PLAN COUNCIL AGENDA
Thursday, October 28, 2004
9:30 a.m.
CITY CONFERENCE ROOM
8:30 a.m. Staff Meeting
1. Approval/Correction of Minutes: September 23, 2004
2. 9:30 a.m. - PC 2001-06 Grande Reserve Unit 10 - Final Plat
3. 10:30 a.m. - PC 2004-14 Swanson Lane Estates - Preliminary Plan
4. Additional Business
•
DT1T.,
United City of Yorkville
Plan Council Meeting
Sept.24,2004
Members:
Joe Wywrot, City Engineer Anna Kurtzman, ICCI
John Whitehouse, EEI Eric Dhuse, Director of Public Works
Jeff Freeman, EEI Tim Fairfield,BKFD
Mike Schoppe, Schoppe Design Sgt. Ron Diedrich, Police Dept.
Guests:
Pete Huinker, Smith Engineering David Schultz, Smith Engineering
Trevor Ryan, Marquette Companies Matt Cudney, Pulte Homes
The meeting was called to order at 9:35 AM.
The minutes from the August 26th meeting were approved with corrections.
Theidel Property—Preliminary Plan
Comments from EEI—John Whitehouse
1) Plat of survey item#8 - Smith will be submitting a single legal description that is on the
plat of survey and on the preliminary plat to the title company, to update from the five
parcel description.
2) Preliminary plat item#20, 21 and 22 -Regarding block lengths, EEI is recommendation
of those in excess of the 1320 feet. Where the trial cuts through, EEI is in favor of these
for pedestrian access and reasonable cross vehicular traffic. Regarding lots 21-33,
another access to Rt. 34 will not be proposed, so the right of way has been provided for a
potential road extension. Mr. Whitehouse stated the stubbed roads will be coordinated
with Grande Reserve. The Gr. Reserve access to Kennedy Rd.was eliminated.
3) Preliminary plat item#26 - There will be 1900 feet between the centerline of the
proposed access for this subdivision and the proposed westerly entrance to Grande
Reserve from U.S. Rt. 34. Mr. Huinker said that there will be signals here, per IDOT.
4) Regarding the additional road way on the north side of Kennedy,Mr. Whitehouse stated
that they would like to remove the road, because of additional road maintenance with the
four driveways. The unincorporated area has two accesses from out lot N, for access to
park access. Mr. Fairfield states there is only one temporary way into the north end of
the subdivision, and he needs a 2nd access, providing additional for traffic during
construction and safety(gas lines)problems. Mr. Whitehouse stated there is an
additional field entrance, backing lots 240 and 251 on the nursery property, which he will
coordinate with the two developments(jogging onto Gr. Reserve's property) and upgrade
with a stone base.
5) Preliminary engineering details requested Mr. Whitehouse have been provided by Smith.
6) Preliminary engineering plan item#40—Mr. Whitehouse stated the City would need
temporary hydrants on the end (on the east). The valves would be in the right of way,
and Gr. Reserve will remove when their mains are extended.
7) Mr. Whitehouse stated that in a condominium, the City prefers a meter room in each
building,with a B-box for each unit. One 6-inch sewer service would be sufficient to
each building per Mr. Whitehouse, with a clean-out on one end. In the annexation
agreement, if the developer had condominiums,Mr. Whitehouse stated the City should
add language that each unit had individual sewer connectors(not fee simple). Mr. Dhuse
and engineering would need to make certain there are adequate valves.
1
0
8) Preliminary engineering plan item#42— The developer will extend the 8"water main
into the school site(lot 21)will be and an additional water main stub into the commercial
area. The number of multi-family units is decreased, because Pulte wanted to reserve
additional depth in the commercial area. The water main has been flipped to the north
side on the northwest side of the school/park area and the sewer will be on the south
side.
9) Preliminary engineering plan item#44—Based on Gr. Reserve(Neighborhood#17)and
Autumn Crest,the proposed Rt. 34 water main and easement coordination will be
monitored by City engineering and EEI.
10) Traffic Study item#47—Traffic adjacent to the commercial site would bring it close to
the ADF classification. The developer has agreed to keep the pavement structure intact.
11) Traffic Study item#49 - The City is preceding with plans across the Kennedy Rd.
frontage and the annexation agreement should provide for the$2000/per unit impact fee.
The bids would be done over the winter, and front money for construction money should
be provided in escrow by the developer for design purposes,prior to the final plat.
12) Storm water item# 52—Mr. Whitehouse stated there is a discrepancy in the commercial
area storm management outlet placement, and if it needs to be tied into Hamman's and
Fox River. The developer will have no detention on the commercial area. The initial
drain will go to the east(out lot A basin) and this basin will not be increased in size.
There will be a serpentine swale developed east of Blackberry Creek and Mr. Schoppe
will be provided these plans by the developer.
13. Mr. Whitehouse stated that, depending on YBSD, a permanent pump station will be
needed north of Kennedy, and a temporary on the Hermann property for the gravity area.
14. In conversation regarding phasing,the City's concern would be the access to Kennedy
along Rt.34. The developer stated final platting will be done in April or May.
Mike Schoppe's comments
1) Preliminary plat item#4—The street is called Prairie Grass Lane in Prairie Meadows, and
Mr. Schoppe stated the cul-de-sac should be named Prairie Grass Court. When Mr.
Schoppe and Smith will explore the school/land cash standard when reconfiguration is
completed to make certain it is within the City's specifications.
2) Comment#1 -Mr. Schoppe needs a document titled"Preliminary PUD plan and plat",
with a separate sheet for preliminary engineering.
3) Comment#2— Per Mr. Cudney the driveways on the east west road configurations will
be changed. Mr. Cudney stated this particular unique layout provides amenities for the
townhouses, e.g. back-up to the detention area, giving a higher premium on the
townhouses.
4) Comment#3 —Inter-city roads connectors for owners in Gr. Reserve,Hamman, and Pulte
were discussed. The developer pointed out the additional stub out of the commercial
property. Of concern is, in particular,the road across Hamman which is commercial on
one side and residential on the other side. The developer will look at the possibility of
an additional two feet of right of way(making it 70 foot) and putting in a turn bay. City
staff advises the developer to continue the hybrid collector through the Hamman property
to Countryside Parkway.
5) Out lot L ownership was discussed. Mr. Cudney suggested the parcel ownership would
be discussed at Park board,City Council and Plan Commission. Mr. Schoppe stated
there is a detention basin there. Mr. Cudney stated that their in the preliminary plan,the
detention area would be a part of the Homeowner's Association and that the flood plain
line would not be bisected.
6) Comment# 9 -CDF information will be forwarded by Mr. Schoppe on the wetland
delineation.
2
7) Comment# 11 -Architectural plans need to be submitted 10 days prior to Plan
Commission.
8) Comment# 12—Per Mr. Schoppe cross access language needed in the annexation
agreement and on the preliminary plan and plan, for access to the adjacent commercial on
the Hamman property.
9) Comment#13 - The developer will clarify the detail for setbacks. Lot detail now shows
a 30' side yard setback.
10) Preliminary Engineering Plan item# 1 —The developer will add notes indicating the
school and park sites will be developed to the City's Park Development Standards.
Anna Kurtzman's comments
1) Comment 3 —Neighborhood#19 for use as a school site is contingent on the Theidel
property(Hinsdale Nursery) on Kennedy also being used as a school campus. Mr.
Schoppe stated that he is proceeding with the assumption that there is no school on the
Theidel property. The intent is that the school site is being proposed on the Hamman
property.
2) Mr. Whitehouse stated the annexation agreement should have language regarding the
storm water/wetland ordinance. Ms. Kurtzman will check into the schedule for the new
ordinance.
3) Comment#5—Ms. Kurtzman's concern is with the width. Mr. Schoppe stated that some
of the buffered area will need to be on the lots. The width of the landscaped area should
be 30 wide strips on the urban section. The benning would begin were the lots back up
again to the basin.
4) Comment# 7—The developer will make the lots abutting with Gr. Reserve 12,000 feet.
5) Comment# 8—The developer will rerun the calculations. If the maximum coverage is
30%, wording should be included that"the intent of having the open area is there". Mr.
Whitehouse suggested a gross summary of lot coverage be provided, making certain lot
lines are in accordance with the setbacks needed.
6) Comment# 10—The developer will add the 10 foot to the internal sides.
7) Comment#11 —The developer will submit the information.
Tim Fairfield added a comment about lot#s being the same. The multi-family will be started
when the street is taken out at the north end, with a note on the plat to designate the single family
and multi-family lot numbers.
This will be scheduled for Plan Commission on October 13, 2004. Deadline for submittal of
35 preliminary plans will be submitted on October 5th. Needed are new submittals for
preliminary engineering, preliminary PUD/plat, and landscaping.
Respectfully submitted,
Annette Williams
3
1.,
'1974 - 2004
52 Wheeler Road • Sugar Grove, IL 60554
TEL: 630 / 466-9350
FAX: 630 / 466-9380
Fare ine_crirp
Fir•,#��rpz-�s:t:=ss, www.eeiweb.com
30 YEARS OF
EXCELLENCE
October 21, 2004
Mr. Joseph A. Wywrot, P.E.
City Engineer
United City of Yorkville
800 Game Farm Road
Yorkville, IL 60560
Re: Preliminary & Final Plat and Preliminary & Final Engineering Improvement Plans,
Grande Reserve, Unit 10, (Neighborhood 7), United City of Yorkville,
Kendall County, Illinois.
Dear Mr. Wywrot:
We have reviewed the Preliminary/Final Plat and the Preliminary/Final Engineering
Improvement Plans for the referenced Unit 10. The Plat has been prepared by Midwest
Technical Consultants, Inc. and contains 2 sheets with latest revision date of September 13,
2004. The Engineering Improvement Plans have been prepared by Cowhey Gudmundson
Leder, Ltd. and contain 16 sheets with latest revision date of September 21 , 2004. We offer
the following comments:
In general, the Plat and Improvement Plans are clear and well presented.
Our review of these plans is to generally determine the plan's compliance with City of Yorkville
ordinances and whether the improvements will conform to existing City systems and
equipment. This review and our comments do not relieve the designer from his duties to
conform to all required codes, regulations, and acceptable standards of engineering practice.
Engineering Enterprises, Inc.'s review is not intended as an in-depth quality assurance review.
We cannot and do not assume responsibility for design errors or omissions in the plans.
GENERAL COMMENTS
It should be noted that this is the first presentation of the proposed land plan for this multi-
family neighborhood and thus, in our opinion, should be looked at primarily as a Preliminary
Plan with regard to overall layout and internal traffic circulation.
An engineer's estimate of probable construction cost should be submitted with the revised
plans for use in establishing the required Letter of Credit for Unit 10.
G:\Public\Yorkville\2002\Y00215 Grande Reserve(MPI)\doc\Iwywrot29GRUNITI0-01.doc
Consulting Engineers Specializing in Civil Engineering and Land Surveying
Water main shall be constructed in accordance with Section 41 of the Standard Specifications
For Water & Sewer Main Construction In Illinois, in addition to City and any other applicable
ordinances.
Cover Sheet
1 . The second benchmark listed should be removed from the plans since this utility pole
has been removed during the Kennedy/Bristol Road reconstruction project.
SHEET 4, Master Utility Plan
2. A valve should be added between Lots 20 and 21 on the 8" main to enable isolation of 9
housing units at one time instead of 18 units. All other proposed valving is adequate.
3. A fire hydrant should be added near the intersection of Litchfield Lane and Matlock
Drive.
4. All other fire hydrant spacing meets the City's spacing requirements. However, since
this is a relatively dense multi-family area, we recommend that additional fire hydrants
be added near the ends of the private access drives for the following lot combinations:
1-2, 5-6, 9-10, 11-12 and 15-16. Since snow will probably be pushed past the end of
the pavement turn-a-rounds, these hydrants should be offset about 20 feet from the
center of these drives.
5. We recommend that manholes be provided at all changes in direction and at the ends of
all sanitary sewer lines serving more than 1 residential unit. We are concerned with the
durability, accessibility and the number of cleanouts proposed. Also, profiles should be
provided for these sanitary sewer lines.
6. Sanitary structures 7-2 and 7-2C should be relocated to eliminate structure 7-2A.
7. Sanitary structure 7-7C should be eliminated and the sewer line run straight from 7-7D
to 7-7.
8. Sanitary structure 7-7A should be eliminated.
9. The storm sewer runs from structure 7-15 to 7-18 should be modified to eliminate the
"inlet to inlet" 21 inch storm sewer crossing of Farren Drive.
SHEETS 5 & 6, Grading Plan North-South
10. We need to discuss an alternate means of access to the common driveways and the
end unit. We believe the "cluster" of 3 access points will be dangerous and confusing.
One alternate to discuss is shown on the attached sketch. All other aspects of the
grading plan are satisfactory as proposed.
G:\Public\Yorkville\2002\YO0215 Grande Reserve(MPI)\doc\Iwywrot29GRUNITI0-01.doc
SHEET 7, Plan & Profile
11. The sanitary sewer length and slope from 7-4B to 7-4 need correction.
SHEET 8, Plan & Profile
12. The "Exception to Blanket Easement" lines should be revised throughout this Unit as
necessary to provide a minimum of 10 feet from the easement line to an underground
utility. The Final Plat will require revisions based on this comment.
SHEET 9, Plan & Profile
13. There does not appear to be a need for the 1 foot drop in Sanitary MH 7-8. The east
invert should be raised and the slope increased.
14. The sanitary sewer length and slope from 7-10B to 7-10 need correction.
15. The sanitary sewer length and slope from 7-8B to 7-8 need correction.
SHEET 10, Plan & Profile
16. We recommend keeping fire hydrant 7-24 on the same side of Duryea Drive as the
water main to avoid the long hydrant lateral. The lot side of the right of way line should
be acceptable.
SHEET 11, Street Lighting Plan
17. Though this area is congested with underground utilities, a street light should be added
along the curve at approximately Station 33+48, 17'R. All other street light locations,
spacing and specifications are in accordance with City standards.
SHEETS 12 & 13 Construction Standards & Details
18. Though allowed by a variance granted as part of the Annexation Agreement, we are
concerned with the garage face to face dimension of 61 feet as shown in Section A-A.
This dimensions yields very little maneuvering room, especially if the garages are not
fully utilized and there are a lot of cars parked in front of them.
STORM DRAINAGE ANALYSIS
19. Drainage Area No. 7 is mislabeled as No. 17.
20. All other data is correctly presented and conforms to the engineering plans.
G:\Public\Yorkville\2002\Y00215 Grande Reserve(MPI)\doc\Iwywrot29GRUNITI0-01.doc
FINAL PLAT
21. To avoid lengthy metes and bounds legal descriptions for both building permit issuance
and fee simple conveyances for the individual units, each parcel containing a multi-
family building (EBE 1, etc.) should be platted as a single lot. Following the consecutive
lot numbering scheme from Unit 9, these lots should be numbered 836 through 865.
22. Lot 19 is designated to contain a proposed 4 unit building but it appears that the
footprint is for a 5 unit building.
23. Non easement areas will need to be revised based on comment #12 above.
24. Farren should be a designated a Street or a Lane, not both.
25. The ultimate owner of Lots 3018 through 3022 inclusive should be noted on the plat.
26. As with other multi-family developments, it is worth noting that if there is a potential that
these housing units will be conveyed as condominiums, it would be beneficial to make
that decision now as the sewer and water service requirements would be one per
building, instead of one per housing unit.
27. That portion of Lot 3022 to be used for stormwater management purposes should be
dimensioned and designated as a Stormwater Management Easement.
28. We need to discus the Building to Building separation requirements for this multi-family
development (Annexation Exhibit E1) and its application to this proposed layout at the
Staff level prior to the Plan Council meeting.
If you have any questions or comments regarding this review, or require any additional
information, please contact our office.
Sincerely,
ENGINEERING ENTERPRISES, INC.
1\ i 4 ,i( ,
! /"- (*" zi(-/C/ ✓ L
/ 1 John T. Whitehouse, P.E., P.L.S.
Senior Project Manager
pc: Liz D'Anna, Deputy Clerk
Tim Winter, P.E., PDG @ 630-325-5595
Dan Oefner, P.E., CGL @ 630-250-9644
JWF, EEI
G:\Public\Yorkville\2002\Y00215 Grande Reserve(MPI)\doc\Iwywrot29GRUNIT10-01.doc
H:\sdskproj\Y00215\dwg\Y0021504-ANNEX-EXHIBITS.dwg,Model,10/20/2004 8:21:55 PM,jwhitehouse
IN
(J1
I—
I°
z
C
m
--i
I:0
I>
C)
z
m
25.00'
� I
o 0o
0 0
0 0 `
' I
II
I �I
II
I 1 12' 1
30.00'
Typical
3ct • 21 • 2004 10 : 54AM No • 6435 P. 2/3
„,, d = � .
Schoppe Design Associates
Landscape Architecture and Land Planning
126 S, Main St. Ph. (630)551-3355
Oswego, IL 60543 Fax (630) 551-3639
October 21, 2004
MEMORANDUM
To: Joe Wywrot, City Engineer
From: Mike Schoppe- Schoppe Design Associates, Inc,
Re: Grand Reserve—Unit 10 (Neighborhood 7)
We have reviewed the Final Plat dated 9/13/04 prepared by Midwest Technical Consultants,
Engineering Improvement Plans dated 9/21/04 prepared by Cowhey Gudmundson Leder, Ltd.,
and the Final Landscape Plans dated September 17, 2004 prepared by Rolf C. Campbell and
Associates, and provide the following comments:
Final Plat
I. The layout of the streets and buildings are consistent with the approved Concept Plan
Exhibit"C” of the annexation agreement.
•
2. The ownership of lots 3019 and 3022 need to be noted.
3. The location of the front, side and rear of the buildings should be clarified by the
Building Department at the Plan Council meeting. The locations of those sides may have
an impact on how the design standards in Exhibit El are applied.
EngineerinE Improvement Plans
1. At the Plan Council meeting, we should discuss with the staff whether or not we feel
there is a need for additional guest parking.
2. The grading plans show certain buildings having a front TF elevation which is 7' to 10'
above the street elevation, such as buildings #1, 30, 20 and 22. Given the mass of these
buildings, we recommend that the elevations be lowered as much as possible. It appears
that several of these buildings could be lowered a couple of feet be redirecting some of
the drainage patterns. For example, the drive between buildings 29 and 30 could have the
majority of the drive drain towards Grand Trail rather than all going to Litchfield.
page I d2
Oct • 21 • 2004 10 . 54AM No . 6435 P . 3/3
•
3. There are walks shown on slopes of 4 or 5 to 1. This walk will create hazards in snow
and ice conditions. The slopes need to be reduced or steps incorporated into the plans to
eliminate this condition.
4. The sidewalk in front of building 22 cuts diagonally across a 4 to 1 slope, which will
create a hazard, Either the elevations need to be reduced, or retaining walls need to be
implemented to eliminate this condition.
Final Landscape Plans
1. It appears there are differences in the number of plant symbols on the landscape plan vs.
the quantities listed in the plant lists. Revise the plan so that the quantity of plant
symbols match the quantity listed in the plant lists.
2. Relocate all parkway trees located in the 5' — 6' islands between driveways. There is
insufficient space available in these islands to assure adequate growing space and the
long term health of the trees.
3. The northeast corner of Neighborhood 7 appears to have two lines dividing the phases.
Eliminate the northern cut line so there is a clear boundary between the two separate
phases.
4. It does not appear the landscaping around the townhomes is in keeping with the
landscape standards that have been embraced for this community. Even though the
landscaping is in compliance with the minimum standards required by the City's
Landscape Ordinance, we recommend additional landscaping by added so that the
facades are more in character with the rest of the community.
5. The landscape plans need to identify the limits and types of the vaxious plant
communities around the stormwater basin.
If you have any questions, please call.
CC: Mayor Art Prochaska
Tony Graff, City Administrator
Liz D'Anna, Deputy Clerk
Tim Winter— MPI
John Whitehouse— EEI
Bill Dettmer, Building Official
peye2of2
PC,' :r")--' 'C' C 1-' C CI
United City of Yorkville
06,
EST. % 1836 County Seat of Kendall County
-:�— 800 Game Farm Road
* Yorkville, Illinois, 60560
_ �� Telephone: 630-553-4350
9,�`kLE `\ " Fax: 630 553 7575
Website: www.yorkvllle.il.us
October 19, 2004
TO: Tony Graff
FROM: Anna B. Kurtzman, AICPZ/C
SUBJECT: Compliance Review
Final Subdivision Plat - Grande Reserve Unit 10 (Neighborhood 7)
I have reviewed the document identified above, along with associated documents, for compliance
with the adopted annexation agreement. Based upon this review I note the following:
1. Building#19 has a note indicating that it will be a 4 unit building, however, based
upon the size of the building and the annexation agreement, I believe this is suppose
to be a 5 unit building.
2. Exhibit El provides separation standards. I do not see separations between buildings
listed on the plat. Please have the petitioner provide that information so compliance
with Exhibit El can be made.
3. One of the separation standards listed in Exhibit El is to provide a 30 foot perimeter
setback. This setback is reflected on all lots, except for the north side of Lot 3022.
Please have the petitioner provide this infoimation.
4. Exhibit D5 of the annexation agreement indicates that architectural details will be
provided for this unit as part of the PUD approval package. This infoiniation was not
provided.
/abk
filename: C:\Documents and Settings\Anna\My Documents\Grande Reserve\Unit 10\10-19-04GrandeReserve.doc
Pc; ace „,_ __ , „,_
r„) .,,.
,.
United City of Yorkville
EST. 1 _1s3s County Seat of Kendall County
-� - 800 Game Farm Road
P (VI ` S2Yorkville, Illinois, 60560
9,f„ , a",,-`=0 Telephone: 630-553-4350
<CE XV Website:
Fax: 630-553-7575
Website: www.yorkville.il.us October 20, 2004
Mr. Kenneth Woods
Landmark Consulting, P.C.
25030 Ramm Drive
Naperville, Illinois 60564
Re: Swanson Lane Estates
Dear Mr. Woods:
I have reviewed the proposed final plan for the referenced development, received on
October 8, 2004, and have the following comments:
General
• A plat of subdivision should be submitted for review.
• The landscape plan will be reviewed by Mike Schoppe, our land planner.
• Please submit plans to Walter E. Deuchler Associates to review on behalf of the
Yorkville-Bristol Sanitary District (YBSD). See comments below about possible
city sanitary service instead of septic fields.
• If individual septic fields are to be built, permits will be needed from the Kendall
County Health Department.
• This development will likely disturb more than one acre of land, therefore a
Notice of Intent needs to be submitted to the Illinois EPA. Please provide proof of
that submittal.
• A site development permit is needed from the city. Attached find an application
form and pertinent portions of our Erosion Control Ordinance.
• Please submit the plans to Bristol-Kendall Fire Protection District to review with
respect to hydrant locations and access.
• The plans call for a public right-of-way dedication for Boomer Lane. I
recommend that Boomer Lane south of the Blackberry Creek North subdivision
remain a private road. An ingress/egress easement should be dedicated along that
road for vehicles and pedestrians. A public utility and drainage easement should
be dedicated over the entire 33-foot width along the west edge of this
development.
• An engineer's estimate of cost is needed once the final plan is approved.
Sheet 1
• A second benchmark is needed.
Sheet 2
• The General Notes should also reference the Yorkville Subdivision Control
Ordinance, and state that in case of conflict the ordinance shall govern.
• Revise the Hydrant Materials note to call for"Safety Red" color.
• Revise the Pipe Culvert note to specify RCP.
• Revise the Watermain Testing note by calling for a 4-hour pressure test. Also,
delete the system pressure leakage test.
• Revise the Water Service Connection Materials note to specify Mueller H15154
curb stops and Mueller H10300 B-Boxes.
Sheet 3
• List the T/F elevation for the existing home on Lot 4, and also show the location
of the existing septic field.
• Our floodplain ordinance requires defines the Base Flood Elevation along
Blackberry Creek as the 500-yr floodplain as shown in the 1989 Soil
Conservation Service Study. The floodplain is shown correctly on the plan.
• Due to the low impact of this development, the large number of trees, and the
fairly steep terrain, stormwater detention will not be required.
Sheet 4
• The existing watermain at the Boomer/Fairhaven intersection is not shown
correctly. Please refer to the attachment. The watermain to the west only serves a
fire hydrant. You can connect directly to the watermain with a 16"x8" reducer,
but you will have to pressure test up against the hydrant leg(constructed in 2003)
and the 16" butterfly valve(constructed in 1990). If you are not comfortable with
those conditions, call for an 8" gate valve in box at the connection to the existing
watermain.
• An offsite easement will be needed for the proposed watermain along Boomer
Lane. If you cannot obtain that easement, you can cross Boomer just south of
Fairhaven.
• Revise the watermain alignment near Lot 2 to increase the distance from the
existing shed and concrete slab to at least 20 feet.
• Show the correct width of the utility easement between Lots 72 and 73. Call for
sod restoration and replacement of the sidewalk and property corners that will be
removed during construction.
• Move Hydrant#3 to the west of the looped cul-de-sac drive to minimize potential
from traffic damage.
• The invert of the existing sanitary sewer on Fairhaven Drive near Lot 73 is
approximately 627.6. It appears that a gravity sewer could be extended south
between 306 and 308 Fairhaven to serve at least Lot 3 and possibly Lots 2 and 4
by gravity. Those lots that could not be served by gravity sewer could have
individual "grinder" pumps that would pump to a common forcemain and
discharge to the gravity sewer. The city would maintain the gravity sewer and
common forcemain, but the grinder pumps would be maintained by the individual
homeowners. We have a similar set-up on River Birch Drive in the White Oak
Estates development.
• All culverts should be RCP with precast flared-end-sections and grates.
• The existing culvert on Boomer Lane north of the Swanson Lane is in poor
condition, and the condition downstream of that point is unknown. Call for the
entire culvert to be removed and replaced with a Swale.
• Existing Boomer Lane south of Fairhaven Drive is about 19 feet wide. It should
be increased to at least 22 feet and given an overlay.
• A streetlight should be provided on Boomer Lane at Swanson Lane.
• Swanson Lane is proposed to be 16 feet wide. The Police Department and BKFD
should review this to determine if it is adequate.
Sheet 6
• The existing fence along the west side of Lot 1 is in conflict with the proposed
sidewalk and Swanson Lane. Call for this fence to be removed.
Sheet 7
• Revise the Bituminous Pavement detail to call for the subgrade fabric to be
installed below the aggregate base course.
• The existing public sidewalk on Boomer Lane is 4 feet wide. Revise the sidewalk
detail to match this width.
• Revise the Valve Vault detail to also have"City of Yorkville" cast into the lid.
• Revise the hydrant detail to call for a Trench Adaptor valve box or clamps to hold
the box plumb with the hydrant barrel. Revise Note 2 to call for"Safety Red"
color.
• Details may be needed for sanitary sewer items. Use YBSD standard details.
• Details may be needed for trench patching depending on possible watermain
revisions and sanitary sewer construction.
This plan is scheduled for review at our Plan Council meeting on October 28, 2004.
Please make the requested revisions and resubmit for review at your earliest convenience.
If you have questions about any of these comments, please call me at 553-8545.
Very truly yours,
Wywrot
h w w t
P
City Engineer
Cc: Tony Grafi; City Administrator
Liz D'Anna, Deputy City Clerk
L
4
cy,
\•\ 4 \
X65 L 21"
• — �� \ NN.
CR ® 0.25% \
1
\/. \ \
27" FES —,
*111114111111i: ST2 N l �1' \
WK GRATE __ \ \\\
INV=635,30 �' _ ,�h
�` - _ I. 74 Ls 18" '
�. . RCP IP 0.46% q- A
cas
---
in3 ry^)
\, /
'''--.�.—, --9.�- M
ST1
/ FES
_. r
INV • --
INV=634.90 IMMO
—8 LF 12" l.' al EXI TING PAVEMEN
RCP ® 0.629x/_•• . _ CURB & GUTTER 1
P
__ "Gs, EX GATE ='= REMOVED AND REF
__� _ 3 VAVLE .i MATCH
TCH EXISTING SI
634.80 --- _-.��
I V--------4".--• C� SN1
csT
in
b' it .-.- _/ Nan _ •..-.-. /
y .8 x8 TEE
_... SS~"a s IN M G ,co �:`3P. ---- -----_- _�... iv.--___________
_9.1-,E. .. �' 0 .�_ OF _ _ _W�
z . �..,,•-.._...__ --- — - LF 8" A „..,...,)r,,5'
�'” � �
" / HE. ` 56 r` o
co
REMOVE & REPLACE EX, FRAME ` ° � \ i
& GRATE W/ DEPRESSED FRAME e -- - SHE ` ~mss
/ ! - _ ---_____________I ....
--o-
& GRATE: RIM-637.63 T DC I w � ,- _.�� HE
� ) EX_ AMERITECH MH �� ir
EX SAN MH EX MH BENCH TO BE
iG
���
ATO BE ADJUSTED RIM=638,14 MODIFIED AS NECESSARY.
'''-'7:
L:
�I
INV=630.20
lap
EX. CURB & GUTTER I
j
/ (a., r..l
TO BE REMOVED & \J
REPLACED. SAWCUT _
EX. CURB TO BE REMOVED. A
INSTALL EXPANSION JOINTS \�f �r ` -•T >`/
TOD X.00URBTWITH PROPOSED CURB �`t , t �� ! r� Nin �_) l"i' ,
United City of Yorkville
Ordinance No. 0p3.1, 1,
SOIL EROSION AND SEDIMENT CONTROL ORDINANCE FOR
UNITED CITY OF YORKVILLE, ILLINOIS
ADOPTED BY THE
MAYOR AND CITY COUNCIL
OF THE
UNITED CITY OF YORKVILLE
Jl.
THIS '/ ` DAY OFf ' fr4 2003.
PUBLISHED IN PAMPHLET FORM BY THE AUTHORITY OF THE MAYOR
AND CITY COUNCIL OF THE UNITED CI OF YORKVILLE,
KENDALL COUNTY, ILLINaIS
THIS ""DAY 0 2003
Page 1 of 15
March 5, 2003
•
400.0 Site Development Permit,
401.0 Permit Required:
• Except as otherwise provided in this ordinance, no person shall commence or perform any clearing,
grading, stripping, excavating, or filling of land that meets the following provisions without having first
obtained a site development permit from the City:
401.1 Any land disturbing activity (i.e., clearing, grading,stripping, excavation,fill, or any combination thereof)
that will affect an area in excess of 10,000 square feet;
401.2 Any land disturbing activity that will affect an area in excess of 500 square feet if the activity is within 25
feet-of a lake, pond, stream, or wetland; or
401.3 Excavation, fill, or any combination thereof that will exceed 100 cubic yards.
402.0 Exceptions:.
A permit shall not be required for any of the following provided that the person responsible for any
such development shall implement necessary soil erosion and sediment control measures to satisfy
• the principles set forth in Section 300.0 of this Ordinance:
. 402.1 Appurtenant structures on a site in excess of two acres for which a building permit has been issued
or excavation below final grade for the basement and footings of a single-family residence;
402.2 Agricultural use of land, including the implementation of conservation measures included in a farm
conservation plan approved by the Soil and Water Conservation District, and including the construction
of agricultural structures; or
• 402.3 Installation, renovation, or replacement of a septic system to serve an existing dwelling or structure.•
403.0 Application for Permit:
Application for a site development permit shall be made by the owner of the property or his
authorized agent to the (permitting authority) on a form furnished for that purpose. Each application
shall bear the name(s) and address (es) of the owner or developer of the site and of any consulting
firm retained by the applicant together with the name of the applicant's principal contact at such
firm, and shall be accompanied by an application fee of$100.00. Each application shall include
certification that any land clearing, construction, or development involving the movement of earth
shall be in accordance with the plans approved upon issuance of the permit.
403.1 Submissions:
Each application for a site development permit shall be accompanied by the following information:
'404.1 A vicinity map in sufficient detail to enable easy location in the field of the site for which the permit-is
sought, and including the boundary line and approximate acreage of the site, existing zoning, and a
legend and scale.
Page 7of15
March 5, 2003 -
ORDINANCE 2003-19
SOIL EROSION & SEDIMENTATION CONTROL ORDINANCE
UNITED CITY OF YORKVILLE
SITE DEVELOPMENT PERMIT APPLICATION
United City of Yorkville OFFICE USE ONLY
• 800 Game Farm Road Date Received:
Yorkville, Illinois 60560 ENG Concurrence:
Approved By:
Date Approved:
Permit Number:
INDICATE TYPE OF IMPROVEMENT:
Subdivision Fill & Grading
Pond Dredging
Other:
,Being duly sworn upon his oath,in application for a Permit
(Applicant)
from The United City of Yorkville,Deposes and Says:
OWNER'S NAME:
ADDRESS:
CITY: STALE: ZIP: TELEPHONE:
APPLICANT'S NAME:
ADDRESS:
CITY: STATE: ZIP: TELEPHONE:
ENGINEER'S NAME:
ADDRESS:
CITY: STA1E: ZIP: 1ELEPHONE:
CON ITIACTOR'S NAME:
ADDRESS:
CITY: STATE: ZIP: 1 ELEPHONE:
MAINTENANCE PERSON'S NAME:
ADDRESS:
CITY: STALE: LIP: 1ELEPHONE:
SI'1'E DEVELOPMENT PLAN: -
1. Prepare a site development plan in accordance with Section 404.0 (Submissions) and Section 500.0
(Design and Operation Standards and Requirements) of the Soil Erosion and Sediment Control
Ordinance.
2. Attach the legal description of the proposed site on a separate page.
3. COMPLETE THE FOLLOWING INFORMATION:
A. Starting date: Anticipated completion date:
B. Acreage of site: Acreage of project:
C. Date of seeding:
D. Total area filled or excavated: Cubic yards of fill:
E. Max. depth of fill or excavation: Type of fill:
F. Presence of: Wetlands Floodplains Woodlands
G. Water supply for pond: Surface runoff Ground water
H. Additional Information:
Signature of Owner Date
Ct �� _
=`,QED cry
United City of Yorkville
Est. - 424"1836 County Seat of Kendall County
800 Game Farm Road
Yorkville, Illinois, 60560
Telephone: 630-553-4350
�<CE `y�?= Fax: 630-553-7575
Website: www.yorkville.il.us
October 20, 2004
TO: Tony Graff
FROM: Anna B. Kurtzmarf-�J//yy
7(
SUBJECT: Swanson Lane Estates
Review Landscape and Engineering Plans
I have reviewed the documents listed above and have the following comments:
1. They have increased the number of lots associated with this subdivision from 5 to
either 6 or 8. The Landscape plans show a total of 8 lots (6 buildable lots and 2
outlots) while the engineering plans show 6 lots. Clarification regarding the number
of lots will need to be provided.
2. If the outlots will remain, please have the petitioner identify the purpose for these
outlots.
3. The petitioner is requesting Estate zoning and has indicated that they want relief from
Section 10-6A-4D. This section requires a 50 foot setback from the front property
line. They are requesting a 25 foot setback measured from the edge of the cross
access easement, which they then state will be roughly 50 feet from Swanson Lane.
Staff will need to discuss this concept with the petitioner. Based upon discussions
with other developers, the location of the setback may be based, in part, upon the
location of utilities within the access easement.
4. Three further comments related to setbacks:
a. By definition, the front of a property is that frontage that abuts a public right-of-
way. Therefore, the front of lots 1 and 6 will be along Boomer Lane. Given the
proposed location of the houses on these two lots, I recommend that the required
50 foot setback from Boomer Lane be reflected on the plat and supporting
documents.
b. Section 10-6A-4 lists the required setbacks (basically 50 feet from all property
lines). Other than relief from the front yard setback the petitioner has not
T. Graff
Swanson Lane Estates
October 20, 2004
Page 2 of 2
requested relief from any other setback. The proposed location of houses on Lots
1, 3 and 6 do not meet the minimum 50 foot setback from all property lines.
c. As the definition of setbacks is based upon the location of the front yard (as
defined this means from an established right-of-way) and as lots 2 through 5 will
not abut a public right-of-way, I would request that all setback lines be drawn on
the plat and supporting documents.
5. The petitioner has indicated that they are seeking relief from the standard stoithwater
management facilities and that the justification for this is due to the extensive
vegetation located on the property. The petitioner also indicated that they would
provide additional compensation by adding vegetation to the site. The petitioner is
attempting to address this by a note that-is located on the landscape plan. Staff will
need to discuss this concept.
6. While the documents indicate the proposed location of houses, no documents have
been produced indicating that houses have to be in these locations. If houses can be
located anywhere on the property (within the setbacks) then the individual
homeowner can elect to place houses where existing trees are located. If trees are
deemed to be a valuable asset to this site, then staff will need to discuss how existing
trees will be protected.
/abk