Public Works Packet 2006 07-03-06 c
United City of Yorkville
800 Game Farm Road
EST: 1 _ isss Yorkville, Illinois 60560
Telephone: 630-553-4350
A �0 Fax: 630-553-7575
tLE
PUBLIC WORKS COMMITTEE MEETING
AGENDA
Monday,July 3,2006
7:00 PM
City Hall Conference Room
Public Works items are scheduled for the 2"d Committee of the Whole meeting each month
Approval/Correction of Minutes: June 5, 2006
Presentations: None
New Business:
1. PW 2006-117 Water Department Report for May 2006
2. PW 2006-118 Rob Roy Creek Interceptor(Contract#3)—Change Order#4
3. PW 2006-119 Wells 3 & 4 Treatment Facility—Change Order#2
4. PW 2006-120 Menard's Commercial Commons (Lot 7)—Sidewalk Agreement
5. PW 2006-121 101 W. Veteran's Parkway— Sidewalk Agreement
6. PW 2006-122 Cozy Corner Subdivision—IDOT Highway Permit and Resolution
7. PW 2006-123 Shops at Veteran's Parkway—IDOT Highway Permit
8. PW 2006-124 Aerial Lift Truck Purchase
9. PW 2006-125 New MWI Water Department Hire—FYI
10. PW 2006-126 Road Fee Resolution
Old Business:
1. PW 2006-105 Fox Hill Unit 7—Request for Acceptance
Additional Business:
Page 1 of 4
UNITED CITY OF YORKVILLE DRAFT
PUBLIC WORKS COMMITTEE MEETING
MONDAY,JUNE 5,2006 7:00 P.M.
City Hall Conference Room
PRESENT:
Mayor Art Prochaska
Alderman Joe Besco, Chairman
Alderman Paul James
Alderman Dean Wolfer
Alderman Marty Munns (arrived at 8:28 pm)
Public Works Director Eric Dhuse
City Engineer Joe Wywrot
David Mogle(left at 7:48 pm)
City Administrator John Crois
Jeff Freeman, EEI
Krista Simons, SRBL
Ray Lee, SRBL
The meeting was called to order at 7:00 pm. by Joe Besco.
Approval/Correction of Minutes: March 6,2006,April 3,2006, and May 1,2006—
The minutes were approved.
Presentations: None.
New Business
1. PW 2006-91 Park Maintenance Building Update-Krista Simons and Ray Lee were
here to discuss the design. There is a parking lot for employees and night meetings,
and a parking lot for visitors during the day and parking for the ball field at night.
There is a basketball hoop at the end of the visitor parking lot. They showed pictures
of buildings in the area, and buildings in other areas that are similar uses. They
discussed the plan for the administrative area and vehicle and shop area. The dashed
line buildings are to be built sometime in the future. The solid line buildings are what
will be built now. To add the future vehicle storage would add $1.3 million to the
project. There was some discussion about the fence. They would probably use green
PVC coated chain link or a PVC material that looks like wood. The storm sewer was
sized for an open grass park. Aggregate and pavers would send the cost up,but it may
be cheaper than changing the storm sewer. There was discussion about moving the
greenhouse and plant and tree storage further away from the salt storage.
Page 2 of 4
There is a multi story office building next door to this facility. The concept plan will
be looked at and roofs can be added to the storage bins. There can also be landscape
islands between the future storage buildings. The price for this design is basically the
same besides the salt storage and inflation. This price is for everything in the design
that does not say"future". This will move on to COW with some additional
information from Speer Financial.
2. PW 2006-92 South Waterworks Improvements—Supplemental Engineering
Agreement—This brings the water up to Fox Rd. and Pavillion Rd. Meadowbrook,
Silver Fox, Evergreen Farm, Aspen Ridge, Chally Farm and Yorkwood Estates
developments are all helping to fund these improvements. The wanted more storage
and supply rather than off site water mains. This will proceed as soon as it is funded
and approved. This will move on to COW for discussion.
3. PW 2006-93 Southwest Transportation Improvements—Engineering Agreement
—Greenbriar Rd. will be extended to Pavillion Rd. Fox Rd. will be resurfaced
approximately 5,000 feet to the East end of the Fox Hill subdivision. There was
discussion about the connection of Pavillion Rd. to Eldamain and a question of
whether Greenbriar Rd. could be extended to Highpoint. Greenbriar could not be
extended that far because of existing development. The county wants curb and gutter
roads by Aspen Ridge. This will be a significant additional cost. There was
discussion about filling in the gaps in sidewalk all the way down Fox Rd. This will
move forward subject to the developers making the deposits. This will go on to COW
for discussion.
4. PW 2006-94 SCADA Improvements—Bid Results—SCADA stands for supervisory
control and data acquisition. This will tie all the waterworks systems together. 2 bids
were received and the recommendation is to award the bid to Kamp/Synergy, LLC in
the amount of$147,237. This is a budgeted amount. This will move on to COW on
June 20'h on Consent Agenda.
5. PW 2006-95 Engineering Agreement—Aux Sable Creek Interceptor, Force Main,
& Pump Station—This is a contract with Water Deutchler and Associates. IT is for a
pump station, a force main, and a gravity interceptor sewer that extends West to
Immanuel Rd. This will be discussed with the developer groups and would be subject
to developer funding. This will go on to the June 20th COW on Consent Agenda.
20. PW 2006-110 Blackberry Creek Dam—Feasibility Study—The Army Corps of
Engineers is donating this feasibility study for removal of the Blackberry Creek Dam.
Other groups may use the study once it is complete. There was some discussion about
the effects of removing the dam on the creek and concerns about J C Pond. This will
go on to COW as informational.
18. PW 2006-108 Route 34/Sycamore Road Intersection—Traffic Signal
Warrants—No money is budgeted for this at this time. If this is sent to IDOT, and
they concur with this study, then the city has to put in the signal. The City will have to
find the money for the engineering this year. There was a question of whether the
developers would help fund the signal. This will be sent to IDOT immediately and go
on to COW for discussion.
Page f 4
6. PW 2006-96 Water Department Report for February 2006—This will go on to
COW on Consent Agenda.
7. PW 2006-97 Water Department Report for March 2006—This will go on to COW
on Consent Agenda.
8. PW 2006-98 Water Department Report for April 2006—This will go on to COW
on Consent Agenda. Eric Dhuse said he has been seeing high water users this past
weekend. He said there is always the rule of even/odd watering only in the early
morning or at night.
9. PW 2006-99 Well No. 7 Treatment Facility—Change Order No. 6—This change
order in the amount of$6,932.27 is for additional valving for the brine tank and the
raw water sample, a permanent space heater outside the electric cabinet and additional
builder's risk insurance. This will go on to COW on Consent Agenda.
10. PW 2006-100 Well Nos. 3 & 4 Treatment Facility—Change Order No. 1—
This change order in the amount of$2,755 is for a pulsation dampener for the brine
pump. This will go on to COW on Consent Agenda.
11. PW 2006-101 Rob Roy Creek Interceptor(Contract#^) -Change Order No.
1 —This is a decrease in the amount of$76,509.16. This will go on to COW on
Consent Agenda.
12. PW 2006-102 Rob Roy Creek Interceptor(North Branch Contract#1)—Bid
Results—The low bidder is Anderson Underground, Inc. Although the city has never
worked with this company before, Walter Deutchler has and they are pleased. The
engineer's estimate was $1.26 million, and the bid came in at$966,861.87. This will
be funded through a bond. This will go on to COW on Consent Agenda.
13. PW 2006-103 Backhoe Bid Results—The bid opening was May 19th. There was
only 1 bid but it was a very competitive price and a fair trade-in value. This will move
on to COW on Consent Agenda.
14. PW 2006-104 Raymond Storm Sewer Outfall—IDOT Highway Permit—This
is the permit to cross Rt. 47 with the 60" diameter storm sewer outfall. IDOT must
approve the plan. At this time,the City does not know who will build it. It will not be
a city contract. If the developer does it,the developer will be bonded for the work. If
it is a builder,there will be a construction guarantee. This will move on to COW on
Consent Agenda.
15. PW 2006-105 Fox Hill Unit 7—Request for Acceptance—Only 2 of the 12
buildings are up, and they are not functional yet. Fox Hill is special, in that there is no
warranty period. Staff recommends not to accept the public improvements at this
time. This will be sent to John Wyeth for review. This will come back to Public
Works in July.
16. PW 2006-106 Prestwick of Yorkville(Phase 1)—Letter of Understanding—
This addresses ownership and maintenance for a section of City storm sewer located
outside the City limits. This will move on to COW for discussion with the
understanding that the draft may change.
Page 4 of 4
17. PW 2006-107 Prestwick of Yorkville (Phase 1)—Construction Guarantee—
This is treated as a letter of credit reduction before the letter of credit is established.
Alderman Besco wondered if the committee should look at the policy for this. The
City could require the developer to take out a letter of credit in the full amount, and
then turn around and give him the letter of credit reduction. Joe Wywrot said there is
no liability for the City in this, it all falls on the developer. This will move on to COW
on Consent Agenda.
19. PW 2006-109 Grande Reserve—Neighborhood 17 Water main Easement—
This easement is needed to complete the loop between Grande Reserve and the rest of
town. There is a 1-way pump and no booster station. There is only a PRV station.
This will move on to COW on Consent Agenda.
21. PW 2006-111 New Water Meter System—This is to try a new water meter
system from American Meter Co. Eric Dhuse does not want to commit to the whole
system until he is able to test them. These 500 meters will be hosted by the company
and the results will be sent to the city. It will cost$3,500 per year for the testing and
$8,000 for the transmitters. There will be 500 of these meters located in Grande
Reserve. This will move on to COW on Consent Agenda.
22. PW 2006-112 MFT Crack Filling Project—Bid Results—This will go on to
COW on Consent Agenda. This will be funded with MFT dollars.
23. PW 2006-113 Sunfield Restaurant—IDOT Highway Permit—This is for the
sidewalk. There will be a bond or a letter of credit for the work. This will go on to
COW on Consent Agenda.
Old Business
1. PW 2006-81 Heartland Circle Sediment Control—There is a new fabric being used
made of heavy duty woven screen. They are using this new material in Wyndett
Ridge. Bristol Bay is using the Baskets. This will be removed from the agenda. No
further action is necessary.
2. Liaison Responsibilities—Joe Besco would like to go to YBSD meetings. Paul
James has been going to some Park Board meetings. Dean Wolfer would split the
meetings with Paul. The Council will be reviewing the status of the liaison
responsibilities.
Additional Business
Alderman Besco received a call from the owner of Wendy's. He said the trees at the car
wash are blocking the Wendy's sign.
He asked why the grass was not cut in front of Wendy's when it was cut everywhere else.
Joe Wywrot said he thought the only reason it would have been missed was if there was
some debris out there.
He also said the sign Wendy's originally proposed, and was told no, is the same sign
Culvers installed. Bill Dettmer will be consulted.
The meeting was adjourned at 9:12 P.M.
Minutes submitted by Laura Leppert
United City of Yorkville
County Seat of Kendall County PV/ ptCDC -° ,( I
J� O� 800 Game Farm Road
Yorkville, Illinois, 60560
EST. 1836 Telephone: 630-553-4350
Fax: 630-553-7575
Website: www.yorkville.il.us
WATER DEPARTMENT REPORT
LE
MAY 2006
MONTH/YEAR
WELLS
NO WELL DEPTH PUMP DEPTH WATER ABOVE PUMP THIS MONTH'S PUMPAGE
FE FE FE MILLION GALLONS
3 1335 463 203 13,145
4 1393 542 186 20,683
TOTAL 33,828
CURRENT MONTH'S PUMPAGE IS 1,711,000 GALLONS MOREILESS THAN LAST MONTH
9,371,000 GALLONS MORE/LESS THAN LAST MONTH
DAILY AVERAGE PUMPED: 1,091,000 GALLONS
DAILY MAXIMUM PUMPED: 1,416,000 GALLONS
DAILY AVERAGE PER CAPITA USE: 109 GALLONS
WATER TREATMENT
CHLORINE FED: 557 LBS. CALCULATED CONCENTRATION: 2.0 MG/L
FLUORIDE FED: 516 LBS. CALCULATED CONCENTRATION: 0.33 MG/L
WATER QUALITY
AS DETERMINED FROM SAMPLES ANALYZED BY ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
BACTERIOLOGICAL: 9 SAMPLES TAKEN SATISFACTORY 9 UNSATISFACTORY(EXPLAIN)
FLUURIDE: 2 SAMPLE(S)TAKEN CONCENTRATION: 1.1 MG/L
MAINTENANCE
NUMBER OF METERS REPLACED: 12 NUMBER OF LEAKS OR BREAKS REPAIRED: 0
NEW CUSTOMERS
RESIDENTIAL: 76 COMMERCIAL: 2 INDUSTRIAL/GOVERNMENTAL: 1
COMMENTS
N6
C/r . Reviewed By:
Legal ❑ City Council
Finance xn-
Cit ❑EST. , 1836 Engineer Administrator El Agenda Item Tracking Number
Consultant
El
aW0 " 4
City Council Agenda Item Summary Memo
Title: Rob Roy Creek Interceptor(Contract 3)—Change Order#4
City Council/COW/ Committee Agenda Date: July 3, 2006 Public Works Committee
Synopsis: This change order in the amount of$9541.15 is for additional work related to
the manhole immediately north of Faxon Road.
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Approval
Submitted by: Joe Wywrot Engineering
Name Department
Agenda Item Notes:
=`- 1 Cl' o United City of Yorkville Memo
'" 800 Game Farm Road
EST. , 1836 Yorkville, Illinois 60560
A` � Telephone: 630-553-8545
�� '' Fax: 630-553-3436
SCE
Date: June 12, 2006
To: John Crois, Interim City Admi istrator
From: Joe Wywrot, City Engineer 6
CC: Lisa Pickering,Deputy City Clerk
Subject: Rob Roy Creek Interceptor(Contract 3)—Change Order#4
Attached find one copy of proposed Change Order#4 for the referenced project. This
change order, in the amount of a$9541.15 increase, is for changes related to Manhole
#18, which is where Contracts 3 and 4 meet.
The original plan was to have this manhole constructed as part of Contract 3,but due to
timing issues related to the hurricanes last summer, the Contract 4 contractor would have
had to wait several months for this manhole to be constructed. To expedite the
construction, we had this manhole constructed as part of Contract 4 instead. This change
order is for additional material and work performed by the Contract 3 contractor to make
the connection to the manhole constructed as part of Contract 4.
I recommend that this change order be approved. Please place this item on the Public
Works Committee agenda of July 3, 2006 for consideration
WALTER E. DEUCHLER ASSOCIATES INC.
Consulting Engineers
230 WOODLAWN AVENUE • TELEPHONE (630) 897-4651 • FAX (630)-897-5696
AURORA,IL 60506
June 8, 2006
Mr. Joe Wywrot
City Engineer
City of Yorkville
800 Game Farm Road
Yorkville, IL 60560
RE: Change Order No. 4
Rob Roy Creek Interceptor - Contract No. 3
W.E.D.A. Job #788-04050-01
Dear Joe:
Please find enclosed Change Order No. 4 which identify changes to the above referenced project as
follows:
1. This item, which was Manhole #18, was bid to be installed by Dempsey Ing, Inc., but was
installed by "D" Construction for Contract #4 because "D" started before Dempsey Ing,
reached their last Manhole #18. However, the manhole was already made. See invoice
#107440 (Kieft Bros.) which is the cost of the manhole material.
2. In order to make the connection to Manhole#18 set by"D" Construction and to make a tight
joint, it was necessary for Dempsey Ing to provide a 36"mechanical joint D.I.P. sleeve,when
connecting the sewer pipe together at the manhole. See Invoice #81311A (Mid America
Water).
3. This item is the time spent by Dempsey Ing to install the additional 36" M.J. sleeve.
NOTE:Manhole#18 bid by Dempsey Ing in the amount of$9,500.00 has been deducted from
their Contract price.
go
• Design and Construction • Project Financing
•Water Works and Sewerage • Buildings and Structures
•Streets and Street Lighting • Investigations and Reports
Mr. Joe Wywrot
City of Yorkville
June 8, 2006
Page 2
We trust Change Order No.4 will be approved by the City Council and should you have any questions,
please contact the undersigned.
Very truly yours,
WALTER DEUCI'LER ASSOCIATES, INC.
Philipp F. Moreau, P.E.
PFM/mw
Encl.
cc: Ralph Pfister, w/Encl.
Bruce Kisser, Dempsey Ing, Inc., w/Encl.
Don Pieart, WEDA, w/Encl.
Ub/Ui3!LVVb Ud . 44 I-A;( bJUdb�bUIZ UtMlStY 1NU 10UU'L/00Z
JUN, S. 2006 8 48A WALTER E DEUCHLER N0. 044 P. 2
CHANGE ORDER
Order No. 4
Date 06-08-06
AgreementDate: Sgptember6,2005
NAME OF PROJECT: ZQJ3 ROY CREEKJI=CUTOR, CONTRACT 3,
YORR'.VILLE, ILLMO
OWNER; UNITED CITY 0 F YORVZLLE.ILLINOIS
CONTRACTOR- DLMPSEY 1NG, INC. _
The following changes are hereby made to the CONTRACT DOCUMENTS:
Justification:
Change to CONTRACT PRICE: $
Original CONTRACT PRICE: $ 1.975,631.00
Current CONTRACT PRICE adjusted by previous CHANGE ORDER$ 2,2263 90.50
The CONTRACT PRICE due to this CHANGE ORDER will be(increased) (decrened)by:
$ 9.541.15
.The new CONTRACT PRICE including this MANGE ORDER wiU be$ 2.235,931,65
Change to CONTRACT TIME:
The CONTRACT TIME w411 be (increased) (&creased) by` 0 calendar days.
The date for completion of work is March 31. 2006 (Date).
Requested- Walter E. DcucWex Associates Inc.
Accepted by: Inc.
Approved by: _
05/17/2006 09:35 FAX 16303655802 DEMPSEY ING INC -> DEUCHLER [ J004
DEMPSEY ING, INC.
Sewer &Water Contractor
601 E.North St.,P.O.Box 127,Elburn,IL 60119 Phone 630-232-7056 Fax: 630-365-5802
May 17, 2006
Mr. Philippe Moreau
Walter E. Deuchler Associates, Inc.
230 Woodlawn Avenue
Aurora, Il 60506
Re: Rob Roy Creek Interceptor, Contract 3
( S
I Each 5' Dia. Manhole Material only $2,315.00 -
10% 231.50
$2,546.50
1 Each 36" Solid M.I Sleeve $3,450.00 0 -
10% 345.00
$3,795.00
6 Hrs. Crew Installation including
excavation around Manhole 18 $2,881.50 'x`
10% 288.15 .
$3,169.65
TOTAL 9 5$ 41.15
DEMPSEY ING, INC
Bruce Kisser
Chief Estimator
5728 n,ca
U5/l U200b 03 : 41 FAX 6303656012 DEMPSEY ING 12002/002
BROLF7S,iCr t
-u- IVOr
•' 937 SOUTH RIVEASIOE DA,
ELMHURST,IL 80128 Q' �
PM. 630-832-8090(FAX) 630-934-5765
CUS7;9MER IPJG
BILL TO:
. .,,,:. ... ;'SHIP•TO:
' QEIN°gCY'11�IG„!1`dG CIO DEE'CONST,
PC; BOX 12-7 J09 572
EL2URN, IL 00.119 'YQRK'•/ILLE, IL
'',``""''I '• ''lid .', r ,: '�:;;!• ;t•;t' I � ,y,, r, 1
A6W�fitii 'i8iUi1 '11h, 1 - ���•,,,45'1,}, 'p .�•'i..l. ,i!„°' 1..,-,' 'S':'•ia„,!'are it �4, ,, Jn,�".7t.� -
j tW;aa14� iYs Cuyc'!i.^�'a ri,7 F•.r , •> t (;,; ,.: t,r,;r �,r''' •',;
�,N'tQd??Ttf7.0 't i r�l�C ,?C At °Y,',-�;,,.,'dI�L�•,,�,1�� .�'r1,..;,, �i". :,i� '•
'1K, h!. 17ltrlr'.TN t�,rprl'..... hn.� ,r•.r,-- I4drdOmC�CronlltlP�$lltlr7 ^; F
1 Z'r.2, a G f~.(a)��E ' . � ' ,� � '� Rams~�.,. . ...•,: ,.
I'J m't 30 •
PO # ORDER DATE SALES ORIJ ER N
1:r 18/06
UANTITY 967271
RT UwR6D Siittvvgp ITEM NUMBER DESCRIPTION UNIT PRIG AMOUNT
AN Nil 1
I 1
0 10-1`i13 y2CI Q, 10-K 72 5Af R-EL 'tP''CA3T r' a
` '• 3'15.00 315.00
,�.N QaT'TODA 11T�i STEP-
1' 1 010-,o01(•JU` 5011 Gl.A PGURE E).NVFPT 0.00 0.00'
1235 A;LL 15: E?0O'T, ��'
t 0.00 000 '
' 1 010-1007 2T&G 00 >f 72 E3ARREL TE.G
0.00 0.00
1171-I STEPS
1 010.1 50 4 00 BARREL. T e,,G
0.00 0.00
,1 T H STEPS y.
1 1 J"0-101322TQ:G 1010 w: 32 DAR R EL.7&0 �
000 •0OC
",TH STEPS
1 1 010-1 t�n�12nC y' �p"',x 1211MCFRS'-T"r-;'O" N 9 T
;qp •, t rrr.
L
r STEPS ^
rr„
�1 In oir,a) Subtotal ; 2315,00
Ir'`;OiO`t: fatal 22)'15.00
,7;1I•
A FINANCE CHARGE OF 1'h%PER MONTH(ANNUAL RATE 18%)
WILL BE ADDED TO ALL INVOICES THAT Rr..rnmp '1n ne Ve n,.c•r r.7 1 11
06/06/2006 07:35 FAX 16303655802 DEXPSEY ING INC --> DEUCHL.ER 10002
INVOICE
MID AMERICAN WATER, INC,
1500 EAST MOUNTAIN
AURORA,IL 60505 TNVOT.CE NUMBER: 8131 1A
PH.630 851-4500
FAX 630 851-4788 INVOICE-DATE;
- 416/06
PAGE:
1
Ship To:
Dempsey Ing Yorkville
601 E. North St. Attn: Bruce
P.O_ Box 127
Eburn, IL 60119
dem0001 YORKMLLE i Bnlce Net 30 Days
712 s 1AN V 0111111111111111111 it
04 MAW TRUCK 416106 516106
119*Yj 115503 Q 3311111M DESCRIPTION
1.00 36'mj long solid sleeve 3,450 A0 3,460.00
2.00 36'mj ace set
7.
3.
PLEASE PAY FROM THIS INVOICE Subtotal 3,450.00
Sales Tax 267.38
ALLATTORNEYS FEE AND OTHER COSTS OF Frei tt
COLLECTING THIS w11 6E PAID 13Y BUYI�t. �
Total Invoice Amount $3,717.38
PAYMENT IS DUE 3o DAYS FRCM NI-CICE DATE. Check Pa mm nUCredlt
AFINANCE CHAFE OF 1 1l2% PER MCNTH �+
08% PER M1NU14 WILL BE ADDED TO ALL TOTAL DUE
PAST DUEACCOUNTS,
M�)
Reviewed By:
Legal ❑ City Council
Esr , Finance El
Engineer 6 1-6
City Administrator ❑ Agenda/Item Tracking Number
Consultant ❑
��1� 00
L�E ❑
City Council Agenda Item Summary Memo
Title: Wells 3 &4 Treatment Facilily—Change Order#2
City Council/ COW/ Committee Agenda Date: July 3, 2006 Public Works Committee
Synopsis: This change order in the amount of a $12,143.00 increase is for changes to
storm sewer and SCADA components
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Approval
Submitted by: Joe Wywrot Engineering
Name Department
Agenda Item Notes:
2` �r o United City of Yorkville Memo
0 800 Game Farm Road
Esr. 1 :1836 Yorkville, Illinois 60560
Telephone: 630-553-8545
X� ,, py Fax: 630-553-3436
LLE
Date: June 12, 2006
To: John Crois, Interim City Administrator
From: Joe Wywrot, City Engineer
CC: Lisa Pickering,=Deputy City Cl
Subject: Wells 3 &4 Treatment Facility—Change Order#2
Attached find one copy of proposed Change Order#2 for the referenced project. This
change order, in the amount of a$12,143.00 increase, is for storm sewer work and
upgrades to the SCADA system.
The original drainage design for this area called for a storm sewer to be constructed along
the Public Works west property line as part of the King Street Raw &Finished
Watermain contract. We approached the school district to obtain an easement for this
sewer,but they were unwilling to grant an easement because it could affect their future
plans for ballfield bleachers in that area. While we will delete the storm sewer from the
watermain contract,we still needed to provide drainage for the public works site. We
finally settled on an infiltration basin design that will discharge some flows overland to
the existing school district swale during higher-frequency storm events. The swale may
also receive some water during the normal start-up procedure for Well #4.
The other change provides greater operational control for our SCADA system. Please
refer to the detailed explanation on the change order form.
I recommend that this change order be approved. Please place this item on the Public
Works Committee agenda of July 3, 2006 for consideration.
CHANGE ORDER
Order No.: CO-02
Date: June 9. 2006
Agreement Date: October 13, 2005
NAME OF PROJECT: Contract B.1. Yorkville Wells No. 3&4 Well House and Treatment Facility
OWNER: United City of Yorkville
CONTRACTOR: Whittaker Construction & Excavating, Inc.
The following changes are hereby made to the CONTRACT DOCUMENTS:
Furnish and install storm sewer, infiltration basin and a flared end section to convey and discharge
storm water(Add: $5,715.00).
Furnish and install additional indicating lights at the motor control center for Well No. 4. Also,
upgrade the Allen Bradley SLC 5/03 processor to an Allen Bradley SLC 5105 processor for the PLC
located at Well No. 4(Add: $6,428.00).
Justification:
The original design called for a storm sewer to be installed by the Well No. 3 raw water main
contractor west of the west property line that the storm sewer from the Contract B.1 project would tie
into. An easement was not granted and the storm sewer was not constructed.
The additional indicating lights allow more flexibility for operations and operator safety. The upgrade
to the Allen Bradley SLC 5/05 processor at Well No. 4 (central SCADA station) will allow more
flexibility for a SCADA contractor to monitor and modify SCADA programs for all sites from a remote
location.
Chanoe of CONTRACT PRICE:
Original CONTRACT PRICE: $ 1,819,000.00
Current CONTRACT PRICE adjusted by previous CHANGE ORDER(S) $ 1,821.755.00
The CONTRACT PRICE due to this CHANGE ORDER will be (increased) (desFeased) by.
$ 12,143.00
The new CONTRACT PRICE including this CHANGE ORDER will be $ 1,833,898.00
CO-01
CHANGE ORDER
Page 2
Change to CONTRACT TIME:
The CONTRACT TIME will be (increased) (decreased) by 0 calendar days.
The date for completion of all work will be August 28, 2006 (Date).
Approvals Required:
To be effective this order must be approved by the agency if it changes the scope or objective of the
PROJECT, or as may otherwise be required by the SUPPLEMENTAL GENERAL CONDITIONS.
Requested by. Whittaker Construction & Excavating. Inc.
Recommended by. Engineering Enterprises, Inc.
Accepted by: United City of Yorkville
State Agency Approval:
CO-02
CONTRACTOR'S PROPOSAL REQUEST
MATERIAL LIST/CHANGE ORDER BREAKDOWN
PROPOSAL REQUEST No. 001
WHITTAKER CONSTRUCTION & EXCAVATING, INC. Phone: 815-246-7119
P. O. BOX 21 - 105 PARK STREET Fax: 815-246-7118
EARLVILLE, ILLINOIS
Project: Wells No. 3 and 4 Well House Treatment Facility
Contract B.1
United City of Yorkville
Date: June 1, 2006
Document: PR 001 "Revised"
DESCRIPTION OF CHANGE: Storm Sewer Changes per issued drawings dated 02/06
Item No. Item Description Unit Qty Description Unit Price Extension
Truck-off excess materials LS 1 Materials $125.00 $125.00
3/4 washes aggregate Tons 21 Materials $20.00 $420.00
Fabric LS 1 Materials $20.00 $20.00
Infiltration basin Ea 1 Materials $660.00 $660.00
Pipe and fittings If 40 Materials $6.81 $272.40
End Section Ea 1 Materials $410.00 $410.00
330 Excavator Hrs. 6.5 Operator/Mach $135.00 $877.50
Laborer to install Hrs. 6.5 Labor $55.00 $357.50
Working Superintendent Hrs. 6.5 Labor $71.00 $461.50
Shape around end section, topsoil, seed&blanket LS 1 Labor/Mat. $595.00 $595.00
Subtotal $4,198.90
O&P 629.84
Subtotal $4,828.74
Bond 86.26
Total $4,915.00
Unit Price for 12"Storm Sewer If 40 Materials $20.00 $800.00
$5,715.00
A 2 day time extension will be required for this change.
v
CONTRACTOR'S PROPOSAL REQUEST
MATERIAL LISTICHANGE ORDER BREAKDOWN
PROPOSAL REQUEST No. 004
WHITTAKER CONSTRUCTION & EXCAVATING, INC. Phone: 815-246-7119
P. O. BOX 21 - 105 PARK STREET Fax: 815-246-7118
EARLVILLE, ILLINOIS
Project: Wells No. 3 and 4 Well House Treatment Facility
Contract B.1
United City of Yorkville
Date: June 8,2006
Document: PR 004
DESCRIPTION OF CHANGE: Cost to add an addition often (10) Push-to-test indicating
lights for Moor Control Center at Well#4, per conference
call on June 07,2006.
Cost to provide Allen Bradley 5/05 processor(32K)at
faclity instead of 05103 specified. Reference June 05,2006
letter from EEI. Includes documentation updates.
This change was performed per EEI direction.
Item No. Item Description Unit Qtv Description Unit Price Extension
Cost to add an addition of ten(10)Push-to-test indicating
lights for Moor Control Center at Well#4, per conference
call on June 07,2006. 3,110.00
Cost to provide Allen Bradley 5/05 processor(32()at
facility instead of 05103 specified. Reference June 05,2006
letter from EEI. Includes documentation updates. 2,631.00
5,741.00
O&P 574.10
Subtotal $6,315.10
Bond 112.90
Total $6,428.00
06/88/2006 13:03 6309061369 RJ ONEIL PAGE 02
CHANGE ORDER REQUEST
1335 S.1-1oe Street
Montgomery,IL 6OWS
(638)906-1300
Fxx(00)"6-130
OwoWs Name Comtracxor: WHiTTAMM Date:
YORXVi!LE WELL 3 A 4 61$/06
Street Address: Job Name: RJO Jolt Number.
YORKVILLE WELL 3&4 36239
City: State,zip Sired:
YORKVII.L.E IL
Existing cnruract Number pate ol:exjting contract City,State,Zip
Pareuaat to tite termo and cmditiions of purchase order Me.36236,the mrderai6eed parries to said eons act
desire to modify same by chang3ag lie eyeipmsest MWVor labor to be fired pnrsnant is said=shad in
accordance wrilb certdo inatruclioms requft*plum andforspedlicaflops of in dw fo rm
1—Addition of Ten(10)Push tv-tcst Indicating tars for Kow Control Centel at Well#4.Per confrreact can
this moon wilt Tam Swift—USFCS,Dam tY Neil—R.7 O'Neil,Inc.,Jana Perkins—WhkWw and Milne
Sclika—EEI.T.adbdes dock updates.
Amounl S 31119.00
2—Provide Allen-Bradley 5105 proeewc(;M A veil fae ty instead of 05/03 speci5ed.Reference Jme 5,
2006,letter from lam.b=hrdes&wumemation updates-
Amomt S 2,531.00
Tbb othr of o wdi8artioa is deemed accepted dad assented to by parch ifwkbin reasonable time ptarehaser to
seller Iran nod objected to lye tpms of this change order in writing.1t being agrad upon by the partim that a
reasonable time far objection is 20 d"s tMsa date bers oe
Date Authorizing SigWdure
(Cosercrw sisa bwe
Audwrimd Siguahue Date 19
THIS IS CHANGE ORDER NO. 001
Sias b06ao0m udnumoeea x..L arrw„bon
�eeeno�vs�vrea�-a�pwae oROepaw�ooteoaooi.lroe
' 86/88/2806 13:03 6389061369 RJ ONEIL PAGE 83
JUM 07 Zone 3:3t3Ptt USFILTER COMTROL SYSTEMS 6512514815 p. t
•'' '►;:Ii3 CHANGE ORDER FORM
Contmi Systems Change Order No.401
1239 Wflbw Lake Blvd
Vadnais Heighb3,MN 55110
Phone:(651)788-2700 Fax (651)766-2701
Tb: R.J.O'Neil, tic. JOB NAME:Yorkville,IL Well 3 and 4
ATTN:Dan O'Neii JOB NUMBER:SO4389
REM NO. DESCRIPTION OF CHANGE AND STATEMENT OF REASON AMOUNT
1 Addition of Ten(10)PdOkc test Indl &kV lights for Mobr Cantral Centar at Well 52.862.00
4. Per conference call this alt Amn with Tom Swift-USFCS,Dan VNell—RJ
O'W.Joan Perkins-Whittaker and Mks 8eHro-EEl. Indudes documentation
updates.
2 Provide Allen-Bradley 5105 processor(321Q at wa fac+AIy instead of 5103 speaTied. s2,so6.80
ReferenoeJune S•2006,fetter from EEL rncrude9 do=rnernacicn updates
1 v
MMOUS CONfR=AMOUNT S
NEW COMMACTAMWIff: S
Date Holslin
Customer Somtum LISFCS •
Date Q61071Q6
Date
Cc: Kevin Forsman, USFCS
Tom Swift;USFCS
M e) `
CJ,- Reviewed By:
Legal City Council
Finance
EST. iaas En neer d 1310�
16Y Agenda Item Tracking Number
Q y City Administrator ❑
Consultant
City Council AgendaRtem Summary Memo
Title: Menards Commercial Commons (Lot 7)—Sidewalk Agreement
City Council/ COW/Committee Agenda Date: PW Committee 7/3/06
Synopsis: This sidewalk agreement allows for the delay of sidewalk construction along Route
47 until IDOT builds their Route 47 improvement.
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Approval
Submitted by: Joe Wywrot Engineering
Name Department
Agenda Item Notes:
Ir o United City of Yorkville Memo
800 Game Farm Road
ESr. 1836 Yorkville, Illinois 60560
^� Telephone: 630-553-8545
Fax: 630-553-3436
SCE �v�
Date: June 13, 2006
To: John Crois, Interim City Administrator
From: Joe Wywrot, City Engineer
CC: John Wyeth, City Attorney
Lisa Pickering, Deputy City Clerk
Subject: Menards Commercial Commons (Lot 7)—Sidewalk Agreement
Attached find one copy of the proposed sidewalk installation covenant for the referenced
site. This agreement allows the developer to delay the construction of public sidewalk
along its Route 47 frontage until one of the following items occurs:
• Completion of the Route 47 improvements by.
• Prior to the property being sold.
• Within 6 months of a written request from the city to construct the sidewalk.
I recommend that this agreement be approved and recorded against the property. Please
place this item on the Public Works Committee agenda of July 3, 2006 for consideration.
i
STATE OF ILLINOIS )
COUNT OF KENDALL )
SIDEWALKS INSTALLATION COVENANT
dba Millco�Yorkville LLC
WHEREAS,the undersigned, Robert Miller , (hereinafter referred to as
"Owner/Developer"), is the owner of the real property upon which is now situated an improved structure
(hereinafter referred to as "Property") described in the Exhibit"A", attached hereto and on incorporated
herein by reference; and
Lot 7, Yorkville Coirmons, menard's OtWtnarcel, Route 47
WHEREAS, said Property located at in the United City of Yorkville,
Kendall County, Illinois is zonedB3—service and
usiness District
WHEREAS, the United City of Yorkville has heretofore issued a building permit for the
construction of the improvements on said Property and, incidental thereto, requiring the installation of
sidewalks along the frontage of the Property adjacent to Illinois Route 47; and
WHEREAS, at the present time,public sidewalk does not exist on Illinois Route 47 in the general
vicinity of the subject property and the undersigned, as the owner, has requested the United City of
Yorkville that it be permitted to defer the installation of the sidewalks; and
WHEREAS,the Untied City of Yorkville has agreed to allow Owner/Developer to delay and defer
the installation of this sidewalk on the Property in further accordance with the provisions of this
Covenant.
Robert Miller DBA Millco-YorkvilleLLC
NOW, THEREFORE,the undersigned do herewith covenant and agree with the
United City of Yorkville that, in consideration of the City issuing the Building permit for the commercial
building located on the real property described in Exhibit"A", that the undersigned, or their heirs,
successors or assigns, shall cause sidewalks to be installed along the frontage of the Property along
Illinois Route 47 in accordance with the Ordinances and guidelines of the United City of Yorkville, then
in effect, regulating the installation of sidewalks, upon the happening of the first of the following events:
(a) when sidewalks are extended along Illinois Route 47 by others to the edge of the subject property or
(b)prior to the Property being sold or (c)within six(6) months written request by the United City of
Yorkville for the installation of sidewalks.
This Covenant shall run with the land and shall be binding upon and shall be obligatory upon the
undersigned Owners, and their heirs, successors and assigns.
IN WITNESS WHEREOF,the undersigned have executed this Covenant this _ -Ist day of
Jana , 2005.
OWNE VELO APPROVED and ACCEPTED
UNITED CITY OF YORKVILLE
By:
Owner City Administrator
i
Exhibit "A"
LOT 7 IN MENARD'S COMMERCIAL COMMONS, RECORDED ON MAY, 13, 2002, AS
DOCUMENT NUMBER 200200011411, BEING A SUBDIVISION OF PART OF SECTION 21 AND
THE WEST 1/2 OF SECTION 22 AND THE NORTH 1/2 OF SECTION 28, TOWNSHIP 37 NORTH,
RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, IN THE CITY OF YORKVILLE,
KENDALL COUNTY, ILLINOIS.
N & �
`A C/r y Reviewed By:
O� Legal ❑ City Council
EST. ' — 1836 Finance ❑
Engineer
City Administrator El enda Item Tracking Number
Consultant ❑ ►^� L 4El
E
City
City Council Agenda Item Summary Memo
Title: 101 W. Veterans Parkway—Sidewalk Agreement
City Council/COW/ Committee Agenda Date: July 3, 2006 Public Works Committee
Synopsis: This agreement allows for the delay in construction of public sidewalk at
101 W. Veterans Parkway (old Castle Bank site)
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Approval
Submitted by: Joe Wywrot Engineering
Name Department
Agenda Item Notes:
Cry United City of Yorkville Memo
800 Game Farm Road
esr =11836 Yorkville, Illinois 60560
Telephone: 630-553-8545
1' �p Fax: 630-553-3436
'<4-E �VV
Date: June 12, 2006
To: John Crois, Interim City Administrator
From: Joe Wywrot, City Engineer U
CC: John Wyeth, City Attorney
Lisa Pickering,Deputy City Clerk
Subject: 101 W. Veterans Parkway—Sidewalk Agreement
Attached find one copy of the proposed sidewalk installation covenant for the referenced
site. This agreement allows the developer to delay the construction of public sidewalk
along its Route 34 frontage until one of the following items occurs:
• Completion of the Route 47 improvements by.
• Prior to the property being sold.
• Within 6 months of a written request from the city to construct the sidewalk.
I recommend that this agreement be approved and recorded against the property. Please
place this item on the Public Works Committee agenda of July 3, 2006 for consideration.
STATE OF ILLINOIS )
COUNT OF KENDALL )
SIDEWALK INSTALLATION COVENANT
WHEREAS, the undersigned, Masoncorp, Inc. , (hereinafter referred
to as "Owner/Developer"), is the owner of the real property upon which is now situated
an improved structure (hereinafter referred to as "Property") described in the Exhibit
"A", attached hereto and on incorporated herein by reference; and
WHEREAS, said Property located at 101 W. Veterans Parkway in the United City
of Yorkville, Kendall County, Illinois is zoned B-3 ; and
WHEREAS, the United City of Yorkville has heretofore issued a building permit
for the construction of the improvements on said Property and, incidental thereto,
requiring the installation of sidewalks along the frontage of the Property adjacent to US
Route 34; and
WHEREAS, at the present time,public sidewalk does not exist on US Route 34 in
the general vicinity of the subject property and the undersigned, as the owner,has
requested the United City of Yorkville that it be permitted to defer the installation of the
sidewalks; and
WHEREAS, the Untied City of Yorkville has agreed to allow Owner/Developer
to delay and defer the installation of this sidewalk on the Property in further accordance
with the provisions of this Covenant.
NOW, THEREFORE, the undersigned_Masoncorp, Inc. do herewith
covenant and agree with the United City of Yorkville that, in consideration of the City
issuing the Building permit for the commercial building located on the real property
described in Exhibit"A", that the undersigned, or their heirs, successors or assigns, shall
cause sidewalks to be installed along the frontage of the Property along US Route 34 in
accordance with the Ordinances and guidelines of the United City of Yorkville, then in
effect, regulating the installation of sidewalks,upon the happening of the first of the
following events: (a) when sidewalks are extended along US Route 34 by others to the
edge of the subject property or(b)prior to the Property being sold or(c) within six(6)
months written request by the United City of Yorkville for the installation of sidewalks.
This Covenant shall run with the land and shall be binding upon and shall be
obligatory upon the undersigned Owners, and their heirs, successors and assigns.
IN WITNESS WHEREOF, the undersigned have executed this Covenant this
day of 12006.
OWNERIDEVELOPER:
r
Owner
APPROVED and ACCEPTED
UNITED CITY OF YORKVILLE
By:
City Administrator
CASTLE BANK, YORKVILLE, IL
Lot 1 of the Resubdivision of Part of Block 1 Countryside Center,unit 1, Yorkville,
Kendall County, Illinois
e) -�
Reviewed By:
Legal ❑ City Council
1836 Finance ❑. (,Jt-jv6
Engineer
r City Administrator El genda Item Tracking Number
Consultant ❑ ►mil �00(n - I��
-�?O
El
LE I
City Council Agenda Item Summary Memo
Title: Cozy Corner Subdivision—IDOT Highway Permit Application&Resolution
City Council/ COW/ Committee Agenda Date: July 3, 2006 Public Works Committee
Synopsis: This routine IDOT highway permit application and resolution are required
before IDOT will issue a permit for work within their right-of-way.
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Authorize Mayor& City Clerk to sign application. Pass resolution
guaranteeing satisfactory completion of the work.
Submitted by: Joe Wywrot Engineering
Name Department
Agenda Item Notes:
o United City of Yorkville Memo
A 800 Game Farm Road
EST 1836 Yorkville Illinois 60560
1
'w Telephone: 630-553-8545
OEM I
Y'
Fax: 630-553-3436
Date: June 12, 2006
To: John Crois, Interim City Administrator \
From: Joe Wywrot, City Engineer
CC: Lisa.Pickering Office Assistant
Subject: Cozy Corner Subdivision—MOT Highway Permit Application &Resolution
Attached find one copy each of the IDOT highway permit application for the referenced
development. The permit is required for construction of new driveway entrances, storm
sewer, grading, sidewalk, and landscaping in IDOT's Route 47 and/or Route 126 right-
of-ways. Also attached is the standard resolution that the City Council must pass which
guarantees satisfactory completion of the work. We will not submit the permit application
to IDOT until we receive the corresponding bond from the developer.
Please place this item on the Public Works Committee agenda of July 3, 2006 for
consideration.
Illinois Department
of Transportation Highway Permit
District Serial No.
L-9916
City of Yorkville for H &J Development
(We) c/o Koziol Engineering 1709 Ogden Avenue
(Name of Applicant) (Mailing Address)
Lisle IL 60532 Hereinafter termed the Applicant,
(City) (State)
request permission and authority to do certain work herein described on the right-of-way of the State Highway
known IL Route 47/126 Section -------- From Station to Station
Kendall County. The work is described in detail on the attached sketch and/or as follows:
Located at the Southeast Quadrant of Routes 47/126.
Upon approval this permit authorizes the applicant to locate, construct, operate and maintain at the above
mentioned location, two bituminous surfaced commercial entrances and related improvements as shown on the
attached plans which become a part hereof.
The appiicant shall notify John Humenick, Field Engineer, Phone: 630-553-7337 or the District Permit Section,
Phone: 815-434-8490 twenty-four hours in advance of starting any work covered by this permit.
Aggregate material shall be obtained from a state approved stockpile and shall be:
SUB-BASE GRANULAR MATERIAL TYPE A (CA-6 GRADATION).
(SEE THE ATTACHED SPECIAL PROVISIONS)
It is understood that the work authorized by this permit shall be completed within 180 days after the date this permit
is approved, otherwise the permit becomes null and void.
This permit is subject to the conditions and restrictions printed on the reverse side of this sheet.
This permit is hereby accepted and its provisions agreed to this Day of 2006
�nfir ess City Clerk Signed Mavnm
Applicant
800 Came Farm Road 800 Game 'Fa-rm Road
Mailing Address Mailing Address
Yorkville Illinois 60560 Yorkville T"I I ipra;c 6n560
City State City State
SIGN AND RETURN TO: Region Engineer 700 East Norris Drive, Ottawa, IL 61350
Approved this day of 20
Department of Transportation
cc Applicant (2)
Field Engineer
Final Inspection
BY:
Deputy Director of Highways,Region Engineer
First: The Applicant represents all parties in interest and shall furnish material, do all work, pay all costs, and
shall in a reasonable length of time restore the damaged portions of the highway to a condition similar or equal to
that existing before the commencement of the described work, including any seeding or sodding necessary.
Second: The proposed work shall be located and constructed to the satisfaction of the Region Engineer or his
duly authorized representative. No revisions or additions shall be made to the proposed work on the right-of-way
without the written permission of the Region Engineer.
Third: The Applicant shall at all times conduct the work in such a manner as to minimize hazards to vehicular
and pedestrian traffic. Traffic controls and work site protection shall be in accordance with the applicable
requirements of Chapter 6 (Traffic Controls for Highway Construction and Maintenance Operations) of the Illinois
Manual on Uniform Traffic Control Devices for Streets and Highways and with the traffic control plan if one is
required elsewhere in the permit. All signs, barricades, flaggers, etc., required for traffic control shall be
furnished by the Applicant. The work may be done on any day except Sunday, New Year's Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day and Christmas Day. Work shall be done only during daylight
hours.
Fourth: The work performed by the Applicant is for the bona fide purpose expressed and not for the purr--v-- .nf,
nor will it result in, the parking or servicing of vehicles on the highway right-of-way. Signs located on or over
hanging the right-of-way shall be prohibited.
Fifth: The Applicant, his successors or assigns, agrees to hold harmless the State of Illinois and its duly
appointed agents and employees against any action for personal injury or property damage sustained by reason
of the exercise of this permit.
Sixth: The Applicant shall not trim, cut or in any way disturb any trees or shrubbery along the highway without
the approval of the Region Engineer or his duly authorized representative.
Seventh: The State reserves the right to make such changes, additions, repairs and relocation's within its
statutory limits to the facilities constructed under this permit or their appurtenances on the right-of-way as may at
any time be considered necessary to permit the relocation, reconstruction, widening or maintaining of the
highway and/or provide proper protection to life and property on or adjacent to the State right-of-way. However,
in the event this permit is granted to construct, locate, operate and maintain utility facilities on the State right-of-
way, the Applicant, upon written request by the Region Engineer, shall perform such alterations or change of
location of the facilities, without expense to the State, and should the Applicant fail to make satisfactory
arrangements to comply with this request within a reasonable time, the State reserves the right to make such
alterations or change of location or remove the work, and the Applicant agrees to pay for the cost incurred.
Eighth: This permit is effective only insofar as the Department has jurisdiction and does not presume to release
the Applicant from compliance with the provisions of any existing statutes or local regulations relating to the
construction of such work.
Ninth: The Construction of access driveways is subject to the regulations listed in the "Policy on Permits for
Access Driveways to State Highways." If, in the future, the land use of property served by an access driveway
described and constructed in accordance with this permit changes so as to require a higher driveway type as
defined in that policy, the owner shall apply for a new permit and bear the costs for such revisions as may be
required to conform to the regulations listed in the policy. Utility installations shall be subject to the "Policy on the
Accommodation of Utilities on Right-of-Way of the Illinois State Highway System."
Tenth: The Applicant affirms that the property lines shown on the attached sheet(s) are true and correct and
binds and obligates himself to perform the operation in accordance with the description and attached sketch and
to abide by the policy regulations.
SPECIAL PROVISIONS
The state right of way shall be left in good condition. (No advertising matter shall be placed on the state right of
way).
The petitioner, their successors, or assigns, shall maintain that portion of the driveway on state right of way in such
a r ari er satisfactory to the department, otherwise the department will maintain the shoulders included in the
entrance driveways to the same standard that exists on adjacent shoulders, and if necessary, such areas will be
restored to the original cross section and earth shoulders.
All turf areas which are disturbed during the course of this work shall be restored to the original line and grade and
be promptly seeded in accordance with Standard State Specifications.
Whenever any of the work under this permit involves any obstruction or hazard to the free flow of traffic in the
normal traffic lanes, plans for the proposed method of traffic control must be submitted to and approved by the
Regional Engineer at least 72 hours, and preferably longer, before the start of work.
Aii a affic control shall be in accordance with the State of Illinois Manual of Uniform Traffic Control Devices and
amendments thereof. It should be noted that standards and typical placement of devices shown in the Uniform
Manual are minimums. Many locations may require additional or supplemental devices.
The petitioner agrees to furnish the necessary barricades, lights, and flagmen for the protection of traffic.
i iaiiic small be maintained at all times.
The applicant agrees to notify the Department of Transportation upon completion of work covered under the terms
and conditions of this permit so that a final inspection and acceptance can be made.
To avoid any revisions to the work completed under the highway permit, the applicant should insure the conditions
and restrictions of this permit, the applicable supplemental permit specifications and permit drawing are fully
understood.
If this permit work is contracted out, it will be the responsibility of the applicant to furnish the contractor with a copy
of this highway permit, as the applicant will be responsible for the contractor's work.
A copy of approved permit shall be present on job site at all times the work is in progress.
The department reserves the right to reject or accept any contractor hired by the applicant.
No person, firm, corporation or institution, public or private, shall discharge or empty any type of sewage, including
the effluent from septic tanks or other sewage treatment devices, or any other domestic, commercial or industrial
waste, or any putrescible liquids, or cause the same to be discharged or emptied in any manner into open ditches
along any public street or highway, or into any drain or drainage structure installed solely for street or highway
drainage purposes.
All excavations shall be promptly backfilled, thoroughly tamped and any excess material removed from the state
right of way (including rock exposed during backfilling operations). Mounding or crowning of backfill will not be
permitted.
Ail material or equipment stored along the highway shall be placed as remote as practical from the edge of
pavement in a manner to minimize its being a hazard to errant vehicles or an obstacle to highway maintenance. If
material is to be stored on the highway right of way for more than two weeks prior to installation, written approval
must be obtained from the department.
RESOLUTION
WHEREAS, the United City of Yorkville is located in the county of Kendall, state of Illinois, wishes to construct two
commercial entrances and related improvements along Illinois 47/126 which by law comes under the jurisdiction and
control of the Department of Transportation of the state of Illinois, and
WHEREAS, a permit from said department is required before said work can be legally undertaken by said United
Ci;; of Yorkville; now
THEREFORE, be it resolved by the United City of Yorkville, county of Kendall, state of Illinois.
FIRST: That we do hereby request from the Department of Transportation, state of Illinois, a permit authorizing the
United City of Yorkville to proceed with the work herein described and as shown on enclosed detailed plans.
SECOND: Upon completion of the commercial entrances by the developer and acceptance by the city, the city
guarantees that all work has been performed in accordance with the conditions of the permit to be granted by the
Department of Transportation of the state of Illinois.
Further, the city will hold the state of Illinois harmless for any damages that may occur to persons or property during
such work.
The city will require the developer to obtain a bond and a comprehensive general liability insurance policy in
acceptable amounts and will require the developer to add the State of Illinois as an additional insured on both
policies.
THIRD: That we hereby state that the proposed work', is not, (delete one) to be performed by the employees of
the United City of Yorkville.
R-)URTH: That the proper officers of the United City of Yorkville are hereby instructed and authorized to sign said
permit in behalf of the United City of Yorkville.
I, , hereby certify the above to be a
City Clerk
tr!!n nnny of the resolution passed by the City Council of the United City of Yorkville, county of Kendall, State of
Illinois.
Dated this day of A.D. 2006
(Signature)
(CORPORATE SEAL)
RESOLUTION
NF,
Reviewed By:
J2 T Legal ❑ City Council
i8ss
Finance ❑
Esr. :'. Engineer �� �I�S1�6
rt y City Administrator ❑ Agenda Item Tracking Number
U, t; = O Consultant ❑ �
City Council Agenda Item Summary Memo
Title: Shops at Veterans Parkway—IDOT Highway Permit Application &Resolution
City Council/COW/ Committee Agenda Date: July 3, 2006 Public Works Committee
Synopsis: This routine IDOT highway permit application and resolution are required
before IDOT will issue a permit for work within their right-of-way.
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Pass resolution guaranteeing satisfactory completion
of the work.
Submitted by: Joe Wywrot Engineering
Name Department
Agenda Item Notes:
United City of Yorkville Memo
800 Game Farm Road
EST 1 x,,1836 Yorkville, Illinois 60560
Telephone: 630-553-8545
,. Fax: 630-553-3436
<LE
Date: June 15, 2006
To: John Crois, Interim City Administrator
From: Joe Wywrot, City Engineer
CC: Lisa Pickering,Deputy City Clerk
Subject: Shops at Veterans Parkway—IDOT Highway Permit Application&Resolution
Attached find one copy each of the IDOT highway permit application for the referenced
development. The permit is required for construction of new driveway entrances, grading,
sidewalk, and landscaping in IDOT's Route 34 right-of-way. Also attached is the
standard resolution that the City Council must pass which guarantees satisfactory
completion of the work. We will not submit the permit application to IDOT until we
receive the corresponding bond from the developer.
Please place this item on the Public Works Committee agenda of July 3, 2006 for
consideration.
RESOLUTION
WHEREAS, the city of Yorkville is located in the county of Kendall, state of Illinois, wishes to construct a
commercial entrance adjacent to U.S. 34 which by law comes under the jurisdiction and control of the Department
of Transportation of the state of Illinois, and
WHEREAS, a permit from said department is required before said work can be legally undertaken by said city of
Yorkville; now
THEREFORE, be it resolved by the city of Yorkville, county of Kendall, state of Illinois.
FIRST: That we do hereby request from the Department of Transportation, state of Illinois, a permit authorizing the
city of Yorkville to proceed with the work herein described and as shown on enclosed detailed plans.
SECOND: Upon completion of the proposed commercial entrance by the developer and acceptance by the city, the
city guarantees that all work has been performed in accordance with the conditions of the permit to be granted by
the Department of Transportation of the state of Illinois.
Fu,' cr, the city will hold the state of Illinois harmless for any damages that may occur to persons or property during
such work.
The city will require the developer to obtain a bond and a comprehensive general liability insurance policy in
acceptable amounts and will require the developer to add the State of Illinois as an additional insured on both
policies.
THIRD: That we hereby state that the proposed work&, is not, (delete one) to be performed by the employees of
the city of Yorkville.
FOURTH: That the proper officers of the city of Yorkville are hereby instructed and authorized to sign said permit in
behalf of the city of Yorkville.
I, , hereby certify the above to be a
City Clerk
true copy of the resolution passed by the city of Yorkville, county of Kendall, State of Illinois.
Dated this day of A.D. 2006
(Signature)
(CORPORATE SEAL)
RESOLUTION
Illinois Department
of Transportation Highway Permit
District Serial No.
L-10117
City of Yorkville for Greco Reggi Yorkville Rt. 34 LLC
(We) c/o JAS Associates 1355 Remington Road, Suite U
(Name of Applicant) (Mailing Address)
Schaumburg IL 60173 Hereinafter termed the Applicant,
(City) (State)
request permission and authority to do certain work herein described on the right-of-way of the State Highway
known U.S. Route 34 Section -------- From Station to Station
Kendall County. The work is described in detail on the attached sketch and/or as follows:
Located at 465 East Veterans Parkway.
Upon approval this permit authorizes the applicant to locate, construct, operate and maintain at the above
mentioned location, a twenty-four (24) foot in width bituminous surfaced right-in, right-out commercial entrance
;? related improvements as shown on the attached plans which become a part hereof.
The applicant shall notify John Humenick, Field Engineer, Phone: 630-553-7337 or the District Permit Section,
Phone: 815-434-8490 twenty-four hours in advance of starting any work covered by this permit.
Aggregate material shall be obtained from a state approved stockpile and shall be:
SUB-BASE GRANULAR MATERIAL TYPE A (CA-6 GRADATION).
(SEE THE ATTACHED SPECIAL PROVISIONS)
It is understood that the work authorized by this permit shall be completed within 180 days after the date this permit
is approved, otherwise the permit becomes null and void.
This permit is subject to the conditions and restrictions printed on the reverse side of this sheet.
This permit is hereby accepted and 'ts provisions agreed to this Day 20
Witness L Signed
Applicant
`ow w p EJa� LJ «So Beyer (ZO
Mailing Address Mailing Address
16�t,t4- 61 0 E J u3t t►, G o v d7 lgh t L. Gal o�
City State City State
SIGN AND RETURN TO: Region Engineer 700 East Norris Drive, Ottawa, IL 61350
Approved this day of 20
Department of Transportation
cc Applicant(2)
Field Engineer
Final Inspection
BY:
Deputy Director of Highways,Region Engineer
First: The Applicant represents all parties in interest and shall furnish material, do all work, pay all costs, and
shall in a reasonable length of time restore the damaged portions of the highway to a condition similar or equal to
that existing before the commencement of the described work, including any seeding or sodding necessary.
Second: The proposed work shall be located and constructed to the satisfaction of the Region Engineer or his
duly authorized representative. No revisions or additions shall be made to the proposed work on the right-of-way
without the written permission of the Region Engineer.
Third: The Applicant shall at all times conduct the work in such a manner as to minimize hazards to vehicular
and pedestrian traffic. Traffic controls and work site protection shall be in accordance with the applicable
requirements of Chapter 6 (Traffic Controls for Highway Construction and Maintenance Operations) of the Illinois
Manual on Uniform Traffic Control Devices for Streets and Highways and with the traffic control plan if one is
required elsewhere in the permit. All signs, barricades, flaggers, etc., required for traffic control shall be ` -
furnished by the Applicant. The work may be done on any day except Sunday, New Year's Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day and Christmas Day. Work shall be done only during dayllght
hours.
Fourth: The work performed by the Applicant is for the bona fide purpose expressed and not for the purpose of,
nor will it result in, the parking or servicing of vehicles on the highway right-of-way. Signs located on or over
hanging the right-of-way shall be prohibited.
Fifth: The Applicant, his successors or assigns, agrees to hold harmless the State of Illinois and its duly
appointed agents and employees against any action for personal injury or property damage sustained by reason
of the exercise of this permit.
Sixth: The Applicant shall not trim, cut or in any way disturb any trees or shrubbery along the highway without
the approval of the Region Engineer or his duly authorized representative.
Seventh: The State reserves the right to make such changes, additions, repairs and relocation's within its
statutory limits to the facilities constructed under this permit or their appurtenances on the right-of-way as may at
any time be considered necessary to permit the relocation, reconstruction, widening or maintaining of the
highway and/or provide proper protection to life and property on or adjacent to the State right-of-way. However,
in the event this permit is granted to construct, locate, operate and maintain utility facilities on the State right-of-
way, the Applicant, upon written request by the Region Engineer, shall perform such alterations or change of
location of the facilities, without expense to the State, and should the Applicant fail to make satisfactory
arrangements to comply with this request within a reasonable time, the State reserves the right to make-such
alterations or change of location or remove the work, and the Applicant agrees to pay for the cost incurred.
Eighth: This permit is effective only insofar as the Department has jurisdiction and does not presume to release
the Applicant from compliance with the provisions of any existing statutes or local regulations relating to the.
construction of such work.
Ninth: The Construction of access driveways is subject to the regulations listed in the "Policy on Permits for
Access Driveways to State Highways." If, in the future, the land use of property served by an access driveway
described and constructed in accordance with this permit changes so as to require a higher driveway type as
defined in that policy, the owner shall apply for a new permit and bear the costs for such revisions as may be
required to conform to the regulations listed in the policy. Utility installations shall be subject to the "Policy on the
Accommodation of Utilities on Right-of-Way of the Illinois State Highway System."
Tenth: The Applicant affirms that the property lines shown on the attached sheet(s) are true and correct and
binds and obligates himself to perform the operation in accordance with the description and attached sketch and
to abide by the policy regulations.
rZ
SPECIAL PROVISIONS
The state right of way shall be left in good condition. (No advertising matter shall be placed on the state right of
way).
All turf areas which are disturbed during the course of this work shall be restored to the original line and grade and
be promptly seeded in accordance with Standard State Specifications.
Whenever any of the work under this permit involves any obstruction or hazard to the free flow of traffic in the
normal traffic lanes, plans for the proposed method of traffic control must be submitted to and approved by the
Regional Engineer at least 72 hours, and preferably longer, before the start of work.
All traffic control shall be in accordance with the State of Illinois Manual of Uniform Traffic Control Devices and
amendments thereof. It should be noted that standards and typical placement of devices shown in the Uniform
Manual are minimums. Many locations may require additional or supplemental devices.
The petitioner agrees to furnish the necessary barricades, lights, and flagmen for the protection of traffic.
Traffic shall be maintained at all times.
The applicant agrees to notify the Department of Transportation upon completion of work covered under the terms
and conditions of this permit so that a final inspection and acceptance can be made.
To avoid any revisions to the work completed under the highway permit, the applicant should insure the conditions
and restrictions of this permit, the applicable supplemental permit specifications and permit drawing are fully
understood.
If Chic r-rmit work is contracted out, it will be the responsibility of the applicant to furnish the contractor with a copy
of this highway permit, as the applicant will be responsible for the contractor's work.
A copy of approved permit shall be present on job site at all times the work is in progress.
The department reserves the right to reject or accept any contractor hired by the applicant.
All excavations shall be promptly backfilled, thoroughly tamped and any excess material removed from the state
right of way (including rock exposed during backfilling operations). Mounding or crowning of backfill will not be
permitted.
K E)
`Arsp�—Z ry Reviewed By:
J� C�
Legal ❑ City Council
Esr. 1 �� .. 18
Finance El
Engineer ❑
y City Administrator ❑ Agenda Item Tracking N ber
Consultant ❑ w L
LE
City Council Agenda Item Summary Memo
Title: Aerial lift truck purchase
City Council/COW/Committee Agenda Date: PW 7-3-06
Synopsis: Results of bid opening for new aerial lift truck
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested: Approval of purchase
Submitted by: Eric Dhuse Public Works
Name Department
Agenda Item Notes:
CO.c United City of Yorkville Memo
Public Works Department
Esr _ 800 Game Farm Road
Yorkville, Illinois 60560
Telephone: 630-553-4370
�LE Fax: 630-553-4377
Date: June 26, 2006
To: Joe Besco, Chairman
From: Eric Dhuse, Director of Public Works
CC:
Subject: Aerial Lift Truck
Joe,
We opened bids for a new aerial lift truck on June 23, 2006. We received two bids which are as
follows:
Bid one—New 2006 Ford F450 with Altec AT37-G articulating aerial unit $75,678.00
Bid two—Demonstrator unit 2006 Ford F450 with Altec AT37-G articulating aerial unit
$69,270.00
I recommend that we purchase the demonstrator unit. It currently has approximately 8,000
miles, can be delivered within 10-14 days and still carries the full factory warranty. The new
unit is $6400+more expensive and will take approximately 240 days to build. This is a
budgeted item under public works capital portion of the budget. I would like to place this on the
July 3, 2006 public works committee agenda for discussion. If you have any questions or
comments, please let me know.
ME)
♦,��D C/Ty Reviewed By:
J2 �� Legal ❑ City Council
Finance ❑
Esr. 1 Engineer ❑
City Administrator ❑ Agenda Item Tracking Number
Consultant ❑ aD
LE
City Council Agenda Item Summary Memo
Title: FYI new MWI water department hire
City Council/COW/Committee Agenda Date: PW 7-3-06
Synopsis: Scheduled hiring of MW I
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by: Eric Dhuse Public Works
Name Department
Agenda Item Notes:
CO.o United City of Yorkville Memo
Public Works Department
ENE 800 Game Farm Road
wt Yorkville, Illinois 60560
�o Telephone: 630-553-4370
�LE Fax: 630-553-4377
Date: June 28, 2006
To: Joe Besco, Chairman
From: Eric Dhuse, Director of Public Works
CC:
Subject: New Hire
Joe,
We have begun the process of hiring a maintenance worker I for the water department. This is a
scheduled hire approved through the budget for a July 1, 2006 start date. I would ask that this be
placed on the Public Works agenda for July 3, 2006 as an FYI item. Please let me know if you
have any questions or concerns.
N6 4 /10
♦,��D C/ry Reviewed By:
J� p� Legal ❑ City Council
EST 1836 Finance ❑
Engineer ( �^' �`'�°6
'�— A enda Item Tracking Number
} y City Administrator ❑ J
Consultant ❑ �N � � �a�
ALE
City Council Agenda Item Summary Memo
Title: Road Fee Resolution
City Council/ COW/Committee Agenda Date: 7/3/06 Public Works Committee
Synopsis: Recommendation to adopt a resolution establishing the road fee.
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Adopt a resolution formally establishing the road fee.
Submitted by: Joe Wywrot Engineering
Name Department
Agenda Item Notes:
United City of Yorkville Memo
800 Game Farm Road
Esr 1836 Yorkville, Illinois 60560
Telephone: 630-553-8545
Fax: 630-553-3436
SCE
Date: June 13, 2006
To: John Crois, Interim City Administrator'' `
From: Joe Wywrot, City Engineer 1
CC: John Wyeth, City Attorney
.Lisa Pickering,Deputy City Clerk
Subject: Road Fee Resolution
The City established a fee of$2000 per residential unit in 2003 during the negotiation of
the Grande Reserve annexation agreement. In that agreement, the city also promised to
endeavor in good faith to apply that fee to other residential developments so that the
Grande Reserve developer would not be placed at a competitive disadvantage.
We have applied the road fee inconsistently in other developments, and in negotiations
with other developers we are beginning to lose sight of the original intent of the fee. The
original intent, and the way it works for Grande Reserve, is that the developer is
obligated to upgrade existing roadways that run through or adjacent to their developments
to "city standards" at their own expense. The city standard would be determined by
taking traffic counts to see what current classification the roadway meets, and then
reconstruct that roadway to that standard. The $2000 per residential unit fee would be
used by the City to upgrade that roadway to a higher standard, or could be applied to any
other roadway anywhere in town at the City's discretion. In some developments,
however, developers have been asking for credit against the fee for the cost of doing the
basic reconstruction to meet city standards.
I recommend that a resolution be adopted to formally establish the road fee, its intent, and
how the funds would be used. Due to the recent increases in the cost of asphalt, I also
recommend that we create a method for periodic increases in the fee amount. Lastly, we
should consider whether we want to apply the fee to non-residential developments, and
how that would be done.
Please place this item on the Public Works Committee agenda of July 3, 2006 for
consideration.
()E)41
,��D CITy Reviewed By:
� City Council
J2 �� Legal ❑
Finance ❑
e
Esr. Z 18 Engineer
lai Agenda Item Tracking Number
y City Administrator El
�O Consultant ❑
LE
City Council Agenda Item Summary Memo
Title: Fox Hill Unit 7—Request for Acceptance
City Council/COW/Committee Agenda Date: 6/5/06 Public Works Committee
Synopsis: The developer has requested final acceptance of the public improvements.
Staff recommendation is to not accept at this time.
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required: Majority
Council Action Requested: Vote to not accept the public improvements.
Submitted by: Joe Wywrot Engineering
Name Department
Agenda Item Notes:
United City of Yorkville Memo
800 Game Farm Road
EST , 1636 Yorkville, Illinois 60560
-� Telephone: 630-553-8545
i y Fax: 630-553-3436
SCE
Date: May 30, 2006
To: John Crois, Interim City Administrator
From: Joe Wywrot, City Engineer
CC: John Wyeth, City Attorney
Lisa Pickering, Deputy City Clerk
Subject: Fox Hill Unit 7—Request for Acceptance
Attached find a letter dated May 12, 2006 from Marvin DeLahr requesting acceptance of
the land improvements for Fox Hill Unit 7. Marvin has stated that all of the
improvements are completed except the final lift of asphalt on the roadway and the public
sidewalk. Per a commitment made by the city years ago,Marvin states that there would
be no one-year warranty for these items.
I have reviewed the request and recommend that the City Council not accept the
improvements at this time. Only two out of the twelve proposed multi-family buildings
have been constructed to date, therefore no punchlist has been prepared. We do not
generate a punchlist until at least 50% of the lots are built out. This is done to minimize
the damage to utilities,roadways, sidewalks, etc.prior to acceptance. With potentially no
warranty period, this becomes even more important.
Please place this item on the Public Works Committee agenda of June 5,2006 for
consideration.
DEVELOPMENT CONSTRUCTION SERVICES L.L.C. Phone:708-479-1306
Fax:708-479-6537
Cell:815-791-6167
19250 EVERETT LANE,SUITE 101 MOKENA,IL 60448 Email•mdelahr@sbcglobal.net
May 12,2006
United City of Yorkville
800 Game Farm Road
Yorkville,II, 60560
Attn.Mr.Joe Wywrot
Re: Fox Hill—Unit 7 letter of credit
Dear Joe,
On behalf of DCI Charrington,Inc,I am requesting a reduction in the current letter of credit
(LOC)on deposit with the United City of Yorkville for Fox Hill,Unit 7.There are currently two
letters of credit.The first LOC(#15716)is in the amount of$30,729.56.The second LOC
(#15804)is in the amount of$203,572.94.These two total$234,302.50.
There are two items that need to be completed.The first item is the asphalt surface course,
which is$14,889.75 on the engineer's estimate of cost(supplied by Smith Engineering
Consultants).The second item is 5,842 sq.ft. of sidewalk,which is$17,233.90 based on the
engineer's estimate of cost of$2.95 per sq.ft. The remaining work totals$32,123.65.We are
requesting the LOC#15716 be,reduced to zero and LOC#15804 be reduced to$35,336.02
($32,123.65 x 110%).
We are also requesting the City accept the completed improvements(not including the two
items listed above).Enclosed is a letter from you to Paul Dresden dated April 9, 1999 stating Fox
Hill Subdivision is grandfathered in under your old subdivision ordinance and there is no 1-year
guarantee period. Since this is the case there is no need for DCI Charrington,Inc.to deliver a
15%maintenance bond to the City as a condition to acceptance of the improvements.
If you have any questions do not hesitate to call.
Sincerely,
Marvin DeLahr
Cc: Paul Dresden
Robert Gamrath III
John Croix
John Wyeth
,9/23/2005 10:52 7084796537 DEUELOPMENTCONSTRUCN PAGE 02
'W. 9.1999 12;25pM C17Y Or YOWV1LLte2 NO-960 1-.d/4
CITY of YORMLL E
C*Woy&ear of K*W*$perry
111 W.Pro%,Ow1w%
0 Y9r1NMs,IL 046
WOi5i,4if0
April 9, 1999
W. Paul Dres4an
Yo*ville D"opumt, lac.
9441 Carsair
Prmk1m,llliaois 60423
Re: Fox N11 Subdivision-Accepthaco of improvements
Dear Paul:
Much of the Fox Kill Subdivision is graodhtharod under our old subdivision ordinance.Two
pmvislow in particular that etv grsndfarhered are ihv construction, guarmnTsN hAd tam*of
acceptance of public ilapMvemen.ts.Construction gvaranteas mast be for 110%of the apptnved
enginte s tatimate of oost for pablic improvements,which would l:lolude items slated to
wsterrnaina,u itaty ecwan,storm eewwv, roadways,eidcwalla,lighting, It Mws"t acto►tioz.
dirtwork is the city tip,4t-of-woy WW parks,ow, Upon suocecsaful cempMoa of the ptmchlist,the
oonstructioc guamwee is reducod to um. There is no 1-yow guarantrm period.
It you have questions about any of these items,please pall me a: 333-4372.
Very say your,
to h w
City a3ngiasw
Cc: liar Niswrirrssy City Adminisara"
Dan Kranw.City Aftmy