Resolution 2005-32 'boas' 3'a
RESOLUTION
WHEREAS, the United City of Yorkville located in the county of Kendall, state of Illinois, wishes to construct a
ubdivision access and related improvements adjacent to IL Route 47 which by law cones under the fur sdiction
-,hd control of the Department of Transportation of the state of Illinois, and COPY
WHEREAS, a permit from said Department is required before said work can be legally 'Mals4ak°^ id United
City of Yorkville; now
.THEREFORE, be it resolved by the United City of Yorkville, county of Kendall, state of Illinois.
FIRST: That we do hereby request from the Department of Transportation, state of Illinois, a permit authorizing
the United City of Yorkville to proceed with the work herein described and as shown on enclosed detailed plans.
SECOND: Upon completion of the proposed subdivision access by the contractor and acceptance by the city,
the city guarantees that all work has been performed in accordance with the conditions of the permit to be
granted by the Department of Transportation of the state of Illinois.
Further, the city will hold the state of Illinois harmless-for any damages that may occur to persons or property
during such work.
The city will require the contractor to obtain a bond and a comprehensive general liability insurance policy in
acceptable amounts and will require the developer to add the State of Illinois as an additional insured on both
policies.
THIRD: That we hereby state that the proposed work is not, (delete one) to be performed by the employees
of the United City of Yorkville.
. , OURTH: That the proper officers of the United City of Yorkville are hereby instructed and authorized to sign
said permit in behalf of the United City of Yorkville.
hereby certify the above to be a
(City r Village Clerk)
copy of the resolution passed by the City Council, county of Kendall, State of Illinois.
Dated this \A day of Sot- A.D. 20
( 'gnature) I,
(CORPORATE SEAL)
RESOLUTION
III
Illinois Department' 3a '
of Transportation Highway Permit
District Serial No.
PMT442ac /L -9059
United City of Yorkville and Windett Ridge
(We) c/o Siebert Engineering 261 Eisenhower Lane South
(Name of Applicant) (Mailing Address)
Lombard IL 60148 Hereinafter termed the Applicant,
(City) (State)
request permission and authority to do certain work herein described on the right -of -way of the State Highway
known IL Route 47 Section -- - - - - -- From Station * . to Station
Kendall County. The work is described in detail on the attached sketch and /or as follows:
Located South of IL Route 71.
Upon approval this permit authorizes the applicant to locate, construct, operate and maintain at the above
mentioned location, a subdivision entrance and related improvements as shown on the attached plans which
become a part hereof.
The applicant shall notify John Humenick, Field Engineer, Phone: 630 - 553 -7337 or the District Permit Section,
Phone: 815- 434 -8490 twenty -four hours in advance of starting any work covered by this permit.
Aggregate material shall be obtained from a State approved stock pile and shall be: SUB -BASE GRANULAR
MATERIAL TYPE A (CA -6 Gradation).
This work shall be done according to the cross section shown on the attached sketch, and at no place between
the edge of the pavement and the ditch line shall the drive be higher than the edge of pavement.
(SEE THE ATTACHED SPECIAL PROVISIONSI
It is understood that the work authorized by this permit shall be completed within 180 days after the date this permit
is approved, otherwise the permit becomes null and void.
This permit is subject to the conditions and restrictions printed on the reverse side of this sheet.
This permit is hereby accepted and its provisions agreed to this \Lk Day of 20 05
Witness J \%. Signed
I N Applicant
800 Game Farm Road 800 Game. ?arm Road
Mailing Address Mailing Address
Yorkville. Illinois 650560 Ybrkv 11e. 1 60560
City State city State
SIGN AND RETURN TO: District Engineer 700 East Norris Drive, Ottawa, IL 61350
Approved this day of 20
Department of Transportation
CC:Applicant (2)
Field Engineer
Final Inspection
BY:
Deputy Director of Highways, Region Engineer
SPECIAL PROVISIONS
she State right -of -way shall be left in good condition. (No advertising matter shall be placed on the State right -
of -way).
All turf areas which are disturbed during the course of this work shall be restored to the original line and grade
and be promptly seeded in accordance with Standard State Specifications.
Whenever any of the work under this permit involves any obstruction or hazard to the free flow of traffic in the
normal traffic lanes, plans for the proposed method of traffic control must be submitted to and approved by the
District Engineer at least 72 hours, and preferably longer, before the start of work.
All traffic control shall be in accordance with the State of Illinois Manual of Uniform Traffic Control Devices and
amendments thereof. It should be noted that standards and typical placement of devices shown in the Uniform
Manual are minimums. Many locations may require additional or supplemental devices.
The petitioner agrees to furnish the necessary barricades, lights, and flagmen for the protection of traffic.
Traffic shall be maintained at all times.
The applicant agrees to notify the Department of Transportation upon completion of work covered under the
terms and conditions of this permit so that a final inspection and acceptance can be made.
To avoid any revisions to the work completed under the highway permit, the applicant should insure the
conditions and restrictions of this permit, the applicable supplemental permit specifications and permit drawing
are fully understood.
If this permit work is contracted out, it will be the responsibility of the applicant to furnish the contractor with a
copy of this highway permit, as the applicant will be responsible for the contractor's work.
A copy of approved permit shall be present on job site at all times the work is in progress.
The Department reserves the right to reject or accept any contractor hired by the applicant.
No person, firm, corporation or institution, public or private, shall discharge or empty any type of sewage,
including the effluent from septic tanks or other sewage treatment devices, or any other domestic, commercial or
industrial waste, or any putrescible liquids, or cause the same to be discharged or emptied in any manner into
open ditches along.any public street or highway, or into any drain or drainage structure installed solely for street
or highway drainage purposes.
The excavation under the pavement shall be replaced with controlled low strength material, and the pavement
replaced in accordance with pavement replacement details. All excess material shall be removed from the
highway right -of -way.
All excavations shall be promptly backfilled, thoroughly tamped and any excess material removed from the State
right -of -way (including rock exposed during backfilling operations). Mounding or crowning of backfill will not be
permitted.
Excavation adjacent to the edge of pavement shall be shored to prevent caving if the distance is less than ten
(10) feet plus the depth of excavation from the edge of pavement.
All material or equipment stored along the highway shall be placed as remote as practical from the edge of
pavement in a manner to minimize its being a hazard to errant vehicles or an obstacle to highway maintenance.
If material is to be stored on the highway right -of -way for more than two weeks prior to installation, written
approval must be obtained from the Department.
PMT442ac/L -9059