Resolution 1994-04 RESOLUTION 1994-
RESOLUTION AUTHORIZING AMENDMENTS TO THE
UNITED CITY OF THE VILLAGE OF YORKVILLE BUILDING
PERMIT FEE AND INSPECTION FEE SCHEDULE
WHEREAS, the City Council and Mayor of the United City of the Village
of Yorkville have investigated the direct costs incurred by the United City
of the Village of Yorkville in the issuance of building permits, and the conduct
of building permit inspections; and
WHEREAS, there has been a substantial increase in those costs to the
City which have been studied by the City Council and the public works department
of the United City of the Village of Yorkville; and
WHEREAS, it is the intention of the City Council to provide that all
*building permit fees and inspection fees be defrayed by the users of those
services from the City:
NOW THEREFORE BE IT ORDAINED by the United City of the Village
of Yorkville, that the building fee permit schedule and inspection fee schedule:.
attached hereto shall be adopted and effective as of the date of the passage
of this ordinance for all future costs in the issuance of a building permit, and
for the conduct of inspections related to those building permits.
In the event any preexisting ordinance exist providing for the payment
of a fee not provided for under the terms of this resolution, said fees shall
continued to be charged at the customary rate indicated at any past ordinance
or resolution passed by the City Council. To the extent that this resolution
modifies any existing fee or creates a new fee, the fee set out in the attached
schedule incorporated herein shall be the required fees from the date of passage
ereof.
PASSED BY THE UNITED CITY OF THE VILLAGE OF YORKVILLE, KENDALL
COUNTY, ILLINOIS, this day of 1994.
SIGNED BY THE MAYOR OF THE UNITED CITY OF THE VILL GI OF
YORKVILLE, KENDALL COUNTY, ILLINOIS, this-;- day of ,
1994.
QAkMA R KE T K. KITT JR.
ATTEST:
JA QU INE S. AU SON, City Clerk
CITY OF YORKVILLE Name
BUILDING FEES St. Address
Permit #
Size
LDING PERMIT FEE
1. Residential - Single Family or Duplex Dwellings
A. BOCA Plan Review
B. $.12 per Sq. Ft. for each floor Sq.Ft. X .12 =
C. Plan Review - $20.00
2. Multifamily - 3 Apts. or More, Business Industrial, Storage or Institutional
A. Attached - $.25 per Sq. Ft. for all floors Sq. Ft X .25 =
B. Maximum fee is $4,000.00
C. Plan Review - $40.00
3. Additions
A. Attached - $.25 per Sq. Ft. Sq. Ft X .25 =
B. Detached (Out Building) - $.10 per Sq. Ft. Sq. Ft X .10 =
C. Plan Review - $40.00
4. Alterations, Remodeling, Reroofing, or Residing
A. $10.00 for first $1,000.00 of estimated cost
$ 5.00 for each additional $1,000.00 of estimated cost 2 X =
5. Signs
A. $10.00 for all signs
Demolition
A. $25.00 for all buildings.
7. Occupancy Permit - $25.00
SUBTOTAL PRIMARY PERMIT COST A.
INSPECTION FEES
1. Stake Out . . . .. . . . .. . .. . . . . . .. . .. . . . . .. .. . . . . . .. ... ... ... $25.00
2. Sewer & Water . . . .. .. . .. . . .. o .. .. . . . . . .. . . .. . . . . . . . . . . . . . $25.00
3. Footing . .. . . . . . .. ... .. . .. . . . . . . . . . ... . . . . . . . . . . . . . . .... . $25.00
4. Backfill .. . . . . . .. .... .. . . . . . . . . .. . . . . ... . . . . . . . . . . ..... . $25.00
5. Under Floor Plumbing . .. . .. . . . .. .. .. . . . . .. . . .. .. . . . . .. ... $25.00
6. Rough-In Plumbing .. . . . . . . .. . . . . . . . . . . .. . .. . . . . .. . . . . .. .. $25.00
7. Frame & Wiring . . . .. .. . . . . .. . . ... . . . . . . .. .. . . .. . . . . . . . . . . $25.00
8. Plumbing Final . . . .... .. .. . .. .. . . . . . .. . .. . . . . . . . .. .. . . .. . $25.00
9. Final . . . .. .. .. . ...... .. .. .. . . . . .. . .. . .. . . . . . . . . . . .. .. .. . $25.00
No. of inspections required X $25.00 =
Note: If additional inspections are required for the same line item, additional inspection
fees may be charged at the discretion of the City Building Inspector. All inspection
fees must be paid before final approval.
SUBTOTAL OF INSPECTION FEES B.
OTHER FEES
1. Water Hook-Up
A. Residential
1. Single Family $800.00 $800.00
2. Single Family attached $800.00/Ea
3. Multi-family (per unit) $400.00/Ea
B. Business/Commercial/Industrial (Based on Meter Size)
1. 3/4 inch $800.00
2. 1 inch $900.00
3. 1 � inches $1400.00
4. 2 inches $2100.00
5. 3 inches $4375.00
6. 4 inches $8750.00
7. 6 inches $14,000.00
2. Sewer Hook-Up
A. $200.00 per unit
B. $400.00 Business/Commercial/Industrial
3. Land-Cash Fee (New Developments, if Applicable)
A. Single family residential: $814.00
B. Mulit-family (per unit) : $420.00
4. School Transition Fee
A. Subdivisions plotted after 8/26/93 $1500.00
Development Fees (New Developments, if Applicable)
A. $1,000.00 for subdivisions platted after 12-17-87
B. $1,150.00 for subdivisions platted after 10-13-88
6. Recapture (If Applicable)
A. City recapture of water or sewer extension and/or oversizing
B. Developer recapture of water or sewer extension and/or oversizing
SUBTOTAL OF OTHER FEES C.
A. + Bo +. C. = TOTAL PERMIT COST:
City of Yorkville Building Permit No.
Tax Identification Parcel Number
Note; If City Building Inspector requires B.O.C.A. review of a business or commercial
buildings? the builder must submit deposit of $1,500.00 prior to review. Final
bill will be adjusted to reflect actual bill received by the City of Yorkville.