Loading...
Plan Commission Packet 2009 09-09-09 _���� c►r o United City of Yorkville 800 Game Farm Road EST. 1836 Yorkville, Illinois 60560 Telephone: 630-553-4350 Fax: 630-553-7575 ALE PLAN COMMISSION AGENDA Wednesday, September 9, 2009 Yorkville Public Library 902 Game Farm Road Meeting Called to Order: 7:00 p.m. Roll Call: Previous Meeting Minutes: July 8, 2009 August 12, 2009 -------------------------------------------------------------------------------------------------------------------- Public Hearings 1. PC 2009-14 SAC Wireless LLC, dlbla Verizon Wireless, petitioner, has filed an application with the United City of Yorkville, Kendall County, Illinois, requesting a Special Use to construct a telecommunications tower with an electrical equipment shelter and install antennas. The real property consists of approximately 4.2 acres, 202 and 204 Wheaton Avenue, Yorkville, Illinois, 60560. Action Item i. Special Use The petitioner wishes to continue the request to the October 14, 2009 Plan Commission meeting. 2. PC 2009-15 JR Yorkville, LLC, petitioner, has filed an application with the United City of Yorkville, Kendall County, Illinois, requesting rezoning from the United City of Yorkville R-3 General Residence to a B-3 Service Business District. The real property consists of approximately 3 acres located at the northeast corner of Route 47 and Galena Road, Yorkville, Illinois, 60560. Action .Item i. Rezoning New Business 1. PC 2009-11 Midco Northgate Yorkville LLC, petitioner has filed an application with the United City of Yorkville, Kendall County, Illinois, requesting a preliminary plan and final plat. The real property consists of approximately 28.13 acres, located at the northeast corner of Route 47 and Galena Road, Yorkville, Illinois, 60560. Action Items i. Preliminary plan ii. Final plat 2. PC 2009-13 RWJ Yorkville LLC, petitioner, has filed an application with the United City of Yorkville, Kendall County, Illinois, requesting a preliminary plan and final plat. The real property consist of approximately 2.55 acres, located at 1402 N. Bridge Street, Yorkville, Illinois, 50560. Action Items i. Final plat Adjournment Page 1 of 3 ORA UNITED CITY OF YORKVILLE PLAN COMMISSION Yorkville Public Library, Historic Meeting Room Wednesday, July 8, 2009 7:00pm Chairman Anne Lucietto called the meeting to order at 7:05pm. Roll Call: Clarence Holdiman Jeff Baker Tom Lindblom Sandy Adams (arr. 7:20pin) Chairman Anne Lucietto Absent: Jack Jones, Brian Schillinger, Michael Crouch, Charles Kraupner It was noted that there initially was no quorum and the meeting was paused until a quorum was established at 7:20pm. The meeting was resumed at this time. Other City Staff: Travis Miller, Community Development Director Stephanie Boettcher, Senior Planner Guests: Matt Schury, Kendall County Record Chris Vitosh, Depo Court Reporter Richard Heath Scott Johnson, CAPS Mike Engelhardt Pat Engelhardt Ruben Rodriguez Gene Lamb Helen Lamb Tom Godleur (sp?), EJ Plumbing Jim Green, Renewable Resource John Philipchuck, Attorney DBC&W John Tomasik, Kendall Land Dev. George Boltor, Kendall Land Dev. Doug Clayton Shirley Clayton Torn Plank Lori Staie Pete Huinker, SEC Group Charles MacKinnon, McKinnon Farm Mariann Manthei, YGC Minutes: June 10, 2009 Mr. Lindblom and Mr. Baker moved and seconded respectively, to approve the minutes as presented. The motion carried on a voice vote. Chairman Lucietto swore in those who would speak at the Public Hearing. Page 2 of 3 Public Hearings: 1. PC 2004-10 Kendall Land Development filed an application with the City requesting rezoning from the United City of Yorkville R-2 One Family District to a Planned Unit Development. The property consists of approximately 51 acres and is located east of Route 47, between Van Emmon and Route 126, Yorkville. A motion was made by Baker and seconded by Lindblom, to open the Public Hearing. It opened at 7:20pm. (See Court Reporter's Transcript of Hearing) During the Hearing a written statement from Gregory and Susan Lambke of 339 E. Van Emmon St. was read by Chairman Lucietto. This written statement shall be attached to the official minutes. Attorney John Philipchuck represented the petitioner. Briefly, he said that in 2007 the final plats for the subdivision came before the City and the plat was recorded at the end of the year. At that time, the subdivision was an annexed parcel of land not subject to an annexation agreement and was zoned R2 single family residential. At 8:35pm, the Hearing was closed on a motion by Lindblom and a second by Adams. Discussion by Plan Commission Members Following HegLn Mr. Lindblom stated several concerns that he saw following a visit to the site. 1. Erosion is so severe that the curbs are being lost, he wondered why that had not been addressed. 2. Where will the stormwater go? 3. All vegetation was removed in order to put in utilities—more value would be realized from wooded lots. 4. He asked that the City not issue a building permit until a connection is made to Route 126, even though there is a legal document. He said in the past, developers have promised that some items will be "done later" and they are not done There must be another entrance in case of emergency. 5. Concern about exceeding the density and that the guidelines in place should be followed. Peter Huinker of the SEC Group responded to the stormwater concern. He said until all vegetation is established, erosion control features would be installed to prevent silt from entering the stormwater system. Filter fabric, straw bales and wire would be used since there are very steep slopes. Mr. Lindblom responded that the hill south of Van Emmon has not been maintained. According to Travis Miller, a schedule of maintenance was discussed at Public Works two weeks ago and was deemed appropriate. Page 3 of 3 The second subdivision entrance was addressed by Attorney Philipchuck who said that the connection would be in place prior to the issuance of the first occupancy permit. Chairman Lucietto thought that she remembered a small access to Rt. 126 being provided in 2007. Mr. Philipchuck said at that time, the development had not come before the City. Later it was recognized that a secondary connection was needed and a right-of-way and easement were obtained. Commission Holdiman commented that the number of houses should be kept to a reasonable level. Ms. Adams said she agreed with Mr. Lindblom's concerns and said the Comp Plan should be followed. Though the Comp Plan recommends 2.25 units, Mr. Philipchuck said their zoning allows 3.3 units. He said the townhomes are clustered to allow for a"greenway" while also working with the infrastructure in place. There was no further discussion and Chairman Lucietto summarized the petitioner's request as a change of zoning from R2 to a PUD. Action Item i. Rezoning Mr. Lindblom then made a motion to recommend to the City Council to approve PC 2009-10. Ms. Adams seconded the motion. Roll call vote: Adams-no; Baker-no, Lindblom-no, Holdiman-no, Lucietto-no. Motion failed 0-5. Additional Business: Chairman Lucietto handed out a Kendall County Planning Consortium agenda and encouraged attendance. There was no further business and the meeting was adjourned on a motion by Baker and Lindblom at 8:47pm. Minutes respectfully submitted by Marlys Young Page 1 PLAN COMMISSION MEETING UNITED CITY OF YORKVILLE, ILLINOIS REPORT OF PROCEEDINGS had at the meeting of the above-entitled matter taken before CHRISTINE M . VITOSH, C . S . R. , on July 8 , 2009 , at the hour of 7 : 00 p.m. , at 902 Game Farm Road in the City of Yorkville, Illinois . D-883509 Page 2 1 P R E S E N T: 2 MS . ANNE LUCIETTO, Chairman, 3 MR. TOM LINDBLOM, 4 MR. CLARENCE HOLDIMAN, 5 MS . ANNE LUCIETTO, 6 MR. JEFF BAKER. 7 ALSO PRESENT : 8 Mr. Travis Miller, 9 Ms . Marlys Young. 10 11 - - - - - 12 13 14 15 16 17 18 19 20 21 22 23 24 Page 3 1 (Witnesses sworn. ) 2 CHAIRMAN LUCIETTO : And now I look for a 3 motion to open PC 2009-10 . 4 MR. BAKER: So moved, Baker. 5 CHAIRMAN LUCIETTO : Do we have a second? 6 MR. HOLDIMAN: Second. 7 CHAIRMAN LUCIETTO : We are now in PC 8 2009-10 . John? 9 MR. PHILIPCHUCK: Good evening. My name 10 is John Philipchuck. My office is at 123 Water Street , Naperville, Illinois . I am an attorney 12 with the law firm of Dommermuth, Brestal , Cobine & 13 West . 14 I 'm here this evening representing 15 the Kendall Development, LLC regarding the 16 Kendallwood Estates subdivision. The Plan 17 Commission may recall back in 2007 that a final 18 plat for this subdivision came through the City 19 and the plat was recorded at the end of that year. 20 At the time that particular 21 subdivision is - - or was an annexed parcel of land 22 not subject to an annexation agreement, was zoned 23 R-2 single-family residential . 24 With me this evening to explain some Page 4 1 of the existing utilities and conditions of the 2 subdivision is Pete Huinker, and I ' ll introduce 3 Pete at this time to give you some background as 4 to what has been constructed out there in the i 5 field. 6 MR. HUINKER: Thank you, John. Again, 7 my name is Pete Huinker from SEC Group. 8 As John stated, this subdivision was 9 recorded - - this plat was recorded back in 2007 in 10 December. I wanted to talk a little bit about 11 what has been constructed. The original 12 subdivision had 83 lots , all single-family. 13 Since the plat has been recorded, 14 all of the roadways have been constructed; to the 15 north is Van Emmon and to the south this is 16 Route 126 . The route basically has a main 17 north/south roadway with some cul-de-sacs and stub 18 streets that are provided to the east and to the 19 west . 20 Essentially with the roadway 21 construction there was some mass grading that had 22 occurred, so basically table-topped the lots , 23 public utilities have been completed, sanitary, 24 storm sewer, as well as water main. Page 5 1 There was seeding and grading of the 2 detention basins . There is four detention basins 3 that have been constructed, two in the northern 4 area, the northeast corner, called the north 5 central west basin, the central west basin, and 6 the southwest basin. 7 From a roadway construction 8 standpoint , basically the binder course has been 9 constructed and not the surface course, so the 10 finish surface has not been completed. Obviously 11 there has not been any sidewalk, which goes 12 in-hand with any of the lot construction, so those 13 are a couple items that have not been completed on 14 the existing subdivision. 15 There is a current letter of credit 16 out in place for the subdivision for those public 17 improvements . We also have a stub road to the 18 south and west which would connect to the 19 Woodstone subdivision and would connect to 20 Route 126 as well , and I believe that was annexed 21 and zoned last year. 22 MR. MILLER: 107 I believe . 23 MR. HUINKER: 107 . 24 MR. PHILIPCHUCK: The subdivision as we Page 6 1 proposed, as Pete pointed out, was 83 lots , 2 detached sing'Je -family product . Now that, as you 3 know, under an R-2 zoning classification, you are 4 allowed to develop properties up to 3 . 3 dwelling 5 units per acre . i 6 The Staff did a nice job in their 7 report about talking about the Comprehensive Plan 8 and how it relates to the area because the 9 petition that is before you this evening is 10 considering taking some of the lots at the south 11 end of the subdivision and doing a rezoning from 12 the R-2 to PUD and then putting some attached 13 housing units on the property, and the reasons 14 that we see this as being a required and a 15 necessity, it (a) , opens up the marketplace, it 16 allows us to offer another type of housing product 17 within the subdivision, basically to the 18 empty-nester, and it also allows a transition. 19 This property, the Woodstone, that 20 was mentioned, came in and that is zoned B-2 21 commercial , so there are office uses , B-1 22 commercial , B-2 commercial uses, that can be put 23 on that property. 24 We see a transition with that land Page 7 1 use that we are proposing then from the more 2 intense development that woodstone will be because 3 when we came in and did the original subdivision, 4 this was shown as residential in the Comp Plan, 5 but obviously the City Council chose to put a 6 different zoning classification on it , so as a 7 result, it allows us to look at this and say, 8 well , this was designed, and still is , as a 9 high-end subdivision. to we ' ll go through some of the 11 covenants and things that been placed on this 12 particular development and you will agree that it 13 is designed with that in mind, and we felt that 14 that would pose some problem developing the 15 southern end with the commercial influence of that 16 particular piece of property. It ' s a little over 17 12 acres there that was brought in and annexed for 18 commercial purposes . 19 So our current density in the 83 h 20 lots is like 1 . 61 . The Comp Plan says 2 . 25 , but 21 remember, it ' s zoned R-2 , which allows 3 . 3 , so it 22 can get confusing when you try to look at the -- 23 what does the Comp Plan say, but I would say 24 what ' s more pertinent is what does the existing Wage 8 1 zoning allow. 2 The existing zoning allows for more 3 units than we have on the property, and bottom 4 line is with our proposal , we are still under the 5 total number of units that could be put on the 6 property based on the existing 3 . 3-DU per acre 7 density that ' s set forth in the zoning ordinance, 8 so while that can be somewhat confusing, I wanted 9 to go through that with you, and if you still have 10 questions about that, we can talk about it . 11 The next thing that the Staff talked w 12 about as far as the proposal is looking at the 13 standards that are in the R-2 and the standards 14 that are in the R-3 , and if we utilize those 15 standards in looking at the two types of product 16 that we are offering, they said that they -- the 17 project as proposed does comply with the R-2 18 standards for the remaining detached single--family 19 product and the R-3 standards for the attached 20 single-family product . 21 The Staff looked at the open space 22 and said, you know, as part of a PUD you have to, 23 you know, have certain criteria that we look for, 24 and we feel that we have certainly designed our Page 1 subdivision such that we can comply with the types 2 of criteria, like the architectural standard -- 3 there is several things , the existing site 4 conditions , architectural interests , pedestrian 5 sidewalks , looking at the vehicular pedestrian 6 circulation systems , parking lots , utilities , 7 detention, and the unified landscape treatment, 8 and that goes to some of what is here as far as 9 open space, that ' s always something that comes 10 out , and we would like to point out that when this 11 subdivision was developed, that because of another 12 park in the area, we were going to do cash 13 donation in lieu of doing the actual putting in of 14 a public type of park in the subdivision, so as a 15 result the park district under the new proposal 16 would receive additional moneys for parks and 17 improvements within the particular area. 18 It would be an increase of $37 , 000 19 over what they would be getting under the 20 subdivision as it ' s proposed - - or as it exists 21 today, and we are like in the $350 , 000 range for 22 the overall donation. 23 The number of school children that 24 would be generated from the development as it ' s Page 10 1 proposed and in existence today would be less 2 under the PUD proposal . 3 When you go to the attached product 4 and you utilize the land cash donation sheets that 5 the City of Yorkville has adopted, you will find 6 that we are 15 students less under this proposal 7 under those population generation tables than we 8 would be if it was all a detached single-family 9 product and, of course, by having the additional 10 units , we are in a position then where we can 11 provide more money to the school district through 12 the property taxes as well as to the City of 13 Yorkville because of having the tax bills on those 14 individual additional units that are in the 15 proposed subdivision, so we think that the change 16 does have benefits to the school district, it has 17 benefits to the park department, and benefits to 18 the City. 19 There is no question that the trades 20 have been decimated and we are hoping that by 21 making some land use change here we can get some 22 more people back to work again and create some 23 demand in this particular area . 24 This is a very nice piece of Page 11 1 property, and in keeping with the character of the 2 area that ' s been established, a large amount of 3 open space was created with the original design 4 and our proposal is to basically erase the lot 5 lines at the southern end of the development and 6 then place the attached units in such a manner so 7 that everything around it is common open area, 8 they basically own the unit that they are buying, 9 and they all then share in all this open space . 10 We have quite a bit of open space 11 above and beyond the detention requirements ; I 12 think we are at 4 . 4 or 4 . 1 acres of open space 13 over and above the detention requirements , and I 14 think with detention we are in the 12-acre - - 12 15 percent area, was it, Peter? 16 MR. HUINKER: Yeah, 13 percent 17 detention, about nine percent open space . 18 MR. PHILIPCHUCK: So those are the 19 criteria that the Staff looks at as far as a PUD, 20 the fact that there is enough open space as part 21 of that PUD, and we have that . 22 One of the thoughts that the Staff 23 had was about taking some of those open areas and 24 putting them into some kind of conservation Page 12 1 easement with the land trust organization. 2 First of all , we think they are 3 probably too small to do that, but, second of all , 4 if the interest is to protect those areas in 5 perpetuity, we would suggest there is a better way 6 to do it . 7 It could still remain in private 8 ownership and control , but that as part of the 9 PUD, those could be designated as open space areas 10 and so they would remain as open space areas , 11 conservation areas if you will in perpetuity, so 12 that ' s a way you can protect that without bringing 13 in an outside party. 14 If there are single-family lots , 1 15 know Staff looked at something about connectivity 16 behind the lots here behind some open space; we 17 would submit again that we would prefer to do that 18 with an easement, and then put language in the 19 easement that says that area remains natural and 20 is protected, so those are our suggestions with 21 regard to that . 22 As far as combining some of the 23 stormwater area, Pete has looked at that . Some of 24 that is just a matter of function of how the Page 13 1 lotting was already in place . We ' re trying to, 2 again, keep detention areas in common areas , again 3 subject to homeowner association requirements for 4 the maintenance and, of course, there would be 5 back-up dormant SSA which covers the unlikely 6 situation, but if it ever happened, that they were 7 unable to continue on with maintenance . 8 The design guideline that the Staff 9 pointed out, we feel that our existing site 10 conditions - - certainly with the open space that 11 we talked about - - satisfies those conditions , and 12 really the bottom line is pretty much is what it 13 is , as Pete said, the infrastructure is all in 14 place, the only thing that remains is the overlay 15 for the final on the streets , and then as the 16 individual home are built , sidewalks would be 17 constructed. 18 The architectural amenities - - and 19 later I ' ll introduce to you Tim Green, who is an 20 architect and gets into the geothermal design of 21 homes -- we ' re anticipating and trying to promote 22 this as a green development , and so as part of 23 that, we are proposing that these homes would have 24 such things as high efficiency applicances, Page 14. 1 furnaces , water heaters , computerized home green 2 programming devices , high efficiency lighting, 3 ceiling fans , different types of approved glass 4 for the windows and doors , certain types of 5 thermal insulation on the exterior walls , 6 environmentally safe roofing products , cedar or 7 Hardie board siding, there is no vinyl or aluminum 8 allowed in the subdivision, a minimal use of the 9 Dryvit exterior, but there are some people who do 10 like the look of the Dryvit , the installation 11 practices are getting better, so we would allow 12 it , but not necessarily encourage it, and 13 suggesting garden pond and plumbing fixtures with 14 water efficiency systems . 15 Tom Godlewski is with us this 16 evening and Tom will explain a little bit about 17 what goes into the plumbing systems as far as 18 water conservation measures and things of that 19 nature . 20 We have in our covenants , and what 21 would be proposed for the attached product as well 22 as the existing detached, is that the minimum of 23 50 percent of all front facades would be masonry, 24 stone cultured stone, cedar Hardie plank, EFIS, so Page 15 1 what we are looking at is 50 percent of that would 2 have to be the masonry on the fronts , and then 3 those other products , but no aluminum or vinyl . 4 Same for the chimneys , masonry, cultured stone or 5 EFTS . 6 We have a minimum requirement of the 7 30-year architectural shingles for the roofs . No 8 three-tab shingles will be permitted. We have no 9 vinyl doors , no vinyl windows . Not allow 10 accessory buildings . There are restrictions on 11 fences . The only fences that can be put in would 12 be as required to go around a swimming pool as 13 required by City rules and regulations . Satellite 14 dishes are going to be regulated as to size and 15 where they can be located. 16 We have minimum house sizes 17 established. Our single-family detached product 18 on a two-story unit minimum is 2800 square feet; 19 on a one-story unit, that ' s 2200 ; in our attached 20 product, depending on whether it was a two-bedroom 21 unit, those minimum would be about 1400 square 22 feet , three-bedroom units around 1800 square feet . 23 So you can tell by the thought 24 that ' s gone into the requirements that the target Page 16 1 is a high-end subdivision for both of the 2 products , the attached product and the detached 3 product . 4 Some of the other design guidelines , 5 such as the pedestrian system, one of the things 6 that we are proposing to add is an additional 7 pathway that would come off our internal sidewalk 8 system that would continue down so that the 9 subdivision will be connected to the future 10 Commonwealth Edison regional bike trail , so that ' s 11 one thing that would be added so we get some 12 connectivity. 13 There is no commercial component , so 14 there is really no parking lots or anything here 15 that need to be considered, so some of the items 16 that are in those design guidelines are really not 17 applicable because this is a totally residential 18 development, and then as far as landscape 19 treatment, we are taking into consideration Staff 20 comments about looking to trying to do seeding as 21 opposed to sod for the yards to get the better 22 root system and root structure for the future . 23 1 think you received in your packets 24 typical elevations of some of the product . of Page 17 1 course, they are all like a minimum of two-car 2 attached garages . we ' ve got varying types of 3 facades . 4 obviously because these are actual 5 photos , some of these developments have been built 6 in other parts of the Chicago area, but in many 7 cases they don ' t have the type of materials that 8 we are requiring. Maybe some of these show vinyl 9 siding and things of that nature which would w 10 not -- would not be allowed in our particular 11 development . 12 So at this time I would like to ask 13 Tim Green, if Tim could come up and just give a 14 few more highlights on some of the green 15 initiatives that we are looking at as far as the 16 buildings that would be constructed. 17 MR. GREEN: My name is Tim Green. My 18 company is Renewable Resource Installation. What 19 we have proposed to the developers to bring in 20 some green components to their homes is a 21 soy-based foam insulation, and what this product 22 is is a high performance insulation that is made 23 with rapidly renewable soybean oil . 24 Unlike fiberglass or other materials Page 18 1 that are not natural plant-based material and are 2 not renewable, this is a much more earth 3 friendly-type product and has also the benefit of 4 being" a very high performance insulation, so given 5 that if the thermal envelope of the house has very 6 good insulation, then we can take advantage of our 7 second proposal , which is a geothermal HVAC 8 system, and geothermal works basically by using 9 the constant temperature of the earth as a storage 10 bank for energy. 11 The way that is tapped is that each 12 home will have a furnace on the inside of the 13 house and on the outside we drill a hole in the ground generally about 300 feet deep. This hole 15 is what ' s called a closed loop . It does not 16 interact with any water aquifer or any ground 17 water. Once the whole is drilled, it is full -- 18 it is encased with concrete , so that it is , you 19 know, stable and does not interact with any 20 subsurface water. 21 Basically in the wintertime we take 22 heat from the earth and put it into the house and 23 in the summer it works in reverse, where we take 24 heat from the house and put it into the ground. Page 19 1 This is an extremely efficient 2 system, and once this - - you know, we couple this 3 with the insulation, we have an extremely 4 efficient house . 5 One benefit is that the federal 5 government is now granting homeowners a 30 percent 7 tax credit for using geothermal in, you know, 8 trying to reduce the carbon footprint and reduce 9 greenhouse gases in the environment . 10 Another benefit of the geothermal is 11 that there are no outdoor air condensers, 12 condensing units , so it makes the subdivision much 13 quieter and just a nicer - - nicer place with live 14 with less noise pollution. 15 If you have any questions , I ' d be 15 happy to answer them. 17 MR. PHILIPCHUCK: Next I ' d like to 18 introduce Tom Godlewski , the plumbing contractor. 19 MR. GODLEWSKI : My name is Tom 20 Godlewski , I am representing EJ Plumbing . What we 21 would like to do in this subdivision is install 22 the plumbing fixtures that can save up to 23 30 percent of water, which is like dual flush 24 system for toilets . You know, right now the Page 20 1 government changed the law to use 1 . 6 gallon per 2 flush. Now the companies redesigned the toilets 3 and so they use both systems . Like, for example , 4 you can flush 0 . 8 or 1 . 6 gallons per flush. 5 Shower head faucets , I mean, you can 6 save up to 30 percent of water, you don' t feel it , 7 I mean, just seems like you completely take a 8 shower with the same amount of stream. 9 What we can do, we can also install 10 the tankless water heaters , what they call hybrid, 11 with the power saving . You can use geostorage of 12 the water; for example, like a 40 , 50-gallon 13 keeping in the basement . We just heat the hot 14 water, you know, at the same time when you turn 15 the water on. 16 or we can install the 96 or 17 97 percent efficiency water heaters , which our 18 government can give you a credit up to $1, 500 and 19 the gas company will reimburse the first gas bill 20 up to $300 . So that ' s typically what we would 21 like to do, just minimize the water, just try to 22 save the water usage in the whole subdivision. 23 Thank you . If you have any 24 questions . Page 21 1 MR. PHILIPCHUCK: So to recap, what I ' d 2 like to point out again is that the infrastructure 3 is all in place, the additional units , the road 4 system that ' s been put in is adequate to handle 5 the additional traffic that would be generated by 6 the additional units . 7 As pointed out , while currently it 8 is just the access to van Emmon, as part of the 9 Woodstone development there is a right-of-way that 10 has been set forth so that a connection can 11 ultimately be made to Route 126 , stubs have been 12 made to the property then also to the east for 13 future connectivity to more locations there . 14 We also have an emergency access 15 that can come out here until such time as a 16 permanent roadway is installed; that was looked at 17 at the time we came through, if you remember, with 18 the original subdivision. 19 The area, we think because of some 20 of the changing conditions in the marketplace, 21 there is more of a demand for attached product as 22 the population is aging, that people are looking 23 for product that requires less maintenance on 24 their part as far as the exterior, yard areas , Page 22 1 et cetera, a little smaller square footage, but 2 still something that resembles a detached 3 single-family home, so from a visual perspective , 4 when you drive through the subdivision or you view 5 it from a distance, it looks like it ' s a detached 6 single-family subdivision and, again, because of 7 the criteria that are set forth in the covenants 8 that we will maintain not only property values in 9 our subdivision, but we will protect the property 10 values of the homes in the surrounding areas as 11 well . 12 The access roads , once you leave the 13 site at Van Emmon and Route 126 , are certainly 14 adequate to handle the traffic from the 15 development . 16 We think that the original design 17 was very nice, we captured as much of the open i 18 space areas and maintained them as treed and open 19 space areas , and that will continue to be the case 20 under this proposal , and so we would suggest that 21 this would be a good change as far as the plan is 22 concerned to allow another product, a 23 single-family product , but an attached, again for 24 obvious reasons , to provide proper transition from Page 23 1 the commercial , the property that ' s south now, as 2 we go into the detached product then further to 3 the north. 4 So for these reasons we would 5 respectfully request that the Planning Commission 6 concur with the petition and would recommend to 7 the City Council the rezoning approval to take it 8 from the R-2 to the PUD . i 9 And with that, that concludes our 10 presentation, but we are happy to answer any 11 questions you might have and certainly respond to 12 any questions that any of the public may have . 13 CHAIRMAN LUCIETTO : I think we ' re going 14 to ask Travis to speak and give us the Staff 15 perspective and then we can go on to public 16 questioning . 17 MR. MILLER: Sure . Staff report was 18 attached in your packet . Typically Staff reports 19 do refer to the Comprehensive Plan. 20 As was stated by the petitioner, 21 this request is for rezoned property that was 22 annexed to the City several years ago. There is 23 no annexation agreement in place . It was annexed 24 more than 20 years ago, so any life of that Page 24 1 annexation agreement has expired. 2 This property was approved through 3 the subdivision platting process a couple years 4 ago and recorded, so this request is to rezone the 5 property to PUD, so even though the current zoning 6 is R-2 , the Comprehensive Plan is still a valid 7 document when you are considering zoning changes . 8 The densities and the allowable 9 units per acre that was explained by the 10 petitioner are correct . The zoning ordinance 11 doesn ' t state that 3 . 3 units per acre is the 12 maximum density, but it does state that 13 12 , 000-square foot lots are the minimum lot size . 14 So doing the math with the acreage, it would 15 yield, you know, approximately 3 . 3 units per acre, 16 so that is a true number, but not - - not a 17 definite range as defined by the -- by the City' s 18 a zoning ordinance . 19 The Comprehensive Plan recommends 20 suburban neighborhood in this area or for this 21 property surrounded by similar uses . 22 The existing uses to the west of 23 this property are residential , that would fit 24 within the description of suburban neighborhood. Page 25 1 The property to the south, as explained by the 2 petitioner, although it ' s not developed, is zoned 3 B-2 . There was an annexation agreement approved 4 by the City a couple years back, reviewed by the 5 Plan Commission. 6 As you recall , that property was 7 zoned B-2 , but the annexation agreement did have 8 zoning limitations on the B-2 ; primarily the uses 9 permitted on that property are office, but it does 10 allow for some B-1 and B-2 uses , retail-type 11 convenience uses , but predominantly the plan that 12 was approved and that ' s attached to that 13 annexation agreement calls for office uses and 14 office building uses . Two-story building was the 15 anchor, with a mix of office and retail uses . 16 The connecting street through that 17 property - - so connecting this subject property to 18 126 - - was articulated in the development 19 agreement with this property owner requiring that 20 that roadway be constructed prior to units being 21 constructed in Kendallwood Estates , so there was 22 not an annexation agreement , but there is a 23 development agreement that requires the 24 construction of that roadway, and this PUD zoning, Page 26 1 future PUD agreement, has not been requested by 2 the petitioner and not recommended by Staff to be 3 amended, so that document would remain and that 4 requirement would stand. 5 A couple of points - - I 'm not going 6 to go through each item of the Staff report -- 7 answer any questions if there are any, I wanted to 8 respond to a couple of things that was given in 9 the testimony by the petitioner. 10 One of the Staff recommendations is 11 the conservation easement be established for the 12 green space areas . The western part of this 13 property is heavily wooded; the current approved 14 subdivision plat called for preserving that area, 15 there is a steep terrain on that side of the 16 property and still several trees , wooded area, on 17 that property. 18 The concern of Staff , as we 've 19 learned in other developments in town, those types 20 of attributes in a development of this size are 21 difficult, I didn ' t explain this well in the Staff 22 report when I stated the concern, was to remain in 23 perpetuity. 24 It ' s not just to remain in Page 227 1 perpetuity, but the concern is also of maintenance 2 of those kind of attributes . A homeowner ' s 3 association fee of 120 a unit may be difficult, 4 they may not have the expertise to be able to ' 5 maintain a wooded area the way it needs to be i I 6 maintained, so the recommendation for a 7 third-party to either hold title to that area or S at least have a - - and the covenant to the 9 subdivision be required to be a partner with the 10 homeowner ' s association is what the Staff ' s 11 recommendation is and the purpose behind that 12 Staff recommendation is . 13 The second part of that Staff 14 recommendation is to reduce Lots 11 through 16 in 15 size to allow for a connection between Lots 57 and 16 59 . 57 and 59 are stormwater detention areas , but 17 primarily where the wooded area is , the strip 18 between that , it ' s Staff ' s recommendation that the 19 lots be decreased so that there is one continuous 20 lot, makes it easier for a third-party to accept 21 the increase in size of that, maybe make it more 22 attractive to the conservation district to want to 23 maintain that, and furthermore, an easement is a 24 mechanism that could protect a wooded area, but Page 28 1 the lot owner would still control that , so it 2 makes it more difficult for a lot owner if he 3 wants to go back and cut trees down. 4 I don ' t expect that to happen; 5 persons purchasing those lots would want to retain 6 those trees , but by reducing the lot sizes , 7 keeping that in the homeowner ' s association or 6 third-party engaged takes that concern completely 9 away. 10 Design guidelines , the points that I 11 wanted to make there, there was discussion of the 12 premium siding . The information that was 13 submitted by the petitioner on the premium siding, 14 there is simply stated all exterior surfaces , so 15 it ' s Staff ' s recommendation that the premium 16 siding be applied to all exterior surfaces within 17 this development . 18 50 percent premium siding on front 19 facade is what the current appearance code 20 requirement is , so that would be above and beyond 21 what the City code is , require premium siding on 22 all facades . Doesn ' t have to be masonry, could be 23 Hardie board, could be cedar siding, but it does 24 allow for premium siding, and Staff ' s Page 29 1 recommendation is all exterior surfaces of all 2 units in the subdivision be required to have that 3 premium siding. That is above and beyond what the 4 appearance code requires . 5 The recommendations , the last part 6 of the Staff report, the additional architectural 7 recommendations, I just want to make clear that 8 the Staff recommendation is that all units in this 9 PUD include these items . 10 The information that was submitted 11 by the petitioner and the testimony tonight is 12 that it ' s being promoted, being encouraged within 13 the units , so when people buy units within the 14 subdivision, they are encouraged to have 15 geothermal heating, they are encouraged to have 16 certain plumbing fixtures . 17 The Staff ' s recommendation would be 18 that all units be required in this PUD to include 19 those items . 20 Lastly, ComEd trail recommendation, 21 the Staff recommendation is that as part of a PUD 22 agreement that the petitioner agree to construct 23 the trail along the front edge of the property, 24 that being the western edge of the property. Page 30 1 ComEd has property and utilities 2 that run north of van Emmon and South of 126 , 3 actually all the way down to 47 . The City has 4 prepared preliminary engineering for a multi-use 5 trail along that property. 6 In fact , the lease agreement has 7 been drafted and is in front of City Council next 8 month for final approval allowing the City access 9 to the property and allowing the City to construct 10 a trail on that property. 11 The City has applied for a grant , 12 couple of grant applications , to help with the 13 funding and there is some matching requirements 14 there . 15 Total from downtown north of van 16 Emmon all the way to Windett Ridge subdivision is 17 a little over two miles in length, and the total 18 cost of that trail is roughly 2 . 8 million dollars 19 remaining engineering that ' s left and the 20 materials to construct - - the construction of that 21 facility. 22 Just yesterday Staff ' s 23 recommendation was as a requirement of this PUD 24 petitioner construct a portion of the trail that ' s Page 31 1 adjacent to this development , which is plus or 2 minus 3200 feet , not listed on here, I am going 3 from memory, but a pretty sizable length. I 4 We have asked the engineers to - - I I 5 have asked the engineers to break down an itemized i 6 cost estimate to determine what that segment would 7 be . We just received that information yesterday 8 and it was a follow-up of this Staff report . That 9 cost estimate for that segment is in excess of a 10 million dollars ; it ' s 1 . 2 million. 11 We have scheduled a meeting with the 12 petitioner to talk about what participation is 13 appropriate, so our recommendation to the Plan 14 commission tonight would be to - - I would ask to 15 have that adjusted to state that the petitioner be 16 required to participate in the construction, but 17 don ' t leave - - Staff wouldn ' t recommend - - 1 18 wouldn ' t recommend the requirement of two million 19 dollars . It wouldn ' t be consistent with other 20 trail requirements that the City has required and 21 certainly is in excess of a reasonable amount ; 22 however, some participation towards that amount I 23 do believe is reasonable . That discussion has yet 24 to be had, but it ' s still an item that Staff would Page 32 1 recommend negotiating in the PUD agreement, so I 2 just wanted to make sure that that was clear when 3 you consider the Staff recommendation. 4 I think that ' s all of my notes . I 5 can answer any questions . Thank you . 5 CHAIRMAN LUCIETTO : Okay. I have a note 7 that was written that I want to enter into the 8 public record. It was written by Susan Lambke for 9 both she and her husband, Gregory. They live at 10 339 East Van Emmon Street . She writes , "Opposed 11 on doubling the population for that area. That 12 was for single dwellings . Also you have to fix 13 the problems that are there already. Thank you . " 14 So I will give it to one of you guys to enter that 15 into the record. 16 Do we have any questions, comments 17 or suggestions from the public from those of you 18 that were sworn in? Could you come up here , f 19 please, and say your name and where you live? 20 MR. ENGELHARDT: Mike Engelhardt, 15 21 Crooked Creek Drive . I am over here . What is 22 this here? Who owns that property there? 23 MR. MILLER: I can try to address that, 24 although I don ' t know the current owner . Page 33 1 MR. PHILIPCHUCK: It was the Shepherd 2 Group, I think it still is . 3 MR. ENGELHARDT: Is this the water line 4 here? 5 MR. MILLER: The water - - 6 MR. ENGELHARDT: The water main? 7 MR. MILLER: That I don ' t know. Pete, 8 can you -- 9 MR. ENGELHARDT: Do I have my bearings 10 right? 11 MR. HUINKER: Where it crosses . 12 CHAIRMAN LUCIETTO : Can you guys speak 13 up? The court reporter cannot hear you . 14 MR. ENGELHARDT : Okay. I 'm just 15 wondering who - - this is not part of this? 16 MR. HUINKER: It ' s a different owner. 17 MR. ENGELHARDT: Different owner . And is this road here, is this a proposed road? 19 MR. HUINKER: This section right here, 20 no . No . This is basically a cul-de-sac . 21 MR. ENGELHARDT: Oh, I see . I see . 22 Okay. That is my question. And are these going 23 to be -- are these condos , do I understand that 24 right? Not apartments , they are condos? Page 34 1 MR. PHILIPCHUCK: Correct . The 2 ownership, yes . 3 MR. ENGELHARDT : That ' s what I wanted to 4 know. Thanks . 5 CHAIRMAN LUCIETTQ : Is there anyone 6 else? Please come up . 7 MR. PRUTCH : My name is Andrew Prutch 8 and I happen to live right here . 9 CHAIRMAN LUCIETTQ: And what ' s your 10 address? 11 MR. PRUTCH : 316 Illini Drive . And I 12 back up to this area right here and I oppose this 13 bike track back here because I don ' t want the 14 added traffic going behind my property. 15 Another thing is when they built 16 this retention pond here, the way they have this 17 all graded, when it rains a lot in the springtime 18 and in the fall , all this water comes rushing down 19 this hill and runs through the back of my property 20 because of the creek that runs through back here . 21 Now, another thing we are concerned 22 about is having more units back here . Are these 23 people going to own these units or are they going 24 to buy them and rent them out and then there is Page 35 1 going to be renters back there and all the 2 increased traffic . 3 I just - - I think it should all be 4 left single-family houses because of the decreased 5 property values of the houses around it, and I ' m 6 just afraid that once they put this trail in here, 7 there ' s going to be so much traffic with kids 8 running back here in the woods and stuff that it ' s 9 just going to be a nightmare . That ' s my opinion. 10 CHAIRMAN LUCIETTO : Is there anyone 11 else? 12 MS . STALE: Hi , I ' m Lori Staie . I live 13 at 311 Illini Drive, actually live right across 14 the street from Andy. I have a couple questions . 15 One thing is the density for the new I 16 plan has the - - has it higher than what the 17 Comprehensive Plan calls for. I was just 18 wondering why do we have a Comprehensive Plan if 19 we don ' t follow by, you know, what the plan is . 20 Another question that I have - - or 21 actually the first thing that comes to mind when 22 you say multi-family home is the fact that the 23 renters will dominate the population, the 24 transient population is already extremely high in Page 36 1 the surrounding area. 2 The block behind us is Walter Street 3 and they have - - it ' s a mixture of homes and 4 duplexes . On that street , 46 percent of the 5 people that own there are - - are granted a 6 homestead exemption, and this is by the County' s 7 records . Across the street at Colonial Parkway, 6 which is all duplex or townhomes , they are at 9 43 percent . 10 I 'm thinking putting more 11 multi-family homes in this area is probably not a 12 good idea, you know. Is there any kind of way we 13 could put covenants in there that says only a 14 certain number of these can be rented? Is there 15 something that can be done along that way? 16 And when John - - John made a comment 17 that this was going to be empty nesters or he is was -- or they were targeting empty nesters , well , 19 if you are looking for a senior population, you 20 wouldn ' t go for a two-story home, you ' d go more 21 for maybe single-story ranches . That might be a 22 little bit more acceptable . I don ' t - - I don ' t 23 see doing two-story homes as a great idea. 24 And the geothermal requirements, who Page 37 1 is going to maintain that? Will that be part of 2 the building permit? Is that -- you know, are 3 these companies that came up and spoke, are they 4 going to be the only ones that are going to be 5 required to do the work on these homes? 6 And did the - - another question I 7 had is the R-2 , the original development , did they 8 have those geothermal requirements when it was 9 origina y submitted? Those are what I ' ve got . 10 CHAIRMAN LUCIETTO: Do you want to say 11 anything to her? 12 MR. PHILIPCHUCK: I can respond at the 13 end if you would like . 14 CHAIRMAN LUCIETTO : Well , we ' ve got 15 quite a list of questions so far, so why don ' t you 16 go ahead and answer? 17 MR. PHILIPCHUCK: Okay. I guess because 1$ I can remember what Lori just said, I will start 19 with her and work my way back, but we are not 20 requiring everyone to have geothermal . We are 21 proposing it to them. We are hoping that some 22 will take advantage of it . 23 It ' s a $45 , 000 option. Let ' s not 24 kid ourselves , there is some payback, but it ' s not Page 38 1 cheap to put in upfront . We didn' t have it as 2 part of that original development because I think 3 they were about $65 , 000 a couple years ago . The 4 prices are coming down, but they are -- they are 5 expensive, so on the geothermal, that ' s a 6 recommended. We are going to suggest that buyers 7 look at that, but that will not be a requirement . 8 So I just wanted to make that clear. 9 As far as the rental situation, we 10 can offer a single level home and we can do an 11 attached product, and you are right, some empty 12 nesters , depending on age, prefer to have one 13 level and some , as long as they are mobile, prefer 14 two-story. 15 The reason we showed you the 16 two-story product is because that ' s what we would 17 anticipate selling in there, but based on today' s 18 numbers , based upon what we have put into the 19 testimony, is what these units contain and price 20 range and that ' ll dictate it ' s not going to be a 21 feasible rental project . It ' s just the way you 22 finance it and having this -- I mean, typically if 23 you are going to do design for rental you want to 24 try to minimize what your exterior treatments are Page 39 1 going to be . 2 You don ' t want 30-year architectural 3 shingles , that ' s for sure, you want the three tab . 4 You try to reduce, reduce costs so you can get 5 your numbers to work out in the market because 6 obviously you are trying to meet your mortgage 7 payment and you are trying to make a profit or, of 8 course , hope that values increase . 9 So for those reasons we do not see 10 this as a rental market much in the way that some t 11 of the older product that was built in the City 12 either was from day one or evolved into it, so 13 that ' s the way we see it . We certainly are not 14 encouraging it . 15 This has come up in other hearings = 16 we have done in other communities . we hate to 17 alienate property. I typically don ' t recommend 18 it . There are situations sometimes that come up 19 where a family can get transferred from their job 20 to another part of the country, but the intent is 21 it ' s a one, two-year deal, they want to come back, 22 they want to live in the house again, they do rent 23 it for a short period of time . If you take that 24 option away from them - - I don ' t know how many Page 40 1 people in this room, you know, would want to have 2 that kind of restriction on their home, that they could never rent 3 cou e t it, but it ' s not something that ' s 4 real popular in the marketplace . 5 So we would ask that that would not 6 be a requirement in this particular development 7 either. 8 The Comp Plan is a guide as you 9 know. It ' s not etched in stone, it ' s just a plan 10 out there for how a community evolves and 11 develops . 12 It ' s hard to keep up and keep them 13 current - - Travis will tell you that - - because 14 it ' s ever changing and evolving . As soon as a 15 decision is made by the council , it can oftentimes 16 affect the Comp Plan and it becomes outdated and 17 another land use decision is made , such as 18 happened here, where the Comp Plan on that 12 19 acres south of us showed it as residential , but 20 what did it come into the City as? B-2 with 21 office uses and retail convenience uses . So 22 that ' s an example . 23 I think the bike path has been in 24 the City' s plans for a number of years . I can Page 41 1 appreciate your concerns about inviting the public 2 into what ' s been a private space, that is the 3 typical concern. 4 Somehow communities have to figure 5 out how do we balance the public ' s need to be in 6 and moved through the community versus the private 7 land owners that have property that is adjacent . 8 That ' s always a difficult thing to 9 work out , I can appreciate your concerns about 10 that , but that really - - we ' re providing a 11 connection from our subdivision to that path so 12 that residents , if they are using the path, can 13 get in and out and have direct access onto the 14 path. 15 It ' s our responsibility, other than 16 the fact that we ' re going to meet with Staff and 17 talk about financial contributions - - for 18 instance, this developer, Woodstone , in their 19 annexation agreement made a commitment to $25 , 000 20 applied to the construction of the trail , so 21 because it was a residential development , there 22 probably was no park donation requirements , so our 23 particular subdivision, you know, we already have 24 a $350 , 000 commitment to the park department, so Page 42 1 that obviously could be applied to construction of 2 the trail . 3 I think the other letter that you 4 received from Susan Lambke, perhaps she 5 misunderstood what was - - she probably heard that 6 there was some attached two-unit product and maybe 7 she thought that that was the entire subdivision 8 and it was doubling, but as we know, that ' s not 9 the case . 10 We still have 45 single-family 11 detached homes closer to the Van Emmon side of the 12 development and it ' s only at that southern end 13 where we are primarily adjacent to open space and 14 commercial that we are looking at the attached 15 product . 16 I hope that addressed some of the 17 questions . I think I had maybe one comment 18 regarding Staff . Looking at that connection back 19 there, we will look at that to see how that could 20 be facilitated, if there is a way to make a 21 connection there for the protection. 22 As I understand it ' s basically you 23 are looking at ways to protect the trees and, 24 again, language in these easements and things can Page 43 1 be directed as to how the trees can be maintained 2 and recommended maintenance and certainly the 3 homeowner ' s associations typically do also connect 4 with the City Staff and look for guidance and 5 assistance . I know we 've done it in our 6 subdivision on some of the common areas as issues 7 that come up . 8 So I think there is expertise out 9 there to the homeowner ' s association, and based on 10 how you draft the language, I think it can work 11 very well . 12 We haven ' t found it to be a problem 13 in White Oak Estates , which there are wide open 14 spaces , we are maintaining them without being a 15 partner with some other outside land conservation 16 group . 17 So we think that this will be a 18 similar quality here and it will also -- also 19 work. So those are our answers to the responses . 20 CHAIRMAN LUCIETTO : Do we have any other 21 questions or comments? 22 MR. McCURDY : My name is Mike McCurdy. 23 I live on the west side . Is it possible to 24 address -- I don' t know, I actually have some Page 44 1 questions . Is it just possible to direct 2 questions to him and have him answer? 3 CHAIRMAN LUCIETTO : Go for it . Come on 4 up. Do me a favor, though. You didn' t state what 5 your actual address is and we would like to have 6 that in the record. 7 MR . McCURDY: It ' s actually a lot . i 8 don ' t know that it has an address . It would 9 probably be 322 East Washington Street . 10 CHAIRMAN LUCIETTO : Okay. That ' s fine . 11 MR. McCURDY: It ' s at the end of 12 Washington Street . It backs also - - so the back 13 of my property is what they' re talking about, the 14 bike trail there . I back up to it just like the 15 other gentleman does , just down a couple streets . 16 But instead of a comment, I have some questions . 17 CHAIRMAN LUCIETTO : That ' s fine . 18 MR. McCURDY: You spoke about a couple 19 of things , first about that geothermal . Travis 20 was - - is that your name? 21 MR . MILLER: Sure . 22 MR. McCURDY: You said you would like to 23 see it mandatory and they are saying they would 24 like to have it optional . Is that something you Page 45 1 are trying to work out or -- 2 MR. MILLER: The Staff ' s recommendation 3 is , you know, these items -- back up . A PUD --- in 4 order for a petitioner to justify a PUD or what ' s 5 expected of a petitioner as written in the PUD 6 ordinance, in order to be considered a PUD or be 7 approved as a PUD, it ' s expected that the 8 petitioner go above and beyond, whether or not it 9 be an architectural standard or green space 10 standard. 11 So one of the things that ' s proposed 12 in the application is that the units being 13 constructed in this subdivision be required to 14 have certain environmental components to them. 15 One of those items was geothermal. , there is a long 16 list of items that they are proposing to include 17 in the residential units , and the Staff comment 18 was not to make that optional , that this is a PUD, 19 Staff ' s recommendation from Plan Commission is to 20 require all of those items for all of the units 21 within the PUD. 22 So to answer your question, yes , 23 Staff is recommending that that item, geothermal , 24 be required for all of the units . Page 46 1 MR. McCURDY : You said it would cost 2 45 , 000 per unit, so you think it should be an 3 option that each individual owner gets to 4 decide - - 5 MR. PHILIPCHUCK: We ' re going to 6 encourage it , we ' re going to point out the 7 benefits to it . obviously some people may have 8 that in their budget and they may be very green IQ thinkers and they may say, you know, that ' s a I 10 great idea. We will show them how the technology 11 works , explain it to them, urge them to do it, 12 because, as we stated earlier on, we want to try 13 to have a green community, but unfortunately at 14 that price it ' s going to take it out of some 15 people ' s price range, so that ' s why we didn ' t want 16 to make it mandatory, but we do want to suggest 17 it, so if we can convince some of the home buyers 18 to put that into their plan, that ' s what we would 19 like . 20 MR. McCURDY : Maybe I 'm off base here, 21 I ' m not sure , but I know, because I am in 22 construction, it ' s very depressed, I hate to use 23 that word, but it ' s very depressed right now. 24 Is part of your reason you are doing Page 47 1 this is to help yourself , you know, be able to 2 sell? 3 MR. PHILIPCHUCK: Absolutely. 4 Absolutely. 5 MR. McCURDY : So the 45 , 000 kind of 5 counteracts what you ' re trying to do. 7 MR. PHILIPCHUCK: We are at a little 8 different higher end market here obviously. This 9 is not a production home , this is all custom-type 10 homes in this subdivision, so it is a different 11 market , but the pockets aren ' t forever, so, you 12 know, what they can afford is what they will look 13 at , and they may say yes , I like it, but others 14 may say I ' ll have to opt out of that, I like all 15 those other features , we ' re going to design those 15 in -- I think I mentioned those things that are 17 going to be mandatory, but the geothermal is not 18 mandatory. 19 MR. PRUTCH : There is not going to be a 20 300 foot hole in the ground when you build a 21 house, come on. That ' s -- don' t believe that . 22 MR. PHILIPCHUCK: Do you want to explain 23 the numbers? Do you want to make a comment? 24 MR. GREEN: The additional cost for the Page 48 1 geothermal , basically it is the intent is you 2 are paying upfront to save over the long-term, so 3 if you pay additional and you can cut your 4 utilities in half or more, then you are getting 5 paid back each month, so over the life of the 6 system you are actually going to make more than ' 7 the additional cost of the system, so it ' s 8 basically an upfront cost to save energy over the 9 long-term, and that ' s basically why -- it is a 10 more expensive system to install , but it has a 11 payback over - - you know, over the lifetime of the 12 system. 13 CHAIRMAN LUCIETTO : Okay. Are there any 14 other questions? Oh, did you have more? Oh, 15 okay. 16 MR. McCURDY : About the trail . 17 That ' s -- I guess both to Travis . This is 18 something that ' s you ' re pretty sure it ' s going to 19 go through, that trail? I mean, I 've heard about 20 it for a long time, but you are pretty sure it ' s 21 going to go through? 22 MR. MILLER: Pretty sure until something 23 is constructed. You never know, but it ' s certain 24 to the point that the City has invested Page 49 1 engineering expenses toward that and have applied 2 for grant dollars to construct it . One of the 3 grants we are hoping to hear as early as November 4 to fund a good portion of the trail . 5 As 3 mentioned earlier, the City has 6 worked over almost two years now with a lease 7 agreement with ComEd, Commonwealth Edison, to 8 allow use of -_ - Iong--term use of the property to 9 construct the trail and to maintain the trail 10 across it . 11 It ' s seen in the Comprehensive Plan 12 and in the Transportation Plan still in draft form 13 as a critical link to large populations . whenever 14 the subdivision, Raintree subdivisions , Country 15 Hills , we have over 2 , 000 residential units that 16 are platted in that part of the city through this 17 trail would be able to have access downtown to a 16 pedestrian trail , so it ' s a -- in the draft and 19 greater transportation plan, this is one of the 20 top priorities in terms of trails city-wide to be 21 constructed, so Y believe it ' s likely given all of 22 those factors . 23 MR. McCURDY; Is this another factor 24 that you are - - because it seemed like you were a Page 50 1 little - - the numbers , I don ' t know, I didn ' t 2 understand exactly because they talk about a 3 million and three million. 4 I would think that that would have a 5 big bearing on you, too, wouldn' t it, I mean, I 6 would think at some point it ' s not going to be 7 worth it for you to do it because a certain amount 8 of money - - 9 MR. PHILIPCHUCK: That ' s why we have to 10 sit down -- you are absolutely right, we have to 11 sit down with Staff and City Council about what ' s 12 a fair donation towards the construction of the 13 trail based on the number of units that we have in 14 the subdivision. 15 MR. McCURDY : So that ' s a sticking point 16 right now. 17 MR. PHILIPCHUCK: Well , we obviously 18 cannot afford to do a million for that trail . We 19 can ' t do that . 20 MR. PRUTCH: Has anybody been down there 21 to look at the grade for that? Because up to my 22 property, up to this - - this is a big retention 23 pond right here, so from this retention pond, here 24 is my house here . Page 51 1 From here all the way down to where 2 my land is is like at a really steep slope, so 3 that means they are going to have to go back in 4 there and regrade all that out, make it flat, have 5 to put what, five bridges across , where the creek 6 goes across here like five times , so when you guys 7 cut into this hill , you ' re going to weaken that 8 retention pond. 9 MR. HUINKER: The creek is actually 10 here . 11 MR. PRUTCH : It comes here . It bends 12 around and cuts in around here . 13 MR. HUINKER: What we ' re proposing is 14 just to connect - - it would end at this property 15 line . what the City is proposing is this regional 16 trail , that would be constructed within -- 17 MR. PRUTCH: Right, but from the top of 18 here down to where my property is -- 19 MR. PHILIPCHUCK: We ' re not going to do 20 anything here . Our path - - 21. MR. PRUTCH: Well , my property is right 22 here . 23 MR. HUINKER: Yes . Well , we are 24 proposing to have it rise right along here . It Page 52 1 would intersect the trail . 2 MR. PRUTCH : And then where would it go, 3 from here , up here? 4 MR. HUINKER: The Com Ed trail 5 essentially goes north/south. 6 MR. PRUTCH: Right, but this whole hill 7 right here is at such a steep slant - - 8 MR. PHILIPCHUCK: That ' s not the ComEd 9 property. 10 MR. HUINKER: This is separate from the 11 ComEd property. 12 MR. PHILIPCHUCK: The ComEd property is 13 low ground at the bottom. 14 MR. HUINKER: Is directly west of this 15 property. It ' s not within this property. 16 MR. PRUTCH: So how are you going to get 17 between my property and this retention pond? 18 MR. PHILIPCHUCK: That ' s Commonwealth 19 Edison ' s property. 20 MR. PRUTCH : Where is that at compared 21 to my property? 22 MR. PHILIPCHUCK: Between the two. 23 MR. PRUTCH: Right, which is at a slant . 24 MR. PHILIPCHUCK: No, it ' s not at a Pace . I slant . 2 MR. PRUTCH: Yeah, it is . If you want 3 to come over, I ' ll show you. The creek runs 4 through my back yard. 5 MR. PHILIPCHUCK: The creek is on the 6 low ground. i 7 MR. PRUTCH : The creek runs through my 8 yard. 9 MR. PHILIPCHUCK: No, that ' s 10 Commonwealth Edison ' s property. 11 MR. HEATH : That ' s fairly level . I 'm 12 Richard Heath, 48 -- 9488 Van Emmon. 13 CHAIRMAN LUCIETTO: Okay, thank you . 14 MR. HEATH : That ' s an old railroad 15 right-of-way and it ' s fairly level . 16 MR. PRUTCH: I understand that , but when 17 they built this , they came in here and they sawed 18 all the trees down and then when they built the 19 subdivision, from my yard is flat, then it goes 20 like this , straight up, all the way to the top 21 here . 22 MR. HUINKER: That ' s your property and 23 that ' s ComEd. 24 MR. PRUTCH : I ' d like to go down there . Page 54 1 MR. PHILIPCHUCK: That ' s ComEd, that ' s 2 your property. 3 UNIDENTIFIED SPEAKER: How wide is it? 4 MR. McCURDY: 50 feet . ComEd is 5 probably 50 feet . 6 MR. MILLER: It varies depending on what 7 it is , but it ' s basically a 50-foot wide strip of 8 land . 9 MR. HUINKER: If you take this western 10 line and you offset that about 50 feet, that ' s 11 basically -- 12 MR. PRUTCH : I know where it ' s going, I 13 can see where - - when they came in there and they 14 ran that sewer line, that ' s exactly where it ' s 15 going to go, but after they put that sewer line in 16 there, they went in there and regraded it all . 17 MR. HUINKER: Now, the design and 18 construction of that is actually Travis ' , the 19 design that ' s currently being done right now, 20 so - - 21 MR. MILLER: One of the reasons for the 22 high cost is dealing with a bridge to cross the 23 creek. 24 MR. PRUTCH : Yeah, because I get enough Page 55 1 water back here now after they went in there and 2 they redid all this . Every time it rains in the 3 spring and the snow, it comes all barreling down 4 this hill , through James ' land, through the other 5 part down there, so, I mean, I ' d love to have you 6 guys go down there sometime and show me exactly s s 7 where it ' s going to be . You can' t see it here . I 8 mean, I know exactly how the creek runs through 9 there, I am down there every day. 10 MR. HUINKER: It crosses back there . 11 MR. PRUTCH : Oh, yeah, and you can' t 12 redirect the creek. 13 MR. HUINKER : And that will have to be 14 addressed in the engineering of ComEd, but that ' s 15 separate from this property, that ' s - - 16 MR. PRUTCH : And I understand that, 17 because I had them - - when they came in here and 18 they did this -- there were supposed to be two 19 houses on the original plans back here and then 20 they moved them over here because they found out 21 that this is all - - when they dug this here , they 22 could never get this dried out, there was always 23 water or a spring running underneath there, so 24 then they built the two lots to go through here Page 1 and then they built - - 2 CHAIRMAN LUCIETTO : One conversation at 3 a time . Can I make a suggestion? Because you 4 definitely have a concern. They haven' t gotten to 5 the point where they know what they' re doing in 6 that area loo percent yet . 7 If I were you, I would get ahold of 8 Travis ' card and just contact him on a regular 9 basis so that you can follow what ' s going on and 10 then maybe they can invite you and actually 11 explain it to you . 12 MR. PRUTCH: That ' s fine . That ' s fine . 13 MR. MILLER: I ' d be happy to . 14 CHAIRMAN LUCIETTO : Does that sound 15 okay? 16 MR . PRUTCH : Okay. I have no problem 17 with that . Thanks . 18 CHAIRMAN LUCIETTO : Is there anybody 19 else? Could you give us your name? 20 MR. RODRIGUEZ : Ruben Rodriguez , 318 21 East Washington Street . 22 CHAIRMAN LUCIETTO: Thank you. 23 MR. RODRIGUEZ : I back up into Mike ' s 24 property and, as a matter of fact , it was his Page 57 1 house . 2 My concern is that - - and I have no 3 problem with the bike trail , I 've seen that in 4 Wheaton, you know, had that long bike trail . 5 I have no problem with the 6 converting it from a B-2 to, you know, condo 7 living, if it ' s only in one area, that ' s fine . I 8 have no problem with that . 9 The thing is are we going to revisit 10 this or water down the zoning later on if the 11 market continues the way it ' s going? I don' t want 12 this to continue into one housing issue after 13 another because they can ' t build, and I don ' t want 14 to convert it into another type of housing where 15 it ' s rental at the end of the day, oh, we can ' t 16 sell now, we ' ve got to rent . That ain ' t 17 happening. That will not happen. Okay? I 'm - - 18 that ' s -- 19 The market is depressed, I 20 understand that, you know, everyone ' s housing is 21 at a low level , but we can' t keep rezoning just 22 because you guys can ' t sell the property. 23 You made the investment, you made 24 the gamble, you bought the property, now you are Page 58 1 in hock. Let ' s be realistic . You ' re coming up 2 here and selling us a bill of goods saying I 'm 3 going to put all this good stuff in there, we ' re 4 going to put this geothermal stuff in there, and 5 it ' s just a selling point because it really 6 doesn ' t exist . It doesn ' t exist . 7 And you tell us to buy into it . 8 Forget it . I 'm not buying it . I agree with all 9 the things that you want to do, but at the end of 10 the day, when you rezone, now are you going to 11 water it down again a year later, oh, we can' t 12 sell it, oh, well , we 've got to come at you again. 13 MR. PHILIPCHUCK: The property owner, 14 your point, always has the right to ask, but the 15 municipality does not have to grant it . 16 MR . RODRIGUEZ : Right . 17 MR. PHILIPCHUCK: Now, they can' t be 18 unreasonable, arbitrary and capricious in their 19 decision, but I think history has shown a 20 reasonable first bite at the apple is one thing, 21 if you come back for more, it ' s usually pretty 22 difficult . I think the Plan Commission has 23 experienced that . Good point . 24 CHAIRMAN LUCIETTO : Is there anything Page 59 1 else? 2 MR. McCURDY : Can I comment then? 3 CHAIRMAN LUCIETTO : Oh, absolutely. 4 MR. McCURDY : I guess I 'm going to 5 counterpoint Ruben because I am in construction, 6 so I mean, I don ' t think what they' re doing is bad f 7 myself . I don ' t see it as a problem- 8 I mean, they ' re not asking to put a 9 factory in, they are keeping it residential , 10 they' re not really changing the scope of it, and 11 the quick question, people keep saying condos . Is 12 there like a four-unit condo building or is this 3 13 attached single-family houses like a duplex? 14 MR . PHILIPCHUCK: It ' s attached 15 single-family. 16 MR. McCURDY: So no condos . 17 MR. PHILIPCHUCK: No . Some people is envision condo. It ' s a type of ownership on this , 19 it ' s a multi-story building with a bunch of units 20 in it . 21 It ' s a common ownership where they 22 own the four walls and there is common ownership 23 of the areas around it , but it ' s in essence a 24 two-unit attached single-family project . Page 60 1 MR. McCURDY: And you know, I know a lot 2 of people have no sympathy for people in that - - 3 you know, but I do, you know, I have to make a 4 living, too, and so do they, and they are 5 proposing something to keep their head above 6 water. 7 You make them like a villain like 8 they' re trying to, you know, cheat everybody. I 9 just don ' t look at it like that . I look at it as 10 yeah, they probably are in trouble, a lot of 11 people are in trouble , a lot of people don ' t have 12 work, a lot of people need to make money. I don ' t 13 think they' re asking for anything that sounds 14 ridiculous or unreasonable . 15 I just want to go out because it 16 seems like nobody ever supports anybody in these 17 situations and I just want to say that I think 18 this is a fine thing they' re asking for, it 19 doesn ' t sound horrible to me , and I don ' t think 20 you should try to get a million dollars out of 21 them out of the back part , they' re not -- that ' s 22 not part of the agreement now that they don ' t have 23 to do that, and I think a lot of people would 24 rather not see that trail go in, but that ' s Page 1 another point that has nothing to do with them 2 really, but I 'm just saying I think what they are 3 proposing is reasonable, it ' s not really going to 4 change anything other than hopefully maybe it will 5 make it easier for them to sell some of their 6 units , and the other way is start to see stuff 7 that ' s all boarded up or, in their case, land is 8 going, you know, back to nothing. Some people 9 like that . 10 But I just want to remind everybody 11 that everybody needs to make a living, and if you 12 don ' t own your own business , you are working for 13 somebody else who is running a company, that 14 you ' re -- - 15 I mean, GM is going out of business , 16 everybody is having a hard time now, and I don ' t 17 think it ' s unreasonable for someone to come in and 18 ask for yes , we did this , but now things have 19 changed, and to keep our head above water, we need 20 to make a change . I don' t think it ' s unreasonable 21 and that ' s my comment . 22 CHAIRMAN LUCIETTO : Okay. Do we have 23 any others? 24 (No response . ) Page 62 1 CHAIRMAN LUCIETTO : Hearing no other 2 comments -- 3 MR. LINDBLOM: I would move to close the 4 public hearing. 5 CHAIRMAN LUCIETTO : Do we have a second? 6 MR. HOLDIMAN: Second. 7 CHAIRMAN LUCIETTO : All in favor say 8 aye . 9 (A chorus of ayes . ) 10 CHAIRMAN LUCIETTO : Not in favor, nay. 11 (No response . ) 12 (Which were all the 13 proceedings had in the 14 public hearing portion of 15 the meeting. ) 16 - - -000- -- 17 18 19 20 d t 21 22 23 24 Page 63 1 STATE OF ILLINOIS ) ) SS . 2 COUNTY OF LA SALLE ) 3 1, Christine M. Vitosh, a Certified 4 Shorthand Reporter, do hereby certify that I 5 reported in shorthand the proceedings had at the 6 hearing of the above--entitled cause and that the 7 foregoing Report of Proceedings , Pages 1 through 8 64 , inclusive , is a true, correct , and complete 9 transcript of my shorthand notes so taken at the 10 time and place aforesaid. 11 I further certify that I am neither 12 counsel for nor related to counsel for any of the 13 parties to this suit, nor am I in any way related 14 to any of the parties to this suit, nor am I in 15 any way interested in the outcome thereof . 16 I further certify that my 17 certificate annexed hereto applies to the original 18 transcript and copies thereof , signed and 19 certified under my hand only. I assume no 20 responsibility for the accuracy of any reproduced 21 copies not made under my control or direction. 22 23 24 Page 64 1 In testimony whereof, I have 2 hereunto set my hand this 12th day of August, 3 A.D . , 2009 . 4 5 6 Christine M. Vitosh, CSR CSR No. 084-002883 9 10 11 12 13 14 is 16 1 18 19 20 21 22 23 24 Page 1 of 3 DRAFT UNITED CITY OF YORKVILLE PLAN COMMISSION Yorkville Public Library, Historic Meeting Room Wednesday, August 12,2009 7:00pm Chairman Anne Lucietto called the meeting to order at 7:00pm. Roll Call: Jack Jones Jeff Baiter Tom Lindblom Clarence Holdiman Michael Crouch Charles Kraupner Brian Schillinger(7:02pm) Chairman Anne Lucietto Absent: Sandra Adams Quorum established. Other City Staff. Travis Miller, Community Development Director Guests- Matt Schury, Kendall County Record Lowell Iverson Loren Miller Martha Price Sandy Henne Verne Henne Richard Scheffrahn Steve Hornik Bill Dun, EEI Kelly Kramer, Attorney Steve Bazan Marion Bazan Gary Matlock Kyle Price New Business: 1. PC 2009-12 First National Bank of Ottawa Trust 42466, petitioner filed an application with the City requesting approval for a preliminary PUD and final subdivision plat. The property consists of approximately 6 acres at the northeast corner of Route 34 and Cannonball Trail, Yorkville. Attorney Kelly Kramer was present on behalf of the petitioner. They are seeking a recommendation for the preliminary PUD and final plat for the 6-acre parcel. This plan does not request a gas station like the previous one and includes other businesses still in negotiations. Commissioner Crouch questioned the proposed daycare next to a restaurant (Buffalo Wild Wings) that serves alcohol. Attorney Kramer said the distance requirements are met. Page 2 of 3 Discussion turned to the original request for a gas station. Mr. Schillinger noted that the Plan Commission had previously voted unanimously against the gas station. Attorney Kramer stated that the request is not withdrawn. She said that while the petitioner is anticipating a retail use, a"special use"provision remains under the PUD. Travis Miller provided a further explanation of the Annexation Agreement. If the property were redeveloped in the future, the PUD would have to be amended. In order to build a gas station, the petitioner would have to come back before the Plan Commission. Travis added that a gas station would also require a reconfiguration of the parking lot. If the land is ever sold, it also retains the "special use" stipulation. Harold Oliver of HRM Properties noted this is a market-driven project. He informed the Plan Commission of the businesses proposed for this development. He said if the current plan is not approved, the gas station is still an option for him. Bill Dunn of EEI commented briefly on the stormwater basin. He said all issues brought forth are manageable at this time. Commissioner Baker suggested that perhaps there should be an emergency access for the daycare, but Commissioner Lindblom said there is ample room around the building. The audience was asked for input, but no comments were voiced. Action Items i. Preliminary PUD Michael Crouch made a motion to approve the preliminary PUD subject to staff comments. Jack Jones seconded the motion. Roll call vote: Jones-aye Baker-aye Lindblom-aye Holdiman-aye Crouch-aye Kraupner-aye Schillinger-aye Lucietto-aye ii. Final Plat Mr. Crouch also moved to approve the final plat subject to staff comments with a second by Mr. Jones. Roll call vote: Baker-aye Lindblom-aye Holdiman-aye Crouch-aye Kraupner-aye Schillinger-aye Jones-aye Lucietto-aye Page 3 of 3 Additional Business: Travis Miller reported on the CMAP 2040 Plan. He said there is an interactive kiosk at the Library's main entrance until Monday, August 17th and input from the public is invited. On this date there is also a meeting regarding the Plan. Update on Kendall County Consortium: the editor of Plan Commissioners Journal is conducting a USA tour and exploring issues being faced by Plan Commissions nationwide. The editor will attend the September 10th Consortium meeting hosted by Montgomery at 7pm. Michael Crouch reported on the Zoning Commission and said they have been meeting monthly to update and revise the verbage. They will continue to meet August through October. The next meeting is August 26th There was no further business and a motion for adjournment was made by Jones and seconded by Crouch. The meeting was adjourned at 7:23pm. Minutes respectfully submitted by Marlys Young SE(c W I A F L E 6 9 September 3, 2009 Mr. Travis Miller United City of Yorkville 800 Game Fame Road Yorkville, IL 60560 Re: Plan Commission Meeting September 9, 2009 Verizon Wireless 204 Wheaton Avenue Cell Tower Special Use Petition Dear Mr. Miller; As you know, SAC Wireless, LLC on behalf of Verizon Wireless, was scheduled to be on the September 9, 2009 agenda for the Plan Commission. Due to the extent of revisions requested by Staff, we respectfully request a continuance until the next Plan Commission Meeting on October 14, 2009. We apologize for any inconvenience this may have caused. 5s Zoning Manager SAC Wireless, LLC —Representatives for Verizon Wireless Site development,Architecture&engineering,Construction 635 East Remington Road,Schaumburg, IL 60173 T 847.944.1622 F 847.991.5707 tony.phiilips @sacw.com 0 C Memorandum To: Plan Commission EST _. � 1836 From: Travis Miller, Community Development Director O �fl r� y CC: Annette Williams, Administrative Assistant (for distribution) 9 � y p Date: September 2, 2009 Subject: PC 2009-15 JR Yorkville LLC (Rezoning R-3 to B-3) Background This property was annexed in October 2002 as part of the Northgate Annexation. The Annexation Agreement included 86 acres and the property was zoned B-3 and R-3. The Bristol Bay Annexation and PUD Agreement approved in 2005 included 57.87 acres of this property, leaving 28.13 acres. 26.04 acres of this property are zoned B-3 and 2.09 acres are zoned R-3. Simultaneously to this request, the property owner is requesting Preliminary and Final Subdivision Plan/Plat approval. This rezoning of the 2.09 acre area to B-3 will allow for the entire 28.13 acre property to allow commercial use. Staff Comments Plan Council reviewed the rezoning request August 20, 2009 and recommend this is simply a housekeeping item and recommend approval. In considering rezoning requests, the Zoning Ordinance requires the Plan Commission to make findings based upon the evidence presented to it in each specific case with respect to the following matters: a. Existing uses of property within the general area of the property in question. b. The zoning classification of property within the general area of the property in question. c. The suitability of the property in question to the uses permitted under the existing zoning classification. d. The trend of development, if any, in the general area of the property in question, including changes, if any, which have taken place since the day the property in question was placed in its present zoning classification. e. The impact that such reclassification and/or annexation will have upon traffic and traffic conditions on said routes; the effect, if any, such reclassification and/or annexation would have upon existing accesses to said routes; and the impact of additional accesses as requested by the petitioner upon traffic and traffic conditions and flow on said routes. (Ord. 1976-43, 11-4-1976) 1 Additional factors to be considered for an amendment to a zoning ordinance as detennined by the `LaSalle' case should also be considered. These factors are as follows: 1) the existing uses and zoning of nearby property; 2) the extent to which property values are diminished by the particular zoning restrictions; 3) the extent to which the destruction of property values of plaintiff promotes the health, safety, morals, and general welfare of the public; 4) the relative gain to the public as compared to the hardship imposed upon the individual property owner; 5) the suitability of the subject property for the zoned purposes; 6) the length of time the property has been vacant as zoned considered in the context of land development in the area in the vicinity of the subject property; 7) the community need for the proposed use; and, S) the care with which the community has undertaken to plan its land use development. 1, to 1 - - - ? 0 71 Vz } r Y PCP 2009- The Data fs provided without warranty or any representation of N accuracy,timeliness,orcompfeteness.It is the responsibility of the "Requester"to determine accuracy,timeliness,completeness,and J R Yorkville, L LC Rezoning appropriateness ofits use.the United City of Yorkville makes no W � E warranties,expressed or implied,to the use of the Data. - .parcel Data&Aerial Photography provided by Kendall County G!S Aerial View Ma p created by UnitedClt of Yorkville WS $ ++++++++�+++r♦rir+ ® ■ ♦♦iii♦♦♦♦ ►�'i'��+�♦=+ ON II 5110m MORE Legend 1111 IIIli1 �+W+�+�♦�+���+���♦ !�+�+�♦�♦�♦�+�♦� 1lIC 11 �1111M � ��. +i+♦++ri+i++�ir�+♦ ►♦♦+fir♦++i+i+++� ,�� i ! 1111 i'i'iriririri'♦+♦r !iri'i+iri'i'i�i Illm �I 0 � ♦r+'♦r♦rr'+r+'+'i+ E-1-Estate Residence ►�'+'ir+r+r+r+'�� o ��♦ ,, I O,�I®I � 111! ♦++ll♦+♦♦ +♦♦♦iii♦ W+++++++i�++++�+++ ►�+i'+++rrr+'+'i ♦ I �� ++�+++++++i+�+i+++ ►♦♦ii+♦♦�+�+++��IIGI 111111 �! �I��e �� 111/ p B ir+'i'i'ir+ririr+♦ ►«'+'+'++ir+r+ii 1111 s. ► �I p�� _Family Residence. ♦iilllii♦ ►++l+iii+ —� ��� • ,,111111111 i ♦♦♦♦fill+ - . Duplex Two Family District ♦♦+i+�+i+++++ii i ♦♦li+l iir+i*iBill R-3-General Residence[)!strict � +liiil+ii ►+♦♦ill♦+ s ♦i♦i♦ii+♦ ♦ii/l♦+♦ ➢111 R-4-General Residence District ii+iiii�+iiii�♦♦ii ►+�+i+i++++ii+�� ` ♦iii♦ill♦ ►++fill+< IIIG . ♦iii♦♦ill ++li+ii♦ +i�♦♦iii+�+ii+iiii iiiii+iiiii+iris �4 . . office . i'iririr�'ir�'i'♦r i'iri'iri'ir♦'i B-1-Limited Business District B-2-General Business i1♦fii♦♦� s District iri'♦'Irir�##ir♦r+r iri'i'ir+ri'i'+'i B-3-Service Business D' trill ` rii♦i♦+♦,fill++ ♦+i♦♦iii - '+'l�+llii♦ +ii♦♦iii♦ - ♦lfiii�♦i +i♦♦i♦ll ♦t♦+iii♦i +♦ill♦t♦ - ' -Business District ♦+iiiiiii ♦♦♦lf♦l♦ 1 � ♦i♦iiiii♦ ♦lull+♦ ii♦♦fill♦ ♦♦♦fill♦ # li♦iiiii •#+•+• ++iii #iffll•�#f ♦iiiil+i+ a#+ l i+hill#+#+�►�!l♦+♦ ill♦+♦iii +#«++ � i+++++i+,•i+i+lp +++��►++�+i+ illrlV�l+#*�*4Ili###Y+fi r++i'►i ++♦+r+i+♦+♦rl+l+l «i►;�►+}+i ►r•'•*i*+►'+♦+++r►i�►'s*s�#.J'#**'►r �.il 'O+r♦Or+l+++l+l *«#«#.#s♦r♦i +l+ Vll ♦+++lfii+ #+#•«"��•► ++ +►#*►lf###+♦♦i! ♦iii♦++i ++#sii bialii►+l'#'►##l#$►rll��*�1�+*++il+i+++irir+'+r+r+r+ri+lr +++►###+i«++i 1######+ *i!►#«#♦i ##ii♦lilli+ i#+ill #a#•+iaV.V.V. i�+lia## •• ♦fill♦/1+ irr+i♦ r#l+alitei+ «## .#illll♦♦+♦ frill♦ ##sa+####a#a###ail ♦l++♦♦ii+ •r al •MS+b+rr## •RM+#aa#++ ♦iiiilii +la�ri+ l#i#a##� ##i##aa+rl♦♦ii+ilii +++1++ ilai+fii+♦♦iii •}##09#41•#a#+i ►i+iiiii♦♦i♦♦♦ ii♦iii #######1t*+++#+iilf it♦♦i♦l♦ i#iii#! #a#•#+ ^+++iti+#liiii♦l/ill l++•+r iba+••l+#++++Miir## ill♦lfll ♦liar+i ##a+i+i� #iaarr +l•1if♦1♦ll+ 41!41 IF •♦ .#i+ll i+tili#+#il# # l♦♦++li+ _ i## •+ 4141+♦iil�-iii+ilii'lllllll+li♦ ♦#aMrl +i+ a###rf ++ll+iii♦♦ +###all+ }i#V V W.*6Fmiir�# ####ri*#**+ � i Oirir♦�i'Oiriri •'►l#aa4+++i i'i i +►i#i i ♦fill♦♦♦ it+i+l#fir♦+##r# }♦♦i*i#'*� lrl#►*4141•##*«+ "+iiOO+iri+iri #1♦li++++i+ii++++`+►isr«♦4141##•`r*+# +4109*++►a#+a++ii♦+iiiiiii♦♦ +i#iii♦il#i##### ►mss*4141###**wi+*lai++++++♦iiiri�r ii♦♦fill♦♦♦�♦i iiiil#+i�il#liri##i#ti*+k+4141##*#+#� ► #'i''4i#'s#rr 'iririririr�r irW'#r#r#i�1 !Wi#•:#WSW*+a: •':* - "i WP�x����r�•r♦#+it+�#1###*•�*,•a*a++il+l+i+i+l♦ i«*+++♦+l♦iii•+++*+s,+a�i�►M�+«.•�*,�+.+�♦� Ni+-11�tri+++*4141#*#*#1«++bi# �+�'#'#ilir ♦++i l#la++ii ♦♦4141#+!4141#a+a ."r•'�i�i. #i++ai ♦iii ♦li#+ iiirifaa#*#####ia ♦ri'l'l'♦♦+'♦'�'♦`♦'r. v i►«!i ii+iii fill++♦'♦iii+l►#r+♦►ril##F##M#+►####+####•9 i`# i+ii+i♦ii/f+ iii ♦+ ♦+ii♦ia'ii+ill♦###+►###ii+br+ ♦i♦i+i♦ill+f ii ♦i+iiaa####r###+ki1#liilM ++++++i+i+i+l+ill+++l++! li+++it+4ii###M###i##*#sfs*•+i#Mi#lie sM#Mi►#r i♦iii♦fllrl• ♦♦iir###a##+ala+a#+ Mr..rMi iill/il�lili +iii###i+sai+Ma«a+MM�•MM#r# illfli+iiii• .r♦♦4141#+1++.•.•#•MM..###•# il/l+l+iiiii •#•aa+ial##.###M####++ ♦♦+♦♦++li♦ii i+iiilM#•#M######a +iiliiiiiii< • ��.+silo###lira++i«+ . �il+i+ii♦ll< +++►+++ +� ♦♦ii♦i♦l♦l+l irl#+i#if#a a a si.. ♦i+♦iii♦ ♦i♦♦ill+l+lt i++iiiii«4141#♦#«i �t�+.��iiii ♦iii l♦f�♦+i♦ lriiii####a•##li♦ i+++ t♦♦ll♦l++ii4 s+irir### «+4141►l+i+i`•. ♦♦ ♦♦♦fill+iii♦ #hill####«faa*ia+iii ♦♦i♦lll++ill iaiff## •.a+.i ♦i++ill+♦♦ii �#ri1►♦r##a#«+i«+b♦i+♦#i#s#iii' . ♦ll'ii+i+♦+it +##a++++aa##a+rll+♦irirrr ♦ll�ii♦♦l♦♦♦ ♦!#a«as•+alt#ia++a##+i##rl#iiiiill`r. l+l+l+l+++i+j+i+i+j+j♦♦i ++#+/###i###�b#a*#i•i#ii«i'i'i+#«i#### Fi#'b####tiiil lri'lrlr+r+r+ilrlrl`l'�. �+f+j+j+j+j+�+�+�+�1j+�4 ♦ri'l♦♦#'i#'+'i 4'i'►i+#;♦++'ir�►riii�ri###�#.++4141*41'41'►♦lr+r�r♦'''li+r�Rr♦'#iirlri�♦+iri� ri'i'i'i+i� *ririr♦"i''s* ' r:*+r:*#+''+*':••ire* `s•:#o`'++++•*r+`:*+#:�+*+41:41+`r+* iliffff+i+fl r♦lli+iii+b*+►++r###+aa.iw«.VTIl 4141##«a+.a##. +f♦f♦iflllii- ♦♦lfliiiai#ia######a+#+ki9,*VW iila##M####•##* ♦♦fill++iili . ♦+♦li+##### ##•#}#ata+ll+far++####l +F.#aas#rt it♦flliliili ♦♦+♦♦a######f•s++•.. +lia+Main•###.####a#a+. if+li+i+♦ti ♦iii+ii###ai#+####.W0 —;P !##lli*4141##M.#all#♦ ♦l f l l+i++i i i'+l+i+#####s l l a r++i ♦♦iii+♦♦++ l+♦ilia#+###la*++b##is••MrM###s.#####i«ia«i+b+ fill♦+♦♦♦i' + ♦l++ir#...####404% +i.rE#.rib####a###ai.+a�►+ii' ♦♦i♦+♦♦♦♦ ♦ ♦♦i♦i+li.#+r+aaaaar#ara•##M##4#. 0+#aM•aar+iii ♦iii+♦iii ♦1 ♦++ii+##.##+cilia♦+IM+aMM#M###+#a#+#Miaiitit# +ii♦i♦ ♦♦ iiii iis+raa+++i+«i«i#si####►#+##«o+aa+««si«ria iiii♦ ♦l1 i++♦iii#+t+ll it+Fi#Mai##+#►###iii,r;baiM«# ' iii♦♦♦ lam♦ ♦iii♦l+i�ri++#l+iiil�r## F####*#+##ir0«a*««sra## .+l+��r♦ 111+it i+i++++il♦lrl'bi*i««+♦viii+++'iai#l.#«#**##.l#r###*i#s#abaa#*+ll +«i+a:b:ala#####sr###i ♦iiffl++a«+ii♦iaa+04 - -wraai++M +lr##1####+• a .+riririri +l+'irOlrirl+ii+�i'+«i'rrr #+F#Mri**4141##*#*«i*i+#*i+ #+«#rte**##Ma+####roll* «i♦♦ ♦lflfla.#♦+sari♦ IIVt ail♦ar+i#aiir+l######al iai♦t ♦illllllllll+l*iM#+►i#a#riiii##ae+iir+#iiiii+i#++ia#i4ras####rri♦ii##++###Mi#a#i#ia+a t lifillii####«rf ##aa+r+++ir+MM#*4141♦f#+++a•#i4 fifi♦♦ii+#r##iii #a+nailaaaa#M####•+a#la all# l�l�+++iri+ri+#####�#+F*i+iai+++#*l+l'+*11M##i*Ma#####Mid####*li+*ii+*+++'# ViWiV W i.`l•#«iia IF+i' +fry#+is+fr air♦#"b#+## l a lls ! i+i+''##ll##�## iii'i'�r�ririrrii�i�','+';iii+:'�rr�rir:':':'�r�,•s+++ir+�+sJri.+ ►'a����r ��i'!a ZmV The Data Is provided without warranty or any representation of N PC 2009-15 Rccurl Jimefiness,or completeness.it Is the responsibility of the "Requestel determine accuracy,timeliness,completeness,and JR • • � -warranties,expressed or Implied,to the use of the Data. P -Parcel Dal&Aerial Photography provided by Kendall County GIS • I_ " _ ` Legend I � 2006 Land Use Plan I \ e tt7 Land Use Classification I .ysfo/ Rural Neighborhood eay 9 Estate Neighborhood I O~ Suburban Neighborhood Traditional Neighborhood LJ.IJ J p Commercial Neighborhood Retail Industrial Office/Research I / �ar-quelte-St- i Mixed Use Public/Quasi Public ParhslOpen Space CommerciaLlOffiee Research d I [ 1 1 IndustnallOffce Research Bertram Dr ! 00 ! C ' ll n Q � � I lJ 070 oo ° D �1 El 0 El L 11 F./(4�7; ' �► rr � � - JD r _ /i r�F / f / i / i A ! ! it Ii I w i I � � I I I ! I I i o PC 2009-15 The Data is provided without warranty or any representation of N accuracy,timeliness,or completeness.It is the responsibility of the "Requester"to determine accuracy,timeliness,completeness,and J R Yorkville, L LC Rezoning appropriateness of its use.The United City of Yorkville makes no w warranties,expressed or implied,to the use of the Data. LandC -ParcelData&AerialPhotography provided by Kendall CountyG1S 1 f� +7 -Map created by United City of Yorkville Gf5 8 43 4� �'r o United City of Yorkville 800 Game Farm Road Yorkville, Illinois 60560 11 Telephone: 630-553-4350 Fax: 630-553-3436 Le PC# APPLICATION & PETITION ANNEXATION, PLANNED UNIT DEVELOPMENT,ZONING OR SPECIAL USE REQUEST Development Name: Northgate Date of Submission: August 11,2009 Requesting: []Annexation ®Zoning Q Planned Unit Development p Special Use: 1. Name of Petitioner(s): Midco Northgate Yorkville, LLC(David Hene) Address: 2303 Butterfield Road, Suite 310, Oakbrook, Illinois 60523 Phone Number: 630-366-2304 Fax Number: 630-954-7701 Email Address: dheneO-midamdevelopment.com Relationship of Petitioner(s)to subject property: [I Owner ® Developer 0 Contract Purchaser 2. Name of holder of legal title, if different from#1: If legal title is held in a Land Trust, list the names of all holders of any beneficial interest therein: 3. a). (i). Street address and physical location of subject property: NEC Galena Road and Route 47 (ii). Zoning of surrounding parcels: North: B-3 Service Business South: B-3 Service Business East: R-3 General Residence, R4 General Residence West: B-3 Service Business b). Legal description of property: attach as Exhibit"A". c). Total Acreage: -3 acres d). Kendall County Parcel Number(s) of property: 02-09-100-011 e). Current Zoning Classification: R-3 General Residence 0. Zoning Classification Requested: B-3 Service Business g). Is this property within City limits? x Yes No, requesting annexation United City of Yorkville Annexalion,PUD,Zoning,Special Use Application Revised: 1.29.09 44 4. Names and addresses of any adjoining or contiguous landowners and landowners within 500` entitled to notice of petition under any applicable City ordinance or State Statute: Attach a separate list and label as Exhibit"B". 5. List all governmental entities or agencies required to receive notice under Illinois law: Bristol Kendall Fire Department,Yorkville School District 115 6. List the Illinois Business Tax Number(IBT#)for the State of Illinois and names of businesses located on subject property to be annexed: None 7. Does a flood plain exist on the subject property? No 8, Do Electors reside on the subject property? No If so, they must execute this petition to annex. (Electors as defined by Illinois Law is a resident of the parcel who is a registered voter. Legal owners of the annexing parcel must sign the petition regardless of place of residence or legal voting status.) 9. Contact Information: Name, address, phone number,fax number, and email address of person to whom inquiries regarding this petition may be directed: David Nene, 2303 Butterfield Road, Suite 310, Oakbrook, Illinois 60523 630-366-2304,630-954-7701 (fax),dhene @midamdevelopment.com Attorney: Name: none Address: Phone Number: Fax Number: Email Address: Engineer: Name: Craig Knoche Address: 24 N. Bennett St, Geneva, Illinois 60134 Phone Number: 630-845-1270 Fax Number: 630-845-1275 Email Address: knochec @crk-eng.com Land Planner: Name: none Address: Phone Number: Fax Number: Email Address: United City of Yorkville Annexation,PUD,Zoning,Special Use Application Revised: 1,29.09 45 10. Submit the following to the Community Development Department in order to be scheduled for the necessary committee meetings. An incomplete submittal could delay the scheduling of your project. a. Original application with legal description plus 35 copies. b. Appropriate filing fee(Please refer to page 4 of this application to"Petitioner Route, Step 1 Fees"and/or contact the Community Development Department for verification of this amount.) c. Concept or Preliminary Site Plan: 35 sets folded to fit in a 10"x 13"envelope. d. One CD containing one electronic copy(pdf) of each of the signed application (complete with exhibits) legal description, and site plan. In witness whereof the following petitioner(s)have submitted this application under oath and verify that to the best of their knowledge its contents are true and correct and swear that the property to be annexed is contiguous to the United City of Yorkville. Date: August 11, 2009 Petiki n na re: I legal property owners signatures must appear on this application.) Subscribed and swom to before/me this 4) day of ` � 200_ , Notary Seal ''-- -Y OFFICIAL SEAL THIS APPLICATION MUST BE NOTARIZED. MARK A.DEI.AFIELD Noivy PubAc.Stets o1 Illinois My ComMeslon Expires Oct 30,2012, United City of Yorkville Annexation,PUD,Zoning,Special Use Application Revised: 1.29.09 46 ANNEXATION, PLANNED UNIT DEVELOPMENT,ZONING OR SPECIAL USE REQUEST PETITIONER ROUTE Step 1: Petitioner must submit a completed application, fees"and all pertinent materials to the Community Development Department a minimum of 45 days prior to the targeted Plan Commission meeting. Petitioner is responsible for making submittals to other review agencies such as Kendall County, Illinois Department of Transportation, Illinois Department of Natural Resources, U.S.Army Corps of Engineers, etc., to allow timely review by City. 'Fees: a. Annexation or Annexation and Rezoning-$250 plus$10 per acre for each acre over 5 acres b. Rezoning only-$200 plus$10 per acre for each acre over 5 acres c. Special Use-$250 plus$10 per acre for each acre over 5 acres d. Engineering Review Fees- 1.25%of the approved engineer's estimate of cost of all land improvements, to be determined by City Engineer. e. Planned Unit Development fee-$500 f. Engineering Review Deposit-up to 1 acre =$1,000; over 1 acre but not over 10=$2,500 over 10 acres, but not over 40= $5,000 over 40 acres, but not over 100 =$10,000 over 100 acres=$20,000 g. Deposit for Outside Consultants-under 2 acres=$1,000 2 to 10 acres= $2,500 over 10 acres =$5,000 Note: Owner/Developer will be responsible for payment of recording fees and costs, public hearing costs including a written transcription of public hearing and outside consultant costs(i.e. legal review, land planner, zoning coordinator,environmental, etc.). Should Owner/Developer not pay these fees directly,they will be responsible for reimbursing the United City of Yorkville for the aforementioned fees and costs. Note: You must present your plan at each of the meetings below as indicated. Step 2: Plan Council: The Plan Council meets the 2"d and 4h Thursday of the month at 9:00 a.m. in the city conference Room. Upon recommendation by the Plan Council, you will move forward to the Plan Commission Meeting. Attendees to this meeting include: Community Development Director, City Engineer, Zoning Official, Public Works Director, Director of Parks and Recreation, l=ire Department Representative, and Police Department representative. Step 3: Park Board planning meeting: The Park Board makes recommendations on any park sites included in residential developments. The Park Board planning meeting is the 4th Thursday of each month at 7:00 p.m. at the Parks and Recreation Office at 201 W. Hydraulic Street Step 4: Plan Commission: The Plan Commission meets the 2nd Wednesday of each month at 7:00 p.m. in the Yorkville public library at 902 Game Farm Road. The Plan Commission will make a recommendation for the City Council's consideration. The Plan Commission consists of 10 members appointed by the Mayor. A public hearing will be held at this time for the Annexation Agreement and/or Rezoning request or Special Use request. Notice will be given by publication by the United City of Yorkville in the Kendall County Record and certified mail by the petitioner to adjacent property owners within 500 ft.of the subject property no less than fifteen days and no more than 30 days prior to the public hearing date. A certified affidavit must be filed by the petitioner with the Community Development Department's office containing the names, addresses and permanent parcel numbers of all property owners. United City orYorkville Annexation,PUD,Zoning,Special Use Application Revised: 1.29.09 47 Step 5- Economic Development Committee: The Economic Development Committee meets the 1st Tuesday of the month at 7:00 p.m. in the Conference Room at City Hall. The project will be discussed in an informal atmosphere where no formal voting takes place. This session is to discuss and consider recommendations of prior committee meetings. Step 6: City Council: A public hearing is required for annexation or PUD agreements. The City Council meets the or 4" Tuesday of the month at 7:00 p.m. in the Council Chambers at City Hall. A public hearing will be held at this time for the Annexation Agreement and/or Planned Unit Development Agreement. Notice will be given by publication by the United City of Yorkville in the Kendall County Record. A certified mailing to surrounding landowners is not required for this public hearing. Any annexation agreement, PUD agreement or development agreement must be signed by the Petitioner prior to being voted on by the City Council. Agreement: I understand and accept all requirements,fees as outlined as well as any incurred Administrative and Planning Consultant Fees which must be current before this project can proceed to the next scheduled committee meeting. Please sign and return this original (retaining a copy for your recordeteom �Development Department, United City of Yorkville, 800 Game Farm Road,Yorkvill Date: August 11, 2009 Signature of Petitioner United City ofYorkvillc Annexation,PUD,Zoning,Special Use Application Revised: 1.29.09 3 . x -- �� nal Plat Ti a "� Northgate b....a• "'r.....pr.d d...•uJ.w.r y.,.,v I NSUOa,.4 rd J,s.nN,rcr quuud dlacdtr.4.t=b.p SS Ur,dl.n.ya'S rs of Oa]nl.f 1'�V.1 lwmua l2Y1.16.y 4 ]a laa.,r F, NW w rr+ ]4f.[•n w•6 p« hl•iV�'i � I1 eA r.larlxso'� ]ttl r3 � r el ins I 4 S� 'e4 � I f I sJar� '7 1 ss !!p M !T !1 d z~ a � I YF� yl _3 p a 4 1 j fI ! 1 His ' � +•ar�r� aa„ fI1 r �]S]•..arlwr e •3M e I Y •a //// ♦a AI la aR.. '11i w ..�fir+.►•«_ i .a' L., .a+•.wsa.r we-IF.4Ra.x. _ � aw rlr ar/rr New**411a.R1. ■r*H. ar.rar.. a. +wp.R rar ar+- . r.aaa■rw a.a..lcr+r r p :+ai.N.r.a rsi 'ii:a, �$ 31C of c .r rififr�iir .w �,.1.,•ieN.. � fi'4rff`f..:1CfI4CFt@& :{ssotiaCeS •n.+rQyr..., n... e2s.ua '^^' Plat of Subdivision - y!«aa„Rai..11.a.1.W—l61M..Cr..f.n.ipy yl:go.f..Wal atlssr! ]- Memorandum To: Plan Commission EST. = 1836 From: Travis Miller, Community Development Director .� CC: Annette Williams, Administrative Assistant (for distribution) O 111 l p Date: September 2, 2009 IGrd Cnry ��E Subject: PC 2009-11 Midco Northgate Yorkville LLC (Preliminary Plan/Final Plat) Background This property was annexed in October 2002. The Annexation Agreement included 86 acres and the property was zoned B-3 and R-3. The Bristol Bay Annexation and PUD Agreement approved in 2005 included 57.87 acres of this property, leaving 28.13 acres. 26.04 acres of this property are zoned B-3 and 2.09 acres are zoned R-3. In addition to requesting the Preliminary Plan and Final Subdivision Plat, the petitioner is requesting to rezone the 2.09 acres to B-3 (PC 2009-15). Staff Comments Plan Council reviewed the Preliminary Plan and Final Plan/Plat August 20, 2009 and requested modifications to the plans in order to be in compliance with the City ordinances. The petitioner resubmitted the Preliminary Plan and Final Subdivision Plan/Plat August 31, 2009. Staff has reviewed this submittal and recommend approval subject to the following items being addressed: Preliminary Plan: • Add a note stating that location of watermain valves and hydrants shall be determined during the final plan approval process. • Move the 16" watermain along the Route 47 frontage of Lot 4 to be located at the new Route 47 ROW line. • Add a note that the alignment of the future 16" watermain extending north to Bertram Drive may be revised to provide better fire protection for Lot 3. • Add a note stating that the developer shall construct that part of the Rob Roy Creek Interceptor along Galena Road. • Revise the storm sewer design to intercept water from the Route 47 access drive at a point close to Route 47. • Revise the storm sewer design by moving the storm sewer stub for Lot 4 to a point close to Route 47. • Revise the storm sewer design by moving the north discharge to the pond to the northwest corner of the pond. This will reduce the potential for short-circuiting of stormwater through the pond. • Revise the note about additional Bertram Drive ROW by deleting the phrase "purchasing as' . • Revise the note about the future traffic signal at the Rt.47/Bertram intersection by deleting the phrase "by others". • Add a streetlight at the first entrance on Galena cast of Route 47. • Revise the grading and trail alignment at the NE corner of Rt.471Galena to conform to the future IDOT right-of-way line as shown on the 2005 Route 47 corridor plan prepared by 1 EEI. The right-of-way line as shown on this preliminary plan, however, should remain as shown. • Show sidewalk extending along the west side of the N-S access road, and also along the south side of the E-W access road. Also show a conceptual extension of sidewalk into the Bristol Bay development. Add a note stating that sidewalk shall also extend north along the access drive to Bertram. Final Plan/Plat: General: • All comments regarding the Phase 1 Final Engineering Plan and Final Plat identified by the September 3, 2009 EEI memo prepared by Bill Dunn should be addressed. • The final plat and plan should conform to the approved preliminary plan (a.k.a. Preliminary Overall Utility Exhibit). • Engineer's estimates of cost for Phase 1 site improvements, future regional site improvements identified on the preliminary plan, and perimeter roadway improvements must be submitted for review. Final Plat: • The outlot to be conveyed to IDOT should be labeled as Lot 7. Add a note stating that Lot 7 will be conveyed to IDOT. • Provide a legible copy of the legal description for review. • Add provisions for public utility and drainage easements, pedestrian easements, and cross-access easements. • Show the locations of easements for the various public utilities to be constructed. Final Plan: Sheet CO.1 • Provide documentation that the development benchmark elevations match those used by Walter E. Deuchler Associates for their sanitary interceptor design. Sheet CLI • Show the sidewalk extension to Bristol Bay. • The trail at the NE corner of Rt.471Galena should extend to Galena at a point beyond the stop bar. The trail should be re-aligned based on grading comments (see Sheet 2.1 comments). The trail should have a triangular configuration generally as shown on the attachment. Sheet C 1.2 • Landscape Plan must include the planting required for Lot 5 (stormwater management area) including basin perimeter planting and required bufferyard planting. The Landscape Plan should also include a note that the remaining Lots of the subdivision are required to comply with the City Landscape ordinance at the time of site development as part of the Building Permit application submittal. 2 Sheet C2.1 • Revise the grading and trail alignment at the NE corner of Rt.47/Galena to conform to the future IDOT right-of-way line as shown on the 2005 Route 47 corridor plan prepared by EEI. • Provide spot grades at regular intervals along the boundary line with Bristol Bay. • The pond bottom slope is less that I%, but should be at least 2%. Sheet C3.1 • Revise the sanitary design to eliminate all manholes within future pavement at the Rt.47/Galena intersection. • Has the sanitary sewer crossing of Route 47 been submitted to IDOT for review? Has the storm sewer outlet to the Galena Road ditch been submitted to Kendall County for review? • Add a note stating that the developers of Lots I and 2 will extend the 16" watermain to align with their north property lines, even though the watermain may be located on another lot. • Restrictor manhole steps should be provided for both access points, and be plastic-coated rebar. The rim elevation for the restrictor manhole needs to be at least 654.5 as shown in the special detail. Revise the rim elevation on the plan section of this sheet, and also on Sheet C2.2. Provide elevations for the top of the interior wall. Specify a minimum 2' sump depth. Sheet C5.1 • Roadway lighting within the development shall be private, therefore light poles and luminaires do not need to be approved by the city. The photometrics, however, do need to be approved by the city. Sheet C6.1 • The connection elevation for the 8" sewer to the 24" YBSD interceptor manhole should be such that the 80% full elevations of these two sewers are the same. Revise the 8" sewer profile accordingly. • The profile of the sewer extending north towards Lot 4 does not match that given on the preliminary plan. Revise accordingly. Sheet C7.1 • Revise the watermain general notes to refer to the 6`h edition (July 2009) of the "Standard Specifications for Water and Sewer Main Construction in Illinois". • Revise the watermain general notes to require a minimum 8-mil thickness for the polyethylene encasement. • Revise the watermain general note regarding gate valves to apply to valves 12" diameter and smaller valves. • Add a watermain general note to specify Series 2500 Resilient Wedge Gate Valve, as manufactured by American Flow Control or approved equal, for 16" and larger valves. The valve shall have spur gearing. 3 Sheet C7.2 • Revise the roadway typical sections to show the bituminous prime coat to be applied to the top of the aggregate base course. • For the B6.12 Curb & Gutter Detail, revise Note 5 to require two continuous No.4 rebars except at expansion joints. Sheet C7.4 • Add a note for the Flared End Section detail to require grates. • Revise the storm manhole detail to require 5-ft minimum diameter structures. • Revise the valve vault detail to require "City of Yorkville—Water" to be cast into the lid. Also add a note stating that vaults for 16" watermain shall be 6-ft diameter. Sheet C7.5 • Revise the manhole details to require "City of Yorkville— Sanitary" to be cast into the lid. 4 h 52 Wheeler Road Sugar Grove, IL 60584 ' TEL: 630 / 466-5700 FAX: 630 / 466-6701 www.eelwob.com F11gin�aring s�t�arPrisas�, lnc. September 3, 2009 Mr. Joseph A. Wywrot, P.E. City Engineer United City of Yorkville 800 Game Farm Road Yorkville, IL 60560 Re: Midco Northgate LLC&JR Yorkville, LLC Preliminary Plan, Phase 4 Final Engineering Plan and Final Plat Review United City of Yorkville, Kendall County, Illinois Dear Mr. Wywrot: We have reviewed the following submitted material for the referenced Preliminary Plan submittal: • Preliminary Overall Utility Exhibit prepared by Craig Knoche & Associates Civil Engineers, Inc. consisting of one (1) sheet with latest revision date of August 24, 2009. • Phase 1Final Engineering Northgate - NEC Galena Rd. & IL Route 47" prepared by Craig Knoche &Associates Civil Engineers, Inc. consisting of fifteen (15) sheets with latest revision date of August 24, 2009. • Preliminary Plat of Subdivision prepared by Craig Knoche & Associates Civil Engineers, P.C. of two (2) sheets dated June 25, 2009. • Two response letters form Craig R. Knoche & Associates Civil Engineers, P.C. to Joe Wywrot dated August 25, 2009. • Response letter form Craig R. Knoche & Associates Civil Engineers, P.C. to Travis Miller dated August 26, 2009. Our review of these plans is to generally determine the plan's compliance with City of Yorkville ordinances and whether the improvements will conform to existing City systems and equipment. This review and our comments do not relieve the designer from his duties to conform to all required codes, regulations, and acceptable standards of engineering practice. Engineering Enterprises, Inc.'s review is not intended as an in- Consulting Engineers Specialising in Civil Engineering and Land Surveying Mr. Joseph A.Wywrot, PE September 3, 2009 Page 2 of 5 depth quality assurance review. We cannot and do not assume responsibility for design errors or omissions in the plans. We offer the following comments: 1. The various permit requirements, agency sign-offs required and additional data needed as cited in the previous review letters have been responded to by the design engineer. These items listed in Comments 1 through 4 in our August 18, 2009 letter are in progress and should be monitored for completion even though they are not listed herein. 2. In addition to the above, an IDOT Highway Permit and Bond will be needed for the construction of the offsite sanitary interceptor across Route 47. SHEET CIA 3. The pathway stub out to the Galena Road edge of pavement is in not functional as shown as it is approximately 130 feet east of the stop bar. The connection to Galena may need to be postponed until the Galena Road widening is done. 4. A note should be added indicating that the offsite sanitary interceptor along Galena Road is to be constructed as part of this improvement in accordance with plans prepared by Walter E. Deuchler Associates, Inc. 5. The developer should post a Letter of Credit or other acceptable security for their portion of the Galena Road improvements and Illinois Route 47 improvements that will be completed at a future date. SHEET C2.1 6. The proposed contours along Galena should be reviewed and revised. Portions of the proposed pathway exceed A.D.A. guidelines. 7. Contours at the northeast corner of Lot 2 are incorrect and should be revised. Similarly the 654 contour at the west end of the overflow route drainage easement should be tied in somewhere. The 658 contour at the southeast corner of Lot 1 is connected to a 659 contour and should be revised. 8. The grading along the south line of Lot 1 should be revised. The current design creates a secondary swale that runs parallel to the existing Galena Rd. ditch and which crosses the proposed trail. 9. A driveway culvert should be provided at right-in right-out access point on Galena Road. 10.A curtain wall should be provided at the detention basin overflow location. A curtain wall detail should be inserted in the plans. 11. The centerline grade of the east-west driveway just east of the north-south driveway should be revised from 646.40 to 656.40. (;TL1hh6YDT*%Ille-Y)EMYOCAM5 khdco Nonhgale doe Mr. Joseph A.Wywrot, PE September 3, 2009 Page 3 of 5 12. Galena Road plans and IL Route 47 plans should be provided to the City for review along with copies of review correspondence from the State and County. SHEET C2.2 13. Inlet protection should be provided and called out for inlets, catch basins and flared end sections shown on the SWPPP plan. SHEET C3.1 14. On the temporary access drive on the north side of Lot 2, storm inlets or catch basins should be provided near the proposed (future) Rte 47 right-of-way line to capture stormwater flows from the east. 15. Inlets or catch basins should also be provided near the Route 47 right-of-way line on Bertram Drive to capture flows from the east. (not shown but similar to#15) 16. The design engineer should review the preliminary proposed grading and storm sewer inverts in Lots 3 and 4 along the western limits of the lots and on Bertram Road near its intersection with Rte 47 to assure adequate depth of storm sewer. 17. As is, the 10-year storm sewer design shows some sewers with hydraulic grade lines extending significantly above the crown of the sewer. Sewers should be adjusted to minimize and ideally eliminate this occurrence. 18. Easements will be required for all utilities and should be shown on the plans in accordance with the Subdivision Control Ordinance. 19.A third restrictor should be added to the stormwater control structure to manage the 25-year storm event release. SHEET C5.1 20. The light poles and luminaires should be approved by the City Engineer. 21. The pole located on the curve of the east-west commercial drive should be moved to the east side of the curve such that the back of the pole faces the property east of the development. This will enable a cutoff lens to be used and prevent the bleeding of light over the east property line. 22. The photometrics plan or utility plan should show the lighting system in detail including cable routes, size of cable, service location(s), controller(s), foundation detail, pole details, service detail, trench detail, etc. SHEET C6.1 23. The invert for San 108 shown and tagged in profile differs significantly from the invert shown in the plan section note. (i.'FubhclYnrktlla'._ 71YCKf �1tido)NnstLgutrl.[.Cel)oc�ltir; nii[l3linalpl�m�plat.dnc Mr. Joseph A.Wywrot, PE September 3, 2009 Page 4 of 5 24. Does the proposed offsite sanitary sewer work extend approximately 1,000 feet west of San 108? If so, the line type for the westward extension should be that of proposed sewer. 25. Details for the casing pipe and casing spacers should be provided. The casing will likely be 18-inch diameter and we recommended calling for adjustable spacers to assist in keeping the carrier pipe on grade. 26. Inlets and catch basins should be used at the locations that receive surface flow from the roadway or turf areas. SHEET C7.2 27. The City Standard Specification requires non-woven geotextile fabric between the approved subgrade and stone base. The various sections shown should include fabric accordingly. STORMWATER MANAGEMENT & FLOODPLAIN REVIEW 28. An equalizer pipe should be provided under the access drive off of IL Route 47 between Lot 2 and Lot 3 to maintain the existing connection between the floodplain storage volume on the east side of Route 47. The roadside ditch should be adjusted to align with the culvert as appropriate. 29. Documentation of IDOT's stormwater review and approval should be provided to the City. 30. A cross section for the overland flow route with calculations should be provided to confirm the adequate width of the stormwater management easement. 31. The TR-20 summary data provided did not appear to include a full input file with the results. A detailedtfull input file for review, preferably in electronic format, should be provided. PRELIMINARY OVERALL UTILITY EXHIBIT 32. We concur with all the review comments included in Mr. Joe Wywrot's memo dated August 28, 2009, 33. The area of trot 1 shown in the site data table should be corrected to read 94,893 sq. ft. FINAL PLAT REVIEW 34. Page 2 of the Plat was not included for review. 35. Dimensions are missing along the common lot line of Lots 1 and 6. Ci sF'uhlrrlYarkilla�0�:�'(NPin;Nildco Noithgutc dcx Mr. Joseph A.Wywrot, PE September 3, 2009 Page 5 of 5 36. The City approved certificates should be used on the plat. An electronic copy of approved City certificates has been forwarded to the design engineer's office for his convenience. 37. The City approved easement provisions should be added to the plat in accordance with the Subdivision Control Ordinance. 38. The basis of the bearings shown on the plat should be stated on the plat. 39. Ingress/Egress easements or Cross-Access easement should be provided between lots and shown on the plat along with the appropriate provision. 40.A certificate for the Kendall County Highway Engineer should be added to the Plat. CONCLUSION We recommend that each of the comments above be addressed by the developer and/or the design engineer and that additional information be submitted as requested. if you have any questions or require additional information, please contact our office. Sincerely, ENGI ERING ENTERPRISES, INC. William E. Dunn, P.E. Senior Project Manager PC: Mr. Brendan McLaughlin, City Administrator Mr. Travis Miller, Community Development Director Ms. Annette Williams, Administrative Assistant JWF,/JPN - EEI (.'PuhJic:lrork61�.�(Nw1�()rx�;�•1�1;,Npcykiga�c I.I.0.f1nc'•J.rtiiuUtU3tinaaplantR:rlat.dcc 1 ': •; f 1 ' � r1• I�r, 1 3:: �� r I ! If If If 1 10' HALT BIKE PATH TO BE BUILT AS EAC LOT IS DEVELOPED ! tr r ".h f h• I f r I f' r r r•' i 1 r � •J, ' I • / 50' BUILDING SETBACK S _ 5' Dt t� it `` 10' ASPHALT BIKE PATH TO BE BUILT A ! I - EACH LOT IS DEVELOPED (� r•.' ••ti:�(r•• ..'.•y..i.'• • ,�i *yam • +:.�.. V, Detectible Woming Strips U O "' o S 1 w - - 130-06 w --N�- - - - - --- - - 565.58 R E V I S I O N S SITE 3 B-24-09 PER U C YORKVILLE 1 8-04-09 PER U C YORKVILLE NO_ DATE DESCRIPTION NO. DATE DESCRIPTON --:C3arrfsati��_=_ u I r k E 4 PC 2009-11 The Data is provided without warranty or any representatbn of N accuracy,timeliness,or completeness.It Is the msponsibiflty of the "Requester"to determine accuracy,timeliness,completeness,and Midco Northgate LLC Preliminary Plan appropriateness oflb use,The United City of Yorkville makes no w E warranties,expressed or implied,to the use ofthe Data. - Aerial View Pares/Data Aerial ted by United City of Yorkville Gi3Gounty GlS 8 ♦♦O♦*♦*♦♦♦*t*♦*t♦♦♦t� = r r ♦♦l♦414►♦♦4 ������'" � ors Legend l 41114 4114♦ s �.� � �J 4� ►►►►►►♦►►►� r•••♦�� �.►s 44►4ii►►li► !♦♦♦♦♦♦� ♦►►♦♦♦♦►►♦. i♦♦1♦♦♦ , ice/F . ♦iii►i*i*i♦i♦i♦i*i4♦. !►♦i♦itt4i♦i♦t� ���/�r .r. � �I � � '�F � I ♦ �./.}� -Agricultural ♦♦llltlltlf 114144/ r� r*# J►�'��' ►rte r + � ��� l♦lllltll/t !14►144 n+ i• �'►-Estate Residence District Oti♦44i*i*i*i*i*i*i*f !*alai►i*i►i*i� � �� f „�f _-One Familiy Residence District *i*i*i♦144►♦♦♦♦♦♦►i*i►i i ►i*►iii♦f !♦ii♦i♦i♦i♦i♦i� j r # a L �R'► !i♦♦ll♦a � �. ' . ! 1 r�� `i'�'J-One Family Residence District **wvvwvvr . . *♦*00.t♦iit•♦tfifif lti�i►•♦t►*O.' � - 114 11 !,$'I I s 4♦i♦i♦4i44►*i*i*►*►*►f r*►alai*►*►*iii " •� ► 1��/ �!/� • ►♦►♦i►i►►♦i►iii►i►i♦►� ►►►iii►♦►♦#ii��� �P. . .�Irr 1 I � ` �.�J�r/�J ♦♦♦14ii♦4♦� ♦♦♦♦♦♦♦ R-4-General Residence District ►►i♦♦♦i♦♦♦♦ i♦♦♦♦♦lay PUD-Planned Unit Developme 4i♦i♦itiitt♦♦it♦♦tti♦t tt4►i!♦itlt♦i# ri! ♦1/1411411/ /41►111# �I • 44►*i♦i*iii*►*►*i444►� �l►►iii*i!►*►*-� .r. 4►►►i4►ii4i !4 l♦♦4♦-a B-1-Limited Business B-2-General Business District ►l►4iiii♦i♦!♦i♦i♦4♦4•� i♦4'♦4♦4♦4i*♦4 �• s��7F ��/�' �•••T-T-•-T-T-T rT T w_4+.w. .•+ : fir ►♦♦tttw►TT+� 1♦+♦111la r s#;I/r •. - It♦ttw►411 t4►♦♦4►► �( Y!w�i District i4i4t♦t♦♦►tt►►►i►ii♦.1 ►►►►►♦►i►i►►l►►►•• ,I��='' J f� 4.ww..►►►►►+J ►►►♦►►►♦ . i♦►♦i♦i♦i♦4♦i♦i♦i♦i�►i ►j♦♦4t♦♦♦t♦ttttt� District ♦ ♦♦4i4♦♦♦♦t♦♦itt♦♦♦t♦�►� �t♦ittt♦ti♦ii4t�♦* /� ♦► ♦lift♦t►{ ►.4_._w.+ws�. +' ♦11/414111 ##* 44F► i►i►i►i►iii►i►►►i►ice #a#a►*aa♦i ►iiii►i!!!•♦• r M• 40* 0 i♦♦♦♦♦♦4♦♦ui wa #*#!aa ►♦!a#w*#�►a#�#*•t*•a�*a*�♦♦♦♦♦♦t♦lll♦♦♦♦4llll��f ►!i#'►i#*a*a•#* i#w#*#ale**4* • #s4�♦♦♦llltltl♦ ►•1#1• - *w4**4*{�*#*♦ s+* * lull♦♦/♦41 !ilf► Fw*#aaaaa##+ •#. +#lull♦♦►►1.�1 !#! *aaaaa*.••##+ +++ 1 4 4 11111►►1♦ illill♦ �**a*#*#*#*a**M-►#•#�F►+'s::*#*a�ii►i♦iliOD►i♦i►♦i*,i� *a#*ftt 14�f 1*i#♦4 * ###► *a•ai . ►4 *{ii♦ill♦♦lit ►►►1►♦ ♦♦ #awaar •* s **l♦♦ll♦l♦ll ►� ai 144 i#i##wae4a## #* * ♦1♦lttltll/ ►a4a11!! rt ♦awa+a**4 ♦***4**lltlllllll )� 41i1i4# #rliaaaa# •+r****#a !lull♦♦4#♦ 41►♦#! rtawa**#*#**##a**41144♦4♦►►'►l #!♦liia 4w****� •#**##►• //►14111♦f► •#4tli+ t**#**# • •#aaaaa♦/♦♦141♦t♦► ►1 *#♦4*aa - — - #�##**# ►##ai •!►♦111►♦/♦►►►f ***'**al �••a##4# #wia♦i#ll ♦►►►►iii♦� ♦ ,**4#*a **►*►t•"+� •*.'w*#a*1►is►a►ai#►iiiiiiii♦iiiiiiii♦iii' 4•*a*a##*#1. 4 #••aa.aar+ssa+r*#a4♦l♦♦ll♦♦l►+ .il*# ♦# ► aa#•• • rw•sasaaa ♦l♦♦♦ll/lta 4 #aa##a� _ **#4*+. ►#4*a**#*ill♦♦llllll' •s••1! ,� - ww*w4*a ►a**aa4a#llllllll/la 1*a ►►*aa*•.######*##* lt/♦14 ltlr•r t 4♦�lia'�r I' a4*##* *•ara• . **1x1114114111► •1lii ►*s*'*#***#•#rs## 41141►1►1f++ •#*s#• k*a*a*44#!r►a*#a►♦lii#*#'►•i•11►i4l►ill►i►i►►♦##401.► ,. ` *a*a;4*45 *#####1►4 +*w#♦1♦►►♦i4♦♦♦4v 4#a*##**' ►**## 1###i♦l►wa4♦►4i♦♦4♦♦♦.) ►4#**4!## ## #*' .*#*•*#*• ►•i#FIr♦#t*#*aa#*1**►*i►i►i*!*♦♦►♦l*♦*lii ##i#*** *b•#iaa**P♦i♦i#i*#*#{ •r.i•aalr****ataa♦♦♦ll♦lll�+ *#***#►#*#•#*+4 ;6 40 ,0 44 iaw4i ea*a#*�airi s** #*4f►l**#**#*s**4♦llllii♦il♦44►♦h� ►i*!►!i4#r*+r► •*+*#•►a*;a****��a #4#*#•* 11♦4W!li#1# ►+►♦4wa#iww4*w#*##*# a*##*#*.Wxi4#*•'!41141♦♦►♦♦ a*a*a*a'•a 4.# ►� #44llii►t♦1♦♦♦► ►* �a** 4# ►4*#***4 4 w*.#a##*aa4a1* #* # #*a*a**99o99 Ir ,u 0 _ - #*##a!#•ii4♦•♦♦i4!#♦♦♦#►#i►►1►►►fill►�i♦♦ I♦a***a*ik*##*##a#*###*****lr##**�#�*i*�• _fs:sue r***s#`*r 4 i##tl!!!♦♦,►!i4►##*i i♦w►w♦w♦w♦�♦�♦r .�a.* r Ia s..- ,v mss,y, �a�!►♦'♦►ii►l!i!t�i#i a**`*li -#y#*_ *�aif##*♦I4�♦♦1♦ltll4ll�.�l•a♦• �l►l14l l4#�#►*#:44, �*a• 4p 4** l fi i1 Fi#,#►*i# •♦♦#V#!►#+►#!►i!!#r a••►• #**l 1 "4#ii4li►i# •**#a#►*a►##i+#►#a�►►#�a4 4 < �►♦#aa+#****11 �- t♦♦♦laaa*4a#w4♦**w♦a*a**#' 4i#*#****##t*******at41#t 41♦il►t♦i#aa*aaa#►a#*#*a+►i#14*##*►i#!***#*i**+**# *a*** 4#*0'0-0'4,- 4 ,�tl;******♦***#*4#*****4•#44##***141+i44! 1####i4►i*#*i **•#•s. +*•4a#*!••all!♦ +s F#!##4i♦#i'a*ii *►►#i!- tea;►♦4lilia4 #4iir ►*4!"►i*;►►a►lri4i►►*ta*4*l*# rii*i*t!♦41�i*!!!!♦�lii'►►tl#1`ir. � +,�►l�li4,�•,�►**1# 11►ta##4#**4► ilia#♦!#! iiiitti♦►t # *• *11#**####*11 t♦ii**4*t♦ltt*4 ### *1**,### * 1♦♦411#*a #ail#!♦! +♦�'+***#�i**►►••**#*1►1#1***4l1******►*# I'�'►*til#aaaaa#*4*♦�ii!!4!1! l*#w#as►ar***a#aa•##***a*a*1*1*#4#ilala#*!i#ia*jai*a**'►iiir4+Fa��l4� a+aMi##*#*e*liT♦i►ii*#! vao*4*�•#1#**!illailii*il4l!'► #1*!!*444ii�Mllll4lil*tl#'! la•••#ialli►# ♦t*+14♦4l*#Ta4♦##ll�F#!!!�l#a## a#�F #*a**#4i ♦1#*f*+#i14►i4t ►►i*l**** ►iti44#*44►111x!***#4►w0 vAD i♦all!*!!♦i* ►l**w►**a►**aa**a4+*+**#4*#;•;4*►**l#1 44i#aaa*►a4#4 .141*# 14x*.+#4!illlii***aa****a#**#�► +#**� ►#wwaa*#f4*1* a i l ♦14�r�r♦ilia A.*J, +i►#lit*aa h***a ► ► a#+•*** w4#wa#aait#a4 ♦♦4 • +il *ww *4ta*114*a*aaaaa+ * rs *ar •**x a****a#1*********4a*a4i*! Ali►i14#*r►**#*►**a*a*a*##r***►*w*#*****r#s*#***##*4*****#t+r4.### s#•4�•a4ti• +►**#4***{x1444 ♦♦►41►#* *a*+wa**•***rr**#•***#*##r#s+r•i1► *****�*1*a *►*411x►*,1�r4� ►i►iii♦i4##***** e*a#**a*e**'**s*####***4*#**s##*****•*•#•***s*s*a#s#*�*i##aril*!! 4a#****►1 141►l1!!!ia•**►► ►ii4i0►*r*****#*a***#***►#i*a###*•#s#44•******aa#r�.*•*•►+ • a#sa, 0 rasa$ *f** ##rl#ill iii#*1 ►♦♦♦♦1****##*# •#i•4►i1•## r r► ###awra* #• *war ra 4ii#!i#-a#a ,♦♦♦♦a#a*••**•• •##4►ix4��i **�r r+##i#*ra** a4,ws*a+►-#* 'l:�li.►ll'►,►'i!;*w*a*a***t ►itllllilitt•#�i4►14♦••�►####**►a#i41�♦+►�i14llw►w1�4*#w#4#www#+a* *aa#aaaaaaaaw*# i!♦w♦***� ♦t♦♦l•#ilii##rr;i#♦ i♦#rraaair**a***44##a• �.♦i4a#*** X411411♦alit+••#•#*liana##*4trra*1## �4**r�*4#*i#4� ►4i11411*lii*�#1*l*!!♦iia�i�#��t*►*l*#iii**►***i+►►+k*******#►�►'�**4♦►*1*4*#*#*#***#*#'� w t�4aaail i141i111 111♦t•i#iti4i#li#s*a****a**##**#*#*****#*a�*�#***r�#*e*###�4�►4aa*a*4•*****#►r .# X11♦i►►►►li♦iwililia***i##****#a*r*#******fa****�*##4##**i**#�►4•#1141►a1a144^►a�#4i•� i►iiiiiii►iiii+l►liiiii*#4 1*s*!*4**#4*:*i*!`4 i*i*#*'r*iai4#*vi##i 4sl#♦t#!!f 0*W i♦iiiiiii♦ii14111t ilil44ali4iatl�!*♦!#a#4#ii#a1Fil4l!!{♦ill!!♦♦#!#4#►!!*#lil4♦t#w�►** ►♦41114♦l♦4lll►*!♦1llilt♦►♦♦♦i#il!♦4♦!!*ia♦♦#all!#!1!♦i4lit!♦•i►ii#*laili*iw***** ►lllltl/lllllllaii##1 iFi♦♦i*►*iaist♦i►i*l4i►l#li*ii4it*#iii ;***a►*##**!*4#**r ►ii41 vow 1411#W W 4;.,a�►4wa r�ii11i1411ti**+a4 aaaaa#***a*►i**#�►*a****#win*lid#1##i141r4111#****#4##r#. ,+� ►1►lli/♦il4tfr *aarl4***4***4�' *##lai►a#*##•*• Thu Data is ptovitfed without warranty or any representation of N PC►i►►♦♦►1111**+*a***a�w*#******era**#**+iii! , ►111*�►*i!i►aaaaa•*♦ii#ilk ►i♦i►►►i♦i♦i4♦1 #i#****a i*4 f►#*a!►# #+►.�a•��1�.�i►rrl.'l�r►,ai��.i�s♦ 2009-11 "Requoster"to determine accuracy,timeliness,completeness,and • • Northgate LLC Preliminary Plan appropriatormss Wts use.The United City of Yorkville makes no W 1 ,- ta&Aerial Phofo_qraphy provided by Kendall County GOS Zoning Legend ��� 2008 Land Use Plan illoughby�,t B -f6tt o Land Use Classification I� Rural Neighborhood Estate Neighborhood - — Die Suburban Neighborhood --ofta Trad'gional Neighborhood � O� e Ln Commercial G7 C �L�J Neighborhood Retail ITI <w Industrial I � oLii Office/Research t Mixed Use quette 5t PubliclQuasi Public -� r(7-1 Parks/Open Space P CommerctallOffice Research N IndustnallOfficeResearch I ��� _'f �• �� Q4r Ej I dIr I1 �ertra -° ap � F� 47 r P 20O The Data Is provided without warranty oranyreprasentadon of N accuracy,timeliness,or completeness.A is the responsibility of the Mideo Northgate LLC Preliminary Plan "R�uesiate nes determine se ccuracy,tdCiness,completeness,and appropriateness of Its use.The United City of Yorkville makes no W E warranties,expressed or implied,to the use of the Data. L+� Pareel Dala&Aerial Photography provided by Kendall County G!S and Use Map created by United City of Yorkville G,S e a ' Final Plat Nort�igate zli u.Ar�...fgl.b.�x...,rqr wd•w w.+.fs�o...�w b ►►.ac�.°.R.v�•,��M.as.....n.w..R+�w.r...•rw«w..,..iru rw..r,�. r.F° 9 y,fa i e F I 1 B as° �■a 1 � r ! q i1� .-r 3wrr-sti a+rsria-+• .n..�...L+lzrr•a � � ~ � [�aa>•�IRSa I ' I I f vl 11 1 ' 1 lab 1 I I 1 ' I 11f I ll f ! I 2 !1 f r f 17 . 111: Lii C.. ci ev..-, •r,sl, mr K�nrwaw•-+r.�•L.�. CYGd1{� :IGT/X-'FW.$'..'�'.SOCtQ.tr:" .cowl.r—. ..r,...,.-,,...1.,....,..-.,... .a�,.y... 1 Plat of Subdivision cN �s'�` '°"�' +.s■.,la a�..�°se..q.ri.•w.w moral r.s.•�,.rrfndYa•.w.JRr laad.Wu,a 3+ i•I,IS 2 Northgate Sate of Illinois tt State of nlinois County ofl:)uYagcJ$'S' County oflauYagv S.S. TYi.a NIY[lua![[Ya l`ie•dannr Yrdwaee[.tL.r tV aare d iW+i u[[wily tlw 1L].[l{�er Orin ae Trr GnrlrlaY Y rW lerrde rlrAn r-n{r+.nYM[w drw rnrr.w[rM...I I'I r AJy I+ai{.«d.•rrrvY-r.r....+n d.w]x.�d ir»Y ar-1 den.w wrt State Of llli nois rLL[wi-M>�[�..rd wr o.ra ear�.r ter wn.l'..� �.rw•L...LY r�L.Y«�wr wr t\[.wur.r-f 8.r.�...1 County of 17u3 age r,.L..ti. ».4 d.L.h w.1.�.1..�.,..[••Ir...[•+rr wn.�- mr.a d...�w-.K �A a mm S.S. C•.. •r O,Y YrsL,m�e era_reY.[,�"A_p y10. Lr a••�M�d�M-i lr[.f Mir r�iwY.K w�Kr[rr41 W Ke•r►..r Mir 1.T�neLla)>+�rr.Rarar>rM MJ»TY.rr 1rrwYY Mr14r{ran�Iw Mw� wf.Jl mrl4in.[Nry LrU.Y 4,[(11 rL1 r�µWr[oa d isn`a u a�LW[u r 1\�x>Y.Jsr YI•IDpq•!alr{r{[s W,l M^._r..�[�W�Y W di..{r or K� ...... �YYew iw�Mi r �.ris, ] re�i.r,��•r•�.a ti7iu�.�i.r�ar°n>naw�.� (��TwrT--.r:J.ve.fi�Y.sv.lr-r•rlw....+dmr Tarr Trrs r+. .w ra:rYr+r+[•rrrw rL..�.r,sbn ar r.�.L�en,a.r Mr.w...�.r-r.Y Mo»--n •W,{'Y h.1 W Ileeer l]eYw.MIIx[Il W rlslau NT!lJ.51I aVy Statc of Illinois $fate of Illinois I+e.e.aw Paa.a...a wa r.rlrw...�.-hr[Mnwr.!.f as Iwo Mil•!>r1TE4 ss[.9M f.+..Yr.-[a S.S. ;n>,aa 4.y.ar r-rga.+r wwa,Y r-Lnw4 w-e'�1+�ti lhr[rr>.rylw].-. Coun oEDu$a c S.S. ty K Goanty ofDuPagc Hia•sr]+•r.r,L.ar_,...eL.llr.sY].s{s.r r.La�I+�drb.u�r�sa.Y dJLr x..r.r ...a x.+[.rer..,.a •y'"•`°'>a°wr,,,.r� - .> �d.s r u....r_,w>TSaf ra.a.N]++rw•e.LrY.r{rr Y,r.M al W r rr.a�. .an W due LL°I;.^- .m a1n ianrY[�FIY er�ra W Per Jea 4.urarrrY rr....lrr..Iy wwY rx ww Yw.L[irrY.r.[Yt.r rr-a Fawn{[e.Ya[of 1Ml.nS lYw r..rra w dr ,�a{•+.w anon».rrrr...ri"-v...�.,u.��[',wM u I`•'°"`a h' Y+ala e[w�]a L r +rw+[YrrJ.Ja u4r.1 Ki..YYi+Irr1 N(TNr3]�i,l0]]�J f twee NO•oVa[•W.f.s_..� Ilr.YfYil lever d.----.•_-rLY...'wrAwlYJWa lrf Lrr.{rrLdr•_ 1>ar Yar J'7. r mu+u M J,.-rem+p.rvn whu..a.rn.Y.ub..nbul ru ,lfrfLhar Aa4 Y Tw C+rrF.Y..V r wrll. bras NrYASYw•i JwR Wd.wJ-J11r.]I1>.i]ler J-,�Lw e.w.frW m.� d...`rnnn wb Larn.....+ir n•Y•..+r.°,,...- r J.rar Fra+w.gar w..- - drfw.rr Tr.r Taro Jw.a.SYOV]a"l.b.R Jr a.r[ti d..L1 m..a.Y.w.T.t�][.q rr.r.dv erl,wr ewer N•..1 drr ra-»nA•1.rwr[dw�...raw[ward fv.w•Y�� .rrw b.,qr pur.u..a u."..tlrurrY w..ea..rw..Ir 6--»w .. ....a{w+dJ.dv• Wl.�Y.nra[.r wf[I ]Mx Lr.r uu Td+K�..frl b Kw+R G.-�r.iLwr•r. .dvvuary ur.°A..au.e-...w+a.arsey.R°frw.em iv.°thrat• W-�..Yr.6r-w1..L..r.f u .. k�-rd.-YwWry Ymlrn�l.LLC Muia.�r/r.l rTrr rwq.a.I. [4d..welly dr W Yer4{w[rHi Meer i.rr.w 1+4 r a ri.-A-ci OwM r{as a• Yrsrn rarrAe.a.y F..r rd war rl drY��[q M Yr�.,-I�n.,Y Iwd eny,rr�..�rL wrap N d.nu•J►.[M..r>•.M Fr+[•wn[r+WUwnr�w M1rweY.1 fnMw s[nl a J'�.I+r yYW I.n{a w o a4wy wn�. y •.[ego-.sn aryr.R•YrY../r1.a<1rY KYr+rwn...pwn rr rsFaw..{I{anrpaFrYwa yi[a W Y ur��1��ys4J rrn...w iAw-w{Yy Jr Jrr W.�... rrwLrR..V YLi 3/41-114 r W[�is W Yw.ver r[rirL I E.wW rw�[}[Ve N1..ei.r.J v.rw an/Yrnr u Jr[rrnanr Irr.rY Wn•_-•.M a 11�H Ln•+-y AY{inr�rara aw ar•-n rn �e ald Ya{�1 rra rLwlrl w»..r. .Vw. ^�•I DJy[ nrr[ry ryrY14r Glw ariv ry arrl.rd L1 rw {-s d .M1 u a40Y ��I4-fo.nMJ 4na!•r•.-rrr.-7 State of Illinois S.S State of lllinois 'a County of DuFage County of Kendall S.S. �F M irrr{!!Jr JK YuL-lLe LLC L+L vrwf.r'aGa Lb aW� .yy W bra-rrd►.rlrr 1MI>w W C'q CirarJ d J..Irr1 C+q _d-w/M w W ad W W by r+W'�-tlr•a.yu dY.-L.rlh rw.�f:�w.W Ser.afirr{drr__�.tlrY rf �Lkw �` eW+rrarar d..{ww rr.w v r...Yx{ pert - �Ywr.a WrwrYl♦r+Le rr[e.ar{awar[r JYeeL r.4r4 W M h-I+►Y YwL.1D.r+wwrWe.vr.sr�l a[r..wL^'Iw(W rdii.W MwMSIw.f 4[ F. Mega Rr H.rsa State of 111inois S.S. County of Kendall State of Illinois ,,.,��ru.faD.rn..awdrn,.a.yn. rarYC.•.,nen.>sJ,.vweo[Y Gounty ofl-)uPage)S.S. M FJ.n.raw i.r.a n n x Ix. Sotc of T]l2,n02,s S.S. County of Kendall} .�.«u MNU UVUx-..1 DV+-ae..cu°w--y.w[wan.°>u..+-. �•..//F �A r Jw ra-a rrd..0°n..y>.z of 11Z vrrrL�u1-i IG // W Yr rY[�-1 Cal r w' .L.wYd Ldu.r..a IN>rrr un{r awY F W aJ r.dwr�I r1rF�w./ � r,.IV x wnml �/r•. W W r YrL.JN, Tr YM urrvy•-irl.. // State of Illinois /`//''• $,$, ! Statc of Ulmois County of L1uPage / - S.S. iCounty of Kendall .Trr r...�.r aeLrd.l aYr,.wr,wa W..r..r/w n.I r Y tl.fwer..wee[.r eMm.M.r K{d•,W a.Ya n e_rr ew.eLp-,w.,a r Jra r.�a r�w a M"ti r."�wL r,r•�-W�W-Yr,e�wY a-w..rrraww[r w wfid n.l r tedv F�{r�,L.J ae ri{,ra lrdw�w.Y.r.r a,-. aw.rd..v..,.r.. 4eP C'— R�ao..4u. State of Illinois a r.�rL�nGNJn�ry r..rw✓ ..r v':•�"we�"�d,"[,:s:w:.]�..�;.a.°.wnL..W..wrd County of LaSalle r•_ •r dL r`u..L.rMnWe MY-�.rb.d .r..atlOC. n I...t far Mr.,aM'^�l.f aw.tfu.nn nry+a-vn.n�nr"(/.n.li y r.iu....r�cr r.n{-o�r W.y• w�n°.ur y Parma]of"AU Mrw Ks.0-r�Mr[,.r-In fkLw.rn w dad� r D. ✓a tM4lP 9 r-irto£+,..rY -n n...d ..w.� n. r w sue»w,w.n,n^,„u o-.»..ay.�YO°�rna•r L>�� �•r State of Illinois S.S. ./ County of Dul'age f e Y+v+Lm++•J du barvtiy a.rb' . State of Illinois ra+[n[ll.rKMR YadrvWe LL[:.who n yr+•orr.W knwu m nr- County of Kend211 5.5. twnF p....uene m varhnnry x«»n.ne u nu r�..r.rua.nl«.r.ry•» NW»the Oar rind vukn.,ry.-r°f MIL Y�dMllr L4.0 rlrr Lr-LI sab J.[.t.rr.Dwri-anr r.e►.Ly1wY lw n,ao�wY lural.rrl arar.�.W Jr�Ly•� .�r•Far rrra w d...rw�.{raw F..a l�rrna[I.a..mr � //i/� �rrf IrrN.. c.n.nry cnan.� ''>%j State Of Illinois County of Kendall TY t[rr w.ruruw.w� State Of Illinois County of Kendall}5.5. sw.....[d..rR.r+..... -- - �.n w.leep�d•Ta•�ti rL wv C d6u V.. •Coq of YarYNb arw�]{r M{r t.►-.a[l+{dw.I+wJ.�.W.uinnrY r+u..I. rw-Y.rw�+t. r�,.r+Y--{fr.[r erwrr{•[...r.wi.ti F.H IFr[_.}q K .d a�r..r w. rd rY rwwYaar.wrr�.-aw..ra rre4w rhL ary a..{nfl over.-ny wn YrYI+Y �rani Lrrr wwr.wq.�.rr.[-Ir.�a[.wJ[.rrr[rrr sYLa.aarw.rw i.Ywr �i.-�-�eYaeYt�ey�w.r-rurr r rY M{wrr-ri[srrl LI aYt Carl, Nrr rrlee wr•rr.-vY, ..i.rr1 rlww�,.Y I.e4aw+{1r-r+rR aadr du r71a Harr unerw rF1 W ..,rY T[^•-r�Y ...[W"4a'--r1 W Ju.aY d11..ai...0 r.d.Tfr.4/+L irr Rw.rrJ w...4.Mrr ul-r w rrrwurw rry rn[� rr•Mr r M�Yi-rr�W•' _ J.r�V wLY W epw-.r.rf rw.r anY.nrvr.Ylr��r I�w lrrm•.+ �C'- ..YL W�Wa Cr�{ [dY Y.arSr..Wwr.Y-r••IN4n�{Jr GL.Lrfue•y b.a...r ury h ur{r Ir.eprr rYw{.�dr r Iry larvfiu�k►W x]rarr{reran r tlWe. rf» ni d.c s°d rF.v r< .In dWr aRr+,wrrr.TM[V.te4�rry^/Yn•1.nne wll pr.. r+NY�^`^4�""'l l^^°°d`r^•+'•'�me6 nec.a...Y µL N W.CLY..•W°•.r..f We VuY..I G1rY+f Y�r\.Sl.- State Of Illinois l S.S. County of Kendall j y�r Wrl�iurl'ryrr»�r-r pane Wrr rru1L{nr rY�+yuarY Yu�aru--mRa,rrl rr f�'r-+Y.L.o.rap.d..dS•�.ral rrV-.•rrrrr 1a+J r Y.r I.JL.JYa.r Jd_J+r uf�]W V Crafe 4l.? m&-4-lwa Late ."""'"l'"w fF_ 4(,-0➢ � Plat of Subdivision rxn� `, •� ,�,>(� 74M3 2 33 0' 20.0 \ ' f \� \ aara nn=e r.,➢.- I� �. 300 _ -_ _ I I 7130 i \ � ' re►-Haar [A-agar � U-4-axr [n-a•oa \ \ ' \ :eo�r+u..w[mlrrxs w.a m+�p.w+x s[rv�n+s.uer mlwr \ zr.arl..wl[�ra.xr+ax.¢rawz arrv�.K�twwa.arr,rLr me+ "�--�u-nm.wi oa.xa um care a.m.x>e ro�aa...+rut mev \ �,•`+. ].a-�eal[rOtn aralae w,oa c wa alFl�.x Ps rta�a ssnlrer mart \ —�1<+run nnc rn.r.as�XDir \ J r \ nvwrm�a 13.13 aM�corrcnc,o ns r+ro[ror rnr r[r.oa Kt[m xe -nv.r�ar..>s rawer mr.c�n m..ac•o.ws r[rm rolam an \ .rrllo.m n•,a r.ywm rr[aarFn.•K rwrun 1 TYPICAL NORTH-SOUTH DRIVE AND DRIVE OFF OF RTE 47 FAST/1ME51 OWE NOT [0 SCALE f ea Y.a. •.rlk S.a FR•1c Y r.df i�; f w... -rY..r•-- r,-r - - w�aran sah�r bww-A [`f> [xra.t Arwur Crr[fX6t 1L1OI — r..irrr - 1�` f t 44 I�rf fI r Yrvr¢� -b u9 'fly _ IM_ a _- !T H.Otl�alrrrr--~ . -A � a ,� vn att aew V sw..v+.11.ln'uorrJ A w r s. ( %Wne___f! 19 il C Y"d `l 7 91EWA TWE m Of AWA IM 1 NG(AC) wi �rrw or j' 7 3 1 ! 7rk A - 1 r 1 7 2r r r�r IV 1 a 1 f A '. i rw:ror.�e l .t f• I. _ _ - ; if�i.'r� b.. T NZJ y f Y f C71 1,704 y mB C � I _ fu o � s��6 L fir,. llr l VI, Lr 11 I r f A- ..... l; It ' filg I R—4 Jet•sv.v. Ey LOCATION MAP NOT BI- iFJL dC3wnm # o Aroe M of N. l pr.rr M a IW 4 wd X..rW>rt Wlr &ar[VOr a.[awYy 31• b,A.V.S art al M.9Nr pwepr '1 T Y [a wr.rr,r! I.+r aan.ar rnw.•ar ta.P rn y SN I•Ataa b VnF p XWbsp l tlCmr1 lar r b l e brr W a Yrfd m scs.�1 I n-wn 13,o a4 11 d3 n.oilgpo ,115 u J .M �' r r. TI•eak7lE 13X.0 rW m Iwa.r h•a.t ro 0 oo•r.a,r+..wrn.nr��<of ,n r.�rw .rsww e..� twri orliyrl o>Cx-^•,/zcnz�z 9713 IM. f"4O'-yea -- rd.r r,.:t'L 13,.^[13 517,NY'd"In.eotl,r.o,saa.w•r raw« ti - _ $ Aacf w 13r aieAdr.er.a m>.af,rznas rot m �wl..,r ao.,,. d 13s.eyht-pF.oy N lrbrsr Arse oz dwKCrM or Na t:vl�r�yta gay 'h ?VD laea l Jr o,aY,tW arVr+`x Nnc.Sr59'46-%yenv r.e.r.,ry Oxnp+/SVEA'Y2&+ r''-...:.: �•��- 1 — Yro n d lrhvn A,a 1300 M.k r^r ca SaS'3 Ia.a n 9 a nYU nr lI Q ar of m 0.r ban bh%3MOP Net, P.sce 32 p,'.9-L unr4 a ml+fr flip.ufA G4�1Q(♦1pf[ : y M,a O,W!Wirt 0.1.ad 0.i-""y__-,Inaear.9.915 tact Il) W7=.FT yl 14 A.I.III—szaer5s-c.A]I 41 Mar t.N.-a.0_1 71303 C'U'R1V.CtD R9M � � # w,rir K riN.c.„r,par 6r Oaornare Ero.Sa].mn Sna'pti c�o^�In+ Jut errca<,..,,Has aoszJ :�'r c g i ' ! r.�►.ar eM s+w a'wIa wiXanmrarGan X �� S,a.T1aH[r.F,llrKa of • ` rr4lIY.Y m rover lwL D7�.9 r.,.l to tn.,ast I m. reYW/I[N-o'if-3.'E i r d M i rt i W W Am i,b Y.ta S o3e 4 r..1 rc�rdeo NM M P oa.mdeM+,ee9r0r1My5C 1,N rnq 7r 0X j c*&r7T M]AaO ILS KNOW w 'f t aow r.nr+w•'9 yr ci rss,<z o-r. m oM re mrvt a sa3,1 .. [ 1{! ..,, till wA.wL tAa~d.1 ➢..✓.wr+2a 31'f, ww'+rt .Xra es am a,I.,a>',r eo :1313 Scale 1'=$� r� rirerwfr are Iir/e dwan.a w eo.+.rsz,ttPan�9z r [. •a� ...iei e ' ' wnx'3at+mv r.v 13r17'a= ern,..e m Ir 13,.mX 0 m 1 . r .za:J. ��`"'_.• _ '.....v:[JJ i+'�. f .. a[.,t n PRELIMINARY OVERALL HGRTHGATE Craig 2LX""he&-?lssoCWes; 6009 r�z r� NEC OF ROUTE 47 AND GALENA ROAD CfviCTtlgineers,P.G [O eau-c3o L�J.L 3 a-7.�. i13= UTILITY EXHIBIT YORKVILLE, ILLINOIS m°"°°'^'•o11-=A.:!�"�""�'ef-f wkv-w' 0°w� r—ws � "g,1 2MOT—ml i.i 26 United City of Yorkville + - 800 Game Farm Road Yorkville, Illinois 60560 11 Telephone: 630-553-4350 Fax: 630-553-7575 ALE ►••., PC# 2c,( -.._I._I APPLICATION & PETITION Please Check One: x Preliminary Plan X Final Plat Development Name: Northgate Subdivision Date of Submission: 6124109 1. Name of Petitioner(s): Midco Northgate, LLC Address: 1110 Jorie Blvd,Suite 350,Oakbrook, 1 60523 Phone Number: 630-366-2304 Fax Number: 630-954-7701 Email Address: dhene@midamdevetopment.com 2. a). Street address and physical location of subject property: NEC Route 47 and Galena Rd b). Legal description of property; attach as Exhibit"A". c). Total Acreage: 26.13 3. Contact Information: Name, address,phone number, fax number, and email address of person to whom inquiries regarding this petition may be directed: David Hene, 1110 Jorie Blvd,Suite 350,Jorie Blvd, Oakbrook, IL 60523 _630-366-2304(o�,_630-954-7701 (fl,773-343-0690 L?,dhene @midamdeyelopment.com Attorney: Name: nLa Address: Phone Number: Fax Number: Email Address: United City of Yorkville Preliminary/Final Plat Application Revised:,1.29.09 i 27 Continued— 3. Contact Information Engineer: Name: Craig R.Knoche 8 Associates(Craig Knoche) Address: 24 N Bennett street. Geneva.It. 60134 Phone Number: 630-845-1270 Fax Number: 630-845-1275 Email Address: KnocheC @crk-eng.com Land PIanner: Name: nla Address: Phone Number: Fax Number: Email Address: 4. Submit the following to the Community Development Department in order to be scheduled for the necessary committee meetings. An incomplete submittal could delay the scheduling of your project. a. Original application with legal description plus 40 copies. b. Appropriate filing fee(Please refer to Page 3 of this application"Petitioner Route, Step 1, Pees"and/or contact the Community Development Department for verification of this amount). c. To begin the review process, the initial submittal must consist of: 1. 12 sets of Preliminary Plans/Final plats folded to fit in a 10"x 13" envelope 2. 7 sets of Landscape Plans folded to fit in a 10"x 13" envelope 3. 7 sets of Preliminary/Final Engineering folded to fit in a 10" x 13" enveloped. d. One CD containing one electronic copy(pdq of each of the signed application (complete with exhibits), preliminary plan or final plat, landscape plans,engineering plans. Within one week of receipt of submittal,the Engineering Department will determine if it is complete or if additional information is needed. Once the submittal is complete, the plan council meeting date will be scheduled for the next meeting that is 6 weeks from this date. One week prior to your scheduled Plan Council meeting, you will be required to submit 15 full size preliminary/final site plans for the packets distributed to the members. United City of Yorkville Preliminarynnal Plitt Application Revised:_1.29.9 1 28 In witness whereof the following petitioner(s)have submitted this application under oath and verify that to the best of their knowledge its contents are true and correct. Date: 6/23109 Petitioner(s) Signature: (All legal property owners signatures or their authorized agents(i.e.Planner, Petitioner's Attorney,Engineer)must appear on this application.) g: 1 Subscribed and sworn to before me this 23rd day of June 2009 Y PZ 1 =oi!�`-�.••�� pIAIdE C CUNNINGNA1d OFFICIAL MY C4 MISSlOR M S - Notary Sea u; nCTOKR al.2012 of THIS APPLICA TION MUST BE NOTARIZED. United City or yori ville Preliminary/Final Plat Application Revised:_1.29.09 29 PRELIMINARY PLAN/FINAL PLAT PETITIONER ROUTE Step I: Petitioner must submit a completed application, fees* and all pertinent materials to the Community Development Department a minimum of 45 days prior to the targeted Plan Commission meeting. Petitioner is responsible for making submittals to other review agencies such as Kendall County, Illinois Department of Transportation, Illinois Department of Natural Resources, U.S. Army Corps of Engineers, etc., to allow timely review by City. *Fees: 1. Preliminary Plan Fee- $500/Final Plat Fee-$500 a. Engineering Review Fees - 1.25%of the approved engineer's estimate of cost of all land improvements,to be determined by City Engineer. b. Engineering Review Deposit-up to 1 acre=$1,000; over 1 acre but not over 10=$2,00 over 10 acres, but not over 40=$5,000 over 40 acres, but not over 100=$10,000 over 100 acres=$20,000 c. Deposit for Outside Consultants-under 2 acres=$1,000 2 to 10 acres= $2,500 over 10 acres=$5,000 Note: Owner/Developer will be responsible for payment of recording fees and costs,public hearing costs including a written transcription of public hearing and outside consultant costs (i.e. legal review,land planner, zoning coordinator, environmental, etc.). Should Owner/Developer not pay these fees directly,they will be responsible for reimbursing the United City of Yorkville for the aforementioned fees and costs. Note: You must present your plan at each of the meetings below as indicated Step 2: Plan Council: The Plan Council meets the 2nd and 4ffi Thursday of the month at 9:00 a.m. in the city conference room. Upon recommendation by the plan council,you will move forward to the Plan Commission Meeting. Attendees to this meeting include: Community Development Director, City Engineer,Building Department Official, Public Works Director,Director of Parks and Recreation,Fire Department Representative, and Police Department representative. Step 3: For Preliminary Plans only;Park Board planning meeting: The Park Board makes recommendations on any Park Sites included in the development. The Park Board planning meeting is the 4`h Thursday of each month at 7:00 p.m. at the Riverfront Building, 201 W. Hydraulic Street. Step 4: Plan Commission: The Plan Commission meets the 2n0 Wednesday of each month at 7:00 p.m. in the Yorkville public library at 902 Game Farm Road. The Plan Commission will make a recommendation for the City Council's consideration. The Plan United City orYorkvillu FreliminmylFinal Plat Application Reviscd:_1.29.09 30 Commission consists of 10 members appointed by the Mayor,the City Attorney and City Land Planner. Step 5: The project will be discussed in an informal atmosphere at the Economic Development Committee meeting,held the first Tuesday of each month at 7 P.M.in the City Council chambers. This session is to discuss and consider recommendations of prior committee meetings. Step 6: City Council: The City Council meets the second and fourth Tuesdays of the month at 7:00 p.m. in the Council Chambers at City Hall. This is where all City Council voting takes place. If this project has included an annexation and/or zoning petition, a Public Hearing will be held at this time with notice given by publication. Any annexation agreement,PUD agreement or development agreement must be signed by the Petitioner prior to being voted on by the City Council. Prior to the recording of the final plat, the petitioner must pay the Administration Fee. This is equal to 1.25%of the approved engineer's estimate of construction costs of land improvements, including but not limited to all public improvements to be dedicated to the City, mass earth grading, and quasi-public improvements to be maintained by the homeowner's associations such as private storm sewer,parking areas, and trails. Step 8: Final Plat recording instructions: Once the final plat is approved by the City Council and all required documents, bonds, and letters of credit are submitted to the city, the final plat may be recorded with Kendall County. Submit the final plat mylar to the Deputy Clerk for signatures. When all city signatures are in place, the developer or his surveyor may take the mylar to the Kendall County Clerk for his signature. The next step is to have six paper prints made and return to the Kendall County Recorder's office for recording. Kendall County requires the mylar and four paper copies. The City of Yorkville requires that you submit two recorded paper copies to the Deputy Clerk. Any copies you may require would be in addition to these. Agreement: I understand and accept all requirements, fees as outlined as well as any incurred administrative and planning consultant fees which must be current before this project can proceed to the next scheduled committee meeting. Please sign and return (retaining a copy for your records)to the Deputy Clerk, United City of Yorkville, 800 Game Farm Road,Yorkville, Illinois 60560. 6123109 Date Signature of Petitioner United City of Yorkville Preliminar)#Final Plat Applical ion Devised:_1.29.09 PROPERTY DESCRIPTION PARCEL 1 PART OF SECTION 4, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, KENDALL COUNTY, ILLINOIS, DESCRIBED AS FOLLOWS: TO WIT: COMMENCING AT THE NORTHEAST CO OF THE SOUTHWEST QUARTER OF SAID SECTION 4: THENCE SOUTH 0 REE 09 MINUTES 47 SECONDS WEST ALONG THE EAST LINE OF SAID S T QUARTER 990.00 FEET (15 CHAINS) TO THE NORTHEASTERLY 0 PARCEL OF LAND DESCRIBED IN BOOK 163 AT PAGE 473:THENCI SOUTH 1 DEGREE 09 MINUTES 47 SECONDS WEST ALONG SAID 4 FEET TO A POINT ON THE SOUTHERLY LINE OF A PARCEL OF L ED IN BOOK 152 AT PAGE 392, SAID POINT BEING THE PO O OF THE HEREIN AFTER DESCRIBED TRACT OF LAND: t 89 DEGREES 38 MINUTES 08 SECONDS WEST ALONG SAID L 4 T: THENCE SOUTH 4 DEGREES 41 MINUTES 35 SECONDS WEST 581. OINT OF INTERSECTION WITH THE WESTERLY LINE OF SAID PARC DESCRIBED IN BOOK 163 AT PAGE 473; THENCE SOUTH 03 DEG S 41 SECONDS WEST ALONG SAID WESTERLY LINE 756.55 CE SOUTH 30 DEGREES 09 MINUTES 41 SECONDS WEST 366.17 SOUTH LINE OF THE SOUTHWEST QUARTER OF SAID SECTION UTH 89 DEGREES 34 MINUTES 05 SECONDS EAST ALONG SAID SO 9 .84 FEET TO THE SOUTHEAST CORNER OF SAID SOUTHWEST R CE NORTH 01 DEGREES 09 MINUTES 47 SECONDS EAST ALONG EA INE OF SAID SOUTHWEST QUARTER, A DISTANCE OF 1655.47 FEET T'O INT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, INOIS. EXCEPTING FROM PARCEL ONE THE FOLLOWING DESCRIBED PROPERTY: WATER TOWER EXCEPTION THAT PART OF THE SOUTHWEST QUARTER OF SECTION 4,TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHWEST CORNER OF SAID SECTION 4:THENCE NORTH 87 DEGREES 58 MINUTES 26 SECONDS EAST(ASSUMED)ALONG THE SOUTH LINE OF SAID SOUTHWEST QUARTER OF SECTION 4, 826.23 FEET TO THE EASTERLY RIGHT-OF-WAY LINE OF ILLINOIS ROUTE 47; THENCE NORTHERLY ALONG SAID EASTERLY RIGHT-OF-WAY LINE BEING A CURVE TO THE LEFT WITH RADIUS OF 1691.42 FEET,AND CHORD BEARING NORTH 12 DEGREES 50 MINUTES 21 SECONDS EAST, AN ARC DISTANCE OF 766.59 FEET TO A POINT OF TANGENCY; THENCE NORTH 00 DEGREES 08 MINUTES 41 SECONDS WEST,ALONG SAID RIGHT-OF-WAY LINE, 9I9.89 FEET TO THE SOUTHERLY LINE OF PROPERTY DESCRIBED IN BOOK 152, PAGE 392; THENCE NORTH 87 DEGREES 54 MINUTES 21 SECONDS EAST, poc:6473511 ALONG SAID SOUTHERLY LINE, 672.35 FEET TO A POINT 945.20 FEET WESTERLY OF (MEASURED ALONG SAID SOUTHERLY LINE) THE EAST LINE OF SAID SOUTHWEST QUARTER; FOR THE POINT OF BEGINNING; THENCE SOUTH 01 DEGREE 58 MINUTES 29 SECONDS EAST 320.03 FEET;THENCE SOUTH 87 DEGREES 54 MINUTES 21 SECONDS WEST, PARALLEL WITH SAID SOUTHERLY LINE, 284.37 FEET;THENCE NORTH 01 DEGREES 58 MINUTES 29 SECONDS WEST,320,03 FEET TO SAID SOUTHERLY LINE: THENCE NORTH 87 DEGRFF,,KA4 MINUTES 21 SECONDS EAST,ALONG SAID SOUTHERLY LINE,284.37 FEET TO POINT'OF BEGINNING, IN BRISTOL TOWNSHIP,KENDALL COUNTY,TLLINO�- PARCEL TWO: PART OF THE NORTHWEST QUARTER O SE WNSWP 37 NORTH,RANGE 7 EAST OF THE THIRD PRINCIP ALL COUNTY, ILLINOIS. DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHEAS C F THE NORTHWEST QUARTER OF SAID SECTION 9; THRICE S ALONG THE EAST LINE OF SAID NORTHWEST QUARTER ON OF SOUTH 01 DEGREE 19 MINUTES 36 SECONDS WEST, A DIS C OF 472.54 FEET; THENCE WESTERLY PERPENDICULAR TO RIBED COURSE ON A BEARING OF NORTH 88 DEGREES 40 'SE S WEST, A DISTANCE OF 330.65 FEET TO THE NORTHEAST CO ARCEL OF LAND CONVEYED BY DOCUMENT NUMBER 8703 NTIMANG WESTERLY ALONG THE NORTH LINE OF SAID PARCEL N A BEARING OF NORTH 88 DEGREES 40 MINUTES 24 SECONDS WEST, ANCE OF 368.68 FEET TO THE NOR'T'HWEST CORNER OF SAID PARCEL; SOUTHERLY ALONG THE WEST LINE OF SAID PARCEL ON A BEARING SOUTH 01 DEGREE 19 MINUTES 36 SECONDS WEST, A DISTANCE OF 187.61 FEET TO THE CENTER LINE OF THE CHICAGO-GALENA ROAD; THENCE NORTHWESTERLY ALONG SAID CENTER LINE NORTH 73 DEGREES 52 MINUTES 25 SECONDS WEST, A DISTANCE OF 778.45 FEET; THENCE CONTINUING NORTHWESTERLY ALONG SAID CENTER LINE OF A BEARING OF NORTH 72 DEGREES 22 MINUTES 25 SECONDS WEST, A DISTANCE OF 708.88 FEET TO THE EASTERLY LINE OF A PARCEL OF LAND DESCRIBED IN BOOK 152 AT PAGE 392; THENCE NORTHEASTERLY ALONG SAID EASTERLY LINE ON A BEARING OF NORTH 31 DEGREES 36 MINUTES 51 SECONDS EAST,A DISTANCE OF 267.67 FEET TO THE NORTH LINE OF THE NORTHWEST QUARTER OF SAID SECTION 9;THENCE EASTERLY ALONG SAID NORTH LINE ON A BEARING OF SOUTH 89 DEGREES 34 Me&r ES 05 SECONDS EAST, A DISTANCE OF 1997.59 FEET TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS, EXCEPTING FROM THE ABOVE TWO PARCELS THE FOLLOWING' (ROUTE 47 EXCEPTION TO PARCELS I &2) Dm:6473511 a o � q THAT PART OF THE SOUTHWEST QUARTER OF SECTION 4, AND OF THE NORTHWEST QUARTER OF SECTION 9, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, KENDALL COUNTY, ILLINOIS DESCRIBED AS FOLLOWS: AND BEARINGS USED HEREIN ARE REFERENCED TO GRID NORTH OF THE ILLINOIS STATE PLANE COORDINATE SYSTEM , EAST ZONE: COMMENCING AT THE SOUTHWEST CORNER OF SAID SOUTHWEST QUARTER:THENCE NORTH 87 DEGREES 57 MINUTES 30 SECONDS EAST 719.88 FEET NG THE SOUTH LINE OF SAID SOUTHWEST QUARTER TO THE EXISTING WEST RIGHT-OF-WAY LINE OF ILLINOIS ROUTE 47 AND THE POINT OF BEd CE NORTHERLY 774.17 FEET ALONG A NON-TANGENTIAL CUR C T THE WEST HAVING A RADIUS OF 1,596.42 FEET, A CENTRAL AN REFS 47 NU NUTES 06 SECONDS AND A CHORD OF NORTH 13 DEG TES 52 SECONDS EAST 766,&D FEET ALONG SAID EXISTING T-OF-WAY LINE; THENCE NORTH 00 DEGREES 09 MINUTES 4 ST 767.39 FEET ALONG SAID EXISTING WESTERLY RIGHT-OF- CE SOUTH 89 DEGREES 50 MINUTES 19 SECONDS WEST 10.0 E NORTH 00 DEGREES 09 MINUTES 41 SECONDS WEST 132.94 FEET TH LINE OF A TRACT DESCRIBED BY DEED RECORDED IN BOOK 243 ALL COUNTY RECORDS;THENCE NORTH 87 DEGREES 58 CONDS EAST 105.06 FEET ALONG SAID NORTH LINE,THENCE SO REES 09 MINUTES 41 SECONDS EAST 923.76 F$ET;THENCE SO ET ALONG A TANGENTIAL CURVE CONCAVE TO THE WEST V A IUS OF 1,691.42 FEET, A CENTRAL ANGLE 25 DEGREES 58 5 E NDS AND A CHORD OF SOUTH 12 DEGREES 49 MI NU TES 21 O T 760.05 FEET TO THE SOUTH LINE OF SAID SOUTHWEST THENCE SOU'TTIERLY 270.97 FEET ALONG A NON- TANGENTIAL NCAVE TO THE WEST HAVING A RADIUS OF 1,691.42 FEET,A CENTRAL A LE OF 09 DEGREES 10 MINUTES 44 SECONDS AND A CHORD OF SOUTH 30 DEGREES 23 MINUTES 46 SECONDS WEST 270.68 FEET; THENCE SOUTH 34 DEGREES 59 MINUTES 08 SECONDS WEST 54.26 FEET TO THE CENTER LINE OF GALENA ROAD; THENCE NORTH 74 DEGREES 59 MINUTES 01 SECONDS WEST 58.52 FEET; THENCE NORTH 74 DEGREES 20 MINUTES 30 SECONDS WEST 42.39 FEET ALONG SAID CENTER LINE;THENCE NORTH 34 DEGREES 59 MINUTES 08 SECONDS EAST 88.27 FEET ALONG THE EXISTING WESTERLY RIGHT-OF-WAY LINE OF ILLINOIS ROUTE 47 AS EXTENDED FROM THE NORTH; THENCE NORT 4ERLY 205.13 FEET ALONG A TANGENTIAL CURVE CONCAVE TO THE WEST HAVING A RADIUS OF I,596,42 FEET, A CENTRAL ANGLE OF 7 DEGREES 21 MINUTES 43 SECONDS AND A CHORD OF NORTH 31 DEGREES 18 MINUTES 16 SECONDS EAST 204.99 FEET TO THE POINT OF BEGINNING,IN KENDALL COUNTY, ILLINOIS. Doo:6473511 30 q STREET ADDRESS: CITY: COUNTY: KENDALL TAX NUMBER: LEGAAL DESCRIMON. AND EXCEPTING FROM THE ABOVE TWO PARCELS THE FOLLOWING THAT PART OF THE SOUTHWEST 1/4 OF SECTION 4,AND THAT PART OF THE NORTHWEST 1/4 OF SECTION 9, ALL IN TOWNSHIP 37 NORTH,RANGE 7 EAST OF THE THIRD PRINCIPAL IDIAN.DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF THE SOUTHWEST 1/ CTION 4;THENCE SOUTH 01 DEGREE 18 MINUTES 17 SECONDS EAST ALONG AN ASSUMED N E EAST LINE OF SAID SOUTHWEST 1/4 990.00 FEET(15 CHAINS)TO THE NORTH FA PARCEL OF LAND DESCRIBED IN BOOK 183 AT PAGE 473;THENCE CONTINUIN EE 19 MINUTES 17 SECONDS EAST ALONG SAID EAST LINE 1.84 FEET TO A POINT ON THE SO Y F A PARCEL OF LAND DESCRIBED IN BOOK 152 AT PAGE 392,SAID POINT BEING THE POI N THE HEREINAFTER DESCRIBED TRACT OF LAND; THENCE SOUTH 87 DEGREES 52 MINUTES 48 E ONG SAID LINE 945.20 FEET TO THE EAST LINE OF THE EXISTING WATER TOWER SITE;THEN S GREES 00 MINUTES 02 SECONDS EAST ALONG SAID EAST LINE 320.03 FEET TO THE SOUTHEAST F D WATER TOWER SITE;THENCE SOUTH 87 DEGREES 62 MINUTES 48 SECONDS WEST PARALLE UTHERLY LINE OF LAND DESCRIBED IN BOOK 152 AT PAGE 392,ALSO BEING THE SOUTHERLY E O D WATER TOWER SITE,A DISTANCE OF 284.37 FEET TO THE SOUTHWEST CORNER OF WATER SOUTH 02 DEGREES 07 MINUTES 12 SECONDS EAST 60.00 FEET;THENCE NORTH 87 DE 48 SECONDS EAST 83.50 FEET;THENCE SOUTH 02 DEGREES 07 MINUTES 12 S 29 FEET;THENCE NORTH 87 DEGREES 52 MINUTES 48 SECONDS EAST 137.48 FEET;THENCE G EES 07 MINUTES 12 SECONDS EAST 244.01 FEET;THENCE SOUTH 26 DEGREES 17 MINUTES SE 14528 FEET;THENCE SOUTH 02 DEGREES 07 MINUTES 12 SECONDS EAST 406.58 FEET;TH 3 DEGREES 52 MINUTES 32 SECONDS WEST 45.74 FEET;THENCE SOUTH 76 DEGREES 21 MINUTES 29 E EAST 131.00 FEET;THENCE SOUTH 13 DEGREES 38 MINUTES 31 SECONDS WEST 51.15 FEET;THENCE 21 DEGREES 12 MINUTES 51 SECONDS WEST 75.66 FEET;THENCE SOUTH 13 DEGREES 38 MINUTES 36 SECONDS WEST 115.22 FEETTO THE CENTER LINE OF THE CHICAGO-GALENA ROAD; THENCE SOUTH 76 DEGREES 21 MINUTES 24 SECONDS EAST ALONG SAID CENTER LINE 185.01 FEET TO THE SOUTHWEST CORNER OF A PARCEL OF LAND CONVEYED BY DOCUMENT NUMBER 670363;THENCE NORTH 01 DEGREES 09 MINUTES 21 SECONDS WEST ALONG THE WEST LINE OF SAID PARCEL 187.60 FEET TO THE NORTHWEST CORNER OF SAID PARCEL:THENM SOUTH 88 DEGREES 50 MINUTES 39 SECONDS EAST ALONG THE NORTH LINE OF SAID PARCEL AND ITS EASTERLY EXTENSION 699.33 FEET TO A POINT ON THE EAST LINE OF THE NORTHWEST 1/4 OF SAID SECTION 9;THENCE NORTH 01 DEGREES 09 MINUTES 21 SECONDS WEST ALONG THE LAST DESCRIBED LINE 472.53 FEET TO THE SOUTHEAST CORNER OF THE SOUTHWEST 1/4 OF SAID SECTION 4;THENCE NORTH 01 DEGREES 19 MINUTES 17 SECONDS WESTALONG THE EAST LINE OF SAID SOUTHWEST 114 1655.75 FEET TO THE POINT OF BEGINNING,IN KENDALL COUNTY,ILLINOIS. p� -Oy-�Da -aaa- Q� CLWALD `jo ciT o Memorandum IEsr. _.` lass To: Plan Commission �� From: Travis Miller, Community Development Director 0 O CC: Annette Williams, Administrative Assistant 'SCE r�`�? (for distribution) Date: September 2, 2009 Subject: RWJ Yorkville LLC - Final Subdivision Plat Background The petitioner is requesting to subdivide property into two lots which was consolidated into one lot in 2006 at the time BP/Amoco was redeveloping the site. The need for a setback variance was identified by staff when the redevelopment plan was submitted. BP/Amoco, which had acquired the adjacent property to the north, decided to consolidate the lots to avoid the need to request a variance. At that time, staff reviewed the existing and planned improvements on the property and determined that the restaurant site included enough parking to remain on the lot and permitted the location of the car wash structure. The separation between the new car wash structure and the restaurant building was adequate since no side yard setback requirements existed and multiple buildings/businesses maybe located on a single lot in the Business Zoning Districts. The current owner of the property has requested a side yard setback variance in order to subdivide the parcels and transfer the restaurant building/site to another owner. The City Council will consider the side yard setback variance necessary for this Plat to be approved at their September 8, 2009 meeting. Staff Recommendations Staff has reviewed the Preliminary Plan and Final Plat submitted. The preliminary plan is an 8.5"xI 1" document that shows basic building and pavement locations and some dimensions. It is not labeled as a preliminary plan, and does not provide the information typically required for a preliminary plan, however, due to this property already having improvements complete, the Plan Council recommended a Preliminary Plan is not necessary, therefore not required for practical purposes. Staff has reviewed the Final Subdivision Plat and recommends approval subject to the following comments: • Add a signature block for IDOT. Staff has advised the petitioner that the latest IDOT plans we have call for additional right-of-way along Route 47 and a temporary easement along Route 34. The petitioner should contact Steve Andrews at IDOT to see if that is still the case, and revise the plat accordingly. • Staff recommends a pedestrian easement on this property along the Route 34 frontage for a future trail (see the attachment) The trail easement dimensions should be confinned and shown on the plat along with appropriate easement language. • Building setback lines should be shown on the plat. }� ?ti e� Jo*r M _op I r f+r r JI PROPOSED BIKE PATH/ �PROPOSED EASEI ENT SIDEWALK EXISTING CURB - - PROPOSED ROW LINE PROPERTY LINE PROPOSED ROADWAY 4- 6At Aim (4 I'*' � R x 1 tl or * 4, �1 a` M , ar E ti+ererat,s Pls,vy . r iA0 Po 0 9�'�'� The Date Is provided without warranty or anyrepresentation of C N V 9 accuracy,timeliness,or completeness.It is the rraponslbflky of the "Requester"to determine accuracy,timeliness,completeness,and RWJ Yorkville L L C Preplan & Final Plat approprhteness of its use.The United City of Yorkville makes no W E vwtranties,expressed or implied,to the use of the Data. Parcel Data&Aerial Photography provided by Kendall County GIS - Aerial V i eW -Map created by United City of Yorkville GfS a ♦`i#+►i### �A�4�4�A�#�#�4'r4r`r 4'4'�i��O���a�a�#�A�A'.i�� - - !w#441##+# ►A4AA♦♦44♦♦44♦44#'4-#Ai.�#� "`+##.##a► ♦AAAAAA♦4444#♦41♦#♦1#441 #�•:�� �• .44A4iAAA4A444444♦41414♦ Legend 4_iA##AaR#• 4441444AAA4A4A#44444441 F-1-Floodplain District #4##1#4�� t'#44+44A4AAAA4A#4444♦## ♦1111### 4444414144AAA44A4444i4ti #! ###!it �444444/114A4A4AAA4A♦♦414. +►1414.*+*+t0!!'A 4*. , ti+i+i*i+i*i#i*i*1414141414141*i*i*i4i*!*i+i4#+iii*#*.`.t°. .a•!'r!#a'_+#.#.#a 4:` *iO+i+i4#44+i*i#4+i*#+i++414141*i4i*i*14111*a##*,#i*!!!•#a -Agricultural • p.r•� . +ra 44 ♦41♦#4#+444441414A144A♦411!##1 -1-Es(ate Residence 1111*`#-•.:11♦ ♦AAAA444♦4♦44444441444♦111##1 ##11##!1 ♦4. ♦AAAA♦♦4A4444444444/A♦ 111##� Distinct #ii### �!#11♦ �1AIAAAAAAA44♦#444#444###4##41 #*###*1111#*�liA444A+4a w s+i4A4A+AAA4A4#4AA44AA4#4A#A4A/A444+!44444444 14164+#4,*ir#11 — • - Familiy Residence Dirincl ►,}##*;#!#i 1w#i4�4�#��` �4�4�#�4*4�#�4�4�4�4�4�4+A+A+i+A4#4#4a4a4a4+M##� #.i - - - District ###ets##i4A4♦ .�...#AT4"���4�44A4A#♦A** 4 i# • t4# #+ #► ♦441 ♦4i44444444/1144AA44♦ 1141#a ### ri#44 4AA♦ �A444444444414144144A♦ ♦1111 #`iii+►*#*#*+`+#•":4*i4i*i/ i*4*4*i#1114444444444*i+i4i*i*Qi*i*4*4414#4#4#44+i#i*#� — • Duplex Two Family Disinct #+>## ♦11� ♦AAAA♦#AAA444444444444####4i I l` Residence # Fa#r- . l4i*4 A-44 a+A•+♦•, i4�A4•A+a#4+4.4A4.A44�A4A44444A44A44444AA44A44 A+4#44A44A444444 44#4*#•*#######.t#####�i 4/14414AA1A4AA4444444♦###1i# -a a.A.4 *+4aAaA#AA4#4A##�1•# i**##a. R-4-General Residence District I III jj PUD-Planned Unit Development ♦####114####i4##4#1#4 4&1 . .� � . t#i##•r444•####�.4ar## •4#i#4 *144#" ' / •i!1# #i i 1## 1!### •ar 11#A#1i## 44Ai#i# ##;!!41#i44A##1i*• #*1111##1►*#4#i#itiF*#t##ili*#41* B-1-Limited Business District IF ##4i4i4t+i*##a###*#4#4#!�►A!*#i ###**`#*##i�ki##*#a 1#4#!+a##111#!#1###!1########## 4114♦}44##f##i ##!####411144'#ti#141#i###1##ii*441##114##4i## : • ►+#ai##r#t##444444#44###4'�4iit4*#tKt4**t!######ttA#####ti####4#+1,44*�#i+i'�i4}+ ,*4t r-# ##t##4#4##4##►4♦#!##aA#############4441 ► #s#*1111# 4-####411#+## 4##4####4####44444 District , 4 4##i!i#########i##!#i.#3` ##i*4►1r#####it #A###i##t4A######i#####ii###4ii*4#4*# r 1114####4•n## +1.441##!##t#+1111##•4##t##i _ District M-1-Limited � 4, 44###!#Ir***#a!###1►,►###4#*it#4ti###tf#i#4�#####4•IF#44t4 141*t##*i1,t###!!*#A#*+r4t###i / ! 1####411#4#### i♦!##aa ###+####4414#1i##* g District #„#,wt#'#4.4#4141##44�#4i+i4+�a4##'ii,1+1111#i#a##,ti!*####T-*###*1111#*ii##i#4i##Air►;a, Via"*�A`#'##i►4. +�Ik1Y.Ir4A44i#1�!## #i######i t###4►i##f r M-2-General Manufacturing District *,*i#1111*#*#t#*i##*#*#*##ii#*#*#�i*# ###*l1}1111!*#�*••#*#*M*4 !####t#tM#4#!A#i##*#*#+r*+►+#*#*#t#iar#!#*�1*!*##!*#v# ########i#i►##*.i#*##i�14!*!##��Ii#*# *#*#*#*#*#*#'►1111#*###7�!#•s#�+1141!#*i*#*!�►#*+1 *#*#*#*#*#i#����a'i�4f##fAi*#*4###1•*#4���*!4A*#4a*t�#*#*#***#*#*114*#+i�*4!i*liars#**a ##11######44111#41#114#iP###*#i#*##1it#+��*# •!i �r+M#####i#aFi#6#}111##1#4^i#!!### ia'##44*#i►�rfa *� #�`4+*.�.*:*.tr*+*•�`##**.**#*###�+►##'►##44,►+#4##4�4�##!!!*#*a.tit!*#*#*�*#*###tt'#*tt##4#a�`r ��4'�4�i#4#!#k*�i*#*#A#��r4#*#*#iA##*#t#�#4#*#*#*t4#*##�*►i#4##i*1444#*##ilit#*#*#�#*#�i #i#4!##'#�#�l1 i.i#*+�####�►is*�Ft#*rR##*#!i*#it!#*4*#�###4�F*##4�4*�"iiit:'ii*!!!!s***!*!*#*i A###ii444#11li#�#4i##4##4• i## ##414##1t#+1i!## ####a�##4A4#####!44♦#444A4#+####41 4#r#�!i!!#a �` tAli!#�#A+le`i#1�4i� � -�3�414ii ##!##i�4►4#######+!!ir 4411##4•F###4#4 # 1111#4i#*1111##•#4a . #4###ii##44A# �-#-#!.,4�Ai1t###4####•## VV 1P V 4441# ir###A### # ### •#•i � � is#4#*441+4#4s�#4 �rAAii � J/� 111##1 ♦###4A44444 +444#*iii44��1►+ 4A##iA 44♦###. 11M14i � �i#A 4i + ►4 4�►11AA*�as#+►# #A##44 aA#4 ►441#1##A. / ►4#441#!#+ / 4411 ►#�#i# 14# 4'a ... - - 4411i4#1#ia k4##*�►IF44#4•►' `# r444##i4##+M AA•#4444�t4#4##iF•# ►.sue ,. ♦4�►#a•##41r# �1#i114►A4#* ►}}111#1 ir11#1 +�####i•## 4i1i4444###�.####•*#4411 4A44sz F#A#iiA#+#r#AA#i*##Ia1AAAi##*#*#*i ►#t#i####414 9911 A♦#*# •##�►_4w►• ►4144 ►aiir#.+►#Ai##* , r###i #4Ai#+r ►44#a14• 4 ►4♦+a #11• r. S + 14*1111+4A41i##♦## #*###' i4A#### ♦♦#i##4 444414#114 ###ii4rYi#•## {l41#*# X44##i# i # * a+*+#A#*.##**#+i4! Ci'L�*r.#i !###t*#*#*44 i•`+w Y#a,`, �A4#A4##ar*i##iF #.� •x.444 .�'lrt ### ►###+r* i+##.II'. #-iris "# rA44ii1## �A♦#1#r1t: ' :- ;#4ia'#°t�1### iii## ►#`i`1'4+.w�.• #4i#a't#' a.A.4,+i►##} ♦44+1141#'#4 ►X11#1!*## !s###*##11#4;+ri #aA##sa ,•.a,�r. *44X1#ii##ri#i4i#441r+ r°#i#i4#ii"rr#*#*#iilt##11#####*i4#a`a4t4i#;4t# " it*#►#*#*i*#*#k 4i*#'r#*#***###t#i#*#i#*111#1+. ilr#,I►rt}#*##t#; ►♦♦4####4#'1 1'1*!"41!11#t*114r,_o 4#411# ♦1♦####aF#4 1111#!!! r##ii ###1#######t 4####14 ►4♦## ##41E4##!#11141## ►#1###i 4#411# ♦4414##411# i4#41#!• M.i•.ii##1 #1!1###1#' '1F 1#44#41 44♦#1###4##+ ri##4# ## s•is#!##i####1###44444 4#44w 44411###11# 1 41144## i4i1i ##1.f41i#11###•►####444 f#i4ar#4##4#i!,►1+^�##i+r41*i*#*1*+ri#*#*#►A*#*+rti*!*#*i#41r 44♦#i#14;## }i♦ # r.#a•+r#f##i####ii#t#1##i###i# #1 rA4A+►#411#!4# 41 A4#!+►�#44F"4�w#_F_4�4+r#lilf##t_#fit 1111#` �14AA#41#♦#i4 #4X11441# +r!#41 !AM 0&19rt###Rli. �A 1�ar#� r**1*�►#i4#►�##4####*i'i'g►;+►'i#���F#�.*�!r►'w 1'I►.! !##Ai�i�i#'#`�#4#*#*ii*.#***#*#A#*#*#*f#t4:#+ice*;1####+1a#####'►#*i*#*# 411144## #4###1##4##n1###� ►#$###1#i �� ♦44!•t##i### ± �►�r4+�###4#I+iA#tt1####### i }4#4#ay*114 1444###1### #wi,{w#�4+.!#444##4A•#•►###1i +►441#4414lf 4♦+/ i##axis# #41w a111;►Xai144###ii1!#144####!##► ��A�A�A�#!#i►!t##'ii ►:' #+►##1#*44►4# ` i ##*Mira##i*4*A##X47,11*A*#*#i+##4!i#*yV4441 •. +.r*a.i_ A. �ai .#44+F#1+.#'"r4i.4A"!� k i 4##i►4 IF#4 IF rA4� #r� # ' t. �� ♦4 ♦4###4'�►♦ x•.4�A4#►#+►#{l4444�►44114#44#4� 1444###*444 •#.. -4.:#4##♦ 14 • #1i ♦A11i#####• ►A44'�r_ 444114* #*#11 ♦444♦ ►41± # 14i1a # r1 ♦4AAA44-� 41 44## A44A .!A+!4+�*,**+**#+,+t1i iA+4+A+A+A+4+A+4+ • # A4+�A+a+.� �j ♦44r�-1+�. �•< ►44444441 X44444###�-#• ♦4111114• ��� 44444###1#1 4♦# t4 X ♦441 r►444♦# #4 ♦ 44 4_ ## ♦ 4X4♦A# #►i4 44444441414/4 y YA4A♦##1#X11 r4444444♦ / ♦4A♦#.#i1#4i ♦4444444• ►4*44A*A*#�{41414#*tlf ►44X4444+44444+4f ►+444+X444###�#�,**4##* 44AA44AA4A4A4444� � Q t+4+1+4+4#+iF*#*i«*#i+r4#1 y1+4444A+4AAA4444� �4441A##4#4 ♦1144X44• ♦4444####AA /1114XA1# ♦44444#44##• ♦.4414444 X444441##4♦ ��±�.X�111 ♦X4441#1### ♦41.t-#,1 ►a4i##Aj+4+j#j#411+44* )+444*4*4*44�A4�f r "«..•.►a.�. ,4�4-4.4..4 I 1 l Legend 1 I 2008 Land Use Plan Land Use Classification 4 I L Rural Neighborhood ,°Mulhern•Cti- 1 C3 Estate Neighborhood ! y Suburban Neighborhood Traditional Neighborhood I f Commercial — — — — — — - I .. _ f�ePkvY71 — 1 - - - - - - - � 1 _ Neighborhood Retail E Coltnt 1 rysrae Pkwy Induslnal ` Office/Research } Mixed Use 1 PubltclQuest Public f Parks/Open Space ! CommercialJOffice Research Industnavolfice Research ! \ I \ I C+ m 47 1 I I 1 ? fI 4 ' -W Veteran$ph 4 I — I i st Ave— I E Veterans Plswy I I I ! I ! -Leisure St I I ! Nom.• •..�M. I ! ! t.Q Pleasure Dr rm 1 1 ' 1 \ r' r d~k —Gffor esnnai St — l rr v¢—T T D4 , J = O : 1 r c ' t?0 I ! r LL The Data is provided without warranty or any reprosentatlonof PC 2009-1 N accuracy,Bmefiness,or compieteness.It fa the responalblflty of the "Requester"to determine accuracy,timeliness,completeness,and RWJ Yorkville L L C Preplan & Final Plat of Its use.The Unite City of Yorkville metres no YY E warranties,expressed or implied,to the use of the Data. Parcel Data B Aerial Photography provided by Kendall County GIS - Land Use -Map created by United City of Yorkville GIS 26 C'T�-o United City of Yorkville 800 Game Farm Road EST. �. f�� '1836 Yorkville, Illinois 60560 o Telephone: 630-553-4350 Fax: 630-553-7575 <tE PC# C;Wn f3 APPLICATION PETITION Please Check One: / Preliminary Plan V-Final Plat Development Name: h6 YW-yi 1l e L-C (idic., Date of Submission: 1 a'`�I U 1. Name of Petitioner(s): RW,1 0 Address: JQ 10 pri e- 8 b V d S-,LL I 4-g--- Zaa. CrLL--a rva k- ..T-/ ( a� Phone Number: b 30- �) —(o U 3 Fax Number: 6030 L 0 3 9 Email Address: BD� � Q kt.J-M e11 S, o I-M, 2. a). S eet address and physical location of subject property: )� Al r 1 d 5 P A -TL b aS b). Legal description of property; attach as Exhibit"A". c). Total Acreage: _ .a09 a4e'l-) 3. Contact Information: Name, address, phone number, fax number, and email address of erson to whom in uiries regarding this petition may be directed: CC r 051.K r-ob 1k- ZL .SGL�s��a((3 ru k-w-eau A0 AOLL Co','L Attorney: Name: Ter f u A-n 6A a II ( rte 5 IY1 k- Ll- P-) Address: J ALA M b6fA,1 Ci- S 1e1 k POO C-lf J AD R &()(d (� Phone Number: Fax Number.�,k Email Address: Rm 14111 T Bn SII C4(, .AIC United City of Yorkville Preliminary/Final Plat Application Revised_ 29.09 27 Continued—3. Contact Information Engineer: Name: Address: Phone Number: Fax Number: Email Address: Land Planner: Name: Address: Phone Number: Fax Number: Email Address: 4. Submit the following to the Community Development Department in order to be scheduled for the necessary committee meetings. An incomplete submittal could delay the scheduling of your project. a. Original application with legal description plus 40 copies. b. Appropriate filing fee (Please refer to Page 3 of this application"Petitioner Route, Step 1, Fees" and/or contact the Community Development Department for verification of this amount). c. To begin the review process, the initial submittal must consist of: 1. 12 sets of Preliminary Plans/Final plats folded to fit in a 10" x 13" envelope 2. 7 sets of Landscape Plans folded to fit in a 10"x 13" envelope 3. 7 sets of Preliminary/Final Engineering folded to fit in a 10" x 13"enveloped. d. One CD containing one electronic copy(pdf) of each of the signed application (complete with exhibits), preliminary plan or final plat, landscape plans, engineering plans. Within one week of receipt of submittal, the Engineering Department will determine if it is complete or if additional information is needed. Once the submittal is complete, the plan council meeting date will be scheduled for the next meeting that is 6 weeks from this date. One week prior to your scheduled Plan Council meeting,you will be required to submit 15 full size preliminary/final site plans for the packets distributed to the members. United City of Yorkviile Preliminary/final Plat Application Revised:_1.29.09 28 In witness whereof the following petitioner(s) have submitted this application under oath and verify that to the best of their knowledge its contents are true and correct. Date: I-Rq-o`l Petitioner(s) Signature: (All legal property owners signatures or their authorized agents(i.e.Planner, Petitioner's Attorney,Engineer)must appear on this application.) a Subscribed and sworn to before me this Xi�- day of , 200-j_. Notary Seal THIS APPLICATION MAST BE NOTARIZED. E"AM 0- OFFOAL M4 LOUISE M AMEW WTMyP=X- WATEQF"W= CM#Mft EWMMAT112 United City of Yorkville PreliminaryfFinal Plal Application Revised:_1.29.09 f 29 PRELIMINARY PLAN/FINAL PLAT PETITIONER ROUTE Step 1: Petitioner must submit a completed application,fees* and all pertinent materials to the Community Development Department a minimum of 45 days prior to the targeted Plan Commission meeting. Petitioner is responsible for making submittals to other review agencies such as Kendall County, Illinois Department of Transportation, IIlinois Department of Natural Resources,U.S. Army Corps of Engineers, etc.,to allow timely review by City. *Fees: 1. Preliminary Plan Fee - $500/Final Plat Fee - $500 a. Engineering Review Fees - 1.25%of the approved engineer's estimate of cost of all land improvements, to be determined by City Engineer. b. Engineering Review Deposit-up to 1 acre= $1,000; over 1 acre but not over 10=$2,00 over 10 acres, but not over 40=$5,000 over 40 acres, but not over 100=$10,000 over 100 acres=$20,000 c. Deposit for Outside Consultants-under 2 acres= $1,000 2 to 10 acres= $2,500 over 10 acres = $5,000 Note: Owner/Developer will be responsible for payment of recording fees and costs,public hearing costs including a written transcription of public hearing and outside consultant costs (i.e. legal review, land planner, zoning coordinator, environmental, etc.). Should Owner/Developer not pay these fees directly,they will be responsible for reimbursing the United City of Yorkville for the aforementioned fees and costs. Note: You must present your plan at each of the meetings below as indicated Step 2: Plan Council: The Plan Council meets the 2nd and 4ds Thursday of the month at 9:00 a.m. in the city conference room. Upon recommendation by the plan council, you will move forward to the Plan Commission Meeting. Attendees to this meeting include: Community Development Director, City Engineer, Building Department Official, Public Works Director, Director of Parks and Recreation,Fire Department Representative, and Police Department representative. Step 3: For Preliminary Plans only; Park Board planning meeting: The Park Board makes recommendations on any Park Sites included in the development. The Park Board planning meeting is the 4th Thursday of each month at 7:00 p.m. at the Riverfront Building, 201 W. Hydraulic Street. Step 4: Plan Commission: The Plan Commission meets the 2nd Wednesday of each month at 7:00 p.m. in the Yorkville public library at 902 Game Farm Road. The Plan Commission will make a recommendation for the City Council's consideration. The Plan [United City of Yorkville Preliminary/Final Plat Application Revised_1 29 09 i 30 Commission consists of 10 members appointed by the Mayor, the City Attorney and City Land Planner. Step 5: The project will be discussed in an informal atmosphere at the Economic Development Committee meeting,held the first Tuesday of each month at 7 P.M. in the City Council chambers. This session is to discuss and consider recommendations of prior committee meetings. Step 6: City Council: The City Council meets the second and fourth Tuesdays of the month at 7:00 p.m. in the Council Chambers at City Hall. This is where all City Council voting takes place. If this project has included an annexation and/or zoning petition, a Public Hearing will be held at this time with notice given by publication. Any annexation agreement, PUD agreement or development agreement must be signed by the Petitioner prior to being voted on by the City Council. Prior to the recording of the final plat,the petitioner must pay the Administration Fee. This is equal to 1.25%of the approved engineer's estimate of construction costs of land improvements, including but not limited to all public improvements to be dedicated to the City,mass earth grading, and quasi-public improvements to be maintained by the homeowner's associations such as private storm sewer,parking areas, and trails. Step 8: Final Plat recording instructions: Once the final plat is approved by the City Council and all required documents, bonds, and letters of credit are submitted to the city, the final plat may be recorded with Kendall County. Submit the final plat mylar to the Deputy Clerk for signatures. When all city signatures are in place, the developer or his surveyor may take the mylar to the Kendall County Clerk for his signature. The next step is to have six paper prints made and return to the Kendall County Recorder's office for recording. Kendall County requires the mylar and four paper copies. The City of Yorkville requires that you submit two recorded paper copies to the Deputy Clerk. Any copies you may require would be in addition to these. Agreement: I understand and accept all requirements, fees as outlined as well as any incurred administrative and planning consultant fees which must be current before this project can proceed to the next scheduled committee meeting. Please sign and return (retaining a copy for your records)to the Deputy Clerk, United City of Yorkville, 800 Game Farm Road, Yorkville, Illinois 6056 P. Date Signature of Petitioner United City of Yorkville Preiuninary/Final Plat Application Revised:_1.29.09 ALTA/AGSM LAND TITLE SURVEY Surveyors Notes Properly Description 1.)THIS SURVEY DOES NOT CONSTnUTF A TITLE SEARCH BY THE Legal Description: SURVEYCR.ALL INFORMATION SHOWN RECARDING RECORD EASEMENTS, BUILDING SETBACK LINES, ADJOINERS.AND OTHER DOCUMENTS WmcH MIGH7 AFFECT THE QUALITY OF MILE TO THE TRACT SHOWN HEREON WAS PARCEL 1: GAINED ECK LEGAL DESCRIPTION E SUBDIVISION WITHOECD OR CH TITLE POLICY AND REPORT ANY LOTS 1 AND THE SOUTH 70.05 FEET OF LOT 2(AS MEASURED ALONG THE EAST AND WEST LINES OF LOT DISCREPANCY IMMEDIATELY. 2)OF COUNTRYSIDE CENTER,UNTr NO.5 IN THE UNITED QTY OF THE VILLAGE OF 2,)THIS IS AN ALTA/ACSM SURVEY. IT IS NOT ORENDED TO BE USED AS YORKVILLE,KE?NDALL COUNTY,ILLINOIS. THE BASIS FOR ENGINEERING/ARCIlnErTURAL DESIGN. Tiitle 331460-071 Schedule B Dart 2: Table 3.) SUBSURFACE ANLT [N`,5Z.;Wiv° IAL c!jN[tIa:INS WC9L M,, E%A41NED OR PARCEL 2: CONSIDERED AS A ^.ARr IN 71 !1 'e HIE ,,v 4WI,P;AND Item Surve ors Comment HANDHOLES WERE LOCATED ON THE SURFACE PER ALTA STANDARD 5(I) NO 1 N A LOT 2 EXCEPT THE SOUTH 70.05 FEET OF LOT 2(AS MEASURED ALONG THE EAST AND WEST LINES OF STATEMENT IS MADE CONCERNING THE EXISTENCE AND/OR CONDITION OF 2 hOWn hereon LOT 2)OF COUNTRYSIDE CENTER,UNIT NO.5 IN THE UNITED CITY OF THE VILLAGE OF UNDERGROUND OR OVERHEAD CONTAINERS OR FACILITIES WHICH MAY YCRKVIL(E,KENDALL COUNTY,ILLINOIS. AFFECT THE USE OR DEVELOPMENT OF THIS TRACT. THE SURFACE 3 Shown hereon STRUCTURES LOCATED HEREON AND IDENTIFIED WHERE BY COVER AND NOT 4 NO IOtOtlle VERIFIED BY OPENING STRUCTURE. Shown hereon 4.) DIMENSIONS SHOWN THUS: 50.25 ARE FEET AND DECIMAL PARIS THEREOF. ANGULAR DATA SHOWN THUS; BV 00'DO-INDICATES DEGREES, 6 Blanket EOSemen no is abl MtNUTES AND SECONDS. Blanket asement no la s.) sD.zs / N k10 OG' 0a-E INDICATES MEASURED DIMENSION/ 8-11 Shown here n BEARING. (N 9Q QD' 00• E) INDICATES RECORD DIMENSION / BEARING. 1 -15 N A f sG.zs'7 / IN eD• 00' DO'EI INDICATES DEED DIMENSION/BEARING. 16 o rovl e o surveyor 6,) BEARINGS SHOWN HEREON ARE ASSUMED. 17 Not I? able note No ids 7.)THIS PROFESSIONAL SERVICE CONFORMS TO THE CURRENT 111A/A 5 Page MINIMUM STANDARDS FOR A BOUNDARY SURVEY BESIDES THE ALT-NM STANDARDS. i Legal, Cert., Notes ,,effaild 2 Boundary Q=Title RL rt itc CALL JULIE TOLL FREE 1(800)892-4123 O=Found Iron Pipe/Rod=FIP/FIR OPERATES 24 HOURS A Topo detail DAY 365 DAYS A YEAR =Found nail=MAG/CST/PK (at corner unless indicated otherwise) WARNING Overhead lines ------------= Easement ----------- Set Back STATE OF ILLINOIS = Guard Rail COUNTY OF DUPAGE))SS G TO: Fuel American Tikle Iwumm, Cmnpeny N,s,E,w = North. South, East, west RWJ YerkviRe LLD. CALL BEFORE NE'ly = Northeasterly, etc... uat WGrWwp a QeM'Beak, Its ■IJ o69 on cnd/or waI YOU DIG Sly, etc - Southerly, etc THIS IS TO CERTIFY THAT THIS MAP DR PLAT AND THE SURVEY ON CALL WHICH R IS BASED WERE MADE IN ACCORDANCE WITH -MINIMUM 1(6001}882-0123 Bituminous Pavement STANDARD DETAIL REOUIRE4ENTS FOR ALTA/ACSM LAND TTTLE 48 HOL(RS BEFORE SURVEYS," JOINTLY ESTABLISHED AND ADOPTED BY ALTA AND NSPS YOU DIG Premier Land Surveying L.L.C. Concrete IN 2005, AND INCLUDES NO ITEMS FROM TABLF A THEREOF. PURSUANT TD THE ACCURACY STANDARDS AS ADOPTED BY ALTA 131 Schiller Place j� = Structure AND NSPS IN EFFECT ON THE DATE OF THIS CERTIFICATION, Heses,1L 60143 '!J` UNDERSIGNED FURTHER CERTIFIES THAT IN MY PROFESSIONAL ce = Catch basin OPINION, AS A LAND SURVEYOR REGISTERED IN THE STATE OF (630)875-1417 ILLINOIS, THE RELATIVE POSIFIDNAL ACCURACY OF THIS SURVEY 17 - Fire Hydrant DOES NOT EXCEED THAT WHICH IS SPECIFIED THEREIN. Client:RWJ COMPANIES INC. 9 = Hand hole GATED AT ITASCA, ILLINOIS ON September 1, 1010 JORIE BLVD. SAE 322 ®= Inlet 4r. OAK BROOK, I!_ 60523-4464 A = bight Rev Date Re;H'Indge Description (D - Manhole PLAt}TZ 91,n C_ PLAUTZ „ •r a Telephone Box EELS. NO, 035-3167, EXPIRES 11/30 "�,i 036"3167 ,•' . - Traffic signal PREMIER LAND SURVEYING L.L.C. n F eId Work Co16 2008 M ° Traffic vault PROFESSIONAL DESIGN FIRM NO. 184-0D4378' .lob Number ee o - Water valve 131 SCHILLER PLACE , / a� Location ® Well TTASCA, IL 60143 ye F�+.oL�+�l•1 .0 1402- 1502 N et O° BP Sign (630) 875-1417 YCrkvaile. IL Survey is valid only if original seal and signature is shown in purple. p WIN Nt SRI am 0, 01, FARIMM Descriptio N 64036'54"W --_ 282-M------------------------ I E I I c 4 � I I k k I I d'7 4 � , k I I 4 � E °'• LOT A/1 I L a I I I , I I — k r— k 20' DR i2 tau�te,1 - ___--N64936'54"W I ti r 30' Setbacks created by this su divisi�rr W l R ti C 2 _ r' cc I rn I COO x ------ . l A3' �} I i I N r N C!:Co. �lt` •'t I � p �, 1 LOT 01 I I i - -0" I I I y �4 ie rr ra sR+l pu e#3 E, -. Jew �� •-- - ----- _ ----- ---- ----- ---- — --- , I�= eR� IEH- 9`191 . 6 - q `= '- -- � - - -- - -- - - -I - �#' 66 116 0 RI 1 = 172 . 53 ' 71 "41 " W us Rt. C LEN= 172 . 53 ' - Prwda,Wy �t" BBC=N 84022 ' 00 " W Surveyors Notes .) FOR ALTA/ACSM SURVEY SEE JOB#2008-0007. Encumbrance items 2.) BEARINGS SHOWN HEREON ARE ASSUMED. 3.) (bearing/distance) is record of Countryside 2. Easement in favor of Commonwealth Edison Company and Illinois Bell Telephone Center Unit 5 aforesaid. Company, their respective successors and assigns, to install, operate and maintain all equipment necessary for the purpose of serving the land and other property, together with right of access to said equipment, and the provisions relating thereto, contained in tree grant recorded January 9, 1990 os d"urr.ert 900205. Scale 1" = 40' 3_ Easement in !ovor of Yarkvilie Lcdg:nq, L .,C_, can Illinois lirnited Iiablilty company, its successors and assigns, to construct, U'Dercte, maintain, repalr. Inspect, replace and Legend remoVe a storm sewer pipe, tk gooier with right of occess, and the provis ons relating QEncumbrance item thereto, contained in the grant recorded October 28, 1958 c:s docurnent 9815155. — 5_ flat of Easement recorded October `1, 2006 as docu nenF 2.0060035290. sme = Stormwater Management Easement a, Building spLback Minn as shown on Lake plat of as Center Emit 5 aforeso4d. pude = Public Utility and Drainage Easement (Affects the West and South 50 feet of Lot 1 and the West 510 feet of 1_at 2) N,S,E,W = North, South, East West 9. Easerent for public utilities, and the provisions relating thereto, as shown on the O=Found Iron Pipe/Rod=FIP7FIR plot of Countryside Center %Jmlt 5 aforesaid. (Affects the West amd South =0 feet of Lots a=Found nail=MAG CST PK SMN 1 and 2) 10. Easement for ingress, egress and public utilities as shown on the plat of (at corner unless indicated otherwise) Countryside Center Unit 5 aforesaid. (Affects the East 32 feet of Lots 1 and 2) ---------= Easement 11. One foot wide easement for the benefit of the immediately adjacent owner to the = Previous Easement East, over the Northerly 102 feet of Lot 1 for the purpose of allowing the existing -------- = Set Back building encroachment as shown on the plat of Countryside Center Unit 5 aforesaid. Previous Set Back Location: Job # 2009_0018 Sheet 2 of 2 Premier Land Surveying L.L.V. 1402--1502 N. Bridge Street Rev. Date Rev. Description 131 Schiller Place Yorkville, IL Itasca, IL 60143 Client:RWJ COMPANIES, INC. (630) 875-1417 1010 JORIE BLVD. STE 322 OAK BROOK, 1L 60523-4464 Field Work Completed: 8/16/20081 MORTGAGEE'S CERTIFICATE RWJ YORKVILLE LLC SUBDIVISION STATE OF ????????) OWNER'S CERTIFICATE COUNTY OF ??????) SS BEING A RESUBDIVISION OF LOT'S 1 AND 2 OF COUNTRYSIDE CENTER, UNIT NO. 5 IN THE UNITED CITY OF The undersigned, as mortgagee, under the provisions of a certain COUNTY OF DuPAGE) STATE ILLINOIS ) SS THE VILLAGE OF YORKVILLE, KENDALL COUNTY, ILLINOIS RECORDED MAY 5th, 1988 as DOCUMENT#882021. mortgage dated —, A.D. and recorded in the recorder's of deeds office of Kendall county, Illinois on the ____ This is to certify that the undersigned RWJ YORKVILLE LLC, is the day of A.D. as document # -- hereby legal owner of the land described on the plat hereon drawn and COUNTY CLERK CERTIFICATE consents to and approves the subdivision of the land as depicted shown hereon as subdivided, and that it has caused said land to hereon. be surveyed, subdivided, staked and platted as shown hereon, for STATE OF ILLINOIS the purpose of having this plat recorded as provided by law. COUNTY OF KENDALL)SS Dated this — day of A.D. Given under my hand and seal this — day, of , 2009. I, _. County Clerk in Kendall County, By: Attest: _ Illinois, do hereby certify that there are no delinquent general Title: ????? Title: ????? taxes, no unpaid current general taxes, no unpaid forfeited taxes, and no redeemable tax sales against any of the land included in NOTARY CERTIFICATE RWJ YORKVILLE LLC the annexed plat. I further certify that I have received all Robert W. Juckniess, ????? statutory fees in connection with the annexed plat. Given under STATE OF ILLINOIS ) SS my hand and seal of the County at Yorkville. Illinois the _— Day COUNTY OF DuPAGE) of —_ A.D. 2009, A Notary Public in and for said County, in the state aforesaid, do NOTARY CERTIFICATE hereby certify that: STATE OF ILLINOIS ) SS (name)____— (title) of M&I Marshall & Ilsley COUNTY OF DuPAGE) County Clerk Bank and (name) (title) of M&1 Marshall & A Notary Public in and for said County, in the state aforesaid, do COUNTY RECORDER'S CERTIFICATE Ilsley Bank who are personally known to me to be the some hereby certify that Robert W. Juckniess, _ _ of RWJ persons whose names are subscribed to the foregoing instrument — STATE OF ILLINOIS ) as such, appeared before me this day in person and YORKVILLE LLC personally known to me to be the some person SS acknowledged that they signed and delivered the said instrument whose name is subscribed to the foregoing instrument, appeared COUNTY OF KENDALL) as their own free and voluntary act, and as the free and before me this day in person and acknowledged that he signed This instrument No. _ was filed for record in the voluntary ct of said M&I Marshall & Ilsle Bank, as mort a e,m an delivered the said instrument as his own free and voluntary ry Y 9 9 Recorder's Office of Kendall County, Illinois, on the _ day of for the uses and purposes therein set forth. act, and as the free and voluntary act of said limited liability P P 2009 at O'Clock _.M. and was recorded in Plat corporation on behalf of said limited liability corporation. Envelope No. Given under my hand and nortarial seal this __ day, of Given under my hand and nortarial seal this -- day, of 2009. 2009. — County Recorder PLANNING COMMISSION CERTIFICATE Notary Public - — STATE OF ILLINOIS ) Notary Public S5 SURVEYOR'S CERTIFICATE COUNTY OF KENDALL) STATE OF ILLINOIS ) by the Planning Commission of the United City of COUNTY OF DuPAGE) SS Yorkville, Illinois this __— day of __ , A.D., 2009. This is to certify that we, Premier Land Surveying LLC, a licensed PLANNING COMMISSION CHAIRMAN Professional Design Firm in the State of Illinois, have surveyed and subdivided the property described as follows: LOT 1 AND 2 OF COUNTRYSIDE CENTER UNIT 5, YORKVILLE, CITY COUNCIL CERTIFICATE KENDALL COUNTY, ILLINOIS RECORDED AS DOCUMENT # 882021. STATE OF ILLINOIS ) SS Premier Land Surveying L.L.C. I also hereby certify that I have inspected the Federal Flood COUNTY OF KENDALL) Approved and accepted b the Mayor and the City Council of the 131 Schiller Place Insurance Rate Map, Community Panel Number ????????????, pp P Y Y Y dated ??????, and have determined that the subject property is United City of Yorkville, Illinois this _ day of Itasca, IL 60143 located within flood zone "C" as identified by the Federal A.D., 2009. (630) 875-1417 Emergency Management Agency. This determination is related only to the designated flood zone, limited by available published Mayor data and bno determination is hereon implied whether or not the Client:RWJ COMPANIES, INC. subject property will actually flood. 1010 JORIE BLVD. STE 322 DEPUTY CLERK OAK BROOK, IL 60523-4464 1 also hereby certify that all subdivision exterior monuments have Rev. Date Rev. Description been set and described on the Final Plat as required by the Plat Act. All dimensions shown are in feet and decimals thereof. CITY ADMINISTRATOR'S CERTIFICATE Given under my hand and seal this _ day, of _ 2009. STATE OF ILLINOIS COUNTY OF KENDALL)SS Field Work Completed: 08/16/2008 Approved by the City Administrator of the United City of Yorkville, Job Number 2009-0018 1 Sheet 1 of 2 Brian C. Plautz Illinois this day of A.D., 2009. Location: Illinois Professional Land Surveyor #035-3167,Expires 11/30/2010 1402-1502 N. Bridge Street Professional Design Firm #184-004378. Expires 4/30/2011 City Administrator Yorkville, IL