Loading...
Resolution 2007-22 ���InOLS rtIYlPJIt Resolution for Improvement by Municipality Under the Illinois of Transportation Highway Code BE IT RESOLVED, by the City Counil of the Council or President and Board of Trustees United City of Yorkville Illinois City, Town or Village that the following described street(s) be improved under the Illinois Highway Code: Name of Thoroughfare Route I From To Game Farm Road US Route 34 Somonauk St. Somonauk Street Game Farm Road Colton St. I BE IT FURTHER RESOLVED, 1. That the proposed improvement shall consist of surveying work and preparation of plats of easement and plats of dedication for right -of -ways. and shall be constructed N/A wide and be designated as Section 03- 00031 -00 -FP 2. That there is hereby appropriated the (additional ® Yes ❑ No) sum of sixty-seven thousand eight hundred and 00/ 100---------------------------------------------------------- - - - - -- Dollars ( $67,800.00 ) for the improvement of said section from the municipality's allotment of Motor Fuel Tax funds. 3. That work shall be done by contract ; and, Specify Contract or Day Labor BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit two certified copies of this resolution to the district office of the Department of Transportation. Authorized MFT Expenditure I, Jackie Milschewski Clerk in and for the United City of Yorkville City, Town or Village �+ County of Kendall , hereby certify the Date foregoing to be a true, perfect and complete copy of a resolution adopted by the City Council Council or President and Board of Trustees Department of Transportation at a meeting on March 27, 2007 Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this day of (� gional gineer ( / J (SEAL) City, Tewa, oPV4kgeClerk Page 1 of 1 BLR 09111 (Rev. 7/05) Printed on 3/9/2007 8:37:01 AM Municipality L Name United City of Yorkville C IIf1 Depalrtn1e11t C Smith Engineering Consultants Township L S Address :T'istol 759 John Street Preliminary Engineering U County Services Agreement L city ty G For T Kendall E Motor Fuel Tax Funds A Yorkville Section C T State 03- 00031 -00 -FP y Illinois Vk THIS AGREEMENT is made and entered into this ajo day of rA,,,A 2 7 between the above Local Agency (LA) and Consultant (ENGINEER) and covers certain professional engineering services in connection with the improvement of the above SECTION. Motor Fuel Tax Funds, allotted to the LA by the State of Illinois under the general supervision of the State Department of Transportation, hereinafter called the "DEPARTMENT ", will be used entirely or in part to finance ENGINEERING services as described under AGREEMENT PROVISIONS. Section Description Name Game Farm Road /Somonauk Street Route FAU 1550 Length 1.04 Mi. 5500.4 FT (Structure No. ) Termini U.S. Route 34 and IL Route 47 Description: Preparation of plat of highways for the reconstruction of Game Farm Road /Somonauk Street from US Route 34 to IL Route 47. Agreement Provisions i'he Engineer Agrees, 1. To perform or be responsible for the performance of the following engineering services for the LA, in connection with the proposed improvements herein before described, and checked below: a. ® Make such detailed surveys as are necessary for the preparation of detailed roadway plans b. ❑ Make stream and flood plain hydraulic surveys and gather high water data, and flood histories for the preparation of detailed bridge plans. c. ❑ Make or cause to be made such soil surveys or subsurface investigations including borings and soil profiles and analyses thereof as may be required to furnish sufficient data for the design of the proposed improvement. Such investigations are to be made in accordance with the current requirements of the DEPARTMENT. d. ❑ Make or cause to be made such traffic studies and counts and special intersection studies as may be required to furnish sufficient data for the design of the proposed improvement. i e. ❑ Prepare Army Corps of Engineers Permit, Department of Natural Resources -Office of Water Resources Permit, Bridge waterway sketch, and /or Channel Change sketch, Utility plan and locations, and Railroad Crossing work agreements. f. ❑ Prepare Preliminary Bridge design and Hydraulic Report, (including economic analysis of bridge or culvert types) and high water effects on roadway overflows and bridge approaches. g. ❑ Make complete general and detailed plans, special provisions, proposals and estimates of cost and furnish the LA with five (5) copies of the plans, special provisions, proposals and estimates. Additional copies of any or all documents, if required, shall be furnished to the LA by the ENGINEER at his actual cost for reproduction. h. ® Furnish the LA with survey and drafts in quadruplicate of all necessary right -of -way dedications, construction easement and borrow pit and channel change agreements including prints of the corresponding plats and staking as required. Note: Four copies to be submitted to the Regional Engineer Printed 3/8/2007 Page 1 of 4 BLR 05510 (Rev. 11/06) i. E] Assist the LA in the tabulation and interpretation of the contractors , proposals j. ❑ Prepare the necessary environmental documents in accordance with the procedures adopted by the DEPARTMENT's Bureau of Local Roads & Streets. k. ❑ Prepare the Project Development Report when required by the DEPARTMENT. (2) That all reports, plans, plats and special provisions to be furnished by the ENGINEER pursuant to the AGREEMENT, will be in accordance with current standard specifications and policies of the DEPARTMENT. It is being understood that all such reports, plats, plans and drafts shall, before being finally accepted, be subject to approval by the LA and the DEPARTMENT. (3) To attend conferences at any reasonable time when requested to do so by representatives of the LA or the Department. (4) In the event plans or surveys are found to be in error during construction of the SECTION and revisions of the plans or survey corrections are necessary, the ENGINEER agrees that he will perform such work without expense to the LA, even though final payment has been received by him. He shall give immediate attention to these changes so there will be a minimum delay to the Contractor. (5) That basic survey notes and sketches, charts, computations and other data prepared or obtained by the Engineer pursuant to this AGREEMENT will be made available, upon request, to the LA or the DEPARTMENT without cost and without restriction or limitations as to their use. (6) That all plans and other documents furnished by the ENGINEER pursuant to this AGREEMENT will be endorsed by him and will show his professional seal where such is required by law. The LA Agrees, 1. To pay the ENGINEER as compensation for all services performed as stipulated in Appendix A. paragFap 4 a, 1 11 2 3, 5 and-5 in a . a. ❑. aWroved by the DEPARTMENT-. the . Schedule for Percentages Based on Awarded Contract Cost Awarded Cost Percentage Fees Under $50,000 (see note) Note: Not necessarily a percentage. Could use per diem, cost -plus or lump sum. stipulated ii pwa gFaphs 1 h, 1G, 1 d, le, 4f 1 h, 1j & 1 k of the F_hlQlAICCC AGGCCQ at aGtu al Gest Of u , be de aC ma , ORSUMAGe, «P, at ENG 1EEP may stall , f, 1 h, 1j & 1 R. If the CAIGIN cublats -all or part ef th weFk, the LA w pay the GA-St W thA ENG p a f (5) PeFARRt Repoirze AhaFge. "Cost to EnORe&'te 138 V84 by fUFR the LA and the DEPARTMENT G9P Q_f frem the paFty do the 6110LI'd RWFna be pe4eFFned by lesser sa pWsenRe the wage Fate b far sun_h s shall "a Printed 3/8/2007 Page 2 of 4 BLR 05510 (Rev. 11/06) 3. That payments due the ENGINEER for services rendered in accordance with this AGREEMENT will be made as soon as practicable after the services have been performed in accordance with the following schedule: a. Upon completion of detailed plans, special provisions, proposals and estimate of cost - being the work required by paragraphs 1a through 1g under THE ENGINEER AGREES - to the satisfaction of the LA and their approval by the DEPARTMENT, 90 percent of the total fee due under this AGREEMENT based on the approved estimate of cost. b. Upon award of the contract for the improvement by the LA and its approval by the DEPARTMENT, 100 percent of the total fee due under the AGREEMENT based on the awarded contract cost, less any amounts paid under "a" above. By Mutual agreement, partial payments, not to exceed 90 percent of the amount earned, may be made from time to time as the work progresses. s 1 s, threugh 1 h and pFiar to the GOMP Of SUGh 69FVIGes, the L.A. sha reimbur-se the —ONG for his. -Rnfilal r plus " " be def as in psrr a gF aph 2 of TIJC I A A a. That, , C E NGINEER AGREES after they have been .�ppMved by the DEPACTIIA �arsasn'�- to -pars Tk'._ _P , _P1T, the LA will 2 9' be def ef' in p^�agraph 2 & THE i AGREES. It used O n th h shall in n It is Mutually Agreed, 1. That any difference between the ENGINEER and the LA concerning their interpretation of the provisions of this Agreement shall be referred to a committee of disinterested parties consisting of one member appointed by the ENGINEER, one member appointed by the LA and a third member appointed by the two other members for disposition and that the committee's decision shall be final. 2. This AGREEMENT may be terminated by the LA upon giving notice in writing to the ENGINEER at his last known post office address. Upon such termination, the ENGINEER shall cause to be delivered to the LA all surveys, permits, agreements, preliminary bridge design & hydraulic report, drawings, specifications, partial and completed estimates and data, if any from traffic studies and soil survey and subsurface investigations with the understanding that all such material becomes the property of the LA. The ENGINEER shall be paid for any services completed and any services partially completed in accordance with Section 4 of THE LA AGREES. 3. That if the contract for construction has not been awarded one year after the acceptance of the plans by the LA and their approval by the DEPARTMENT, the LA will pay the ENGINEER the balance of the engineering fee due to make 100 percent of the total fees due under this AGREEMENT, based on the estimate of cost as prepared by the ENGINEER and approved by the LA and the DEPARTMENT. 4. That the ENGINEER warrants that he /she has not employed or retained any company or person, other than a bona fide employee working solely for the ENGINEER, to solicit or secure this contract, and that he /she has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the ENGINEER, any fee, commission, percentage, brokerage fee, gifts or any other consideration, contingent upon or resulting from the award or making of this contract. For Breach or violation of this warranty the LA shall have the right to annul this contract without liability. Printed 3/8/2007 Page 3 of 4 BLR 05510 (Rev. 11/06) IN WITNESS WHEREOF, the parties have caused the AGREEMENT to be executed in quadruplicate counterparts, each of which shall be considered as an original by their duly authorized officers. Executed by the LA: United City of Yorkville of the (Mun icipal ity/Townsh ip /County) ATTEST: State of Illinois, acting by and through its By City Clerk By r� -Zgz (Seal) Title Mayor 4 Executed by the ENGINEER: Smith Engineering Consultants 759 John Street ATTEST: Yorkville, Illinois 60560 By By Title Office Coordinator Title Principal OFFICIAL SEAL _ JUDITH M KOESM VOTARY PU" • STA1E OF Y.L " W COAMNIS M EXPRE801/31101 Approved 4/- / � _ - Date Department of Transportation �RalEngineer Printed 3/8/2007 Page 4 of 4 BLR 05510 (Rev. 11/06) Smith Engineering Consultants Civil /Structural Engineers and Surveyors APPENDIX A PROPOSAL /AGREEMENT for LAND SURVEYING SERVICES GAME FARM ROAD PLAT OF HIGHWAYS Mr. Joe Wywrot City Engineer United City of Yorkville 800 Game Farm Road Yorkville, Illinois 60560 Phone: (630) 553 -8545 Fax: (630) 553 -7575 SEC Job No.: YORK- 040098.05 -4 January 24, 2007 Illinois ■ Texas A division of SEC Group, Inc. 759 John Street, Yorkville, IL 60560 t. 630.553.7560 f. 630.553.7646 www.secgroupinc.com Mr. Joe Wywrot United City of Yorkville Game Farm Road Plat of Highways SEC Job No.: YORK- 040098.05 -4 January 24, 2007 Page 2 t • II _ _ ' .:l I � The project is located between U.S. Route 34 and IL Route 47 along Game Farm Road and Somonauk Street in Yorkville, Kendall County, Illinois. Surveying services are necessary to prepare a plat of highways required for right -of -way and easement acquisition along Game Farm Road and Somonauk Street. This scope of work is based upon exhibits prepared by Smith Engineering Consultants (SEC) affecting approximately 29 parcels of land within the project area. A. Surveying Services 1. Research- Obtain necessary information to complete the project regarding boundaries and rights -of -way. United City of Yorkville (Client) to supply SEC with current title commitments of the 29 subject properties that may be affected by land acquisition along with supporting documents prior to completion of the survey. 2. Boundary Survev - Boundary survey will be performed on the 29 subject parcels as described in the provided title commitments Schedule A as required to complete the proposed plat of highways. Preliminary fieldwork will be done using subdivision plats and legal descriptions for subject parcels. 3. Tonogranhic Survev -SEC will survey the existing buildings located on each affected parcel within the project. This information is required on the plat of highways. Previous topographic survey performed in 2004 will be verified for use on this project. 4. Right- of -Wav Survev -SEC will verify the existing right -of -way of Game Farm Road and Somonauk Street from U.S. Route 34 south to IL Route 47 that may be affected by the Game Farm Road/Somonauk Street right -of -way /easement acquisition. i Mr. Joe Wywrot United City of Yorkville Game Farm Road Plat of Highways SEC Job No.: YORK- 040098.05 -4 January 24, 2007 Page 3 5. Plat of Highways -SEC will prepare a plat of highways for approximately 5,000 feet of Game Farm Road and Somonauk Street in Yorkville, Illinois. SEC will create legal descriptions for each proposed right -of -way and easement acquisition. SEC will prepare the plats and legal descriptions per current MOT standards. This surveying service will be completed on a cost per parcel basis. There are approximately 24 parcels that may be affected by the Game Farm Road and Somonauk Street right -of- way /easement acquisition. If the school district and city parcel easements may be granted through a plat of easement, each of these parcels will not be included in the plat of highways. Each proposed right - of -way and easement shall be staked temporarily with wood lath to assist in the appraisal process. This shall be done once upon request of the City or appraiser working on this project. Following construction, each proposed right -of -way parcel will be monumented with 5/8" steel bars or other suitable markers. 6. Plat of Easement -SEC will prepare plats of easement for the school district and United City of Yorkville parcels. It is assumed that each party will grant the required easements along Game Farm Road, therefore will not be included in the plat of highways. 7. Parcel Plats -SEC will prepare an individual parcel plat for each affected parcel according to the Illinois Department of Transportation (IDOT) District 3 requirements. If the proposed plat of highways requires MOT District 3 review, these plats will be required to complete the requirements. B. Deliverables/Reimbursables 1. Plat of Highways. 2. Parcel Plats. 3. Plats of Easement. C. Information to be Provided by Client 1. Title Commitments for affected parcels.* *SEC will provide PIN'S for the current title commitments to assist in the ordering of each document. Mr. Joe Wywrot United City of Yorkville Game Farm Road Plat of Highways SEC Job No.: YORK- 040098.05 -4 January 24, 2007 Page 4 Based upon our understanding of the project as detailed in this Contract, the following is a summary of fee associated with the project. This Contract will be completed as a Time & Material Not To Exceed Contract for professional surveying services. The individual fees are estimates, while the total is the overall Not To Exceed Contract Fee. TIME & MATERIAL: rt - :a��_� ., t� . i'. , _ i . -i � _ .� L PITT �r,Y I u aq -. -. � .iY - F's ...Y. a ` _ x. ,.� z `a #sr' S±' 3 ' �- Surveying Services (Plat of Highways -24 parcels - $2,200.00 per parcel) $52,800.00 Plat of Easements for School District and City parcels (5 parcels) $3,000.00 Parcel Plats (24 parcels) $12,000.00 $67,800.00 Mr. Joe Wywrot United City of Yorkville Game Farm Road Plat of Highways SEC Job No.: YORK- 040098.05 -4 January 24, 2007 Page 5 Extra Work Any work required but not included as part of this contract shall be considered extra work. Extra work will be billed on a Time and Material basis with prior approval of the CLIENT. Outside Consultants SMITH ENGINEERING CONSULTANTS, A division of SEC Group, Inc., is not responsible for accuracy of any plans, surveys or information of any type including electronic media prepared by any other consultants, etc. provided to SEC for use in preparation of plans. SEC is not responsible for accuracy of topographic surveys provided by others. A field check of a topographic survey provided by others will not be done under this contract unless indicated in the Scope of Work. Attorneys' Fees In the event of any litigation arising from or related to the services provided under this AGREEMENT, the prevailing party will be entitled to recovery of all reasonable costs incurred, including staff time, court costs, attorneys' fees and other related expenses. Certificate of Merit The CLIENT shall make no claim for professional negligence, either directly or in athird party claim, against SEC unless the CLIENT has first provided SEC with a written certification executed by an independent design professional currently practicing in the same discipline as SEC and licensed in the State of Illinois. This certification shall: a) contain the name and license number of the certifier; b) specify each and every act or omission that the certifier contends is a violation of the standard of care expected of a Design Professional performing professional services under similar circumstances; and c) state in complete detail the basis for the certifier's opinion that each such act or omission constitutes such a violation. This certificate shall be provided to SEC not less than thirty (30) calendar days prior to the presentation of any claim or the institution of any arbitration or judicial proceeding. Standard of Care Services provided by SEC under this AGREEMENT will be performed in a manner consistent with that degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar circumstances. Job Site Safety Neither the professional activities of SEC, nor the presence of SEC'S employees and subconsultants at a construction site, shall relieve the General Contractor and any other entity of their obligations, duties and responsibilities including, but not limited to, construction means, methods, sequence, techniques or procedures necessary for perfomung, superintending or coordinating all portions of the work of construction in accordance with the contract documents and any health or safety precautions required by any regulatory agencies. SEC and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. The CLIENT agrees that the General Contractor is solely responsible for job site safety, and warrants that this intent shall be made evident in the CLIENT's AGREEMENT with the General Contractor. The CLIENT also agrees that the CLIENT, SEC and SEC'S consultants shall be indemnified and shall be made additional insureds on the General Contractor's and all subcontractor's general liability policies on a primary and non - contributory basis. Reuse of Documents All project documents including, but not limited to, plans and specifications furnished by SEC under this project are intended for use on this project only. Any reuse, without specific written verification or adoption by SEC, shall be at the CLIENTs sole risk, and CLIENT shall indemnify and hold harmless SEC from all claims, damages and expenses including attorney's fees arising out of or resulting therefrom. Mr. Joe Wywrot United City of Yorkville Game Farm Road Plat of Highways SEC Job No.: YORK- 040098.05 -4 January 24, 2007 Page 6 Ownership of Instruments of Service All reports, plans, specifications, field data, field notes, laboratory test data, calculations, estimates and other documents including all documents on electronic media prepared by SEC as instruments of service shall remain the property of SEC. SEC shall retain these records for a period of five (5) years following completion/submission of the records, during which period they will be made available to the CLIENT at all reasonable times. Failure to Abide by Design Documents or to Obtain Guidance The CLIENT agrees that it would be unfair to hold SEC liable for problems that might occur should SEC'S plans, specifications or design intents not be followed, or for problems resulting from others' failure to obtain and /or follow SEC'S guidance with respect to any errors, omissions, inconsistencies, ambiguities or conflicts which are detected or alleged to exist in or as a consequence of implementing SEC'S plans, specifications or other instruments of service. Accordingly, the CLIENT waives any claim against SEC, and agrees to defend, indemnify and hold SEC harmless from any claim for injury or losses that results from failure to follow SEC'S plans, specifications or design intent, or for failure to obtain and/or follow SEC'S guidance with respect to any alleged errors, omissions, inconsistencies, ambiguities or conflicts contained within or arising as a result of implementing SEC'S plans, specifications or other instruments of services. The CLIENT also agrees to compensate SEC for any time spent and expenses incurred by SEC'S prevailing fee schedule and expense reimbursement policy. Design Information in Electronic Form Because CADD information stored in electronic form can be modified by other parties, intentionally or otherwise, without notice or indication of said modifications, SEC reserves the right to remove all indicia of its ownership and/or involvement in the material from each electronic medium not held in its possession. The CLIENT shall retain copies of the work performed by SEC in CADD form only for information and use by the CLIENT for the specific purpose for which SEC was engaged. Said materials shall not be used by the CLIENT, or transferred to any other party, for use in other projects, additions to the current project, or any other purpose for which the material was not strictly intended by SEC without SEC'S express written permission. Any use or reuse of original or altered CADD design materials by the CLIENT, agents of the CLIENT, or other parties without the review and written approval of SEC shall be at the sole risk of the CLIENT. Furthermore, the CLIENT agrees to defend, indemnify, and hold SEC harmless from all claims, injuries, damages, losses, expenses, and attorney's fees arising out of the modification or reuse of these materials. The CLIENT recognizes that designs, plans, and data stored on electronic media including, but not limited to computer disk and magnetic tape, maybe subject to undetectable alteration and/or uncontrollable deterioration. The CLIENT, therefore, agrees that SEC shall not be liable for the completeness or accuracy of any materials provided on electronic media after a 30 day inspection period, during which time SEC shall correct any errors detected by the CLIENT to complete the design in accordance with the intent of the contract and specifications. After 40 days, at the request of the CLIENT, SEC shall submit a final set of sealed drawings, and any additional services to be performed by SEC relative to the submitted electronic materials shall be subject to separate AGREEMENT. Dispute Resolution In an effort to resolve any conflicts that arise during the design or construction of the project or following the completion of the project, the Consultant and CLIENT agree that all disputes between them arising out of or relating to this AGREEMENT shall be submitted to nonbinding mediation unless the parties mutually agree otherwise. If the dispute cannot be settled amicably, it shall then be settled by arbitration in the State of Illinois in accordance with the American Arbitration Associates. The Award of the arbitrator shall be conclusive and binding upon the parties. The CLIENT agrees, to the fullest extent permitted by law, to limit the liability of SEC and its subconsultants to the CLIENT for any and all claims, losses, costs, damages of any nature whatsoever of claims expenses from any cause or causes, including attorneys' fees and costs and expert witness fees and costs, so that the total aggregate liability of SEC and its subconsultants to all those named shall not exceed SEC'S total fee for services rendered on this project, whichever is greater. It is intended that this limitation apply to any and all liability or cause of action however alleged or arising, unless otherwise prohibited by law. Mr. Joe Wywrot United City of Yorkville _ Game Farm Road Plat of Highways SEC Job No.: YORK- 040098.05 -4 January 24, 2007 Page 7 Hazardous Materials It is acknowledged by both parties that SEC'S scope of services does not include any services related to asbestos or hazardous or toxic materials. In the event SEC or any other party encounters asbestos or hazardous or toxic materials at the job site, or should it become known in any way that such materials may be present at the job site or any adjacent areas that may affect the performance of SEC'S services, SEC may, at its option and without liability for consequential or any other damages, suspend performance of services on the project until the CLIENT retains appropriate specialist consultant(s) or contractor(s) to identify, abate and/or remove the asbestos or hazardous or toxic materials, and warrant that the job site is in full compliance with applicable laws and regulations. Exclusion This fee does not include attendance at any meetings or public hearings other than those specifically listed in the Scope of Services. These work items are considered extra and are billed separately on an hourly basis. Payment 1. All work will be invoiced on a monthly basis. All invoices shall be paid within 30 days of the invoice date. Should the CLIENT fail to pay for professional services hereunder, as billed within 30 days of such billing, SEC shall be excused from rendering any further services under this project. No work shall be signed or sealed until payment in full is received. 2. This AGREEMENT shall not be enforceable by either party until each has in its possession a copy of this AGREEMENT signed by the other. Inclement Weather In the event of a substantial weather system affecting the completion of the said project, SEC retains the right to renegotiate additional fees to cover time needed to complete the said project. Substantial weather conditions include but not limited to extensive rain, high winds, snow greater than two (2) inches and ice. Time Limit This AGREEMENT must be executed within thirty (30) days of the composition date to be accepted under the terms set forth herein. This contract shall expire one year from date of execution. Work cannot begin until we have your signed AGREEMENT. If this AGREEMENTmerits your approval and acceptance, please sign both copies, retain one copy for your files and return one to our office. Y:Uobs \Smith\2004 \040098 Game Farm Phase 1\040098.05 YORK Game Farm Road Plat of Highways\administration\contract\040098.05- contractWywrot-0 12407-mrf.doc SEC GROUP, INC. SMITH ENGINEERING CONSULTANTS RATE SCHEDULE - 2007 PRINCIPAL ....................................................................... ............................... $150.00/HR ASSOCIATE / DIRECTOR ................................................. ............................... $140.00/HR SENIOR STRUCTURAL ENGINEER ............................. ............................... $135.00/HR STRUCTURAL ENGINEER ............................................. ............................... $120.00/HR SENIOR PROJECT /TECHNICAL MANAGER ............... ............................... $135.00/HR PROJECT MANAGER ...................................................... ............................... $125.00/HR SENIOR CIVIL ENGINEER ............................................. ............................... $130.00/HR CIVIL ENGINEER III ....................................................... ............................... $120.00/HR CIVIL ENGINEER II ......................................................... ............................... $110.00/HR CIVIL ENGINEER I ........................................................... ............................... $ 95.00/HR ENVIRONMENTAL SCIENTIST .................................... ............................... $ 90.00/HR SENIOR SURVEYOR ....................................................... ............................... $115.00/HR SURVEYOR III ................................................................. ............................... $ 95.00/HR SURVEYOR II ................................................................... ............................... $ 90.00/HR i SURVEYOR I .................................................................... ............................... $ 80.00/HR SENIOR CONSTRUCTION ENGINEER ........................ ............................... $ 125.00/HR CONSTRUCTION ENGINEER III .................................. ............................... $ 100.00/HR CONSTRUCTION ENGINEER I1 ..................................... ............................... $ 90.00/HR CONSTRUCTION ENGINEER I ...................................... ............................... $ 85.00/HR ENGINEERING TECHNICIAN ........................................ ............................... $ 85.00/HR ADMINISTRATIVE .......................................................... ............................... $ 65.00/HR PRINTS/IN HOUSE* .......................................................... ..............................$ .45 /SQ FT MILEAGE* ........................................................................ ............................... $ . 45/MILE PROPERTY IRONS* ......................................................... ............................... $ 2.50 /EA HUB /LATH* ...................................................................... ............................... $ 2.00/EA MAILING/ SHIPPING* ..................................................... ............................... VARIABLE *Indicates Reimbursable Items i I i i i �I I I f= r:fvFD APR 16 7.007 D ° LOCAL R ®ADS I