Loading...
Public Works Packet 2005 08-22-05 Joint Meeting ,QED C/4 $' °► United City of Yorkville 7Aan 1 800 Game Farm Road EST.1 1836 Yorkville, Illinois 60560 o L e4 Telephone: 630-553-4350 1 „_„,ns- ` a Fax: 630-553-7575 4LEti` w PUBLIC WORKS COMMITTEE AND PARK BOARD JOINT MEETING AGENDA Monday,August 22,2005 6:30 PM City Hall Conference Room 1. Approval/Correction of Minutes: None 2. Parks Maintenance Facility 3. Park District Discussion 4. Additional Business o United City of Yorkville J Park and Recreation Department EST1836 800 Game Farm Road i , �7� Yorkville, Illinois 60560 -c LLL o Telephone: 630-553-4350 1.4 Kendod County<CE ,�'`' Fax: 630-553-7575 Memo Date: July 26, 2005 To: Public Works Committee From: Park Board Laura J. Brown, Executive Director CC: Eric, Dhuse, Public Works Director Tony Graff, City Administrator Art Prochaska, Mayor Traci Pleckham, Finance Director Subject: Parks Maintenance Facility In November 2004, the City Council approved an agreement with the Architect firm Sentle Rubel Bosman Lee for a space needs analysis and cost summary for the construction of a parks maintenance facility. This was an effort to alleviate the current overcrowded and congested space at the joint Public Works and Parks Maintenance building,by separating the two departments into two buildings, and temporarily alleviate space problem. In addition, Public Works could pursue other building options at a later date when funding would be available. The proposed 7 acre park in the Prairie Meadows subdivision was selected as a possible location for the parks maintenance facility. It is estimated between 3-4 acres would be necessary to construct a facility with outside storage. The space needs for the building were developed using a 5-7 year projected growth and staffing needs for the parks department. (Compiled using the adopted parks maintenance standards). In addition, the core part of the building was sized for total build out with the garage area size for a 7 year build out and position so an addition can be added. Park Board comments were solicited subsequent to the completed space needs summary. In addition, a follow up meeting was conducted with Kevin McCanna from Speer Financial and Traci Pleckham, Finance Director to discuss funding options if the Park Board was to move forward to City Council with a recommendation for the building construction. Through this meeting the City's current debit and revenue projections were discussed. In light of the City's current debit commitment for the library addition and anticipated new growth revenue, the park maintenance facility has two potential options for financing. The following are the two options available: 1. Utilize a combination of land cash reserve of approximately$1.2 million and alternate bonds for a financing option of 13 years (which could be extended to as much as 20 years)with an annual payment of$200,000. At the conclusion of the bond, the balance of the balloon bond would be due of$2.5 million. The pay off funding options could be future land cash or general fund or sales tax revenues. If land cash is tolled to construct this space, the City would still be obligated to secure additional funding options to build the future parks in the upcoming subdivisions as committed by the annexation and development agreements. 2. Construct a joint facility with Public Works utilizing the sizing and space needs findings with the goal in 8-15 years building a larger Public Works/Parks building. The current Public Works site could be utilized as storage and water treatment site/offices. This new site would become a joint(Parks and Public works) satellite facility. Funding options would include a 50/50 share. Parks land cash would fund the initial payment of$1.2 million and share in the annual fees of$200,000 through land cash or parks capital, and public works capital. Public Works would pay the debit balance at the conclusion of the bond $2.0 million and share 50% of the annual fees. Refinancing options of the bond could also be developed at a later date as other revenue sources or streams are identified. Both options allow for the immediate construction of a building and much needed space for the operation of both departments. In addition,both options have positive and negative points. The following are discussion items for the August 22, 2005 Public Works/Parks Meeting. 1. Does the City have other plans for the construction and funding of the Public Works facility? 2. Would a combined City facility(Parks and Public Works)be a desire? Or is it better to separate? 3. Are the funding options viable? (based on future growth). 4. Can the space proposed in the Sente Rubel proposal accommodate the combined departments? (Eric and I met, and feel the proposed building size would accommodate both departments for our current needs). 5. What options could the current space provide during the projected growth for space, and storage? 6. How is the Yas space needs for Public Works or other City buildings affected? 7. If the City's available debit limit is maxed by the library addition for the next 3 years, it can only be assumed the next immediate need for the city would be a Public Safety Building before a Public Works/Parks facility. This would mean that available new growth dollars and debit limit would not be available for more than +7 years. 8. Another option to constructing a Park Maintenance facility, could be constructing a combined site with Recreation for a recreation center/maintenance facility. Funding would still be an concern,but a referendum could be explored for this option. The residents would be more likely to support a referendum for a recreation center . Is this an option that needs to be explored? ►.: Sente•RUbel•Bosman•Lee Arc h,i ,.ci ', ! tri. United City of Yorkville Updated March 29,2005 Parks and Recreation Department Updated April 15,2005 Park Maintenance Facility Updated April 19,2005 SRBL Project No.04134 DRAFT Program Statement Budget Cost per square foot ranges Proposed Low Range High range Room/Area/Space SF Cost/SF total Cost Cost/SF total Cost Notes ADMINISTRATIVE&MAINTENANCE STAFF Office&Work Spaces General Receptionist/Administrative Assistant 165 $140 $23,100 $150 $24,750(1)Current Staff,near public entrance-"L"shaped workstation w/box and file drawers; one task chair,two waiting chairs w/small end table Coffee Area 50 $145 $7,250 $155 $7,750 Counter w/cabinets above and below,microwave,small sink,refrigerator below counter Executive Director Office 175 $140 $24,500 $150 $26,250(1)Current Staff,private office w/door;"U"shaped desk w/box and file drawers,OH storage,task chair,two quest chairs.Includes closet —Reeeptient Space deleted. Waiting area added to General Reception in space A-10 above. (4-)- Superintendent Office 142 $140 $19,880 $150 $21,300(1)Current Staff,private office w/door;"U"shaped desk w/box and file drawers,task chair,two quest chairs Foreman's Office Space 293 $140 $41,020 $150 $43,950(3)Future Staff,one general open office space with 3"L"shaped workstation w/box and file drawers one•uest chair for each work station 140 •,42 000 ..150 •.45 000 Division Operators/Leads Report Writing and 552 $140 $77,280 $150 $82,800(3)Current Staff;(2)future Staff-require computer access for each;space for 5"L" Office Space&Manuals Library shaped workstations w/box and file drawers,OH storage,task chair,central filing area for letter and legal size documents. Bookcase for manuals. $140 $150 . . .. Space deleted.Facility Manager is Foreman of Building Maintenance and is one of the three staff in Foreman's Office.FT Janitor office space to be in space A- 21 on next page.Building Maintenance assistant shall share office space with foreman. Conference/Meetinq Room Combined with Board/Training Room A-8 below Staff Toilet Rooms 85 $190 $16,150 $200 $17,000 Two unisex single user toilet rooms-HC accessible,(1)toilet,(1)sink,(1)mirror,grab bars,toilet room accessories Work Room 120 $140 $16,800 $150 $18,000 Copier,fax,mail,etc.-counters w/cabinets below and above;power and data for office equipment. Multi-Purpose Space Public Meeting/Board 1,850 $150 $277,500 $160 $296,000 Proposed Multi-Use space for Board Room,Public Meetings,Staff Training,Lunch and Room Training&Break/Lunch Room as well as Break Room for an audience of 50 in addition to(8)P&R Dept.Staff,(7)P&R Board Conference Room Members; 100sf storage room.Pedestal tables w/armless chairs,no permanent board dais, A/V for training, 150 sfKitchen with full fridge,elec.stove,(4)abv cntr micr, dishwsh. vending,marker/tack bds.. Public Toilet Rooms 355 $190 $67,450 $200 $71,000 Men's and Women's-HC accessible-in each:(2)sinks,(1)long mirror,(1)baby changing facility,toilet partitions and accessories;Men's:(1)urinal stall and(2)toilet stalls;Women's:(3)toilet stalls. Easy access from the Board/Trainina Room Conference Room/Meeting Room/Work Room 305 $140 $42,700 $150 $45,750 Seating for 10-12 people(space for individual divisions to meet w/staff and seasonal staff based on future staff size.)Boat or rectangular table seating 12. Wall mounted white and tack boards.Shelving for books and manuals. Storage for Office Supplies Mechanics office moved to Vehicle area Break Room/Traininq Room Combined with Board/Training Room A-8 above. Page 1 of 4 Locker Room w/Unisex toilet/shower rooms 1,145 $195 $223,275 $205 $234,725(49)total lockers-(7)2x2x6 lockers for Current FT Staff,(11)1x2x6 lockers for Current seasonal staff,(18)2x2x6 lockers for Future FT Staff,(13)1x2x6 lockers for Future seasonal staff.Includes benches,uniform drop/stor.(2)Unisex toilet rooms w/sink and adjacent shower room(possibly fiberglass shower unit with curtain);(3)Unisex toilet rooms w/sink(Room/fixture count based on future staff numbers) Office Supply Closet Combined with Conference Room/Meeting Room/Work Room above. Library Room/Area Combined with Conference Room/Meeting Room/Work Room above Server Room/Security Room 100 $145 $14,500 $155 $15,500 Space for up to(4)server racks and small rectangular work surface,task chair Building Maintenance/Janitor Closet 110 $150 $16,500 $160 $17,600(1)Future FT Janitor,2'-6"x6'-0"work surface with shelving above,task stool, floor mop sink,mop hooks,storage shelving,storage for garbage can and vacuum 130 $165 $21,450 $175 $22,750 Industrial washer/dryer,laundry tub,boot wash racks,hooks on wall for winter gear. Laundry/Mudroom Immediately adjacent to Storage and shop area. shop Arco $140 $150 This room deleted. Work Area size in Work Area/Shop Area below adjusted for additional space. :. .• •• • - • • . " , Mechanical Room 300 $140 $42,000 $150 $45,000 Mechanical equipment,water heater,water service,sprinkler service;double door entrance for large equipment(outside access if possible for ease of equipment replacement or service) Electrical Room Main Distribution Room to be part of Vehicle Storage Area;see below Generator Room 0 Generator shall be an outside unit;donated by other city dept.;used;see exterior storage areas for listing Sub Total Staff&Support Areas 6,177 $158 $973,355 $168 $1,035,125 Vehicle Storage&Shop Areas Vehicle Maintenance Bay 400 $175 $70,000 $185 $74,000 For future staff to repair and maintain driving vehicles(up to 1-ton truck w/plow)and other labor equipment-vehicle lift,tool cabinet,work bench,pull down lube/fluid rack, compressed air connection Mechanic's Office 105 $140 $14,700 $150 $15,750(1)Future Staff,must have view to shop floor;"L"shaped desk w/box and file drawers, OH storage,task chair. Bookshelf storage for manuals,etc. Mechanic's Area/Welding Area 250 $160 $40,000 $170 $42,500 Currently have portable MIG welder,would like to add TIG welder Parks&Recreations Vehicle Storage&Public 6,000 $95 $570,000 $105 $630,000(6)Current Division,1-ton pick up trucks w/plows;(1)Current Seasonal 1-ton pick up Works Vehicle Storage trucks w/plows. Public Works:(2)Current Five Ton Dump Trucks w/salt spreaders and plows and(1)Current combination backhoe Future Expansion for Vehicle Storage Estimated 10,000 square foot area for 22 future pick up truck vehicles with aisles. Work Area/Shop Area 450 $140 $63,000 $150 $67,500 Woodworking area with workbench and storage and elec.for power tools. Open space for maintenance of picnic tables,etc Public Works Vehicle Storage $95 $0 $105 $0 See above Dedicated Wash Bay 650 $155 $100,750 $165 $107,250 Sized for single-vehicle(5 yd.dump truck max.),heated pressure washer w/2 reels and wands Page 2 of 4 $95 $0 $105 $0 This space deleted. Owner will store this equipment at existing locations. Steffe. . Herbicide/Fungicide Storage(gallons only) 75 $95 $7,125 $105 $7,875 Tool Stora.e 200 '.95 19 000 105 21 000 Shared tool stora•e for all P&R divisions 5 total divisions Electrical Distribution Room 250 $140 $35,000 $150 $37,500 Main Distribution Panel,Distribution panels,transformer. Close to generator Facility Maintenance/Parts Storage 150 $55 $8,250 $65 $9,750 Storage for miscellaneous building maintenance items(light bulbs,light fixtures,filters, spare parts,attic stock of building finishes,etc.) Mezzanine Storage Public Decoration Storage 700 $55 $38,500 $65 $45,500 City banners,signs,holiday decorations,etc. Mezzanine Storage Portable Scoreboard storage Scoreboard and parts storage,stored off site Air Compressor Room 50 $120 $6,000 $130 $6,500 Located on Mezzanine Gasoline,gas/oil mix,kerosene,diesel(flammable cabinet for each)Provide cabinet for Gas can storage each shop. Vehicle fluids,oil cans,oil recycling center,empty fuel cans,paint cabinet. Provide Fluids&Storage cabinet for each shop. Sub Total Maintenance Storage Areas 10,280 $104 $1,067,325 $114 $1,170,125 Walls,corridors,mechanical chases,etc. 3,704 $140 518,490 $150 555,525 Based on 30%of net area of Admin and Staff areas&18%of Vehicle&Storage areas Total Square Footage of Building 20,161 $127 2,559,170 $137 2,760,775 Cost of primary building construction Exterior Storage Areas Cold Storage(on pallets) 600 $55 $65 Future Grass seed(6),Fertilizer(6),Field Chalk(6),Turface(4),Snow melt(4),Straw seed blanket's.-25 rolls,Temporary fence;athletic field drag mats,skid of concrete Cold Storage for Off-Season Plow Storage 1,650 $55 $65 Future (36)Boss(or equivalent)plows Bulk Material Bins 2,000 $60 $120,000 $70 $140,000 Shredded Hardwood Mulch(6000;Playground Mulch(100CY);Black Dirt(1800;Turface (1800;Infield Clay(1800;CA-6(180);AG Lime(18CY);Potting Soil(25CY);Top Dressing Soil(25 CY);Fertilizer(18 CY);Sand and bin for dumping scrap dirt,spoils, edging,etc.Located off the side(s)of the Salt Storage Building Parks&Recreation Equipment Storage 3,000 $55 $165,000 $65 $195,000 Unheated cold storage area (4)Current 12'to 24'trailers,(5)Current riding mowers (1)Current utility tractors,(2)Current utility golf carts,(3)Current tractor attachments Future Parks&Recreation Equipment 3,600 Estimated area for future trailers,riding mowers,untility tractors,golf carts&various Storage attachments.(6)Future 12'to 24'trailers,(7)Future riding mowers,(2)Future utility tractors,(4)Future tractor attachments Public Works Cold Storage 350 $55 $65 Future Trailer-30'long X 9'wide Salt Storage Building 1,500 quote $100,100 estimate $125,000 Separate Building-current need 500 tons of salt storage-future need to be 1,000 tons Plants and Tree Storage 300 Future Annuals,Perennials,30 Trees Allow open space on site for future Greenhouse Generator 100 Back up generator;exterior unit;natural gas,60kW,120/240,3 phase.To power whole building;SF number includes 3'-0"clearance on three sides-assumes reuse of existing estimate $10,000 estimate $15,000 unit Sub Total Exterior Storage Areas 13,000 $395,100 $475,000 Page 3 of 4 Site Employee Parking(Administration) (8)stalls-(4)Current staff and(3)Future staff,(1)Hdc'p. Employee Parking(Aquatics,Athletic Fields, (24)stalls-(6)Current staff and(17)Future staff,(1)Hdc'p. Beautification,Playgrounds,Turf,Building Maintenance) Employee Parking(Seasonal) (22)stalls-(10)Current seasonal staff and(11)Future seasonal staff stalls,(1)Hdc'p Total Amount Parking Stalls(FT and Seasonal (54)stalls plus(3)handicapped stalls Staff and Public Works Staff) Guest Parking No separate guest parking provided. Parking is same as regular employee parking. Total Parking 57 $2,000 $114,000 $2,500 $142,500(54)stalls plus(3)handicapped stalls Perimeter Fencing estimate 25,000 estimate 30,000 Fencing based on approximately 1000 lineal feet of PVC coated chainlink fencing Storage Yard paving 4,500 26 117,000 29 130,500 Pavement estimate based on square yards of surface 256,000 303,000 Cost of Construction,Building and Site 159 3,210,270 176 3,538,775 Contingency Allowance Design and Construction 385,232 424,653 Total Cost of Construction including continency 178 3,595,502 197 3,963,428 Allowances for Items to be Purchased by the Village Furniture&Office Equipment(incl.First Aid and Eye Wash Stations) $35,000 $45,000 Furnishings Design Fee $5,000 $7,500 Kitchen Appliances $9,500 $12,500 Laundry Equipment Washer&Dryer-Heavy Duty Residential Type $3,500 $5,500 Interior Signage $2,500 $3,500 Exterior Signage $5,500 $7,500 Maintenance/Janitorial Equipment $6,500 $8,500 Telephone/Video/PA System and Equipment $25,000 $30,000 Security System $15,000 $17,000 Staff and Equipment Moving Costs $7,500 $10,000 Above grade fuel island $25,000 $30,000 Based on two 500 gallon tanks,one for diesel,one for gasoline Sub Total Allowances for Items to be Purchased by the Village $140,000 $177,000 Allowances for Items Not Included in the Construction Budget Architectural and Engineering Fees 8.00% $287,640 8.00% $317,074 Soil Investigations $17,000 $22,000 Surveys $0 $0 Assumed to be existing and available Material Testing During Construction $10,000 $15,000 Blueprinting $10,000 $15,000 Utility Company Charges(Electric,Gas,Telephone) $25,000 $35,000 Utility costs during construction $20,000 $30,000 IDOT/Kendall County Roadwork and Infrastructures Improvements Unknown Permit Fees $0 $0 Assumed waived Sub Total $369,640 $434,074 TOTAL PROJECT BUDGET 4,105,143 , 4,574,502 Notes This budget is preliminary in nature,and assumes the use of a Pre-Qualified General Contractor. Project Budgets do not include land costs,legal fees or financing costs. Construction costs are based on Fall 2005 bid date. Page 4 of 4 Vehicle Area Worksheet Vehicle/Equipment Act length Act width Design length_Design width Design Area Design Area -(feet) (feet) (feet) (feet) (CurrentZ (future) Parks and Recreation I Aquatics,Beautification and Playgrounds Forman of Aquatics, 4x4 Pickup Truck w/0 plow(future) 17.66 7.67 23.66 13.67 323 Beautification& Playgrounds _ Operator of Aquatics 4x4 Utility Truck w/o plow(future) 17.66 7.67 23.66 13.67 323 Operator of 4x4 Utility Truck w/plow(future) 19.66 7.67 25.66 13.67 351 Beautification _ Operator of 4x4 Utility Truck w/plow(future) 19.66 7.67 25.66 13.67 351 Playgrounds MWII of Beautification 4x4 Pickup Truck w/plow(current) 19.66 7.67 25.66 13.67 351 351 MWII of Playgrounds 4x4 Pickup Truck w/plow(1999 Ford F-350 22.00 7.67 28.00 13.67 383 383 Utility Truck)(current) MWI of Beautification 4x4 Pickup Truck w/plow(2003 Ford F-350 22.00 7.77 28.00 13.77 386 386 Dump Truck)(current) MWI of Beautification 4x4 Pickup Truck w/plow(future) 22.00 7.77 28.00 13.77 386 MWI of Playgrounds 4x4 Pickup Truck w/plow(2003 Ford F-150) 19.66 7.67 25.66 13.67 351 351 (current) MWI of Playgrounds 4x4 Pickup Truck w/plow(future) 19.66 7.67 25.66 13.67 351 2004 Toro Workman Utility Cart(current) 7.00 4.50 13.00 10.50 137 137 Sub Total 1,606 3,691 Athletic Fields and Turf Forman of Athletic 4x4 Pickup Truck w/o plow(future) 17.66 7.67 23.66 13.67 323 Fields&Turf Operator 0f Athletic 4x4 1 Ton Dump w/plow(future) 25.50 9.50 31.50 15.50 488 Fields Operator of Turf 4x4 1 Ton Dump w/plow(future) 25.50 9.50 31.50 15.50 488 MWII of Athletic Fields 4x4 Pickup Truck w/plow(future) 19.66 7.67 25.66 13.67 351 MWII of Turf 4x4 Pickup Truck w/plow(2003 Ford F-350) 21.00 7.77 27.00 13.77 372 372 (current) MWII of Turf 4x4 Pickup Truck w/plow(future) 21.00 7.77 27.00 13.77 372 MWI of Athletic Fields 4x4 Pickup Truck w/plow(2000 Ford F-350) 21.00 7.77 27.00 13.77 372 372 (current) MWI of Turf 4x4 Pickup Truck w/plow(2005 Ford F-350 22.00 7.77 28.00 13.77 386 386 Landscape Truck)(current) MWI of Turf 4x4 Pickup Truck w/plow(future) 22.00 7.77 28.0013.77 386 John Deere Utility Cart(current) 7.00 4.50_ 13.00- 10.50 137 137 Sub Total 1,266 3,674 Building 4x4 Utility Truck w/o plow(future) 17.66 7.67 23.66 13.67 323 Maintenance Foreman Building 4x4 Pickup Truck w/plow(future) 19.66 7.67 25.66 13.67 351 Maintenance Assistant Sub Total 0 674 Seasonal Workers (8)4x2 Pickup Trucks(1 current,7 future) 17.66 7.67 23.66 13.67 323 2,587 Sub Total - 323 2,587 Parks and Recreation Vehicle Storage Total 3,195 10,626 Parks and Recreation Eauioment (10)Trailers(12'min.-24'max.=18.0'avg. 18.00 7.25 24.00 13.25 1,272 3,180 length 7.25 avg.width)(4 current,6 future) (12)Riding/Push Mowers(4'-4"min.-11'-0" 7.00 7.80 13.00 13.80 897 2,153 max.=7-8"avg.(5 current,7 future) (3)Utility Tractors(1 current,2 future) 7.00 4.50 13.00 10.50 137 410 (2)Utility Golf Carts(current) 7.00 4.50 13.00 10.50 273 273 (7)Tractor Attachments(3 current,4 future) varies varies varies varies 200 400 approx. Sub Total 2,779, 6,415 Staff Vehicles Superintendent Car 16.75 6.1 22.75 12.10 275 Park Forman 2003 Chevy Impala 16.75 6.1 22.75 12.10 275 Park Planner 2004 Ford Taurus 16.5 6.1 22.50 12.10 272 Park Designer Car 16.75 6.1 22.75 12.10 275 1,098 Public Works (2)Five Ton International Dump Truck 30.00 11.00 36.00 17.00 1,224 w/plow and salt spreader Combination Backhoe 23.50 8.00 29.50 14.00 413 Total 1,637 Staff Parking Standard Stalls(50 Employees+4 PW 10.00 18.00 9,720 Employees) Sub Total 9,720 36 Snow Plows-cold storage(equipment only) 9.00 4.00 10.00 4.50 1,620 i _ 1,620 Page 1 m. SF Costs Worksheet Work&Storage Areas Building Area 7,019 Category Cost/SF Total Cost Excavation 7 49,133 Foundations 6 42,114 Slab-on-grade 6 42,114 6"thick Exterior Masonry 27 189,513 10-2-4 ground faced CMU exterior, reinf. CMU interior Misc. Steel 4 28,076 Lintels, OH door jambs Roof steel 15 105,285 Open-web steel gable trusses, 1-1/2" mtl. Deck Roofing 8 56,152 Asphalt shingles on vented nail-base H.M. Doors 1 7,019 5 hollow metal doors&frames Overhead doors 6 42,114 (3)22x16, (1) 16x16, (1) 12x8 Painting 4 28,076 Wash Bay Equipment 2 14,038 Plumbing 10 70,190 Fire Protection 3 21,057 Dry-pipe system HVAC 9 63,171 Electrical 14 98,266 Total 122 856,318 Mezzanine Area 1,525 Precast Plank w/2"Conc.Topping 11 16,775 Misc. Steel 15 22,875 Stairs&railings Masonry Partitions 5 7,625 Fire Protection 3 4,575 HVAC 5 7,625 Electrical 10 15,250 Total 49 74,725 Page 1 SF Costs Worksheet Covered Parking Area Area 2,600 Excavation 1 2,600 Foundations 9 23,400 Fencing 2 5,200 Masonry Walls 4 10,400 Masonry Piers 3 7,800 (6) masonry piers+/-6' high Roof Steel 15 39,000 Open-web steel gable trusses, 1-1/2" mtl. Deck, Beams Steel Columns 1 2,600 (6) 8' high steel columns Roofing 8 20,800 Asphalt shingles on vented nail-base Fire Protection 3 7,800 Electrical 5 13,000 Lighting and power for block heaters Total 51 132,600 Sitework Landscaping 15,000 Asphalt paving 9,560 28,680 3/SF Barrier curb - - 15/LF Concrete walks&aprons 990 4,950 5/SF Trash enclosure 5,000 Earthwork 80,000 Site Utilities 50,000 Misc demolition 5,000 Site Lighting 7,500 Total 196,130 Page 2 Attached please find the latest version of the program. I think we have captured all the revisions but would like you each to review and confirm. Please note that this Program is arranged a little differently based on some of the changes we have made to this point. A couple of items we would like to point out. 1. The salt storage barn is still included in the costs now. See line #85 of the program. 2. Bulk storage bins are still in this cost. See line 81 3. Above grade fuel tanks are added. See line 120. Note: this based on two 500 gallon pre-packaged tank units and does not include any canopy. 4. All "Exterior Storage Areas" on the program, have been omitted from the costs EXCEPT for"Park and Recreation Equipment Storage" (line 82) and the"generator" (line 87). 5. Perimeter Fencing has been added. Line 98. 6. Line 19 shows the change to the Planners Office that we discussed yesterday 7. For Vehicle Storage Areas, we now have separated the area into Current needs and Future. See lines 51 and 52. The attached generic conceptual plan for the vehicle storage and shop area shows a possible layout based on having your current fleet, PW's 2 plow trucks and loader, and a few spaces for future pick up trucks. This plan shows the minimum areas for the division storage areas, tool storage, work/shop areas and the welding area. It also assumes the Public Decoration storage, Air Compressor, and Facility Maintenance Storage to go on the mezzanine. The Future Vehicle Storage Area will need to be built to provide for the additional vehicles as you grow. 8. Same goes for the Park& Rec Equipment Storage. We have split that into current and future as well. We have called for 3000 square feet for current and for 3600 for future. (Lines 82 and 83). Iffi-4' / t:d 2 -d t t 22'-d p_d r i 1 \ N Plow Plow ES Plow Dedicated l;iIay Area - '.1- LI__ WriI,, ALL DIVISION bill INI WI , STORAGE SI ,�. 1,000 S.F. Truck 1 rq b Truck Truck Pickup Truck ��pp Pickup Pickup One ton Pickup 5 Yard One ton One ton One ton 311 I Dump (future) (- TOOL IIP I J STOR. AREA WELDING-., It i H PlowPlow Plow Plow AREA 11.1iii iii I•IJUL 250 S.F. WORK 260 S.F. i W W WAREA 11 w IMI 1.1 VailSTOgni LII l 490 S.F. 15, Q l J H r.__ - -- o Truck Truck Truck Truck 11 Q Pickup Pickup Pickup Pickup pipI One ton One ton One ton e s ton MEZZ. ABOVE VEHICLE MAINTENACE 900 S.F. Y Plow Plow Plow Plow B7 OAS.F. " < VOA g 11( >1 0 - Front EndADMIN. BLDG. Loader MECH. Truck Truck Truck Truck OFFICE ELECTRICAL ,� 11110 Pickup Pickup Pickup Pickup 4 O f S.F. ' ---J One ton One ton One ton One ton r�J 250 S.F. = (future) (future) (future) (future) 1 I-o i 1TI* I SCALE: 3/32" -1'-0" II 10,205 SS. INSIDE FOOTPRINT 04194 EMERG. GENER. I>. gc° } dad dr 4'-0. 2'-0. di, 1§11 W W I.. 1 C $ I \ I 47 SINK >a SINGLE SINGLE �g I I 00 leY cc USE USE N CLEAR AREA ' izzMICROWAVE a a IN FRONT OF 'o COUNTER • IP 1 111 • o REFRIGERATOR _ =_ 1Z-(BELOW COUNTER) 0 \ r I 5'-II. 5'-II. I r C A-6 A-1 v COFFEE BAR AREA a SINGLE USE TOILETS SCALE: Y.I. = 1.-0.SCALE: 1/4.=C-0. g S Ii �r- 04134 . '— I— To 17-1 m � 2'-O• ix > \ \ cn n — ) ,-, ,,,_, 1 , ,.., iv . _,, ... ,- u' am �- ' m i n I -i MIMI I 11111 ) I- 0 0• LAT.30 LAT.30• LAT. FILE FILE FILE q \ la-0. / / 1111 c i 03011 LAN= CITY OF YORKVILLE Sente•Rubel•Bosman•Lee PARKS AND RECREATION DEPARTMENT w .., .. :!.!1:.,!,:: PARK MAINTENANCE FACILITY STUDY A %SMOL .uveas n N C m -n w /I Li m I I m mI 1,WWII s. 1 IN\ r_, \ . / ' (o' / m O F < U1 = m D Q _ 111 110021Limn 411 A I 110021 Limn OF YORKVILLE Sente•Rubel•Bosman•Lee PARKS AND RECREATION DEPARTMENT w U.. Ar ctIlt ° PARK MAINTENANCE FACILITY STUDY 'TI c:3 r- < m...,m --I 3, 71Z r- VI / \ ---'9 -c3 m ii 73 7CS 7CS -- I 3> = - M 73 d ,..1 1 i 0. LAT. C)' LAT. C). LAT. FILE FILE FILE 1 ..........._ - . II \ 1 !, i'li :•• NEL --1 aft -ts. A . .. •: Ji.' il 73 pr:1 sin i--7Z (:) _ ____ ___ 1 I M D• 7;3 ,-._ C r) 7s M tf) * I ,I ' 1 --I 7Z -<(j") 3c3 - • , , 1 77J)„, 71 Itt 7i m 111 . ,, 1' 1 ; 1 1 , ..''`- - —1 A __J I _______,_ / / / / 22'--4. / / II 0 I mow mar birilSente.Rubel•Bosman•Lee CITY OF YORKVILLE ii, =TM PARKS AND RECREATION DEPARTMENT g ;:',1;,-,v1,-.v:: ....',.;;;•:z,.'.:::°4,=::......... PARK MAINTENANCE FACILITY STUDY mom&was 27-0' I-- / , / 11 cc 0 4c›, ( ..........._.) \ ic cl 1 i \ la 0401 >:filit c)iu z ot 1 o ei lc WALL co x MOUNTEP \.. ,'"---`• "Nii ------",,) sc cr EXECUTIVE a , a in a fie Cr< <ci. a. CENTER—\A- a ,-' 5'-e). / - - 5._6,' I CU OA MO _i _ i f-10. .4&.x0x1qe, - *- ns , A , • E . 2- 'C - 1 M111 i co , -, 1-j. :- ce IIII II 1 111 1111 1111 . = 7 CU . CU csrj a I i -cll -CN rt.. S I . ..-, a I A-5 ADMINISTRATIVE ann_row CONFERENCE ROOM 43D S.F. SCALE I/4V-0 04134. n > 1 mIP � _ �'g I�, MoD 1 ,- m m o %% w map, 1 s Dnp 1 � zz (\ (n ml 7z 1 I I .. — -0 / / 1 1 o appy u CITY OF YORKVILLE I - + gilSente•Rubel•Bosman•Lee PARKS AND RECREATION DEPARTMENT 2 WC , chi facts Ltd , PARK MAINTENANCE FACILITY STUDY vawen,a,uror 36I'-4' 1410 \LI ,....) STORAGE o I§ Q \ 40, at AI 4111k 404 / 100 S.F. 1- a W W BOARD i JGV ~!ill _ Op �a } t5z- 1-] 00000000_c.,i , 00000000 co,- ct (4) STAFF n (nn (� nhn) (4) STAFF . o cJ SEATS SEATS CO E ..TABLE 0 0 0 0 0 0 0 D TABLE ,.--- Ti.; 00000000 ces c . :. 0.. ouououuo , ) (-I (56.) AUDIENCE SEATS I I h A-8 , ilPUBLIC BOARD ROOM 04134 1650 S.F. err SCALE: 1/ .=l'-O' 22'-d 1 t D1/431 13/ mSA(\ 4 n' m _ j— c). N Km - z 0 0 CI) ., c,D , a)=- o f N — I- m r I RN • •—7— _ 0 ,_ 73 l‘ tj 0 I m _.=---'N\\.:--"---) z \ I 0 1 "0°"tA11om Sente.Rubel•Bosman.Lee CITY OF YORKVILLE Itt p =CM ►�. be PARKS AND RECREATION DEPARTMENT h ° ; PARK MAINTENANCE FACILITY STUDY mama LAOIS ` i y ,, dii ,111, 4. t lb Ilk t i 41Z 111 .. s „gilkiiii ♦ w A s^ ti i . ssrw a,. , 4 ar =.1;z...,,. .,,,,,;.,_r.-;, 41 14 1 ` w Barn-StyleDetailView Page 1 of 1 Barn-Style Detail View / Specifications _ Ali Home '1° 4 0 Ail ` _ 00 +4 '' I • ilk e Products1. r- , - ro .. [Barn- Specs] -. <:: � gyp"' "` , [Barns Images] - . ,� ` -- -� #tk, '—r [Barns - More] `.,b ,""i . ., f ' • + K Otr5;.•s j, zt, ' ---,:`'.1',... iit- ,k`. t-.a, w It7FGf., .'7., ,s(:‘," '.e t!` 3 4. anglitdait _._ __ _ ., * Back Our salt storage structures are renowned for excellence in engineering, design, strength, and beauty. Each salt storage structure is designed around your specifications and salt usage history, by our in-house staff AT NO ADDITIONAL CHARGE TO YOU. OVERALL SIZE TONS INCREASED CAPACITY With 10'Base Wall 80#/Cubic Foot Additional Tons per Linear Ft. 30'x 30' 385 16 Tons per ft. 40'x 40' 757 25 Tons per ft. 50'x 50' 1,283 34 Tons per ft. 60'x 60' 1,983 44 Tons per ft. I 70'x 70' I 2,877 56 Tons per ft. 80'x 80' 3,981 69 Tons per ft. Any length or width structure can Back be built to suit your exact need. a� t '? r,, ,'�, ,a£ • k' t. 1 . [Home] [Welcome] [About Us] [Products] [Services] [Contact Us] [Info Request] http://www.bulkstorageinc.com/html/barn-styledetailview.html 2/17/2005 Barn-Style Structures Page 1 of 2 Barn-Style Structures Storemore AS Barn-style Buildings... Products The addition to our storage building line, .:k our`New England Wing Truss' _ _ _1a toxr Structure offers expanded storage flexibility in an aesthetically pleasing design. Depending on the size of the ilk desired unit, hundreds to thousands of tons of salt or sand can be stored under roof, protected from nature's wrath. Ali Storage capacity can be augmented by external 'lean-to' sheltered storage areas for such things as landscape materials, mulch, aggregates, cold patch, or vehicles and equipment. Other available options include break-resistant windows, leak-proof skylights, multiple entrances, and more. Our buildings can be further customized by adding cupolas, windows, shutters, and sliding doors. The STOREMORE's distinctive building s design has been especially developed ., # . for salt/sand storage. This storage structure will resolve problems with space constraints, poor soil conditions, ealtWONAL environmental contamination, or uneven sites. It utilizes tested and proven materials that resist salt corrosion and minimize the chances for • ; y loader damage. The concrete base walls are 12 inches thick and 10 feet tall. Using epoxy- coated rebar and special sealers, our walls have been designed to be maintenance free. Walls can be used to push against for loading and will resist direct contact by loaders. Our concrete base walls are far superior to wood base walls. The leech-proof footing design minimizes ground water contamination. The center aisle is up to 30' £ � tall for easy inside loading and dumping. Solid plywood yai roof decking easily adapts to # 1 any type of roofing material. Your STOREMORE can be V: sr, expanded at any time to meet increased needs. Bulk Storage Inc. specializes in providing effective, affordable storage solutions. Our trained design staff will analyze your storage requirements and site conditions. `A' " ^ We lead our industry with construction techniques that focus on safe salt storage. Our goal is to supply quality, low maintenance, low cost, attractive and functional buildings. http://www.bulkstorageinc.com/html/barn-style_structures.html 2/17/2005 Services Page 1 of 1 Services irk Home Construction / Assembly Services. iii iik DESIGN / BUILD .1! e J T r- A t . ilk We offer a complete `turn-key' wt. — N,-:-• T Ai Services design/build service. . We will prepare sealed custom `'" � . prints with all site plans. We will provide i ` "' ..y.�.K.r _• 4 ilk specifications and complete materials �" , lists. Complete building construction is done at your site with our experienced t - " crews. '.gym , . . . . Under this program, domes are _, - u s ,, .-,.J - $ 3°"#� generally assembled and ready for full- '� service operation within a matter of a few weeks. Usually, from the time an order is placed with us, most domes structures are completed and ready for service within 60 to 90 days. A building lease program is also 4 available. } f . VALUE-BASED ASSEMBLY , t h',- 1 F(( { 3 M i ,. 's 16- fa We specialize in owner-built Domes. / S =, 3 . . . . You can build your own Dome and 3 . 708-946-9595 save thousands of dollars. We supply a supervisor and blueprints; You supply local ".%"" materials and labor. Under our supervisor's watchful eye, your dome is assembled to the same exacting specifications as if we'd done the work ourselves. [Home] [Welcome] [About Us] [Products] [Services] [Contact Us] [Info Request] http://www.bulkstorageinc.com/html/services.html 2/17/2005 1