Loading...
Public Works Minutes 1998 08-17-98 -09/09/98 19:48 FAX Q002 UNITED CITY OF YORKVILLE Committee Meeting Public Works August 17, 1998 Time Convened: 6.30 P.M. Date of Meeting: Time Adjourned: 9:35 p-M- Location: 111 W. Fox Attendees: Jeff Spang Tom sowinski Joe Wywrot Richard Sticka Larry Kot Art Prochaska J.T. Johnson Mayor Johnson Discussion: 1. ) Walter, Olson, & Van Emmon Repairs - We are almost ready with the places and specs. Van Emtuon added ofrom last-yearo,OThat as budgeted. There was an $11,000 surplus gh to do Walter should be enouter and Olson. We will sent it out for bid including Van Emmon with thaen F.mmpzbisic=ambling doing s Van Emmon. The concrete part of City property. We are not looking to completely redo Van EmmOn. By fixing it this year, there is the possibility that we would have to teDepending it up no tho year we plan oncsolving the water main underneath. radium issue. To do Morgan by Madison the cost would be about $7,000 . Younger drivers are using Morgan as a launch ramp. Mayor Johnson and Hot have been out there talking with the residents and Hot feels that this is a Public Safety iscould It is not an area that warrants a stop sign. A stop hsignaco increase the safety issue. Kids are jumping the someone is going to loose controfeels�that state and Ridgeyhave going to seriously hurt. Spang the same type of situation. Kot does not feel that it is even close. Next year we plan on doing a combination water and street project there next year. Residents on Morgan feel a lot of people use Morgan as a short cut to Fox. Sowinski thMQrgsan that maybe we should put off Van Emmon and do Morgan. to Ridge was proposed as a water main project. Wywrot thinks it would be silly to put in another water main in there- There are already two mains. We eliminated curbing on Waiter because of the cost. Wywrot is proposing an overlay on the curbing. We would be covering the curb with asphalt. At the and of washes out Olson Street there is no curbing tall. The aterw where the the residents gravel driveway. Wywrot funds are going to come from. It is up to the Committee to prioritize. We will be able to handle Madison and Morgan as a change order_ If we do in house, we might be able to get the cost down to $4,000. The do later �n,the fall.1STake to COW. out. Might be 2 . ) Former Amoco service Station - 207 E. Main Street - We received Letter documenting some soil contamination. Letter states that it a003 -09/09/98 19:48 FAX Page 2 Public Works can stay there but if the City or the State comes in and disturbs the property and the contaminated soil, then the property owner would have to pay to have the soil removed. We regiment. Spang is' concerned with the would need to sign an ag private might people in the area and the at risktoftntamination. pIt has well because they not been a service station f waved from the ground- Some Some ofg was vacated, the tanks were the homes have City water adCitylwater.T-We can sjusttleavesit everybody in that area s On 0 the way it is . Once we decide that we need to de he agreement the road then we would have to retest the and lthe State Amoco is between the property owner, the City, did not own the property- The building permit will list the two property owner. Accordatedto Agreement letter there a only areas that are contain in there building permit and prohibit ground water etwere under akenaat 85 Street. It appears that ground water same feet deep and that was contaminated. c Delta Environientalwelwould draw up the agreement- WyTho that may be in the arerequired Catythisdtime.beoverdseveralss. Clean up would not be years the problem will�crectWiy otfwilltcheck onllong•t Delta a is the consultant for effects. Bring back. Bid opening 3. ) public Sidewalk Repairs - Project ocedure° b then it ill October. is August 27. If we follow pr with the lowest bidder and Asking Committee to concur to go recommend at COW on September 3. l have estimated gfeet000 square feet. J.T. has approximately 3,000 square committed. We do not have specific locations buts nclistarded we will have maps. Take straight with the original nine residents that wanted el do proomote theT- is meeting with the.Beacon News tomorrow to help P project. Alderman n the older sections of town need to go out and walk and talk to the residents. There are not any sidewalks by Circle Center. Kirom colonial Parkway talk to school. There is a crossing guard, would need cross street there is not a sidewalk. The City to prioritize areas that need sidewalks. What is the liabilit if someone trips and falls? Does the liability g or to the homeowner? City owns the sidewalks. Take low bidder to COW. 4. ) River Crossing - watermataCrossing�.edIt needssto befit from Illinois D & R for he River signed by Mayor Johnson. Wywrot would like to recommend at COW. We are working with D & R on easements. Take to COW. 5. ) Super 8 Motel Sign - Sign is southeast of Burger Ring. The Super S sign is on an old foundato has aopriceaofaffi1�700nto The sign needs to be moved_ WYwr relocate the sign. The foundation was there before the sign Q004 D9/09/98 19:48 FAX page 3 public Works was put up. The sign will be moved closer to Rt_ 47 and JULIE actually have a better location- We will need to ere. re. on the utilities. $1,700 w issued a permit. The original agreement is from 1989. The City The concrete foundation with the sign on it is crushing the sewer pipe underneath. 3ticka thinks that maybe the cost should be shared. Take agreement)to Dan iandofind out Bring the legalities are. Have Dan send back with opinion from Dan. from 6. ) Gawne Lift Station - we received estimate in a propepol�f Pump today. They estimate $30,000 to p _ is station with separate vaiteserviceshfourrhomes, butstherenhas way down by the river. eo le. We would abandon been some interest from some other p P Woodward and Gawne and just use the new lift station. We might be able to collect some money from the people that are wanting to use it. There 12 homes that thatgare notiin themcityyare hook on to city services. not part of this. The four original homeowners paid for the current lift station and had it built within thetCitlift specifications at the time. The City maintains J.T. figures we station. have spent $4,000 to $6,000 in repairs. we need to decide the amount that the httwantnto hook contribute. There are five more people that mig on. They might be willing to help out with the cost. We would need to have easements along the river. There are signs of interest. A new lift station would be a big benefit to That City. We could possible budget this for next Y B give us some time to talk to the residents there. Wywrot and J.T. will contact the residents. 7_ ) Access management Handbook - Basically we have received a from Kane County. back This ordinance to address County. this. 8. ) White Oak Sidewalks - We received a letter from Mike steck. We are requesting them to extend the sidewalk Wegwould They want d to the City to fill in the area by not extend the culvert. It is a concrete c dehaventhem extend the be cheap to do this. We could say o' culvert or we could let them stop the sidewalk short. They are trying to get Phase Four established and they need to get a letter of credit. Dan does not recommend including this with that letter of credit. Spang thinks we have been messing around with this long enough. Unit four is the end of the subdivision, so there is nothing else for us to tie it to. Wywrot thinks it would be best for us to extend the culvert. We could argue that it is their responsibility toot�^Tr would also Wywrot thinks it would cost $101000 or less. WY recommend to include sidewalks from Fox to White Oak Way- Maybe some of the residents from River Birch would be willing to help With this. Wywrot will talk with them and talk with to 005 09/49/9,8 19:48 FAX Page 4 public Works Dan to find out why he does noback reportnfromeDan Letter of h the letter of credit. Wywrot will bring expiring. W rot will check Credits on unit one an stthatr maybe weshould consider a with Dan. Spang expiration date- construction ao d because they d Unit One. We are doing Calling a letter of credit can be kind of messy has filled three swimming 9 . ) Filling of Swimming Pools - The City you fill from a pools this year. We currently charge $75. If y Swimming water hose it cost is about one tenth of a cent.e Fire pools take a lot of water in the beginning. Department does not want to o this. Thereoare privatehpeoplea service but charge a high that will haul water in to fill your Pool-becIf the City highs from a fire hydrant, so Kot and Sticka do not feel that the pressure. Mayor Johnson, City should fill pools�e sidewalk fund- could be good City d revenue generator for it on Saturdays an waiver of liability. Could consider doing it employees Sundays and the customer will need to pay overtime also. Bring back. liSt lo. ) Greenbriar - Unit 3, Final Acceptance - PEng neeringsre�esting complete. Received a letter f Wywrot is confident that they will do the two us to accept_ ld k acceptance. main things. T ey ou on lots that been developed. there are only sidewalks Current ordinance requires Then sidewalks problem daQtaget is developed or not. letters of Spang would like to know why there are so many i We e t e last credit with this developer. uggesta resolutionthatthese two items get done. Prochaska them to carry a items are going to get done. We could require rot thinks a letter of credit on the four larger items. Wl'�''' iration bond is best for the City because there is not a would be to deal date, but he does not know how a bond company with. A bond company would probably bring in another company to complete the work. Maybe ndseande communities that require dealt with bonding companies. J.T said we have had a pro bleut with a bonding company before. Take toenCO letReruireWa bond ony the otEwillbeth Street related items. call. 11. ) 1999 Street Program - There are two projects. A watermain and street plans. Morgan and Adams. We do not need to do the done. A of fcst street back. done. A lot o $1.4 million worth of work has been ep�ustsdbutcwe didour nvttevene revenue was based on 150 building P put ions come close to that many. It is much easier to p P together now tnsithstethe plan should be yearly along 1995. Spang fee IM006 09,/09/98 19:48 FAX Page 5 Public Works with the cost. Mayor Johnson does not and eMillaStreets need to streets will make it that long. a collector street. once Federalhfunds we be repaired. Mill is population of 5,000 people then we can g to pay for 75 percent of Mill Street. Beaver Street Van Some this year- of done in the spring. We might just do an overlay the watermain projects may not need to be done. We need to do some checking on the watermain projects. be We need a large watermain down to thLnboostertstat1on one Lane able to feed that area adequately. bad shape. It will in spots. A lot of our streets are in very cost approximately $7,000 to do Morgan and Madison. We could use some of the savings from the health insurance. Rate increases were added ebyt$7 million ishbecauseaofs that now has been increased the radium issue. Prochaska thinks that we should be petitioning for Federal funds. Well five might help brevenue uy time and lower the radium and maybe by that would be high enough to help fund. 12. ) Additional Business -Update on Riverfront Blocks - Contractor has asked for a few more days. At a stop on number right now. -Washington Street Drainage - Currently the rain water runs down Main into a catch basin between Washington and Orange streets and goes into a residents front lawn. The ncatch basi does get the water because the topo is wrong. We at this. Material cost to fix is $1,755. We would have to remove and replace sidewalk. We need to look at this at the and of the year. If we have funds left in operating accounts then we should consider fixing. The resident is requesting a resolution to his problem. The water ends up in the parking lot behind cKeJvTrssaidtsomelwvrkoneedstto homeowners property to get there. on SrMain Spang will get a video tape. -Letter from Joe Moore - Moore received letter stating that we needed more water storage- We run well four out because it has less radium. Basic cross connection controls require additional valve to keep backing up into water usage. -Mulch Site - No update. J.T. is trying to get in touch with the farmer for an agreement. We need about one acre of land. We might need to pay a few hundred dollars, but we need to get the farmer to agree. J.T. will check on cost to have an outside contractor pick up and mulch_ Mulch will need to moved around every few weeks. -Update on Public Works Building - Building is almost done. Garage doors has not been installed yet. Sowge nsXi would lileike to see something done with the landscaping. to get rid of any old equipment. We need to line everything up with electrical_ J_T_ will get a bid from the concrete contractor that does our sidewalks to do the floor in the new building. J.T. will advertise the sweeper for sale. Minutes by: Mollie Anderson