City Council Packet 2014 10-28-14
AGENDA
CITY COUNCIL MEETING
CITY COUNCIL CHAMBERS
7:00 p.m.
Tuesday, October 28, 2014
Call to Order:
Pledge of Allegiance:
Roll Call by Clerk: WARD I WARD II WARD III WARD IV
Carlo Colosimo Jackie Milschewski Chris Funkhouser Rose Ann Spears
Ken Koch Larry Kot Joel Frieders Diane Teeling
Establishment of Quorum:
Amendments to Agenda:
Presentations:
Public Hearings:
Citizen Comments on Agenda Items:
Consent Agenda:
1. ADM 2014-66 Monthly Treasurer’s Report for September 2014
2. ADM 2014-69 Annual Treasurer’s Report
3. PW 2014-73 Water Department Reports for July and August 2014
4. PW 2014-75 Kennedy Road Improvements – Change Order No. 1 – authorize Mayor to execute
5. PW 2014-76 Grant of Easement for Route 47 Improvements (Schomer) – authorize Mayor and City
Clerk to execute
6. PW 2014-77 Route 47 and Cannonball Trail Improvements – Supplemental Agreement with HR Green
– authorize Mayor to execute
7. PW 2014-78 Road To Better Roads Program
a. Ridge Street Water Main Improvements Professional Services Agreement with EEI for Design and
Construction Engineering – authorize Mayor and City Clerk to execute
b. 2015 Road Program Professional Services Agreement with EEI for Design and Construction
Engineering – authorize Mayor and City Clerk to execute
8. PW 2014-79 Blackberry Woods Acceptance – accept the public improvements for the paving (pavement
and curb/gutter) portion of the public improvements as described in the Bill of Sale for ownership and
maintenance by the City, subject to receipt of an executed Bill of Sale and subject to verification that
the developer has no outstanding debt owed to the City for this project
United City of Yorkville
800 Game Farm Road
Yorkville, Illinois 60560
Telephone: 630-553-4350
www.yorkville.il.us
City Council Agenda
October 28, 2014
Page 2
Consent Agenda (cont’d):
9. PW 2014-80 Skidsteer RFP Request – authorize staff to issue a request for proposal for a skidsteer
10. PW 2014-81 Autumn Creek Parking Restrictions – authorize staff to send letters to surrounding
property owners notifying them of the proposal to restrict parking along the south/west side of
Autumn Creek Boulevard between Kennedy Road and Route 34 at all times and notifying them that the
item will be discussed at an upcoming meeting
Minutes for Approval:
Bills for Payment (Informational): $1,402,707.63
Mayor’s Report:
Public Works Committee Report:
Economic Development Committee Report:
1. EDC 2014-12 Ordinance Adopting Incentive Programs for the Construction of New Homes
Public Safety Committee Report:
Administration Committee Report:
1. ADM 2014-70 Tax Levy Estimate
2. ADM 2014-71 Resolution for the Redesign of a City Website
Park Board:
1. CC 2014-92 131 E. Hydraulic Street Unit C – Request for Proposal
2. CC 2014-93 Stephen G. Bridge Park – Baseball Diamond Safety Nets RFP – Contract Award
Plan Commission:
Zoning Board of Appeals:
City Council Report:
City Clerk’s Report:
Community and Liaison Report:
Staff Report:
Additional Business:
Executive Session:
Citizen Comments:
Adjournment:
City Council Agenda
October 28, 2014
Page 3
COMMITTEES, MEMBERS AND RESPONSIBILITIES
ADMINISTRATION: November 20, 2014 – 6:30 p.m. – City Hall Conference Room
Committee Departments Liaisons
Chairman: Alderman Spears Finance Library
Vice-Chairman: Alderman Milschewski Administration
Committee: Alderman Funkhouser
Committee: Alderman Frieders
ECONOMIC DEVELOPMENT: November 4, 2014 – 6:00 p.m. – City Hall Conference Room
Committee Departments Liaisons
Chairman: Alderman Koch Community Development Plan Commission
Vice-Chairman: Alderman Teeling Building Safety and Zoning Yorkville Econ. Dev. Corp.
Committee: Alderman Colosimo Kendall Co. Plan Commission
Committee: Alderman Frieders
PUBLIC SAFETY: November 6, 2014 – 6:30 p.m. – City Hall Conference Room
Committee Departments Liaisons
Chairman: Alderman Colosimo Police Human Resource Comm.
Vice-Chairman: Alderman Spears School District
Committee: Alderman Kot
Committee: Alderman Funkhouser
PUBLIC WORKS: November 18, 2014 – 6:00 p.m. – City Hall Conference Room
Committee Departments Liaisons
Chairman: Alderman Teeling Public Works Park Board
Vice-Chairman: Alderman Kot Engineering YBSD
Committee: Alderman Milschewski Parks and Recreation
Committee: Alderman Koch
2014/2015 City Council Goals – City Council
Goal Priority Staff
“Staffing” 6 All Departments
“Vehicles and Small Equipment” 9 All Departments
UNITED CITY OF YORKVILLE
WORKSHEET
CITY COUNCIL
Tuesday, October 28, 2014
7:00 PM
CITY COUNCIL CHAMBERS
----------------------------------------------------------------------------------------------------------------------------------------
AMENDMENTS TO AGENDA:
----------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------
PRESENTATIONS:
-----------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------
CITIZEN COMMENTS ON AGENDA ITEMS:
-----------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------
CONSENT AGENDA:
-----------------------------------------------------------------------------------------------------------------------------------------
1. ADM 2014-66 Monthly Treasurer’s Report for September 2014
□ Approved: Y ______ N ______ □ Subject to __________________________________________
□ Removed ________________________________________________________________________
□ Notes _____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
-----------------------------------------------------------------------------------------------------------------------------------------
2. ADM 2014-69 Annual Treasurer’s Report
□ Approved: Y ______ N ______ □ Subject to __________________________________________
□ Removed ________________________________________________________________________
□ Notes _____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
-----------------------------------------------------------------------------------------------------------------------------------------
3. PW 2014-73 Water Department Reports for July and August 2014
□ Approved: Y ______ N ______ □ Subject to __________________________________________
□ Removed ________________________________________________________________________
□ Notes _____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
-----------------------------------------------------------------------------------------------------------------------------------------
4. PW 2014-75 Kennedy Road Improvements – Change Order No. 1
□ Approved: Y ______ N ______ □ Subject to __________________________________________
□ Removed ________________________________________________________________________
□ Notes _____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
-----------------------------------------------------------------------------------------------------------------------------------------
5. PW 2014-76 Grant of Easement for Route 47 Improvements (Schomer)
□ Approved: Y ______ N ______ □ Subject to __________________________________________
□ Removed ________________________________________________________________________
□ Notes _____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
-----------------------------------------------------------------------------------------------------------------------------------------
6. PW 2014-77 Route 47 and Cannonball Trail Improvements – Supplemental Agreement with HR Green
□ Approved: Y ______ N ______ □ Subject to __________________________________________
□ Removed ________________________________________________________________________
□ Notes _____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
-----------------------------------------------------------------------------------------------------------------------------------------
7. PW 2014-78 Road to Better Roads Program
a. Ridge Street Water Main Improvements – Agreement with EEI
b. 2015 Road Program – Agreement with EEI
□ Approved: Y ______ N ______ □ Subject to __________________________________________
□ Removed ________________________________________________________________________
□ Notes _____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
-----------------------------------------------------------------------------------------------------------------------------------------
8. PW 2014-79 Blackberry Woods Acceptance
□ Approved: Y ______ N ______ □ Subject to __________________________________________
□ Removed ________________________________________________________________________
□ Notes _____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
-----------------------------------------------------------------------------------------------------------------------------------------
9. PW 2014-80 Skidsteer RFP Request
□ Approved: Y ______ N ______ □ Subject to __________________________________________
□ Removed ________________________________________________________________________
□ Notes _____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
-----------------------------------------------------------------------------------------------------------------------------------------
10. PW 2014-81 Autumn Creek Parking Restrictions
□ Approved: Y ______ N ______ □ Subject to __________________________________________
□ Removed ________________________________________________________________________
□ Notes _____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
-----------------------------------------------------------------------------------------------------------------------------------------
BILLS FOR PAYMENT:
-----------------------------------------------------------------------------------------------------------------------------------------
1. Bills for Payment (Informational)
□ Notes _____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
----------------------------------------------------------------------------------------------------------------------------------------
ECONOMIC DEVELOPMENT COMMITTEE:
----------------------------------------------------------------------------------------------------------------------------------------
1. EDC 2014-12 Ordinance Adopting Incentive Programs for the Construction of New Homes
□ Approved: Y ______ N ______ □ Subject to __________________________________________
□ Removed ________________________________________________________________________
□ Notes ___________________________________________________________________________
________________________________________________________________________________
_________________________________________________________________________________
----------------------------------------------------------------------------------------------------------------------------------------
ADMINISTRATION COMMITTEE:
----------------------------------------------------------------------------------------------------------------------------------------
1. ADM 2014-70 Tax Levy Estimate
□ Approved: Y ______ N ______ □ Subject to __________________________________________
□ Removed ________________________________________________________________________
□ Notes ___________________________________________________________________________
________________________________________________________________________________
_________________________________________________________________________________
-----------------------------------------------------------------------------------------------------------------------------------------
2. ADM 2014-71 Resolution for the Redesign of a City Website
□ Approved: Y ______ N ______ □ Subject to __________________________________________
□ Removed ________________________________________________________________________
□ Notes _____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
----------------------------------------------------------------------------------------------------------------------------------------
PARK BOARD:
----------------------------------------------------------------------------------------------------------------------------------------
1. CC 2014-92 131 E. Hydraulic Street Unit C – Request for Proposal
□ Approved: Y ______ N ______ □ Subject to____________________________________________
□ Removed__________________________________________________________________________
□ Notes_____________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
----------------------------------------------------------------------------------------------------------------------------------------
2. CC 2014-93 Stephen G. Bridge Park – Baseball Diamond Safety Nets RFP – Contract Award
□ Approved: Y ______ N ______ □ Subject to____________________________________________
□ Removed__________________________________________________________________________
□ Notes_____________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
-----------------------------------------------------------------------------------------------------------------------------------------
ADDITIONAL BUSINESS:
-----------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------
CITIZEN COMMENTS:
-----------------------------------------------------------------------------------------------------------------------------------------
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
CA #1
Tracking Number
ADM 2014-66
Monthly Treasurer’s Report for September 2014
City Council – October 28, 2014
Majority
Approval
Rob Fredrickson Finance
Name Department
Beginning
Fund Balance
September
Revenues YTD Revenues
Revenues
Budget
% of
YTD
Budget
September
Expenses YTD Expenses
Expenses
Budget
% of
YTD
Budget
Projected
Ending Fund
Balance
General Fund
01 - General 3,860,581 2,238,803 7,574,266 13,726,625 55%1,283,996 5,077,215 13,570,112 37%6,357,632
Special Revenue Funds
15 - Motor Fuel Tax 1,030,456 67,274 395,480 483,000 82%37,635 168,438 863,499 20%1,257,498
79 - Parks and Recreation 546,485 202,453 906,649 1,765,856 51%135,635 836,892 1,911,447 44%616,242
72 - Land Cash 187,984 8,927 98,190 73,000 135%23,421 88,542 406,850 22%197,633
87 - Countryside TIF (534,087) 5,492 12,788 20,000 64%4,372 41,504 91,398 45%(562,803)
88 - Downtown TIF 231,529 21,753 60,124 85,075 71%2,012 26,756 52,788 51%264,896
11 - Fox Hill SSA 11,134 3,630 8,323 8,536 98%- 1,901 19,603 10%17,555
12 - Sunflower SSA 2,574 7,517 16,969 17,416 97%1,480 6,894 35,985 19%12,649
Debt Service Fund
42 - Debt Service 5,319 133,912 2,694,283 332,179 811%1,408 2,450,471 330,354 742%249,131
Capital Funds
25 - Vehicle and Equipment 147,746 28,979 139,057 434,553 32%15,669 178,017 559,202 32%108,785
23 - City-Wide Capital 676,555 871,079 5,724,350 6,549,840 87%884,473 1,068,407 2,548,272 42%5,332,498
Enterprise Funds
51 - Water 1,350,923 41,501 1,044,929 2,839,226 37%134,621 966,186 3,093,781 31%1,429,666
52 - Sewer 2,879,168 103,148 876,375 2,385,472 37%174,346 663,823 3,217,226 21%3,091,720
Library Funds
82 - Library Operations 471,076 258,077 657,333 732,685 90%38,356 311,453 783,453 40%816,956
83 - Library Debt Service - 293,965 705,189 731,351 96%- 113,160 731,321 15%592,029
84 - Library Capital 26,870 3,151 10,855 20,020 54%2,697 13,060 55,015 24%24,665
Total Funds 10,894,313 4,289,659 20,925,159 30,204,834 69%2,740,120 12,012,719 28,270,306 42%19,806,753
Rob Fredrickson, Finance Director/Deputy Treasurer
Cash Basis
As Deputy Treasurer of the United City of Yorkville, I hereby attest, to the best of my knowledge, that the information contained in this Treasurer's Report is accurate as of the date detailed herein. Further
information is available in the Finance Department.
UNITED CITY OF YORKVILLE
TREASURER'S REPORT - for the period ending September 30, 2014
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
CA #2
Tracking Number
ADM 2014-69
Annual Treasurer’s Report
City Council – October 28, 2014
See attached.
Rob Fredrickson Finance
Name Department
UNITED CITY OF YORKVILLE
TREASURER’S REPORT
FOR THE FISCAL YEAR ENDED APRIL 30, 2014
I certify that the following is true and correct to the best of my knowledge and belief.
______________________________
Rob Fredrickson
Deputy City Treasurer
Summary Statement of Operations *
Fund Type
Beginning Fund
Balance / Net
Position
Revenues Expenditures Other Financing
Sources/(Uses)
Ending Fund
Balance / Net
Position *
General Fund 4,223,820 13,442,672 10,017,702 (3,788,209) 3,860,581
Library Fund 461,825 1,495,646 1,649,981 190,456 497,946
Parks & Recreation Fund 320,370 524,415 1,574,761 1,276,461 546,485
Countryside TIF Fund 1,572,335 2,150 2,151,575 43,003 (534,087)
Special Revenue Funds 1,523,727 977,061 1,095,611 58,500 1,463,677
Debt Service Funds 12,046 322,226 328,953 - 5,319
Capital Projects Funds (67,301) 1,389,792 1,489,515 991,325 824,301
Enterprise Funds 45,221,277 3,764,613 4,538,659 3,284,911 47,732,142
Fiduciary Funds 5,051,439 1,064,518 425,486 - 5,690,471
* NOTE: Detailed financial information may be found at http://www.yorkville.il.us/documents/ComprehensiveAnnualFinancialReport-
FiscalYearEnded4-30-14.pdf
United City of Yorkville - FOR THE FISCAL YEAR ENDING APRIL 30, 2014: RECEIPTS –
GENERAL FUND: PROPERTY TAXES 2,725,879; MUNICIPAL SALES TAX 2,586,460; NON-HOME RULE
SALES TAX 1,986,566; ELECTRIC UTILITY TAX 615,878; NATURAL GAS UTILITY TAX 310,979; EXCISE
TAX 461,554; TELEPHONE UTILITY TAX 12,625; CABLE FRANCHISE FEES 232,206; HOTEL TAX 65,605;
AMUSEMENT TAX 144,118; ADMISSIONS TAX 103,720; BUSINESS DISTRICT TAX 325,724; AUTO
RENTAL TAX 10,638; STATE INCOME TAX 1,613,102; LOCAL USE TAX 296,298; ROAD & BRIDGE TAX
164,398; VIDEO GAMING TAX 26,047; PERSONAL PROPERTY REPL TAX 16,672; FEDERAL GRANTS
8,880; STATE GRANTS 266; MISC INTERGOVERNMENTAL 1,427; LIQUOR LICENSE 47,781; OTHER
LICENSES & PERMITS 4,156; BUILDING PERMITS 116,182; CIRCUIT COURT FINES 45,653;
ADMINISTRATIVE ADJUDICATION 42,430; OFFENDER REGISTRATION FEES 215; POLICE TOWS
85,656; GARBAGE SURCHARGE 1,003,263; COLLECTION FEE - YBSD 150,249; LATE PENALTIES -
GARBAGE 21,054; POLICE SPECIAL DETAIL 600; INVESTMENT EARNINGS 8,792; REIMBURSEMENTS
188,257; RENTAL INCOME 7,495; MISCELLANEOUS INCOME 11,840; INTERFUND TRANSFERS 2,479;
TOTAL 13,445,144.
FOX HILL SSA FUND: PROPERTY TAXES 3,786; INVESTMENT EARNINGS 1; TOTAL 3,787.
SUNFLOWER SSA FUND: PROPERTY TAXES 7,467; INVESTMENT EARNINGS 2; TOTAL 7,469.
MOTOR FUEL TAX FUND: MOTOR FUEL TAX 417,742; MFT HIGH GROWTH 41,814; STATE GRANTS
204,299; ILLINOIS JOB NOW PROCEEDS 73,122; FEDERAL GRANTS 75,195; INVESTMENT EARNINGS
3,417; REIMBURSEMENTS 110; TOTAL 815,699.
MUNICIPAL BUILDING FUND: BUILD PERMITS 3,930; TRANSFERS 571,615; TOTAL 575,545.
CITY WIDE CAPITAL FUND: FEDERAL GRANTS 230,839; DEVELOPMENT FEES 9,908; BUILD PERMITS
71,634; ROAD CONTRIBUTION FEE 2,000; ROAD INFRASTRUCTURE FEES 684,319; INVESTMENT
EARNINGS 204; REIMBURSEMENTS 89,356; INTERFUND TRANSFERS 270,401; LOAN PROCEEDS
193,963; TOTAL 1,552,624.
VEHICLE & EQUIPMENT FUND: DEVELOPMENT FEES 29,790; BUILD PERMITS 30,960; WEATHER
WARNING SIREN FEES 12,264; ENGINEERING CAPITAL FEES 3,400; DUI FINES 7,569; ELECTRONIC
CITATION FEES 684; MOWING INCOME 12,845; PUBLIC WORKS CHARGEBACK 144,650; INVESTMENT
EARNINGS 446; REIMBURSEMENTS 50,000; MISCELLANEOUS INCOME 4,994; SALE OF CAPITAL
ASSETS 7,825; TOTAL 305,427.
DEBT SERVICE FUND: PROPERTY TAXES 315,790; RECAPTURE FEES 5,958; BUILD PERMITS 400;
INVESTMENT EARNINGS 78; TOTAL 322,226.
WATER FUND: PROPERTY TAXES 3,611; BUILD PERMITS 84,544; WATER SALES 1,789,296; BULK
WATER SALES 4,750; LATE PENALTIES - WATER 92,386; WATER METER SALES 47,785; WATER
INFASTRUCTURE FEES 341,083; WATER CONNECTION FEES 34,650; INVESTMENT EARNINGS 2,231;
REIMBURSEMENTS 14,844; RENTAL INCOME 51,917; INTERFUND TRANSFERS 82,988; TOTAL
2,550,085.
SEWER FUND: BUILD PERMITS 16,800; SEWER MAINTENANCE FEES 756,746; SEWER
INFRASTRUCTURE FEES 333,587; SEWER CONNECTION FEES 10,000; LATE PENALTIES - SEWER
13,821; RIVER CROSSING FEES 278; INVESTMENT EARNINGS 9,260; REIMBURSEMENTS 1,300;
INTERFUND TRANSFERS 1,137,220; TOTAL 2,279,012.
LAND CASH FUND: RTP GRANT - CLARK PARK 31,286; BUILD PERMITS 1,733; INVESTMENT
EARNINGS 4; AUTUMN CREEK 42,367; BLACKBERRY WOODS 2,841; BRIARWOOD 9,371; INTERFUND
TRANSFERS 50,000; TOTAL 137,602.
PARKS & RECREATION FUND: SPECIAL EVENTS 47,745; CHILD DEVELOPMENT 81,114; ATHLETICS
AND FITNESS 139,158; CONCESSION REVENUE 31,461; INVESTMENT EARNINGS 382;
REIMBURSEMENTS 35,728; RENTAL INCOME 87,418; HOMETOWN DAYS 90,597;
SPONSORSHIPS/DONATIONS 4,582; MISCELLANEOUS INCOME 6,227; INTERFUND TRANSFERS
1,765,504; TOTAL 2,289,916.
RECREATION CENTER FUND: PROGRAM FEES 3,409; CONCESSION REVENUE 492; MEMBERSHIP
FEES 37,189; GUEST FEES 1,136; SWIM CLASS FEES 2,275; PERSONAL TRAINING FEES 360; TANNING
SESSION FEES 30; RENTAL INCOME 444; SCHOLARSHIPS/DONATIONS 28; MISCELLANEOUS INCOME
100; INTERFUND TRANSFERS 489,043; TOTAL 534,506.
LIBRARY FUND: PROPERTY TAXES 642,838; PERSONAL PROPERTY TAX 5,525; STATE GRANTS
17,389; LIBRARY FINES 9,680; LIBRARY SUBSCRIPTION CARDS 7,194; COPY FEES 2,628; PROGRAM
FEES 885; INVESTMENT EARNINGS 1,313; RENTAL INCOME 2,098; DVD RENTAL INCOME 4,550;
MISCELLANEOUS INCOME 1,344; INTERFUND TRANSFERS 45,948; TOTAL 741,392.
LIBRARY DEBT SERVICE FUND: PROPERTY TAXES 746,464; INVESTMENT EARNINGS 71;
INTERFUND TRANSFERS 21,185; TOTAL 767,720.
LIBRARY CAPITAL FUND: DEVELOPMENT FEES 53,650; INVESTMENT EARNINGS 16; TOTAL 53,666.
COUNTRYSIDE TIF FUND: BUSINESS DISTRICT TAX 2,043; INVESTMENT EARNINGS 106; TOTAL
2,149.
DOWNTOWN TIF FUND: BUSINESS DISTRICT TAX 9,458; PROPERTY TAXES 52,811; INVESTMENT
EARNINGS 53; MICELLANEOUS INCOME 184; SALE OF CAPITAL ASSETS 8,500; TOTAL 71,006.
PAYROLL: 0.01 TO 25,000.00: ARENTSEN, DALE; ARES, KENNETH E; ARNFELT, LUKE; BAHR,
NANCY; BALDINE, TAMMY; BATES, LESLIE; BATTLE, BETTYE; BAZAN, JEAN; BIEGALSKI, LOUISE;
BRADSTREET, PATRICIA; BRANNING, TINA; BRETTHAUER, JANET; BREYNE, DONNA; BROWN,
MIKE; CARLSON, JARED; CATHEY, CHANDLER; CHATMAN, DEB; CHERWIN, REBECCA; COLOSIMO,
CARLO; CREADEUR, ROBERT; CRYDER, CRYSTAL; CYKO, ERICA; CYKO, NATALIE; DAVIS,
CHARLES; DAVIS, KYLE; DILLON, SALLY; DRESSEL, JACOB; EBERHARDT, MARIANNE; ELWOOD,
ADAM; ENGBERG, JASON; ESSEX, JANET; FAEDTKE, JESSICA; FRIEDERS, JOEL; FUNKHOUSER,
CHRIS; GARBELMAN, EMILY; GARDINER, DONALD; GODINEZ, KARINA; GOLDEN, BROOKE;
GOLDEN, HEATHER; GOLINSKI, GARY; GOSS, VIRGINIA; GREZLIK, CATHY; GUENZLER, CAROL L;
GUENZLER, GRANT; HAGEMAN, HANNAH; HAGEMAN, JONATHON; HARMON, RHIANNON;
HARRISON, NICHOLAS; HEINEN, CHRISTOPHER; HERIAUD, ELIZABETH; HILL, NATHAN; HILL,
TERRY; HURT, KAREN; JAKSICH, ZACHARY; JEKA, CHRIS; JOHNSON, DOREEN; KARAGIANIS,
ALEXANDRA; KIEST, DAVID; KLAAS, BAILEY; KLINE, STEVE; KNUTSON, JOAN; KOCH, KENNETH;
KONEN, CHRISTIE; KOT, LARRY; KOVACS, RICHARD; KRUSE, HADLEY; KUEHLEM, CHRISTOPHER;
LACOCO, PRISCILLA; LEEDY, MATTHEW; LILL, STEVEN; LIVINGSTON, KAY; LONG, DIANE; MAHR,
MADISON; MANNING, BARBARA; MATLOCK, JOANNE; MILLER, CHRISTOPHER; MILSCHEWSKI,
JACQUELYN; MINOR, ALLAN; MOHLER, DEBI; MORKERT, CHRISTOPHER; MUNNS, MARTIN;
MURRAY, WILLIAM; NEGRE, RYAN; NEHRING, JILL; NELSON, TYLER; NICHOLSON, MICHELLE;
NIESEN, CATHERINE; PAGE, DALE; PASSERO, CHARLES; PLECKHAM, TRACI; REDMON, ERIC;
REDMON, STEVEN; ROBBINS, KATIE; ROBINSON, MIKAELA; SALLEE, REBECCA; SCHMIDT, MARGO;
SEDGWICK, KELSEY; SEIBEL, CARLY; SILAS, LA DON; SKIBINSKI, TREVOR; SLEEZER, MORGAN;
SMITH, JACOB; SMITH, KATHERINE; SOELKE, THOMAS; SPEARS, ROSE; SPURLOCK, RALPH;
STAGGS, NISACHERI; STEINHOFF, DAVID; STRICKER, BETH; TEELING, DIANE; UCHIDA, HEATHER;
VACA, CINDY; VACA, DYLAN; VAN CLEAVE, VIANNE; VELAQUEZ, JUAN; VOGUS, KENNETH;
WALKER, RON; WALTER, JACOB; WARREN, BETH; WECKBACH, JEFFREY; WEISS, JENNETTE;
WILKINSON, PEGGY; WILLIAMS, MELISSA; WILSON, DONNA; WYETH, DWIGHT.
PAYROLL: 25,000.01 TO 50,000.00: AUGUSTINE, SHELLEY; BAUER, JONATHAN; BROWN, DAVID;
COLLINS JR, ALBERT; DYON, JUDY; FELTES, RITA; GAWRYCH, KRISTOPHER; HERNANDEZ, ADAM;
HORNER, RYAN; IWANSKI, SHARYL; JACKSON, JAMIE; LAWRENTZ, KEVIN; OLSEM, PAMELA;
OSTREKO, MEGHAN; RASMUSSON, AMBER; REISINGER, BARBARA; REMUS, SHAY; SCHRAW,
LAURA; SCOTT, WILLIAM; SIMMONS, AMY; WALKER, KIRSTEN; WEBER, ROBERT; WEINERT,
ANDREA.
PAYROLL: 50,000.01 TO 75,000.00: BEHRENS, BRETT; BEHRENS, DAVID; DEBORD, DIXIE; DECKER,
NICOLE; EVANS, TIMOTHY; GERLACH, SARA; HELLAND, JONATHON; HENNE, DURKEN; HOULE,
ANTHONY; HUNTER, JOHN; KLETT, STEPHEN; KOLOWSKI, TIMOTHY; KONEN, THOMAS; NELSON,
MATTHEW; PFISTER, MICHAELEEN; PICKERING, LISA; RATOS, PETER; SCODRO, PETER; SENG,
MATTHEW; SLEEZER, JOHN; SOEBBING, ROMAN; WRIGHT, RACHEL.
PAYROLL: 75,000.01 TO 100,000.00: BARKSDALE-NOBLE, KRYSTI; CARLYLE, MITCHELL;
FREDRICKSON, ROB; GOLDSMITH, RYAN; GRIMES, TOM; HART, ROBBIE; HAYES, CHRISTOPER;
HILT, LARRY; JELENIEWSKI, ANDREW; JOHNSON, JEFFREY; KETCHMARK, MATTHEW; KLINGEL,
SARAH; KLINGEL, TERRY; MCMAHON, PATRICK; MIKOLASEK, RAYMOND; MOTT, STACEY;
PLECKHAM, DANIEL; PRESNAK, JAMES; SLEEZER, SCOTT; STROUP, SAMUEL.
PAYROLL: 100,000.01 TO 125,000.00: DHUSE, ERIC; HART, RICHARD.
PAYROLL: 125,000.01 TO 150,000.00: OLSON, BART; TOTAL 5,483,093.
VENDOR DISBURSEMENTS OVER $2,500: ACTION GRAPHIX LTD 5,735; ADVANCED AUTOMATION &
CONTROLS 6,675; ADVANCED DISPOSAL 1,209,732; ALARM DETECTION SYSTEMS 14,110; ALL STAR
SPORTS INSTRUCTION 15,665; COSIE ALLEN 4,200; ALTEC INDUSTRIES 2,842; AMERICAN ENGLISH
5,500; AMPERAGE ELECTRICAL SUPPLY 16,775; DAVE ANGLE 4,664; CHASE & DAVE ANGLE 6,536;
ANIRI LLC 4,332; ARAMARK UNIFORM SERVICES 6,836; AREA RESTROOM SOLUTIONS 4,742; AT&T
15,317; AT&T GLOBAL SERVICES, INC. 3,790; ATLAS BOBCAT 6,424; AURORA AREA CONVENTION
BUREAU 56,839; BAKER & TAYLOR 31,630; ANGELA BARTON 10,000; BATTERY SERVICE
CORPORATION 2,765; RAINBOW GROUP LLC 3,529; ANKUR & DIVYA BEHL 10,000; BERTHOLD
ELECTRIC POWER SERVICES 3,312; BRIAN BETZWISER 78,436; BLACKBERRY HILL CONGREGATION
6,900; BLUE CROSS BLUE SHIELD 1,169,470; BNY MELLON 3,865,346; BOOMBAH 11,360; JIM & RYAN
BOWEN 10,000; BP AMOCO OIL COMPANY 3,539; BRANDT BUILDERS 117,900; BRISTOL KENDALL
FIRE DEPARTMENT 119,100; BSN/PASSON'S/GSC/CONLIN SPORTS 11,020; BUILDERS ASPHALT LLC
19,186; UNITED COMMUNICATION SYSTEMS 36,056; CAMBRIA SALES COMPANY 7,046; TONY
CANZONERI 10,000; CARGILL 168,160; ISMAEL CARRASQUILLO 10,000; JUAN A CASTENEDA JR.
10,000; CENTRAL SOD 12,137; CENTRAL LIMESTONE COMPANY 6,715; CINTAS CORPORATION 6,891;
CIVIC ARTWORKS 2,500; CLARK ENVIRONMENTAL 6,865; COLLECTION PROFESSIONALS 4,347;
MICHAEL COLLINS 10,000; COMMONWEALTH EDISON 83,659; ERIC CONNOLLY 10,000; DIANE
CONOVER 23,525; CONSTELLATION NEW ENERGY 240,960; D CONSTRUCTION 890,607; LINDLE
DAILEY 10,000; DAVID L CHELSEN 19,438; DEKANE EQUIPMENT CORP 37,546; CHANDRA
DISSANAYAKE 10,000; DRS SKINNERS AMUSEMENTS 2,617; MICHAEL DUBAJIC 10,000; MICHAEL &
JENNIFER DUFF 10,000; EBSCO INDUSTRIES 3,228; EJ EQUIPMENT 3,503; ENCAP 31,200;
ENGINEERING ENTERPRISES 1,193,046; EUCLID BEVERAGE 17,558; EXPRESS SIGNS & LIGHTING
10,188; RACHEL FANDEL 10,000; FARREN HEATING & COOLING 21,639; FENCE CONNECTION 16,897;
SUMMER FERRARIO 10,000; FIDELITY SECURITY LIFE INSURANCE 10,022; FIRST NATIONAL BANK
OF OMAHA 8,680; FIRST NONPROFIT UNEMPLOYMENT 10,210; FIRST PLACE RENTAL 3,071; RAQUEL
HERRERA 4,170; FOX VALLEY TROPHY & AWARDS 5,458; FOX VALLEY SANDBLASTING 2,520;
FULTON TECHNOLOGIES 5,809; CRAIG T. GABALEC 10,000; GARDINER KOCH & WEISBERG 147,298;
GENEVA CONSTRUCTION 744,944; GENEVA VALVE TAPPING COMPANY 6,200; GLATFELTER PUBLIC
PRACTICE 114,731; GOLD MEDAL PRODUCTS 11,098; GOOD YEAR WHOLESALE TIRE CENTER 3,067;
GREEN CHEVROLET 22,034; HERB & JOYCE GRIEVES 10,000; GROUND EFFECTS 2,993; GUARDIAN
89,881; GIOVAN A GUIDA 10,065; HD BACKHOE SERVICE 3,030; MICHAEL HAMILTON 10,000; JASON
& KATIE HANAHAN 10,000; HARRIS COMPUTER SYSTEMS 15,081; HAWKINS INC 9,922; HD SUPPLY
WATERWORKS 21,994; MICHAEL & KATHERINE HEIMAN 4,500; HENDERSON PRODUCTS 2,839;
HERTZ EQUIPMENT RENTAL 6,805; HI FI EVENTS 14,750; STEVE HILLGOTH 10,000; HOME DEPOT
3,288; HOMER INDUSTRIES 6,560; HR GREEN 74,365; IL VALLEY URBAN LUMBERJACKS 12,150;
ILLINOIS DEPARTMENT OF TRANSPORTATION 129,275; ILLINOIS EPA 232,081; ILLINOIS PUBLIC
SAFETY AGENCY 6,660; STATE POLICE SERVICES FUND 2,882; ILLINOIS TRUCK MAINTENANCE
21,522; ILLINOIS PUBLIC RISK FUND 149,876; IMAGE PLUS 3,754; IMAJE RECORDS 5,000;
INFRASTRUCTURE SOLUTIONS 3,615; ITRON 5,789; J & S CONSTRUCTION 234,010; JEFFREY L.
JERABEK 3,064; JACK DOHENY COMPANIES 7,608; JAY M HEAP & ASSOCIATES 52,500; JET
SEALCOATING 18,811; JOHNSON OIL COMPANY 10,170; RAE & DANIEL JONES 10,000; JULIE INC
4,521; KATHLEEN FIELD ORR & ASSOC 154,908; IRENE & WAYNE KAUFFMAN 10,000; KENCOM
PUBLIC SAFETY DISPATCH 25,295; KENDALL COUNTY CHIEF OF POLICE ASSOCIATION 4,205;
KENDALL COUNTY CONCRETE 6,651; KENDALL COUNTY COLLECTOR 55,890; KENDALL COUNTY
HIGHWAY DEPT. 82,750; KENDALL COUNTY PROBATION 3,118; KENDALL COUNTY RECORDER'S
OFFICE 9,003; KENDALL COUNTY RECORD 5,057; KENDALL CO SHERIFF'S OFFICE 3,758; KENDALL
CROSSING LLC 293,245; KENDALL HILL NURSERY 5,195; KENDALL COUNTY ADMIN SERVICES
22,214; ANNETTE M POWELL 4,173; MATTHEW KINSEY 10,000; HERBERT & PAMELA
KLEINWACHTER 23,000; DAN KOLAR 10,000; KONICA MINOLTA 2,527; GARY L. KRITZBERG 24,500;
SUSAN KRITZBERG 8,000; BRIAN & DIANE KRUPICKA 10,000; PAULA KUMMER 10,000;
LAUTERBACH & AMEN LLP 34,000; LAWSON PRODUCTS 2,568; LEADS ONLINE LLC 4,476; ROBERT
LOFTUS 4,665; JUVENCIO A LOPEZ 10,000; LOUGHBERRY MFG CORP 3,112; MAD BOMBER
FIREWORK PRODUCTION 7,078; ARCH CHEMICALS 4,872; MARTENSON TURF PRODUCTS 6,474;
MARYWOOD LANDSCAPING 5,718; AURELIA MATAISZ 10,000; THOMAS MATTERA 10,000; THE
PRESTWICK GROUP 4,963; MC CUE BUILDERS 5,000; MCGRATH OFFICE EQUIPMENT 27,299; RANDY
MCKIRGAN 59,729; MICHAEL MCKNIGHT 10,000; ANN MCNELIS 17,000; MENARDS INC 187,705;
MENARDS - YORKVILLE 21,612; MESIROW INSURANCE SERVICES 43,690; METROPOLITAN
INDUSTRIES 15,643; MID AMERICAN WATER 14,800; MIDAMERICA BOOKS 2,857; MIDWEST TAPE
7,612; MILES CHEVROLET 53,870; MILLER, CANFIELD, PADDOCK & 8,350; MINER ELECTRONICS
23,387; BRUCE MORRICK 3,300; MIGUEL A. MUNOZ 10,000; MARGARET MURPHY 3,600; NORMAN C
MURRAY 3,500; MICHAEL NAGY 10,000; NATIONAL WASH AUTHORITY 4,724; NEOPOST 6,500; NICOR
GAS 41,819; NORTH EAST MULTI-REGIONAL TRAINING 4,230; NORTHWEST INDIANA LAW
ENFORCEMENT ACADEMY 3,650; RON & CINDY O'CONNOR 10,000; CYNTHIA O'LEARY 4,190;
OFFICE WORKS 2,729; OLIVEJAR GROUP 17,360; OPENLANDS 12,000; JAMES A AGEMA 3,782;
OSWEGOLAND PARK DISTRICT 4,400; OVERDRIVE 3,000; SAL PALETTA 10,000; PARKREATION
15,730; PARKWAY LLC 13,500; PATTEN INDUSTRIES 11,008; PEDRO DEL CORRAL 10,000; PEPSI-COLA
GENERAL BOTTLERS 5,215; PRAIRIE AREA LIBRARY SYSTEM 3,514; PRAIRIECAT 10,972; PRO-
VISION INC 5,535; PULTE HOMES 160,000; R. SMITS & SONS 4,320; R.J. KUHN INC 9,331; RAGING
WAVES 103,720; JAMES RATOS 1,826,205; RAY O'HERRON COMPANY 8,564; LAURA REGER 10,000;
REINDERS INC 16,262; KEN RICHARDS 10,000; RIVERVIEW FORD 15,485; RUSH-COPLEY MEDICAL
CENTER 5,150; RUSSO HARDWARE 3,252; SERVICE PRINTING CORPORATION 23,984;
SERVICEMASTER 15,556; SHANAHAN & SHANAHAN LLP 28,450; SCOTT M. SHAW 10,000;
SIMPLEXGRINNELL 2,770; SKYHAWKS SPORTS ACADEMY 5,611; MEGAN SMITH 10,000; SOUND
INCORPORATED 4,371; SWFVCTC 74,883; SPECIALTY FLOORS 3,878; SPEEDWAY 119,039; SPEER
FINANCIAL 28,324; SPORTSFIELDS INC 15,245; STANDARD & POORS RATING SERVICES 18,380;
STANLEY P STONE & ASSOCIATES 4,600; STATE OF ILLINOIS TREASURER 338,576; STEVE PIPER &
SONS INC 28,276; STEVEN'S SILKSCREENING 6,636; STREICHERS 9,190; LAURA SUAREZ 10,000; SUN-
TIMES MEDIA 2,860; SUBURBAN LABORATORIES 11,377; TAPCO 22,700; THE BANK OF NEW YORK
433,600; BNY MIDWEST TRUST COMPANY 4,718; THE GALE GROUP 3,291; JASON R THERIAULT
10,000; THYSSENKRUPP ELEVATOR 3,524; TIGERDIRECT 4,665; TIM GREYER BUILDERS 11,732; TKB
ASSOCIATES 10,664; TODAY'S BUSINESS SOLUTIONS 3,793; JOEL L TORRES 10,000; TRAFFIC
CONTROL CORPORATION 8,027; DANIEL V TRANSIER 4,200; TRI-RIVER POLICE TRAINING 3,500;
TRICO MECHANICAL SERVICE GROUP 10,821; TRUE PITCH 3,687; TRUGREEN 8,993; TUCKER
DEVELOPMENT CORP 144,282; UNION HILL SALES & SERVICE 11,319; US BANK 163,791; JOSEPH J.
DEMARCO 3,100; VERIZON WIRELESS 18,332; VERMONT SYSTEMS 3,450; VISA 72,750; CHRISTINE M
VITOSH 6,564; WALKER CUSTOM HOMES 119,000; WAREHOUSE DIRECT 9,819; BRIAN PARISH 3,419;
WATER PRODUCTS 12,442; WATER SERVICES CO 3,659; WATER SOLUTIONS UNLIMITED 16,802;
WALLY WERDERICH 4,200; WILKINSON EXCAVATING 5,029; AMANDA WILLIAMS 10,000; WILLMAN
& GROESCH GENERAL CONTRACTORS 24,585; WILSONS FAMILY SHOW 23,776; WINDETT RIDGE
LLC 33,342; WINDING CREEK NURSERY 3,065; MICHAEL WIRTH 3,097; WRIGLEY CORPORATION
3,280; WYNDHAM DEERPOINT HOMES 3,375; YORKVILLE BRISTOL SANITARY DISTRICT 3,012,444;
YORKVILLE AREA CHAMBER OF COMMERCE 4,080; YORKVILLE ECONOMIC DEVELOPMENT
CORPORATION 47,200; YORKVILLE NAPA AUTO PARTS 5,314; YORKVILLE PC 9,709; YORKVILLE
POSTMASTER 19,567; YORKVILLE SCHOOL DIST #115 98,279; MARLYS J. YOUNG 2,751; EXPENSE
DISBURSEMENTS UNDER $2,500.00 - 283,004; TOTAL 21,460,471.
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
CA #3
Tracking Number
PW 2014-73
Water Department Reports for July and August 2014
City Council – October 28, 2014
Majority
Approval
Monthly water reports that are submitted to the IEPA.
Eric Dhuse Public Works
Name Department
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
CA #4
Tracking Number
PW 2014-75
Kennedy Road Widening – Autumn Creek
City Council – October 28, 2014
Consideration of Approval
Change Order Consideration
Brad Sanderson Engineering
Name Department
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
CA #5
Tracking Number
PW 2014-76
Route 47 Improvements
City Council – October 28, 2014
Consideration of Approval
Consideration of Easement
Brad Sanderson Engineering
Name Department
Attached find one copy of a grant of easement for proposed sanitary sewer related improvements
to be constructed by a private resident as part of the Route 47 project.
The easement and subsequent improvements are necessary as a result of the property owner
losing their septic field during the Route 47 project. IDOT and property owner negotiations have
just recently been finalized.
City staff has reviewed the easement and are recommending acceptance. If you have any
questions or require additional information, please let us know.
Memorandum
To: Bart Olson, City Administrator
From: Brad Sanderson, EEI
CC: Eric Dhuse, Director of Public Works
Krysti Barksdale-Noble, Community Dev. Dir.
Lisa Pickering, Deputy City Clerk
Date: October 13, 2014
Subject: Route 47 Improvements
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
CA #6
Tracking Number
PW 2014-77
Cannonball and Route 47 Improvements
City Council – October 28, 2014
Consideration of Approval
Supplemental Agreement Consideration
Brad Sanderson Engineering
Name Department
HR Green performed construction engineering on this project for the City. They have recently
requested consideration of a supplemental engineering amendment in the amount of $13,000.00.
Items noted by HR Green as to reasons for the proposed increase are as follows:
Utility Relocation Delays that impacted the contractor’s ability to start the project during the
summer of 2012
Contractor worked during “Non-Working Day” periods (Dec – April) while still utilizing his full
55 Working Days. This greatly increased the amount of hours HR Green’s Resident Engineer was
required to be on the project
HR Green total Man-hours were 799.5 compared to the original estimated contract hours of
approximately 500 hours. An increase of almost 300 hours.
Pay Increases for HR Green employees from the time the project began (Spring 2012) until the
project was complete (Fall 2014) adversely impacted the overall budget.
The overall extended duration of the contractor’s work schedule impacted our ability to fulfill the
original scope of the contract within the original upper limit of compensation and therefore we are
graciously requesting our upper limit of compensation to be increased by an estimated amount of
$13,000.00.
As you may recall, this project was initially awarded in February 2012 with the intention of the
work being completed during the 2012 construction season. Due to private utility relocation
delays, the contractor was not able to start until summer 2013.
We have reviewed the information provided by HR Green and support the request for the
supplemental agreement in the amount of $13,000.00. As a reminder, this project is funded
through monies received from the Kendall Marketplace development.
If you have any questions or require additional information, please call.
Memorandum
To: Bart Olson, City Administrator
From: Brad Sanderson, EEI
CC: Eric Dhuse, Director of Public Works
Krysti Barksdale-Noble, Community Dev. Dir.
Lisa Pickering, Deputy City Clerk
Date: October 1, 2014
Subject: Cannonball and Rte 47 Improvements
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
CA #7
Tracking Number
PW 2014-78
2015 Road To Better Roads Program –
Ridge Street Water Main Improvements and 2015 Road Program Agreements with EEI
City Council – October 28, 2014
See attached.
Brad Sanderson Engineering
Name Department
In accordance with our planned 2015 RTBR Program, we are hereby submitting two proposals
for your consideration. The proposals are as follows:
1. Ridge Street Water Main Improvements
2. 2015 Road Program
As we have discussed, our goal is to bid both projects in the spring and to begin construction
shortly after the new fiscal year begins. The water main project is to be completed prior to the
roadway work.
If you have any questions or require additional information, please let us know.
Memorandum
To: Bart Olson, City Administrator
From: Brad Sanderson, EEI
CC: Eric Dhuse, Director of Public Works
Krysti Barksdale-Noble, Community Dev. Dir.
Lisa Pickering, Deputy City Clerk
Date: October 15, 2014
Subject: 2015 Roads to Better Roads Program
a y R R
B N S F R R
Rob Roy Creek
Rob Roy Creek
F o x R i v e r
Rob Roy Creek
R o b R o y C ree k
B la c k b e rr y C r e e k
Blackberry Creek
F o x R i v e r
B l a c k b e r r y C reek
B l a c k b e r r y C r e e k
Fox River
M o
F o x R i v e r
Fox River
Eldamain Rd
S
B
r
i
d
ge
S
t
Beecher Rd
P a r k s i d e L n
S Main St
G r e e n fi e l d T u r n
N R o y
F a i r h a v e n Dr
Walsh Cir
Naw akw a L n
S u m a c D r
Yellowstone Ln
N o r w a y C i r
W
h
i
te Oak W a yW
i
n
d
h
a
m
C
i
r
Kelly Ave
Iroqois Ln
Deer St
Aspen Ln
T w i n l e a f T r l
E Barberry Cir
R
i
c
h
m
o
n
d
A
v
e
M
u
r
f
i
e
l
d
D
r
F
o
x Gle n D r W
W Lexington Cir
D
e
e
r
p
a
t
h
D
r
W
i
n
g
R
d
Prairie Ln
W o o d S age
Av
e
W
R
o
yal Oaks Dr
Illini Dr
T a u s Cir
Bruell St
Marketview Dr
M
a
r
k
et Place Dr
Homestead Dr
Game Farm Rd
Freemont St
Arrowhead Dr
W
Kendall D
r
W Kendall Dr
D
i
e
h
l
F
a
r
m
Rd
H a y d e n D r
McHugh Rd
Center Pkwy
K e n n e d y R d
J o h n S t
Carolyn Ct
Wacker Dr
Corneils Rd
Cannonball
Va n E m m o n R d
Cannonball Trl
Pavillion Rd
Tu
m
a
R
d
W F o x S t
Faxon Rd
Windett Ridge Rd
Country Hills Dr
E
m
e
r
al
d
L
n
Prairie Cro ssing Dr
Mill St
Wa
l
sh
Dr
Hawk Hollow Dr
H a m p t o n L n
E Van Emmon St
R
iv
e
r
si
d
e
D
r
Hillside Dr
Poplar Dr
Highview Dr
Autumn Creek
B
l
v
d
M c M urtrie Way
K
i
n
g
s
m
i
l
l
S
t
Alice Ave
R
a
i
n
t
r
e
e
R
d
Crooked Creek Dr
S u t t o n St
Gr e en B riar R d
Western Ln
Fairfield Ave
aple Ln
Lillian Ln
Heustis St
E Countryside Pkwy
Quinsey Ln
E
ve
r
gre
en Ln
Commercial Dr
W Madison St
W Ridge St
E Fox St
K
e
High Ridge Ln
C oach Rd
P e n man Rd
S Royal Oak
Shad o w Wood Dr
Colonia l Pkwy
E Washington St
Bea v e r S t
Ridge St
Teri Ln
E Veterans Pkwy
Northland Ln
Wheaton Ave
G o l d e n r o d D r
E l d e n D r
F
o
r
d
D
r
R i v e r B ir c h Dr
Lauren Dr
W Van Emmon St
E lizabe th St
River Birch Ln
Morgan St
Wooden Bridge Dr
We
st St
M anchester Ln
O a k S t
Adrian St
Coral Dr
W i n t e r b e r r y D r
B
a
n
b
u
r
y
A
v
e
W
h
i
t
e
O
a
k
W
a
y
W arbler Ln
Bristol Av
e
Drayto
n
C
t
King St
Appletree Ct
Fox
G
l
e
n
D
r
E
F l i n t C r e e k L n
Omaha
Dr
H a r v e s t T rl
Cedar Ct
B
l
u
eja
y
D
r
O a k L n
Colton St
P i n e C t
Denise Ct
Ga
rd
en Cir
Bristol Ri
d
ge R
d
J o n a than Dr
W
e
s
t
o
n
A
v
e
H on e y s u c k l e L n
E Elm St
W Veterans Pkwy
C
a
n
dleberry Ln
Gawne Ln
K a t e D r
Blaine St
S
w
it
c
h
g
r
a
s
s Ln
Yorkville Rd
G oldfinch Ave
Garden S t
C l a re m o n t Ct
Boomer Ln
C
olumb
i
ne
D
r
A
st
e
r
D
r
We s tw i n d D r
Woodland Dr
Walnut St
Woodworth St
Hunt St
Jackson St
Tremont Ave
S P a r k D r
B o n nie L n
N Park Dr
North St
C a n a r y A ve
W
y
t
h
e
P
l
Dalton Ave
C hally Dr
Division St
South St
Aubur
n
D
r
Birchwood Dr
Wolf St
C
h
ris
t
y
L
n
W
a
l
n
u
t
D
r
C
o
r
a
l
b
e
r
r
y
C
t
C l o v e r C t
O
v
e
r
l
o
o
k
C
t
M a p l e S t
Hillcrest Ave
S a ge Ct
Dakota Dr
A
m
a
nda Ln
W John St
Behrens St
S u n n y D e ll Ct
P
a
t
r
i
c
i
a
L
n
Walter St
A n d r e a C t
E Ridge St
Winte r t h u r Grn
F a w n R i d g e C t
P
a
l
m
e
r
C
t
Spruce Ct
Strawberry Ln
W Dolph St
Mistwood Ct
F
a
r
m
s
t
e
a
d
D
r
Mul h e r n C tE B l a c k b e r r y L n
Naden Ct
Tower Ln
H i c k o r y C t
Red Tail Ln
Chestnut Cir
E Kendall Dr
Liberty St
P o w e r s C t
B l u e s t e m D r
Q u i n s e y L n
Birch Ct
Norton Ln
R iv e r R d
R e n a Ln
S Main St
W Fox St
Church St
Haley Ct
Wells St
Fir Ct
Cannonball Trl
E Main St
Wals
h
D
r
J
ohnson
St
W S o mo n a u k St
El
damain Rd
C a n n o n b a l l Tr l
F o x R d
W Veterans Pkwy
Mil
l
St
S Bridge St
Jefferson St
State St
State St
Madison Ct
E Orange St
Olsen St
Illini Ct
W W a s h i n g t o n S t
W Dolph St
W Orange St
W Washington St
W Beecher St
R
e
d
h
o
r
s
e
L
n
F
o
x
G
le
n
C
ir
Fox Glen Ct
LegionRd Arcadia Ln
E
H
i
g
h
p
o
i
n
t
R
d
W
a
l
s
h
D
r
S u nf lo w e r C t
Hawthorne Ct
Walsh Ct
B u c k t h o r n e C t
W
B
a
r
b
e
r
r
y
C
i
r
C
o
r
n
e
r
s
ton
e
Dr
B u r n i n g B u s h Dr
Spi c e b u s h Ct
Deer St
West
St
W Center St
E Center St
W Som o na uk S t
W Spring St
W Main St
River Rd
N Bridge St
E Spring St
E Park St
E S o monauk St
Sanders Ct
Worsley St
E Main StOakwood St
Freemont St
Martin Ave
Victoria Ave
Marie Ave
Heritage Dr
H e a rtl a n d Dr
Stillwa
te
r
C
t
Omaha Dr
Redwood Dr
G
r
a
ce Dr
E Spring St
E Spring S
t
C e n t ra l D r
Acorn Ln
R iv e r si d e R d
Wheatl
a
n
d
C
t
Landmark Ave
M c H u g h R d
Tuma Rd
Carpenter St
Menard Dr
D i c k s o n C t
C
e
n
t
e
r
P
k
w
y
W C o u n t r y s i d e P k w y
B
l
a
c
k
b
e
r
r
y
C
t
W B l a c k b e r r y L n
A
n
d
e
r
s
o
n
C
t
Cornell Ln
Independen c e B l v d
John St
Hic
k
o
r
y
Ln
Meadowview Ln
Canyon Trl
Canyon Trl Ct
White Plains Ln
Alan Dale Ln
Faxon Rd
F a x o n R d
C h e s h i r e C t
N
e
w
b
u
r
y
C
t
Es
sex Ct
D
o
v
e
r
Ct N
Dover Ct SCatalpa T
r
l
Redbud Dr
C a n n o n b all T rl
A
l
a
n
D
a
l
e
L
n
Crestwood Dr
Caledonia Dr
Caledonia Dr
Fontana Dr
Pinewood Dr
Nathan Dr
Gabriel Dr
Corneils Rd
Corneils Rd Corneils Rd Corneils Rd
H u n t e r Ln Charity Ln
Pl
um
St
Grove St
Cross St
Main St
K e n n e d y Rd
Lakevie
w
D
r
Bell St
Chestnut Ct
S
a
r
a
v
a
n
o
s
D
r
T
o
m
m
y Hug h e s W a y
N
B
r
i
d
g
e
S
t
C
o
n
c
o
r
d
C
t E Lexington C
i
r
P
r
i
a
r
i
e
M
e
a
d
o
w
D
rW
i
l
d
I
n
d
i
g
o
L
n
P
r
a
i
r
i
e
R
o
s
e
L
n
C
o
n
e
f
l
o
w
e
r
C
t
Pr a i r i e G rass Ln
McHugh Rd
P
rairie
C
lo
v
e
r
D
r
E Countryside P
k
w
y
M
c
H
u
g
h
R
d
Conover Ln
Leisure St
Pleasure Dr
Georgeanna St
Syca
m
o
r
e
R
d
John St
Sequ o i a C ir
C h e s t nut LnC
hestnut Ln
White Pine Ct
Stone r i d g e C tStoneridge Ci r
Cypre s s L n
C o t t onwood Tr l
C o t t o n w o o d C t
Willo
w
W
a
y
R i v e r R d
S t o n y C r e e k L n
S h a r o n L n
T
y
l
e
r
C
r
e
e
k
C
t
A a r o n L n (P l a t t e d )
W Veterans Pkwy
P
o
p
l
a
r
D
r
Wal
s
h
C
i
r
R e d Tail Ct
Beecher Rd
S i e n n a D r
Madden Ct
Cobalt Dr
M e a d o w l a r k L n
MeadowlarkCt
Greenfield T urn
S u n n y D e l l
L nHazeltine W a y
St Jose p h s W a y
Waverly Cir
Blueberry
Hill
Hearthstone Ave
Hartfield Ave
Bra e m o r e Ln
Ash w o r t h L n
Fairfax W ay
Fitzhugh Turn
Wilton Ct
H ill v i e w C t
L a k e sid e C t
Eldamain Rd
Eldamain Rd
P
a
v
i
l
l
i
o
n
R
d
N
B
r
i
d
g
e
S
t
Beecher Rd
N Bridge St
Schoolhouse Rd
I l l i n o i s R o u t e 7 1
Illin ois R o u te 7 1
Ca n n o n b all Trl
Trilliu
m C
t
Meadow Rose Ln
Candleberry Ct
V
i
l
l
a
g
e
V
i
e
w
D
r
D
e
e
r
p
o
i
n
t
L
n
I
n
g
e
m
u
n
s
o
n
L
n
S t a g e c o a c h T r l
Illi n o i s R o u t e 7 1
Illin
ois R
o
ute 126
S
B
ri
d
g
e
S
t
L e g i o n R d
Wren Rd
Prestwick L
n
S h etla n d L n
Shetla
n
d
C
t
Gleneagles L
CallandWhitekirk L n
E Hydraulic Ave
N Conover Ct
S Conover Ct
Schoolhouse Rd
B ator StDydyna C t B e nja m in S t
Rodak St
Benjamin St
Tomasik Ct
Bu h r m a s t e r Ct
Ryan Dr
Longview Dr
L
a
v
e
n
d
e
r
W
a
y
Sunset Ave
W Hydraulic Ave
W Hydraulic Ave
R y a n C t
Identa R
d
Isa
bel
Dr
Erica Ln
Blackberry Shore Ln
G ille s pie L n
Edward Ln
Edward Ln Isabel Dr
Beecher Rd
Purcell St
N Carly Cir
S Carly Cir
C
a
rl
y
D
r
Carl y C t
P
a
t
r
i
c
k Ct
C
o
d
y
C
t
Division St
Swan s o n L n
Prairie Pointe Dr
Fountainview
Dr
EXHIBIT A
RECOMMENDED 5-YEAR PLAN
DATE:
PROJECT NO.:
FILE:
BY:
MARCH 5, 2014
YO1123
YO1123-5 YEAR PLAN (REVISED 3-5-14).MXD
KKP
PAVEMENT MANAGEMENT
SYSTEM
UNITED CITY OF YORKVILLE, ILLINOIS
Engineering Enterprises, Inc.
52 Wheeler Road
Sugar Grove, Illinois 60554
(630) 466-6700
www.eeiweb.com
PATH:H:\GIS\PUBLIC\YORKVILLE\2011\YO1123
United City of Yorkville
800 Game Farm Road
Yorkville, IL 60560
NORTH
°
YEAR OF IMPROVEMENT
2013 (Completed)
2014
2015
2016
2017
2018
Non Programmed
2015 Road Program
United City of Yorkville, Kendall County, IL
Professional Services Agreement - Design and Construction Engineering
THIS AGREEMENT, by and between the United City of Yorkville, hereinafter referred
to as the "City" or “OWNER” and Engineering Enterprises, Inc. hereinafter referred to as
the "Contractor" or “ENGINEER” agrees as follows:
A. Services:
ENGINEER agrees to furnish to the City the following services: The ENGINEER shall
provide any and all necessary engineering services to the City as indicated on the
included Attachment A. Design engineering for all roadways indicated on Attachment D
will be provided; additionally construction engineering will be provided for all roadways
on Attachment D that can be included without exceeding the approved 2015 Roadway
Program budget. All Engineering will be in accordance with all City and Illinois
Department of Transportation requirements.
B. Term:
Services will be provided beginning on the date of execution of this agreement and
continuing, until terminated by either party upon 7 days written notice to the non-
terminating party or upon completion of the Services. Upon termination the ENGINEER
shall be compensated for all work performed for the City prior to termination.
C. Compensation and maximum amounts due to ENGINEER:
ENGINEER shall receive as compensation for all work and services to be performed
herein, an amount based on the Estimate of Level of Effort and Associated Cost included
in Attachment B. Design Engineering will be paid for as a Lump Sum in the amount of
$32,930.00 and Construction Engineering will be paid for hourly at the actual rates for
services to be performed, currently estimated at $45,120.00. The hourly rates for this
project are shown in the attached 2013 Standard Schedule of Charges. All payments will
be made according to the Illinois State Prompt Payment Act and not less than once every
thirty days.
D. Changes in Rates of Compensation:
In the event that this contract is designated in Section B hereof as an Ongoing Contract,
ENGINEER, on or before February 1st of any given year, shall provide written notice of
any change in the rates specified in Section C hereof (or on any attachments hereto) and
said changes shall only be effective on and after May 1st of that same year.
2015 Road Program
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
E. Ownership of Records and Documents:
ENGINEER agrees that all books and records and other recorded information developed
specifically in connection with this agreement shall remain the property of the City.
ENGINEER agrees to keep such information confidential and not to disclose or
disseminate the information to third parties without the consent of the City. This
confidentiality shall not apply to material or information, which would otherwise be
subject to public disclosure through the freedom of information act or if already
previously disclosed by a third party. Upon termination of this agreement, ENGINEER
agrees to return all such materials to the City. The City agrees not to modify any original
documents produced by ENGINEER without contractors consent. Modifications of any
signed duplicate original document not authorized by ENGINEER will be at OWNER’s
sole risk and without legal liability to the ENGINEER. Use of any incomplete, unsigned
document will, likewise, be at the OWNER’s sole risk and without legal liability to the
ENGINEER.
F. Governing Law:
This contract shall be governed and construed in accordance with the laws of the State of
Illinois. Venue shall be in Kendall County, Illinois.
G. Independent Contractor:
ENGINEER shall have sole control over the manner and means of providing the work
and services performed under this agreement. The City’s relationship to the ENGINEER
under this agreement shall be that of an independent contractor. ENGINEER will not be
considered an employee to the City for any purpose.
H. Certifications:
Employment Status : The Contractor certifies that if any of its personnel are an employee
of the State of Illinois, they have permission from their employer to perform the service.
Anti-Bribery : The Contractor certifies it is not barred under 30 Illinois Compiled
Statutes 500/50-5(a) - (d) from contracting as a result of a conviction for or admission of
bribery or attempted bribery of an officer or employee of the State of Illinois or any
other state.
Loan Default: If the Contractor is an individual, the Contractor certifies that he/she is not
in default for a period of six months or more in an amount of $600 or more on the
repayment of any educational loan guaranteed by the Illinois State Scholarship
Commission made by an Illinois institution of higher education or any other loan made
from public funds for the purpose of financing higher education (5 ILCS 385/3).
2015 Road Program
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
Felony Certification: The Contractor certifies that it is not barred pursuant to 30 Illinois
Compiled Statutes 500/50-10 from conducting business with the State of Illinois or any
agency as a result of being convicted of a felony.
Barred from Contracting : The Contractor certifies that it has not been barred from
contracting as a result of a conviction for bid-rigging or bid rotating under 720 Illinois
Compiled Statutes 5/33E or similar law of another state.
Drug Free Workplace: The Contractor certifies that it is in compliance with the Drug
Free Workplace Act (30 Illinois Compiled Statutes 580) as of the effective date of this
contract. The Drug Free Workplace Act requires, in part, that Contractors, with 25 or
more employees certify and agree to take steps to ensure a drug free workplace by
informing employees of the dangers of drug abuse, of the availability of any treatment or
assistance program, of prohibited activities and of sanctions that will be imposed for
violations; and that individuals with contracts certify that they will not engage in the
manufacture, distribution, dispensation, possession, or use of a controlled substance in
the performance of the contract.
Non-Discrimination, Certification, and Equal Employment Opportunity : The Contractor
agrees to comply with applicable provisions of the Illinois Human Rights Act (775
Illinois Compiled Statutes 5), the U.S. Civil Rights Act, the Americans with Disabilities
Act, Section 504 of the U.S. Rehabilitation Act and the rules applicable to each. The
equal opportunity clause of Section 750.10 of the Illinois Department of Human Rights
Rules is specifically incorporated herein. The Contractor shall comply with Executive
Order 11246, entitled Equal Employment Opportunity, as amended by Executive Order
11375, and as supplemented by U.S. Department of Labor regulations (41 C.F.R.
Chapter 60). The Contractor agrees to incorporate this clause into all subcontracts under
this Contract.
International Boycott: The Contractor certifies that neither it nor any substantially owned
affiliated company is participating or shall participate in an international boycott in
violation of the provisions of the U.S. Export Administration Act of 1979 or the
regulations of the U.S. Department of Commerce promulgated under that Act (30 ILCS
582).
Record Retention and Audits: If 30 Illinois Compiled Statutes 500/20-65 requires the
Contractor (and any subcontractors) to maintain, for a period of 3 years after the later of
the date of completion of this Contract or the date of final payment under the Contract, all
books and records relating to the performance of the Contract and necessary to support
amounts charged to the City under the Contract. The Contract and all books and records
related to the Contract shall be available for review and audit by the City and the Illinois
Auditor General. If this Contract is funded from contract/grant funds provided by the
U.S. Government, the Contract, books, and records shall be available for review and
audit by the Comptroller General of the U.S. and/or the Inspector General of the federal
2015 Road Program
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
sponsoring agency. The Contractor agrees to cooperate fully with any audit and to
provide full access to all relevant materials.
United States Resident Certification: (This certification must be included in all contracts
involving personal services by non-resident aliens and foreign entities in accordance with
requirements imposed by the Internal Revenue Services for withholding and reporting
federal income taxes.) The Contractor certifies that he/she is a: x United States Citizen
___ Resident Alien ___ Non-Resident Alien The Internal Revenue Service requires that
taxes be withheld on payments made to non resident aliens for the performance of
personal services at the rate of 30%.
Tax Payer Certification : Under penalties of perjury, the Contractor certifies that its
Federal Tax Payer Identification Number or Social Security Number is (provided
separately) and is doing business as a (check one): ___ Individual ___ Real Estate
Agent ___ Sole Proprietorship ___ Government Entity ___ Partnership ___ Tax
Exempt Organization (IRC 501(a) only) x Corporation ___ Not for Profit Corporation
___ Trust or Estate ___ Medical and Health Care Services Provider Corp.
I. Indemnification:
ENGINEER shall indemnify and hold harmless the City and City’s agents, servants, and
employees against all loss, damage, and expense which it may sustain or for which it will
become liable on account of injury to or death of persons, or on account of damage to or
destruction of property resulting from the performance of work under this agreement by
ENGINEER or its Subcontractors, or due to or arising in any manner from the wrongful
act or negligence of ENGINEER or its Subcontractors of any employee of any of them.
In the event that the either party shall bring any suit, cause of action or counterclaim
against the other party, the non-prevailing party shall pay to the prevailing party the cost
and expenses incurred to answer and/or defend such action, including reasonable attorney
fees and court costs. In no event shall the either party indemnify any other party for the
consequences of that party’s negligence, including failure to follow the ENGINEER’s
recommendations.
J. Insurance :
The ENGINEER agrees that it has either attached a copy of all required insurance
certificates or that said insurance is not required due to the nature and extent of the types
of services rendered hereunder. (Not applicable as having been previously supplied)
K. Additional Terms or Modification:
The terms of this agreement shall be further modified as provided on the attachments.
Except for those terms included on the attachments, no additional terms are included as a
part of this agreement. All prior understandings and agreements between the parties are
merged into this agreement, and this agreement may not be modified orally or in any
2015 Road Program
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
manner other than by an agreement in writing signed by both parties. In the event that
any provisions of this agreement shall be held to be invalid or unenforceable, the
remaining provisions shall be valid and binding on the parties. The list of attachments
are as follows:
Attachment A: Scope of Services
Attachment B: Estimated Level of Effort and Associated Cost
Attachment C: Anticipated Project Schedule
Attachment D: Location Map
Attachment E: 2013 Standard Schedule of Charges
L. Notices:
All notices required to be given under the terms of this agreement shall be given mail,
addressed to the parties as follows:
For the City: For the ENGINEER:
City Administrator and City Clerk Engineering Enterprises, Inc.
United City of Yorkville 52 Wheeler Road
800 Game Farm Road Sugar Grove Illinois 60554
Yorkville, IL 60560
Either of the parties may designate in writing from time to time substitute addresses or
persons in connection with required notices.
Agreed to this _____day of __________________, 2014.
United City of Yorkville: Engineering Enterprises, Inc.:
_________________________________ ________________________________
Gary Golinski Brad Sanderson, P.E.
Mayor Vice President
_________________________________ ________________________________
Beth Warren Angie Ford
City Clerk Executive Assistant
2015 Road Program
United City of Yorkville
Kendall County, IL
Professional Services Agreement - Design and Construction Engineering
Attachment A – Scope of Services
Design Engineering:
Process required documents with the Illinois Department of Transportation for Motor Fuel Tax Projects
including:
o Section Number Request
o BLR09111 - Resolution
o BLR11510 - Preliminary Estimate of Cost
Coordinate and develop with City Staff the final scope of improvements
Obtain, review and inventory existing utility, roadway, right-of-way, ownership, soil data, etc.
Obtain utility information to identify potential conflicts
Obtain geotechnical site data, consisting of pavement cores taken every 300-500 feet; confirm pavement
design and rehabilitation methodology
Prepare MFT Construction Section bid package, and ancillary documents, including:
o BLR12210 - Cover
o BLR12220 - Notice to Bidders
o BLR12221 - Proposal
o BLR12222 - Schedule of Prices
o BLR12223 - Signatures
o BLR12230 - Bid Bond Form
o BLR12325 - Apprenticeship Certification
o BC57 - Affidavit of Availability
o Special Provisions
o Prevailing Wage
o Local Roads Special Provisions/Checksheets
o District Special Provisions
o Bureau of Design and Environment Special Provisions/Checksheets
o City Provisions & Details
o Existing/Proposed Typical Cross Sections
o Plan View Exhibits (when necessary)
o Profile View Exhibits (when necessary)
o Cross sections at 50-100 foot intervals (when necessary)
o Highway Standards
Coordinate IDOT and City review, including revisions and approval
Prepare preliminary and final cost estimates
Prepare a final estimate of work days and construction schedule
Assist in bidding, contractor/bid evaluations, contract preparation and additional contract administration
as required; facilitate IDOT approval of Contract
Attend public meetings with Staff to review design progress
Attend the Pre-Construction Conference with the Contractor
Provide all bid packages in 8 ½” x 11½” format (11" x 17" for any required plan sheets in the bid
package)
Provide planning/design/construction schedule and frequent updates regarding any potential items
affecting the schedule
2015 Road Program
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
Attachment A - Scope of Services
Construction Engineering:
Provide resident engineering for on-site observation
Daily documentation of work tasks and calculation of installed pay items
Monitor adherence to specifications
Gather material inspection and coordinate any required testing on behalf of the City
Provide guidance to the contractor when questions arise during construction
Prepare/verify payment estimates
Gather certified payrolls and waivers of lien
Provide information to residents as required
Perform punch list inspections, provide follow up inspections and recommend acceptance when
appropriate
Communicate activities with City weekly, or as required based on onsite activities
Prepare necessary IDOT closeout paperwork
AT
T
A
C
H
M
E
N
T
B
-
E
S
T
I
M
A
T
E
O
F
L
E
V
E
L
O
F
E
F
F
O
R
T
A
N
D
A
S
S
O
C
I
A
T
E
D
C
O
S
T
PR
O
F
E
S
S
I
O
N
A
L
E
N
G
I
N
E
E
R
I
N
G
S
E
R
V
I
C
E
S
20
1
5
R
O
A
D
P
R
O
G
R
A
M
Un
i
t
e
d
C
i
t
y
o
f
Y
o
r
k
v
i
l
l
e
,
I
L
EN
T
I
T
Y
:
ADMIN.WORK
PR
I
N
C
I
P
A
L
S
E
N
I
O
R
S
E
N
I
O
R
S
E
N
I
O
R
I
T
E
M
C
O
S
T
WO
R
K
IN
P
R
O
J
E
C
T
P
R
O
J
E
C
T
P
R
O
J
E
C
T
P
R
O
J
E
C
T
P
R
O
J
E
C
T
P
R
O
J
E
C
T
C
A
D
P
R
O
J
E
C
T
H
O
U
R
P
E
R
IT
E
M
CH
A
R
G
E
M
A
N
A
G
E
R
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
M
A
N
A
G
E
R
S
U
R
V
E
Y
O
R
I
T
E
C
H
N
I
C
I
A
N
M
A
N
A
G
E
R
T
E
C
H
N
I
C
I
A
N
A
D
M
I
N
.
S
U
M
M
.
I
T
E
M
NO
.
W
O
R
K
I
T
E
M
H
O
U
R
L
Y
R
A
T
E
:
$
1
7
1
$
1
5
0
$
1
2
9
$
1
1
7
$
1
5
0
$
1
2
9
$
1
4
1
$
1
5
0
$
1
1
7
$
7
8
FI
N
A
L
E
N
G
I
N
E
E
R
I
N
G
2.
1
P
r
o
j
e
c
t
M
a
n
a
g
e
m
e
n
t
a
n
d
A
d
m
i
n
i
s
t
r
a
t
i
o
n
6
18
24 3,726$
2.
2
P
r
o
j
e
c
t
M
e
e
t
i
n
g
s
6
8
4
18 2,742$
2.
3
G
e
o
t
e
c
h
n
i
c
a
l
I
n
v
e
s
t
i
g
a
t
i
o
n
(
C
o
o
r
d
i
n
a
t
i
o
n
,
F
i
e
l
d
W
o
r
k
,
R
e
v
i
e
w
R
e
p
o
r
t
)
4
4
8 1,116$
2.
4
A
n
a
l
y
z
e
/
F
i
n
a
l
i
z
e
R
o
a
d
w
a
y
R
e
h
a
b
il
i
t
a
t
i
o
n
M
e
t
ho
d
s
4
4
8 1,116$
2.
5
P
r
i
v
a
t
e
U
t
i
l
i
t
y
C
o
o
r
d
i
n
a
t
i
o
n
2
2 300$
2.
6
S
i
t
e
R
e
v
i
e
w
,
I
d
e
n
t
i
f
i
c
a
t
i
o
n
o
f
R
e
q
u
i
r
e
d
I
m
p
r
o
v
e
m
e
n
t
s
4
2
4
2 30 3,852$
2.
7
P
r
e
p
a
r
e
P
r
e
-
F
i
n
a
l
P
l
a
n
s
/
E
x
h
i
b
i
t
s
-
5
0
%
2
4
2
4
12
4
2
5,442$
2.
8
S
u
b
m
i
t
P
r
e
-
F
i
n
a
l
P
l
a
n
s
t
o
U
t
i
l
i
t
i
e
s
2
2
4 558$
2.
9
P
r
e
p
a
r
e
P
r
e
-
F
i
n
a
l
P
l
a
n
s
/
E
x
h
i
b
i
t
s
a
n
d
B
i
d
P
a
c
k
a
g
e
-
9
0
%
4
2
4
12
4
0
5,100$
2.
1
0
P
r
e
p
a
r
e
E
n
g
i
n
e
e
r
'
s
O
p
i
n
i
o
n
o
f
P
r
o
b
a
b
l
e
C
o
n
s
t
r
u
c
t
i
o
n
C
o
s
t
-
9
0
%
4
8
12 1,632$
2.
1
1
S
u
b
m
i
t
B
i
d
P
a
c
k
a
g
e
f
o
r
I
D
O
T
R
e
v
i
e
w
2
4
6 816$
2.
1
2
R
e
v
i
s
e
a
n
d
R
e
s
u
b
m
i
t
B
i
d
P
a
c
k
a
g
e
f
o
r
I
D
O
T
A
p
p
r
o
v
a
l
/
A
d
v
e
r
t
i
s
e
m
e
n
t
4
2
0
12
3
6
4,584$
2.
1
3
B
i
d
d
i
n
g
a
n
d
C
o
n
t
r
a
c
t
i
n
g
4
8
4 16 1,944$ - -$
Fi
n
a
l
E
n
g
i
n
e
e
r
i
n
g
S
u
b
t
o
t
a
l
:
1
4
6
4
1
2
6
-
-
-
-
-
3
6
6
246 32,928$
CO
N
S
T
R
U
C
T
I
O
N
E
N
G
I
N
E
E
R
I
N
G
3.
1
C
o
n
t
r
a
c
t
A
d
m
i
n
i
s
t
r
a
t
i
o
n
4
1
6
3
2
52 6,828$
3.
2
C
o
n
s
t
r
u
c
t
i
o
n
L
a
y
o
u
t
6
3
2
38 4,644$
3.
3
O
b
s
e
r
v
a
t
i
o
n
a
n
d
D
o
c
u
m
e
n
t
a
t
i
o
n
8
1
6
2
2
0
244 29,508$
Co
n
s
t
r
u
c
t
i
o
n
E
n
g
i
n
e
e
r
i
n
g
S
u
b
t
o
t
a
l
:
1
2
3
8
-
2
8
4
-
-
-
-
-
-
334 40,980$
PR
O
J
E
C
T
T
O
T
A
L
:
2
6
1
0
2
1
2
6
2
8
4
-
-
-
-
3
6
6
580 73,908
Pr
i
n
t
i
n
g
=
5
0
0
$
69,228$
Su
p
p
l
i
e
s
&
M
i
s
c
.
=
-
$
-$
Ge
o
t
e
c
h
n
i
c
a
l
(
R
u
b
i
n
o
)
=
2
,
5
0
0
$
4,212$
Ma
t
e
r
i
a
l
T
e
s
t
i
n
g
(
R
u
b
i
n
o
)
=
5
,
0
0
0
$
468$ 73,908$
DI
R
E
C
T
E
X
P
E
N
S
E
S
=
8
,
0
0
0
$
81,908$
G:
\
P
u
b
l
i
c
\
Y
o
r
k
v
i
l
l
e
\
2
0
1
4
\
Y
O
1
4
4
3
-
P
2
0
1
5
R
o
a
d
P
r
o
g
r
a
m
\
P
S
A
\
[
A
t
t
a
c
h
m
e
n
t
B
-
F
e
e
E
s
t
i
m
a
t
e
.
x
l
s
x
]
F
e
e
S
u
m
m
a
r
y
PR
O
J
E
C
T
R
O
L
E
:
Surveying Expenses = Drafting Expenses = Administrative Expenses = TOTAL LABOR EXPENSES = TOTAL EXPENSES =
EN
G
I
N
E
E
R
I
N
G
S
U
R
V
E
Y
I
N
G
D
R
A
F
T
I
N
G
Engineering Expenses =
DI
R
E
C
T
E
X
P
E
N
S
E
S
LABOR SUMMARY
WO
R
K
Ye
a
r
:
IT
E
M
M
o
n
t
h
:
NO
.
W
O
R
K
I
T
E
M
W
e
e
k
S
t
a
r
t
i
n
g
:
12
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
FI
N
A
L
D
E
S
I
G
N
E
N
G
I
N
E
E
R
I
N
G
2.
1
P
r
o
j
e
c
t
M
a
n
a
g
e
m
e
n
t
a
n
d
A
d
m
i
n
i
s
t
r
a
t
i
o
n
2.
2
P
r
o
j
e
c
t
M
e
e
t
i
n
g
s
2.
3
G
e
o
t
e
c
h
n
i
c
a
l
I
n
v
e
s
t
i
g
a
t
i
o
n
(
C
o
o
r
d
i
n
a
t
i
o
n
,
F
i
e
l
d
W
o
r
k
,
R
e
v
i
e
w
R
e
p
o
r
t
)
2.
4
A
n
a
l
y
z
e
/
F
i
n
a
l
i
z
e
R
o
a
d
w
ay
R
e
h
a
b
i
l
i
t
a
t
io
n
M
e
t
h
o
d
s
2.
5
P
r
i
v
a
t
e
U
t
i
l
i
t
y
C
o
o
r
d
i
n
a
t
i
o
n
2.
6
S
i
t
e
R
e
v
i
e
w
,
I
d
e
n
t
i
f
i
c
a
t
i
o
n
o
f
R
e
q
u
i
r
e
d
I
m
p
r
o
v
e
m
e
n
t
s
2.
7
P
r
e
p
a
r
e
P
r
e
-
F
i
n
a
l
P
l
a
n
s
/
E
x
h
i
b
i
t
s
-
5
0
%
2.
8
S
u
b
m
i
t
P
r
e
-
F
i
n
a
l
P
l
a
n
s
t
o
U
t
i
l
i
t
i
e
s
2.
9
P
r
e
p
a
r
e
P
r
e
-
F
i
n
a
l
P
l
a
n
s
/
E
x
h
i
b
i
t
s
a
n
d
B
i
d
P
a
c
k
a
g
e
-
9
0
%
2.
1
0
P
r
e
p
a
r
e
E
n
g
i
n
e
e
r
'
s
O
p
i
n
i
o
n
o
f
P
r
o
b
a
b
l
e
C
o
n
s
t
r
u
c
t
i
o
n
C
o
s
t
-
9
0
%
2.
1
1
S
u
b
m
i
t
B
i
d
P
a
c
k
a
g
e
f
o
r
I
D
O
T
R
e
v
i
e
w
;
I
D
O
T
R
e
v
i
e
w
2.
1
2
R
e
v
i
s
e
a
n
d
R
e
s
u
b
m
i
t
B
i
d
P
a
c
k
a
g
e
f
o
r
I
D
O
T
A
p
p
r
o
v
a
l
/
A
d
v
e
r
t
i
s
e
m
e
n
t
2.
1
3
B
i
d
d
i
n
g
a
n
d
C
o
n
t
r
a
c
t
i
n
g
CO
N
S
T
R
U
C
T
I
O
N
E
N
G
I
N
E
E
R
I
N
G
3.
1
C
o
n
t
r
a
c
t
A
d
m
i
n
i
s
t
r
a
t
i
o
n
3.
2
C
o
n
s
t
r
u
c
t
i
n
g
L
a
y
o
u
t
3.
3
O
b
s
e
r
v
a
t
i
o
n
a
n
d
D
o
c
u
m
e
n
t
a
t
i
o
n
G:\Public\Yorkville\2014\YO1443-P 2015 Road Program\PSA\[Attachment C - Schedule.xls]Schedule
Le
g
e
n
d
Pr
o
j
e
c
t
M
a
n
a
g
e
m
e
n
t
&
Q
C
/
Q
A
P
r
e
l
i
m
i
n
a
r
y
Me
e
t
i
n
g
(
s
)
D
e
s
i
g
n
W
o
r
k
I
t
e
m
Bi
d
d
i
n
g
a
n
d
C
o
n
t
r
a
c
t
i
n
g
C
o
n
s
t
r
u
c
t
i
o
n
JulyAugustSeptember
AT
T
A
C
H
M
E
N
T
C
:
AN
T
I
C
I
P
A
T
E
D
P
R
O
J
E
C
T
S
C
H
E
D
U
L
E
20
1
5
R
O
A
D
P
R
O
G
R
A
M
UN
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
,
I
L
20
1
4
De
c
e
m
b
e
r
No
v
e
m
b
e
r
Ma
y
20
1
5
October
Ja
n
u
a
r
y
F
e
b
r
u
a
r
y
M
a
r
c
h
A
p
r
i
l
J
u
n
e
F o x R i v e r
S Main St
N o r w a y C i r
W
h
i
te Oak W a y
Deer St
E Barberry Cir
d S age Av
e
Illini Dr
Freemont St
W F o x S t
Mill St
E Van Emmon St
Heustis St
W Madison St
W Ridge St
E Fox St
C olo nial Pk wy
E Washington St
B e a ve r S t
R iv e r B i r c h Dr
W Van Emmon St
Eliz ab e t h St
River Birch Ln
Morgan St
W
Adri
an St
W
h
i
t
e
O
a
k
W
a
y
King St Colton St
G
a
r
d
e
n
C
i
r
Blaine St
G a rd en S t
Wolf St
C
o
r
a
l
b
e
r
r
y
C
t
Walter St
E Ridge St
Spr
uc
e Ct
W Dolph St
Liberty St
R i v e r R d
S Main St
W Fox St
Church St
Fir Ct
E Main St
Wals
h
D
r
W S o m o n a u k S t
Mill St
S Bridge St
Jefferson
St
State St
State St
Madi
son Ct
E Orange St
Olsen St
Ill
ini C
t
W W a s h i n g t o n S t
W Dolph St
W Orange St
W Washington St
W Beecher St
Hawthorne Ct
B u c k t h o r n e Ct
W
B
a
r
b
e
r
r
y
B u r n i n g B u s h Dr
Spi c e b u sh Ct
Deer St
West St
W Center St
E Center St
W
W Spring St
W Main St
River Rd
N Bridge St
E Spring St
Bell
St
School
hou
s
e Rd
E Hydraulic Ave
S
W Hydraulic Ave
W Hydraulic Ave
Engineering Enterprises, Inc.
52 Wheeler Road
Sugar Grove, Illinois 60554
(630) 466-6700
YEAR OF IMPROVEMENT
2015
EXHIBIT D
LOCATION MAP
www.eeiweb.com
DATE:
PROJECT NO.:
FILE:
PATH:
BY:
October 2014
YO1443
YO1443_Location.MXD
H:\GIS\PUBLIC\YORKVILLE\2014\
KKP ³
Standard Schedule of Charges
January 1, 2013
EMPLOYEE DESIGNATION CLASSIFICATION HOURLY RATE
Senior Principal E-4 $171.00
Principal E-3 $171.00
Senior Project Manager E-2 $165.00
Project Manager E-1 $150.00
Senior Project Engineer/Planner/Surveyor II P-6 $138.00
Senior Project Engineer/Planner/Surveyor I P-5 $129.00
Project Engineer/Planner/Surveyor P-4 $117.00
Senior Engineer/Planner/Surveyor P-3 $108.00
Engineer/Planner/Surveyor P-2 $ 99.00
Associate Engineer/Planner/Surveyor P-1 $ 88.00
Senior Project Technician II T-6 $129.00
Senior Project Technician I T-5 $117.00
Project Technician T-4 $108.00
Senior Technician T-3 $ 99.00
Technician T-2 $ 88.00
Associate Technician T-1 $ 78.00
Administrative Assistant A-3 $ 78.00
CREW RATES, VEHICLES AND REPROGRAPHICS
1 Man Field Crew with Standard Survey Equipment $141.00
2 Man Field Crew with Standard Survey Equipment $219.00
1 Man Field Crew with RTS or GPS * $174.00
2 Man Field Crew with RTS or GPS * $252.00
Vehicle for Construction Observation $15.00
In-House Scanning and Reproduction $0.25/Sq. Ft. (Black & White)
$1.00/Sq. Ft. (Color)
*RTS = Robotic Total Station / GPS = Global Positioning System
ATTACHMENT E
Ridge Street Water Main Improvements
United City of Yorkville, Kendall County, IL
Professional Services Agreement - Design and Construction Engineering
THIS AGREEMENT, by and between the United City of Yorkville, hereinafter referred
to as the "City" or “OWNER” and Engineering Enterprises, Inc. hereinafter referred to as
the "Contractor" or “ENGINEER” agrees as follows:
A. Services:
ENGINEER agrees to furnish to the City the following services: The ENGINEER shall
provide any and all necessary engineering services to the City as indicated on the
included exhibits. Design and Construction engineering will be provided for
approximately 1,200 linear feet of 8-inch water main improvements on Ridge Street (see
Exhibit 5 for project limits). Engineering will be in accordance with all City, Standard
Specifications for Water and Sewer Construction in Illinois, Illinois Department of
Transportation, and Illinois Environmental Protection Agency requirements.
B. Term:
Services will be provided beginning on the date of execution of this agreement and
continuing, until terminated by either party upon 7 days written notice to the non-
terminating party or upon completion of the Services. Upon termination the ENGINEER
shall be compensated for all work performed for the City prior to termination.
C. Compensation and maximum amounts due to ENGINEER:
ENGINEER shall receive as compensation for all work and services to be performed
herein, an amount based on the Estimate of Level of Effort and Associated Cost included
in Exhibit 3. Design Engineering will be paid for as a Fixed Fee (FF) in the amount of
$28,000.00 and Construction Engineering will be paid for Hourly (HR) at the actual rates
for services to be performed, currently estimated at $23,286.00. The hourly rates for this
project are shown in the attached 2013 Standard Schedule of Charges (Exhibit 6). All
payments will be made according to the Illinois State Prompt Payment Act and not less
than once every thirty days.
D. Changes in Rates of Compensation:
In the event that this contract is designated in Section B hereof as an Ongoing Contract,
ENGINEER, on or before February 1st of any given year, shall provide written notice of
any change in the rates specified in Section C hereof (or on any attachments hereto) and
said changes shall only be effective on and after May 1st of that same year.
Ridge Street Water Main Improvements
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
E. Ownership of Records and Documents:
ENGINEER agrees that all books and records and other recorded information developed
specifically in connection with this agreement shall remain the property of the City.
ENGINEER agrees to keep such information confidential and not to disclose or
disseminate the information to third parties without the consent of the City. This
confidentiality shall not apply to material or information, which would otherwise be
subject to public disclosure through the freedom of information act or if already
previously disclosed by a third party. Upon termination of this agreement, ENGINEER
agrees to return all such materials to the City. The City agrees not to modify any original
documents produced by ENGINEER without contractors consent. Modifications of any
signed duplicate original document not authorized by ENGINEER will be at OWNER’s
sole risk and without legal liability to the ENGINEER. Use of any incomplete, unsigned
document will, likewise, be at the OWNER’s sole risk and without legal liability to the
ENGINEER.
F. Governing Law:
This contract shall be governed and construed in accordance with the laws of the State of
Illinois. Venue shall be in Kendall County, Illinois.
G. Independent Contractor:
ENGINEER shall have sole control over the manner and means of providing the work
and services performed under this agreement. The City’s relationship to the ENGINEER
under this agreement shall be that of an independent contractor. ENGINEER will not be
considered an employee to the City for any purpose.
H. Certifications:
Employment Status: The Contractor certifies that if any of its personnel are an employee
of the State of Illinois, they have permission from their employer to perform the service.
Anti-Bribery : The Contractor certifies it is not barred under 30 Illinois Compiled
Statutes 500/50-5(a) - (d) from contracting as a result of a conviction for or admission of
bribery or attempted bribery of an officer or employee of the State of Illinois or any
other state.
Loan Default: If the Contractor is an individual, the Contractor certifies that he/she is not
in default for a period of six months or more in an amount of $600 or more on the
repayment of any educational loan guaranteed by the Illinois State Scholarship
Commission made by an Illinois institution of higher education or any other loan made
from public funds for the purpose of financing higher education (5 ILCS 385/3).
Ridge Street Water Main Improvements
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
Felony Certification: The Contractor certifies that it is not barred pursuant to 30 Illinois
Compiled Statutes 500/50-10 from conducting business with the State of Illinois or any
agency as a result of being convicted of a felony.
Barred from Contracting : The Contractor certifies that it has not been barred from
contracting as a result of a conviction for bid-rigging or bid rotating under 720 Illinois
Compiled Statutes 5/33E or similar law of another state.
Drug Free Workplace: The Contractor certifies that it is in compliance with the Drug
Free Workplace Act (30 Illinois Compiled Statutes 580) as of the effective date of this
contract. The Drug Free Workplace Act requires, in part, that Contractors, with 25 or
more employees certify and agree to take steps to ensure a drug free workplace by
informing employees of the dangers of drug abuse, of the availability of any treatment or
assistance program, of prohibited activities and of sanctions that will be imposed for
violations; and that individuals with contracts certify that they will not engage in the
manufacture, distribution, dispensation, possession, or use of a controlled substance in
the performance of the contract.
Non-Discrimination, Certification, and Equal Employment Opportunity : The Contractor
agrees to comply with applicable provisions of the Illinois Human Rights Act (775
Illinois Compiled Statutes 5), the U.S. Civil Rights Act, the Americans with Disabilities
Act, Section 504 of the U.S. Rehabilitation Act and the rules applicable to each. The
equal opportunity clause of Section 750.10 of the Illinois Department of Human Rights
Rules is specifically incorporated herein. The Contractor shall comply with Executive
Order 11246, entitled Equal Employment Opportunity, as amended by Executive Order
11375, and as supplemented by U.S. Department of Labor regulations (41 C.F.R. Chapter
60). The Contractor agrees to incorporate this clause into all subcontracts under this
Contract.
International Boycott: The Contractor certifies that neither it nor any substantially owned
affiliated company is participating or shall participate in an international boycott in
violation of the provisions of the U.S. Export Administration Act of 1979 or the
regulations of the U.S. Department of Commerce promulgated under that Act (30 ILCS
582).
Record Retention and Audits: If 30 Illinois Compiled Statutes 500/20-65 requires the
Contractor (and any subcontractors) to maintain, for a period of 3 years after the later of
the date of completion of this Contract or the date of final payment under the Contract, all
books and records relating to the performance of the Contract and necessary to support
amounts charged to the City under the Contract. The Contract and all books and records
related to the Contract shall be available for review and audit by the City and the Illinois
Auditor General. If this Contract is funded from contract/grant funds provided by the
U.S. Government, the Contract, books, and records shall be available for review and
audit by the Comptroller General of the U.S. and/or the Inspector General of the federal
Ridge Street Water Main Improvements
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
sponsoring agency. The Contractor agrees to cooperate fully with any audit and to
provide full access to all relevant materials.
United States Resident Certification: (This certification must be included in all contracts
involving personal services by non-resident aliens and foreign entities in accordance with
requirements imposed by the Internal Revenue Services for withholding and reporting
federal income taxes.) The Contractor certifies that he/she is a: x United States Citizen
___ Resident Alien ___ Non-Resident Alien The Internal Revenue Service requires that
taxes be withheld on payments made to non resident aliens for the performance of
personal services at the rate of 30%.
Tax Payer Certification : Under penalties of perjury, the Contractor certifies that its
Federal Tax Payer Identification Number or Social Security Number is (provided
separately) and is doing business as a (check one): ___ Individual ___ Real Estate
Agent ___ Sole Proprietorship ___ Government Entity ___ Partnership ___ Tax
Exempt Organization (IRC 501(a) only) x Corporation ___ Not for Profit Corporation
___ Trust or Estate ___ Medical and Health Care Services Provider Corp.
I. Indemnification:
ENGINEER shall indemnify and hold harmless the City and City’s agents, servants, and
employees against all loss, damage, and expense which it may sustain or for which it will
become liable on account of injury to or death of persons, or on account of damage to or
destruction of property resulting from the performance of work under this agreement by
ENGINEER or its Subcontractors, or due to or arising in any manner from the wrongful
act or negligence of ENGINEER or its Subcontractors of any employee of any of them.
In the event that the either party shall bring any suit, cause of action or counterclaim
against the other party, the non-prevailing party shall pay to the prevailing party the cost
and expenses incurred to answer and/or defend such action, including reasonable attorney
fees and court costs. In no event shall the either party indemnify any other party for the
consequences of that party’s negligence, including failure to follow the ENGINEER’s
recommendations.
J. Insurance :
The ENGINEER agrees that it has either attached a copy of all required insurance
certificates or that said insurance is not required due to the nature and extent of the types
of services rendered hereunder. (Not applicable as having been previously supplied)
K. Additional Terms or Modification:
The terms of this agreement shall be further modified as provided on the attachments.
Except for those terms included on the attachments, no additional terms are included as a
part of this agreement. All prior understandings and agreements between the parties are
merged into this agreement, and this agreement may not be modified orally or in any
Ridge Street Water Main Improvements
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
manner other than by an agreement in writing signed by both parties. In the event that
any provisions of this agreement shall be held to be invalid or unenforceable, the
remaining provisions shall be valid and binding on the parties. The list of exhibits is as
follows:
Exhibit 1: Professional Engineering Services
Exhibit 2: Limitation of Authority, Duties and Responsibilities of the
Resident Construction Observer
Exhibit 3: Estimate of Level of Effort and Associated Cost
Exhibit 4: Anticipated Project Schedule
Exhibit 5: Location Map
Exhibit 6: 2013 Standard Schedule of Charges
L. Notices:
All notices required to be given under the terms of this agreement shall be given mail,
addressed to the parties as follows:
For the City: For the ENGINEER:
City Administrator and City Clerk Engineering Enterprises, Inc.
United City of Yorkville 52 Wheeler Road
800 Game Farm Road Sugar Grove Illinois 60554
Yorkville, IL 60560
Either of the parties may designate in writing from time to time substitute addresses or
persons in connection with required notices.
Agreed to this _____day of __________________, 2014.
United City of Yorkville: Engineering Enterprises, Inc.:
_________________________________ ________________________________
Gary Golinski Brad Sanderson, P.E.
Mayor Vice President
_________________________________ ________________________________
Beth Warren Angie Smith
City Clerk Executive Assistant
1
EXHIBIT 1
SECTION A - PROFESSIONAL DESIGN ENGINEERING SERVICES
For purposes of this Exhibit 1 and all attachments hereto, the term “contractor” shall not refer to
Engineering Enterprises, Inc., but shall instead refer to individuals or companies contracted with, to
construct or otherwise manage the project described herein. The ENGINEER shall furnish professional
design engineering services as follows:
1. The ENGINEER will attend conferences with the OWNER, or other interested parties as may be
reasonably necessary.
2. The ENGINEER will perform the necessary design surveys, accomplish the detailed design of
the project, prepare construction drawings, specifications and contract documents, and prepare a
final cost estimate based on final design for the entire system. It is also understood that if
subsurface explorations (such as borings, soil tests, rock soundings and the like) are required, the
ENGINEER will furnish coordination of said explorations without additional charge, but the
costs incident to such explorations shall be paid for by the OWNER as set out in Section D
hereof.
3. The contract documents furnished by the ENGINEER under Section A-2 shall utilize IEPA
endorsed construction contract documents, including Supplemental General Conditions, Contract
Change Orders, and partial payment estimates.
4. Prior to the advertisement for bids, the ENGINEER will provide for each construction contract,
not to exceed 10 copies of detailed drawings, specifications, and contract documents for use by
the OWNER, appropriate Federal, State, and local agencies from whom approval of the project
must be obtained. The cost of such drawings, specifications, and contract documents shall be
included in the basic compensation paid to the ENGINEER.
5. The ENGINEER will furnish additional copies of the drawings, specifications and contract
documents as required by prospective bidders, material suppliers, and other interested parties,
but may charge them for the reasonable cost of such copies. Upon award of each contract, the
2
ENGINEER will furnish to the OWNER five sets of the drawings, specifications and contract
documents for execution. The cost of these sets shall be included in the basic compensation paid
to the ENGINEER. Original documents, survey notes, tracings, and the like, except those
furnished to the ENGINEER by the OWNER, are and shall remain the property of the
ENGINEER.
6. The drawings prepared by the ENGINEER under the provisions of Section A-2 above shall be in
sufficient detail to permit the actual location of the proposed improvements on the ground. The
ENGINEER shall prepare and furnish to the OWNER without any additional compensation,
three copies of map(s) showing the general location of needed construction easements and
permanent easements and the land to be acquired. Property surveys, property plats, property
descriptions, abstracting and negotiations for land rights shall be accomplished by the OWNER,
unless the OWNER requests, and the ENGINEER agrees to provide those services. In the event
the ENGINEER is requested to provide such services, the ENGINEER shall be additionally
compensated as set out in Section D hereof.
7. The ENGINEER will attend the bid opening and tabulate the bid proposal, make an analysis of
the bids, and make recommendations for awarding contracts for construction.
8. The ENGINEER further agrees to obtain and maintain, at the ENGINEER’s expense, such
insurance as will protect the ENGINEER from claims under the Workman’s Compensation Act
and such comprehensive general liability insurance as will protect the OWNER and the
ENGINEER from all claims for bodily injury, death, or property damage which may arise from
the performance by the ENGINEER or by the ENGINEER’s employees of the ENGINEER’s
functions and services required under this Agreement.
9. The ENGINEER will complete the final plans, specifications and contract documents and submit
for approval of the OWNER, and all State regulatory agencies to meet the project schedule(s) as
summarized in Exhibit 4: “Anticipated Project Schedule – Ridge Street Water Main
Improvements” dated October 14, 2014.
3
SECTION B - PROFESSIONAL CONSTRUCTION ENGINEERING SERVICES
The ENGINEER shall furnish professional construction engineering services as follows:
1. The ENGINEER will review, for conformance with the design concept, shop and working
drawings required by the construction Contract Documents and indicate on the drawings the
action taken. Such action shall be taken with reasonable promptness.
2. The ENGINEER will interpret the intent of the drawings and specifications to protect the
OWNER against defects and deficiencies in construction on the part of the contractors. The
ENGINEER will not, however, guarantee the performance by any contractor.
3. The ENGINEER will evaluate and determine acceptability of substitute materials and equipment
proposed by Contractor(s).
4. The ENGINEER will establish baselines for locating the work together with a suitable number of
bench marks adjacent to the work as shown in the contract documents.
5. The ENGINEER will provide general engineering review of the work of the contractor(s) as
construction progresses to ascertain that the contactor is conforming to the design concept.
(a) ENGINEER shall have authority, as the OWNER’s representative, to require special
inspection of or testing of the work, and shall receive and review all certificates of
inspections, testing and approvals required by laws, rules, regulations, ordinances, codes,
orders or the Contract Documents (but only to determine generally that their content
complies with requirements of, and the results certified indicate compliance with, the
Contract Documents).
(b) During such engineering review, ENGINEER shall have the authority, as the OWNER’s
representative, to disapprove of or reject contractor(s)’ work while it is in progress if
ENGINEER believes that such work will not produce a completed Project that conforms
generally to the Contract Documents or that it will prejudice the integrity of the design
concept of the Project as reflected in the Contract Documents.
4
6. The ENGINEER will provide resident construction observation. Resident construction
observation shall consist of visual inspection of materials, equipment, or construction work for
the purpose of ascertaining that the work is in substantial conformance with the contract
documents and with the design intent. Such observation shall not be relied upon by others as
acceptance of the work. The ENGINEER’s undertaking hereunder shall not relieve the
contractor of contractor’s obligation to perform the work in conformity with the drawings and
specifications and in a workmanlike manner; shall not make the ENGINEER an insurer of the
contractor’s performance; and shall not impose upon the ENGINEER any obligation to see that
the work is performed in a safe manner. Exhibit 2 - The Limitations of Authority, Duties and
Responsibilities of the Resident Construction Observer is attached to this Agreement.
7. The ENGINEER will cooperate and work closely with representatives of the OWNER.
8. Based on the ENGINEER’s on-site observations as an experienced and qualified design
professional, on information provided by the Resident Construction Observer, and upon review
of applications for payment with the accompanying data and schedules by the contractor, the
ENGINEER:
(a) Shall determine the amounts owing to contractor(s) and recommend in writing payments
to contractor(s) in such amounts. Such recommendations of payment will constitute a
representation to OWNER, based on such observations and review, that the work has
progressed to the point indicated, and that, to the best of the ENGINEER’s knowledge,
information and belief, the quality of such work is generally in accordance with the
Contract Documents (subject to an evaluation of such work as a functioning whole prior
to or upon substantial completion, to the results of any subsequent tests called for in the
Contract Documents, and to any other qualifications stated in the recommendation).
(b) By recommending any payment, ENGINEER will not hereby be deemed to have
represented that exhaustive, continuous or detailed reviews or examinations have been
made by ENGINEER to check the quality or quantity of contractor(s)’ work as it is
furnished and performed beyond the responsibilities specifically assigned to ENGINEER
in the Agreement and the Contract Documents. ENGINEER’s review of contractor(s)’
5
work for the purposes of recommending payments will not impose on Engineer
responsibility to supervise, direct or control such work or for the means, methods,
techniques, sequences, or procedures of construction or safety precautions or programs
incident thereto or contractor(s) compliance with laws, rules, regulations, ordinances,
codes or orders applicable to their furnishing and performing the work. It will also not
impose responsibility on ENGINEER to make any examination to ascertain how or for
what purposes any contractor has used the moneys paid on account of the Contract Price,
or to determine that title to any of the work, materials equipment has passed to OWNER
free and clear of any lien, claims, security interests, or encumbrances, or that there may
not be other matters at issue between OWNER and contractor that might affect the
amount that should be paid.
9. The ENGINEER will prepare necessary contract change orders for approval of the OWNER, and
others on a timely basis.
10. The ENGINEER will make a final review prior to the issuance of the statement of substantial
completion of all construction and submit a written report to the OWNER. Prior to submitting
the final pay estimate, the ENGINEER shall submit the statement of completion to and obtain the
written acceptance of the facility from the OWNER.
11. The ENGINEER will provide the OWNER with one set of reproducible record (as-built)
drawings, and two sets of prints at no additional cost to the OWNER. Such drawings will be
based upon construction records provided by the contractor during construction and reviewed by
the resident construction observer and from the resident construction observer’s construction
data.
12. If State Statutes require notices and advertisements of final payment, the ENGINEER shall assist
in their preparation.
13. The ENGINEER will be available to furnish engineering services and consultations necessary to
correct unforeseen project operation difficulties for a period of one year after the date of
statement of substantial completion of the facility. This service will include instruction of the
OWNER in initial project operation and maintenance but will not include supervision of normal
6
operation of the system. Such consultation and advice shall be at the hourly rates as described in
the attached Exhibit 6: Standard Schedule of Charges dated January 1, 2013. The ENGINEER
will assist the OWNER in performing a review of the project during the 11th month after the
date of the certificate of substantial completion.
14. The ENGINEER further agrees to obtain and maintain, at the ENGINEER’s expense, such
insurance as will protect the ENGINEER from claims under the Workman’s Compensation Act
and such comprehensive general liability insurance as will protect the OWNER and the
ENGINEER from all claims for bodily injury, death, or property damage which may arise from
the performance by the ENGINEER or by the ENGINEER’s employees of the ENGINEER’s
functions and services required under this Agreement.
15. The ENGINEER will provide construction engineering services in accordance with the periods
summarized in Exhibit 4: “Anticipated Project Schedule – Ridge Street Water Main
Improvements” dated October 14, 2014.
If the above is not accomplished within the time period specified, this Agreement may be terminated by
the OWNER. The time for completion may be extended by the OWNER for a reasonable time if
completion is delayed due to unforeseeable cases beyond the control and without the fault or negligence
of the ENGINEER. Pursuant to Paragraph D “Changes in Rates of Compensation”, the contract shall be
designated on-going consistent with the project schedule.
7
SECTION C – COMPENSATION FOR ENGINEERING SERVICES
1. The OWNER shall compensate the ENGINEER for professional design engineering services in
the amount of Twenty Eight Thousand Fifty Dollars – Fixed Fee (FF) ($28,000.00 FF) as
summarized on Exhibit 3: “Estimate of Level of Effort and Associated Cost for Professional
Engineering Services for Ridge Street Water Main Improvements” dated October 14, 2014.
(a) The compensation for the professional design engineering services shall be payable as
follows:
(1) A sum which does not exceed ninety percent (90%) of the total compensation
payable under Section C-1 shall be paid in monthly increments for work actually
completed and invoiced, for grant administration and for the preparation and
submission to the OWNER and/or IEPA of the construction drawings,
specifications, cost estimates and contract documents.
(2) A sum which, together with the compensation paid pursuant to Section C-1(a)(1)
above, equals one hundred percent (100%) of the total compensation due and
payable in accord with Section C-1 above, shall be due immediately after the
award of construction contract(s) is approved by the corporate authorities.
2. The OWNER shall compensate the ENGINEER for the construction administration, construction
staking, construction observation (including the Resident Construction Observer), and any
additional consultation and surveying services on the basis of Hourly Rates (HR) as described on
the attached Exhibit 6: Standard Schedule of Charges dated January 1, 2013. The estimated
values are included in Exhibit 3: “Estimate of Level of Effort and Associated Cost for
Professional Engineering Services for Ridge Street Water Main Improvements” dated October
14, 2014 and are estimated at $23,286.00 Hourly (HR).
(a) The compensation for the construction administration, construction staking, construction
observation (including the Resident Construction Observer), and any additional
consultation and surveying services shall be payable as follows:
8
(1) A sum which equals any charges for work actually completed and invoiced shall
be paid at least once per month.
3. The OWNER shall compensate the ENGINEER for direct expenses as identified in the contract
and as noted on Exhibit 3 at the actual cost or hourly cost for the work completed.
(1) A sum which equals any charges for work actually completed and invoiced shall be paid
at least once per month.
4. The compensation for any additional engineering services authorized by the OWNER pursuant to
Section D shall be payable as follows:
(a) A sum which equals any charges for work actually completed and invoiced shall be paid
at least once per month.
9
SECTION D – ADDITIONAL ENGINEERING SERVICES
In addition to the foregoing being performed, the following services may be provided UPON PRIOR
WRITTEN AUTHORIZATION OF THE OWNER.
1. Site surveys outside of the project limits and other similar special surveys as may be required.
2. Laboratory tests, well tests, borings, specialized geological soils hydraulic, or other studies
recommended by the ENGINEER.
3. Property surveys, detailed description of sites, maps, drawings, or estimates related thereto;
assistance in negotiating for land and easement rights.
4. Necessary data and filing maps for litigation, such as condemnation.
5. Redesigns ordered by the OWNER after final plans have been accepted by the OWNER and
IEPA.
6. Appearances before courts or boards on matters of litigation or hearings related to the project.
7. Preparation of environmental impact assessments or environmental impact statements.
8. Making drawings from field measurements of existing facilities when required for planning
additions or alterations thereto.
9. Services due to changes in the scope of the Project or its design, including but not limited to,
changes in size, complexity, schedule or character of construction.
10. Revising studies or reports which have previously been approved by the OWNER, or when
revisions are due to cases beyond the control of the ENGINEER.
10
11. Preparation of design documents for alternate bids where major changes require additional
documents.
12. Preparation of detailed renderings, exhibits or scale models for the Project.
13. Providing special analysis of the OWNER’s needs such as owning and operating analysis, plan
for operation and maintenance, OWNER’s special operating drawings or charts, and any other
similar analysis.
14. The preparation of feasibility studies, appraisals and evaluations, detailed quantity surveys of
material and labor, and material audits or inventories by the OWNER.
15. Additional or extended services during construction made necessary by (1) work damaged by
fire or other cause during construction, (2) defective or incomplete work of the contractor, and/or
(3) the contractor’s default on the Construction Contract due to delinquency or insolvency.
16. Providing design services relating to future facilities, systems and equipment which are not
intended to be constructed or operated as a part of the Project.
17. Providing other services not otherwise provided for in this Agreement, including services
normally furnished by the OWNER as described in Section E – SPECIAL PROVISIONS –
Owner’s Responsibilities.
Payment for the services specified in this Section E shall be as agreed in writing between the OWNER
and the ENGINEER prior to commencement of the work. The ENGINEER will render to OWNER for
such services an itemized bill, separate from any other billing, once each month, for compensation for
services performed hereunder during such period, the same to be due and payable by OWNER to the
ENGINEER on or before the 10th day of the following period. Payment for services noted in D shall be
at Actual Cost (AC), Fixed Fee (FF) or Hourly (HR).
11
SECTION E - SPECIAL PROVISIONS
1. OWNER’S RESPONSIBILITIES
(a) Provide to the ENGINEER all criteria, design and construction standards and full
information as to the OWNER’s requirements for the Project.
(b) Designate a person authorized to act as the OWNER’s representative. The OWNER or
his representative shall receive and examine documents submitted by the ENGINEER,
interpret and define the OWNER’s policies and render decisions and authorizations in
writing promptly to prevent unreasonable delay in the progress of the ENGINEER’s
services.
(c) Furnish laboratory tests, air and water pollution tests, reports and inspections of samples,
materials or other items required by law or by governmental authorities having
jurisdiction over this Project, or as recommended by the ENGINEER.
(d) Provide legal, accounting, right-of-way acquisition and insurance counseling services
necessary for the Project, legal review of the construction Contract Documents, and such
auditing services as the OWNER may require to account for expenditures of sums paid to
the contractor.
(e) Furnish above services at the OWNER’s expense and in such manner that the
ENGINEER may rely upon them in the performance of his services under this Agreement
and in accordance with the Project timetable.
(f) Guarantee full and free access for the ENGINEER to enter upon all property required for
the performance of the ENGINEER’s services under this Agreement.
(g) Give prompt written notice to the ENGINEER whenever the OWNER observes or
otherwise becomes aware of any defect in the Project or other event which may
substantially affect the ENGINEER’s performance of services under this Agreement.
12
(h) Protect and preserve all survey stakes and markers placed at the project site prior to the
assumption of this responsibility by the contractor and bear all costs of replacing stakes
or markers damaged or removed during said time interval.
2. Delegation of Duties - Neither the OWNER nor the ENGINEER shall delegate his duties under
this Agreement without the written consent of the other.
3. The ENGINEER has not been retained or compensated to provide design services relating to the
contractor’s safety precautions or to means, methods, techniques, sequences, or procedures
required by the contractor to perform his work but not relating to the final or completed
structure. Omitted services include but are not limited to shoring, scaffolding, underpinning,
temporary retainment of excavations and any erection methods and temporary bracing.
4. The ENGINEER intends to render his services under this Agreement in accordance with
generally accepted professional practices for the intended use of the Project.
5. Since the ENGINEER has no control over the cost of labor, materials, equipment or services
furnished by others, or over the contractor(s) methods of determining prices, or over competitive
bidding or market conditions, his opinions of probable Project Costs and Construction Costs
provided for herein are to be made on the basis of his experience and qualifications and represent
his best judgment as an experienced and qualified professional engineer, familiar with the
construction industry. The ENGINEER cannot and does not guarantee that proposals, bids or
actual project or construction cost will not vary from opinions of probable cost prepared by him.
If prior to the bidding or negotiating phase OWNER wishes greater assurance as to project or
construction costs he shall employ an independent cost-estimator.
6. Access to Records:
(a) The ENGINEER agrees to include subsections E-6(b) through E-6(e) below in all
contracts and all subcontracts directly related to project services which are in excess of
$25,000.
13
(b) The ENGINEER shall maintain books, records, documents and other evidence directly
pertinent to performance of Agency loan work under this Agreement consistent with
generally accepted accounting standards in accordance with the American Institute of
Certified Public Accountants Professional Standards (666 Fifth Avenue, New York, New
York 10019; June 1, 1987). The Agency or any of its duly authorized representatives
shall have access to such books, records, documents and other evidence for the purpose
of inspection, audit and copying. The ENGINEER will provide facilities for such access
and inspection.
(c) Audits conducted pursuant to this provision shall be in accordance with generally
accepted auditing standards.
(d) The ENGINEER agrees to the disclosure of all information and reports resulting from
access to records pursuant to subsection E-6(b) above, to the Agency. Where the audit
concerns the ENGINEER, the auditing agency shall afford the ENGINEER an
opportunity for an audit exit conference and an opportunity to comment on the pertinent
portions of the draft audit report. The final audit report will include the written
comments, if any, of the audited parties.
(e) Records under subsection E-6(b) above shall be maintained and made available during
performance on Agency loan work under this agreement and until three years from date
of final Agency loan audit for the project. In addition, those records which relate to any
“dispute” appeal under an Agency loan agreement, or litigation, or the settlement of
claims arising out of such performance, costs or items to which an audit exception has
been taken, shall be maintained and made available until three years after the date of
resolution of such appeal, litigation, claim or exception.
7. Covenant Against Contingent Fees - The ENGINEER warrants that no person or selling agency
has been employed or retained to solicit or secure this contract upon an agreement or
understanding for a commission, percentage, brokerage, or contingent fee, excepting bonafide
employees. For breach or violation of this warranty, the loan recipient shall have the right to
annul this agreement without liability or in its discretion to deduct from the contract price or
14
consideration or otherwise recover, the full amount of such commission, percentage, brokerage,
or contingent fee.
8. Covenant Against Contingent Fees - The loan recipient warrants that no person or agency has
been employed or retained to solicit or secure a PWSLP loan upon an agreement or
understanding for a commission, percentage, brokerage, or contingent fee. For breach or
violation of this warranty, the Agency shall have the right to annul the loan or to deduct from the
loan or otherwise recover, the full amount of such commission, percentage, brokerage, or
contingent fee.
9. Certification Regarding Debarment – The ENGINEER certifies that the services of anyone that
has been debarred or suspended under Federal Executive Order 12549 has not, and will not, be
used for work under this Agreement.
10. Affirmative Action – The ENGINEER agrees to take affirmative steps to assure that
disadvantaged business enterprises are utilized when possible as sources of supplies, equipment,
construction and services in accordance with the Clean Water Loan Program rules. As required
by the award conditions of USEPA's Assistance Agreement with IEPA, the ENGINEER
acknowledges that the fair share percentages are 5% for MBEs and 12% for WBEs.
11. The ENGINEER shall not discriminate on the basis of race, color, national origin or sex in the
performance of this contract. The contractor shall carry out applicable requirements of 40 CFR
Part 33 in the award and administration of contracts awarded under EPA financial assistance
agreements. Failure by the contractor to carry out these requirements is a material breach of this
contract which may result in the termination of this contract or other legally available remedies.
15
EXHIBIT 2
THE LIMITATIONS OF AUTHORITY, DUTIES AND RESPONSIBILITIES OF THE RESIDENT
CONSTRUCTION OBSERVER ARE AS FOLLOWS:
1. The Resident Construction Observer shall act under the direct supervision of the ENGINEER,
shall be the ENGINEER’s agent in all matters relating to on-site construction review of the
contractor’s work, shall communicate only with the ENGINEER and the contractor (or
contractor’s), and shall communicate with subcontractors only through the contractor or his
authorized superintendent. The OWNER shall communicate with the Resident Construction
Observer only through the ENGINEER.
2. The Resident Construction Observer shall review and inspect on-site construction activities of
the contractor relating to portions of the Project designed and specified by the Engineer as
contained in the Construction Contract Documents.
3. Specifically omitted from the Resident Construction Observer’s duties is any review of the
contractor’s safety precautions, or the means, methods, sequences, or procedures required for the
contractor to perform the work but not relating to the final or completed Project. Omitted design
or review services include but are not limited to shoring, scaffolding, underpinning, temporary
retainment of excavations and any erection methods and temporary bracing.
4. The specific duties and responsibilities of the Resident Construction Observer are enumerated as
follows:
(a) Schedules: Review the progress schedule, schedule of Shop Drawing submissions and
schedule of values prepared by contractor and consult with ENGINEER concerning their
acceptability.
(b) Conferences: Attend preconstruction conferences. Arrange a schedule of progress
meetings and other job conferences as required in consultation with ENGINEER and
notify those expected to attend in advance. Attend meetings and maintain and circulate
copies of minutes thereof.
16
(c) Liaison:
(1) Serve as ENGINEER’s liaison with contractor, working principally through
contractor’s superintendent and assist him in understanding the intent of the
Contract Documents.
(2) Assist ENGINEER in serving as OWNER’s liaison with contractor when
contractor’s operations affect OWNER’s on-site operations.
(3) As requested by ENGINEER, assist in obtaining from OWNER additional details
or information, when required at the job site for proper erection of the work.
(d) Shop Drawings and Samples:
(2) Receive and record date of receipt of Shop Drawings and samples.
(3) Receive samples which are furnished at the site by contrctor, and notify
ENGINEER of their availability for examination.
(3) Advise ENGINEER and contractor or its superintendent immediately of the
commencement of any work requiring a Shop Drawing or sample submission if
the submission has not been approved by ENGINEER.
(e) Review of Work, Rejection of Defective Work, Inspections and Tests:
(1) Conduct on-site inspection of the work in progress to assist ENGINEER in
determining if the work is proceeding in accordance with the Contract Documents
and that completed work will conform to the Contract Documents.
(2) Report to ENGINEER whenever he believes that any work is unsatisfactory,
faulty or defective or does not conform to the Contract Documents, or does not
meet the requirements of any inspections, test or approval required to be made or
17
has been damaged prior to final payment; and advise ENGINEER when he
believes work should be corrected or rejected or should be uncovered for
inspection, or requires special testing, inspection or approval.
(3) Verify that tests, equipment and systems start-ups, and operating and maintenance
instructions are conducted as required by the Contract Documents and in presence
of the required personnel, and that contractor maintains adequate records thereof;
observe, record and report to ENGINEER appropriate details relative to the test
procedures and start-ups.
(4) Accompany visiting inspectors representing public or other agencies having
jurisdiction over the Project, record the outcome of these inspections and report to
ENGINEER.
(f) Interpretation of Contract Documents: Transmit to contractor ENGINEER’s clarifications
and interpretations of the Contract Documents.
(g) Modifications: Consider and evaluate contractor’s suggestions for modifications in
Drawings or Specifications and report them with recommendations to ENGINEER.
(h) Records:
(1) Maintain at the job site orderly files for correspondence, reports of job
conferences, Shop Drawings and samples submissions, reproductions of original
Contract Documents including all addenda, change orders, field orders, additional
drawings issued subsequent to the execution of the Contract, ENGINEER’s
clarifications and interpretations of the Contract Documents, progress reports, and
other Project related documents.
(2) Keep a diary or log book, recording hours on the job site, weather conditions, data
relative to questions of extras or deductions, list of visiting officials and
representatives of manufacturers, fabricators, suppliers and distributors, daily
18
activities, decisions, observations in general and specific observations in more
detail as in the case of observing test procedures. Send copies to ENGINEER.
(4) Record names, addresses and telephone numbers of all contractor’s,
subcontractors and major suppliers of materials and equipment.
(i) Reports:
(1) Furnish ENGINEER periodic reports as required of progress of the work and
contractor’s compliance with the approved progress schedule and schedule of
Shop Drawing submissions.
(2) Consult with ENGINEER in advance of schedule major tests, inspections or start
of important phases of the work.
(3) Report immediately to ENGINEER upon the occurrence of any accident.
(j) Payment Requisitions: Review applications for payment with contractor for compliance
with the established procedure for their submission and forward them with
recommendations to ENGINEER, noting particularly their relation to the schedule of
values, work completed and materials and equipment delivered at the site but not
incorporated in the work.
(k) Certificates, Maintenance and Operating Manuals: During the course of the work, verify
that certificates, maintenance and operation manuals and other data required to be
assembled and furnished by contractor are applicable to the items actually installed; and
deliver this material to ENGINEER for his review and forwarding to OWNER prior to
final acceptance of the work.
(l) Completion:
(1) Before ENGINEER issues a Statement of Substantial Completion, submit to
contractor a list of observed items requiring completion or correction.
19
(2) Conduct final review in the company of ENGINEER, OWNER and contractor
and prepare a final list of items to be completed or corrected.
(3) Verify that all items on final list have been completed or corrected and make
recommendations to ENGINEER concerning acceptance.
EN
T
I
T
Y
:
ADMIN.WORK
PR
I
N
C
I
P
A
L
SE
N
I
O
R
S
E
N
I
O
R
SE
N
I
O
R
S
E
N
I
O
R
I
T
E
M
C
O
S
T
WO
R
K
IN
P
R
O
J
E
C
T
PR
O
J
E
C
T
P
R
O
J
E
C
T
PR
O
J
E
C
T
P
R
O
J
E
C
T
P
R
O
J
E
C
T
C
A
D
P
R
O
J
E
C
T
H
O
U
R
P
E
R
IT
E
M
CH
A
R
G
E
M
A
N
A
G
E
R
EN
G
I
N
E
E
R
I
E
N
G
I
N
E
E
R
MA
N
A
G
E
R
S
U
R
V
E
Y
O
R
I
I
T
E
C
H
N
I
C
I
A
N
I
M
A
N
A
G
E
R
T
E
C
H
N
I
C
I
A
N
I
A
D
M
I
N
.
S
U
M
M
.
I
T
E
M
NO
.
W
O
R
K
I
T
E
M
H
O
U
R
L
Y
R
A
T
E
:
$
1
7
1
$
1
5
0
$1
2
9
$
1
1
7
$1
5
0
$
1
3
8
$
1
1
7
$
1
2
9
$
1
1
7
$
7
8
FI
N
A
L
E
N
G
I
N
E
E
R
I
N
G
2.
1
P
r
o
j
e
c
t
M
a
n
a
g
e
m
e
n
t
a
n
d
A
d
m
i
n
i
s
t
r
a
t
i
o
n
2
4
2
-
-
-
-
-
-
-
8 1,200$
2.
2
P
r
o
j
e
c
t
M
e
e
t
i
n
g
s
-
4
4
-
-
-
-
-
-
-
8 1,116$
2.
3
T
o
p
o
g
r
a
p
h
i
c
S
u
r
v
e
y
-
-
-
-
2
0
2
7
-
-
-
-
47 6,726$
2.
4
U
t
i
l
i
t
y
C
o
o
r
d
i
n
a
t
i
o
n
-
1
1
2
-
-
-
-
-
1
5 591$
2.
5
F
i
n
a
l
P
l
a
n
s
,
S
p
e
c
i
f
i
c
a
t
i
o
n
s
a
n
d
E
s
t
i
m
a
t
e
s
2
7
3
9
1
9
-
-
-
3
0
3
0
-
127 16,026$
2.
6
P
e
r
m
i
t
t
i
n
g
-
1
3
-
-
-
-
-
-
-
4 537$
2.
7
B
i
d
d
i
n
g
a
n
d
C
o
n
t
r
a
c
t
i
n
g
-
2
8
-
-
-
-
-
-
5
15 1,722$
Fi
n
a
l
E
n
g
i
n
e
e
r
i
n
g
S
u
b
t
o
t
a
l
:
4
1
9
5
7
2
1
2
0
2
7
-
3
0
3
0
6
214 27,918$
CO
N
S
T
R
U
C
T
I
O
N
E
N
G
I
N
E
E
R
I
N
G
3.
1
C
o
n
t
r
a
c
t
A
d
m
i
n
i
s
t
r
a
t
i
o
n
4
1
4
1
5
-
-
-
-
-
-
-
33 4,719$
3.
2
C
o
n
s
t
r
u
c
t
i
o
n
L
a
y
o
u
t
a
n
d
R
e
c
o
r
d
D
r
a
w
i
n
g
s
-
-
2
-
1
1
0
1
0
-
-
-
23 2,958$
3.
3
O
b
s
e
r
v
a
t
i
o
n
a
n
d
D
o
c
u
m
e
n
t
a
t
i
o
n
3
9
9
9
7
-
-
-
-
-
2
120 15,609$
Co
n
s
t
r
u
c
t
i
o
n
E
n
g
i
n
e
e
r
i
n
g
S
u
b
t
o
t
a
l
:
7
2
3
1
1
6
7
1
1
0
1
0
-
-
2
176 23,286$
PR
O
J
E
C
T
T
O
T
A
L
:
1
1
4
2
1
7
3
2
8
2
1
3
7
1
0
3
0
3
0
8
390 51,204
Pr
i
n
t
i
n
g
=
5
0
0
$
33,774$
Mi
l
e
a
g
e
=
5
0
0
$
9,426$
Ma
t
e
r
i
a
l
T
e
s
t
i
n
g
=
1
,
0
0
0
$
7,380$
1,
5
0
0
$
624$
DI
R
E
C
T
E
X
P
E
N
S
E
S
=
3
,
5
0
0
$
51,204$ 54,704$
G:
\
P
u
b
l
i
c
\
Y
o
r
k
v
i
l
l
e
\
2
0
1
4
\
Y
O
1
4
4
1
-
P
R
i
d
g
e
S
t
r
e
e
t
W
a
t
e
r
M
a
i
n
I
m
p
r
o
v
e
m
e
n
t
s
\
P
S
A
\
[
E
x
h
i
b
i
t
3
-
L
e
v
e
l
o
f
E
f
f
o
r
t
.
x
l
s
x
]
F
e
e
S
u
m
m
a
r
y
Oc
t
o
b
e
r
1
4
,
2
0
1
4
ES
T
I
M
A
T
E
O
F
L
E
V
E
L
O
F
E
F
F
O
R
T
A
N
D
A
S
S
O
C
I
A
T
E
D
C
O
S
T
F
O
R
PR
O
F
E
S
S
I
O
N
A
L
E
N
G
I
N
E
E
R
I
N
G
S
E
R
V
I
C
E
S
F
O
R
EX
H
I
B
I
T
3
RI
D
G
E
S
T
R
E
E
T
W
A
T
E
R
M
A
I
N
I
M
P
R
O
V
E
M
E
N
T
S
Un
i
t
e
d
C
i
t
y
o
f
Y
o
r
k
v
i
l
l
e
,
I
L
PR
O
J
E
C
T
R
O
L
E
:
Surveying Expenses = Drafting Expenses = Administrative Expenses = TOTAL LABOR EXPENSES = TOTAL EXPENSES =
EN
G
I
N
E
E
R
I
N
G
S
U
R
V
E
Y
I
N
G
D
R
A
F
T
I
N
G
Engineering Expenses =
DI
R
E
C
T
E
X
P
E
N
S
E
S
LABOR SUMMARY
En
v
i
r
o
n
m
e
n
t
a
l
A
s
s
e
s
s
m
e
n
t
=
WO
R
K
Ye
a
r
:
IT
E
M
M
o
n
t
h
:
NO
.
W
O
R
K
I
T
E
M
W
e
e
k
S
t
a
r
t
i
n
g
:
2
9
1
6
2
3
3
0
7
1
4
2
1
2
8
4
1
1
1
8
2
5
1
8
1
5
2
2
1
8
1
5
2
2
2
9
5
1
2
1
9
2
6
3
1
0
1
7
2
4
3
1
7
1
4
2
1
2
8
5
1
2
1
9
2
6
2
9
1
6
2
3
3
0
FI
N
A
L
D
E
S
I
G
N
E
N
G
I
N
E
E
R
I
N
G
2.
1
P
r
o
j
e
c
t
M
a
n
a
g
e
m
e
n
t
a
n
d
A
d
m
i
n
i
s
t
r
a
t
i
o
n
2.
2
P
r
o
j
e
c
t
M
e
e
t
i
n
g
s
2.
3
T
o
p
o
g
r
a
p
h
i
c
S
u
r
v
e
y
2.
4
U
t
i
l
i
t
y
C
o
o
r
d
i
n
a
t
i
o
n
2.
5
F
i
n
a
l
P
l
a
n
s
,
S
p
e
c
i
f
i
c
a
t
i
o
n
s
a
n
d
E
s
t
i
m
a
t
e
s
2.
6
P
e
r
m
i
t
t
i
n
g
2.
7
B
i
d
d
i
n
g
a
n
d
C
o
n
t
r
a
c
t
i
n
g
CO
N
S
T
R
U
C
T
I
O
N
E
N
G
I
N
E
E
R
I
N
G
3.
1
C
o
n
t
r
a
c
t
A
d
m
i
n
i
s
t
r
a
t
i
o
n
3.
2
C
o
n
s
t
r
u
c
t
i
o
n
L
a
y
o
u
t
a
n
d
R
e
c
o
r
d
D
r
a
w
i
n
g
s
3.
3
O
b
s
e
r
v
a
t
i
o
n
a
n
d
D
o
c
u
m
e
n
t
a
t
i
o
n
G:
\
P
u
b
l
i
c
\
Y
o
r
k
v
i
l
l
e
\
2
0
1
4
\
Y
O
1
4
4
1
-
P
R
i
d
g
e
S
t
r
e
e
t
W
a
t
e
r
M
a
i
n
I
m
p
r
o
v
e
m
e
n
t
s
\
P
S
A
\
[
E
x
h
i
b
i
t
4
-
S
c
h
e
d
u
l
e
.
x
l
s
]
S
c
h
e
d
u
l
e
(
S
t
a
t
e
+
A
d
r
i
a
n
)
Pr
o
j
e
c
t
M
a
n
a
g
e
m
e
n
t
&
Q
C
/
Q
A
P
e
r
m
i
t
t
i
n
g
Me
e
t
i
n
g
(
s
)
B
i
d
d
i
n
g
a
n
d
C
o
n
t
r
a
c
t
i
n
g
De
s
i
g
n
C
o
n
s
t
r
u
c
t
i
o
n
EX
H
I
B
I
T
4
AN
T
I
C
I
P
A
T
E
D
P
R
O
J
E
C
T
S
C
H
E
D
U
L
E
RI
D
G
E
S
T
R
E
E
T
W
A
T
E
R
M
A
I
N
I
M
P
R
O
V
E
M
E
N
T
S
UN
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
,
K
E
N
D
A
L
L
C
O
U
N
T
Y
,
I
L
Oc
t
o
b
e
r
1
4
,
2
0
1
4
Ja
n
u
a
r
y
F
e
b
r
u
a
r
y
A
p
r
i
l
20
1
4
20
1
5
JulyAugust
Le
g
e
n
d
Ma
y
J
u
n
e
Ma
r
c
h
No
v
e
m
b
e
r
D
e
c
e
m
b
e
r
F o x R i v e r
e
S
t
S Main St
N o r w a y C i r
W
h
i
te Oak W a y
Deer St
E Barberry Cir
W o o d S age A
v
e
Illini Dr
Freemont St
McHugh Rd
W F o x S t
Mill St
E Van Emmon St
Crooked Creek Dr
Heustis St
W Madison St
W Ridge St
E Fox St
Colo nial P kw y
E Washington St
B e a v e r St
R i v e r B ir c h D r
W Van Emmon St
Elizabeth St
River Birch Ln
Morgan St
Wooden Bridge Dr
Adrian St
W
h
i
t
e
O
a
k
W
a
y
Bristol Ave
King St
Appletree Ct
Colton St
C t G
a
r
d
e
n C
ir
E Elm St
Gawne Ln
Blaine St
Garden S t
Jackson St
Wolf St
C
o
r
a
l
b
e
r
r
y
C
t
Walter St
E Ridge St
Spruce Ct
W Dolph St
Tower Ln
Libert
y St
Ri v e r R d
S Main St
W Fox St
Church St
Fir Ct
E Main St
Wals
h
D
r
W S o mon a u k St
Mil
l
S
t
S Bridge St
Jefferson St
State St
State St
Madison Ct
E Orange St
Olsen St
Il
l
i
ni Ct
W W a s h i n g t o n S t
W Dolph St
W Orange St
W Washington St
W Beecher St
Hawthorne Ct
B u c k t h o r n e C t
W
B
a
r
b
e
r
r
y
C
i
r
B u r n i n g B u s h Dr
Spi c e b u sh Ct
Deer St
West St
W Center St
E Center St
W S om o na uk S t
W Spring St
W Main St
River Rd
N Bridge St
E Spring St
E Park St
E S o monauk St
Sanders Ct
Worsley St
Freem
Bell St
Schoolhouse Rd
E Hydraulic Ave
Schoolhouse Rd
B ato r StDydyna C t B e nja m in S t
Rodak
Benjamin St
Tomasik Ct
Bu h r m a s t e
W Hydraulic Ave
W Hydraulic Ave
Engineering Enterprises, Inc.
52 Wheeler Road
Sugar Grove, Illinois 60554
(630) 466-6700
IMPROVEMENT LIMITS
WATER
EXHIBIT 5
LOCATION MAP
www.eeiweb.com
DATE:
PROJECT NO.:
FILE:
PATH:
BY:
October 2014
YO1441
YO1441_Location.mxd.MXD
H:\GIS\PUBLIC\YORKVILLE\2014\
KKP ³
01,0002,000500
Feet
Standard Schedule of Charges
January 1, 2013
EMPLOYEE DESIGNATION CLASSIFICATION HOURLY RATE
Senior Principal E-4 $171.00
Principal E-3 $171.00
Senior Project Manager E-2 $165.00
Project Manager E-1 $150.00
Senior Project Engineer/Planner/Surveyor II P-6 $138.00
Senior Project Engineer/Planner/Surveyor I P-5 $129.00
Project Engineer/Planner/Surveyor P-4 $117.00
Senior Engineer/Planner/Surveyor P-3 $108.00
Engineer/Planner/Surveyor P-2 $ 99.00
Associate Engineer/Planner/Surveyor P-1 $ 88.00
Senior Project Technician II T-6 $129.00
Senior Project Technician I T-5 $117.00
Project Technician T-4 $108.00
Senior Technician T-3 $ 99.00
Technician T-2 $ 88.00
Associate Technician T-1 $ 78.00
Administrative Assistant A-3 $ 78.00
CREW RATES, VEHICLES AND REPROGRAPHICS
1 Man Field Crew with Standard Survey Equipment $141.00
2 Man Field Crew with Standard Survey Equipment $219.00
1 Man Field Crew with RTS or GPS * $174.00
2 Man Field Crew with RTS or GPS * $252.00
Vehicle for Construction Observation $15.00
In-House Scanning and Reproduction $0.25/Sq. Ft. (Black & White)
$1.00/Sq. Ft. (Color)
*RTS = Robotic Total Station / GPS = Global Positioning System
EXHIBIT 6
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
CA #8
Tracking Number
PW 2014-79
Blackberry Woods Subdivision Acceptance
City Council – October 28, 2014
Consideration of Approval
See attached memo.
Brad Sanderson Engineering
Name Department
The Developer has requested that the City accept the paving (pavement and curb/gutter) portion
of the public improvements for the Blackberry Woods Development for ownership and
maintenance.
At this time all work related to the paving portion of the public improvements, including any
punchlist items is complete.
Attached is the draft Bill of Sale for the development. We recommend that the public
improvements for paving (pavement and curb/gutter) as described in the Bill of Sale be accepted
for ownership and maintenance by the City.
Upon approval by the City Council, the letter of credit will be reduced accordingly
administratively.
Please place this item on the Public Works Committee agenda of October 21, 2014 for
consideration.
Memorandum
To: Bart Olson, City Administrator
From: Brad Sanderson, EEI
CC: Eric Dhuse, Director of Public Works
Krysti Barksdale-Noble, Community Dev. Dir.
Lisa Pickering, Deputy City Clerk
Date: October 15, 2014
Subject: Blackberry Woods
1
BILL OF SALE
Seller, _______________, in consideration of One and 00/100th Dollar ($1.00), receipt
hereby acknowledged, does hereby sell, assign, transfer and convey to the Buyer, the United City
of Yorkville, an Illinois municipal corporation, at 800 Game Farm Road, Yorkville, Illinois
60560, the following personal property to wit described in Exhibit A attached hereto for the
development know as Blackberry Woods, and generally shown on Exhibit B.
Seller hereby represents and warrants to Buyer that Seller is the absolute owner of said
property, that said property is free and clear of all liens, charges and encumbrances, and that
Seller has full right, power, and authority to sell said property and to make this Bill of Sale.
IN WITNESS WHEREOF, Seller has signed and sealed this Bill of Sale at
___________________________________, this _____ day of _______________, 20__.
Subscribed and Sworn to
before me this _____ day
of _____________, 20__.
_______________________
Notary Public
EXHIBIT A
BLACKBERRY WOODS
UNITED CITY OF YORKVILLE
ROADWAY UNIT QUANTITY
CANNONBALL TRAIL FOOT 1677
PURCELL STREET FOOT 512
SOUTH CARLY CIRCLE FOOT 699
NORTH CARLY CIRCLE FOOT 1185
CARLY DRIVE FOOT 627
CARLY COURT FOOT 541
PATRICK COURT FOOT 269
CODY COURT FOOT 331
NOTE: ACCEPTING PAVING ONLY (PAVEMENT AND CURB/GUTTER)
P u r c e ll S tr e e t
Ca
r
ly Cour
t
Independence C o d yCou r t
Beecher
Patrick Court
South Car
l
y Circle
C a rl y D ri v e
Nor
th Car
l
y Cir
cle
C
a
n
n
o
n
b
a
ll
T
r
a
il
En
g
i
n
e
e
r
i
n
g
E
n
t
e
r
p
r
i
s
e
s
,
I
n
c
.
52
W
h
e
e
l
e
r
R
o
a
d
Su
g
a
r
G
r
o
v
e
,
I
l
l
i
n
o
i
s
6
0
5
5
4
(6
3
0
)
4
6
6
-
6
7
0
0
/
w
w
w
.
e
e
i
w
e
b
.
c
o
n
EXHIBIT B LOCATION MAP
DA
T
E
:
OC
T
O
B
E
R
2
0
1
4
Un
i
t
e
d
C
i
t
y
o
f
Y
o
r
k
v
i
l
l
e
80
0
G
a
m
e
F
a
r
m
R
o
a
d
Yo
r
k
v
i
l
l
e
,
I
L
6
0
5
6
0
(6
3
0
)
5
5
3
-
4
3
5
0
ht
t
p
:
/
/
w
w
w
.
y
o
r
k
v
i
l
l
e
.
i
l
.
u
s
BLACKBERRY WOODS UNITED CITY OF YORKVILLE KENDALL COUNTY, ILLINOIS
CO
N
S
U
L
T
I
N
G
E
N
G
I
N
E
E
R
S
NO
.
D
A
T
E
R
E
V
I
S
I
O
N
S
PR
O
J
E
C
T
N
O
.
:
YO
1
2
1
7
PA
T
H
:
H:
/
G
I
S
/
P
U
B
L
I
C
/
Y
O
R
K
V
I
L
L
E
/
2
0
1
2
/
YO
1
2
1
7
-
L
O
C
A
T
I
O
N
.
M
X
D
FI
L
E
:
hhhää NORTH0200400Feet
Pa
v
i
n
g
A
c
c
e
p
t
a
n
c
e
(
C
u
r
b
&
G
u
t
t
e
r
a
n
d
P
a
v
e
m
e
n
t
O
n
l
y
)
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
CA #9
Tracking Number
PW 2014-80
Skidsteer RFP Request
City Council – October 28, 2014
Request permission to seek RFP’s for new skidsteer for Public Works
Eric Dhuse Public Works
Name Department
All,
I would like to ask for your approval to go to bid for a new skidsteer. We currently have one
unit, but we would like to get a second smaller unit on tracks for smaller jobs such as grading
dirt, removing sidewalk, and other applications where a smaller machine will be better suited for
the job.
We currently have $60,000 budgeted for the purchase of a new skidsteer. Approximately
$30,000 is for the sale of our old combination backhoe loader. We would like to move forward
and request proposals for the purchase of the new skidsteer and trade in of the old combination
backhoe.
After bids are opened and tabulated, I will bring forward a recommendation for City Council
approval. I would ask that this be placed on the October 21, 2014 public works committee
agenda for discussion. If you have any question or need further information, please let me know.
Memorandum
To: Public Works Committee
From: Eric Dhuse, Director of Public Works
CC: Bart Olson, Administrator
Date: October 15, 2014
Subject: Skidsteer RFP
United City of Yorkville, Illinois
Request for Proposal
Skid Steer Purchase and
Trade in of Caterpillar
436 Combination Backhoe Loader
Request for Proposals
1. The United City of Yorkville, Illinois (the “City”) is issuing this Request for Proposal (“RFP”)
for the purpose of soliciting vendor proposals for the purchase of new skid steer loader, and the
trade in of a used 436 Caterpillar combination backhoe loader.
2. The City intends to seek the most cost-effective solution, based on the Criteria contained in this
RFP, for its needs.
3. One original and one copy of the proposal will be accepted until 12:00 pm Friday November 14,
2014. Proposals submitted must be binding for not less than ninety (90) days after the date
received. The City will select the proposal, or combination of proposals, that, in its opinion, is in
the best interest of the City. The City reserves the right to reject any and all proposals or
portions of a proposal. The City also reserves the right to waive minor technicalities in the
proposal. The City not only reserves the right at the sole discretion of the City to reject any and
all proposals and to waive technicalities, but also reserves the right of evaluation and the right to
determine the methodology for evaluation of the proposals to determine which is the best
proposal and to accept the proposal (or proposals) deemed to be in the best interest of the City,
i.e., the most qualified proposal will not necessarily be the proposal with the lowest cost.
Further, the City reserves the right to accept a proposal (or proposals) for any or all items
separately or together.
4. All inquiries shall only be addressed at a meeting open to all potential bidders with Eric Dhuse or
John Sleezer on Monday November 3, 2014 at 9:00 am at the United City of Yorkville City
Council chambers, 800 Game Farm Road Yorkville, Illinois.
5. Proposals may also be hand-delivered to the following address by the date and time specified. It
is the responsibility of the bidder to deliver the proposal in accordance with these instructions
contained above and/or elsewhere in the RFP. Proposals dispatched, but not received by the City
by proposal closing time, will be returned, after receipt, unopened to the bidder. All proposals
should be addressed to:
United City of Yorkville
Re: (vendor name)
Proposal for Skid Steer RFP
Attention: Eric Dhuse
800 Game Farm Rd.
Yorkville, Illinois 60560
Proposal packets are available online at www.yorkville.il.us or at the United City of Yorkville
city hall which is located at 800 Game Farm Rd., Yorkville, Illinois.
6. Award of Contract. The United City of Yorkville City Council will make the final award of
the proposal or contract.
7. Contract. In addition to the completed proposal, a resulting contract shall be required by the City,
and may require product literature. All agreements between the United City of Yorkville and the
vendor will be handled through our legal counsel. In addition, any legal restrictions or provisions,
enforced by the vendor or its parent company, which are not in line with the industry’s standard,
should be pointed out.
8. Confidentiality of Documents. Proposals shall be unopened so as to avoid disclosure of contents
to competing bidders and kept secret during the process of negotiation. However, all proposals that
have been submitted shall be open for public inspection after contract award. Trade secrets and
confidential information, as specified by the vendor, contained in the proposals shall not be open for
public inspection.
9. Contact with City Employees. In order to ensure fair and objective evaluation, all questions
related to this RFP should be addressed only to the person (s) in attendance at the potential bidders
meeting on November 3, 2014. Contact with any other City employee is expressly prohibited
without prior consent of the persons so named herein. Vendors directly contacting other City
employees will risk elimination of their proposal from further consideration.
Conditions
The bidder shall, as part of this proposal, submit a bid to purchase the City’s Caterpillar 436
combination backhoe loader. The City will evaluate all bids based on this criteria. All bidders are
welcome to make an appointment to view/test the combination machine at any time during the
bidding process with a 24 hour notice.
The winning bidder shall deliver the skid steer no more than 30 days after award of bid. Any
exceptions shall be noted on the proposal.
Specifications for Skid Steer.
Machine must be bid with all standard equipment as shown in manufacturer’s printed
literature.
Machine shall have tracks, no bids with tires will be accepted. This must be stated clearly in
the bid package.
Operating weight shall be between 8000-9400 pounds
Operating capacity shall be no less than 2000 pounds
Machine shall have a Tier 4 engine rating
Machine shall have a Minimum horsepower - 74
Machine shall have two speed forward and two speeds reverse with speed controlled by
switch mounted on joystick control lever.
Machine will come with standard tooth bucket
Hydraulic system shall be high flow
Loader arm must feature hydraulic bucket self-leveling
Minimum lift height to bucket pin shall be 9’11”
Joystick control set to” Case” operation
Cab shall be equipped with factory installed heater and air conditioning and door mounted
windshield wiper
Cab unit shall include standard hydraulic universal front coupler system, controlled from the
operator’s seat
Machine shall have an electronic monitoring system to include visual and audible alarms for
low oil pressure, high engine coolant temp., air cleaner restriction, coolant level, and battery
charge level
Must have hour meter, fuel gauge, and water temperature gauge
Track width must be a minimum of 12.6” and must have a minimum ground contact length
of 54.7”
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
CA #10
Tracking Number
PW 2014-81
Parking restriction on Autumn Creek Boulevard
City Council – October 28, 2014
N/A
Majority
Approval
See attached memo.
Bart Olson Administration
Name Department
Summary:
A discussion related to off-street parking on Autumn Creek Boulevard.
Background:
Parking on Autumn Creek Boulevard between Prairie Grass Lane and Crimson lane is
prohibited on the south/west side of the street during baseball games (April-July, weeknights).
This restriction was approved by the City Council in June 2011, as a result of parking complaints
caused by baseball game visitor parking along Autumn Creek Boulevard.
In the past few days, the City has received a few complaints about double-sided parking
on Autumn Creek Boulevard near the school. These complaints have originated on Facebook
and one email to City staff. As a result of the complaints, City staff looked at the roadway width,
use of the surrounding area, and traffic patterns on Autumn Creek Boulevard.
Based on our staff analysis, we think that the use of Autumn Creek Boulevard as a
subdivision and regional thoroughfare warrants a one-sided parking restriction for the entire
length of Autumn Creek Boulevard. The school day traffic, school event traffic, use of the park
outside of baseball season, and width of the roadway were also deciding factors on our
recommendation.
Recommendation:
Staff recommends that the City Council adopt a permanent restriction for the south/west
side of Autumn Creek Boulevard between Kennedy Road and Route 34. If the committee
supports the recommendation, the item will move to City Council for informal adoption. With
City Council approval, we would notify adjacent landowners of the proposed restriction and
invite them to a future PW Committee meeting.
Memorandum
To: Public Works Committee
From: Bart Olson, City Administrator
Date: October 16, 2014
Subject: Parking on Autumn Creek Boulevard
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
Bills for Payment
Tracking Number
Bills for Payment (Informational): $1,402,707.63
City Council – October 28, 2014
None – Informational
Amy Simmons Finance
Name Department
DA
T
E
:
1
0
/
2
1
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
TI
M
E
:
1
2
:
1
8
:
5
8
M
A
N
U
A
L
C
H
E
C
K
R
E
G
I
S
T
E
R
ID
:
A
P
2
2
5
0
0
0
.
C
B
L
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
T
E
M
C
H
E
C
K
I
N
V
O
I
C
E
#
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
D
A
T
E
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
9
0
0
0
0
6
F
N
B
O
F
I
R
S
T
N
A
T
I
O
N
A
L
B
A
N
K
O
M
A
H
A
1
0
/
2
5
/
1
4
1
0
2
5
1
4
-
A
.
S
I
M
M
O
N
S
0
9
/
3
0
/
1
4
0
1
T
B
S
H
O
T
F
O
R
1
E
M
P
L
O
Y
E
E
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
6
2
1
0
2
.
1
0
0
2
S
E
P
T
.
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
4
0
1
5
.
6
2
0
3
S
E
P
T
.
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
0
1
-
2
2
0
-
5
4
-
0
0
-
5
4
4
0
1
1
.
7
2
0
4
S
E
P
T
.
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
0
1
-
1
2
0
-
5
4
-
0
0
-
5
4
4
0
1
5
.
6
3
0
5
S
E
P
T
.
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
7
9
-
7
9
0
-
5
6
-
0
0
-
5
6
2
0
2
1
.
4
8
0
6
S
E
P
T
.
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
4
0
1
0
1
.
5
5
0
7
S
E
P
T
.
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
7
9
-
7
9
5
-
5
6
-
0
0
-
5
6
0
2
2
1
.
4
8
0
8
S
E
P
T
.
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
5
2
-
5
2
0
-
5
6
-
0
0
-
5
6
2
0
1
1
.
7
2
0
9
S
E
P
T
.
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
0
1
-
4
1
0
-
5
6
-
0
0
-
5
6
2
0
1
5
.
6
2
1
0
S
E
P
T
.
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
2
0
1
9
.
5
3
1
1
Q
U
I
L
L
-
L
A
B
E
L
S
0
1
-
1
2
0
-
5
6
-
0
0
-
5
6
1
0
3
7
.
9
9
IN
V
O
I
C
E
T
O
T
A
L
:
3
7
4
.
4
4
*
1
0
2
5
1
4
-
B
.
O
L
S
E
M
0
9
/
3
0
/
1
4
0
1
A
D
D
I
N
G
M
A
C
H
I
N
E
T
A
P
E
0
1
-
1
1
0
-
5
6
-
0
0
-
5
6
1
0
6
.
1
6
0
2
P
A
P
E
R
0
1
-
1
1
0
-
5
6
-
0
0
-
5
6
1
0
3
2
9
.
4
0
IN
V
O
I
C
E
T
O
T
A
L
:
3
3
5
.
5
6
*
1
0
2
5
1
4
-
B
.
O
L
S
O
N
0
9
/
3
0
/
1
4
0
1
I
C
M
A
B
A
S
I
C
A
N
N
U
A
L
D
U
E
S
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
6
0
2
5
.
0
0
0
2
I
C
M
A
A
N
N
U
A
L
C
O
N
F
E
R
E
N
C
E
L
O
D
G
I
N
G
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
1
5
6
4
2
.
0
3
0
3
I
L
C
M
A
M
E
M
B
E
R
R
E
G
I
S
T
R
A
T
I
O
N
F
O
R
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
6
0
3
0
.
0
0
0
4
I
N
T
E
R
N
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
6
9
7
.
0
3
*
1
0
2
5
1
4
-
B
.
R
E
I
S
I
N
G
E
R
0
9
/
3
0
/
1
4
0
1
A
R
E
A
R
E
S
T
-
A
U
G
.
2
0
1
4
P
O
R
T
-
A
-
P
O
T
S
7
9
-
7
9
5
-
5
6
-
0
0
-
5
6
2
0
1
,
2
5
3
.
0
9
0
2
R
E
N
T
A
L
*
*
C
O
M
M
E
N
T
*
*
0
3
A
R
A
M
A
R
K
#
1
5
8
8
6
3
8
9
6
2
-
U
N
I
F
O
R
M
S
7
9
-
7
9
0
-
5
6
-
0
0
-
5
6
0
0
4
5
.
7
6
0
4
A
R
A
M
A
R
K
#
1
5
8
8
6
4
8
3
0
2
-
U
N
I
F
O
R
M
S
7
9
-
7
9
0
-
5
6
-
0
0
-
5
6
0
0
7
0
.
0
4
0
5
A
R
A
M
A
R
K
#
1
5
8
8
6
5
7
7
5
1
-
U
N
I
F
O
R
M
S
7
9
-
7
9
0
-
5
6
-
0
0
-
5
6
0
0
4
5
.
0
2
0
6
A
R
A
M
A
R
K
#
1
5
8
8
6
6
6
9
8
0
-
U
N
I
F
O
R
M
S
7
9
-
7
9
0
-
5
6
-
0
0
-
5
6
0
0
4
4
.
2
8
0
7
S
U
N
-
T
I
M
E
S
M
E
D
I
A
-
H
O
M
E
T
O
W
N
D
A
Y
S
7
9
-
7
9
5
-
5
6
-
0
0
-
5
6
0
2
9
0
0
.
0
0
0
8
F
E
S
T
I
V
A
L
A
D
*
*
C
O
M
M
E
N
T
*
*
0
9
A
T
&
T
U
-
V
E
R
S
E
-
T
O
W
N
S
Q
U
A
R
E
P
A
R
K
7
9
-
7
9
5
-
5
4
-
0
0
-
5
4
4
0
4
5
.
0
0
1
0
S
I
G
N
I
N
T
E
R
N
E
T
*
*
C
O
M
M
E
N
T
*
*
1
1
I
P
R
A
C
O
N
F
E
R
E
N
C
E
R
E
G
I
S
T
R
A
T
I
O
N
7
9
-
7
9
5
-
5
4
-
0
0
-
5
4
1
2
2
,
6
0
0
.
0
0
1
2
F
O
R
4
P
E
O
P
L
E
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
5
,
0
0
3
.
1
9
*
1
0
2
5
1
4
-
C
.
H
E
I
N
E
N
0
9
/
3
0
/
1
4
0
1
F
O
A
M
B
O
A
R
D
0
1
-
2
2
0
-
5
6
-
0
0
-
5
6
2
0
4
9
.
4
7
0
2
G
U
N
M
E
T
A
L
F
R
A
M
E
S
0
1
-
2
2
0
-
5
6
-
0
0
-
5
6
2
0
8
8
.
3
3
IN
V
O
I
C
E
T
O
T
A
L
:
1
3
7
.
8
0
*
1
0
2
5
1
4
-
E
.
D
H
U
S
E
0
9
/
3
0
/
1
4
0
1
W
A
T
E
R
P
R
O
D
U
C
T
S
#
0
2
5
1
6
6
6
-
G
A
R
D
E
N
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
6
4
5
9
.
2
3
0
2
H
O
S
E
*
*
C
O
M
M
E
N
T
*
*
0
3
A
R
A
M
A
R
K
#
1
5
8
8
6
3
8
9
6
1
-
U
N
I
F
O
R
M
S
0
1
-
4
1
0
-
5
6
-
0
0
-
5
6
0
0
3
4
.
7
5
0
4
A
R
A
M
A
R
K
#
1
5
8
8
6
3
8
9
6
1
-
U
N
I
F
O
R
M
S
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
0
0
3
4
.
7
5
Page 1 of 34
DA
T
E
:
1
0
/
2
1
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
2
TI
M
E
:
1
2
:
1
8
:
5
8
M
A
N
U
A
L
C
H
E
C
K
R
E
G
I
S
T
E
R
ID
:
A
P
2
2
5
0
0
0
.
C
B
L
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
T
E
M
C
H
E
C
K
I
N
V
O
I
C
E
#
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
D
A
T
E
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
9
0
0
0
0
6
F
N
B
O
F
I
R
S
T
N
A
T
I
O
N
A
L
B
A
N
K
O
M
A
H
A
1
0
/
2
5
/
1
4
1
0
2
5
1
4
-
E
.
D
H
U
S
E
0
9
/
3
0
/
1
4
0
5
A
R
A
M
A
R
K
#
1
5
8
8
6
3
8
9
6
1
-
U
N
I
F
O
R
M
S
5
2
-
5
2
0
-
5
6
-
0
0
-
5
6
0
0
3
4
.
7
6
0
6
A
R
A
M
A
R
K
#
1
5
8
8
6
5
7
7
5
0
-
U
N
I
F
O
R
M
S
0
1
-
4
1
0
-
5
6
-
0
0
-
5
6
0
0
3
4
.
7
6
0
7
A
R
A
M
A
R
K
#
1
5
8
8
6
5
7
7
5
0
-
U
N
I
F
O
R
M
S
5
2
-
5
2
0
-
5
6
-
0
0
-
5
6
0
0
3
4
.
7
5
0
8
A
R
A
M
A
R
K
#
1
5
8
8
6
5
7
7
5
0
-
U
N
I
F
O
R
M
S
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
0
0
3
4
.
7
5
0
9
A
R
A
M
A
R
K
#
1
5
8
8
6
6
6
9
7
9
-
U
N
I
F
O
R
M
S
0
1
-
4
1
0
-
5
6
-
0
0
-
5
6
0
0
4
6
.
4
3
1
0
A
R
A
M
A
R
K
#
1
5
8
8
6
6
6
9
7
9
-
U
N
I
F
O
R
M
S
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
0
0
4
6
.
4
3
1
1
A
R
A
M
A
R
K
#
1
5
8
8
6
6
6
9
7
9
-
U
N
I
F
O
R
M
S
5
2
-
5
2
0
-
5
6
-
0
0
-
5
6
0
0
4
6
.
4
3
1
2
W
A
T
E
R
P
R
O
D
U
C
T
S
#
0
2
5
1
7
9
6
-
H
O
S
E
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
4
0
3
,
4
0
3
.
7
6
1
3
G
A
S
K
E
T
S
,
P
U
M
P
G
A
S
K
E
T
S
,
V
A
L
V
E
*
*
C
O
M
M
E
N
T
*
*
1
4
R
U
B
B
E
R
,
V
A
L
V
E
S
E
A
T
S
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
3
,
8
1
0
.
8
0
*
1
0
2
5
1
4
-
J
.
D
Y
O
N
0
9
/
3
0
/
1
4
0
1
P
A
P
E
R
T
O
W
E
L
,
K
L
E
E
N
E
X
,
C
U
P
S
0
1
-
1
1
0
-
5
6
-
0
0
-
5
6
1
0
3
7
.
6
4
0
2
S
A
M
S
C
L
U
B
A
N
N
U
A
L
M
E
M
B
E
R
S
H
I
P
0
1
-
1
2
0
-
5
4
-
0
0
-
5
4
6
0
4
5
.
0
0
0
3
T
O
N
E
R
0
1
-
1
2
0
-
5
6
-
0
0
-
5
6
1
0
3
6
.
5
5
0
4
T
O
N
E
R
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
2
0
4
6
.
8
3
0
5
T
O
N
E
R
5
2
-
5
2
0
-
5
6
-
0
0
-
5
6
1
0
2
3
.
6
3
IN
V
O
I
C
E
T
O
T
A
L
:
1
8
9
.
6
5
*
1
0
2
5
1
4
-
K
.
B
A
R
K
S
D
A
L
E
0
9
/
3
0
/
1
4
0
1
A
P
A
-
I
L
C
O
N
F
E
R
E
N
C
E
R
E
G
I
S
T
R
A
T
I
O
N
0
1
-
2
2
0
-
5
4
-
0
0
-
5
4
1
2
3
4
0
.
0
0
0
2
F
O
R
1
P
E
R
S
O
N
*
*
C
O
M
M
E
N
T
*
*
0
3
C
N
A
S
U
R
E
T
Y
-
1
N
O
T
A
R
Y
P
U
B
L
I
C
0
1
-
2
2
0
-
5
6
-
0
0
-
5
6
2
0
3
0
.
0
0
0
4
C
U
S
T
O
M
E
R
S
E
R
V
I
C
E
S
E
M
I
N
A
R
F
O
R
0
1
-
2
2
0
-
5
4
-
0
0
-
5
4
1
2
1
7
9
.
0
0
0
5
P
E
R
S
O
N
*
*
C
O
M
M
E
N
T
*
*
0
6
I
C
S
C
M
E
M
B
E
R
S
H
I
P
R
E
N
E
W
A
L
0
1
-
2
2
0
-
5
4
-
0
0
-
5
4
6
0
2
7
0
.
0
0
0
7
I
C
S
C
C
H
I
C
A
G
O
D
E
A
L
M
A
K
I
N
G
0
1
-
2
2
0
-
5
4
-
0
0
-
5
4
1
2
2
9
5
.
0
0
0
8
M
E
E
T
I
N
G
R
E
G
I
S
T
R
A
T
I
O
N
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
1
1
4
.
0
0
*
1
0
2
5
1
4
-
L
.
H
I
L
T
0
9
/
3
0
/
1
4
0
1
I
N
F
O
R
U
S
#
3
3
7
4
3
-
U
S
0
6
A
-
M
O
B
I
L
E
2
5
-
2
0
5
-
6
0
-
0
0
-
6
0
7
0
6
,
6
1
8
.
5
0
0
2
W
I
T
H
M
A
P
P
I
N
G
M
A
I
N
T
E
N
A
N
C
E
&
*
*
C
O
M
M
E
N
T
*
*
0
3
L
I
C
E
N
S
E
F
E
E
*
*
C
O
M
M
E
N
T
*
*
0
4
D
A
V
E
A
U
T
O
#
2
2
3
0
1
-
S
Q
U
A
D
R
E
P
A
I
R
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
9
5
1
9
5
.
0
0
0
5
V
E
R
I
Z
O
N
#
9
7
3
1
3
3
3
9
5
7
-
0
8
/
0
5
-
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
4
0
5
0
6
.
3
2
0
6
0
9
/
0
1
M
O
B
I
L
E
B
R
O
A
D
B
A
N
D
I
N
C
A
R
*
*
C
O
M
M
E
N
T
*
*
0
7
U
N
I
T
S
*
*
C
O
M
M
E
N
T
*
*
0
8
M
I
N
E
R
E
L
E
C
T
#
2
5
4
7
2
3
-
I
N
S
T
A
L
L
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
9
5
1
,
7
5
0
.
0
0
0
9
N
E
W
D
O
C
K
S
I
N
7
S
Q
U
A
D
S
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
9
,
0
6
9
.
8
2
*
1
0
2
5
1
4
-
L
.
P
I
C
K
E
R
I
N
G
0
9
/
3
0
/
1
4
0
1
C
D
/
D
V
D
S
L
E
E
V
E
S
0
1
-
1
1
0
-
5
6
-
0
0
-
5
6
1
0
1
1
.
2
6
0
2
C
D
-
R
V
E
R
B
A
T
I
M
D
I
S
C
S
0
1
-
1
1
0
-
5
6
-
0
0
-
5
6
1
0
3
0
.
3
5
IN
V
O
I
C
E
T
O
T
A
L
:
4
1
.
6
1
*
1
0
2
5
1
4
-
N
.
D
E
C
K
E
R
0
9
/
3
0
/
1
4
0
1
J
I
F
F
Y
L
U
B
E
#
3
9
5
4
9
8
-
O
I
L
C
H
A
N
G
E
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
9
5
7
2
.
9
8
Page 2 of 34
DA
T
E
:
1
0
/
2
1
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
3
TI
M
E
:
1
2
:
1
8
:
5
8
M
A
N
U
A
L
C
H
E
C
K
R
E
G
I
S
T
E
R
ID
:
A
P
2
2
5
0
0
0
.
C
B
L
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
T
E
M
C
H
E
C
K
I
N
V
O
I
C
E
#
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
D
A
T
E
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
9
0
0
0
0
6
F
N
B
O
F
I
R
S
T
N
A
T
I
O
N
A
L
B
A
N
K
O
M
A
H
A
1
0
/
2
5
/
1
4
1
0
2
5
1
4
-
N
.
D
E
C
K
E
R
0
9
/
3
0
/
1
4
0
2
J
I
F
F
Y
L
U
B
E
#
3
9
5
7
0
8
-
O
I
L
C
H
A
N
G
E
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
9
5
6
3
.
9
8
0
3
G
O
O
D
Y
E
A
R
#
4
0
7
9
7
6
9
1
-
8
T
I
R
E
S
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
9
5
1
,
0
5
4
.
1
6
0
4
M
I
N
E
R
E
L
E
C
T
#
2
5
4
3
5
1
-
R
E
M
O
V
A
L
O
F
2
5
-
2
0
5
-
6
0
-
0
0
-
6
0
7
0
3
,
6
2
1
.
8
8
0
5
P
D
E
Q
U
I
P
M
E
N
T
F
R
O
M
D
E
F
E
C
T
I
V
E
*
*
C
O
M
M
E
N
T
*
*
0
6
V
E
H
I
C
L
E
*
*
C
O
M
M
E
N
T
*
*
0
7
A
T
&
T
#
6
3
0
5
5
3
3
4
3
6
-
0
8
1
4
-
0
8
/
2
5
-
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
4
0
7
5
.
7
3
0
8
0
9
/
2
4
S
E
R
V
I
C
E
*
*
C
O
M
M
E
N
T
*
*
0
9
M
I
N
E
R
E
L
E
C
T
#
2
5
3
9
6
0
-
F
U
L
L
S
Q
U
A
D
2
5
-
2
0
5
-
6
0
-
0
0
-
6
0
7
0
1
1
,
4
8
9
.
8
4
1
0
I
N
S
T
A
L
L
*
*
C
O
M
M
E
N
T
*
*
1
1
C
O
M
C
A
S
T
-
0
8
/
0
8
-
0
9
/
0
7
C
A
B
L
E
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
4
0
4
.
2
5
IN
V
O
I
C
E
T
O
T
A
L
:
1
6
,
3
8
2
.
8
2
*
1
0
2
5
1
4
-
P
.
R
A
T
O
S
0
9
/
3
0
/
1
4
0
1
3
M
P
H
O
T
O
M
O
U
N
T
,
C
A
R
W
A
S
H
0
1
-
2
2
0
-
5
6
-
0
0
-
5
6
2
0
2
9
.
7
3
IN
V
O
I
C
E
T
O
T
A
L
:
2
9
.
7
3
*
1
0
2
5
1
4
-
R
.
F
R
E
D
R
I
C
K
S
O
N
0
9
/
3
0
/
1
4
0
1
I
M
L
C
O
N
F
E
R
E
N
C
E
R
O
O
M
C
H
A
R
G
E
S
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
1
2
2
,
5
1
8
.
3
2
0
2
F
O
R
5
A
L
D
E
R
M
A
N
*
*
C
O
M
M
E
N
T
*
*
0
3
I
M
L
C
O
N
F
E
R
E
N
C
E
R
O
O
M
C
H
A
R
G
E
0
1
-
0
0
0
-
4
6
-
0
0
-
4
6
9
0
2
9
7
.
1
4
0
4
S
E
P
T
E
M
B
E
R
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
4
0
2
7
.
6
4
0
5
S
E
P
T
E
M
B
E
R
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
0
1
-
2
2
0
-
5
4
-
0
0
-
5
4
4
0
2
0
.
7
3
0
6
S
E
P
T
E
M
B
E
R
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
0
1
-
1
2
0
-
5
4
-
0
0
-
5
4
4
0
2
7
.
6
4
0
7
S
E
P
T
E
M
B
E
R
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
7
9
-
7
9
0
-
5
4
-
0
0
-
5
4
4
0
3
8
.
0
0
0
8
S
E
P
T
E
M
B
E
R
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
4
0
1
7
9
.
6
2
0
9
S
E
P
T
E
M
B
E
R
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
7
9
-
7
9
5
-
5
4
-
0
0
-
5
4
4
0
3
8
.
0
0
1
0
S
E
P
T
E
M
B
E
R
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
5
2
-
5
2
0
-
5
4
-
0
0
-
5
4
4
0
2
0
.
7
3
1
1
S
E
P
T
E
M
B
E
R
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
0
1
-
4
1
0
-
5
4
-
0
0
-
5
4
4
0
2
7
.
6
4
1
2
S
E
P
T
E
M
B
E
R
2
0
1
4
I
N
T
E
R
N
E
T
C
H
A
R
G
E
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
4
0
1
1
9
.
4
0
1
3
A
U
G
.
2
0
1
4
V
E
R
I
Z
O
N
C
E
L
L
C
H
A
R
G
E
S
0
1
-
2
2
0
-
5
4
-
0
0
-
5
4
4
0
1
8
0
.
0
0
1
4
A
U
G
.
2
0
1
4
V
E
R
I
Z
O
N
C
E
L
L
C
H
A
R
G
E
S
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
4
0
5
8
3
.
6
0
1
5
A
U
G
.
2
0
1
4
V
E
R
I
Z
O
N
C
E
L
L
C
H
A
R
G
E
S
7
9
-
7
9
0
-
5
4
-
0
0
-
5
4
4
0
1
0
7
.
7
4
1
6
A
U
G
.
2
0
1
4
V
E
R
I
Z
O
N
C
E
L
L
C
H
A
R
G
E
S
7
9
-
7
9
5
-
5
4
-
0
0
-
5
4
4
0
1
4
7
.
0
8
1
7
A
U
G
.
2
0
1
4
V
E
R
I
Z
O
N
C
E
L
L
C
H
A
R
G
E
S
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
4
0
3
1
2
.
2
9
1
8
2
C
E
L
L
P
H
O
N
E
C
A
S
E
S
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
2
0
7
4
.
9
8
1
9
A
U
G
.
2
0
1
4
V
E
R
I
Z
O
N
C
E
L
L
C
H
A
R
G
E
S
0
1
-
4
1
0
-
5
4
-
0
0
-
5
4
4
0
8
6
.
3
0
2
0
A
U
G
.
2
0
1
4
V
E
R
I
Z
O
N
C
E
L
L
C
H
A
R
G
E
S
5
2
-
5
2
0
-
5
4
-
0
0
-
5
4
4
0
5
9
.
1
0
2
1
R
E
O
C
U
R
R
I
N
G
W
E
B
U
P
K
E
E
P
F
E
E
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
5
0
1
5
.
9
5
2
2
P
O
S
T
A
G
E
0
1
-
0
0
0
-
1
5
-
0
0
-
1
5
8
6
6
.
1
5
2
3
2
0
1
4
I
G
F
O
A
D
E
B
T
I
N
S
T
I
T
U
T
E
0
1
-
1
2
0
-
5
4
-
0
0
-
5
4
1
2
2
1
0
.
0
0
2
4
R
E
G
I
S
T
R
A
T
I
O
N
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
5
,
0
9
8
.
0
5
*
1
0
2
5
1
4
-
R
.
H
A
R
M
O
N
0
9
/
3
0
/
1
4
0
1
P
R
E
S
C
H
O
O
L
S
U
P
P
L
I
E
S
7
9
-
7
9
5
-
5
6
-
0
0
-
5
6
0
6
1
5
1
.
3
3
0
2
M
E
N
A
R
D
S
-
B
A
T
T
E
R
I
E
S
,
D
O
O
R
S
T
O
P
7
9
-
7
9
5
-
5
6
-
0
0
-
5
6
0
6
1
0
.
4
7
0
3
C
R
A
F
T
K
N
I
F
E
,
P
A
P
E
R
7
9
-
7
9
5
-
5
6
-
0
0
-
5
6
0
6
2
6
.
4
8
0
4
B
R
E
A
D
,
S
T
R
A
W
B
E
R
R
I
E
S
7
9
-
7
9
5
-
5
6
-
0
0
-
5
6
0
6
1
3
.
1
8
Page 3 of 34
DA
T
E
:
1
0
/
2
1
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
4
TI
M
E
:
1
2
:
1
8
:
5
8
M
A
N
U
A
L
C
H
E
C
K
R
E
G
I
S
T
E
R
ID
:
A
P
2
2
5
0
0
0
.
C
B
L
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
T
E
M
C
H
E
C
K
I
N
V
O
I
C
E
#
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
D
A
T
E
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
9
0
0
0
0
6
F
N
B
O
F
I
R
S
T
N
A
T
I
O
N
A
L
B
A
N
K
O
M
A
H
A
1
0
/
2
5
/
1
4
1
0
2
5
1
4
-
R
.
H
A
R
M
O
N
0
9
/
3
0
/
1
4
0
5
L
U
C
K
Y
C
H
A
R
M
S
7
9
-
7
9
5
-
5
6
-
0
0
-
5
6
0
6
4
.
5
2
0
6
E
D
U
C
A
T
I
O
N
.
C
O
M
P
L
U
S
A
N
N
U
A
L
P
L
A
N
7
9
-
7
9
5
-
5
6
-
0
0
-
5
6
0
6
4
7
.
8
8
IN
V
O
I
C
E
T
O
T
A
L
:
2
5
3
.
8
6
*
1
0
2
5
1
4
-
R
.
W
R
I
G
H
T
0
9
/
3
0
/
1
4
0
1
S
E
P
T
.
2
0
1
4
H
R
A
A
D
M
I
N
F
E
E
S
0
1
-
1
1
0
-
5
2
-
0
0
-
5
2
1
6
1
2
.
0
0
0
2
S
E
P
T
.
2
0
1
4
H
R
A
A
D
M
I
N
F
E
E
S
0
1
-
1
1
0
-
5
2
-
0
0
-
5
2
3
5
9
.
0
0
0
3
S
E
P
T
.
2
0
1
4
H
R
A
A
D
M
I
N
F
E
E
S
0
1
-
1
2
0
-
5
2
-
0
0
-
5
2
1
6
3
.
0
0
0
4
S
E
P
T
.
2
0
1
4
H
R
A
A
D
M
I
N
F
E
E
S
0
1
-
2
1
0
-
5
2
-
0
0
-
5
2
1
6
6
9
.
0
0
0
5
S
E
P
T
.
2
0
1
4
H
R
A
A
D
M
I
N
F
E
E
S
0
1
-
2
2
0
-
5
2
-
0
0
-
5
2
1
6
1
2
.
0
0
0
6
S
E
P
T
.
2
0
1
4
H
R
A
A
D
M
I
N
F
E
E
S
0
1
-
4
1
0
-
5
2
-
0
0
-
5
2
1
6
4
.
0
0
0
7
S
E
P
T
.
2
0
1
4
H
R
A
A
D
M
I
N
F
E
E
S
7
9
-
7
9
0
-
5
2
-
0
0
-
5
2
1
6
9
.
0
0
0
8
S
E
P
T
.
2
0
1
4
H
R
A
A
D
M
I
N
F
E
E
S
7
9
-
7
9
5
-
5
2
-
0
0
-
5
2
1
6
9
.
0
0
0
9
S
E
P
T
.
2
0
1
4
H
R
A
A
D
M
I
N
F
E
E
S
5
1
-
5
1
0
-
5
2
-
0
0
-
5
2
1
6
1
3
.
0
0
1
0
S
E
P
T
.
2
0
1
4
H
R
A
A
D
M
I
N
F
E
E
S
5
2
-
5
2
0
-
5
2
-
0
0
-
5
2
1
6
4
.
0
0
1
1
S
E
P
T
.
2
0
1
4
H
R
A
A
D
M
I
N
F
E
E
S
0
1
-
6
4
0
-
5
2
-
0
0
-
5
2
4
0
1
5
.
0
0
1
2
S
E
P
T
.
2
0
1
4
H
R
A
A
D
M
I
N
F
E
E
S
8
2
-
8
2
0
-
5
2
-
0
0
-
5
2
1
6
1
5
.
0
0
1
3
S
E
P
T
.
2
0
1
4
F
S
A
A
D
M
I
N
F
E
E
S
0
1
-
1
1
0
-
5
2
-
0
0
-
5
2
1
6
9
.
0
0
1
4
S
E
P
T
.
2
0
1
4
F
S
A
A
D
M
I
N
F
E
E
S
0
1
-
1
2
0
-
5
2
-
0
0
-
5
2
1
6
6
.
0
0
1
5
S
E
P
T
.
2
0
1
4
F
S
A
A
D
M
I
N
F
E
E
S
0
1
-
2
1
0
-
5
2
-
0
0
-
5
2
1
6
2
3
.
9
9
1
6
S
E
P
T
.
2
0
1
4
F
S
A
A
D
M
I
N
F
E
E
S
0
1
-
2
2
0
-
5
2
-
0
0
-
5
2
1
6
3
.
0
0
1
7
S
E
P
T
.
2
0
1
4
F
S
A
A
D
M
I
N
F
E
E
S
0
1
-
4
1
0
-
5
2
-
0
0
-
5
2
1
6
3
.
0
0
1
8
S
E
P
T
.
2
0
1
4
F
S
A
A
D
M
I
N
F
E
E
S
5
1
-
5
1
0
-
5
2
-
0
0
-
5
2
1
6
6
.
0
0
1
9
S
E
P
T
.
2
0
1
4
F
S
A
A
D
M
I
N
F
E
E
S
0
1
-
6
4
0
-
5
2
-
0
0
-
5
2
4
0
3
.
0
0
2
0
R
U
S
H
C
O
P
L
E
Y
-
N
E
W
E
M
P
L
O
Y
E
E
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
6
2
2
5
.
0
0
2
1
T
E
S
T
I
N
G
*
*
C
O
M
M
E
N
T
*
*
2
2
R
U
S
H
C
O
P
L
E
Y
-
N
E
W
E
M
P
L
O
Y
E
E
8
2
-
8
2
0
-
5
4
-
0
0
-
5
4
6
2
2
5
.
0
0
2
3
T
E
S
T
I
N
G
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
2
7
7
.
9
9
*
1
0
2
5
1
4
-
S
.
R
E
D
M
O
N
0
9
/
3
0
/
1
4
0
1
N
A
M
O
Y
K
A
Y
A
K
E
V
E
N
T
R
E
F
R
E
S
H
M
E
N
T
S
8
8
-
8
8
0
-
6
0
-
0
0
-
6
0
0
0
3
6
9
.
4
0
IN
V
O
I
C
E
T
O
T
A
L
:
3
6
9
.
4
0
*
1
0
2
5
1
4
-
S
.
S
L
E
E
Z
E
R
0
9
/
3
0
/
1
4
0
1
W
A
T
E
R
,
G
A
T
O
R
A
D
E
,
P
O
P
7
9
-
7
9
5
-
5
6
-
0
0
-
5
6
0
2
5
7
.
1
8
0
2
R
&
P
C
A
R
R
I
A
G
E
S
D
E
P
O
S
I
T
7
9
-
7
9
0
-
5
6
-
0
0
-
5
6
4
0
2
5
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
8
2
.
1
8
*
1
0
2
5
1
4
-
T
.
H
O
U
L
E
0
9
/
3
0
/
1
4
0
1
L
A
S
E
R
L
I
N
E
F
O
O
T
G
R
A
D
E
R
O
D
7
9
-
7
9
0
-
5
6
-
0
0
-
5
6
3
0
1
6
7
.
3
8
IN
V
O
I
C
E
T
O
T
A
L
:
1
6
7
.
3
8
*
1
0
2
5
1
4
-
T
.
K
L
I
N
G
E
L
0
9
/
3
0
/
1
4
0
1
6
B
A
G
S
O
F
I
C
E
,
W
A
T
E
R
0
1
-
2
1
0
-
5
6
-
0
0
-
5
6
2
0
2
8
.
1
8
0
2
D
A
V
E
S
A
U
T
O
-
S
Q
U
A
D
R
E
P
A
I
R
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
9
5
4
5
0
.
0
0
0
3
D
A
V
E
S
A
U
T
O
#
2
2
2
8
0
-
S
Q
U
A
D
R
E
P
A
I
R
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
9
5
7
3
5
.
0
0
0
4
D
A
V
E
S
A
U
T
O
#
2
2
3
1
2
-
S
Q
U
A
D
R
E
P
A
I
R
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
9
5
2
4
0
.
0
0
0
5
R
T
.
3
4
A
U
T
O
#
2
2
4
1
-
T
I
R
E
R
O
T
A
T
I
O
N
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
9
5
1
0
.
4
0
0
6
H
A
N
E
S
T
-
S
H
I
R
T
S
,
2
F
L
A
S
H
D
R
I
V
E
S
0
1
-
2
1
0
-
5
6
-
0
0
-
5
6
0
0
1
0
2
.
1
6
Page 4 of 34
DA
T
E
:
1
0
/
2
1
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
5
TI
M
E
:
1
2
:
1
8
:
5
8
M
A
N
U
A
L
C
H
E
C
K
R
E
G
I
S
T
E
R
ID
:
A
P
2
2
5
0
0
0
.
C
B
L
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
T
E
M
C
H
E
C
K
I
N
V
O
I
C
E
#
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
D
A
T
E
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
9
0
0
0
0
6
F
N
B
O
F
I
R
S
T
N
A
T
I
O
N
A
L
B
A
N
K
O
M
A
H
A
1
0
/
2
5
/
1
4
1
0
2
5
1
4
-
T
.
K
L
I
N
G
E
L
0
9
/
3
0
/
1
4
0
7
D
A
V
E
S
A
U
T
O
#
2
2
3
5
5
-
S
Q
U
A
D
R
E
P
A
I
R
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
9
5
6
9
2
.
0
0
0
8
S
H
I
R
T
S
0
1
-
2
1
0
-
5
6
-
0
0
-
5
6
0
0
1
2
0
.
0
0
0
9
P
A
N
T
S
&
S
H
O
R
T
S
0
1
-
2
1
0
-
5
6
-
0
0
-
5
6
0
0
8
2
.
5
8
1
0
M
E
A
S
U
R
E
R
,
D
O
O
R
O
P
E
N
E
R
0
1
-
2
1
0
-
5
6
-
0
0
-
5
6
2
0
1
2
7
.
0
0
1
1
R
T
.
3
4
A
U
T
O
-
O
I
L
C
H
A
N
G
E
S
A
N
D
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
9
5
4
2
0
.
9
3
1
2
S
Q
U
A
D
R
E
P
A
I
R
*
*
C
O
M
M
E
N
T
*
*
1
3
R
T
.
3
4
A
U
T
O
-
O
I
L
C
H
A
N
G
E
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
9
5
5
4
.
7
8
IN
V
O
I
C
E
T
O
T
A
L
:
3
,
0
6
3
.
0
3
*
1
0
2
5
1
4
-
T
.
K
O
N
E
N
0
9
/
3
0
/
1
4
0
1
H
O
M
E
D
E
P
O
-
C
A
U
T
I
O
N
T
A
P
E
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
2
0
2
3
.
9
7
0
2
H
O
M
E
D
E
P
O
-
S
U
P
E
R
G
L
U
E
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
2
0
5
.
9
7
0
3
S
T
A
F
F
O
R
D
S
-
R
E
A
R
B
U
M
B
E
R
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
2
8
2
5
0
.
0
0
0
4
T
A
Y
L
O
R
T
E
C
H
-
C
H
E
M
I
C
A
L
S
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
3
8
7
0
.
0
5
0
5
M
O
N
T
H
L
Y
A
C
R
O
B
A
T
P
R
O
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
3
5
2
1
.
2
4
0
6
S
U
B
S
C
R
I
P
T
I
O
N
*
*
C
O
M
M
E
N
T
*
*
0
7
L
E
S
M
A
N
I
N
S
T
R
U
M
E
N
T
-
C
H
A
R
T
H
U
B
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
4
0
6
8
.
3
6
0
8
K
I
T
*
*
C
O
M
M
E
N
T
*
*
0
9
Y
O
R
K
A
C
E
#
C
0
0
6
7
3
-
T
R
I
M
M
E
R
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
3
0
3
0
5
.
9
9
1
0
H
O
M
E
D
E
P
O
-
G
A
S
C
A
N
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
3
8
1
1
.
9
8
1
1
D
W
Y
E
R
I
N
S
T
R
U
M
E
N
T
-
F
L
O
T
E
C
T
F
L
O
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
3
8
2
7
5
.
6
1
1
2
S
W
I
T
C
H
*
*
C
O
M
M
E
N
T
*
*
1
3
Y
O
R
K
A
C
E
#
C
0
0
7
7
3
-
O
I
L
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
3
0
1
6
.
7
4
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
0
4
9
.
9
1
*
1
0
2
5
1
4
-
T
.
N
E
L
S
O
N
0
9
/
3
0
/
1
4
0
1
Y
O
R
K
A
C
E
-
K
E
Y
7
9
-
7
9
5
-
5
6
-
0
0
-
5
6
0
6
4
.
9
8
IN
V
O
I
C
E
T
O
T
A
L
:
4
.
9
8
*
1
0
2
5
1
4
-
U
C
O
Y
O
P
0
9
/
3
0
/
1
4
0
1
A
U
G
.
2
0
1
4
T
R
A
S
H
S
E
R
V
I
C
E
0
1
-
5
4
0
-
5
4
-
0
0
-
5
4
4
1
6
,
4
2
1
.
5
6
0
2
A
U
G
.
2
0
1
4
T
R
A
S
H
S
E
R
V
I
C
E
0
1
-
5
4
0
-
5
4
-
0
0
-
5
4
4
2
9
1
,
3
7
1
.
1
8
IN
V
O
I
C
E
T
O
T
A
L
:
9
7
,
7
9
2
.
7
4
*
1
0
2
5
1
4
-
W
A
S
T
E
2
0
9
/
3
0
/
1
4
0
1
A
N
N
U
A
L
M
E
M
B
E
R
S
H
I
P
F
E
E
0
1
-
1
2
0
-
5
4
-
0
0
-
5
4
6
2
1
0
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
0
.
0
0
*
1
0
2
5
1
4
-
W
A
S
T
E
S
E
R
V
I
C
E
0
9
/
3
0
/
1
4
0
1
F
N
B
O
A
N
N
U
A
L
M
E
M
B
E
R
S
H
I
P
F
E
E
0
1
-
1
2
0
-
5
4
-
0
0
-
5
4
6
2
1
0
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
0
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
1
4
5
,
3
6
5
.
9
7
TO
T
A
L
A
M
O
U
N
T
P
A
I
D
:
1
4
5
,
3
6
5
.
9
7
Page 5 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
6
0
A
A
C
V
B
A
U
R
O
R
A
A
R
E
A
C
O
N
V
E
N
T
I
O
N
0
8
3
1
1
4
-
A
L
L
1
0
/
1
4
/
1
4
0
1
A
U
G
.
2
0
1
4
A
L
L
S
E
A
S
O
N
H
O
T
E
L
T
A
X
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
8
1
3
6
.
4
6
IN
V
O
I
C
E
T
O
T
A
L
:
3
6
.
4
6
*
0
8
3
1
1
4
-
H
A
M
P
T
O
N
1
0
/
1
4
/
1
4
0
1
A
U
G
.
2
0
1
4
H
A
,
P
T
O
N
I
N
N
H
O
T
E
L
T
A
X
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
8
1
4
,
7
9
6
.
9
3
IN
V
O
I
C
E
T
O
T
A
L
:
4
,
7
9
6
.
9
3
*
0
8
3
1
1
4
-
S
U
P
E
R
1
0
/
1
0
/
1
4
0
1
A
U
G
.
2
0
1
4
S
U
P
E
R
8
H
O
T
E
L
T
A
X
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
8
1
1
,
4
6
6
.
8
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
4
6
6
.
8
0
*
CH
E
C
K
T
O
T
A
L
:
6
,
3
0
0
.
1
9
5
1
8
4
6
1
A
D
S
A
L
A
R
M
A
L
A
R
M
D
E
T
E
C
T
I
O
N
S
Y
S
T
E
M
S
I
N
C
1
5
8
1
2
7
-
1
0
0
5
1
4
1
0
/
0
5
/
1
4
0
1
O
C
T
-
D
E
C
A
L
A
R
M
M
O
N
I
T
O
R
I
N
G
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
6
2
4
8
9
.
5
4
IN
V
O
I
C
E
T
O
T
A
L
:
4
8
9
.
5
4
*
CH
E
C
K
T
O
T
A
L
:
4
8
9
.
5
4
5
1
8
4
6
2
A
I
R
G
A
S
A
I
R
G
A
S
N
O
R
T
H
C
E
N
T
R
A
L
9
9
2
1
7
6
1
7
1
4
1
0
/
0
1
/
1
4
0
1
C
Y
L
I
N
D
E
R
L
E
A
S
E
R
E
N
E
W
A
L
0
1
-
4
1
0
-
5
4
-
0
0
-
5
4
6
2
8
3
.
2
5
IN
V
O
I
C
E
T
O
T
A
L
:
8
3
.
2
5
*
CH
E
C
K
T
O
T
A
L
:
8
3
.
2
5
5
1
8
4
6
3
A
M
P
E
R
A
G
E
A
M
P
E
R
A
G
E
E
L
E
C
T
R
I
C
A
L
S
U
P
P
L
Y
I
N
C
0
5
2
5
4
3
2
-
C
M
0
7
/
0
7
/
1
4
0
1
M
E
R
C
H
A
N
D
I
S
E
R
E
T
U
R
N
C
R
E
D
I
T
7
9
-
7
9
0
-
5
6
-
0
0
-
5
6
4
0
-
1
6
7
.
4
8
IN
V
O
I
C
E
T
O
T
A
L
:
-
1
6
7
.
4
8
*
0
5
3
4
9
0
3
-
C
M
0
9
/
1
1
/
1
4
0
1
M
E
R
C
H
A
N
D
I
S
E
R
E
T
U
R
N
C
R
E
D
I
T
0
1
-
4
1
0
-
5
6
-
0
0
-
5
6
2
0
-
7
1
.
7
6
IN
V
O
I
C
E
T
O
T
A
L
:
-
7
1
.
7
6
*
0
5
3
8
8
6
6
-
I
N
1
0
/
0
1
/
1
4
0
1
C
O
B
R
A
H
E
A
D
S
L
E
D
0
1
-
4
1
0
-
5
6
-
0
0
-
5
6
4
0
3
0
7
.
9
1
IN
V
O
I
C
E
T
O
T
A
L
:
3
0
7
.
9
1
*
CH
E
C
K
T
O
T
A
L
:
6
8
.
6
7
Page 6 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
2
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
6
4
A
T
T
A
T
&
T
6
3
0
5
5
3
6
8
0
5
-
0
9
1
4
0
9
/
2
5
/
1
4
0
1
0
9
/
2
5
-
1
0
/
2
4
S
E
R
V
I
C
E
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
4
0
1
4
6
.
6
5
IN
V
O
I
C
E
T
O
T
A
L
:
1
4
6
.
6
5
*
CH
E
C
K
T
O
T
A
L
:
1
4
6
.
6
5
5
1
8
4
6
5
B
C
B
S
B
L
U
E
C
R
O
S
S
B
L
U
E
S
H
I
E
L
D
1
0
0
8
1
4
1
0
/
0
8
/
1
4
0
1
N
O
V
.
2
0
1
4
H
E
A
L
T
H
I
N
S
U
R
A
N
C
E
0
1
-
1
1
0
-
5
2
-
0
0
-
5
2
1
6
5
,
9
7
6
.
1
6
0
2
N
O
V
.
2
0
1
4
H
E
A
L
T
H
I
N
S
U
R
A
N
C
E
0
1
-
1
1
0
-
5
2
-
0
0
-
5
2
3
5
5
,
7
2
6
.
5
8
0
3
N
O
V
.
2
0
1
4
H
E
A
L
T
H
I
N
S
U
R
A
N
C
E
0
1
-
1
2
0
-
5
2
-
0
0
-
5
2
1
6
1
,
6
2
9
.
9
6
0
4
N
O
V
.
2
0
1
4
H
E
A
L
T
H
I
N
S
U
R
A
N
C
E
0
1
-
2
1
0
-
5
2
-
0
0
-
5
2
1
6
4
0
,
6
3
1
.
8
5
0
5
N
O
V
.
2
0
1
4
H
E
A
L
T
H
I
N
S
U
R
A
N
C
E
0
1
-
2
2
0
-
5
2
-
0
0
-
5
2
1
6
5
,
3
8
7
.
4
5
0
6
N
O
V
.
2
0
1
4
H
E
A
L
T
H
I
N
S
U
R
A
N
C
E
0
1
-
4
1
0
-
5
2
-
0
0
-
5
2
1
6
8
,
4
8
5
.
4
0
0
7
N
O
V
.
2
0
1
4
H
E
A
L
T
H
I
N
S
U
R
A
N
C
E
0
1
-
6
4
0
-
5
2
-
0
0
-
5
2
4
0
7
,
2
2
1
.
9
4
0
8
N
O
V
.
2
0
1
4
H
E
A
L
T
H
I
N
S
U
R
A
N
C
E
7
9
-
7
9
0
-
5
2
-
0
0
-
5
2
1
6
9
,
1
5
3
.
3
7
0
9
N
O
V
.
2
0
1
4
H
E
A
L
T
H
I
N
S
U
R
A
N
C
E
7
9
-
7
9
5
-
5
2
-
0
0
-
5
2
1
6
5
,
8
4
8
.
9
2
1
0
N
O
V
.
2
0
1
4
H
E
A
L
T
H
I
N
S
U
R
A
N
C
E
5
1
-
5
1
0
-
5
2
-
0
0
-
5
2
1
6
8
,
5
1
7
.
2
7
1
1
N
O
V
.
2
0
1
4
H
E
A
L
T
H
I
N
S
U
R
A
N
C
E
5
2
-
5
2
0
-
5
2
-
0
0
-
5
2
1
6
3
,
2
8
9
.
3
3
1
2
N
O
V
.
2
0
1
4
H
E
A
L
T
H
I
N
S
U
R
A
N
C
E
8
2
-
8
2
0
-
5
2
-
0
0
-
5
2
1
6
4
,
8
4
3
.
7
7
IN
V
O
I
C
E
T
O
T
A
L
:
1
0
6
,
7
1
2
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
1
0
6
,
7
1
2
.
0
0
5
1
8
4
6
6
B
U
I
L
D
E
R
S
B
U
I
L
D
E
R
S
A
S
P
H
A
L
T
L
L
C
1
3
4
7
4
0
9
/
2
6
/
1
4
0
1
A
S
P
H
A
L
T
F
O
R
R
O
A
D
R
E
P
A
I
R
1
5
-
1
5
5
-
5
6
-
0
0
-
5
6
3
4
2
,
1
2
0
.
1
2
IN
V
O
I
C
E
T
O
T
A
L
:
2
,
1
2
0
.
1
2
*
CH
E
C
K
T
O
T
A
L
:
2
,
1
2
0
.
1
2
5
1
8
4
6
7
C
A
M
V
A
C
C
A
M
-
V
A
C
I
N
C
.
7
3
5
1
0
/
0
8
/
1
4
0
1
T
E
L
E
V
I
S
E
A
N
D
C
U
T
R
O
O
T
S
I
N
5
2
-
5
2
0
-
5
4
-
0
0
-
5
4
9
5
2
,
3
2
7
.
0
0
0
2
S
A
N
I
T
A
R
T
Y
L
I
N
E
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
2
,
3
2
7
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
2
,
3
2
7
.
0
0
Page 7 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
3
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
6
8
C
E
N
T
R
A
L
L
C
E
N
T
R
A
L
L
I
M
E
S
T
O
N
E
C
O
M
P
A
N
Y
,
I
N
C
2
0
4
1
0
9
/
3
0
/
1
4
0
1
G
R
A
V
E
L
0
1
-
4
1
0
-
5
6
-
0
0
-
5
6
2
0
2
1
1
.
4
6
IN
V
O
I
C
E
T
O
T
A
L
:
2
1
1
.
4
6
*
CH
E
C
K
T
O
T
A
L
:
2
1
1
.
4
6
5
1
8
4
6
9
C
O
L
L
E
P
R
O
C
O
L
L
E
C
T
I
O
N
P
R
O
F
E
S
S
I
O
N
A
L
S
I
N
C
.
2
1
4
8
3
0
-
J
-
0
9
3
0
1
4
0
9
/
3
0
/
1
4
0
1
C
O
M
M
I
S
I
O
N
O
N
C
O
L
L
E
C
T
I
O
N
S
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
6
2
8
4
.
4
4
IN
V
O
I
C
E
T
O
T
A
L
:
8
4
.
4
4
*
CH
E
C
K
T
O
T
A
L
:
8
4
.
4
4
5
1
8
4
7
0
C
O
M
E
D
C
O
M
M
O
N
W
E
A
L
T
H
E
D
I
S
O
N
0
1
8
5
0
7
9
1
0
9
-
0
9
1
4
0
9
/
3
0
/
1
4
0
1
0
8
/
2
7
-
0
9
/
3
0
4
2
0
F
A
I
R
H
A
V
E
N
5
2
-
5
2
0
-
5
4
-
0
0
-
5
4
8
0
1
5
1
.
5
4
IN
V
O
I
C
E
T
O
T
A
L
:
1
5
1
.
5
4
*
0
6
6
3
1
1
2
2
3
0
-
0
9
1
4
0
9
/
3
0
/
1
4
0
1
8
/
2
9
-
9
/
2
9
1
0
3
1
/
2
B
E
A
V
E
R
L
I
F
T
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
8
0
2
0
9
.
9
8
IN
V
O
I
C
E
T
O
T
A
L
:
2
0
9
.
9
8
*
0
9
0
3
0
4
0
0
7
7
-
0
9
1
4
0
9
/
2
7
/
1
4
0
1
0
8
/
1
2
-
0
9
/
2
6
M
I
S
C
.
S
T
R
E
E
T
L
I
G
H
T
S
1
5
-
1
5
5
-
5
4
-
0
0
-
5
4
8
2
2
,
3
4
0
.
9
5
IN
V
O
I
C
E
T
O
T
A
L
:
2
,
3
4
0
.
9
5
*
0
9
0
8
0
1
4
0
0
4
-
0
9
1
4
0
9
/
3
0
/
1
4
0
1
0
9
/
0
3
-
0
9
/
3
0
6
7
8
0
R
T
.
4
7
W
E
L
L
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
8
0
1
2
4
.
3
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
2
4
.
3
0
*
1
4
0
7
1
2
5
0
4
5
-
0
9
1
4
1
0
/
0
2
/
1
4
0
1
0
8
/
2
9
-
1
0
/
0
2
F
O
X
H
I
L
L
L
I
F
T
5
2
-
5
2
0
-
5
4
-
0
0
-
5
4
8
0
8
9
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
8
9
.
5
0
*
2
0
1
9
0
9
9
0
4
4
-
0
9
1
4
1
0
/
0
4
/
1
4
0
1
0
8
/
1
4
-
0
9
/
1
2
4
6
0
0
B
R
I
D
G
E
W
E
L
L
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
8
0
7
.
3
0
IN
V
O
I
C
E
T
O
T
A
L
:
7
.
3
0
*
4
0
8
5
0
8
0
0
3
3
-
0
9
1
4
0
9
/
3
0
/
1
4
0
1
0
8
/
2
7
-
0
9
/
3
0
1
9
9
1
C
A
N
N
O
N
B
A
L
L
T
R
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
8
0
1
4
0
.
2
6
IN
V
O
I
C
E
T
O
T
A
L
:
1
4
0
.
2
6
*
Page 8 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
4
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
7
0
C
O
M
E
D
C
O
M
M
O
N
W
E
A
L
T
H
E
D
I
S
O
N
4
4
4
9
0
8
7
0
1
6
-
0
9
1
4
1
0
/
0
4
/
1
4
0
1
0
8
/
2
7
-
0
9
/
3
0
M
I
S
C
L
I
F
T
S
T
A
T
I
O
N
S
5
2
-
5
2
0
-
5
4
-
0
0
-
5
4
8
0
7
2
4
.
2
8
IN
V
O
I
C
E
T
O
T
A
L
:
7
2
4
.
2
8
*
4
4
7
5
0
9
3
0
5
3
-
0
9
1
4
0
9
/
2
9
/
1
4
0
1
0
8
/
2
8
-
0
9
/
2
9
6
1
0
T
O
W
E
R
L
A
N
E
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
8
0
1
8
4
.
3
6
IN
V
O
I
C
E
T
O
T
A
L
:
1
8
4
.
3
6
*
7
0
9
0
0
3
9
0
0
5
-
0
9
1
4
1
0
/
0
8
/
1
4
0
1
0
9
/
0
9
-
1
0
/
0
8
R
T
.
3
4
&
C
A
N
N
O
N
B
A
L
L
1
5
-
1
5
5
-
5
4
-
0
0
-
5
4
8
2
2
0
.
2
1
IN
V
O
I
C
E
T
O
T
A
L
:
2
0
.
2
1
*
CH
E
C
K
T
O
T
A
L
:
3
,
9
9
2
.
6
8
5
1
8
4
7
1
C
O
N
S
T
E
L
L
C
O
N
S
T
E
L
L
A
T
I
O
N
N
E
W
E
N
E
R
G
Y
0
0
1
7
9
4
1
0
2
6
0
9
/
2
8
/
1
4
0
1
0
8
/
2
6
-
0
9
/
2
5
2
2
2
4
T
R
E
M
O
N
T
S
T
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
8
0
4
,
0
5
8
.
9
3
IN
V
O
I
C
E
T
O
T
A
L
:
4
,
0
5
8
.
9
3
*
0
0
1
8
0
2
8
0
6
7
1
0
/
0
1
/
1
4
0
1
0
8
/
2
8
-
0
9
/
2
8
6
1
0
T
O
W
E
R
L
A
N
E
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
8
0
6
,
3
3
7
.
8
8
IN
V
O
I
C
E
T
O
T
A
L
:
6
,
3
3
7
.
8
8
*
0
0
1
8
3
1
4
1
5
4
1
0
/
0
6
/
1
4
0
1
0
9
/
0
3
-
0
9
/
3
0
1
W
E
S
T
A
L
L
E
Y
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
8
0
7
6
4
.
0
3
IN
V
O
I
C
E
T
O
T
A
L
:
7
6
4
.
0
3
*
CH
E
C
K
T
O
T
A
L
:
1
1
,
1
6
0
.
8
4
5
1
8
4
7
2
E
E
I
E
N
G
I
N
E
E
R
I
N
G
E
N
T
E
R
P
R
I
S
E
S
,
I
N
C
.
4
-
5
5
0
0
0
0
9
/
2
6
/
1
4
0
1
R
T
.
4
7
S
T
R
E
E
T
L
I
G
H
T
&
2
3
-
2
3
0
-
6
0
-
0
0
-
6
0
4
8
1
,
6
2
8
.
9
5
0
2
S
T
R
E
E
T
S
C
A
P
E
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
6
2
8
.
9
5
*
CH
E
C
K
T
O
T
A
L
:
1
,
6
2
8
.
9
5
5
1
8
4
7
3
E
E
I
E
N
G
I
N
E
E
R
I
N
G
E
N
T
E
R
P
R
I
S
E
S
,
I
N
C
.
5
5
0
0
1
-
1
0
9
/
2
6
/
1
4
0
1
C
A
N
N
O
N
B
A
L
L
T
R
A
I
L
L
A
F
O
1
5
-
1
5
5
-
6
0
-
0
0
-
6
0
8
9
1
,
2
2
6
.
9
5
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
2
2
6
.
9
5
*
CH
E
C
K
T
O
T
A
L
:
1
,
2
2
6
.
9
5
Page 9 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
5
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
7
4
E
E
I
E
N
G
I
N
E
E
R
I
N
G
E
N
T
E
R
P
R
I
S
E
S
,
I
N
C
.
5
5
0
0
2
0
9
/
2
6
/
1
4
0
1
R
T
.
4
7
O
F
F
S
T
R
E
E
T
P
A
R
K
I
N
G
1
5
-
1
5
5
-
6
0
-
0
0
-
6
0
7
2
2
,
1
7
5
.
0
0
0
2
I
M
P
R
O
V
E
M
E
N
T
S
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
2
,
1
7
5
.
0
0
*
5
5
0
0
3
0
9
/
2
6
/
1
4
0
1
C
E
N
T
R
A
L
R
T
.
4
7
I
M
P
R
O
V
E
M
E
N
T
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
2
,
2
1
2
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
2
,
2
1
2
.
5
0
*
5
5
0
0
4
0
9
/
2
6
/
1
4
0
1
R
T
.
3
4
I
M
P
R
O
V
E
M
E
N
T
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
2
5
6
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
2
5
6
.
5
0
*
5
5
0
0
5
0
9
/
2
6
/
1
4
0
1
G
A
M
E
F
A
R
M
/
S
O
M
O
N
A
U
K
I
M
P
R
O
V
E
M
E
N
T
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
4
,
9
8
8
.
7
5
IN
V
O
I
C
E
T
O
T
A
L
:
4
,
9
8
8
.
7
5
*
CH
E
C
K
T
O
T
A
L
:
9
,
6
3
2
.
7
5
5
1
8
4
7
5
E
E
I
E
N
G
I
N
E
E
R
I
N
G
E
N
T
E
R
P
R
I
S
E
S
,
I
N
C
.
5
5
0
0
6
0
9
/
2
6
/
1
4
0
1
C
A
N
N
O
N
B
A
L
L
&
R
T
.
4
7
I
M
P
R
O
V
E
M
E
N
T
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
1
6
0
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
6
0
.
5
0
*
CH
E
C
K
T
O
T
A
L
:
1
6
0
.
5
0
5
1
8
4
7
6
E
E
I
E
N
G
I
N
E
E
R
I
N
G
E
N
T
E
R
P
R
I
S
E
S
,
I
N
C
.
5
5
0
0
7
0
9
/
2
6
/
1
4
0
1
K
E
N
D
A
L
L
M
A
R
K
E
T
P
L
A
C
E
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
1
7
1
.
0
0
0
2
I
M
P
R
O
V
E
M
E
N
T
S
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
1
7
1
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
1
7
1
.
0
0
5
1
8
4
7
7
E
E
I
E
N
G
I
N
E
E
R
I
N
G
E
N
T
E
R
P
R
I
S
E
S
,
I
N
C
.
5
5
0
0
8
0
9
/
2
6
/
1
4
0
1
W
H
I
S
P
E
R
I
N
G
M
E
A
D
O
W
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
8
5
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
8
5
.
5
0
*
Page 10 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
6
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
7
7
E
E
I
E
N
G
I
N
E
E
R
I
N
G
E
N
T
E
R
P
R
I
S
E
S
,
I
N
C
.
5
5
0
0
9
0
9
/
2
6
/
1
4
0
1
A
U
T
U
M
N
C
R
E
E
K
-
U
N
I
T
1
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
3
6
7
.
5
0
0
2
R
E
S
U
B
D
I
V
I
S
I
O
N
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
3
6
7
.
5
0
*
5
5
0
1
0
0
9
/
2
6
/
1
4
0
1
A
U
T
U
M
N
C
R
E
E
K
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
3
6
7
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
3
6
7
.
5
0
*
5
5
0
1
2
0
9
/
2
6
/
1
4
0
1
U
T
I
L
I
T
Y
P
E
R
M
I
T
R
E
V
I
E
W
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
3
0
0
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
3
0
0
.
0
0
*
5
5
0
1
3
0
9
/
2
6
/
1
4
0
1
A
U
T
U
M
N
C
R
E
E
K
,
U
N
I
T
2
A
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
1
,
0
2
3
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
0
2
3
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
2
,
1
4
3
.
5
0
5
1
8
4
7
8
E
E
I
E
N
G
I
N
E
E
R
I
N
G
E
N
T
E
R
P
R
I
S
E
S
,
I
N
C
.
5
5
0
1
4
0
9
/
2
6
/
1
4
0
1
K
E
N
N
E
D
Y
R
D
I
M
P
R
O
V
E
M
E
N
T
S
2
3
-
2
3
0
-
6
0
-
0
0
-
6
0
0
7
5
1
,
8
9
8
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
5
1
,
8
9
8
.
5
0
*
CH
E
C
K
T
O
T
A
L
:
5
1
,
8
9
8
.
5
0
5
1
8
4
7
9
E
E
I
E
N
G
I
N
E
E
R
I
N
G
E
N
T
E
R
P
R
I
S
E
S
,
I
N
C
.
5
5
0
1
5
0
9
/
2
6
/
1
4
0
1
B
R
I
A
R
W
O
O
D
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
1
3
3
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
3
3
.
5
0
*
5
5
0
1
6
0
9
/
2
6
/
1
4
0
1
A
U
T
U
M
N
C
R
E
E
K
,
U
N
I
T
2
B
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
7
6
9
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
7
6
9
.
5
0
*
5
5
0
1
7
0
9
/
2
6
/
1
4
0
1
B
L
A
C
K
B
E
R
R
Y
W
O
O
D
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
6
,
2
7
6
.
7
5
IN
V
O
I
C
E
T
O
T
A
L
:
6
,
2
7
6
.
7
5
*
5
5
0
1
8
0
9
/
2
6
/
1
4
0
1
K
E
N
D
A
L
L
C
R
O
S
S
I
N
G
9
0
-
0
3
9
-
3
9
-
0
0
-
0
1
1
1
9
7
2
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
9
7
2
.
0
0
*
Page 11 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
7
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
7
9
E
E
I
E
N
G
I
N
E
E
R
I
N
G
E
N
T
E
R
P
R
I
S
E
S
,
I
N
C
.
5
5
0
1
9
0
9
/
2
6
/
1
4
0
1
C
A
L
E
D
O
N
I
A
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
2
,
2
8
3
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
2
,
2
8
3
.
0
0
*
5
5
0
2
0
0
9
/
2
6
/
1
4
0
1
R
T
.
3
4
M
C
D
O
N
A
L
D
S
S
I
T
E
9
0
-
0
6
0
-
6
0
-
0
0
-
0
1
1
1
8
6
1
.
7
5
0
2
I
M
P
R
O
V
E
M
E
N
T
S
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
8
6
1
.
7
5
*
5
5
0
2
1
0
9
/
2
6
/
1
4
0
1
Y
O
R
K
V
I
L
L
E
C
H
R
I
S
T
A
I
N
S
C
H
O
O
L
9
0
-
0
5
5
-
5
5
-
0
0
-
0
1
1
1
1
7
3
.
2
5
IN
V
O
I
C
E
T
O
T
A
L
:
1
7
3
.
2
5
*
5
5
0
2
3
0
9
/
2
6
/
1
4
0
1
A
U
T
U
M
N
C
R
E
E
K
,
U
N
I
T
2
C
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
6
9
3
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
6
9
3
.
0
0
*
5
5
0
2
4
0
9
/
2
6
/
1
4
0
1
Y
O
R
K
V
I
L
L
E
H
I
G
H
S
C
H
O
O
L
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
2
2
4
.
2
5
0
2
E
X
P
A
N
S
I
O
N
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
2
2
4
.
2
5
*
5
5
0
2
5
0
9
/
2
6
/
1
4
0
1
K
I
N
G
D
O
M
H
A
L
L
O
F
J
E
H
O
V
A
H
9
0
-
0
5
7
-
5
7
-
0
0
-
0
1
1
1
2
8
1
.
2
5
0
2
W
I
T
N
E
S
S
E
S
-
S
I
T
E
P
L
A
N
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
2
8
1
.
2
5
*
5
5
0
2
6
0
9
/
2
6
/
1
4
0
1
G
R
E
E
N
O
R
G
A
N
I
C
S
9
0
-
0
6
1
-
6
1
-
0
0
-
0
1
1
1
6
5
4
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
6
5
4
.
0
0
*
5
5
0
2
7
0
9
/
2
6
/
1
4
0
1
1
9
8
C
O
M
M
E
R
C
I
A
L
D
R
9
0
-
0
5
9
-
5
9
-
0
0
-
0
1
1
1
4
3
6
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
4
3
6
.
5
0
*
CH
E
C
K
T
O
T
A
L
:
1
3
,
7
5
8
.
7
5
5
1
8
4
8
0
E
E
I
E
N
G
I
N
E
E
R
I
N
G
E
N
T
E
R
P
R
I
S
E
S
,
I
N
C
.
5
5
0
2
9
0
9
/
2
6
/
1
4
0
1
R
A
I
N
T
R
E
E
V
I
L
L
A
G
E
U
N
I
T
S
4
,
5
&
6
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
2
1
,
7
7
9
.
7
5
0
2
C
O
M
P
L
E
T
I
O
N
O
F
I
M
P
R
O
V
E
M
E
N
T
S
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
2
1
,
7
7
9
.
7
5
*
CH
E
C
K
T
O
T
A
L
:
2
1
,
7
7
9
.
7
5
Page 12 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
8
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
8
1
E
E
I
E
N
G
I
N
E
E
R
I
N
G
E
N
T
E
R
P
R
I
S
E
S
,
I
N
C
.
5
5
0
3
2
0
9
/
2
6
/
1
4
0
1
M
U
N
I
C
I
P
A
L
E
N
G
I
N
E
E
R
I
N
G
S
E
R
V
I
C
E
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
1
,
9
0
0
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
9
0
0
.
0
0
*
5
5
0
3
3
0
9
/
2
6
/
1
4
0
1
M
I
S
C
.
G
I
S
M
A
P
P
I
N
G
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
1
2
9
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
2
9
.
0
0
*
5
5
0
3
4
0
9
/
2
6
/
1
4
0
1
R
I
V
E
R
F
R
O
N
T
P
A
R
K
I
M
P
R
O
V
E
M
E
N
T
S
7
2
-
7
2
0
-
6
0
-
0
0
-
6
0
4
5
1
,
7
4
9
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
7
4
9
.
0
0
*
5
5
0
3
5
0
9
/
2
6
/
1
4
0
1
S
T
A
T
E
S
T
S
A
N
I
T
A
R
Y
S
E
W
E
R
&
5
1
-
5
1
0
-
6
0
-
0
0
-
6
0
2
5
1
,
0
4
5
.
6
8
0
2
A
D
R
I
A
N
S
T
W
A
T
E
R
M
A
I
N
&
*
*
C
O
M
M
E
N
T
*
*
0
3
D
R
A
I
N
A
G
E
I
M
P
R
O
V
E
M
E
N
T
S
*
*
C
O
M
M
E
N
T
*
*
0
4
S
T
A
T
E
S
T
S
A
N
I
T
A
R
Y
S
E
W
E
R
&
5
2
-
5
2
0
-
6
0
-
0
0
-
6
0
2
5
1
,
0
4
5
.
6
9
0
5
A
D
R
A
I
N
S
T
W
A
T
E
R
M
A
I
N
&
*
*
C
O
M
M
E
N
T
*
*
0
6
D
R
A
I
N
A
G
E
I
M
P
R
O
V
E
M
E
N
T
S
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
2
,
0
9
1
.
3
7
*
5
5
0
3
6
0
9
/
2
6
/
1
4
0
1
S
A
N
I
T
A
R
Y
S
E
W
E
R
L
I
N
I
N
G
-
R
T
.
4
7
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
1
,
8
9
6
.
2
6
0
2
I
M
P
R
O
V
M
E
N
T
S
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
8
9
6
.
2
6
*
5
5
0
3
7
0
9
/
2
6
/
1
4
0
1
C
A
S
C
A
D
E
W
A
T
E
R
W
O
R
K
S
D
R
A
I
N
A
G
E
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
1
2
9
.
0
2
0
2
R
E
V
I
E
W
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
1
2
9
.
0
2
*
5
5
0
3
8
0
9
/
2
6
/
1
4
0
1
G
R
A
N
D
E
R
E
S
E
R
V
E
-
P
A
R
K
B
7
2
-
7
2
0
-
6
0
-
0
0
-
6
0
4
7
5
0
7
.
1
3
0
2
I
M
P
R
O
V
E
M
E
N
T
S
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
5
0
7
.
1
3
*
5
5
0
3
9
0
9
/
2
6
/
1
4
0
1
H
E
U
S
T
I
S
S
T
R
E
E
T
I
M
P
R
O
V
E
M
E
N
T
S
2
3
-
2
3
0
-
6
0
-
0
0
-
6
0
2
5
1
,
2
7
1
.
0
2
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
2
7
1
.
0
2
*
5
5
0
4
0
0
9
/
2
6
/
1
4
0
1
L
I
G
H
T
H
O
U
S
E
A
C
A
D
E
M
Y
9
0
-
0
6
5
-
6
5
-
0
0
-
0
1
1
1
1
,
0
3
5
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
0
3
5
.
0
0
*
Page 13 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
9
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
8
1
E
E
I
E
N
G
I
N
E
E
R
I
N
G
E
N
T
E
R
P
R
I
S
E
S
,
I
N
C
.
5
5
0
4
1
0
9
/
2
6
/
1
4
0
1
W
R
I
G
L
E
Y
S
I
T
E
E
X
P
A
N
S
I
O
N
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
6
6
6
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
6
6
6
.
0
0
*
5
5
0
4
2
0
9
/
2
6
/
1
4
0
1
R
E
D
D
O
T
S
T
O
R
A
G
E
-
S
I
T
E
P
L
A
N
9
0
-
0
6
8
-
6
8
-
0
0
-
0
1
1
1
9
3
9
.
0
0
0
2
R
E
V
I
E
W
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
9
3
9
.
0
0
*
5
5
0
4
3
0
9
/
2
6
/
1
4
0
1
U
S
R
T
.
3
4
I
M
P
R
O
V
E
M
E
N
T
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
1
,
0
9
6
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
0
9
6
.
0
0
*
5
5
0
4
4
0
9
/
2
6
/
1
4
0
1
R
O
B
R
O
Y
D
R
A
I
N
A
G
E
D
I
S
T
R
I
C
T
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
8
9
7
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
8
9
7
.
0
0
*
5
5
0
4
5
0
9
/
2
6
/
1
4
0
1
P
L
A
N
O
W
A
S
T
E
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
1
,
5
2
5
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
5
2
5
.
5
0
*
5
5
0
7
2
0
9
/
2
6
/
1
4
0
1
H
E
A
R
T
L
A
N
D
M
E
A
D
O
W
S
9
0
-
0
6
4
-
6
4
-
0
0
-
0
1
1
1
1
,
9
3
7
.
2
5
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
9
3
7
.
2
5
*
5
5
0
7
5
0
9
/
2
6
/
1
4
0
1
W
I
N
D
E
T
T
R
I
D
G
E
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
3
,
1
0
5
.
7
5
IN
V
O
I
C
E
T
O
T
A
L
:
3
,
1
0
5
.
7
5
*
5
5
0
7
8
0
9
/
2
6
/
1
4
0
1
W
A
L
S
H
D
R
.
D
R
A
I
N
A
G
E
I
M
P
R
O
V
E
M
E
N
T
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
9
,
7
7
5
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
9
,
7
7
5
.
5
0
*
5
5
0
7
9
0
9
/
2
6
/
1
4
0
1
S
U
N
F
L
O
W
E
R
E
S
T
A
T
E
S
&
G
R
E
E
N
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
7
9
4
.
2
5
0
2
B
R
I
E
R
N
A
T
U
R
A
L
I
Z
A
T
I
O
N
B
A
S
I
N
*
*
C
O
M
M
E
N
T
*
*
0
3
C
O
N
V
E
R
S
I
O
N
*
*
C
O
M
M
E
N
T
*
*
0
4
S
U
N
F
L
O
W
E
R
E
S
T
A
T
E
S
&
G
R
E
E
N
1
2
-
1
1
2
-
5
4
-
0
0
-
5
4
1
6
7
9
4
.
2
5
0
5
B
R
I
E
R
N
A
T
U
R
A
L
I
Z
A
T
I
O
N
B
A
S
I
N
*
*
C
O
M
M
E
N
T
*
*
0
6
B
A
S
I
N
C
O
N
V
E
R
S
I
O
N
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
5
8
8
.
5
0
*
CH
E
C
K
T
O
T
A
L
:
3
2
,
2
3
8
.
3
0
Page 14 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
0
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
8
2
E
N
C
A
P
E
N
C
A
P
,
I
N
C
.
5
0
2
0
7
/
3
1
/
1
4
0
1
K
E
N
D
A
L
L
M
A
R
K
E
T
P
L
A
C
E
0
1
-
0
0
0
-
2
4
-
0
0
-
2
4
4
0
1
,
1
6
6
.
6
6
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
1
6
6
.
6
6
*
5
2
8
0
7
/
3
1
/
1
4
0
1
K
E
N
D
A
L
L
M
A
R
K
E
T
P
L
A
C
E
M
A
N
A
G
E
M
E
N
T
0
1
-
0
0
0
-
2
4
-
0
0
-
2
4
4
0
1
,
1
6
6
.
6
6
0
2
S
I
T
E
V
I
S
I
T
O
N
0
7
/
2
1
/
1
4
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
1
6
6
.
6
6
*
CH
E
C
K
T
O
T
A
L
:
2
,
3
3
3
.
3
2
5
1
8
4
8
3
E
R
I
C
K
S
O
N
E
R
I
C
K
S
O
N
C
O
N
S
T
R
U
C
T
I
O
N
1
0
0
2
1
4
1
0
/
0
2
/
1
4
0
1
1
3
S
E
P
T
E
M
B
E
R
I
N
S
P
E
C
T
I
O
N
S
0
1
-
2
2
0
-
5
4
-
0
0
-
5
4
5
9
5
2
0
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
5
2
0
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
5
2
0
.
0
0
5
1
8
4
8
4
G
A
R
D
K
O
C
H
G
A
R
D
I
N
E
R
K
O
C
H
&
W
E
I
S
B
E
R
G
H
-
2
3
6
4
C
-
1
0
3
8
7
6
1
0
/
0
2
/
1
4
0
1
K
I
M
B
A
L
L
H
I
L
L
M
A
T
T
E
R
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
1
3
,
2
2
6
.
1
2
IN
V
O
I
C
E
T
O
T
A
L
:
3
,
2
2
6
.
1
2
*
H
-
3
0
5
5
C
-
1
0
3
8
7
4
1
0
/
0
2
/
1
4
0
1
I
C
C
I
M
A
T
T
E
R
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
1
1
6
0
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
6
0
.
0
0
*
H
-
3
1
8
1
C
-
1
0
3
8
0
9
1
0
/
0
2
/
1
4
0
1
G
E
N
E
R
L
A
C
I
T
Y
L
E
G
A
L
M
A
T
T
E
R
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
1
6
2
0
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
6
2
0
.
0
0
*
H
-
3
5
2
5
C
-
1
0
3
8
7
5
1
0
/
0
2
/
1
4
0
1
K
I
M
B
A
L
L
H
I
L
L
U
N
I
T
4
M
A
T
T
E
R
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
1
2
,
2
4
0
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
2
,
2
4
0
.
0
0
*
H
-
3
5
4
8
C
-
1
0
3
8
1
0
1
0
/
0
2
/
1
4
0
1
W
A
L
K
E
R
H
O
M
E
S
M
A
T
T
E
R
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
1
8
4
8
.
3
0
IN
V
O
I
C
E
T
O
T
A
L
:
8
4
8
.
3
0
*
H
-
3
5
8
6
C
-
1
0
4
0
6
0
1
0
/
0
3
/
1
4
0
1
N
I
C
H
O
L
S
O
N
M
A
T
T
E
R
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
1
8
0
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
8
0
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
7
,
1
7
4
.
4
2
Page 15 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
1
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
8
5
G
A
T
Z
A
A
N
D
R
E
W
G
A
T
Z
1
0
0
7
1
4
1
0
/
0
7
/
1
4
0
1
G
A
S
R
E
I
M
B
U
R
S
E
M
E
N
T
F
O
R
P
D
0
1
-
2
1
0
-
5
6
-
0
0
-
5
6
9
5
4
0
.
0
0
0
2
T
R
A
I
N
I
N
G
I
N
S
T
I
T
U
T
E
T
R
A
V
E
L
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
4
0
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
4
0
.
0
0
5
1
8
4
8
6
G
R
A
I
N
C
O
G
R
A
I
N
C
O
F
S
.
,
I
N
C
.
0
2
3
3
2
3
0
9
/
3
0
/
1
4
0
1
L
P
G
A
S
E
X
C
H
A
N
G
E
0
1
-
4
1
0
-
5
6
-
0
0
-
5
6
2
0
4
6
.
0
3
IN
V
O
I
C
E
T
O
T
A
L
:
4
6
.
0
3
*
CH
E
C
K
T
O
T
A
L
:
4
6
.
0
3
5
1
8
4
8
7
G
R
O
U
N
D
G
R
O
U
N
D
E
F
F
E
C
T
S
I
N
C
.
3
0
5
4
3
4
0
9
/
0
9
/
1
4
0
1
D
I
R
T
F
O
R
P
L
A
N
T
I
N
G
T
R
E
E
S
0
1
-
0
0
0
-
2
4
-
0
0
-
2
4
2
6
2
6
7
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
2
6
7
.
0
0
*
3
0
6
9
3
2
0
9
/
3
0
/
1
4
0
1
D
I
R
T
F
O
R
P
L
A
N
T
I
N
G
T
R
E
E
S
0
1
-
0
0
0
-
2
4
-
0
0
-
2
4
2
6
3
1
1
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
3
1
1
.
5
0
*
3
0
7
4
1
7
1
0
/
0
7
/
1
4
0
1
D
I
R
T
F
O
R
P
L
A
N
T
I
N
G
T
R
E
E
S
0
1
-
0
0
0
-
2
4
-
0
0
-
2
4
2
6
3
1
1
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
3
1
1
.
5
0
*
CH
E
C
K
T
O
T
A
L
:
8
9
0
.
0
0
5
1
8
4
8
8
H
A
Y
E
S
C
C
H
R
I
S
T
O
P
H
E
R
H
A
Y
E
S
1
0
/
0
3
/
1
4
1
0
/
0
3
/
1
4
0
1
T
R
A
I
N
I
N
G
M
E
A
L
R
E
I
M
B
U
R
S
E
M
E
N
T
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
1
5
8
0
.
9
6
IN
V
O
I
C
E
T
O
T
A
L
:
8
0
.
9
6
*
CH
E
C
K
T
O
T
A
L
:
8
0
.
9
6
5
1
8
4
8
9
H
D
S
U
P
P
L
Y
H
D
S
U
P
P
L
Y
W
A
T
E
R
W
O
R
K
S
,
L
T
D
.
Page 16 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
2
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
8
9
H
D
S
U
P
P
L
Y
H
D
S
U
P
P
L
Y
W
A
T
E
R
W
O
R
K
S
,
L
T
D
.
D
0
7
8
6
6
5
1
0
/
0
8
/
1
4
0
1
M
X
U
B
A
T
T
E
R
I
E
S
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
6
4
4
1
7
.
8
0
IN
V
O
I
C
E
T
O
T
A
L
:
4
1
7
.
8
0
*
CH
E
C
K
T
O
T
A
L
:
4
1
7
.
8
0
5
1
8
4
9
0
H
O
M
E
D
E
P
O
H
O
M
E
D
E
P
O
T
6
0
1
2
4
9
6
0
9
/
3
0
/
1
4
0
1
J
U
N
C
T
I
O
N
B
O
X
0
1
-
4
1
0
-
5
6
-
0
0
-
5
6
4
0
2
1
.
5
1
IN
V
O
I
C
E
T
O
T
A
L
:
2
1
.
5
1
*
CH
E
C
K
T
O
T
A
L
:
2
1
.
5
1
5
1
8
4
9
1
H
O
M
E
F
I
E
L
I
L
L
I
N
O
I
S
P
O
W
E
R
M
A
R
K
E
T
I
N
G
1
0
2
3
8
9
4
1
4
1
0
1
1
0
/
0
2
/
1
4
0
1
0
9
/
0
2
-
0
9
/
2
9
1
C
O
U
N
T
R
Y
S
I
D
E
P
K
W
Y
1
5
-
1
5
5
-
5
4
-
0
0
-
5
4
8
2
1
4
6
.
4
6
IN
V
O
I
C
E
T
O
T
A
L
:
1
4
6
.
4
6
*
CH
E
C
K
T
O
T
A
L
:
1
4
6
.
4
6
5
1
8
4
9
2
H
R
G
R
E
E
N
H
R
G
R
E
E
N
9
3
5
2
6
0
7
/
3
0
/
1
4
0
1
G
A
M
E
F
A
R
M
R
D
-
O
N
G
O
I
N
G
U
P
D
A
T
E
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
3
6
0
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
3
6
0
.
0
0
*
9
3
5
2
7
0
7
/
3
0
/
1
4
0
1
G
A
M
E
F
A
R
M
R
O
A
D
S
U
P
P
L
E
M
E
N
T
#
3
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
2
2
,
9
8
0
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
2
2
,
9
8
0
.
0
0
*
9
4
6
3
9
1
0
/
0
7
/
1
4
0
1
G
A
M
E
F
A
R
M
R
D
-
O
N
G
O
I
N
G
U
P
D
A
T
E
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
4
3
2
.
5
0
IN
V
O
I
C
E
T
O
T
A
L
:
4
3
2
.
5
0
*
9
4
6
5
1
1
0
/
0
8
/
1
4
0
1
G
A
M
E
F
A
R
M
R
D
-
S
U
P
P
L
E
M
E
N
T
#
3
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
6
5
1
2
,
7
6
8
.
5
5
IN
V
O
I
C
E
T
O
T
A
L
:
1
2
,
7
6
8
.
5
5
*
CH
E
C
K
T
O
T
A
L
:
3
6
,
5
4
1
.
0
5
Page 17 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
3
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
9
3
I
L
F
I
R
E
P
D
I
L
L
I
N
O
I
S
F
I
R
E
&
P
O
L
I
C
E
2
0
1
5
D
U
E
S
1
0
/
0
7
/
1
4
0
1
2
0
1
5
M
E
M
B
E
R
S
H
I
P
D
U
E
R
E
N
E
W
A
L
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
1
1
3
7
5
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
3
7
5
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
3
7
5
.
0
0
5
1
8
4
9
4
I
L
P
D
4
8
1
1
I
L
L
I
N
O
I
S
S
T
A
T
E
P
O
L
I
C
E
1
0
1
0
1
4
1
0
/
1
0
/
1
4
0
1
B
A
C
K
G
R
O
U
N
D
C
H
E
C
K
7
9
-
7
9
0
-
5
4
-
0
0
-
5
4
6
2
3
1
.
5
0
0
2
B
A
C
K
G
R
O
U
N
D
C
H
E
C
K
8
2
-
8
2
0
-
5
4
-
0
0
-
5
4
6
2
6
3
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
9
4
.
5
0
*
CH
E
C
K
T
O
T
A
L
:
9
4
.
5
0
5
1
8
4
9
5
I
M
P
E
R
I
N
V
I
M
P
E
R
I
A
L
I
N
V
E
S
T
M
E
N
T
S
A
U
G
U
S
T
2
0
1
4
-
R
E
B
A
T
E
1
0
/
1
3
/
1
4
0
1
A
U
G
U
S
T
2
0
1
4
D
O
W
N
T
O
W
N
B
U
S
I
N
E
S
S
8
8
-
0
0
0
-
2
4
-
0
0
-
2
4
8
8
1
,
0
2
3
.
2
2
0
2
D
I
S
T
R
I
C
T
R
E
B
A
T
E
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
0
2
3
.
2
2
*
CH
E
C
K
T
O
T
A
L
:
1
,
0
2
3
.
2
2
5
1
8
4
9
6
J
A
Y
M
H
E
A
P
J
A
Y
M
.
H
E
A
P
&
A
S
S
O
C
I
A
T
E
S
,
L
T
D
1
0
0
2
1
4
1
0
/
0
2
/
1
4
0
1
R
O
A
D
I
M
P
R
O
V
E
M
E
N
T
P
R
O
J
E
C
T
2
3
-
2
3
0
-
6
0
-
0
0
-
6
0
7
3
1
0
,
5
0
0
.
0
0
0
2
N
E
G
O
T
I
A
T
I
O
N
S
R
E
P
O
R
T
I
N
G
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
1
0
,
5
0
0
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
1
0
,
5
0
0
.
0
0
5
1
8
4
9
7
J
S
H
O
E
S
J
E
F
F
R
E
Y
L
.
J
E
R
A
B
E
K
0
4
3
4
-
1
3
1
0
/
0
3
/
1
4
0
1
S
T
E
E
L
-
T
O
E
B
O
O
T
S
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
0
0
1
6
9
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
6
9
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
1
6
9
.
0
0
Page 18 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
4
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
9
8
K
C
H
I
G
H
W
A
K
E
N
D
A
L
L
C
O
U
N
T
Y
H
I
G
H
W
A
Y
D
E
P
T
.
0
8
2
9
1
4
-
#
2
0
8
/
2
9
/
1
4
0
1
R
I
V
E
R
R
O
A
D
B
R
I
D
G
E
I
N
V
O
I
C
E
#
2
2
3
-
2
3
0
-
9
7
-
0
0
-
8
0
0
0
7
5
,
0
0
0
.
0
0
0
2
O
F
6
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
7
5
,
0
0
0
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
7
5
,
0
0
0
.
0
0
5
1
8
4
9
9
K
C
S
H
E
R
I
F
K
E
N
D
A
L
L
C
O
.
S
H
E
R
I
F
F
'
S
O
F
F
I
C
E
1
0
1
3
1
4
-
D
U
P
A
G
E
1
0
/
1
3
/
1
4
0
1
D
U
P
A
G
E
C
O
.
F
T
A
B
O
N
D
F
E
E
0
1
-
0
0
0
-
2
4
-
0
0
-
2
4
1
2
7
0
.
0
0
0
2
R
E
I
M
B
U
R
S
E
M
E
N
T
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
7
0
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
7
0
.
0
0
5
1
8
5
0
0
K
E
N
D
C
R
O
S
K
E
N
D
A
L
L
C
R
O
S
S
I
N
G
,
L
L
C
A
M
U
R
E
B
A
T
E
-
0
9
/
1
4
1
0
/
1
5
/
1
4
0
1
S
E
P
T
.
2
0
1
4
N
C
G
A
M
U
S
E
M
E
N
T
T
A
X
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
3
9
2
,
0
2
7
.
5
1
0
2
R
E
B
A
T
E
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
2
,
0
2
7
.
5
1
*
B
D
R
E
B
A
T
E
-
0
8
/
1
4
1
0
/
1
3
/
1
4
0
1
A
U
G
U
S
T
2
0
1
4
N
C
G
C
O
U
N
T
R
Y
S
I
D
E
8
7
-
0
0
0
-
2
4
-
0
0
-
2
4
8
8
7
5
9
.
6
4
0
2
B
U
S
I
N
E
S
S
D
I
S
T
R
I
C
T
T
A
X
R
E
B
A
T
E
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
7
5
9
.
6
4
*
CH
E
C
K
T
O
T
A
L
:
2
,
7
8
7
.
1
5
5
1
8
5
0
1
K
E
N
D
H
I
L
L
K
E
N
D
A
L
L
H
I
L
L
N
U
R
S
E
R
Y
,
I
N
C
.
1
1
4
7
0
0
9
/
2
2
/
1
4
0
1
P
A
R
K
W
A
Y
T
R
E
E
S
0
1
-
0
0
0
-
2
4
-
0
0
-
2
4
2
6
5
,
4
4
5
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
5
,
4
4
5
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
5
,
4
4
5
.
0
0
5
1
8
5
0
2
K
E
N
D
T
R
E
A
K
E
N
D
A
L
L
C
O
U
N
T
Y
Page 19 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
5
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
5
0
2
K
E
N
D
T
R
E
A
K
E
N
D
A
L
L
C
O
U
N
T
Y
1
4
-
2
4
1
0
/
0
3
/
1
4
0
1
2
N
D
B
I
-
A
N
N
U
A
L
F
Y
2
0
1
4
M
U
N
I
C
I
P
A
L
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
7
3
1
1
,
7
7
5
.
0
0
0
2
C
O
N
T
R
I
B
U
T
I
O
N
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
1
1
,
7
7
5
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
1
1
,
7
7
5
.
0
0
5
1
8
5
0
3
M
C
O
F
F
I
C
E
M
C
G
R
A
T
H
O
F
F
I
C
E
E
Q
U
I
P
M
E
N
T
,
I
N
C
.
1
0
1
0
9
1
0
/
0
1
/
1
4
0
1
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
L
E
A
S
E
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
8
5
1
9
5
.
5
6
0
2
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
L
E
A
S
E
0
1
-
1
2
0
-
5
4
-
0
0
-
5
4
8
5
1
5
6
.
4
4
0
3
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
L
E
A
S
E
0
1
-
2
2
0
-
5
4
-
0
0
-
5
4
8
5
2
8
9
.
0
0
0
4
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
L
E
A
S
E
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
8
5
4
5
7
.
0
0
0
5
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
L
E
A
S
E
0
1
-
4
1
0
-
5
4
-
0
0
-
5
4
8
5
4
2
.
0
0
0
6
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
L
E
A
S
E
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
8
5
4
2
.
0
0
0
7
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
L
E
A
S
E
5
2
-
5
2
0
-
5
4
-
0
0
-
5
4
8
5
4
2
.
0
0
0
8
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
L
E
A
S
E
7
9
-
7
9
0
-
5
4
-
0
0
-
5
4
8
5
4
2
.
0
0
0
9
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
L
E
A
S
E
7
9
-
7
9
5
-
5
4
-
0
0
-
5
4
8
5
2
7
4
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
5
4
0
.
0
0
*
1
0
1
1
0
1
0
/
0
1
/
1
4
0
1
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
C
H
A
R
G
E
S
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
3
0
2
5
5
.
1
5
0
2
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
C
H
A
R
G
E
S
0
1
-
1
2
0
-
5
4
-
0
0
-
5
4
3
0
8
5
.
0
5
0
3
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
C
H
A
R
G
E
S
0
1
-
2
2
0
-
5
4
-
0
0
-
5
4
3
0
8
7
.
8
7
0
4
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
C
H
A
R
G
E
S
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
3
0
8
3
.
2
6
0
5
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
C
H
A
R
G
E
S
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
3
0
2
.
0
7
0
6
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
C
H
A
R
G
E
S
5
2
-
5
2
0
-
5
4
-
0
0
-
5
4
3
0
2
.
0
6
0
7
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
C
H
A
R
G
E
S
7
9
-
7
9
0
-
5
4
-
0
0
-
5
4
6
2
1
.
3
8
0
8
0
8
/
2
8
-
0
9
/
2
8
C
O
P
I
E
R
C
H
A
R
G
E
S
7
9
-
7
9
5
-
5
4
-
0
0
-
5
4
6
2
1
3
4
.
5
6
IN
V
O
I
C
E
T
O
T
A
L
:
6
5
1
.
4
0
*
CH
E
C
K
T
O
T
A
L
:
2
,
1
9
1
.
4
0
5
1
8
5
0
4
M
E
N
L
A
N
D
M
E
N
A
R
D
S
-
Y
O
R
K
V
I
L
L
E
8
4
3
9
4
0
9
/
1
9
/
1
4
0
1
L
O
N
G
R
I
V
E
T
,
S
H
O
R
T
R
I
V
E
T
,
0
1
-
2
1
0
-
5
6
-
0
0
-
5
6
2
0
2
4
.
2
7
Page 20 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
6
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
5
0
4
M
E
N
L
A
N
D
M
E
N
A
R
D
S
-
Y
O
R
K
V
I
L
L
E
8
4
3
9
4
0
9
/
1
9
/
1
4
0
2
S
W
I
V
E
L
H
E
A
D
R
I
V
E
T
T
O
O
L
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
2
4
.
2
7
*
8
5
4
7
3
0
9
/
2
9
/
1
4
0
1
B
A
T
T
E
R
I
E
S
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
6
5
2
9
.
9
7
IN
V
O
I
C
E
T
O
T
A
L
:
2
9
.
9
7
*
8
5
4
9
7
0
9
/
2
9
/
1
4
0
1
F
A
U
C
E
T
F
O
R
B
E
E
C
H
E
R
2
3
-
2
1
6
-
5
6
-
0
0
-
5
6
5
6
3
4
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
3
4
.
0
0
*
8
5
6
1
9
0
9
/
3
0
/
1
4
0
1
B
A
T
T
E
R
I
E
S
,
G
O
R
I
L
L
A
T
A
P
E
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
2
0
1
8
.
9
7
IN
V
O
I
C
E
T
O
T
A
L
:
1
8
.
9
7
*
8
5
7
1
7
1
0
/
0
1
/
1
4
0
1
F
E
N
D
E
R
W
A
S
H
E
R
,
H
E
X
W
A
S
H
E
R
,
5
2
-
5
2
0
-
5
6
-
0
0
-
5
6
1
3
1
4
.
9
7
0
2
P
L
U
M
B
E
R
S
P
U
T
T
Y
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
1
4
.
9
7
*
8
5
8
5
5
-
1
4
1
0
/
0
2
/
1
4
0
1
R
E
T
U
R
N
E
D
M
E
R
C
H
A
N
D
I
S
E
C
R
E
D
I
T
0
1
-
4
1
0
-
5
6
-
0
0
-
5
6
2
0
-
1
0
.
5
7
IN
V
O
I
C
E
T
O
T
A
L
:
-
1
0
.
5
7
*
8
5
9
7
1
1
0
/
0
3
/
1
4
0
1
T
O
O
L
B
O
X
,
E
L
E
C
T
R
I
C
A
L
P
L
I
E
R
S
,
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
3
0
2
3
.
7
0
0
2
B
I
T
S
,
S
P
I
N
N
E
R
H
A
N
D
L
E
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
2
3
.
7
0
*
8
6
4
0
6
1
0
/
0
7
/
1
4
0
1
B
A
L
L
A
S
T
,
W
I
R
E
G
U
A
R
D
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
3
8
1
6
.
7
7
IN
V
O
I
C
E
T
O
T
A
L
:
1
6
.
7
7
*
CH
E
C
K
T
O
T
A
L
:
1
5
2
.
0
8
5
1
8
5
0
5
M
E
R
L
I
N
D
E
Y
C
O
,
I
N
C
.
3
1
2
4
7
1
0
/
0
1
/
1
4
0
1
T
I
R
E
P
L
U
G
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
9
5
2
2
.
4
6
IN
V
O
I
C
E
T
O
T
A
L
:
2
2
.
4
6
*
CH
E
C
K
T
O
T
A
L
:
2
2
.
4
6
Page 21 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
7
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
5
0
6
M
I
D
A
M
M
I
D
A
M
E
R
I
C
A
N
W
A
T
E
R
1
0
7
6
5
0
A
0
9
/
2
6
/
1
4
0
1
C
A
S
T
C
O
U
P
L
I
N
G
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
2
0
3
3
2
.
9
0
IN
V
O
I
C
E
T
O
T
A
L
:
3
3
2
.
9
0
*
CH
E
C
K
T
O
T
A
L
:
3
3
2
.
9
0
5
1
8
5
0
7
N
I
C
O
R
N
I
C
O
R
G
A
S
0
0
-
4
1
-
2
2
-
8
7
4
8
4
-
0
9
1
4
1
0
/
0
7
/
1
4
0
1
0
9
/
0
5
-
1
0
/
0
7
1
1
0
7
P
R
A
I
R
I
E
L
A
N
E
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
8
0
2
5
.
4
0
IN
V
O
I
C
E
T
O
T
A
L
:
2
5
.
4
0
*
1
5
-
6
3
-
7
4
-
5
7
3
3
2
-
0
9
1
4
1
0
/
0
3
/
1
4
0
1
0
9
/
0
2
-
1
0
/
0
1
1
9
5
5
S
B
R
I
D
G
E
S
T
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
8
0
2
9
.
9
0
IN
V
O
I
C
E
T
O
T
A
L
:
2
9
.
9
0
*
1
5
-
6
4
-
6
1
-
3
5
3
2
5
-
0
9
1
4
1
0
/
0
7
/
1
4
0
1
0
8
/
0
7
-
1
0
/
0
7
1
9
9
1
C
A
N
N
O
N
B
A
L
L
T
R
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
8
0
1
9
.
1
2
IN
V
O
I
C
E
T
O
T
A
L
:
1
9
.
1
2
*
2
0
-
5
2
-
5
6
-
2
0
4
2
1
-
0
9
1
4
1
0
/
0
8
/
1
4
0
1
0
9
/
0
8
-
1
0
/
0
8
4
2
0
F
A
I
R
H
A
V
E
N
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
8
0
7
7
.
6
6
IN
V
O
I
C
E
T
O
T
A
L
:
7
7
.
6
6
*
2
3
-
4
5
-
9
1
-
4
8
6
2
5
-
0
9
1
4
1
0
/
0
3
/
1
4
0
1
0
9
/
0
3
-
1
0
/
0
3
1
0
1
B
R
U
E
L
L
S
T
R
E
E
T
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
8
0
7
5
.
0
6
IN
V
O
I
C
E
T
O
T
A
L
:
7
5
.
0
6
*
3
1
-
6
1
-
6
7
-
2
4
9
3
1
-
0
9
1
4
1
0
/
0
7
/
1
4
0
1
0
8
/
0
6
-
1
0
/
0
6
2
7
6
W
I
N
D
H
A
M
C
I
R
C
L
E
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
8
0
2
1
.
7
7
IN
V
O
I
C
E
T
O
T
A
L
:
2
1
.
7
7
*
4
6
-
6
9
-
4
7
-
6
7
2
7
1
-
0
9
1
4
1
0
/
0
7
/
1
4
0
1
0
9
/
0
5
-
1
0
/
0
7
1
9
7
5
B
R
I
D
G
E
S
T
R
E
E
T
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
8
0
7
8
.
7
3
IN
V
O
I
C
E
T
O
T
A
L
:
7
8
.
7
3
*
4
9
-
2
5
-
6
1
-
1
0
0
0
5
-
0
9
1
4
1
0
/
0
3
/
1
4
0
1
0
9
/
0
2
-
1
0
/
0
1
1
V
A
N
E
M
M
O
N
R
D
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
8
0
3
9
.
8
2
IN
V
O
I
C
E
T
O
T
A
L
:
3
9
.
8
2
*
6
2
-
3
7
-
8
6
-
4
7
7
9
6
-
0
9
1
4
1
0
/
0
9
/
1
4
0
1
0
9
/
0
8
-
1
0
/
0
7
1
8
5
W
O
L
F
S
T
R
E
E
T
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
8
0
5
6
.
8
1
IN
V
O
I
C
E
T
O
T
A
L
:
5
6
.
8
1
*
6
6
-
7
0
-
4
4
-
6
4
2
9
-
0
9
1
4
1
0
/
0
7
/
1
4
0
1
0
9
/
0
8
-
1
0
/
0
7
1
0
0
R
A
I
N
T
R
E
E
R
D
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
8
0
8
3
.
0
4
IN
V
O
I
C
E
T
O
T
A
L
:
8
3
.
0
4
*
CH
E
C
K
T
O
T
A
L
:
5
0
7
.
3
1
Page 22 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
8
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
5
0
8
O
R
R
K
K
A
T
H
L
E
E
N
F
I
E
L
D
O
R
R
&
A
S
S
O
C
.
1
4
4
8
3
1
0
/
0
6
/
1
4
0
1
M
I
S
C
.
C
I
T
Y
L
E
G
A
L
M
A
T
T
E
R
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
5
6
1
3
,
2
5
2
.
5
0
0
2
A
U
T
U
M
N
C
R
E
E
K
M
A
T
T
E
R
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
5
6
8
5
.
5
0
0
3
C
O
U
N
T
R
Y
S
I
D
E
T
I
F
M
A
T
T
E
R
S
8
7
-
8
7
0
-
5
4
-
0
0
-
5
4
2
0
6
0
8
.
0
0
0
4
D
O
W
N
T
O
W
N
T
I
F
M
A
T
T
E
R
S
8
8
-
8
8
0
-
5
4
-
0
0
-
5
4
6
6
8
5
5
.
0
0
0
5
F
O
X
I
N
D
U
S
T
R
I
A
L
T
I
F
M
A
T
T
E
R
S
0
1
-
0
0
0
-
2
4
-
0
0
-
2
4
8
5
3
8
0
.
0
0
0
6
G
A
M
E
F
A
R
M
R
D
M
A
T
T
E
R
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
5
6
2
,
9
7
3
.
5
0
0
7
H
E
A
R
T
L
A
N
D
M
A
T
T
E
R
S
9
0
-
0
6
4
-
6
4
-
0
0
-
0
0
1
1
3
8
9
.
5
0
0
8
P
A
R
K
/
R
E
C
L
E
G
A
L
M
A
T
T
E
R
S
7
9
-
7
9
0
-
5
4
-
0
0
-
5
4
6
6
1
,
9
5
7
.
0
0
0
9
P
L
A
N
O
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
M
A
T
T
E
R
S
0
1
-
6
4
0
-
5
4
-
0
0
-
5
4
5
6
6
6
5
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
2
1
,
1
6
6
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
2
1
,
1
6
6
.
0
0
5
1
8
5
0
9
O
S
W
P
R
I
N
T
J
A
M
E
S
A
A
G
E
M
A
7
2
8
0
4
0
9
/
2
2
/
1
4
0
1
2
,
0
0
0
I
N
S
P
E
C
T
I
O
N
F
O
A
M
S
0
1
-
2
2
0
-
5
6
-
0
0
-
5
6
2
0
1
7
4
.
1
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
7
4
.
1
0
*
CH
E
C
K
T
O
T
A
L
:
1
7
4
.
1
0
5
1
8
5
1
0
P
A
R
A
D
I
S
E
P
A
R
A
D
I
S
E
C
A
R
W
A
S
H
2
2
2
8
5
8
1
0
/
0
3
/
1
4
0
1
S
E
P
T
.
2
0
1
4
C
A
R
W
A
S
H
E
S
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
9
5
3
0
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
3
0
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
3
0
.
0
0
5
1
8
5
1
1
P
E
S
S
I
N
A
P
E
S
S
I
N
A
T
R
E
E
S
E
R
V
I
C
E
1
7
6
6
0
9
/
0
8
/
1
4
0
1
T
R
E
E
R
E
M
O
V
A
L
F
O
R
W
A
L
S
H
D
R
2
3
-
2
3
0
-
6
0
-
0
0
-
6
0
9
5
3
,
6
5
0
.
0
0
0
2
D
R
A
I
N
A
G
E
I
M
P
R
O
V
E
M
E
N
T
S
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
3
,
6
5
0
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
3
,
6
5
0
.
0
0
Page 23 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
9
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
5
1
2
R
0
0
0
1
3
9
1
L
O
Y
A
L
L
I
N
D
S
E
Y
1
0
1
4
1
4
1
0
/
1
4
/
1
4
0
1
R
E
F
U
N
D
O
V
E
R
P
A
Y
M
E
N
T
O
N
F
I
N
A
L
0
1
-
0
0
0
-
1
3
-
0
0
-
1
3
7
1
8
.
2
0
0
2
B
I
L
L
F
O
R
A
C
C
T
#
0
1
0
1
2
6
4
5
1
0
-
0
0
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
8
.
2
0
*
CH
E
C
K
T
O
T
A
L
:
8
.
2
0
5
1
8
5
1
3
R
E
T
A
C
O
A
C
C
H
A
R
L
E
S
K
E
L
L
Y
C
O
F
E
R
1
6
3
3
1
0
/
1
0
/
1
4
0
1
I
M
P
L
E
M
E
N
T
A
T
I
O
N
O
F
R
E
C
R
U
I
T
M
E
N
T
0
1
-
2
2
0
-
5
4
-
0
0
-
5
4
6
2
5
,
0
0
0
.
0
0
0
2
S
T
R
A
T
E
G
Y
F
O
R
S
O
U
T
H
S
I
D
E
*
*
C
O
M
M
E
N
T
*
*
0
3
C
O
M
M
E
R
C
I
A
L
D
E
V
.
M
A
R
K
E
T
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
5
,
0
0
0
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
5
,
0
0
0
.
0
0
5
1
8
5
1
4
S
P
E
E
D
W
A
Y
S
P
E
E
D
W
A
Y
1
0
0
1
5
4
2
4
3
8
-
1
0
1
4
1
0
/
0
1
/
1
4
0
1
S
E
P
T
E
M
B
E
R
2
0
1
4
G
A
S
O
L
I
N
E
7
9
-
7
9
0
-
5
6
-
0
0
-
5
6
9
5
1
,
9
0
2
.
7
8
0
2
S
E
P
T
E
M
B
E
R
2
0
1
4
G
A
S
O
L
I
N
E
7
9
-
7
9
5
-
5
6
-
0
0
-
5
6
9
5
6
5
.
0
6
0
3
S
E
P
T
E
M
B
E
R
2
0
1
4
G
A
S
O
L
I
N
E
0
1
-
2
1
0
-
5
6
-
0
0
-
5
6
9
5
5
,
4
3
4
.
2
7
0
4
S
E
P
T
E
M
B
E
R
2
0
1
4
G
A
S
O
L
I
N
E
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
9
5
9
4
3
.
5
7
0
5
S
E
P
T
E
M
B
E
R
2
0
1
4
G
A
S
O
L
I
N
E
5
2
-
5
2
0
-
5
6
-
0
0
-
5
6
9
5
9
4
3
.
5
7
0
6
S
E
P
T
E
M
B
E
R
2
0
1
4
G
A
S
O
L
I
N
E
0
1
-
4
1
0
-
5
6
-
0
0
-
5
6
9
5
9
4
3
.
5
7
0
7
S
E
P
T
E
M
B
E
R
2
0
1
4
G
A
S
O
L
I
N
E
0
1
-
2
2
0
-
5
6
-
0
0
-
5
6
9
5
2
8
1
.
2
6
IN
V
O
I
C
E
T
O
T
A
L
:
1
0
,
5
1
4
.
0
8
*
CH
E
C
K
T
O
T
A
L
:
1
0
,
5
1
4
.
0
8
5
1
8
5
1
5
S
T
R
E
I
C
H
S
T
R
E
I
C
H
E
R
S
I
1
1
1
4
1
5
5
0
9
/
2
5
/
1
4
0
1
P
A
N
T
S
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
3
0
4
5
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
4
5
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
4
5
.
0
0
Page 24 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
2
0
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
5
1
6
S
U
B
U
R
L
A
B
S
U
B
U
R
B
A
N
L
A
B
O
R
A
T
O
R
I
E
S
I
N
C
.
1
1
6
4
1
5
0
9
/
3
0
/
1
4
0
1
C
O
L
I
F
O
R
M
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
2
9
2
1
6
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
2
1
6
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
2
1
6
.
0
0
5
1
8
5
1
7
T
A
P
C
O
T
A
P
C
O
I
4
6
8
0
5
7
0
9
/
3
0
/
1
4
0
1
S
I
G
N
S
,
P
O
S
T
S
1
5
-
1
5
5
-
5
6
-
0
0
-
5
6
1
9
1
,
2
4
3
.
1
2
IN
V
O
I
C
E
T
O
T
A
L
:
1
,
2
4
3
.
1
2
*
CH
E
C
K
T
O
T
A
L
:
1
,
2
4
3
.
1
2
5
1
8
5
1
8
T
R
O
T
S
K
Y
T
R
O
T
S
K
Y
I
N
V
E
S
T
I
G
A
T
I
V
E
Y
O
R
K
V
I
L
L
E
P
D
1
4
-
0
1
0
9
/
2
9
/
1
4
0
1
P
O
L
Y
G
R
A
P
H
F
O
R
2
P
D
O
F
F
I
C
E
R
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
1
1
2
6
0
.
0
0
0
2
A
P
P
L
I
C
A
N
T
S
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
2
6
0
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
2
6
0
.
0
0
5
1
8
5
1
9
U
N
D
E
R
G
R
U
N
D
E
R
G
R
O
U
N
D
P
I
P
E
&
V
A
L
V
E
C
O
0
0
4
4
5
7
1
0
/
0
6
/
1
4
0
1
F
L
A
R
E
S
,
F
L
A
R
E
N
U
T
S
,
U
N
I
O
N
S
,
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
2
0
7
7
6
.
0
0
0
2
B
A
L
L
C
U
R
B
S
T
O
P
S
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
7
7
6
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
7
7
6
.
0
0
5
1
8
5
2
0
U
P
S
S
T
O
R
E
M
I
C
H
A
E
L
J
.
K
E
N
I
G
1
0
0
7
1
4
1
0
/
0
7
/
1
4
0
1
4
P
K
G
T
O
K
F
O
,
1
P
K
G
T
O
A
.
H
E
A
P
,
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
5
2
1
6
7
.
1
3
0
2
2
P
K
G
T
O
C
I
R
U
S
C
N
T
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
5
2
2
1
.
2
9
IN
V
O
I
C
E
T
O
T
A
L
:
1
8
8
.
4
2
*
CH
E
C
K
T
O
T
A
L
:
1
8
8
.
4
2
Page 25 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
2
1
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
5
2
1
W
A
T
E
R
S
Y
S
W
A
T
E
R
S
O
L
U
T
I
O
N
S
U
N
L
I
M
I
T
E
D
,
I
N
C
3
5
5
8
8
0
9
/
2
6
/
1
4
0
1
C
H
E
M
I
C
A
L
S
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
3
8
2
,
3
6
6
.
4
0
IN
V
O
I
C
E
T
O
T
A
L
:
2
,
3
6
6
.
4
0
*
CH
E
C
K
T
O
T
A
L
:
2
,
3
6
6
.
4
0
5
1
8
5
2
2
W
E
R
D
E
R
W
W
A
L
L
Y
W
E
R
D
E
R
I
C
H
1
0
1
5
1
4
1
0
/
1
5
/
1
4
0
1
0
9
/
1
0
&
0
9
/
2
4
A
D
M
I
N
H
E
A
R
I
N
G
S
0
1
-
2
1
0
-
5
4
-
0
0
-
5
4
6
7
3
0
0
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
3
0
0
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
3
0
0
.
0
0
5
1
8
5
2
3
W
I
N
-
9
1
1
S
P
E
C
T
E
R
I
N
S
T
R
U
M
E
N
T
S
,
I
N
C
1
4
0
7
0
3
2
9
6
0
0
7
/
1
4
/
1
4
0
1
A
N
N
U
A
L
R
E
N
E
W
A
L
O
F
S
O
F
T
W
A
R
E
5
1
-
5
1
0
-
5
6
-
0
0
-
5
6
3
5
3
9
5
.
0
0
0
2
M
A
I
N
T
E
N
A
N
C
E
&
S
U
P
P
O
R
T
F
O
R
*
*
C
O
M
M
E
N
T
*
*
0
3
W
I
N
-
9
1
1
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
3
9
5
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
3
9
5
.
0
0
5
1
8
5
2
4
Y
B
S
D
Y
O
R
K
V
I
L
L
E
B
R
I
S
T
O
L
0
5
5
1
-
0
1
1
1
8
2
9
6
9
0
9
/
3
0
/
1
4
0
1
S
E
P
T
.
2
0
1
4
T
R
A
N
S
P
O
R
T
&
T
I
P
P
I
N
G
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
4
5
6
,
1
0
5
.
6
6
IN
V
O
I
C
E
T
O
T
A
L
:
6
,
1
0
5
.
6
6
*
CH
E
C
K
T
O
T
A
L
:
6
,
1
0
5
.
6
6
5
1
8
5
2
5
Y
B
S
D
Y
O
R
K
V
I
L
L
E
B
R
I
S
T
O
L
0
9
3
0
1
4
S
F
1
0
/
1
4
/
1
4
0
1
S
E
P
T
E
M
B
E
R
2
0
1
4
S
A
N
I
T
A
R
Y
F
E
E
S
9
5
-
0
0
0
-
2
4
-
0
0
-
2
4
5
0
1
9
2
,
7
6
0
.
5
1
IN
V
O
I
C
E
T
O
T
A
L
:
1
9
2
,
7
6
0
.
5
1
*
CH
E
C
K
T
O
T
A
L
:
1
9
2
,
7
6
0
.
5
1
Page 26 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
2
2
TI
M
E
:
1
2
:
3
0
:
0
7
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
8
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
5
2
6
Y
O
R
K
N
A
P
A
Y
O
R
K
V
I
L
L
E
N
A
P
A
A
U
T
O
P
A
R
T
S
0
8
5
0
1
2
0
9
/
0
3
/
1
4
0
1
F
U
E
L
F
I
L
T
E
R
5
2
-
5
2
0
-
5
6
-
0
0
-
5
6
2
8
5
.
2
6
IN
V
O
I
C
E
T
O
T
A
L
:
5
.
2
6
*
0
8
5
1
4
2
0
9
/
0
5
/
1
4
0
1
B
A
T
T
E
R
Y
,
W
I
N
D
S
H
I
E
L
D
W
A
S
H
0
1
-
2
1
0
-
5
6
-
0
0
-
5
6
2
0
1
0
8
.
9
8
IN
V
O
I
C
E
T
O
T
A
L
:
1
0
8
.
9
8
*
0
8
5
8
3
9
0
9
/
1
3
/
1
4
0
1
H
A
L
O
G
E
N
C
A
P
S
U
L
E
0
1
-
2
1
0
-
5
6
-
0
0
-
5
6
2
0
1
8
.
9
8
IN
V
O
I
C
E
T
O
T
A
L
:
1
8
.
9
8
*
CH
E
C
K
T
O
T
A
L
:
1
3
3
.
2
2
5
1
8
5
2
7
Y
O
U
N
G
M
M
A
R
L
Y
S
J
.
Y
O
U
N
G
0
9
1
6
1
4
1
0
/
0
4
/
1
4
0
1
0
9
/
1
6
P
U
B
L
I
C
W
O
R
K
S
M
E
E
T
I
N
G
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
6
2
7
7
.
0
0
0
2
M
I
N
U
T
E
S
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
7
7
.
0
0
*
0
9
2
5
1
4
1
0
/
0
7
/
1
4
0
1
0
9
/
2
5
A
D
M
I
N
M
E
E
T
I
N
G
M
I
N
U
T
E
S
0
1
-
1
1
0
-
5
4
-
0
0
-
5
4
6
2
5
3
.
7
5
IN
V
O
I
C
E
T
O
T
A
L
:
5
3
.
7
5
*
CH
E
C
K
T
O
T
A
L
:
1
3
0
.
7
5
TO
T
A
L
A
M
O
U
N
T
P
A
I
D
:
6
7
2
,
4
5
4
.
8
2
Page 27 of 34
DA
T
E
:
1
0
/
0
9
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
TI
M
E
:
1
3
:
1
5
:
3
1
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
0
9
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
NU
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
5
7
Y
O
R
K
P
O
S
T
Y
O
R
K
V
I
L
L
E
P
O
S
T
M
A
S
T
E
R
10
0
9
1
4
1
0
/
0
9
/
1
4
0
1
P
O
S
T
A
G
E
F
O
R
0
8
/
3
1
P
E
N
A
L
T
Y
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
5
2
3
8
9
.
0
0
02
B
I
L
L
S
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
3
8
9
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
3
8
9
.
0
0
TO
T
A
L
A
M
O
U
N
T
P
A
I
D
:
3
8
9
.
0
0
Page 28 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
1
4
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
TI
M
E
:
1
4
:
0
9
:
4
2
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
1
5
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
5
8
E
J
E
Q
U
I
P
E
J
E
Q
U
I
P
M
E
N
T
E
J
1
6
6
3
0
9
/
2
2
/
1
4
0
1
N
E
W
V
A
C
-
C
O
N
V
E
H
I
C
L
E
5
2
-
5
2
0
-
6
0
-
0
0
-
6
0
7
0
3
7
7
,
2
2
9
.
0
0
0
2
N
E
W
V
A
C
-
C
O
N
V
E
H
I
C
L
E
5
2
-
0
0
0
-
4
9
-
0
0
-
4
9
1
0
-
1
1
0
,
0
0
0
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
2
6
7
,
2
2
9
.
0
0
*
E
J
1
6
6
3
-
0
1
0
9
/
2
3
/
1
4
0
1
R
O
T
A
T
I
N
G
C
L
E
A
N
I
N
G
N
O
Z
Z
L
E
F
O
R
5
2
-
5
2
0
-
6
0
-
0
0
-
6
0
7
0
2
,
7
5
7
.
0
0
0
2
N
E
W
V
A
C
-
C
O
N
V
E
H
I
C
L
E
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
2
,
7
5
7
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
2
6
9
,
9
8
6
.
0
0
TO
T
A
L
A
M
O
U
N
T
P
A
I
D
:
2
6
9
,
9
8
6
.
0
0
Page 29 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
0
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
TI
M
E
:
1
4
:
1
6
:
4
5
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
0
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
4
5
9
W
I
L
K
I
N
S
O
W
I
L
K
I
N
S
O
N
E
X
C
A
V
A
T
I
N
G
,
I
N
C
.
1
2
5
9
4
1
0
/
1
7
/
1
4
0
1
G
R
A
N
D
R
E
S
E
R
V
E
P
A
R
K
B
E
N
G
I
N
E
E
R
S
7
2
-
7
2
0
-
6
0
-
0
0
-
6
0
4
7
6
9
,
0
1
9
.
2
0
0
2
F
I
N
A
L
P
A
Y
M
E
N
T
E
S
T
I
M
A
T
E
#
1
*
*
C
O
M
M
E
N
T
*
*
IN
V
O
I
C
E
T
O
T
A
L
:
6
9
,
0
1
9
.
2
0
*
CH
E
C
K
T
O
T
A
L
:
6
9
,
0
1
9
.
2
0
TO
T
A
L
A
M
O
U
N
T
P
A
I
D
:
6
9
,
0
1
9
.
2
0
Page 30 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
1
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
TI
M
E
:
1
3
:
5
2
:
5
6
M
A
N
U
A
L
C
H
E
C
K
R
E
G
I
S
T
E
R
ID
:
A
P
2
2
5
0
0
0
.
C
B
L
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
T
E
M
C
H
E
C
K
I
N
V
O
I
C
E
#
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
D
A
T
E
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1
3
1
0
4
4
K
C
R
K
E
N
D
A
L
L
C
O
U
N
T
Y
R
E
C
O
R
D
E
R
'
S
1
0
/
2
0
/
1
4
1
7
6
0
9
7
1
0
/
2
0
/
1
4
0
1
R
E
L
E
A
S
E
4
U
T
I
L
I
T
Y
L
I
E
N
S
5
1
-
5
1
0
-
5
4
-
0
0
-
5
4
4
8
1
9
6
.
0
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
9
6
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
1
9
6
.
0
0
TO
T
A
L
A
M
O
U
N
T
P
A
I
D
:
1
9
6
.
0
0
Page 31 of 34
01
-
1
1
0
AD
M
I
N
I
S
T
R
A
T
I
O
N
12
-
1
1
2
SU
N
F
L
O
W
E
R
SS
A
42
-
4
2
0
DE
B
T
SE
R
V
I
C
E
83
-
8
3
0
LI
B
R
A
R
Y
DEBT SERVICE
01
-
1
2
0
FI
N
A
N
C
E
15
-
1
5
5
MO
T
O
R
FU
E
L
TA
X
(M
F
T
)
51
-
5
1
0
WA
T
E
R
OP
E
R
A
T
I
O
N
S
84
-
8
4
0
LI
B
R
A
R
Y
CAPITAL
01
-
2
1
0
PO
L
I
C
E
23
-
2
1
6
MU
N
I
C
I
P
A
L
BU
I
L
D
I
N
G
52
-
5
2
0
SE
W
E
R
OP
E
R
A
T
I
O
N
S
87
-
8
7
0
CO
U
N
T
R
Y
S
I
D
E
TIF
01
-
2
2
0
CO
M
M
U
N
I
T
Y
DE
V
E
L
O
P
M
E
N
T
23
-
2
3
0
CI
T
Y
-
W
I
D
E
CA
P
I
T
A
L
72
-
7
2
0
LA
N
D
CA
S
H
88
-
8
8
0
DO
W
N
T
O
W
N
TIF
01
-
4
1
0
ST
R
E
E
T
OP
ER
A
T
I
O
N
S
25
-
2
0
5
PO
L
I
C
E
CA
P
I
T
A
L
79
-
7
9
0
PA
R
K
S
DE
P
A
R
T
M
E
N
T
90
-
X
X
X
DE
V
E
L
O
P
E
R
ESCROW
01
-
6
4
0
AD
M
I
N
S
T
R
A
T
I
V
E
SE
R
V
I
C
E
S
25
-
2
1
5
PU
B
L
I
C
WO
R
K
S
CA
P
I
T
A
L
79
-
7
9
5
RE
C
R
E
A
T
I
O
N
DE
P
T
95
-
X
X
X
ES
C
R
O
W
DEPOSIT
11
-
1
1
1
FO
X
HI
L
L
SS
A
25
-
2
2
5
PA
R
K
S
& RE
C
R
E
A
T
I
O
N
CA
P
I
T
A
L
82
-
8
2
0
LI
B
R
A
R
Y
OP
E
R
A
T
I
O
N
S
DA
T
E
:
1
0
/
2
2
/
1
4
U
N
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
P
A
G
E
:
1
TI
M
E
:
1
2
:
4
3
:
3
2
C
H
E
C
K
R
E
G
I
S
T
E
R
PR
G
I
D
:
A
P
2
1
5
0
0
0
.
W
O
W
CH
E
C
K
D
A
T
E
:
1
0
/
2
2
/
1
4
CH
E
C
K
#
V
E
N
D
O
R
#
I
N
V
O
I
C
E
I
N
V
O
I
C
E
I
T
E
M
N
U
M
B
E
R
D
A
T
E
#
D
E
S
C
R
I
P
T
I
O
N
A
C
C
O
U
N
T
#
I
T
E
M
A
M
T
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
1
8
5
2
8
R
0
0
0
1
3
9
2
J
O
S
H
U
A
W
Y
A
T
T
2
0
1
4
0
2
8
7
-
B
U
I
L
D
1
0
/
1
7
/
1
4
0
1
1
4
0
4
V
I
O
L
E
T
C
T
B
U
I
L
D
P
R
O
G
R
A
M
2
3
-
0
0
0
-
2
4
-
0
0
-
2
4
4
5
3
,
9
8
6
.
4
0
0
2
1
4
0
4
V
I
O
L
E
T
C
T
B
U
I
L
D
P
R
O
G
R
A
M
2
5
-
0
0
0
-
2
4
-
2
0
-
2
4
4
5
6
0
0
.
0
0
0
3
1
4
0
4
V
I
O
L
E
T
C
T
B
U
I
L
D
P
R
O
G
R
A
M
2
5
-
0
0
0
-
2
4
-
2
1
-
2
4
4
5
1
,
6
0
0
.
0
0
0
4
1
4
0
4
V
I
O
L
E
T
C
T
B
U
I
L
D
P
R
O
G
R
A
M
2
5
-
0
0
0
-
2
4
-
2
2
-
2
4
4
5
1
0
0
.
0
0
0
5
1
4
0
4
V
I
O
L
E
T
C
T
B
U
I
L
D
P
R
O
G
R
A
M
4
2
-
0
0
0
-
2
4
-
0
0
-
2
4
4
5
5
0
.
0
0
0
6
1
4
0
4
V
I
O
L
E
T
C
T
B
U
I
L
D
P
R
O
G
R
A
M
5
1
-
0
0
0
-
2
4
-
0
0
-
2
4
4
5
3
,
6
6
3
.
6
0
IN
V
O
I
C
E
T
O
T
A
L
:
1
0
,
0
0
0
.
0
0
*
CH
E
C
K
T
O
T
A
L
:
1
0
,
0
0
0
.
0
0
TO
T
A
L
A
M
O
U
N
T
P
A
I
D
:
1
0
,
0
0
0
.
0
0
Page 32 of 34
RE
G
U
L
A
R
O
V
E
R
T
I
M
E
T
O
T
A
L
I
M
R
F
F
I
C
A
T
O
T
A
L
S
MA
Y
O
R
&
L
I
Q
.
C
O
M
.
90
8
.
3
4
$
-
$
9
0
8
.
3
4
$
-
$
6
9
.
4
9
$
9
7
7
.
8
3
$
CL
E
R
K
58
3
.
3
4
-
5
8
3
.
3
4
9
.
6
8
3
2
.
9
2
6
2
5
.
9
4
TR
E
A
S
U
R
E
R
83
.
3
4
-
8
3
.
3
4
9
.
6
8
6
.
3
6
9
9
.
3
8
AL
D
E
R
M
A
N
4,
0
0
0
.
0
0
-
4
,
0
0
0
.
0
0
3
4
8
.
6
0
2
8
2
.
7
1
4
,
6
3
1
.
3
1
UN
I
T
E
D
C
I
T
Y
O
F
Y
O
R
K
V
I
L
L
E
PA
Y
R
O
L
L
S
U
M
M
A
R
Y
Oc
t
o
b
e
r
2
4
,
2
0
1
4
AD
M
I
N
I
S
T
R
A
T
I
O
N
11
,
3
7
5
.
6
7
-
1
1
,
3
7
5
.
6
7
1
,
2
7
6
.
5
4
7
9
3
.
7
9
1
3
,
4
4
6
.
0
0
FI
N
A
N
C
E
7,
8
0
3
.
7
9
-
7
,
8
0
3
.
7
9
9
0
6
.
8
0
5
8
4
.
3
1
9
,
2
9
4
.
9
0
PO
L
I
C
E
91
,
1
6
3
.
9
3
2
,
0
6
6
.
1
7
9
3
,
2
3
0
.
1
0
5
4
0
.
4
5
6
,
8
4
4
.
6
9
1
0
0
,
6
1
5
.
2
4
CO
M
M
U
N
I
T
Y
D
E
V
.
12
,
1
9
5
.
5
2
-
1
2
,
1
9
5
.
5
2
1
,
2
9
1
.
6
1
8
9
4
.
3
2
1
4
,
3
8
1
.
4
5
ST
R
E
E
T
S
11
,
9
5
7
.
1
6
-
1
1
,
9
5
7
.
1
6
1
,
3
8
9
.
4
2
8
7
6
.
7
5
1
4
,
2
2
3
.
3
3
WA
T
E
R
12
,
9
0
8
.
3
3
6
5
.
0
4
1
2
,
9
7
3
.
3
7
1
,
5
0
7
.
5
1
9
3
5
.
7
0
1
5
,
4
1
6
.
5
8
SE
W
E
R
7,
2
1
9
.
0
5
-
7
,
2
1
9
.
0
5
8
3
8
.
8
5
5
3
8
.
7
8
8
,
5
9
6
.
6
8
PA
R
K
S
18
,
4
6
0
.
9
9
6
.
7
5
1
8
,
4
6
7
.
7
4
2
,
0
6
2
.
2
9
1
,
3
7
8
.
0
8
2
1
,
9
0
8
.
1
1
RE
C
R
E
A
T
I
O
N
11
,
4
2
9
.
3
1
-
1
1
,
4
2
9
.
3
1
1
,
0
9
0
.
7
5
8
4
7
.
9
8
1
3
,
3
6
8
.
0
4
LI
B
R
A
R
Y
15
,
6
6
4
.
8
8
-
1
5
,
6
6
4
.
8
8
8
7
3
.
0
5
1
,
1
7
3
.
9
2
1
7
,
7
1
1
.
8
5
TO
T
A
L
S
20
5
,
7
5
3
.
6
5
$
2
,
1
3
7
.
9
6
$
2
0
7
,
8
9
1
.
6
1
$
1
2
,
1
4
5
.
2
3
$
1
5
,
2
5
9
.
8
0
$
2
3
5
,
2
9
6
.
6
4
$
TO
T
A
L
P
A
Y
R
O
L
L
23
5
,
2
9
6
.
6
4
$
Page 33 of 34
ACCOUNTS PAYABLE DATE
Manual Check Register- City MasterCard 10/25/2014 $145,365.97
City Check Register 10/28/2014 $672,454.82
SUB-TOTAL: $817,820.79
OTHER PAYABLES
Manual Check #518457 - Yorkville Post Office - 08/31 UB Penalty Bills10/09/2014 $389.00
MlChk#518458EJEitNVCVhil 10/15/2014 $26998600
UNITED CITY OF YORKVILLE
BILL LIST SUMMARY
Tuesday, October 28, 2014
Manual Check #518458- E.J. Equipment - New Vac-Con Vehicle 10/15/2014 $269,986.00
Manual Check #518459 - Wilkinson Excavating - Grande Reserve Park B10/20/2014 $69,019.20
Clerk's Check #13103 - Kendall County Recorder 10/20/2014 $196.00
Manual Check #518528 - Wyatt Build Check 10/22/2014 $10,000.00
SUB-TOTAL: $349,590.20
Bi - Weekly 10/24/2014 $235,296.64
SUB-TOTAL: $235,296.64
TOTAL DISBURSEMENTS:$1,402,707.63
PAYROLL
Pa
g
e
34
of
34
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
See Memorandum.
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Agenda Item Number
EDC #1
Tracking Number
EDC 2014-12
Residential Builder Incentives
City Council – October 28, 2014
N/A
N/A
N/A
Majority
Vote
Discussion of current builder incentives and proposed builder incentives.
Chris Heinen Community Development
Name Department
Background & Introduction:
In an effort to stimulate new residential construction in Yorkville, staff has proposed additional
incentives for new homes in Yorkville to boost development on the south side of town similar to the
success seen on the north side as a result of the B.U.I.L.D. program. Listed below is a summary of the
proposed model and spec home incentive programs.
Proposed New Construction Builder Programs:
Staff is proposing two separate programs to boost the marketability of the homebuilder as well as
create an inventory of new homes in the area for immediate sale. Spec homes are typically built within the
development to allow a quick sale of a home to the builder. Model homes are typically built to showcase
the variety of homes offered by the builder. These homes are constructed and are not available for sale
until the development reaches the end of completion. Staff is proposing the 50% reduction for spec
homes, as these are intended to be sold immediately, and 100% reduction for model homes, as these are
intended to last the duration without selling. Also, these programs cannot be combined with the
B.U.I.L.D. program.
Spec Home Incentive:
o When the builder purchases existing, platted lots within an established development, the
City will reduce the City’s portion of the building permit by 50% to construct a Spec
Home within the development at time of building permit issuance.
o The average City portion of a typical building permit ranges from $2,600 to $11,500 and
consists of the following fees: Building permit fee, Building Plan Review fee, water
connection fee, sewer connection fee, water meter, public walk and driveway fee, capital
fees (library, police, public works, and parks) and inspection fees (see attached sample
building permit). The builder would be refunded 50% of these permit fees.
o Upon application for the Spec Home Incentive program, the builder will need to provide
a title of the transaction that demonstrates ownership of a minimum of at least ten (10)
residential lots within the development.
o A builder would only be allowed to build spec homes on 10% of the total lots acquired
within the development. (Example, if the builder purchases 122 total lots, the total
number of spec homes allowed at a reduced permit fee would be 12. Any fraction as a
result of the 10% calculation shall not be rounded up to the nearest whole number.)
o One (1) initial Spec Home Incentive permit will be granted to the builder upon proof of
lot ownership of at least ten (10) residential lots within the development. After the builder
constructs and closes on ten (10) homes within the development, one (1) additional Spec
Home permit will be granted, up to a maximum of 10% of the total lots purchased.
(Example, if a builder purchases 122 total lots, they will be permitted one (1) Spec Home
permit at proof of lot ownership. For every ten (10) homes built within the same
development, the builder will be granted one (1) additional Spec Home permit. The
maximum number of Spec Home permits allowed in this example would be 12.)
o The City will cap the number of spec home incentives to 30 permits. These will be based
on a first come, first serve basis.
Model Home Incentive:
Memorandum
To: City Council
From: Chris Heinen, Planner
CC: Bart Olson, City Administrator
Krysti Barksdale-Noble, Community Development Director
Date: October 6, 2014
Subject: Model Home/Spec Home Incentives
o When the builder purchases existing, platted lots within an established development, the
City will grant the reduction of 100% of the City’s portion of one (1) building permit to
construct a model home.
o When the builder completes and closes on ten (10) homes, the City will reduce the City’s
portion of the next building permit by 100% to construct a model home within the
development.
o The average City portion of a typical building permit ranges from $2,600 to $11,500 and
consists of the following fees: Building permit fee, Building Plan Review fee, water
connection fee, sewer connection fee, water meter, public walk and driveway fee, capital
fees (library, police, public works, and parks) and inspection fees (see attached sample
building permit). The builder would be refunded 100% of these permit fees.
o A builder would only be allowed to construct model homes on 5% of the total lots
acquired within the development. (Example, if the builder purchases 122 total lots, the
total number of model homes allowed at a reduced permit fee would be 6. Any fraction as
a result of the 5% calculation shall not be rounded up to the nearest whole number.)
o Should the builder sell the model home within one (1) year of the issuance of a
Certificate of Occupancy as part of the Model Home Incentive program, the builder will
then be required to refund the City the 50% of the City’s portion of the originally issued
building permit. In this instance, the home is no longer considered a “model” and would
now be considered a Spec Home. The builder would then be “charged” a Spec Home
incentive permit. If the builder has completed 100% of the allowable spec homes at that
time, the builder would then be required to refund the full amount of the City’s portion of
the building permit before the issuance of that home’s certificate of occupancy.
o Once the builder has completed and closed on 95% of the purchased lots (minus the lots
that have the models on them), the builder will be able to sell the remaining model homes
at no penalty from the City.
o The City will cap the number of model home incentives to 15 permits. These will be
based on a first come, first serve basis.
Conclusion:
Staff had polled several builders in conjunction with these new incentives. The builders agreed
that this type of incentive would spark additional sales in one form or another. The addition of model
homes would allow a wider variety of styles the potential homebuyer would have to look at. The addition
of spec homes would allow the builder to create an inventory of homes that could be marketed as a quick
sale to the appropriate homebuyer. At the last EDC meeting, staff was asked to create a form that will be
used to distinguish the difference between a builder and developer. Staff is in the process of creating
these forms and will accompany the appropriate application submitted to the City for either of the
incentives.
Ordinance No. 2014-____
Page 1
Ordinance No. 2014-_____
AN ORDINANCE OF THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS
ADOPTING INCENTIVE PROGRAMS FOR THE CONSTRUCTION OF NEW HOMES
WHEREAS, the United City of Yorkville, Kendall County, Illinois (the “City”), is a duly
organized and validly existing non home-rule municipality created in accordance with the
Constitution of the State of Illinois of 1970 and the laws of the State; and,
WHEREAS, new construction programs to induce the construction of speculative homes
and model homes have been recommended in order to create an inventory of new homes in the
City for immediate sale; and,
WHEREAS, the Mayor and City Council have reviewed the proposed new programs and
have determined that it is in the best interest of the City and its future residential growth to adopt
the Speculative Home Incentive and the Model Home Incentive as hereinafter set forth.
NOW, THEREFORE, BE IT ORDAINED by the Mayor and City Council of the
United City of Yorkville, Kendall County, Illinois, as follows:
Section 1. There is hereby adopted a Speculative Home Incentive Program applicable to
a maximum of thirty (30) homes which authorizes a rebate of fifty percent (50%) of the City’s
portion of the cost of a building permit, as hereinafter defined, where the builder meets the
following criteria:
(i) Provides proof of ownership of a minimum of ten (10) lots as a part of any
development which has been subdivided pursuant to the recordation of an
approved final plat of subdivision; and,
(ii) Builds speculative homes on no more than ten percent (10%) of the total number
of residential lots owned by such builder.
Ordinance No. 2014-____
Page 2
Any builder who has received certificates of occupancy for ten (10) homes and proof of
sale of said forms for immediate residential occupancy, shall be eligible for another reduction of
said fees.
Section 2. There is hereby adopted a Model Home Incentive Program applicable to a
maximum of fifteen (15) model homes, which authorizes any builder of residential property to
receive one hundred percent (100%) of the City’s portion of the cost of a building permit, as
hereinafter defined, for the construction of a model home, subject to the following:
(i) The builder provides the City with proof of ownership of no less than ten (10)
residential lots;
(ii) No more than five percent (5%) of the residential lots owned by a single builder
are developed with model homes;
(iii) The model home may not be sold by the builder until such builder has constructed
homes, received a certificate of occupancy and has sold the homes for residential
occupancy for ninety-five percent (95%) of the total number of residential lots
owned by the builder;
(iv) A builder may be entitled to another reduction of one hundred percent (100%) of
the City’s portion of permit fees applicable to another model home upon receipt
of certificates of occupancy and sale to a third party for residential use, ten (10)
homes other than the model home for which the reduction had been received; and,
(v) The builder agrees to remit fifty percent (50%) of the City’s portion of permit fees
if the model home is sold within one year of the issuance of a certificate of
occupancy or one hundred percent (100%) of the reduction if such builder had
received a reduction in Speculative Home Incentive Program.
Ordinance No. 2014-____
Page 3
Section 3. For purposes of this Ordinance, the City’s portion of permit fees shall include
the following fees:
(i) Building permit fee;
(ii) Building plan review fee;
(iii) Water connect fee;
(iv) Sewer connect fee;
(v) Public walk and driveway fee;
(vi) Parks land cash fee;
(vii) Capital fees for municipal building, library, police, public works, engineering and
parks; and,
(viii) Inspection fees.
Section 4. All ordinances or parts of ordinances in conflict with the provisions of this
ordinance are hereby repealed to the extent of such conflict.
Section 5. This Ordinance shall be in full force and effect after its passage, publication,
and approval as provided by law.
Passed by the City Council of the United City of Yorkville, Kendall County, Illinois, this
________ day of ____________________, 2014.
______________________________
City Clerk
CARLO COLOSIMO ________ KEN KOCH ________
JACKIE MILSCHEWSKI ________ LARRY KOT ________
CHRIS FUNKHOUSER ________ JOEL FRIEDERS ________
ROSE ANN SPEARS ________ DIANE TEELING ________
Approved by me, as Mayor of the United City of Yorkville, Kendall County, Illinois, this
________ day of ____________________, 2014.
______________________________
Mayor
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
ADM #1
Tracking Number
ADM 2014-70
Tax Levy Estimate
City Council – October 28, 2014
N/A
Majority
Approval
See attached memo.
Bart Olson Administration
Name Department
Summary
Approval of a 2014 tax levy estimate, for purposes of publishing a public notice for an upcoming
public hearing.
Background
Each year, the first step of the tax levy process involves adopting a tax levy estimate for purposes
of holding a public hearing (if required). The recommended tax levy estimate for the City and Library
operations (capped taxes) is $3,833,677. Per past practice and tax levy laws, the City expects the actual
tax levy will be lower.
When the City was discussing property tax abatements in the FY 15 budget discussion, the City
unofficially adopted a plan to reduce its tax levy from FY 15 through FY 18. This plan was a modified
extension of the process began in FY 12 as a result of non-abated property taxes and the passage of the
non-home rule sales tax referendum.:
2% reduction in FY 15 (current fiscal year)
1% reduction in FY 16 (under discussion)
1% reduction in FY 17
1% reduction in FY 18
~0.69% increase in FY 19
The above reduction schedule is reflected between the City property tax line-item (a calculation of the
City uncapped taxes and City capped taxes) and the Library property tax-line-item (a calculation of the
Library uncapped taxes and Library capped taxes).
The 1% overall reduction between Library and City property taxes will be achieved by an
estimated 2.95% increase in the capped taxes (Library operations tax plus all City capped taxes), a
2.53% increase in the Library uncapped taxes, and a 50% decrease in the City uncapped taxes (through
abating more bond-related taxes). This plan reflects the City’s overall policy direction to continue to
levy the maximum allowed under tax cap laws and to continue to reduce the non-abated, bond-related
property taxes. This direction gives the City more flexibility with its property tax dollars because it
receives more unrestricted property taxes than it does restricted property taxes (i.e. bond-related).
Memorandum
To: Administration Committee
From: Bart Olson, City Administrator
CC:
Date: October 9, 2014
Subject: 2014 Tax Levy Estimate
Details
The FY 15 (2013 levy) certification from the County Clerk is attached to this memo. The first
page contains all City (non-library) taxes, and the second page contains library taxes (operations and
bonds for the building). If desired by the City, we could calculate a property tax cap for each page
individually. Similar to last year, that conversation is moot for this year.
Last levy year, the Library’s maximum tax levy only yielded $630,038, which was a decrease
from their FY 14 amount of $664,658 and was below their FY 14 estimate of $692,000. While the EAV
throughout the City is expected to increase 0.53% this year, this amount is less than the tax cap
calculations allow. This means that while the Library will be able to receive $633,423 this upcoming
year (a $3,385 increase), they will still be at $0.15 per $100/EAV. If they did not have that statutorily
imposed tax rate maximum, their levy would be around $648,000. So, for this year, it makes sense for
the City to continue to consider the Library under the City’s tax cap umbrella.
The breakdown of the sublevies is attached for your review. These do not need to be formally
decided upon until the City passes its levy ordinance in November or December. The County’s current
EAV estimate is $422,282,275 which is a 0.53% increase from last year. Like last year, we are
continuing to direct all incremental property taxes in the City’s operations to the police pension. We
expect that amount to be an additional $101,000 this year.
The abatement ordinances for the non-abated (uncapped) City property taxes do not have to be
voted on until January or February. As stated above, we expect a reduction of 50% in non-abated City
property taxes, which will help us yield the overall 1% property tax reduction between the City and the
Library. This non-abatement will result in $165,000 in bond-related property taxes, and puts us ahead of
schedule to roll back these property taxes by FY 18.
Homeowner Impact
The property tax bill lists the City and the Library as two different levies. The City (capped and
uncapped) levy request will be 2.09% lower than it was in 2013 levy year (payable in 2014). The
Library (capped and uncapped) will be 1.61% higher than it was in 2013 levy year (payable in 2014).
Based on those two statements only, the amount that each property owner pays to the City and to the
Library should be lower than the prior tax bill. For reasons1 that will be fully explored in the public
hearing and the subsequent discussions, this may not be the case for every property owner. Also, for the
first time in a few years, the modest increase in EAV will cause the City property tax rate to go down,
and the Library tax rate to go up.
Recommendation
The preliminary staff recommendations for aggregate levy amounts are below. The breakdown
of the individual sublevies is attached to this memo, but does not need to be set for purposes of holding a
public hearing (they can be changed at anytime). The actual numbers to achieve the 1% overall
reduction are below. We would propose to hold the public hearing at the November 10th City Council
meeting.
1 Assessment reductions or increases of your property compared to all other properties in Yorkville.
2013 Levy Extension 2014 Maximum Levy
(Estimate)
2014 Levy
Recommended Amount
City and Library
Operations
(Capped)
3,545,425 3,650,100 ~3,833,677
City Bonds
(Uncapped) 334,816 N / A ~165,527
Library Bonds
(Uncapped) 731,348 N / A 749,846
Totals 4,611,589 N / A 4,749,050
2012 Rate
Setting EAV
2013 Rate
Setting EAV
2014 Estimated
Rate Setting EAV
% Change over
Prior Yr EAV
Farm 2,568,351$ Farm 2,618,131$ Farm 2,730,335$ 4.29%
Residential 332,551,186$ Residential 311,316,069$ Residential 310,979,347$ -0.11%
Commercial 101,264,981$ Commercial 99,434,012$ Commercial 95,574,577$ -3.88%
Industrial 6,720,962$ Industrial 6,656,792$ Industrial 12,980,688$ 95.00%
State Railroad 17,328$ State Railroad 17,328$ State Railroad 17,328$ 0.00%
Total 443,122,808$ Total 420,042,332$ Estimated Total 422,282,275$ 0.53%
2012 2012 2012 2013 2013 2013 2014 2014 Est.% Change over $ Change over
Rate Levy Request Levy Extension Rate Levy Request Levy Extension Estimated Rate Levy Request Prior Yr Ext.Prior Yr Ext.
Corporate 0.23542 1,043,154$ 1,043,200$ 0.25931 1,089,190$ 1,043,217$ 0.24704 1,043,200$ 0.00%(17)$
Bonds & Interest 0.10971 486,146 486,150 0.07971 334,816 334,816 0.03920 165,527 -50.56%(169,289)
IMRF Pension 0.10155 450,000 449,991 0.10714 450,000 449,991 0.10656 450,000 0.00%9
Police Protection 0.07898 350,000 349,978 0.08333 350,000 349,979 0.08288 350,000 0.01%21
Police Pension 0.12292 662,538 544,687 0.17610 739,683 627,207 0.17251 728,477 16.15%101,270
Audit 0.00677 30,000 29,999 0.00715 30,000 29,991 0.00710 30,000 0.03%9
Liability Insurance 0.00903 40,000 40,014 0.00953 40,000 39,988 0.00947 40,000 0.03%12
Social Security 0.06770 300,000 299,994 0.07143 300,000 300,036 0.07104 300,000 -0.01%(36)
School Crossing Guard 0.00564 25,000 24,992 0.00596 25,000 24,993 0.00592 25,000 0.03%7
Unemployment Insurance 0.01128 50,000 49,984 0.01191 50,000 49,985 0.01184 50,000 0.03%15
Subtotal City 0.74900 3,436,838$ 3,318,990$ 0.81157 3,408,689$ 3,250,204$ 0.75357 3,182,204$ -2.09%(68,000)
Library Operations 0.15000 700,000$ 664,658$ 0.15000 692,000$ 630,038 0.15000 633,423$ 0.54%3,385$
Library Bonds & Interest 0.17418 771,763 771,801 0.17412 731,320 731,348 0.17757 749,846 2.53%18,498
Subtotal Library 0.32418 1,471,763$ 1,436,459$ 0.32412 1,423,320$ 1,361,385$ 0.32757 1,383,269$ 1.61%21,884
Total City (PTELL & Non-PTELL)1.07318 4,908,601$ 4,755,449$ 1.13569 4,832,009$ 4,611,589$ 1.08114 4,565,473$ -1.00%(46,116)$
less Bonds & Interest 0.28389 1,257,909 1,257,951 0.25383 1,066,136 1,066,163 0.21677 915,373 -14.14%(150,790)
P-TELL Totals 0.78929 3,650,692$ 3,497,498$ 0.88186 3,765,873$ 3,545,425$ 0.86437 3,650,100$ 2.95%104,675$
2014 Tax Levy - Estimated Actual
% Inc(Dec) Over $ Inc(Dec) Over
2012 Requested 2012 Extended 2013 Requested 2013 Extended 2014 Requested Prior Yr Extended Prior Yr Extended
City 2,288,154 2,288,153 City 2,334,190 2,288,181 City 2,288,200 0.00%19
Library 700,000 664,658 Library 692,000 630,038 Library 633,423 0.54%3,385
Police Pension 662,538 544,687 Police Pension 739,683 627,207 Police Pension 728,477 16.15%101,270
City Debt Service 486,146 486,150 City Debt Service 334,816 334,816 City Debt Service 165,527 -50.56%(169,289)
Library Debt Service 771,763 771,801 Library Debt Service 731,320 731,348 Library Debt Service 749,846 2.53%18,498
Total 4,908,601 4,755,449 Total 4,832,009 4,611,589 Total 4,565,473 -1.00%(46,116)
less Bonds & Interest 1,257,909 1,257,951 less Bonds & Interest 1,066,136 1,066,163 less Bonds & Interest 915,373 -14.14%(150,790)
PTELL Subtotal 3,650,692 3,497,498 PTELL Subtotal 3,765,873 3,545,425 PTELL Subtotal 3,650,100 2.95%104,675
- - - - - - -
City Debt Service Levy Breakout City Debt Service Levy Breakout City Debt Service Levy Breakout
Series 2005A - Debt Service Fund 328,180$ Series 2005A - Debt Service Fund 329,580$ Series 2014B - Debt Service Fund 165,527$ 100.00%
Series 2007A - Water Fund 43,029 Series 2007A - Water Fund 5,236 Series 2007A - Water Fund -
Series 2004B - Sewer Fund 114,941 Series 2004B - Sewer Fund - Series 2004B - Sewer Fund -
Total 486,150$ Total 334,816$ Total 165,527$
2014 Tax Levy - Estimated Actual Summary
2012 Rate
Setting EAV
2013 Rate
Setting EAV
2014 Estimated
Rate Setting EAV
% Change over
Prior Yr EAV
Farm 2,568,351$ Farm 2,618,131$ Farm 2,730,335$ 4.29%
Residential 332,551,186$ Residential 311,316,069$ Residential 310,979,347$ -0.11%
Commercial 101,264,981$ Commercial 99,434,012$ Commercial 95,574,577$ -3.88%
Industrial 6,720,962$ Industrial 6,656,792$ Industrial 12,980,688$ 95.00%
State Railroad 17,328$ State Railroad 17,328$ State Railroad 17,328$ 0.00%
Total 443,122,808$ Total 420,042,332$ Estimated Total 422,282,275$
2012 2012 2012 2013 2013 2013 2014 2014 Est.% Change over $ Change over
Rate Levy Request Levy Extension Rate Levy Request Levy Extension Estimated Rate Levy Request Prior Yr Ext.Prior Yr Ext.
Corporate 0.23542 1,043,154$ 1,043,200$ 0.25931 1,089,190$ 1,043,217$ 0.24704 1,043,200$ 0.00%(17)$
Bonds & Interest 0.10971 486,146 486,150 0.07971 334,816 334,816 0.03920 165,527 -50.56%(169,289)
IMRF Pension 0.10155 450,000 449,991 0.10714 450,000 449,991 0.10656 450,000 0.00%9
Police Protection 0.07898 350,000 349,978 0.08333 350,000 349,979 0.08288 350,000 0.01%21
Police Pension 0.12292 662,538 544,687 0.17610 739,683 627,207 0.20211 853,477 36.08%226,270
Audit 0.00677 30,000 29,999 0.00715 30,000 29,991 0.00710 30,000 0.03%9
Liability Insurance 0.00903 40,000 40,014 0.00953 40,000 39,988 0.00947 40,000 0.03%12
Social Security 0.06770 300,000 299,994 0.07143 300,000 300,036 0.07104 300,000 -0.01%(36)
School Crossing Guard 0.00564 25,000 24,992 0.00596 25,000 24,993 0.00592 25,000 0.03%7
Unemployment Insurance 0.01128 50,000 49,984 0.01191 50,000 49,985 0.01184 50,000 0.03%15
Subtotal City 0.74900 3,436,838$ 3,318,990$ 0.81157 3,408,689$ 3,250,204$ 0.78317 3,307,204$ 1.75%57,000
Library Operations 0.15000 700,000$ 664,658$ 0.15000 692,000$ 630,038 0.16387 692,000$ 9.83%61,962$
Library Bonds & Interest 0.17418 771,763 771,801 0.17412 731,320 731,348 0.17757 749,846 2.53%18,498
Subtotal Library 0.32418 1,471,763$ 1,436,459$ 0.32412 1,423,320$ 1,361,385$ 0.34144 1,441,846$ 5.91%80,461
Total City (PTELL & Non-PTELL)1.07318 4,908,601$ 4,755,449$ 1.13569 4,832,009$ 4,611,589$ 1.12462 4,749,050$ 2.98%137,461$
less Bonds & Interest 0.28389 1,257,909 1,257,951 0.25383 1,066,136 1,066,163 0.21677 915,373 -14.14%(150,790)
P-TELL Totals 0.78929 3,650,692$ 3,497,498$ 0.88186 3,765,873$ 3,545,425$ 0.90785 3,833,677$ 8.13%288,252$
2014 Tax Levy - Requested
% Inc(Dec) Over $ Inc(Dec) Over
2012 Requested 2012 Extended 2013 Requested 2013 Extended 2014 Requested Prior Yr Extended Prior Yr Extended
City 2,288,154 2,288,153 City 2,334,190 2,288,181 City 2,288,200 0.00%19
Library 700,000 664,658 Library 692,000 630,038 Library 692,000 9.83%61,962
Police Pension 662,538 544,687 Police Pension 739,683 627,207 Police Pension 853,477 36.08%226,270
City Debt Service 486,146 486,150 City Debt Service 334,816 334,816 City Debt Service 165,527 -50.56%(169,289)
Library Debt Service 771,763 771,801 Library Debt Service 731,320 731,348 Library Debt Service 749,846 2.53%18,498
Total 4,908,601 4,755,449 Total 4,832,009 4,611,589 Total 4,749,050 2.98%137,461
less Bonds & Interest 1,257,909 1,257,951 less Bonds & Interest 1,066,136 1,066,163 less Bonds & Interest 915,373 -14.14%(150,790)
PTELL Subtotal 3,650,692 3,497,498 PTELL Subtotal 3,765,873 3,545,425 PTELL Subtotal 3,833,677 8.13%288,252
- - - - - - -
City Debt Service Levy Breakout City Debt Service Levy Breakout City Debt Service Levy Breakout
Series 2005A - Debt Service Fund 328,180$ Series 2005A - Debt Service Fund 329,580$ Series 2014B - Debt Service Fund 165,527$ 100.00%
Series 2007A - Water Fund 43,029 Series 2007A - Water Fund 5,236 Series 2007A - Water Fund -
Series 2004B - Sewer Fund 114,941 Series 2004B - Sewer Fund - Series 2004B - Sewer Fund -
Total 486,150$ Total 334,816$ Total 165,527$
2014 Tax Levy - Requested Summary
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
ADM #2
Tracking Number
ADM 2014-71
Website RFP vendor selection and contract approval
City Council – October 28, 2014
N/A
Majority
Approval
See attached memo.
Bart Olson Administration
Name Department
The past two
Summary
Selection of Civic Plus as the City’s website vendor and approval of a contract for web redesign.
Background
This item was last discussed at the October Administration Committee meeting. At that meeting,
the committee reviewed the attached memo for website RFP vendor selection and unanimously
approved the staff recommendation of Civic Plus. The original Civic Plus proposal is also attached to
this memo.
At the Administration Committee meeting, Bryan Hahlbeck, Civic Plus representative,
committed to increasing the City’s website storage limit to 40GB from 20GB, and for waiving the
inflationary increase on the annual hosting fee should the City approve a four year commitment to Civic
Plus as part of this contract. Both of those terms are reflected in the attached redesign contract.
Additionally, Mr. Hahlbeck has committed to a further 5% one-time reduction in the redesign fee should
this contract be approved by the end of October. That reduction is reflected in the contract, but would
be removed if the contract is not approved at the October 28th City Council meeting.
Summary of contract
1) Price:
a. $41,864 for a website redesign, 4 years of content management system upgrades,
support, and hosting
b. Billed out at ~$15,000 at time of completion of website layout, ~$15,000 at time of
go-live, and then ~$3,900 at anniversary of 1 year of contract signing, ~$3,900 at 2-
year anniversary, and ~$3,900 at 3-year anniversary.
2) Project scope:
a. Exhibit A page 2 and 3 has a timeline
i. Staff and steering committee design input
ii. Website cleanup
iii. Content migration
iv. Design production
v. Staff training
vi. Project rollout
b. Exhibit page 4 of 4 has a complete list of website functions
i. Agenda center
ii. Emergency alerts
iii. Calendar
iv. Citizen Request Tracker
Memorandum
To: City Council
From: Bart Olson, City Administrator
CC:
Date: October 23, 2014
Subject: Civic Plus contract
v. E-payment center
vi. E-mail list module
vii. Surveys
viii. Mobile website
ix. Robust content management system with change log
Recommendation
Staff recommends approval of Civic Plus as the website redesign vendor and the Civic Plus
Project Development Contract.
Resolution No. 2014-_____
Page 1
Resolution No. 2014-___
A RESOLUTION OF THE MAYOR AND CITY COUNCIL
OF THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS
FOR THE REDESIGN OF A CITY WEBSITE
WHEREAS, the United City of Yorkville, Kendall County, Illinois (“City”) is a duly
organized and validly existing non home-rule municipality created in accordance with the
Constitution of the State of Illinois of 1970 and the laws of this State and a duly constituted
public agency of this State; and,
WHEREAS, the City requested proposals for services to provide a complete web site
content management system and ancillary services including date conversion, system integration,
hosting services, training of staff and ongoing technical support for improvements to the City’s
website located at www.yorkville.il.us; and,
WHEREAS, in response to the City’s request for proposals, Civic Plus of Manhattan,
Kansas, provided a proposal to provide such services which met all of the criteria and experience
believed necessary to undertake the redesign of the City’s website in accordance with the terms
and conditions as set forth in the Project Development Agreement attached hereto.
NOW, THEREFORE, BE IT RESOLVED, by the Mayor and City Council of the
United City of Yorkville, Kendall County, Illinois, as follows:
Section 1. The Project Development by and between the City and Icon Enterprises, Inc. d/b/a
Civic Plus in the form attached hereto and made a part hereof is hereby approved
and the City Administrator is hereby authorized to execute on behalf of the City.
Section 2. If any section, paragraph, clause, or provision of this Resolution shall be held
invalid, the invalidity of such section, paragraph, clause, or provision shall not
affect any of the other provisions of this Resolution.
Resolution No. 2014-_____
Page 2
Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this
_____ day of _______________ 2014.
______________________________
City Clerk
CARLO COLOSIMO ________ KEN KOCH ________
JACKIE MILSCHEWSKI ________ LARRY KOT ________
CHRIS FUNKHOUSER ________ JOEL FRIEDERS ________
ROSE ANN SPEARS ________ DIANE TEELING ________
Approved by me, as Mayor of the United City of Yorkville, Kendall County, Illinois, this
_____ day of _______________ 2014.
____________________________________
Mayor
Service & License Agreement for Yorkville, IL
Exhibit A 1 of 4
CivicPlus • 317 Houston St., Suite E • Manhattan, KS 66502 • www.CivicPlus.com
Toll Free 888-228-2233 • Accounting Ext. 291 • Support Ext. 307 • Fax 785-587-8951
Project Development
Organization United City of Yorkville URL http://www.yorkville.il.us
Street Address xx
Address 2 xx
City xx State xx Postal
Code xx
CivicPlus provides telephone support for all trained clients from 7am –7pm Central Time, Monday-Friday (excluding holidays). Emergency
Support is provided on a 24/7/365 basis for representatives named by the Client. Client is responsible for ensuring CivicPlus has current
updates.
Emergency Contact & Mobile Phone xx
Emergency Contact & Mobile Phone xx
Emergency Contact & Mobile Phone xx
Billing Contact xx E-Mail xx
Phone xx Ext. xx Fax xx
Billing Address xx
Address 2 xx
City xx ST xx Postal
Code xx
Tax ID # xx Sales Tax
Exempt # xx
Billing Terms xx Account
Rep Bryan Hahlbeck
Info Required on Invoice (PO or Job #) xx
Contract Contact xx Email xx
Phone xx Ext. xx Fax xx
Project Contact xx Email xx
Phone xx Ext. xx Fax xx
Terms & Conditions
Client Deliverable
1. Icon Enterprises, Inc., d/b/a CivicPlus (“CivicPlus”) will create a unique website for the United City of Yorkville (“Client”)
http://www.yorkville.il.usthat includes all functionality and hosting as defined in Exhibit A – CivicPlus Project Deliverables,
attached hereto.
2. After 48 consecutive months under these terms and associated pricing, Client becomes fully eligible for a CP Basic Redesign
at no additional cost. See Exhibit B for complete details.
Additional Services
3. Client may contract with CivicPlus for additional Consulting, Website Design, Setup, Programming, site modification, Training
services (Project Development Services), additional Graphic Design, or content from other URLs and/or intranet sites for that
exceed those defined in Exhibit A. CivicPlus will invoice Client at the completion of the service and prior to project Go-Live.
Service & License Agreement for Yorkville, IL
Exhibit A 2 of 4
CivicPlus • 317 Houston St., Suite E • Manhattan, KS 66502 • www.CivicPlus.com
Toll Free 888-228-2233 • Accounting Ext. 291 • Support Ext. 307 • Fax 785-587-8951
Services that involve billable time beyond the contracted amount will be documented and invoiced. Written approval by the
Client is necessary before billable time is incurred.
4. Client may contract with CivicPlus for additional Annual Services that exceed those defined in Exhibit A and CivicPlus will
invoice Client for additional Annual Services upon completion of the service and prior to project Go-Live. Product Suites or
modules that incur additional usage fees may be purchased and activated at any time.
5. Client may contract with CivicPlus for the migration of Agendas & Minutes beyond the included Agenda & Minutes migration
for an additional fee. Client may also contract with CivicPlus for the conversion of Agendas & Minutes to Microsoft Word or
PDF for a conversion fee of $4,500.
6. Acceptance of this Agreement signifies Client’s approval of any billable time specifically related to training services as detailed
in Exhibit A, wherein a stated number of attendees is specified. Coverage for additional attendees not covered under this
agreement is billed at a per diem rate specified in Exhibit A.
Billing & Payment Terms
7. As detailed in Exhibit A.1 – Project Development Scope of Work, one half of the Total Fee will be billed upon completion of
Phase 2: Website Layout. The remainder of the Total Fee and any additional Project Development services will be invoiced
after Phase 4: Customized Website Training has been completed. Acceptance of the timeline established with the CivicPlus
project manager indicates the acceptance of the billing milestones.
8. The Client shall acknowledge project completion and acceptance notification prior to project go-live. The date may be
extended if material system or operational failures are encountered. Immediately after completing training the final bill for the
project development services will be billable and payable. All Parties agree that the website will not go-live until the project is
accepted in writing by the Client.
9. Total First Year invoices are due by the first of the following month, but no later than 30 days from invoice date. Project
Development will be discontinued if payment is not made within 30 days after the invoice due date.
10. Invoicing for Year 2 Annual Services begins one (1) year from contract signing.
11. Annual Services invoices may be prorated in order to correlate with the Client’s budget year, and are invoiced prior to the year
of service.
12. After project go-live, if the Client’s account exceeds 60 days past due, Support will be discontinued until the Client’s account is
made current. If the Client's account exceeds 90 days past due, Annual Services will be discontinued until the Client's account
is made current. Client will be given 30 days notice prior to discontinuation of services for non-payment.
13. The Client will be invoiced electronically through email. Upon request CivicPlus will mail invoices and the Client will be charged
a $5.00 convenience fee.
14. Unless otherwise limited by law, a finance charge of 2.9 percent (%) per month or $5.00, whichever is greater, will be added to
past due accounts. Payments received will be applied first to finance charges, then to the oldest outstanding invoice(s).
15. Provided the Client's account is current, at any time the Client may request an electronic copy of the website graphic designs,
the page content, all module content, all importable/exportable data, and all archived information (“Customer Content”). Client
agrees to pay $250 per completed request. Provided the Client's account is current, upon termination of services Client may
request a complimentary electronic copy of website Customer Content.
16. Client acknowledges and agrees that certain services for which Client is contracting hereunder may be rendered by or with
third-party providers under contract with CivicPlus, and thus the cost of such services hereunder is dependent upon the
financial arrangements between CivicPlus and such third-party providers. Client acknowledges and agrees that the price to
Client for the services hereunder may be reasonably adjusted at any time, at CivicPlus’ sole discretion, to reflect an increase in
cost to CivicPlus as a result of its financial arrangement with a third-party provider. Client acknowledges and agrees that this
Agreement as so modified will continue in full force and effect as otherwise provided herein, and that Client will pay any such
increased price according to such other payment terms hereof.
Agreement Renewal
17. This contract shall remain in effect for a period of four year (48 months) from signing. In the event that neither party gives 60
days’ notice prior to the end of the initial or any subsequent term, this Agreement will automatically renew for an additional
contract term. After 48 consecutive months under the terms of this contract and associated pricing, Client will be fully eligible
for a CP Basic Redesign at no additional cost.
Service & License Agreement for Yorkville, IL
Exhibit A 3 of 4
CivicPlus • 317 Houston St., Suite E • Manhattan, KS 66502 • www.CivicPlus.com
Toll Free 888-228-2233 • Accounting Ext. 291 • Support Ext. 307 • Fax 785-587-8951
18. Either party may terminate the agreement at the end of the contract term by providing the other party with 60 days written
notice prior to the contract renewal date.
19. In the event of early termination of this Agreement by the Client, Client forfeits eligibility for the CP Basic Redesign and all
funds applied to such eligibility and payment for services rendered is due within 15 days of termination.
20. Starting in Year 5, each year this Agreement is in effect, a technology investment and benefit fee of 2.5 percent (%) of the total
Annual Services costs will be applied.
Support
21. CivicPlus will provide unlimited telephone support Monday-Friday, 7:00 am – 7:00 pm (Central Time) excluding holidays, for all
trained Client staff. Emergency Support is provided on a 24/7/365 basis for emergency contacts named by the Client. Client is
responsible for providing CivicPlus with contact updates.
22. Support includes providing technical support of the GCMS® software, application support (pages and modules), and technical
maintenance of Client’s website. CivicPlus support does not include support of 3rd party applications. Following initial setup,
additional page design, graphic design, user training, site modification, and custom programming may be contracted
separately for an additional fee.
23. During the period of this agreement and subsequent annual renewals, CivicPlus warrants that it will, without additional charge
to the Client, take action to correct any problems or defects discovered in the GCMS® software and reported to CivicPlus by
the Client, such warranty to include ongoing maintenance upgrades and technical error correction.
24. CivicPlus provides online website statistics software at no extra charge. If Client desires to use other website statistic software,
CivicPlus will provide the necessary log file access.
Marketing
25. Client will work with the CivicPlus Marketing Department to make a reasonable attempt to gather information and meet
deadlines associated with website award contest entries throughout the term of this agreement, and to create a case study
related to their website.
26. Client permits CivicPlus to include an example of the Client’s home page and a link to the Client’s website on the CivicPlus
corporate website.
27. Client will make a reasonable attempt to work with the CivicPlus Marketing Department to create a news item to be released in
conjunction with their project Go-Live date. Client will provide CivicPlus with contact information for local and regional media
outlets. CivicPlus may use the press release in any marketing materials as desired throughout the term of this Agreement.
28. Client allows CivicPlus to display a “Government Websites by CivicPlus” insignia, and web link at the bottom of their web
pages. Client understands that the pricing and any related discount structure provided under this agreement assumes such
perpetual permission.
Intellectual Property, Ownership & Content Responsibility
29. Upon full and complete payment of submitted invoices for the Project Development and launch of the website, Client will own
the Customer Content.
30. Upon completion of the development of the site, Client will assume full responsibility for website content maintenance and
content administration. Client, not CivicPlus, shall have sole responsibility for the accuracy, quality, integrity, legality, reliability,
appropriateness, and intellectual property ownership or right to use of all Customer Content.
31. Client shall not (i) license, sublicense, sell, resell, transfer, assign, distribute or otherwise commercially exploit or make
available to any third party the GCMS® software in any way; (ii) modify or make derivative works based upon the GCMS®
software; (iii) create Internet “links” to the GCMS® software or “frame” or “mirror” any GCMS® administrative access on any
other server or wireless or Internet-based device; or (iv) reverse engineer or access the GCMS® software in order to (a) build
a competitive product or service, (b) build a product using similar ideas, features, functions or graphics of the GCMS®
software, or (c) copy any ideas, features, functions or graphics of the GCMS® software.
32. The CivicPlus name, the CivicPlus logo, and the product and module names associated with the GCMS® software are
trademarks of CivicPlus, and no right or license is granted to use them.
Indemnification
33. CivicPlus shall defend, indemnify and hold harmless the Client, its partners, employees, and agents from and against any and
all lawsuits, claims, demands, penalties, losses, fines, liabilities, damages, and expenses including attorney’s fees of any kind,
without limitation, in connection with the operations of and installation of software contemplated by this Agreement, or
Service & License Agreement for Yorkville, IL
Exhibit A 4 of 4
CivicPlus • 317 Houston St., Suite E • Manhattan, KS 66502 • www.CivicPlus.com
Toll Free 888-228-2233 • Accounting Ext. 291 • Support Ext. 307 • Fax 785-587-8951
otherwise arising out of or in any way connected with the CivicPlus provision of service and performance under this
Agreement. This section shall not apply to the extent that any loss or damage is caused by the negligence or willful
misconduct on the part of the Client. If Client and CivicPlus are both negligent, damages shall be apportioned in accordance
with the percentage of negligence of each party. This paragraph is not intended to benefit entities not a party to this contract.
34. CivicPlus agrees throughout the term of this agreement to maintain insurance no less than the amount specified in Exhibit D,
attached hereto.
Liabilities
35. CivicPlus will not be liable for any act, omission of act, negligence or defect in the quality of service of any underlying carrier or
other service provider whose facilities or services are used in furnishing any portion of the service received by the Client.
CivicPlus will not be liable for any failure of performance that is caused by or the result of any act or omission by Client or any
entity other than CivicPlus that furnishes services, facilities or equipment used in connection with CivicPlus services or
facilities.
36. Except as expressly provided in this Agreement, CivicPlus makes no expressed or implied representations or warranties,
including any warranties regarding merchantability or fitness for a particular cause.
Force Majeure
37. No party shall have any liability to the other hereunder by reason of any delay or failure to perform any obligation or covenant if
the delay or failure to perform is occasioned by force majeure, meaning any act of God, storm, fire, casualty, unanticipated
work stoppage, strike, lockout, labor dispute, civic disturbance, riot, war, national emergency, act of Government, act of public
enemy, or other cause of similar or dissimilar nature beyond its control.
Taxes
38. It is CivicPlus’ policy to pass through sales tax in those jurisdictions where such tax is required. If the Client is tax-exempt, the
Client must provide CivicPlus proof of their tax-exempt status, within fifteen (15) days of contract signing, and this agreement
will not be taxed. If the Client’s state taxation laws change, the Client will begin to be charged sales tax in accordance with
their jurisdiction’s tax requirements and CivicPlus has the right to collect payment from the Client for past due taxes.
Acceptance
CivicPlus hereby restates the statements made on Exhibit C as fully set forth herein.
We, the undersigned, agreeing to the conditions specified in this document, understand and authorize the provision of services
outlined in this Agreement.
Client Date
CivicPlus Date
Sign and e-mail or Fax this Copy And – Mail Two (2) Signed Originals
Attn: Contract Manager
Email: SalesCoordinators@CivicPlus.com
Fax: 785-587-8951
CivicPlus Contract Manager
317 Houston St., Suite E
Manhattan, KS 66502
We will e-mail or fax a counter-signed copy of the contract back to you so we can begin your project. Upon receipt of two signed
originals, we will counter-sign and return one copy for your files.
--Remainder of this page left intentionally blank—
Service & License Agreement for Yorkville, IL
Exhibit A 1 of 5
CivicPlus • 317 Houston St., Suite E • Manhattan, KS 66502 • www.CivicPlus.com
Toll Free 888-228-2233 • Accounting Ext. 291 • Support Ext. 307 • Fax 785-587-8951
Exhibit A - CivicPlus Project Deliverables
All Quotes are in US Dollars and Valid for 30 Days from October 21, 2014.
5th Year Annual Services (Continuing GCMS® System Enhancements , Maintenance,
Support and Hosting)
subject to annual 2.5% increase
$4,025
--Remainder of this page left intentionally blank--
Project Development and Deployment
Initial GCMS® upgrades, maintenance, support and hosting – no additional cost
Server Storage not to exceed 40 GB
$33,226
Employee Discount -$4,984
Fees Year 1 $28,242
Fees Year 2 - 4 $3,927 per year
Total Fee $40,023
Service & License Agreement for Yorkville, IL
Exhibit A 2 of 5
CivicPlus • 317 Houston St., Suite E • Manhattan, KS 66502 • www.CivicPlus.com
Toll Free 888-228-2233 • Accounting Ext. 291 • Support Ext. 307 • Fax 785-587-8951
Project Development Scope of Work
Kick-Off Meeting
Deliverable: Project Timeline, training jump start and worksheets
CivicPlus will:
assign a project manager to this project
conduct a Project kickoff to review awarded
contract
establish communication plan for the duration of
the project effort
work with the City to identify all key internal and
external project stakeholders
develop project plan and timeline
provide Project Management and Support
Yorkville will:
review and approve of project plan within 5 business
days
if modifications are required after the review of the
initial project plan, the City has 10 business days to
address the modifications and come to a
consensus.
approve the project plan (limited to two reviews)
prior to proceeding with the project.
complete the following prior to Phase 1:
Functionality and Design Form, Web Team Form
and Content Form
update the current primary live website content and
delete any pages from the website that are no
longer wanted or needed.
Phase 1: Website Optimization
Deliverable: Needs assessment, best practices and worksheets
CivicPlus will:
provide communication support to the City, key
stakeholders and personnel via weekly status
reports and via phone when required
review the goals and expectations submitted on
the forms the City completed to ensure the City’s
needs are clearly understood
conduct a presentation of findings and
recommendations to key project stakeholders
Yorkville will:
gather statistics from the current website from the
past 12 months and provide to CivicPlus
collect pictures to be used in the overall design of
the new website and provide to CivicPlus
provide a MS Word document template that features
your branding/logo and provide to CivicPlus.
compile a list of all divisions and/or departments
within the organization and provide to CivicPlus
submit a list of third-party and in-house developed
applications presently being utilized on the current
website and provide to CivicPlus
pull a site map or outline of the current website’s
navigational structure and provide to CivicPlus
a list of any content on the current primary website
that must remain as is (verbatim) because of legal
requirements
Phase 2: Website Layout
Deliverable: Website layout and mood board will be presented for your approval
CivicPlus will:
present one custom layout and one mood
board based on the goals determined in the
previous phase. The presented layout will
show the placement of the navigation and
functionality. The mood board will reflect the
color and imagery that will represent the tone
of the design
begin development of the website design
upon layout and mood board approval
Yorkville will:
approve one layout and the mood board
review marketing packet material and
guidelines
will provide CivicPlus will all the necessary DNS
items identified for the website
1st billing milestone approved
Service & License Agreement for Yorkville, IL
Exhibit A 3 of 5
CivicPlus • 317 Houston St., Suite E • Manhattan, KS 66502 • www.CivicPlus.com
Toll Free 888-228-2233 • Accounting Ext. 291 • Support Ext. 307 • Fax 785-587-8951
Phase 3: Website Reveal
Deliverable: Completed website design and navigation structure will be presented. You will be able to
propose changes at this time.
CivicPlus will:
present a fully functional website
migrate all content pages from
http://www.yorkville.il.us to the new website.
After the City approves the design, content
and functionality CivicPlus will conduct a
review of the website to ensure the statement
of work is met
work with the City to prepare for training
migrate current plus the past three years
Agendas & Minutes in Microsoft Word.DOC
or Adobe PDF format
Yorkville will:
evaluate the website design and content and
provide CivicPlus with feedback
collaborate with CivicPlus on proposed
changes
revise the design as many times as deemed
necessary, up to the deadline set by the City
and CivicPlus during the Kick-off meeting
If design changes are requested after the set
date, the project’s go live will be adjusted
Phase 4: 3 Days of Customized On-Site Implementation Training for up to 12 employees
Quote includes travel expenses ($80 per person per day for the 13th attendee and beyond)
Deliverable: Train System Administrator(s) on GCMS® Administration, permissions, setting up groups
and users, module administration. Basic User training on pages, module entries, applying modules to
pages. Applied use and usability consulting to result in effective communication through your website.
CivicPlus will:
provided training to the City before the
website goes live
train up to 12 City staff members based on
internal daily task and workflow
train staff members on how to use the
GCMS®, update content pages and modules
provide access to training online training
manuals and videos for the City staff
Yorkville will:
provide a location for training in the City with
internet access
provide computers for staff to be trained on
2nd billing milestone approved
Phase 5: Go Live
Deliverable: Custom website launched to the public.
CivicPlus will:
fix system issues and bugs that the City finds
CivicPlus’ Quality Control team will complete
a final spelling and links check
redirect the domain name to the newly
developed website when the City signs off on
the project
Yorkville will:
have about three weeks to test and update the
final site
notify CivicPlus on any system issues or bugs
that CivicPlus needs to fix
Project Enhancements:
Google Translation Tool
Responsive Website Design
Links or iFrames as needed for current online services
Phase 1: Content Consultation Two days on-site, up to six departments per day. Quote includes travel
expenses.
A consultation package concentrating on evaluating current website content and making recommendations for
improved content development, presentation and maintenance.
Deliverable: A comprehensive report on evaluation of current content (placement, length, style and
effectiveness), recommendations for improvement or creation of new content, a follow-up report reviewing
the results of implemented suggestions.
Service & License Agreement for Yorkville, IL
Exhibit A 4 of 5
CivicPlus • 317 Houston St., Suite E • Manhattan, KS 66502 • www.CivicPlus.com
Toll Free 888-228-2233 • Accounting Ext. 291 • Support Ext. 307 • Fax 785-587-8951
Project Development and Deployment Includes the Following:
Modules Functionality
Agenda Center Action Items Queue
Alerts Center & Emergency Alert Notification Audit Trail / History Log
Archive Center Automated PDF Converter
Bid Postings Automatic Content Archiving
Blog Dynamic Breadcrumbs
Business/Resource Directory Dynamic Sitemap
Calendar Expiring Items Library
Carbon Calculator Graphic Link Administration
Citizen Request Tracker™ (5 users) Links Redirect and Broken Links Finder
Community Connection Menu Management
Community Voice™ Mouse-over Menu Structure
Document Center MuniMobile™ (Mobile Website Browsing)
ePayment Center Online Editor for Editing and Page Creation (WYSIWYG)
Facilities & Reservations Online Web Statistics
Frequently Asked Questions Printer Friendly/Email Page
Forms Center Rotating Content
Healthy City RSS
Intranet Site Layout Options
Job Postings Site Search & Entry Log
My Dashboard Slideshow
News Flash Social Media Integration (Facebook, Share and Twitter)
Notify Me® email and 500 SMS subscribers User & Group Administration Rights
Online Job Application with 1 Generic Application Web Page Upload Utility
Opinion Poll Website Administrative Log
Photo Gallery
Quick Links
Real Estate Locator
Spotlight
Staff Directory
Support Maintenance of CivicPlus
Application & Modules
Hosting
7 a.m. – 7 p.m. (CST) Monday – Friday
(excluding holidays)
Install Service Patches for OS
System Enhancements
Shared Web/SQL Server
DNS Consulting & Maintenance
24/7 Emergency Support Fixes Monitor Bandwidth-Router Traffic
Dedicated Support Personnel Improvements Redundant ISP
2-hour Response During Normal Hours Integration Redundant Cooling
Usability Improvements Testing Diesel Powered Generator
Integration of System Enhancements Development Daily Tape Backup
Proactive Support for Updates & Fixes Usage License Intrusion Detection & Prevention
Online Training Manuals Antivirus Protection
Monthly Newsletters Upgrade Hardware
Phone Consulting
CivicPlus Connection
Service & License Agreement for Yorkville, IL
Exhibit A 5 of 5
CivicPlus • 317 Houston St., Suite E • Manhattan, KS 66502 • www.CivicPlus.com
Toll Free 888-228-2233 • Accounting Ext. 291 • Support Ext. 307 • Fax 785-587-8951
Yorkville RFP Scope of Services
1. The vendor proposal shall provide for a complete web site content management system software package to support up to 5
concurrent users.
2. The vendor proposal shall provide for ancillary services associated with the conversion of existing web pages and content into
the new content management system including, but not limited to, any work necessary to ensure post-installation ADA
compliance, and metadata classification of web server content. This includes integration with the City’s current Laserfiche
webportal and compatibility with an online live video streaming software package.
3. The proposal must include a responsive design component, to allow for a more user friendly version of the website when
viewed by a mobile device.
4. The vendor proposal will include pre-installation advisory services regarding any IT infrastructure accommodations the City will
make to implement the new content management system.
5. The vendor proposal will include on-call installation and technical support services during the anticipated 90 day “deployment
phase” of the project.
6. The City desires, but does not require, web analytics that will track new and returning visitors per day, week, month or year or
identify the most frequently requested web pages on the site.
7. The City also desires, but does not require, a reduced cost or option plan which allows the City to redesign their website in a
future year.
Service & License Agreement for Yorkville, IL
Exhibit B 1 of 1
CivicPlus • 317 Houston St., Suite E • Manhattan, KS 66502 • www.CivicPlus.com
Toll Free 888-228-2233 • Accounting Ext. 291 • Support Ext. 307 • Fax 785-587-8951
Exhibit B – Redesign Details
CivicPlus Project Development Services & Scope of Services for
CP Basic Redesign
New design
Redevelop banner
Redevelop navigation method (may choose top drop-down or other options)
Design setup - wireframe
Redevelop graphic elements of website (Newsflash, FAQs, Calendar, etc.)
Project Management
Testing
Review
Content Migration – Includes retouching of all existing published pages to ensure proper formatting, menu
structure, and application of new site styles. Note: Content will not be rewritten, reformatted or pages broken up
(shortened or re-sectioned)
Site styles and page layouts will be touched so all pages match the new design and migrate cleanly
Spelling and broken links will be checked and reported if unable to correct
Service & License Agreement for Yorkville, IL
Exhibit C 1 of 1
CivicPlus • 317 Houston St., Suite E • Manhattan, KS 66502 • www.CivicPlus.com
Toll Free 888-228-2233 • Accounting Ext. 291 • Support Ext. 307 • Fax 785-587-8951
Exhibit C – Yorkville Terms and Conditions
1. CivicPlus certifies that it is not barred from bidding or contracting with the City as a result of a violation of either Paragraph
33E-3 or 33E-4 of Act 5, Chapter 720 of the Illinois Compiled Statutes regarding criminal interference with public contracting;
2. CivicPlus is not delinquent in the payment of any tax administered by the Illinois Department of Revenue as required by
Chapter 65, Act 5, paragraph 11-42.1 of the Illinois Compiled Statutes;
3. CivicPlus states that it has a written sexual harassment policy as required by the Illinois Human Rights Act (775 ILCS 5/2-
105(A)(4), a copy of which shall be provided to the City upon request; and
4. CivicPlus complies with the civil rights standards set forth in Title VII of the Civil Rights Act as mandated in Executive Order
No. 11246, U.S.C.A. Section 2000e n. 114 (September 24, 1965).
Service & License Agreement for Yorkville, IL
Exhibit D 1 of 1
CivicPlus • 317 Houston St., Suite E • Manhattan, KS 66502 • www.CivicPlus.com
Toll Free 888-228-2233 • Accounting Ext. 291 • Support Ext. 307 • Fax 785-587-8951
Exhibit D – CivicPlus Insurance Coverage
CivicPlus certifies that has all of the insurance coverage required by law that would normally be expected for the work to be
performed.
UNITED CITY OF YORKVILLE
REQUESTS FOR PROPOSALS
FOR
WEBSITE REDESIGN
June 2014
800 Game Farm Road
Yorkville, IL 60560
GENERAL INFORMATION
The United City of Yorkville (the City), Illinois is requesting proposals for vendor services to
provide a complete web site content management system and ancillary services including data
conversion, system integration, hosting services, training of staff and ongoing technical support
for improvements to the City’s website located at www.yorkville.il.us.
The City of Yorkville desires to:
• “Reinvent” the City’s web site.
• Make the City's website functional, attractive and an exciting portal into the City of Yorkville
and its government.
• Make content editing and content replacement by multiple parties possible
• Create, deploy and edit a visually engaging web site.
• Improve site navigation for the public.
• Streamline content production and delivery among the contributor community.
• Position the site to add on-line services and GIS functionality in the future.
REQUIREMENTS OF THE PROPOSAL
The purpose of this Request for Proposals (RFP) is to assist the City of Yorkville in selecting a
highly qualified vendor to redesign the City’s website and automate the process by which
multiple departments can create, publish and update the website content using a Content
Management System. The City currently uses the Adobe Contribute software for content
management.
The City desires to procure a complete solution including the Content Management System
software, website design services, installation services, training services, hosting services, and
on-going assistance through the testing and deployment process. The CMS application should be
a commercial product that can be purchased "off-the-shelf" or an Open Source product. The
CMS application must have proven use in existing web sites with high volume and complex
multimedia content.
The Content Management System software will enable multiple users, both technical and non-
technical, to gather, edit and create web content, assemble the content using standard templates,
and publish the content as a dynamic web site. The primary purpose of this system is the ability
to publish and maintain a website with a large number of pages, requiring input from numerous
sources, in a standard, managed and maintainable way. The City would prefer to utilize a
software system with functionality similar to that of the Adobe Contribute software.
The web site is in need of numerous renovations including the addition of separate sections for
each functional area or department within the city, complete and easy to use navigational
structure, information architecture, folder reorganization, file pruning and cleanup, visual
redesign as well as standards and workflow development.
The website and all content will be rebuilt to meet ADA accessible design standards as defined
in the United States Department of Justice Policy Ruling, 09/09/96: ADA Accessibility
Requirements Apply to Internet Web Pages.
SCOPE OF SERVICES REQUIRED
For a proposal to the RFP to be considered and evaluated, the company must meet the following:
1. The vendor proposal shall provide for a complete web site content management system
software package to support up to 5 concurrent users.
2. The vendor proposal shall provide for ancillary services associated with the conversion of
existing web pages and content into the new content management system including, but
not limited to, any work necessary to ensure post-installation ADA compliance, and
metadata classification of web server content. This includes integration with the City’s
current Laserfiche webportal and compatibility with an online live video streaming
software package.
3. The proposal must include a responsive design component, to allow for a more user
friendly version of the website when viewed by a mobile device.
4. The vendor proposal will include pre-installation advisory services regarding any IT
infrastructure accommodations the City will make to implement the new content
management system.
5. The vendor proposal will include on-call installation and technical support services
during the anticipated 90 day “deployment phase” of the project.
6. The City desires, but does not require, web analytics that will track new and returning
visitors per day, week, month or year or identify the most frequently requested web pages
on the site.
7. The City also desires, but does not require, a reduced cost or option plan which allows the
City to redesign their website in a future year.
The Scope of work will include the following tasks:
Task 1 - Pre-installation Advisory Consultations
The vendor shall provide a timely, written recommendation for any infrastructure
accommodations the City will need to make in order to ensure the proper installation and
functioning of the software product. Include any recommended hardware, network, database,
operating system, and any other benchmarks related to the proper operation of the software
product, and any client (workstation) software.
The vendor shall meet with key personnel from each department within the City to ascertain their
needs and goals and objectives for the website.
Task 2 - Software Product Delivery
The vendor will provide the software and services necessary for installation on an agreed upon
date to be determined. The vendor will complete installation within the timeframe as agreed
upon by the vendor and the City.
Task 3 -Software Product Configuration
The vendor will ensure that the software product is configured and production-ready within the
timeframe as agreed upon by the vendor and the City.
Task 4 -Training
The vendor will provide training for up to 10 staff members in the following roles:
A) The content-provider’s use of the software product.
B) The designer’s use of the software product
C) The manager’s use of the software product
D) Product and systems administration.
Training will be conducted on-site at the City. The vendor shall provide training for City staff on
the operation, administration and maintenance of the CMS. A minimum of two levels of training
shall be required with classes held for content contributors focusing on the features of the CMS
and their proper use, and for technical support personnel focusing on the administration of the
CMS and required/recommended maintenance. The vendor shall also provide a quote for
additional training at a per day or per class rate.
The vendor will provide a single point of contact for training follow-up. The vendor is
responsible for the tracking of all help requests initiated by the City and is expected to comply
with the service level agreement as determined by the support contract.
Task 5 -Project Management
The vendor is expected to provide a complete estimate of costs during each phase of the project.
The vendor will provide a sole individual as point of contact for project management during the
course of the project. The vendor will communicate any anticipated problems with the project
schedule, or unanticipated expense, to the City, with possible remedies in a timely manner.
SUBMISSION OF PROPOSALS
Proposals submitted in response to this RFP should include the following components and each
component should be clearly defined and separate from the other components:
A. A statement of the proposer’s history and experience in providing website redesign
services.
B. A brief description of the proposer’s website content management system and key
features of the website redesign, including distinguishing points and how they will meet
the required scope of services that are outlined in the section title “Scope of Services
Required” and “Scope of Work”. For each of these items please address point by point
how you will meet each of the 5 required items, 2 desired items, and 5 tasks outlined in
these sections.
C. Identification of the individuals who would be the primary contacts for the project.
D. A detailed schedule of fees and corresponding charges for service calls. The schedule
should include all fees that could potentially be charged to the City. The fees should be
extended across estimated quantities so as to project a total annual fee for the City. The
detailed schedule should include, but not be limited to, the following items.
1. Total all-inclusive maximum pricing including all direct and indirect costs
2. Rates for additional professional services
3. Cost option to host the site on internal City servers or externally
4. Alternative bids of any “desired” components that you include
E. A list of three (3) client references of similar sized municipalities which the entity has
offered these services to within the last three years. Provide a contact person and
telephone number for each reference. By submitting a proposal, the proposer agrees to
permit the City to contact the proposer’s clients to confirm the quality of its past work for
said clients.
F. A proposed schedule of the project, including client meetings, build time, beta testing,
estimated date of the online publication of the new website, and any other pertinent
scheduling components of the project.
G. A proposed contract. The contract should address all of the services described in this
RFP.
H. The signature of an officer of the company or qualified firm who is empowered to make
proposals on the company or firms behalf.
PROPOSAL INSTRUCTIONS
A. Instructions
To be considered, an electronic copy of the proposal in pdf format can be sent to:
bolson@yorkville.il.us
Proposals can also be mailed in a sealed envelope to the following address:
United City of Yorkville
Attn: Bart Olson
800 Game Farm Road
Yorkville, Illinois 60560
All proposals must be received no later than 3:00 p.m. on Tuesday, July 22, 2014..
Questions on the proposal can be submitted to the e-mail address listed above. Any
response will be submitted to all firms, who the City has knowledge of, who may be
submitting a proposal.
B. Schedule
The following schedule will be adhered to:
June 20, 2014 – Distribution of Request for Proposals
July 22, 2014 – Proposals due to the City by 3:00 p.m.
Aug 21, 2014 – Administration Committee review of proposal
Aug 26, 2014 – City Council approval of proposal
September 9, 2014 – Project Commencement
The City intends to adhere to the proposed schedule, however, it is expressly understood
that your proposal will be valid for a period of ninety (90) days after July 22.
C. Term of the Agreement
The website redesign services detailed in this section will be performed for the City, on a
contractual basis for one year, with an option to renew for an additional two (2) year
period.
D. Selection Criteria
The following unranked criteria will be used to evaluate the responses and select the
winning proposer:
1. Complete responses to all required items.
2. The City’s assessment of the proposer’s capability to provide the required services.
3. Financial condition of the institution providing the proposal.
4. The City’s assessment of the proposer’s relative qualifications to provide such
services.
5. The City’s assessment of the qualifications of the individuals identified to supervise
the services to be provided.
6. The results of the reference checks.
7. The amount of proposed fees.
When the City has tentatively selected a successful proposer, a conference may be
requested to formulate plans in greater detail, to clarify any unclear items, and to
otherwise complete negotiations prior to the formal award. At any time during the
conference(s), the City may choose to modify the choice of a selected proposer, if there is
just cause and the City determines that such a change would be in the best interest of the
City.
E. Terms and Conditions
1. The City reserves the right to reject any or all proposals, to waive any irregularities or
informalities in any proposal or proposal procedures, and to accept or reject any item or
combination of items. The award will be to the proposer whose proposal complies with
all the requirements set forth in this RFP, and whose proposal in the opinion of the City,
is the best proposal taking into consideration all aspects of the proposer’s response,
including the total net cost to the City.
2. In the event that the proposer to whom services are awarded does not execute a
contract within sixty (60) calendar days after the award of the bid, the City may give
notice to such proposer of intent to award the contract to the next most qualified proposer
or call for new proposals and may proceed to act accordingly. The City assumes no cost
by the proposers in preparation of this proposal.
3. Proposers shall thoroughly examine and be familiar with these specifications. The
failure or omission of any proposer to receive or examine this document shall in no way
relieve any proposer of obligations with respect to this proposal or the subsequent
contract.
4. The contract may be terminated by either party by giving written notice to the other
party no later than sixty (60) calendar days before the proposed termination date. This
provision may be exercised only after the contract has been in effect for six (6) calendar
months. The company shall be entitled to just and equitable compensation for any
satisfactory work completed by the termination date. Under no circumstances will any
damages be paid as a result of termination of this contract. If the vendor exercises the
right to terminate this contract early, they cannot bid on future proposals for a period of
seven (7) years.
5. All work under this proposal and contract shall be executed in accordance with all
applicable federal, state and City laws, ordinances, rules and regulations which may in
any manner affect the performance of this contract. The Proposer:
a. Certifies that it is not barred from bidding or contracting with the City as a result of a
violation of either Paragraph 33E-3 or 33E-4 of Act 5, Chapter 720 of the Illinois
Compiled Statutes regarding criminal interference with public contracting;
b. Is not delinquent in the payment of any tax administered by the Illinois Department of
Revenue as required by Chapter 65, Act 5, paragraph 11-42.1 of the Illinois Compiled
Statutes;
c. States that it has a written sexual harassment policy as required by the Illinois Human
Rights Act (775 ILCS 5/2-105(A)(4), a copy of which shall be provided to the City upon
request; and
d. Complies with the civil rights standards set forth in Title VII of the Civil Rights Act as
mandated in Executive Order No. 11246, U.S.C.A. Section 2000e n. 114 (September 24,
1965).
6. The Proposer certifies that it has all insurance coverage required by law or would
normally be expected for the work to be performed. A copy of such coverage shall be
provided upon the request of the City.
7. For the purposes of this Proposal and contract, the company hereby agrees to
indemnify, defend and hold harmless the City, its employees and agents from any and all
loss where loss is caused or incurred or alleged to be caused or incurred in whole or in
part as a result of the negligence or other actionable fault of the company. It is agreed as
a specific element of consideration of this Agreement that this indemnity shall apply
notwithstanding the joint, concurring, or contributory or comparative fault or negligence
of the City or any third party and, further notwithstanding any theory of law including,
but not limited to, a characterization of the City’s or any third-party’s joint, concurring,
or contributory or comparative fault or negligence as either passive or active in nature;
provided, however, that the company’s obligation hereunder shall not include amounts
attributable to the fault or negligence of the City. Nothing in this section shall be deemed
to impose liability on the company to indemnify the City for loss when the City’s
negligence or other actionable fault is the sole cause of the loss.
8. Failure to comply with any of these terms and conditions of this RFP by the awarded
company will be cause for termination of the “Website Design agreement” to be entered
into.
Summary
After sending out a RFP for our website redesign, we received 17 vendors’ responses. Using a
point-based selection process, the staff made its initial recommendation of five vendors. From those five
vendors, staff has narrowed their recommendation down to one candidate.
Background
In June 2014, a request for proposals was posted in order to contract a vendor to complete the
website redesign. Our focus was to find a vendor that provides a complete web site content management
system and services such as data conversion, system integration, hosting services, training for staff and
ongoing technical support.
Our original responses of 17 vendors were reviewed by the staff, who rated each response using
a point-based system. Points were awarded to each vendor based on their ability to address the RFP,
their capability of providing the required service, financial condition of the company, firm and
employees’ qualifications, references and total fees.
The top five proposals—American Eagle, CivicLive, Vision Internet, Civic Plus and Revize—
were selected and reviewed in-depth by the staff. Our focus remained on the vendors’ ability to provide
a low-cost solution, mobile responsiveness, technical support, adequate onsite training, fluid content
migration and citizen-friendly features.
American Eagle was the first initial recommendation to be eliminated. Due to high costs and
mixed recommendations from references, the staff did not feel that this vendor could provide us with the
best solution for the web site redesign.
CivicLive and Vision Internet provided viable options for the staff. Their references expressed
overall satisfaction with each respective vendors. One of Vision’s references suggested some deadline
issues with a rollout and that the content management system was not as easy as other content
management systems. One of CivicLive’s references indicated that the website had an issue with
pulling information and updates from multiple servers across the organization (Yorkville has multiple
servers across departments). CivicLive was the second most expensive bid, while Vision Internet had
the longest estimated launch time. Overall, both CivicLive and Vision Internet provided desirable
features, but were eliminated due to their mixed reviews, fees, and timelines.
Memorandum
To: Mayor and City Council
From: Eivilyn Lopez, Administrative Intern
Bart Olson, City Administrator
CC:
Date: October 8, 2014
Subject: Staff recommendation for website RFP
CivicPlus and Revize both provided the most features at a reasonable price. Both vendors
included customer service request trackers with a complete citizen-specific dashboard, emergency alerts,
a robust e-notification system, online bill payment, an agenda and minutes database, calendars, e-
newsletter, staff directories, and search functions among other features.
Both vendors had their successes and issues with mobile responsiveness. CivicPlus mobile sites
seem to work better on Android devices, while Revize is most responsive on Apple products. Both bids
allow for a free redesign in approximately four to five years. They both provide similar packages for
technical support, both included in their quoted fees.
CivicPlus’s fees are in the middle of the pack of finalists. Their quoted fee for the first year is
$29,904, then $3,927 annually that is subject to a 5% increase from the third year and beyond. Revize
had the cheapest upfront fee ($27,934) and annual fee ($2,800) of all five finalists.
We felt that CivicPlus had a more robust citizen request tracking system and document server
than Revize. CivicPlus’s citizen request tracking system allows individuals to create a website account
which archives each request to City staff and response from City staff. It also allows staff to run reports
on the backend to see which requests are still open and which have been closed. Revize has a citizen
request tracking system, but it did not appear to have the same feature as CivicPlus’s. Neither company
does full scale meeting video-packet-indexing, but CivicPlus has committed to creating this feature in
the near future. They feel that creating this Granicus-style streaming and video-indexing service is a
natural extension of their company progression, as they are moving away from being a website-only
company to a full-fledged software provider.
Both companies included full content migration from the old website in their base bid. However,
CivicPlus asks City staff to eliminate all non-essential information from the existing website before
transfer, and Revize leaves the process relatively open-ended (content migration responsibilities will be
discussed at the kickoff meeting). CivicPlus’s references both said that the content migration process
was particularly easy.
CivicPlus’s references—Geneva and Lockport—and they both had overall positive reviews.
Geneva mentioned that they had issues with high quoted fees and additional costs, but the cost was
eventually negotiated. Lockport’s contact has gone through two website redesigns with two different
municipalities in three years, and said that CivicPlus was by far the better product and process (alternate
company was Vision). Three days of onsite training for up to 12 employees (additional employees can
be added for $80 a day) is included in the price.
Revize’s references were both positive. High Point, NC has used Revize since the early 2000’s
and has down three website redesigns since then, with a fourth scheduled for next year. College Park,
MD was also happy with Revize’s services. Both groups had their training done online, which is the
Revize’s proposal in the base package.
Finally, both groups had a couple issues with their physical proposal. Both were very thorough
in describing how they are going to complete the entire process, but Revize’s proposal more directly
answered the items required in the proposal. However, Revize failed to include a proposed contract and
a signature from an officer within the company. While Revize was able to send these items over after
the proposal closed, it was an omission.
Recommendation
Ultimately, the staff recommends CivicPlus. The seven member team was split with their final
recommendation for CivicPlus 4-3, but all seven members indicated that either vendor would be an
acceptable selection. We felt that CivicPlus’s document center and citizen request tracking features,
desktop webdesign, design process, and content migration was better than Revize’s modestly lower
price, more eye-catching mobile designs, and shorter rollout schedule.
Developed by Bryan Hahlbeck
Regional Sales Manager
317 Houston St., Suite E Manhattan, KS 66502
888-228-2233 x314 Direct 785-477-3007
Fax 785-587-8951 Hahlbeck@CivicPlus.com
Website Redesign
United City of Yorkville, Illinois
July 22, 2014
Serving more than 1,700 clients in 49 states, Canada and Australia,
we partner with governments to create award-winning websites.
Proposal for the United City of Yorkville, IL
Dear Mr. Olson and Committee Members:
Thank you for considering CivicPlus as a partner for Yorkville’s website redevelopment. I’ve carefully reviewed your
RFP, and am excited to present a solution to your challenges in creating a navigationally friendly, easy -to-update and
visually appealing website.
Of the proposals you review, all should offer a good website design and navigation solution; however, the best
solution should also include the latest innovations in pain -saving government functionality, tailored to Yorkville.
CivicPlus is the unique provider of the Government Content Management System – and one of the most innovative,
knowledgeable sources for engaging eGovernment websites. Our expertise lies in our ability to deliver a
comprehensive solution that considers administrative eas e and collaboration, end-user empowerment … all housed
within a sophisticated design that resonates with your community – and all with making government work better in
mind.
Now in our second decade, CivicPlus has created eGovernment solutions for more than 1,700 towns, cities and
counties serving more than 32 million people in 49 states, Canada and Australia, including Bensenville, Buffalo
Grove, Des Plaines, Elgin, Elmhurst, Mokena, Moline, Montgomery, Geneva, Highland Park, Lisle (In Development),
Lockport, Lombard, McLean County, Naperville Settlement, Niles, Oak Brook, Oak Forest, Orland Park, Tinley Park,
Warrenville, Waukegan, and Woodridge. These communities are using CivicPlus technology to connect in more
engaging ways with their residents, visitors and businesses.
In addition to a solution-centric website, CivicPlus provides unrivaled service, support, automatic upgrades and
enhancements at no additional charge – guaranteed. Our relentless pursuit of government innovations ensures that
our clients’ websites continue to move upward today and tomorrow.
The following proposal details how the CivicPlus solution will reduce your staff’s workload, respect budget constraints
and, most importantly, provide your community with a powerful online resource that promotes open and transparent
access to your municipal offices and becomes an engaging communication hub for your community. Forrester data
shows that online resources for information cost roughly $0.10 per answer provided; phone calls average $9.00. Our
company leadership is extremely passionate about our mission to make government better, and we continue to see
examples where we’re building more than just a website – we’re building trust between government and citizens and
giving them both a better future state.
I sincerely welcome the opportunity to elaborate further on our proposal answer additional questions you may have
about partnering with CivicPlus. Our entire company is fueled by the drive to make government work better. Our
consultants and project managers are experts at this and we can’t wait to share their expertise with Yorkville.
Proposal Submitted by:
Authorized Signature:
Bryan Hahlbeck
Tim Grant, Interim Director of Sales
Regional Sales Manager Icon Enterprises, Inc., d/b/a CivicPlus
Direct Line 785-477-3007 317 Houston Street, Suite E
Hahlbeck@CivicPlus.com Manhattan, KS 66502
Proposal for the United City of Yorkville, IL
1
A. History and Experience .............................................................................................................................................. 2
B. Scope of Work ........................................................................................................................................................... 4
C. Primary Contacts ..................................................................................................................................................... 12
D. Project Development Estimate ................................................................................................................................ 14
E. References .............................................................................................................................................................. 21
F. Project Schedule ...................................................................................................................................................... 22
G. Proposed Contract .................................................................................................................................................. 23
Conclusion ................................................................................................................................................................... 26
Additional Documentation ............................................................................................................................................ 27
Proposal for the United City of Yorkville, IL
2
A. History and Experience
History of CivicPlus
Since our inception, CivicPlus has been capturing the passion our customers have for their communities and their
residents with high-quality, next-generation websites. We consider it a privilege to partner with municipalities to
provide the individuals, families and organizations in your community a website that serves as a primary, interactive
communication tool.
Icon Enterprises, Inc., does business as CivicPlus and Networks Plus and employs more than 100 people.
Incorporated in Kansas in 1998, we began providing technical-related services in 1994.
CivicPlus was born out of four rural cities’ desire for a progressive way to maintain their websites without the burden
of employing a continual webmaster. They sought a system that would allow routine updates and changes to be
implemented by city staff, regardless of technical skill. After close consultation with these four initial cities, an
innovative tool that automated the process of updating website content was developed.
Today, under the leadership of founder Ward Morgan, CivicPlus has more than 165 staff members and continues to
implement new technologies and services to maintain the highest standards of excellence and efficiency for our more
than 1,700 clients. Our commitment to setting the standard in website design, management and government
communication has been instrumental in making CivicPlus a leader in web design, communication programming and
hosting.
Our technical and development staff holds a variety of certifications including: Microsoft -certified system engineer,
Cisco-certified engineer, Microsoft-certified software developer, Microsoft Office user specialist and project
management professional from the Project Management Institute.
Company & Contact Information
At CivicPlus, we have a passion for building websites. We’d
like to partner with you to build a website your citizens will use.
Contact Information Bryan Hahlbeck
Regional Sales Manager
Hahlbeck@CivicPlus.com
Toll Free 888-228-2233,
Ext. 314
Cell 785-477-3007
Primary Office 317 Houston St.
Suite E
Manhattan, KS 66502
Toll Free 888-228-2233
Fax 785-587-8951
Incorporated In State of Kansas Company Website www.CivicPlus.com
Legal Name Icon Enterprises, Inc., d/b/a
CivicPlus
Company Founder Ward Morgan,
President/CEO
GSA Contract # GS-35F-0124U DIR Contract # DIR SDD 1636
CMAS Contract # 3-13-70-2966A TIPS/TAPS Contract # 2092613
Additional Locations Charleston, SC
Sherwood, OR
Chicago, IL
Spring Hill, KS
Fort Collins, CO
St. Louis, MO
Hermitage, TN
Topeka, KS
Proposal for the United City of Yorkville, IL
3
Experience of CivicPlus
The United City of Yorkville, an organization serving more than 17,495 residents, has initiated a Request for Proposal
to transform its website with an innovative design that enables visitors to find the services and information they need.
The website should be user-friendly and utilize the latest technology to provide a convenient source of information to
better communicate with citizens.
The CivicPlus-Proven Development Approach
CivicPlus provides our eGovernment communication solution to more than 50 million citizens in more than 1,700
municipalities – cities and counties of every size across the United States, Canada and Australia. For more than a
decade, CivicPlus has focused on government clients, giving our customers access to the latest in next -generation
applications that meet and exceed their needs. Those needs include:
A unique and customized website design with minimal work and time commitments from United City of
Yorkville’s staff
Intuitive navigation and page layout with unlimited submenus and subpages
Interactive functionality through our Government Content Management System (GCMS®)
Continuously updated, cutting-edge solutions designed by eGovernment experts for governments
A per-project, customized pricing model with comprehensive training and unlimited support included
Hundreds of Cities & Counties Are Upgrading to CivicPlus Each Year
It’s simple: CivicPlus knows municipal government.
No one else offers the CivicPlus
Government Content Management
System (GCMS®).
No one can match our interactive
suite of tools that enable
governments to better engage and
communicate with their citizens.
No one can match the CivicPlus
development process and the
depth of our implementations
designed by experts who know
local government, its people and
its processes.
No one can match our track record
– period.
CivicPlus for United City of Yorkville
Per your RFP, Website Redesign, the following proposal contents include:
CivicPlus’ capabilities, experience and commitment to our clients, as well as our approach and methodology
to transforming your site
Ongoing training and consultation
Creativity and recommended functionality usage to engage and attract site visitors
Price estimate
These recommendations for United City of Yorkville were developed to address your defined needs. All estimates are
negotiable based on client requests. We encourage you to schedule a 45 -minute demonstration of the latest site
developments and the administrative interface that allows non-technical users the ability to update the website as
needed.
CivicPlus Client Map
Proposal for the United City of Yorkville, IL
4
B. Scope of Work
Let Our Experts Be Your Trusted Advisors
Only CivicPlus offers the depth and breadth of staff for next-generation eGovernment communication projects.
Depending on the size of and duration of your project and whether you utilize our creative, branding and advisory
consulting teams, we will engage between six to 11 experienced staff members, representing approximately 7-13% of
our full-time staff.
A member of our seasoned project management team oversees the inter-departmental and client interactions,
assuring that your project will be developed in a timely manner by professional website experts. Using their
knowledge of effective online citizen engagement techniques – with specific case studies and examples – they will
ensure the process transitions smoothly from phase to phase. After the completion of each phase, you will be
encouraged to fill out a survey rating the project process as well as CivicPlus personnel. The CEO receives the
surveys and is personally accountable for your satisfaction, which we guarantee, or we’ll refund your money.
A Process Dedicated to Helping You Succeed
Upon completion of a custom design, setup of the website, development of modules, content development and
quality control review, your trainer works to ensure your staff masters the simple Government Content Management
System (GCMS®) and learns basic website usability concepts. Your new site is then launched and your support calls
are handled by our Client Care Department.
Your Role
Your role during the project will be to answer questions, provide input, gain your staff’s feedback to complete forms
and provide necessary information so CivicPlus can develop recommendations for your design, navigation and
content. Your project manager will explain the work required to achieve your goals. Pre-project, on-site strategic
planning sessions can be added to the project at an additional cost.
Proposal for the United City of Yorkville, IL
5
Kick-Off Meeting
During the initial kick-off meeting, you will meet your project manager, senior content developer and senior designer.
You will work with your project manager to establish your project timeline, review the startup kit and discuss the
takeaway items that need to be completed prior to consulting.
Whether you prefer a more relaxed schedule or a more aggressive timeline, your project manager will discuss the
implications of deadlines and the expectations required to keep the project on track. Timelines may be modified upon
discussion with your project manager.
Your Role
Tasks your staff will need to complete:
Assess Your Current Website
For the best consulting experience possible the following takeaways need to be completed prior to your
consulting:
The 6 Stages of Digital Community Engagement Survey – You will take a 3-5 minute online
questionnaire to determine where your current website fits on the Community Engagement Scale,
www.digitalcommunityengagement.com.
Department / Division Form - This form will be filled out by each department or division. Each department /
division should have an understanding of what services they provide, to whom they provide those services,
how they are currently communicating information, their future online communications goals and what they
like/dislike about their current web presence.
Functionality and Design Form - This form will be filled out by your project web team. Prior to starting this
form, research other websites that you like based on functionality and design elements. Provide URLs and
specifics about what you like. This form also asks for details on your community’s tagline, logo and branding.
Training Information Form for Departments - This form will be filled out by your project web team to help
CivicPlus understand the pain points you encounter in your job. We will call out ways to address your pain
points during your training sessions.
Web Team Form - This form will be filled out by your project web team. Prior to starting this form, please
have an understanding of your project goals, focus and expectations. This allows your CivicPlus Project
Team to develop a site specific to your needs and lays the foundation for developing a highly
functional information architecture.
Clean House
Update the content on your current primary live website. This step is critical to guaranteeing the information
available is relevant, fresh and on-point. Your staff should delete any pages from your current website that
you no longer want or need and ensure the remaining information is applicable and up -to-date.
Proposal for the United City of Yorkville, IL
6
Phase 1: Consulting
A CivicPlus consultant will work with you to determine the right direction for your new website. The items you
complete prior to consulting play a critical role in establishing the best approach for your site. The items to be
reviewed are:
Needs Assessment
Review the 6 Stages of Digital Community Engagement Survey to determine at which stage your current
website ranks and set a goal for your new website. Review the goals and expectations you submitted on the
Web Team Form to make sure there is a clear understanding of what the new website needs. Together, we
will establish what it will take to meet your website goals regarding design, content and engagement.
Functionality & Design
Review the information submitted via the Functionality & Design Form to make sure there is a clear
understanding of what the new website has to have.
Department Needs
Meet with your departments to ensure a clear understanding of CivicPlus’ Best Practices & Standards for
content and gather information on the potential pain points for each department.
Your Role
Items your staff will need to provide:
Website Statistics
Gather statistics from your current website from the past 12 months.
Photos and Template for PDFs
Collect pictures to be used in the overall design of the website. Provide a MS Word document template that
features your branding / logo. This will be used when converting content into a PDF.
List of Departments
Compile a list of all divisions and/or departments within your organization.
Applications
Submit a list of third-party and in-house developed applications presently being utilized on your website.
Site Map
Pull a site map or outline of your current website’s navigational structure. This gives a clear overview of the
existing information on the website, including the number and location of pages.
Content
Provide a list of any content on the current primary website that must remain as is (verbatim) because of
legal requirements. Continue updating the current content on your primary website.
“I think that the modules that are offered give a lot of flexibility to not only the taxpayers but our
employees. We can use this site as much as a tool as the taxpayers do.”
-Michael Leiker, Ellis County, Kansas
Proposal for the United City of Yorkville, IL
7
Phase 2: Website Preview Presentation
Based on your results and goals outlined during consulting, your Project Team will collaborate to present the most
effective user interface for your website, ensuring a flexible design optimized to display in any format now and in the
future. Deliverables include:
Layout
You will be presented with a custom layout that showcases the placement of your navigation and key functionality.
Very similar to the floor plan of a house, the layout will allow you to focus on where things are and if the function and
proportion of the space is adequate.
Website Layout
The examples below are not template layouts. They were created based on specific clients’ goals, during their
consulting phase. Though layouts may contain the same elements, you must keep in mind that they can be arranged
differently.
Intuitive, Usable Main Navigation
Simple navigation and consistent page layouts ensure that your visitors can easily find the information they seek.
We’ll provide you with a complete recommended navigation for your new website based on your community
engagement goals and our prior experience in working with government entities.
What will your
website’s floor
plans look like?
Proposal for the United City of Yorkville, IL
8
Mood Board
Your Project Team will also present a custom mood board reflecting the color and imagery that will set the tone for
your design.
What is a “Mood Board”?
A mood board is a collection of colors, textures, images, graphics, text and descriptive words. These items will be
applied to the floor plan you choose. Think of this as the paint that will be used on the canvas that you have chosen.
Example of a Mood Board
Your Role
Approval
Once you approve your layout and mood board, your designer will begin development of your design.
Marketing Packet Meeting
Review marketing packet materials and guidelines.
DNS Worksheet Due
You will need to ensure that CivicPlus has all the necessary DNS items identified for your website launch to
be successful.
“The design phase was great. Your design team was really great. They could take our little comments
and make our design reflect our city. They were so good about making our changes and coming up with
great ideas.”
- Melissa Weiss, Creve Coeur, Missouri
Proposal for the United City of Yorkville, IL
9
Phase 3: Website Reveal Presentation
Your Project Team will present a fully functional website based on your goals, our recommendations and our
combined vision. The team will explain how its expertise has shaped your design and transformed your navigational
structure. Your website is now 85 percent complete and, with minimal time investment, your website will be ready to
launch!
Content Migration
During the Kick-Off Meeting and Phase 1 your staff had the role of updating the content on your current primary site.
While you were making design decisions, our content development team will optimize and reorganize your content
based on CivicPlus best practices. Content from sites other than the primary site can be migrated to the new primary
site for an additional fee.
The CivicPlus content usability experts research and establish their standards from the following resources: Jakob
Nielsen, www.Usability.gov and www.HowTo.gov. We will format and reorganize your content so it is easy for visitors
to quickly scan and retrieve desired information. We will also bring over your agendas and minutes. There is no limit
to the pages you can create after you have gone through training.
Design/Wireframe Review
You will have the opportunity to evaluate and collaborate with the Project Team on proposed changes. You can
revise your design composition as many times as you deem necessary, up to the deadline that you and your project
manager agree upon during the timeline meeting (the average client requests a total of three). After that deadline,
your project’s Go Live date will be adjusted.
Following design approval and functionality development, we conduct a review to ensure your expectations are met
and website best practices are upheld. Custom designs are rarely produced in anticipation of a project. Copyright
authorization and/or photography production are required unless you already have quality, usable photographs.
Additional fees for stock photographs or other images are not included in the estimate.
Accessibility Compliance
Our designers and programmers automatically implement all the accessibility features necessary to ensure your si te
is compliant with accessibility standards outlined within Section 508. W e will make recommendations on best
practices for keeping your content accessible and available for all users by ensuring that, among other things:
All menu items are clickable
Submenus display throughout the site
Alt tags are used for images
Site maps are dynamically generated
Documents and links can be set to open in the same window
CivicPlus recognizes accessibility standards recommendations made by a variety of groups, including the World Wide
Web Consortium (W3C) and the Web Accessibility Initiative (WAI) as written in the Web Content Accessibility
Guidelines (WCAG). Through adherence to Section 508, CivicPlus is able to meet almost all Priority One, Two and
Three guidelines set forth in the WCAG. Those left unmet do not need to be addressed in order to allow basic access
to content; some of the more stringent requirements of the WCAG may limit design and content development options.
Your Role
Approval
Evaluate presented design and revisions until you are satisfied.
Content Review
You will review your new website’s content and create a list of all the items you would like to see changed.
Your CivicPlus trainer will go over your list with you during training, so your staff can gain hands-on
experience.
Training Preparation Meeting
We will help you identify the skills and tools your staff needs to quickly and easily update your website.
Proposal for the United City of Yorkville, IL
10
Phase 4: Customized Website Training
Our goal for training is to give your staff the skills and tools they need to quickly and easily keep your website current.
Trainers will work with you to ensure your staff is correctly trained. Before your site is launched, CivicPlus provides in-
person or online webinar training to equip your staff with the knowledge, tools and comfort level needed to maintain
the site’s integrity upon Go Live.
We want to make this an enjoyable experience, while encouraging your staff to participate in learning activities that
give them a comprehensive understanding of your website. Regardless of technical ability, we will help your staff gain
the confidence to effectively maintain your website.
Website Best-Practice & Usability Consultation
Based on your internal daily tasks and workflow, CivicPlus consultants share best practices with your staff for
delivering automated services to your site’s visitors. One-on-one or department-specific task analysis is included.
Each hands-on session is designed to enhance your team's communication skills and highlight their individual
specialties that emphasize your public value.
Features, Module & Page Creation Training for Administrators & Content Contributors
To better understand your site’s navigation and page layout and how these affect target audiences, we will instruct
your staff on creating area-rights and back-end features for site administration as well as review all the modules
included with your site. Your staff will learn how to create links, format text and lay out pages for usability and
scannability.
Typical CivicPlus Training Schedule
Admin Training
Introduction to Website
Admin Dashboard
Admin Tools
Intranet
Urchin Statistics
Set Up Groups & Users
Modules Training
Quick Links
FAQs
Calendar
Modules (cont.)
News Flash
Document Ctr. / Archive Ctr.
Opinion Polls
Staff Directory
Resource Directory
Notify Me®
Jobs, Bids & OJA
Photo Gallery & Postcard
Slideshow
My Dashboard
Modules (cont.)
Alert Center
Community Voice
Facilities & Reservations
Forms
Request Tracker
Agenda Center
Featured Info
Real Estate Locator
Carb. Calc. & Healthy City
Pages & Wrap-Up
Page Creation
Advanced Page
Creation
Assist departments and
staff in page creation
Consult with
departments and staff
on further development
and ways to enhance
site
Wrap-up session
Training schedules vary depending on the number users to be trained and hours available but will cover the topics
shown. Training manuals are available online and can be downloaded at no cost.
“CivicPlus is the company for municipal websites. I can’t imagine working with anyone else.”
-Krystal Britton, Hinesville, Georgia
Proposal for the United City of Yorkville, IL
11
Phase 5: Go Live
Your Project Team will provide you the information you need to prepare your site for Go Live. This is an exciting time;
it is the last step before your new site launches!
Testing and Review
You typically have three weeks after training to become familiar with your site. This will allow you to add, create and
make adjustments to content on your production site, as well as ensure overall satisfaction with your website. Content
changes will display and function the same way before and after your Go Live date.
Upon completion of a collaborative final review of the website and a final spelling and links checkup by our Quality
Control Team, your domain name is directed to the newly developed website.
We will confirm that your initial communication goals developed in Phase 1 have been met, and then your new
website is launched to the public. You will continue to receive both technical and consultative support.
Search Engine Registration & Optimization
Before Go Live, your site will be registered with the top search engines. A brief description and a list of key words
pertaining to your new website will provide search engines the necessary information to find the website when a user
enters a search for your website.
Search engine optimization (SEO) is an important tool to improve search engine page rankings. CivicPlus uses
several methods to improve the SEO of our websites. These include development of quality content, use of strong
keywords and solid page descriptions. In the near future, changes are planned to further strengthen SEO for our
clients. These changes include but are not limited to: user friendly URLs, optimized images and improvements to the
site map and page descriptions. These changes will help drive your website to the top of search engine result s.
Continued Communication
After your site launches, CivicPlus provides ongoing support. As your site grows, our support team will ensure that
you receive the following resources:
Press release creation
Monthly e-newsletter
CivicPlus online support
Annual site reviews
“With CivicPlus, you’re not just getting a website. It’s social media, it’s emergency alerts, it’s my weekly
blog, it’s the mobile version of the site. Our website is tied to Facebook and Twitter, so updates are
automatic. We’re pushing information to where the people are. What good is all the good in your
community if no one knows about it?”
-Thomas Russo, Newton Township, New Jersey
Proposal for the United City of Yorkville, IL
12
C. Primary Contacts
CivicPlus maintains a staff of dozens of personnel who excel in the development and support of government
websites. From project management, design and development to training and support, our highly qualified staff
ensures the success of your website throughout all phases of construction and beyond. Our expert project leade rs
(listed below) will match you and your needs to a team of highly qualified specialists who will work directly with you
throughout your entire project. If selected, your project team, including project manager, will be assigned upon
contract signing.
Bryan Hahlbeck – Regional Sales Manager
Education
BS Management & Marketing
Resume
Software Sales
Client Relationship Management
Financial Services
Management
10+ Years of Experience
Increase industry exposure and emphasize client
functionality options
Experience in private and government sector
Negotiate contracts
Manage multiple software client accounts
Resource optimization
Role at CivicPlus
Determine the best solution for
your website and budget
Overall account management
Ensure customer satisfaction
Oversee product development
and product marketing
Katrina Lewison – Manager of Project Administration
Education
MA Organizational Psychology
and Leadership
BS International Relations
Master of Public Policy
Administration
Resume
Talent Acquisition Consultant
Director of Development and
Talent Acquisition
Executive Officer U.S. Army
9+ Years of Experience
Client needs analysis & account management
Deadline satisfaction goals
Personal coaching and goal setting career moves
Policy implementation and tracking
Leadership and ethics trainer
Managed community development projects, including
engineering/construction work
Role at CivicPlus
Direct tasks and staff members
Timeline allocation
Project consultation and quality
assurance
Jessica Jones – Manager of Content Development
Education
BA English Arts
Resume
Project Management
Customer Service
Contract Development and
Administration
4+ Years of Experience
Customer Service
Content Migration and Editing
Customer support
Education
Role at CivicPlus
Oversee content quality
management
Test new products and services
for CivicPlus
Ensure incoming projects remain
on schedule and are completed in
an excellent manner
Proposal for the United City of Yorkville, IL
13
Tony Ridder – Manager of Creative Services
Education
BA Fine Art
Resume
Digital Imaging Instructor
Creative Director
Senior Illustrator & Photographer
Thorough recognition of web
design and video creation
20+ Years of Experience
Graphic design, web design and assembly, computer
and traditional illustration, photography, and
interactive media
Branding and logo expertise
Create and direct marketing media campaigns
Photography and graphic design teaching
Proficient in website layout, initial design, setup of
initial pages and functionality of site
Role at CivicPlus
Head creative development and
graphic representations
Direct design team and
programming
Responsible for each website
overview and uniqueness
Quinton Randel – Manager of Training and Consulting
Education
Information Assurance and
Network Security
Resume
Trainer and Consultant
Operation Management
Technology Sales
Lending Analyst
10+ Years of Experience
Website usability expertise
Content development
Customer service
Expertise in MS Word, Website Management
Systems, module functionality, admin functions and
creativity
Account Management
Role at CivicPlus
Customize the training and
consulting experience to your skill
set
Provide creative application ideas
for the CivicPlus GCMS®
Effective communication in plain
language
Amy Vikander – Director of Account Management
Education
Graphic Design
Resume
Property Management
Client Service Team Leader
Client Implementation
Coordinator
10+ Years of Experience
Customer Service
Project management
Team management and leadership
Managing customer relationships
Training
Role at CivicPlus
Conscientious care of the
continuing relationship between
CivicPlus and client
Prompt aid on support issues
Knowledgeable answers for “how
to” questions from client’s staff
Proposal for the United City of Yorkville, IL
14
D. Project Development Estimate
All Quotes are in US Dollars and Valid 90 days from July 22, 2014
Project Development and Deployment
Initial GCMS® upgrades, maintenance, support and hosting – no additional cost
Server Storage not to exceed 20 GB
$33,226
Minus Employee Discount -$3,322
Total Fees Year 1 $29,904
With CivicPlus’ Annual Services, you’ll enjoy redundant hosting services, daily backups, extensive disaster recovery
plans, 24/7 support, software maintenance, unlimited upgrades, recurring training , and access to the CivicPlus
community. Protecting your investment is important, and our Annual Services allow you to receive maximum benefit
at minimal cost. Over the course of a year, you’ll receive software upgrades, maintenance and optimization.
Additionally, your staff will have full access to our support staff, ensuring that they’re always up to date on our latest
features and functionality.
Annual Services (Continuing GCMS® Upgrades, Maintenance, Support and Hosting)
Billed 12 months from contract signing; subject to annual 5% increase year 3 and beyond
$3,927
Optional Payment Plan – CivicPlus Advantage
CivicPlus Advantage offers local governments an alternative payment plan that eases the impact of a new website on
your budget and spreads the one-time project development costs over a longer period of time.
Through a minimum three-year contract, CivicPlus Advantage dramatically lowers the one-time project development
and start-up costs of launching a new website, combining one-time and recurring fees and spreading them over
the life of the contract. And because we value our continuing relationships with our customers, those who extend
their contract beyond the three-year minimum will receive a redesign at the end of their fourth year with CivicPlus – at
no additional charge.
CivicPlus Advantage 1st Year 2nd Year 3rd Year 4th Year
Annual Recurring Fees $12,586 $12,586 $12,586 $4,330
Proposal for the United City of Yorkville, IL
15
The CivicPlus Redesign Option
At CivicPlus, we realize that over time, you might decide that you want to change your design by giving it a visual
refresh, so to speak. On average, we have noticed that clients tend to request a redesign about every four or five
years in the life of a typical government website.
But instead of starting completely over from scratch with a new website rebuild, CivicPlus has an option that can not
only help save you time and effort, but lots of money too!
With our CivicPlus Redesign Option, at the end of your fourth year of continuous service with us, you will
automatically receive a website redesign with no further out-of-pocket expense. The cost of the redesign is included
in your annual fees each year, giving you the knowledge that your website design will ne ver become stale and that
you’ll never have to build your site from the ground up again!
The CivicPlus Redesign Option Includes:
New CivicPlus Basic Redesign
Redevelop banner
Up to three graphic buttons to promote special services
Redevelop navigation method (may choose top drop-down or other options)
Select color scheme to match new graphics
Design setup – wireframe
Print this page option
Email this page option
Breadcrumbs
Sitemap
Redevelop graphic elements of website (Newsflash, FAQs, Calendar, etc.)
Project management
Testing
Review
Content migration – Includes retouching of all existing pages on the redesigned website to ensure
proper formatting, menu structure, and application of new site styles. Note: Content will be rewritten or
pages broken up (shortened or resectioned) during this process to reflect best web usability practices.
Site styles and page layouts will be touched so all pages match the new design and migrate cleanly
Proposal for the United City of Yorkville, IL
16
Project Development
Kick-Off Meeting
Deliverable: Project Timeline, training jump start and worksheets Included
Phase 1: Consulting
Deliverable: Needs assessment, best practices and worksheets Included
Phase 2: Website Preview Presentation
Deliverable: Website layout and mood board will be presented for your
approval
Included
Phase 3: Website Reveal Presentation
Deliverable: Completed website design and navigation structure will be
presented. You will be able to propose changes at this time.
Included
Phase 4: 3 Days of Customized On-Site Implementation Training for up to 12
employees
Quote includes travel expenses ($80 per person per day for the 13th attendee and
beyond)
Deliverable: Train System Administrator(s) on GCMS® Administration,
permissions, setting up groups and users, module administration. Basic User
training on pages, module entries, applying modules to pages. Applied use
and usability consulting to result in effective communication through your
website.
Included
Phase 5: Go Live
Deliverable: Content migrated from the current primary site to new site based
on best practice recommendations. Custom website. Registration of site with
all major search engines.
Note: Content from sites other than the primary site can be migrated to the
new primary site for an additional fee.
Included
Additional Functionality
Google Translation Tool Included
Responsive Website Design Included
Links or iFrames as needed for current online services Included
Options Included in One-Time Fee
Phase 1: Content Consultation Two days on-site, up to five departments per day.
Quote includes travel expenses.
A consultation package concentrating on evaluating current website content and
making recommendations for improved content development, presentation and
maintenance.
Deliverable: A comprehensive report on evaluation of current content
(placement, length, style and effectiveness), recommendations for
improvement or creation of new content, a follow-up report reviewing the
results of implemented suggestions.
Included
Total Project Development and Deployment Fee
Initial GCMS® upgrades, maintenance, support and hosting included – no additional cost
Server Storage not to exceed 20 GB
$33,226
Minus Employee Discount -$3,322
Total Fees Year 1 $29,904
Proposal for the United City of Yorkville, IL
17
Project Enhancement Options
Options One-Time Fee
Phase 1: Process Roadmap Consultation Three days on-site. Quote includes travel
expenses
A consultation package concentrating on evaluation of processes for customer and citizen
services. Designed to fit specific client needs in management of the website design and
creation process on the client side.
Deliverable: A comprehensive report of current citizen-facing practices and
citizen/customer-facing processes, recommendations for improving quality and
efficiency of government-to-citizen and government –to-customer relations and
processes, a follow-up report reviewing the results of implemented suggestions.
Optional
$10,000
Phase 1: Citizen Engagement/Website Marketing Suite Three days on-site. Quote
includes travel expenses.
This consultation will focus on creating a strategic marketing plan for the new website
directed at your main public-facing stakeholders (citizens, visitors and businesses) in an
effort to increase awareness of the site and increase interaction with the site’s functionality.
We will work with you to create a custom plan for advertising and driving traffic to your
website geared toward capturing and building upon the momentum gained in the days and
weeks that follow the new site’s launch.
Deliverable:
Strategic Initiatives: A strategic marketing plan aimed to increase
awareness of the site and increase interaction with the site’s functionality
using targeted marketing tactics, a recommended plan of action for
implementing new site and tools, a follow-up report reviewing the results of
implemented suggestions.
PR Services: Press release development, distribution and measurement,
letter to local library development, letter to local library development, letter to
request dedicated link development, how to guide – approach local paper,
how to guide – invite local media.
Social Media Services: Consultation and recommended posts, Facebook
update examples, how to guide – respond to social media.
Optional
$10,000
Phase 1: Public Engagement Evaluation Two days on-site. Quote includes travel
expenses.
A consultation package concentrating on evaluation the satisfaction of citizens/customers
regarding the current website and online services. A survey will be conduct to discover
general levels of satisfaction, desired site functions, features and tools, current tools
features or functions that are not considered valuable or need altered.
Deliverable: A follow-up report containing findings of current engagement level along
with recommendations and roadmap for getting to the desired level of engagement.
Optional
$7,800
Phase 1: Intranet Consultation Three days on-site. Quote includes travel expenses.
A consultation package concentrating on evaluating and improving current functions of
interdepartmental relations and recommendations for increasing effectiveness through the
use of all available web tools.
Deliverable: A comprehensive report on all findings regarding the current intranet
system being used and success rate of current system functions, a detailed plan for
making improvements and adapting the intranet system to your needs, a follow-up
report reviewing the results of implemented suggestions.
Optional
$10,000
Proposal for the United City of Yorkville, IL
18
Phase 5: Consolidation of Identified External Site – Full Content, less than 100 pages
An option that allows for pages of content to be migrated from sites other than the current
primary site to the new primary site. Migration of top-level navigation is included.
Optional
$2,450
Phase 5: Consolidation of Identified External Site – Full Content, more than 100
pages, 50 page block An option that allows for pages of content to be migrated from sites
other than the current primary site to the new primary site. Migration of top-level navigation
is included.
Optional
$1,400 per block
Phase 4: 24 Hours Customized Interactive Webinar Training for up to 6 employees
Optional
$4,000
Phase 4: Training/Consulting Two days on-site Review website with department
administrators and provide additional time for basic learners. Review website procedures.
Must be held concurrently with original on-site training session.
Optional
$7,800
Post-Training: Website Presentation Two days of on-site meetings to present website to
stakeholders. Quote includes travel expenses.
Optional
$7,800
Post-Training: Three-Month Checkup Held three months after go-live, includes two days
on-site of additional consultation/training. Quote includes travel expenses.
Optional
$7,800
Post-Training: Three Day Annual Refresher One day on-site consultation, two days on-
site refresher/advanced training. Quote includes travel expenses.
Optional
$10,000
Post Go-Live: 50 Pages of Additional Content $1,450
Virtual Webmaster: Five Hours of Content Updates per month. Optional $5,700
Annual Minimum
Annual Recurring Training: Training on new functionality and services
Deliverable:
New User Training: A three-hour training for new users to learn basic
features of the GCMS®.
Refresher Training/New Module Training: A three-hour session designed to
refresh existing users as well as to train them on new modules.
New Feature Overview: A three-hour session designed to make users aware
of recently released modules and features.
Website Review Consulting: An hour-long, in-depth review of the client
website followed by a two-hour session with client users.
Optional
$2,000
Annually
Functionality Options One-Time Annual
GoCitizen Pro Custom Mobile App (iOS & Android) $4,500 $1,200
Additional Department Header Packages – includes up to 20 pages of content
migration
(No annual fee in the first year; annual fees starts in second year)
$3,500 $650
Human Resource Management System (HRMS) – Applicant Tracking
Key features include: Assessment lists, social media integration, career portal,
resume parsing, candidate source capture, job management, job requisitions, job
sourcing metrics, application management, candidate management, reporting,
profile metrics, e-mail tool, cost-per-hire metrics, candidate routing, background
check integration.
(Annual subscription fee is subject to an annual 5% increase year 3 and beyond)
n/a $13,995
Proposal for the United City of Yorkville, IL
19
HRMS – Applicant Tracking Lite
Key features include: Assessment lists, social media integration, career portal,
resume parsing, candidate source capture, one (1) free custom job application.
(Annual subscription fee is subject to an annual 5% increase year 3 and beyond)
n/a $4,495
HRMS – Onboarding
Employee onboarding module streamlines the process with our intuitive user
interface, solid business logic, strong auditing and great customer support.
(Annual subscription fee is subject to an annual 5% increase year 3 and beyond)
n/a $3,995
Language Translation (hand translation, priced per single language) $125/page or
$1,000/10 pages n/a
LDAP Integration $1,200 $300
Media Center with Live Streaming Video (10GB of server storage included) $1,000 $1,000
New Logo Development $5,000 n/a
New Logo Development with Branding & Graphics Development $7,000 n/a
Subsite – includes up to 20 pages of content migration
(No annual fee in the first year; annual fees starts in second year) $8,000 $1,575
Proposal for the United City of Yorkville, IL
20
Project Development and Deployment Includes the Following:
Modules Functionality
Agenda Center Action Items Queue
Alerts Center & Emergency Alert Notification Audit Trail / History Log
Archive Center Automated PDF Converter
Bid Postings Automatic Content Archiving
Blog Content Library (Content Templates)
Business/Resource Directory Dynamic Breadcrumbs
Calendar Dynamic Sitemap
Carbon Calculator Expiring Items Library
Citizen Request Tracker™ (5 users) Graphic Link Administration
Community Connection Links Redirect and Broken Links Finder
Community Voice™ Menu Management
Document Center Mouse-over Menu Structure
ePayment Center MuniMobile™ (Mobile Website Browsing)
Facilities & Reservations with Activities Online Editor for Editing and Page Creation (WYSIWYG)
Frequently Asked Questions Online Web Statistics
Forms Center Printer Friendly/Email Page
Healthy City Rotating Content
Intranet RSS
Job Postings Search Engine Registration
My Dashboard Site Layout Options
News Flash Site Search & Entry Log
Notify Me® & 500 SMS Text Slideshow
subscribers Social Media Integration (Facebook, Share and Twitter)
Online Job Application with 1 Generic Application User & Group Administration Rights
Opinion Poll Web Page Upload Utility
Photo Gallery Website Administrative Log
Postcard
Quick Links
Real Estate Locator
Spotlight
Staff Directory
Support Maintenance of CivicPlus
Application & Modules
Hosting
7 a.m. – 7 p.m. (CST) Monday – Friday
(excluding holidays)
Install Service Patches for OS
Upgrades
Shared Web/SQL Server
DNS Consulting & Maintenance
24/7 Emergency Support Fixes Monitor Bandwidth-Router Traffic
Dedicated Support Personnel Improvements Redundant ISP
2-hour Response During Normal Hours Integration Redundant Cooling
Usability Improvements Testing Diesel Powered Generator
Integration New & Upgraded Services Development Daily Tape Backup
Proactive Support for Updates & Fixes Usage License Intrusion Detection & Prevention
Online Training Manuals Antivirus Protection
Monthly Newsletters Upgrade Hardware
Phone Consulting
CivicPlus Connection
Proposal for the United City of Yorkville, IL
21
E. References
Geneva, IL www.geneva.il.us
(Population 21,400)
Client since November 2012
Mary McKittrick, City Administrator
630-262-8495, mmckittrick@geneva.il.us
Lockport, IL www.vil.woodridge.il.us
(Population 24,800)
Client since December 2013
Ben Benson, City Manager
815-838-0549, bbensonr@lockport.org
Oak Brook, IL www.villageofparkforest.com
(Population 8,000)
Client since January 2011
Jim Fox, Information Technology Manager
630-368-5174, jfox@oak-brook.org
Proposal for the United City of Yorkville, IL
22
F. Project Schedule
Our Project Development Approach
Consulting, design, usability guidance, programming, secure hosting and dedicated training -- CivicPlus delivers all of
this and more during the development of your new website.
Typical Project Timeline Timeline
Phase 1 - Consulting (may vary with on-site meetings)
Includes: Needs assessment, best practices, and takeaways assigned.
4-5 weeks
Phase 2 - Website Preview Presentation
Includes: Layout presentation, mood board and main navigation review, design feedback meeting and
approval and takeaways assigned.
3-5 weeks
Phase 3 – Website Reveal Presentation
Includes: Presentation of a functional website based on goals, recommendations and combined vision ;
final approval and takeaways assigned.
3-4 weeks
Phase 4 – Customized Website Training (varies based upon amount of content)
Includes: Customized to give your staff the skills they need to maintain your website.
3-4 week
Phase 5 – Go Live 3-4 weeks
Website Launch 16 -22 Weeks
(On Average)
The timeline above is representative of a typical project; upon contract signing your project manager will work with
you to create an ideal timeline for your project. Working together, we want to ensure a realistic timeline is available to
meet your specific goals. Through the outline of our proven development model provided in this proposal,
development timelines can be estimated based on the date of the project’s initiation.
Proposal for the United City of Yorkville, IL
23
G. Proposed Contract
Sample Contract - Standard Terms & Conditions
CivicPlus looks forward to negotiating a mutually beneficial contract with the United City of Yorkville.
Client Deliverable
1. Icon Enterprises, Inc., d/b/a CivicPlus (“CivicPlus”) will create a unique website for the Unity City of Yorkville,
Illinois (“Client”) that includes all functionality as defined in Exhibit A – CivicPlus Project Deliverables,
attached hereto.
2. After 48 consecutive months under these terms and associated pricing, Client becomes fully eligible for a
CP Basic Redesign at no additional cost. See Exhibit B for complete details.
Additional Services
3. Client may contract with CivicPlus for additional Consulting, Website Design, Setup, Programming, site
modification, Training services (Project Development and Deployment Services), Additional Page and/or
Graphic Design that exceed those defined in Exhibit A. CivicPlus will invoice Client for the additional
services immediately prior to project Go-Live. Services that involve billable time beyond the contracted
amount will be documented and invoiced. Written approval by the Client is necessary before billable time is
incurred.
4. Client may contract with CivicPlus for additional Annual Services that exceed those defined in Exhibit A.
CivicPlus will invoice Client for Annual Services immediately prior to project Go-Live. Modules that incur
additional usage fees may be purchased and activated at any time.
5. Acceptance of this Agreement signifies Client’s approval of any billable time specifically related to training
services as detailed in Exhibit A, wherein a stated number of attendees is specified. Coverage for additional
attendees not covered under this agreement is billed at a per diem rate specified in Exhib it A.
Billing & Payment Terms
6. One-third of the total First Year Fee will be billed upon completion of Phase 1: Consulting; one-third of the
total First Year Fee will be billed upon completion of Phase 3: Website Reveal Presentation. The remainder
of the total First Year Fee and any additional Project Development and Deployment services will be invoiced
after Phase 4: Customized Website Training has been completed.
7. The Client shall sign a project completion and acceptance form prior to project go-live. The date may be
extended if material system or operational failures are encountered. Immediately after completing training
the final bill for the project development and deployment services will be billable and payable. All Parties
agree that the website will not go-live until the project is accepted in writing by the Client.
8. Total First Year invoices are due by the first of the following month, but no later than 30 days from invoice
date. Project Development will be discontinued if payment is not made within 30 days after the invoice due
date.
9. Invoicing for Annual Services begins one (1) year from contract signing.
10. Annual Services invoices may be prorated in order to correlate with the Client’s budget year, and are
invoiced prior to the year of service.
11. After project go-live, if the Client’s account exceeds 60 days past due, Support will be discontinued until the
Client’s account is made current. If the Client's account exceeds 90 days past due, Annual Services will be
discontinued until the Client's account is made current. Client will be given 30 days notice prior to
discontinuation of services for non-payment.
12. The Client will be invoiced electronically through email. Upon request CivicPlus will mail invoices and the
Client will be charged a $5.00 convenience fee.
13. Unless otherwise limited by law, a finance charge of 2.9 percent (%) per month or $5.00, whichever is
greater, will be added to past due accounts. Payments received will be applied first to finance charges, then
to the oldest outstanding invoice(s).
Proposal for the United City of Yorkville, IL
24
14. Provided the Client's account is current, at any time the Client may request an electronic copy of the website
graphic designs, the page content, all module content, all importable/exportable data, and all archived
information (“Customer Content”). Client agrees to pay $250 per completed request. Provided the Client's
account is current, upon termination of services Client may request a complimentary electronic copy of
website Customer Content.
Agreement Renewal
15. This contract shall remain in effect for a period of one year (12 months) from signing. In the event that
neither party gives 60 days’ notice prior to the end of the initial or any subsequent term, this Agreement will
automatically renew for an additional contract term. After 48 consecutive m onths under the terms of this
contract and associated pricing, Client will be fully eligible for a CP Basic Redesign at no additional cost.
16. Either party may terminate the agreement at the end of the contract term by providing the other party with 60
days written notice prior to the contract renewal date.
17. In the event of early termination of this Agreement by the Client, Client forfeits eligibility for the CP Basic
Redesign and all funds applied to such eligibility and full payment of the remainder of the c ontract is due
within 15 days of termination.
18. Each year this Agreement is in effect, a technology investment and benefit fee of 5 percent (%) of the total
Annual Services costs will be applied.
Support
19. CivicPlus will provide unlimited telephone support Monday through Friday, 7 a.m. to 7 p.m. (Central Time)
excluding holidays, for all trained Client staff. Emergency Support is provided on a 24/7/365 basis for
emergency contacts named by the Client. Client is responsible for providing CivicPlus with contac t updates.
20. Support includes providing technical support of the GCMS® software, application support (pages and
modules), and technical maintenance of Client’s website. Following initial setup, additional page design,
graphic design, user training, site modification, and custom programming may be contracted separately for
an additional fee.
21. During the period of this agreement and subsequent annual renewals, CivicPlus warrants that it will, without
additional charge to the Client, take action to correct any problems or defects discovered in the GCMS®
software and reported to CivicPlus by the Client, such warranty to include ongoing maintenance and
technical error correction.
22. CivicPlus provides online website statistics software at no extra charge. If Client des ires to use other website
statistic software, CivicPlus will provide the necessary log file access.
Marketing
23. Client will work with the CivicPlus Marketing Department to make a reasonable attempt to gather information
and meet deadlines associated with website award contest entries throughout the term of this agreement,
and to create a case study related to their website.
24. Client permits CivicPlus to include an example of the Client’s home page and a link to the Client’s website
on the CivicPlus corporate website.
25. Client will make a reasonable attempt to work with the CivicPlus Marketing Department to create a news
item to be released in conjunction with their project Go -Live date. Client will provide CivicPlus with contact
information for local and regional media outlets. CivicPlus may use the press release in any marketing
materials as desired throughout the term of this Agreement.
26. Client allows CivicPlus to display a “Government Websites by CivicPlus” insignia, and web link at the bottom
of their web pages. Client understands that the pricing and any related discount structure provided under
this agreement assumes such perpetual permission.
Intellectual Property, Ownership & Content Responsibility
27. Upon full and complete payment of submitted invoices for the Project Development and Deployment and
launch of the website, Client will own the Customer Content.
Proposal for the United City of Yorkville, IL
25
28. Upon completion of the development of the site, Client will assume full responsibility for website content
maintenance and content administration. Client, not CivicPlus, shall have sole responsibility for the
accuracy, quality, integrity, legality, reliability, appropriateness, and intellectual property ownership or right to
use of all Customer Content.
29. Client shall not (i) license, sublicense, sell, resell, transfer, assign, distribute or otherwise commercially
exploit or make available to any third party the GCMS® software in any way; (ii) modify or make derivative
works based upon the GCMS® software; (iii) create Internet “links” to the GCMS® software or “frame” or
“mirror” any GCMS® administrative access on any other server or wireless or Internet-based device; or (iv)
reverse engineer or access the GCMS® software in order to (a) build a competitive product or service, (b)
build a product using similar ideas, features, functions or graphics of the GCMS® software, or (c) copy any
ideas, features, functions or graphics of the GCMS® software.
30. The CivicPlus name, the CivicPlus logo, and the product and module names associated with the GCMS®
software are trademarks of CivicPlus, and no right or license is granted to use them.
Indemnification
31. Client and CivicPlus shall defend, indemnify and hold the other Party harmless, its partners, employees, and
agents from and against any and all lawsuits, claims, demands, penalties, losses, fines, liabilities, damages,
and expenses including attorney’s fees of any kind, without limitation, in connection with the operations of
and installation of software contemplated by this Agreement, or otherwise arising out of or in any way
connected with the CivicPlus provision of service and performance under this Agreement. This section shall
not apply to the extent that any loss or damage is caused by the gross negligence or willful misconduct on
the part of either party.
Liabilities
32. CivicPlus will not be liable for any act, omission of act, negligence or defect in the quality of service of any
underlying carrier or other service provider whose facilities or services are used in furnishing any portion of
the service received by the Client. CivicPlus will not be liable for any failure of performance that is caused by
or the result of any act or omission by Client or any entity other than CivicPlus that furnishes services,
facilities or equipment used in connection with CivicPlus services or facilities.
33. Except as expressly provided in this Agreement, CivicPlus makes no expressed or implied representations
or warranties, including any warranties regarding merchantability or fitness for a particular cause.
Force Majeure
34. No party shall have any liability to the other hereunder by reason of any delay or failure to perform any
obligation or covenant if the delay or failure to perform is occasioned by force majeure, meaning any act of
God, storm, fire, casualty, unanticipated work stoppage, strike, lockout, labor dispute, civic disturbance, riot,
war, national emergency, act of Government, act of public enemy, or other cause of similar or dissimilar
nature beyond its control.
Taxes
35. It is CivicPlus’ policy to pass through sales tax in those jurisdictions where such tax is required. If the Client
is tax-exempt, the Client must provide CivicPlus proof of their tax-exempt status, within fifteen (15) days of
contract signing, and this agreement will not be taxed. If the Client’s state taxation laws change, the Client
will begin to be charged sales tax in accordance with their jurisdiction’s tax requirements and CivicPlus has
the right to collect payment from the Client for past due taxes.
--Remainder of this page left intentionally blank—
Proposal for the United City of Yorkville, IL
26
Conclusion
As your website committee narrows the search for a partner to create the website for the United City of Yorkville,
CivicPlus would like to be your partner of choice.
Our experienced and knowledgeable professionals are committed to creating the c ommunication infrastructure that
United City of Yorkville desires.
Your city will have access to the most experienced staff in the municipal website management market, and your
project team will work with you to create a unique and engaging site that reflects your community.
CivicPlus will remain a trusted advisor and support resource after the site launches; United City of Yorkville will
always have access to government communication experts.
Your site will grow and change with you as industry trends and t echnology change. CivicPlus will ensure that
your website is on the cutting edge – always.
We have the expertise to help your city work better, help
citizens help themselves and build a website both you and
your citizens will use.
Proposal for the United City of Yorkville, IL
27
Additional Documentation
CivicPlus Applications & Functionality
Developed for organizations that have a need to update their site frequently, CivicPlus provides a powerful
government content management structure and website menu management system. The system allows non -
technical employees the ability to easily update any portion of your website instantaneously. The CivicPlus
Government Content Management System (GCMS®) utilizes Microsoft SQL Server, ASP, JavaScript and HTML for
web development.
No HTML knowledge is needed to update your website. However, if desired, HTML code can be used throughout the
website for advanced users.
With extensive web applications in place, continual enhancement and an easy -to-use interface, our clients are the
proud owners of their websites and are excited to be part of the CivicPlus community.
Additional benefits of the CivicPlus GCMS® include webpage version controls, customizable levels of user-rights,
searchable data, accessible customer support services, instantaneous functionality updates , comprehensive security
and much more.
Each website begins with a unique design developed to meet your specific communication and marketing goals,
while showcasing the individuality of your community. Features and capabilities are added and customized as
necessary, and all content is organized in accordance with web usability standards.
Included GCMS® Functionality
Archive Center
The Archive Center has been developed specifically for the storage and retrieval of agendas, minutes, newsletters
and other date-driven documents. Archives can be searched by date, category or keyword, and the unique “View
Most Recent” link functionality on your website pages automatically pulls the most recently uploaded item every time
you add a new document within that category.
Calendar
The Calendar Module allows administrators to set up calendar
items to help keep the public informed about upcoming events and
meetings in your community. Events can be set on a
one-time basis or as recurring events for multiple
months in advance, with short descriptions and
hyperlinks to display the event details. The calendar
recognizes the current date as the starting date for
the display of events and provides easy navigation to
future events. Multiple calendars are available.
Department Calendar: Any page on your
site can display the most current calendar
items in a special content area, great for departments or
sections of the website that wish to have their calendar
events appear on their page(s).
Featured Events: You can draw attention to upcoming
events using the Featured Events functionality, within the
Calendar module.
The Calendar supports multiple views, including a monthly view that displays all the events in a month.
Proposal for the United City of Yorkville, IL
28
Document Center
The Document Center is a document storage center that allows for a variety of file types (e.g., PDF, spreadsheets,
pictures, video files, sound clips and more) to be downloaded or viewed by the end user, allowing for easy access for
your site visitors. Instead of bogging down your employees with requests for documentation, site visitors can locate
the forms and documents they need easily online. Your employees can easily add new documents and direct
residents to the information they requested online, without sending out extra paperwork. Mor eover, all files are
organized by our structured filing system of folders and subfolders, keeping all of your information easily obtainable
by your citizenry 24/7.
Frequently Asked Questions
Help your citizens reduce time-consuming phone calls or trips to government offices by answering commonly asked
questions through your website. Frequently Asked Questions (FAQs) – which can be organized by departments
and/or category – may be added to any page of your website and can be set up to link to additional info rmation or
documentation for easy reference. FAQs have their own search feature, so your site visitors can easily find answers
to the questions they ask the most.
News Flash
The News Flash Module provides an area where important and timely news and announ cements are posted. Any
department may utilize this module for posting information that is specific to their department, like a change in
meeting location, results from an election, rainout announcements for sports fields and more. News Flash is a
dynamic page element that may be placed on any page, and each News Flash item has its own start and expiration
date.
Photo Gallery
The Photo Gallery Module is designed to allow you to
store and display photographs in a central location to
showcase to your citizens and the world the best that your
community has to offer. Photo Gallery helps your website
become the place to put your community’s best face out
there and to attract new citizens to your area. Users will be
able to:
Explore your municipality through albums and
favorites
Browse your featured photos and events
Share with friends or send as postcard
Submit images
View images as thumbnails or full-size
Write descriptions with each photo
Search the Photo Gallery
View a slideshow of photos
Give photo credits
Give images “thumbs up”
You can use the Photo Gallery to store and organize photo files by department, division, and/or event. Like the
Document Center, you can store as many pictures in as many albums as you like.
Quick Links
The Quick Links Module allows you to place links to related and often -requested information directly on the page of
your choice. The entire collection of these links is contained within the actual module, and is unlimited in the amount
of categories and links that you can provide to your users. The links can be to interior pages of your website, to
documents and forms, or to outside websites. You can organize the links by category or item and can set them up to
auto-publish and unpublish.
Proposal for the United City of Yorkville, IL
29
Spotlight
The Spotlight function creates additional space on a webpage
that allows you to highlight important text or widgets in a
compact, easy-to-update module. The information posted with
this module can relate to one or more pages.
Staff Directory
If the Business/Resource Directory is your website’s Yellow
Pages, then the Staff Directory Module is the white pages. A
time-saving resource for your residents, Staff Directory
provides detailed contact information for your staff and various
offices all in one place, decreasing the number of calls
requesting contact information. You can include as much or as
little employee and department information as you deem necessary; plus, Staff Directory entries can be linked to
pages throughout your site, providing quick access to a specific department or employee’s information.
Employee information can include title, biography, photo and contact links via email or form submittal (email
addresses are blocked from email harvesting programs). Website users can search the directory for a specific
employee by last name, first name or department.
Form Center & ePayment
Having online forms makes it easy for you to receive useful information from your community and for your community
to complete tasks online. These completely customizable forms can be used as a means for citizens to contact you
with questions, requests and feedback or to sign up for various events and activities. You can have as many online
forms as you need with this module, creating forms easily from scratch or from our library of sample online forms.
Various field options include long answer, radio button, drop -down lists and multiple choice (among others), with
formatting options that include font colors, background colors, text alignment and more.
You can preview forms as you create and edit them instead of sending it to someone else for changes. The Form
Center lets you develop every aspect of your online form with no programming knowledge necessary through a
simple drag-and-drop interface.
In addition to being able to create your own form, you can track your forms through your website! No more lost emails
and sorting for statistical data through multiple emails. Any form submitted on your website can be received via email
to as many people as you wish and/or be kept in a backend database with basic analytical reporting available. This
data can then be exported to Microsoft Access, Excel or other database software.
Integrate eCommerce on your website with no third-party store to setup, and save your citizen’s time and effort by
affording them the opportunity to pay for services directly through your website. You have the ability to customize or
make changes to any form that you create to take in online payments such as registration fees, pool passes, etc.
Email notifications are sent out to both customer and client when a transaction is made. Financial reporting through
our trusted PCI-compliant partner is also available with the click of a button.
Proposal for the United City of Yorkville, IL
30
Interactions & Communications Modules
Alert Center
The Alert Center provides an efficient and noticeable way to get
important news out to your community, whether it be local
inconveniences like street closures and road conditions or critical,
up-to-the-minute emergencies like flood warnings and Amber
Alerts. With one click, graphics and information can be activated on
your website from a variety of layouts that best fit the alert’s
importance, with public notifications sent out through email, text
message and social media.
When a user clicks on an alert that is displayed on the site, they will
be taken to the module information that details the alert, as well as
provides photos, links to other resources and a history of updates.
My Dashboard
With My Dashboard, residents and users can set up a profile on your website that allows them to pick and choose the
information that automatically becomes fed to their dashboard upon site login. In one simple and streamlined view,
your users can immediately see important news, available job openings, keyword search es, favorite pages, calendar
feeds and much more.
Your users will be able to login to My Dashboard using the Facebook Connect feature, negating the need for multiple
usernames and passwords.
Notify Me®
With Notify Me®, visitors can sign up to be notified via
email and/or SMS text message about community
activities, meetings and other updates to your website.
Users can self-manage multiple subscriptions at once,
and unsubscribing is easy. You can send out unlimited
emails and have 500 SMS subscribers.
This module automatically integrates with our Alerts
Center, News Flash, Calendar, Job Postings, Bid
Postings and Blog modules. Also, administrators can
create as many Notify Me® lists as they want.
Notify Me® supports HTML and plain text versions of
email messages, and newsletter templates can be
created for added presentation quality.
You can set up notifications as drafts and set them to send to subscribers at a specified date and time. Additionally,
most current subscriber notification lists can be imported to our system, while the email lists created by your CivicPlus
system can be exported for other files and/or purposes.
All of these features make Notify Me® an excellent and valuable communication tool for your website, allowing you to
continuously stay in contact with your residents by sending them important information updates that they are
interested in receiving.
Social Networking & Gov 2.0
CivicPlus understands the importance of Gov 2.0 and how social networking sites like Facebook and Twitter help
governments connect with their residents in unique and innovative ways. From community -centric pages on
Facebook to real-time Twitter feeds that can deliver emergency alerts, we are dedicated to helping our clients
integrate their web content into the most dynamic social media sites and make their marks in the world of Gov 2.0.
Proposal for the United City of Yorkville, IL
31
Other social networking sites (such as LinkedIn, YouTube, Pinterest, etc.) can be featured on your website as links to
your organization’s profile on those particular websites.
Facebook and Twitter
Many governments are finding Facebook to be an essential part of their online presence, as it provides another
avenue to share news, announcements, events, pictures and videos with a wide range of regular site visitors.
CivicPlus can create your Facebook page and sync your website to your Facebook profile to automatically publish
news and calendar events on Facebook with a link to your website for more information.
Twitter’s short, 140-character “tweets” offer a way for municipalities to distribute information quickly and effectively.
CivicPlus can link your website to your Twitter account for automatic publishing of news and announcements such as
road closings, meeting schedules and emergency notifications.
Administrative Features
Feature Description Benefit
Instantaneous
Updates
Updates are posted to the live site in real-
time once the administrator publishes the
page.
Timesaver – Ensures your site is
communicating the most up-to-date
information.
Browser Based
No installation of programs or software
needed, meaning you and your staff can
update the site from any Internet connection
or platform (Mac or PC) at any time.
Convenience – Updates can be made
anywhere at any time.
Money Saver – Does not charge a per seat
rate to install software.
Mobile Updates
Immediately update your site from any
location with urgent announcements using
your tablet.
Crisis Communication – Warn audiences
of crisis situations from anywhere at any
time.
Action Items
Direct access to a queue of items waiting to
be published or reviewed by the
administrator provided immediately upon
login.
Convenience – Helps the administrator stay
organized and timely with the site.
Site Search and Site
Search Log
Powerful site search automatically indexes
all content making it easy for all visitors to
find information. This feature also keeps a
log of all words that are searched by your
visitors.
Knowledge – The search log serves as a
tool in making decisions about updates and
upgrades as well as placement of key items
on the homepage.
Automatic Alt Tags Built-in features ensure your site is Section
508 compliant.
Convenience – Editors do not need to know
Section 508 requirements as the system will
automatically format to accommodate for
Section 508 compliance.
Application Programming Interfaces (APIs)
We have nearly a dozen application programming interfaces (APIs) scattered throughout the system and continue to
build more to make integrations with the GCMS® and disparate applications as straightforward as possible. It’s this
“open architecture” approach that allows your IT staff and programmers to spend time creating applications and
systems that are specific to your community’s needs and tie them into the site, using the site itself as a sturdy
platform on which to build. Maintaining the site’s base code will fall on CivicPlus’ shoulders, saving you time, effort
and, most importantly, money.
Bad Links Identifier
You may not be aware of any broken links on your website, but your guests are. This module creates a list of the
broken links on your site when they are accessed. It also allows a site visitor the ability to enter comments concerning
how they accessed the page. On the administrative side of the system an asterisk alerts you that a comment
concerning a bad link has been posted.
Proposal for the United City of Yorkville, IL
32
Content Creation
Recognizing that not all site administrators possess high levels of technical expertise, the CivicPlus GCMS® makes it
easy to add new content, edit old content, and keep page layout consistent through use of our WY SIWYG editor.
The page content creation functionality is separate from the overall design of the site; the content will reflect font
sizes and styles associated with the various heading levels and content types. Content changes will not affect the
design, though the site breadcrumbs, page structure and sitemap will dynamically update upon publish of any content
changes.
This front-end edit feature makes updating website content even quicker and easier, as users have point-click-edit
access to information, right from the front-end of the website. To edit content, all you have to do is follow the steps
below.
Step 1: Find the page creation icon, and click on the area of the website that you wish to edit.
Step 2: Make changes to the website, then click 'Save'. Changes are immediately reflected on the site.
A great tool for users to update the website from the public view, CivicPlus’ Live Edit allows you to see where your
information will be posted before you make any changes. If you would like to move a page under a different
department or move the entire department section of your website to a different location , just follow the steps below.
Step 1: Find the page creation icon, and click on the section of the navigation you wish to move.
Step 2: Drag-and-drop the page or section in its new location. Changes are immediately reflected on the
site.
Unlimited pages can be created with the CivicPlus GCMS® and there is no limit to the depth of pages that can be
created. You are responsible for the depth of navigation. With mega menus and dropdown and pop-out menu
functionality, you can essentially get to any page on your website within a single click if you desire.
Content Scheduling
When creating an entry, simply select the date and time desired for the material to publish and/or unpublish. Material
can be set to auto-unpublish or it can be manually retired.
Every aspect of the system has the ability to have expiration dates. These dates are logged in an Expiring Items
Report and can have an automatic email sent to you 72 hours before it is set to expire. When items expire they are
unpublished from public view but will remain in the system until someone manually removes them from the archive.
This allows you to bring the page back at any time with updated content.
Content Versioning
The GCMS® includes version control, a history log for reviewing changes made within the system, file locking
through our permission system and an archive of all published content so that previous versions can be accessed or
used, if necessary.
Archived content can be viewable by the public if desired, but is typically not shown on the public -facing side of the
site and just housed within the Archives. Administrators and staff with module access may access those archives;
others will not see them.
Dynamic Layout
The layout for your website is determined by you and the designer. The placement of navigation and dynamic areas
are important in guiding site visitors to key information quickly and easily. Our consultants make recommendations
based upon website-user studies and research on best practices.
Dynamic Page Components
Events Calendar, FAQs, Opinion Poll, News Flash and other new features may be included as dynamic page
components. Dynamic Page Components may be placed on any page and will help dedicated areas of th e site
appear as its own website. For example, the entry page for your Parks and Recreation Department can be
customized with specific lists of events, FAQs and news announcements pertaining to that department.
Proposal for the United City of Yorkville, IL
33
Dynamic Breadcrumbs & Site Map
When a user visits your site, Dynamic Breadcrumbs are used to show their location within the website. Breadcrumbs
are automatically generated by the CivicPlus system. This feature assists a site visitor in understanding the site
structure and navigation. A dynamically generated site map automatically updates itself to your menu system. So if a
menu item is renamed, added or deleted in your navigation, the site map will reflect those changes.
eCommerce Integration
While CivicPlus does offer our ePayment Center, we also work with numerous trusted third-party payment processors
to handle payment and account information, allowing your citizens to easily log on and pay bills ranging from property
taxes to utilities. The payment processor used for transactions is dependent upon the municipality’s wants and needs,
with every effort made to ensure a clean, seamless on-site presentation of the payment portal.
Of the vendors that we’ve worked with, many allow for one-time credit card or debit card payments, payment through
the Automated Clearing House (ACH) network and even Interactive Voice Response (IVR) payment options via
telephone. Many give users the option for automatic bill payment, with payment being automatically withdrawn from
the specified account on a certain day each month. These payment processors feature payment and usage reporting,
and all of our eCommerce partners meet the Payment Card Industry’s Data Security Standard (PCI DSS). Integration
of third-party vendors is subject to scope and additional fees.
History Log
Easily track changes made to your website by all of your users with the History Log. Track changes made to items in
your Page Menu, Archive Center, Document Center and more. History Log information is searchable, sortable and
exportable.
Integration/Interfacing
CivicPlus has performed a variety of integration services for our clients, all of which work cohesively with most third -
party software applications. The CivicPlus GCMS® is different from other standard design programs, in that we have
the ability to link with most software or databases you are currently utilizing. Systems such as purchasing, taxes,
assessment and utilities have been developed for many of our clients.
Integration can take place on varying levels, from simply linking to a third-party-hosted site to dynamically drawing in
content from other existing sites to actual custom programming to integrate services into our GCMS®. Our typical
method of integration involves dynamically scraping content from an existing web application, allowing con tinuously
updating content or form fields to access an application to be drawn directly into the CivicPlus -created site.
If a web interface currently exists for an application on a client’s web server, we recommend moving it to a third -level
domain so that it can remain active when the CivicPlus site is launched; CivicPlus can then draw in that content from
the third-level domain directly into the primary site at a lower cost than actual integration into the GCMS®.
If true integration rather than interfacing is required, the project will need to be more fully scoped and additional
charges may be incurred.
Intranet
We can set up an Intranet for your site to be used by employees or other groups that need to share non -public
resources. An intranet is a secure location on your website that allows employees to login and access information
specific to them, and you have the ability to set up multiple Intranet groups with varying view rights.
Most modules available to the public on your site are also available for use on the Intranet. For example, you can use
the Calendar Module to notify employees of work events; FAQs to answer questions about wages; Notify Me® to
send notification of flexible benefits deadlines; and News Flash module to let employees know of birt hs, marriages
and other personal events.
Proposal for the United City of Yorkville, IL
34
Levels of Rights
Most information is constantly changing and needs to be updated frequently. With CivicPlus, each department is
capable of updating their own content. Even though each department can update their own information and web
pages, the menu structure, top of page, banner and navigation throughout the site remains the consistent.
A central administrator is given the ability to establish groups with specific rights and capabilities to update the
website. Users are then assigned to those groups based upon the role they will have in updating the website. Users
of the administrative system may be defined as publishers or authors of the content, or as administrators of modules.
A central publisher for each department can then approve the pages.
Link Redirects
This is helpful in marketing an area of your website by creating a web address that is easy to remember. Instead of
sending your users to http://civicplus.com/248/Awards-and-Recognition, you can send them to
http://civicplus.com/awards. A more obvious link is great for print materials and much easier to tell people how to find
a particular page on the website.
Maps – Clickable, JavaScript or Flash
Help website users find commonly requested information such as:
Bus schedules
Parks
Walking tours
Bike paths
Trash pick-up schedules
Location of highways
Tourist attractions
Education information
Major employers
Demographics
Maps can be customized as simple, clickable maps through the use of our Image Map Editor, or more sophisticated
JavaScript or Flash (additional fees required for Javascript or Flash development). Either one provides a great way to
present your community to web visitors.
Printer Friendly
Our printer friendly functionality does more than simply call the browser’s print command – it separates the critical
content from the template so as to give a clean presentation of the information that needs to be printed without the
menu structure and banner information.
RSS Feeds
RSS stands for Real Simple Syndication, and in short, it’s a way of bringing your site to the people rather than waiting
for them to come to your site to find out new information. When a user signs up for RSS feeds, they receive email
notifications of the latest news updates without having to visit your website. RSS begins by downloading a free reader
and then subscribing to the feed. Then, as often as the website is updated, the subscriber receives notifications of
these updates at their earliest convenience.
Site Search
On the public side of the site, we supply all our clients with a robust site search with advanced search features. The
CivicPlus Site Search will search through web pages on your site, PDF documents, any module entries and
document files. Video and sound files are searched by name. The Site Search organizes the results by the type of
information (calendar item, web page, Microsoft files, PDF documents, etc.)
Clickable Area
Proposal for the United City of Yorkville, IL
35
With the Site Search Log, site administrators can review a history of searched-for words by frequency, date, time and
exact terms input by site visitors. This is a helpful tool for your site users and also a means of keeping your staff in-
the-know of what items are being regularly searched on your site.
Supported Browsers
Websites built by CivicPlus are viewable in all common browsers; however, they are optimized for administrative use
with Windows 2000+ and supported in the two most recent versions of any major browser including: Internet
Explorer, Firefox, Safari and Chrome.
Website Statistics
In order to review how your site visitors are using the site, administrators will be trained on the use and analysis of the
web statistics, which are provided through Piwik Analytics. Important information can be pulled from this data in order
to make decisions about the use of the website.
Responsive Design
Design is not only about reflecting your community’s unique personality, but also about the citizen experience. Every
day, more users visit websites using tablets and mobile devices than ever before. T hose users are looking for the
same content and features available on the full website – CivicPlus’ responsive design capabilities open the door for
a truly device-independent experience.
Through dynamic resizing of graphics and architectural elements, responsive CivicPlus sites alter their presentation
to fit whatever devices citizens are using to access the content – mobile devices, tablets, laptops and desktops.
There’s no need for separate mobile versions of the website that may limit the amount of cont ent that can be
displayed. A responsive site covers all devices and all screen sizes. This means more than a trendsetting way to view
content; it means accessibility and communicating with your citizens in the ways they expect.
In addition to responsive design, CivicPlus can meet your accessibility needs through a number of other methods,
including custom mobile applications for specific smartphone or tablet operating systems and our advanced mobile
detect and display technology, MuniMobile. Your project te ams will consult with you regarding the possibilities of all
options, ensuring your new site meets both your needs and your citizens’ expectations.
Ongoing Training & Support Opportunities
We want your website to be an investment that holds its value over time rather than a big expense that you have to
budget for every few years. We apply this same thinking to our approach toward training and support, too. After the
launch of your website you should be able to keep current staff as well as new-hires trained and supported as they
update and maintain your site. CivicPlus offers ongoing training and support, as well as the incredible resource of
more than 1,700 other municipalities that use the CivicPlus Government Content Management System (GCMS®).
Stay up to date and always informed with unlimited access to the CivicPlus Connection.
When you join the CivicPlus community, you’re connecting with our entire staff as well as a network of more than
1,700 cities, counties and other government entities that use the CivicPlus solution. CivicPlus Connection – a social
network for CivicPlus users – invites our customers to engage us and each other even more!
By logging onto CivicPlus Connection, you can:
Earn different levels of CivicPlus certification, from contributor to webmaster, at our online testing center
Access online training manuals and videos to learn the tips, tricks and processes to become the expert at
creating the best website for your users in the CivicPlus University section
Attend webinar series for refresher trainings or for sneak peeks at the newest features and functionality in
development
Try to stump the CivicPlus trainers with a question
Share ideas and contribute to bettering our community through opinion polls, surveys and group discussions
Stay up to date on the latest trends in web technology, design and government processes through blogs,
webinars and informational updates tailored to local government professionals
Access our always-available online support center for our clients
Proposal for the United City of Yorkville, IL
36
Resource Center
With CivicPlus, you will discover a team of people ready to help you at any time. We are not just with you for the
development, design and launch – we will be here year after year to respond to new needs and new opportunities for
you to build you site into the best site it can be.
Dedicated Account Managers
CivicPlus has a team of Account Managers to help you implement the tools needed to successfully meet the level of
Community Engagement that you desire. Upon website Go Live, you will have a dedicated member of this team to
help you keep up on new CivicPlus products and optimize your site. This specialized team member can provide you
with further information on how to engage your citizens, utilizing the tools that CivicPlus has put into place on your
new website.
Around-the-Clock Technical Support
Our support personnel are ready to answer your staff members’ questions and ensure their confidence in using our
site. When you choose CivicPlus, our knowledgeable staff is available from 7 a.m. to 7 p.m. (CST) to field your calls
and emails, and emergency services are available after regular hours with our on -call staff 24-hours a day.
In addition to fielding support requests, CivicPlus is proactive in identifying any potential system issues. Through
regularly scheduled reviews of site logs, error messages, servers, router activity and the internet in general, our
personnel often identify and correct issues before they even affect our clients’ websites. Our expertise in website
management provides assurance to our clients that their site is in good hands.
Maintenance & Support Includes:
Support Maintenance of CivicPlus Application & Modules
7 a.m. – 7 p.m. (CST) Mon. – Fri. (excluding holidays) Install Service Patches for OS
24/7 Emergency Support System Enhancements
Dedicated Support Personnel Fixes
2-hour Response During Normal Hours Improvements
Usability Improvements Integration
Integration of System Enhancements Testing
Proactive Support for Updates and Fixes Development
Online Training Manuals Usage License
Monthly Newsletters
Phone Consulting
CivicPlus Connection
Mobile Website Detection & Browsing
Mobile browsing is automatically available with a CivicPlus-developed website, meaning your residents can easily
access and refresh your site and its important content from any mobile platform, such as their iPhones, Androids,
Blackberrys, etc.
Software Licensing
No programs or software are necessary to install, meaning you and your staff can update the site from any internet
connection or platform (Mac or PC) at any time. Portland will not pay money per seat to install software. You can
have an unlimited number of users in the system. Citizens Request Tracker is limited to 5 users; additional user
licenses may be purchased.Personnel and Prior Experience
CivicPlus maintains a staff of dozens of personnel who excel in the development and support of government
websites. From project management, design and development to training and support, our highly qualified staff
ensures the success of your website throughout all phases of construction and beyond. Our expert project leaders
(listed below) will match you and your needs to a team of highly qualified specialists who will work directly with you
throughout your entire project. If selected, your project team, including project manager, will be assigned upon
contract signing.
Proposal for the United City of Yorkville, IL
37
Hosting & Security Features
CivicPlus’ Network Operations Center – based in Kansas City, MO – is set up specifically for website hosting and
administration. Redundant power sources and internet access ensure consistent and stable connections, and regular
hardware upgrades make certain that CivicPlus-hosted sites are maintained on up-to-date, reliable equipment.
Hosting With CivicPlus Includes:
Shared Web/SQL Server
DNS Consulting and Maintenance
Monitor Bandwidth-Router Traffic
Redundant ISP
Redundant Cooling
Diesel Powered Generator
Nightly Tape Backup
Intrusion Detection and Prevention
Antivirus Protection
Hardware Upgrades
Physical Security Biometric access
Proximity card key system prevents unauthorized access to servers
High-resolution, closed-circuit video with time lapse recording covering secured
areas
All visitors require a full-time escort within hosting area
Redundant cooling systems
Power All systems fed by uninterruptible power supplies (UPSs) with diesel-powered
generator backup
Bandwidth 1GB burstable internet capability with option to expand
Multiple carriers to provide redundancy for continuous connectivity – including
MCI/Verizon, Hurricane Electric and Cogent
AT&T: 45Mbps fiber optic network
Cox: 100Mbps fiber optic network
BGP internet routing; continuously monitor and manually balance internet load
between carriers for optimal speed
Monitoring Round-the-clock (24/7/365) monitoring of all critical components, including: internet
connectivity, servers, routers, switches and power systems
Backup Tape backup performed daily
Off-site tape archive
Antivirus Continuously scan system
Signature files auto-updated every 4 hours from national registry
Data Security Server operating systems applied as necessary
Router level port blocking and reporting
Router level packet filtering and reporting
Server level port blocking and logging
Ongoing security analysis by Cisco security specialist
Data Redundancy RAID Level 5 data storage array
RAID 1 + 0
Intrusion Detection Redundant Palo Alto Advanced Services Firewalls
Staff Certifications Full-time electrical engineers (EE)
Full-time Microsoft-certified systems engineers (MCSE)
Full-time Cisco-certified network associates (CCNA)
Full-time Cisco-certified network professionals (CCNP)
Proposal for the United City of Yorkville, IL
38
High-Impact, Custom Designs Created Specifically for Your Community
Our programmers implement our designers work – not the other way around – so options for a unique site are
endless. Designs that truly represent your unique image, message and brand come through extensive access to and
consultation with our design team. Our portfolio demonstrates our graphic designers’ vast creative abilities and styles.
Additional examples can be provided upon request or can be viewed at www.CivicPlus.com/designs.
Washington County, OH – www.washingtongov.org
Design Details: Washington County’s history shines through in
this simple yet sophisticated design. An intuitive layout guides the
user to important information while fostering ease of use among
the community.
Also Look For: Mouse-over buttons and click through scrolling
menus guide you easily to popular features within this homepage.
Jeffersontown, KY – www.jeffersontownky.com
Design Details: Jeffersontown’s website does a great job
showing off the amenities offered in the State of Kentucky. The
design color scheme is a reflection of their branding and seal.
Also Look For: The use of the ePayment module and Code Red
integration.
McKinney, TX - www.mckinneytexas.org
Design Details: Straightforward navigation coupled with an
uncluttered homepage and subtle color scheme make the user
experience an enjoyable – and easy – one.
Also Look For: McKinney’s Economic Development Corporation
and Convention & Visitors Bureau subsites.
Banff, AB – www.banff.ca
Design Details: Client wanted a minimalist website design. The
top banner features pop-out navigation. Simple homepage for
ease of search and navigation.
Also Look For: Extensive use of Calendar and Citizen Request
Tracker modules.
Flagstaff, AZ – www.flagstaff.az.gov
Design Details: Flagstaff fosters community engagement by
providing a simple and clean navigation structure. The beautiful
landscape imagery is a reflection of a unique natural formation
that dominates the landscape.
Also Look For: The “E-Services” section enables the user to
monitor their utility account and pay bills as well as view streamed
city meetings right from the comfort of their homes.
Proposal for the United City of Yorkville, IL
39
Clarifications & Exceptions
Reference Your Language CivicPlus Proposes
RFP Page 4
Scope of Services
Required
Task 5- Project
Management
The vendor is expected to provide a
complete estimate of costs during each
phase of the project. The vendor will
provide a sole individual as point of contact
for project management during the course
of the project. The vendor will communicate
any anticipated problems with the project
schedule, or unanticipated expense, to the
City, with possible remedies in a timely
manner.
To exempt and replace with:
CivicPlus prices on a per project basis. We
have found that this type of pricing structure
eliminates surprise costs and is overall more
cost effective. Our goal is not to “nickel and
dime” our clients with hidden fees or hourly
rates. We have attempted to come up with
the most cost effective solution while still
meeting your needs. This model of pricing
eliminates the uncertainty of paying by the
hour and provides you with a concrete price
that only varies if additional functionality or
work outside of the original project scope is
requested.
RFP Page 8
Proposal
Instructions
E. Term and
Conditions
#7
Indemnification - entire section To exempt and replace with:
Client and CivicPlus shall defend, indemnify
and hold the other Party harmless, its
partners, employees, and agents from and
against any and all lawsuits, claims,
demands, penalties, losses, fines, liabilities,
damages, and expenses including attorney’s
fees of any kind, without limitation, in
connection with the operations of and
installation of software contemplated by this
Agreement, or otherwise arising out of or in
any way connected with the CivicPlus
provision of service and performance under
this Agreement. This section shall not apply
to the extent that any loss or damage is
caused by the gross negligence or willful
misconduct on the part of either party.
Proposal for the United City of Yorkville, IL
40
Certificate of Insurance
Proposal for the United City of Yorkville, IL
41
Bank Letter of Reference
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
PKBD #1
Tracking Number
CC 2014-92
131 E. Hydraulic Street., Unit C, Request for Proposal
City Council – October 28, 2014
See attached memo.
Tim Evans Parks and Recreation
Name Department
Summary
Review of a concession license request for proposals document for the City's Riverfront
Building at 131 E Hydraulic Ave., Unit C.
Background
In February, 2011, the Parks and Recreation Department received a concession-lease
request for proposals document from River City Roasters for a portion of the building located at
131 E Hydraulic Ave., to be used as a food and concession business. River City Roasters was
approved for a two year concession lease by the City Council in June 2011. Their lease was
renewed for an additional two years in June 2013. In May, 2014, the River City Roasters lease
was approved for early termination.
Currently, the 131 E. Hydraulic Ave. Unit C rental space does not have a tenant. The building
occupies a small section at the western end of Riverfront Park, previously used as a City-run
preschool before being rented as a food/concession business. The potential rental space has
access to two bathrooms, an HVAC system and some non- structural interior walls. The unit is
approximately 750 square feet with exterior doors located on both the East and North sides. The
remainder of the building structure is currently operating as an ice cream shop concession
business.
With the rental space being located in the Yorkville downtown area as well as near Riverfront
Park and the Marge Cline Whitewater Course, it creates an excellent opportunity for both the
City and the licensee. This opportunity will only be enhanced as Riverfront Park is improved
over the next year and the construction on Rt. 47 is completed.
Memorandum
To: Yorkville City Council
From: Tim Evans, Director of Parks and Recreation
CC: Bart Olson, City Administrator
Scott Sleezer, Superintendent of Parks
Shay Remus, Superintendent of Recreation
Date: October 22, 2014
Subject: 131 E. Hydraulic Ave., Unit C, Request for Proposal
Analysis
Over the past three years, the City of Yorkville Parks and Recreation Department has
leased three (3) businesses rental space in facilities located near Riverfront Park. Two of the
businesses are still operating with leases up for renewal next year. For all future leases, the City
plans to change the leases into licenses. By making this change, it is anticipated that a license
will lessen the tax burden on the occupying entities and, in turn, would make the businesses more
successful.
Recommendation
As directed by the Park Board and City Council and in order to start the concession-license
request for proposals, attached is the Request for Proposal to license the 131 E. Hydraulic Unit C
space. Staff added the following conditions to the license, different from the previous lease:
1) Add that liquor may be sold with an approved city liquor license.
2) Security deposit is increased to $1,500.
3) City has free use of the conference room.
4) Free Riverfront Park rentals limited to two within a year.
5) Sewer, water and natural gas are the responsibility of the three 131 E. Hydraulic Ave.
licensees. A written contract between the licensees concerning this must be submitted to
the Park and Recreation Director.
6) If the licensee chooses not to occupy the building during the winter months, inside
temperature must be maintained at 60 Degrees Fahrenheit.
7) At no time are utilities allowed to be shut-off.
8) Any damage caused from the building not being occupied will be the responsibility of the
licensee to fix and/or replace.
At its October 17, 2014 meeting the Park Board approved the Request for Proposal, with the
following changes and additions in red:
a) Section 14.8:
The Licensee may be permitted to sell alcoholic beverages at the Premises, provided that
the City has issued the Licensee a liquor license for the Premises and the Licensee
maintains said liquor license while this Agreement remains in effect.
b) Section 14.9:
The Licensee expressly acknowledges that it may rent Riverfront Park free of charge only
two times in each license year, with approval from the Director of Parks and Recreation.
If the Licensee desires to rent Riverfront Park more than two times in a license year, it
must apply for such rental by filling out and submitting a City Park’s rental form and
paying the applicable rental fee.
c) Fee:
Change the fee structure from $250 and 5% of the annual sum of the total adjusted gross
receipts, to allowing the potential renter to choose one of the following:
$300 a month rent and 5% of the annual sum of the total adjusted gross receipts
Or a $600 monthly fee with 0% of the annual sum of the total adjusted gross
receipts.
Staff seeks City Council approval of the Park Board recommendation of the 131 E. Hydraulic
Ave. Unit C License Request for Proposal.
United City of Yorkville, Illinois
Request For Proposals
The United City of Yorkville, Illinois will accept proposals for:
The operation of a food service business at 131 East Hydraulic Street, Unit C, Yorkville,
Illinois.
Specifications and all contract documents are available at the Office of the City Clerk, Yorkville
City Hall, 800 Game Farm Road, Yorkville, Illinois 60560 during the hours of 9:00 AM until
4:00 PM, Monday through Friday.
Proposals must be submitted to the attention of the Director of Parks and Recreation at the above
address no later than _____ AM on _____, _____, 2014 (the closing date). Proposals received
after the closing date will not be accepted and will be returned to the Proposer.
Proposals must include the following information:
1) What type of business does the Proposer intend to operate (i.e., restaurant, sandwich
shop, coffee shop, concession stand, etc.);
2) Proposed days of operation;
3) Proposed hours of operation;
4) Proposed months of operation;
5) The goods that the Proposer intends to offer for sale, including an estimate of the price
that the Proposer will charge for each type of goods;
6) Experience of the Proposer in operating the particular type of business that the
Proposer intends to operate.
All costs incurred in the preparation, submission, and/or presentation of any Proposal including
any Proposer’s travel or personal expenses will be the sole responsibility of the Proposer and will
not be reimbursed by the City.
A Proposal that is in the possession of the City may be altered by a letter bearing the signature
and name of the Proposer, provided that such letter is received by the Director of Parks and
Recreation prior to the closing date. Telephone, e-mail and verbal alterations of a Proposal will
not be accepted.
General questions regarding this Request for Proposals shall be directed to Timothy Evans,
Director of Parks and Recreation, at 630-553-4357. All detailed questions concerning the actual
specifications are to be forwarded in writing via fax to __________ not less than ten (10)
business days prior to the scheduled closing date. No oral or telephone interpretations of
specifications shall be binding upon the City.
The person submitting the Proposal shall at all times observe and conform to all laws,
ordinances, rules and regulations of the federal government, the State of Illinois, and the City
which may in any manner affect the preparation or the performance of the contract.
LICENSE AGREEMENT
This LICENSE AGREEMENT (the “Agreement”) entered into this _____ day of
__________, 2014, by and between the United City of Yorkville, Kendall County, Illinois, a
municipal corporation (hereinafter referred to as the “City”), and __________, ___________
(hereinafter referred to as the “Licensee”).
WITNESSETH:
WHEREAS, the City is a duly organized and validly existing non home-rule municipality
of the State of Illinois under the 1970 Illinois Constitution and the laws of the State of Illinois
and the owner of property located at 131 East Hydraulic Street, Unit C, Yorkville, Illinois (the
“Premises”); and,
WHEREAS, the City and the Licensee desire to enter into this License Agreement for the
operation of _______________.
NOW, THEREFORE, in consideration of the mutual covenants and agreements herein
contained, the City and the Licensee agree as follows:
I. TERMS AND CONDITIONS
1. CITY ORDINANCES
The Licensee will strictly comply with all ordinances of the United City of
Yorkville and laws of the State of Illinois.
2. USE OF CITY'S NAME
The Licensee is specifically denied the right of using in any form or medium the
name of the City for public advertising unless express permission is granted by
the City.
3. INDEMNITY AND HOLD HARMLESS AGREEMENT
To the fullest extent permitted by law, the Licensee shall indemnify, keep and
save harmless the City and its agents, officers, and employees, against all injuries,
deaths, losses, damages, claims, suits, liabilities, judgments, costs and expenses,
which may arise directly or indirectly from any negligence or from the reckless or
willful misconduct of the Licensee, its agents, its employees, or any other person
using the Premises, and the Licensee shall at its own expense, appear, defend and
pay all charges of attorneys and all costs and other expenses arising therefrom or
incurred in connection therewith, and, if any judgment shall be rendered against
the City in any such action, the Licensee shall, at its own expense, satisfy and
discharge the same. This Agreement shall not be construed as requiring the
Licensee to indemnify the City for its own negligence. The Licensee shall
indemnify, keep and save harmless the City only where a loss was caused by the
negligent, willful or reckless acts or omissions of the Licensee, its agents, its
employees, or any other person using the Premises.
4. INSURANCE REQUIREMENTS
4.1. Prior to the effective date of this Agreement, the Licensee shall procure,
maintain and pay for such insurance as will protect against claims for bodily
injury or death, or for damage to property, including loss of use, which may arise
out of operations by the Licensee, or by anyone employed by the Licensee, or by
anyone for whose acts the Licensee may be liable. Such insurance required of the
Licensee shall not be less than the greater of coverages and limits of liability
specified below or coverages and limits required by law unless otherwise agreed
to by the City:
Workers Compensation $500,000 Statutory
Employers Liability $1,000,000 Each Accident
$1,000,000 Disease Policy Limit
$1,000,000 Disease Each Employee
Comprehensive General Liability $2,000,000 Each Occurrence
$2,000,000 Aggregate
(Applicable on a
Per Project Basis)
Umbrella Liability $3,000,000
4.2. The Licensee shall have its Comprehensive General Liability (including
products/completed operations coverage), Employers Liability, and
Umbrella/Excess Liability policies endorsed to add the "City of Yorkville, its
officers, officials, employees and volunteers" as "additional insureds" with respect
to liability arising out of operations performed, including but not limited to claims
for bodily injury or death brought against the City by the Licensee and/or the
Licensee’s employees, however caused, related to the performance of operations
under this Agreement. Such insurance afforded to the City shall be endorsed to
provide that the insurance provided under each policy shall be Primary and Non-
Contributory.
4.3. The Licensee shall maintain in effect all insurance coverages required by this
Agreement at its sole expense and with insurance carriers licensed to do business
in the State of Illinois and having a current A.M. Best rating of no less than A-
VIII. In the event that the Licensee fails to procure or maintain any insurance
required by this Agreement, the City may, at its option, purchase such coverage
and deduct the cost thereof from any monies due to the Licensee, or withhold
funds in an amount sufficient to protect the City, or terminate this Agreement
pursuant to its terms.
4.4. All insurance policies shall contain a provision that coverages and limits
afforded hereunder shall not be canceled, materially changed, non-renewed or
restrictive modifications added, without thirty (30) days prior written notice to the
City. Renewal certificates shall be provided to the City not less than five (5) days
prior to the expiration date of any of the required policies. All Certificates of
Insurance shall be in a form acceptable to the City and shall provide satisfactory
evidence of compliance with all insurance requirements. The City shall not be
obligated to review such certificates or other evidence of insurance, or to advise
the Licensee of any deficiencies in such documents, and receipt thereof shall not
relieve the Licensee from, nor be deemed a waiver of the right to enforce the
terms of, the obligations hereunder. The City shall have the right to examine any
policy required and evidenced on the Certificate of Insurance.
5. SUBLETTING OF AGREEMENT
The Licensee shall not sublet the Premises or any portion of it, nor shall the
Licensee assign this Agreement or any interest in it; any attempted assignment of
this Agreement or subletting of the Premises shall be of no force or effect, and
shall confer no rights upon any assignee or sublicensee.
6. TERM OF AGREEMENT
The term of this Agreement shall be from _________, 2014 until __________,
_____, with the City having an option to exercise two, two-year option terms.
The Licensee may negotiate in good faith, on request of the City, for an extension
to this Agreement, provided that the extension is approved by the City Council no
later than one hundred twenty (120) days before the termination of the existing
Agreement.
7. TERMINATION OF AGREEMENT
The City reserves the right to terminate the whole or any part of this Agreement,
upon thirty (30) days written notice to the Licensee, in the event of default by the
Licensee. Default is defined as failure of the Licensee to perform any of the
provisions of this Agreement or failure to make sufficient progress so as to
endanger performance of this Agreement in accordance with its terms. In the
event that the Licensee fails to cure the default upon notice, and the City declares
default and termination, the City may procure, upon such terms and in such
manner as the City may deem appropriate, supplies or services similar to those so
terminated. Any such excess costs incurred by the City may be set-off against
any monies due and owing by the City to the Licensee.
8. RELATIONSHIP BETWEEN THE LICENSEE AND THE CITY
The relationship between the City and _________ is that of a Licensor and a
Licensee.
9. GOVERNING LAW
This Agreement will be governed by and construed in accordance with the laws of
the State of Illinois without regard for the conflict of laws provisions. Venue is
proper only in the County of Kendall and the Northern District of Illinois.
10. WAIVER OF LICENSE BREACH
The waiver by one party of any breach of this Agreement or the failure of one
party to enforce at any time, or for any period of time, any of the provisions
hereof will be limited to the particular instance and will not operate or be deemed
to waive any future breaches of this Agreement and will not be construed to be a
waiver of any provision except for the particular instance.
11. AMENDMENT
This Agreement will not be subject to amendment unless made in writing and
signed by all parties.
12. SEVERABILITY OF INVALID PROVISIONS
If any provisions of this Agreement are held to contravene or be invalid under the
laws of any state, country or jurisdiction, it will not invalidate the entire
Agreement, but it will be construed as if not containing the invalid provision and
the rights or obligations of the parties will be construed and enforced accordingly.
13. NOTICE
Any notice will be in writing and will be deemed to be effectively served when
deposited in the mail with sufficient first class postage affixed, and addressed to
the party at the party's place of business.
Notices shall be addressed to the City as follows:
Director of Parks and Recreation
City of Yorkville
800 Game Farm Road.
Yorkville, IL 60560
Notices shall be addressed to the Licensee as follows:
_________________________
_________________________
131 East Hydraulic Street, Unit C
Yorkville, IL 60560
14. OPERATING SPECIFICATIONS OF THE LICENSE AGREEMENT
14.1. In general terms, the City is seeking to grant the Licensee the exclusive
privilege of operating ________________ in Unit C of the premises generally
located at 131 East Hydraulic Street in Yorkville.
14.2. The City shall have the right to enter and to inspect the Premises at all
times, without any prior notice to the Licensee.
14.3. The Licensee expressly acknowledges that the City has reserved the right to
use the conference room located at the Premises upon providing, either verbally
or in writing, the Licensee with two weeks’ notice.
14.4. The Licensee shall be responsible for all taxes and personal property, and
maintenance work on the Premises and for maintaining the hot water heater that
serves the Premises (the “Hot Water Heater”), which is located in Unit A of 131
East Hydraulic Street, Yorkville, Illinois. Any capital improvements done on the
Premises over $5,000 in value, including any maintenance to, repairs of, or
replacement of the Hot Water Heater, other than the initial improvements, shall be
approved by the Park Board prior to commencement. For the purposes of this
Agreement, maintenance work shall include regular upkeep of all components of
the Premises and the Hot Water Heater, including maintenance and repairs. If any
component of the Premises or the Hot Water Heater is in need of repair or
replacement, and the repair or replacement is greater than $500, then the City
shall be responsible for the replacement of said component, provided the cost of
repair of the component is greater than 50% of the cost of replacing the
component. The preceding sentence does not apply to any capital improvements
initiated and installed by the Licensee as a result of the renovation of the
Premises, or to any repairs or replacements that are necessary because of any
damage to or destruction of the Premises, the Hot Water Heater, and/or Units A
and B of 131 East Hydraulic Street, Yorkville, Illinois caused by or resulting from
the actions or omissions of the Licensee. Any capital improvements done on the
Premises of $5,000 or less, including any maintenance to, repairs of, or
replacement of the Hot Water Heater, other than the initial improvements, shall be
approved by the Director of Parks and Recreation prior to commencement. Any
capital improvements must be inspected by the City and all work and contractors
must be licensed, bonded, and insured. For all determinations made on the 50%
repair/replacement cost above, the Licensee shall require no less than three bids
from qualified contractors for all repair and replacement quotes.
14.5. At the end of the agreement term, the City shall conduct an inspection of
the Premises, and the Licensee shall be informed of the outcome of said
inspection. The Licensee shall be responsible for returning the Premises to its
original state, subject to the discretion of the Park Board.
14.6. The Licensee does not have exclusive rights to all concession operations
within the park, but rather, only to the specific operation at the Premises.
14.7. The Licensee shall be permitted to operate a business offering the following
goods and services in the premises defined herein, without further action by the
City, and all other uses and operations must be approved by the City:
14.7.1.1. _________________________
14.8. The Licensee shall be permitted to sell alcoholic beverages at the Premises,
provided that the City has issued the Licensee a liquor license for the Premises
and the License maintains said liquor license while this Agreement remains in
effect.
14.9. The Licensee expressly acknowledges that it may rent Riverfront Park free
of charge only two times in each license year. If the Licensee desires to rent
Riverfront Park more than two times in a license year, it must apply for such
rental by filling out and submitting a City Park’s rental form and paying the
applicable rental fee.
14.10. The City agrees to furnish to the Licensee access to City water and sewer
utilities. The Licensee is responsible for applicable usage payments for all
utilities (sewer, water, natural gas electricity, phone, internet, etc.), and is
responsible for costs associated with utility connections and upgrades, including
metering of the portion of the building to be used. The City shall furnish to the
Licensee bi-monthly utility bills for water and sewer services. The Licensee
expressly agrees to divide the monies owned for any natural gas bill between it
and the Licensee of Units A and B based on the total square footage of each
Licensee’s respective unit(s).
14.11. If the Licensee chooses not to occupy the Premises through the winter
months, the Licensee shall take all necessary precautions and measures to
properly winterize the Premises. These precautionary measures shall include, but
not be limited to, maintaining a minimum level of heat no less than 60 degrees
Fahrenheit to protect the Premises from extreme freezing conditions. If
alternative methods of winterizing are to be utilized, those methods shall be
subject to approval from the property owner. The Licensee is expressly
prohibited from shutting-off utilities at the Premises or placing said utilities on
snow bird operations at any time during the term of this Agreement.
14.12. The Licensee expressly agrees to be responsible for any and all damage to
and/or destruction of the Premises, the Hot Water Heater, and/or Units A and B of
131 East Hydraulic Street, Yorkville, Illinois occurring during the term of this
Agreement and caused by or resulting from the actions or omissions of the
Licensee. The Licensee agrees to repair and replace said damaged or destroyed
portions of the Premises, the Hot Water Heater, and/or Units A and B of 131 East
Hydraulic Street, Yorkville, Illinois, at the Licensee’s sole expense, in accordance
with all ordinances of the City and while this Agreement remains in effect.
15. PAYMENTS AND OTHER REPORTS TO THE CITY
15.1. The Licensee is required to submit certain payments, forms, financial
statements, and other items on a timely basis. Failure to submit any of the
required items in a timely fashion may result in a breach of the Agreement.
15.2. The Licensee, at minimum, shall make payments equivalent to 5% of the
annual sum of the total adjusted gross receipts. The Licensee shall make said
payment prior to February 1 of each year.
15.3. The Licensee shall make payments for the privilege of using the Premises
of $250.00 per month for each month through the term of the Agreement, due
prior to the first of each calendar month.
15.4. The Licensee shall provide the City with a security deposit in the amount of
$1,500.00, to be due to the City prior to the start of the agreement term. Said
deposit shall be held until after the end of the term of the Agreement, and will be
used to offset any damage to the Premises.
15.5. The Licensee shall provide to the City, prior to the start of the Agreement,
confirmation of insurance coverage for the Premises and the operations of the
business for the entire term, with the City named as an additional insured on all
policies.
15.6. Failure to meet any deadline for payment will result in an interest charge of
10% on said late payment.
15.7. The Licensee is required to submit to the Director of Parks and Recreation
an annual concession financial statement by January 30 of each year.
16. PRINCIPAL CONTACT FOR THE CITY
The principal contact for the City that will coordinate assistance to the
Licensee will be Tim Evans, Director of Parks and Recreation.
17. EMPLOYEES
The Licensee shall undertake to perform all services rendered in a neat, orderly
and efficient manner; to use care and diligence in the performance of this
Agreement; and to provide neat, orderly and courteous personnel. The Licensee
agrees to prohibit any drinking of alcoholic beverages or use of illegal drugs or
drugs which impair the ability of the employee or agent to safely and adequately
perform his or her job while on duty or in the course of performing his or her
duties under this Agreement. The Licensee also agrees to ensure that each
employee driving a vehicle shall at all times carry a valid operator’s license for
the type of vehicle he/she is driving. The Licensee’s employees will be attired, at
all times, in a professional-type manner.
18. ACCIDENT PREVENTION
Precaution shall be exercised at all times for the citizens, employees and
property. The safety provisions of all applicable laws and building and
construction codes shall be observed. Machinery, equipment and all hazards shall
be guarded or eliminated in accordance with safety provisions.
19. TAXES, LICENSES & PERMITS
The Licensee shall pay all sales, use, property, income and other taxes that
are lawfully assessed against the City or the Licensee in connection with the
Premises and the work included in this Agreement, and shall obtain and pay for
all licenses, permits, certificates of authority, and inspections required for the
work. The Licensee shall furnish to the City satisfactory evidence that it has all
permits, licenses, and certificates of authority required to operate for the term of
this Agreement.
20. DEFAULT
If the Licensee fails to observe any portion of this License Agreement and there
has not been sufficient cause to justify such lack of observance, the City shall
serve notice, either personally or by affixing such notice to the Premises, that this
Agreement shall be in default if the Licensee does not take action to remedy the
lack of observance within twenty-four (24) hours of said notice. If at the end of
the twenty-four (24) hour period, the Licensee has not made the necessary
corrections, the City shall take such steps as are necessary to provide such
services. The Licensee will be liable for any costs of such steps from the date of
the notice of default. If deemed necessary by the City’s designated representative,
the City shall have the right to take over all equipment and facilities of the
Licensee.
21. CERTIFICATIONS
21.1. The Licensee makes the following certifications as required by law:
21.1.1. The Licensee certifies that it is not barred from bidding or
contracting with any unit of State or local government as a result of a
violation of either Section 33E-3 or 33E-4 of Act 5, Chapter 720 of the
Illinois Complied Statutes regarding criminal interference with public
contracting; and,
21.1.2. The Licensee swears under oath that it is not delinquent in the
payment of any tax administered by the Illinois Department of Revenue as
required by Chapter 65, Act 5, paragraph 11-42.1-1 of the Illinois
Complied Statutes; and,
21.2. The Licensee shall at all times abide by all applicable federal, state, and
City laws, ordinances, rules and regulations which may in any manner affect the
performance of this Agreement.
IN WITNESS, WHEREOF, the parties hereto have caused this License Agreement to be
executed by their duly authorized officers on the day and year first hereinabove written.
UNITED CITY OF YORKVILLE,
KENDALL COUNTY, ILLINOIS
By: ________________________________
Its: ________________________________
Attest: ______________________________
City Clerk
___________________________________
By: ________________________________
Its: ________________________________
Attest: ______________________________
Secretary
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
PKBD #2
Tracking Number
CC 2014-93
Stephen G. Bridge Park – Baseball Diamond Safety Nets Request for Proposal –
Contract Award
City Council – October 28, 2014
See attached memo.
Tim Evans Parks and Recreation
Name Department
Summary
Two bid proposals were received, opened and tabulated at 11:00 a.m., Oct. 3, 2014 for three ball
field safety netting work to be done at the Steven G. Bridge Park. A representative from
Northern Illinois Fence, Inc. and Park and Recreation Department staff were in attendance. For
your information and records, attached is the request for proposal, with the bid tabulation
following:
1) Golf Range Netting, Inc. - $118,000.00
2) Northern Illinois Fence, Inc. - $72,485.00
Background
Steven G. Bridge Park, located at 3651 Kennedy Road (corner of Kennedy and Galena Rd. at the
intersection of Mill St.) contains a three field, lighted ball complex with a concession stand,
baseball-themed playground structure and parking lot. Also included in this area are naturalized
detention basins for storm water mitigation.
Since its opening, the park has become one of the main locations for youth baseball and softball,
youth baseball tournaments and adult softball. The Parks and Recreation Department has
maintained the complex since its opening. With the playground located in the middle of the three
ball fields, it has become an unsafe area for kids who want to use the baseball-themed play
structure during practices or games. Additionally, numerous cars parked near the ball fields have
been damaged over the years from foul balls hitting the vehicles. Staff has determined that the
safety netting is needed on all three ball fields to prevent possible, future injuries or damages to
vehicles.
Memorandum
To: Yorkville City Council
From: Tim Evans, Director of Parks and Recreation
CC: Bart Olson, City Administrator
Scott Sleezer, Superintendent of Parks
Shay Remus, Superintendent of Recreation
Date: October 22, 2014
Subject: Steve G. Bridge Park Improvements
Recommendation
Financing for this project is budgeted for in the Parks and Recreation portion of the Vehicle and
Equipment Capital Fund. Staff recommends the acceptance of the bid and approval of award be
made to the low bidder, Northern Illinois Fence, Inc., in the amount of $72,485.00. Staff seeks
City Council approval of Northern Illinois Fence, Inc. bid to add ball field safety netting at Steve
G. Bridge Park.
UNITED CITY OF YORKVILLE PARKS AND RECREATION DEPARTMENT
REQUEST FOR PROPOSALS
FOR
INSTALLATION OF THIRTY FEET (30’) TALL
BASEBALL DIAMOND SAFETY NETS
AT STEVEN G. BRIDGE PARK (3651 KENNEDY RD.)
September 2014
800 Game Farm Road
Yorkville, IL 60560
United City of Yorkville, Illinois
Request For Proposals
The United City of Yorkville, Illinois will accept proposals for:
Installation of thirty feet (30’) tall baseball diamond safety nets above existing sideline and
backstop fences for three baseball diamonds at Steven G. Bridge Park, located at 3651
Kennedy Road, Yorkville, IL 60560.
Specifications and all contract documents are available at the United City of Yorkville, 800
Game Farm Road, Yorkville, Illinois 60560 during the hours of 9:00 AM until 4:00 PM, Monday
through Friday. Prices quoted must be valid for a minimum of 90 days from the date received.
Proposals will be received at the United City of Yorkville, at the above address until 11:00 AM
on Friday, October 3, 2014 (the closing date).
Persons submitting proposals are advised of the following requirements of this contract by the
boxes checked below:
[] 1. performance bond on award of contract, and
[] 2. labor and material payment bond on award of contract
General questions regarding this Request for Proposals shall be directed to Timothy Evans,
Director of United City of Yorkville Parks and Recreation Department at 630-553-4357. All
detailed questions concerning the actual specifications are to be forwarded in writing via fax to
630-553-4360 not less than ten (10) business days prior to the scheduled closing date.
The person submitting the proposal shall at all times observe and conform to all laws,
ordinances, and regulations of the Federal, State, and City which may in any manner affect the
preparation of the performance of the contract.
SPECIFICATIONS AND PLANS
Vendor agrees to provide labor and material for installation of approximately:
1. 680’ of baseball netting at three (3) existing baseball diamonds.
2. Top of nets will be approximately thirty feet (30’) in air with bottom of nets being no
more than eight feet ( 8’) above grade.
3. Nets will be supported on a cable system that is held up by metal post setting with
concrete footings.
4. Bottom of nets will be tied to existing fence. Nets at backstops will start at fifteen feet
(15’) above grade.
5. Nets will handle up to a 90 mph wind load.
Scope of work
Scope of work includes:
- Prevailing wage and certified payroll
- Public utility locates
- Use of a lift for the safe installation of cabling and nets
- 1 mobilization of equipment to site
- Use of UV protected materials for long life of materials
- All saw cuts/core cuts into existing concrete surfaces for installation of support poles
- All patch work to refinish any concrete surface getting a hole in it for support of new nets
UNITED CITY OF YORKVILLE, ILLINOIS
SPECIAL CONDITIONS
1. Persons Submitting Proposals Qualifications: If requested, the interested Person submitting the proposal
must provide a detailed statement regarding the business and technical organization of the Person
submitting the proposal that is available for the work that is contemplated. Information pertaining to
financial resources, experiences of personnel, previously completed projects, plant facilities, and other
data may also be required to satisfy the City that the Person submitting the proposal is equipped and
prepared to fulfill the Contract should the Contract be awarded to him. The competency and
responsibility of Persons submitting proposals and of their proposed subcontractors will be considered in
making awards.
If requested by the City, the Person submitting the proposal shall include a complete list of all
equipment and manpower available to perform the work intended on the Plans and Specifications. The
list of equipment and manpower must prove to the City that the Person submitting the proposal is well
qualified and able to perform the work, and it shall be taken into consideration in awarding the Contract.
The City may make such investigations as it deems necessary, and the Person submitting the proposal
shall furnish to the City all such information and data for this purpose as the City may request. A
responsible Person submitting the proposal is one who meets all of the following requirements:
Have adequate financial resources or the ability to secure such resources.
Have the necessary experience, organization, and technical qualifications, and has or can acquire,
the necessary equipment to perform the proposed Contract.
Is able to comply with the required performance schedule or completion date, taking into account
all existing commitments.
Has a satisfactory record of performance, integrity, judgment, and skills.
Is qualified and eligible under all applicable laws and regulations.
If the Person submitting the proposal possesses a current Illinois Department of Transportation
“Certificate of Eligibility” with an amount for the work specified at least equal to the minimum amount
of qualification indicated on the Legal Notice he may choose to provide the City a copy of the certificate
in lieu of providing the above mentioned Persons Submitting Proposals Qualification requirements.
2. Basis of Payment: the Contractor shall submit with each payment request the Contractor’s Partial
Waiver of Lien for the full amount of the requested payment. Beginning with the second payment
request, and with each succeeding payment request, the Contractor shall submit partial waivers of lien
for each subcontractor and supplier showing that the amount paid to date to each is at least equivalent to
the total value of that subcontractor’s work, less retainage, included on the previous payment request.
The Contractor’s request for final payment shall include the Contractor’s Final Waiver of Lien which
shall be for the full amount of his Contract, including any change orders thereto, and Final Waivers of
Lien from all subcontractors and suppliers for which Final Waivers of Lien have not previously been
submitted.
3. Project Acceptance Procedures: All final pay item quantities shall be agreed upon between the City and
the Contractor, and a final invoice shall be submitted by the Contractor, complete with all required
waivers of lien and surety. Approval of the final pay estimate by the Director of Parks and Recreation
shall constitute acceptance of the project by the United City of Yorkville, and written notice of such
action shall be given to the Contractor. The date of approval of the final pay estimate shall be the Date
of Acceptance, and shall also be the date of the Start of Guarantee.
Prior to the required Date(s) of Substantial Completion, a partial project acceptance may be granted in
accordance with the foregoing procedure for entire project acceptance, with the exception that the pay
estimate for the quantities of items included in the partial project acceptance shall not be the final pay
estimate for the entire project. In the case of the City’s acceptance of any portion of the work as may be
required because of the inclusion of a Date of Substantial Completion requirement, or for other reasons
as may be agreed to by the United City of Yorkville, such partial acceptance action shall not constitute
acceptance of any other portion of the project not noted in the written notice of partial acceptance which
shall be provided to the Contractor by the Director of Parks and Recreation.
4. General Guarantee: Neither the final certificate of payment nor any provision in the Contractor
Documents, nor partial or entire occupancy of the premises by the City, shall constitute an acceptance of
work not done in accordance with the Contract Documents or relieve the Contractor of liability in
respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor
shall remedy any defects in the work and pay for any damage to other work resulting there from, which
shall appear within a period of one (1) year from the date of final acceptance of the work unless a longer
period is specified. The United City of Yorkville will give notice of observed defects with reasonable
promptness. The Contractor shall guarantee all materials and workmanship as defined by the
Performance Bond, Labor and Material Payment Bond, and Maintenance Bond requirements, if
required.
Unless otherwise amended in writing by the Director of Parks and Recreation, the date of the Start of
any Guarantees, Warranties and Maintenance Bonds shall be coincident with the Date of Acceptance of
the entire project.
5. Termination of Contract: the United City of Yorkville reserves the right to terminate the whole or any
part of this Contract, upon written notice to the Contractor, in the event that sufficient funds to complete
the Contract are not appropriated by the corporate authorities of the United City of Yorkville.
The United City of Yorkville further reserves the right to terminate the whole or any part of this
Contract, upon written notice to the Contractor, in the event of default by the Contractor. Default is
defined as failure of the Contractor to perform any of the provisions of this Contract, or failure to make
sufficient progress so as to endanger performance of this Contract in accordance with its terms. In the
event of default and termination, the United City of Yorkville may procure, upon such terms and in such
manner as the United City of Yorkville may deem appropriate, supplies or services similar to those so
terminated.
The Contractor shall be liable for any excess costs for such similar supplies or service unless acceptable
evidence is submitted to the United City of Yorkville that failure to perform the Contract was due to
causes beyond the control and without the fault or negligence of the Contractor.
6. Notification of Work: The Contractor shall notify the City’s Director of Parks and Recreation 48 hours
prior to commencement of work.
7. Cleaning: During construction, the Contractor and his subcontractors shall remove from the premises,
rubbish, waste material, and accumulations, and shall keep the premises clean. The Contractor shall
keep the premises clean during construction to the satisfaction of the Director of Parks and Recreation.
8. Restoration: the calculation of quantities and limits of Restoration which will be allowed for payment
will be in accordance with the “Standard Specifications.” Restoration, fill sand, stone, etc., required
outside of the limits as indicated in the Contract Documents will be considered incidental to the
Contract. The Contractor shall at all times maintain all equipment and materials within the limits of
restoration as specified.
9. Removal and Replacement: all removal and replacement items will be marked and measured for
payment prior to removal by the Contractor. Any removal beyond these lines will be replaced to the
satisfaction of the Director Parks and Recreation with no additional compensation.
10. Business/Resident Notification: The Contractor shall not close any street or private driveway without
the consent of the Director of Parks and Recreation, and the proper notification of the affected
business/resident.
11. Use of Fire Hydrants: no fire hydrants shall be used to obtain water for non-emergency use. Water can
be purchased and obtained at the City’s Public Works Building.
UNITED CITY OF YORKVILLE, ILLINOIS
GENERAL CONDITIONS
These General Conditions apply to all proposals requested and accepted by the City and become
a part of the contract unless otherwise specified. Persons submitting proposals or their
authorized representatives are expected to fully inform themselves as to the conditions,
requirements, and specifications before submitting proposals. The City assumes that submission
of a proposal means that the person submitting the proposal has familiarized himself with all
conditions and intends to comply with them unless noted otherwise.
1. Forms – All proposals must be submitted on the forms provided, complete with all blank
spaces filled in and properly signed in ink in the proper spaces. All proposal forms may be
obtained from the United City of Yorkville, 800 Game Farm Road, Yorkville, Illinois
60560 and when completed delivered to the same Office prior to the proposal closing date
and time. Persons submitting proposals may attach separate sheets for the purpose of
explanation, exception, or alternative proposal and to cover required unit prices.
2. Submittal of Proposal – Proposals must be submitted to the attention of the Director of
Parks and Recreation at the above address no later than 11:00 AM on Friday October 3,
2014.
3. Examination of Proposal Forms, Specifications, and Site – The person submitting the
proposal shall carefully examine the proposal forms which may include the request for
proposal, instruction to Persons submitting proposals, general conditions, special
conditions, plans, specifications, proposal form, bond, contract, and any addenda to them,
and sites of the proposed work (when known) before submitting the proposal. The person
submitting the proposal shall verify all measurements relative to the work, shall be
responsible for the correctness of same. The person submitting the proposal will examine
the site and the premises and satisfy themselves as to the existing conditions under which
the person submitting the proposal will be obligated to operate. Failure of the person
submitting the proposal to notify the City, in writing, of any condition(s) or
measurement(s) making it impossible to carry out the work as shown and specified, will be
construed as meaning no such conditions exist and no additional moneys will be added to
the contract. The successful person submitting the proposal must notify all utility
companies that are a part of J.U.L.I.E. of the responsibility of each utility company to
locate its utilities.
The submission of the proposal shall be considered conclusive evidence that the person
submitting the proposal has investigated and is satisfied as to all conditions to be
encountered in performing the work, and is fully informed as to character, quality,
quantities, and costs of work to be performed and materials to be furnished, and as to the
requirements of the proposal forms. If the proposal is accepted, the person submitting the
proposal will be responsible for all errors in his proposal resulting from his failure or
neglect to comply with these instructions, and the City shall not be responsible for any
charge for extra work or change in anticipated profits resulting from such failure or neglect.
4. Scope of Work – The person submitting the proposal shall supply all required supervision,
skilled labor, transportation, new materials, apparatus, and tools necessary for the entire
and proper completion of the work. The person submitting the proposal shall supply,
maintain and remove all equipment for the performance of the work and be responsible for
the safe, proper and lawful construction, maintenance and use of the same. This work shall
be completed to the satisfaction of the City. The person submitting the proposal shall
provide adequate protection of the job site to protect the general public and adjacent
property. The City is not responsible for site safety. The person submitting the proposal is
solely and exclusively responsible for construction means, methods, technologies and site
safety.
5. Completeness – All information required by the Request for Proposal must be supplied to
constitute a responsive proposal. The Person submitting the proposal shall include the
completed Proposal Sheet found in the contract documents. The City will strictly hold the
person submitting the proposal to the terms of the proposal. The proposal must be
executed by a person having the legal right and authority to bind the person submitting the
proposal.
6. Error in Proposals – When an error is made in extending total prices, the unit proposal
price and/or written words shall govern. Otherwise, the person submitting the proposal is
not relieved from errors in proposal preparation. Erasures in proposals must be explained
over signature of person submitting the proposal.
7. Withdrawal of Proposals – A written request for the withdrawal of a proposal or any part
thereof may be granted if the request is received by the Director of Parks and Recreation
prior to the specified time of closing.
8. Person Submitting the Proposal Interested in More than One Proposal – Unless
otherwise specified, if more than one proposal is offered by any one party, by or in the
name of his or their agent, partner, or other persons, all such proposals may be rejected. A
party who has quoted prices on work, materials, or supplies to other Persons submitting
proposals is not thereby disqualified from quoting prices to other Persons submitting
proposals or from submitting a proposal directly for the work, materials, or supplies.
9. Person Submitting the Proposal’s Qualifications – No award will be made to any person
submitting the proposal who cannot satisfy to the City that they have sufficient ability and
experience in this class of work, as well as sufficient capital and equipment to do the job
and complete the work successfully within the time named (i.e. responsible). The City’s
decision or judgment on these matters shall be final and binding. The City may make such
investigations as it deems necessary. The person submitting the proposal shall furnish to
the City all information and data the City may request for the purpose of investigation.
10. Proposal Award for All or Part – Unless otherwise specified, proposals shall be
submitted for all of the work or items for which proposals are requested. The City reserves
the right to make award on all items, or any of the items, according to the best interests of
the City.
11. Samples – Samples or drawings requested shall be delivered and removed at no cost to the
City. The City shall not be responsible for damage to samples. Samples shall be removed
by the person submitting the proposal within thirty (30) days after notification. Samples
must be submitted prior to the time set for the opening of proposals.
12. Equipment or Materials – Each person submitting the proposal shall submit catalogs,
descriptive literature, and detailed drawings necessary to fully describe those features or the
material or work not covered in the specifications. The parts and materials proposals must
be of current date (latest model) and meet specifications. This provision excludes surplus,
remanufactured, and used products except as an alternate proposal. The brand name and/or
manufacturer of each item proposed must be clearly stated in the proposal. Guarantee
and/or warranty information must be included with this proposal.
13. Toxic Substance – Prior to delivery of any material which is caustic, corrosive, flammable
or dangerous to handle, the supplier shall provide written directions as to methods of
handling such products, as well as the antidote or neutralizing material required for its first
aid (Material Safety Data Sheet).
14. Delivery – Where applicable all materials shipped to the City must be shipped F.O.B.
delivered, designated location, Yorkville, Illinois. If delivery is made by truck,
arrangements must be made in advance by the person submitting the proposal, with
concurrence by the City, for receipt of the materials. The materials must be delivered
where directed.
15. Estimated Proposal Quantities – On “Estimated Quantities”, the City may purchase more
or less than the estimates. The Contractor shall not be required to deliver more than ten
(10) percent in excess of the estimated quantity of each item, unless otherwise agreed upon.
16. Trade Names – Alternative Proposal – When an item is identified in the specifications by
a manufacturer’s or trade name or catalog number, the person submitting an alternative
shall identify that item.
If the specifications state “or equal” proposals on other items will be considered provided
the person submitting the proposal clearly identifies in his proposal the item to be
furnished, together with any descriptive matter which will indicate the character of the
item.
Persons submitting proposals which deviate from these specifications, but which they
believe are equivalent, are requested to submit alternate proposals. However,
ALTERNATE PROPOSALS MUST BE CLEARLY INDICATED AS SUCH AND
DEVIATIONS FROM THE APPLICABLE SPECIFICATIONS PLAINLY NOTED. The
proposal must be accompanied by complete specifications for the items offered. Persons
submitting proposals wishing to submit a secondary proposal must submit it as an alternate
proposal.
The City shall be the sole and final judge unequivocally as to whether any substitute from
the specifications is of equivalent or better quality.
17. Price – Unit prices shall be shown for each unit on which there is a proposal as well as the
aggregate price and shall include all packing, crating, freight and shipping charges, and
cost of unloading at the destination unless otherwise stated in the proposal.
Unit prices shall not include any local, state, or federal taxes. The City is exempt, by law,
from paying State and City Retailer’s Occupation Tax, State Service Occupation and Use
Tax and Federal Excise Tax. The City will supply the successful person submitting the
proposal with its tax exemption number.
Cash discounts will not be considered in determining overall price, but may be used in an
overall evaluation.
18. Consideration of Proposal – No proposal will be accepted from or contract awarded to
any person, firm or corporation that is in arrears or is in default to the City upon any debt or
contract, or that is a defaulter, as surety or otherwise, upon any obligation to the City or had
failed to perform faithfully any previous contract with the City.
The person submitting the proposal, if requested, shall present within 48 hours evidence
satisfactory to the City of performance ability and possession of necessary facilities,
pecuniary recourses and adequate insurance to comply with the terms of these
specifications and contract documents.
19. Execution of Contract – The successful person submitting the proposal shall, within
fourteen (14) days after notification of the award: (a) enter into a contract in writing with
the City covering all matters and things as are set forth in the specifications and his
proposal and (b) carry insurance acceptable to the City, covering public liability, property
damage, and workmen’s compensation.
After the acceptance and award of the proposal and upon receipt of a written purchase
order executed by the proper officials of the City, this Instruction to Persons submitting
proposals, including the specifications, will constitute part of the legal contract between the
United City of Yorkville and the successful person submitting the proposal.
20. Performance and Labor and Material Payment Bonds – Unless specifically waived or
amended in the Special Conditions, the successful person submitting the proposal shall
furnish at the time of execution of the contract a performance bond for the full amount of
the contract acceptable in form and surety to the City to guarantee the completion of any
work to be performed by the contractor under the contract.
Unless specifically waived or amended in the Special Conditions, the successful person
submitting the proposal shall furnish at the time of execution of the contract a bond for the
full amount of the contract acceptable in form and surety to the City conditioned upon the
faithful performance and completion of the contract, payment of material used in such
work, and for all labor performed in such work including by subcontractors.
In the event that the person submitting the proposal fails to furnish the bonds within 14
days after notification of the award, then the proposal guarantee shall be retained by the
City as liquidated damages and not as a penalty. It is agreed that the sum is a fair estimate
of the amount of damages that the City will sustain due to the person submitting the
proposal's failure to furnish the bonds.
21. Compliance with All Laws – All work under the contract must be executed in accordance
with all applicable federal, state, and local laws, ordinances, rules, and regulations which
may in any manner affect the preparation of the proposal or performance of the contract.
22. Prevailing Wage – Not less than the prevailing rate of wages as established by the City
shall be paid by the Contractor and each subcontractor to its laborers, workers, and
mechanics constructing public works under this contract as determined by the Illinois
Department of Labor pursuant to the Prevailing Wage Act (820 ILCS 130/0.01 et seq.). It
shall be the responsibility of the Contractor to monitor the prevailing wage rates for any
increase in rates during the contract and adjust wage rates accordingly. The current
prevailing wage rates are available on the Illinois Department of Labor web site at
www.state.il.us/agency/idol or by calling the United City of Yorkville at 630-553-4350.
The Contractor and its subcontractors shall comply with Section 5 of the Act that requires
the Contractor and its subcontractors to submit to the City monthly certified payroll records
along with a statement affirming that such records are true and accurate, that the wages
paid to each worker are not less than the required prevailing rate and that the Contractor or
subcontractor is aware that filing records it knows to be false is a Class B misdemeanor.
Each month's certified payroll(s) must be filed with the City before the end of the next
month or prior to payment by the City for work that includes that payroll.
23. Compliance with the Substance Abuse Prevention on Public Works Projects Act – The
Contractor and its Subcontractors shall comply with the Substance Abuse Prevention on
Public Works projects Act (820 ILCS 265/1 et seq.) and prior to commencing work on a
“public works” project (as defined in the Prevailing Wage Act) file with the City its
program to comply with the Act or file that portion of its collective bargaining agreement
that deals with the matters covered by the Act.
24. Equal Employment Opportunity – During the performance of the contract and/or
supplying of materials, equipment, and suppliers, person submitting the proposal must be in
full compliance with all provisions of the Acts of the General Assembly of the State of
Illinois relating to employment, including equal opportunity requirements.
25. Contract Alterations – No amendment of a contract shall be valid unless made in writing
and signed by the City Administrator or his authorized agent.
26. Notices – All notices required by the contract shall be given in writing.
27. Nonassignability – The Contractor shall not assign the contract, or any part thereof, to any
other person, firm, or corporation without the previous written consent of the City
Administrator. Such assignment shall not relieve the Contractor from his obligations, or
change the terms of the contract.
28. Indemnity – To the fullest extent permitted by law, the Contractor hereby agrees to
defend, indemnify, and hold harmless the City, its officials, agents, and employees, against
all injuries, deaths, loss, damages, claims, patent claims, suits, liabilities, judgments, cost,
and expenses, which may in anywise accrue against the City, its officials, agents, and
employees, arising in whole or in part or in consequence of the performance of this work
by the Contractor, its employees, or subcontractors, or which may anywise result therefore,
except that arising out of the sole legal cause of the City, its agents, or employees, the
Contractor shall, at its own expense, appear, defend, and pay all charges of attorneys and
all costs and other expenses arising therefore or incurred in connections therewith, and, if
any judgment shall be rendered against the City, its officials, agents, and employees, in any
such action, the Contractor shall, at its own expense, satisfy and discharge the same.
Contractor expressly understands and agrees that any performance bond or insurance
policies required by this contract, or otherwise provided by the Contractor, shall in no way
limit the responsibility to indemnify, keep, and save harmless and defend the City, its
officials, agents, and employees as herein provided.
29. Insurance – In submission of a proposal, the person submitting the proposal is certifying
that he has all insurance coverages required by law or would normally be expected for
person submitting the proposal’s type of business. In addition, the person submitting the
proposal is certifying that he has or will obtain at least the insurance coverages on the
attached Insurance requirements.
30. Default – The City may terminate a contract by written notice of default to the Contractor
if:
a. The Contractor fails to make delivery of the materials or perform the services
within the time specified in the proposal, or
b. fails to make progress so as to endanger performance of the contract, or
c. fails to provide or maintain in full force and effect, the liability and
indemnification coverages or performance bond as required.
If the City terminates the contract, the City may procure supplies or services similar to
those so terminated, and the Contractor shall be liable to the City for any excess costs for
similar supplies and services, unless the Contractor provides acceptable evidence that
failure to perform the contract was due to causes beyond the control and without the fault
or negligence of the Contractor.
31. Inspection – The City shall have a right to inspect, by its authorized representative, any
material, components, or workmanship as herein specified. Materials, components, or
workmanship that has been rejected by the authorized representative as not in accordance
with the terms of the specifications shall be replaced by the Contractor at no cost to the
City.
32. Supplementary Conditions – Wherever special conditions are written into the
specifications or supplementary conditions which are in conflict with conditions stated in
these Instructions to Person submitting the proposal, the conditions stated in the
specifications or supplementary conditions shall take precedence.
33. Permits and Licenses – The successful person submitting the proposal and their
subcontractor(s) shall obtain, at their own expense, all permits and licenses which may be
required to complete the contract. Fees for all City permits and licenses shall be waived.
34. Person submitting the proposal's Certification – - In compliance with the Illinois State
Law that requires each person submitting the proposal to file a certification regarding
proposal rigging and proposal rotating and that it is not delinquent in its taxes, the person
submitting the proposal shall file with its proposal the attached Proposal Certification.
35. Change Orders – After the contract award, changes in or additions to the work and/or a
change in the amount of money to be paid to the person submitting the proposal must be
the result of an approved change order first ordered by the Director of the lead department
and approved by the City Administrator and/ or City Board.
36. Time of Completion – The successful person submitting the proposal shall completely
perform its proposal in strict accordance with its terms and conditions within the number of
consecutive calendar days after notification of award of the contract as stated in the
proposal.
37. Payment – Payment will be made within thirty (30) days after acceptance of the job by the
City after the completion of the work as covered within the contract documents.
38. Guarantees and Warranties – All guarantees and warranties required shall be furnished
by the successful person submitting the proposal and shall be delivered to the City before final
payment on the contract is issued.
39. Waiver of Lien – where applicable a waiver of lien and contractor’s affidavit must be
submitted by the successful person submitting the proposal, verifying that all subcontractors and
material invoices have been paid prior to the City approving final payment.
UNITED CITY OF YORKVILLE, ILLINOIS
INSURANCE REQUIREMENTS
Contractor shall procure and maintain, for the duration of the contract, insurance against claims
for injuries to persons or damages to property, which may arise from or in connection with the
performance of the work hereunder by the Contractor, his agents, representatives, employees, or
subcontractors.
1. MINIMUM SCOPE OF INSURANCE Coverage shall be at least as broad as:
A. Insurance Services Office Commercial General Liability Occurrence Form CG 0001 with
the City named as additional insured; on a form at least as broad as the endorsement in
paragraph 10 including ISO Additional Insured Endorsement CG 2026, CG 2010.
B. Owners and Contractors Protective Liability (OCP) policy is required with the City as
insured (for contracts with subcontractors and projects that are inherently dangerous).
C. Insurance Service Office Business Auto Liability Coverage Form Number CA 0001,
Symbol 01 "Any Auto."
D. Workers' Compensation as required by the Worker's Compensation Act of the State of
Illinois and Employers' Liability insurance.
E. Builder Risk Property Coverage with City as loss payee.
2. MINIMUM LIMITS OF INSURANCE Contractor shall maintain limits no less than if
required under above scope:
A. Commercial General Liability: $1,000,000 combined single limit per occurrence for
bodily injury, personal injury, and property damage. The general aggregate shall be
twice the required occurrence limit. Minimum General Aggregate shall be no less than
$2,000,000 or a project/contract specific aggregate of $1,000,000.
B. Owners and Contractors Protective Liability (OCP): $1,000,000 combined single limit
per occurrence for bodily injury and property damage.
C. Businesses Automobile Liability: $1,000,000 combined single limit per accident for
bodily injury and property damage.
D. Workers' Compensation and Employers' Liability: Workers' Compensation coverage
with statutory limits and Employers' Liability limits of $1,000,000 per accident.
E. Builder's Risk shall insure against "All Risk" of physical damage, including water
damage (flood and hydrostatic pressure not excluded), on a completed value, replacement
cost basis. (Protection against loss of materials during construction, renovation, or repair
of a structure.)
F. Umbrella Excess Insurance: $3,000,000. “Following form” of the underlying and excess
policies including listing the City as an additional insured.
3. DEDUCTIBLES AND SELF-INSURED RETENTIONS
Any deductibles or self-insured retentions must be declared to and approved by the City. At
the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-
insured retentions as respects the City, its officials, agents, employees, and volunteers; or the
Contractor shall procure a bond guaranteeing payment of losses and related investigation,
claim administration, and defense expenses.
4. OTHER INSURANCE PROVISIONS
The policies are to contain, or be endorsed to contain, the following provisions:
A. General Liability and Automobile Liability Coverages
1. The City, its officials, agents, employees, and volunteers are to be covered as
additional insured’s as respects: liability arising out of the Contractor's work,
including activities performed by or on behalf of the Contractor; products and
completed operations of the Contractor; premises owned, leased, or used by the
Contractor; or automobiles owned, leased, hired, or borrowed by the Contractor. The
coverage shall contain no special limitations on the scope of protection afforded to
the City, its officials, agents, employees, and volunteers.
2. The Contractor's insurance coverage shall be primary as respects the City, its
officials, agents, employees, and volunteers. Any insurance or self-insurance
maintained by the City, its officials, agents, employees, and volunteers shall be excess
of Contractor's insurance and shall not contribute with it.
3. Any failure to comply with reporting provisions of the policies shall not affect
coverage provided to the City, its officials, agents, employees, and volunteers.
4. The Contractor's insurance shall contain a Severability of Interests/Cross Liability
clause or language stating that Contractor's insurance shall apply separately to each
insured against who claim is made or suit is brought, except with respect to the limits
of the insurer's liability.
5. If any commercial general liability insurance is being provided under an excess or
umbrella liability policy that does not "follow form," then the Contractor shall be
required to name the City, its officials, agents, employees, and volunteers as
additional insured’s.
6. All general liability coverages shall be provided on an occurrence policy form.
Claims-made general liability policies will not be accepted.
B. All Coverages
Each insurance policy shall be endorsed to state that coverage shall not be suspended,
voided, cancelled, reduced in coverage, or in limits except after thirty (30) days prior
written notice by certified mail, return receipt requested, has been given to the City.
5. ACCEPTABILITY OF INSURERS
Insurance is to be placed with insurers with a Best's rating of no less than A-, VII, and
licensed to do business in the State of Illinois.
6. VERIFICATION OF COVERAGE
Contractor shall furnish the City with certificates of insurance naming the City, its officials,
agents, employees, and volunteers as additional insured’s, and with original endorsements
affecting coverage required by this clause. The certificates and endorsements for each
insurance policy are to be signed by a person authorized by that insurer to bind coverage on
its behalf. The certificates and endorsements are to be received and approved by the City
before any work commences. Other additional insured endorsements may be utilized, if they
provide a scope of coverage at least as broad as the coverage stated in paragraph 10, such as
ISO Additional Insured Endorsements CG 2026 or CG 2010. The City reserves the right to
request full certified copies of the insurance policies and endorsements.
7. SUBCONTRACTORS
Contractor shall include all subcontractors as insured’s under its policies or shall furnish
separate certificates and endorsements for each subcontractor. All coverages for
subcontractors shall be subject to all of the requirements stated herein.
8. ASSUMPTION OF LIABILITY
The contractor assumes liability for all injury to or death of any person or persons including
employees of the contractor, any subcontractor, any supplier, or any other person and
assumes liability for all damage to property sustained by any person or persons occasioned
by or in any way arising out of any work performed pursuant to this agreement.
9. INDEMNITY/HOLD HARMLESS PROVISION
To the fullest extent permitted by law, the Contractor hereby agrees to defend, indemnify,
and hold harmless the City, its officials, agents, and employees, against all injuries, deaths,
loss, damages, claims, patent claims, suits, liabilities, judgments, cost, and expenses, which
may in anywise accrue against the City, its officials, agents, and employees, arising in whole
or in part or in consequence of the performance of this work by the Contractor, its
employees, or subcontractors, or which may anywise result therefore, except that arising out
of the sole legal cause of the City, its agents, or employees, the Contractor shall, at its own
expense, appear, defend, and pay all charges of attorneys and all costs and other expenses
arising therefore or incurred in connections therewith, and, if any judgment shall be rendered
against the City, its officials, agents, and employees, in any such action, the Contractor shall,
at its own expense, satisfy and discharge the same.
Contractor expressly understands and agrees that any performance bond or insurance policies
required by this contract, or otherwise provided by the Contractor, shall in no way limit the
responsibility to indemnify, keep, and save harmless and defend the City, its officials, agents,
and employees as herein provided.
10. ADDITIONAL INSURED ENDORSEMENT
The "WHO IS AN INSURED" section of the policy/coverage document shall be amended to
include as an insured, the City, but only with respect to liability arising out of your work.
For purpose of this endorsement, "arising out of your work" shall mean: (1) Liability the
Additional Insured may incur resulting from the actions of a contractor it hires, (2) Liability
the Additional Insured may incur for negligence in the supervision of the Named Insured
Contractors work, (3) Liability the Additional Insured may incur for failure to maintain safe
worksite conditions, and (4) Liability the Additional Insured may incur due to joint
negligence of the Named Insured Contractor and the Additional Insured.
PROPOSAL
Note: The Person submitting the proposal must complete all portions of this Proposal Sheet
The undersigned, having examined the specifications, and all conditions affecting the specified project, offer to
furnish all services, labor and incidentals specified for the price below.
The undersigned Person submitting the proposal certifies that they are not barred from entering into a contract
as a result of a conviction for the violation of state laws prohibiting proposal rigging or proposal rotating (720
ILCS 5/33E-1, et seq.) and is not delinquent in any taxes to the Illinois Department of Revenue (65 ILCS 5/11-
42.2-1).
It is understood that the City reserves the right to reject any and all proposals and to waive any irregularities and
that the prices contained herein will remain valid for a period of not less than forty-five (45) days.
I (We) propose to complete the following project as more fully described in the specifications for the following:
Company Name: _______________________________________________________________
Proposal Details: (Insert Proposal Form)
___ Our firm has not altered any of the written texts within this document. Only those areas requiring input by
the respondent have been changed or completed.
___ Our firm will comply with the Prevailing Wage requirements as outlined in section entitled “A. General
Conditions” and Public Act 095-0635.
If it is the Contractor’s intention to utilize a subcontractor(s) to fulfill the requirements of the Contract, the City
must be advised of the subcontractor’s company name, address, telephone and fax numbers, and a contact
person’s name at the time of proposal submittal.
YES NO
Will you be utilizing a subcontractor? ____ ____
If yes, have you included all required
Information with your proposal submittal? _____ _____
OR
NO PROPOSAL – Keep our company on your
Persons submitting proposals List
______________________________
Signature
______________________________
Date
NO PROPOSAL – Remove our company from
Your Persons submitting proposals List
______________________________
Signature
______________________________
Date
I hereby certify that the item(s) proposed is/are in accordance with the specifications as noted and that the prices
quoted are not subject to change; and that
The Person submitting the proposal is not barred by law from submitting a proposal to the City for the project
contemplated herein because of a conviction for prior violations of either Illinois Compiled Statutes, 720 ILCS
5/33E-3 (Proposal Rigging) or b720 ILCS 5/33-4 (Proposal Rotating); and that
The Person submitting the proposal is not delinquent in payment of any taxes to the Illinois Department of
Revenue in accordance with 65 ILCS 5/11-42.1; and that
The Person submitting the proposal provides a drug free workplace pursuant to 30 ILCS 580/1, et seq., and that
The Person submitting the proposal certifies they have a substance-abuse program and provide drug testing in
accordance with 820 ILCS 130/11G, Public Act 095-0635; and that
The Person submitting the proposal is in compliance with the Illinois Human Rights Act 775 ILCS 5/1.101 et
seq. including establishment and maintenance of sexual harassment policies and program
________________________________________ ____________________________________
Firm Name Signed Name and Title
________________________________________ ____________________________________
Street Address Print Name and Title
________________________________________ ____________________________________
City State Zip E-mail Address
________________________________________ ____________________________________
Phone Number Fax Number
________________________________________
Date
UNITED CITY OF YORKVILLE
800 Game Farm Road
YORKVILLE, ILLINOIS 60560
CONTRACT
THIS CONTRACT made this _____ day of ______________, 201_, by and between the
United City of Yorkville, an Illinois municipal corporation hereinafter called the “Owner” and
_________________________________________ located at _________________________
hereinafter called the “Contractor”.
WITNESSETH:
WHEREAS, the Owner has heretofore solicited Proposals for all labor and materials
necessary to complete the work specified in the ______________________________________;
WHEREAS, the Owner has found that the Contractor is the lowest responsible person
submitting the proposal for said work and has awarded the Contractor this contract for said work.
NOW, THEREFORE, for and in consideration of their mutual promises and
agreements, the parties hereto do hereby agree as follows:
1. The Contractor agrees to furnish all materials, supplies, tools, equipment, labor and
other services necessary to commence and complete the _______________________
in accordance with the conditions and prices stated in the Request for Proposal,
Instructions to Persons submitting proposals – General Conditions, Special
Conditions, Insurance Requirements, Specifications and Plans, Proposal, and Detail
Exception Sheet all of which are made a part hereof and herein called the “Contract
Documents”.
2. The Owner will pay the Contractor in the amounts, manner and at times as set forth in
the Contract Documents.
IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed
by their duly authorized officials, this Contract as of the day and year first above written:
UNITED CITY OF YORKVILLE
By: _________________________________
Director of Parks and Recreation
CONTRACTOR:
By: __________________________________
Signature
__________________________________
Print Name and Title
ADVERTISMENT FOR BIDS
United City of Yorkville
800 Game Farm Road
Yorkville, Illinois 60560
The United City of Yorkville is accepting sealed contract bids for
Installation of thirty feet (30’) tall baseball nets above existing sideline
and back stop fences on three (3) ball field diamonds at Steven G. Bridge Park,
located at 3651 Kennedy Road, Yorkville, IL 60560. Bids will be received by
Tim Evans, Director of Parks and Recreation, at the office of the United City
of Yorkville, 800 Game Farm Road, Yorkville, Illinois 60560 until 11:00 a.m.,
local time, Friday Oct. 3, 2014.
Copies of the contract documents may be obtained at the following location:
United City of Yorkville
800 Game Farm Rd.
Yorkville, Illinois 60560
630.553.4350