Loading...
Resolution 2014-12 aoN- la, Resolution for Maintenance of Illinois Department Streets and Highways by Municipality of Transportation Under the Illinois Highway Code BE IT RESOLVED, by the Council of the (Council or President and Board of Trustees) United City of Yorkville , Illinois, that there is hereby (City,Town or Village) (Name) appropriated the sum of $275,000.00 of Motor Fuel Tax funds for the purpose of maintaining streets and highways under the applicable provisions of the Illinois Highway Code from May 1, 2014 (Date) to April 30, 2015 (Date) BE IT FURTHER RESOLVED, that only those streets, highways, and operations as listed and described on the approved Municipal Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this resolution, are eligible for maintenance with Motor Fuel Tax funds during the period as specified above. BE IT FURTHER RESOLVED, that the Clerk shall, as soon a practicable after the close of the period as given above, submit to the Department of Transportation, on forms furnished by said Department, a certified statement showing expenditures from and balances remaining in the account(s) for this period; and BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this resolution to the district office of the Department of Transportation, at Ottawa , Illinois. I, Beth Warren Clerk in and for the United City (City,Town or Village) of Yorkville County of Kendall hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the Council at a meeting on May 27, 2014 (Council or President and Board of Trustees) Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 27th day of May, 2014 (SEAL) City Clerk (City,Town or Village) Approved PUA i( Regional Engineer Department of Transportation lWe Da b Printed 5/27/2014 BLR 14230(Rev.07/15/13) r RECEIVED JUL 2 3 2014 03 - LOCAL ROADS Illinois Department Municipal Estimate of _ of Transportation Maintenance Costs Local Public Agency: United City of Yorkville County: Kendall Maintenance Period 5/1/2014 to 4/30/2015 Section Number: 14-00000-00-GM,SUPP 1 Estimated Cost of Maintenance O erations Maintenance For Group I,IIA,118,or III Est Total Operation Maint. Insp. Unit Item Operation No.Descri tion Group Re q. Item Unit uantity Price Cost Cost RESURFACING IV Y 242,077.10 Total Estimated Maintenance Operation Cost 242,077.10 Estimated Cost MFT Portion Other Funds Preliminary Engineering 13,353.86 Maintenance 242,077.10 1 242,077.10 Engineering Ins ection 14,524.63 Maint Engi 32,878.49 1 32 878.49 1 Material Testing 5,000.00 Totals:l 274,955.59 1 274,955.59 1 Advertising Bridge Inspections Total Estimated Maintenance Engineering Cost 32,878.49 Total Estimated Maintenance Costj 274,955.59 Submitted: /7 •� � � Approved: aj� 624e /XYf Mayor Munici a Official Title Regional Engineer 5/27/2014 :7&,& Date Date BLR 14231(Rev 02/18/14) Printed on 6/30/2014 2:30 PM ,w RECEIVED JUL 2 3 2014 D3 - LOCAL ROADS 111inob Department Maintenance Engineering to be of Transportation Performed by a Consulting Engineer (to be attached to BLR 14231 or BLR 14221) Local Agency United City of Yorkville Section Number /S(- 49x4;0 -Oo 15 2 The services to be performed by the consulting engineer, pertaining to the various items of work included in the estimated cost of maintenance operations (BLR 14231 or BLR 14221), shall consist of the following: PRELIMINARY ENGINEERING shall include: Investigation of the condition of the streets or highways for determination (in consultation with the local highway authority)of the maintenance operations to be included in the maintenance program: preparation of the maintenance resolution, maintenance estimate of cost and, if applicable, proposal; attendance at meetings of the governing body as may reasonably be required; attendance at public letting; preparation of the contract and/or acceptance of BLR 12330 form. The maintenance expenditure statement must be submitted to IDOT within 3 months of the end of the maintenance period. ENGINEERING INSPECTION shall include: Furnishing the engineering field inspection, including preparation of payment estimate for contract, material proposal and/or deliver and install proposal and/or checking material invoices of those maintenance operations requiring engineering field inspection, as opposed to those routine maintenance operations as described in Chapter 14-2.04 of BLRS Manual, which may or may not require engineering inspection. For furnishing preliminary engineering, the engineer will be paid a base fee PLUS a negotiated fee percentage. For furnishing engineering inspection the engineer will be paid a negotiated fee percentage. The negotiated preliminary engineering fee percentage for each group shown in the"Schedule of Fees" shall be applied to the total estimated costs of that group. The negotiated fee for engineering inspection for each group shall be applied to the total final cost of that group for the items which required engineering inspection. In no case shall this be construed to include supervision of contractor operations. SCHEDULE OF FEES Total of the Maintenance Operation Base Fee -9—> $20,000 $1,250.00 E:1 :5$20,000 (Negotiated: $1,250 Max. PLUS Group Preliminary Engineering Engineering Inspection Operation to be p Acceptable Fee% Negotiated Fee % Acceptable Fee% Negotiated Fee % Inspected NA NA NA NA NA IIA 0 0 �tlUllltll►tt►// 0 0 &0 N M. 0 o Q, 0 0 0 0 65• ': • LICENSED ' * PROFESSIONAL ENGINEER 7k By: By: Cz� A() k VAgeri6y Official Signature Cons Engineer Signa � ����,11/'i� h�•OF•N. `` Mayor Project Manager �C►NOg�1�������``` Title Title �'al 5/27/2014 Date Date P.E.License Expiration Date Printed 5/27/2014 BLR 05520(Rev. 12/06/11) RECEIVED JUL 2 3 2014 D3 - LOCAL ROADS Route Various Local Roads Illinois Department County Kendall of Transportation Local Agency United City of Yorkville Section 14-00000-00-GM, SUPP 1 (Construction) Estimate of Cost Location and brief description (Sta.and land description of beginning;Sta.only for end for county and road districts;street limits for municipality.) Various local roads to undergo pavement patching, milling, resurfacing, curb and gutter removal and replacement sidewalk removal and replacement, driveway removal and replacement, structure adjustments, restoration, crack sealing, striping and all other work necessary to complete the project. Total Project Length 2650' Net Length 2650' _ Brk a or Calvert Surface Type HMA Shoulder Type Agg Length Width 20-30' Width 2' Width Item Items Unit Quantity Unit Price Total Cost Number CARRIED FORWARD 1 BITUMINOUS MATERIALS (PRIME COAT) GAL 2,226.00 0.10 $222.60 2 AGGREGATE (PRIME COAT) TON 34.00 1.00 34.00 3 HMA SURFACE REMOVAL- BUTT JOINT SO YD 315.00 8.00 $2,520.00 4 LEVELING BINDER (HAND METHOD), N50 TON 5.00 100.00 $500.00 5 LEVELING BINDER (MACHINE METHOD), N50 TON 383.00 72.00 $27,576.00 6 HMA BINDER COURSE, IL-19.0, N50 TON 354.00 70.00 $24,780.00 7 HMA SURFACE COURSE, MIX"D", N50 TON 827.00 70.00 $57,890.00 8 PCC CURB AND GUTTER R&R FOOT 120.00 30.00 $3,600.00 9 PCC DRIVEWAY R&R SO YD 65.00 60.00 $3,900.00 10 INCIDENTAL HOT-MIX ASPHALT SURFACING TON 95.00 90.00 $8,550.00 11 PCC SIDEWALK R&R SO FT 450.00 7.00 $3,150.00 12 DETECTABLE WARNINGS SO FT 80.00 25.00 $2,000.00 13 HMA SURFACE REMOVAL- 1 INCH SO YD 1,560.00 2.50 $3,900.00 14 HMA SURFACE REMOVAL-VARIABLE DEPTH SO YD 750.00 3.00 $2,250.00 15 HMA SURFACE REMOVAL-SPECIAL SO YD 1,170.00 3.50 $4,095.00 16 CLASS D PATCHES, 4 INCH SO YD 270.00 32.00 $8,640.00 17 INLETS TO BE ADJUSTED EACH 2.00 250.00 $500.00 18 MANHOLES TO BE ADJUSTED EACH 1.00 450.00 $450.00 19 SANITARY MANHOLES TO BE ADJUSTED EACH 8.00 500.00 $4,000.00 20 VALVE BOX TO BE ADJUSTED EACH 1.00 200.00 $200.00 21 THPL PVMT MARKINGS LTRS &SYM SO FT 791.00 4.00 $3,164.00 22 THPL PVMT MARKINGS- LINE 4" FOOT 3,800.00 0.75 $2,850.00 23 THPL PVMT MARKINGS- LINE 6" FOOT 7,870.00 1.00 $7,870.00 24 THPL PVMT MARKINGS- LINE 8" FOOT 420.00 1.50 $630.00 25 THPL PVMT MARKINGS- LINE 12" FOOT 730.00 3.00 $2,190.00 26 THPL PVMT MARKINGS- LINE 24" FOOT 325.00 4.00 $1,300.00 ® Page Total ❑ Total Estimated Cost $176,761.60 Made by Christopher Ott Date 06/30/14 Checked by Jason Bauer Date 06/30/14 Page 1 of 2 BLR 11510(Rev.7/05) Printed on 6/30/2014 2:32 PM Route Various Local Roads Illinois Department County Kendall of Transportation Local Agency United City of Yorkville Section 14-00000-00-GM, SUPP1 (Construction) Estimate of Cost Location and brief description (Sta.and land description of beginning;Sta.only for end for county and road districts;street limits for municipality.) Various local roads to undergo pavement patching, milling, resurfacing, curb and gutter removal and replacement sidewalk removal and replacement, driveway removal and replacement, structure adjustments, restoration, crack sealing, striping and all other work necessary to complete the project. Total Project Length 2650' Net Length 2650' Bridge or C"Wert Surface Type HMA Shoulder Type Agg Length Width 20-30' Width 2" Width Item Items Unit Quantity Unit Price Total Cost Number CARRIED FORWARD 176 761.60 27 RESTORATION SQ YD 1,375.00 8.00 $11,000.00 28 SIDEWALK REMOVAL SQ FT 75.00 5.00 $375.00 29 PCC SIDEWALK 5" SPECIAL SQ FT 120.00 8.00 $960.00 30 CRACK ROUTING FOOT 98,000.00 0.01 $980.00 31 CRACK FILLING POUND 32,667.00 1.50 $49,000.50 32 CRACK SEALING FOOT 2,500.00 1.00 $2,500.00. 33 RELOCATE EXISTING SHRUB EACH 2.00 250.00 $500.00 ❑ Page Total ® Total Estimated Cost $242,077.10 Made by Chris Ott Date 6/30/14 Checked by Jason Bauer Date 6/30/14 Page 2 of 2 BLR 11510(Rev.7/05) Printed on 6/30/2014 2:32 PM RECEIVED JUL 2 3 2014 D3 - LOCAL ROADS Illinois Department of Transportation Division of Highways/Region 2/District 3 700 East Norris Drive/Ottawa, Illinois/61350-0697 Telephone 815/434-6131 July 28, 2014 Ms. Beth Warren, City Clerk City of Yorkville 800 Game Farm Rd. Yorkville, IL 60560 CITY-MFT City of Yorkville Section No. 14-00000-00-GM Dear Ms. Warren: The resolution adopted by the City Council of Yorkville on May 27, 2014 appropriating $275,000.00 of Motor Fuel Tax funds for the maintenance of streets and highways in the city from May 1, 2014 to April 1, 2015 was approved on July 28, 2014. The municipal estimate of maintenance costs for$274,955.59, the maintenance engineering statement, and the contract proposal were approved on July 28, 2014. This maintenance program is approved with the understanding that any claims for labor and equipment for day labor and routine maintenance will be on file and available for compliance review by Local Roads and Streets and for audit by the Office of Quality and Compliance Review. Authorization to expend $32,878.49 for maintenance engineering of Motor Fuel Tax funds for this section has been approved and should appear on the city's next Motor Fuel Tax transaction detail. Authorization to expend additional Motor Fuel Tax funds will be given upon approval of a contract and/or Acceptance of Proposal to Furnish Materials and Approval of Award (BLR 12330)for this section. Bids are required for purchases of materials if the expenditures exceed $20,000 during any maintenance period either(1)for the same type of materials, or(2)from any one vendor if the purchase includes the placement or incorporation of the material. Please be advised that ALL projects involving pavement alterations and/or replacement/repair of sidewalks shall have curb ramps that comply with the current Americans with Disabilities Act(ADA) Guidelines. Ms. Beth Warren Page Two July 28, 2014 For Group IV items, the Contractor's Certificate of Eligibility must be submitted with the fully executed contract when prequalification was a bidding requirement. One copy of the approved maintenance papers has been forwarded to Engineering Enterprises, Inc. If you have any questions, please contact Dan Meagher at (815)433-7088. Sincerely, Paul A. Loete, P.E. Deputy Director of Highways, Region Two Engineer ba4g By: Donald R. Ernat, P.E. Local Roads and Streets Engineer cc: Engineering Enterprises, Inc. Compliance Review