Loading...
Resolution 2006-001 I RESOLUTION c WHEREAS, the City of Yorkville located in the county of Kendall, state of Illinois, wishes to install a sanitary sewer main beneath IL Route 47 which by law comes under the jurisdiction and control of the Department of 'transportation of the state of Illinois, and WHEREAS, a permit from said Department is required before said work can be legally undertaken by said City of Yorkville; now THEREFORE, be it resolved by the City of Yorkville, county of Kendall, state of Illinois. FIRST: That we do hereby request from the Department of Transportation, state of Illinois, a permit authorizing the City of Yorkville to proceed with the work herein described and as shown on enclosed detailed plans. SECOND: Upon completion of the proposed sanitary sewer by the contractor and acceptance by the City, the City guarantees that all work has been performed in accordance with the conditions of the permit to be granted by the Department of Transportation of the state of Illinois. Further, the City will hold the state of Illinois harmless for any damages that may occur to persons or property during such work. The City will require the contractor to obtain a bond and a comprehensive general liability insurance policy in acceptable amounts and will require the developer to add the State of Illinois as an additional insured on both policies. THIRD: That we hereby state that the proposed work*, is not, (delete one) to be performed by the employees of the City of Yorkville. ' FOURTH: That the proper officers of the City of Yorkville are hereby instructed and authorized to sign said permit in behalf of the City of Yorkville. I %::-\ , hereby certify the above to be a i (City or-�c ye clerk) O true copy of the resolution passed by the City Council, county of Kendall, State of Illinois. �p Dated this day Nja - A.D. 20 06 rr� (Signatkl (CORPORATE SEAL) RESOLUTION 0 Illinois Department of Transportation hwa I lermit 1T f 4 k ] District Serial No. PMT572ac /L -10176 City of Yorkville (We) c/o Walter E. Deuchler Associates 230 Woodlawn Ave. (Name of Applicant) (Mailing Address) Aurora IL 60506 Hereinafter termed the Applicant, (City) (State) request permission and authority to do certain work herein described on the right -of -way of the State Highway known IL Routes 47 Section -- - - - - -- From Station to Station Kendall County. The work is described in detail on the attached sketch and /or as follows: Located North of Corneils Road. i Upon approval this permit authorizes the applicant to locate, construct, operate and maintain at the above mentioned location, a twenty -four (24) inch sanitary sewer main encased in a sixty (60) inch steel casing as shown on the attached plans which become a part hereof. The applicant shall notify John Humenick, Field Engineer, Phone: 630 - 553 -7337 or the District Permit Section, Phone: 815 - 434 -8490 twenty -four hours in advance of starting any work covered by this permit. The State right -of -way shall be left in good condition. (No advertising matter shall be placed on the State right - I -way). All turf areas which are disturbed during the course of this work shall be restored to the original line and grade and be promptly seeded in accordance with Standard State Specifications. (SEE THE ATTACHED SPECIAL PROVISIONSI It is understood that the work authorized by this permit shall be completed within 180 days after the date this permit is approved, otherwise the permit becomes null and void. This permit is subject to the conditions and restrictions printed on the reverse side of this sheet. This permit is hereby accepted and its provisions agreed to this i— Da of t 20 Witnes - Signed i ��r_.�2�y =� - - Applicant 800 Game Farm Road 800 Game Farm Road Mailing Address Mailing Address Yorkville Illinois 60560 Yorkville. Illinois 60560 City State City State SIGN AND RETURN TO: District Engineer 700 East Norris Drive, Ottawa, IL 61350 Approved this day of 20 Department of Transportation i '',':Applicant (2) Field Engineer Final Inspection BY: Deputy Director of Highways, Region Engineer SPECIAL PROVISIONS Whenever any of the work under this permit involves any obstruction or hazard to the free flow of traffic in the normal traffic lanes, plans for the proposed method of traffic control must be submitted to and approved by the % District Engineer at least 72 hours, and preferably longer, before the start of work. All traffic control shall be in accordance with the State of Illinois Manual of Uniform Traffic Control Devices and amendments thereof. It should be noted that standards and typical placement of devices shown in the Uniform Manual are minimums. Many locations may require additional or supplemental devices. The petitioner agrees to furnish the necessary barricades, lights, and flagmen for the protection of traffic. Traffic shall be maintained at all times. The applicant agrees to notify the Department of Transportation upon completion of work covered under the terms and conditions of this permit so that a final inspection and acceptance can be made. To avoid any revisions to the work completed under the highway permit, the applicant should insure the conditions and restrictions of this permit, the applicable supplemental permit specifications and permit drawing are fully understood. If this permit work is contracted out, it will be the responsibility of the applicant to furnish the contractor with a copy of this highway permit, as the applicant will be responsible for the contractor's work. A copy of approved permit shall be present on job site at all times the work is in progress. The Department reserves the right to reject or accept any contractor hired by the applicant. No person, firm, corporation or institution, public or private, shall discharge or empty any type of sewage, including the effluent from septic tanks or other sewage treatment devices, or any other domestic, commercial or industrial waste, or any putrescible liquids, or cause the same to be discharged or emptied in any manner into open ditches along any public street or highway, or into any drain or drainage structure installed solely for street or highway drainage purposes. All excavations shall be promptly backfilled, thoroughly tamped and any excess material removed from the State right -of -way (including rock exposed during backfilling operations). Mounding or crowning of backfill will not be permitted. The diameter of any bored hole shall not be more than one (1) inch larger than the outside diameter of the pipe. The tunneling under the pavement shall be properly braced and promptly backfilled with dry sand or screenings and thoroughly tamped. It is the applicant's responsibility for insuring that all requirements of the Illinois Environmental Protection Agency, Division of Water Pollution Control and Public Water Supplies have been satisfied. All material or equipment stored along the highway shall be placed as remote as practical from the edge of pavement in a manner to minimize its being a hazard to errant vehicles or an obstacle to highway maintenance. If material is to be stored on the highway right -of -way for more than two weeks prior to installation, written approval must be obtained from the Department. PMT572ac /L -10176