Loading...
Public Works Minutes 1993 06-16-1993 a UNITED CITY OF THE VILLAGE OF YORKVILLE COMMITTEE MINUTES-PUBLIC WORKS DATE OF MEETING: June 16,1993 ATTENDEES LOCATION: City Hall ELECTED OFFICIALS: PUBLICLY ANNOUNCED: Yes Art Prochaska Bill Baird Pat Clark TIME CONVENED: 6:00 p.m. TIME ADJOURNED: 7:10 p.m. OTHERS: Don Peck DISCUSSION: Don informed the committee that he had received the engineering bids for the Hydraulic Avenue Storm Sewer Study,the Hydraulic Street Paving and the Van Emmon Street plans. The bids are as follows: Hydraulic St. Hydraulic St. Van Emmon St. Storm Sewer Paving Baxter and Woodman $22,500.00 $35,000.00 $ 7,500.00 Pavia and Marting $ 6,721.50 $31,688.50 $ 8,958.00 Don recommended Pavia and Marting for the three engineering projects,the committee concurred. This will be brought to council for formal approval. Don received plans from Baxter and Woodman for South West interceptor,and had the bid notice put in the paper, with a hopeful start date of July 15th. Don advertised for the Detention Pond with a hopeful start date of July 15th. North West interceptor estimated starting time of July 15th also. Don will inform the council of the name of the individual he hired for the public works position so the council can formally approve that appointment. Don recommended Gary Michael Bennett for the six month temporary job with a start date of July 1,1993 and an anticipated ending date of January 29,1993 at a rate of$5.00 per hour. The committee concurred and this will be brought to council for formal approval. Don received bids for the 240 feet of the fence on top of the retaining wall that needs to be repaired. Hinckley Concrete (Steve Urang) estimated $8,400.00 for galvanized rails, 1/2 inch metal (estimated 5­8 years life) fencing and for the concrete patching. Bob Davidson will be doing the labor on a time and material basis. Don recommended that this project proceed on a time and material basis,the committee concurred and this will be brought to the council for formal approval. 'r Don Altman bid$6,000.00(38.00 per hour per man,using three men for seven days to do the concrete facework. Don recommended,and the committee concurred,to do the facework at a future date. ri Don informed that committee that the rock and dirt pile`will be used in the street program and the pile will start diminishing and it should be largely gone by the end of July. As the bid from Aurora Blacktop came in at$200,000.00+,the committee began to discuss what could,might or should be done with the remaining money as this was originally estimated at $400,000+. Don informed the committee he would return to the committee with a suggestion of what could be accomplished by the end of the road work season.