Public Hearings:
1. PC 2004-07 Pulte Homes and LaSalle Bank Trust#1198, petitioners, have filed an
application with the United City of Yorkville, Kendall County, Illinois requesting annexation
to the United City of Yorkville and rezoning from Kendall County A-1 Agricultural to
United City of Yorkville Planned Unit Development containing R-2 One-Family Residence
District, R-3 General Residence, and B-3 Service Business District. The real property
consists of approximately 286 acres North of Route 34, East of Route 47 and West of Bristol
Ridge Road, Bristol Township, Kendall County, Illinois.
Presentation: None
Old Business: None
New Business:
1. PC 2004-07 Pulte Homes and LaSalle Bank Trust #4198, petitioners, have filed an
application with the United City of Yorkville, Kendall County, Illinois requesting annexation
to the United City of Yorkville and rezoning from Kendall County A-1 Agricultural to
United City of Yorkville Planned Unit Development containing R-2 One-Family Residence
District, R-3 General Residence, and B-3 Service Business District. The real property
consists of approximately 286 acres North of Route 34, East of Route 47 and West of Bristol
Ridge Road, Bristol Township, Kendall County, Illinois. (Autumn Creek f/k/a Theidel
Property)
2. PC 2004-07 Autumn Creek (f/k/a Theidel Property) -Preliminary Plan
3. PC 2004-16 Lee Farm- Concept Plan
(155.825 acres at the Southeast corner of Ament and Penman Roads)
Page 2
Plan Commission
October 13, 2004
New Business (con't):
4. PC 2004-17 Blackberry Woods- Concept Plan
(60 acres at 10701 River Road)
Additional Business:
Adjournment:
(to be published in the October 21st Kendall County Record)
PUBLIC NOTICE
NOTICE OF PUBLIC HEARING
NOTICE IS HEREWITH GIVEN that the United City of Yorkville will hold
and conduct a public hearing on the United City of Yorkville South
Comprehensive Plan Amendment. This hearing will be held at the Plan
Commission Meeting at 7:00 p.m. on Wednesday, November 10, 2004, in
the City Council Chambers, City Hall, 800 Game Farm Road, Yorkville, IL
60560.
Any person interested may appear and be heard.
A copy of said United City of Yorkville South Comprehensive Plan
Amendment will be available for viewing from 5:00 - 7:00 p.m. on
Wednesday, November 10, 2004, at the City of Yorkville Council
Chambers, 800 Game Farm Road, Yorkville, IL 60560.
Published by authority of the City Council.
Jacquelyn Milschewski
City Clerk
By: Elizabeth A. D'Anna
Deputy City Clerk
UNITED CITY OF YORKVILLE
PETITION APPLICATION LOG October 6, 2004
NAME PETITIONER TYPE OF APPLICATION DATE OF AP STATUS
Fox Hill Unit 7 POD 10 DCI Charrington Preliminary/Final Plat 12/11/03 10/12/04 City Council
Villas at the Preserve Burnside Homes Annex, Zoning, PUD & 5/25/04 10/19/04 COW
Preliminary Plan
Raintree Village Wyndham Deerpoint Final Plat 6/13/04 Approved @ 9/28/04 City Council
Units 4, 5, & 6- Final Plat Homes & Creek Partners
Grande Reserve Unit 9 MPI Final Plat 7/12/04 12/8/04 Plan Commission
Swanson Lane Estates Gordon& Marcia Swanson Annex, Zoning & PUD 7/16/04 Public hearing @ 10/12/04
City Council
Rt. 71 &Rt. 47 Larry Saravanos Annexation& Zoning 8/4/04 Public Hearing @ 10/26/04
2 acre Commercial City Council
Autumn Creek(£k.a. Pulte Homes Annex, Zoning & 8/10/04 Public Hearing @ 10/13/04
Theidel Property) Preliminary Plan Plan Comm
Bristol Bay Centex Homes Annex, Zoning & PUD 8/17/04 *See Below
Lee Farm Montalbano Homes Concept 9/13/04 10/13/04 Plan Commission
Blackberry Woods Blackberry Woods, LLC Concept 9/16/04 10/13/04 Plan Commission
Grande Reserve Unit 10 MPI Final Plat 9/23/04 12/8/04 Plan Commission
Blackberry Oaks Annexation &Zoning Pending Future Plan Commission
Golf Course
Yorkville Ace Hardware Annexation & Zoning Pending Future Plan Commission
*Centex has purchased two additional parcels, 40 acres and 3.5 acres. There will be a public hearing for annexation and zoning scheduled for the
November Plan Commission meeting with a redesign of the master PUD plan.
rgi
- T
United City of Yorkville
Plan Council Meeting
Sept. 24,2004
Members:
Joe Wywrot, City Engineer Anna Kurtzman, ICCI
John Whitehouse, EEI Eric Dhuse, Director of Public Works
Jeff Freeman,EEI Tim Fairfield,BKFD
Mike Schoppe, Schoppe Design Sgt. Ron Diedrich, Police Dept.
Guests:
Pete Huinker, Smith Engineering David Schultz, Smith Engineering
Trevor Ryan, Marquette Companies Matt Cudney, Pulte Homes
The meeting was called to order at 9:35 AM.
The minutes from the August 26th meeting were approved with corrections.
Theidel Property—Preliminary Plan
Comments from EEI—John Whitehouse
1) Plat of survey item#8 - Smith will be submitting a single legal description that is on the
plat of survey and on the preliminary plat to the title company,to update from the five
parcel description.
2) Preliminary plat item#20, 21 and 22-Regarding block lengths, EEI is recommendation
of those in excess of the 1320 feet. Where the trial cuts through, EEI is in favor of these
for pedestrian access and reasonable cross vehicular traffic. Regarding lots 21-33,
another access to Rt. 34 will not be proposed, so the right of way has been provided for a
potential road extension. Mr. Whitehouse stated the stubbed roads will be coordinated
with Grande Reserve. The Gr. Reserve access to Kennedy Rd. was eliminated.
3) Preliminary plat item #26- There will be 1900 feet between the centerline of the
proposed access for this subdivision and the proposed westerly entrance to Grande
Reserve from U.S. Rt. 34. Mr. Huinker said that there will be signals here, per IDOT.
4) Regarding the additional road way on the north side of Kennedy,Mr. Whitehouse stated
that they would like to remove the road,because of additional road maintenance with the
four driveways. The unincorporated area has two accesses from out lot N, for access to
park access. Mr. Fairfield states there is only one temporary way into the north end of
the subdivision, and he needs a 2nd access, providing additional for traffic during
construction and safety (gas lines) problems. Mr. Whitehouse stated there is an
additional field entrance, backing lots 240 and 251 on the nursery property,which he will
coordinate with the two developments(jogging onto Gr. Reserve's property) and upgrade
with a stone base.
5) Preliminary engineering details requested Mr. Whitehouse have been provided by Smith.
6) Preliminary engineering plan item#40—Mr. Whitehouse stated the City would need
temporary hydrants on the end (on the east). The valves would be in the right of way,
and Gr. Reserve will remove when their mains are extended.
7) Mr. Whitehouse stated that in a condominium,the City prefers a meter room in each
building, with a B-box for each unit. One 6-inch sewer service would be sufficient to
each building per Mr. Whitehouse, with a clean-out on one end. In the annexation
agreement, if the developer had condominiums, Mr. Whitehouse stated the City should
add language that each unit had individual sewer connectors(not fee simple). Mr. Dhuse
and engineering would need to make certain there are adequate valves.
1
8) Preliminary engineering plan item#42— The developer will extend the 8"water main
into the school site(lot 21)will be and an additional water main stub into the commercial
area. The number of multi-family units is decreased, because Pulte wanted to reserve
additional depth in the commercial area. The water main has been flipped to the north
side on the northwest side of the school/park area and the sewer will be on the south
side.
9) Preliminary engineering plan item#44—Based on Gr.Reserve(Neighborhood#17)and
Autumn Crest,the proposed Rt. 34 water main and easement coordination will be
monitored by City engineering and EEI.
10) Traffic Study item#47—Traffic adjacent to the commercial site would bring it close to
the ADF classification. The developer has agreed to keep the pavement structure intact.
11) Traffic Study item#49 The City is preceding with plans across the Kennedy Rd.
frontage and the annexation agreement should provide for the$2000/per unit impact fee.
The bids would be done over the winter, and front money for construction money should
be provided in escrow by the developer for design purposes,prior to the final plat.
12) Storm water item# 52—Mr. Whitehouse stated there is a discrepancy in the commercial
area storm management outlet placement, and if it needs to be tied into Hamman's and
Fox River. The developer will have no detention on the commercial area. The initial
drain will go to the east(out lot A basin)and this basin will not be increased in size.
There will be a serpentine swale developed east of Blackberry Creek and Mr. Schoppe
will be provided these plans by the developer.
13. Mr. Whitehouse stated that, depending on YBSD, a permanent pump station will be
needed north of Kennedy, and a temporary on the Hermann property for the gravity area.
14. In conversation regarding phasing,the City's concern would be the access to Kennedy
along Rt. 34. The developer stated final platting will be done in April or May.
Mike Schoppe''comments
1) Preliminary plat item#4—The street is called Prairie Grass Lane in Prairie Meadows, and
Mr. Schoppe stated the cul-de-sac should be named Prairie Grass Court. When Mr.
Schoppe and Smith will explore the school/land cash standard when reconfiguration is
completed to make certain it is within the City's specifications.
2) Comment#1 -Mr. Schoppe needs a document titled"Preliminary PUD plan and plat",
with a separate sheet for preliminary engineering.
3) Comment#2— Per Mr. Cudney the driveways on the east west road configurations will
be changed. Mr. Cudney stated this particular unique layout provides amenities for the
townhouses,e.g. back-up to the detention area, giving a higher premium on the
townhouses.
4) Comment#3 —Inter-city roads connectors for owners in Gr. Reserve,Hamman, and Pulte
were discussed. The developer pointed out the additional stub out of the commercial
property. Of concern is, in particular,the road across Hamman which is commercial on
one side and residential on the other side. The developer will look at the possibility of
an additional two feet of right of way(making it 70 foot) and putting in a turn bay. City
staff advises the developer to continue the hybrid collector through the Hamman property
to Countryside Parkway.
5) Out lot L ownership was discussed. Mr. Cudney suggested the parcel ownership would
be discussed at Park board, City Council and Plan Commission. Mr. Schoppe stated
there is a detention basin there. Mr. Cudney stated that their in the preliminary plan,the
detention area would be a part of the Homeowner's Association and that the flood plain
line would not be bisected.
6) Comment#9 -CDF information will be forwarded by Mr. Schoppe on the wetland
delineation.
2
7) Comment# 11 - Architectural plans need to be submitted 10 days prior to Plan
Commission.
8) Comment# 12—Per Mr. Schoppe cross access language needed in the annexation
agreement and on the preliminary plan and plan, for access to the adjacent commercial on
the Hamman property.
9) Comment#13 - The developer will clarify the detail for setbacks. Lot detail now shows
a 30' side yard setback.
10) Preliminary Engineering Plan item# 1 —The developer will add notes indicating the
school and park sites will be developed to the City's Park Development Standards.
Anna Kurtzman's comments
1) Comment 3 —Neighborhood#19 for use as a school site is contingent on the Theidel
property(Hinsdale Nursery) on Kennedy also being used as a school campus. Mr.
Schoppe stated that he is proceeding with the assumption that there is no school on the
Theidel property. The intent is that the school site is being proposed on the Hamman
property.
2) Mr. Whitehouse stated the annexation agreement should have language regarding the
storm water/wetland ordinance. Ms. Kurtzman will check into the schedule for the new
ordinance.
3) Comment#5—Ms.Kurtzman's concern is with the width. Mr. Schoppe stated that some
of the buffered area will need to be on the lots. The width of the landscaped area should
be 30 wide strips on the urban section. The Benning would begin were the lots back up
again to the basin.
4) Comment# 7—The developer will make the lots abutting with Gr. Reserve 12,000 feet.
5) Comment# 8—The developer will rerun the calculations. If the maximum coverage is
30%, wording should be included that"the intent of having the open area is there". Mr.
Whitehouse suggested a gross summary of lot coverage be provided, making certain lot
lines are in accordance with the setbacks needed.
6) Comment# 10—The developer will add the 10 foot to the internal sides.
7) Comment#11 —The developer will submit the information.
Tim Fairfield added a comment about lot#s being the same. The multi-family will be started
when the street is taken out at the north end,with a note on the plat to designate the single family
and multi-family lot numbers.
This will be scheduled for Plan Commission on October 13, 2004. Deadline for submittal of
35 preliminary plans will be submitted on October 5t. Needed are new submittals for
preliminary engineering, preliminary PUD/plat, and landscaping.
Respectfully submitted,
Annette Williams
3
10/05/2004 TUE 16:27 FAX 630 466 9380 EEInc, Z001/006
PC, —Ci`...)C
•
52 Wheeler Road • Sugar Grove, IL 60554
TEL: 630 I 488-9350
Irl/
sr FAX: 630 / 466-9360
L<:rErp,,u:s.e.,,,ntr•inen
www.eeiwoh.com
h` Glace..
yEIR F
.ti
EXCELLENCE
stx.:xn'swr.v'na�e.n..rr:rr..^�a+rr�ra
October 5, 2004
Mr, Joseph A. Wywrot, P.E.
City Engineer
United City of Yorkville
800 Game Farm Road
Yorkville, IL 60560
Re: Preliminary P.U.D. Plan Review,Autumn Creek Subdivision (Theidel),
United City of Yorkville.
• Dear Mr.Wywrot:
• We have reviewed the following submitted material for the referenced Preliminary P.U.D.
Plan submittal:
• Application and Petition for Annexation and Planned Unit Development dated August 10,
• 2004.
• Plat of Survey prepared by Smith Engineering Consultants, Inc. consisting of 1 sheet
with latest revision date of September 24, 2004.
• Preliminary P.U.D. Plat and Plan prepared by Smith Engineering Consultants, Inc.
consisting of 6 sheets with latest revision date of September 28, 2004
• Preliminary Engineering Plans prepared by Smith Engineering Consultants, Inc,
consisting of 6 sheets with latest revision date of September 28, 2004.
• Preliminary Stormwater Management Study and Report prepared by Smith Engineering
Consultants, Inc. with latest revision date of September 29, 2004
• Traffic Impact Study prepared by Smith Engineering Consultants, Inc. with latest revision
date of August 10, 2004
• Drain Tile Atlas from the files of Hinsdale Nurseries, Inc., undated.
•
• Report of Soils Exploration prepared by Testing Service Corporation dated January 29,
2004.
• Wetland Assessment report prepared by Christopher B. Burke Engineering, Ltd. dated
August, 2004.
G:V�uti;iclYr rw le`,:'inC\Y:)r.]d I:i l Yir?ir:el Pv:Ipo:iiy(Pvre Hc!'pe5ii[?n:aiwy:.vr O?.do C
Consulting Engineers Specializing in Civil Engineering and Land Surveying
10/05/2004 TUE 16:27 FAX 630 466 9380 EEInc, 1002/006
•
• Application for Consultation Agency Action Report submitted to IDNR on July 5, 2004.
• Correspondence from IHPA dated August 2, 2004 assigning Log #013070804 and
requesting additional information.
Our review of these plans is to generally determine the plan's compliance with City of
Yorkville ordinances and whether the improvements will conform to existing City systems
and equipment. This review and our comments do not relieve the designer from his duties to •
conform to all required codes, regulations, and acceptable standards of engineering
practice. Engineering Enterprises, Int.'s review is not intended as an in-depth quality
assurance review. We cannot and do not assume responsibility for design errors or
omissions in the plans.
We offer the following comments:
General
1. Part of the development is located within a Special Flood Hazard Area as identified
by FEMA based on the Flood Boundary and Floodway Map 170341 0020 dated July
19, 1982. However, all floodplain areas are located in Lot L, a proposed Natural
Area to be preserved.
2. A thorough review of the Wetland Study should be completed by the City's wetland
consultant prior to Preliminary Plan approval.
3. A copy of the Natural Resource Information Report by the Kendall County Soil and •
Water Conservation District should be filed with the City.
4. Permits or Sign-offs will be required from the following agencies: •
a. (IDNR) Consultation Agency Action Report regarding endangered/threatened
species or natural areas. •
b. (IHPA) regarding preservation of cultural resources.
c. Yorkville-Bristol Sanitary District regarding Sanitary Sewer Facilities.
d. (IEPA) Division of Water Pollution Control regarding Sanitary Sewer Facilities.
e. (IEPA) Division of Public Water Supplies regarding water supply and
distribution.
f. (IEPA) Division of Water Pollution Control regarding a Notice of Intent (NOI)
General permit to discharge storm water.
g. !DOT regarding intersection improvements and right of way requirements at U.
S. Route 34.
We recommend that items "a" and "b" be received prior to Preliminary Plan approval and
that for item g, a preliminary indication be received from IDOT concerning access location,
C.:Pubiicworkv!:Ie`2 O4'V l r, e:rje; Prope* (.{OR1;YG)\ii'a:VV.,ywrei02.(too
10/05/2004 TLE 16:27 FAX 630 466 9380 EEInc, 2003/006
•
•
required right of way dedications and required highway and intersection improvements.
Items c, d, e &f will be required prior to the start of construction activities.
Application and,Petition
5. All previous comments under this heading have been satisfactorily addressed.
•
Plat of Survey
6. All previous comments under this heading have been satisfactorily addressed.
Preliminary Plat
7. Proposed street names should be provided on the Preliminary Plat for review by the
City and KenCom. •
• 8. The proposed block length along Lots 166 through 181 is 1411 feet which exceeds •
•
the maximum allowable of 1320 feet. However, due to the land plan and proposed
subdivision geometry In this area of the development, we believe this •length
deviation, cannot:be cost effectively overcome .and recommend its acceptance as
•
• proposed.
9. The proposed block length along Lots 46'through 55 and 77 is 1537 feet which
•exceeds the maximum allowable of 1320 feet. However, this block is cut by an
• appropriate pedestrian trail through Lot E and we recommend its acceptance as
proposed.
10. The proposed block length along Lots 21 through 33 is 1494 feet which exceeds the
maximum allowable of 1320 feet. However, a right of way has appropriately been
•
provided for a potential road extension into the adjoining property which would
break this block. We recommend this block configuration as proposed.
11. The cul-de-sac serving multi-family Lots 1 through 9 exceeds the maximum
allowable length of 600 feet by 65 feet. We recommend acceptance of the
proposed configuration as proposed, All other rights of way, cul-de-sacs, centerline
geometry and intersection offsets meet the City's design requirements.
12. There will be approximately 1900 feet between the centerline of the proposed
access for this subdivision and the proposed westerly entrance to Grande Reserve
• from U. S. Route 34.
•
13. We have participated with you in discussions with CGL, MPI, SEC and Pulte Homes
regarding the coordination of rights of way and utilities between this development
and Neighborhoods 17, 18 and 19 in Grande Reserve. All parties are continuing to
cooperate.
•
14. All other comments under this heading have been satisfactorily addressed.
•
•
Preliminary Engineering Plan
15. Proposed street names should be added to the Plans.
0. Pub i `Ycr..,I t7;,f1c'Yi)i;n; 7"!':di Prop2^;i(PL:(;e h'.Gme5;1C__'Jv. V.i !::' acc
10/05/2004 TUE 16:27 FAX 630 466 9380 EEInc, 4:004/006
• 16. The final water main sizing will be determined at Final Engineering after we have
input the proposed layout into the City's model and performed a pressure and fire
flow analysis.
17.All other comments under this heading have been satisfactorily addressed
Traffic Study
18. We have reviewed the Traffic Impact Study and find it to be well presented and
accurate. The roadway network as proposed complies with the functional
requirements of the traffic data presented with the following exception.
19. Considering that the projected ADT of 2313 at the U. S. Route 34 access point is
close to the 2500 ADT classification for a major collector and that the future
• commercial traffic has not been considered, this access road easterly of the •
commercial site, up to where it becomes the 34 foot back to back hybrid collector, .•
should be constructed to major collector design specifications.
. 20.•Kennedy Road is planned to be improved next year to a 3 lane curb and gutter •
• . cross section with transportation impact fees collected from this development. Our • •
preliminary design is complete and we are coordinating the 2 access intersection • •
designs for this development with SEC.
• .21:All other comments.under this heading have been satisfactorily addressed •
•
Preliminary Stormwater Management Study and Report '
Questions or comments regarding the following review of this report should be directed
to Jay Nemeth, P.E. at 630-466-9350.. • • •
22. The design engineer has responded to our initial comments regarding the
stormwater management facilities. However, additional items need discussion and
revision as noted below. We do not believe that any of the additional information or
data required will have an adverse impact on the land plan of the proposed
development.
23. Supporting documentation should be provided for the depressional storage
discharge rating curves used in the existing conditions hydrology model.
24. Global summary tables and/or electronic files should be provided for the existing
and proposed conditions HEC-HMS modeling. Note that the existing site runoff
appears to be low due to depressional storage on the site. Should the existing site
release rate be lower than the proposed site release rate (as calculated as
described below), additional storage will be required in the proposed condition to
reduce the proposed site release rate to a maximum of that in the existing condition.
25. According to the spreadsheet at the end of Section 4, not all of the existing •
depressional storage areas are to be filled. eased upon a review of the preliminary
site plan, it appears that most of these areas will be filled or occupied by detention
basins. The depressional storage to be filled or rendered ineffectual by the
development should be quantified and mitigated for.
C.Pub:It'Wor,(vj!le',2;),* OC)-11 j ho;:ic.-:P,tvc;:y; ':Att.Hon lei; \;v:yYJICI0:..a::4
10/05/2009 TUE 16:27 FAX 630 466 9380 EEInc, [ 005/006
26. The storage values used in the HEC-HMS model for existing depression 10 differ
slightly from those values found in the following supporting calculation spreadsheet.
27. The allowable release rate used as the basis of calculating required detention
storage volume has changed from the previous preliminary stormwater
management submittal. Previously, the Yorkville modified rational method was
used for the purposes of calculating required detention storage volume utilizing a
0.00 cfs/acre allowable release rate for area currently tributary to the Fox River and
a 0.05 cfs/acre allowable release rate for the area currently tributary to Blackberry
Creek. In the current report, a 0.00 cfs/acre allowable release rate for area
currently tributary to the Fox River and a 0.10 cfs/acre allowable release rate for the
area currently tributary to Blackberry Creek are used in the Yorkville modified
rational method calculations. As proposed, all site runoff will be directed to
Blackberry Creek (including the 80.8 acres currently tributary to the Fox River), To
accommodate this watershed diversion, we recommend the following criteria be.
used for the calculation of required detention storage volume and these criteria be
• incorporated into the annexation agreement as such;
•
a. Each of the following methodologies should be performed, with the methodology
• . • calculating the greater detention storage volume necessary to meet the noted •
• • allowable peak release rate utilized as the 'required detention storage volume'.
Proposed detention basin outlet structures should be sized and modeled using a
• continuous simulation event hydrograph method such as HEC-HMS to ensure
the required detention storage volume is achieved in the 100-yr 24-hr storm
event.
✓ The Yorkville modified rational method should be used to calculate required
detention storage volume utilizing a 0.00 cfs/acre allowable release rate for
area currently tributary to the Fox River and a 0.15 cfs/acre allowable release •
rate for the area currently tributary to Blackberry Creek (roughly equivalent to
an allowable release rate of 0.105 cfs/ac for the entire site).
/ A continuous simulation event hydrograph method such as HEC-HMS should
•
be used to calculate required detention storage volume utilizing a 0.00
cfs/acre allowable release rate for area currently tributary to the Fox River
and a 0.05 cfs/acre allowable release rate for the area currently tributary to
Blackberry Creek, as recommended in the Blackberry Creek Watershed Plan
(roughly equivalent to an allowable release rate of 0.035 cfs/ac for the entire
site).
b. The allowable release rate for the 25-yr 24-hr storm shall be 1/2 of the allowable
release rate for the 100-yr 24-hr storm, The allowable release rate for the 2-yr
24-hr storm shall be % of the allowable release rate for the 100-yr 24-hr storm.
28. We recommend that the developer be required to utilize retention/infiltration best
management practices and to minimize the direct connection of impervious areas.
• Specific best management practices can be identified as the preliminary design
progresses. Specific best management practices to be required should be
incorporated into the annexation agreement.
,11 ...;,4',YOO/I':'111,,:;(1.1 P;np?.ri'y
10/05/2004 TUE 16:27 FAX 630 466 9380 EEInc, ?006/006
29.The curve numbers used in the proposed conditions HEC-HMS model for Y4 acre
lots and townhomes are slightly lower than the values recommended for type B soils
in Table 2-2a of TR-55. The curve numbers should be adjusted accordingly.
30. Generally, the 'C' values used in the Yorkville modified rational method required .
detention storage volume calculations are acceptable; however there is a .
discrepancy in the C value for subbasin 7. The C value for subbasin 7 appears low
compared to other subbasins with similar curve numbers.
31.The assumed restrictor sizes used in the proposed conditions HEC-HMS model
basin discharge rating tables should be indicated. Supporting preliminary sizing
calculations reflective of the basin discharge rating table would be useful,
32. The proposed wet bottom detention basins have a 'bounce' between the normal
water line and the high water line of 6,0-ft. Bounce is typically limited to 4:0-ft due
• to the resulting long basin drawdown times. 6.0-ft of bounce is acceptable; however
the selection of the proposed basin vegetation should be performed to ensure
survival under longer periods of inundation.
33. The report indicates that approximately 8.1 acres of non-jurisdictional wetlands are
located within the center of the project site in addition to wetlands running parallel to
Blackberry Creek. The U.S. Army Corps of Engineers jurisdictional determination
should be provided.
34. Detention storage volume has not been provided for the proposed commercial area •
at the south edge of the property. The proposed commercial area is shown draining
freely to proposed detention basin 1. Stormwater management requirements for the
proposed commercial area should be determined and provided for as part of the
preliminary plan.
35.The influence of tailwater elevations in Blackberry Creek should be considered in
the design of proposed detention basin 6.
Conclusion
We recommend Plan Commission approval of the referenced Preliminary P.U.D. Plat
and Plan subject to the above comments. Our review will continue as the above
comments are addressed by the developer and the design engineer. If you have any
questions or require additional information, please contact our office.
Sincerely.
ENGINEERING ENTERPRISE INC.
/ c
,1 John T. Whitehouse, P.E., P.L.S.
• Senior Project Manager
pc: Liz D'Anna, Deputy Clerk
JWF/JPN, EEI
Ci:1('laht!C1'Yo:1Mile,Z)04',Y004 i ;'f 'I P.Cp�r;y i'r'uI 1-1 n:�^,.i'dDoc:hay',Nro:O2!ioc
Oct . 6 . 2004 8 : 31AM No . 6295 P. 2/9
,1C-;C —C'
Schoppe Design Associates
Landscape Architecture and Land Planning
126 S. Main St. Ph. (630)551-3355
Oswego, IL 60543 Fax(630) 551-3639
October 5, 2004
MEMORANDUM
To: Tony Graff, City Administrator •
From: Mike Schoppe - Schoppe Design Associates, Inc.
Re: Autumn Creek- Theidel Property
We have reviewed the Preliminary P.U.D. Plat and Plan dated 9/28/04, the Preliminary
Engineering Plans for Autumn Creek Subdivision dated 9/28/04, both prepared by Smith
Engineering Consultants, and the Preliminary Landscape Plan dated 9/27/04 prepared by Gary
R. Weber and Associates, and provide the following comments:
Preliminary P.U.D. Plat and Plan
1. Two concerns were brought up at the City Council and Plan Commission meeting. The
first is that the lots backing up to Grand Reserve should be increased to the same size as
the adjacent lots in Grand Reserve. This has been addressed be increasing the lot sizes,
adjacent to Grand Reserve, to a minimum of 12,000 s.f. The second issue that was
brought up was the appropriateness of the townhomes, near the commercial, separating
two single-family areas. It does not appear that this has been addressed. The
development team should be prepared to identify how this concern is being addressed.
2. The City Council, during their Concept Plan review, mentioned that this development
must create inter-city roads so drivers can avoid traveling on major roads. To
accomplish this, we anticipate that the road stubbed to the Hamman property will
extend west to Countryside Parkway. This road will provide the alternative route to the
commercial areas without needing to travel on the major roads. The traffic study
identifies this section of road as having an ADT of 416. The petitioner should be
prepared to discuss how the design of this will help reduce the need to travel on the
adjacent major roads.
Nylon
Oct . 6 . 2004 8 : 37AM No . 6295 P. 3/9
3. We are having CDF, the City's wetland consultant,review the wetland delineation and
engineering plan and provide comments related to the existing on-site wetlands.
4. Add generic street names for ease in referencing.
5. Preliminary architectural plans need to be submitted. We recommend that these be
submitted for review prior to the Plan Commission meeting.
6. As we indicated in our June 2, 2004,memorandum,the City's School Site Study
identifies a combined elementary/middle school site in this general area. We
recommend that before the Plan Commission meeting, the School District be contacted
to determine if in fact they want a combined site or just an elementary school site, or
just a middle school site. Per the School District's standards, a combined
elementary/middle school site needs to be 35 acres. A middle school site by itself needs
to be 25 acres, and an elementary school site by itself needs to be 15 acres. Knowing
that 6 acres of the 24.22 acre lot B is to be for park use, and knowing that the land-cash
obligation for schools for this project is approximately 23.5 acres, if the School District
wants this site for a middle school or combined elementary/middle school, the size of
lot B will likely need to be increased.
7. Revise Note 11 on Sheet 1 to incorporate the following:
A. Lot L along Blackberry Creek should be labeled as being conveyed to the City
of Yorkville.
B. Lot N will be owned by Association.
C. Lot B to be conveyed to the City of Yorkville.
8. The location of the proposed bike trail on Lot L will require the trail to go down a fairly
steep wooded slope. Additionally,the engineering plans show a storm sewer running
along the north portion of lot 265 through the same fairly steep wooded slope. We
recommend that the bike path and storm sewer be relocated as shown on the attached
sketch#1 to avoid the wooded slope.
9. The R.O.W. for the north/south street fronting lots 278 through 282 and lot 269 should
be widened by 5', from 66' wide to 71' wide to allow for the 10' bike path, in lieu of 5'
sidewalks, as requested by the Park Board,
Preliminary EnEineering Plans
1. All of our comments relative to the Preliminary Engineering Plans have been
satisfactorily addressed.
moon
Oct . 6. 2004 8 : 37AM No . 6295 P. 4/9
Preliminary Landscape Plan
1. All of our comments relative to the Preliminary Landscape Plan have been satisfactorily
addressed.
We recommend approval of the Preliminary Plat and Plan,Preliminary Engineering Plans and
Preliminary Landscape Plan subject to addressing these comments.
CC: Mayor Art Prochaska
Joe Wywrot, City Engineer
Liz D'Anna, Deputy Clerk
John Whitehouse, EEI
Anna Kurtman, Zoning Administrator
Bill Dettrner, Certified Building Official
fage 3 013
Oct . 6. 2004 8: 37AM No . 6295 P. 5/9
.. 630 - , I+ / LINE NOT TO SCALE II
dc.„,,' `
i /' \.
461461r6/111 11111 I .
'N. 01/044
O~`` da)12416•
� PROPOSED
• : BIO-5WALE
eika *Ili
.. 111` \\''''
�.. ��I ,\ // '
�pr EXISTING TREE DRIP LINE
� .::-..":�.. .a,y�:= \. ., `.w.••�',:. •
...�.. . ... .•.Sit. . . 1.
•
•
•
•
•
•
, .:\\,1‘ . .. \....., \ !4 f 1 ji i ,I/,,,.
•
``. \ l'�'' :''' \ L0T\L /" r' ;` rl7ra;% / SAN MH 4' DIA
\.• . =,� \ `?ARK ARTA....:.— _ j I. q•�+ ' RIM = 651.67
,�• \ •\;���- 1vQ�pe .. y', `•., ,..,- NVV = 64567 (8')
G TREE LINE �� ,- =;,-_.r:.:.. ....•....._��� - �%.�
j . .,-,,,.e;, - - - -wa.: - err. ... :J �.
F
i • 265 �� OWE
i;
ROPOSEI ` LOT 266iLt
,_.....t OT 263 1\` ....
� .,LOT267 R15.00'r'
�J
850.00' 0.
[ LOr�'68,, o� B.O.C.
f ., ,, ' (1, \
. /, LOT 262 % i' r
/ �\ i•hr " ..,.• �� L0�752
,.,. LOT 261 /
t �+ o.00' rr
' J 6� ,LOT 260 ' LOT 2 3
,_�. .6 66.0• /- ;
Z....• �� R.D,W. �, `r
)T 283 \ %I► , LOT 259/ , !
00' 4.*• SEAN 4' tai, /LOT 2 4 / •
='/
w. :,e.rs� •`•• /RIM = '.65 . �/ 4
�`Wie,'
r i:' ► \ O 258 !� /LOT 255 1,.• �f
-)C, �C C �
f C'7
,i° United City of Yorkville
EST 1836 County Seat of Kendall County
� 800 Game Farm Road
' tq
Yorkville, Illinois 60560
=a Telephone: 630-553-4350
�y�<�E ,��nry � Fax: 630-553-7575
Website: www.yorkville.il.us
September 30, 2004
TO: Tony Graff
FROM: Anna B. Kurtzman�•�/
SUBJECT: Preliminary PUD Plan Review
Autumn Creek Subdivision(f/k/a Theidel Property)
I have reviewed the documents submitted to the City on September 29, 2004 against the
comments from my September 16th memo. Based upon this review, I have the following
comments:
1. I had previously noted that several single-family residential lots did not meet the
minimum lot size. I also requested information regarding the minimum lot width as
measured at the building setback line and have determined that several lots do not
meet the minimum lot width. I have identified the non-conforming lots in the
attached table. As this is a proposed PUD the City will need to evaluate these
variances and deteiiiiine if they are acceptable.
2. There are three lots in the R-3 area that do not meet the minimum lot width
requirement of 90 feet. These lots are: 349 (73.68 ft), 350 (20.61 ft) and 351 (89.87
ft). Again, as this is a proposed PUD, the City will need to evaluate these variances
to determine if they are acceptable.
3. The Plan Commission and the City Council should be made aware that Lot 350 is
designed as a"flag lot." Based upon the definitions associated with various lot lines
determining the setbacks from all properties lines is not possible in a"flag lot"
situation. However, in this case the proposed plat of subdivision does have enough
information associated with it that setbacks can be determined and therefore a
building peiniit could be issued.
4. As discussed in the Plan Council meeting, Outlot M will be used as pedestrian access
between unincorporated Bristol Lake Subdivision and this development. I would
recommend that a note be added to the plat indicating the intended use of this outlot.
/abk
attachment
filename: C:\Documents and Settings\Anna\My Documents\Autumn Creek\Ptan Commission review9-30-04.doc
Sep 29 04 01 : 45p Yorkville Recreation 630-553-4347 p. 2
1
STAFF REVIEW AND PARK BOARD COMMENTS
Pulte Homes
Theidal Property (Hinsdale Nursery)
Route 34 and Kennedy Road
South of the MPI development
Parks and Open Space Planning area#4
Park Board Review 5/24104
Land Cash donation requirements is 17.7 acres
Comments
Park board requested the developer relocate a 6 acres park more in the single family
area somewhere closer to the school location. Also a trail connection from the park to
the MPI trail connection (1 1/2 acre trail credit)
In addition explore the possibility of a 1 acre trailhead /parking on the west end of the
property where the property meets with the 88 acres of the MPI Blackberry regional trail.
Preliminary Plan Review 9/20/04
For discussion at Park Board on 9/27/04
Location and distance of the MPI Parks#H (5 acre park) and Park#E (11 acre park)
Hamman Property to the south is proposed commercial /beach area
Outlot# B School / Park Site—confirmation of the school requirement for acreage and
what is left for the parks requirement. Is the current combined location the best site or
shape for the parks? How will the separation of ownership be indicated?
Request of the cash balance of the land cash obligation at the time of final plat. (this will
help with the funding of the regional parks maintenance area, and the park development
in this site).
On the Plans ownership of outlots should be clearly marked with intended ownership
indicated. (Outlots# D, C, A)
What is the acreage or requested credit for the trail-head area?
What is the Park Board's intend in regards to trails throughout the conservation area?
Recommendations from Park Board 9/27/04(Preliminary Plat)
Park Board is only interested in the regional trail system, all other trails should be private
/ HOA.
Land cash obligation needs to be adjusted with the changes of the preliminary plat, there
is a slight increase in houses.
Sep 29 04 01 : 45p Yorkville Recreation 630-553-4347 p. 3
Park Board would like a six acre park and if possible adjacent to the school property.
Developer needs to firm up with the School District their land donation. Also the Park
Board with the shape of the park to be usable and continuous with street frontage on at
least two sides,
The 1 acre trail head needs to be re-worked to show how a trail connection would work.
Currently there is a large detention area. The Park board does not want ownership of the
detention area.
Desire to have the trail-head and trail connection 25' away from the detention basin with
a slope not to exceed 8%. All region trails should be 10' with 5' on each side.
The Park Board will give 50% credit for trail acreage or 100% if they construct the trail.
There is one place along the regional trail from the trail head to the school site we are
recommending the developer install a trail verses sidewalk.
Sep 29 04 02: 25p Yorkville Recreation 630-553-4347 p. 2
PC.;
Li)STAFF REVIEW AND PARK BOARD COMMENTS l
Lee Farm / Montalbano Homes (conceptual design)
Location-- Southeast corner of Ament and Penman Roads
Parks and Open Space Master Plan— Planning Area#11
Other subdivision and parks in this area include; Windett Ridge, D'huse, Raintree,
Country Hills
Land Cash Obligation is 10.875 acres
DISCUSSION ITEMS
The developer is proposing 10 acre park with limited street frontage, in the middle of the
subdivision. The estimated housing units is 290 single family.
1. The street view of the proposed park site is limited, traditionally the Park Board
has like access to at least one to two sides of the park.
2. What is the desired park size for this development? And balance of cash.
Other parks in this planning area include, Raintree —7-9 acres, Country Hills—2
acres, Windett Ridge 7 acres, D'huse 5.29 acre park
3. Is there an opportunity to consider a trail connections to adjoining subdivision and
the Forest Preserve's proposed regional trail?
4, What is the proposed grade for the park site? Is all of this site high and dry?
Is the creek running through the site?
5, Who will maintain and own the detention areas?
Park Board Meeting 9127104 Comments and Recommendations
Drainage ditch runs through the Park property, (could be piped out /storm sewer).
Park Board would like a 6 acre park on the east side of the property and a trail
connection/ greenway for the AuSable trail connection.
Oct . 6. 2004 8 : 38AM No • 6295 P . 8/9
C U.
Schoppe Design,Associates
Landscape Architecture and Land Planning
126 S.Main St. Ph. (630) 551-3366
Oswego, IL 60543 Fax(830) 551-3639
October 5, 2004
MEMORANDUM
To: Tony Graff, City Administrator
From: Mike Schoppe - Schoppe Design Associates, Inc.
Re: Penman & Ament Roads (Lee Farm)—Montalbano Homes
We have reviewed the Concept Plan for the Lee Farm prepared by Glyman Design Ltd. dated
September 10, 2004. The following information is provided to assist you, the Plan Commission
and the City Council in providing conceptual input to the developer on their Concept Plan.
General
Montalbano Homes is investigating the feasibility of developing the 155.8 acre Lee Farm as a
single-family lot development. The property is not yet contiguous to the City. They are
currently looking for conceptual input from the Plan Commission, Park Board and City Council
on their Concept Plan. Formal action by the Plan Commission and City Council is not needed at
this time. However,the Commission and City Council members should be prepared to discuss
and provide comments on the following:
1. The appropriateness of the residential land use, the density, and the lot sizes being
proposed.
2. The open space system.
3. The overall style and general character of the development.
4. Other comments that the Plan Commission and City Council might have.
Comprehensive Plan
The Comprehensive Plan identifies the site as Estate Neighborhood, which allows a gross density
of 1.5 dwelling units per acre or less. A greenway running northwest to southeast along the
drainage corridor is also planned for.
Page1g2
Oct . 6. 2004 8 : 38AM No • 6295 P . 9/9
Existing Land Uses
The property is currently zoned A-1 in Kendall County. The surrounding land uses and zoning
are as follows:
North: Agricultural use zoned A-1 in Kendall County
East: Agricultural use zoned A-1 in Kendall County
South: Agricultural use zoned A-1 in Kendall County
West: Agricultural use zoned A-I in Kendall County
Transportation
The City's Transportation Plan calls for an east/west extension of Wheeler Road to be located on
the property to the south of this site.
Schools
The City's School Site Study identifies an elementary school to be located on the parcel east of
this site.
Open Space
Based on the City's Land Cash Ordinance, the park requirement for this site is approximately
10.8 acres.
If you have any questions,please call.
CC: Joe Wywrot, City Engineer
Liz D'Anna, Deputy Clerk
Anna Kurtman, Zoning Administrator
,page2e2
Sep 29 04 03: 07p Yorkville Recreation 630-553-4347 p. 2
STAFF REVIEW AND PARK BOARD COMMENTS
Blackberry Woods
Location — River Road — PNA Camp
Parks and Open Space Master Plan-- Planning Area#5
Other subdivision and parks in this area include; Fox Hill, Beecher
Community Park, Town Square
Land Cash Obligation is 4.045 acres
DISCUSSION ITEMS
The developer is proposing 3.51 acre park. The estimated housing units 146 single family
and Duplex units.
1, The shape of the Park has a street view on the proposed playground area with
limited view of the elongated portion. Is this all useful, or is there a need for
greenway/ non-park
2. What is the desired park size for this development? Is a 3.5 acre park needed?
What is the balance of cash. Is all of the proposed park able to be developed?
What is the environmental value of the proposed tree line? What will be done with
the proposed tree line?
3. What is the proposed grade for the park site? Is all of this land site high and dry?
4. Who will maintain the detention areas?
5. Is there opportunities to expand this park area in the future?
6. Would like to request from the developer the balance of cash obligation to be paid
at the time of final plat.
7. Can the park property be connected to the Blackberry Creek trail? What would be
the credit for the trail connection? What would be the width /acre requirement of
the 10 foot trail and 5 foot on either side (20 foot trail connection). Do we want
and easement or ownership?
Park Board Meeting 9/27/04 Comments and Recommendations
Age-targeted community with association upkeep. / adjacent to Cimarron ridge.
Park board would like developer to preserve the tree line as natural area. (no credit).
As part of the land /cash obligation, the park board would like a 2 % acre park located on
the south west side of the property. (As adjoining property's develop the park could be
enlarged by combining land cash obligations).
Oct • 6. 2004 6 : 37AM No . 6295 P. 6/9
PC.- r)t—' C(1-- (
Schoppe Design Associates
Landscape Architecture and Land Planning
126 S. Main St. Ph. (690) 551-3355
Oswego, IL 60543 Fax(830)551-3839
October 5,2004
MEMORANDUM
To: Tony Graff, City Administrator
From: Mike Schoppe - Schoppe Design Associates, Inc.
Re: Blackberry Woods
We have reviewed the Concept Plan for the Blackberry Woods Subdivision prepared by Cemcon
dated September 8, 2004. The following information is provided to assist you, the Plan
Commission and the City Council in providing conceptual input to the developer on their
Concept Plan.
General
Blackberry Woods, LLC is investigating the feasibility of developing the 60 acre Blackberry
Woods site as a mixed use development, including 12,000 s.f. single-family lots and 7,200 s.f.
single-family lots. They are currently looking for conceptual input from the Plan Commission,
Park Board and City Council on their Concept Plan. Formal action by the Plan Commission and
City Council is not needed at this time. However, the Commission and Council members should
be prepared to discuss and provide comments on the following:
1. The appropriateness of the residential land use, the density, and the lot sizes being
proposed.
2. The residential product type being proposed.
3. The open space system.
4. The overall style and general character of the development.
5. Other comments that the Plan.Commission and City Council might have.
Pogo 1 of 2
Oct . 6 . 2004 8 : 37AM No . 6295 P. 7/9
Comprehensive Plan
The Comprehensive Plan identifies the northern portion of the property as Suburban
Neighborhood which allows a gross density of 1.5 to 2.25 dwelling units per acre. The southern
portion of the property is identified as Estate Neighborhood which allows a gross density of 1.5
dwelling units per acre.
Existing Land Uses
The property is currently zoned A-1 in Kendall County. The surrounding land uses and zoning
are as follows:
North: Kendall County Government Center zoned 0 in Yorkville and Cimarron Ridge
Subdivision zoned R-2 in Yorkville
East: Agricultural use zoned A-1 in Kendall County
South: Agricultural use zoned A-1 in Kendall County
West: Agricultural use zoned A-1 in Kendall County
Transportation
The City's Transportation Plan calls for an east/west collector to run along the southern portion
of this property and ultimately would connect to Game Farm Road and Eldamain Road, Running
north/south through this site is the southerly extension of Cannonball Trail as a collector road.
Schools
The City's School Site Study identifies an elementary school to the west of this site.
Open Space
Based on the City's Land Cash Ordinance,the park requirement for this site is approximately 4.0
acres.
If you have any questions,please call.
CC: Joe Wywrot, City Engineer
Liz D'Anna, Deputy Clerk