Ordinance 2017-34 UNITED CITY OF YORKVILLE
KENDALL COUNTY, ILLINOIS
ORDINANCE NO. 2017-34
AN ORDINANCE DECLARING THE UNITED CITY OF YORKVILLE'S
COMPLIANCE WITH ILLINOIS PREVAILING WAGE ACT
Passed by the City Council of the
United City of Yorkville,Kendall County,Illinois
This 27 b day of June,2017
Published in pamphlet form by the
authority of the Mayor and City Council
of the United City of Yorkville,Kendall
County,Illinois on July 5,2017.
Ordinance No. 2017- 23 L41
AN ORDINANCE DECLARING THE UNITED CITY OF YORKVILLE'S
COMPLIANCE WITH ILLINOIS PREVAILING WAGE ACT
WHEREAS,the State of Illinois has enacted"An ACT regulating wages of laborers,
mechanics, and other workers employed in any public works by the State, County, City or any
public body or any political subdivision or by anyone under contract for public works," approved
June 26, 1941, as amended,being Chapter 820 ILCS 130/1-12 Illinois Compiled Statutes; and
WHEREAS, the aforesaid Act requires that the United City of Yorkville investigate and
ascertain the prevailing rate of wages as defined in said Act for laborers,mechanics, and other
workers in the locality of said City employed in performing construction of public works, for
said City.
NOW THEREFORE, BE IT ORDAINED by the Mayor and City Council of the
United City of Yorkville, Kendall County, Illinois, as follows:
Section 1. As required by"An Act regulating wages of laborers, mechanics and other
workers employed in any public works by the State, County, City or any public body or any
political subdivision or by anyone under contract for public works" approved June 26, 1941, as
amended, the general prevailing rate of wages in the locality for laborers, mechanics, and other
workers engaged in the construction of public works coming under the jurisdiction of this City is
hereby ascertained to be the same as the prevailing rate of wages for construction work in the
Kendall County area as determined by the Department of Labor and the State of Illinois as of
June 5, 2017, a copy of that determination being attached hereto as Exhibit"A"and incorporated
herein by reference. The definition of any terms appearing in this Ordinance which are also used
in the aforesaid Act shall be the same as in said Act.
Section 2. Nothing herein shall be construed to apply said general prevailing rate of
wages as herein ascertained to any work or employment except public works of this City to the
extent required by the aforesaid Act.
Section 3. The City Clerk shall publicly post or keep available for inspection by any
interested party in the main office of this City this determination of such prevailing rate of wage.
Section 4. The City Clerk shall mail a copy of this determination to any employer, and to
any association of employers and to any person or association of employees who have filed or
file their names and addresses,requesting copies of any determination stating the particular rates
and the particular class of workers whose wages will be affected by such rates.
Section S. The City shall promptly file a copy of this Ordinance with the Department of
Labor of the State of Illinois.
Ordinance No.2017- 3q
Page 2
Section 6. The City Clerk shall cause a notice to be published in a newspaper of general
circulation within the area that the determination of prevailing wages has been made. Said notice
shall conform substantially to the notice attached hereto as Exhibit`B". Such publication shall
constitute notice that this is the determination of the City and is effective.
PASSED by the City Council of the United City of Yorkville, Kendall County, Illinois,
this day of A.D. 2017.
City Clerk
CARLO COLOSIMO KEN KOCH
1 �
JACKIE MILSCHEWSKI ARDEN JOE PLOCHER
CHRIS FUNKHOUSER Y JOEL FRIEDERS
\
SEAVER TARULIS l�
ALEX HERNANDEZ
APPROVED by me, as Mayor of the United City of Yorkville, Kendall County, Illinois,
this 30 day of J U E , A.D. 2017.
Mayor
Ordinance No.2017-5q
Page 3
Exhibit A
This schedule contains the prevailing wage rates required to be paid for work performed on or after Monday,June 5,2017 on public works
projects in this County. Pursuant to 820 ILCS 130/4,public bodies in this County that have active public works projects are responsible for
notifying all contractors and subcontractors working on those public works projects of the change(if any)to rates that were previously in
effect. The failure of a public body to provide such notice does not relieve contractors or subcontractors of their obligations under the
Prevailing Wage Act,including the duty to pay the relevant prevailing wage in effect at the time work subject to the Act is performed.
KENDALL COUNTY
PREVAILING WAGE
RATES EFFECTIVE JUNE
5,2017
Base Foreman M-F
TradeTitle Region Type Class Wage Wage OT OSA OSH H/W Pension Vacation Training
ASBESTOS ABT-GEN All All 39.40 39.95 1.5 1.5 2.0 13.42 11.28 0.00 0.50
ASBESTOS ABT-MEC All BLD 37.46 39.96 1.5 1.5 2.0 11.62 11.06 0.00 0.72
BOILERMAKER All BLD 47.07 51.30 2.0 2.0 2.0 6.97 18.13 0.00 0.40
BRICK MASON All BLD 44.88 49.37 1.5 1.5 2.0 10.25 15.30 0.00 0.85
CARPENTER All All 45.35 47.35 1.5 1.5 2.0 11.79 17.61 0.00 0.63
CEMENT MASON All All 43.95 45.95 2.0 1.5 2.0 10.00 19.66 0.00 0.50
CERAMIC TILE FINISHER All BLD 37.81 37.81 1.5 1.5 2.0 10.55 10.12 0.00 0.65
COMMUNICATION
TECH All BLD 39.02 41.27 1.5 1.5 2.0 10.90 10.93 0.00 1.37
ELECTRIC PWR EQMT
OP All All 37.89 51.48 1.5 1.5 2.0 5.00 11.75 0.00 0.38
ELECTRIC PWR EQMT
OP All HWY 40.59 55.15 1.5 1.5 2.0 5.25 12.59 0.00 0.71
ELECTRIC PWR
GRNDMAN All All 29.30 51.48 1.5 1.5 2.0 5.00 9.09 0.00 0.29
ELECTRIC PWR
GRNDMAN All HWY 32.50 55.15 1.5 1.5 2.0 5.25 10.09 0.00 0.58
ELECTRIC PWR
LINEMAN All All 45.36 51.48 1.5 1.5 2.0 5.00 14.06 0.00 0.45
ELECTRIC PWR
LINEMAN All HWY 48.59 55.15 1.5 1.5 2.0 5.25 15.07 0.00 0.85
ELECTRIC PWR TRK
DRV All All 30.34 51.48 1.5 1.5 2.0 5.00 9.40 0.00 0.30
ELECTRIC PWR TRK
DRV All HWY 31.40 53.29 1.5 1.5 2.0 5.00 9.73 0.00 0.31
ELECTRICIAN All BLD 48.63 52.88 1.5 1.5 2.0 11.31 13.62 0.00 1.70
ELEVATOR
CONSTRUCTOR All BLD 51.94 58.43 2.0 2.0 2.0 14.43 14.96 4.16 0.90
FENCE ERECTOR All All 45.56 49.20 2.0 2.0 2.0 11.02 21.51 0.00 0.70
GLAZIER All BLD 41.70 43.20 1.5 2.0 2.0 13.94 18.99 0.00 0.94
HT/FROST INSULATOR All BLD 49.95 52.45 1.5 1.5 2.0 11.62 12.26 0.00 0.72
IRON WORKER All All 45.56 49.20 2.0 2.0 2.0 11.02 21.51 0.00 0.70
LABORER All All 40.20 40.95 1.5 1.5 2.0 13.52 12.28 0.00 0.50
LATHER All All 42.52 44.52 1.5 1.5 2.0 13.29 12.76 0.00 0.63
MACHINIST All BLD 45.35 47.85 1.5 1.5 2.0 7.26 8.95 1.85 0.00
MARBLE FINISHERS All All 33.45 33.45 1.5 1.5 2.0 10.25 14.44 0.00 0.46
MARBLE MASON All BLD 44.13 48.54 1.5 1.5 2.0 10.25 14.97 0.00 0.59
MATERIAL TESTER I All All 30.20 30.20 1.5 1.5 2.0 13.52 12.28 0.00 0.50
MATERIALS TESTER II All All 35.20 35.20 1.5 1.5 2.0 13.52 12.28 0.00 0.50
MILLWRIGHT All All 45.35 47.35 1.5 1.5 2.0 11.79 17.61 0.00 0.63
OPERATING ENGINEER All BLD 1 49.10 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30
OPERATING ENGINEER All BLD 2 47.80 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30
OPERATING ENGINEER All BLD 3 45.25 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30
OPERATING ENGINEER All BLD 4 43.50 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30
OPERATING ENGINEER All BLD 5 52.85 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30
OPERATING ENGINEER All BLD 6 50.10 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30
OPERATING ENGINEER All BLD 7 52.10 53.10 2.0 2.0 2.0 18.05 13.60 1.90 1.30
OPERATING ENGINEER All FLT 37.00 54.75 1.5 1.5 2.0 17.65 12.65 1.90 1.35
OPERATING ENGINEER All HWY 1 47.30 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30
OPERATING ENGINEER All HWY 2 46.75 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30
OPERATING ENGINEER All HWY 3 44.70 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30
OPERATING ENGINEER All HWY 4 43.30 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30
OPERATING ENGINEER All HWY 5 42.10 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30
OPERATING ENGINEER All HWY 6 50.30 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30
OPERATING ENGINEER All HWY 7 48.30 51.30 1.5 1.5 2.0 18.05 13.60 1.90 1.30
ORNAMNTL IRON
WORKER All All 45.56 49.20 2.0 2.0 2.0 11.02 21.51 0.00 0.70
PAINTER All All 42.93 44.93 1.5 1.5 1.5 10.30 8.20 0.00 1.35
PAINTER SIGNS All BLD 33.92 38.09 1.5 1.5 1.5 2.60 2.71 0.00 0.00
PILEDRIVER All All 45.35 47.35 1.5 1.5 2.0 11.79 17.61 0.00 0.63
PIPEFITTER All BLD 47.50 50.50 1.5 1.5 2.0 9.55 17.85 0.00 2.07
PLASTERER All BLD 42.25 44.79 1.5 1.5 2.0 13.65 9.50 5.00 0.65
PLUMBER All BLD 48.25 50.25 1.5 1.5 2.0 14.09 12.65 0.00 1.18
ROOFER All BLD 41.70 44.70 1.5 1.5 2.0 8.28 11.59 0.00 0.53
SHEETMETAL WORKER All BLD 45.77 47.77 1.5 1.5 2.0 10.65 14.10 0.00 0.82
SPRINKLER FITTER All BLD 47.20 49.20 1.5 1.5 2.0 12.25 11.55 0.00 0.55
STEEL ERECTOR All All 45.06 48.66 2.0 2.0 2.0 10.52 20.76 0.00 0.70
STONE MASON All BLD 44.88 49.37 1.5 1.5 2.0 10.25 15.30 0.00 0.85
TERRAZZO FINISHER All BLD 39.54 39.54 1.5 1.5 2.0 10.55 11.79 0.00 0.67
TERRAZZO MASON All BLD 43.38 43.38 1.5 1.5 2.0 10.55 13.13 0.00 0.79
TILE MASON All BLD 43.84 47.84 1.5 1.5 2.0 10.55 11.40 0.00 0.99
TRUCK DRIVER All All 1 37.91 38.46 1.5 1.5 2.0 8.10 7.97 0.00 0.15
TRUCK DRIVER All All 2 38.06 38.46 1.5 1.5 2.0 8.10 7.97 0.00 0.15
TRUCK DRIVER All All 3 38.26 38.46 1.5 1.5 2.0 8.10 7.97 0.00 0.15
TRUCK DRIVER All All 4 38.46 38.46 1.5 1.5 2.0 8.10 7.97 0.00 0.15
TUCKPOINTER All BLD 44.90 45.90 1.5 1.5 2.0 8.30 14.29 0.00 0.48
Explanations
KENDALL COUNTY
The following list is considered as those days for which holiday rates
of wages for work performed apply: New Years Day, Memorial Day,
Fourth of July, Labor Day,Thanksgiving Day,Christmas Day and
Veterans Day in some classifications/counties. Generally,any of
these holidays which fall on a Sunday is celebrated on the following
Monday. This then makes work performed on that Monday payable at the
appropriate overtime rate for holiday pay.Common practice in a given
local may alter certain days of celebration. If in doubt, please
check with IDOL.
EXPLANATION OF CLASSES
ASBESTOS-GENERAL-removal of asbestos material/mold and hazardous
materials from any place in a building,including mechanical systems
where those mechanical systems are to be removed. This includes the
removal of asbestos materials/mold and hazardous materials from
ductwork or pipes in a building when the building is to be demolished
at the time or at some close future date.
ASBESTOS-MECHANICAL-removal of asbestos material from mechanical
systems,such as pipes,ducts,and boilers,where the mechanical
systems are to remain.
CERAMIC TILE FINISHER
The grouting,cleaning,and polishing of all classes of tile,whether
for interior or exterior purposes,all burned,glazed or unglazed
products;all composition materials,granite tiles,warning detectable
tiles,cement tiles,epoxy composite materials, pavers,glass,
mosaics,fiberglass,and all substitute materials,for the made in
tile-like units; all mixtures in tile like form of cement, metals,and
other materials that are for and intended for use as a finished floor
surface,stair treads, promenade roofs,walks,walls,ceilings,
swimming pools,and all other places where tile is to form a finished
interior or exterior. The mixing of all setting mortars including but
not limited to thin-set mortars,epoxies,wall mud,and any other
sand and cement mixtures or adhesives when used in the preparation,
installation,repair,or maintenance of the and/or similar materials.
The handling and unloading of all sand,cement, lime,tile,
fixtures,equipment, adhesives,or any other materials to be used in
the preparation, installation,repair,or maintenance of tile and/or
similar materials. Ceramic Tile Finishers shall fill all joints and
voids regardless of method on all tile work,particularly and
especially after installation of said tile work. Application of any
and all protective coverings to all types of tile installations
including,but not be limited to,all soap compounds,paper products,
tapes,and all polyethylene coverings, plywood,masonite,cardboard,
and any new type of products that may be used to protect the
installations,Blastrac equipment,and all floor scarifying equipment
used in preparing floors to receive tile. The clean up and removal of
all waste and materials. All demolition of existing tile floors and
walls to be re-tiled.
COMMUNICATIONS TECHNICIAN
Construction, installation,maintenance and removal of
telecommunication facilities(voice,sound,data and video),
telephone,security,and data inside wire,interconnect,terminal
equipment,central offices, PABX and equipment, micro waves,V-SAT,
bypass,CAN,WAN (wide area network), LAN(local area networks),and
ISDN(integrated system digital network), pulling of wire in
raceways,but not the installation of raceways.
MARBLE FINISHER
Loading and unloading trucks,distribution of all materials(all
stone,sand,etc.),stocking of floors with material,performing all
rigging for heavy work,the handling of all material that may be
needed for the installation of such materials, building of
scaffolding, polishing if needed, patching,waxing of material if
damaged,pointing up,caulking,grouting and cleaning of marble,
holding water on diamond or Carborundum blade or saw for setters
cutting, use of tub saw or any other saw needed for preparation of
material,drilling of holes for wires that anchor material set by
setters,mixing up of molding plaster for installation of material,
mixing up thin set for the installation of material,mixing up of sand
to cement for the installation of material and such other work as may
be required in helping a Marble Setter in the handling of all
material in the erection or installation of interior marble,slate,
travertine,art marble,serpentine,alberene stone, blue stone,
granite and other stones(meaning as to stone any foreign or domestic
materials as are specified and used in building interiors and
exteriors and customarily known as stone in the trade),carrara,
sanionyx,vitrolite and similar opaque glass and the laying of all
marble tile,terrazzo tile,slate tile and precast tile,steps, risers
treads, base,or any other materials that may be used as substitutes
for any of the aforementioned materials and which are used on interior
and exterior which are installed in a similar manner.
MATERIAL TESTER I: Hand coring and drilling for testing of materials;
field inspection of uncured concrete and asphalt.
MATERIAL TESTER II: Field inspection of welds,structural steel,
fireproofing, masonry,soil,facade, reinforcing steel,formwork,
cured concrete,and concrete and asphalt batch plants;adjusting
proportions of bituminous mixtures.
OPERATING ENGINEER-BUILDING
Class 1.Asphalt Plant;Asphalt Spreader;Autograde; Backhoes with
Caisson Attachment; Batch Plant; Benoto(requires Two Engineers);
Boiler and Throttle Valve;Caisson Rigs; Central Redi-Mix Plant;
Combination Back Hoe Front End-loader Machine;Compressor and Throttle
Valve;Concrete Breaker(Truck Mounted); Concrete Conveyor;Concrete
Conveyor(Truck Mounted);Concrete Paver Over 27E cu.ft;Concrete
Paver 27E cu.ft.and Under:Concrete Placer;Concrete Placing Boom;
Concrete Pump(Truck Mounted);Concrete Tower;Cranes,All;Cranes,
Hammerhead;Cranes, (GCI and similar Type);Creter Crane;Spider
Crane;Crusher,Stone,etc.; Derricks,All; Derricks,Traveling;
Formless Curb and Gutter Machine;Grader, Elevating;Grouting
Machines; Heavy Duty Self-Propelled Transporter or Prime Mover;
Highlift Shovels or Front Endloader 2-1/4 yd.and over; Hoists,
Elevators,outside type rack and pinion and similar machines; Hoists,
One,Two and Three Drum;Hoists,Two Tugger One Floor; Hydraulic
Backhoes; Hydraulic Boom Trucks; Hydro Vac(and similar equipment);
Locomotives,All; Motor Patrol; Lubrication Technician; Manipulators;
Pile Drivers and Skid Rig; Post Hole Digger; Pre-Stress Machine; Pump
Cretes Dual Ram; Pump Cretes:Squeeze Cretes-Screw Type Pumps;Gypsum
Bulker and Pump; Raised and Blind Hole Drill; Roto Mill Grinder;
Scoops-Tractor Drawn;Slip-Form Paver;Straddle Buggies;Operation
of Tie Back Machine;Tournapull;Tractor with Boom and Side Boom;
Trenching Machines.
Class 2. Boilers; Broom,All Power Propelled; Bulldozers;Concrete
Mixer(Two Bag and Over);Conveyor, Portable; Forklift Trucks;
Highlift Shovels or Front Endloaders under 2-1/4 yd.; Hoists,
Automatic; Hoists, Inside Elevators; Hoists,Sewer Dragging Machine;
Hoists,Tugger Single Drum; Laser Screed; Rock Drill (Self-Propelled);
Rock Drill(Truck Mounted); Rollers,All;Steam Generators;Tractors,
All;Tractor Drawn Vibratory Roller;Winch Trucks with"A" Frame.
Class 3.Air Compressor;Combination Small Equipment Operator;
Generators; Heaters, Mechanical; Hoists, Inside Elevators(remodeling
or renovation work); Hydraulic Power Units(Pile Driving, Extracting,
and Drilling); Pumps,over 3" (1 to 3 not to exceed a total of 300
ft.); Low Boys; Pumps,Well Points;Welding Machines(2 through 5);
Winches,4 Small Electric Drill Winches.
Class 4. Bobcats and/or other Skid Steer Loaders;Oilers;and Brick
Forklift.
Class 5.Assistant Craft Foreman.
Class 6.Gradall.
Class 7. Mechanics;Welder.
OPERATING ENGINEERS-HIGHWAY CONSTRUCTION
Class 1.Asphalt Plant;Asphalt Heater and Planer Combination;Asphalt
Heater Scarfire;Asphalt Spreader;Autograder/GOMACO or other similar
type machines:ABG Paver; Backhoes with Caisson Attachment; Ballast
Regulator; Belt Loader;Caisson Rigs;Car Dumper;Central Redi-Mix
Plant;Combination Backhoe Front Endloader Machine, (1 cu.yd. Backhoe
Bucket or over or with attachments);Concrete Breaker(Truck
Mounted);Concrete Conveyor;Concrete Paver over 27E cu.ft.;Concrete
Placer;Concrete Tube Float; Cranes,all attachments;Cranes,Tower
Cranes of all types:Creter Crane:Spider Crane;Crusher,Stone,etc.;
Derricks,All;Derrick Boats; Derricks,Traveling; Dredges;
Elevators,Outside type Rack&Pinion and Similar Machines; Formless
Curb and Gutter Machine;Grader, Elevating;Grader, Motor Grader,
Motor Patrol,Auto Patrol, Form Grader, Pull Grader,Subgrader; Guard
Rail Post Driver Truck Mounted; Hoists,One,Two and Three Drum; Heavy
Duty Self-Propelled Transporter or Prime Mover; Hydraulic Backhoes;
Backhoes.with shear attachments up to 40'of boom reach; Lubrication
Technician; Manipulators;Mucking Machine; Pile Drivers and Skid Rig;
Pre-Stress Machine; Pump Cretes Dual Ram; Rock Drill-Crawler or Skid
Rig; Rock Drill-Truck Mounted; Rock/Track Tamper; Roto Mill
Grinder;Slip-Form Paver;Snow Melters; Soil Test Drill Rig(Truck
Mounted);Straddle Buggies; Hydraulic Telescoping Form(Tunnel);
Operation of Tieback Machine; Tractor Drawn Belt Loader;Tractor
Drawn Belt Loader(with attached pusher-two engineers);Tractor with
Boom;Tractaire with Attachments;Traffic Barrier Transfer Machine;
Trenching;Truck Mounted Concrete Pump with Boom; Raised or Blind Hole
Drills(Tunnel Shaft); Underground Boring and/or Mining Machines 5
ft. in diameter and over tunnel, etc; Underground Boring and/or Mining
Machines under 5 ft. in diameter;Wheel Excavator,Widener(APSCO).
Class 2. Batch Plant; Bituminous Mixer; Boiler and Throttle Valve;
Bulldozers;Car Loader Trailing Conveyors;Combination Backhoe Front
Endloader Machine(Less than 1 cu.yd. Backhoe Bucket or over or with
attachments);Compressor and Throttle Valve;Compressor,Common
Receiver(3);Concrete Breaker or Hydro Hammer;Concrete Grinding
Machine;Concrete Mixer or Paver 7S Series to and including 27 cu.
ft.; Concrete Spreader,Concrete Curing Machine, Burlap Machine,
Belting Machine and Sealing Machine; Concrete Wheel Saw;Conveyor Muck
Cars(Haglund or Similar Type); Drills,All; Finishing Machine-
Concrete; Highlift Shovels or Front Endloader; Hoist-Sewer Dragging
Machine; Hydraulic Boom Trucks(All Attachments); Hydro-Blaster; Hydro
Excavating(excluding hose work); Laser Screed;All Locomotives,
Dinky;Off-Road Hauling Units(including articulating)Non
Self-Loading Ejection Dump; Pump Cretes:Squeeze Cretes-Screw Type
Pumps,Gypsum Bulker and Pump; Roller,Asphalt; Rotary Snow Plows;
Rototiller,Seaman,etc.,self-propelled;Self-Propelled Compactor;
Spreader-Chip-Stone,etc.;Scraper-Single/Twin Engine/Push and
Pull;Scraper-Prime Mover in Tandem (Regardless of Size);Tractors
pulling attachments,Sheeps Foot,Disc,Compactor,etc.;Tug Boats.
Class 3. Boilers; Brooms,All Power Propelled;Cement Supply Tender;
Compressor,Common Receiver(2); Concrete Mixer(Two Bag and Over);
Conveyor, Portable; Farm-Type Tractors Used for Mowing,Seeding,etc.;
Forklift Trucks; Grouting Machine; Hoists,Automatic; Hoists,All
Elevators; Hoists,Tugger Single Drum;Jeep Diggers; Low Boys; Pipe
Jacking Machines; Post-Hole Digger; Power Saw,Concrete Power Driven;
Pug Mills; Rollers,other than Asphalt;Seed and Straw Blower;Steam
Generators;Stump Machine;Winch Trucks with "A" Frame;Work Boats;
Tamper-Form-Motor Driven.
Class 4.Air Compressor;Combination-Small Equipment Operator;
Directional Boring Machine;Generators; Heaters, Mechanical; Hydraulic
Power Unit(Pile Driving, Extracting,or Drilling); Light Plants,All
(1 through 5); Pumps,over 3" (1 to 3 not to exceed a total of 300
ft.); Pumps,Well Points;Vacuum Trucks(excluding hose work);Welding
Machines(2 through 5);Winches,4 Small Electric Drill Winches.
Class 5.SkidSteer Loader(all); Brick Forklifts;Oilers.
Class 6. Field Mechanics and Field Welders
Class 7. Dowell Machine with Air Compressor; Gradall and machines of
like nature.
OPERATING ENGINEERS-FLOATING
Diver. Diver Wet Tender, Diver Tender, ROV Pilot, ROV Tender
SURVEY WORKER-Operated survey equipment including data collectors,
G.P.S.and robotic instruments,as well as conventional levels and
transits.
TRUCK DRIVER-BUILDING, HEAVY AND HIGHWAY CONSTRUCTION
Class 1. Two or three Axle Trucks. A-frame Truck when used for
transportation purposes;Air Compressors and Welding Machines,
including those pulled by cars, pick-up trucks and tractors;
Ambulances Batch Gate Lockers; Batch Hopperman;Car and Truck Washers;
Carry-alls; Fork Lifts and Hoisters; Helpers; Mechanics Helpers and
Greasers;Oil Distributors 2-man operation; Pavement Breakers; Pole
Trailer, up to 40 feet; Power Mower Tractors;Self-propelled Chip
Spreader;Skipman;Slurry Trucks,2-man operation;Slurry Truck
Conveyor Operation, 2 or 3 man;Teamsters; Unskilled Dumpman;and
Truck Drivers hauling warning lights, barricades,and portable
toilets on the job site.
Class 2. Four axle trucks; Dump Crets and Adgetors under 7 yards;
Dumpsters,Track Trucks, Euclids, Hug Bottom Dump Turnapulls or
Turnatrailers when pulling other than self-loading equipment or
similar equipment under 16 cubic yards; Mixer Trucks under 7 yeards;
Ready-mix Plant Hopper Operator,and Winch Trucks, 2 Axles.
Class 3. Five axle trucks; Dump Crets and Adgetors 7 yards and over;
Dumpsters,Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or
turnapulls when pulling other than self-loading equipment or similar
equipment over 16 cubic yards; Explosives and/or Fission Material
Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit;
Oil Distributors, 1-man operation;Pole Trailer,over 40 feet; Pole
and Expandable Trailers hauling material over 50 feet long;Slurry
trucks, 1-man operation;Winch trucks,3 axles or more;
Mechanic--Truck Welder and Truck Painter.
Class 4. Six axle trucks; Dual-purpose vehicles,such as mounted
crane trucks with hoist and accessories; Foreman; Master Mechanic;
Self-loading equipment like P.B.and trucks with scoops on the front.
TERRAZZO FINISHER
The handling of sand,cement, marble chips,and all other materials
that may be used by the Mosaic Terrazzo Mechanic,and the mixing,
grinding,grouting,cleaning and sealing of all Marble, Mosaic,and
Terrazzo work,floors, base,stairs,and wainscoting by hand or
machine,and in addition,assisting and aiding Marble, Masonic,and
Terrazzo Mechanics.
Other Classifications of Work:
For definitions of classifications not otherwise set out,the
Department generally has on file such definitions which are available.
If a task to be performed is not subject to one of the
classifications of pay set out,the Department will upon being
contacted state which neighboring county has such a classification and
provide such rate,such rate being deemed to exist by reference in
this document. If no neighboring county rate applies to the task,
the Department shall undertake a special determination,such special
determination being then deemed to have existed under this
determination. If a project requires these,or any classification not
listed, please contact IDOL at 217-782-1710 for wage rates or
clarifications.
LANDSCAPING
Landscaping work falls under the existing classifications for laborer,
operating engineer and truck driver. The work performed by landscape
plantsman and landscape laborer is covered by the existing
classification of laborer. The work performed by landscape operators
(regardless of equipment used or its size) is covered by the
classifications of operating engineer. The work performed by
landscape truck drivers(regardless of size of truck driven)is
covered by the classifications of truck driver.
MATERIAL TESTER&MATERIAL TESTER/INSPECTOR I AND II
Notwithstanding the difference in the classification title,the
classification entitled "Material Tester I" involves the same job
duties as the classification entitled"Material Tester/Inspector I".
Likewise,the classification entitled "Material Tester II" involves
the same job duties as the classification entitled "Material
Tester/Inspector II".
Exhibit "B"
Public Notice
Notice of Ordinance No.
Prevailing Wage Rates
The United City of Yorkville has passed an Ordinance establishing the prevailing rate of
wages hereby ascertained to be the same as the prevailing rate of wages for construction
work in the Kendall County area as determined by the Department of Labor and the State
of Illinois as of June 5, 2017. Anyone wishing to inspect the ordinance may do so at:
City Hall, 800 Game Farm Road,Yorkville, Illinois, Monday through Friday,between
the hours of 8:00 A.M. and 4:30 P.M.
BETH WARREN
City Clerk
BY: Lisa Pickering
Deputy Clerk