Resolution 2005-77 RESOLUTION
WHEREAS, the City of Yorkville located in the county of Kendall, state of Illinois, wishes to commercial entrance
and related improvements along US Route 34 which by law comes under the jurisdiction and control of the
Department of Transportation of the state of Illinois, and
WHEREAS, a permit from said Department is required before said work can be legally undertaken by said City of
Yorkville; now
THEREFORE, be it resolved by the City of Yorkville, county of Kendall, state of Illinois.
FIRST: That we do hereby request from the Department of Transportation, state of Illinois, a permit authorizing
the City of Yorkville to proceed with the work herein described and as shown on enclosed detailed plans.
SECOND: Upon completion of the proposed commercial entrance by the contractor and acceptance by the city,
the city guarantees that all work has been performed in accordance with the conditions of the permit to be
granted by the Department of Transportation of the state of Illinois.
Further, the city will hold the state of Illinois harmless for any damages that may occur to persons or property
during such work.
The city will require the contractor to obtain a bond and a comprehensive general liability insurance policy in
acceptable amounts and will require the developer to add the State of Illinois as an additional insured on both
policies.
THIRD: That we hereby state that the proposed work4o is not, (delete one) to be performed by the employees
of the City of Yorkville.
FOURTH: That the proper officers of the City of Yorkville are hereby instructed and authorized to sign said
permit in behalf of the City of Yorkville.
I, -� , hereby certify the above to be a
(City or Village Clerk)
true copy of the resolution passed by the City Council, county of Kendall, State of Illinois.
Dated this 8 day of 40VF- MaF - A.D. 20 05
(Sign ture)
(CORPORATE SEAL)
RESOLUTION
Illin Department aoos •-n
of Transportation Highway Permit
District Serial No.
PMT482ac /L -9504
City of Yorkville
(We) Castle Bank c/o Koziol Eng. 1709 Ogden Ave.
(Name of Applicant) (Mailing Address)
Lisle IL 60532 Hereinafter termed the Applicant,
(City) (State)
request permission and authority to do certain work herein described on the right -of -way of the State Highway
known US Route 34 Section - - - - -- From Station to Station
Kendall County. The work is described in detail on the attached sketch and /or as follows:
Located east of Center Parkway.
Upon approval this permit authorizes the applicant to locate, construct, operate and maintain at the above
mentioned location, a bituminous surfaced, right -in /right -out, commercial entrance and related improvements as
shown on the attached plans which become a part hereof.
The applicant shall notify John Humenick, Field Engineer, Phone: 630 -553 -7337 or the District Permit Section,
Phone: 815- 434 -8490 twenty -four hours in advance of starting any work covered by this permit.
Aggregate material shall be obtained from a State approved stock pile and shall be: SUB -BASE GRANULAR
MATERIAL TYPE A, (CA -6 Gradation).
This work shall be done according to the cross section shown on the attached sketch, and at no place between
the edge of the pavement and the ditch line shall the drive be higher than the edge of pavement.
(SEE THE ATTACHED SPECIAL PROVISIONS)
It is understood that the work authorized by this permit shall be completed within 180 days after the date this permit
is approved, otherwise the permit becomes null and void.
This permit is subject to the conditions and restrictions printed on the reverse side of this sheet.
This permit is hereby accepted and its provisions agreed to this -%� Da ..of 20
Witness Signed
Applicant
800.Game Farin Road 800 Game Farm Road
Mailing Address Mailing Address .
Yorkville Illinois- 60560 Yorkvill Illinois 60
City State City State
SIGN AND RETURN TO: District Engineer 700 East Norris Drive, Ottawa, IL 61350
Approved this day of 20
Department of Transportation
CC:Applicant (2)
Field Engineer
Final Inspection
BY:
Deputy Director of Highways, Region Engineer
I
SPECIAL PROVISIONS
The State right -of -way shall be left in good condition. (No advertising matter shall be placed on the State right -
of -way).
I
The petitioner, their successors, or assigns, shall maintain that portion of the driveway on State right -of -way in
such a manner satisfactory to the Department, otherwise the Department will maintain the shoulders included in
the entrance driveways to the same standard that exists on adjacent shoulders, and if necessary, such areas will
be restored to the original cross section and earth shoulders.
All turf areas which are disturbed during the course of this work shall be restored to the original line and grade
and be promptly seeded in accordance with Standard State Specifications.
Whenever any of the work under this permit involves any obstruction or hazard to the free flow of traffic in the
normal traffic lanes, plans for the proposed method of traffic control must be submitted to and approved by the
District Engineer at least 72 hours, and preferably longer, before the start of
All traffic control shall be in accordance with the. State of Illinois Manual of Uniform Traffic Control Devices and
amendments thereof. It should be noted that standards and typical placement of devices shown in the Uniform
Manual are minimums. Many locations may require additional or supplemental devices.
The petitioner agrees to furnish the necessary barricades, lights, and flagmen for the protection of traffic.
Traffic shall be maintained at all times.
The applicant agrees to notify the Department of Transportation upon completion of work covered under the
terms and conditions of this permit so that a final inspection and acceptance can be made.
To avoid any revisions to the work completed under the highway permit, the applicant should insure the
conditions and restrictions of this permit, the applicable supplemental permit specifications and permit drawing
are fully understood.
If this permit work is contracted out, it will be the responsibility of the applicant to furnish the contractor with a
copy of this highway permit, as the applicant will be responsible for the contractor's work.
A copy of approved permit shall be present on job site at all times the work is in progress.
The Department reserves the right to reject or accept any contractor hired by the applicant.
PMT482ac /L -9504