HomeMy WebLinkAboutPlan Commission Packet 2004 06-09-04 ,coo Co),
0 United City of Yorkville
County Seat of Kendall County
EST.erwi 1836
800 Game Farm Road
V) Yorkville, Illinois 60560
o Ii' 4' ` o Phone:630-553-4350
Fax:630-553-7575
KerMeil Counl'
PLAN COMMISSION
AGENDA
Wednesday, June 9, 2004
City Council Chambers
800 Game Farm Road
Meeting Called to Order: 7:00 p.m.
Roll Call:
Previous Meeting Minutes: Corrections/Approval: May 12, 2004
Public Hearings: None
Presentation: None
Old Business: None
New Business:
1. PC 2004-05 Prairie Meadows - Final Plat
2. PC 2004-06 Bristol Bay - Concept Plan
3. PC 2004-07 Theidel Property - Concept Plan
Additional Business:
Adjournment:
Page 1 of 6
UNITED CITY OF YORKVILLE
PLAN COMMISSION MEETING
YORKVILLE CITY HALL COUNCIL CHAMBERS
WEDNESDAY, MAY 12, 2004
Deputy Chairman Anne Lucietto called the meeting to order at 7:02 p.m.
ROLL CALL
Members present: Andrew Kubala, Brian Schillinger, Bill Davis and Clarence Holdiman.
No quorum was established; Deputy Chairman Lucietto stated that there was no action to
be taken this evening and asked the presenters to proceed.
Members Michael Crouch arrived 7:04 and Kerry Green arrived 7:20.
VISITORS
Mayor Art Prochaska; Alderman Richard Sticka; City Attorney Kelly Kramer; City
Planner Mike Schoppe; Lynn Dubajic from the Yorkville Economic Development
Corporation; and John Whitehouse, Engineering Enterprises, Inc. Also, see attached sign-
in sheet.
MINUTES
None
PUBLIC HEARINGS
None
PRESENTATIONS
Land Use Plan for Regional Stormwater Management for Galena Road & Route 47
Planning Area
City Planner Mike Schoppe reported that, due to developer's interest in the area, City
Administrator Grafi requesting that he prepare a conceptual regional storm water land use
plan for the area east of Route 47 from Corneils Road to Route 30.
Some things that need to be taken into consideration when developing the land use are:
o There have been meetings between Fox Metro and Yorkville-Bristol Sanitary
District (YB SD)to discuss how this area will be serviced.
o There is water infrastructure being built in the area.
o Engineering Enterprises, Inc. (EEI) has done a floodplain study of Rob Roy Creek
which investigated a tributary going into the creek called the Raymond Drainage
They found this tributary has significant floodplain issues.
He stated that the purpose of the presentation was to bring the Commission up to date
with research being done to update the Comprehensive Plan and begin discussions on
how to approach certain issues in the area.
Page 2 of 6
He turned the floor over to Mr. Whitehouse who explained the floodplain issues in the
area:
o Raymond Drainage is a tributary area of approximately 1300-1400 acres of land
south of Route 30 and east of Route 47 that contributes stormwater to the Rob
Roy Creek.
o Originally, the Raymond Drainage was not included in the Rob Roy Creek
Floodplain Study because it was thought to flow into the Blackberry Creek. Upon
further investigation, it was found to flow into the Rob Roy Creek.
o Anytime a tributary area is greater than a square mile and contributes to a
floodplain, the floodway needs to be identified.
o Over 180 acres has been identified which holds water up to 3' at its deepest
before it spills over and carries over to the Caledonia area and then to the Rob
Roy Creek.
o This area presents development problems such poor soil, depressional water
storage and stormwater detention.
Mr. Whitehouse went over maps which exhibited the conceptual development plans for
the area. He explained that the depressional area to the south could be excavated to a
depth of five to seven feet along with a new piped outlet to the Rob Roy Creek would
provide approximately 1,358 feet of stormwater storage. This would provide stormwater
detention plus depressional storage for the whole area. All the developments in the area
could send their stormwater to this area; there would be no need for individual detention
basins. Conveyance channels would route the water to the detention area. He reiterated
that this is a conceptual plan and is not based on any development or concept plans for
the area.
Mr. Schoppe stated that the study area (Route 30 on the north, Corneils Road on the
south, Dickson Road to the east and Route 47 on the west)is approximately 1620 acres
with 225 acres of commercial use. Based on the current Comprehensive Plan, the
remaining acreage is projected to hold 3,400 homes at a density of 2.6 units/acre. Mr.
Schoppe explained that there are two issues the City needs to consider when amending to
Comprehensive Plan:
1. Maintain the same amount of commercial area as currently planned.
2. Maintain the same unit count(3,400 units)to support the commercial with less
land to work with due to the storm water management.
He proposed two options:
1. Additional density to maintain the same unit count
2. Providing density bonuses within developments in trade for receiving additional
high and dry open space beyond that which is required.
Mr. Whitehouse noted that typically in residential development 10% of land is set aside
to storm water management purposes. He stated that the overall acreage of the site is
Page 3 of 6
1,620 so it would be expected to set aside 162 acres. The large green area south of
Galena Road is 185 acres. This green area along with those set aside for conveyance
channels and swales brings the total area to approximately 275 acres. This is in access of
the typical area for storm water management and there is 120 acres less land for
development.
Mr. Schoppe and Mr. Whitehouse asked the Commission for their input.
Brian Schillinger noted that even though there is 120 acres less to develop, a developer
has more developable acreage to work with because they do not have to put detention
areas in.
Andrew Kubala questioned why the same numbers of units should be maintained. He
objected to this because the depressional area is a natural phenomenon and this area
should be deducted out and the original Comprehensive Plan maintained. Mr. Schoppe,
Mr. Whitehouse and Mr. Kubala further discussed the balance between residential and
commercial areas and the existing Comprehensive Plan.
Bill Davis asked what the reduction of commercial property would be. Mr. Schoppe
stated that he had not calculated this but estimated that it could be 10% less.
There was further discussion on the conveyance channels and the storage area. Mr.
Whitehouse further explained the concept:
o The channel would be similar to a bio-swale.
o It will convey water and have detention capabilities however it would be more of
a wetland area.
o There will be overflow weirs which will gradually control water flow in the case
of an extreme storm.
o The storage area will hold the runoff from a 100-year storm.
o The design will hold all the water from the north and east of the area or
everything in the Raymond Watershed.
Mike Crouch noted that the plan stops north of Comeils Road and he asked if there was
any other areas affected by the floodplain or wetlands extending to the railroad tracks.
Mr. Whitehouse stated that the area south of Corneils Road is in the Blackberry Creek
Watershed and he explained how the proposed plan helps out the Blackberry Creek
floodplain.
Mr. Crouch clarified that the commercial would be diminished because there will not be
enough residents to support it. Mr. Schoppe stated that this is the assumption however at
this time here are no statistics to support it; further research is needed. Mr. Crouch stated
that he felt it was hard to accept this assumption.
Mr. Davis asked Mayor Prochaska asked what the reasoning was behind maintaining
density as it related to commercial property. Mayor Prochaska stated that the United City
of Yorkville is in competition with other communities for attracting commercial
Page 4 of 6
properties because commercial developers look at unit count to support the commercial
area. Lynn Dubajic, Executive Director of the Yorkville Economic Development
Corporation, stated that commercial developers also look at the demographics of the
surrounding area of a property before they develop.
Mr. Schillinger commented that while he understood the concept of keeping the same
amount of addresses and population in the area to attract commercial he felt that larger lot
sizes larger gave a certain character to the town. He stated that he felt commercial will
still come to the area even with fewer homes. Mayor Prochaska stated that according to
the Comprehensive Plan, the transition areas cannot ask for more density without giving
the City something in return such as more usable open space.
Anne Lucietto stated that addressing the density was hard without available statistics.
She suggested that Mr. Schoppe do some further research and bring back some concrete
numbers to the Planning Commission so they could give direction.
Mr. Crouch commented that he liked the idea of a regional storm water management but
agreed more information was needed before density was addressed.
The Planning Commission discussed the second question posed to them; should the City
pursue providing density bonuses within developments in trade for receiving additional
high and dry open space beyond that which is required.
Mr. Schoppe explained that there will be open space around the water storage area. It has
been suggested that the City could acquire an additional 50— 150 acres of open space
around the site that could be used for a community recreation feature. In exchange for
the additional land, the City could consider trading a density "bonus" with the
landowners.
There was further discussion on this question including the change in density, cost of
land, potential uses for a larger parcel of land, etc.
Mr. Kubala and Mr. Green stated that they liked the idea of a trade for increased density
for increased open space. Mr. Crouch agreed however noted that each case has its own
merit. Mr. Davis commented that he would like to see the overall density remain as it is,
with no change to the Comprehensive Plan, but agreed to allow developer's to trade for
open space.
Mr. Schoppe clarified that the majority of the Commission felt that trading additional
units for open space was acceptable however the units/acre, location, etc. should be
considered before making the trade. The Commission agreed.
There was further discussion on the number of units as it relates to the commercial area.
Mr. Schoppe indicated that he would work with Mrs. Dubajic to investigate the statistics
related to this and bring this information back to the Commission.
•
Page 5 of 6
Mr. Whitehouse commented that there are a lot of"smart growth" seminars going on
which discuss if a population should be concentrated in one area with high design
standards versus spreading the population over as much land as possible. He noted that
units on smaller lots with more open space means less roads, sewers, watermains,
streetlights, etc. for the City to maintain. The City is better off in this situation with
regards to long term maintenance.
There was no further discussion.
Blackberry Creek Alternative Futures Project
Ksenia Rudensiuk of the Conservation Foundation addressed the Commission. She
shared the following data with the Commission:
o The Blackberry Creek begins in Elburn, Illinois and joins the Fox River in
Yorkville.
o The area has progressed from prairie to agricultural to urban development and as
the population increases in the area, a degradation of streams is seen.
o In this area of the country, rain water infiltrates the water table through wetlands
which filters the water that feeds local creeks.
o In a predevelopment system, some water evaporates and some slowly feeds
creeks. After an area develops, creeks are fed by surface runoff causing pollution,
erosion, etc.
o It is importance to maintaining creek quality for wildlife, and flooding.
o The use of native prairie grass with long root structure retards runoff, channels
and filters water to the water table, etc.
Ms. Rudensiuk explained that the Blackberry Creek Alternative Future Analysis Study
took municipal comprehensive plans for the watershed area and through the use of
computer modeling investigated the impact of the build out of the area on water quality.
The study looked at conventional (storm sewers, dense pavement, etc) and conservation
methods (wetlands, prairie grass, porous pavement, etc.) to water management along with
flooding and water quality information. She explained that the conservation method
maps creeks and rivers, flood plains, wetlands and hydrous soils and then the land use is
developed around this information. She stated that the study looked at once-a-year rain
event discharge rate, the required detention volume and the TQ mean (the portion of time
the flow is greater than average).
Ms. Rudensiuk stated that the study took 40 acre parcels and compared conventional
methods to conservation methods. She showed slides demonstrating the application of
both methods with regards to:
o Stream Corridors
o Wetlands
o Commercial —parking lots, retention areas, etc.
o Moderate Denisity—Residential
o Rural/Estate—Residential
•
Page 6 of 6
It was determined that the increase of conventional methods of storm water management
would increase runoff and flooding whereas the conservation method decreases this.
She also noted that the study did not address the clustering of buildings as Mr.
Whitehouse suggested earlier however clustering provides even better results than those
indicated in the study. There are benefits to clustering such as improving the
environment, lowering flooding and lowering infrastructure costs.
She stated that Aurora is a community who is implementing conservation principals with
developers in the Blackberry Creek Watershed. She stated that their comprehensive plan
has more details such as creeks, wetlands, hydrous soils, flood plains, etc. and developers
submit plans using this plan.
Ms. Rudensiuk also distributed various handouts regarding conservation design and
guidelines for local ordinances.
Ms. Rudensiuk asked if the Commissions had any questions. There were none. Deputy
Chairman Lucietto thanked her for the presentation.
OLD BUSINESS
None
NEW BUSINESS
None
ADDITIONAL BUSINESS
None
ADJOURNMENT
A motion was made by Mr. Kubala to adjourn the meeting; seconded by Mr. Schillinger.
The motion was approved by a viva voce vote.
The meeting adjourned at 8:45 p.m.
Minutes respectfully submitted by Jackie Milschewski, City Clerk
UNITED CITY OF YORKVILLE
PETITION APPLICATION LOG June 2, 2004
TYPE OF DATE OF AP
NAME PETITIONER APPLICATION STATUS
Westbury Village Ocean Atlantic Annexation &PUD 10/2/02 6/8/04 City Council
Preliminary Plan 6/12/03 -
Yorkville Hill Landscaping Edelmira Ortega& Annexation/Zoning 7/28/03 6/22/04 City Council
Gerardo Barajas .
Bailey Meadows IRED Development Annexation/Zoning & 8/6/03 6/15/04 COW
(f/k/a Runge Property) Ventures, Inc. Preliminary Plan
Fox Hill POD 9 & 10 DCI Charrington Rezone, Amend. to 12/11/03 6/8/04 City Council .
Annex. & PUD Agree.
Preliminary Plan
Cornerstone Triangle Investments Preliminary/Final Plat 4/19/04 7/14/04 Plan Comm
Prairie Meadows Menard's Final Plat 4/19/04 6/9/04 Plan Comm
Bristol Bay Centex Homes Concept Plan 5/4/04 6/9/04 Plan Comm
Theidel Property Pulte Homes Concept Plan 5/14/04 6/9/04 Plan Comm
Villas at the Preserve Burnside Homes Annex, Zoning, PUD & 5/25/04 Public hearing at 7/14/04 Plan Comm
Preliminary Plan
Heartland Center Richard Marker & Special Use 6/1/04 Public hearing at 7/14/04 Plan Comm
Assoc.
•
United City of Yorkville ,,
6 �
Plan Council
May 13, 2004
Members
Tony Graff, City Administrator Eric Dhuse, Director of Public Works
Tim Fairfield, BKFD Harold Martin, Police Chief
Mike Schoppe, Schoppe Design Laura Brown, Director of Parks &Rec
Joe Wywrot, Engineer Anna Kurtzman, Planning and Zoning
Guests
Greg Kunstman, Menards Chad Gunderson, AMG Homes
Kevin Biscan, SEC
The meeting began at 9:40 AM
The March 25 minutes were approved, after spelling corrections and change of Tim
Fairfield's title on page 5.
Prairie Meadows—Final Plat
Land plan comments by Mike Schoppe
1) Point#4 under Final Plat — In discussing the discrepancy regarding 70' versus
66' ROW, Mr. Schoppe stated the plat needs to be revised to show 70' ROW
instead of the 66' shown. The land cash contribution is a lump sum amount
separate from the building permit fees, as stated by Laura Brown. The annexation
agreement was for 7.1 acres, with a 66' ROW and there is only 7.05' acres being
provided, so in addition to the $286,230 there is an additional $2900 in cash that
Menards must provide. The 70' will be all ROW, with no easement.
2) Point#1 under General—Kevin Biscan will provide site line study on Kennedy
Road to Joe Wywrot.
3) Point#2 under Civil Engineering Plans—Mr. Biscan asked about the placement
of the water service to the park site. It was agreed upon that"on site"water
service means bringing the line just inside the property line and that it would be a •
4" ductile cross with a valve. Anna Kurtzman stated that the annexation
agreement reads that the building materials or cash would be for a park storage
building, and would be provided upon recording of the final plat. Mike Schoppe
will be putting together a design for the park and storage shed.
4) Point#1 under Civil Engineering Plans—Mr. Biscan will be using a 2% slope on
the park site, according to park site standards. City staff concurs that by May of
2005, the building and park areas will be complete and seeding of the seven acres
will be done.
5) Point#1 under Final Landscape Plans—Mr. Graff stated that CDF is reviewing a
management plan for the basins. Mr. Wywrot stated that the Kennedy Basin,
with a wetland bottom, is the one that is a concern. Mr. Biscan stated that Mark
Baker will put together a separate document as part of the landscape plan. Mr.
Schoppe recommends disking once a year for management and maintenance of
the basin.
2
6) Point#2 under Final Landscaping Plans—Mr. Biscan stated that Mark Baker will
make revisions on the number of trees needed for the landscape plan.
Annexation Review comments by Anna Kurtzman
1) Point#3 and#4—Mike Schoppe stated it is okay for the utilities to be in a
landscape easement. Ms. Kurtzman stated an additional 5' needs to be dedicated
in the easement to reflect a 45' foot wide easement. Because a backup SSA has
already been established, Ms. Kurtzman stated that maintenance issues do not
need to be addressed.
2) Point # 5 —Mr. Graff suggested that to avoid conflict and confusion for a
homeowner, that the rear building setbacks should be clearly identified. Mr.
Biscan will establish a 45' building setback.
3) Point #6—The plat notation on lots 119 and 136 will be changed to reflect a 40'
setback line.
4) Point #7—Ms. Kurtzman is recommending a 10% building setback on lot 165,
because it would be greater than the zoning code's ten feet.
5) Point #8—Ms. Kurtzman stated that the lot detail notation should reflect "the
side yard setback is 10 feet or 10%".
6) Point #9—Ms. Kurtzman needs verification at the building setbacks on the 29 lots
noted. These can be in a separate document independent of the plat.
Engineering comments by Joe Wywrot
1) Point#2 under plat—Normally a 30' wide flat easement for sanitary easements is
required because of the landscape beim. Joe will ask for comments from Ralph
Pfister at YBSD. Mr. Graff suggested a 20' easement along Kennedy Road may
be an option.
2) Point # 4 under Sheet 4 - Mr. Wywrot stated that language needs to be on the
plan stating the maximum capacity of 574 PE is attainable. Mr. Biscan stated the
pump is sized for the correct capacity, and it would be a matter of adjusting the
pillars, per the company's contact at Metropolitan Pump.
3) Point#4 under Sheet 5&6—Mr. Biscan stated there were 6-8 additional circuits
on the commercial site, and their electrician is confident that the lights can be
added on Kennedy and McHugh. The intent was the taller lights will be in non-
residential areas, on the circuits on Countryside Parkway. These will be operated
by controller, not photo cells.
4) Point # 4 under Sheet 4—Mr. Wywrot would like to have Kennedy Rd. open
during construction. Mr. Gunderson and the city staff prefer having the road built
out all at one time. Mr. Graff stated the City would like to see the curve softened
out and that the road would be built out to the end of the property. Mr. Biscan
stated that local access only would be permitted at some time during the
reconstruction process. Mr. Gunderson will provide the City with a preliminary
plan.
5) The storm items #1-17 are cleanup items and make it more maintainable.
Point#1 under Sheet 22—Mr. Wywrot suggested if a landscape plan was added,
that the streets would be too narrow. The street would need to be widened to the
south. Mr. Graff suggested three or four owners on the north side may agree to a
•
3
10-12' easements, if it were for safety reasons, but it is late in the planning stage
to accommodate this. In regards to the curb issue and safety issues on Kennedy
Rd. Mr. Wywrot and Chief Martin will meet with Smith Engineering to further
explore the options, and will set up an additional meeting with the developer if
there are changes.
6) Mr. Wywrot suggested the City would be in favor of having grading contours and
Spot elevations on the plans. Mr. Biscan will supplement the spot elevations with
notes stating "contours are not shown and grading shall be uniform from one spot
elevation to another". City staff will look at the standard contour language for the
subdivision control ordinance, with the public hearing scheduled on June 8th .
7) Mr. Wywrot is asking for additional landscaping for the Blackberry Creek, pipe
has been in the ground for outfall about a year. There is a vegetated swale for
infiltration and filtering.
8) Tim Fairfield stated that Lot 165 has no direct access to Kennedy Road which
poses a problem for their parking. He has seen no traffic design for Kennedy
Road, but he would like the emergency vehicle access first onto McHugh. Mr.
Graff stated the Plan Commission needs to look at ingress/egress issue. Mr.
Schoppe and Joe Wywrot state the easements be dedicated to extend a roadway
west off McHugh on the south side of Lot 165. Greg Kunstman will check with
Menards to see if they would be willing to build the driveway, 24' wide, with
sidewalks all along the street extension.
9) Four full revised engineering, landscaping and the plat will be in the office on
May 21St by 4 P.M.
This is scheduled for Plan Commission on June 9t1, with a submittal deadline of June 1st
at 4:30 P.M. for 35 preliminary plans. It is scheduled for COW on June 15t1 and City
Council on June 22nd.
Meeting was adjourned at 11:45 P.M.
Respectfully submitted.
Annette Williams
•
pc}
o
United City of Yorkville
County Seat of Kendall County
EST. 7836 800 Game Farm Road
\ =
fn Yorkville, Illinois 60560
p 0 Phone:630-553-4350
'A Fax:630-553-7575
K�Mtou,ny
v
ELLE "
June 2, 2004
Mr. Kevin Biscan
Smith Engineering Consultants, Inc.
759 John Street
Yorkville, Illinois 60560
Re: Prairie Meadows—Final Plat & Plan
Dear Kevin:
I have reviewed the revised plat and plan for the referenced development, received on
May 21, 2004, and have the comments listed below:
General
• The revised landscape plan has been forwarded to Mike Schoppe for review.
• Please submit an engineer's estimate of cost for review once the final plan is
approved.
• Individual comments are only made one time, but may require changes to several
plat and/or plan sheets.
• The sanitary lift station that serves this site is currently sized for a maximum of
500 PE, while the proposed development is 574 PE. The station can be upgraded
to as high as 1370 PE; please provide a plan for upgrading the station. The Illinois
EPA will probably require this upgrade plan to be submitted to them before they
will issue the construction permit for the gravity sewers for this development.
• Please contact Walter E. Deuchler Associates regarding approval of the sanitary
sewer design on behalf of YBSD.
• Several comments listed below may impact the storm sewer design. Therefore I
have delayed a detailed review of the sewer and restrictor design until the next
submittal.
• A plan is needed for the proposed lighting along Kennedy (west of McHugh) and
along McHugh. Presumably all of these lights will connect to the existing
controller at the Route 47/Kennedy intersection, and have the same general
spacing as existing Kennedy and McHugh.
• Please send the plans to Jim Heinz at the Bristol Twp. Highway Department
regarding the Kennedy Road taper construction east of Christy Lane.
• The data submitted for the sight distance analysis indicates that the current
roadway layout provides an Intersection Sight Distance (ISD) of about 490 feet,
which is adequate for vehicles up to single-unit trucks at 35 MPH. A recent speed
study done by the Yorkville Police Department, however, indicates an 85th
percentile speed of 53.5 MPH. Since none of the roadway improvements will tend
to slow the traffic down, the observed 85th percentile speed should be the design
speed. This results in an ISD of around 750 feet. It appears that the Kennedy Road
intersection with proposed Prairie Meadows Drive should be eliminated, and that
Switchgrass Lane should be extended to Kennedy Road instead.
Plat
• Easements will be checked for accuracy once the final storm sewer design is
approved.
• YBSD has plans to construct a sanitary interceptor someday along the south side
of Kennedy Road in this area. Work with Deuchler regarding the location of this
easement. YBSD normally requires separate easement language.
• We need to decide if the landscape buffer easement should run to the City of
Yorkville, the Homeowner's Association, or both.
• Provide an ingress/egress easement along the south side of Lot 165 to allow
BKFD to construct a driveway out to McHugh opposite Bluestem Drive.
• Revise Lot 165 to have a 25' radius at its SE corner in anticipation of Bluestem
begin extended west of McHugh in the future.
• Call for a minimum 20' utility and drainage easement along the south side of
Kennedy (west of McHugh).
• A 60' utility and drainage easement is shown along the south side of Kennedy
(east of McHugh) at some locations, but is overlapped with smaller easements.
Delete reference to the smaller easements and just refer to the 60 easement.
Plan
Sheet 4:
• The stationing for the Kennedy Road taper detail is incorrect. The taper should
extend to somewhere near Sta. 783+00.
Sheets 5 & 6:
• Watermain Tag 156A(on Kennedy near Lot 17) should be deleted.
• The watermain diameters currently show a 12" watermain on Bluestem (McHugh
to Prairie Meadows), on all of Wild Indigo Lane, and on Hayden (McHugh to
Prairie Clover). These should be 8" watermains.
• The watermain diameters currently show a 16" watermain on Switchgrass Lane
from Bluestem to Valve 200, and along Kennedy from Prairie Meadows to the
sideyard watermain along Lot 35. These should be 8" watermains.
Sheet 10:
• Eliminate the storm sewer between ST 249 and ST 248A. Reverse the pitch
between ST 249 and ST 251, and then run a storm sewer from ST 251 to ST 252.
Move the streetlight at the NW corner of Prairie Meadows/Bluestem to the NE
corner. These comments would change if Prairie Meadows Drive gets shifted over
to Switchgrass Lane.
• Eliminate the sag vertical curve at Sta. 215+50.
• Call for a 16" valve in vault in the parkway along the common lot line of Lots
35-36.
Sheet 16:
• Eliminate the sag vertical curve at Sta. 600+70.
• Need a detail for signage/barricades at the temporary dead-end of Prairie Clover
Drive.
• It appears that a low spot will exist at the temporary dead-end of Prairie Clover.
How will this be graded and drained?
Sheet 17:
• Delete the PVC designation for watermain section 178A.
Sheet 18:
• This sheet is missing.
Sheet 19:
• Delete the PVC designation for watermain sections 186A and 188.
Sheet 21:
• Eliminate the sag vertical curve at Sta. 1002+50.
• I had previously asked for a temporary turn-around at the dead-end of Prairie
Grass Lane, but due to the significant re-grading of this area a temporary turn-
around would not work well. Instead, add a note to the plans stating that the
driveways for Lots 47 and 48 will serve at temporary turn-arounds. Delete the
turn-around detail. Show the public sidewalk extending to the same station as the
roadway curb.
• Adequate cover over the watermain is a problem at the dead-end. Move the valve
and hydrant to the Lot 46-47 lot line and stub the main to the same station as the
roadway curb.
• Show the existing ground surface profile beyond the end of the roadway dead-end
and how this area will be graded. Show the temporary storm sewer in the profile
view. Call for riprap or vegetation at the FES.
• Need a detail for signage/barricades at the temporary dead-end of Prairie Grass
Lane.
Sheet 22:
• Eliminate the sag vertical curve at Sta. 753+00.
• Call for the existing hydrants along Kennedy to be relocated/adjusted as
necessary.
• Check with BKFD to make sure that hydrant 116 is not too close to their proposed
driveway.
• Move the new watermain out from under the turn bay to an easement south of the
sidewalk.
• The match line should refer to Sheet 23.
Sheet 23:
• The match lines should refer to Sheets 22 and 24.
• Provide roadway slope data east of Sta. 767+00.
• Move the hydrant and valve at the Kennedy/McHugh intersection about 20 feet
south. Place the hydrant to the west of the McHugh watermain.
Sheet 24:
• The match line should refer to Sheet 23.
• Eliminate the sag vertical curve at Sta. 772+50.
• It appears that a sag vertical curve is needed at the Kennedy/Christy intersection.
• The watermain on Kennedy may need to be moved into the easement to make
room for the future YBSD interceptor.
• Move Valve 165 to the watermain that runs between Lots 35 and 36.
• Move the streetlight at Sta. 777+80 to the east about 40 feet so it can also serve
the Christy intersection.
• Call for PCC gutter outlets to the existing ditched on Kennedy and Christy.
Sheet 25:
• Call for aggregate shoulder to extend to the butt joint on Christy Lane.
• It appears that an undrained low spot will be created on the south side of Kennedy
at Christy Lane. How will this be drained?
• The stationing along Kennedy is incorrectly shown. Also, specify a station for the
end of construction.
Sheet 26:
• Show the water and sanitary service to the park site near Sta. 527+50. The water
service is to be a 4" DIP line.
Sheet 28:
• Watermain section 113A is incorrectly labeled as section 111.
Sheet 29:
• Call for the stop sign in the Kennedy/McHugh detail to be mounted on the
streetlight pole.
Sheet 33:
• Add the Christy Lane radius return to Phase 2 construction.
• Correct the alignment of the hatching east of Sta. 778+00.
Sheet 34:
• Call for a striped crosswalk across McHugh at Kennedy Road.
• Revise the stop bar width at Prairie Meadows Drive to 12".
• We need to discuss the speed limit along Kennedy Road. I seem to recall that the
safety study indicated a minimum speed limit of 45 MPH.
• Add supplemental "35 MPH" signs at the bottom of the W1-1 signs at Stations
763+06 and 769+06. Change the orientation of the arrow for the sign at Sta.
769+06.
• Call for all signs to have high-intensity (honeycomb pattern) reflective sheeting.
Sheet 35:
• We need to determine if we want to have the roadway striped at the future BKFD
driveway to discourage motorists from blocking the driveway.
Sheet 38:
• Revise the typical basin section detail to state that the embankment slope above
the safety shelf varies between 3:1 and 4:1.
• Do the existing outfalls to the detention basin need to be moved? Call for riprap at
the existing 60" outfall to the pond.
• Identify the location of the restrictor manhole.
• ST 578A and ST 578B are missing from the tag schedule.
• The ST 714 diameter should match ST 715 diameter.
Sheet 39:
• Revise the Kennedy berm grading near Lots 24-26 to avoid the proposed
sidewalk.
Sheet 42:
• Additional spot elevations are needed for Lots 47 and 48 adjacent to the existing
farm fields.
Sheet 48:
• Need cross-sections for Stations 778+30 to the end of construction east of Christy
Lane.
Sheet 49:
• Identify the structure number of the restrictor manhole.
Sheet 50:
• Revise the manhole cover detail to require"City of Yorkville" and "Storm" to be
cast into all solid lids.
• Need a detail for 16" butterfly valve in vault.
Sheet 52:
• Need a detail or at least specifications for the luminaire along Kennedy (west of
McHugh) and along McHugh.
• Revise the Tee Manhole detail to specify 60" diameter, which I believe is the
largest storm sewer proposed for this development.
Sheet 54:
• Specify the location of the construction entrance. Presumably this would be at the
Kennedy/McHugh intersection.
Please make the requested revisions and resubmit three prints of each document at your
earliest convenience. It you have questions about any of these items, please call me at
553-8545.
Very truly yours,
Jos ph Wywrot
City Engineer
Cc: Tony Graff, City Administrator
Jun . 2 . 2004 9: 03AM No . 5034 P . 2/3
ftt)
Schiopp �e Des ' associates oc
Landscape Architecture and Land Planning
430 W. Downer Place Ph. (630) 896-2501
Aurora, IL 60506 Fax(630)896-3228
June 2, 2004
•
MEMORANDUM
To: Joe Wywrot, City Engineer
From: Mike Schoppe - Schoppe Design Associates, Inc.
Re: Prairie Meadows—Final Approval
We have reviewed the revised Final Plat of Prairie Meadows Subdivision dated 5/18/04
prepared by Smith Engineering Consultants, the Civil Engineering Plans for Prairie Meadows
Subdivision dated 5/21/04 prepared by Smith Engineering Consultants, and the Final
Landscape Plans dated May 21, 2004 prepared by SEC Planning Consultants, and provide the
following comments:
Final Plat
1. The layout of the streets and lots is consistent with the approved Preliminary Plat.
2. The lot sizes, widths and setbacks are consistent with the standards set out in the
annexation agreement.
3. All other Final Plat issues have been satisfactorily addressed.
Civil Engineering Plans
1. The grading of the park site, Lot 167, needs to be revised to reflect a minimum slope of
2% per the City's Park Development Standards.
2. Provide a water stub and sanitary service to the park site along the McHugh Road
frontage.
3. Revise contouring of berm on Lots 25 and 26 to avoid conflict with public sidewalk.
Yege 1 oft
• Jun . 2 . 20,04 9 .03AM No 5034 P. 3/3
Final Landscape Plan
1. All Final Landscape Plan issues have been satisfactorily addressed.
Significant progress has been made in addressing our previous comments. Therefore, we
recommend approval of the Final Plat, subject to resolving these remaining issues.
If you have any questions, please call.
CC: Tony Graff, City Administrator
Liz D'Anna, Deputy Clerk
Anna Kurtzman, Zoning Administrator
Pep 2of2
Jun . 2. 2004 1H6PM No . 5043 P. 4/5
Schoppe !esgn Associates
126
-
Landscape Architecture and Land Planning
430 W. Downer Place Ph. (630) 896-2501
Aurora, IL 60506 Fax(630) 896-3228
June 2, 2004
MEMORANDUM
To: Tony Graff, City Administrator
From: Mike Schoppe - Schoppe Design Associates, Inc.
Re: Bristol Bay - Centex
We have reviewed the Concept Plan for the Bristol Property prepared by SEC Planning
Consultants dated May 4, 2004. The following information is provided to assist you and the
Plan Commission in providing conceptual input to the developer on their Concept Plan.
General
Centex Homes is investigating the feasibility of developing a 597 acre assemblage as a mixed
use development, including commercial, single-family lots, townhomes and condos. They are
currently looking for conceptual input from the Plan Commission, Park Board and City Council
on their Concept Plan. Formal action by the Plan Commission is not needed at this time.
However, the Commission members should be prepared to discuss and provide comments on
the following:
1. The appropriateness of the commercial land use, its size and location within the plan
2. The appropriateness of the residential land use, the density, and the products and lot
sizes being proposed
3. The open space system
4. The overall style and general character of the development
5. Other comments that the Plan Commission might have
Page I of 7
Jun . 2. 2004 1216PM No . 5043 P. 5/5
Comprehensive Plan
The Comprehensive Plan identifies the easterly half of this site as Suburban Neighborhood,
which allows for a gross density of 1.5 and 2.25 du/ac. The majority of the western half is
identified as Transition Neighborhood, with an allowable density range of between 2.25 to 3.5
dwelling units per acre, depending on the amount of additional open space provided. The
Route 47 portion of the western half is identified as commercial, which has been annexed to
Yorkville as part of Northgate zoned B-3.
Existing Land Uses
The majority of the property is zoned A-1 in Kendall County, except for the Northgate parcel
which is zoned B-3 and R-4 in the City, and the Bristol Club Property at the far side of the site
zoned R-3 in Kendall County, The surrounding land uses and zoning are as follows:
North: Agricultural zoned A-1 in Kendall County
East: Agricultural zoned A-I in Kendall County
• South: Agricultural zoned A-1 in Kendall County
West: Agricultural zoned A-1 in Kendall County
Transportation
The City's Transportation Plan identifies an east/west minor collector (80' R.O.W.) south of
Galena Road connecting Route 47 to Cannonball Trail. Another east/west minor collector is
planned generally in the northern portion of the site connecting Route 47 with Dickson Road.
Schools
The City's School Site Study identifies a combined elementary/middle school north of Comeils
Road, in the general area of the eastern portion of this property. The School Site Study also
identifies an elementary school site on this property south of Comeils Road.
Open Space
Based on the City's Land Cash Ordinance, the park requirement for this site is approximately
53 acres.
If you have any questions, please call.
CC: Joe Wywrot, City Engineer
Liz D'Anna, Deputy Clerk
Anna Kurtman, Zoning Administrator
Page 2 ort
Jun . 2 . 2004 12 : 5PM No .5043 P . 2/5
Pco - oi
Schoppe Design Associates
Landscape Architecture and Land Planning
430 W.Downer Place Ph. (630)896-2501
Aurora, IL 80506 Fax (630) 896-3228
June 2,2004
MEMORANDUM
To: Tony Graff, City Administrator
From: Mike Schoppe- Schoppe Design Associates, Inc.
Re: Theidel Property
We have reviewed the Preliminary Land Plan for the Sexton Property prepared by Gary R.
Weber and Associates dated May 11, 2004. The following information is provided to assist
you and the Plan Commission in providing conceptual input to the developer on their
Preliminary Land Plan.
General
Pulte Homes is investigating the feasibility of developing the 286 acre Theidel Property as a
mixed use development, including commercial, 12,000 s.f. single-family lots, 10,000 s.f.
single-family lots, and townhomes. They are currently looking for conceptual input from the
Plan Commission, Park Board and City Council on their Preliminary Land Plan. Formal action
by the Plan Commission is not needed at this time. However, the Commission members should
be prepared to discuss and provide comments on the following:
1, The appropriateness of the commercial land use, its size and location within the plan
2. The appropriateness of the residential land use, the density, and the lot sizes being
proposed
3. The open space system
4. The overall style and general character of the development
5. Other comments that the Plan Commission might have
Ne 1 oft
Jun . 2. 2034 12 :•15PM No. 5043 P. 3/5
Comprehensive Plan
The Comprehensive Plan identifies the portion of the site north of Kennedy Road as Estate
Neighborhood, which allows a gross density of 1.5 dwelling units per acre or less. The Plan
identifies the area south of Kennedy Road primarily as Suburban Neighborhood, which allows
a gross density of between 1.5 and 2.25 du/ac. The balance of the site south of Kennedy Road
is shown as commercial along the Route 34 frontage. Two greenways running east and west
are also planned for.
Existing Land Uses
The property is currently zoned A-i in Kendall County. The surrounding land uses and zoning
are as follows:
North: Open Space corridor along Blackberry Creek zoned A-1 in Kendall County and
an existing County subdivision zoned R3 in Kendall County
East: Grand Reserve zoned P.U.D. in Yorkville
South: Agricultural use zoned A-1 and an existing County subdivision zoned R3 in
Kendall County
West: Agricultural zoned R-2, City of Yorkville for the majority of the western edge
except for B-3, City of Yorkville for the Route 34 frontage
Transportation
The City's Transportation Plan calls for a north/south minor collector (80' R.O.W.) to run
through the site connecting Kennedy Road with Route 34. A second minor collector is planned
for the site, which runs from the previously mentioned north/south minor collector, east
through Grand Reserve and eventually connecting to Bristol Ridge Road.
Schools
The City's School Site Study identifies a combined elementary/middle school in this general
area.
Open Space
Based on the City's Land Cash Ordinance,the park requirement for this site is approximately
17.7 acres.
If you have any questions, please call.
CC: Joe Wywrot, City Engineer
Liz D'Anna, Deputy Clerk
Anna Kurtman, Zoning Administrator
Page 2 or 2
UNITED CITY OF YORKVILLE
Clerk's Office
FROM THE DESK OF LIZ D'ANNA
June 4, 2004
TO: Plan Commission Members
Mayor and City Council
RE: June 9th Plan Commission Meeting
Please add the attached memo from Anna Kurtzman regarding the Prairie
Meadows Final Plat to your packets for the above meeting.
If you have any questions, please call me.
Thank you,
L
Liz D'Anna
Deputy Clerk
-- r
//,<:;:o
0
United City of Yorkville
County Seat of Kendall County
EST.Aro1836
800 Game Farm Road
U) Yorkville,Illinois 60560
Q !1 \ Q Phone:630-553-4350
•P Fax:630-553-7575
June 3, 2004
TO: Tony Graff r
FROM: Anna B. Kurtzman, AICP
SUBJECT: Prairie Meadows Final Plat of Subdivision
I have reviewed the document listed above for compliance with the approved annexation
agreement and have the following comments:
1. The park donation requirements were calculated based upon a park donation of 7.1
acres. The plat indicates that the park site (Lot 167) is 7.05 acres in size.
a. The size of this lot should be verified. The February 25, 2004 version of the plat
indicated that the lot size was 7.05 acres. Since then, additional right-of-way has
been taken from this property (along Hayden Drive and Prairie Clover Drive).
With this additional right-of-way, I believe that Lot 167 is probably less than the
stated 7.05 acres.
b. The annexation agreement addresses land/cash donation requirements for park
purposes. The agreement indicates that 12.035 acres is owed for the entire
development (single-family and townhome components), with 7.1 acres of land to
be dedicated when the single-family portion is platted (i.e. Final Platting of Prairie
Meadows). The balance of what is owed is to be converted to cash (using
$58,000 per acre) and to be paid prior to final platting of the R-3 portion. As two
lots are being created in the R-3 portion of the property, I would argue that
payment is due prior to recording the Prairie Meadow Final Subdivision Plat.
c. Based upon 12.035 acres being owed and 7.1 acres being dedicated, the
agreement indicates that S286.230 (4.935 acres x $58,000 = $286,230) is owed. I
believe that since less than 7.1 acres is being dedicated, the cash amount should
be increased accordingly.
2. The southern building setback line for Lot 165 (to be used by the Fire Protection
District) is being established at 30 feet. This property is zoned R-3 with a side yard
setback based upon the use of the property. The applicant indicates that they want to
T. Graff
t Prairie Meadow Final Plat of Subdivision
June 3, 2004
Page 2 of 2
set the side yard setback at 30 feet for the possible future extension of Bluestem
Drive. (If this extension occurs, the southern lot line becomes a corner side, which
requires a 30 foot setback.)
a. A fire station requires a special use peunit. As the use was established through
the annexation agreement, a presumption may be made that the special use peiniit
was granted. Although the use was established, setbacks were not. The setbacks
in the R-3 district indicate that a 10 foot setback is required for single-family
attached housing. A setback of 10 feet or 10% of lot width, whichever is greater,
is used for single-family detached. At the Plan Council meeting, a
recommendation was made to use the more restrictive setback (10% of lot width).
For this property, it appears that the setback will be approximately 24 feet from
the southern property line.
b. I would further recommend that the side yard and rear yard setbacks not be listed
on the plat. The only setback that is required to be placed on the plat is the front
and corner side yard setbacks. When a building pelniit is applied for, it is
presumed that the zoning code is used for deteiniining all other setbacks.
/abk
c: J. Wvwrot
M. Schoppe
L. Brown
filename: C'\Documents and Settings'\Anna\My Documents\Menards\Prairie Meadow\6-4-04memo.doc