Loading...
Plan Council Packet 2004 09-23-04 United City of Yorkville County Seat of Kendall County EST. 1836 800 Game Farm Road , rr v) Yorkville, Illinois 60560 Q t n Q Phone630-553-4350 v>� Fax:630-553-7575 E PLAN COUNCIL AGENDA Thursday, September 23, 2004 9:30 a.m. CITY CONFERENCE ROOM 8:30 a.m. Staff Meeting 1. Approval/Correction of Minutes: August 26, 2004 2. 9:30 a.m. - PC 2004-07 Theidel Property - Preliminary Plan 3. Street Naming Procedure 4. Additional Business 1 United City of Yorkville Plan Council Meeting August 26, 2004 Attendees: Tony Graff, City Administrator Joe Wywrot, City Engineer Mike Schoppe, Schoppe Design Sgt. Ron Diedrich, Yorkville Police Jeff Freeman, EEI John Whitehouse, EEI Tim Fairfield, BKFD Laura Brown, Director of Parks &Rec Eric Dhuse, Director of Public Works Guests: Eric VanBeest, Pasquinelli Development Brian Urban, Cowey, Gunderson, Leder Dan Oefner, Cowey, Gunderson, Leder Bill Zalewski, Jacob &Hefner Rich Guerard, Wyndham Deerpoint Rob Zoromski, Concord Homes Mr. Graff called the meeting to order at 9:45 AM. Mr. Wywrot questioned the Fox Hill bike trail's path, and it was determined the trail would go into the cul-de-sac, back out to Eldamain and not along the south property. The bridge easement winds into the cul-de-sac area, per Ms. Brown. As part of the Fox Hill agreement, Mr. Schoppe stated, that Marvin DeLahr, DCS, would be giving the City land along the west side of the creek(from the bridge south) which would allow the land connecting it to Unit 7. The City opts not to build the trail now. The July 22, 2004 minutes were approved as written. Grande Reserve Unit 9—Final Plat Mike Schoppe's comments 1) Comment#1 —Final Plat: The annexation agreement document shows an opening to the street at lot 806 and the plat shows it as a build able lot. Mr. Urban took an open space to make 112 build able lots, as stated in the annexation agreement. Mr. Graff stated that the final plat lot numbers cannot be compromised if there are landplane or engineering issues. Staff believes Lot 106 was designated as an emergency and visibility area. If owners want to explore and redesign the area for 112 lots, they should resubmit in writing as an amendment to the plan. 2) Comment#4—Engineering Improvement Plans: This is a City Council issue, not plan commission. Mr. Schoppe stated that the City consultants, CDF, recommended the 2" o.c. spacing. Mr. Urban suggested that the plugs were an improvement over the initial specifications, which were for seeding only, in some of the other neighborhoods. Mr. Schoppe suggests if the plan is to seed at 5000 plant per area, and, in addition, add the plugs, this would be a fair compromise. 3) Comment# 1 —Engineering Improvement Plans: Mr. Schoppe would prefer a stub alongside the east side of Matlock, which is on the west side of the park. It should be centered to the east side into the ROW, with a 1"water and a 6" sanitary. Staff will look into putting parking spaces at this site. Ms. Brown stated that there will be a drinking fountain in the park, and typically only the larger acreage parks are equipped with restroom facilities. 2 EEI comments 1) Sheets 5-10, Grading plan—John Wywrot has been in contact with Brian Schiber in regards to the grading. A site visit will be arranged. 2) Eric Dhuse, Joe Wywrot and John Whitehouse agree that storm sewer stubs should be extended beyond the typical length into front yards during construction. 3) Comment# 5, Sheets 11-19: Allegiance intersection will be realigned per Mr. Oefner. 4) Comment# 8, Sheets 11-19: Tim Fairfield is working with Oswego on an intergovernmental agreement on service boundaries, to interconnect and make hydrant supplies available. The water supply is the foremost concern, not the logistics of the hydrant placement. 5) Comment #12, Sheet 1-19: Options for Seely Street are a) eliminate the current single feed and do a loop around the cul-de-sac, b) run up with a single pipe into Mill Rd, cross under the railroad, come back to Mill; c) come north with a single, go west following the electric line, then tie into the water line leaving the tower(which crosses the railroad) and onto Galena. Recommended to the developer is option#2, making a better water supply source for portions of area north of Mill Rd. This would be a 8"main. Interceptor lines should be 15' from ComEd. 6) Comment#18. Sheets 21 & 22: The City will get written direction is needed from IDOT. 7) Comment# 27, Sheet 21 &22: The typical lot detail would be sufficient if there are no side yard abutting streets that are differing per Mr. Whitehouse. 8) Comment #6, Sheet 11-19: The City will keep the 66' ROW. The developer will tie in the curb should tie in at the curb cross section with a 28' back to back. The sidewalk will slope 30' transitionally. Anna Kurtzman's comments 1) Comment#3: These lots are shown in their entirety on the front cover. Mr. Whitehouse believes this is sufficient. 2) Comment#4: A note needs to be made on the cover sheet. There should be a note on the cover sheet conveying the area to the Home Owners Association. There is language on the plat allows a bike path through the storm water management easement. (see lot 4 language, and note #4). Per Ms. Brown the City maintains 5' on either side of the trail. 3) Comment#5: The landscape median is maintained by the HOA, needed is the typical easement detail language. 4) Comment#6 and#7: Typical detail language needs to be provided by the developer. 5) Comment#8: Mr. Urban does not want to show on the plat. Rear yards must be shown if they are a deviation, per Mr. Wywrot. The developer should show as done in other units. 6) Comment#10: Mr. Urban will provide the architectural details. 7) There was discussion as to whether or not all setbacks need to be shown on the plat. If then, a resident asked for a variance, would all residents in the Unit would be required to sign off on this. The developer will show the front setbacks only on the plat, and typicals on the side and rear setbacks. The developer will present Units 9, 10 and 11 at the November 10th Plan Commission. Submittal of revised engineering, landscaping preliminary plans and preliminary plats for Unit 9 should be submitted by September 30th. Raintree Village Units 4,5 & 6— Final Plait Mike Schoppe comments 3 1) There was a discussion on the naming of Bluebird Lane in Unit 4. It was determined that Hawk Hollow Drive will continue north to River Crossing Drive. North of there it will be Bluebird Lane. Anna Kurtzman's comments 1) The developer will comply, on Unit 4, to include acreage on each lot on the plat. John Whitehouse comments 1) Plats need additional easement widths and access restrictions. 2) Comment#4—Grading plans: The developer needs to ease the peaks on the side yards so overflow flows are not contained. 3) John is asking for an additional sewer line running through the school lots, 291 and 292. Needed is an 8" sewer line. Watermain will be from west property line and tap into the south side of Prairie crossing. 4) The detention basin on lot#336 serves the school site, as well as the water tower and park site. Mr. Whitehouse suggested the storm sewer be put in first and soon. The water main is now going up to Prairie Crossing (40 ft easement in Unit 2) which eliminates the need for the booster station. Rob Zoromski asked if the city might allow construction, with a permit log number documentation number, and Mr. Wywrot suggested that the City may give a right to proceed, if Kramer's office okays the request. If storm sewer is and grading is completed, Mr. Whitehouse is suggesting that cover issues will not be problematic when water line is ready for installation. The developer stated that permits will be turned in next week to the City, and forecasts that the IEPA would receive these the first week of September. 5) Per Rich Guerard , Wyndham Deerpoint will convey ownership of Lot#466 to the City, indicated on the plat "to be conveyed" to the City. 6) If Tremont Lane is not constructed yet, Rob is asking that the water main valve be moved alongside the road, for access along Astor to the water tower site. 7) Mike Schoppe commented on grading on the school/park site on Unit 2 to make it more flexible as a one site area, not knowing where the park improvements or school will be located. Shown is a 4-5" slope alongside the east side. Options were: 1) pull dirt back, 2) put in additional fill on the low side, or 3) put the larger slope along the far east side. Mr. Whitehouse stated there is a water main down the east easement property line, and a 460V. electric line, but the grading at these lines could not be changed. At this time, the developer will not be asked to regrade, and staff will look at options when the school or park site is developed. 8) On Unit 5, Parkside will continue it name until Rt. 126. Keeping the connecting street name into the adjoining subdivision will be addressed when staff review those plats. 9) Wyndham Deerpoint will keep the streetlights banded as close to T intersections as possible, per Mr. Dhuse's request. 10) Mr. Fairfield requested that Manchester Lane name be changed. This will go to Plan Commission on Sept. 8th, with final plat approval subject to final engineering and landscaping reviews. Revised final plats, engineering and landscape submittals are due by Sept. 3rd. Respectfully submitted, Annette Williams UNITED CITY OF YORKVILLE 800 Game Farm Road Yorkville, IL 60560 630/553-4350 PC# APPLICATION & PETITION ANNEXATION, PLANNED UNIT DEVELOPMENT, ZONING OR SPECIAL USE REQUEST Development Name: TBD Date of Submission: August 10, 2004 Requesting: El Annexation [j Zoning ti Planned Unit Development [j Special Use: 1. Name of Petitioner(s): P,11 to Home Corporation Address: 2250 Point Blvd. Elgin, IL 60123 Phone Number: (847) 841-3583 Fax Number: (847) 783-0875 Relationship of Petitioner(s) to subject property: [) Owner [4 Developer ] Contract Purchaser 2. Name of holder of legal title, if different from#1: LaSalle Bank Trust #4198 If legal title is held in a Land Trust, list the names of all holders of any beneficial interest therein: Richard Theidel 100% 3. a). (i). Street address and physical location of subject property: 8111 State Route 34 (north of Rt. 34, east of Menards, west of MPI) (ii). Zoning of surrounding parcels: North: R-2 PUD (Yorkville) R-3 and A-1 (Kendall County) South: R-3 and A-1 (Kendall County) East: R-2 PUD (Yorkville) West: R-2 PUD, R-2 and B-3 (Yorkville) b). Legal description of property; attach as Exhibit "A". c). Total Acreage: 286 Page 1 of 5 United City of Yorkville Annexation,PUD,Zoning,Special Use Application Revised: 2/25/04 3. (con't): d). Kendall County Parcel Number(s) of property for which PUD is sought: Please see attached. e). Current Zoning Classification: A-1 (Kendall County) f). Zoning Classification Requested: R-2 PUD, R-3 PUD and B-3 g). Is this property within City limits? Yes X No, requesting annexation 4. Names and addresses of any adjoining or contiguous landowners and landowners within 500' entitled to notice of petition under any applicable City ordinance or State Statute: Attach a separate list and label as Exhibit"B". 5. List all governmental entities or agencies required to receive notice under Illinois law: IHPA, IDNR, IDOT, KCSWCD, YBSD, United City of Yorkville USACOE 6. List the Illinois Business Tax Number(IBT#) for the State of Illinois and names of businesses located on subject property to be annexed: 36-1221170 7. Does a flood plain exist on the subject property? Yes 8. Do Electors reside on the subject property? No If so, they must execute this petition to annex. (Electors as defined by Illinois Law is a resident of the parcel who is a registered voter. Legal owners of the annexing parcel must sign the petition regardless of place of residence or legal voting status.) 9. Contact Information: Name, address, phone number and fax number of person to whom inquiries regarding this petition may be directed: Matt Cudney, Pulte Homes 2250 Point Blvd. Suite 401, Elgin, IL 60123 (847) 841-3583 office (847) 783-0875 fax Attorney: Name: Julie Workman, Esq. (Gardner, Carton & Douglas) Address: 191 N. Wacker Drive, Suite 3700, Chicago, IL 60606 Phone Number: (312) 569-1232 Fax Number: (312) 569-3232 Engineer: Name: Pete Huinker (Smith Engineering) Address: 759 John St. , Yorkville, IL 60560 Phone Number: (630) 553-7560 Fax Number: (630) 553-7646 Land Planner: Name: Gary Weber (Gary R. Weber & Associates) Address: 224 S. Main St. , Wheaton, IL 60187 Phone Number: (630) 668-7197 Fax Number: (630) 668-9693 Page 2 of 5 United City of Yorkville Annexation,PUD,Zoning,Special Use Application Revised: 2/25/04 10. Submit the following to the Deputy Clerk in order to be scheduled for the necessary committee meetings. An incomplete submittal could delay the scheduling of your project. a. Original application with legal description plus 40 copies. b. Appropriate filing fee (Please refer to page 4 of this application to "Petitioner Route, Step 1, Fees" and/or contact the Deputy Clerk for verification of this amount). c. Concept or Preliminary Site Plan: 40 sets folded to fit in a 10" x 13" envelope In witness whereof the following petitioner(s)have submitted this application under oath and verify that to the best of their knowledge its contents are true and correct and swear that the property to be annexed is contiguous to the United City of Yorkville. Date: August 10, 2004 Petitioner(s) Si na re: (All legal property owners signatures must appear on this application.) Subscribed and sworn to before me this /O day of grCic( , 200 . 1 OFFICIAL SEAL - € BERNADE I 1 h E FITTS NOTARY PUBLIC STATE OF ILLINOIS - Y:/Wa 7// Notary Cotvli�rlCr.c Fxrs.APR.5,2DIt5 E y " THIS APPLICATION MUST BE NOTARIZED. Page 3 of 5 United City of Yorkville Annexation,PUD,Zoning,Special Use Application Revised: 2/25/04 ANNEXATION, PLANNED UNIT DEVELOPMENT, ZONING OR SPECIAL USE REQUEST PETITIONER ROUTE Step 1: Petitioner must submit a completed application, fees* and all pertinent materials to the Deputy Clerk a minimum of 45 days prior to the targeted Plan Commission meeting. Petitioner is responsible for making submittals to other review agencies such as Kendall County, Illinois Department of Transportation, Illinois Department of Natural Resources, U.S. Army Corps of Engineers, etc., to allow timely review by City. *Fees: a. Annexation or Annexation and Rezoning- $250 plus $10 per acre for each acre over 5 acres b. Rezoning only- $200 plus $10 per acre for each acre over 5 acres c. Special Use - $250 plus $10 per acre for each acre over 5 acres d. Engineering Review Fees - 1.25% of the approved engineer's estimate of cost of all land improvements, to be determined by City Engineer. e. Planned Unit Development fee- $500 f. Engineering Review Deposit-up to 1 acre= $1,000; over 1 acre but not over 10= $2,500 over 10 acres, but not over 40= $5,000 over 40 acres, but not over 100 = $10,000 over 100 acres =$20,000 g. Deposit for Outside Consultants -under 2 acres =$1,000 2 to 10 acres = $2,500 over 10 acres= $5,000 Note: Owner/Developer will be responsible for payment of recording fees and costs, public hearing costs including a written transcription of public hearing and outside consultant costs (i.e. legal review, land planner, zoning coordinator, environmental, etc.). Should Owner/Developer not pay these fees directly, they will be responsible for reimbursing the United City of Yorkville for the aforementioned fees and costs. Note: You must present your plan at each of the meetings below as indicated. Step 2: Plan Council: The Planning Council meets the 2nd and 4th Thursday of the month at 9:30 a.m. in the City Administration Office. Upon recommendation by the Plan Council,you will move forward to the Plan Commission Meeting. Attendees to this meeting include: City Administrator, City Land Planner, Sanitary District Director, City Engineer, Building .._.....__. Depai fluent Official, Emergency Medical Rep, Public Works Director, Executive Director of Parks and Recreation, Fire Department Rep, and Police Chief. Step 3: Park Board Planning Meeting: The Park Board makes recommendations on any Park Sites included in residential developments. The Park Board Planning Meeting is the fourth Monday of each month at 7:00 p.m. at the Riverfront Building, 301 E. Hydraulic Street. Page 4 of 5 United City of Yorkville Annexation,PUD,Zoning,Special Use Application Revised: 2/25/04 Step 4: Plan Commission: The Plan Commission meets the second Wednesday of each month at 7:00 p.m. in the Council Chambers at City Hall. The Plan Commission will make a recommendation for the City Council's consideration. The Plan Commission consists of 10 members appointed by the Mayor, the City Attorney and City Land Planner. A Public Hearing will be held at this time for the Annexation Agreement and/or Rezoning request or Special Use request. Notice will be given by publication by the United City of Yorkville in the Kendall County Record and certified mail by the Petitioner to adjacent property owners within 500 feet of the subject property no less than fifteen days and no more than 30 days prior to the public hearing date. A certified affidavit must be filed by the petitioner with the City Clerk's office containing the names, addresses and permanent parcel numbers of all parties that were notified. Step 5: Economic Development Committee: The Economic Development Committee meets the third Thursday of each month at 7:00 p.m. in the City Hall Conference Room. All projects (regardless of a positive or negative EDC recommendation) proceed to the Committee of the Whole for discussion. The Economic Development Committee consists of three (plus one alternate) City Council members. Step 6: Committee of the Whole: The Committee of the Whole meets the first and third Tuesdays of the month at 7:00 p.m. in the Conference Room at City Hall. The project will be discussed in an informal atmosphere at the Committee of the Whole where no formal voting takes place. This session is to discuss and consider recommendations of prior committee meetings. Step 7: City Council: The City Council meets the second and fourth Tuesdays of the month at 7:00 p.m. in the Council Chambers at City Hall. This is where all City Council voting takes place. A Public Hearing will be held at this time for the Annexation Agreement and/or Planned Unit Development Agreement. Notice will be given by publication by the United City of Yorkville in the Kendall County Record. A certified mailing to surrounding landowners is not required for this public hearing. Any annexation agreement, PUD agreement or development agreement must be signed by the Petitioner prior to being voted on by the City Council. Agreement: I understand and accept all requirements, fees as outlined as well as any incurred Administrative and Planning Consultant Fees which must be current before this project can proceed to the next scheduled committee meeting. Please sign and return this original (retaining a copy for your records) to the Deputy Clerk, United City of Yorkville, 800 Game Farm Road, Yorkville, Illinois 60560., Date: I b1-1 Signature of Petitioner Page 5 of 5 United City of Yorkville Annexation,PUD,Zoning,Special Use Application Revised: 2/25/04 69441.4 CHICAGO TITLE INSURANCE COMPANY COMMITMENT FOR TITLE INSURANCE ) c 3 SCHEDULE A (CONTINUED) ORDER NO.: 1401 SA33.04011 F1 • S. THE LAND REFERRED TO IN THIS COMMITMENT IS DESCRIBED AS FOLLOWS: PARCEL 1: THAT PART OF THE WEST 1/2 OF SECTION 22, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT AN EXISTING IRON PIPE STAKE SAID TO BE OVER THE ORIGINAL LOCATION OF A STONE IN THE CENTER :.INE OF THE BRISTOL AND OSWEGO ROAD, PREVIOUSLY DESCRIBED AS BEING 23.05 CHAINS WEST AND NORTH 35 DEGREES 30 MINUTES WEST 11.02 CHAINS FROM THE SOUTHEAST CORNER OF SAID SECTION 22; THENCE NORTH 34 DEGREES 59 MINUTES 00 SECONDS, ALONG A LINE FORMING AN ANGLE OF 93 DEGREES 23 MINUTES 07 SECONDS WITH THE CENTERLINE OF U.S. ROUTE • 34, MEASURED FROM NORTHEAST TO NORTHWEST, 2,054.60 FEET FOR POINT OF BEGINNING; THENCE SOUTH 52 DEGREES 08 MINUTES 00 SECONDS WEST, 825.40 FEET; THENCE NORTH 38 DEGREES 06 MINUTES 00 SECONDS WEST, 1,083.88 FEET TO THE CENTER LINE OF KESATEDY ROAD; THENCE NORTHEASTERLY ALONG SAID CENTER LINE, 1,581.49 FEET TO A POINT 'WHICH IS 350.0 FEET SOUTHWESTERLY OF, AS MEASURED ALONG SAID CENTER LINE, THE MOST EASTERLY CORNER OF BRISTOL LAKE SUBDIVISION; THENCE SOUTH 38 DEGREES 15 MINUTES 40 SECONDS EAST, 1,639.93 FEET TO A LINE DRAWN NORTH 52 DEGREES 45 MINUTES 1.7 SECONDS EAST FROM THE POINT OF BEGINNING; THENCE SOUTH 52 DEGREES 45 MINUTES 17 SECTION WEST, 750.69 FEET TO THE POINT OF BEGINNING, IN BRISTOL TOWNSHIP, XENDALL COUNTY, ILLINOIS. PARCEL 2: THAT PART OF THE SOUTH 1/2 OF SECTION 15 AND THAT PART OF THE NORTH 1/2 OF SECTION 22, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHEASTERLY CORNER OF BRISTOL LAKE SUBDIVISION, AS PER THE FLAT THEREOF FILED FOR RECORD AS DOCUMENT 137733 I.l1 PLAT BOOR 10 AT PAGE 58 ON MAY 10, 1962; THENCE NORTHWESTERLY ALONG THE NORTHEASTERLY LINE OF SAID SUBDIVISION 1988.0 FEET TO THE NORTHEASTERLY CORNER OF SAID SUBDIVISION; THENCE NORTHWESTERLY ALONG A LINE MAKING AN ANGLE OF 180 DEGREES 13 MINUTES 25 SECONDS MEASURED COUNTER-CLOCKWISE FROM THE LAST DESCRIBED COURSE, A DISTANCE OF 895.02 FEET TO AN EXISTING IRON PIPE STAKE THENCE EASTERLY ALONG AN OLD FENCE LINE FORMING AN INTERIOR ANGLE OF 58 DEGREES 15 MINUTES 28 SECONDS WITH THE LAST DESCRIBED COURSE, A DISTANCE OF 1298.88 FEET (19.68 CHAINS) TO AN IRON PIPE STAKE HEREWITH PLACED; THENCE SOUTHEASTERLY ALONG AN OLD ESTABLISHED LINE OF OCCUPATION FORMING AN INTERIOR ANGLE OF 124 DEGREES 23 MINUTES 38 SECONDS WITH THE LAST DESCRIBED COURSE A DISTANCE OF 2185.47 FEET TO AN EXISTING IRON PIPE STAKE ON THE CENTER LINE OF KENNEDY ROAD WHICH IS 1213.59 FEET NORTHEASTERLY FROM THE POINT OF BEGINNING, AS MEASURED ALONG SAID CENTER LINE; THENCE SOUTHWESTERLY ALONG SAID CENTER LINE 1213.59 FEET TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS PARCEL 3: THAT PART OF THE NORTH 1/2 OF SECTION 22, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHEASTERLY CORNER OF BRISTOL LAKE SUBDIVISION AS PER THE PLAT THEREOF FILED FOR RECORD AS DOCUMENT 137733 IN PLAT BOOK 10 AT PAGE 58 ON MAY 10, 1962; THENCE NORTHEASTERLY ALONG THE CENTER LINE OF KENNEDY ROAD, WHICH MAKES AN ANGLE OF 88 DEGREES 58 • MINUTES 47 SECONDS WITH THE NORTHEASTERLY LINE OF SAID SUBDIVISION, MEASURED CLOCKWISE THEREFROM, A DISTANCE OF 1213.59 FEET; THENCE SOUTHERLY ALONG AN OLD EXISTING LINE OF OCCUPATION FORMING AN INTERIOR ANGLE OF 94 DEGREES 54 MINETES 43 SECONDS WITH THE LAST DESCRIBED COURSE, A DISTANCE OF 1228.39 FEET; THENCE ------------ EEE 16:31:24 Epi-CHICAGO TITLE INSURANCE COMPANY COMMITMENT FOR TITLE INSURANCE 2 4 3 SCHEDULE A (CONTINUED) ORDER NO. : 1401 SA.3104011 F1 SOUTHWESTERLY PARALLEL WITH THE AFORESAID CENTER LINE OF KENNEDY ROAD, 1348.57; THENCE NORTHWESTERLY ALONG A LINE FORMING AN INTERIOR ANGLE OF 88 DEGREES 37 MINUTES 37 SECONDS WITHT EH LAST DESCRIBED COURSE A DISTANCE OF 1224.23 FEET TO A POINT ON THE SOUTHEASTERLY LINE OF SAID BRISTOL LAKE SUBDIVISION WHICH IS 0.46 FEET SOUTHWESTERLY FROM THE POINT OF BEGINNING; THENCE NORTHEASTERLY ALONG SAID SOUTHEASTERLY LINE 0.46 FEET TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS; (EXCEPTING THEREFROM THAT LAND CONVEYED TO KENNETH D- DOTY, .rR., IN DEED RECORDED AS DOCUMENT NUMBER R85-5973, DESCRIBED AS FOLLOWS: THAT PART OF THE NORTHWEST 1/4 OF SECTION 22, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHEASTERLY CORNER OF BRISTOL LAKE SUBDIVISION; THENCE NORTHEASTERLY ALONG THE CENTER LINE OF KENNEDY ROAD, 299.54 FEET; THENCE SOUTHEASTERLY AT RIGHT ANGLES TO THE LAST DESCRIBED COURSE, 287.11 FEET; THENCE SOUTHWESTERLY, AT RIGHT ANGLES TO THE LAST DESCRIBED COURSE, 306.88 FEET TO THE EASTERLY LINE OF A TRACT OF LAND CONVEYED TO HERBERT L. RUCKS BY A WARRANTY DEED RECORDED AUGUST 1, 1966 IN BOOK 149 ON PAGE 303; THENCE NORTHWESTERLY ALONG SAID EASTERLY LINE TO A POINT ON SAID CENTER LINE WHICH IS 0.46 FEET SOUTHWESTERLY OF THE POINT OF BEGINNING; THENCE NORTHEASTERLY ALONG SAID CENTER LINE, 0.46 FEET TO THE POINT OF BEGINNING, IN BRISTOL TOWNSHIP, KENDALL COUNTY, ILLINOIS) PARCEL 4: THAT PART OF SECTION 22, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEASTERLY CORNER OF BRISTOL LAKE SUBDIVISION AS PER THE PLAT THEREOF FILED FOR RECORD AS DOCUMENT 137733 IN PLAT BOOK 10 AT PAGE 58 ON MAY 10, 1962; THENCE NORTHEASTERLY ALONG THE CENTER LINE OF KENNEDY ROAD WHICH MAKES AN ANGLE OF 88 DEGREES 58 MINUTES 47 SECONDS WITH THE NORTHEASTERLY LINE OF SAID SUBDIVISION, MEASURED CLOCKWISE THEREFROM, A DISTANCE OF 1213.59 FEET; THENCE SOUTHERLY ALONG AN OLD EXISTING LINE OF OCCUPATION FORMIIIG AN INTERIOR'ANGLE OF 94 DEGREES 54 MINUTES 43 SECONDS WITH THE LAST DESCRIBED CODRSE, A DISTANCE OF 1228.39 FEET; THENCE SOUTHWESTERLY PARALLEL WITH THE AFORESAID CEETER LINE OF KENNEDY ROAD, 1364.57 FEET FOR THE POINT OF BEGINNING; THENCE NORTHEASTERLY ALONG THE LAST DESCRIBED COURSE 1348.57 FEET TO THE PENULTIMATE DESCRIBED POINT; THENCE SOUTHEASTERLY ALONG A LINE FORMING AN INTERIOR ANGLE OF 94 DEGREES 54 F.INUTES 43 SECONDS WITH THE LAST DESCRIBED COURSE, A DISTANCE OF 1402.38 FEET; THENCE SOUTHWESTERLY ALONG A LINE FORMING AN INTERIOR ANGLE OF 84 DEGREES S2 MINUTES 28 SECONDS WITH THE LAST DESCRIBED COURSE (BEING A LINE DRAWN PARALLEL WITH THE CENTER LINE OF U.S. HIGHWAY ROUTE 34) A DISTANCE OF 2301.24 FEET; THENCE NORTHWESTERLY ALONG A LINE DRAWN NORTH 35 DEGREES 30 MINUTES WEST FROM A POINT ON THE SOUTHERLY LINE OF SAID SECTION 22 WHICH IS 23.03 CHAINS WEST OF THE SOUTHEAST CORNER OF SAID SECTION 22 (SAID LINE FORMING AN INTERIOR ANGLE OF 93 DEGREES 23 MINUTES 07 SECONDS WITH THE LAST DESCRIBED COURSE) A DISTANCE OF 914,67 FEET; THENCE NORTHEASTERLY ALONG A LINE FORMING AN INTERIOR ANGLE OF 92 DEGREES 15 MINUTES 44 SECONDS WITH THE LAST DESCRIBED COURSE 877.73 FEET; THENCE NORTHWESTERLY ALONG A LINE FORMING AN INTERIOR ANGLE OF 263 DEGREES 11 MINUTES 34 SECONDS WITH THE LAST DESCRIBED COURSE, A DISTANCE CF 392.38 TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. - PARCEL 5: • THT PART OF SECTION 22, TOWN5HIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEASTERLY CORNER OF BRISTOL LAKE SUBDIVISION AS PER THE PLAT THEREOF FILED FOR RECORD AS DOCUMENT 137733 IN PLAT BOOK 10, PAGE 58 ON MAY 10, 1962; THENCE NORTHEASTERLY ALONG THE CENTER LINE CF • PAGE A 3 "•" _. , 16:31:29 4 CHICAGO TITLE INSURANCE COMPANY COMMITMENT FOR TITLE INSURANCE 3,f3 SCHEDULE A(CONTINUED) ORDER NO.: 1401. SA37.04311 Fl KENNEDY ROAD FORMING AN ANGLE OF 88 DEGREES 58 MINUTES 47 SECONDS WITH THE NORTHEASTERLY LINE OF SAID SUBDIVISION, MEASURED CLOCKWISE THEREFROM, A DISTANCE OF 1213.59 FEET; THENCE SOUTHERLY ALONG AN OLD EXISTING LINE OF OCCUPATION FORMIKG AN INTERIOR ANGLE OF 94 DEGREES 54 MINUTES 43 SECONDS WITH THE LAST DESCRIBED COiRSE, 2630.77 FEET FOR THE POINT OF BEGINNING; THENCE SOUTHEASTERLY ALONG THE PROLONGATION OF THE LAST DESCRIBED COURSE 1142.51 FEET TO THE CENTER LINE OF U.S. HIGHWAY ROUTE 34; THENCE SOUTHWESTERLY ALONG SAID CENTER LINE FORMING AN INTERIOR ANGLE WITH THE LAST DESCRIBED COURSE OF 84 DEGREES 52 MINUTES 28 SECONDS, 2336.0 FEET TO AN EXISTING IRON PIPE STAKE SAID TO BE OVER THE ORIGINAL LOCATION OF A STONE IN THE CENTER. LINE OF THE ORIGINAL BRISTOL AND OSWEGO ROAD PREVIOUSLY DESCRIBED AS BEING 23.05 CHAINS WEST AND THENCE NORTH 35 DEGREES 30 MINUTES WEST 11.02 CHAINS FROM THE SOUTHEAST CORNER OF SAID SECTION 22; THENCE NORTH 35 DEGREES 30 MINUTES WEST ALONG A LIKE FORMING AN INTERIOR ANGLE OF 93 DEGREES 23 MINUTES 07 SECONDS WITH THE LAST DESCRIBED COURSE 1139.93 FEET TO A LINE DRAWN SOUTHWESTERLY PARALLEL WITH SAID CENTER LINE OF SAID ROUTE NO. 34 FROM THE POINT OF BEGINNING; THENCE NORTHEASTERLY ALONG SAIL PARALLEL LINE FORMING AN INTERIOR ANGLE OF 86 DEGREES 36 MINUTES 53 SECONDS WITH THE LAST DESCRIBED COURSE 2301.24 FEET TO THE POINT OF BEGINNING; IN THE TOWNSHIP OF BRISTOL; KENDALL COUNTY, ILLINOIS Eylulri+ a- OWNER P.I.N. Moser Enterprises, Inc. _ 02-15-451-001 Howard Wyman 02-15-351-001 Peter S. Bocher Trust 02-15-353-001 John N. Phillips 02-15-353-002 Jack L. Schaefer 02-15-353-003 John D. and Karen S. Harris 02-15-353-004 Margaret Smith 02-22-103-001 Robert C. and Diana J. May 02-22-103-002 David and Sandra Gonzalez 02-22-126-001 Cynthia Lou Fox 02-22-126-002 Elmer B. and Nancy Leifheit 02-22-126-004 Ronald E. Sittler 02-22-126-005 Brand Family Trust 02-22-126-006 Gerald Brand Living Trust 02-22-126-007 Mark C. and Robin E. Guzman 02-22-104-006 Joseph W. and Mary L. McElroy 02-22-104-005 Russell L. Harris 02-22-104-004 Lame and G. Kennedy 02-22-102-016 Douglas A. Schmidt 02-22-102-005 Clarence Bazan 02-22-151-008 _ Bernard G. and Karla A. Schupback 02-22-151-011 Edward D. and Shari A. Wilson 02-22-151-015 Menards, Inc 02-22-300-001 Joseph G. and Ida Mae Reck 02-22-176-002 Ken Doty, Jr. and Cynthia K. Doty 02-22-251-003 Donald J. and Carol S. Hammqn 02-22-300-002 Kristen A. Koridek 02-22-400-011 Daniel and Carol Goodwin 02-27-201-006 Jose A. and Salvador Gonzalez 02-22-476-001 Brett A. and Kristen Carrington 02-22-426-004 Michael J. and Seppelfrick Sr. 02-22-426-003 Kenneth L. and Eva M. Kott 02-22-426-002 Robert E. and Deborah Briggs 02-22-426-001 MPI-2 Yorkville South ILLC 02-22-276-001 Gerald D. & Mattie Cowger 02-22-102-002 02-22-102-003 Garland & Gloria Edwards 02-22-102-004 02-22-102-011 Bernard G. & Karla A. Schupbach 02-22-151-005 02-22-151-010 02-22-151-009 EA•dbi 2— OWNER P.I.N. Lloyd W. &Mae C. Johnson 02-22-102-015 James Nicholson Jr. 02-22-102-008 William &Kimberly Schomer 02-22-102-007 Earl P. & Cynthia M. Fox 02-22-102-006 Michael J. & Gayla Miller 02-22-102-009 Bobbie & Suzanne Spencer 02-22-102-010 Ben M. Wasman Trust 02-22-102-012 Rodger L. & Linda Melhouse 02-22-102-013 • Kenneth W. & Louella F. Currier 02-22-102-014 • Edward D. & Sharia Wilson 02-22-151-015 Ronald& Wagner-Kring 02-22-151-014 James & Sally Bassett 02-22-151-013 Dennis E. & Susan L. Ohlenkamp 02-22-151-012 Bank of Lyons TR 1052 02-22-151-002 Ronald R. &Marsha J. Bell 02-22-104-002 Wilmer J. & Betty Hermann 02-22-104-001 Brendan H. & Ann Moehring 02-22-126-003 Kenneth J. & Mary Brummel 02-22-104-003 Robert J. & Joan O'Malley 02-15-352-001 Mark R. O'Malley Living Trust 02-15-352-002 James & Charlotte O'Hara 02-15-352-003 Phillip D. & Roseann Burnett 02-22-476-002 Charles J. Musaraca 02-22-427-001 Bryan & Jennifer Scott 02-23-302-005 Peter A. &Victoria L. Grandys 02-23-302-004 Scott& Patricia E. Hall 02-23-302-001 Glen A. & Christine Dahlstrom 02-23-302-002 Jerome T. Heitschmidt 02-23-302-003 Lawrence L. & Denise Vana 02-23-351-001 Ripper, Linda Helmond Living Trust 02-23-351-002 Warren C. Denardo 02-21-200-015 Y:Vobs\Smith\2004\040024-2-PULT-Theidel-Property\engineering\design\PIN Numbers.doc PIN Numbers Theidel Property 02-22-176-004-0000 02-22-127-001-0000 02-15-376-001-0000 02-22-251-002-0000 02-22-400-001-0000 UNITED CITY OF YORKVILLE 800 Game Farm Road Yorkville, IL 60560 630/553-4350 PC# APPLICATION & PETITION Please Check One: V Preliminary Plan Final Plat Development Name: TBD Date of Submission: August 10, 2004 1. Name of Petitioner(s): Pulte Home Corp. Address: 2250 Point Blvd. . Suite 401 , Elgin, TT. 6U123 Phone Number: (847) 841-3583 Fax Number: (847) 783-0875 2. a). Street address and physical location of subject property: 8111 State Route 34 (north of Rt. 34, east of Menards, west of MPI) b). Legal description of property; attach as Exhibit "A". c). Total Acreage: 286 3. Contact Information: Name, address, phone number and fax number of person to whom inquiries regarding this petition may be directed: Matt Cudney, Pulte Homes 2250 Point Blvd. , Suite 401, Elgin, IL 60123 (847) 841-3583 office (847) 783-0875 fax Attorney: Name: Julie Workman, Esq. (Gardner, Carton & Douglas) Address: 191 N. Wacker Drive, Suite 3700, Chicago, IL 60606 Phone Number: (312) 569-1232 Fax Number: (312) 569-3237 Engineer: Name: Pete Huinker (Smith Engineering) Address: 759 John St. , Yorkville, TL 60560 Phone Number: (630) 553-7560 Fax Number: (630) 553-7646 Land Planner: Name: Gary Weber (Gary R. Weber & Associates) Address: 224 S. Main St. , Wheaton, IL 60187 Phone Number: (630) 668-7197 Fax Number: (630) 668-9693 Page 1 of 7 United City of Yorkville Preliminary/Final Plat Application Revised: 5/4/04 4. Submit the following to the Deputy Clerk in order to be scheduled for the necessary committee meetings. An incomplete submittal could delay the scheduling of your project. a. Original application with legal description plus 40 copies. b. Appropriate filing fee (Please refer to Page 3 of this application"Petitioner Route, Step 1, Fees" and/or contact the Deputy Clerk for verification of this amount). c. To begin the review process, the initial submittal must consist of: 1. 6 sets of Preliminary Plans/Final plats folded to fit in a 10" x 13" envelope 2. 6 sets of Landscape Plans folded to fit in a 10" x 13" envelope 3. 6 sets of Preliminary/Final Engineering folded to fit in a 10" x 13" envelope Within one week of receipt of submittal, the Engineering Department will determine if it is complete or if additional information is needed. Once the submittal is complete, the Plan Council Meeting date will be scheduled for the next meeting that is 6 weeks from this date. One week prior to your scheduled Plan Council meeting, you will be required to submit 15 full size preliminary/final site plans for the packets distributed to the members. In witness whereof the following petitioner(s) have submitted this application under oath and verify that to the best of their knowledge its contents are true and correct. Date: August 10, 2004 Petitioner(s) Signature: (All legal property owners signatures or their authorized agents (i.e.Planner, Petitioner's Attorney,Engineer)must appear on this application.) ider Rk Subscribed and sworn to before me this /(7day of i(r(l�' , 200 l .IALSEAL NO" •��_ ... ..�.___ .4/n.1)//- ( J � i. STATE OF ILLINOIS ktif . „ ; _-Seal "1:N EXP.APR 5,2005 THIS APPLICATION MUST BE NOTARIZED. Page 2 of 7 United City of Yorkville Preliminary/Final Plat Application Revised: 5/4/04 PRELIMINARY PLAN/FINAL PLAT PETITIONER ROUTE Step 1: Petitioner must submit a completed application, fees* and all pertinent materials to the Deputy Clerk a minimum of 45 days prior to the targeted Plan Commission meeting. Petitioner is responsible for making submittals to other review agencies such as Kendall County, Illinois Department of Transportation, Illinois Department of Natural Resources, U.S. Army Corps of Engineers, etc., to allow timely review by City. *Fees: 1. Preliminary Plan Fee - $500/Final Plat Fee - $500 a. Engineering Review Fees - 1.25% of the approved engineer's estimate of cost of all land improvements, to be determined by City Engineer. b. Engineering Review Deposit -up to 1 acre =$1,000; over 1 acre but not over 10 = $2,00 over 10 acres,but not over 40 = $5,000 over 40 acres,but not over 100 = $10,000 over 100 acres = $20,000 c. Deposit for Outside Consultants - under 2 acres = $1,000 2 to 10 acres= $2,500 over 10 acres = $5,000 Note: Owner/Developer will be responsible for payment of recording fees and costs, public hearing costs including a written transcription of public hearing and outside consultant costs (i.e. legal review, land planner, zoning coordinator, environmental, etc.). Should Owner/Developer not pay these fees directly, they will be responsible for reimbursing the United City of Yorkville for the aforementioned fees and costs. Note: You must present your plan at each of the meetings below as indicated. Step 2: Plan Council: The Planning Council meets the 2nd and 4th Thursday of the month at 9:30 a.m. in the City Administration Office. Upon recommendation by the Plan Council, you will move forward to the Plan Commission Meeting. Attendees to this meeting include: City Administrator, City Land Planner, Sanitary District Director, City Engineer, Building Depai tinent Official, Emergency Medical Rep, Public Works Director, Executive Director of Parks and Recreation, Fire Depai tnient Rep, and Police Chief. Step 3: For Preliminary Plans only; Park Board Planning Meeting: The Park Board makes recommendations on any Park Sites included in the development. The Park Board Planning Meeting is the fourth Monday of each month at 7:00 p.m. at the Riverfront Building, 301 E. Hydraulic Street. Step 4: Plan Commission: The Plan Commission meets the second Wednesday of each month at 7:00 p.m. in the Council Chambers at City Hall. The Plan Commission will make a recommendation for the City Council's consideration. The Plan Commission consists of 10 members appointed by the Mayor, the City Attorney and City Land Planner. Page 3 of 7 United City of Yorkville Preliminary/Final Plat Application Revised: 5/4/04 Step 5: Economic Development Committee: The Economic Development Committee meets the third Thursday of each month at 7:00 p.m. in the City Hall Conference Room. All projects (regardless of a positive or negative EDC recommendation)proceed to the Committee of the Whole for discussion. The Economic Development Committee consists of three (plus one alternate) City Council members. Step 6: Committee of the Whole: The Committee of the Whole meets the first and third Tuesdays of the month at 7:00 p.m. in the Conference Room at City Hall. The project will be discussed in an informal atmosphere at the Committee of the Whole where no formal voting takes place. This session is to discuss and consider recommendations of prior committee meetings. Step 7: City Council: The City Council meets the second and fourth Tuesdays of the month at 7:00 p.m. in the Council Chambers at City Hall. This is where all City Council voting takes place. If this project has included an annexation and/or zoning petition, a Public Hearing will be held at this time with notice given by publication. Any annexation agreement, PUD agreement or development agreement must be signed by the Petitioner prior to being voted on by the City Council. Prior to the recording of the final plat, the petitioner must pay the Administration Fee. This is equal to 1.75% of the approved engineer's estimate of construction costs of land improvements, including but not limited to all public improvements to be dedicated to the City, mass earth grading, and quasi-public improvements to be maintained by the homeowner's associations such as private storm sewer,parking areas, and trails. Step 8: Final Plat recording instructions: Once the final plat is approved by the City Council and all required documents, bonds, and letters of credit are submitted to the City, the final plat may be recorded with Kendall County. Submit the final plat mylar to the Deputy Clerk for signatures. When all City signatures are in place, the developer or his surveyor may take the mylar to the Kendall County Clerk for his signature. The next step is to have six paper prints made and return to the Kendall County Recorder's office for recording. Kendall County requires the mylar and four paper copies. The City of Yorkville requires that you submit two recorded paper copies to the Deputy Clerk. Any copies you may require would be in addition to these. Agreement: I understand and accept all requirements, fees as outlined as well as any incurred Administrative and Planning Consultant Fees which must be current before this project can proceed to the next scheduled committee meeting. Please sign and return(retaining a copy for your records) to the Deputy Clerk, United City of Yorkville, 800 Game Farm Road, Yorkville, Illinois 60560. Date Signature of Petit on r Page 4 of 7 United City of Yorkville Preliminary/Final Plat Application Revised: 5/4/04 CHECK LIST FOR PRELIMINARY PLANS SECTION 1: WRITTEN DOCUMENTS 1. A land use application containing the following: Not Applicable Acceptable Deficient A. A statement of planning objectives to be achieved by the plan B. A time schedule of the proposed development of the area covered by such preliminary plan C. Exceptions or variations to City Zoning or Subdivision Ordinances being requested as part of the plan,including the specific section of the Ordinance. 2. A boundary survey of the area covered by such preliminary plan, prepared and certified by a registered Illinois surveyor. SECTION 2: GENERAL PLAN INFORMATION 1. A rendered outline of the area covered by such preliminary plan drawn at a scale of not less than 1 inch equals 100 feet. 2. The plan must contain the following information: A. Scale B. North Arrow C. Original and Revised dates D. Name and address of owner of record E. Name and address of site plan designer F. Current zoning of the property G. All categories of proposed land use 3. The following information regarding contiguous property: A. Location of contiguous property B. Zoning of contiguous property C. Land use of contiguous property 4. The following site data provided in the lower right corner: A. Size of property in square feet or acres B. Square footage and percent of site coverage with buildings C. Square footage and percent of site coverage with pavement D. Number of parking spaces to be provided E. Number of parking spaces required by zoning ordinance F. Number of proposed buildings/dwelling units/lots SECTION 3: PLAN DATA REQUIREMENTS 1. A site location map. 2. Dimensions of the property. 3. A topographical survey of the area covered by such preliminary plan at two-foot contour intervals drawn at not less than one inch equals one hundred feet. 4. A detailed plan for the treatment of any proposed stormwater detention or retention facilities. 5. Existing or proposed public roads, streets,and alleys, including classifications,width of right-of-way and paved surfaces, and existing and proposed sidewalks. 6. Dimensioned building setbacks, and as applicable; areas for off-street parking, trucking maneuvering and service, and open space/recreational facilities. 7. A schematic of existing or proposed public utility systems,including the size of sanitary sewers,storm water lines,&streetlights. 8. Existing vegetation and plantings. 9. Any other information required by the City,to clearly show the proposed site plan elements. Page 5 of 7 United City of Yorkville Preliminary/Final Plat Application Revised: 5/4/04 CHECK LIST FOR FINAL PLANS SECTION 1: WRITTEN DOCUMENTS 1. A land use application containing the following: Not Applicable Acceptable Deficient A. A statement of planning objectives to be achieved by the plan. D. A development schedule,indicating the approximate dates for construction of the Final Plan. E. Petitioners proposed covenants,restrictions,and conditions to be established as part of the Final Plan. F. Exceptions or variations to City Zoning or Subdivision Ordinances being requested as part of the Final Plan, including the specifics of the Ordinance. SECTION 2: GENERAL PLAN INFORMATION 1. Must be drawn to accurate engineering scale. 2. Must contain the following information: A. Scale B. North Arrow C. Original and Revised dates D. Name and address of owner of record E. Name and address of site plan designer 3. The following information regarding contiguous property: A. Location of contiguous property B. Zoning of contiguous property C. Land use of contiguous property 4. Site data to be provided in lower right hand corner: A. Legal Description B. Size of property in square feet and acres C. Current Zoning D. Square footage&percent of site coverage with buildings E. Square footage&percent of site coverage with pavement F. Square footage&percent of site coverage with landscaping G. Number of parking spaces required by zoning ordinance H. Number of parking spaces to be provided I. Number of buildings J. Number of dwelling units K. Breakdown of dwelling unit bedroom types 5. Landscape data to be provided in lower left hand corner: A. Number of plantings by type B. Size of plantings at installation C. On-center spacing for hedges(Should be 3 feet apart) D. Caliper size of all trees at installation Page 6 of 7 United City of Yorkville Preliminary/Final Plat Application Revised: 5/4/04 CHECK LIST FOR FINAL PLANS, CONTINUED SECTION 3: PLAN DATA REQUIREMENTS 1. Dimensions of property. 2. Existing and proposed public and private streets,right-of-ways, driveways, all principal and accessory buildings and their uses, dimensioned building setbacks,lot sizes,sidewalks,off-street parking,service areas, open spaces, and recreation facilities. 3. Preliminary architectural plans for all residential buildings, in sufficient detail to show basic building plan. 4. The existing and proposed vehicular and pedestrian circulation systems,indicating their inter-relationship and proposed treatments of points of conflict. 5. Existing and proposed utility systems, including sanitary sewers,water,electric,gas,telephone,and cable television lines, including their sizes. 6. Proposed public and private lighting systems. 7. Existing and proposed easements for utility services. 8. Proposed signage, indicating location and size. 9. Existing vegetation and plantings. 10. Proposed berming and fencing. 11. The location and size in acres or square feet of all areas to be conveyed,dedicated,or reserved as common open space,public parks,recreational areas,school sites,and similar semi-public uses. 12. Any other information necessary to clearly show the proposed site plan elements. Page 7 of 7 United City of Yorkville Preliminary/Final Plat Application Revised: 5/4/04 6444 A CHICAGO TITLE INSURANCE COMPANY COMMITMENT FOR TITLE INSURANCE ) C 3 SCHEDULE A(CONTINUED) ORDER NO.: 1401 5A3104011 Fl 5. THE LAND REFERRED TO IN THIS COMMITMENT IS DESCRIBED AS FOLLOWS: PARCEL 1: THAT PART OF THE WEST 1/2 OF SECTION 22, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT AN EXISTING IRON PIPE STARE SAID TO BE OVER THE ORIGINAL LOCATION OF A STONE IN THE CENTER LINE OF THE BRISTOL AND OSWEGO ROAD, PREVIOUSLY DESCRIBED AS BEING 23.05 CHAINS WEST AND NORTH 35 DEGREES 30 MINUTES WEST 11.02 CHAINS FROM THE SOUTHEAST CORNER OF SAID SECTION 22; THENCE NORTH 34 DEGREES 59 MINUTES 00 SECONDS, ALONG A LINE FORMING AN ANGLE OF 93 DEGREES 23 MINUTES 07 SECONDS WITH THE CENTERLINE OF U.S. ROUTE • 34, MEASURED FROM NORTHEAST TO NORTHWEST, 2,054.60 FEET FOR POINT OF BEGINNING; THENCE SOUTH 52 DEGREES 08 MINUTES 00 SECONDS WEST, 825.40 FEET; THENCE NORTH 38 DEGREES 06 MINUTES 00 SECONDS WEST, 1,083.88 FEET TO THE CENTER LINE OF KENNEDY ROAD; THENCE NORTHEASTERLY ALONG SAID CENTER LINE, 1,581.49 FEET TO A POINT WHICH IS 350.0 FEET SOUTHWESTERLY OF, AS MEASURED ALONG SAID CENTER LINE, THE MO.3T EASTERLY CORNER OF BRISTOL LAKE SUBDIVISION; THENCE SOUTH 38 DEGREES 15 MINUTES 40 SECONDS EAST, 1,639.93 FEET TO A LINE DRAWN NORTH 52 DEGREES 45 MINUTES 17 SECONDS EAST FROM THE POINT OF BEGINNING; THENCE SOUTH 52 DEGREES 45 MINUTES 17 SECTION WEST, 750.69 FEET TO THE POINT OF BEGINNING, IN BRISTOL TOWNSHIP, KENDALL COUNTY, ILLINOIS. PARCEL 2: THAT PART OF THE SOUTH 1/2 OF SECTION 15 AND THAT PART OF THE NORTH 1/2 OF SECTION 22, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHEASTERLY CORNER OF BRISTOL LASE SUBDIVISION, AS PER THE PLAT THEREOF FILED FOR RECORD AS DOCUMENT 137733 IV PLAT BOOK 10 AT PAGE 58 ON MAY 10, 1962; THENCE NORTHWESTERLY ALONG THE NORTHEASTERLY LINE OF SAID SUBDIVISION 1988.0 FEET TO THE NORTHEASTERLY CORNER OF SAID SUBDIVISION; THENCE NORTHWESTERLY ALONG A LINE MAKING AN ANGLE OF 180 DEGREES 13 MINUTES 25 SECONDS MEASURED COUNTER-CLOCKWISE FROM THE LAST DESCRIBED COURSE, A DISTANCE OF 895.02 FEET TO AN EXISTING IRON PIPE STAKE THENCE EASTERLY ALONG AN OLD FENCE LINE FORMING AN INTERIOR ANGLE OF 58 DEGREES 15 MINUTES 28 SECON:3S WITH THE LAST DESCRIBED COURSE, A DISTANCE OF 1298.88 FEET (19.68 CHAINS) TO AN IRON PIPE STAKE HEREWITH PLACED; THENCE SOUTHEASTERLY ALONG AN OLD ESTABLISHED LINE OF OCCUPATION FORMING AN INTERIOR ANGLE OF 124 DEGREES 23 MINUTES 38 SECONDS WITH THE LAST DESCRIBED COURSE A DISTANCE OF 2185.47 FEET TO AN EXISTING IRON PIPE STAKE ON THE CENTER LINE OF KENNEDY ROAD WHICH IS 1213.59 FEET NORTHEASTERLY FROM THE POINT OF BEGINNING, AS MEASURED ALONG SAID CENTER LINE; THENCE SOUTHWE•3TERLY ALONG SAID CENTER LINE 1213.59 FEET TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS PARCEL 3: THAT PART OF TEE NORTH 1/2 OF SECTION 22, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHEASTERLY CORNER OF BRISTOL LAKE SUBDIVISION AS PER THE PLAT THEREOF FILED FOR RECORD AS DOCUMENT 137733 IN PLAT BOOK 10 AT PAGE 58 ON MAY 10, 1962; THENCE NORTHEASTERLY ALONG THE CENTER LINE OF KENNEDY ROAD, WHICH MAKES AN ANGLE OF 88 DEGREES 58 • MINUTES 47 SECONDS WITH THE NORTHEASTERLY LINE OF SAID SUBDIVISION, MEASURED CLOCKWISE THEREFROM, A DISTANCE OF 1213.59 FEET; THENCE SOUTHERLY ALONG AN OLD EXISTING LINE OF OCCUPATION FORMING AN INTERIOR ANGLE OF 94 DEGREES 54 MIN3TES 43 SECONDS WITH THE LAST DESCRIBED COURSE, A DISTANCE OF 1228.39 FEET; THENCE RNRO P[i 4i *+,.•r ao ruc noire.2inn 16.31:24 EY.61,14.- A CHICAGO TITLE INSURANCE COMPANY COMMITMENT FOR TITLE INSURANCE 2 .13 SCHEDULE A (CONTINUED) ORDER NO.: 1403. SA310403,1 n SOUTHWESTERLY PARALLEL WITH THE AFORESAID CENTER LINE OF KENNEDY ROAD, 1348.57; THENCE NORTHWESTERLY ALONG A LINE FORMING AN INTERIOR ANGLE OF 88 DEGREES 37 MINUTES 37 SECONDS WITHT EH LAST DESCRIBED COURSE A DISTANCE OF 1224.23 FEET TO A POIr.T ON THE SOUTHEASTERLY LINE OF SAID BRISTOL LAKE SUBDIVISION WHICH IS 0.46 FEET SOUTHWESTERLY FROM THE POINT OF BEGINNING; THENCE NORTHEASTERLY ALONG SAID SOUTHEASTERLY LINE 0.46 FEET TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS; (EXCEPTING THEREFROM THAT LAND CONVEYED TO KENNETH D_ DOTY, JR., IN DEED RECORDED AS DOCUMENT NUMBER R85-5973, DESCRIBED AS FOLLOWS: THAT PART OF THE NORTHWEST 1/4 OF SECTION 22, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHEASTERLY CORNER OF BRISTOL LAKE • SUBDIVISION; THENCE NORTHEASTERLY ALONG THE CENTER LINE OF KENNEDY ROAD, 299.54 FEET; THENCE SOUTHEASTERLY AT RIGHT ANGLES TO THE LAST DESCRIBED COURSE, 287.11 FEET; THENCE SOUTHWESTERLY, AT RIGHT ANGLES TO THE CAST DESCRIBED COURSE, 306.88 FEET TO THE EASTERLY LINE OF A TRACT OF LAND CONVEYED TO HERBERT L. RUCKS BY A WARRANTY DEED RECORDED AUGUST 1, 1966 IN BOOK 149 ON PAGE 303; THENCE NORTHWESTERLY ALONG SAID EASTERLY LINE TO A POINT ON SAID CENTER LINE WHICH IS 0.46 FEET SOUTHWESTERLY OF THE POINT OF BEGINNING; THENCE NORTHEASTERLY ALONG SAID CENTER LINE, 0.46 FEET TO THE POINT OF BEGINNING, IN BRISTOL TOWNSHIP, KENDALL COUNTY, ILLINOIS) PARCEL 4: THAT PART OF SECTION 22, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEASTERLY CORNER OF BRISTOL LAKE SUBDIVISION AS PER THE PLAT THEREOF FILED FOR RECORD AS DOCUMENT 137733 IN PLAT BOOK 10 AT PAGE 58 ON MAY 10, 1962; THENCE NORTHEASTERLY ALONG THE CENTER LINE OF KENNEDY ROAD WHICH MAKES AN ANGLE OF 88 DEGREES 58 MINUTES 47 SECONDS WITH THE NORTHEASTERLY LINE OF SAID SUBDIVISION, MEASURED CLOCKWISE THEREFROM, A DISTANCE OF 1213.59 FEET; THENCE SOUTHERLY ALONG AN OLD EXISTING LINE OF OCCUPATION FORM/1G AN INTERICR'ANGLE OF 94 DEGREES 54 MINUTES 43 SECONDS WITH THE LAST DESCRIBED COURSE, A DISTANCE OF 1228.39 FEET; THENCE SOUTHWESTERLY PARALLEL WITH THE AFORESAID CENTER LINE OF KENNEDY ROAD, 1364.57 FEET FOR THE POINT OF BEGINNING; THENCE NORTHEASTERLY ALONG THE LAST DESCRIBED COURSE 1348.57 FEET TO THE PENULTIMATE DESCRIBED POINT; THENCE SOUTHEASTERLY ALONG A LINE FORMING AN INTERIOR ANGLE OF 94 DEGREES 54 MINUTES 43 SECONDS WITH THE LAST DESCRIBED COURSE, A DISTANCE OF 1402.38 FEET; THENCE SOUTHWESTERLY ALONG A LINE FORMING AN INTERIOR ANGLE OF 84 DEGREES 52 MINUTES 28 SECONDS WITH TEE LAST DESCRIBED COURSE (BEING A LINE DRAWN PARALLEL WITH THE CENTER LINE OF U.S. HIGHWAY ROUTE 34) A DISTANCE OF 2301.24 FEET; THENCE NORTHWESTERLY ALONG A LINE DRAWN NORTH 35 DEGREES 30 MINUTES WEST FROM A POINT ON THE SOUTHERLY LINE OF SAID SECTION 22 WHICH IS 23.03 CHAINS WEST OF THE SOUTHEAST CORNER OF SAID SECTION 22 (SAID LINE FORMING AN INTERIOR ANGLE OF 93 DEGREES 23 MINUTES 07 SECONDS WITH THE LAST DESCRIBED COURSE) A DISTANCE OF 914.67 FEET; THENCE NORTHEASTERLY ALONG A LINE FORMING AN INTERIOR ANGLE OF 92 DEGREES 15 MINUTES 44 SECONDS WITH THE LAST DESCRIBED COURSE 877.73 FEET; THENCE NORTHWESTERLY ALONG A LINE FORMING AN INTERIOR ANGLE OF 263 DEGREES 11 MINUTES 34 SECONDS WITH THE LAST DESCRIBED COURSE, A DISTANCE CP 392.38 TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. • PARCEL 5: THT PART of SECTION 22, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEASTERLY CORNER OF BRISTOL LAKE SUBDIVISION AS PER THE PLAT THEREOF FILED FOR RECORD AS DOCUMENT 137733 IN PLAT BOOK 10, PAGE 58 ON MAY 10, 1962; THENCE NORTHEASTERLY ALONG THE CENTER LINE CF xcscHA L PAGE A 3 16:31:29 - •��--, a r;.„ ,x evD•rworhYfl x DNIS:3224 CSID:x DURATION(mm•ss):04.56 Fr 6`1-4-16I� CHICAGO TITLE INSURANCE COMPANY COMMITMENT FOR TITLE INSURANCE 3/3 SCHEDULE A(CONTINUED) ORDER NO.: 1401 SA3104011 Fa. KENNEDY ROAD FORMING AN ANGLE OF 88' DEGREES 58 MINUTES 47 SECONDS WITH THE NORTHEASTERLY LINE OF SAID SUBDIVISION, MEASURED CLOCKWISE THEREFROM, A DISTANCE OF 1213.59 FEET; THENCE SOUTHERLY ALONG AN OLD EXISTING LINE OF OCCUPATION FORMING AN INTERIOR ANGLE OF 94 DEGREES 54 MINUTES 43 SECONDS WITH THE LAST DESCRIBED COURSE, 2630.77 FEET FOR THE POINT OF BEGINNING; THENCE SOUTHEASTERLY ALONG THE PROLONGATION OF THE LAST DESCRIBED COURSE 1142.51 FEET TO THE CENTER LINE OF U.S. HIGHWAY ROUTE 34; THENCE SOUTHWESTERLY ALONG SAID CENTER LINE FORMING AN INTERIOR ANGLE WITH. THE LAST DESCRIBED COURSE OF 84 DEGREES 52 MINUTES 28 SECONDS, 2336.0 FEET TO AN EXISTING IRON PIPE STAKE SAID TO BE OVER THE ORIGINAL LOCATION OF A STONE IN THE CENTER LINE OF THE ORIGINAL BRISTOL AND OSWEGO ROAD PREVIOUSLY DESCRIBED AS BEING 23.05 CHAINS WEST AND THENCE NORTH 35 DEGREES 30 MINUTES WEST 11.02 CHAINS FROM THE SOUTHEAST CORNER OF SAID SECTION 22; THENCE NORTH 35 DEGREES 30 MINUTES WEST ALONG A LINE FORMING AN INTERIOR ANGLE OF 93 DEGREES 23 MINUTES 07 SECONDS WITH THE LAST DESCRIBED COURSE 1139.93 FEET TO A LINE DRAWN SOUTHWESTERLY PARALLEL WITH SAID CENTER LINE OF SAID ROUTE NO. 34 FROM THE POINT OF BEGINNING; THENCE NORTHEASTERLY ALONG SAIL PARALLEL LINE FORMING AN INTERIOR ANGLE OF 86 DEGREES 36 MINUTES 53 SECONDS WITH THE LAST DESCRIBED COURSE 2301.24 FEET TO THE POINT OF BEGINNING; IN THE TOWNSHIP OF BRISTOL; KENDALL COUNTY, ILLINOIS • Theidel Property Preliminary Plan Submittal August 10, 2004 Planning Objectives Pulte Homes intends to develop a mixed-use residential and commercial Planned Unit Development on the approximately 286 acres located at 8111 Route 34 (the "Theidel Property"), for which Pulte has petitioned for annexation to the City of Yorkville. Pulte Homes plans to incorporate a variety of products and strategies to create a unique development on the Theidel Property with the objectives of preserving many natural features of the site and improving the systems that contribute to the health, safety and welfare of its residents and the residents of Yorkville as a whole. Because the Theidel Property is bordered by other properties that had been previously planned, Pulte was presented with both challenges and opportunities for planning the site in an imaginative way to maximize its potential for use as a mixed residential and commercial development. The unusual configuration of the site added to the design challenges. Pulte Homes, however, has designed a plan for the Theidel Property that achieves the City's goals of preserving natural resources, improving transportation and modernizing infrastructure, each of which will enhance the health, safety and well-being of the residents of this area. PRESERVATION The northernmost portion of the Theidel Property lies adjacent to Blackberry Creek, which is an important natural resource not only for the United City of Yorkville, but for the greater region as well. Protection and preservation of the creek and the large stand of mature trees in its vicinity was a high priority. Pulte's plan provides significant preservation that protects the creek and tree stand and promotes the unique natural beauty of the area. In addition, there is an existing farm pond and associated plant material in an area of the Theidel Property south of Kennedy Road. This area is also being preserved and enhanced as a part of the overall detention plan for the site. The project also develops open space corridors for trail networks, linkages to adjacent properties. CH01/12379820.2 TRANSPORTATION Pulte understands that Yorkville is sensitive to traffic issues. Funding for major improvements to Route 34 and 47 is not coming fast enough to satisfy growing needs. Because of these concerns, we understand the importance of creating areas where traffic can flow freely without creating a major thoroughfare. Pulte's plan minimizes access to Route 34 and Kennedy Road but maintains an internal network that allows traffic to move well. Connection points to adjacent subdivisions will allow traffic to move throughout the community without burdening the major streets. It also allows the Grand Reserve development to eliminate two of its access points on Kennedy Road by providing alternative points of entry through the Theidel Property. The construction of this development will also provide the funding mechanism for roadway improvements to Route 34 and Kennedy Road in that this project will provide the missing piece between the planned improvements by Menards and Grand Reserve on either side of the Theidel property, thereby allowing the Route 34 improvements to commence. Our planned transportation network and improvements will improve the general welfare of the community and create safe, efficient traffic circulation patterns for the public and accommodates the city transportation plan. INFRASTRUCTURE This property lies between the Menards and Hamman property, which are being developed to the west of the Theidel Property, and Grand Reserve, which is being developed to the east. As noted above, the development of the Theidel Property fills the gap between those projects and allows for looping of water lines, and the extension of the sanitary sewer and stormwater detention system. This infrastructure plan is consistent with orderly growth practices and promotes the public health and safety of the community. CH01/12379820.2 Theidel Property Preliminary Plan Submittal August 10, 2004 Time Schedule & ExceptionsNariances Schedule Preliminary Approval—November, 2004 Final Approval—March, 2005 Start Earthwork—April, 2005 Finish Improvements—Summer, 2005 Start Home Construction—Summer, 2005 Exceptions and Variances Lot size under 12,000--Section 10-6C-3.B Setback for paths from rear/side yards--Section 09/16/2004 THU 23:51 FAX 630 466 9380 EEInc. ?002/010 PA=Y aoo - C • \RPi.�TP.:.,i�7ew+VJh'"S4.+lY;•. .' �` 52 Wheeler Road • Sugar Grove, IL 60554 • *WO; TEL: 630 / 466-9350 °> • ,,,,5s' tr FAX: 630 / 466-9380 www.eeiweb.com 30 `lE.AF_ CF. . September 16, 2004 Mr. Joseph A. Wywrot, P.E. City Engineer • United City of Yorkville 800 Game Farm Road Yorkville, IL 60560 Re: Preliminary P.U.D. Plan Review, Theidel Subdivision, United City of Yorkville • Dear Mr. Wywrot: We have reviewed the following submitted material for the referenced Preliminary • P.U.D. Plan submittal: • Application and Petition for Annexation and Planned Unit Development dated August 10, 2004. • Plat of Survey prepared by Smith Engineering Consultants, Inc. consisting of 1 sheet with latest revision date of August 10, 2004. • Preliminary Plat of Subdivision prepared by Smith Engineering Consultants, Inc. consisting of 6 sheets with latest revision date of August 10, 2004 • Preliminary Engineering Plans prepared by Smith Engineering Consultants, Inc. consisting of 6 sheets with latest revision date of August 10, 2004. • Preliminary Stormwater Management Study and Report prepared by Smith Engineering Consultants, Inc. with latest revision date of August 10, 2004 • Traffic Impact Study prepared by Smith Engineering Consultants, Inc. with latest revision date of August 10, 2004 • Drain Tile Atlas from the files of Hinsdale Nurseries, Inc., undated. • Report of Soils Exploration prepared by Testing Service Corporation dated January 29, 2004. G:\Public\Yorkville120041Y00415 Theidel Property(Pulte Homes)\Doc\Iwywrot0l doc Consulting Engineers Specializing in Civil Engineering and Land Surveying 09/16/2004 TAU 23:51 FAX 630 466 9380 EEInc. ?003/010 • Wetland Assessment report prepared by Christopher B. Burke Engineering. Ltd. dated August, 2004. • Application for Consultation Agency Action Report submitted to IDNR on July 5, 2004. • Correspondence from IHPA dated August 2, 2004 assigning Log #013070804 and requesting additional information. Our review of these plans is to generally determine the plan's compliance with City of Yorkville ordinances and whether the improvements will conform to existing City systems and equipment. This review and our comments do not relieve the designer from his duties to conform to all required codes, regulations, and acceptable standards of engineering practice. Engineering Enterprises, Inc.'s review is not intended as an in-depth quality assurance review. We cannot and do not assume responsibility for design errors or omissions in the plans. We offer the following comments: General 1. Part of the development is located within a Special Flood Hazard Area as identified by FEMA based on the Flood Boundary and Floodway Map 170341 0020 dated July 19, 1982. However, all floodplain areas are located in Lot L, a proposed Natural Area to be preserved. 2. A thorough review of the Wetland Study should be completed by the City's wetland consultant prior to Preliminary Plan approval. 3. A copy of the Natural Resource Information Report by the Kendall County Soil and Water Conservation District should be filed with the City. 4. Permits or Sign-offs will be required from the following agencies: a. (IDNR) Consultation Agency Action Report regarding endangered/threatened species or natural areas. b. (IHPA) regarding preservation of cultural resources. c. Yorkville-Bristol Sanitary District regarding Sanitary Sewer Facilities. d. (IEPA) Division of Water Pollution Control regarding Sanitary Sewer Facilities. G:\Public\Yorkville\20041Y00415 Model Property(Pulte Homes)\Doc\lwywrot01.doc 09/16/2004 THU 23:51 FAX 630 466 9380 EEInc, ?004/010 e. (TEPA) Division of Public Water Supplies regarding water supply and distribution. f. (TEPA) Division of Water Pollution Control regarding a Notice of Intent (NOI) General permit to discharge storm water. g. !DOT regarding intersection improvements and right of way requirements at U. S. Route 34. We recommend that items "a" and "b" be received prior to Preliminary Plan approval and that for item g, a preliminary indication be received from IDOT concerning access location, required right of way dedications and required highway and intersection improvements. Items c, d, e & f will be required prior to the start of construction activities. Application and Petition 5. The legal description that appears throughout the documents included in the petition should be the same, i.e. the Application, Plat of Survey and Preliminary Plat. Plat of Survey 6. The Plat should be signed by the surveyor. 7. The graphic scale is incorrect. 8. Though the legal descriptions appear to describe the same property, the legal description on the Plat of Survey is not the same as that which appears in the Commitment for Title Insurance which is attached to the Application, and which contains 5 parcels. We recommend that the legal description appearing on the Plat of Survey and the Preliminary Plat be used as the basis for this application with one necessary correction. The distance in the legal description of the most southwesterly line of the property is incorrectly stated as 1083.65 feet instead of 1803.65 feet. 9. A complete and current Commitment for Title Insurance containing the preferred legal description should be submitted for verification of existing rights of way and easements. The Plat of Survey and Preliminary Plat should be revised to show such easements and rights of way as well. Preliminary Plat 10.The same legal description correction noted in comment 7 above should be made on the Preliminary Plat. G:\Public\Yorkville\20041Y00415 Theidel Property(Pulle Homes)\Doc\Iwywrot01.doc 09/16/2004 TAU 23:51 FAX 630 466 9380 EEInc. ?005/010 11.A note should be added to the Single Family Setback and Easement Detail stating "where City storm sewers, sanitary sewers or water mains are run along side lot lines, a minimum 20 foot wide (10 feet each side) Utility and Drainage Easement shall be provided". 12.Proposed street names should be provided on the Preliminary Plat for review by the City and KenCom. 13.The graphic scale on Sheet 1 is incorrect. 14.The term "Outlot" should not be used. The alphabetic designation of the non-residential lots is appropriate and preferred. These lots should be designated Lot A, Lot B, etc. 15.Individual Lot areas should be provided in tabular form for Lots A through M. 16.The dimension along the northerly line of Lot G should be 555.66 feet and the dimension along the northerly line of Lot D should be 211.88 feet. 17.There appears to be an extraneous lot line in Lot 221. 18.The proposed means of conveyance and ownership of the individual townhome units should be noted on the Preliminary Plat. Also, blanket or specific easements for ingress, egress utilities and drainage should be noted and indicated in the Multi-Family Setback and Easement Detail. 19.Right of Way radii in the transition areas along Lots 1, 70, 231 and 309 should be provided on the Plat. 20.The proposed block length along Lots 166 through 181 is 1411 feet which exceeds the maximum allowable of 1320 feet. However, due to the land plan and proposed subdivision geometry in this area of the development, we believe this length deviation cannot be cost effectively overcome and recommend its acceptance as proposed. 21.The proposed block length along Lots 46 through 55 and 77 is 1537 feet which exceeds the maximum allowable of 1320 feet. However, this block is cut by an appropriate pedestrian trail through Lot E and we recommend its acceptance as proposed. 22.The proposed block length along Lots 21 through 33 is 1494 feet which exceeds the maximum allowable of 1320 feet. However, a right of way has appropriately been provided for a potential road extension into the adjoining property which would break this block. We recommend this block configuration as proposed. G:\Public\Yorkville\20041YO0415 Theidel Property(Pulte Homes)\Doc\Iwywrot0l.doo 09/16/2004 TIT 23:51 FAX 630 466 9380 EEInc, X006/010 23.The cul-de-sac serving multi-family Lots 1 through 9 exceeds the maximum allowable length of 600 feet by 65 feet. We recommend acceptance of the proposed configuration as proposed. All other rights of way, cul-de-sacs, centerline geometry and intersection offsets meet the City's design requirements. 24.The blocks containing Lots 275 through 281 and 269 through 274 are relatively small considering the number of lots within them and the street and utility lengths required to serve them. The proposed street and utilities between these blocks should be eliminated, yielding one additional single family lot and eliminating the long term maintenance and replacement costs associated with an unnecessary street. 25,The main north-south roadway connecting U. S. Route 34 with Kennedy Road, with the exception of its northerly and southerly extremes, is proposed as a "hybrid" collector. Based on the projected ADT for this roadway, we agree with this proposal. 26.There will be approximately 1900 feet between the centerline of the proposed access for this subdivision and the proposed westerly entrance to Grande Reserve from U. S. Route 34. 27.We have participated with you in discussions with CGL, MPI, SEC and Pulte Homes regarding the coordination of rights of way and utilities between this • development and Neighborhoods 17, 18 and 19 in Grande Reserve. All parties are continuing to cooperate. Preliminary Engineering Plan 28.Note 6 on Sheet 1 should read " at midpoint of Lot", not Block. 29.Proposed street names should be added to the Plans. 30.A typical detail showing curb and island dimensions in the proposed cul-de- sacs should be added to the plans. 31.Street lights should be place on the side of the street opposite the water main. Several location do not provide for this. 32.A note calling for "hot poured joint sealer at the pavement-curb joint" should be added to the proposed cross sections as has been required in other recent developments. 33.Strom sewer laterals appear to be missing between Lots 78/79 and Lots 10/11. G:\Publifforkville\20041Y00415 Theidel Property(Pune Homes)\Ooc1Iwywrot01.doc 09/16/2004 THU 23:51 FAX 630 466 9380 EEInc, ?007/010 34.The northeasterly inlet and outlet for the stormwater management basin in Lot C should be separated by at least 300 feet for stormwater quality purposes. 35.The stormwater management area on Lot D is not shown on any of the plan sheets except in the general plan on Sheet 1. 36.The rest of the proposed storm sewer layout appears adequate. Inlet spacing and storm sewer sizing will be reviewed when the Storm Sewer Design Report is submitted with Final Engineering. 37.At a minimum, inverts should be added to the end sanitary manholes of each run and at key junctions throughout the system. 38.An 8" diameter lateral sanitary sewer main should be provided for each set of townhomes served by a common access driveway. Individual sewer service lines should then be provided from these mains. All mains should be terminated in a manhole, 39.The extraneous water vault symbols should be deleted from the plans. 40.Additional water main loops should be provided in the townhome area to avoid extremely long services and to provide additional fire hydrants at the extreme end of the access driveways. These may be able to be 6 inch mains. 41.The final water main sizing will be determined at Final Engineering after we have input the proposed layout into the City's model and performed a pressure and fire flow analysis. 42.The water main across the frontage of Lot 21 should be extended (8") across the street into the school site and terminated with an 8" valve box followed by an in-line temporary hydrant. 43.We should meet with Eric Dhuse and the design engineer to discuss the City's preferred method of looping water main in the cul-de-sacs. Some can be looped between lots to other streets, but some will have to loop back to the mouth of the cul-de-sac. 44.A connection to the proposed Route 34 water main will be coordinated with our plans, so no matter which construction occurs first, a pressure tap will not be necessary. 45.Fire hydrant spacing and the proposed valve layout are satisfactory at this preliminary plan stage. G:\Publicvrorkville\20041Y00415 Theidel Property(Pulte Homes)\Docltwywro101.doc 09/16/2004 THU 23:52 FAX 630 466 9380 EEInc, 2008/010 Traffic Study 46.We have reviewed the Traffic Impact Study and find it to be well presented and accurate. The roadway network as proposed compiles with the functional requirements of the traffic data presented with the following exception. 47.Considering that the projected ADT of 2313 at the U. S. Route 34 access point is close to the 2500 ADT classification for a major collector and that the future commercial traffic has not been considered, this access road easterly of the commercial site, up to where it becomes the 34 foot back to back hybrid collector, should be constructed to major collector design specifications. 48.Right of way and improvement requirements for U. S. Route 34 and access to U. S. Route 34 will be controlled and permitted by IDOT. Copies of any preliminary correspondence with IDOT relating to this development should be provided to the City. 49.Kennedy Road is planned to be improved next year to a 3 lane curb and gutter cross section with transportation impact fees collected from this development. Our preliminary design is complete and we are coordinating the 2 access intersection designs for this development with SEC. Preliminary Stormwater Management Study and Report Questions or comments regarding the following review of this report should be directed to Jay Nemeth, P.E. at 630-466-9350. 50. For the purposes of calculating required detention volumes, the Yorkville modified rational method has been used with a 0.0 cfs/acre allowable release rate for area currently tributary to the Fox River and a 0.05 cfs/acre allowable release rate for the area currently tributary to Blackberry Creek. The proposed condition stormwater management basins are designed to direct all site runoff (excluding the commercial area) to Blackberry Creek (approximately 89 acres are currently tributary to the Fox River). In order to accommodate this significant watershed diversion, we would recommend that the developer be required to utilize retention/infiltration best management practices and to minimize the direct connection of impervious areas. Specific best management practices can be identified as the preliminary design progresses. G;\Public\Yorkville\2004\Y00415 Theidel Property(Pulte Homes)1Doc\Iwywrot01.doc 09/16/2004 THU 23:52 FAX 630 466 9380 EEInc. ?009/010 51.We recommend that HEC-HMS (or equivalent) be utilized to model the proposed conditions as the design progresses to ensure that detention basin outlet structures are designed to utilize the maximum amount of retention/detention volume to be provided. Due to the expected long drawdown times, proposed basin vegetation should be selected with care to ensure survival under long periods of inundation. 52.There appears to be an inconsistency in the accounting of areas currently tributary to the Fox River in the Yorkville method proposed detention basin required volume calculations. Basin 3 and Basin 5 utilize a 0.0 cfs/acre allowable release rate for area currently tributary to the Fox River and a 0.05 cfs/acre allowable release rate for the area currently tributary to Blackberry Creek. The total tributary area accounted in the Basin 3 and Basin 5 detention calculations does not add up to the total area tributary to the Fox River in the existing condition (when adding the commercial area and Basin 1 tributary area as well). It appears that the 0.0 cfs/acre allowable release rate for area currently tributary to the Fox River has not been applied in the calculations for Basin 1, The areas currently tributary to the Fox River should be checked and the 0.0 cfs/acre allowable release rate for area currently tributary to the Fox River should be applied consistently in each of the proposed required detention volume calculations. 53.The report indicates that approximately 8.1 acres of non-jurisdictional wetlands are located within the center of the project site in addition to wetlands running parallel to Blackberry Creek. The limits of the wetland areas should be shown on the plans. 54,The contour labeling on the existing conditions drainage area map is not legible at the scale provided. The contour label size and/or the drawing scale should be increased. Spot elevations would also be useful in the verification of depressional storage areas. 55.The existing conditions HEC-HMS model used to determine the existing depressional storage on the site is an inaccurate representation of the existing condition. The sub-basin areas in the model have not been interconnected such that sub-basin areas tributary to other sub-basins are routed through the downstream sub-basin area depressional storage volume. The contribution of off-site tributary areas has also not been included. This would appear to have led to the underestimation of the depressional storage volume achieved in Sub-basin C (dep. 10); and potentially others. 56,The area in the vicinity of proposed Basin 3 is not shown on the Preliminary Engineering Plan. Most of this area is cut off between the match-lines of sheets 3, 5, and 6. G:\Public\Yorkville\2004\Y00415 Theidel Property(Pulte Homes)\DocllwywrotOt.doc • 09/16/2004 THU 23:52 FAX 630 466 9380 EEInc. 2010/010 • 57.Stormwater management requirements for the proposed commercial area should be determined and provided prior to any mass grading activity in the commercial area, Routing of an outlet for the commercial detention facility should be considered before this Preliminary Plan is approved 58.The City's wetland consultant should review this report and we should • discuss what, if any parts of the proposed "Stormwater and Water Runoff Quality Ordinance" will be applied to this development. Conclusion Our review will continue as the above comments are addressed by the developer and the design engineer. If you have any questions or require additional information, please contact our office. Sincerely, ENGINEERING ENTERPRISES, INC. N ,Cn ( John T. Whitehouse, P,E., P.L.S. Senior Project Manager pc: Liz D'Anna, Deputy Clerk JWF/JPN, EEI G:1PublicWorkOle12004\Y00415 Theidel Property(Pulte Homes) oc\lwywrot01.doc Sep . 16 . 2004 4 : 25PM No . 6105 P. 2/4 PO, Foci--oel Schoppe Design dissociates Landscape Architecture and Land Planning 126 S. Main St. Ph. (630) 551.3355 Oswego, IL 50543 Fax(630) 551-3639 September 16, 2004 MEMORANDUM To: Tony Graff, City Administrator From: Mike Schoppe - Schoppe Design Associates, Inc, Re: Theidel Property We have reviewed the Preliminary Plat of Theidel Subdivision dated 8/10/04, the Preliminary Engineering Plans for Theidel Subdivision dated 8/10/04, both prepared by Smith Engineering Consultants, and the Preliminary Landscape Plan dated 8/10/04 prepared by Gary R. Weber and Associates, and provide the following comments: Preliminary Plat 1. Because this is proposed as a P.U.D., and also to reduce confusion as we have seen on previous projects, we recommend that the Preliminary Plat be referenced as Preliminary P.U.D. Plan and Plat, and that it contain all the information on it outlined in the City's Planned Development ordinance under Section 10-13.5. 2. Two concerns were brought up at the City Council and Plan Commission meeting. The first is that the lots backing up to Grand Reserve should be increased to the same size as the adjacent lots in Grand Reserve. This has been addressed be increasing the lot sizes, adjacent to Grand Reserve, to a minimum of 12,000 s.f The second issue that was brought up was the appropriateness of the townhomes, near the commercial, separating two single-family areas. It does not appear that this has been addressed. The development team should be prepared to identify how this concern is being addressed. 3. The City Council, during their Concept Plan review,mentioned that this development must create inter-city roads so drivers can avoid traveling on major roads. To accomplish this, we anticipate that the road stubbed to the Hamman property will extend west to Countryside Parkway. This road will provide the alternative route to the commercial areas without needing to travel on the major roads. The traffic study identifies this section of road as having an ADT of 416. The petitioner should be prepared to discuss how the design of this will help reduce the need to travel on the adjacent major roads. Peye 7 or) Sep . 16 . 2004 4 : 25PM No • 6105 P . 3/4 4. The alignment of the street connecting to Prairie Gross Lane in Prairie Meadows should be revised to provide a continuous street to entry drive off of Kennedy Road. This will make street naming easier. 5. What is the intended purpose for Outlot 1? 6. We are in the process of preparing a school/park plan for Outlot B, which will be reviewed by the Park and Recreation Department and School District,to determine if the geometry of Outlot B is acceptable. 7. The intended ownership for all of the open space lots needs to be labeled. 8. The size of the outlots should be shown. 9. We are having CDP,the City's wetland consultant,review the wetland delineation and engineering plan and provide comments related to the existing on-site wetlands. 10. Add generic street names for ease in referencing. 11. Preliminary architectural plans need to be submitted. We recommend that these be submitted for review prior to the Plan Commission meeting. 12. Add a note that identifies that cross access easements will be provided on lot 324 that provide access to the adjacent commercial on the Hamman property. 13. The sideyard setback shown on the Multi-Family Setback and Easement Detail on Sheet 4 needs to be clarified. The detail identifies is as 30',while the distance between buildings is dimensioned as 20'. 14. The lot sizes for lots 208 through 210 are missing from the lot area chart. Preliminary En2ineerinn Plans 1. Add a note indicating that the school and park sites will be developed to the City's Park Development Standards. 2. Outfall pipe for S.W.M. basin in Outlot L should not discharge directly into Blackberry Creek. Preliminary Landscape Plan 1. In accordance with the City's Landscape Ordinance, (Title 10 — Section 3-3), the minimum size of evergreen trees is 8' in height. Revise all evergreens to be a minint.utn of 8'. 2. Identify approximate limits of natural plantings on the plan. Vgl2of3 Sep 16 . 2004 4 : 25PM No •6105 P. 4/4 3. The quantity of plant material shown is consistent with the City's Landscape Ordinance. Please call with any questions or comments. CC: Mayor Art Prochaska Joe Wywrot, City Engineer Liz D'Anna, Deputy Clerk John Whitehouse, EEI Anna Kurtman, Zoning Administrator Bill Dettmer, Certified Building Official Psga 7 of 9 PC) D-00L- di .11 United City of Yorkville EST. 1836 County Seat of Kendall County 17 800 Game Farm Road ^< ` Yorkville, Illinois, 60560 ' 0 Telephone: 630-553-4350 Lj ' ,y‘. Fax: 630-553-7575 Website: www.yorkville.il.us September 16, 2004 TO: Tony Graff ��G� FROM: Anna B. Kurtzman �a�' SUBJECT: Theidel Property I have reviewed the preliminary subdivision plat for the property identified above against the terms of the agreements for the adjacent properties (Menards and Grande Reserve) and against the zoning code. Based upon my review I have the following comments: 1. The proposed roads do not align with the roads approved in the Menards and Grande Reserve projects. 2. The Grande Reserve agreement has some flexibility in how the land north of Kennedy Road (adjacent to the Theidel property) will develop. This flexibility is based upon negotiations with the School District. The outcome of those negotiations will impact the development of the Theidel property north of Kennedy Road. 3. I am not aware of any development plans for the Hamman property. If there are any plans,then location of proposed roads need to be verified for alignment purposes. 4. In the unincorporated Bristol Lake Subdivision there is a right-of-way provided that abuts the Theidel property where Outlot M is proposed. Does the City want to have a corresponding right-of-way at this location? 5. The Menards agreement provides for a 60 foot wide landscaped buffer area adjacent to Kennedy Road. Outlot C is not 60 feet wide adjacent to single family Lot 52. I also do not see landscape easement areas reflected on the plat. 6. The proposed setbacks within the R-2 component meet City standards. 7. The minimum lot size in the R-2 district is 12,000 sq ft. There are a number of lots that do not meet this minimum standard. 8. In the R-3 zoning district, the minimum lot area is 15,000 sq ft. Multi-family lot 8 is 14,727 sq ft. • T. Graff Theidel Subdivision September 16, 2004 Page 2 of 2 9. The maximum lot coverage allowed in the R-3 zoning district is 30%. There are several townhomes that will exceed this standard. 10. The plat illustrates typical setbacks for the townhomes. The setbacks provided are: Standard Standard Provided Front yard 30 ft 30 ft Rear yard 30 ft 30 ft Corner Side 20 ft 30 ft Internal side 10 ft Not provided Back of building to 60 ft 60 ft back of building Front of building to 50 ft 50 ft front of building Side of building to 20 ft 20 ft side of building Side of building to 40 ft 40 ft back of building Front to side 50 ft Not provided Rear to front 100 ft Not provided 11. The City measures the minimum lot width at the building setback line. I did not see this information in the packets provided. Please have the developer submit this information(either a separate document providing the information in tabular form or reflected on the plat). /abk filename: C:\Documents and Settings\Owner\Desktop\Yorkville\Theidel9-16-04.doc ' ` i 0 6ilreikd Wily e# WOIA/VitteVelleeAM64€14 al,�. 800 wan vurk 2/?oeu ".EST. 1836 .� �\\.......j , N� 60560 1.4 680/558-8545 <L a-f.ate,e44,./g.,,,,,,,A,„ 96.4ich, 66,74,..,,,,,,e5z,44,,,,,t eleil .ones 680/558-8528, 4aarr 680/558-8486 ' o i/ua- 'TO o Liz D'Anna ,47E Friday, September 17, 2004 E'Et Street Name Duplication Inquiries - Plan Council Agenda Item Please place the above item on the next Plan Council agenda. Proposed street names are checked for duplication through KENCOM and the Yorkville Post Office.KENCOM has requested that no duplications be made to existing streets within the 911-dispatch area. This includes Aurora, Montgomery, Oswego, Joliet,Plano, and Sandwich. A determination should be made as to whether street names shall be checked for duplication to only those existing within Bristol and Kendall townships, or the entire 911-dispatch area. Thank you.