Resolution 1994-02 RESOLUTION - 9
WHEREAS, the city of Yorkville located in the county of Kendall , state of
Illinois, wishes to bore a steel casing and push a watermain inside under Illinois
47 which by law comes under the jurisdiction and control of the Department of
Transportation of the state of Illinois, and
WHEREAS, a permit from said Department is required before said work can be
legally undertaken by said city of Yorkville; now
THEREFORE, be it resolved by the city of Yorkville, county of Kendall , state of
Illinois.
FIRST: That we do hereby request from the Department of Transportation, state of
Illinois, a permit authorizing the city of Yorkville to proceed with the work
herein described and as shown on enclosed detailed plans.
SECOND: Upon completion of the proposed boring by the contractor and acceptance
by the city of Yorkville, the city of Yorkville guarantees that all work has been
performed in accordance with the conditions of the permit to be granted by the
Department of Transportation of the state of Illinois.
Further, the city of Yorkville will hold the state of Illinois harmless for any
damages that may occur to persons or property during such work.
The city of Yorkville will require the contractor to obtain a bond and a
comprehensive general liability insurance policy in acceptable amounts and will
require the contractor to add the State of Illinois as an additional insured on
,oth policies.
THIRD: That we hereby state that the proposed work is not (delete one) to
be performed by the employees of the city of Yorkville.
FOURTH: That the proper officers of the city of Yorkville are hereby instructed
and authorized to sign said Ver 't in behalf of the city of Yorkville.
I, �K—c ? hereby certify the above to be a
(C ty or V lage Clerk)
true (Cof the resolution passed by the City Council of Yorkville, county of
Kendall , state of Illinois.
Dated this In day of ✓CL- A.D. 199441
(Signature)
(CORPORATE SEAL)
Illinois D
ef,,,rtment
of Transportation ^ Permit
ember 16, 1993 V
District Serial No.
WHEREAS, I (We) Ci ty of Yorkvi 11 a 610 Tower Lane
(Name of Applicant) (Mailing Address)
Yorkville IL 60560 ,hereinafter termed the Applicant,
(City) (State)
request permission and authority to do certain work herein described on the right-of-way of the State highway
known as . 1.1 1 Route—47 Section from Station * to Station
Kendall County.The work is described in detail on the attached sketch and/or as follows:
*@ Van Emmon Road
Upon approval this permit authorizes the applicant to locate, construct, operate and
maintain at the above mentioned location, twenty (20) inch in diameter steel casing
with an eight (8) inch in diameter watermain as shown on the attached plans which
become a part hereof.
The applicant is aware of existing signals at this intersection and the bore pits
could damage the existing signal detector loops. The applicant agrees to replace any
damaged loops and contact the district traffic signal engineer prior to replacing.
The applicant shall notify Tom Morrall , Field Engineer, Phone: 815-942-0351 or the
District Permit Section, Phone: 815-434-6131 twenty-four hours in advance of
starting any work covered by this permit.
SPECIAL PROVISIONS CONTINUED ON NEXT PAGE
It is understood that the work authorized by this permit shall be completed within 120 days after the date this
permit is approved,otherwise the permit becomes null and void.
This permit is subject to the conditions and restrictions printed on the reverse side of this sheet.
This permit is hereby accepted and its provisions agreed to this id} y c.�,•
19
` Signed
Witnessj� C Appican C'
1 B .4
D v Mailing Address
ZaJ ng A ddress Yo j-4 L)!f/
J�� 1 e / City State
lCUi`
City State
700 E. Norris Drive, Ottawa
SIGN AND RETURN TO: District Engineer ,Illinois
red this day of 19 .
Applicant (2) Doc.6428-1 DEPARTMENT OF TRANSPORTATION
Field Engineer
Final Inspection L-2742 BY:
BT 1045(Rev.2/87) District Engineer
IL 494-0135
Special Provisions PERMIT NO.
The State right—of—way shall be left in good condition. (No advertising matter shall
be placed on the State right—of—way) .
All turf areas which are disturbed during the course of this work shall be restored
to the original line and grade and be promptly seeded in accordance with Standard
State Specifications.
Whenever any of the work under this permit involves any obstruction or hazard to the
free flow of traffic in the normal traffic lanes, plans for the proposed method of
traffic control must be submitted to and approved by the District Engineer at least
72 hours, and preferably longer, before the start of work.
All traffic control shall be in accordance with the State of Illinois Manual of
Uniform Traffic Control Devices and amendments thereof. It should be noted that
standards and typical placement of devices shown in the Uniform Manual are minimums.
Many locations may require additional or supplemental devices.
The petitioner agrees to furnish the necessary barricades, lights, and flagmen for
the protection of traffic.
Traffic shall be maintained at all times.
All excavations shall be promptly backfilled, thoroughly tamped and any excess
material removed from the State right—of—way (including rock exposed during
backfilling operations) . Mounding or crowning of backfill will not be permitted.
the diameter of any bored hole shall not be more than one (1) inch larger than the
outside diameter of the pipe.
Boring of pipe over six (6) inches in diameter shall be accomplished with an auger
and following pipe. Borings six (6) inches and under may be accomplished by either
jacking or auger and following pipe method.
Excavation adjacent to the edge of pavement shall be shored to prevent caving if the
distance is less than ten (10) feet plus the depth of excavation from the edge of
pavement.
The applicant agrees to notify the Department of Transportation upon completion of
work covered under the terms and conditions of this permit so that a final inspection
and acceptance can be made.
To avoid any revisions to the work completed under the highway permit, the applicant
should insure the conditions and restrictions of this permit, the applicable
supplemental permit specifications and permit drawing are fully understood.
If this permit work is contracted out, it will be the responsibility of the applicant
to furnish the contractor with a copy of this highway permit, as the applicant will
be responsible for the contractor's work.
A copy of approved permit shall be present on job site at all times the work is in
progress.
;428-2