Loading...
Plan Council Packet 2005 10-13-05 i cuir ���D Cary � F o United City of Yorkville 800 Game Farm Road Plan Council EST isss Yorkville Illinois 60560 Sept. 8, 2005 ,� Telephone: 630-553-4350 Attendees: 611 il1.4 O� Fax: 630-553-7575 Tony Graff, City Administrator John Whitehouse, EEI ilk"°"�`°'"" ��? Tom Lindblom, BKFD Jeff Freeman, EEI CE tV Mike Schoppe, Schoppe Design Assoc. Eric Dhuse, Dir. of Public Works Anna Kurtzman, Zoning official Laura Brown, Dir. of Parks & Rec. Sgt. Ron Diederich, Police Dept. Guests: PLAN COUNCIL AGENDA Patti Bernhard, DBC & W Scott Mai, Smith Engineering Thursday, October 13, 2005 John Tomasik, Kendall Land Dev., LLC Wesley Dydyna, Kendall Land Dev. 9:30 a.m. The meeting was called to order at 9:35 am by Mr. Graff. The Sept. 1 minutes were CITY CONFERENCE ROOM approved after one minor change. Kendallwood Estates (Willman Property)—Preliminary Plan 8:30 a.m. Staff Meeting Schoppe comments 1. Minutes for Approval/Correction: September 8, 2005 1) The Rt. 126 intersection right in and right out needs to be shown on the preliminary plat. It will be two lanes. Then a note should be added to the plans identifying a proposed for future full access. According to Mr. Mai, it may tie in 2. 9:30 a.m. - PC 2005-46 Prestwick of Yorkville - Final Plat through the commercial area and they have received an engineering okay for the geometry. 3. 10:30 a.m. - PC 2005-16 Kendallwood Estates - Preliminary Plan 2) The plat should be marked with the center line and right of way of Van Emmon. 3) On the road stub to the east,parcel lines and owner names should be added so 4. 11:30 a.m. - PC 2005-26 Eldamain Center for Business - Preliminary PUD Plan staff can determine appropriate road location. 4) The wetland report is needed. 5) Tree removal should be according to the tree preservation ordinance. 1:00 p.m. Staff Meeting regarding Konicek and Hageman Parcels Engineering comments 1) The right in, right out access should meet the 80 degree requirement for full access, as stated in the subdivision ordinance. 2) It was agreed for preliminary play that a 66' right of way with curb and gutter will be shown. During final engineering, they will look at rural cross section to save additional existing trees. 3) This is a two zone water supply area, and looping will be determined in final engineering. Locked hydrants may be utilized on the lower pressure mains. 4) No EPA permits will be issued without annexation to the sanitary district. 5) Lots 100 and 102 should be labeled as open space or for storm water management. 6) Out lots 95 and 96 will not be on the final plat, as there is no entrance there onto Rt. 126. 2 7) Lots 95, 96, 97 and 98 should be 20 feet minimum width and will be landscape easements, not lots. Lots 5 and 6 will be corner lots when Lots 95 and 96 are revised as landscape easements. 8) Street names should be added. 9) A road stub to the east is needed. The road may move to the south because of a grading problem. Information is needed on the plat regarding the adjacent parcel and owner. Currently there is gravel road along the fence to the east. This is scheduled for Plan Commission on October 12, with 35 revised preliminary plans due in by October 4th. Revise preliminary plans are to be submitted by Sept. 20 for additional discussion at the Sept. 22 plan council. Respectfully submitted by Annette Williams Oct . 7 . 2005 10: 39AM No . 9642 P • 2/3 s - ( ' ( cry Schope eAssociates, enc. Landscape Architecture and Land Planning 126 S.Main St. Ph. (630)551-3355 Oswego,IL 60543 Fax(630) 551-3639 October 7, 2005 MEMORANDUM To: Mayor Art Prochaska From: Mike Schoppe - Schoppe Design Associates, Inc. Re: Prestwick Final Plat—Unit 1 We have reviewed the Final Plat dated 8/15/05,the Final Engineering Plans dated 8/16/05, and the Final Landscape Plans dated July 29, 2005, all prepared by Smith Engineering Consultants, and provide the following comments. Final Plat 1. The overall street network, open space system and lot layout is consistent with the Preliminary Plat. 2. The lot sizes, setbacks and lot widths are consistent with the R-2 zoning standards. Final Engineering 1. The City's Park Development Standards require written approval by the Park and Recreation Department prior to stockpiling material on park sites. The Parks Department should begin to develop preliminary development plans for the park site to help determine if any stockpiling would be acceptable. Any authorization to stockpile should clarify the timing for topsoil removal. 2. Water and sanitary sewer service need to be stubbed to the park site, 3. A maintenance and monitoring plan needs to be prepared and submitted for the stormwater management areas on lots 361, 362 and 367. Final Landscape Plans 1. The plans identify an 80' — 150' wide landscape buffer along Route 126. The proposed plantings in the buffer consist primarily of bluegrass turf and informal clusters of ornamental shade and evergreen trees. This design would create an attractive landscape, N.l ori Oct . 7 . 2005 10 : 39AM No . 9642 P . 3/3 • however, it would not be any different than other nice looking landscapes throughout the City. One of the objectives of the City Council is that developments south of the river look somewhat different than other developments. One of the important objectives of the Comprehensive Plan design guidelines is that the landscaping in the City's "Gateways", of which Route 126 is one of, be used to create"the natural feel of the rural landscape" and "to enhance the rural identity". We recommend that the design style for the buffer landscape be revised to more directly accomplish these goals. Elements such as fencing, wood lots, naturalized turf,prairie or wind breaks might be considered as potential rural landscape elements. If you have any questions,please call. CC: Liz D'Arma, Deputy Clerk Joe Wywrot, City Engineer John Wyeth, City Attorney John Whitehouse, EEI Anna Kurtman, Zoning Administrator "L 2 OF 2 cc&L , 52 Cr„ Wheeler Road • Sugar Grove, IL 60554 TEL:630/466-9350 FAX:630/466-9380 www.eeiweb.com Engineering Enterprises, Inc. October 6, 2005 Mr. Joseph A. Wywrot, P.E. City Engineer United City of Yorkville 800 Game Farm Road Yorkville, IL 60560 Re: Final Plat and Final Improvement Plan Review, Prestwick of Yorkville, Unit 1, United City of Yorkville, Kendall County, Illinois Dear Mr. Wywrot: We have reviewed the Final Plat and Engineering Improvement Plans for the referenced Prestwick of Yorkville, Unit 1, consisting of the following material received to date: • Application and Petition for Final Plat approval dated September 1, 2005. • Final Plat of Subdivision for Prestwick of Yorkville, Unit 1, prepared by Smith Engineering Consultants, Inc. consisting of 6 sheets with initial issue date of August 15, 2005. • Civil Engineering Plans for Prestwick of Yorkville, Phase 1, prepared by Smith Engineering Consultants, Inc. consisting of 84 sheets with initial issue date of August.16, 2005. • Storm Water Management Report for Prestwick of Yorkville Subdivision prepared by SEC, Inc. dated of August 17, 2005. • Drainage Report and Storm Sewer Sizing for Prestwick of Yorkville, Phase 1, prepared by Smith Engineering Consultants, Inc. with initial issue date of August 22, 2005. • Agricultural Existing Drain Tile Investigation Plan for Prestwick Subdivision prepared by Huddleston-McBride Co. dated July 7, 2005. • Report of Soils Exploration prepared by Testing Service Corporation dated December 10, 2003. Consulting Engineers Specializing in Civil Engineering and Land Surveying • Non-Jurisdictional Determination letter from the U. S. Army Corps of Engineers dated January 22, 2004. • NRCS letter to Hey and Associates dated December 23, 2003. • Consultation Agency Action Report from IDNR (Project Code 0401854) issued October 20, 2003 stating "consultation terminated". • IHPA clearance letter for the project site (Log #005101403) dated October 22, 2003 stating there are no historic, architectural or archaeological sites within the project area. The clearance expires on October 22, 2005. • Copy of NRI Report Application to the Kendall County Soil and Water Conservation District dated June 23, 2005. • Copy of IEPA NOI, undatedand website printout of received NOls showing a received date of June 29, 2005 for this application. Note: If this permit has been issued, a copy should be forwarded to the City. Our review of these plans is to generally determine the plan's compliance with City of Yorkville ordinances and whether the improvements will conform to existing City systems and equipment. This review and our comments do not relieve the designer from his duties to conform to all required codes, regulations, and acceptable standards of engineering practice. Engineering Enterprises, Inc.'s review is not intended as an in- depth quality assurance review. We cannot and do not assume responsibility for design errors or omissions in the plans. We offer the following comments: GENERAL • No part of the development is located within a Special Flood Hazard Area as identified by FEMA based on the Flood Insurance Rate Map 170341 0075 C dated July 19, 1982. Final Plat 1. The Topographic Study required by 765 ILCS 205/2 should be submitted for the City's permanent record and filing. 2. The Final Plat is clear and very well presented. 3. Lines 9 through 13 of the legal description in the Surveyor's Certificate do not correspond with the face of the Plat. 4. In the Note Box on Sheet 1, the abbreviation S.W.M. should be expanded to S.W.M.E. — Storm Water Management Easement. This abbreviation should be modified where it appears on other plat sheets as well. G:\Public\Yorkville\2004\Y00420 Stewart Farms(Illinois Rte 126)\docs\IwywrotO3FinalEngPhasel_01.doc I 5. In the Note Box on Sheet 1, note 6 is duplicated in note 9 and note 7 should be removed from the Final Plat. 6. In the Note Box on Sheet 1, note 13 should be revised to read "Public Utility and Drainage Easements are hereby granted to the United City of Yorkville over all of Lots 357, 358 and 360-363. 7. On Sheet 2, the document number should be filled in for the previous conveyance to IDOT for the Route 126 right of way. 8. Reference to and line work for "Prestwick Unit 2" should be removed from the Plat since it does not yet exist. 9. The Kendall County Engineer's Certificate and the Kendall County Highway Department Certificates should be removed from Sheet 6. 10.The Stormwater Management Easement Provisions should be added to the Plat. 11.The Pedestrian and Bike Trail Easement Provisions should be added to the Plat. 12.In addition to the City's standard Public Utility and Drainage Easement Provisions, the standard ComEd and SBC Easement Provisions should be added to the Plat. Engineering Improvement Plans 13. I have not yet completed compiling the engineering plan review comments from our staff but will have those available in final form by close of business Tuesday, October 11. If you have any questions or require additional information, please contact our office. Sincerely, ENGINEERING ENTERPRISES, INC. 1 ,7 , _ John T. Whitehouse, P.E., P.L.S. Senior Project Manager pc: Liz D'Anna, Administrative Assistant JWF, EEI PJH/DWS/GEK, SEC G:\PubliclYorkville120041YO0420 Stewart Farms(Illinois Rte 126)1docs\IwywrotO3FinalEngPhasel_01.doc • 52 Wheeler Road • Sugar Grove, IL 60554 TEL: 630/466-9350 FAX: 630/466-9380 www.eeiweb.com Engineering Enterprises, Inc. October 6, 2005 Mr. Joseph A. Wywrot, P.E. City Engineer United City of Yorkville 800 Game Farm Road Yorkville, IL 60560 Re: Kendallwood Estates, Preliminary Plan Review, United City of Yorkville, Kendall County, Illinois Dear Mr. Wywrot: We have reviewed the Preliminary Plan for the referenced Willman Subdivision consisting of the following material received to date: • Preliminary Plan Application and Petition by John Tomisik, dated April 8, 2005. • Preliminary Plat of Subdivision prepared by Smith Engineering Consultants, Inc. consisting of 2 sheets with latest revision date of September 20, 2005. • Preliminary Engineering Plan prepared by Smith Engineering Consultants, Inc. consisting of 4 sheets with latest revision date of September 20, 2005. • Preliminary Landscape Plan prepared by SEC Planning Consultants consisting of 5 sheets with initial issue date of August 10, 2005. • Engineering Report for The Willman Property prepared by Smith Engineering Consultants, Inc. dated April 7, 2005 which includes the following: > Summary > Location Map > USGS Photo Exhibit > Kendall County Soils Map > Flood Insurance Rate Map 170341 0075 C > Tree Survey > Wetland Delineation Report Consulting Engineers Specializing in Civil Engineering and Land Surveying ➢ Soils Report ➢ IHPA Correspondence ➢ IDNR Correspondence ➢ USF&WS Correspondence • Letter from SEC dated September 22, 2005 responding to our previous review letter dated September 1, 2005. General 1. No part of the proposed development is located within a Special Flood Hazard Area as identified by FEMA based on Flood Boundary and Floodway Map 170347 0001, dated June 1, 1982. 2. Permits or Sign-offs will be required from the following agencies: a. (IDNR) Consultation Agency Action Report regarding endangered - threatened species or natural areas. A clearance letter was received December 30, 2004 from IDNR for the original property and an additional request for clearance has been submitted to IDNR. b. (IHPA) Division of Preservation Services regarding Historic and Archaeological Resources. In a letter dated December 6, 2004 (Log # 025111704) the IHPA has requested a Phase I reconnaissance survey. This Phase I reconnaissance should be expanded to include all of the current subdivision. c. Yorkville-Bristol Sanitary District regarding Sanitary Sewer Facilities. d. (IEPA) Division of Water Pollution Control regarding Sanitary Sewer Facilities. e. (IEPA) Division of Public Water Supplies regarding water supply and distribution. f. (TEPA) Division of Water Pollution Control regarding a Notice of Intent (NOI) General permit to discharge storm water. g. Illinois Department of Transportation, District 3 regarding point of access to Illinois Route 126 and any required improvements. We recommend that items a, b and g be received prior to Preliminary Plan approval. Items c, d, e &f will be required prior to the start of construction activities. G:\Public\Yorkville\20D4\YO0430 Kendallwood Estates of Yorkville(Wilman Property)\docs\IwywrotPrelimPlan03.doc • 3. A Natural Resource Information Report should be applied for and prepared by the Kendall County Soil and Water Conservation District and submitted • for review. 4. A Preliminary Stormwater Management Report should be prepared and submitted for review. 5. A Traffic Study should be prepared and submitted for review. Streets and Right of Way 6. All block lengths substantially conform to City Standards with the exception of Benjamin Street between Tomasik Court and Dydyna Court. However, due to the unique nature of this property, we feel the proposed block length of 1589 feet versus the City maximum of 1320 is warranted. 7. Proposed street names have been provided on the Plat and Plan. A list of the proposed street names should be submitted to the U. S. Postal Service and to KENCOM for approval. A copy of the letter approving the names should be submitted to the City for their records. One name should be drawn from the City's list of historic names. Water Mains 8. Water main routing, looping and extensions for future use appear adequate as presented except as noted below. The proposed system will be input into the City model prior to our final recommendations during final engineering review. 9. The trees along the east line of Lots 88 and 95 should be evaluated as to whether or not they should be preserved, and if so, the water main moved westerly to make it possible to be constructed without damaging the trees. If moving this main is necessary, a lot reconfiguration may be necessary since Lot 88 will have a limited buildable area. 10. The water main stubs at Lots 87, 95 and 55 should not extend onto adjoining properties without easement acquisition. 11. We believe it advantageous to loop the Buhrmaster Lane water main back (300 feet) to Benjamin Street in the south parkway of Buhrmaster Lane instead of a 600 foot run down rear and side lot lines. 12. Detailed review of fire hydrant and valve locations will be accomplished at Final Engineering. G:\PublicWorkville\20041YO0430 Kendal!wood Estates of Yorkville(Wilman Property)\docslIwywrotPrelimPlan03.doc 13.This development contains property in both the North Central and South Central water system pressure zones. Unless a system booster pump/PRV station is considered in conjunction with a water main extension to Van Emmon Street, it is likely that about 30% of the proposed residences will need individual PRVs. 14. The funding and timing of the construction of the required off-site water mains which will serve this development will need to be established prior to approval of a Final Plat. Sanitary Sewers 15. The internal preliminary sanitary sewer layout appears adequate as presented except as noted below and provides service to all proposed lots. 16. It is anticipated that the ComEd interceptor sewer will be available for use by this development. The location and elevation of that interceptor will need to be verified at Final Engineering. 17. In light of comment 11 above, the sanitary sewer on Buhrmaster Lane will need to be moved southerly into easements on Lots 56 and 57. This sewer should be stubbed, (i.e. ended with a manhole, flow thru invert, boot and cap) to the easterly end of Buhrmaster Lane. Also, the invert elevation shown for the manhole in front of Lot 56 is incorrect. 18. The east invert of the drop manhole near the southeasterly corner of Lot 40 should be raised to lessen the slope of the sewer to the east to much less than 12 percent. Storm Sewers 19. The design engineer should be advised that a detailed design report for the ditches, cross road culverts and driveway culverts will be required with the Final Engineering Plans. 20. Extreme erosion and sediment control measures will need to be implemented and diligently maintained until this site is revegetated. Preliminary Plat of Subdivision 21. The Plat should be signed by the Professional Land Surveyor. Further, the bearings and distances shown on the Plat around the boundary of the subdivision should be reconciled with the legal description. Repeat comment. G:\Public\Yorkvitle120041Y00430 Kendal!wood Estates of Yorkville(Wi(man Property)kiocsllwywrotPrelimPlan03.doc 22. The ultimate purpose of Lots 96 and 100 should be declared on the Plat, i.e., Open Space, Stormwater Management, etc. 23. The open space areas adjacent to Lot 4 and the Benjamin Street right of way heading towards Illinois 126 should be labeled or dedicated as public right of way. Conclusion Our review of this Preliminary Plan will continue as the above comments are addressed by the developer and the design engineer and additional information is submitted as requested. If you have any questions or require additional information, please contact our office. Sincerely, ENGINEERING ENTERPRISES, INC. 11114 ir Appol John T. Whitehouse, P.E., P.L.S. Senior Project Manager pc: Liz D'Anna, Administrative Assistant JWF, EEI Scott J. Mai, P.E., SEC, Inc. G:1PublicWorkville120041Y00430 Kendal!wood Estates of Yorkville(Wilman Property)ldocsllwywrotPrelimPlan03.doc Oct . 7 . 2005 8 :36AM No . 9636 P. 2/3 PC,/ I (I) Schoppe Design Associates, Inc. Landscape Architecture and Land Planning 126 S. Main St. Ph. (630) 551-3355 Oswego,IL 60543 Fax(830)551.3838 October 7, 2005 MEMORANDUM To: Mayor Art Prochaska From: Mike Schoppe - Schoppe Design Associates, Inc. Re: Kendallwood Estates - Willman Property We have reviewed the Preliminary Plat dated 9/20/05, the Preliminary Engineering Plans dated 9/20/05,prepared by Smith Engineering Consultants, and provide the following comments. Preliminary Plat 1. The south R.O.W. line for Benjamin Street between C23 and C24 should be coincidental with the south property line to allow for possible future access to the adjoining property. 2. A street connection needs to be provided to the adjacent property to the south. We recommend that it generally be in the location of lot 8. 3. Show the Van Emmon Road right of way. We need to identify what part of Van Emmon Road, if any, needs to be dedicated. 4. Identify contiguous property lines along the north and west sides of the northerly 14 acres. 5. Identify the area east of lot 14 as open space and assign a lot number. 6. We would agree with the recommendation found on page 7 of the submitted wetland report,that a minimum 75' buffer measured from the edge of the wetland be established. All construction activity should be kept out of this buffer. The preliminary plat should be revised to reflect this buffer. We have forwarded a copy of the wetland report to the City's wetland consultant for further input on the quality and extent of the existing wetlands. Quite)of/ Oct . 7 . 2005 8 :36AM No . 9636 P . 3/3 7. The location of Buhrmaster Lane is shown stubbing into the Tom Plank property which is a relatively narrow parcel in an east west direction. Immediately east of the Plank property is a developed county subdivision. We recommend that Buhrmaster Lane be moved slightly south, generally in the location of lot 58, and aligned such that it can provide access to both the Plank property and the Holmberg property. 8. Identify on the plat how maintenance access to lots 100 and 101 will be provided. Preliminary Engineering 1. Trees to be preserved and trees to be removed need to be identified on the Preliminary Engineering Plan. This needs to also include the northerly 14 acres. A tree removal permit will need to be issued in accordance with the City's tree preservation standards. 2. Note 2 on Sheet 4 of 4 indicates that the trees from the R.O.W. line up to the building setback line will be removed. Clarify why those trees will be removed. If you have any questions,please call. CC: Liz D'Anna, Deputy Clerk Joe Wywrot, City Engineer John Wyeth, City Attorney John Whitehouse, EEl Anna Kurtman, Zoning Administrator /oye 2 of 2 cam au: 52 Wheeler Road • Sugar Grove, IL 60554 TEL: 630/466-9350 FAX: 630/466-9380 www.eeiweb.com • Engineering Enterprises, Inc. October 6, 2005 Mr. Joseph A. Wywrot, P.E. City Engineer United City of Yorkville 800 Game Farm Road Yorkville, IL 60560 Re: Preliminary Plan Review, Eldamain Center for Business (Inland), United City of Yorkville. Dear Mr. Wywrot: We have reviewed the following submitted material for the referenced Preliminary Plan submittal: • Application and Petition for Preliminary Plan dated June 3, 2005. Note: The Application and Petition is checked for both Preliminary Plan and Final Plat, though this is only a Preliminary Plan submittal. • Preliminary Plat of Subdivision prepared by CEMCON, Ltd. consisting of 1 sheet dated September 2, 2005. • Preliminary Engineering Plan prepared by CEMCON, Ltd. consisting of 1 sheet dated September 2, 2005. • Preliminary Landscape Plan prepared by HKM Architects and Planners, Inc. dated June 3, 2005. Our review of these plans is to generally determine the plan's compliance with City of Yorkville ordinances and whether the improvements will conform to existing City systems and equipment. This review and our comments do not relieve the designer from his duties to conform to all required codes, regulations, and acceptable standards of engineering practice. Engineering Enterprises, Inc.'s review is not intended as an in- depth quality assurance review. We cannot and do not assume responsibility for design errors or omissions in the plans. We offer the following comments: Consulting Engineers Specializing in Civil Engineering and Land Surveying General 1. No part of the development is located within a Special Flood Hazard Area as identified by FEMA based on the Flood Insurance Rate Map 170341 0020 C dated July 19, 1982. 2. A Preliminary Stormwater Management Report should be submitted for review. 3. A Traffic Study completed in accordance with the City's Standard Specifications for Improvements should be completed and submitted for review. 4. A soils report should be completed and submitted for review. 5. A field tile investigation should be completed and the results submitted for review. 6. While it appears that no wetlands exist on the site, a Wetland Study should be completed and submitted for review by the City's wetland consultant prior to Preliminary Plan approval. 7. A copy of the Natural Resource Information Report by the Kendall County Soil and Water Conservation District should be filed with the City. 8. Permits or Sign-offs will be required from the following agencies: a. (IDNR) Consultation Agency Action Report regarding endangered/threatened species or natural areas. b. (IHPA) regarding preservation of cultural resources. c. Yorkville-Bristol Sanitary District regarding Sanitary Sewer Facilities. d. (IEPA) Division of Water Pollution Control regarding Sanitary Sewer Facilities. e. (TEPA) Division of Public Water Supplies regarding water supply and distribution. f. (TEPA) Division of Water Pollution Control regarding a Notice of Intent (NOI) General permit to discharge storm water. g. IDOT regarding the proposed access to U. S. Route 34. h. Kendall County Engineer with regard to access to Eldamain Road. We recommend that items "a" & "b" be received prior to Preliminary Plan approval. Items c, d, e & f will be required prior to the start of construction activities. For item g, we recommend that preliminary comments from IDOT be received, prior to Preliminary Plan approval, addressing the proposed access location on U. S. Route 34 and any required G:1Public\Yorkvifle\20051Y00502 Inland,Eldamain-Route 34\docsMwywrotPrelimPlan02.doc improvements or additional right of way to be provided in conjunction with the proposed access. For item h, we recommend that preliminary comments from the Kendall County Engineer be received, prior to Preliminary Plan approval, addressing the proposed access location on Eldamain Road and any required improvements or additional right of way to be provided in conjunction with the proposed access. Preliminary Plat 9. Proposed street names should be provided on the Preliminary Plat for review by the City and KenCom. 10. The minimum centerline radius per the City's Subdivision Ordinance is 500 feet for business and industrial districts. The curve in front of Lot 4 is proposed to have a radius of about 185 feet while the other 2 curves near Lot 11 have radii of 325 feet and 350 feet. Due to the property configuration, it will be difficult to modify the Lot 4 curve with this land plan, but the others near Lot 11 should be revised to a minimum of 500 feet, maintaining the required 200 foot tangent distance which has been provided. The curve in front of Lot 4 could be eliminated by extending the north-south road between Lots 3 and 4 to the north property line. Schoppe Design Associates should comment on the land plan. 11. We do not believe any additional right of way will be necessary along Eldamain Road, but this issue should be addressed in the Traffic Study and in comments requested from the Kendall County Engineer. Preliminary Engineering Plan 12. Proposed street names should be added to the Plans. 13. It is intended that this subdivision will ultimately be served by the City's North Pressure Zone (No. 1). However, until the Kylan's Ridge/Whispering Meadows area water main is extended westerly through the Sexton Property, water service for these lots will be from the North Central Pressure Zone (No. 2). The lowest pressures expected during this interim phase will be approximately 33 psi if the tower level drops to the bottom capacity line (BCL). The water connection will have to be across U. S. Route 34 from the Fox Hill commercial area as proposed. 14. The installation of a Pressure Reducing Valve will be premature and unnecessary at this time. An easement (35' x 35') has been provided at the northeast corner of Lot 12 and southeast corner of Lot 13, as requested, for future installation of a PRV once the extension from the North Pressure Zone has been installed and connected to the stub being provided at the northwest corner of Lot 1 or the southeast corner of Lot 6. 15. All other fire hydrant and valve spacing appears adequate at this preliminary stage. Specific locations will be reviewed in detail at Final Engineering. G:\Public\Yorkville\2005W00502 Inland,Eldamain-Route 34\docs\lwywrotPrelimPlan02.doc 16.The final water main sizing will be determined at Final Engineering after we have input the proposed layout into the City's model and performed a pressure and fire flow analysis. 17. The sanitary sewer system as proposed appears adequate to serve the proposed lots. 18. The proposed street light layout meets the City's spacing requirement. Some lights may have to be moved from the water main side of the roadway where they are now proposed. 19. We should discuss providing utility stubs (sewer and water) to the property southerly of Lot 11 and to the property westerly of Lots 12 and 13 at the respective owner's cost. 20. As you requested, we have looked at the possibility of connecting the existing detention/infiltration basin on the Savitsky property to the proposed stormwater management basin in this subdivision. However, the HWL in the proposed basin is above the finished floor on the Savitsky property and the existing restricted outlet is only 0.5 feet above the proposed normal water level. Development of this property will significantly diminish the area tributary to the Savitsky basin and should minimize any adverse functionality that may now be present. 21. There appears to be an extra storm sewer line at the rear of Lot 8. Conclusion Our review will continue as the requested additional material is submitted and the above comments are addressed by the developer and the design engineer. If you have any questions or require additional information, please contact our office. Sincerely, ENGINEERING ENTERPRISES, INC. John T. Whitehouse, P.E., P.L.S. Senior Project Manager pc: Liz D'Anna, Administrative Assistant JWF, EEI Mike Mueller, P.E., CEMCON @630-862-2199 Rodger Brown, Inland Group G:\Public\Yorkville120051Y00502 Inland,Eldamain-Route 34\docs\IwywrotPrelimPlan02.doc Oct . 7 . 2005 7 : 53AM No .9635 P . 2/4 Schoppe Design Associates, Inc. Landscape Architecture and Land Planning 126 S. Main St. Ph. (630) 551.3355 Oswego, IL 60543 Fax(530) 551-3639 October 6,2005 MEMORANDUM To: Mayor Art Prochaska From: Mike Schoppe - Schoppe Design Associates, Inc. Re: Eldamain.Center for Business We have reviewed the Preliminary P.U.D. Plat dated 9/02/05 prepared by Cemcon, Ltd., the Preliminary Engineering Plan dated 9/2/05 prepared by Cemcon, Ltd., and the Preliminary Landscape Plan dated June 3, 2005,prepared by HKM Architects & Planners Inc., and provide the following comments. General 1. This property was annexed and zoned in 1999 with an Annexation and Planned Unit Development Agreement identified as Ordinance No. 1999-3. Section 2C on page 3 identified that the property shall develop in substantial compliance with City ordinances, in effect at the time of the passage of the agreement for a period of 5 years. With the 5 years having lapsed,the ordinances that we are reviewing the proposal against are the current P.U.D., zoning and subdivision ordinances. 2. Per the City's P.U.D. ordinance, prior to the City's approving a Preliminary P.U.D. plan, a Concept P.U.D. Plan is to be reviewed by the Plan Commission and City Council. I don't believe this has been done for this proposal, and therefore the City should provide direction to the petitioner as to whether or not they will be required to go through Conceptual P.U.D. Plan review process. 3. Per the City's P.U.D. ordinance, the following additional documents are to be submitted for review as part of the Preliminary P.U.D. Plan approval. a. Aerial photograph illustrating the subject property and adjacent property within 'V4 mile of the site. b. Photometric Plan. The City should provide direction as to whether this would be appropriate at this time or not. c. If requested by Plan Commission or City Council,preliminary architectural drawings for all primary buildings. The Plan Commission and/or City Council Y►go I a) Oct . 7 . 2005 7 : 5304 No • 9635 P. 3/4 should provide input to the petitioner as to whether or not the preliminary architecture is appropriate at this time or not. d. Zoning Plat Preliminary P.U.D. Plat 1. The following additional information should be added to the plat: a. Percent of lot coverage b. Municipal limits c. Footprints of non-residential buildings. The City should provide direction as to whether this is appropriate at this time. d. Off street parking and loading areas 2. It is a possibility that Road B will ultimately be extended north and east to become New Faxon Road. As is shown on the Comprehensive Plan, New Faxon Road will serve to provide access and to separate residential and office land uses immediately east of this site. New Faxon Road is identified in the City's Transportation Planning Report as an 80' R.O.W., 39' B/B collector. Therefore, we recommend that architectural standards for the building facades facing Road B and landscaping standards for the lots along Road B be established as part of the Preliminary P.U.D. Plat approval. 3. Road A should be extended north and provide a future road connection to the Brummel Property. 4. A note should be provided on the plat that states that a public access easement will be placed on lots 12 and 13 to provide access to Old Second National Bank Trust#8560 property to the west of this site. 5. We recommend that a note be added to the plan that identifies that the permitted uses are those uses allowed under the City of Yorkville Ordinance in all"B" Business Classification District, "0" Office District, and "M-1" Limited Manufacturing District, which are set out in Exhibit"G" of the annexation agreement,that is used in relation to retail sales on the subject site. Preliminary Engineering Plan 1. No comment. Page 2of) • Oct . 7 . 2005 7 : 53AM No • 9635 P. 4/4 Preliminary Landscape Plan 1. The annexation agreement(Exhibit F)establishes some landscape standards for certain portions of this site. The plan should be revised to incorporate these standards as well as the standards from the City's landscape ordinance. 2. The plan should be revised to reflect the current site plan. If you have any questions,please call. CC: Liz D'Anna, Deputy Clerk Joe Wywrot, City Engineer John Wyeth, City Attorney John Whitehouse, EEI Anna Kurtman, Zoning Administrator Roger Brown, Inland Page 1 of 5 KB HOME 5U LETTER OF TRANSMITTAL TO: LIZ D'ANNA FROM: JASON SAHIN COMPANY: UNITED CITY OF DATE: 6 OCT 2005 YORKVILLE 800 GAME FARM RD RE: KB HOME KONICEK AND YORKVILLE, IL 60506 HAGEMAN PROPERTIES 630-553-4350 ❑ URGENT 0 FOR REVIEW 0 PLEASE 0 PLEASE REPLY COMMENT NOTES/COMMENTS: Enclosed please find the following: Copies Description 10 Aerials for Planning council, 13 OCT A III r: ��� .. �: • M -� ���-�{- �fis i � ��;� � ILLINOIS � .::iI 4 Via, ;w4"�4,0,,* .. '- } ' , . i�. , � -•..---,,N 47 • _,.......7.5. arra t I 44v- ,-.. .- 10... ma , . . _ . i , A . �, � 1 . , ,, .4.„,• �....__ � y " : Y�� . S, j , � ;+d�i • „ , w ;fi � k it .t. . , , ., ,• , Ko • ek - . . � ,... . .. .t . 1-.... - - {.: i 1I•t , t011r \.. , / It k- ti S � *4_,,,, ,,,,a,, . . _ , to• Iy�� r4 '-;;,;Af--'"1'.e'':!0-'..'..:..1241.111'0\P.:_'„-, ter' F ams' ` `4.��������� ,. _ ' --- .. , -+..4# a`.,. t - yr Ar . _ .y y f P h y Iv r ',�Y' , xF W iK ;�. � � 1997-2005 tr otoUSA�