennedy Road—Purchase of Right-of-Way
❑ Moved forward to CC consent agenda? Y N
❑ Approved by Committee
❑ Bring back to Committee
❑ Informational Item
❑ Notes
---------------------------------------------------------------------------------------------------------------------------------------
6. PW 2011-20 Route 126 Relocation at Route 71 —MFT Appropriation Resolution
❑ Moved forward to CC consent agenda? Y N
❑ Approved by Committee
❑ Bring back to Committee
❑ Informational Item
❑ Notes
---------------------------------------------------------------------------------------------------------------------------------------
7. PW 2011-21 Creating a Stormwater Utility—Discussion
❑ Moved forward to CC consent agenda? Y N
❑ Approved by Committee
❑ Bring back to Committee
❑ Informational Item
❑ Notes
---------------------------------------------------------------------------------------------------------------------------------------
OLD BUSINESS:
---------------------------------------------------------------------------------------------------------------------------------------
1. PW 2011-05 Verizon Wireless —Water Tower Lease Agreement
❑ Moved forward to CC consent agenda? Y N
❑ Approved by Committee
❑ Bring back to Committee
❑ Informational Item
❑ Notes
---------------------------------------------------------------------------------------------------------------------------------------
2. PW 2011-12 802 S. Bridge Street—Proposed Highway Authority Agreement
❑ Moved forward to CC consent agenda? Y N
❑ Approved by Committee
❑ Bring back to Committee
❑ Informational Item
❑ Notes
---------------------------------------------------------------------------------------------------------------------------------------
ADDITIONAL BUSINESS:
---------------------------------------------------------------------------------------------------------------------------------------
D C/Ty Reviewed By: Agenda Item Number
J� b, O Legal ❑ Minutes
Finance ❑
EST.,` : 1836
Engineer ❑ Tracking Number
L�j City Administrator ❑
0 ICI I a� �� Public Works ❑
.e Ift c—y
Agenda Item Summary Memo
Title: Minutes of the Public Works Committee—February 15, 2011
Meeting and Date: Public Works—3/15/11
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Committee Approval
Submitted by: Minute Taker
Name Department
Agenda Item Notes:
DRAFT
UNITED CITY OF YORKVILLE
800 Game Farm Road
Yorkville, IL 60560
PUBLIC WORKS COMMITTEE MEETING
City Hall, Conference Room
Tuesday, February 15, 2011 — 6:30 P.M.
COMMITTEE MEMBERS PRESENT:
Alderman Plocher
Alderman Gilson
Alderman Teeling
OTHERS CITY OFFICIALS PRESENT
Joe Wywrot - City Engineer
Eric Dhuse—Public Works Director
Rob Frederickson—Finance Director
Members of the Public Present:
Nick Orf, Strand &Associates
Mike Waldron, Strand &Associates
Barton Jones, Strand & Associates
This meeting was called to order at 6:30pm. The minutes for the January 18, 2011,
meetings were unanimously approved.
Citizen Comments: There were no citizen comments.
Presentation: "Creating a Storm Water Utility" by Strand &Associates
Three members of Strand &Associates were present to introduce their firm and explain
the services they provide. In addition to working with municipalities on engineering,
they also work to create Storm Water Utilities. Historically, storm water management
has been funded out of the general tax fund competing against fire, police, and other
municipal services. Water Quality Base requirements are being changed in the near
future at the behest of the federal government, creating an potential financial burden on
municipalities. Storm Water Utility is a methodology to finance storm water
management needs by charging service fees to fund the storm water management
requirements of the federal government. The utility provides a dedicated funding source,
relieving the burden on the general fund. Currently, there are only a few utilities in the
State of Illinois, though more communities are considering them. Because this is a
service fee, the municipality has the ability to change the fee based upon the needs of the
community. The rate will be revenue sufficient, technically and legally defensible,
equitably distributable and publicly acceptable. Implementation of the program will be
1
dependent on degree of prior storm water programs, organizational structure, staff
knowledge of storm water requirements and the type of data regarding storm water needs.
Following the presentation, Strand &Associates offered to come before the Council with
an even more detailed presentation at any time in the future.
New Business:
1. PW 2011 — 08 Raging Waves—Letter of Credit Expiration
Coamerica Bank has provided noticed that Letter of Credit#628335-04, for the
amount of$428,925.01, will expire May 1, 2011. The LOC guarantees the
completion of site work with the exception of landscaping and street lighting.
Staff staff is reconunending the letter be called prior to April 15, 2011.
Engineer Wyrot requested that this item be removed from the agenda as staff had
received the renewal from the developer prior to tonight's meeting.
2. PW 2011 — 09 Stagecoach Crossing (Saravanos Development) —Letter of
Credit Expiration
Notice from First Midwest Bank, dated January 31, 2011, states that the site work
letter of credit for the Saravanos development will expire June 13, 2011. This
letter of credit, in the amount of$193,573.88, guarantees satisfactory completion
of all land improvements for this development with the exception of earthwork
and Route 47 improvements. Staff recommends that the City Council authorize
the City Clerk call the letter of credit if it not renewed prior to May 20, 2011. The
committee recommended the item be placed on the Consent agenda.
3. PW 2011 -10 Route 47& Cannonball Trail Intersection —Engineering
Agreements
Staff is recommending approval of two proposed engineering agreements with HR
Green, Inc. for the Route 47/Cannonball Trail intersection improvement. The
intersection improvement is required by IDOT Highway Permit#3-10399-07,
which was issued to the City but is related to the Kendall Marketplace
development. The original developer has lost the property, and it is now the City's
obligation to complete the work covered by the highway permit.
2
The first agreement finalizes the engineering plans and prepares contract
documents that will allow us to seek bids from contractors. Work performed
under this agreement is to be paid on a time and material basis, not to exceed,
$16,060.45.
The second agreement is to provide construction inspection services. This work
includes constructing, staking, observation, material testing, preparing payouts and
change orders, and preparation of record drawings. Work performed under this
agreement is to be paid on a time and material basis, not to exceed $80,894.00.
Funds have been set aside to complete the work covered by the IDOT perinit in
the amount of$2,000,000. The current cost estimates to perform the various tasks
are:
Finalize Plans: $ 16,060.45
Construction Observations: $ 80,894.00
Construction: $ 917,809.22
ROW Acquisition: unknown
Utility Relocation: $ 119 909.32
TOTAL $1,134,672.99+
The committee recommended this item be forwarded for the Consent Agenda.
4. PW 2011 -11 North McDonald's— Temporary Easement
Staff is recommending approval of a proposed temporary easement for the
McDonald's restaurant at 3 West Route 34. The easement is needed for water
main construction to be performed as part of IDOT's Route 47 widening project.
The new water main would be constructed along the south side of Route 34, and
the existing water main on the north side would be abandoned. The existing cast-
iron water main will be abandoned after the IDOT project is completed requiring a
new 1.5" diameter water service that will connect to an existing water main along
McDonald's east property line. Though there already 10-foot wide utility
easements along the east and south side of the McDonald's property, construction
of the new water service requires temporary easement. The cost of constructing
the new water service would be borne by the city. The committee recommended
this item be forwarded for Consent agenda.
5. PW 2011 - 12 802 South Bridge Street—Proposed Highway Authority
Agreement
Staff is recommending approval of an agreement granting highway authority for
the fonner Yorkville Marathon gas station at the southeast corner of Route 47 and
3
Orange Street. This property was the location of a leaking underground petroleum
storage tank several years ago. All underground tanks and much of the
contaminated soil have since been removed, but some contaminated soil remains
within the Orange street right-of-way. The contaminated area is estimated to be
around 500 square feet, located beneath the property's driveway entrance to
Orange Street and underneath the street.
Although considerable effort has been made to clean up the site, one constituent
(benzene) measured at one location exceeded the Illinois EPA's minimum clean-
up objectives. A coinmon way to address this situation is to establish an
institutional control to protect the general public from the remaining
contamination. The institutional control is this proposed highway authority
agreement, which is a restriction on the use of the subject area. Once an
institutional control is established, the Illinois EPA can issue a No Further
Remediation letter to the property owner, which essentially states that the site is
free of contamination. In this agreement, the City agrees to prohibit the use of any
groundwater originating within the subject area from being used as drinking water.
The agreement allows for roadway work to be performed within the subject area,
but the City agrees to allow construction access by permit only, and require that
the permittee "take all measures necessary to protect human health (including
worker safety) and the environment". While the area of contaminated soil is
estimated to be located in the south half of the Orange Street right-of-way, the area
subject to the highway authority agreement extends over a larger area to the north
edge of the Orange Street pavement.
If this agreement is approved the City would need to issue a pen-nit to IDOT to
allow them to work within the subject area. IDOT's Route 47 plans identify
several locations where contaminated soil exists, including Orange Street. IDOT's
proposed protection measure at this location consists of limiting the depth of
excavation to no more than 6 feet. Discussions with Chase Environmental,
however, indicate that there are no contaminated soils in the IDOT right-of-way at
this location. The information provided indicates soil contamination at a depth of
4 feet in the Orange Street right-of-way, which is still below normal roadway
excavation depths. The extent of contamination, however, is below the threshold
where special precautions would be needed during construction. If contaminated
soil is encountered during construction, it would need to be treated as special
waste and disposed of accordingly.
Alderman Gilson expressed concerned about the No Further Remediation Letter
that will be issued to the property owner. Engineer Wyrot stated that the letter will
state that no further remediation will be required, it is clean enough for the
property to be developed without concern about environmental issues. Alderman
Gilson wondered what would happen if the City does not enter into the agreement.
4
The state would not issue the letter, and thereby, the property would not be
developed. The property owner would then have to clean it up or ignore it,
without redeveloping it. Over time, the pollutants in the right-of-way will go
away, thereby solving the problem. Chair Plochman requested clarification of
ownership of the property. Staff responded that it is owned by an estate and the
beneficiaries are wanting to sell the property. If the property is reimediated, and
sold, it could be redeveloped, thereby improving the overall look and value of the
property. For the record, Alderman Gilson is against the agreement. Alderman
Teeling wanted to know if the contaminates would spread and was assured that it
would be extremely unlikely.
Chair Plochman requested that this item be tabled until next month so that the
Committee members can further review the item.
6. PW 2011 -13 Rush-Copley Freestanding Emergency Center—IDOT
Highway Permit
Staff is recommending authorization and approval of the proposed IDOT highway
permit application and corresponding resolution for construction of a new entrance
to Route 34 approximately 1000 feet west of Beecher Road. The entrance is for
Rush-Copley's proposed Freestanding Emergency Center (FEC). Construction of
the entrance requires the widening of Route 34 to provide a westbound left-turn
lane into the FEC. The entrance would not be signalized nor would it allow
vehicles leaving the FEC to make a left turn onto Route 34. Persons leaving the
FEC that want to go west on Route 34 would be able to do so via Beecher Road.
IDOT requires the municipality to be the applicant for all work in their right-of-
way. They also require a resolution from the City to guarantee that the work will
be performed properly. We in turn will require Rush-Copley to provide insurance
and a bond guaranteeing that they will perform the work and satisfy IDOT's
requirements.
The committee agreed to forward this item to the Consent Agenda.
7. PW 2011 - 14 CMAQ Grant Application —Review of Potential Projects
Staff is seeking recommendations for FY 2012-2016 grant application project candidates.
Upon review of potential City project, staff has identified two potential projects that
could be funded. One project is along Route 71, and the other is across from Kendall
Marketplace. In the past, CMAQ called for projects every year, however, it is anticipated
this year will be the last year for another 5 years. Chair Plochman wondered if this was a
fully funded grant. Staff responded that the CMAQ funds 80%. Alderman Gilson stated
that he felt there were other things within the City that matching money could be used for
instead one of these projects. Alderman Teeling clarified that if we do receive the grant
5
we wouldn't necessarily have to complete the project. Alderman Gilson stated that is
true but it reflects negatively on the City and their future grant prospects. Alderman
Teeling feels that the item should be forwarded to the Council for further discussion.
Old Business
Additional Business
There be no further business, the Committee adjourned at 7:27pm.
Minutes Respectfully Submitted by:
Kristia RM Leyendecker
Minute Taker
6
`Al D C/Ty Reviewed By: Agenda Item Number
n; O
Legal ❑ CA#1
y Finance ❑
EST �. 1836
Engineer ❑
-- g Tracking Number
City Administrator ❑
0 1� ( -1111-1 Q Public Works ■
�� A��� ❑ PW 2011-13
�E
Agenda Item Summary Memo
Title: Water Department Report for January 2011
Meeting and Date: Public Works—3/15/11
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Approval
Submitted by: Brian Sorensen Water
Name Department
Agenda Item Notes:
United City of Yorkville
MT 18M WATER DEPARTMENT REPORT
<E JANUARY 2011
MONTH/YEAR
WELLS
NO WELL DEPTH PUMP DEPTH WATER ABOVE PUMP THIS MONTH'S PUMPAGE
FEET FEET FEET GALLONS
3 1335 501 205 0
4 1393 542 188 10,390,000
7 1500 883 553 3,218,600
8 1500 861 477 33,000
9 1500 1125 576 27,550,000
TOTAL 41,191,600
CURRENT MONTH'S PUMPAGE IS 225,000 GALLONS MORE THAN LAST MONTH
3,101,200 GALLONS LESS THAN LAST YEAR
DAILY AVERAGE PUMPED: 1,327,800 GALLONS
DAILY MAXIMUM PUMPED: 1,821,000 GALLONS
DAILY AVERAGE PER CAPITA USE: 83.1 GALLONS
WATER TREATMENT
CHLORINE FED: 1206 LBS. CALCULATED CONCENTRATION: 3.5 MG/L
FLUORIDE FED: 410.5 LBS. CALCULATED CONCENTRATION: 0.22 MG/L
POLYPHOSPHATE 723.2 LBS. CALCULATED CONCENTRATION: 0.72 MG/L
WATER QUALITY
AS DETERMINED FROM SAMPLES ANALYZED BY ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
BACTERIOLOGICAL: 18 SAMPLES TAKEN 18 SATISFACTORY 0 UNSATISFACTORY (EXPLAIN)
FLOURIDE: 3 SAMPLE(S)TAKEN CONCENTRATION: 1.01 MG/L
MAINTENANCE
NUMBER OF METERS REPLACED: 8 NUMBER OF LEAKS OR BREAKS REPAIRED: 1
MXU'S 1
NEW CUSTOMERS
RESIDENTIAL: _4 COMMERCIAL: 1 INDUSTRIAL/GOVERNMENTAL: 0
COMMENTS
1 main break at 1213 Deer St. Lost 600,000 gallons of water due to break
`,QED C/1.y Reviewed By: Agenda Item Number
Y O
0 Legal ❑ CA#2
ti Finance ❑
EST. �� --._ � 1836
Engineer El^�=,�..-- Tracking Number
0 `� City Administrator ❑
lO Public Works
K�K.wY ■
Con�Soa
PW 2011-14
'fit,<C e ,�,� ❑
Agenda Item Summary Memo
Title: Water Department Report for February 2011
Meeting and Date: Public Works—3/15/11
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Approval
Submitted by: Brian Sorensen Water
Name Department
Agenda Item Notes:
United City of Yorkville
_
WATER DEPARTMENT REPORT
EST td36
FEBRUARY 2011
MONTH/YEAR
WELLS
NO WELL DEPTH PUMP DEPTH WATER ABOVE PUMP THIS MONTH'S PUMPAGE
FEET FEET FEET GALLONS
3 1335 501 206 0
4 1393 542 189 10,493,000
7 1500 883 554 2,889,600
8 1500 861 476 1,155,000
9 1500 1125 578 23,736,000
TOTAL 38,273,600
CURRENT MONTH'S PUMPAGE IS 2,918,000 GALLONS LESS THAN LAST MONTH
1,485,900 GALLONS MORE THAN LAST YEAR
DAILY AVERAGE PUMPED: 1,326,200 GALLONS
DAILY MAXIMUM PUMPED: 1,707,100 GALLONS
DAILY AVERAGE PER CAPITA USE: 82.9 GALLONS
WATER TREATMENT
CHLORINE FED: 1095 LBS. CALCULATED CONCENTRATION: 3.9 MG/L
FLUORIDE FED: 390.2 LBS. CALCULATED CONCENTRATION: 0.26 MG/L
POLYPHOSPHATE 669.7 LBS. CALCULATED CONCENTRATION: 0.75 MG/L
WATER QUALITY
AS DETERMINED FROM SAMPLES ANALYZED BY ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
BACTERIOLOGICAL: 18 SAMPLES TAKEN 18 SATISFACTORY 0 UNSATISFACTORY (EXPLAIN)
FLOORIDE: 3 SAMPLE(S)TAKEN CONCENTRATION: 1.06 MG/L
MAINTENANCE
NUMBER OF METERS REPLACED: 3 NUMBER OF LEAKS OR BREAKS REPAIRED: 2
MXU'S 0
NEW CUSTOMERS
RESIDENTIAL: 2 COMMERCIAL: 0 INDUSTRIAL/GOVERNMENTAL: 0
COMMENTS
2 main breaks, 1011 Sunset& intersection of Naden Ct&Center Pkwy 1,000,000 gallons of water lost due to
break.
D C/p. Reviewed By: Agenda Item Number
G. O
Legal ❑ NB #1
Finance ❑
EST. 1836
Engineer ■
g Tracking Number
City Administrator ❑
El
PS 2011-15
Agenda Item Summary Memo
Title: Traffic Signal Master Agreement
Meeting and Date: March 15, 2011 Public Works Committee
Synopsis: This proposed agreement would replace the existing agreement with IDOT, which
is due to expire on June 30, 2011.
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Approval
Submitted by: Joe Wywrot Engineering
Name Department
Agenda Item Notes:
o� Memorandum
EST. 1936 To: Bart Olson, City Administrafor
.4 From: Joe Wywrot, City Engineer
p� �� p CC: Lisa Pickering, Deputy City CI
�rk
Eric Dhuse, Director of Public Works
<4E
Date: March 3, 2011
Subject: Traffic Signal Master Agreement
Attached find one copy of the proposed Traffic Signal Master Agreement with IDOT, which
would cover the time period from July 1, 2011 to June 30, 2021. This agreement would replace
our existing agreement with IDOT, which expires on June 30, 2011. The purpose of the
agreement is to establish maintenance and cost-sharing responsibilities for 26 of the 30 existing
traffic signals in and around Yorkville. The other 4 traffic signals are maintained by IDOT or
Kendall County.
The proposed agreement is very similar to the existing agreement. Following is a list of changes:
1. Part 1.F—Language was added regarding subcontracting and the purchase of goods or
services using federal or state funds. The language regarding federal funds is not applicable
because IDOT does not use federal funds to reimburse the city for maintenance or energy costs.
The language regarding state funds requires the city to obtain quotes for goods and services
valued between$10,000 and$31,300, and to go out for bid for goods and services in excess of
$31,300.
2. Part 4.0—Language was added allowing IDOT to terminate the agreement if they find that the
city is not adequately fulfilling its obligations.
3. Part 4.I to 4.N—Language was added regarding travel expenses (none are allowed), and that
the city shall:
J. Indemnify IDOT for any damages related to the agreement. The existing agreement has
indemnity language, which is found in Part 5.J of the proposed agreement.
K. Comply with equal employment opportunity laws.
L. Provide information regarding its tax status.
M. Not participate in international boycotts.
N. Shall comply with the Forced Labor Act.
4. Part 6.B —Invoices submitted to IDOT for reimbursement shall be submitted quarterly. The
current agreement allows for monthly billing.
5. Exhibit B, Section B.4—Language was added clarifying the maintenance requirements for
L.E.D. signal head and module replacement.
6. Exhibit B, Section B.5 —The requirements for bi-annual inspection, testing, and maintenance
was eliminated. Those tasks would be required on an annual basis.
I recommend that this intergovernmental agreement be approved. Please place this item on the
March 15, 2011 Public Works Committee agenda for consideration.
Illinois Department
of Transportation Intergovernmental Agreement
Governmental Body Name
City of Yorkville
Address
800 Game Farm Road
City,State,Zip
Yorkville, Illinois 60560
Remittance Address(if different from above)
City.Slate,Zip
Illinois
Telephone Number Fax Number FEIN/TIN
630-553-4350 830-553-7575 36-6006164
Brief Description of Service(full description specified in Part 5)
This is the Master Agreement for Governmental Body maintenance and apportionment of energy costs for traffic control devices located on State
highways within or near the Governmental Body as shown on the attached Exhibit A. This agreement Is authorized by 92 III.Adm.Code 544.
Compensation Method(full details Travel Expense ❑ Yes Agreement Term
specified in Part 6) From: July 1,2011
Actual Cost ® No
Total Compensation Amount Travel Amount Advance Pay ❑ Yes To
$300,000 $0.0 ® No June 30.2021
REQUIRED SIGNATURES
By signing below,the GOVERNMENTAL.BODY and the DEPARTMENT agree to comply with and abide by all provisions set forth
in Parts 1-7 herein and any Appendices thereto.
FOR THE GOVERNMENTAL,BODY:
Mayor Valerie Burd
Signature and Job Title of Authorized Representative Type or Print Name of Authorized Representative Date
FOR THE DEPARTMENT:
Eric Therkildsen,Acting Regional Engineer,Division of Highways Ellen Schanzle-Haskins,Chief Counsel Date
(Approved as to form)
By:
Christine M.Reed,P.E.,Director,Division of Highways,Chief Engineer Matthew R.Hughes,Acting Director,Finance& Date
Administration
Date: By:
By: Gary Hannig,Secretary of Transportation Date
By:
Printed 2/28!2011 Page 1 of 9 BoBS 2804(Rev.03/23110)
INTERGOVERNMENTAL AGREEMENT
FOR
GOVERNMENTAL BODY MAINTENANCE OF TRAFFIC CONTROL DEVICES
This Agreement is by and between
City of Yorkville
Please type or print legibly the GOVERNMENTAL BODY'S legal name and
800 Game Farm Road
Yorkville, IL 60560
Aftn: Mayor Valerie Burd
E-mail
hereinafter called the GOVERNMENTAL BODY, and the State of Illinois,acting by and through Its Department of Transportation,
hereinafter called the DEPARTMENT.
Part 1 Scope/Compensation/Term
Part 2 General Provisions
Part 3 Federally Funded Agreements
Part 4 Specific Provisions
Part 5 Scope of Services/Responsibilities
Part 6 Compensation for Services
Part 7 Agreement Award Notification
Exhibit A Locations and Cost Proportionment of Traffic Control Devices
Exhibit B Traffic Signal Maintenance Provisions
PART 1
SCOPE/COMPENSATION/TERM
A. Scope of Services and Responsibilities. The DEPARTMENT and the GOVERNMENTAL BODY agree as specified in
Part 5.
6. Compensation. Compensation(if any)shall be as specified in Part 6,
C. Term of Agreement. The term of this Agreement shall be from July 1,2011 to June 30,2021.
D. Amendments. All changes to this Agreement must be mutually agreed upon by the DEPARTMENT and the
GOVERNMENTAL BODY and be incorporated by written amendment, signed by the parties.
E. Renewal. This Agreement may not be renewed.
Printed?128/2011 Page 2 or 9 BoBS 2804(Rev.03/23/10)
PART 2
GENERAL PROVISIONS
A. Changes. If any circumstance or condition in this Agreement changes, the GOVERNMENTAL BODY must notify
the DEPARTMENT in writing within seven days.
B. Compliance/Governing Law. The terms of this Agreement shall be construed in accordance with the laws of
the State of Illinois. Any obligations and services performed under this Agreement shall be performed in compliance
with all applicable state and federal laws.
C. Availability of Appropriation (30 ILCS 500120-60): This Agreement is contingent upon and subject to the
availability of funds. The Department, at its sole option, may terminate or suspend this Agreement, in whole or in part,
without penalty or further payment being required, if (1)the Illinois General Assembly or the federal funding source fails
to make an appropriation sufficient to pay such obligation, or if funds needed are insufficient for any reason, (2) the
Governor decreases the Department's funding by reserving some or all of the Department's appropriation(s)pursuant to
power delegated to the Governor by the Illinois General Assembly, or (3) the Department determines, in its sole
discretion or as directed by the Office of the Governor, that a reduction is necessary or advisable based upon actual or
projected budgetary considerations. The GOVERNMENTAL BODY will be notified in writing of the failure of
appropriation or of a reduction or decrease.
D. Records Inspection. The DEPARTMENT or a designated representative shall have access to the
GOVERNMENTAL BODY's work and applicable records whenever it Is In preparation or progress, and the
GOVERNMENTAL BODY shall provide for such access and inspection.
E. Records Preservation. The GOVERNMENTAL BODY, shall maintain for a minimum of three years after the
completion of the Agreement, adequate books, records and supporting documents to verify the amounts, recipients and
uses of all disbursements of funds passing in conjunction with the Agreement.
F. Subcontracting/Procurement Procedures/Employment of Department Personnel
1. Subcontracting. Subcontracting, assignment or transfer of all or part of the interests of the
GOVERNMENTAL BODY concerning any of the obligations covered by this Agreement is prohibited without prior
written consent of the DEPARTMENT.
2. Procurement of Goods or Services — Federal Funds. For purchases of products or services with any
Federal funds that cost more than$3,000.00 but less than the simplified acquisition threshold fixed at 41 U.S.0
403(11), (currently set at$100,000.00)the GOVERNMENTAL BODY shall obtain price or rate quotations from an
adequate number (at least three) of qualified sources. Procurement of products or services with any Federal
funds that are in excess of the simplified acquisition threshold fixed at 41 U.S.C. 403(11), (currently set at
$100,000.00) will require the GOVERNMENTAL BODY to use the Invitation for Bid process or the Request for
Proposal process. In the absence of formal codified procedures of the GOVERNMENTAL BODY,the procedures
of the DEPARTMENT will be used, provided that the procurement procedures conform to the provisions in Part
3(K) below. The GOVERNMENTAL BODY may only procure products or services from one source with any
Federal funds if: (1) the products or services are available only from a single source; or (2) the DEPARTMENT
authorizes such a procedure; or, (3) after solicitation of a number of sources, competition is determined
inadequate.
3. Procurement of Goods or Services — State Funds. For purchases of products or services with any
State of Illinois funds that cost more than $10,000.00, ($5,000.00 for professional and artistic services) but less
than the small purchase amount set by the Illinois Procurement Code Rules, (currently set at $31,300.00 and
$20,000.00 for professional and artistic services) the GOVERNMENTAL BODY shall obtain price or rate
quotations from an adequate number(at least three) of qualified sources. Procurement of products or services
with any State of Illinois funds in excess of the small purchase amount (currently set at $31,300.00 for goods
and services and $20,000.00 for professional and artistic services) will require the GOVERNMENTAL BODY to
use the Invitation for Bid process or the Request for Proposal process. In the absence of formal codified
procedures of the GOVERNMENTAL BODY, the procedures of the DEPARTMENT will be used. The
GOVERNMENTAL BODY may only procure products or services from one source with any State of Illinois funds
N: (1) the products or services are available only from a single source; or (2) the DEPARTMENT authorizes such
a procedure; or, (3) after solicitation of a number of sources,competition is determined inadequate.
Printed 2/14/2011 Page 3 of 9 BOBS 2804(Rev.03/23/10)
The GOVERNMENTAL BODY shall include a requirement in all contracts with third parties that the contractor or
consultant will comply with the requirements of this Agreement in performing such contract, and that the
contract is subject to the terms and conditions of this Agreement.
4. EMPLOYMENT OF DEPARTMENT PERSONNEL. The GOVERNMENTAL BODY will not employ any person
or persons currently employed by the DEPARTMENT for any work required by the terms of this Agreement.
PART 3
FEDERALLY FUNDED AGREEMENTS
[Not applicable to this Agreement.]
PART 4
SPECIFIC PROVISIONS
A. Invoices.The amount shown on each invoice shall be in accordance with the rates established in Part 6. All
non-labor costs, if allowable,shall be listed and itemized as provided in Part 6.
Any Invoices/bills issued by the GOVERNMENTAL BODY to the DEPARTMENT pursuant to this Agreement shall be
sent to the following address:
Illinois Department of Transportation
Attn: Bureau of Operations
700 East Norris Drive
Ottawa, IL 61350
All invoices shall be signed by an authorized representative of the GOVERNMENTAL BODY.
B. Billing and Payment. All invoices for services performed and expenses incurred by the GOVERNMENTAL
BODY prior to July 1 st of each year must be presented to the DEPARTMENT no later than August 31 of that same year
for payment under this Agreement. Notwithstanding any other provision of this Agreement, the DEPARTMENT shall not
be obligated to make payment to the GOVERNMENTAL BODY on invoices presented after said date. Failure by the
GOVERNMENTAL BODY to present such invoices prior to said date may require the GOVERNMENTAL BODY to seek
payment of such invoices through the Illinois Court of Claims and the Illinois General Assembly. No payments will be
made for services performed prior to the effective date of this Agreement. The DEPARTMENT will send all payments to
the GOVERNMENTAL BODY's remittance address listed in this Agreement.
C. Termination. If the DEPARTMENT is dissatisfied with the GOVERNMENTAL BODY'S performance or believes
that there has been a substantial decrease in the GOVERNMENTAL BODY'S performance, the DEPARTMENT may
give written notice that remedial action shall be taken by the GOVERNMENTAL BODY within seven (7) calendar days.
If such action is not taken within the time afforded,the DEPARTMENT may terminate the Agreement by giving seven(7)
days written notice to the GOVERNMENTAL BODY. Additionally, the Department may terminate the Agreement by
giving thirty(30)days written notice. In either instance, the GOVERNMENTAL BODY shall be paid for the value of all
authorized and acceptable work performed prior to the date of termination, based upon the payment terms set forth in
the Agreement.
D. Location of Service. Service to be performed by the GOVERNMENTAL BODY shall be performed as
described in Part 5.
E. Ownership of DocumentsJTitle to Work.
[Not applicable to this Agreement.]
F. Software.
[Not applicable to this Agreement.]
G. Confidentiality Clause.
[Not applicable to this Agreement.]
H. Reporting/Consultation.
Printed 211412011 Page 4 of 9 So9S 2804(Rev.03/23/10)
[Not applicable to this Agreement]
I. Travel Expenses. No expenses for travel, lodging, or per diem shall be paid by the Department pursuant to
this Agreement.
J. Indemnification. Unless prohibited by State law, the GOVERNMENTAL BODY agrees to hold harmless and
indemnify the DEPARTMENT, and its officials, employees, and agents, from any and all losses, expenses, damages
(including loss of use), suits, demands and claims, and shall defend any suit or action, whether at law or in equity,
based on any alleged injury or damage of any type arising from the actions or Inactions of the GOVERNMENTAL BODY
and/or the GOVERNMENTAL BODY'S employees, officials, agents, contractors and subcontractors, and shall pay all
damages, judgments, costs, expenses, and fees, including attorney's fees, incurred by the DEPARTMENT and its
officials,employees and agents in connection therewith.
K. Equal Employment Opportunities, Affirmative Action, Sexual Harassment. The GOVERNMENTAL BODY
will comply with the Illinois Human Rights Act with respect to public contracts, Including equal employment opportunity,
refraining from unlawful discrimination and having a written sexual harassment policy.
L. Tax Identification Number.
GOVERNMENTAL BODY certifies that:
1. The number shown on this form is a correct taxpayer identification number (or it is waiting for
a number to be issued.), and
2. It is not subject to backup withholding because: (a) it is exempt from backup withholding, or
(b) has not been notified by the Internal Revenue Service (IRS) that it is subject to backup
withholding as a result of a failure to report all interest or dividends, or (c)the IRS has notified
the GOVERNMENTAL BODY that it is no longer subject to backup withholding,and
3. It is a U.S. entity(including a U.S. resident alien).
NAME OF GOVERNMENTAL BODY: United City of Yorkville
Taxpayer Identification Number: 36-6006169
Legal Status (check one):
❑ Tax-exempt Government
❑ Nonresident Alien ❑ Other
M. International Boycott, The GOVERNMENTAL BODY certifies that neither GOVERNMENTAL BODY nor any
substantially owned affiliate is participating or shall participate in an international boycott in violation of the U.S. Export
Administration Act of 1979 or the applicable regulations of the U.S. Department of Commerce. This applies to contracts
that exceed$10,000(30 ILCS 682).
N. Forced Labor. The GOVERNMENTAL BODY certifies it complies with the State Prohibition of Goods from
Forced Labor Act, and certifies that no foreign-made equipment, materials, or supplies furnished to the DEPARTMENT
under this Agreement have been or will be produced in whole or in part by forced labor, or indentured labor under penal
sanction (30 ILCS 583)
Printed 2/14/2011 Page 6 of 9 BoBS 2804(Rev.03123/10)
PART 5
SCOPE OF SERviCEMESPONSIBIUTIES
A. Cost. The DEPARTMENT and the GOVERNMENTAL BODY agree to the maintenance responsibility and to
the division of energy costs,for the traffic signals and other traffic control devices listed on the attached Exhibit A.
B. Maintenance. Modernization of traffic control devices is not covered under this agreement. It is agreed that the
actual maintenance will be performed by the GOVERNMENTAL BODY indicated on Exhibit A,either with its own forces
or through contractual agreements.
C. Maintenance Level. It is agreed that the signals and devices shall be maintained to at least the level of
maintenance specified in Exhibit B, which is hereby made a part of this agreement. It is understood this will meet the
minimum requirements of the Illinois Manual on Uniform Traffic Control Devices for Streets and Highways.
Additional provisions regarding maintenance may be Incorporated In this document upon agreement on both parties.
D. Deficiencies in Maintenance. It is also understood that 0, in the judgment of the Regional Engineer,the
GOVERNMENTAL BODY has not provided maintenance in accordance with the maintenance level specified for those
signal installations and devices which it has agreed to maintain,the DEPARTMENT will give the GOVERNMENTAL
BODY a 30 day notice in writing of specific deficiencies. If the GOVERNMENTAL BODY has not corrected the
deficiencies and notified the DEPARTMENT within the 30-day period,the DEPARTMENT will arrange for the
appropriate maintenance efforts and bill the GOVERNMENTAL BODY for its share of the costs.
E. Interconnect&Timing. The GOVERNMENTAL BODY agrees to maintain all signal equipment and
interconnects associated with Interconnected signal systems and Interconnects with at-grade railroad crossings. The
DEPARTMENT, in cooperation with the GOVERNMENTAL BODY, shall determine the signal timing to coordinate and
regulate the flow of traffic. No signal timing shall be changed at any state system intersection without prior
DEPARTMENT approval. The DEPARTMENT may elect to allow the GOVERNMENTAL BODY to determine the signal
timing to coordinate and regulate the flow of traffic at any location. The GOVERNMENTAL BODY shall Inform the
DEPARTMENT of any changes made in signal timings. The DEPARTMENT reserves the right to withdraw the privilege
of timing signals from the GOVERNMENTAL BODY at any time.
Traffic signals Interconnected with an at-grade railroad crossing shall not be modified without prior Illinois Commerce
Commission and DEPARTMENT notification and approval. Interconnected signals at an at-grade railroad crossing may
be repaired to the original condition; however, the Illinois Commerce Commission and the DEPARTMENT must be
notified thereof.
F. Interconnections: Installation& Damage. The DEPARTMENT is not responsible for the cost of installing or
maintaining traffic signals not on (but interconnected to traffic signals on) U.S.or State routes. Any damage done to
State traffic signals in the attempt to connect local traffic signals shall be repaired to the DEPARTMENT's satisfaction
and shall be the responsibility of the GOVERNMENTAL BODY.
G. Master Monitoring Costs. Master controllers installed on State intersections for the coordination of traffic
signals are primarily used for the traffic signals located on U.S.or State routes. The GOVERNMENTAL BODY may
connect traffic signals to a State owned master controller for the coordination or operation of non-State owned traffic
signals,for the purpose of synchronizing time or gaining remote access. If the GOVERNMENTAL BODY desires a
communications link to their office for monitoring purposes,the GOVERNMENTAL BODY shall pay the entire cost of
installing and maintaining such monitoring system.
H. Payment for Energy Costs. The DEPARTMENT will reimburse the GOVERNMENTAL BODY for the
DEPARTMENT's proportionate share of the energy charges.
I. Costs for Pavement Markings. The DEPARTMENT shall reimburse the GOVERNMENTAL BODY for any
DEPARTMENT authorized pavement marking maintenance required for the operations of the traffic signal installation.
This shall include any stop bars, crosswalks, symbols, reflectors,edge lines or lane lines required for supplementing the
traffic signal installation.
Printed 2/1412011 Page 6 of 9 BoBS 2604(Rev.03/23J10)
J. Indemnity. The GOVERNMENTAL BODY shall indemnify and hold harmless the DEPARTMENT for any and
all third party claims for personal injury and property damage arising solely out of the maintenance of the signals and
devices listed in Exhibit A.
K. Maintenance Contractors. Maintenance contracts shall be subject to DEPARTMENT approval prior to award.
The DEPARTMENT,after consultation with the GOVERNMENTAL BODY, reserves the right to reject any
electrical/maintenance contractor assigned work by the GOVERNMENTAL BODY that, in the judgment of the
DEPARTMENT, has proposed or bid rates or charges in excess of usual and customary for the type of work being
performed.
L. Emergency Vehicle Preemption Devices. The costs of installation,timing, phasing,and maintenance of
emergency vehicle preemption systems shall be the sole responsibility of the GOVERNMENTAL BODY. Any
Governmental Body must notify the DEPARTMENT of any change in the emergency vehicle preemption system.
However,the DEPARTMENT reserves the right to approve or reject,at any time,the placement of such systems on its
traffic signal equipment.
M. Previous Agreements. All traffic signal and traffic control device maintenance and electrical energy provisions
contained in presently existing agreements or understandings between the DEPARTMENT and the GOVERNMENTAL
BODY for traffic signals and/or other traffic control devices covered by this Master Agreement shall upon execution of
this Master Agreement by the DEPARTMENT be superseded and be of no force or effect.
All parking ordinances and provisions bearing on items other than traffic signal and traffic control device maintenance
and energy charges contained in presently existing agreements or letters of understanding between the DEPARTMENT
and the GOVERNMENTAL BODY shall remain in full force and effect.
N. Modification. Exhibit A can be modified to add or delete signals or devices, but only by written revision signed
by the Regional Engineer,the Englneer of Operations and the authorized representative for the GOVERNMENTAL
BODY. The modification shall be effective when fully executed and filed with the Clerk or Secretary of the
GOVERNMENTAL BODY. This provision applies only to modification of Exhibit A.
0. Plan Review. All traffic signal plans prepared by others for installation on State highways within municipal
corporate limits, which are to be added to this agreement, must be reviewed and approved by the DEPARTMENT and
the GOVERNMENTAL BODY.
Printed 2/14/2011 Page 7 of 9 BoBS 2804(Rev.03/23/10)
PART 6
COMPENSATION FOR SERVICES
A. Cost Sharing. As indicated in Exhibit A,the cost of energy and maintenance of traffic signals, and/or other
traffic control devices shall be shared in proportion to the number of approaches maintained by each unit of
government. The maintenance cost of the interconnect and interconnect related equipment, as listed in Exhibit A, as
well as engineering costs for any approved coordination and timing studies,shall be shared in proportion to the
approaches maintained by each unit of government at all intersections within the interconnected system.
H. Billing. Bills shall be submitted on a quarterly basis. The amount billed shall be the costs incurred less any
proceeds from third party damage claims received during the billing period for repair of signals or devices that are the
responsibility of the DEPARTMENT. Any proposed single expenditure in excess of$10,000 for repair or damage to an
installation must be approved by the DEPARTMENT before the expenditure is made.
The hours,or parts thereof,billed for each maintenance item will be at the actual time directly related to the work task.
The DEPARTMENT reserves the right to examine the records of the GOVERNMENTAL BODY to determine that costs
billed are fully documented.
GOVERNMENTAL BODY costs are composed of labor, equipment, materials and the quantity of each. The cost for
labor will be determined by the actual hourly rate for the employee plus a multiplier calculated by the GOVERNMENTAL
BODY to include direct and indirect labor related costs, retirement, social security, health, hospitalization and life
insurance, holidays, vacation, sick leave and workers compensation. Equipment costs will be as listed in the Schedule
of Average Annual Equipment Ownership Expense. Materials will be at cost.
The cost for contracted work will be the actual cost for the contractor.
Printed 2/14/2011 Page a of 9 WS 2804(Rev.03/23110)
PART 7
AGREEMENT AWARD NOTIFICATION
REQUIRED FOR ALL PROJECTS
Does this project receive Federal funds? ❑ Yes ® No
Amount of Federal funds:
Federal Project Number:
Name of Project:
CFDA Number`, Federal Agency, Program Title:
*For CFDA(Catalog of Federal Domestic Assistance) Number, refer to original Federal Award/Grant Agreement.
ANNUAL CERTIFICATION FOR COMPLIANCE WITH FEDERAL OMB-
CIRCULAR A-133
NOTICE
• Do not submit this certification to the department with your
signed contract.
• This certification applies ONLY to governmental agencies, local units of government and non-
profit agencies expending federal funds for this project. It does not apply to for-profit public or
private entities.
• If OMB Circular A-133 applies to your organization, this certification or a copy of your OMB A-133
single audit must be submitted to the department at the end of your fiscal year for any fiscal year
in which you expended any federal funds related to this contract.
NOTE: ANNUAL COMPLIANCE WITH THIS REQUIRE„ IIEtiT 1S MANDATORY FOR EVERY YEAR IN WHICH
FEDERAL FUNDS ARE EXPENDED FOR THIS PROJECT BY ANY STATES,LOCAL GOVERNMENTS OR
NONPROFIT R ANIZA S. FAILURE TO COMPLY WITH THE ANNUAL CERTIFICATION TO THE
DEPARTMENT WILL RESULT IN THE SUSPENSION OF PAYMENTS TO REIMBURSE PROJECT COSTS.
In accordance with OMB Circular A-133, Audits of States, Local Governments, and Non-Profit Organizations,
such non-federal entities that expend$500,000 or more in federal awards in a year are required to have a single
audit performed in accordance with OMB Circular A-133. The Illinois Department of Transportation (IDOT)is
required by federal law to obtain and review the single audit of all entities that had any federally participating
funds pass through it,irrespective of the amount provided by IDOT. It is the responsibility of the agencies
expending federal funds to comply with the requirements of OMB Circular A-133 and determine whether they are
required to have a single audit performed.
In order to comply with this requirement,your agency must provide the following information to the department on
an annual basis for every year in which you expended funds for costs associated with this project:
1. If your agency expended$500,000(or the current OMB Circular A-133 qualifying amount) or more in
federal awards from all sources,including other agencies, in a year, you are required to have a single
Printed 2/14/2011 Page 9 of 9 BOBS 2804(Rev.03123/10)
EXHIBIT A
Following is the list of signalized intersections and locations with traffic control devices along State highways located within or near the City of Yorkville,
that are subject to the provisions of the attached Master Agreement to which this list is an Exhibit B.
%OF %OF ENERGY AGENCY
LOC.# INTER5ECTION MAINTANENCE CHARGES PERFORMING LEVEL
RESPONSIBILITY RESPONSIBILITY
MAINTANENCE
STATE LOCAL STATE LOCAL
1 US 34&CENTER PARKWAY 50 50 50 50 CORP 1
2 IL 47(BRIDGE ST.)&VAN EMMON ST. (RAILROAD PREEMPT. BNSF) 50 50 50 50 CORP 1
3 US 34&IL 47 100 0 100 0 CORP 1
4 IL 47&IL 71 100 0 100 0 CORP 1
5 IL 47&IL 126 100 0 100 0 CORP 1
6 US 34&CANNONBALL TRAIL 50 50 50 50 CORP 1
7 IL 47&SOMONAUK ST. 50 50 50 50 CORP 1
8 IL 47& FOX ST, 50 50 50 50 CORP 1
9 IL47&COUNTRY SIDE PARKWAY 50 50 50 50 CORP 1
10 IL 47&CANNONBALL TRAIL(TRAIL(INCLUDES NB YELLOW FLASHER) 50 50 50 50 CORP 1
11 US 34&COUNTRY SIDE PARKWAY 67 33 67 33 CORP 1
12 IL 47& KENNEDY 67 33 67 33 CORP 1
13 US 34& MARKET PLACE 67 33 67 33 CORP 1
14 IL 47& LANDMARK AVENUE 50 50 50 50 CORP 1
15 US 34&MCHUGH RD. 50 50 50 50 CORP 1
16 US 34 &GAME FARM ROAD 67 33 67 33 CORP 1
17 IL 71&IL 126 100 0 100 0 CORP 1
18 US 34 & BRISTOL RIDGE RD. (GRAND RESERVE) 67 33 67 33 CORP 1
19 IL 47&WHEATION AVE. 67 33 67 33 CORP 1
20 IL47&SARAVANAS 0 100 0 100 CORP 1
21 IL 47&FOUNTAIN VILLAGE 50 50 50 s0 CORP 1
22 US 34&SYCAMORE RD. 0 100 0 100 CORP 1
23 US 34& BEECHER RD. 50 50 50 50 CORP 1
24 US 34&AUTUMN CREEK 67 33 67 33 CORP 1
25 IL 47 & ROSENWINKEL(WATERPARK WAY) 67 33 67 33 CORP 1
26 U5 34& ISABELL ST. 0 100 0 100 CORP 1
Following is the list of signalized intersections and locations with traffic control devices along State highways located within or near the City of Yorkville,
EXHIBIT B
TRAFFIC SIGNAL MAINTENANCE PROVISIONS
A. GENERAL PROVISIONS
1. CABINET PACK
Wiring diagrams, phase diagrams, and manuals that are required to be In each traffic signal
controller cabinet at the time of construction completion shall remain in the cabinet. Written
documentation of all traffic signal timing changes shall be provided in the cabinet. All entries
shall be written in a clear and concise manner. The agent of the maintaining agency making
any entries shall provide his/her signature and date of entry. These shall be kept in the cabinet
to assist the DEPARTMENT on emergency call outs.
2. HARDWARE SPECIFICATIONS
All equipment and material used shall comply with the requirements of the DEPARTMENT's
Standard ifi tion for Road AW Bridge Construction. Failure to meet the
DEPARTMENT's specifications shall be justification for permanent removal of the non-compliant
equipment by the DEPARTMENT, with the cost of removal to be the responsibility of the
GOVERNMENTAL BODY.
Any costs incurred as a result of exceeding the DEPARTMENT's specifications for installing
new equipment or painting new or used equipment;for example,installing decorative style
poles, posts, or mast arm assemblies, will be the sole responsibility of the GOVERNMENTAL
BODY.
3. HIGHWAY LIGHTING
For maintenance involving combination traffic signal and lighting unit mast arm assemblies and
poles,the foundation,traffic signal mast arm assembly, pole and all signal cable shall be
considered part of the traffic signal system. The lighting arm, luminaire and all lighting cable
shall be part of the highway lighting system.
The highway lighting system components of each combination mast arm assembly and pole
shall be tested for proper operation and physical condition during the Intersection cabinet
inspection. All cost of inspecting and maintaining the highway lighting system equipment, is the
responsibility of the GOVERNMENTAL BODY. In addition to regular inspection and
maintenance, all cost of repairing or replacing damaged or missing highway lighting system
equipment is the responsibility of the GOVERNMENTAL BODY.
4. EMERGENCY VEHICLE PREEMPTION SYSTEM
Test Emergency Vehicle Preemption System (EVPS) equipment for proper operation and
physical condition during the intersection cabinet inspection,. All program settings and each
sequence of operation must be verified to be correct during each Inspection. All cost of
inspection and maintaining the EVPS equipment, Including the light detectors, light detector
amplifiers, radio transmitters and receivers, antennas,confirmation lights,and cables and
related components,is the responsibility of the GOVERNMENTAL BODY. In addition to regular
inspection and maintenance, all cost of repairing or replacing damaged or missing EVPS
equipment is the responsibility of the GOVERNMENTAL BODY.
5. RAILROAD PREEMPTION
At all locations with railroad/traffic signal interconnects, respond to any and all emergency and
all red flash alarms in a timely manner and notify the Illinois Commerce Commission and the
DEPARTMENT of the malfunction.
None of the traffic signal railroad preempt parameters including but not limited to the phase
timings, phase sequences and pedestrian and vehicular clearance intervals can be modified
without prior approval from the DEPARTMENT and the Illinois Commerce Commission.
Maintain unique spare controller data modules or sets of data chips containing the final railroad
preemption parameters for each location.
Cooperate in any inspection as deemed necessary by the DEPARTMENT or the Illinois
Commerce Commission.
The DEPARTMENT shall provide contact personnel available at all times to who railroad
preemption malfunctions must be reported.
6. DAMAGE REPAIRS
Repair or replace any and all equipment damaged by any cause whatsoever.
7. ACCIDENT DAMAGE
Be responsible to make recovery for damage to any part of the installation or system from the
party causing the damage.
Whenever third party claims cannot be recovered, the DEPARTMENT shall share in the loss.
8. TEMPORARY TRAFFIC CONTROL
Provide temporary traffic control during a period of equipment failure or for when the controller
must be disconnected. This may be accomplished through the Installation of a spare controller,
placing the intersection on flash, manually operating the controller, manually directing traffic
through the use of proper authorities, or installing temporary stop signs which will be removed
once the signal is in working condition.
9. EMERGENCY PERSONNEL
Provide skilled maintenance personnel who will be available to respond without delay to
emergency calls. This may be provided by agency forces, contract, or maintenance agreement.
Controller failure, lights out, knockdowns, or two (2) red lights out at intersection are considered
emergencies.
Provide the DEPARTMENT the names, addresses and telephone numbers of at least two
persons, who will be available for emergency repair of the traffic signals and keep the
DEPARTMENT informed of any changes of same.
10. L.E.D. SIGNAL HEADS
Install all light emitting diodes (L.E.D.) signal heads according to instructions provided by each
head's manufacturer and vendor so as to prolong their Irfe and assure compliance under any
warranties. Maintain logs of the dates of the L.E.D. modules installation for warranty and for end
of service life determination purposes.
2
B. AS REPORTED OR OBSERVED
1. LAMP REPLACEMENT
Replace burned out lamps for all red signal indications within twenty-four(24) hours of
notification of burnout or on the next business day following the notification. However, if two or
more red indications for an approach are burned out,these lamps must be replaced as soon as
possible, and under no circumstances longer than twenty-four(24) hours after notification.
Replace all other burned out lamps within forty-eight(48) hours or next business day of
notification of burnout. Lamp changes shall always include a lens cleaning.
2. SIGNAL ALIGNMENT
Keep signal heads properly adjusted, including plumb, and tightly mounted. All controller
cabinets, signal posts and controller pedestals should be tight on their foundations and in
alignment.
3. CONTROLLER PROBLEMS
Check the controllers, relays, and detectors after receiving complaints or calls to ascertain that
they are functioning properly and make all necessary repairs and replacement.
4. L.E.D. SIGNAL HEAD AND L.E.D. MODULE REPLACEMENT
An L.E.D. module shall be considered failed and shall be replaced if at least one-fourth of the
signal indication Is dark or if the module fails to meet ITE specification on minimum maintained
luminous Intensity.
Replace failed modules for all red signal indications within twenty-four(24) hours of notification
of failure or on the next business day following the notification. However, if two or more red
indications for an approach are failed,these modules must be replaced as soon as possible,
and under no circumstances longer than twenty-four(24) hours after notification. Replace all
other failed modules within forty-elght(48) hours or next business day of notification of faillure.
Provide replacement light emitting diodes (L.E.D.) signal heads and modules that fully comply to
the latest applicable Institute of Transportation Engineers (I.T.E.) specifications for vehicular and
pedestrian L.E.D. signal modules. including but not limited to, color and intensity requirements.
The signal and pedestrian housings shall also comply with the applicable ITE specifications.
5. PAINTING
Repaint all signal components exposed to weather as needed.
C. WEEKLY
1. MASTER CONTROLLER SYSTEMS
At locations that are a part of a closed loop signal system maintained by the GOVERNMENTAL
BODY, repair any and all malfunctions in a timely manner so that the signals remain under the
control of the master at all times.
As needed assist in the implementation of the signal system timing plans.
Maintain the central signal system software on a PC so that the signal system is monitored
weekly. Check weekly by phone or location visit for any malfunction. Verify software accuracy
to central office software.
3
D. ANNUAL
1. CABINET INSPECTION
Check the controllers, relays, and detectors to ascertain that they are functioning properly and
make all necessary repairs and replacement.
Keep interior of controller cabinet in a clean and neat condition at all times.
2. OBSERVE SIGNALS
Observe the signals at the time of the annual cabinet inspection. This involves stopping and
watching for correct detection and timing operation.
3. DETECTION TESTING
Test and inspect vehicle detection Inductance loops, loop detectors, and pedestrian detection
during cabinet visit annually.
4. VIDEO DETECTION TESTING
Inspect, maintain, and clean all video detection and surveillance systems annually or as
needed,to achieve clean lenses, proper alignment and proper focus. This shall include system
camera, lenses, camera housings and hood/shield, pan,tilt, and zoom mechanisms and motors,
mounting brackets and hardware, poles, microprocessors, controller, cables and communication
equipment, and other related components. Maintenance shall include modifications to
programmable detection zones.
6. RELAMP
For the remaining incandescent signal heads, clean reflectors, lenses and lamps once at least
every twelve (12) months or more often, if necessary. Replacement of lamps shall be
performed on the same occasion as the cleaning required in this provision.
6. CONTROLLER CHECK
When solid state controllers malfunction,they shall be removed, repaired, and bench checked.
Solid state controllers shall not be removed for annual maintenance inspections.
This annual check should verify software with central office software and reprint cabinet pack
timings sheet. Controller check shall occur during a annual cabinet inspection.
7. FUSE AND BREAKER CHECKS
Fuse and breaker check should occur during a annual cabinet inspection. Replace burned out
fuses or deteriorated breakers as needed.
8. CLEARANCE TRIMMING
Remove any obstruction blocking the line of sight of the traffic signal face to the motorist. The
maintaining agency shall trim trees, bushes or any other form of vegetation blocking said lines
of sight. The maintaining agency shall remove, or order the removal of,any man-made
obstructions such as signs or banners blocking said line of sight. Visibility for line of sight shall
meet the standards established and contained in the Manual on Uniform Traffic Control Devices
(MUTCD). All trimmed vegetation shall be legally disposed of by the maintaining agency off the
right of way.
4
9. HARDWARE INSPECTION
Inspect all mast arm assemblies, mast arm poles, brackets (or other types of hardware)
supporting traffic heads or pedestrian signal heads on an annual basis. The inspection shall
focus on the structural elements of the mast arm assembly and must include a close up, arms
length investigation of the mast arm, pole,mast to pole connection, base plate, and anchor
bolts.
The arm of the assembly shall be visually inspected at all signal head connections for any
defects, such as cracks or buckles. Inspect the mast arm to pole connection for significant loss
of section, cracks in welds or base metal, and deterioration of the connection plates. The bolts
of the arm to pole connection shall be inspected for tightness and condition. Check the pole for
external corrosion, impact damage, rust through perforation,deflection, distortion, or cracking.
Closely inspect pole for corrosion near the base plate, especially if mounted on a grout bed.
Check welds of the pole to base plate connection for cracks. Inspect base plate for section loss
or deformation. Inspect mast arm anchor bolts for any corrosion or bending, and for loose or
missing nuts.
Upon discovery of any buckles or significant structural defects (loose or missing nuts, severe
corrosion or dents, cracks in welds, plate or structure, etc.), immediately notify the
DEPARTMENT.
10 PAVEMENT MARKINGS
Inspect pavement markings and replace as necessary to Insure proper motorist and pedestrian
guidance. Insure that stop bars, symbols and crosswalks are in good condition. Insure lane,
edge and center lines, and reflectors, provide clear delineation for motorists during daytime and
nighttime.
s:%genlwpdocsllrafflc1yg12011 12011_11final master agreement exhibit b 1-24�011.docx
5
,tg0 C/T� Reviewed By: Agenda Item Number
J� f, O Legal ❑ NB #2
EST. 1836 Finance ❑
Engineer
❑
g Tracking Number
0 l City Administrator ■
Consultant ❑ PW 2011-16
�E `��. Public Works ■
Agenda Item Summary Memo
Title: Fox Hill and Sunflower SSA mowing and Maintenance RFP
Meeting and Date: Public Works March 15, 2011
Synopsis: RFP bid results for upcoming mowing and maintenance season for Fox Hill and
Sunflower SSA areas
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: positive
Council Action Requested: approval
Submitted by: Eric Dhuse Public Works
Name Department
Agenda Item Notes:
C/,-,.y
Memorandum
To: Bart Olson, Administrator
Esr. - ;____; pass From: Eric Dhuse, Director of Public Works
0 Ji! ;�1
C.is.. Date: March 7, 2011
K-9C-.v, Subject: Fox Hill & Sunflower SSA mowing and maintenance
C E
J g
Bart,
The Bid opening for the Fox Hill and Sunflower SSA mowing and maintenance areas is on
Monday March 14, 2011. I will bring the completed bid tabulation with my recommendation to
the March 15th Public Works committee meeting. I am attaching the RFP documents for the
packet. If you have any question,please let me know.
UNITED CITY OF YORKVILLE, ILLINOIS
Request for Proposal
Mowing and Maintenance of the Sunflower Estates and Fox Hill
Subdivisions Special Service Areas
February 2011
Introduction
1. The United City of Yorkville, Illinois (the "City") is issuing this Request for
Proposal ("RFP") for the purpose of soliciting vendor proposals for the mowing
and maintenance of certain areas in the Sunflower Estates and Fox Hill
subdivisions Special Service Areas (see attached maps) to serve the current and
projected needs of the City.
2. The City intends to seek the most cost-effective solution, based on the Criteria
contained in this RFP, for its needs.
3. One original and one copy of the proposal will be accepted until 12:00 p.m., on
Thursday, March 14, 2011. Proposals submitted must be binding for not less than
ninety (90) days after the date received. The City will select the proposal, or
combination of proposals, that, in its opinion, is in the best interest of the City.
The City reserves the right to reject any and all proposals or portions of a
proposal. The City also reserves the right to waive minor technicalities in the
proposal. The City not only reserves the right at the sole discretion of the City to
reject any and all proposals and to waive technicalities, but also reserves the right
of evaluation and the right to determine the methodology for evaluation of the
proposals to determine which is the best proposal and to accept the proposal (or
proposals) deemed to be in the best interest of the City, i.e., the most qualified
proposal will not necessarily be the proposal with the lowest cost. Further, the
City reserves the right to accept a proposal (or proposals) for any or all items
separately or together.
4. All inquiries shall only be addressed at a meeting open to all potential bidders
with Eric Dhuse, Director of Public Works of the United City of Yorkville to be
held Wednesday, March 9, 2011, at 9:00 AM at the United City of Yorkville City
Council chambers, 800 Game Farm Road Yorkville, Illinois.
5. Proposals may also be hand-delivered to the following address by the date and
time specified. It is the responsibility of the bidder to deliver the proposal in
accordance with these instructions contained above and/or elsewhere in the RFP.
Proposals dispatched, but not received by the City by proposal closing time, will
be returned, after receipt, unopened to the bidder. All proposals should be
addressed to:
United City of Yorkville
Re: (vendor name)
Proposal for Fox Hill and Sunflower Estates subdivisions Special Service Areas
Mowing and Maintenance
Attention: Eric Dhuse, Director of Public Works
800 Game Farm Rd.
Yorkville,Illinois 60560
6. Award of Contract. The United City of Yorkville City Council will make the
final award of the proposal or contract.
7. Contract. In addition to the completed proposal, a resulting contract may be
required by the City, including but not limited to,written correspondence between
the City and the vendor subsequent to the proposal submission, facsimiles and
product literature. All agreements between the United City of Yorkville and the
vendor will be handled through our legal counsel. In addition, any legal
restrictions or provisions, enforced by the vendor or its parent company, which
are not in line with the industry's standard, should be pointed out.
8. Confidentiality of Documents. Proposals shall be opened so as to avoid disclosure
of contents to competing bidders and kept secret during the process of
negotiation. However, all proposals that have been submitted shall be open for
public inspection after contract award. Trade secrets and confidential
information, as specified by the vendor, contained in the proposals shall not be
open for public inspection.
9. Contact with City Employees. In order to ensure fair and objective evaluation, all
questions related to this RFP should be addressed only at the meeting with Mr.
Dhuse. Any other contact with a City employee is expressly prohibited without
prior consent of the persons so named herein. Vendors directly contacting other
City employees will risk elimination of their proposal from further consideration.
Conditions
1. Contractor shall perform the maintenance and furnish all labor, equipment,
services and supplies for the mowing and string trimming and other maintenance
and services for the Fox Hill and Sunflower Estates subdivisions Special Service
Areas (see attached maps) for the approximate period of April 1, 2011 through
November 1, 2011.
2. Contractor will furnish the following certificates of insurance with provision that
insurance policies may not be cancelled or reduced in any way which would limit
coverage without thirty (30) days prior written notice to the United City of
Yorkville.
A. Workmens' Compensation Insurance covering employees performing the
services outlined in this contract.
B. Comprehensive General Liability Insurance on an occurrence basis in an
insurance company licensed to do business in this state.
$1,000,000.002,000,000.00
3. Work Completed under this contract shall be subject to the approval of the United
City of Yorkville. For the practical implementation of the contract,the contractor
agrees to meet with the City as often as necessary to discuss any and all aspects of
the contract.
4. If in the opinion of the United City of Yorkville Public Works Department or the
Parks and Recreation Department, the contractor has or is not satisfactorily
performing the work covered by the contract, within fourteen (14) calendar days
of receipt of a written demand from the United City of Yorkville, for performance
by registered mail, or has not cured any defect in performance specifically
itemized in such written demand,the United City of Yorkville may, at its option:
a. Consider all or any part of the contract terminated and no further payment
due from the City to the contractor; or,
b. Hire another contractor to cure any defects in performance or to complete
all work by the amount paid to the replacement contractor for the
remaining term of the contract and reduce all sums due and owing to the
contractor's replacement.
5. Neither the contractor nor the United City of Yorkville shall be held liable for
damages caused beyond its control and without its fault or negligence including
but not limited to, acts of God or the public enemy, acts of the government, fires,
floods, epidemics, quarantine restrictions, strikes, freight embargoes, or unusually
severe weather.
Criteria
1. Mowing—All mowable areas will be maintained at a height of 2 '/z" (or 3" in hot
and dry conditions.) Grass shall be cut weekly or when it is 1" higher than
specified height. Grass next to light poles, trees, etc., shall be mechanically
trimmed to the same height as specified above at the time of each mowing. All
grass clippings and debris, shall be removed from the sidewalks, trails, and streets
at the time cutting takes place.
2. Mulching— Shredded hardwood mulch shall be placed around trees, flower beds,
and other landscape areas to a depth of 3"two times per year or as needed.
All pricing to be per cubic yard, installed.
3. Weeding — All landscaped areas will be hand weeded as requested by the City.
All weeding to be performed within seven(7) days of request.
All pricing to be hourly rate,for labor.
4. Monument Repair— This includes but is not limited to painting, washing, mortar
repair or replacement, staining and monument replacement if necessary.
All pricing to be hourly rate. All.specific jobs will be quoted as needed.
5. General Maintenance — This includes but is not limited to the following: erosion
repair, reseeding including the use of erosion control blanket, or other essential
maintenance repairs not covered under any specific line item.
All pricing to be hourly rate. All specif c jobs will be quoted as needed.
6. Beautification—Planting of annual or perennial flowers, various size bushes or 3"
diameter trees as needed for replacement or new installation.
All pricing will be labor only to install. All tree/plant pricing will be negotiated
separately.
7. Billing/Invoicing—All billing and invoicing will be done on a monthly basis with
detailed itemized billing for each work item performed for each SSA subdivision
area. Billing will include the date the work item was performed, the cost per
work item and the total cost for the month.
Fox Hill and Sunflower Estates
3114111 12:0013 !SSA areas mowing and maintenance
Witness: ED :Bid Form ,FY 11-12
,Cost per Season
City*Estimate- ;Item Unit— Quantity i Price per Acre Cost per Cuffin (est 28 cuttings)
Mowing- Fox Hill IAC s 5.291 $50.00 $264.50 $7,406.00'
Mowing-Sunflower Estates ;AC 51 $50.00 $250.00 $7,000.00.
Item l'Unit Rate
Mulching IN PLACE $45.00�
Needing H i
----.$40.00[__
'Monument re HR $40.001
pa!lrs--.
'General Maintenance HR $40.00I
Beautification HR_.. $40.00'
Vendor Bid i Cost per Season
Item Unit Quantity Price per Acre Cost per Cutting (est 28 cuttings)
Q . .
Vowing-Fox Hill 'AC 5.29 00.1
Mowing-Sunflower Estates 'AC
5
=N, m -41
1 _01V MA
=4a�m W WX
1 Item Wit Rate
�CY IN PLACE
Bid pricing for [Mulchinm91—
both SSA areas `Weeding HIR
;Monument repairs HIR
[General Maintenance Hk_
;Beautification 1HR
Vendor lnf,6iiWit_ion
Name
Address
Phone
---------- - - -- -i---- -. . . i.
I�ax Signature
SUNFLOWER ESTATES SUBDIVISION
HOME OWNERS ASSOCIATION PROPERTY
Eli
` 3 STOKE
I �
LSH WESTmND DR.
T.
L -. i
y G EEN BRIAR RD.
NFLOWER
Soulh Ent
o
SmIllower WALSH CIRCLE j
Park if JI
..D r - —.......
Now • .•
r
Note: Existing
COLUMBINE OR < '- irrigation system i
M-7. 1
—-...--- -- — -- I will not be
v maintained
?IINk� I�iA� I LL IIJ,
DR1VE LSH L I
I i
j" V)
\ j <
IL ROUTE 71 (STAGECOACH TRAIL)
s
NORTH
Not to scale
J
\\� UTE
RO 34
��\\ \��\���,.. 1>OS ^ •- 1620 � � �� � n°a
\ � •` \�_ \•1707 calf N t fi22 � c in '� g yy� � \�\\���
1624 161j
� cress
627
w �� x \�\\ \\\\\ 'o o 1452 1457 140 1407 140 140 1439 1440 r v a
•• ` � \; � b i � ,.
,.\. `'�\•�''�\`�\\\��\ ' r 1450 7 7 7 1
\\\•�`_.�_.��\�\\�\�O-�\\� 447 4047 0 3•W 0 1440 0 4 1�> i4p /4J`�1 y 14`1 m g
< v
-
�h \ ^ \•�\ 1445 9 � 1409 j� 1408 143j 14J? 4pB� ® �3
.'�.`'^�\•\ � h �'� 1444 yo o x�, 1410 lags aaa.E
1412 1427
141 �pL Sato m m
`10j 1305 1306 1438 141 423 g g
1304 !'pia ,D 172 1303
cq
1225 1226 1732 1228
1223 '� 1224 /'JJ 1734 1227 1224
1221 1222 1735 1736 1225
1222
1219 1220 AREAS TO BE MAINTAINED BY
\1.y'� ^ � 1738 1223 .j�?j r:���,i
1217 121 — 1742 1221 1220 J HOMEOWNERS ASSOCIATION OR S.S.A.
1215 0 0 c 1218 5.29 ACRES OF LANDSCAPE AREA
w w w o on 217 1.54 ACRES OF WALK TRAIL (8303')
Ntio� m 1216 6.83 ACRES TOTAL
ry ry N ° o N V. 1214
AREAS TO BE MAINTAINED BY
Cr Y OF YORKVILLE
NOM 22.11 ACRES TOTAL
is SCALE : I"— 400' DATE BY: M. DELAHR
07/
t
United City of Yorkville
Public Works Department
800 Game Farm Rd.
Yorkville, IL 60560
Phone—630-553-4370
-
ALE �e� Fax—630-553-4377
�4
ADDENDUM NO. 1
Date: March 2, 2011
Project: Fox Hill Estates and Sunflower Estates SSA Mowing and Maintenance 2011
From: United City of Yorkville
800 Game Farm Rd.
Yorkville, IL 60560
To: All Prospective Bidders
Note: This addendum is hereby declared a part of the CONTRACT DOCUMENTS for the
project and designated above and in case of conflict, the following addendum shall govern,
bidders shall state in their proposal or at time of bid opening that this addendum has been
received.
Request for Proposal
Introduction section number 3.
3. One original and one copy of the proposal will be accepted until 12:00 p.m., on MONDAY,
March 14,2011. Proposals submitted must be binding for not less than ninety(90)days after the
date received. The City will select the proposal, or combination of proposals, that, in its opinion,
is in the best interest of the City. The City reserves the right to reject any and all proposals or
portions of a proposal. The City also reserves the right to waive minor technicalities in the
proposal. The City not only reserves the right at the sole discretion of the City to reject any and
all proposals and to waive technicalities,but also reserves the right of evaluation and the right to
determine the methodology for evaluation of the proposals to determine which is the best
proposal and to accept the proposal (or proposals) deemed to be in the best interest of the City,
i.e.,the most qualified proposal will not necessarily be the proposal with the lowest cost.
Further, the City reserves the right to accept a proposal (or proposals) for any or all items
separately or together.
0 Memorandum
To: Bart Olson, Administrator
Esr. -� 1836 From: Eric Dhuse, Director of Public Works
o o cc:
Date: March 15, 2011
Subject: Fox Hill/Sunflower RFP results
CE
Bart,
I have attached the RFP results for the yearly mowing and maintenance for the Fox Hill and
Sunflower Estates SSA areas for your review. The low bidder for the mowing was Classic
Landscape LTD., of West Chicago. They were also lower priced for mulch and very comparably
priced for all other maintenance items. Classic Landscape LTD was the contractor that
maintained the areas last year and I was very satisfied with their work and would recommend
them again this year. I will bring this information to the PW committee meeting tonight for
discussion. If you have any questions, please let me know.
FOX HILL ESTATES&SUNFLOWER ESTATES SSA BID FORM
Bid Opening
FY 11-12 3/14/2011 Vendor Vendor Vendor Vendor
12:00 PM City of Yorkville Twin Oaks Landscaping Inc. BLC Yardworks Best Kutters,Inc. Grenlend Lawn Mgmt.Serv.
ED Estimate 997 Harvey Rd P.O.Box 836 P.O.Box 12
Oswego,IL 60543 Yorkville,IL 60560 Somonauk,IL 60552 Bristol,IL 60512
Mowing-Fox Hill 5.29 AC $50.00 $45.00 $45.00 $42.50 $45.00
Mowing-Sunflower 5.00 AC $50.00 $45.00 $45.00 $42.50 $45.00
Yearly Mowing Costs
equals mowing per time cost x 28 FHE $7,406.00 $6,665.40 $6,665.40 $6,295.10 $6,665.40
mowings per year SFE $7,000.00 $6,300.00 $6,300.00 $5,950.00 $6,300.00
TOTAL $14,406.00 $12,965.40 $12,965.40 $12,245.10 $12,965.40
ITEM Unit Rate Rate Rate Rate
Mulching CY $45.00 $45.00 $45.00 $45.00 $43.00
Weeding HR $40.00 $40.00 $35.00 $30.00 $35.00
Monument Repairs HR $40.00 $40.00 $35.00 $30.00 $35.00
General Maintenance HR $40.00 $40.00 $35.00 $30.00 $35.00
Beautification HR $40.00 $40.00 $35.00 $30.00 $35.00
FOX HILL ESTATES&SUNFLOWER ESTATES SSA BID FORM
Bid Opening
FY 11-12 3/14/2011 Vendor Vendor Vendor Vendor
12:00 PM City of Yorkville George's Landscaping,Inc. Nelson's Landscaping English Landscaping Classic Landscape LTD.
ED Estimate 1410 Mills Rd P.O.Box 154 3N471 Powis Rd
Joliet,IL 60433 Sandwich,IL Yorkville,IL 60560 West Chicago,IL 60185
Mowing-Fox Hill 5.29 AC Per AC $50.00 $42.50 $44.50 $38.00 $29.00
Mowing-Sunflower 5.00 AC Per AC $50.00 $42.50 $44.50 $38.00 $26.00
Yearly Mowing Costs
equals mowing per time cost x 28 FHE $7,406.00 $6,295.10 $6,591.34 $5,628.56 $4,295.48
mowings per year SFE $7,000.00 $5,950.00 $6,230.00 $5,320.00 $3,640.00
TOTAL $14,406.00 $12,245.10 $12,821.34 $10,948.56 $7,935.48
ITEM Unit Rate Rate Rate Rate
Mulching CY $45.00 $48.50 $30.00 $42.00 $45.00
Weeding HR $40.00 $26.50 $30.00 $35.00 $30.00
Monument Repairs HR $40.00 $54.00 $30.00 $35.00 $35.00
General Maintenance HR $40.00 $54.00 $30.00 $35.00 $30.00
Beautification HR $40.00 $54.00 $30.00 $35.00 $30.00
FOX HILL ESTATES&SUNFLOWER ESTATES SSA BID FORM
Bid Opening
FY 11-12 3/14/2011 Vendor Vendor Vendor Vendor
12:00 PM City of Yorkville 4 Seasons Landscaping
ED Estimate 6139 Caton Farm Rd
Yorkville,IL 60560
Mowing-Fox Hill 5.29 AC $50.00 $60.00
Mowing-Sunflower 5.00 AC $50.00 $60.00
Yearly Mowing Costs
equals mowing per time cost x 28 FHE $7,406.00 $8,887.20 $0.00 $0.00 $0.00
mowings per year SFE $7,000.00 $8,400.00 $0.00 $0.00 $0.00
TOTAL $14,406.00 $17,287.20 $0.00 $0.00 $0.00
ITEM Unit Rate Rate Rate Rate
Mulching CY $45.00 $55.00
Weeding HR $40.00 $35.00
Monument Repairs HR $40.00 $35.00
General Maintenance HR $40.00 $35.00
Beautification HR $40.00 $35.00
Reviewed By: Agenda Item Number
n O
J /4i- -n Legal ❑ NB #3
-R Finance ❑
EST.,` � �_1836
Engineer ❑
g Tracking Number
0 , City Administrator ■
Consultant ❑ PW cwi�5eat
w:bau ca,my
C.E `�`� Public Works ■ -
Agenda Item Summary Memo
Title: MFT general maintenance appropriation FY 11-12
Meeting and Date: Public Works Committee March 15, 2011
Synopsis: Yearly appropriation of MFT funds for goods such as salt, signs, cold patch
And hot patch
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Positive
Council Action Requested: Approval
Submitted by: Eric Dhuse Public Works
Name Department
Agenda Item Notes:
cry
O� Memorandum
t To: Bart Olson, Administrator
EST. - pass From: Eric Dhuse, Director of Public Works
g CC:
1i fry 0 Date: March 7, 2011
K�r—" Subject: MFT appropriation
�.E
'< J
Bart,
I have attached the yearly appropriation of MFT funds for general maintenance for FY 11-12.
This appropriation is for our basic supplies such as salt, cold patch,hot patch, and street signs.
This year's amount is $234,400 which is down from $245,000 last year. The difference is in the
salt pricing. I do estimate conservatively the price of salt so we do not fall short and have to re-
appropriate funds that may already be spoken for. Any money that is not used during the year
simply returns to the MFT fund as un-obligated. I would ask that this be placed on the March
15, 2011 Public Works committee agenda for discussion. If you have any question, please let me
know.
Illinois Department Resolution for Maintenance of
of Transportation Streets and Highways by Municipality
Under the Illinois Highway Code
BE IT RESOLVED, by the Mayor and City Council of the
(Council or President and Board of Trustees)
Uited City of Yorkville Illinois, that there is hereby
(City,Town or Village) QJ� (Name)
appropriated the sum of of Motor Fuel Tax funds for the purpose of maintaining
streets and highways under the applicable provisions of the Illinois Highway Code from May 1, 2011
to April 30, 2012 (Date)
(Date)
BE IT FURTHER RESOLVED, that only those streets, highways, and operations as listed and described on the
approved Municipal Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection
with this resolution, are eligible for maintenance with Motor Fuel Tax funds during the period as specified above.
BE IT FURTHER RESOLVED, that the Clerk shall, as soon a practicable after the close of the period as given above,
submit to the Department of Transportation, on forms furnished by said Department, a certified statement showing
expenditures from and balances remaining in the account(s)for this period; and
BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this
resolution to the district office of the Department of Transportation, at Ottawa , Illinois.
I, Jackie Milschewski Clerk in and for the United City
of Yorkville County of Kendall (City,Town or Village)
hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by
the Mayor and City Council at a meeting on March 22, 2011
(Council or President and Board of Trustees) Date
IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this day of
(SEAL) Clerk
(City,Town or Village)
Approved
Date
Department of Transportation
Regional Engineer
Printed 2/1612011 BLR 14230(Rev. 11/06)
Illinois Department Municipal Estimate of
of Transportation Maintenance Costs
Section Number 11 -00000-00-GM
Period from 05/01/2011 to 04/30/2012 Municipality United City of Yorkville
Estimated Cost of Maintenance Operations
Maintenance For Group 1 II or III Material E ui ment or Labor
Operation Group I I I Unit I d Operation
(No.—Description) (i,u,ui,iv) I Item Unit I Quantity Price Cost Cost
Bituminous Patching II Bituminous Cold Patch Ton 100 110.00 $11,000.00 11 000.00
Surface Hot Mix Ton 200 70.00 $14,000.00 14,000.00
Signs, Posts & Hardware II Various Signs EA 150 45.00 $6,750.00 6,750.00
Sin Posts EA 150 36.00 $5,400.00 5,400.00
Brackets and Hardware EA 150 35.00 $5,250.00 5,250.00
Snow Removal II Bulk Rock Salt TON 1 2400 80.00 $192,000.00 192,000.00
b
Total Day Labor Costs $234,400.00
Total Estimated Maintenance Operation Cost $234,400.00
Preliminary Engineering
Engineering Inspection
Material Testing
Total Estimated Engineering Cost
Total Estimated Maintenance Cost $234,400.00
Submitted: Approved:
Date Date
By:
Municipal Official Title Regional Engineer
Submit Four(4)Copies to Regional Engineer
Page 1 of 1 BLR 14231 (Rev.2/23/06)
Printed on 2116/2011 8:07:13 AM
Illinois Department
of Transportation Special Provisions
The following Special Provisions supplement the"Standard Specifications for Road and Bridge Construction", Adopted
January 1, 2007 the latest edition of the"Manual on Uniform Traffic Control Devices for Streets
and Highways", and the "Manual of Test Procedures of Materials" in effect on the date of invitation of bids, and the
Supplemental Specifications and Recurring Special Provisions indicated on the Check Sheet included here in which apply to
and govern the construction of 11-00000-00-GM , and in case of conflict with any part, or
parts, of said Specifications, the said Special Provisions shall take precedence and shall govern.
Bituminous patching - The United City of Yorkville will use a N-30 or N-50 surface course mix on all patches throughout the
city. All patches will be performed in accordance with Section 406 of the Standard Specifications for Road and Bridge
Construction adopted January 1, 2007.
Page 1 of 1 BLR 11310(Rev.7/05)
Printed on 2/16/2011 8:07:29 AM
r
LR 1013 1
Page 1 of I.
State of Illinois
DEPARTMENT OF TRANSPORTATION
Bureau of Local'Roads and Streets
SPECIAL PROVISION
FOR
ROCK SALT
Effective August 1, 1969
Revised January 1, 2002
All references to Sections or Articles in this s-speciflcation shall be construed to mean a specific
Seotlon or Article of the Standard Specifications for Road and Bridge Construction, adopted by
the Department of Transportation.
Description, This item shall consist of furnishing rock salt(sodium chloride) In bins or stockpiles
at location designated In the Proposal.
Materials. Material shall meet the requirements of Article 1013.02 except that the gradation
shall be as follows:
Passing 12.5 mm 0/2 inch)sieve 100%
Passing 9.5 mm (3/8 Inch)sieve 95- 100 %
Passing 4.75 mm(No.4)sieve 20- .90 %
Passing 2.36 mm(No. 8)sieve 10- 60 °/G.
Passing 600-pin (No. 30) sieve . 0.- 10 %
The.Department reserves the right to reject any shipments.of rock salt which are delivered In a
frozen'or caked condition or which contain free water.
The Department reserves the right to accept delivery of Rock Salt which, according to analysis
by the Department, has a sodium chloride (NaCI).content of less,than 96.0 %, but is riot less
than 90.0 %. Material With, less than 90.0 % sodium chloride will be rejected. When such
exceptions are allowed, payment will-be adjusted.
Method of Measurement..Rock salt will be measured by the metric ton (ton).
Baal's of Payment. This work will be paid for at the contract unit price per metric ton (ton)'for
furnishing and transporting ROCK SALT based on the sodium chloride content.-Payment will be
in accordance with the following schedule:
NaCI Content 96.0%to 100.0%Net Bid price-per ton.
NaCI Content 95.0%to 95.9%Bid price less $0.50 per met ic.ton (ton).
NaCI Content 94.0%to 94.9%.Bid price less $2.00 per metric ton (ton).
NaCI Content 90.0%to 93.9% Bid price less $4,00 per metric-ton (ton).
LR 442
Page 1 of 2
STATE OF ILLINOIS
DEPARTEMENT OF TRANSPORTION
DIVISION OF HIGHWAYS
LOCAL ROADS AND STREETS
BITUMINOUS PATCHING MIXTURES
FOR MAINTENANCE USE
Effective: January 1, 2004
Revised: June 1, 2007
This special provision covers course graded and fine graded bituminous mixtures for use in
maintaining small areas on flexible and rigid type pavement.
Materials. The materials, control, quality, sampling,testing, inspection and storage of material
shall conform to the specific requirements of the Standard Specifications for Road and Bridge
Construction adopted by the Department of Transportation.
Bituminous Patching Mixtures.The material supplier or contractor may furnish any of the
following Bituminous Patching Mixtures listed in the individual Group for which the award was
made.
Group I —Bituminous Patching Mixtures
Serial No. M-17-07: Bituminous Mixture for Maintenance Use, Emulsified Asphalt Type
Serial No. M-19-07: Bituminous Mixture for Maintenance Use, Liquid Asphalt Type
Serial No. M-20-07: Bituminous-Sand Mixture for Maintenance Use
Serial No. M-48-02: Bituminous Premix for Maintenance Use, Inverted Emulsified Asphalt
CBAE-2
Serial No. M-126-07: Bituminous Mixes for Maintenance Use, Reinforced Fiber Mixture
Bituminous Patching Mixture (HMA): This mixture shall conform to the material
requirements of Section 1030. The mixture shall be a High ESAL IL-12.5 N50, High ESAL
IL-9.5 N50, or Low ESAL IL-9.5 N30 mix. The bituminous material shall be limited to asphalt
PG 58-28 or PG 52-28.
Group II—Bituminous Patching Mixture(Proprietary)
Serial No. M-120-07: Bituminous Premix for Maintenance Use-Optimix, Sylcrete, UPM,
QPR-2000, EZ Street, SMP- Proprietary Sources
Serial No. M-133-96: Bituminous Premix for Maintenance Use, Instant Road Repair-
Proprietary
Placing of Bituminous Patching Mixture.All holes and depressions in the existing surface
which exceed %" in depth shall be repaired by removal of all loose and defective material and
replaced with the specified Bituminous Patching Mixture. The material shall be compacted to
produce a tight surface conforming to the adjacent area.
Method of Measurement. Bituminous patching mixture will be measured for payment in metric
tons (tons).
LR 442
Page 2 of 2
Basis of Payment. This work will be paid for at the contract unit price per metric ton (ton)for
BITUMINOUS PATCHING MIXTURE (GROUP 1); BITUMINOUS PATCHING MIXTURE
(GROUP II);
When bids are taken F.O.B. trucks at the mixing plant a hauling differential of$ per ton-
mile haul from mixing plant to location designated in the proposal will be used to determine the
low bid. Round trip distance shall be used to calculate the hauling differential to ba usad to
compare bids. Bidders are required to fill in the location of the plant from where they propose to
supply the patching mixture, on the material proposal form.
State of Illinois
Department of Transportation
Division of Highways
Springfield
SPECIFICATIONS
FOR
BITUMINOUS PREMIX FOR MAINTENANCE USE
PROPRIETARY MIXES
Serial Number: M 120-10
1. DESCRIPTION. The patching material shall be composed of a mineral aggregate, plant-mixed
with a liquid asphalt and chemical additives from the suppliers of the proprietary mixtures. The
bituminous material shall be capable of coating wet aggregates without stripping, and shall be
available in various grades so that one such grade will enable a stockpile to remain pliable and
workable at a temperature of-26 °C(-15 °F). The patching material shall be capable of maintaining
adhesive qualities in patched areas which are damp or wet at time of application, and also after
remaining in an uncovered stockpile for up to twelve(12) months.
2. MATERIALS. Control of the materials shall be in accordance with the general requirements of
Section 106 of the current Standard Specifications for Road and Bridge Construction. If required, a f
five kilogram (ten-pound)sample of the mineral aggregate and one-liter(one-quart) sample of the
liquid asphalt shall be submitted to the Bureau of Materials and Physical Research, 126 East Ash
Street, Springfield, Illinois, for performing the tests specified herein.
(a) Aggregate
All Coarse Aggregate used in the proprietary mixtures shall consist of crushed stone of
Class B quality or better as defined in Article 1004.01(a)&(b)of the above cited Standard
Specifications.
(b) Bituminous Materials
The bituminous material shall be a formulation of the liquid asphalt blend prepared under
the supervision of the proprietary mix supplier. It shall meet the requirements of ASTM D
2026 or ASTM 2027, whichever applies, modified as follows:
1
ASTM D 92
Flash point(COC) 94(200) 94(200) 94(200) 94(200) 9200) 94(200) 121 (250)
°C(°F)-minimum
ASTM D 2170
Kinematic Viscosity
60°C(140°F)mm'Js(cSt) 350-3000 300-4000 300-4000 300-4000 400-2500 280-400 300-4000 300-4000 400 600
cPs
ASTM D 95 Water
%-maximum 0.2 0.2 0.2 0.2 0.2 — 0.2 0.2 0.1
ASTM D 402 Distillate
%by Volume of
Original Sample
Temperature
Distillate to 225°C(437°F) 0 0 0 0 0 0 0 0 0
Distillate to 260°C(500°F) 0-5 0-5 0-5 0-5 0-5 0-5 0-5 0-5 0-0
Distillate to 315°C(600°F) 0-21 0-25 0-25 0-25 0-18 8-50 0-25 0-25 0-55
Residue from distillation
to 360°C(680°F) 70-94 72-95 — — 73-95 70-95 72-95 72-95 80-90
%Volume by Difference
Residue Tests:
ASTM D 2171 Absolute 11.5-04.0 12.5-42.5 12.5-42.5 12.542.5 12.5-42.5 12.042.5 12.5-42.5 12.5-42.5 12.542.5
P Viscosity al 60 Seconds lse (115440) (125425) (125425) (125425) (125425) (120425) (125-425) (125425
Pascal Seconds(Poises) ) (125-425)
ASTM D 5 Penetration
25°C(77°F) — 200 — — —
100 g,5s–minimum — 2D0 200 300
ASTM D 5 Penetration,
modified with
cone,25°C(77°F) 200 160 180 180 180 — — —
150 g,5s–minimum
ASTM D 113 Ductility
21°C(70°F)
lcmlmin. — — 100 100 — 100 — — —
cm–minimum
ASTM D 113 Ductility
4°C(39°F)
lcmlmin, 85 100 — — 100 1D0 100 100 100
cm–minimum
ASTM D 2042
Solubility in
Trichloroethylene 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.9
%-minimum
2
(c)Stripping Tests
The combined UPM and liquid asphalt shall meet the following stripping tests:
(1) Stripping Tests: Dry Aggregate. Two-hundred grams of the air-dried aggregate
passing the 12.5 mm('/z-inch)sieve and retained on the 4.75 mm (No. 4) sieve shall be
combined with 6.3 percent, by weight, UPM liquid asphalt and mixed in a hemispherical
metal dish with a stiff spatula for three to five minutes or until a uniform coating is
obtained. Twenty-five grams of this material shall be immediately place in an oven at
60°C t 3°C(140 OF t 5°F),for eighteen to twenty-four hours, after which it shall be
thoroughly mixed and allowed to cool to room temperature. The sample shall then be
immersed in water at a temperature of 49 °C t 3 °C(120 IF t 5°F), and maintained at
this temperature for twenty-four hours. At the end of this period,the area of the
aggregate remaining coated shall be determined visually while the sample is still
immersed in water. Surface coating of at least 90 percent must be retained on the
aggregate. A test similar to the above using MC-250 shall be made for comparison.
(2) Stripping Test: Wet Aggregate. Two-hundred grams of the aggregate passing the 12.5
mm(Y2-inch)sieve and retained on the 4.75 mm (No. 4) sieve shall be immersed in
water for twenty-four hours and the excess water drained off, leaving the aggregate
surface wet. This aggregate shall be combined with 6.3 percent; by weight, UPM liquid
asphalt and mixed in a hemispherical metal dish with a stiff liquid spatula for three to
five minutes or until a uniform coating is obtained. Twenty-five grams of this material
shall be immediately place in an oven at 60 °C t 3°C
(140 OF t 5°F), for eighteen to twenty-four hours, after which it shall be thoroughly
mixed and allowed to cool to room temperature. The sample shall then be immersed in
water at a temperature of 49 °C t 3°C(120 OF f 5°F), and maintained at this
temperature for twenty-four hours. At the end of this period,the area of the aggregate
remaining coated shall be determined visually while the sample is still Immersed in
water. Surface coating of at least 90 percent must be retained on the aggregate. A test
similar to the above using MC-250 shall be made for comparison. In estimating the
percentage of area remaining coated, any thin or translucent area shall not be
considered as being coated
Proprietary mixes, Sylcrete EV, Sylcrete VA, Optimix, QPR-2000, EZ Street,SMP, Sakrete All
Weather, and Proline shall meet the following stripping tests.
(1) Place 50 grams of cold mix into a beaker containing 400 ml of boiling distilled water.
Bring back to boiling and boil for 3 minutes with constant stirring at 1 revolution per
second. At the end of 3 minutes, remove the beaker from the heat source and
immediately decant the water. Empty the wet mix onto a paper towel and examine.
The retained coating shall not be less than 95 percent.
(2) AASHTO T 182-06 Coating and Stripping of Bitumen-Aggregate Mixtures.
3. INSPECTION. The Engineer or his authorized representative shall have access at any time to
all parts of the plant in order to verify weights or proportions and quality of materials used in the
preparation of the mixture. The manufacturer shall afford such facilities as may be required for
making inspection at the plant and for collecting and forwarding samples of the ingredient materials
and bituminous mixture to the Department.
3
i
4. PLANT AND EQUIPMENT. Storage facilities and all equipment used in the preparation of the
mixture shall be approved by the Department. An approved drier shall be available for surface
drying the aggregate when needed. The materials for individual batches shall be measured
accurately, either by volume or weight, by approved methods and equipment. A batch type mixer
of approved design and capacity shall be used in mixing the ingredient materials. However,
approval for the use of a continuous mixer will be given if it can be shown that satisfactory results
will be obtained.
5. PREPARATION OF MIXTURE. The aggregate and Optimix, or QPR-2000, or Sylcrete, or
UPM, or EZ Street, or SMP liquid asphalt shall be proportioned into the mixer and mixed for at
least 30 seconds or until a uniformly coated mixture is obtained. The liquid asphalt shall be heated
to a temperature of 93 °C i 28°C (200°F t 50° F), at the time of mixing, and in accordance with
the instructions of proprietary mix supplier. When necessary to heat the aggregates, the
aggregates should not be heated to more than 68 °C (155 °F).
6. COMPOSITION OF MIXTURE. The ingredients shall be combined to produce a mixture
meeting the approval of the Department and conforming to the following composition limits, by
weight, as determined by tests of the prepared mixture:
4
Gradation of Extracted Aggregate % Passing)
I
12.5 mm 1/2" 100 100 100 100 100 100 100 100 100 100 100 100
9.5 mm 318" 90-100 100 90-100 90-100 90-100 100 90-100 95-100 100 90-100 90-100 100
4.75 mm No.4 20-55 85-100 20-55 20-55 15-55 70-100 20-55 80-100 85-100 20-55 20-55 70-100
2.36 mm No. 8 5-30 10-40 5-30 5-30 5-30 0-10 10-40 5-30 5-30 1 20-40
1.18 mm No. 16 0-10 0-10 0-10 0-10 0-10 0-10 0-10 0-10 0-10 0-10 0-10 10-30 !I
f
600 prn(No.30) 0-7 0-7 0-10 0-25
300 pm No.50 0-5 0-5 0-5 0-5 0-5 0-10 0-5 0-5 0-5 0-20
75 pm(No.200) 0-2 0-2.5 0-2.5 0-2 0-4 0-4 0-3 1.5-3.5 0-4 0-4 0-2 0-5
Residual yBitumen 3-6.5 3-6.5 3-7.0 3.5-6.5 3.5-6.5 3-7 3-7 3.5-7.0 3.5-7.0 3-7.0 4.0-6.0
'Based on percent of total aggregate weight.
2JBased on percent of total mixture weight.
5
7. LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC. The laws to be observed; permits
and licenses; patented devices; materials, and processes; and responsibility for damage claims,
shall be in accordance with the requirements of Section 107 of the above cited Standard
Specifications.
Effective June 1, 2010
lit aAl fl d � rtae
JDP/M120-10
6
8-12
' (200-]001
3 1751
lH(9501
4
4 AgEr I (1001 mtn.
11001 4
1 c II001
A (1001 -"E
4
_ (1001
4 ry C
4-6(100-1501
N Ir I N°0 4-6 1100-150)
Oronpe Orange
COME REFLECTOR® COME RMBLE DOMEATOR YERIM PANEL DRUM
POST MOUNTED
(3001
A A117
mI ®I� g ll50)
_ (1501
N a _
gE 2 24(600) g =E
E rtln, �E
�I 241 i ml I 16001
9in
TYPE 1 BARRICADE TYPE B BARRICAM TYPE RI BARRICADE MAI'MN INDICATOR 11ERi m BARRr"
BARRR:ADE
i
GENERAL NDTES
Ad nights shown shell be measured above the
pavement surface.
•
warning tignts(7 requlre )
Al dimen5l0.-t5 are in Irknes fmOCm�etersl
unless pthervlse shown.
DATE REVISIONS TRAFFIC COM01.
®Imneb oeoar rmenr of Trauaortellon TRAFFIC Y �1
1-1-09 Switched units to
�ptppyre bnsr L ropy - Engllsh/metrlcl,01(dtted DACES
light on Vertical p—L
1-1-09 Renumbered Standard (Sheet I of ])
P°A°�0t0o9 - 702001-06.Rev.note for tTANDARD 7D190I-01
croco[w n otsJSw wo prvuu srT temp,signs on Sheet 2.
I
I
Type B monod(recticnd
flashing light 1848 145OXA501
•• orange flops
6'- 12'
11.9 m-3.6 m)
ROAD
'c CONSTRUCTION FEND
E I NEXT X MILES CONSTRUCTION
o '
G20-1(0)-6036 G20-2aW)-6024
I
rood DOSt 24- 10'
- -
S'115 no (600 3 m)min turd Edge of-- °o=
v 4'U.2 all rural '12.1 M min urban povement ^. SIGN Tnls signing is redutred for all prolecta
6.11.2 m)urban or tats E 1IF SPECIFIED) 2 mlks 13200 ml or more In lenOth.
of Curb E
ROAD CONSTRUCTION NEXT %MILES s(gn shag
H E oa placed 500'1150 m)In odvdnce of pro-
. lent Wts.
Elevation aF edge Elevation of edge END CONSTRUCTION sign shoal oe erected ar
of coven of El povement the end of the Job unless another lob is
within 2 miles(3200 mL
5'ILS m1 m1n.
embedment SIGNS ON MEW"SUPPOrtiE Oual sign OlepkYS shall be urlllzea on—III-
lone highways.
•• When work operations exceed
POST NIODNIEO SNWS four days this dimension shall HM LM WAR DEVICE WIM umff SIWCNO
De 5'(1.5 m)min. If located
•• when curb ar paved shoulder ore present behind other devices, the height
this dimeUn shall be 24(600) to the shoo be sufficient to be seen by
fate of Curb Or 6' 3.11 m)to the OUtside motorists.
edge of the paved 61hadder.
24
(6001
5 7
0251 (IT51
N
8(200)Federal series C 1
7 (LBO)Federal ertes S
I
1 a
15131 i� I6 1
(4001
I
(151
E
AN dimen lens are In Inches(mllimetersl
unless otherwise shorn.
FRONT SIDE REVERSE SIDE
�1 9gnola De{arfinenr of ire�eort011en Tf F C CONTROL
DEVICES
FUMEW TRAFM CONMIL SIGN (Sheet 2 of 3)
_HGIIC�ER O0 p°ERni[�xS
.RtRO.(g C 716— � - UMDARD 7019"
alauaal a 51'.�..d pWNwi
i
rA 24 1600) z
(2-4 ml
—1 -----------------------------
R'
pdrL
0
s t.5 ml « ---------- _ ______ � p°p p
1
Weep hobs {{{
°oec E .____________________________ 2 2 I 2
19 m) fe m) IB ml Consfructfpn
200 700 200 advance
A
160 m) t <60 m) k 160 1 i warning signs
E E �►A
E '�E rvE
PLAN
f 5, ID mt
1Y,1451 z (l.5 ml r
TM A TM 8 im c steppedyoresmootn
ROOF ROOF OR TRAM 1RABEB Trafflc
NIODUiED MOONTED MOUNTED 0 0 II S S
Epoxy chnnnele J
ARROW BOARD! I 31/ (eas z 11 I II 1 1
SECTION A—A TYPICAL IWAUATM
1 7EMPOBARY MATBLE XMINS
i
'px 12(3001
TYPE A }. —1 I 6(150) —`� 6 1150) E E min.
flosMr I max. max. Rll-2 I max. E E )
1 0l°n
ROAD
CLOSED R$
Edo. of
hoLdder
'319
Pavement min.
ROAD CLOSED TO ALL TRAFFIC Type A R❑-4
flasher
Refbc'orized striping may be omitted MMAD(lOSf:D ROAD QOSFD
i On the bock side of the barricades. TO TD
If a Type 111 barrieade with an attached THRU TRAFFIC THRU TRAFFIC
sign Donal rhlch meats NCHRP 350 is not
avallabb, the 31on may be mounted an Oil
NCHRP 350 temporary sign sappor directly
in front of the borrica le. Pavement AN dimensions are In inches(mHDmeters)
unless otherwise shown.
ROAD CLOSED TO THRO TRAFFIC
nPlrAl APRI Reflectorized striping shall appear on TRAFFIC CONTROL
®Hanel.Oaprrr�ya*W TraruvorroNan both aldes of the barricades. if a
weo�tD Jawar.1. xoof � TYPE RI BAM MES CLDSINB A ROAD sign !II barricade with CH ot350 1. DEVICES
elfin panel wnich meets NCHPP 35(1 is
T.1ulcEea�-sue o not available, 'the signs my be mounted (Sheet 3 of 31
on NCHRP 350 temporary sign S Dperte
chatty In front of the barricade. ST W8 71H"
[4 a OES G
W/AD
W20-1101.48 Mdel
MEAD
Or
i � II01a
+�e, 1eAo
W20-7101-48 '�
ID
W20-4101-48
Q W20-I1031W-4B
100 a
�p __IyDe I or Type 1 Barricades —One ray/an* lane operation
Goa O i Type 1 or Type II barricades b
a0
i
O O 1 100 130 0D 02 �noso Type 0 brrlcadea Qz
aA. O
- E R11-2 SAD
Inc YEAR
■ale W20-1101-48 ssAD W20-3407-48
NEW For W20-4101-4e
maintenance
or
and utNty
projGo+e W20-7101-48
RDAs NoAD
W20-110310)-46 ppp
NEAO caniroci W20-1]03(01-49 IIGD Or NEAP
ac utructlon W20-IIO)-49
projects
SIGN SPACING �M�L=
ostetl Speed Sign SDxing
55 500'1150 ed
50-45 350'IlCO ml ® Work ores Q Refer to SIGN SPACING TABLE
C45 200'f6D ml for distances.
O Can*,drum or borriccce
Inot requlrod for movin0 aper.floml Q For approved alderoad closures.
GENERAL NOTE!
I, Q Cones at 25'18 rd centers for 250' This Standard Is used where at an time,day r
r SICn on portable or permanent swport ITS ml.Additional cones may be placed night.any vehicle, eautpment.workers or their
at 50'115 ml centers. When drums or
Flower activltha
Fla with traffic control sign Ty I r Type]I barricades re encroach on the pavement requiring the closure
used.the Interval between devices of one traffic lane In on urban area
Barricade or arum with flashing Bght may be doubled.
AI dlmeother are h inches(mlllmeTers)
®Canes,drums er barrlcodes of OhI99G otherwise shave.
Type I[1 barrlcode with flashing Bah+s 20'16 m1 centers.
DATE REVISIONS
®ilea•oeo°ria.rtt pf 7ronepartgtk^ 1-1-11 Revlsed flogger sign, URBAN LANE CLOSURE,
""m"m�'°"
2L 2W,UNDMDED
DK1 M or MT,IJAMIQm•°
1-1-05 Switched units to
EngBeD bneirlG. STAN � �
a uo pve Corrected sign Nora. MM
♦,tED C/�.y Reviewed By: Agenda Item Number
J� r0-� Legal ❑ NB #4
EST. lei 1636 Finance ❑
Engineer ■ Tracking Number
e City Administrator F1 0� i l ��d Consultant ❑
Wrn
❑ PW 2011-18
'��t.E �i'♦.
Agenda Item Summary Memo
Title: Hampton Inn—Final Approval/Acceptance & Bond Reduction
Meeting and Date: March 15, 2011 Public Works Committee
Synopsis: Recommend final approval/acceptance of the land improvements for Hampton Inn,
and a bond reduction in the amount of$122,015.68.
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Approval
Submitted by: Joe Wywrot Engineering
Name Department
Agenda Item Notes:
CI P
V. Memorandum
EST: 1836
1 To: Bart Olson, City Administrator
From: Joe Wywrot, City Engineer
CC: Lisa Pickering, Deputy City Clerk
� t o� Eric Dhuse, Director of Public Works
Date: March 4, 2011
Subject: Hampton inn—310 E. Countryside Parkway
Final Approval/Acceptance&Bond Reduction
The punchlist for the referenced development has been completed. All land improvements for
this development with the exception of watermain and some sanitary sewer are to be privately
owned and maintained. The developer has signed the Bill of Sale(attached)transferring
ownership of the watermain and certain sanitary sewers to the city.
I recommend that the land improvements for Hampton Inn be approved and the public
improvements be accepted by the city for ownership and maintenance. I also recommend that
Western Surety Company Bond#70706014 be reduced in accordance with Ordinance No. 2011-
03. The bond reduction would be in the amount of$122,015.68. The remaining bond amount
would be $8,156.10, and would remain in effect through the one-year warranty period.
Please place this item on the March 15, 2011 City Council agenda for consideration.
BILL OF SALE
Seller, Yorkville Hospitality,LLC of Kendall County, Illinois, in consideration of One
and No/100 Dollar($1.00), receipt hereby acknowledged, does hereby sell, assign,
transfer and convey to the Buyer, The United City of Yorkville, an Illinois municipal
corporation, at 800 Game Farm Road, Yorkville,Illinois 60560,the following personal
property to wit described in Exhibit A attached hereto for the development known as
Hampton Inn, 310 E. Countryside Parkway,and as generally shown on Exhibit B.
Seller hereby represents and warrants to Buyer that Seller is the absolute owner of said
property,that said property is free and clear of all liens, charges and encumbrances, and
that Seller has full right,power, and authority to sell said property and to make this Bill
of Sale.
IN WITHNESS WHEREOF, Seller has signed and sealed this bill of sale at
Yorkville, Illinois,this 4th day of March,2011.
Yorkville Hospitality, LLC
,j o
Kishor Patel, General Member
STATE OF Illinois)
COUNTY OF Kendall)
On this 4th day of March,2011,before me a Notary Public within and for said
County and State,personally appeared Kishor Patel,to me personally known,who being
by me duly sworn did say that he is a General Member of Yorkville Hospitality,LLC,the
corporation named in the foregoing instrument, and that the instrument was signed on
behalf of the corporation by authority of its Board of Directors and Kishor Patel
acknowledged the instrument to be the free act and deed of the corporatio .
Notary P lic
Kendall County
My Commission expires
dFFICU1l SEAL
ANDREA M WE�IERT
NOTARY PIIC-STATE OF ILLMIOIS
Exhibit A
Project Name: Hampton Inn
Location: 310 E. Countryside Parkway
Developer: Yorkville Hospitality, LLC
1510A N. Bridge Street
Yorkville, Illinois 60560
Item Unit Quanti
8"DIP Watermain LF 374
Fire Hydrant EA 2
8"Valve &Valve Box EA 2
8"PVC Sanitary Sewer, SDR26 LF 56
Manhole, Type A, 4' Dia EA 1
Exhibit B
IIao1I y _ ,,, �dsn,Gr rsla call 0]A«M.E
a led..lA►.�rl 1Ra.11a
Ir ' Y Grr INC
{�• �[eaM0 r14r MrK � &«I16yrwaM�G>t.1A«b,�Aal«I«pee-4lCOatl.111E
s"'"'"ERrws«.nur � w.nwsu� ac'rmrrw I.OT1 t.UAwa.awvas
v w.m H'atP 1
Im10KAW NI aCAIr OOSIna . 1 IOC MO' OalagAW PIw Mar wIMDMINAOE nE}t1CnM f f i Oa«�W"
M A!D O9ua«S«II OBAI 1)a4 tl4 /I
Wd «
R 17P4 Kv(�1 1 w�iR apm M
a..IP+wr1 1J IJ a4vnw maw@aw "wuK'"'
0 —om na1 -PAN. dr-E O am T_ 9W GIRL• QSA"MAWYAGS
- 40r 9P.ItSt sq R. lja AM$
_e. ' PAMtfD AtfA•b.,10a1.M�.K MfJ(*rte 1 M.0 �O A.MO
MAM API AA£A tSkA21V W n..(tJ3A1 .ALL)!K Y of-1140
ro.s e.11 tn.utoo J.Y r
- NW190f Cr teatlA PAnIOV.0 SIAUS>4 eY1PNto'r a) m«
kAMM..� ro NO.BM d��A«1NC RKM srrft-E ! &.R'IE.P.aroum
t"hr(-AW*C sr—IrMQ N, reS J sAVw A.'ON 7MAYL
rMM AIYE MW 71' SM eraxs�aad wr
.°_ _ r • P sR► A r. R£OIrNEa PARAWC Aqr Npl[ alQNANd) 1 m g ff sw ID e nl"m
P1 om OOWa.M nGWf.4SAU g2TI PLU1 dJF IR>w-a.11a'
H°MH
Afar Nlpyry[aarr AEf16GA1E `:, 4 1 - _ _. _- v r 1 •-M rAU X r7 aesr ROOM 1 AVA MIL J ItM.�fpp{r{A!�]A 600 IV--Pi0O •W
m f •elcaarr ® arc .1 3:: f �. omuawrs aaw*Any m
yyI N AE'r PAIQ 7 WX"d?NFPwSE N070, Ir1.piM
OP
I.dt Pi r1x �_ � r*�KJ •rNArarEO aas _ ' - - -- c apie'«m:-w.ca��ia Aw,Arq
Ai IC SC30' - - A arcerAeac AIn]e,0 a .4«Nrs
hr - n a1 snM«v.una
{^.�] a0«MrOUr.}f`A.Cfn+mn)
Yq�. ' OMU�wev { ! as rdR s-IACARJ
�' �.. ae. �„'- 7 I gip° �PA.'w��cust+s fe7�'� f.r aVJWa arwu mm olwPfb
II qq p ��' * Y rN.Al seE7 (, ��n«u P41a,ar,Ynwmxrl
8j i6 to }� `r 6T'aFi4a aa. z
1 LJ ] t u rl.aM Aina r nwaxr
Aaarertrutt I� i5 1 t
"Max A � j a OW Wo
mralt r > i LOT 3
LOT 2
p� !r I aNr hr.1 car ways ,i A IOre. ... 1 A i. m
0WATM MAIN TAG!
. ps 10 n 4% t `, �. i ro Arrec�errr
.. Ai tl�. � °� ..rA«raNO .INiR �0' �` ewerA«e1PCN�IOt.e.ar cal[
s, 1 Qa�_ AtrtetAert P t. _ nu'c _ _ w,rPw I,smu.ul R am ww r
AA/lln 4X"0k, +{ I 4-� i �i coNPLxTTwos I i�ia«wwA>
RE
as I SiM1�4.f d l I ««IQNw rYi.M M4K
\ �1 I� 4 K I IfI MSAA�Mf,U d 1 1 iOalr 9f roA1* I ! M INh MU01 rM'Y
I 0y
4"W OLaOrOLEQ tO�G g•\ .\ti I{ `�, - 1 M� aC. y//�//pOgRpI1 Ma'Y
� E A ' ! -- PPr a.IAO'• > HR PN«C I@ bfOO 0.NtPmP
anal>a.Vm .`�.. 1�'•. � rm.�a�r o v .�Alarraenllrr I1M4��.MI�"1,4y,L�"MI
t*ITN*amII tIGV ��\ qj Ir1P1 ••.� Ay At f _I-1, Wrr I , mr mo�,.JC 7
? RNA$anvil ll'�°11 J Sta1Y Yml Ob«
lCF.A8I1£LKM4 IYAAb IIADr1M.5
W HaJOA EAOOTLL eat Im"lal \ ` 1!
iiE7VILRAI
a.r]a annv AAi M d A«O moral eoal m aw«ma. ! �. —Ampo dm ov)
rlArrawlar's nme.r n!t Aae as la/Rac y " A Sanitary Sewer
aL t1.Ar Jiver r.aaama w'.w««ax L� � °•.
4IA= P a1.1 A1MIJY.ta qR n IaPEMr Or ana I ' -
69
'RM.A.nI1M,AI MI.TS4P.M..LLGr 4A'A««r or nlaaa,At
11
� Wat ermain
ecw.v Alt Ar Aam e
ilArye.,cOivoJ M��aw N a 1 1 I _ .
ov�nPas s.aAn rc.r,.«mm rONARrAlP ra*rw.r ..r ._ �_.._-_ • � rnu -
..oe.'�naa «r.++�x.Ma1r w,eeP ws rwu[nwMS /�, !ppgrp
on"falanl W IW114 aJlu 0 ebl
+IRfA+o sa00«t ar¢f yat•+m+I�IlNaaell Oerre« YI�Mw�nR1t�A�tlnd* / � r � r•� '�
r+a alo aaM.R Ara/ArR el+l•• � e{falF]NR�ar eFUacleex mr tERaArE tMA.wI nna. r ,
pmfy�/A+....1.�aabr an.r pr�pp nw Mpl�>m.r Effi97'7hiG S'OPlli BASIN - ! YORKvl]•e*4&r9L.$Wm
nr«Al AWL A rrW a�nb�lr rJ7lraa P�i4 -'-'�TJl' Dtt�l'p AW aP 111Yi R�Did1IR eYa NO aniew raa-IP Ma- R • i
ar alana AYYi N aaamoA.aerai m.a eaM.«�Iw AA ts-n.Ir.r..Alnto • j {
I Y«11FMa111f Omr OMt f«OIM N AM OF llaHal.K 011 iEMR 11O IUCt.[A�1�-M N Aa-1, / Y'rPa w>..uq Lg
rr
a A -A 4. wuAC A«S -}1 SI Arrrr '+a"rrP NA-� Yrraa�AMRIJnaJIi PJnIM
.n«ala,¢ aleenl aaeine N.a via rrn m .aura non Ir1•ASeao.rLa./ar r
r W b* u••��r• i 1
naiMM atl«IO Oti1a!IP n JRI«tR AW Aleraaa OAO« l OBWM AIM a WAW W"PAVINt tOMM.
waafa tlaM«R aaN Alfa r[/aa nra W 00aa1.
ad utlNawi c«rqa q° W e[w. � Wmu ANA OF 970u "IN"ewrla. • - 4 or car I w1Y f"�GNFi 5 Or t3
a1A1 aMA RPr1«ua Al—IrRLaMPAa-
1 " a
4-Mar-11
Subdivision: Hampton Inn Date of last bond/LOC adjustment: Dec-08
Reduction No. 1 ENR-CC Index for date of last adjustment: 8551
Bond/LOC No. Western Surety Company, Band#70706014 Current ENR-CC Index: 8998
LOC/Bond
Approved LOC/Bond Amt. Amount complete prior Amount of Amount to remain
Item Eng. Est. Prior to Reduction No.1 to Reduction No.1 Reduction No.1 after Red. No.1
Earthwork $34,930.70 $38,423.77 $34,930.70 $38,423.77 $0.00
Parking Lot $250,286.75 $51,286.68 $250,286.75 $51,286.68 $0.00
Storm Sewer $54,725.00 $11„213.79 $54,725.00 $11,213.79 $0.00
Watermain $25,944.00 $5,316.23 $25,944.00 $2,951.56 $2,364.67
Sanitary $31,456.00 $6,445.70 $31,456.00 $5,924.19 $521.51
Landscaping $50,081.22 $10,262.23 $50„081.22 $4,992.31 $5,269.92
Miscellaneous $35.250.00 $7,223.38 $;35,250.00 $7,223.38 $0.00
Totals $482,673.67 $130,171.78 $482,673.67 $122,015.68 $8,156.10
Notes: a) LOC/Bond amt.to be 20% of substantially completed items plus 110%of uncompleted items prior to final acceptance.
b) LOC/Bond reduced to 10%at final acceptance.
c) LOC/Bond amt. to remain is updated based on Engineering News Record-Construction Cost Index
d)Manual input required for cells highlighted in yellow.
Public Infrastructure
Watermain Unit Quantily Unit Price Value
8” DIP Watermain LF 374 $28.00 $10,472.00
Fire Hydrant EA 2 $3,000.00 $6,000.00
8”Valve&Valve Box EA 2 $3,000.00 $6,000.00
Sub-total $22,472.00
Sanitary Sewer
8"PVC Sanitary Sewer, SDR26 LF 56 $26.00 $1,456.00
Manhole,Ty A,4'dia. EA 1 $3,500.00 $3,500.00
Sub-total $4,956.00
Reviewed By: Agenda Item Number
O
Legal ❑ NB #5
isas
eEST. - Finance ❑
Engineer ■
City Administrator F1 Tracking Number
O ill O� Consultant ❑
El PW 2011-19
Agenda Item Summary Memo
Title: 8660 Kennedy Road-Purchase of Right-of-Way
Meeting and Date: March 15, 2011 Public Works Committee
Synopsis: The property owners at 8660 Kennedy Road have agreed to sell a portion of their
property to the city for public right-of-way purposes.
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Approval
Submitted by: Joe Wywrot Engineering
Name Department
Agenda Item Notes:
CIP
O� Memorandum
Esr , 1636 To: Bart Olson, City Administrator
From: Joe Wywrot, City Engineer `.,n�m=
CC: Kathy Orr, City Attorney
�C—
<4E
Date: March 3, 2011
Subject: 8660 Kennedy Road—Purchase of Right-of-Way
Attached find a letter from Attorney Pamela Terry representing Joseph and Ida Mae Reck who
own the property at 8660 Kennedy Road. The Reek property is unincorporated and their property
extends to the centerline of Kennedy Road. We would like to obtain a 40-foot wide parcel from
the Reek's for future Kennedy Road improvements and also the proposed Kennedy Road trail. I
had been communicating with Mr. Reck last fall, and have since learned that their entire property
is for sale. Ms. Terry indicates that the Reek's will sell this ROW parcel to the city for the
amount of$5000.
Also related to this ROW purchase is a storm sewer that Pulte is obligated to construct to drain a
stormwater basin in Autumn Creek. The best alignment for this sewer is along the south side of
Kennedy Road,but Pulte had been unsuccessful in purchasing ROW or obtaining easements
from the Reek's for that purpose. Consequently,the currently proposed storm sewer alignment
is beneath the north half of Kennedy Road which is previously dedicated ROW. This is a more
expensive alignment,however, due to the cost of trench backfill and pavement restoration and is
also disruptive because Kennedy Road would need to be shut down for a couple of weeks to put
in the storm sewer and patch the road. For these reasons, Pulte is willing to work with us to
purchase this ROW parcel. Our informal agreement with Pulte was that if the city could obtain
the Reek's consent to sell the ROW parcel, then Pulte would pay the purchase price(within
reason). Pulte had said, however, that they would prefer to offer improvements to the property
rather than a cash payment.
We had originally offered to remove 3 large trees along the Reek's Kennedy Road frontage since
Joe Reek had said he would like to have them removed, and to perhaps overlay their driveway,
but Ms. Terry was interested in a cash transaction. I have forwarded Ms Terry's letter to Pulte
and they have agreed to fund the ROW purchase.
Please place this on the March 15, 2011 Public Works Committee agenda for consideration.
r
IN
NIP
4 It
ti 1111!1 111
- 111111 fill tis 7
le.-zI-
—
�
„� ' ,
MAR-01-2011 12 :46 PM 6309330729 P. 01
Pamela R. Carp
Attorneys at Law
1749 South Naperville Rd,
Suite 201
Wheaton,IL 60189
Phone (630)933-0638 e-mail Atty.T @sbcglobal.net Fax (630)933-0639
March 1, 2011
Joseph Wywrot
City Engineer
United City of Yorkville
800 Game Farm Rd,
Yorkville, IL 60560
Via Facsimile: 630-553-7575
Re: Reck Estate, 8660 Kennedy Rd., Yorkville
Dear Mr, Wywrot:
Pursuant to our telephone conversation last week I have discussed the matter of the sale of the 40
foot strip of land along the northern edge of the above captioned property with both the listing
Realtor and the Reck's Guardian. As I explained to you the"in kind"trade of the property for
the removal of the three large front trees or the resealing of the driveway are not useful to the
estate. This estate at this time needs financial assets. To that end we wish to begin negotiations
by offering the sale of the 40 foot strip of property for$5000.00. This offer is based upon a
calculation of$0.36 per sq t. for 13,872 sq.ft.(.318 acres)of the above captioned property.
Please review this offer with the City and advised the undersigned of their response. Also,
please be advised that upon the agreement of all parties the Estate is prepared to transfer title
immediately to the City.
If you have any questions or wish to discuss this further please feel free to call our office.
4a ;ul.y erry
cc. L. Warren
D.Foote
Page 1 of 1
Joe Wywrot
From: Bernie Pallardy
Sent: Thursday, March 03, 2011 10:27 AM
To: Joe Wywrot
Cc: Bart Olson; Krysti Barksdale-Noble; 'Kathleen Field Orr'
Subject: RE: Reck property-Kennedy Road ROW acquisition
Joe,as discussed, Pulte will pay for the ROW acquisition.
Bernie
From: Joe Wywrot[mailto:JWywrot @yorkville.il.us]
Sent: Wednesday, March 02, 20113:23 PM
To: Bernie Pallardy
Cc: Bart Olson; Krysti Barksdale-Noble; 'Kathleen Field Orr'
Subject: Reck property - Kennedy Road ROW acquisition
Bernie,
Per our discussion today, attached find a letter from Pamela Terry who is an attorney helping the Reck's liquidate
their estate. Also attached is a plat of dedication that EEI had prepared for this parcel several years ago.
I checked the SSA bond ordinance,which states in Section 1.b that the SSA bonds are to pay for, among other
items, "...storm drainage systems and storm sewers,..."and"...costs for land and easement acquisition relating to
any of the forgoing improvements...". Since this ROW acquisition will allow for the construction of a storm sewer
that will serve Autumn Creek Unit 2, we agree that Autumn Creek SSA bond funds can be used for the
acquisition.
Please confirm that Pulte will pay for this ROW acquisition. Upon receipt of that confirmation, I will contact Ms.
Terry and begin the acquisition process.
Thanks,
Joe Wywrot
Yorkville City Engineer
(630)553-8527
(630)553-3436 fax
(630)878-2021 mobile
?f
m y core .Ti con c_n:i_ t_- t. .:;n. ,.: 1 roc,; 'r,..,s}.nay rEV,ew u-, ..
o ._by c" !rict'i prontt ._d ,o:i h' t.r c_ .rtr trap ct' rror xi:r tha nc i.',r. b7 _
r cc., ;e _r~Tr
3/3/2011
Reviewed By: Agenda Item Number
O
a ,- - -� Legal ❑ NB #6
EST. 1836 Finance ❑
Engineer ■
—�--�� Tracking Number
��i!a City Administrator El cwua Consultant ❑
/�.. Ner�llpur?y PW 2011-20
Agenda Item Summary Memo
Title: Route 126 Relocation at Route 71 —MFT Appropriation Resolution
Meeting and Date: March 15, 2011 Public Works Committee agenda
Synopsis: This MFT appropriation resolution in the amount of$12,488.56 is needed to fund
the city's share of this IDOT project.
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Approval
Submitted by: Joe Wywrot Engineering
Name Department
Agenda Item Notes:
CIP
0 Memorandum
7836 To: Bart rt Olson, City Administrator
From: Joe Wywrot, City Engineer
eW p., CC: Rob Fredrickson, Finance Director '
<LEc;�2 Lisa Pickering, Deputy City Clerk
Date: March 8, 2011
Subject: Route 126 Relocation at Route 71 —
MFT Appropriation Resolution
In 2006 the city entered into a joint agreement with IDOT to fund a portion of their Route 126
relocation project at Route 71. We had asked IDOT to incorporate three general items into the
project, those being streetlighting, emergency vehicle pre-emption, and two watermain casings
for future use. The total city cost was estimated to be $37,950, and at that time we passed an
MFT appropriation resolution in the amount of$19,000 to pay for the streetlighting,pre-emption
equipment, and engineering related to the overall project. In 2007 IDOT invoiced us for the
watermain work and a small amount of streetlighting, and we paid them from our water fund and
MFT fund.
The final city cost for the project is $53,953.56. The cost breakdown is as follows:
Item Original Estimate Final Cost MFT funding Water Funding
Streetlighting $ 6,000.00 $10,778.86 $10,778.86
Pre-emption: $ 8,000.00 $13,672.30 $13,672.30
Signage: $ 1,000.00 $ 0.00 $ 0.00
Watermain casing: $18,000.00 $22,465.00 $22,465.00
15% Engineering: $ 4,950.00 $ 7,037.40 $ 7,037.40
Sub-total: $37,950.00 $53,953.56 $31,488.56 $22,465.00
MFT-eligible work: $31,488.56
MFT appropriation to date: $19,000.00
Required MFT appropriation: $12,488.56
IDOT has now sent us an invoice for the final amount due,but we need to appropriate additional
MFT funds before we can pay the invoice. Therefore, attached find a proposed MFT
appropriation resolution in the amount of$12,488.56 to pay for the balance of the city's share of
IDOT's Route 126 relocation project.
Please place this item on the March 15, 2011 Public Works Committee agenda for consideration.
(t Illinois Department Resolution for Improvement by
Municipality Under the Illinois
of Transportation Highway Code
BE IT RESOLVED, by the City Council of the
Council or President and Board of Trustees
United City of Yorkville Illinois
City,Town or Village
that the following described street(s) be improved under the Illinois Highway Code:
Name of Thoroughfare I Route I Frnm To
Schoolhouse Road IL 126 at IL 71
BE IT FURTHER RESOLVED,
1. That the proposed improvement shall consist of streetlighting and emergency pre-emption equipment
and shall be constructed varies wide
and be designated as Section 06-00033-00-TL
2. That there is hereby appropriated the (additional ® Yes ❑ No) sum of twelve thousand, four hundred and
eighty-eight and 56/100----------------------------------------------- Dollars ( $12,488.56 )for the
improvement of said section from the municipality's allotment of Motor Fuel Tax funds.
3. That work shall be done by contract ; and,
Specify Contract or Day Labor
BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit two certified copies of this resolution to the
district office of the Department of Transportation.
Approved I, Jacquelyn Milschewski Clerk in and for the
United City of Yorkville
City,Town or Village
County of Kendall hereby certify the
Date
foregoing to be a true, perfect and complete copy of a resolution adopted
by the City Council
Council or President and Board of Trustees
Department of Transportation at a meeting on March 22, 2011
Date
IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this
day of
Regional Engineer
(SEAL)
City,Town,or Village Clerk
Printed 3/8/2011 BLR 09111 (Rev. 11/06)
C�Ty Reviewed By: Agenda Item Number
O
Legal ❑ OB #1
EST. - l` 1836 Finance F1
❑Engineer Engi
�- Agenda Item Tracking Number
City Administrator ■
0 Consultant El�W r PW 2011-05
El kE
City Council Agenda Item Summary Memo
Title: Verizon Wireless—Water Tower Lease Agreement
Meeting and Date: PW/January 18, 2011
Synopsis: Revised proposed land lease agreement for a new telecommunications antenna(s) and
equipment installed on a city water tower located at 3099 Lehman Crossing.
Council Action Previously Taken:
Date of Action: 1-18-11 Action Taken: Informational Item
Item Number: PW 2011-05
Type of Vote Required: Majority
Council Action Requested: Approval
Submitted by: Krysti Barksdale-Noble, AICP Community Development
Name Department
Agenda Item Notes:
See attached staff memorandum.
D C/ry Memorandum
To: Public Works Committee
ESUM _ _1836 From: Krysti J. Barksdale-Noble, Community Development Director
CC: Bart Olson, City Administrator
`fax p� Date: March 11, 2011
K ,!, Subject: Verizon Wireless—Water Tower Lease Agreement
♦�kE ��U Proposed Lease Agreement for a new telecommunications antenna
installed on a city water tower at 3099 Lehman Crossing.
Background & Request:
As the Public Works Committee may recall from the January 18th meeting when this
matter was first discussed, Verizon Wireless is requesting to enter into a land lease agreement
with the City of Yorkville for the purposes of installing a new telecommunications antenna
structure and related equipment on the city's water tower located at 3099 Lehman Crossing in
Yorkville.
The water tower, which was constructed in 2004, is approximately 171.58' feet tall and
part of the the Grande Reserve Unit 8 development. Currently, the city has an existing
Supervisory Control and Data Acquisition (SCADA) system antenna on the water tower and
adjacent treatment facility which transmits information to the Public Works control center. All
design elements of the antenna, equipment shelter and other proposed improvements will be
reviewed by the various city departments and will be required to obtain a building permit. An
aerial along with digital photographs of the water tower have been provided for your reference.
Since Yorkville's City Code permits telecommunication towers and antennas to be
located on city-owned, leased or otherwise controlled land without special zoning approval, staff
is providing the proposed lease agreement language for PW Committee review and
recommendation as rental proceeds from the lease will be allocated to the Public Works Capital
Fund.
Proposed Water Tower Lease Agreement:
As proposed, Verizon Wireless will lease a yet to-be-determined area of the property for
the antenna, any needed mounting structures and other related equipment, and access easement
for an initial 5-year lease term with an option for up to three (3) additional 5-year terms for a
total of up to 20 years. Verizon is proposing an annual lease rental rate of$21,600.00 with a
yearly rent increase of two percent (2%). Attached is a redlined copy of the most recent version
of the land lease agreement prepared by Verizon with minor proposed revisions from staff and
the city attorney.
Should the Public Works Committee find the terms of the proposed lease favorable, staff
will present the agreement to the City Council at the March 22nd meeting with a request to
authorize its execution. Representatives from Verizon will be in attendance at Tuesday night's
Public Works Committee meeting to answer any questions.
1
Water Tower
Lease Agreement
1.1 Landlord's Contact Person 1.9 Property
Landlord is the owner of a parcel of
Bart Olson Land(the"Property")located at 3099
800 Game Farm Rd. Lehman Crossing,Yorkville,IL 60560.
Yorkville,IL 60560 The Property is more specifically
described in Exhibit"A",annexed
1.2 Landlord hereto.
United City of Yorkville
800 Game Farm Rd. 1.10 Premises
Yorkville,IL 60560 Landlord hereby leases to and Tenant
leases from Landlord,approximately
1.3 Name and Address for Payment of Rent 15 x 30(450 square feet)of the
Property, comprising a portion of the
United City of Yorkville City-owned elevated water storage
Attn:Bart Olson tower(the"Water Tower")and all
800 Game Farm Rd. access and utility easements,if any(the
Yorkville,IL 60560 "Premises"),as more specifically
depicted on Exhibit`B",annexed
1.4 Landlord's Taxpayer ID hereto.
36-6006169
1,11 Lease
1.5 Property Identification Numbers This Water Tower Lease Agreement,
02-11-300-105 including Exhibits"A"&`B".
1.6 Commencement Date
The first day of the month following the 1.12 Tenant Address
Last to occur of:(i)the execution of this Chicago SMSA Limited Partnership
agreement or(6)the Tenant's
commencement of installation of the d/b/a Verizon Wireless
facility,as defined herein One Verizon Way,Mail Stop
but no later than 4AW 100
December 1,2011. Basking Ridge,New Jersey 07920
Attention:Network Real Estate
1.7 Tenn
Five(5)years with three(3)
additional 1.13 Tenant's Notice Address and Contact
Five(5)year renewal tens;subject to
Paragraph 3. Chicago SMSA Limited Partnership
d/b/a Verizon Wireless
1.8 Rent Durine First Year 180 Washington Valley Road
See Section 4.1 Bedminster,New Jersey 07921
Attention:Network Real Estate
NOC#800-852-2671
1
THIS WATER TOWER LEASE AGREEMENT (the "Lease"), made this _day of
—2011,between The united City of Yorkville,an Illinois municipal corporation,with
an address as stated in Paragraph 1.2, (hereinafter designated "Landlord") and Chicago SMSA
Limited Partnership d/b/a Verizon Wireless,with its principal address as stated in Paragraph 1.12,
hereinafter designated"Tenant"). The Landlord and Tenant are at times collectively referred to
hereinafter as the"Parties"or individually as the"Party".
2:Premises
2.1 Premises. Landlord hereby leases to Tenant a portion of that certain parcel of
property(the entirety of Landlord's property is referred to hereinafter as the"Property"),located
at 3099 Lehman Crossing, Yorkville, IL 60560 and being described as a 15 X 30 parcel
containing 450 square feet together with the non-exclusive right for ingress and egress,seven(7)
days a week twenty-four(24)hours a day, as further described in Paragraph 11 for access and
utility easements (hereinafter collectively referred to as the "Premises") being substantially as
described herein in Exhibit"A"and Exhibit-13"attached hereto and made a part hereof.
3: Term and Options to Extend
3.1 Term. This Lease shall be effective as of the dale of execution by both parties,
provided, however, the initial term shall be for five (5) years and shall commence on the
Commencement Date(as hereinafter defined) at which time rental payments will be due per
Paragraph 4. The Commencement Date is defined as the later of the first(I")day of the month
following: (a)the date this Lease is executed by the parties or: (b)the date Tenant commences
the installation of its Facility,but no later December 1,2011.
3.2 Option to Extend. The teen of this Lease shall be automatically renewable for
three(3)additional tcrms of five(5)years("Renewal Terms")each following the original term or
any renewable term at the annual rental stated below and otherwise upon the same terms and
conditions stated in this Lease.If Tenant desires not to extend any subsequent term of the Lease it
shall give Landlord written notice of its intention not to extend the term at least ninety(90)days
prior to the expiration of the then current term whereupon the Lease shall be deemed canceled
upon the expiration of the then current term. The initial term and all extensions shall be
collectively referred to herein as the"Term".
4:Rent
4.1 Annual Rent. The annual rent for this Lease shall be Twenty-One Thousand Six
Hundred and no/100 Dollars($21,600.00)made payable in monthly installments beginning on the
Commencement Date as defined in Paragraph 3.1(the"Rent"). Rent shall be payable monthly in
advance by the first day of the month to Landlord or to such other person, firm or place as
Landlord may,from time to time,designate in writing at least forty-five(45)days in advance of
any rental payment date by notice given in accordance with Paragraph 22 below. Rent shall in no
event be paid later that the tenth(]0`h)day of that month for the Term. Rent for any fractional
year at the beginning or at the end of the Term or Renewal Term shall be prorated. The parties
acknowledge that the first payment of rent("Initial Rent Payment")shall not be sent to Landlord
until forty-five(45)days after the Commencement Date.
2
4.2 Late Payments. Rent payments made after the tenth(10'h)day of the month of
the Tenn year shall be considered late (hereinafter"Late Payments"). Late Payments shall be
subject to a processing fee of one and one-half percent(1.5%)of the rent then-due per month or
any portion thereof that Rent is received late (the "Processing Fee"), such amount shall not be
considered a penalty but rather an estimation of additional processing costs incurred by Landlord.
Landlord shall, on or before the fifteenth (15'h) of the month after a Late payment is made,
provide Tenant written notice of such late Payment and the Processing Fee amount due. Tenant
shall include payment for the Processing Fee on or before the fifteenth(150i) of the subsequent
month following the written notice. All Rent payments submitted by Tenant shall first be applied
towards the balance of any outstanding Processing Fees and then to the balance of Rent then due
and payable.
4.3 Annual Rent Increase. The annual rent shall increase two percent (2%) on
each anniversary of the Commencement Date for the duration of the term and any renewal term.
4.4 Performance and Payment Bond. Tenant hereby guarantees that its
improvements will be constructed without the attachment of any construction liens and in the
event that any such lien is filed against the Premises on account of Tenant's acts or omissions,
Tenant shall either promptly post a bond (in form and substance reasonably acceptable to
Landlord) indemnifying and defending Landlord for such lien claim or cause such lien to be
removed of record. As additional security for the faithful and prompt performance of its
obligation under this Lease and in lieu of the obligation to post a security deposit,Tenant agrees
to provide Landlord a performance and payment bond in the amount of Fifty Thousand Dollars
($50,000.00) in a form reasonably acceptable to Landlord (the "Security Deposit"). If Tenant
defaults under this Lease, and the default is not cured by Tenant as provided in Paragraph 13,
Landlord may use,apply or retain all or a part of this Security Deposit to compensate Landlord
for any actual loss, damage or expense incurred or suffered by Landlord by reason of Tenant's
incurred default. Prior to Landlord withdrawing the Security Deposit, it shall first give Tenant
written notice of its intention to do so and with that notice shall provide to Tenant written
documentation of the loss,damage or expense for which Landlord seeks compensation from the
Security Deposit. Such notice and documentation shall be provided by landlord to Tenant after
the date of the occurrence which gave rise to Landlord's claimed loss, damage or expense.
Failure to provide such notice and documentations shall result in a waiver by Landlord of the
right to withdraw from the Security Deposit. If the Security Deposit is reduced by Landlord in
accordance with this Paragraph, Tenant shall restore the Security Deposit within forty-five(45)
days after the notice and demand from Landlord. Landlord shall return the Security Deposit to
Tenant or Tenant's assignee within one hundred twenty(120)days after the date of expiration or
termination of this Lease. Nothing, contained herein shall be construed to limit Landlord's
damages to the amount of the Security Deposit.
4.5 Location for Payment. Rent shall be paid to Landlord at the Address for
Payment of Rent in Paragraph 1.3 or to another person, firm or place which the Landlord may
from time to time designate in writing at least forty-five(45)days in advance of a rent payment
date.
4.6 Landlord's Legal Fees. Within sixty (60) days after full execution of this
Lease,Tenant shall reimburse Landlord for Landlord's attorneys'fees associated with reviewing
this form of Lease. Notwithstanding the foregoing said reimbursement shall not exceed Two
Thousand and no/100 Dollars($2,000.00)and shall be contingent on Landlord providing Tenant
with a line item invoice evidencing said fees, redacted to protect any attorney-client privileged
communication.
3
5: Use of Property
5.1 Use. Tenant may use the Property only for Tenant's lawful telecommunications
purposes as well as for related site preparation, improvements and maintenance purposes in
accordance with local rules and governmental regulations, and such use shall not interfere with
Landlord's use of the Property (i.e., if Tenant is making improvements to the Property, Tenant
cannot place equipment or materials in such a manner as to block Landlord's access). Tenant
may not perform or permit to be performed any advertising or signs(unless required by the FCC
or other governmental entity from or on the Tenant's Facilities.
5.2 Construction
A. Improvements. Tenant may install an antenna structure (including a
mounting structure and equipment) directly affixed to the Water Tower of which the
Premises comprises a portion, together with antennas, equipment (including antenna
mounting structures and equipment), an equipment shelter, equipment cabinets and other
enclosures, fencing, equipment, other personal property, fixtures, cables, pipes, conduits,
transmission lines, and utilities; and make any other improvements,subject to the conditions
and approval of the Landlord as provided in this Article, said improvements herein
collectively referred to as the "Facility" and as depicted in Exhibit A and B attached hereto.
Tenant shall have the right to mount up to twelve (12) antennas. Tenant may from time to
time replace any of these items with new or like-kind items(similar in size and character with
then-existing Tenant equipment) with the same or different specifications so long as their
installation is otherwise in compliance with the Lease and applicable laws, ordinances and
codes.
B. Tenant shall not construct/install Tenant's Facility without receipt of a building
permit issued by the Landlord. Prior to execution of this agreement and issuance of building
permit,Tenant shall submit Tenant's construction and antenna drawings to Landlord as depicted
in Exhibit"B"attached hereto to sign off and approve the construction and antenna installations.
Landlord shall review such drawings within twenty-five (25)business days of receipt of plans.
Within thirty (30) days from the date of completion of all construction activity (or as soon as
possible thereafter weather conditions permitting),whether upon installation or later maintenance,
repair and replacement,Tenant shall restore or cause to be restored to the reasonable satisfaction
of Landlord,the Premises and other affected areas of the Property, including without limitation
any and all landscaping,as nearly as may be,to the same condition or to a condition better than
that which existed immediately prior to the commencement of such activities by Licensee.
6:Tenant's Installation
6.1 Improvements. Without obtaining Landlord consent,Tenant may from time to
time replace Tenant's Facilities with new or like-kind items (similar in size and character with
then-existing Tenant equipment)but no additional,items with the same or different specification
("Improvements") so long as their installation is otherwise in compliance with this Lease,
applicable laws,ordinances and Codes. Tenant's installation of Improvements shall not interfere
with Landlord's use of the Property. Tenant agrees to obtain Landlord's consent prior to making
any penetration of the walls of the Water Tower in connection with Tenant's installation of
equipment on the Water Tower.
4
6.2 Workmanlike Construction. Tenant agrees that the installation and any
subsequent Improvements shall be completed in a neat workmanlike condition and consistent
with good engineering practices. All costs of the installation, including, but not limited to,the
cost of bringing electrical service to Tenant's equipment by directional boring or by open
trenching in the event any unforeseen conditions are encountered during the underground boring
process, will be paid by the Tenant. Tenant agrees to work in good faith with the appropriate
utility companies to install all utilities, where it is possible, underground within the easement
areas designated in Exhibit B.
6.3 Title to Various Items.— The Tenant shall at all times be the sole and exclusive
owner of Tenant's Facilities. All of Tenant's Facilities shall remain Tenant's personal property
and are not fixtures.
6.4 Utilities. Tenant shall pay for the electricity it consumes in its operations at a
rate charged by the servicing utility company.Tenant shall have the right to draw electricity,by
separate meter or by sub meter, and other utilities from the existing utilities on the Property or
obtain separate utility service from any utility company that will provide service to the Property
(including a standby power generator for Tenant's exclusive use only in the event of power loss at
the Property and for periodic testing as necessary to ensure proper function of said generator).
Landlord agrees to sign such documents or easements as may be reasonably required by said
utility company to provide such service to the Premises,including the grant to Tenant or to the
servicing utility company at no cost to the Tenant,of an easement in,over across or through the
Land as required by such servicing utility company to provide utility services as provided herein
. The parties agree that the easements granted to Tenant at the full execution of this Lease are as
depicted as listed in the survey attached to Exhibit B.
6.5 Approvals. Tenant's work shall be completed in accordance with all applicable
building codes and will conform to all applicable governing codes, ordinances, and approved
plans.Tenant undertakes full and complete responsibility at all times hereafter for the expenses
of, and quality of, construction and compliance with all code requirements and regulations of
governmental authorities having jurisdiction over the construction, including but not limited to
compliance with acts effecting construction of public buildings and service areas used by public
employees,and Tenant agrees to remedy or correct any deficiencies with such compliance. The
constructions shall be processed pursuant to permit and conducted by authorized and licensed
personnel and shall be performed in compliance with local and State requirements for
construction activities upon public property. The construction work shall proceed without
interference or disruption,or minimalization of same,to the current operations of the Landlord.
6.6 Liens. Tenant shall: (A)pay before delinquency all costs and expenses of work
done or caused to be done by Tenant in the Premises;(B)keep the title to the Tenant's Facilities
and every part thereof free and clear of any lien or encumbrance in respect of such work;and(C)
indemnify and hold harmless Landlord against any claim, loss, cost, demand (including
reasonable legal fees), whether in respect of liens or otherwise, arising out of the supply of
material,services,or labor for such work. Tenant shall notify Landlord of any lien,claim of lien,
or other action of which Tenant has or reasonably should have knowledge and which affects the
title to the Tenant's Facilities or any part thereof,and shall cause the same to be removed within
thirty(30)days(or such additional time as Landlord may consent to in writing),either by paying
and discharging such lien or by posting a bond or such other security as may be reasonably
satisfactory to the Landlord. If Tenant shall fail to remove same within with said time period;
5
Landlord may take such action as Landlord deems necessary to remove the same and the entire
cost thereof shall be immediately due and payable by Tenant to Landlord.
7: Taxes
Tenant shall be solely responsible for and shall timely pay all taxes levied and assessed
against its use of the Premises including real estate taxes levied and assessed against its leasehold
estate. Tenant shall not be responsible for any real estate, special assessments or similar taxes
relating to the Property except to the extent permitted by statute. Tenant shall have the right,at
its sole option and at its sole cost and expense,to appeal,challenge or seek modification of any
tax assessment or billing for which is wholly or partly responsible for payment. If Landlord
receives notice of any personal property or real property tax assessment or bill against Landlord,
which may affect Tenant and is directly attributable to Tenant's installation, Landlord shall
provide timely notice of the assessment to Tenant sufficient time to pay said tax assessment or to
allow Tenant to consent to or challenge such assessment, whether in a court, administrative
proceeding,or other venue,on behalf of Landlord and/or Tenant.
8: Tenant Indemnification
4— '.': ,a �Tenant hereby agree to indemnify,defend and hold e° ,he Landlord
harmless from and against any claim of liability or loss from personal injury or property damage
in connection with the Property or resulting from or arising out of the use and occupancy of the
Property by the iademHit.•:.., paftyTenant or its agents, excepting, however, such claims or
damages as may be due to or caused by the negligent acts or omissions of the indemnified party
or its agents. Neither paFtyThc Tenant Shall have any obligation under this Paragraph 8 unless
notified in writing of any such claim or loss within sixty(60)business days of receipt by the OdWF
paFtyLandlord of notice of such claim or loss.
9: Insurance
9.1 Requirements. During the Term and Renewal Term of this Lease,Tenant shall
carry and maintain commercial general liability insurance, naming the Landlord, its officers,
agents, employees and volunteers as additional insured, insuring against liability for injury to
persons or property occurring in or about the Property and Premises or arising out of the
ownership,maintenance,use or occupancy thereof. Coverage under such policy shall be no less
than two million ($2,000,000.00) per occurrence for personal injuries and no less than five-
hundred thousand ($500,000.00) per occurrence for property damage or three million
($3,000,000.00) combined single limit coverage for bodily injury and property damage. In
addition, Tenant shall carry and maintain workers' compensation insurance in the statutory
amount throughout the term of this Lease. Tenant shall provide Landlord with a certificate of
insurance evidencing such coverage required by this Paragraph 9.1 within fifteen(15)days of the
Commencement Date. Further,each certificate of insurance shall require no less than thirty(30)
days written notice to each additional insured prior to cancellation(10 days notice shall apply to
non-payment).
9.2 Non-Waiver. Under no circumstances shall the Landlord be deemed to have
waived any of the insurance requirements of this Agreement by: (A) allowing any work to
commence before receipt of certificates of insurance or additional insured endorsements;(B)by
failing to review any certificates or documents received; or(C) by failing to advise the Tenant
that any certificate of insurance fails to contain all of the required insurance provisions or is
otherwise deficient in any manner. The Tenant agrees that the obligation to provide the insurance
6
required by these documents is solely Tenant's responsibility and that Tenant's obligations cannot
be waived by any act or omission of the Landlord.
10. Landlord's Representations
In order to induce Tenant to enter into this Lease, Landlord covenants, represents and
warrants,as of the date of this Lease and throughout its Term,as follows:
10.1 Authority. Landlord is the owner of Property in fee simple. Landlord has full
authority to execute, deliver and perform this Lease and there is no mortgage affecting this
Property. Landlord asserts that it is the owner of the Water Tower.
10.2 No Condemnation. Landlord has received no actual or constructive notice of
any condemnation or eminent domain proceedings or negotiations for the purchase of the
Property,or any part instead of condemnation.
10.3 No Unrecorded Liens. Landlord has not performed and has not caused to be
performed any work on the Property during the six �6) months preceding the date of this Lease
which could give rise to any mechanic's or material men's liens.
10.4 Rights Upon Sale: Should the Landlord, at any time during the term or any
extension tern of this Lease,decide to sell that portion of the Property containing the Premises to
a purchaser other than Tenant,condemnation as stated in Paragraph 14 excluded,such sale shall
be under and subject to this Lease and Tenant's rights hereunder,and any sale by the Landlord of
the portion of the Property underlying the easement granted herein shall be under and subject to
the right of the Tenant in and to such easement,
11: Easements
11.1 Access. For the Term and Renewal Terms of this Lease, Landlord grants to
Tenant, and its agents, employees, contractors, guests and invitees, a non-exclusive right and
easement for pedestrian and vehicular ingress and egress across that portion of the Property
described in Exhibit'B".Tenant and its authorized representatives shall have the right of ingress
and egress to and from the Property and Premises twenty-four(24)hours a day,seven(7)days a
week, subject to the terms and conditions provided herein, on foot or motor vehicle, including
trucks across a twenty(20)foot wide non-exclusive access easement extending from the nearest
public right-of-way to the demised Premises and for the installation and maintenance of utility
wires, poles, cables, conduits, and pipes under or along a separate eight (8) foot wide non-
exclusive utility easement, to the demised Premises as shown on Exhibit B, subject to the
Landlord's right to relocate the aforementioned access easement at Tenant's cost. In the event
that Landlord requires relocation of said access,Landlord agrees that Tenant shall have the right
of access to the Facility during the period of said relocation. Tenant agrees to work in good faith
with the appropriate utility companies to install all utilities, where it is possible, underground
within the easement areas designated in Exhibit B.
Notwithstanding the foregoing,Tenant shall have access to the Premises at no charge
between the hours of 7:00 AM and 3:30 PM Monday through Friday ("Normal
Working Hours")for the purpose of installing,repairing,replacing and maintaining the
Facility (as defined herein) on said Water Tower. In the event of an emergency
7
regarding the operation of Tenant's Facility at the Premises that requires Tenant access
to the Water Tower outside of Normal Working Hours Tenant shall have the right of
access subject to payment of a fee to Landlord. If Tenant accesses the Tower outside
of Landlord's Normal Working Hours or on a holiday recognized by Landlord,Tenant
shall contact Landlord for access and agrees to reimburse Landlord for its actual
contractual personnel incurred directly as a result of Tenants outside of Normal
Working Hours access to the Premises. The parties acknowledge that the minimum fee
for such access shall be$75.00 per hour for access outside of Normal Working Hours
when such access occurs on a non-holiday. The parties acknowledge that the minimum
fee for such access shall be $100.00 per hour for access outside of Normal Working
Hours when such access occurs on Landlord's designated holiday. Tenant agrees that
there shall be a minimum charge equal to 2 hours for any such instance where access
outside of Normal Working Hours is necessary.
It is agreed,however,that only authorized engineers,employees or properly authorized
contractors of Tenant or persons under their direct supervision will be permitted to
enter said Premises.
11.2 Modifications. If subsequent to the date of this Lease it is reasonably
determined by Tenant that any access or utility easement obtained does not or no longer
adequately serves the Premises and Tenant's use thereof, Landlord agrees to cooperate with
Tenant to relocate such Easements where practical at Tenant's sole cost and expense. In the
event the Landlord is unable to relocate any of the necessary Easements,then at Tenant's option
this Lease may be terminated upon thirty (30) days' prior written notice to Landlord.
Notwithstanding anything to the contrary contained herein,Tenant shall be required to restore the
Location of the prior easement to its original condition,reasonable wear and tear excepted within
30 days.
12: Assignment
12.1 By Tenant. This Lease may be sold, assigned, subleased or transferred by the
Tenant without any approval or consent of the Landlord to the Tenant's principal, affiliates,
subsidiaries of its principal;to any entity which acquires all or substantially all of Tenant's assets
in the market defined by the Federal Communications Commission in which the Property is
located by reason of a merger,acquisition or other business reorganization;or to any entity which
acquires or receives an interest in the majority of communication towers of the Tenant in the
market defined by the Federal Communications Commission in which the Property is located. As
to other parties,this Lease may not be sold,assigned,subleased or transferred without the written
consent of the Landlord.
12.2 By Landlord. Landlord may assign this Lease upon written notice to Tenant,
subject to the assignee assuming all of Landlord's obligations herein.
13: Defaults
13.1 By Tenant. In the event of default under this Lease by Tenant,Landlord shall be
entitled to remedies as shall then be provided by law except that Landlord shall not be entitled to
remove any personal property(including fixtures)on the Property;and provided that prior to,and
as a condition precedent to, the exercise of any remedy, Landlord shall give to Tenant written
notice of default to Tenant and the nature of the default and Tenant shall have thirty (30)days
(or,if the default cannot be cured within thirty(30)days,a longer period as shall be necessary to
8
cure the default, acting with due diligence), after receipt of the notice within which to cure the
default,during which period no remedy shall be pursued. If Tenant fails to cure a default within
the period stated above, in addition to any other remedies available to Landlord, the Landlord
may then,but not before,elect to commence eviction proceedings.
13.2 By Landlord. If Landlord defaults in any of its obligation under this Lease, in
addition to any remedies available at law or equity, Tenant may perform Landlord's obligation
and may offset from the rent or any other amounts next payable Tenant's costs and expenses of
doing so. Notwithstanding anything else in this Lease, Tenant may defer payment of rent
including the first rent payment, during any period in which Landlord is in default in any of its
obligations under this Lease;has failed to provide or execute or cause to be provided or executed
(A) any document reasonably necessary for Tenant's use of the Property in the manner
contemplated excluding a building permit when Tenant is not in compliance with the regulations
for that permit, (B) any license, or (C) any document reasonably necessary to obtain any title
insurance or there necessary or desirable insurance or consent. Notwithstanding the foregoing,in
the event of a default under this Lease,Tenant shall give to Landlord written notice of the default
specifying the nature of the default and Landlord shall have thirty (30) days (or, if the default
cannot be cured within thirty(30)days,a longer period as shall be necessary to cure the default,
acting with due diligence), after the receipt of the notice within which to cure the default. If
Landlord fails to cure a default,in addition to any other remedies available to Tenant,the Tenant
may elect to terminate this lease.
14: Condemnation
In the event of any condemnation of the Property,Tenant may terminate this Lease upon
fifteen(15)days written notice to Landlord if such condemnation may reasonably be expected to
disrupt Tenant's operations at the Premises for more than forty-five(45)days.Tenant may on its
own behalf make a claim in any condemnation proceeding involving the Premises for losses
related to the antennas,equipment,its relocation costs and its damages and losses(but not for the
loss of its leasehold interest).Any such notice of termination shall cause this Lease to expire with
the same force and effect as though the date set forth in such notice were the date originally set as
the expiration date of this Lease and the parties shall make an appropriate adjustment as of such
termination date with respect to payments due to the other under this lease.
15: Casualty
In the event the Property is or Tenant's Facilities are destroyed or damaged in whole or in part by
casualty during the Term or Renewal Terms of this Lease then,at Tenant's option(exercised by notice to
Landlord),this Lease may be terminated as of the date of the event or at any time within ninety(90)days
thereafter and no further rent shall be due under the termination section or any other section of this Lease.
For the purposes of this section,casualty shall be defined as such damage as may reasonably be expected to
disrupt LESSEE'S operations at the Premises for more than ninety(90)days.
16:Quiet Enjoyment
Landlord covenants and agrees that upon payment by the Tenant of the rent under this
Lease and upon the observance and performance of all the covenants, terms and conditions on
Tenant's part to be observed and performed,Tenant shall peaceably and quietly hold and enjoy
the property, the right, and privileges granted for the term demised without hindrance or
interference by Landlord or any other person and Landlord shall perform all of its obligations
under this Lease.
9
17: Termination
17.1 By Tenant. In addition to termination as a result of action or inaction pursuant
to other parts of this Lease,Tenant may terminate this Lease: (A)at any time for any reason upon
sixty (60) days written notice to Landlord and payment of six (6) month's rent, or (B)
immediately, without payment of any rent not yet due following written notice to Landlord of
either(i) Tenant's inability to secure necessary governmental approvals and/or Tenant has lost,
been denied,or has had cancelled,withdrawn or terminated said approvals,or if Tenant fails to
satisfy any necessary governmental authorization or radio engineering criteria to use the Property
as contemplated in this Lease; or (ii) Tenant's having obtained a soil test which shows
contamination to building conditions which in Tenant's judgment are unsuitable for Tenant's
purposes; or (iii) Tenant is unable to occupy and utilize the Premises for the use stated in
Paragraph 5.1 above due to an action of the FCC, including without limitation, a take-back of
channels or change in frequencies;or(iv)Tenant determines that the Premises are not appropriate
for its operations for technological reasons,including without limitation,signal interference.
17.2 By Landlord. Landlord may terminate this Lease following a determination by
an applicable federal governing body (which collects data using appropriate instruments which
are properly calibrated)that the power density levels emitted from Tenant's equipment located on
the Property exceed guidelines established by the Federal Communications Commission
("FCC"),at points accessible to and intended for the general public and the inability of Tenant to
bring its equipment into compliance with such standard within sixty (60)days after receipt of a
written copy of Landlord's engineering findings;or,if Tenant abandons the leased Premises for a
period of twelve(12)consecutive months_
Landlord may also terminate this Agreement at any time following the second Renewal
Term and provided that Landlord provides not less than three hundred sixty-five (365)
days notice to Tenant, if Landlord 4 determines, in its sole discretion and for any reason to
discontinue use of and to dismantle the water tower,provided,that Lessee at its option shall be
permitted to continue its occupancy and use of the premises until not less than thirty days prior to
the scheduled demolition date of the water tower, unless the Lessee's continued use of the
premises would create a compelling health, safety or welfare issue. In the event that notice of
termination is provided pursuant to this paragraph and it is conclusively determined by the parties
that Lessee's continued use of the premises would create a compelling health safety or welfare
issue.then Lessor agrees that it shall permit Lessee to install a temporary installation(cellular on
wheels facility or similar temporary installation as mutually agreed by the Parties) the
Property for a period of one year following the discontinued use and dismantling of f the
water tower.
Landlord may also terminate this Agreement if it determines at any time following the
first Renewal Term,—after review by an independent third-party licensed structural engineering
firm,that the dei+efwater tower is structurally unsound due to the age of the structure,damage or
destruction of all or part of the water tower from any source,o-other.c,.ter -elating to the safe
eandi en of the dome—and or water tower, or compelling health, safety or welfare reasons,
provided that there are no alternative solutions, but to require the removal of the antenna
facilities. In the event that Landlord elects to terminate pursuant to this paragraph, it shall
allow Tenant to install a temporaa installation (cellular on wheels facility or similar
temporary installation as mutually aweed by the Parties)on the Property for a period of one
year followine receipt of notice of termination from Landlord. , Formatted:Font:11 pt,No underline
10
17.3 Removal of Equipment. Upon the expiration of this Lease, or its earlier
termination or cancellation for any reason,Landlord may request Tenant, at its sole expense,to
remove the Property all or any part of its antennae,antenna structures,transmitting and receiving
equipment, transmitting lines, shelter, sidewalks and foundations below grade level, other
personal property,fixtures and other improvements. Tenant shall be required to remove its access
road unless Landlord then desires that it will remain,in which case Tenant shall not be required to
remove any portion of the access road. Tenant shall have up to ninety (90) days after the
effective date of the expiration, termination, cancellation to complete removal of all items. If
Tenant requires any additional time after the ninety(90) day period,Tenant shall pay Landlord
the then current monthly rent(or in the case of annual rent one-twelfth of the annual rental) in
advance for each thirty (30) day period or portion thereof Tenant requires to complete the
removal. All of Tenant's Facilities for which Landlord does not request removal shall become
the personal property of the Landlord and shall be conveyed al the termination of the Lease by a
duly-executed bill of sale.
18:Cooperation
Landlord agrees to cooperate with Tenant in any efforts by Tenant to secure any
governmental permits necessary to use the Property as contemplated in this Lease,and to join in
any application or other document reasonably requested by Tenant within ten (10) days of
Tenant's written request. At any time after the date of this Lease or the Commencement Date,
either party shall execute or cause to he executed any documents,or take or cause to be taken any
actions,reasonably necessary to carry out the intent of this Lease.
19:Lease Construction
This Lease shall be construed in accordance with the laws of the State of where the
Property is located. In the event that any provisions of this Lease are legally unenforceable,the
other provisions shall remain in effect.
20: Entire Binding Understanding;No Oral Modification
All prior understandings and agreements between the parties are merged into this Lease
and this Lease may not be modified orally or in any manner other than by an agreement in writing
signed by both parties. Presentation of this Lease by Tenant to Landlord shall not constitute an
offer unless the Lease has been signed by Tenant, and this Lease shall not be binding until
executed by both Landlord and Tenant.
21: Successors;Separability
Subject to the provisions regarding assignment, this Lease shall be binding upon, and
inure to the benefit of,the successors-in-interest and permitted assigns or subtenant of the parties
and any grantee of Landlord,but only in accordance with the terms of paragraph 12.
22: Notices
All notices hereunder must be in writing and shall be deemed validly given if sent by
certified mail,return receipt requested or by commercial courier,provided the courier's regular
business is delivery service and provided further that it guarantees delivery to the addressee by
the end of the next business day following the courier's receipt from the sender,addressed as
11
follows(or any other address that the Party to be notified may have designated to the sender by
like notice):
Landlord: United City of Yorkville
800 Game Farm Rd.
Yorkville,IL 60560
Tenant: Chicago SMSA Limited Partnership/b/a Verizon Wireless
180 Washington Valley Road
Bedminster,New Jersey 07921
Attention:Network Real Estate
Notice shall be effective upon actual receipt or refusal as shown on the receipt obtained
pursuant to the foregoing.
23:Performance
Time is of the essence in this lease.
24: Broadcast Interference
24.1 Definition. As used in this Lease "interference" with a broadcasting activity
means;
(A) Interference within the meaning of the provisions of the recommended
practices of the Electronics Industries Association (`EIA") and the rules and
regulations of the Federal Communications Commission ("FCC")then in effect,
or
(B) A material impairment of the quality of either sound or picture signals on a
broadcasting activity as may be defined by the FCC at any hour during the period
of operation of activity, as compared with that which would be obtained if no
other broadcaster were broadcasting from the Property or had any equipment on
the Property,
24.2 Interference.
(A) Tenant shall operate Tenant Facilities in a manner that shall not cause
physical, mechanical, radio frequency or signal interference to Landlord and
other tenant.-,or licensees of the Property,provided that their installation predates
the execution of this Lease. All operations by Tenant shall be in compliance with
all FCC requirements.
(B) Subsequent to the installation of the Tenant Facilities, Landlord shall not
permit itself,its tenants or licensees to install new equipment on the Property if
such equipment is likely to cause physical,mechanical,radio frequency or signal
interference with Tenant's operations. Such interference shall be deemed a
material breach by Landlord, for which there is no adequate remedy at law,
allowing Tenant the right to specifically enforce the provisions of this paragraph
in a court of competent jurisdiction. In the event interference occurs,Landlord
agrees to take all reasonable steps necessary to eliminate such interference in a
12
reasonable time period. Landlord shall have the right to install equipment that is
in compliance with all FCC standards and regulations.
(C) Intentionally omitted.
(D) Tenant's equipment must accept any interference caused by and may not
cause any interference to the operation of any ex-i public safety equipment
such as police,fire department and 911 dispatches.
25: Environmental Matters
25.1 Definition. For purposes of this Lease:
(A) "Applicable Environmental Laws" includes the Comprehensive
Environmental Response,Compensation,and Liability Act,and so called"Super-
fund" or "Super-lien" law, or any other Federal, state or local statute, law,
ordinance, code, rule, regulation, order or decree regulating, relating to, or
imposing liability or standard of conduct concerning any hazardous, toxic or
dangerous waste,substance or material,as now or at any time hereafter in effect.
(B) "Hazardous Material" includes any hazardous, toxic or dangerous waste,
substance or material as that term is defined in Applicable Environmental Laws.
25.2 No Hazardous Material. Neither the Landlord nor, to the best knowledge of
Landlord, any other person has ever caused or permitted any Hazardous Material to be placed,
held, located or disposed of on,under or at the Property or any part thereof nor any part thereof
has ever been used by the Landlord, or to the best knowledge of the Landlord, by any other
person either as a permanent or temporary dump site or storage site for any Hazardous material.
25.3 Tenant's Indemnity. Tenant indemnifies the Landlord and agrees to hold the
Landlord harmless from and against any and all losses, liabilities, damages, injuries, costs,
expenses and claims of any and every kind whatsoever paid,incurred or suffered by or asserted
against Landlord,for with respect to,or as a direct or indirect result of,the presence on or under,
or the escape, seepage, leakage, spillage, discharge, emission, discharging or release from the
Property or into or upon any land,the atmosphere,or any watercourse,body of water or wetland,
of an Hazardous Material(including,without limitation,any losses,liabilities,damages,injuries,
costs,expenses or claims asserted or arising under applicable Environmental Laws)caused by or
in control of Tenant or its employees or agents.Tenant will be responsible for all obligations of
compliance with any and all environmental and industrial hygiene laws, including any
regulations, guidelines, standards, or policies of any governmental authorities regulating or
imposing standards of liability or standards of conduct with regard to any environmental or
industrial hygiene conditions or concerns as may now or at any time hereafter be in effect,that
will be in any way related to activity proposed to be conducted in,on,or in any way related to the
Tenant improvements,unless such conditions or concerns were or are caused,in whole or in part,
by the specific activities of Landlord.
25.4 Landlord's Indemnity. In all other cases,Landlord indemnifies the Tenant and
agrees to hold the Tenant harmless from and against any and all losses, liabilities, damages,
injuries, costs expenses and claims of any and every kind whatsoever paid, incurred or suffered
by or asserted against Tenant for,with respect to,or as a direct result of,the presence on or under,
13
or the escape seepage, leakage, spillage, discharge, emission, discharging or release from the
Premises or into or upon any land,the atmosphere,or any watercourse,body of water or wetland,
of any Hazardous Material (including, without limitation, any losses, liabilities, damages,
injuries, costs, expenses or claims asserted or arising under Applicable Environmental Laws)
caused by or in control of Landlord.
25.5 Survival. The provisions of and undertakings and indemnification set out in this
Section shall survive the termination of this Lease.
26: Waiver of Landlord's Lien
Landlord waives any lien rights it may have concerning the Tenant Facilities which are
deemed Tenant's personal property and not fixtures,and Tenant has the right to remove the same
at any time without Landlord's consent.
27: Memorandum of Agreement
Landlord acknowledges that a Memorandum of Agreement will be recorded by Tenant in the
official's records of the County where the Property is located. Landlord agrees to execute said
Memorandum of Agreement upon request by Tenant.
28: Consent
In any case where approval or consent of one party hereto is required, requested or
otherwise to be given under this Lease, such party shall not unreasonably delay or withhold its
approval or consent.
29:Tower Compliance
Landlord covenants that it will keep the Water Tower in good repair as required by all
Laws (as defined in Paragraph 30 below). The Landlord shall also comply with all rules and
regulations enforced by the Federal Communications Commission with regard to the lighting,
marking and painting of towers.Upon written notification by the Tenant,if the Landlord fails to
make such repairs within a reasonable time,the Tenant's sole remedy shall be to exercise its right
to terminate the lease in accordance with the terms of paragraph 17 of this agreement.
No materials may be used in the installation of the antennas or transmission lines that will
cause corrosion or rust or deterioration of the Water Tower structure or its appurtenances.
All antenna(s)on the Water Tower must be identified by a marking fastened securely to its
bracket on the Water"Lower and all transmission lines are to be tagged at the conduit opening where
it enters any user's equipment space.
Not later than fifteen (15) business days following the execution of this Agreement,
Landlord shall supply to Tenant copies of all structural analysis reports that have done with respect
to the Water Tower and throughout the Term, Landlord shall supply to Tenant copies of all
structural analysis reports that are done with respect to the Water Tower promptly after the
completion of the same.
Upon request of the Landlord on two occasions total during the Initial Term and any of the
Renewal Terms,Tenant agrees to relocate its equipment on a temporary basis to another location on
14
the Property, hereinafter referred to as the "Temporary Relocation," for the purpose of Landlord
performing maintenance,repair or similar work at the Property or on the Water Tower provided:
a. The Temporary Relocation is similar to Tenants existing location in size and is
fully compatible for Tenant's use. in Tenant's reasonable determination; and shall
be subject to City's prior approval. which approval shall not be unreasonably
withheld;
b. Tenant agrees to pay all costs associated with the first relocation and pay one-half
(1/2)of all costs associated with the second instance where Temporary Relocation
and reinstallation of equipment on the Water Tower is necessary and required by
Landlord. For all other subsequent requests for Temporary Relocation, Tenant
approval to relocate shall be required and Landlord shall pay all costs incurred by
Tenant for relocating Tenant's equipment to the Temporary Relocation and
improving the Temporary Relocation so that it is full)- compatible for the Tenant's
use,in Tenant's reasonable determination;
c. Landlord gives Tenant at least ninety (90) days written notice prior to requiring
Tenant to relocate;
d. Tenant's use at the Premises is not interrupted or diminished during the relocation
and Tenant is allowed,if necessary,in Tenants reasonable determination,to place a
temporary installation on the Property during any such relocation;and
e. Upon the completion of any maintenance, repair or similar work by Landlord,
Tenant is permitted to return to its original location from the temporary location.
30:Applicable Laws
During the Term,Landlord shall maintain the Property in compliance with all applicable
laws,rules,regulations,ordinances,directives,covenants,easements,zoning and land use
regulations,and restrictions of record,permits,building codes,and the requirements of any
applicable fire insurance underwriter or rating bureau,now in effect or which may hereafter come
into effect(including,without limitation,the Americans with Disabilities Act and laws regulating
hazardous substances)(collectively"Laws"). Tenant shall,in respect to the condition of the
Premises and at Tenant's sole cost and expense,comply with(a)all Laws relating solely to
Tenant's specific and unique nature of use of the Premises(other than general office use);and(b)
all building codes requiring modifications to the Premises due to the improvements being made
by Tenant in the Premises.
(Signatures on next page)
IN WITNESS WHEREOF, the parties hereto have set their hands and affixed their
respective signatures the day and year first written above:
15
LANDLORD TENANT
B
Chicago SMSA Limited
Partnership d/b/a Verizon
Wireless
By:Cellco Partnership,its General
Partner
Name:
Title:
Date:
By:
Beth Ann Drohan
Area Vice President Network
Date:
16
Exhibit A
Description of Property
(see attached)
Exhibit B
17
Depiction of Premises
(see attached)
18
' 1 V y �• V ' r (1)
Lu
J
W W Fr •�
W w V W W EXISTING GRASS D 2a <a
W W EXISTING GRASS AREA W V W W �—
AREA
'N'A3B'PRSOO7HE PVLLSCAIE � 00
PORMAT.ANYSMOTHEKTKAK J Top
SVMEV / EXISTING GENERATOR ON THAT LR AT REDUCED
SOME Opp61
CONCRETE SLAB L m(m
PROPOSED 4'WIDE / / \\ + o 1 010
CONCRETE SIDEWALK EXISTING STORAGE WATER TANK 8 =
(TYP.) y 9\
aEXISTING TRAIN
TRACK
PROPOSED 8'UTILITY >�n M
m m
EASEMENT 0-y ..
W W PROPOSED LEASE SITE , w w w J• J (0 D°d UL
w (2(Y x 36')SEE SHEET G7 W + w +
W w tL
PROPOSED LESSEE ANTENNAS ' I EXISTING BUILDING
MOUNTED ON PROPOSED POD " W
MOUNT ASSEMBLY ON I I EXISTING TELCO PEDESTAL
EXISTING 17Tt HIGH WATER #7012M
0
TOWER @ 179'A.G.L. � I EXISTING TRANSFORMER
#471114A1 ON CONCRETE PAD
W W 1
EXISTING CONCRETE
W W W
SIDEWALK W Y Z " " W w I j C.
J w W W W I I (no w W W W W
EXISTING FENCED y w + W w o a W W v
COMPOUND LU W W I I W W W V
0 EXISTING GRASS' W W o m
0. w w AREA PROPOSED 20'WIDE j 9 W
W w w W w W W ACCESS EASEMENT
W W Ul
N " W W W W w W j EXISTING ACCESS ASPHALT DRIVE J
Cox
EXISTING DOUBLE SWING
ENTRY GATE
ASSUMED PROPERTY LINE
W W
W W W V 2
EXISTING GRASS W W
AREA w + W W W W
W W Y W W
W W W W V
w w w W w W w J LOC#2250598
WEST OSWEGO
w W ' W W
U)
3099 LEHMAN CROSSING
U YORKVILLE,IL 60560
Z
Q
g
w
J
ORAYVN BY LS
CHECKEO BY OM
•i I All DLL F^,'—
DATE 1213/10
U800)092-0723
L+isa'YL.2a-,
PROJECT Y• 33411
BERRYWOOD LN
(i SHEET TITLE
—�— BERRYW OOD LN
LOCATION PLAN
ni�ecreeE
YOU OJG --
t<800 92-012] SHEET NUMBER
48 HDLRS BEFORE
YOU DIG
LP
i lz Lu Lu
Lu
6 PSSUoEO
EXISTING CHAIN
LINK FENCE
/
-� J ��0 00
3o0 a
01
/ \ N v\I\
W m�00
PROPOSED 8'UTILITY 0'13.E x
N \ EASEMENT tot°
,Ai
b
PROPOSED LESSEE EQUIPMENT SHELTER(11.5'X 28')
,
ql
I ` PROPOSED 20'X 39 LEASE AREA ACCESS EASEMENT
i
/ OUTLINE OF WATER-- 0 o s
TANK ABOVE w
/ w °
PROPOSED 4'WIDE
CONCRETE SIDEWALK \
I / d .d /
25 �� a d
/ a
g
I
W
PROPOSED LESSEE IC BRIDGE
BE I FOR ANTENNA COAX ARLES /// ° �' LOC#2250598
W [IN ROPOSED CABL PENETRATION / WEST OSWEGO
1n
BASE OF SHAT /
PROPOSED LESSEE ANTENNAS a
MOUNTED ON f ROPOSED POD MOUNT w
ASSEMBLY 0 EXISTING 172'*HIGH ` 3099 LEHMAN CROSSING
WATER TOWER 0 179'A.G.L. a
I 1 YORKVILLE,IL 80580
I EXISTING T�WER FOUNDATION - 1
EXISTING TOWER OVERFLOW d
I I DRAWN BY LS
I I d 0 7 4' 6 I ---
A CHECKED BY DU
1A'x3r P10NT IgTMEgp�'Sru c DATE. 12/lJ10
FORMAT.ANY SIlP DDERTWW II
TKATISATIGDUCFDBGIE 1
p � PROJECT 33-911
CALL JULIE TULL FREL I a
I<SM892-0123 I SHEET TITLE
BPCOM z9 wants n
Bars wvs n rrn" SITE
vARHIHC BEFORE AND DURING CONSTRUCTION,THE CONTRACTOR THE CONTRACTOR WILL,UPON BECOMING AWARE OF SUBSURFACE OR LATENT SKETCH
CONTRACTOR TO PROVIDE APPROXIMATE 50'x50'STAGING SHALL PROVIDE ADEQUATE EROSION CONTROL AS PHYSICAL CONDITIONS DIFFERING FROM THOSE DISCLOSED BY THE ORIGINAL SOIL
AREA AND TEMPORARY ROAD.CONTRACTOR SHALL NECESSARY IN THE FORM OF SILT FENCES FOR THE SITE INVESTIGATION WORK,PROMPTLY NOTIFY THE OWNER VERBALLY AND IN WRITING,
�o COORDINATE WITH ANTENNA CONTRACTOR,A STAGING AND BALES AROUND ANY EXISTING MANHOLES,INLETS.OR AS TO THE NATURE OF THE DIFFERING CONDITIONS.NO CLAIM BY THE CONTRACTOR SHEET NUMBER
nLL OEFf}R[ CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO EXISTING PAVEMENT. AREA AND TEMPORARY ROAD THAT ISACCEPTABLE TO THE CATCHBASINS SUSCEPTIBLE TO EROSION.EROSION FOR ANY CONDITIONS DIFFERING FROM THOSE ANTICIPATED IN THE PLANS AND
rou nIG CONTRACTOR SHALL PHOTOGRAPH AND VIDEOTAPE EXISTING PAVEMENT PRIOR OWNER.STAGING AREA AND TEMPORARY ROAD SHALL BE CONTROL MEASURES SHALL BE PERIODICALLY INSPECTED SPECIFICATIONS AND DISCLOSED BY THE SOIL STUDIES WILL BE ALLOWED UNLESS
CALL TO CONSTRUCTION.ANY DAMAGE CAUSED DURING CONSTRUCTION SHALL BE RESTORED TO EXISTING CONDITIONS AS NECESSARY UPON TO ENSURE PROPER FUNCTION.EROSION CONTROL SHALL THE CONTRACTOR HAS SO NOTIFIED THE OWNER,VERBALLY AND IN WRITING,AS
1<HMM692I JUR REPLACED TO EXISTING OR BETTER CONDITION AT NO ADDITIONAL COST. COMPLETION OF THE PROJECT. BE REMOVED UPON COMPLETION OF WORK REQUIRED ABOVE,OF SUCH DIFFERING SUBSURFACE CONDITIONS.
98 H(BIHS -0123L
You BIG
r,% Ul
NOTE:
PENDING STRUCTURAL EXISTING OBSTRUCTION LIGHT AND [pia w
ANALYSIS TO DETERMINE LIGHTNING ROD TO BE RELOCATED iJ]
LESSEE ANTENNA MOUNTS TO TOP OF NEW POD EXTENSION
EXISTING ANTENNA TO REMAIN - - - -
PROPOSED LESSEE -a a!
ANTENNAS @ 179' A.G.L. — a
ON PROPOSED MOUNTING
PLATFORM _
PROPOSED STACKABLE POD
MOUNT ASSEMBLY
O _
J >"O o
YOM VILLE
3 to
L��o ,
�J 100
n
Im of X
41 ODtp
d tonal,_
I j +4k\ "
z
4 � u-
nt J
W O
11 W < FA3
J fA FQ o .-
� � U
I d z O
w wzv z
Q CD
* Iw z
I a
J
I
o L 0
I w 8
a o
PROPOSED LESSEE ANTENNA I ul
Z 0. W
COAX CABLES ROUTED ON I 0
EXISTING LADDER
LL z
O
PROPOSED TOWER BASE I OF
PENETRATION FOR LESSEE w
ANTENNA COX CABLES I = O
I
� O
o w
PROPOSED LESSEE ICE BRIDGE J
FOR ANTENNA COAX CABLES J
> LOC#2250598
PROPOSED SHELTER(11.5'x 2;EQUIPMENT I WEST OSWEGO
I
I
EXISTING CHAIN LINK
FENCE 3099 LEHMAN CROSSING
-- YORKVILLE,IL90560
DRAWN BY' LS
CHECKED BY OM
DATE — MOO
PROJECTS 33411
CaLL P fr TML VREE
ROOM 2-a123 SHEET TITLE
W-.Icg et!dV w ft9YY SITE
uaaHlwc ELEVATION
SHEET NUMBER
L dLFON!
TW OIG
ME
I(R0Nn9P-0121
4"Houas BEFORE 1 WEST ELEVATION
YOU ntc
�I
I
I
r
oil
9
I -
i
h
'�"" I{• -sue_. _. - �i •-" ♦.
Io
Clly Reviewed By: Agenda Item Number
O
Legal ❑ OB #2
EST. `� 1836 Finance ❑
Engineer ■ Tracking Number
4 ��i �t City Administrator ■
„ tea
O Consultant ❑
6-11c— ® PW 2011-12
Agenda Item Summary Memo
Title: 802 S. Bridge Street—Proposed Highway Authority Agreement
Meeting and Date: March 15, 2011 Public Works Committee
Synopsis: This agreement would allow the Illinois EPA to issue a No Further Remediation
Letter to property owner.
Council Action Previously Taken:
Date of Action: PW 2/15/11 Action Taken: Tabled to 3/15/11 Public Works meeting
Item Number: PW 2011-12 (NB#5)
Type of Vote Required: Majority
Council Action Requested: Approval
Submitted by: Joe Wywrot Engineering
Name Department
Agenda Item Notes:
21,��o cir o
Memorandum
ESE1 .` 'yeas To: Bart Olson, City Administrat
.�
O From: Joe Wywrot, City Engineer
e
p` CC: Lisa Pickering, Deputy City C er
uem�'Cwry `?
Date: February 9, 2011
Subject: 802 S. Bridge Street—Proposed Highway Authority Agreement
Attached find a proposed highway authority agreement for the former Yorkville Marathon gas
station at the southeast corner of Route 47 and Orange Street. This property was the location of a
leaking underground petroleum storage tank several years ago. All underground tanks and much
of the contaminated soil have since been removed,but some contaminated soil remains within
the Orange Street right-of-way. The contaminated area is estimated to be around 500 square feet,
located beneath the property's driveway entrance to Orange Street and underneath the street.
The property owner has made considerable effort to clean up the site,but one constituent
(benzene)measured at one location exceeded the Illinois EPA's minimum clean-up objectives. A
common way to address this situation is to establish an institutional control to protect the general
public from the remaining contamination. The institutional control is this proposed highway
authority agreement, which is a restriction on the use of the subject area. Once an institutional
control is established, the Illinois EPA can issue a No Further Remediation letter to the property
owner, which essentially states that the site is free of contamination. In this agreement, the city
agrees to prohibit the use of any groundwater originating within the subject area from being used
as drinking water. The agreement allows for roadway work to be performed within the subject
area,but the city agrees to allow construction access by permit only, and require that the
permittee "take all measures necessary to protect human health(including worker safety) and the
environment". While the area of contaminated soil is estimated to be located in the south half of
the Orange Street right-of-way(Exhibit A), the area subject to the highway authority agreement
extends over a larger area to the north edge of the Orange Street pavement (Exhibit Q.
IDOT's Route 47 project includes this area of Orange Street. If this agreement is approved the
city would need to issue a permit to IDOT to allow them to work within the subject area. IDOT's
Route 47 plans identify several locations where contaminated soil exists, including Orange
Street. IDOT's proposed protection measure at this location consists of limiting the depth of
excavation to no more than 6 feet. Discussions with Chase Environmental, however, indicate that
there are no contaminated soils in the IDOT right-of-way at this location. The information
provided by Chase indicates soil contamination at a depth of 4 feet in the Orange Street right-of-
way, which is still below normal roadway excavation depths. The extent of contamination,
however, is below the threshold where special precautions would be needed during construction.
If contaminated soil is encountered during construction, it would need to treated as special waste
and disposed of accordingly.
There are two existing city utilities that run through the subject area,but both will be abandoned
as part of IDOT's Route 47 project. IDOT's project also includes construction of a new
watermain across Route 47 at Orange Street,but it will be north of the subject area. Since the
depth of contamination exceeds normal roadway construction depth and there will be no city
utilities located within the subject area, I recommend that this agreement be approved.
Please place this highway authority agreement on the February 15, 2011 Public Works
Committee agenda for consideration.
Highway Authority Agreement
This Agreement is entered into this day of 2011
pursuant to 35 III.Adm.Code 742.1020 by and between the(1) Estate of Patrick Beardsley("Owner
/Operator")and (2) City of Yorkville("Highway Authority"), collectively known as the "Parties."
WHEREAS, Estate of Patrick Beardsley, is the owner or operator of one or more leaking
underground storage tanks presently or formerly located at 802 S. Bridge Street,Yorkville. Illinois("the
Site");
WHEREAS, as a result of one or more releases of contaminants from the above referenced Site
("the Release"),soil and/or groundwater contamination at the Site exceeds the Tier 1 residential
remediation objectives of 35 III.Adm. Code 742;
WHEREAS,the soil and/or groundwater contamination exceeding Tier 1 residential remediation
objectives extends or may extend into the Highway Authority's right-of-way;
WHEREAS,the Owner/Operator or Property Owner is conducting corrective action in response
to the Release;
WHEREAS,the Parties desire to prevent groundwater beneath the Highway Authority's right-of-
way that exceeds Tier 1 remediation objectives from use as a supply of potable or domestic water and
to limit access to soil within the right-of-way that exceeds Tier 1 residential remediation objectives so
that human health and the environment are protected during and after any access;
NOW,THEREFORE,the Parties agree as follows:
1. The recitals set forth above are incorporated by reference as if fully set forth herein.
2. The Illinois Emergency Management Agency has assigned incident number 20060740 to
the Release.
3. Attached as Exhibit A is a scaled map prepared by the Owner/Operator that shows the
Site and surrounding area and delineates the current and estimated future extent of soil
and groundwater contamination above the applicable Tier 1 residential remediation
objectives as a result of the Release.
4. Attached as Exhibit B are tables prepared by the Owner/Operator that lists each
contaminant of concern that exceeds its Tier 1 residential remediation objective, its Tier
1 residential remediation objective and its concentrations within the zone where Tier 1
residential remediation objectives are exceeded. The locations of the concentrations
listed in Exhibit B are identified on the rrm;.p in Exhibit A.
5. Attached as Exhibit C is a scaled map prepared by the Owner/Operator showing the area
of Highway Authority's right-of-way that is governed by this agreement("Right-of-
Way"). Because Exhibit C is not a surveyed plat,the Right-of-Way boundary may be an
approximation of the actual Right-of-Way lines.
6. The Highway Authority stipulates it has jurisdiction over the Right-of-Way that gives it
sole control over the use of the groundwater and access to the soil located within or
beneath the Right-of-Way.
7. The Highway Authority agrees to prohibit within the Right-of-Way all potable and
domestic uses of groundwater exceeding Tier 1 residential remediation objectives.
8. The Highway Authority further agrees to limit access by itself and others to soil within
the Right-of-Way exceeding Tier 1 residential remediation objectives. Access shall be
allowed only if human health (including worker safety) and the environment are
protected during and after any access. The Highway Authority may construct,
reconstruct, improve, repair, maintain and operate a highway upon the Right-of-Way, or
allow others to do the same by permit. In addition,the Highway Authority and others
using or working in the Right-of-Way under permit have the right to remove soil or
groundwater from the Right-of-Way and dispose of the same in accordance with
applicable environmental laws and regulations. The Highway Authority agrees to issue
all permits for work in the Right-of-Way, and make all existing permits for work in the
Right-of-Way,subject to the following or a substantially similar condition:
As a condition of this permit the permittee shall request the office issuing this permit to identify
sites in the Right-of-Way where a Highway Authority Agreement governs access to soil that
exceeds the Tier 1 residential remediation objectives of 35 III.Adm.Code 742. The permittee
shall take all measures necessary to protect human health (including worker safety)and the
environment during and after any access to such soil.
1. This agreement shall be referenced in the Agency's no further remediation
determination issued for the Release.
2. The Agency shall be notified of any transfer of jurisdiction over the Right-of-Way at
least 30 days prior to the date the transfer takes effect. This agreement shall be null
and void upon transfer unless the transferee agrees to be bound by this agreement
as if the transferee were an original party to this agreement. The transferee's
agreement to be bound by the terms of this agreement shall be memorialized at the
time of transfer in a writing("Rider")that references this Highway Authority
Agreement and is signed by the Highway Authority,or subsequent transferor, and
the transferee.
3. This agreement shall become effective on the date the Agency issues a no further
remediation determination for the Release. It shall remain effective until the Right-
of-Way is demonstrated to be suitable for unrestricted use and the Agency issues a
new no further remediation determination to reflect there is no longer a need for
this agreement, or until the agreement is otherwise terminated or voided.
4. In addition to any other remedies that may be available,the Agency may bring suit
to enforce the terms of this agreement or may, in its sole discretion, declare this
agreement null and void if any of the Parties or any transferee violates any term of
this agreement. The Parties or transferee shall be notified in writing of any such
declaration.
5. This agreement shall be null and void if a court of competent jurisdiction strikes
down any part or provision of the agreement.
6. This agreement supersedes any prior written or oral agreements or understandings
between the Parties on the subject matter addressed herein. It may be altered,
modified or amended only upon the written consent and agreement of the Parties.
7. Any notices or other correspondence regarding this agreement shall be sent to the
Parties at following address:
Manager, Division of Remediation Management Estate of Patrick Beardsley
Bureau of Land 6290 North SR42
Illinois Environmental Protection Agency Quincy, IN 47456
P.O. Box 19276
Springfield, IL 62974
City of Yorkville
c/o Joe Wywrot,City Engineer
800 Game Farm Road
Yorkville, IL 60560
IN WITNESS WHEREOF,the Parties have caused this agreement to be signed by their dully authorized
representatives.
City of Yorkville
Date: By:
Its:
Estate of Patrick Beardslev
Date: By:
Title:
4
/
d
Gl�r sly /
Nr
I!
L4
ORANGE 51&ET
SM
JW 3 13 SAN
F I F
W4• ly
� 0 5
• W Q
W-1 PL PL —p —PL PL —PL —APL I+
AVo
0 616F 1SIGN
/ LEGEND
W UNE
1 O X
5 4:�-- SANRARY SEWER
—W— WATER LINE
pip-4 X
—Olin-- ONERLIEAD ELF.CIRIC
—PL— PROPERTY UNE
JII — T— IOEPNONE UNE
�c can=3 / 41 FQM POLE
HAA SOIL PLUME AREA
p L691OE�Rt
Sr1 k WIN" EXCAVA71DN AREA
/
X bMrl NO SAW LE LABMM
ISHELBY TUBE-Sr
X p Rowm "ML-40
/ COO MM ACWN WILL SOME LOCKM W-
•OOgECM ACM FLOOR SORE LWAM F-
�t
PL pL PL
PL P / rre ®AACa�sect e+wa
L PL�
PL PL —
1 20
802 South Bridge Street PROJECT NAME
Kendall County - Yorkville Marathon
Yorkville, IL. 60560 �� � DRAWN BYMBS PROJEeT No.F1OO9029
LUST Incident No. 20060740 REVISED BY* T nTTE HAA Soil Plume
LPC # 0930255026 Environmental Group Ins. DAM JAN 2011 wc. NAMESITE.DWG
SCALE:1"=30' DWQ N°•Exhibit: A
Site: Yorkville Marathon
Incident No. 20060740
LPC No. : 0930255026
Site Address: 802 South Bridge Street
Table 1
Corrective Action Soil Analytical Summary (BTEX)
Wall and Floor Closure Samples
(Reported in pm)
Sample ID I Sample Depth Date Benzene Toluene Eth lbenzene Total X lenes
TACO Tier I Most Stringent Soil CUOs 0.03 12 13 *5.6
WI 4' 3/25/09 0.005 0.005 0.005 0.005
W2 4' 3/25/09 0.005 0.005 0.005 0.005
W3 4' 3/25/09 0.005 0.005 0.005 0.005
W4 4' 3/25/09 0.644 0.5 2.88 0.856
W5 4' 3/25/09 0.007 0.005 0.005 0.005
F1 8' 3/25/09 0.005 0.005 0.005 0.005
F2 8' 3/25/09 0.005 0.005 0.005 0.005
BH-12A 4' 2/21/08 <.005 <.005 <.005 <,005
BH-12B 8' 2/21/08 <.005 <.005 <,005 <,005
BH-13 9' 8/5/08 <.005 <.005 <.005 <.005
HA-1 4-4.5' 8/19/08 <.005 <.005 <.005 <.005
Bold numbers are actual quantities above the reporting limit.
Numbers not bold indicate results less than the reporting limit. The reporting limit is shown.
SHADING --Exceeds the most stringent Tier 1 soil clean-up objective.
*Construction Worker Inhalation Value
I
le
I
d'
I
e
GIF1"
all
a'
o /
I
SAN_ _ O
F I P 0 1
W-29 RdV�J x /
PL PL —PL —PL PL —PL APL t-
o �!
BU" :5S SIGN a
X
/ LEGEND
GAS LINE
i
D x --SA--- SANRARY SEWER
cmory I —W— WATER UNE
pU 15-*25 h —ONE— OVERHEAD ELECTRIC
PL— PROPERTY LINE
T .•.... TELEPHONE LINE
41 t �
POMFR POLE ;,,r'
q ��•a �:; ( PROPOSED HAA
51.1 a teat EXCAVATION AREA
OMM WELL AND SAMPLE LABELIN0
ISHELBY TUBE-ST
sm wome-m
>< Q
Mm mom WELL-Mw
I •CDiI WK ACWN O L WIM LOCAMN W-
•CORwECTM ACIIM FLOOII SAMPLE LOG10N F-
�c
PL PL Da COLOR Ill ACM KaGmR COWAMAMY ca mmaattaa
PL PL PL 4 A•DSE TADD nr i wlnoomAL nwF-UP n.[cn4s
PL �PL �PL �PL
ib b 30
802 South Bridge Street PROJECT NAME:
Kendall County Yorkville Marathon
Yorkville, IL. 60560 DRAWN BY:MC PROJECT No.F1009029
LUST Incident No. 20060740 REVISED By.-.KT TTnu, Pro osed HAA
LPC # 0930255026 � nvi�°onmental Gr®up �W- DATE: JAN 2011 D . NAMESITE.DWG
-
SCALE:1°=30' DWG. ND.Exhibit: C