Loading...
Resolution 2005-21 I i STATE OF ILLINOIS ) )ss COUNTY OF KENDALL ) RESOLUTION NO. 2005- a\ RESOLUTION APPROVING AGREEMENT WITH Engineering Enterprises, Inc FOR Raymond Storm Sewer Outfall WHEREAS, the City Council of the United City of Yorkville has considered approval of an agreement with Engineering Enterprises Inc. ( "EEI ") for Design and Construction Engineering Services for the Raymond Storm Sewer Outfall; and WHEREAS, a copy of said agreement dated is attached hereto and incorporated herein as Exhibit "A "; and NOW THEREFORE, upon Motion duly made, seconded and approved by the majority of those members of the City Council voting, the Agreement in the form set forth in Exhibit "A" is hereby approved subject to receipt of funding, and the Mayor and City Clerk are authorized to execute said Agreement on behalf of the United City of Yorkville. WANDA OHARE JOSEPH BESCO VALERIE BURD PAUL JAMES LARRY KOT � MARTY Mi1NNS ROSE SPEARS RICHARD STICKA c Approved by me, as Mayor of the United City of Yorkville, Kendall County, Illinois, this \ Day of jct2 D , A.D. 2005. MAYOR Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this \2- day of Cam - , A.D. 2005. ATTEST: CITY CLERK Prepared by: John Justin Wyeth City Attorney United City of Yorkville 800 Game Farm Road Yorkville, IL 60560 52 Wheeler Road • Sugar Grove, IL 60554 TEL: 630/466 -9350 FAX: 630/466 -9380 www.eeiweb.com Englnssring Entsrprlws=. Inc. March 30, 2005 Mr. Joseph A. Wywrot, P.E. City Engineer United City of Yorkville 800 Game Farm Road Yorkville, IL 60560 Re; Design and Construction Engineering Services for the Raymond Storm Sewer Outfall, United City of Yorkville, Kendall County, Illinois Dear Mr. Wywrot: Thank you for the opportunity to submit this proposal for professional services, consisting of civil engineering and land surveying services, for the above referenced project. Our proposal presents in more detail below the following items: Project Description, Scope of Services, Fees and Conditions, Qualifications and Acceptance. PROJECT DESCRIPTION ' The United City of Yorkville, hereinafter called Client, has requested a proposal from our firm to provide professional services for a drainage improvement project within the Raymond Drainage Area in Bristol Township, Kendall County, Illinois. SCOPE OF SERVICES Our firm proposes to furnish the necessary personnel, materials, equipment and transportation to make necessary investigations (exclusive of subsurface soil sampling and testing, drain tile investigations, wetland delineations or investigations, archaeological studies, endangered species studies and NPDES permitting), analyses and designs to perform field and office professional services for the above referenced project, in accordance with the detailed scope of services listed below and accepted civil engineering and land surveying practices. Consulting Engineers Specializing in Civil Engineering and Land Surveying Mr. Joseph A. Wywrot, P.E. March 30, 2005 Page 2 Preliminary Desiqn Services The preliminary design services for this project which were required for timely decisions regarding routing and sizing for the benefit of proposed developments along the potential route have been performed under a separate contract and are not included in this proposal. Final Desian Services To help ensure quality in the improvement plans, our Project Manager will coordinate the activities of our design team and the desires of the Client. Major individual work items are described in more detail as follows: Easement Documents Easement documents covering the route of the proposed storm sewer, including both permanent and temporary construction easements, will be prepared for execution by the affected property owners and the Client. Improvement Plans A complete set of improvement plans will be provided detailing the design of the drainage system. Special Provisions and Contract Proposal A complete set of detailed special provisions will be prepared to govern the construction of the proposed improvements. The contract proposal will be utilized in securing bids from contractors for construction of the project. Cost Estimate An engineer's opinion of probable construction cost will be prepared, based on the summary of quantities prepared as part of the improvement plans. Contract Award We will assist the Client in the receipt and evaluation of proposals and the awarding of the construction contract. G:1PubliclYorkville120041YO0413 Raymond Storm Sewer Outfandocs1pp103Final.doc I Mr. Joseph A. Wywrot, P.E. March 30, 2005 Page 3 Construction Services To help ensure quality in the constructed project, our Project Manager will continue his involvement in the project for the various activities during construction. Major individual work items are described in more detail below as follows: Construction Administration To ensure that the contractor will meet the requirements of the contract proposal, our firm will administer the execution of the contract documents, conduct a pre- construction conference and certify payouts when requested by the contractor. Construction Stakinq Engineering Enterprises, Inc. will provide line and grade construction staking to enable the contractor to proceed with his work through a field interpretation of the improvement plans. One staking will be provided at critical locations for the proposed improvements. Record Drawinqs Upon completion of all construction activities for this project, the original drawings will be modified to reflect record information to be provided by the contractors. One (1) set of reproducible sepia mylar drawings, two (2) sets of blueline prints of the record drawings and one (1) electronic file in an acceptable format will be furnished to the Client. Construction Observation To determine the general conformance with the improvement plans and contract proposal, Engineering Enterprises, Inc. will provide periodic observation of the work performed by contractors and will report our findings to the Client. FEES AND CONDITIONS The proposed methods of payment for the required professional engineering and land surveying services are at Lump Sum (LS), Hourly (HR), and /or Actual Cost (AC) fees for the various classifications of employees who will perform the work as listed on the attached Standard Schedule of Charges dated January 1, 2005. A brief explanation of the reasons for the various proposed Lump Sum and Hourly and /or Actual Cost fees is in order and is as follows: 1. The proposed Lump Sum fee is for work that is clearly defined and is under our control; 2. The proposed Hourly fee is for work that is subject to unknown conditions, experience of the contractors, and other conditions that are not under our control; and 3. The proposed Actual Cost fee is for work and /or expenses the exact cost of which cannot be determined in advance. GAPub1ic\Yorkvi11e\2004 \Y00413 Raymond Storm Sewer Outfandocs\pp103Final.doc Mr. Joseph A. Wywrot, P.E. March 30, 2005 Page 4 The proposed methods and amounts of payment for Final Design Services is as follows: $44,000 Lump Sum. The proposed methods and amounts of payment for Construction Engineering Services are as follows: Construction Administration - $7,000 Lump Sum; Construction Staking - $7,500 (estimated) Hourly; Record Drawings - $2,500 Lump Sum and Construction Observation - $18,000 (estimated) Hourly. Therefore, the total estimated Lump Sum and Hourly fees for Final Design and Construction Services is $79,000. The proposed method of payment for reproduction services for plans and /or plats is at the rate of $1.50 per sheet for blueline prints and $3.00 per sheet for mylar sheets reproduced by our firm or at the actual cost of reproduction services provided by our vendors. In the alternative, the Client may borrow the original drawings, make the necessary reproductions and return the original drawings to our firm. Payment for all work will be based on invoices submitted periodically by our firm, but not more frequently than monthly as the work progresses. Invoices will be payable by the Client within 30 days of the date of the invoice. Additional assignments not described above will be performed at an hourly rate for the various classifications of employees who will perform the work as listed on the attached Standard Schedule of Charges dated January 1, 2005, or in accordance with a separate proposal. QUALIFICATIONS Engineering Enterprises, Inc. is actively engaged in the planning, design and construction of both public and private improvement projects requiring professional engineering and land surveying services in Northern Illinois. We have invested in the most current technological equipment to provide quality field investigations and accurate drawings with rapid and cost effective survey, design and construction document production and revision capabilities. Our staff has the experience, enthusiasm and commitment to provide the required services in a reliable, timely and cost effective manner. While various members of our firm will perform the work on this project, the principal contact person with our firm will be John T. Whitehouse, P.E., P.L.S., Senior Project Manager. Jeffrey W. Freeman, P.E., Senior Project Manager will also be available as necessary to ensure the satisfactory completion of the project. G:\Pub1ic \Yorkvi11e\2004 \Y00413 Raymond Storm Sewer 0utfa11 \docs\pp103Fina1.doc Mr. Joseph A. Wywrot, P.E. March 30, 2005 Page 5 ACCEPTANCE If selected, we will give our full attention to the project so that it may be constructed as soon as practicable, consistent with performance of our services, and other considerations. If the Project Description, Scope of Services, and Fees and Conditions, as cited above are satisfactory, please indicate your acceptance by signing both of the enclosed proposals and returning one of them to us for our records. We understand that the Notice to Proceed with the Final Design Services is contingent upon the City receiving developer deposits or on other funding sources which may not yet be in place. We are anxious to proceed as soon as possible on this design work so this project may be constructed this year. We welcome the opportunity to submit this proposal for professional services to you for your consideration. We look forward to working with and for you on this exciting and necessary project. Respectfully submitted, ENGINEERING ENTERPRISES, INC. '_ Ile John T. Whitehouse, P.E., P.L.S. Senior Project Manager Enclosures i i I i I ' I G: \Public \Yorkville\?_0041YO0413 Raymond Storm Sewer Outfa111docs\pp103Fina1.doc Mr. Joseph A. Wywrot, P.E. March 30, 2005 Page 6 AGREEMENT All terms and conditions to this Agreement for Professional Services Accepted this \ a day of (1� 2005. i By UNITED CITY OF YORKVILLE Organization 800 Game Farm Road Address Yorkville IL 60560 City State Zip Accepted this day of , 2005. ENGINEERING ENTERPRISES. INC. Organization 52 Wheeler Road Address Suaar Grove IL 60554 _= �kk�;' 154 •,c� � P62.28evn •� City State Zip ' �' R o Fesslo NA 1. DESIGN ; n By 0 A A Senior Project Manager ' By Secretary t ` G: \Pub1ic \Yorkvi11e\2004 \Y00413 Raymond Storm Sewer 0utfa11\dots \pp103Fina1.doc 52 Wheeler Road • Sugar Grove, IL 60554 TEL: 630/466 -9350 FAX: 630/466.9380 lit STANDARD SCHEDULE OF CHARGES www•eelwob.com January 1, 2005 Englnssring Entsrprimeow. Inc. EMPLOYEE DESIGNATION CLASSIFICATION HOURLY RATE Principal Engineer E -3 $138.00 Senior Project Manager E -2 $126.00 Project Manager E -1 $114.00 Senior Project Engineer /Surveyor P -5 $102.00 Project Engineer /Surveyor P -4 $ 93.00 Senior Engineer /Surveyor P -3 $ 84.00 Engineer /Surveyor P -2 $ 75.00 Associate Engineer /Surveyor P -1 $ 66.00 Senior Project Technician T -5 $ 93.00 Project Technician T -4 $ 84.00 I Senior Technician T -3 $ 75.00 Technician T -2 $ 66.00 i Associate Technician T -1 $ 57.00 Secretary A -3 $ 66.00 VEHICLES, EQUIPMENT AND REPROGRAPHICS Vehicle for Construction Observation VEH $ 10.00 Global Positioning System Equipment GPS $ 25.00 Scanning ($1.50 per Sheet) SCA N/A Reproduction ($1.50 per Sheet) REP N/A G: \EEI \DOCS \FORMS \GENERAL\STADS0105.DOC Consulting Engineers Specializing in Civil Engineering and Land Surveying