Public Works Packet 2017 12-19-17
AGENDA
PUBLIC WORKS COMMITTEE MEETING
Tuesday, December 19, 2017
6:00 p.m.
City Hall Conference Room
800 Game Farm Road, Yorkville, IL
Citizen Comments:
Minutes for Correction/Approval: November 21, 2017
New Business:
1. PW 2017-85 Snow Operations Report
2. PW 2017-86 2017 Road to Better Roads Program – Change Order No. 1
3. PW 2017-87 2017 Road to Better Roads Program Additional Work – Change Order No. 1
4. PW 2017-88 Center Parkway / Countryside Parkway Resurfacing – Change Order No. 1
5. PW 2017-89 Kennedy Road Resurfacing – Change Order No. 1
6. PW 2017-90 2018 Sanitary Sewer Lining Engineering Agreement
7. PW 2017-91 East Orange Street Water Main Replacement Engineering Agreement
8. PW 2017-92 Bristol Bay Unit 11 – Partial Acceptance
9. PW 2017-93 Water Code Amendment – Section 7-5-4-1 Meter Costs
Old Business:
1. ADM 2017-70 Building Conditions Survey Results
Additional Business:
2017/2018 City Council Goals – Public Works Committee
Goal Priority Staff
“Municipal Building Needs and Planning” 5 Bart Olson & Eric Dhuse
“Vehicle Replacement” 6 Bart Olson & Eric Dhuse
“Water Planning” 8 Eric Dhuse & Brad Sanderson
“Capital Improvement Plan” 11 Bart Olson & Eric Dhuse
“Water Conservation Plan” 15 Eric Dhuse & Brad Sanderson
United City of Yorkville
800 Game Farm Road
Yorkville, Illinois 60560
Telephone: 630-553-4350
www.yorkville.il.us
UNITED CITY OF YORKVILLE
WORKSHEET
PUBLIC WORKS COMMITTEE
Tuesday, December 19, 2017
6:00 PM
CITY HALL CONFERENCE ROOM
---------------------------------------------------------------------------------------------------------------------------------------
CITIZEN COMMENTS:
---------------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------------
MINUTES FOR CORRECTION/APPROVAL:
---------------------------------------------------------------------------------------------------------------------------------------
1. November 21, 2017
□ Approved __________
□ As presented
□ With corrections
---------------------------------------------------------------------------------------------------------------------------------------
NEW BUSINESS:
---------------------------------------------------------------------------------------------------------------------------------------
1. PW 2017-85 Snow Operations Report
□ Moved forward to CC __________ consent agenda? Y N
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
2. PW 2017-86 2017 Road to Better Roads Program – Change Order No. 1 and Final
□ Moved forward to CC __________ consent agenda? Y N
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
3. PW 2017-87 2017 Road to Better Roads Program Additional Work – Change Order No. 1
□ Moved forward to CC __________ consent agenda? Y N
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
4. PW 2017-88 Center Parkway / Countryside Parkway Resurfacing – Change Order No. 1
□ Moved forward to CC __________ consent agenda? Y N
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
5. PW 2017-89 Kennedy Road Resurfacing – Change Order No. 1
□ Moved forward to CC __________ consent agenda? Y N
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
--------------------------------------------------------------------------------------------------------------------------------------
6. PW 2017-90 2018 Sanitary Sewer Lining Engineering Agreement
□ Moved forward to CC __________ consent agenda? Y N
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
7. PW 2017-91 East Orange Street Water Main Replacement – Engineering Agreement
□ Moved forward to CC __________ consent agenda? Y N
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
8. PW 2017-92 Bristol Bay Unit 11 – Partial Acceptance
□ Moved forward to CC __________ consent agenda? Y N
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
9. PW 2017-93 Water Code Amendment – Section 7-5-4-1 Meter Costs
□ Moved forward to CC __________ consent agenda? Y N
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
OLD BUSINESS:
---------------------------------------------------------------------------------------------------------------------------------------
1. ADM 2017-70 Building Condition Survey Results
□ Moved forward to CC __________ consent agenda? Y N
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
ADDITIONAL BUSINESS:
---------------------------------------------------------------------------------------------------------------------------------------
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
Minutes
Tracking Number
Minutes of the Public Works Committee – November 21, 2017
Public Works Committee – December 19, 2017
Majority
Committee Approval
Minute Taker
Name Department
Page 1 of 3
DRAFT
UNITED CITY OF YORKVILLE
PUBLIC WORKS COMMITTEE
Tuesday, November 21, 2017, 6:00pm
Yorkville City Hall, Conference Room
800 Game Farm Road
IN ATTENDANCE:
Committee Members
Chairman Joel Frieders Alderman Ken Koch
Alderman Jackie Milschewski Alderman Seaver Tarulis
Other City Officials
City Administrator Bart Olson Engineer Brad Sanderson, EEI
Public Works Director Eric Dhuse City Attorney Kathleen Field Orr (6:40-7:10pm)
Other Guests: None
The meeting was called to order at 6:00pm by Chairman Joel Frieders.
Citizen Comments: None
Previous Meeting Minutes: October 17, 2017
The minutes were approved on a unanimous voice vote.
New Business:
1. PW 2017-75 Water Department Reports for July, August and September 2017
Mr. Dhuse reported well #9 was out of service in September, but is now repaired. Well #8 absorbed the
volume while #9 was down. A small correction is needed in the August report and this item moves to
the consent agenda.
2. PW 2017-76 2017 Sanitary Sewer Lining – Change Order No. 1
Mr. Sanderson reported the project is now complete and this balancing order reduces the cost by $400.
This moves to consent agenda.
3. PW 2017-77 West Washington Street Water Main Improvements – Change Order No. 1
This project is also complete and the cost was reduced by $25,000 with this change order. To consent.
4. PW 2017-78 Countryside Water Main and Roadway Improvements – Change Order No. 2
The change order resulted in a reduction of $320,000+ for several items not used in this project which
is now complete. To consent agenda.
Page 2 of 3
5. PW 2017-79 Kennedy Road Shared Use Path (ITEP) – Authorization No. 3
An extra $5,000 was needed for flaggers required by the railroad for right-of-way work and Mr.
Sanderson is recommending approval. A final balancing order is anticipated. He said some punchlist
items remain and completion is not expected until mid-2018. Alderman Tarulis asked why trees were
not planted to replace the ones removed. Mr. Dhuse said the previous trees were a factor in accidents
and also contributed to the bad road conditions there. Autumn Creek also has plans for this area. This
moves to consent.
6. PW 2017-80 Fountain Village – Completion of Improvements – Engineering Agreement
Mr. Sanderson said the city had an agreement with a bank to obtain funds for completion of
improvements. The letter of credit was called in August. A bid package will be drafted and the work
will start in April. If the agreement still requires Council approval, it will be placed on the consent
agenda.
7. PW 2017-81 Kendall County TAP Grant Application
Mr. Olson said the city has applied for this grant for Rt. 47 and part of Kennedy. If the ITEP does not
go through for Fox Rd., then the City would apply for TAP through the County to identifiy a corridor
for Fox Rd. He said there is no penalty to withdraw from the TAP grant. ITEP results are given in
September and the County announces their grants in May. The TAP is $50,000 and ITEP is about
$750,000 to 1 million. If the City received an ITEP, a matching funding source would have to be
found. This moves to consent.
8. ADM 2017-82 Mill Street Parking
Mr. Olson said there are restrictions on both sides of the street. The signs say 'no parking on
pavement”. Staff recommends amending the ordinance to say no parking permitted on the pavement
or grass”. This moves to the consent agenda.
9. PW 2017-83 Traffic Control Signs – Heustis/Van Emmon
Mr. Sanderson said this intersection was evaluated for sight distance concerns, crash data, icy weather
conditions, poor lighting, etc. He said it is a collector street and data supports having the stop signs on
Heustis. Alderman Milschewski said drivers simply do not stop at the intersection and accidents there
were most likely from the weather conditions. After much discussion, she ultimately suggested it
remain the same. Mr. Olson said the study results did not support a 4-way stop and said the City could
be liable if decisions are made on personal feelings as opposed to the data. Aldermen Tarulis and Koch
supported a 4-way stop . Traffic counts show 2,000 vehicles a day on Van Emmon. Alderman Tarulis
asked if there are any plans for pedestrian crossings. Ms. Milschewski noted that as the area becomes
developed there will be more pedestrians. Chairman Frieders suggested observing the location for two
more months and re-evaluate. The committee was undecided on action and will move this to Council
for further discussion and input.
10. PW 2017-84 Solid Waste Contract – Food Scraps Update
Mr. Olson will give an update when information is received from the hauler.
Old Business:
1. ADM 2017-70 Building Conditions Survey Results
The city hall and 610 Tower Lane were reviewed. The recommendation is to not maintain the Tower
Lane location, but to maintain the city hall for future use. The roof on city hall needs to be replaced
Page 3 of 3
which will not be deferred. If there are no life safety issues, no other maintenance will be done at this
time. Alderman Koch was concerned that the report does not discuss revenue streams for repairs. Mr.
Olson said the scope of the survey did not include funding. The Administration Committee decided to
review 2-3 buildings per meeting and these buildings will be discussed at other committees also.
Additional buildings will be addressed next month.
2. PW 2014-74 Railroad Quiet Zones
Mr. Sanderson reported on follow-up requested from a previous meeting. He said a partial quiet zone
requires everything that a full zone requires, thus no cost savings. He said 2 Illinois Railnet crossings
could be considered separately, but all others fall outside the required parameters. Regarding the
BNSF, improvements would be minimal for quiet zones. Kendall County is researching the
Cannonball crossing for a quiet zone. Mr. Dhuse said the number of trains per day changes since
BNSF tells Railnet when they can go to Aurora. Overall there are fewer trains now due to less
fracking. No further action will be taken at this time.
Additional Business: None
There was no further business and the meeting was adjourned at 7:08pm.
Minutes respectfully transcribed by
Marlys Young, Minute Taker
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #1
Tracking Number
PW 2017-85
Snow Removal Update
Public Works Committee - December 19, 2017
None, informational only
Monthly update of snow removal operations
Eric Dhuse Public Works
Name Department
Summary
Monthly report of manpower, resources and time spent snow plowing and salting
Background
12/7-12/8/2017 – sprayed brine solution on city streets in anticipation of forecast snow on 12/9.
Two employees spent 12 hours each spreading brine. Approximately 5000 gallons of brine were
used.
12/9/2017 – 8 large dump trucks and 2 small dump trucks were used to spread salt on all city
streets and parking lots. The operation lasted from approximately 7:00 am – 10:00am and there
was 100 tons of salt used.
Recommendation
With only a slight chance of snow on Sunday, we are taking this week to recalibrate our
brine and salt equipment now that we have had a chance to use them and get a good base line for
reference.
Memorandum
To: Public Works Committee
From: Eric Dhuse, Director of Public Works
CC: Bart Olson, Administrator
Date: December 11. 2017
Subject: Monthly snow report
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #2
Tracking Number
PW 2017-86
2017 Roads to Better Roads
Public Works Committee – December 19, 2017
Consideration of Approval
Consideration of Change Order No. 1 and Final
Brad Sanderson Engineering
Name Department
The purpose of this memo is to present Change Order No. 1 for the above referenced project.
A Change Order, as defined by in the General Conditions of the Contract Documents, is a written
order to the Contractor authorizing an addition, deletion or revision in the work within the
general scope of the Contract Documents, or authorizing an adjustment in the Contract Price or
Contract Time.
Background:
The United City of Yorkville and D Construction, Inc. entered into an agreement for a contract
value of $607,981.72 for the above referenced project.
Construction is now substantially complete.
Questions Presented:
Should the City approve Change Order No. 1 – MFT, which would decrease the original contract
by $111,738.07?
Discussion:
The Change Order included additions/deletions to the contract quantities to reflect as-built
quantities and new pay items for unexpected field conditions (see attached for detail).
No additional change orders are anticipated as the project is complete. We anticipate final
contract values of $496,243.65 for the original contract.
We are recommending approval of the Change Order.
Action Required:
Consideration of approval from the City Council for the Change Order.
Memorandum
To: Bart Olson, City Administrator
From: Brad Sanderson, EEI
CC: Eric Dhuse, Director of Public Works
Krysti Barksdale-Noble, Community Dev. Dir.
Lisa Pickering, Deputy City Clerk
Date: December 19, 2017
Subject: 2017 RTBR Change Order No. 1 – MFT
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #3
Tracking Number
PW 2017-87
2017 Roads to Better Roads
Public Works Committee – December 19, 2017
Consideration of Approval
Consideration of Change Order No. 1 and Final – Additional Work
Brad Sanderson Engineering
Name Department
The purpose of this memo is to present Change Order No. 1 for the above referenced project.
A Change Order, as defined by in the General Conditions of the Contract Documents, is a written
order to the Contractor authorizing an addition, deletion or revision in the work within the
general scope of the Contract Documents, or authorizing an adjustment in the Contract Price or
Contract Time.
Background:
The United City of Yorkville and D Construction, Inc. entered into an agreement for Additional
Work with a contract value of $454,857.47 for the above referenced project.
Construction is now substantially complete.
Questions Presented:
Should the City approve Change Order No. 1 – Additional Work, which would decrease the
original contract by $22,081.07?
Discussion:
The Change Order included additions/deletions to the contract quantities to reflect as-built
quantities and new pay items for unexpected field conditions (see attached for detail).
No additional change orders are anticipated as the project is complete. We anticipate final
contract values of $432,776.40 for the additional work.
We are recommending approval of the Change Order.
Action Required:
Consideration of approval from the City Council for the Change Order.
Memorandum
To: Bart Olson, City Administrator
From: Brad Sanderson, EEI
CC: Eric Dhuse, Director of Public Works
Krysti Barksdale-Noble, Community Dev. Dir.
Lisa Pickering, Deputy City Clerk
Date: December 11, 2017
Subject: 2017 RTBR Change Order No. 1 – Additional Work
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #4
Tracking Number
PW 2017-88
Center Parkway / Countryside Parkway Resurfacing
Public Works Committee – December 19, 2017
Consideration of Approval
Consideration of Change Order No. 1 and Final
Brad Sanderson Engineering
Name Department
The purpose of this memo is to present Change Order No. 1 for the above referenced project.
A Change Order, as defined by in the General Conditions of the Contract Documents, is a written
order to the Contractor authorizing an addition, deletion or revision in the work within the
general scope of the Contract Documents, or authorizing an adjustment in the Contract Price or
Contract Time.
Background:
The United City of Yorkville and D Construction, Inc. entered into an agreement for a contract
value of $239,317.66 for the above referenced project.
Construction is now substantially complete.
Questions Presented:
Should the City approve Change Order No. 1 & Final, which would decrease the original contract by
$35,395.58?
Discussion:
The Change Orders included additions/deletions to the contract quantities to reflect as-built quantities and
new pay items for unexpected field conditions (see attached for detail for items which exceed a $10,000
change).
No additional change orders are anticipated as the project is complete. We anticipate a final contract
value of $209,922.08.
We are recommending approval of the Change Order.
Action Required:
Consideration of approval from the City Council for the Change Order.
Memorandum
To: Bart Olson, City Administrator
From: Brad Sanderson, EEI
CC: Eric Dhuse, Director of Public Works
Krysti Barksdale-Noble, Community Dev. Dir.
Lisa Pickering, Deputy City Clerk
Date: December 11, 2017
Subject: Center Parkway/Countryside Parkway Resurfacing Change Order No. 1 & Final
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #5
Tracking Number
PW 2017-89
Kennedy Road Resurfacing – Change Order No. 1
Public Works Committee – December 19, 2017
Consideration of Approval
Consideration of Approval
Brad Sanderson Engineering
Name Department
The purpose of this memo is to present Change Order No. 1 for the above referenced project.
A Change Order, as defined by in the General Conditions of the Contract Documents, is a written order to
the Contractor authorizing an addition, deletion or revision in the work within the general scope of the
Contract Documents, or authorizing an adjustment in the Contract Price or Contract Time.
Background:
The United City of Yorkville and Geneva Construction Co. entered into an agreement for a contract value
of $388,437.24 for the above referenced project. The intent of this project was to resurface Kennedy
Road.
Questions Presented:
Should the City approve Change Order No. 1 which would decrease the contract amount by $34,884.06.
Discussion:
Changes are per as-built quantities measured in the field. Please see the attached summary spreadsheet.
We are recommending approval of the change order.
Action Required:
Consideration of approval of Change Order No. 1 in the amount of $34,884.06.
Memorandum
To: Bart Olson, City Administrator
From: Brad Sanderson, EEI
CC: Eric Dhuse, Director of Public Works
Erin Willrett, Assistant City Administrator
Krysti Barksdale-Noble, Community Dev. Dir.
Lisa Pickering, Deputy City Clerk
Date: December 19, 2017
Subject: Kennedy Road Improvements
CHANGE ORDER
Order No. 1
Date: December 4, 2017
Agreement Date: May 9, 2017
NAME OF PROJECT: Kennedy Road Improvements
OWNER: United City of Yorkville
CONTRACTOR: Geneva Construction Co.
The following changes are hereby made to the CONTRACT DOCUMENTS:
1) See Attached
Change of CONTRACT PRICE:
Original CONTRACT PRICE: $388,437.24
Current CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $388,437.24
The CONTRACT PRICE due to this CHANGE ORDER will be (increased) (decreased)
by: $34,884.06
The new CONTRACT PRICE including this CHANGE ORDER will be: $ 353,553.18
Change to CONTRACT TIME:
The CONTRACT TIME will be (increased) (decreased) by 0 calendar days.
The date for completion of all work will be May 1, 2018
Justification
1-19) Changes per as-built quantities measured in the field.
Approvals Required
Requested by: Geneva Construction Co.
Recommended by: Engineering Enterprises, Inc.
Accepted by: United City of Yorkville
BALANCE CHANGE ORDER NO. 1KENNEDY ROAD IMPROVEMENTSUNITED CITY OF YORKVILLEQUANTITY COST QUANTITY COST1BITUMINOUS MATERIALS (TACK COAT)20774 POUND0.01$ 7786.00 77.86$ 0.00‐$ 2HOT‐MIX ASPHALT SURFACE REMOVAL ‐ BUTT JOINT 889 SQ YD5.00$ 0.00‐$ 159.00 795.00$ 3LEVELING BINDER (HAND METHOD), N50 20 TON97.00$ 0.00‐$ 20.00 1,940.00$ 4LEVELING BINDER (MACHINE METHOD), N50 1769 TON57.00$ 0.00‐$ 330.50 18,838.50$ 5HOT‐MIX ASPHALT SURFACE COURSE, MIX "D", N50 2654 TON57.00$ 5.20 296.40$ 0.00‐$ 6INCIDENTAL HOT MIX ASPHALT SURFACING 115 TON93.00$ 0.00‐$ 46.10 4,287.30$ 7HOT‐MIX ASPHALT SURFACE REMOVAL, VARIABLE DEPTH 225 SQ YD7.00$ 0.00‐$ 18.00 126.00$ 8CLASS D PATCHES, 4 INCH 2844 SQ YD24.65$ 0.00‐$ 142.40 3,510.16$ 9RESTORATION512 SQ YD11.45$ 0.00‐$ 76.00 870.20$ 10AGGREGATE WEDGE SHOULDER, TYPE B 610 TON25.00$ 0.00‐$ 181.50 4,537.50$ 11THERMOPLASTIC PAVEMENT MARKINGS, LETTERS & SYMBOLS 59 SQ FT4.50$ 146.60 659.70$ 0.00‐$ 12THERMOPLASTIC PAVEMENT MARKINGS, 4" 35205 FOOT0.48$ 0.00‐$ 597.00 286.56$ 13THERMOPLASTIC PAVEMENT MARKINGS, 6" 1389 FOOT0.90$ 0.00‐$ 1056.00 950.40$ 14THERMOPLASTIC PAVEMENT MARKINGS, 12" 150 FOOT2.25$ 332.00 747.00$ 0.00‐$ 15THERMOPLASTIC PAVEMENT MARKINGS, 24" 50 FOOT4.50$ 183.00 823.50$ 0.00‐$ 16RAILROAD PROTECTIVE LIABILITY INSURANCE 1 LSUM4,850.00$ 0.00‐$ 0.00‐$ 17CRACK SEALING200 FOOT3.00$ 0.00‐$ 200.00 600.00$ 18SHORT TERM PAVEMENT MARKING 2100 FOOT0.70$ 0.00‐$ 862.00 603.40$ 19WORK ZONE PAVEMENT MARKING REMOVAL 700 SQ FT0.50$ 0.00‐$ 287.00 143.50$ 2,604.46$ (37,488.52)$ 388,437.24$ ($34,884.06)353,553.18$ DEDUCTIONSITEMSITEM NO.UNITCONTRACT QUANTITYUNIT PRICEADDITIONSAMOUNT OF CURRENT CHANGE ORDER:NEW CONTRACT PRICE:TOTAL ADDITIONS =TOTAL DEDUCTIONS =ORIGINAL CONTRACT PRICE:
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #6
Tracking Number
PW 2017-90
2018 Sanitary Sewer Lining Engineering Agreement
Public Works Committee – December 19, 2017
Majority
Approval
See attached memo.
Bart Olson Administration
Name Department
Summary
Approval of an engineering agreement with EEI for design and construction engineering for the
2018 sanitary sewer lining program.
Background
This item was last discussed by the City Council in October 2017, when the City Council
approved an engineering agreement for design and construction engineering work related to the 2018
Road to Better Roads program. As part of that determination, the staff selected various sanitary sewers
on the southeast side of the City for lining in 2018 (map included as an exhibit to the agreement).
Accordingly, EEI has submitted an engineering agreement for our consideration for the design and
construction engineering of the sanitary sewer lining program.
The attached contract contains a $9,827 fixed cost for design engineering and $9,379 cost
estimate for construction engineering. These amounts are included in the FY 18 sewer fund budget.
Recommendation
Staff recommends approval of the engineering agreement with EEI for design and construction
engineering for the 2018 sanitary sewer lining program.
Memorandum
To: City Council
From: Bart Olson, City Administrator
CC:
Date: December 13, 2017
Subject: 2018 Sanitary Sewer Lining Engineering Agreement
2018 Sanitary Sewer Lining Program
United City of Yorkville, Kendall County, IL
Professional Services Agreement - Design and Construction Engineering
THIS AGREEMENT, by and between the United City of Yorkville, hereinafter referred
to as the "City" or “OWNER” and Engineering Enterprises, Inc. hereinafter referred to as
the "Contractor" or “ENGINEER” agrees as follows:
A. Services:
ENGINEER agrees to furnish to the City the following services: The ENGINEER shall
provide any and all necessary engineering services to the City as indicated on the
included exhibits. Design and Construction engineering will be provided for sanitary
sewer lining (see Exhibit 5 for project limits). Engineering will be in accordance with all
City, Standard Specifications for Water and Sewer Construction in Illinois, Illinois
Department of Transportation, and Illinois Environmental Protection Agency
requirements.
B. Term:
Services will be provided beginning on the date of execution of this agreement and
continuing, until terminated by either party upon 7 days written notice to the non-
terminating party or upon completion of the Services. Upon termination the ENGINEER
shall be compensated for all work performed for the City prior to termination.
C. Compensation and maximum amounts due to ENGINEER:
ENGINEER shall receive as compensation for all work and services to be performed
herein, an amount based on the Estimate of Level of Effort and Associated Cost included
in Exhibit 3. Design Engineering will be paid for as a Fixed Fee (FF) in the amount of
$9,827 and Construction Engineering will be paid for Hourly (HR) at the actual rates for
services to be performed, currently estimated at $9,379. Direct expenses are estimated at
$750. The hourly rates for this project are shown in the attached 2017 Standard Schedule
of Charges (Exhibit 6). All payments will be made according to the Illinois State Prompt
Payment Act and not less than once every thirty days.
D. Changes in Rates of Compensation:
In the event that this contract is designated in Section B hereof as an Ongoing Contract,
ENGINEER, on or before February 1st of any given year, shall provide written notice of
any change in the rates specified in Section C hereof (or on any attachments hereto) and
said changes shall only be effective on and after May 1st of that same year.
2018 Sanitary Sewer Lining Program
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
E. Ownership of Records and Documents:
ENGINEER agrees that all books and records and other recorded information developed
specifically in connection with this agreement shall remain the property of the City.
ENGINEER agrees to keep such information confidential and not to disclose or
disseminate the information to third parties without the consent of the City. This
confidentiality shall not apply to material or information, which would otherwise be
subject to public disclosure through the freedom of information act or if already
previously disclosed by a third party. Upon termination of this agreement, ENGINEER
agrees to return all such materials to the City. The City agrees not to modify any original
documents produced by ENGINEER without contractors consent. Modifications of any
signed duplicate original document not authorized by ENGINEER will be at OWNER’s
sole risk and without legal liability to the ENGINEER. Use of any incomplete, unsigned
document will, likewise, be at the OWNER’s sole risk and without legal liability to the
ENGINEER.
F. Governing Law:
This contract shall be governed and construed in accordance with the laws of the State of
Illinois. Venue shall be in Kendall County, Illinois.
G. Independent Contractor:
ENGINEER shall have sole control over the manner and means of providing the work
and services performed under this agreement. The City’s relationship to the ENGINEER
under this agreement shall be that of an independent contractor. ENGINEER will not be
considered an employee to the City for any purpose.
H. Certifications:
Employment Status: The Contractor certifies that if any of its personnel are an employee
of the State of Illinois, they have permission from their employer to perform the service.
Anti-Bribery : The Contractor certifies it is not barred under 30 Illinois Compiled
Statutes 500/50-5(a) - (d) from contracting as a result of a conviction for or admission of
bribery or attempted bribery of an officer or employee of the State of Illinois or any
other state.
Loan Default: If the Contractor is an individual, the Contractor certifies that he/she is not
in default for a period of six months or more in an amount of $600 or more on the
repayment of any educational loan guaranteed by the Illinois State Scholarship
Commission made by an Illinois institution of higher education or any other loan made
from public funds for the purpose of financing higher education (5 ILCS 385/3).
2018 Sanitary Sewer Lining Program
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
Felony Certification: The Contractor certifies that it is not barred pursuant to 30 Illinois
Compiled Statutes 500/50-10 from conducting business with the State of Illinois or any
agency as a result of being convicted of a felony.
Barred from Contracting : The Contractor certifies that it has not been barred from
contracting as a result of a conviction for bid-rigging or bid rotating under 720 Illinois
Compiled Statutes 5/33E or similar law of another state.
Drug Free Workplace: The Contractor certifies that it is in compliance with the Drug
Free Workplace Act (30 Illinois Compiled Statutes 580) as of the effective date of this
contract. The Drug Free Workplace Act requires, in part, that Contractors, with 25 or
more employees certify and agree to take steps to ensure a drug free workplace by
informing employees of the dangers of drug abuse, of the availability of any treatment or
assistance program, of prohibited activities and of sanctions that will be imposed for
violations; and that individuals with contracts certify that they will not engage in the
manufacture, distribution, dispensation, possession, or use of a controlled substance in
the performance of the contract.
Non-Discrimination, Certification, and Equal Employment Opportunity : The Contractor
agrees to comply with applicable provisions of the Illinois Human Rights Act (775
Illinois Compiled Statutes 5), the U.S. Civil Rights Act, the Americans with Disabilities
Act, Section 504 of the U.S. Rehabilitation Act and the rules applicable to each. The
equal opportunity clause of Section 750.10 of the Illinois Department of Human Rights
Rules is specifically incorporated herein. The Contractor shall comply with Executive
Order 11246, entitled Equal Employment Opportunity, as amended by Executive Order
11375, and as supplemented by U.S. Department of Labor regulations (41 C.F.R. Chapter
60). The Contractor agrees to incorporate this clause into all subcontracts under this
Contract.
International Boycott: The Contractor certifies that neither it nor any substantially owned
affiliated company is participating or shall participate in an international boycott in
violation of the provisions of the U.S. Export Administration Act of 1979 or the
regulations of the U.S. Department of Commerce promulgated under that Act (30 ILCS
582).
Record Retention and Audits: If 30 Illinois Compiled Statutes 500/20-65 requires the
Contractor (and any subcontractors) to maintain, for a period of 3 years after the later of
the date of completion of this Contract or the date of final payment under the Contract, all
books and records relating to the performance of the Contract and necessary to support
amounts charged to the City under the Contract. The Contract and all books and records
related to the Contract shall be available for review and audit by the City and the Illinois
Auditor General. If this Contract is funded from contract/grant funds provided by the
U.S. Government, the Contract, books, and records shall be available for review and
audit by the Comptroller General of the U.S. and/or the Inspector General of the federal
2018 Sanitary Sewer Lining Program
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
sponsoring agency. The Contractor agrees to cooperate fully with any audit and to
provide full access to all relevant materials.
United States Resident Certification: (This certification must be included in all contracts
involving personal services by non-resident aliens and foreign entities in accordance with
requirements imposed by the Internal Revenue Services for withholding and reporting
federal income taxes.) The Contractor certifies that he/she is a: x United States Citizen
___ Resident Alien ___ Non-Resident Alien The Internal Revenue Service requires that
taxes be withheld on payments made to non resident aliens for the performance of
personal services at the rate of 30%.
Tax Payer Certification : Under penalties of perjury, the Contractor certifies that its
Federal Tax Payer Identification Number or Social Security Number is (provided
separately) and is doing business as a (check one): ___ Individual ___ Real Estate
Agent ___ Sole Proprietorship ___ Government Entity ___ Partnership ___ Tax
Exempt Organization (IRC 501(a) only) x Corporation ___ Not for Profit Corporation
___ Trust or Estate ___ Medical and Health Care Services Provider Corp.
I. Indemnification:
ENGINEER shall indemnify and hold harmless the City and City’s agents, servants, and
employees against all loss, damage, and expense which it may sustain or for which it will
become liable on account of injury to or death of persons, or on account of damage to or
destruction of property resulting from the performance of work under this agreement by
ENGINEER or its Subcontractors, or due to or arising in any manner from the wrongful
act or negligence of ENGINEER or its Subcontractors of any employee of any of them.
In the event that the either party shall bring any suit, cause of action or counterclaim
against the other party, the non-prevailing party shall pay to the prevailing party the cost
and expenses incurred to answer and/or defend such action, including reasonable attorney
fees and court costs. In no event shall the either party indemnify any other party for the
consequences of that party’s negligence, including failure to follow the ENGINEER’s
recommendations.
J. Insurance :
The ENGINEER agrees that it has either attached a copy of all required insurance
certificates or that said insurance is not required due to the nature and extent of the types
of services rendered hereunder. (Not applicable as having been previously supplied)
K. Additional Terms or Modification:
The terms of this agreement shall be further modified as provided on the attachments.
Except for those terms included on the attachments, no additional terms are included as a
part of this agreement. All prior understandings and agreements between the parties are
merged into this agreement, and this agreement may not be modified orally or in any
2018 Sanitary Sewer Lining Program
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
manner other than by an agreement in writing signed by both parties. In the event that
any provisions of this agreement shall be held to be invalid or unenforceable, the
remaining provisions shall be valid and binding on the parties. The list of exhibits is as
follows:
Exhibit 1: Professional Engineering Services
Exhibit 2: Limitation of Authority, Duties and Responsibilities of the
Resident Construction Observer
Exhibit 3: Estimate of Level of Effort and Associated Cost
Exhibit 4: Anticipated Project Schedule
Exhibit 5: Location Map
Exhibit 6: 2017 Standard Schedule of Charges
L. Notices:
All notices required to be given under the terms of this agreement shall be given mail,
addressed to the parties as follows:
For the City: For the ENGINEER:
City Administrator and City Clerk Engineering Enterprises, Inc.
United City of Yorkville 52 Wheeler Road
800 Game Farm Road Sugar Grove Illinois 60554
Yorkville, IL 60560
Either of the parties may designate in writing from time to time substitute addresses or
persons in connection with required notices.
Agreed to this _____day of __________________, 2017.
United City of Yorkville: Engineering Enterprises, Inc.:
_________________________________ ________________________________
Gary Golinski Brad Sanderson, P.E.
Mayor Vice President
_________________________________ ________________________________
Beth Warren Angie Smith
City Clerk Executive Assistant
1
EXHIBIT 1
SECTION A - PROFESSIONAL DESIGN ENGINEERING SERVICES
For purposes of this Exhibit 1 and all attachments hereto, the term “contractor” shall not
refer to Engineering Enterprises, Inc., but shall instead refer to individuals or companies
contracted with, to construct or otherwise manage the project described herein. The
ENGINEER shall furnish professional design engineering services as follows:
1. The ENGINEER will attend conferences with the OWNER, or other interested
parties as may be reasonably necessary.
2. The ENGINEER will perform the necessary design surveys, accomplish the
detailed design of the project, prepare construction drawings, specifications and
contract documents, and prepare a final cost estimate based on final design for the
entire system. It is also understood that if subsurface explorations (such as
borings, soil tests, rock soundings and the like) are required, the ENGINEER will
furnish coordination of said explorations without additional charge, but the costs
incident to such explorations shall be paid for by the OWNER as set out in
Section D hereof.
3. The contract documents furnished by the ENGINEER under Section A-2 shall
utilize IEPA endorsed construction contract documents, including Supplemental
General Conditions, Contract Change Orders, and partial payment estimates.
4. Prior to the advertisement for bids, the ENGINEER will provide for each
construction contract, not to exceed 10 copies of detailed drawings, specifications,
and contract documents for use by the OWNER, appropriate Federal, State, and
local agencies from whom approval of the project must be obtained. The cost of
such drawings, specifications, and contract documents shall be included in the
basic compensation paid to the ENGINEER.
2
5. The ENGINEER will furnish additional copies of the drawings, specifications and
contract documents as required by prospective bidders, material suppliers, and
other interested parties, but may charge them for the reasonable cost of such
copies. Upon award of each contract, the ENGINEER will furnish to the
OWNER five sets of the drawings, specifications and contract documents for
execution. The cost of these sets shall be included in the basic compensation paid
to the ENGINEER. Original documents, survey notes, tracings, and the like,
except those furnished to the ENGINEER by the OWNER, are and shall remain
the property of the ENGINEER.
6. The drawings prepared by the ENGINEER under the provisions of Section A-2
above shall be in sufficient detail to permit the actual location of the proposed
improvements on the ground. The ENGINEER shall prepare and furnish to the
OWNER without any additional compensation, three copies of map(s) showing
the general location of needed construction easements and permanent easements
and the land to be acquired. Property surveys, property plats, property
descriptions, abstracting and negotiations for land rights shall be accomplished by
the OWNER, unless the OWNER requests, and the ENGINEER agrees to provide
those services. In the event the ENGINEER is requested to provide such services,
the ENGINEER shall be additionally compensated as set out in Section D hereof.
7. The ENGINEER will attend the bid opening and tabulate the bid proposal, make
an analysis of the bids, and make recommendations for awarding contracts for
construction.
8. The ENGINEER further agrees to obtain and maintain, at the ENGINEER’s
expense, such insurance as will protect the ENGINEER from claims under the
Workman’s Compensation Act and such comprehensive general liability
insurance as will protect the OWNER and the ENGINEER from all claims for
bodily injury, death, or property damage which may arise from the performance
by the ENGINEER or by the ENGINEER’s employees of the ENGINEER’s
functions and services required under this Agreement.
3
9. The ENGINEER will complete the final plans, specifications and contract
documents and submit for approval of the OWNER, and all State regulatory
agencies to meet the project schedule(s) as summarized in Exhibit 4:
“Anticipated Project Schedule – 2018 Sanitary Sewer Lining Program” dated
December 5, 2017.
SECTION B - PROFESSIONAL CONSTRUCTION ENGINEERING SERVICES
The ENGINEER shall furnish professional construction engineering services as follows:
1. The ENGINEER will review, for conformance with the design concept, shop and
working drawings required by the construction Contract Documents and indicate
on the drawings the action taken. Such action shall be taken with reasonable
promptness.
2. The ENGINEER will interpret the intent of the drawings and specifications to
protect the OWNER against defects and deficiencies in construction on the part of
the contractors. The ENGINEER will not, however, guarantee the performance
by any contractor.
3. The ENGINEER will evaluate and determine acceptability of substitute materials
and equipment proposed by Contractor(s).
4. The ENGINEER will establish baselines for locating the work together with a
suitable number of bench marks adjacent to the work as shown in the contract
documents.
4
5. The ENGINEER will provide general engineering review of the work of the
contractor(s) as construction progresses to ascertain that the contactor is
conforming to the design concept.
(a) ENGINEER shall have authority, as the OWNER’s representative, to
require special inspection of or testing of the work, and shall receive and
review all certificates of inspections, testing and approvals required by
laws, rules, regulations, ordinances, codes, orders or the Contract
Documents (but only to determine generally that their content complies
with requirements of, and the results certified indicate compliance with,
the Contract Documents).
(b) During such engineering review, ENGINEER shall have the authority, as
the OWNER’s representative, to disapprove of or reject contractor(s)’
work while it is in progress if ENGINEER believes that such work will
not produce a completed Project that conforms generally to the Contract
Documents or that it will prejudice the integrity of the design concept of
the Project as reflected in the Contract Documents.
6. The ENGINEER will provide resident construction observation. Resident
construction observation shall consist of visual inspection of materials,
equipment, or construction work for the purpose of ascertaining that the work is in
substantial conformance with the contract documents and with the design intent.
Such observation shall not be relied upon by others as acceptance of the work.
The ENGINEER’s undertaking hereunder shall not relieve the contractor of
contractor’s obligation to perform the work in conformity with the drawings and
specifications and in a workmanlike manner; shall not make the ENGINEER an
insurer of the contractor’s performance; and shall not impose upon the
ENGINEER any obligation to see that the work is performed in a safe manner.
Exhibit 2 - The Limitations of Authority, Duties and Responsibilities of the
Resident Construction Observer is attached to this Agreement.
5
7. The ENGINEER will cooperate and work closely with representatives of the
OWNER.
8. Based on the ENGINEER’s on-site observations as an experienced and qualified
design professional, on information provided by the Resident Construction
Observer, and upon review of applications for payment with the accompanying
data and schedules by the contractor, the ENGINEER:
(a) Shall determine the amounts owing to contractor(s) and recommend in
writing payments to contractor(s) in such amounts. Such
recommendations of payment will constitute a representation to OWNER,
based on such observations and review, that the work has progressed to
the point indicated, and that, to the best of the ENGINEER’s knowledge,
information and belief, the quality of such work is generally in accordance
with the Contract Documents (subject to an evaluation of such work as a
functioning whole prior to or upon substantial completion, to the results of
any subsequent tests called for in the Contract Documents, and to any
other qualifications stated in the recommendation).
(b) By recommending any payment, ENGINEER will not hereby be deemed
to have represented that exhaustive, continuous or detailed reviews or
examinations have been made by ENGINEER to check the quality or
quantity of contractor(s)’ work as it is furnished and performed beyond the
responsibilities specifically assigned to ENGINEER in the Agreement and
the Contract Documents. ENGINEER’s review of contractor(s)’ work for
the purposes of recommending payments will not impose on Engineer
responsibility to supervise, direct or control such work or for the means,
methods, techniques, sequences, or procedures of construction or safety
precautions or programs incident thereto or contractor(s) compliance with
laws, rules, regulations, ordinances, codes or orders applicable to their
furnishing and performing the work. It will also not impose responsibility
on ENGINEER to make any examination to ascertain how or for what
6
purposes any contractor has used the moneys paid on account of the
Contract Price, or to determine that title to any of the work, materials
equipment has passed to OWNER free and clear of any lien, claims,
security interests, or encumbrances, or that there may not be other matters
at issue between OWNER and contractor that might affect the amount that
should be paid.
9. The ENGINEER will prepare necessary contract change orders for approval of
the OWNER, and others on a timely basis.
10. The ENGINEER will make a final review prior to the issuance of the statement of
substantial completion of all construction and submit a written report to the
OWNER. Prior to submitting the final pay estimate, the ENGINEER shall submit
the statement of completion to and obtain the written acceptance of the facility
from the OWNER.
11. The ENGINEER will provide the OWNER with one set of reproducible record
(as-built) drawings, and two sets of prints at no additional cost to the OWNER.
Such drawings will be based upon construction records provided by the contractor
during construction and reviewed by the resident construction observer and from
the resident construction observer’s construction data.
12. If State Statutes require notices and advertisements of final payment, the
ENGINEER shall assist in their preparation.
13. The ENGINEER will be available to furnish engineering services and
consultations necessary to correct unforeseen project operation difficulties for a
period of one year after the date of statement of substantial completion of the
facility. This service will include instruction of the OWNER in initial project
operation and maintenance but will not include supervision of normal operation of
the system. Such consultation and advice shall be at the hourly rates as described
in the attached Exhibit 6: Standard Schedule of Charges dated January 1, 2017.
7
The ENGINEER will assist the OWNER in performing a review of the project
during the 11th month after the date of the certificate of substantial completion.
14. The ENGINEER further agrees to obtain and maintain, at the ENGINEER’s
expense, such insurance as will protect the ENGINEER from claims under the
Workman’s Compensation Act and such comprehensive general liability
insurance as will protect the OWNER and the ENGINEER from all claims for
bodily injury, death, or property damage which may arise from the performance
by the ENGINEER or by the ENGINEER’s employees of the ENGINEER’s
functions and services required under this Agreement.
15. The ENGINEER will provide construction engineering services in accordance
with the periods summarized in Exhibit 4: “Anticipated Project Schedule – 2018
Sanitary Sewer Lining Program” dated December 5, 2017.
If the above is not accomplished within the time period specified, this Agreement may be
terminated by the OWNER. The time for completion may be extended by the OWNER
for a reasonable time if completion is delayed due to unforeseeable cases beyond the
control and without the fault or negligence of the ENGINEER. Pursuant to Paragraph D
“Changes in Rates of Compensation”, the contract shall be designated on-going
consistent with the project schedule.
8
SECTION C – COMPENSATION FOR ENGINEERING SERVICES
1. The OWNER shall compensate the ENGINEER for professional design
engineering services in the amount of $9,827 (FF) as summarized on Exhibit 3:
“Estimate of Level of Effort and Associated Cost for Professional Engineering
Services for 2018 Sanitary Sewer Lining” dated December 5, 2017.
(a) The compensation for the professional design engineering services shall
be payable as follows:
(1) A sum which does not exceed ninety percent (90%) of the total
compensation payable under Section C-1 shall be paid in monthly
increments for work actually completed and invoiced, for grant
administration and for the preparation and submission to the
OWNER and/or IEPA of the construction drawings, specifications,
cost estimates and contract documents.
(2) A sum which, together with the compensation paid pursuant to
Section C-1(a)(1) above, equals one hundred percent (100%) of the
total compensation due and payable in accord with Section C-1
above, shall be due immediately after the award of construction
contract(s) is approved by the corporate authorities.
2. The OWNER shall compensate the ENGINEER for the construction
administration, construction staking, construction observation (including the
Resident Construction Observer), and any additional consultation and surveying
services on the basis of Hourly Rates (HR) as described on the attached Exhibit 6:
Standard Schedule of Charges dated January 1, 2017. The estimated values are
included in Exhibit 3: “Estimate of Level of Effort and Associated Cost for
Professional Engineering Services for 2018 Sanitary Sewer Lining” dated
December 5, 2017 and are estimated at $ 9,379 Hourly (HR).
9
(a) The compensation for the construction administration, construction
staking, construction observation (including the Resident Construction
Observer), and any additional consultation and surveying services shall be
payable as follows:
(1) A sum which equals any charges for work actually completed and
invoiced shall be paid at least once per month.
3. The OWNER shall compensate the ENGINEER for direct expenses as identified
in the contract and as noted on Exhibit 3 at the actual cost or hourly cost for the
work completed.
(1) A sum which equals any charges for work actually completed and
invoiced shall be paid at least once per month.
4. The compensation for any additional engineering services authorized by the
OWNER pursuant to Section D shall be payable as follows:
(a) A sum which equals any charges for work actually completed and
invoiced shall be paid at least once per month.
10
SECTION D – ADDITIONAL ENGINEERING SERVICES
In addition to the foregoing being performed, the following services may be provided
UPON PRIOR WRITTEN AUTHORIZATION OF THE OWNER.
1. Site surveys outside of the project limits and other similar special surveys as may
be required.
2. Laboratory tests, well tests, borings, specialized geological soils hydraulic, or
other studies recommended by the ENGINEER.
3. Property surveys, detailed description of sites, maps, drawings, or estimates
related thereto; assistance in negotiating for land and easement rights.
4. Necessary data and filing maps for litigation, such as condemnation.
5. Redesigns ordered by the OWNER after final plans have been accepted by the
OWNER and IEPA.
6. Appearances before courts or boards on matters of litigation or hearings related to
the project.
7. Preparation of environmental impact assessments or environmental impact
statements.
8. Making drawings from field measurements of existing facilities when required for
planning additions or alterations thereto.
9. Services due to changes in the scope of the Project or its design, including but not
limited to, changes in size, complexity, schedule or character of construction.
11
10. Revising studies or reports which have previously been approved by the OWNER,
or when revisions are due to cases beyond the control of the ENGINEER.
11. Preparation of design documents for alternate bids where major changes require
additional documents.
12. Preparation of detailed renderings, exhibits or scale models for the Project.
13. Providing special analysis of the OWNER’s needs such as owning and operating
analysis, plan for operation and maintenance, OWNER’s special operating
drawings or charts, and any other similar analysis.
14. The preparation of feasibility studies, appraisals and evaluations, detailed quantity
surveys of material and labor, and material audits or inventories by the OWNER.
15. Additional or extended services during construction made necessary by (1) work
damaged by fire or other cause during construction, (2) defective or incomplete
work of the contractor, and/or (3) the contractor’s default on the Construction
Contract due to delinquency or insolvency.
16. Providing design services relating to future facilities, systems and equipment
which are not intended to be constructed or operated as a part of the Project.
17. Providing other services not otherwise provided for in this Agreement, including
services normally furnished by the OWNER as described in Section E –
SPECIAL PROVISIONS – Owner’s Responsibilities.
Payment for the services specified in this Section E shall be as agreed in writing between
the OWNER and the ENGINEER prior to commencement of the work. The ENGINEER
will render to OWNER for such services an itemized bill, separate from any other billing,
once each month, for compensation for services performed hereunder during such period,
12
the same to be due and payable by OWNER to the ENGINEER on or before the 10th day
of the following period. Payment for services noted in D shall be at Actual Cost (AC),
Fixed Fee (FF) or Hourly (HR).
SECTION E - SPECIAL PROVISIONS
1. OWNER’S RESPONSIBILITIES
(a) Provide to the ENGINEER all criteria, design and construction standards
and full information as to the OWNER’s requirements for the Project.
(b) Designate a person authorized to act as the OWNER’s representative. The
OWNER or his representative shall receive and examine documents
submitted by the ENGINEER, interpret and define the OWNER’s policies
and render decisions and authorizations in writing promptly to prevent
unreasonable delay in the progress of the ENGINEER’s services.
(c) Furnish laboratory tests, air and water pollution tests, reports and
inspections of samples, materials or other items required by law or by
governmental authorities having jurisdiction over this Project, or as
recommended by the ENGINEER.
(d) Provide legal, accounting, right-of-way acquisition and insurance
counseling services necessary for the Project, legal review of the
construction Contract Documents, and such auditing services as the
OWNER may require to account for expenditures of sums paid to the
contractor.
13
(e) Furnish above services at the OWNER’s expense and in such manner that
the ENGINEER may rely upon them in the performance of his services
under this Agreement and in accordance with the Project timetable.
(f) Guarantee full and free access for the ENGINEER to enter upon all
property required for the performance of the ENGINEER’s services under
this Agreement.
(g) Give prompt written notice to the ENGINEER whenever the OWNER
observes or otherwise becomes aware of any defect in the Project or other
event which may substantially affect the ENGINEER’s performance of
services under this Agreement.
(h) Protect and preserve all survey stakes and markers placed at the project
site prior to the assumption of this responsibility by the contractor and
bear all costs of replacing stakes or markers damaged or removed during
said time interval.
2. Delegation of Duties - Neither the OWNER nor the ENGINEER shall delegate his
duties under this Agreement without the written consent of the other.
3. The ENGINEER has not been retained or compensated to provide design services
relating to the contractor’s safety precautions or to means, methods, techniques,
sequences, or procedures required by the contractor to perform his work but not
relating to the final or completed structure. Omitted services include but are not
limited to shoring, scaffolding, underpinning, temporary retainment of
excavations and any erection methods and temporary bracing.
4. The ENGINEER intends to render his services under this Agreement in
accordance with generally accepted professional practices for the intended use of
the Project.
14
5. Since the ENGINEER has no control over the cost of labor, materials, equipment
or services furnished by others, or over the contractor(s) methods of determining
prices, or over competitive bidding or market conditions, his opinions of probable
Project Costs and Construction Costs provided for herein are to be made on the
basis of his experience and qualifications and represent his best judgment as an
experienced and qualified professional engineer, familiar with the construction
industry. The ENGINEER cannot and does not guarantee that proposals, bids or
actual project or construction cost will not vary from opinions of probable cost
prepared by him. If prior to the bidding or negotiating phase OWNER wishes
greater assurance as to project or construction costs he shall employ an
independent cost-estimator.
6. Access to Records:
(a) The ENGINEER agrees to include subsections E-6(b) through E-6(e)
below in all contracts and all subcontracts directly related to project
services which are in excess of $25,000.
(b) The ENGINEER shall maintain books, records, documents and other
evidence directly pertinent to performance of Agency loan work under this
Agreement consistent with generally accepted accounting standards in
accordance with the American Institute of Certified Public Accountants
Professional Standards (666 Fifth Avenue, New York, New York 10019;
June 1, 1987). The Agency or any of its duly authorized representatives
shall have access to such books, records, documents and other evidence
for the purpose of inspection, audit and copying. The ENGINEER will
provide facilities for such access and inspection.
(c) Audits conducted pursuant to this provision shall be in accordance with
generally accepted auditing standards.
15
(d) The ENGINEER agrees to the disclosure of all information and reports
resulting from access to records pursuant to subsection E-6(b) above, to
the Agency. Where the audit concerns the ENGINEER, the auditing
agency shall afford the ENGINEER an opportunity for an audit exit
conference and an opportunity to comment on the pertinent portions of the
draft audit report. The final audit report will include the written
comments, if any, of the audited parties.
(e) Records under subsection E-6(b) above shall be maintained and made
available during performance on Agency loan work under this agreement
and until three years from date of final Agency loan audit for the project.
In addition, those records which relate to any “dispute” appeal under an
Agency loan agreement, or litigation, or the settlement of claims arising
out of such performance, costs or items to which an audit exception has
been taken, shall be maintained and made available until three years after
the date of resolution of such appeal, litigation, claim or exception.
7. Covenant Against Contingent Fees - The ENGINEER warrants that no person or
selling agency has been employed or retained to solicit or secure this contract
upon an agreement or understanding for a commission, percentage, brokerage, or
contingent fee, excepting bonafide employees. For breach or violation of this
warranty, the loan recipient shall have the right to annul this agreement without
liability or in its discretion to deduct from the contract price or consideration or
otherwise recover, the full amount of such commission, percentage, brokerage, or
contingent fee.
8. Covenant Against Contingent Fees - The loan recipient warrants that no person or
agency has been employed or retained to solicit or secure a PWSLP loan upon an
agreement or understanding for a commission, percentage, brokerage, or
contingent fee. For breach or violation of this warranty, the Agency shall have
the right to annul the loan or to deduct from the loan or otherwise recover, the full
amount of such commission, percentage, brokerage, or contingent fee.
16
9. Certification Regarding Debarment – The ENGINEER certifies that the services
of anyone that has been debarred or suspended under Federal Executive Order
12549 has not, and will not, be used for work under this Agreement.
10. Affirmative Action – The ENGINEER agrees to take affirmative steps to assure
that disadvantaged business enterprises are utilized when possible as sources of
supplies, equipment, construction and services in accordance with the Clean
Water Loan Program rules. As required by the award conditions of USEPA's
Assistance Agreement with IEPA, the ENGINEER acknowledges that the fair
share percentages are 5% for MBEs and 12% for WBEs.
11. The ENGINEER shall not discriminate on the basis of race, color, national origin
or sex in the performance of this contract. The contractor shall carry out
applicable requirements of 40 CFR Part 33 in the award and administration of
contracts awarded under EPA financial assistance agreements. Failure by the
contractor to carry out these requirements is a material breach of this contract
which may result in the termination of this contract or other legally available
remedies.
17
EXHIBIT 2
THE LIMITATIONS OF AUTHORITY, DUTIES AND RESPONSIBILITIES OF THE
RESIDENT CONSTRUCTION OBSERVER ARE AS FOLLOWS:
1. The Resident Construction Observer shall act under the direct supervision of the
ENGINEER, shall be the ENGINEER’s agent in all matters relating to on-site
construction review of the contractor’s work, shall communicate only with the
ENGINEER and the contractor (or contractor’s), and shall communicate with
subcontractors only through the contractor or his authorized superintendent. The
OWNER shall communicate with the Resident Construction Observer only
through the ENGINEER.
2. The Resident Construction Observer shall review and inspect on-site construction
activities of the contractor relating to portions of the Project designed and
specified by the Engineer as contained in the Construction Contract Documents.
3. Specifically omitted from the Resident Construction Observer’s duties is any
review of the contractor’s safety precautions, or the means, methods, sequences,
or procedures required for the contractor to perform the work but not relating to
the final or completed Project. Omitted design or review services include but are
not limited to shoring, scaffolding, underpinning, temporary retainment of
excavations and any erection methods and temporary bracing.
4. The specific duties and responsibilities of the Resident Construction Observer are
enumerated as follows:
(a) Schedules: Review the progress schedule, schedule of Shop Drawing
submissions and schedule of values prepared by contractor and consult
with ENGINEER concerning their acceptability.
18
(b) Conferences: Attend preconstruction conferences. Arrange a schedule of
progress meetings and other job conferences as required in consultation
with ENGINEER and notify those expected to attend in advance. Attend
meetings and maintain and circulate copies of minutes thereof.
(c) Liaison:
(1) Serve as ENGINEER’s liaison with contractor, working principally
through contractor’s superintendent and assist him in
understanding the intent of the Contract Documents.
(2) Assist ENGINEER in serving as OWNER’s liaison with contractor
when contractor’s operations affect OWNER’s on-site operations.
(3) As requested by ENGINEER, assist in obtaining from OWNER
additional details or information, when required at the job site for
proper erection of the work.
(d) Shop Drawings and Samples:
(2) Receive and record date of receipt of Shop Drawings and samples.
(3) Receive samples which are furnished at the site by contractor, and
notify ENGINEER of their availability for examination.
(3) Advise ENGINEER and contractor or its superintendent
immediately of the commencement of any work requiring a Shop
Drawing or sample submission if the submission has not been
approved by ENGINEER.
19
(e) Review of Work, Rejection of Defective Work, Inspections and Tests:
(1) Conduct on-site inspection of the work in progress to assist
ENGINEER in determining if the work is proceeding in
accordance with the Contract Documents and that completed work
will conform to the Contract Documents.
(2) Report to ENGINEER whenever he believes that any work is
unsatisfactory, faulty or defective or does not conform to the
Contract Documents, or does not meet the requirements of any
inspections, test or approval required to be made or has been
damaged prior to final payment; and advise ENGINEER when he
believes work should be corrected or rejected or should be
uncovered for inspection, or requires special testing, inspection or
approval.
(3) Verify that tests, equipment and systems start-ups, and operating
and maintenance instructions are conducted as required by the
Contract Documents and in presence of the required personnel, and
that contractor maintains adequate records thereof; observe, record
and report to ENGINEER appropriate details relative to the test
procedures and start-ups.
(4) Accompany visiting inspectors representing public or other
agencies having jurisdiction over the Project, record the outcome
of these inspections and report to ENGINEER.
(f) Interpretation of Contract Documents: Transmit to contractor
ENGINEER’s clarifications and interpretations of the Contract
Documents.
20
(g) Modifications: Consider and evaluate contractor’s suggestions for
modifications in Drawings or Specifications and report them with
recommendations to ENGINEER.
(h) Records:
(1) Maintain at the job site orderly files for correspondence, reports of
job conferences, Shop Drawings and samples submissions,
reproductions of original Contract Documents including all
addenda, change orders, field orders, additional drawings issued
subsequent to the execution of the Contract, ENGINEER’s
clarifications and interpretations of the Contract Documents,
progress reports, and other Project related documents.
(2) Keep a diary or log book, recording hours on the job site, weather
conditions, data relative to questions of extras or deductions, list of
visiting officials and representatives of manufacturers, fabricators,
suppliers and distributors, daily activities, decisions, observations
in general and specific observations in more detail as in the case of
observing test procedures. Send copies to ENGINEER.
(4) Record names, addresses and telephone numbers of all
contractor’s, subcontractors and major suppliers of materials and
equipment.
(i) Reports:
(1) Furnish ENGINEER periodic reports as required of progress of the
work and contractor’s compliance with the approved progress
schedule and schedule of Shop Drawing submissions.
21
(2) Consult with ENGINEER in advance of schedule major tests,
inspections or start of important phases of the work.
(3) Report immediately to ENGINEER upon the occurrence of any
accident.
(j) Payment Requisitions: Review applications for payment with contractor
for compliance with the established procedure for their submission and
forward them with recommendations to ENGINEER, noting particularly
their relation to the schedule of values, work completed and materials and
equipment delivered at the site but not incorporated in the work.
(k) Certificates, Maintenance and Operating Manuals: During the course of
the work, verify that certificates, maintenance and operation manuals and
other data required to be assembled and furnished by contractor are
applicable to the items actually installed; and deliver this material to
ENGINEER for his review and forwarding to OWNER prior to final
acceptance of the work.
(l) Completion:
(1) Before ENGINEER issues a Statement of Substantial Completion,
submit to contractor a list of observed items requiring completion
or correction.
(2) Conduct final review in the company of ENGINEER, OWNER
and contractor and prepare a final list of items to be completed or
corrected.
(3) Verify that all items on final list have been completed or corrected
and make recommendations to ENGINEER concerning
acceptance.
ENTITY:ADMIN. WORKPRINCIPAL SENIORSENIOR SENIOR ITEM COSTWORKIN PROJECTPROJECT PROJECTPROJECT PROJECT PROJECT CAD PROJECT GIS HOUR PERITEMCHARGE MANAGERENGINEER II ENGINEERMANAGER SURVEYOR II TECHNICIAN MANAGER TECHNICIAN TECHNICIAN ADMIN. SUMM. ITEMNO. WORK ITEM HOURLY RATE: $191 $185 $155 $133 $168 $155 $145 $145 $121 $67 $80FINAL ENGINEERING2.1 Project Management and Administration1 6 4 11 1,833$ 2.2 Project Meetings2 2 - 4 752$ 2.3 Bid Package, Specifications and Estimates4 24 20 48 5,272$ 2.4 Bidding and Contracting1 3 8 2 14 1,970$ Final Engineering Subtotal:4 15 - 36 - - - - - 20 2 77 9,827$ CONSTRUCTION ENGINEERING3.1 Contract Administration1 8 6 15 2,469$ 3.2 Construction Layout and Record Drawings1 1 185$ 3.3 Observation and Documentation4 45 49 6,725$ Construction Engineering Subtotal:1 13 - 51 - - - - - - 65 9,379$ PROJECT TOTAL:5 28 - 87 - - - - - 20 2 142 19,206 Printing =250$ 17,706$ Mileage =500$ -$ Material Testing = -$ 1,340$ -$ 160$ DIRECT EXPENSES =750$ 19,206$ 19,956$ \\Milkyway\EEI_Storage\Docs\Public\Yorkville\2017\YO1744-P 2018 Sanitary Sewer Lining\PSA\[3. Exhibit 3 - Level of Effort.xlsx]Fee SummaryTOTAL EXPENSES = ENGINEERING SURVEYINGEngineering Expenses = DIRECT EXPENSESLABOR SUMMARYEnvironmental Assessment =DRAFTINGPROJECT ROLE:Surveying Expenses = Drafting Expenses = Administrative Expenses = TOTAL LABOR EXPENSES = December 5, 2017ESTIMATE OF LEVEL OF EFFORT AND ASSOCIATED COST FORPROFESSIONAL ENGINEERING SERVICES FOREXHIBIT 32018 SANITARY SEWER LINING PROGRAMUnited City of Yorkville, IL
WORKYear:ITEMMonth:NO. WORK ITEM Week Starting:1234123412341234123412341234123412341234FINAL DESIGN ENGINEERING2.1 Project Management and Administration2.2 Project Meetings2.3 Bid Package, Specifications and Estimates2.4 Bidding and ContractingCONSTRUCTION ENGINEERING3.1 Contract Administration3.2 Construction Layout and Record Drawings3.3 Observation and Documentation\\Milkyway\EEI_Storage\Docs\Public\Yorkville\2017\YO1744-P 2018 Sanitary Sewer Lining\PSA\[4. Exhibit 4 - Schedule.xls]ScheduleProject Management & QC/QAPermittingMeeting(s)Bidding and ContractingDesignConstructionAugust2017DecemberSeptemberMayJuneMarchJulyLegendEXHIBIT 4ANTICIPATED PROJECT SCHEDULE2018 SANITARY SEWER LINING PROGRAMUNITED CITY OF YORKVILLE, ILDecember 5, 2017January FebruaryApril2018
!.
!.
!.!.
!.
!.
!.!.!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.!.!.
!.
!.
!.
!.
!.
!.!.!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.
!.
!.
!.
!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.
!.
!.
!.!.
!.
!.!.
!.!.
!.
!.
!.
!.!.!.!.!.
!.!.
!.
!.
!.
!.!.
!.
!.
!.!.
!.
!.
!.
!.
!.
!.!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.
!.
!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.
!.!.
!.
!.
!.!.
!.
!.!.
!.!.
!.!.
!.
!.!.
!.!.
!.
!.!.!.
!.
!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.!.
!.
!.!.S Bridge StMill StB
e
nj
a
mi
n
S
tState StS Main StDeer StSchoolhouse RdHeustis StE Fox St
W Fox St
B e a v e r S t
E Van Emmon St
E Orange St
Adrian StW Ridge St
Morgan StW Madison St
C olo n ial P kw y
Badger StGa r d en S t
E Washington St
Wolf St
Illini DrAdams StW Hydraulic Ave
Eliza bet h St
W Van Emmon St
W Orange St
Wooden Bridge Dr
W Washington St
Blaine St
Olsen St
Walter St
Crooked Creek DrW Dolph St
E Hydraulic Ave
E Ridge St
Garden CirW o o d S a g eAveDydyna CtBell StT
o
m
asi k Ct
W Beecher St
W Hydraulic Ave
Morgan StEngineering Enterprises, Inc.
52 Wheeler Road
Sugar Grove, Illinois 60554
(630) 466-6700
SANITARY LINING
LOCATION MAP
www.eeiweb.com DATE
DATE:
PROJECT NO.:
FILE:
PATH:
BY:
October 2017
YO1744
YO1744_2018 Proposed.MXD
H:\GIS\PUBLIC\YORKVILLE\2017\
MJT
NO.REVISIONS ³United City of Yorkville
800 Game Farm Road
Yorkville, IL 60560
630-553-4350www.yorkville.il.us
0600300
Feet
Legend
2018 LINING
SANITARY SEWER
!.SANITARY MANHOLES
S2-22A
S2-22
S2-21
S2-20
S2-19
S2-60
S3-20A
S2-61
S3-20
S3-8
S3-9
S3-10
S1-28
S 1 -2 7
S1-29
S1-63
S2-59
S2-59B
S2-9
S2-10
S2-12A
S2-12BS2-13
S2-15
S2-15A
S2-15D
S2-16
!.
!.
!.
!.
!.
!.!.
!.
!.
E Fox StBell StS Bridge StS2-15
S2-15A
S2-15D
S2-16
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #7
Tracking Number
PW 2017-91
East Orange Street Water Main Replacement – Engineering Agreement
Public Works Committee – December 19, 2017
Majority
Approval
See attached memo.
Bart Olson Administration
Name Department
Summary
Approval of an engineering agreement with EEI for design engineering related to the East
Orange St water main replacement project.
Background
This item was last discussed by the City Council in October 2017, when the City Council
approved an engineering agreement for design and construction engineering work related to the 2018
Road to Better Roads program. As part of that determination, the City Council selected the East Orange
St water main project to be funded out of the water fund’s 2018 RTBR budget. Accordingly, EEI has
submitted an engineering agreement for our consideration for the design of the project.
The attached contract contains a $43,000 fixed cost for design engineering only. This amount is
included in the FY 18 budget. This contract does not contain a construction engineering component,
which would come forward at a later date depending on the decisions made by the City Council on the
project after the design is completed. The City Council has $250,000 budgeted for water main work in
2018, but the Orange St water main project could easily reach $800,000 for a full replacement. The idea
behind the design-only engineering contract would be to dive into the details of the area to make better
decisions about which section to do first and how large that section will be, and then to proceed with a
construction engineering contract for that part.
Recommendation
Staff recommends approval of the engineering agreement with EEI for design engineering
related to the East Orange St water main replacement project.
Memorandum
To: City Council
From: Bart Olson, City Administrator
CC:
Date: December 13, 2017
Subject: East Orange Street Water Main Replacement Project Engineering Agreement
East Orange Street Water Main Replacement
United City of Yorkville, Kendall County, IL
Professional Services Agreement - Design Engineering
THIS AGREEMENT, by and between the United City of Yorkville, hereinafter referred
to as the "City" or “OWNER” and Engineering Enterprises, Inc. hereinafter referred to as
the "Contractor" or “ENGINEER” agrees as follows:
A. Services:
ENGINEER agrees to furnish to the City the following services: The ENGINEER shall
provide any and all necessary engineering services to the City as indicated on the
included exhibits. Design engineering will be provided for approximately 1,650 linear
feet of 8-inch water main improvements on East Orange Street (see Exhibit 5 for project
limits). Engineering will be in accordance with all City, Standard Specifications for
Water and Sewer Construction in Illinois, Illinois Department of Transportation, and
Illinois Environmental Protection Agency requirements.
B. Term:
Services will be provided beginning on the date of execution of this agreement and
continuing, until terminated by either party upon 7 days written notice to the non-
terminating party or upon completion of the Services. Upon termination the ENGINEER
shall be compensated for all work performed for the City prior to termination.
C. Compensation and maximum amounts due to ENGINEER:
ENGINEER shall receive as compensation for all work and services to be performed
herein, an amount based on the Estimate of Level of Effort and Associated Cost included
in Exhibit 3. Design Engineering will be paid for as a Fixed Fee (FF) in the amount of
$43,000. Direct expenses are estimated at $750. The hourly rates for this project are
shown in the attached 2017 Standard Schedule of Charges (Exhibit 6). All payments will
be made according to the Illinois State Prompt Payment Act and not less than once every
thirty days.
D. Changes in Rates of Compensation:
In the event that this contract is designated in Section B hereof as an Ongoing Contract,
ENGINEER, on or before February 1st of any given year, shall provide written notice of
any change in the rates specified in Section C hereof (or on any attachments hereto) and
said changes shall only be effective on and after May 1st of that same year.
East Orange Street Water Main Replacement
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
E. Ownership of Records and Documents:
ENGINEER agrees that all books and records and other recorded information developed
specifically in connection with this agreement shall remain the property of the City.
ENGINEER agrees to keep such information confidential and not to disclose or
disseminate the information to third parties without the consent of the City. This
confidentiality shall not apply to material or information, which would otherwise be
subject to public disclosure through the freedom of information act or if already
previously disclosed by a third party. Upon termination of this agreement, ENGINEER
agrees to return all such materials to the City. The City agrees not to modify any original
documents produced by ENGINEER without contractors consent. Modifications of any
signed duplicate original document not authorized by ENGINEER will be at OWNER’s
sole risk and without legal liability to the ENGINEER. Use of any incomplete, unsigned
document will, likewise, be at the OWNER’s sole risk and without legal liability to the
ENGINEER.
F. Governing Law:
This contract shall be governed and construed in accordance with the laws of the State of
Illinois. Venue shall be in Kendall County, Illinois.
G. Independent Contractor:
ENGINEER shall have sole control over the manner and means of providing the work
and services performed under this agreement. The City’s relationship to the ENGINEER
under this agreement shall be that of an independent contractor. ENGINEER will not be
considered an employee to the City for any purpose.
H. Certifications:
Employment Status: The Contractor certifies that if any of its personnel are an employee
of the State of Illinois, they have permission from their employer to perform the service.
Anti-Bribery : The Contractor certifies it is not barred under 30 Illinois Compiled
Statutes 500/50-5(a) - (d) from contracting as a result of a conviction for or admission of
bribery or attempted bribery of an officer or employee of the State of Illinois or any
other state.
Loan Default: If the Contractor is an individual, the Contractor certifies that he/she is not
in default for a period of six months or more in an amount of $600 or more on the
repayment of any educational loan guaranteed by the Illinois State Scholarship
Commission made by an Illinois institution of higher education or any other loan made
from public funds for the purpose of financing higher education (5 ILCS 385/3).
East Orange Street Water Main Replacement
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
Felony Certification: The Contractor certifies that it is not barred pursuant to 30 Illinois
Compiled Statutes 500/50-10 from conducting business with the State of Illinois or any
agency as a result of being convicted of a felony.
Barred from Contracting : The Contractor certifies that it has not been barred from
contracting as a result of a conviction for bid-rigging or bid rotating under 720 Illinois
Compiled Statutes 5/33E or similar law of another state.
Drug Free Workplace: The Contractor certifies that it is in compliance with the Drug
Free Workplace Act (30 Illinois Compiled Statutes 580) as of the effective date of this
contract. The Drug Free Workplace Act requires, in part, that Contractors, with 25 or
more employees certify and agree to take steps to ensure a drug free workplace by
informing employees of the dangers of drug abuse, of the availability of any treatment or
assistance program, of prohibited activities and of sanctions that will be imposed for
violations; and that individuals with contracts certify that they will not engage in the
manufacture, distribution, dispensation, possession, or use of a controlled substance in
the performance of the contract.
Non-Discrimination, Certification, and Equal Employment Opportunity : The Contractor
agrees to comply with applicable provisions of the Illinois Human Rights Act (775
Illinois Compiled Statutes 5), the U.S. Civil Rights Act, the Americans with Disabilities
Act, Section 504 of the U.S. Rehabilitation Act and the rules applicable to each. The
equal opportunity clause of Section 750.10 of the Illinois Department of Human Rights
Rules is specifically incorporated herein. The Contractor shall comply with Executive
Order 11246, entitled Equal Employment Opportunity, as amended by Executive Order
11375, and as supplemented by U.S. Department of Labor regulations (41 C.F.R. Chapter
60). The Contractor agrees to incorporate this clause into all subcontracts under this
Contract.
International Boycott: The Contractor certifies that neither it nor any substantially owned
affiliated company is participating or shall participate in an international boycott in
violation of the provisions of the U.S. Export Administration Act of 1979 or the
regulations of the U.S. Department of Commerce promulgated under that Act (30 ILCS
582).
Record Retention and Audits: If 30 Illinois Compiled Statutes 500/20-65 requires the
Contractor (and any subcontractors) to maintain, for a period of 3 years after the later of
the date of completion of this Contract or the date of final payment under the Contract, all
books and records relating to the performance of the Contract and necessary to support
amounts charged to the City under the Contract. The Contract and all books and records
related to the Contract shall be available for review and audit by the City and the Illinois
Auditor General. If this Contract is funded from contract/grant funds provided by the
U.S. Government, the Contract, books, and records shall be available for review and
audit by the Comptroller General of the U.S. and/or the Inspector General of the federal
East Orange Street Water Main Replacement
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
sponsoring agency. The Contractor agrees to cooperate fully with any audit and to
provide full access to all relevant materials.
United States Resident Certification: (This certification must be included in all contracts
involving personal services by non-resident aliens and foreign entities in accordance with
requirements imposed by the Internal Revenue Services for withholding and reporting
federal income taxes.) The Contractor certifies that he/she is a: x United States Citizen
___ Resident Alien ___ Non-Resident Alien The Internal Revenue Service requires that
taxes be withheld on payments made to non resident aliens for the performance of
personal services at the rate of 30%.
Tax Payer Certification : Under penalties of perjury, the Contractor certifies that its
Federal Tax Payer Identification Number or Social Security Number is (provided
separately) and is doing business as a (check one): ___ Individual ___ Real Estate
Agent ___ Sole Proprietorship ___ Government Entity ___ Partnership ___ Tax
Exempt Organization (IRC 501(a) only) x Corporation ___ Not for Profit Corporation
___ Trust or Estate ___ Medical and Health Care Services Provider Corp.
I. Indemnification:
ENGINEER shall indemnify and hold harmless the City and City’s agents, servants, and
employees against all loss, damage, and expense which it may sustain or for which it will
become liable on account of injury to or death of persons, or on account of damage to or
destruction of property resulting from the performance of work under this agreement by
ENGINEER or its Subcontractors, or due to or arising in any manner from the wrongful
act or negligence of ENGINEER or its Subcontractors of any employee of any of them.
In the event that the either party shall bring any suit, cause of action or counterclaim
against the other party, the non-prevailing party shall pay to the prevailing party the cost
and expenses incurred to answer and/or defend such action, including reasonable attorney
fees and court costs. In no event shall the either party indemnify any other party for the
consequences of that party’s negligence, including failure to follow the ENGINEER’s
recommendations.
J. Insurance :
The ENGINEER agrees that it has either attached a copy of all required insurance
certificates or that said insurance is not required due to the nature and extent of the types
of services rendered hereunder. (Not applicable as having been previously supplied)
K. Additional Terms or Modification:
The terms of this agreement shall be further modified as provided on the attachments.
Except for those terms included on the attachments, no additional terms are included as a
part of this agreement. All prior understandings and agreements between the parties are
merged into this agreement, and this agreement may not be modified orally or in any
East Orange Street Water Main Replacement
United City of Yorkville
Professional Services Agreement
Design and Construction Engineering
manner other than by an agreement in writing signed by both parties. In the event that
any provisions of this agreement shall be held to be invalid or unenforceable, the
remaining provisions shall be valid and binding on the parties. The list of exhibits is as
follows:
Exhibit 1: Professional Engineering Services
Exhibit 2: Limitation of Authority, Duties and Responsibilities of the
Resident Construction Observer
Exhibit 3: Estimate of Level of Effort and Associated Cost
Exhibit 4: Anticipated Project Schedule
Exhibit 5: Location Map
Exhibit 6: 2017 Standard Schedule of Charges
L. Notices:
All notices required to be given under the terms of this agreement shall be given mail,
addressed to the parties as follows:
For the City: For the ENGINEER:
City Administrator and City Clerk Engineering Enterprises, Inc.
United City of Yorkville 52 Wheeler Road
800 Game Farm Road Sugar Grove Illinois 60554
Yorkville, IL 60560
Either of the parties may designate in writing from time to time substitute addresses or
persons in connection with required notices.
Agreed to this _____day of __________________, 2017.
United City of Yorkville: Engineering Enterprises, Inc.:
_________________________________ ________________________________
Gary Golinski Brad Sanderson, P.E.
Mayor Vice President
_________________________________ ________________________________
Beth Warren Angie Smith
City Clerk Executive Assistant
1
EXHIBIT 1
SECTION A - PROFESSIONAL DESIGN ENGINEERING SERVICES
For purposes of this Exhibit 1 and all attachments hereto, the term “contractor” shall not
refer to Engineering Enterprises, Inc., but shall instead refer to individuals or companies
contracted with, to construct or otherwise manage the project described herein. The
ENGINEER shall furnish professional design engineering services as follows:
1. The ENGINEER will attend conferences with the OWNER, or other interested
parties as may be reasonably necessary.
2. The ENGINEER will perform the necessary design surveys, accomplish the
detailed design of the project, prepare construction drawings, specifications and
contract documents, and prepare a final cost estimate based on final design for the
entire system. It is also understood that if subsurface explorations (such as
borings, soil tests, rock soundings and the like) are required, the ENGINEER will
furnish coordination of said explorations without additional charge, but the costs
incident to such explorations shall be paid for by the OWNER as set out in
Section D hereof.
3. The contract documents furnished by the ENGINEER under Section A-2 shall
utilize IEPA endorsed construction contract documents, including Supplemental
General Conditions, Contract Change Orders, and partial payment estimates.
4. Prior to the advertisement for bids, the ENGINEER will provide for each
construction contract, not to exceed 10 copies of detailed drawings, specifications,
and contract documents for use by the OWNER, appropriate Federal, State, and
local agencies from whom approval of the project must be obtained. The cost of
such drawings, specifications, and contract documents shall be included in the
basic compensation paid to the ENGINEER.
2
5. The ENGINEER will furnish additional copies of the drawings, specifications and
contract documents as required by prospective bidders, material suppliers, and
other interested parties, but may charge them for the reasonable cost of such
copies. Upon award of each contract, the ENGINEER will furnish to the
OWNER five sets of the drawings, specifications and contract documents for
execution. The cost of these sets shall be included in the basic compensation paid
to the ENGINEER. Original documents, survey notes, tracings, and the like,
except those furnished to the ENGINEER by the OWNER, are and shall remain
the property of the ENGINEER.
6. The drawings prepared by the ENGINEER under the provisions of Section A-2
above shall be in sufficient detail to permit the actual location of the proposed
improvements on the ground. The ENGINEER shall prepare and furnish to the
OWNER without any additional compensation, three copies of map(s) showing
the general location of needed construction easements and permanent easements
and the land to be acquired. Property surveys, property plats, property
descriptions, abstracting and negotiations for land rights shall be accomplished by
the OWNER, unless the OWNER requests, and the ENGINEER agrees to provide
those services. In the event the ENGINEER is requested to provide such services,
the ENGINEER shall be additionally compensated as set out in Section D hereof.
7. The ENGINEER will attend the bid opening and tabulate the bid proposal, make
an analysis of the bids, and make recommendations for awarding contracts for
construction.
8. The ENGINEER further agrees to obtain and maintain, at the ENGINEER’s
expense, such insurance as will protect the ENGINEER from claims under the
Workman’s Compensation Act and such comprehensive general liability
insurance as will protect the OWNER and the ENGINEER from all claims for
bodily injury, death, or property damage which may arise from the performance
by the ENGINEER or by the ENGINEER’s employees of the ENGINEER’s
functions and services required under this Agreement.
3
9. The ENGINEER will complete the final plans, specifications and contract
documents and submit for approval of the OWNER, and all State regulatory
agencies to meet the project schedule(s) as summarized in Exhibit 4:
“Anticipated Project Schedule – East Orange Street Water Main Replacement”
dated December 7, 2017.
SECTION B - PROFESSIONAL CONSTRUCTION ENGINEERING SERVICES
The ENGINEER shall furnish professional construction engineering services as follows:
1. The ENGINEER will review, for conformance with the design concept, shop and
working drawings required by the construction Contract Documents and indicate
on the drawings the action taken. Such action shall be taken with reasonable
promptness.
2. The ENGINEER will interpret the intent of the drawings and specifications to
protect the OWNER against defects and deficiencies in construction on the part of
the contractors. The ENGINEER will not, however, guarantee the performance
by any contractor.
3. The ENGINEER will evaluate and determine acceptability of substitute materials
and equipment proposed by Contractor(s).
4. The ENGINEER will establish baselines for locating the work together with a
suitable number of bench marks adjacent to the work as shown in the contract
documents.
4
5. The ENGINEER will provide general engineering review of the work of the
contractor(s) as construction progresses to ascertain that the contactor is
conforming to the design concept.
(a) ENGINEER shall have authority, as the OWNER’s representative, to
require special inspection of or testing of the work, and shall receive and
review all certificates of inspections, testing and approvals required by
laws, rules, regulations, ordinances, codes, orders or the Contract
Documents (but only to determine generally that their content complies
with requirements of, and the results certified indicate compliance with,
the Contract Documents).
(b) During such engineering review, ENGINEER shall have the authority, as
the OWNER’s representative, to disapprove of or reject contractor(s)’
work while it is in progress if ENGINEER believes that such work will
not produce a completed Project that conforms generally to the Contract
Documents or that it will prejudice the integrity of the design concept of
the Project as reflected in the Contract Documents.
6. The ENGINEER will provide resident construction observation. Resident
construction observation shall consist of visual inspection of materials,
equipment, or construction work for the purpose of ascertaining that the work is in
substantial conformance with the contract documents and with the design intent.
Such observation shall not be relied upon by others as acceptance of the work.
The ENGINEER’s undertaking hereunder shall not relieve the contractor of
contractor’s obligation to perform the work in conformity with the drawings and
specifications and in a workmanlike manner; shall not make the ENGINEER an
insurer of the contractor’s performance; and shall not impose upon the
ENGINEER any obligation to see that the work is performed in a safe manner.
Exhibit 2 - The Limitations of Authority, Duties and Responsibilities of the
Resident Construction Observer is attached to this Agreement.
5
7. The ENGINEER will cooperate and work closely with representatives of the
OWNER.
8. Based on the ENGINEER’s on-site observations as an experienced and qualified
design professional, on information provided by the Resident Construction
Observer, and upon review of applications for payment with the accompanying
data and schedules by the contractor, the ENGINEER:
(a) Shall determine the amounts owing to contractor(s) and recommend in
writing payments to contractor(s) in such amounts. Such
recommendations of payment will constitute a representation to OWNER,
based on such observations and review, that the work has progressed to
the point indicated, and that, to the best of the ENGINEER’s knowledge,
information and belief, the quality of such work is generally in accordance
with the Contract Documents (subject to an evaluation of such work as a
functioning whole prior to or upon substantial completion, to the results of
any subsequent tests called for in the Contract Documents, and to any
other qualifications stated in the recommendation).
(b) By recommending any payment, ENGINEER will not hereby be deemed
to have represented that exhaustive, continuous or detailed reviews or
examinations have been made by ENGINEER to check the quality or
quantity of contractor(s)’ work as it is furnished and performed beyond the
responsibilities specifically assigned to ENGINEER in the Agreement and
the Contract Documents. ENGINEER’s review of contractor(s)’ work for
the purposes of recommending payments will not impose on Engineer
responsibility to supervise, direct or control such work or for the means,
methods, techniques, sequences, or procedures of construction or safety
precautions or programs incident thereto or contractor(s) compliance with
laws, rules, regulations, ordinances, codes or orders applicable to their
furnishing and performing the work. It will also not impose responsibility
on ENGINEER to make any examination to ascertain how or for what
6
purposes any contractor has used the moneys paid on account of the
Contract Price, or to determine that title to any of the work, materials
equipment has passed to OWNER free and clear of any lien, claims,
security interests, or encumbrances, or that there may not be other matters
at issue between OWNER and contractor that might affect the amount that
should be paid.
9. The ENGINEER will prepare necessary contract change orders for approval of
the OWNER, and others on a timely basis.
10. The ENGINEER will make a final review prior to the issuance of the statement of
substantial completion of all construction and submit a written report to the
OWNER. Prior to submitting the final pay estimate, the ENGINEER shall submit
the statement of completion to and obtain the written acceptance of the facility
from the OWNER.
11. The ENGINEER will provide the OWNER with one set of reproducible record
(as-built) drawings, and two sets of prints at no additional cost to the OWNER.
Such drawings will be based upon construction records provided by the contractor
during construction and reviewed by the resident construction observer and from
the resident construction observer’s construction data.
12. If State Statutes require notices and advertisements of final payment, the
ENGINEER shall assist in their preparation.
13. The ENGINEER will be available to furnish engineering services and
consultations necessary to correct unforeseen project operation difficulties for a
period of one year after the date of statement of substantial completion of the
facility. This service will include instruction of the OWNER in initial project
operation and maintenance but will not include supervision of normal operation of
the system. Such consultation and advice shall be at the hourly rates as described
in the attached Exhibit 6: Standard Schedule of Charges dated January 1, 2017.
7
The ENGINEER will assist the OWNER in performing a review of the project
during the 11th month after the date of the certificate of substantial completion.
14. The ENGINEER further agrees to obtain and maintain, at the ENGINEER’s
expense, such insurance as will protect the ENGINEER from claims under the
Workman’s Compensation Act and such comprehensive general liability
insurance as will protect the OWNER and the ENGINEER from all claims for
bodily injury, death, or property damage which may arise from the performance
by the ENGINEER or by the ENGINEER’s employees of the ENGINEER’s
functions and services required under this Agreement.
15. The ENGINEER will provide construction engineering services in accordance
with the periods summarized in Exhibit 4: “Anticipated Project Schedule – East
Orange Street Water Main Replacement” dated December 7, 2017.
If the above is not accomplished within the time period specified, this Agreement may be
terminated by the OWNER. The time for completion may be extended by the OWNER
for a reasonable time if completion is delayed due to unforeseeable cases beyond the
control and without the fault or negligence of the ENGINEER. Pursuant to Paragraph D
“Changes in Rates of Compensation”, the contract shall be designated on-going
consistent with the project schedule.
8
SECTION C – COMPENSATION FOR ENGINEERING SERVICES
1. The OWNER shall compensate the ENGINEER for professional design
engineering services in the amount of $43,000 Fixed Fee as summarized on
Exhibit 3: “Estimate of Level of Effort and Associated Cost for Professional
Engineering Services for East Orange Street Water Main Replacement” dated
December 7, 2017.
(a) The compensation for the professional design engineering services shall
be payable as follows:
(1) A sum which does not exceed ninety percent (90%) of the total
compensation payable under Section C-1 shall be paid in monthly
increments for work actually completed and invoiced, for grant
administration and for the preparation and submission to the
OWNER and/or IEPA of the construction drawings, specifications,
cost estimates and contract documents.
(2) A sum which, together with the compensation paid pursuant to
Section C-1(a)(1) above, equals one hundred percent (100%) of the
total compensation due and payable in accord with Section C-1
above, shall be due immediately after the award of construction
contract(s) is approved by the corporate authorities.
2. The OWNER shall compensate the ENGINEER for the construction
administration, construction staking, construction observation (including the
Resident Construction Observer), and any additional consultation and surveying
services on the basis of Hourly Rates (HR) as described on the attached Exhibit 6:
Standard Schedule of Charges dated January 1, 2017. The estimated values are
included in Exhibit 3: “Estimate of Level of Effort and Associated Cost for
Professional Engineering Services for East Orange Street Water Main
9
Replacement” dated December 7, 2017 and are estimated at $XXXX Hourly
(HR).
(a) The compensation for the construction administration, construction
staking, construction observation (including the Resident Construction
Observer), and any additional consultation and surveying services shall be
payable as follows:
(1) A sum which equals any charges for work actually completed and
invoiced shall be paid at least once per month.
3. The OWNER shall compensate the ENGINEER for direct expenses as identified
in the contract and as noted on Exhibit 3 at the actual cost or hourly cost for the
work completed.
(1) A sum which equals any charges for work actually completed and
invoiced shall be paid at least once per month.
4. The compensation for any additional engineering services authorized by the
OWNER pursuant to Section D shall be payable as follows:
(a) A sum which equals any charges for work actually completed and
invoiced shall be paid at least once per month.
10
SECTION D – ADDITIONAL ENGINEERING SERVICES
In addition to the foregoing being performed, the following services may be provided
UPON PRIOR WRITTEN AUTHORIZATION OF THE OWNER.
1. Site surveys outside of the project limits and other similar special surveys as may
be required.
2. Laboratory tests, well tests, borings, specialized geological soils hydraulic, or
other studies recommended by the ENGINEER.
3. Property surveys, detailed description of sites, maps, drawings, or estimates
related thereto; assistance in negotiating for land and easement rights.
4. Necessary data and filing maps for litigation, such as condemnation.
5. Redesigns ordered by the OWNER after final plans have been accepted by the
OWNER and IEPA.
6. Appearances before courts or boards on matters of litigation or hearings related to
the project.
7. Preparation of environmental impact assessments or environmental impact
statements.
8. Making drawings from field measurements of existing facilities when required for
planning additions or alterations thereto.
9. Services due to changes in the scope of the Project or its design, including but not
limited to, changes in size, complexity, schedule or character of construction.
11
10. Revising studies or reports which have previously been approved by the OWNER,
or when revisions are due to cases beyond the control of the ENGINEER.
11. Preparation of design documents for alternate bids where major changes require
additional documents.
12. Preparation of detailed renderings, exhibits or scale models for the Project.
13. Providing special analysis of the OWNER’s needs such as owning and operating
analysis, plan for operation and maintenance, OWNER’s special operating
drawings or charts, and any other similar analysis.
14. The preparation of feasibility studies, appraisals and evaluations, detailed quantity
surveys of material and labor, and material audits or inventories by the OWNER.
15. Additional or extended services during construction made necessary by (1) work
damaged by fire or other cause during construction, (2) defective or incomplete
work of the contractor, and/or (3) the contractor’s default on the Construction
Contract due to delinquency or insolvency.
16. Providing design services relating to future facilities, systems and equipment
which are not intended to be constructed or operated as a part of the Project.
17. Providing other services not otherwise provided for in this Agreement, including
services normally furnished by the OWNER as described in Section E –
SPECIAL PROVISIONS – Owner’s Responsibilities.
Payment for the services specified in this Section E shall be as agreed in writing between
the OWNER and the ENGINEER prior to commencement of the work. The ENGINEER
will render to OWNER for such services an itemized bill, separate from any other billing,
once each month, for compensation for services performed hereunder during such period,
12
the same to be due and payable by OWNER to the ENGINEER on or before the 10th day
of the following period. Payment for services noted in D shall be at Actual Cost (AC),
Fixed Fee (FF) or Hourly (HR).
SECTION E - SPECIAL PROVISIONS
1. OWNER’S RESPONSIBILITIES
(a) Provide to the ENGINEER all criteria, design and construction standards
and full information as to the OWNER’s requirements for the Project.
(b) Designate a person authorized to act as the OWNER’s representative. The
OWNER or his representative shall receive and examine documents
submitted by the ENGINEER, interpret and define the OWNER’s policies
and render decisions and authorizations in writing promptly to prevent
unreasonable delay in the progress of the ENGINEER’s services.
(c) Furnish laboratory tests, air and water pollution tests, reports and
inspections of samples, materials or other items required by law or by
governmental authorities having jurisdiction over this Project, or as
recommended by the ENGINEER.
(d) Provide legal, accounting, right-of-way acquisition and insurance
counseling services necessary for the Project, legal review of the
construction Contract Documents, and such auditing services as the
OWNER may require to account for expenditures of sums paid to the
contractor.
13
(e) Furnish above services at the OWNER’s expense and in such manner that
the ENGINEER may rely upon them in the performance of his services
under this Agreement and in accordance with the Project timetable.
(f) Guarantee full and free access for the ENGINEER to enter upon all
property required for the performance of the ENGINEER’s services under
this Agreement.
(g) Give prompt written notice to the ENGINEER whenever the OWNER
observes or otherwise becomes aware of any defect in the Project or other
event which may substantially affect the ENGINEER’s performance of
services under this Agreement.
(h) Protect and preserve all survey stakes and markers placed at the project
site prior to the assumption of this responsibility by the contractor and
bear all costs of replacing stakes or markers damaged or removed during
said time interval.
2. Delegation of Duties - Neither the OWNER nor the ENGINEER shall delegate his
duties under this Agreement without the written consent of the other.
3. The ENGINEER has not been retained or compensated to provide design services
relating to the contractor’s safety precautions or to means, methods, techniques,
sequences, or procedures required by the contractor to perform his work but not
relating to the final or completed structure. Omitted services include but are not
limited to shoring, scaffolding, underpinning, temporary retainment of
excavations and any erection methods and temporary bracing.
4. The ENGINEER intends to render his services under this Agreement in
accordance with generally accepted professional practices for the intended use of
the Project.
14
5. Since the ENGINEER has no control over the cost of labor, materials, equipment
or services furnished by others, or over the contractor(s) methods of determining
prices, or over competitive bidding or market conditions, his opinions of probable
Project Costs and Construction Costs provided for herein are to be made on the
basis of his experience and qualifications and represent his best judgment as an
experienced and qualified professional engineer, familiar with the construction
industry. The ENGINEER cannot and does not guarantee that proposals, bids or
actual project or construction cost will not vary from opinions of probable cost
prepared by him. If prior to the bidding or negotiating phase OWNER wishes
greater assurance as to project or construction costs he shall employ an
independent cost-estimator.
6. Access to Records:
(a) The ENGINEER agrees to include subsections E-6(b) through E-6(e)
below in all contracts and all subcontracts directly related to project
services which are in excess of $25,000.
(b) The ENGINEER shall maintain books, records, documents and other
evidence directly pertinent to performance of Agency loan work under this
Agreement consistent with generally accepted accounting standards in
accordance with the American Institute of Certified Public Accountants
Professional Standards (666 Fifth Avenue, New York, New York 10019;
June 1, 1987). The Agency or any of its duly authorized representatives
shall have access to such books, records, documents and other evidence
for the purpose of inspection, audit and copying. The ENGINEER will
provide facilities for such access and inspection.
(c) Audits conducted pursuant to this provision shall be in accordance with
generally accepted auditing standards.
15
(d) The ENGINEER agrees to the disclosure of all information and reports
resulting from access to records pursuant to subsection E-6(b) above, to
the Agency. Where the audit concerns the ENGINEER, the auditing
agency shall afford the ENGINEER an opportunity for an audit exit
conference and an opportunity to comment on the pertinent portions of the
draft audit report. The final audit report will include the written
comments, if any, of the audited parties.
(e) Records under subsection E-6(b) above shall be maintained and made
available during performance on Agency loan work under this agreement
and until three years from date of final Agency loan audit for the project.
In addition, those records which relate to any “dispute” appeal under an
Agency loan agreement, or litigation, or the settlement of claims arising
out of such performance, costs or items to which an audit exception has
been taken, shall be maintained and made available until three years after
the date of resolution of such appeal, litigation, claim or exception.
7. Covenant Against Contingent Fees - The ENGINEER warrants that no person or
selling agency has been employed or retained to solicit or secure this contract
upon an agreement or understanding for a commission, percentage, brokerage, or
contingent fee, excepting bonafide employees. For breach or violation of this
warranty, the loan recipient shall have the right to annul this agreement without
liability or in its discretion to deduct from the contract price or consideration or
otherwise recover, the full amount of such commission, percentage, brokerage, or
contingent fee.
8. Covenant Against Contingent Fees - The loan recipient warrants that no person or
agency has been employed or retained to solicit or secure a PWSLP loan upon an
agreement or understanding for a commission, percentage, brokerage, or
contingent fee. For breach or violation of this warranty, the Agency shall have
the right to annul the loan or to deduct from the loan or otherwise recover, the full
amount of such commission, percentage, brokerage, or contingent fee.
16
9. Certification Regarding Debarment – The ENGINEER certifies that the services
of anyone that has been debarred or suspended under Federal Executive Order
12549 has not, and will not, be used for work under this Agreement.
10. Affirmative Action – The ENGINEER agrees to take affirmative steps to assure
that disadvantaged business enterprises are utilized when possible as sources of
supplies, equipment, construction and services in accordance with the Clean
Water Loan Program rules. As required by the award conditions of USEPA's
Assistance Agreement with IEPA, the ENGINEER acknowledges that the fair
share percentages are 5% for MBEs and 12% for WBEs.
11. The ENGINEER shall not discriminate on the basis of race, color, national origin
or sex in the performance of this contract. The contractor shall carry out
applicable requirements of 40 CFR Part 33 in the award and administration of
contracts awarded under EPA financial assistance agreements. Failure by the
contractor to carry out these requirements is a material breach of this contract
which may result in the termination of this contract or other legally available
remedies.
17
EXHIBIT 2
THE LIMITATIONS OF AUTHORITY, DUTIES AND RESPONSIBILITIES OF THE
RESIDENT CONSTRUCTION OBSERVER ARE AS FOLLOWS:
1. The Resident Construction Observer shall act under the direct supervision of the
ENGINEER, shall be the ENGINEER’s agent in all matters relating to on-site
construction review of the contractor’s work, shall communicate only with the
ENGINEER and the contractor (or contractor’s), and shall communicate with
subcontractors only through the contractor or his authorized superintendent. The
OWNER shall communicate with the Resident Construction Observer only
through the ENGINEER.
2. The Resident Construction Observer shall review and inspect on-site construction
activities of the contractor relating to portions of the Project designed and
specified by the Engineer as contained in the Construction Contract Documents.
3. Specifically omitted from the Resident Construction Observer’s duties is any
review of the contractor’s safety precautions, or the means, methods, sequences,
or procedures required for the contractor to perform the work but not relating to
the final or completed Project. Omitted design or review services include but are
not limited to shoring, scaffolding, underpinning, temporary retainment of
excavations and any erection methods and temporary bracing.
4. The specific duties and responsibilities of the Resident Construction Observer are
enumerated as follows:
(a) Schedules: Review the progress schedule, schedule of Shop Drawing
submissions and schedule of values prepared by contractor and consult
with ENGINEER concerning their acceptability.
18
(b) Conferences: Attend preconstruction conferences. Arrange a schedule of
progress meetings and other job conferences as required in consultation
with ENGINEER and notify those expected to attend in advance. Attend
meetings and maintain and circulate copies of minutes thereof.
(c) Liaison:
(1) Serve as ENGINEER’s liaison with contractor, working principally
through contractor’s superintendent and assist him in
understanding the intent of the Contract Documents.
(2) Assist ENGINEER in serving as OWNER’s liaison with contractor
when contractor’s operations affect OWNER’s on-site operations.
(3) As requested by ENGINEER, assist in obtaining from OWNER
additional details or information, when required at the job site for
proper erection of the work.
(d) Shop Drawings and Samples:
(2) Receive and record date of receipt of Shop Drawings and samples.
(3) Receive samples which are furnished at the site by contrctor, and
notify ENGINEER of their availability for examination.
(3) Advise ENGINEER and contractor or its superintendent
immediately of the commencement of any work requiring a Shop
Drawing or sample submission if the submission has not been
approved by ENGINEER.
19
(e) Review of Work, Rejection of Defective Work, Inspections and Tests:
(1) Conduct on-site inspection of the work in progress to assist
ENGINEER in determining if the work is proceeding in
accordance with the Contract Documents and that completed work
will conform to the Contract Documents.
(2) Report to ENGINEER whenever he believes that any work is
unsatisfactory, faulty or defective or does not conform to the
Contract Documents, or does not meet the requirements of any
inspections, test or approval required to be made or has been
damaged prior to final payment; and advise ENGINEER when he
believes work should be corrected or rejected or should be
uncovered for inspection, or requires special testing, inspection or
approval.
(3) Verify that tests, equipment and systems start-ups, and operating
and maintenance instructions are conducted as required by the
Contract Documents and in presence of the required personnel, and
that contractor maintains adequate records thereof; observe, record
and report to ENGINEER appropriate details relative to the test
procedures and start-ups.
(4) Accompany visiting inspectors representing public or other
agencies having jurisdiction over the Project, record the outcome
of these inspections and report to ENGINEER.
(f) Interpretation of Contract Documents: Transmit to contractor
ENGINEER’s clarifications and interpretations of the Contract
Documents.
20
(g) Modifications: Consider and evaluate contractor’s suggestions for
modifications in Drawings or Specifications and report them with
recommendations to ENGINEER.
(h) Records:
(1) Maintain at the job site orderly files for correspondence, reports of
job conferences, Shop Drawings and samples submissions,
reproductions of original Contract Documents including all
addenda, change orders, field orders, additional drawings issued
subsequent to the execution of the Contract, ENGINEER’s
clarifications and interpretations of the Contract Documents,
progress reports, and other Project related documents.
(2) Keep a diary or log book, recording hours on the job site, weather
conditions, data relative to questions of extras or deductions, list of
visiting officials and representatives of manufacturers, fabricators,
suppliers and distributors, daily activities, decisions, observations
in general and specific observations in more detail as in the case of
observing test procedures. Send copies to ENGINEER.
(4) Record names, addresses and telephone numbers of all
contractor’s, subcontractors and major suppliers of materials and
equipment.
(i) Reports:
(1) Furnish ENGINEER periodic reports as required of progress of the
work and contractor’s compliance with the approved progress
schedule and schedule of Shop Drawing submissions.
21
(2) Consult with ENGINEER in advance of schedule major tests,
inspections or start of important phases of the work.
(3) Report immediately to ENGINEER upon the occurrence of any
accident.
(j) Payment Requisitions: Review applications for payment with contractor
for compliance with the established procedure for their submission and
forward them with recommendations to ENGINEER, noting particularly
their relation to the schedule of values, work completed and materials and
equipment delivered at the site but not incorporated in the work.
(k) Certificates, Maintenance and Operating Manuals: During the course of
the work, verify that certificates, maintenance and operation manuals and
other data required to be assembled and furnished by contractor are
applicable to the items actually installed; and deliver this material to
ENGINEER for his review and forwarding to OWNER prior to final
acceptance of the work.
(l) Completion:
(1) Before ENGINEER issues a Statement of Substantial Completion,
submit to contractor a list of observed items requiring completion
or correction.
(2) Conduct final review in the company of ENGINEER, OWNER
and contractor and prepare a final list of items to be completed or
corrected.
(3) Verify that all items on final list have been completed or corrected
and make recommendations to ENGINEER concerning
acceptance.
ENTITY:ADMIN. WORKPRINCIPAL SENIORSENIOR SENIOR SENIOR ITEM COSTWORKIN PROJECTPROJECT PROJECTPROJECT PROJECT PROJECT CAD PROJECT HOUR PERITEMCHARGE MANAGERENGINEER I ENGINEERMANAGER SURVEYOR II TECHNICIAN MANAGER TECHNICIAN I ADMIN. SUMM. ITEMNO. WORK ITEM HOURLY RATE: $191 $185 $155 $133 $168 $155 $145 $145 $133 $80FINAL ENGINEERING2.1 Project Management and Administration 5 18 2 - - - - - - - 25 4,595$ 2.2 Project Meetings3 4 6 - - - - - - - 13 2,243$ 2.3 Topographic Survey - - - - 8 23 - - - - 31 4,909$ 2.4 Utility Coordination- - 1 3 - - - - - - 4 554$ 2.5 Final Plans, Specifications and Estimates 8 10 70 45 - - - 15 35 - 183 27,043$ 2.6 Permitting- - 4 2 - - - - - - 6 886$ 2.7 Bidding and Contracting - 4 8 1 - - - - - 6 19 2,593$ Final Engineering Subtotal: 16 36 91 51 8 23 - 15 35 6 281 42,823$ CONSTRUCTION ENGINEERING3.1 Contract Administration- - - - - - - - - - - -$ 3.2 Construction Layout and Record Drawings- - - - - - - - - - - -$ 3.3 Observation and Documentation- - - - - - - - - 2 2 160$ Construction Engineering Subtotal: - - - - - - - - - 2 2 160$ PROJECT TOTAL: 16 36 91 51 8 23 - 15 35 8 283 42,983 Printing = 250$ 30,604$ Mileage = -$ 4,909$ Material Testing = -$ 6,830$ 500$ 640$ DIRECT EXPENSES = 750$ 42,983$ 43,733$ \\Milkyway\EEI_Storage\Docs\Public\Yorkville\2017\YO1751-P East Orange Water Main Replacement\PSA\[03.Exhibit 3 - Level of Effort.xlsx]Fee Summary - No CODecember 7, 2017EXHIBIT 3ESTIMATE OF LEVEL OF EFFORT AND ASSOCIATED COST FORPROFESSIONAL ENGINEERING SERVICES FOREAST ORANGE STREET WATER MAIN REPLACEMENTUnited City of Yorkville, ILENGINEERING SURVEYING DRAFTINGPROJECT ROLE:DIRECT EXPENSESLABOR SUMMARYTOTAL EXPENSES = Engineering Expenses = Surveying Expenses = Drafting Expenses = Environmental Assessment = Administrative Expenses = TOTAL LABOR EXPENSES =
WORKYear:ITEMMonth:NO. WORK ITEM Week Starting:1234123412341234123412341234123412341234FINAL DESIGN ENGINEERING2.1 Project Management and Administration2.2 Project Meetings2.3 Topographic Survey2.4 Utility Coordination2.5 Final Plans, Specifications and Estimates2.6 Permitting2.7 Bidding and ContractingCONSTRUCTION ENGINEERING3.1 Contract Administration3.2 Construction Layout and Record Drawings3.3 Observation and Documentation\\Milkyway\EEI_Storage\Docs\Public\Yorkville\2017\YO1751-P East Orange Water Main Replacement\PSA\[04.Exhibit 4 - Schedule.xls]ScheduleProject Management & QC/QA PermittingMeeting(s) Bidding and ContractingDesign ConstructionEXHIBIT 4ANTICIPATED PROJECT SCHEDULEEAST ORANGE STREET WATER MAIN REPLACEMENTUNITED CITY OF YORKVILLE, ILDecember 7, 2017January February April20172018July AugustLegendMay JuneMarchNovember December
GF
GF
GF
GF
GF
GF
GF GF
GF
GF
GF
GF
GF
GF
GF
GF
GF GF
GF
GF
GF
GF
GF
GF
GF
GF
GF
GF
GF
GF
GF
GF
GF
GF
GF GF GF
GF
GF
GF
GF
GF
GF
GF
GF
GF
GF GF
GF
GF
GF
GF
GF
GFGF
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(!(
!(!(
!(
!(!(
!(
!(
!(
!(!(
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(!(MillFox
BridgeMainOrange
Washington
Colonial
S
c
h
o
ol
h
o
u
s
eHeustis Illini
Olsen
WalterBell
DeerDolph
Beecher
Elizabeth
Engineering Enterprises, Inc.
52 Wheeler Road
Sugar Grove, Illinois 60554
(630) 466-6700
Legend
!(VALVE
GF HYDRANT
UNKNOWN WATER MAIN
3" WATER MAIN AND SMALLER
4" WATER MAIN
6" WATER MAN
8" WATER MAIN
10" WATER MAIN
12" WATER MAIN
16" WATER MAIN
WATER IMPROVEMENT LIMITS
LOCATION MAP
www.eeiweb.com
DATE:
PROJECT NO.:
FILE:
PATH:
BY:
December 2017
YO1751
YO1751_Location Map.mxd.MXD
H:\GIS\PUBLIC\YORKVILLE\2016\
MJT ³
300 0 300150 Feet
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #8
Tracking Number
PW 2017-92
Bristol Bay Subdivsion – Unit 11
Public Works Committee – December 19, 2017
Consideration of Approval
Subdivision Partial Acceptance Consideration
Brad Sanderson Engineering
Name Department
Pulte has requested that the City accept the public improvements for a portion of Bristol Bay –
Unit 11 for ownership and maintenance (see attached).
All work related to the public improvements, including punch list work in the area described has
been completed. We recommend that the public improvements (water main, sanitary sewer and
storm sewer) as described in the attached Bill of Sale be accepted for ownership and
maintenance by the City.
As required by City Code, the developer will be responsible to provide a performance guarantee
to cover the one-year maintenance period. This period starts after the City formally accepts the
improvements. The amount required is to be 10% of the value of the public improvements.
Accordingly, the guarantee shall be as follows:
Unit 11 Improvements (Partial)
Original Value of Improvements $161,591.65
Required Maintenance Guarantee Value (10% of Original) $16,159.00
There are currently three (3) bonds that cover improvements within Unit 11. The reduction
($907,282.55) and release of those bonds will be addressed as part of the Bristol Bay
Resubdivision and are summarized below.
Unit 11 $18,025.26 Arch Insurance
Co., # SU1114162
Earthwork Replacement bond to be
provided per agreement
Bond to be
released
Unit 11 $657,233.93 Arch Insurance
Co., # SU1114155
Site Work Replacement bond to be
provided per agreement
Bond to be
released
Unit 11 $232,023.36 Arch Insurance
Co., # SU1114156
Landscaping Replacement bond to be
provided per agreement
Bond to be
released
$907,282.55
If you have any questions or require additional information, please call.
Memorandum
To: Bart Olson, City Administrator
From: Brad Sanderson, EEI
CC: Eric Dhuse, Director of Public Works
Krysti Barksdale-Noble, Community Dev. Dir.
Lisa Pickering, Deputy City Clerk
Date: November 27, 2017
Subject: Bristol Bay – Unit 11
1
BILL OF SALE
Seller, _______________, in consideration of One and 00/100th Dollar ($1.00), receipt
hereby acknowledged, does hereby sell, assign, transfer and convey to the Buyer, the United City
of Yorkville, an Illinois municipal corporation, at 800 Game Farm Road, Yorkville, Illinois
60560, the following personal property to wit described in Exhibit A attached hereto for the
development know as Bristol Bay – Unit 11, and generally shown on Exhibit B.
Seller hereby represents and warrants to Buyer that Seller is the absolute owner of said
property, that said property is free and clear of all liens, charges and encumbrances, and that
Seller has full right, power, and authority to sell said property and to make this Bill of Sale.
IN WITNESS WHEREOF, Seller has signed and sealed this Bill of Sale at
___________________________________, this _____ day of _______________, 20__.
Subscribed and Sworn to
before me this _____ day
of _____________, 20__.
_______________________
Notary Public
EXHIBIT A (PARTIAL ACCEPTANCE)
BRISTOL BAY - UNIT 11
UNITED CITY OF YORKVILLE
UNIT QUANTITY
FOOT 128
FOOT 746
FOOT 86
FOOT 0
EACH 6
EACH 5
EACH 0
CU YD 250
FOOT 208
FOOT 13
FOOT 1,078
EACH 2
EACH 2
CU YD 260
FOOT 733
FOOT 347
FOOT 268
FOOT 0
FOOT 0
FOOT 218
FOOT 0
FOOT 0
FOOT 0
EACH 1
EACH 0
EACH 1
EACH 0
EACH 2
EACH 3
EACH 1
EACH 4
EACH 1
EACH 3
EACH 0
8" PVC (SDR 26) SANITARY SEWER (10'-15' DEEP)
INLETS, TYPE A 2' DIAMETER, TYPE 11 FRAME, OPEN LID
INLETS, TYPE A 2' DIAMETER, TYPE 11 FRAME & GRATE
MANHOLES, TYPE A, 4' DIAMETER, TYPE 1 FRAME CLOSED LID
MANHOLES, TYPE A, 4' DIAMETER, TYPE 8 GRATE
MANHOLES, TYPE A, 4' DIAMETER, TYPE 11 FRAME & GRATE
MANHOLES, TYPE A, 5' DIAMETER, TYPE 1 FRAME CLOSED LID
STORM SEWERS, CLASS A, 48"
CATCH BASINS, TYPE A 4" DIAMETER, TYPE 11 FRAME & GRATE
CATCH BASINS, TYPE A 5" DIAMETER, TYPE 11 FRAME & GRATE
CATCH BASINS, TYPE A 4' DIAMETER, TYPE 8 GRATE
CATCH BASINS, TYPE A 4' DIAMETER, TYPE 1 FRAME, OPEN LID
INLETS, TYPE A 2' DIAMETER, TYPE 8 GRATE
STORM SEWERS, CLASS A, 18"
STORM SEWERS, CLASS A, 21"
STORM SEWERS, CLASS A, 24"
STORM SEWERS, CLASS A, 30"
STORM SEWERS, CLASS A, 36"
STORM SEWERS, CLASS A, 42"
STORM SEWERS, CLASS A, 15"
4' MANHOLES (10'-15' DEEP)
TRENCH BACKFILL
WATER MAIN CONSTRUCTION
2 - INCH WATER MAIN SERVICE, COPPER TY K
6 - INCH WATER MAIN, DUCTILE IRON
8 - INCH WATER MAIN, DUCTILE IRON
WATER VALVE AND VALVE BOX, 8"
FIRE HYDRANTS WITH AUXILARY VALVE
TRENCH BACKFILL
STORM SEWER CONSTRUCTION
STORM SEWERS, CLASS A, 12"
4' MANHOLES (<10' DEEP)
4' MANHOLES (15'-20' DEEP)
UTILITIES
SANITARY SEWER CONSTRUCTION
6" SANITARY SEWER SERVICE
8" PVC (SDR 26) SANITARY SEWER (<10' DEEP)
8" PVC (SDR 26) SANITARY SEWER (10'-15' DEEP)
EXHIBIT A (PARTIAL ACCEPTANCE)
BRISTOL BAY - UNIT 11
UNITED CITY OF YORKVILLE
EACH 0
EACH 3
EACH 0
EACH 1
EACH 1
EACH 0
EACH 0MANHOLES, TYPE A, 8' DIAMETER, TYPE 11 FRAME & GRATE
MANHOLES, TYPE A, 5' DIAMETER, TYPE 8 GRATE
MANHOLES, TYPE A, 5' DIAMETER, TYPE 11 FRAME & GRATE
MANHOLES, TYPE A, 6' DIAMETER, TYPE 1 FRAME OPEN LID
MANHOLES, TYPE A, 6' DIAMETER, TYPE 8 GRATE
MANHOLES, TYPE A, 6' DIAMETER, TYPE 11 FRAME & GRATE
MANHOLES, TYPE A, 7' DIAMETER, TYPE 11 FRAME & GRATE
100010050FeetEngineering Enterprises, Inc.52 Wheeler RoadSugar Grove, Illinois 60554(630) 466-6700 / www.eeiweb.conUNIT 11LOCATION MAPDATE:NOVEMBER 2017United City of Yorkville800 Game Farm RoadYorkville, IL 60560(630) 553-4350http://www.yorkville.il.usBRISTOL BAYUNITED CITY OF YORKVILLEKENDALL COUNTY, ILLINOISCONSULTING ENGINEERSNO. DATEREVISIONSPROJECT NO.:YO1728PATH:H:/GIS/PUBLIC/YORKVILLE/2017/YO1728- BRISTOL BAY UNIT 11 .MXDFILE:fffääNORTHUnit BoundaryArea of Acceptance
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #9
Tracking Number
PW 2017-93
Revision to Water Meter Price – Section 7-5-4-1
Public Works Committee - December 19, 2017
Majority
Approval
Updated costs to Section 7-5-4-1 to the City’s Code to match the water meter price
that was authorized by City Council on July 25, 2017
Erin Willrett Administration
Name Department
Summary
Updated costs to Section 7-5-4-1 to the City’s Code to match the water meter price that was
authorized by City Council on July 25, 2017.
Background
Several sections of the code were modified and adopted by the City Council in October, 2017.
Unfortunately, the water meter price was not updated to reflect the price increase that was authorized by
City Council on July 25, 2017.
CURRENT LANGUAGE:
7-5-4-1: METER COSTS:
All meters and shall be purchased from the City at the then current prices as established by the City
Council and will include the meter, couplers, gaskets, back flow prevention device (for residential units
only) meter wire and outside reader.
Applicants purchasing non-residential meters will be required to purchase an approved back flow
prevention device separately.
Residential Meter Costs
5/8”x3/4” - $435.00
¾”x3/4” - $460.00
* 1” - $590.00
* used only when necessitated by plumbing code
Non-Residential Meter Costs
1 ½” - $1900.00
2” - $2110.00
3” - $2600.00
Memorandum
To: Public Works Committee
From: Erin Willrett, Assistant City Administrator
CC: Bart Olson, City Administrator
Date: December 19, 2017
Subject: Revision to Water Meter Price – Section 7-5-4-1
APPROVED LANGUAGE (July 25, 2017)/PROPOSED LANGUAGE:
7-5-4-1: METER COSTS
All meters and shall be purchased from the City at the then current prices as established by the
City Council and will include the meter, couplers, gaskets, back flow prevention device (for
residential units only) meter wire and outside reader.
Applicants purchasing non-residential meters will be required to purchase an approved back
flow prevention device separately.
Residential Meter Costs:
Meter Size Cost
¾ inch $550.00
1 inch* $700.00
*used only when necessitated by plumbing code
Non-Residential Meter Costs:
Meter Size Cost
1.5 inch $2,300.00
2 inches $2,500.00
3 inches $3,100.00
Recommendation
Staff recommends approval of the City Council approved language from July 25, 2017, as
outlined in the Ordinance Amending the Water Meter Fees.
Ordinance No. 2017-____
Page 1
Ordinance No. 2017-_____
AN ORDINANCE OF THE UNITED CITY OF YORKVILLE, ILLINOIS
AMENDING THE WATER METER FEES
WHEREAS, the United City of Yorkville (the “City”) is a duly organized and validly
existing non home-rule municipality created in accordance with the Constitution of the State of
Illinois of 1970 and the laws of the State; and,
WHEREAS, the water meter fee includes for new construction the cost of the meter,
outside reader, wire, residential backflow prevention device, couplers, flanges and installation of
the outside reader; and,
NOW THEREFORE BE IT ORDAINED by the Mayor and City Council of the United
City of Yorkville, Kendall County, Illinois, as follows:
Section 1: That Section 7-5-4-1 of the Yorkville City Code be and is hereby amended to
read as follows:
“7-5-4-1: METER COSTS
All meters and shall be purchased from the City at the then current prices as established
by the City Council and will include the meter, couplers, gaskets, back flow prevention
device (for residential units only) meter wire and outside reader.
Applicants purchasing non-residential meters will be required to purchase an approved
back flow prevention device separately.
Residential Meter Costs:
Meter Size Cost
¾ inch $550.00
1 inch* $700.00
*used only when necessitated by plumbing code
Non-Residential Meter Costs:
Meter Size Cost
1.5 inch $2,300.00
2 inches $2,500.00
3 inches $3,100.00
Section 2: This Ordinance shall be in full force and effect upon its passage, approval, and
publication as provided by law.
Ordinance No. 2017-____
Page 2
Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this _____
day of _________________ 2017.
____________________________________
City Clerk
CARLO COLOSIMO ________ KEN KOCH ________
JACKIE MILSCHEWSKI ________ ARDEN JOE PLOCHER ________
CHRIS FUNKHOUSER ________ JOEL FRIEDERS ________
SEAVER TARULIS ________ ALEX HERNANDEZ ________
Approved by me, as Mayor of the United City of Yorkville, Kendall County, Illinois, this _____
day of _________________ 2017.
____________________________________
Mayor
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
Old Business #1
Tracking Number
ADM 2017-70
Building Condition Reports 2017
Public Works Committee – December 19, 2017
N/A
N/A
N/A
Discussion of the Reports from the Building Condition Survey that EMG performed
on City-owned structures and facilities.
Erin Willrett Administration
Name Department
Summary
Review of 908 Game Farm Road and 185 Wolf Street from the Building Condition Survey that
EMG performed on City-owned structures and facilities.
Background
EMG’s reports include an assessment of all City-owned buildings, structures and parking
facilities (structural frame and building envelope, curtain wall, roofing, plumbing, heating, air
conditioning and ventilation, electrical, vertical transportation, life safety/fire protection, interior
elements, code inquiries, ADA, and mold).
The presentation walks a reader through Report #005 “Beecher Community Center 908 Game
Farm Road” and Report #036 “Public Works Garage (Frame Building) 185 Wolf Street”.
One component of the report is to calculate the immediate repair cost. This was calculated by
EMG and represents items that were in disrepair as of the date of the site visit. The description and cost
are provided in the Immediate Repairs Report at the beginning of each document.
Another important report is the Replacement Reserve Report which spans a 20 year period. This
outlines the description, cost and estimates the year that the item will need to be
replaced/repaired/maintained. In time, this report will be uploaded to a database for staff to maintain
and keep updated when items are programmed and/or completed.
Other items to note within the report is the Executive Summary where the general property
information is located as well as the site visit date, point of contact and the general systematic condition
summary is located.
Another major goal of the reports was to calculate the Facility Condition Index (FCI), which
gives an indication of a building’s overall condition. The FCI ranking is calculated by dividing the cost
of the Immediate Repair cost by the cost of the Current Replacement Value. That number is represented
by a percentage and that equates to a condition rating from “Good” to “Very Poor”. This FCI was
calculated for the current state of the facility and also the 10-year FCI. This rating can be used as a
guide for each facility when determining to maintain facilities or to replace facilities.
Within the FCI findings page also included is the Current Replacement Value (CRV) and the
calculation of the Total Capital Needs. The Total Capital needs is calculated by the cost of the
immediate repairs added to the Replacement Reserves. This represents a cost that it will take to
maintain the facility over the next 10 years.
Memorandum
To: Public Works Committee
From: Erin Willrett, Assistant City Administrator
CC: Bart Olson, City Administrator
Date: December 19, 2017
Subject: EMG Building Condition Reports 2017
Other items included in the report are photographs of the facility and certain equipment, a site
plan of the facility, an aerial photograph of the facility, ADA checklist, and a pre-visit questionnaire.
This is all information relevant to the facility and was used in the creation of the overall report.
Recommendation
Staff has made recommendations for both City facilities based on the Building Condition
Reports. This is informational at this time.
Beecher Center, 908 Game Farm Road – Continue to Maintain
Parks Facility, 185 Wolf Street – Continue to Maintain
Ykill M iil Fili Yorkville Municipal Facility Condition Assessment ReviewCondition Assessment ReviewFACILITY CONDITION ASSESSMENT
Report #005Beecher Community Center908 Game Farm Road
Immediate Repairs Report 908 Game Farm Road9EMG outlined items that were in disrepair as of the date of the site visit The main item are listed below:of the site visit. The main item are listed below:Backflow Replacement- $2,605Fire Alarm System Upgrade - $22,234Fire Alarm Control Panel Replacement$20298Fire Alarm Control Panel Replacement-$20298Outlines Item Number ID for more detail in report Page 3 of the report gives description of the immediate irepairAppendix A outlines the pictures of the areas reviewed
Immediate Repairs Report908 Game Farm Road
Backflow & Fire Control Panel908 Game Farm Road9
Replacement Reserve Report – 20 years908 Game Farm Road9Chart shows planned repairs/replacements over a 20 year time-frame (Page 3 and 4 of the Report)frame (Page 3 and 4 of the Report)This data will be uploaded to a databaseCreate report and update when items are programmed and/or completedpThis report shows additional projects to be programmed within the next 20 years. Large Items are listed below. Total Escalated Costs = $1,619,074Parking Lot ReplacementSidewalk ReplacementRoof ReplacementExterior Wall ReplacementpAir Handler ReplacementFire Alarm UpgradeInterior and Exterior Door ReplacementInterior Floor ReplacementInterior Floor ReplacementKitchen Cabinet, Counter and Appliance Replacement
Executive Summary 908 Game Farm Road9General Property pyInformationSite Visit Date/Point of ContactBuilding Condition S (Fi)Summary (Fair)
Facility Condition Index (FCI) 908 Game Farm Road9Indication of Building’s Overall ConditionOverall ConditionMeasured for Current Year and +10 YearsCurrent =Ratio of Current =Ratio of Immediate Repair Costs to Current Replacement Value10 Year = Ratio of Anticipated Capital Reserve Needs to the 10 Y Rl t VlYear Replacement ValueRating from Very Poor to Good
FCI Rating Cont’d 908 Game Farm Road9Metric for Current Year FCI = FairFCI = Immediate Repair ($46,159) / Current Replacement Value ($1,726,643) = 2.6%p ($4 , 59) / p ($ ,7 , 43)Metric for Current Year FCI = Good10-Year FCI = Replacement Reserves ($1,068,339) / Current Replacement Value ($1,726,643) = 61.8% = Very PoorTotal Capital Needs through 2037 (IR + RR) = $1,114,498C t R l t V l (CRV) $1 26 643Current Replacement Value (CRV) = $1,726,643
Important Pictures908 Game Farm Road9
Work Completed Since EMG Site Visit908 Game Farm Road9Parking Lot Paving and Stripingggpg
FCA Report #036Parks Department p(Public Works Garage (Frame Building)185 Wolf Street
Immediate Repairs Report 185 Wolf Street5Total Immediate Repair Cost $109,797p9,797Page 2 of the ReportCosts Include:Sprinkler System Retrofit $84,786Fire Alarm System Install 25,011
Replacement Reserve Report 185 Wolf Street5Total Deficiency Repair Estimate through 2037 = $638,251Page 3 of the reportCtl ItCostly Items:Parking Lot ReplacementFurnace ReplacementpInterior Lighting System UpgradeSprinkler System UpgradeFire Alarm System InstallFire Alarm System InstallInterior PaintingKitchen Cabinet Replacement
FCI 185 Wolf Street5PDF Page 6 of the report, page number 2number 2Current Year Metric for FCI = FairCurrent Year FCI = Immediate Repair ($109,797) / Current Replacement Value ($1 832 371) = Replacement Value ($1,832,371) = 5.9% = FairMetric for 10-Year FCI = Good10-Year FCI = Replacement R ($6) / Ct Reserves ($53,136) / Current Replacement Value ($1,832,731) = 2.8% = GoodTotal Capital Needs through 2037 (IR RR) $ 6(IR + RR) = $162,933Current Replacement Value (CRV) = $1,832,371
Important Pictures185 Wolf Street5
Work Completed Since EMG Site Visit185 Wolf Street5Parking Lot Paving and Stripingggpg
Staff RecommendationsBeecher Community Center–908 Game Farm Roady9Immediate Repairs = $48,168p4,Replacement Reserves Report (20 year) = $1,818,074Current Year FCI = 2.6% = Good10-Year FCI = 61.8% = Very PoorCurrent Replacement Value (CRV) = $1,726,643Total Capital Needs = $1,114,498Recommendation = Continue to Maintain
Staff RecommendationsParks Department– 185 Wolf Streetp5Immediate Repairs = $109,797p9,797Replacement Reserves Report (20 year) = $638,251Current Year FCI = 5.9% = Fair5910-Year FCI = 2.8% = GoodCurrent Replacement Value (CRV) = $1,832,371p ( ) $ , 3 ,37Total Capital Needs = $162,933Recommendation = Continue to Maintain
EMG Corporate Headquarters 10461 Mill Run Circle, Suite 1100, Owings Mills, MD 21117 www.EMGcorp.com p 800.733.0660
Prepared for:
United City of Yorkville
800 Game Farm Road
Yorkville, Illinois 60560
FACILITY CONDITION ASSESSMENT
Beecher Community Center
908 Game Farm Road
Yorkville, Illinois 60560
PREPARED BY: EMG CONTACT:
EMG Andrew Hupp
10461 Mill Run Circle, Suite 1100 Senior Engineering Consultant
Owings Mills, Maryland 21117 800.733.0660 x6632
800.733.0660 arhupp@emgcorp.com
www.EMGcorp.com
EMG Project Number: Date of Report: On Site Date:
122700.17R000-005.322 September 13, 2017 May 23, 2017
FACILITY CONDITION ASSESSMENT
Immediate Repairs Report
Beecher Community Center
9/13/2017
Location Name EMG Renamed Item NumberID Cost Description QuantityUnit Unit Cost Subtotal Deficiency Repair Estimate *
Beecher Community Center 5.4 612426 Retaining Wall, Brick/Stone (per SF Face), Repair 50 SF $11.39 $569 $569
Beecher Community Center 7.2 612452 Backflow Preventer, 2", Replace 1 EA $2,603.17 $2,603 $2,603
Beecher Community Center 7.2 612469 ADA, Restroom, Lavatory Pipe Wraps, Install 6 EA $75.90 $455 $455
Beecher Community Center 7.6 612440 Fire Alarm System, Office Building, Upgrade 9423 SF $2.36 $22,234 $22,234
Beecher Community Center 7.6 612434 Fire Alarm Control Panel, Addressable, Replace 1 EA $20,297.59 $20,298 $20,298
Immediate Repairs Total $46,159
* Location Factor included in totals.
Replacement Reserves Report
Beecher Community Center
9/13/2017
Location Name
EMG
Renamed
Item
Number
ID Cost Description Lifespan
(EUL)EAge RUL QuantityUnit Unit Cost Subtotal 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
Deficiency
Repair
Estimate
Beecher Community Center 5.2 612307 Parking Lots, Asphalt Pavement, Mill & Overlay 25 23 2 43802 SF $3.28 $143,688 $143,688 $143,688
Beecher Community Center 5.2 612308 Parking Lots, Asphalt Pavement, Seal & Stripe 5 0 5 11308 SF $0.38 $4,291 $4,291 $4,291 $4,291 $12,874
Beecher Community Center 5.2 612309 Pedestrian Pavement, Sidewalk, Concrete, Replace 30 29 1 6052 SF $19.82 $119,962 $119,962 $119,962
Beecher Community Center 5.4 612426 Retaining Wall, Brick/Stone (per SF Face), Repair 0 0 0 50 SF $11.39 $569 $569 $569
Beecher Community Center 5.5 612412 High Pressure Sodium Lighting Fixture, 400 W, Replace 20 10 10 1 EA $1,033.67 $1,034 $1,034 $1,034
Beecher Community Center 5.5 612305 Signage, Property, Monument/Pylon, Replace 20 10 10 1 EA $8,602.00 $8,602 $8,602 $8,602
Beecher Community Center 5.5 612411 Flagpole, Metal, Replace 20 5 15 1 EA $2,530.00 $2,530 $2,530 $2,530
Beecher Community Center 5.5 612410 Pole Light, Exterior, 135 to 1000 W HID (Fixture Only), Replace 20 10 10 4 EA $4,630.42 $18,522 $18,522 $18,522
Beecher Community Center 6.3 612306 Roof, Asphalt Shingle, Replace 20 15 5 11308 SF $3.42 $38,679 $38,679 $38,679
Beecher Community Center 6.4 612310 Exterior Wall, Aluminum Siding, Replace 40 34 6 6000 SF $8.67 $52,049 $52,049 $52,049
Beecher Community Center 6.6 612419 Window, Aluminum, Replace 30 28 2 2 EA $584.21 $1,168 $1,168 $1,168
Beecher Community Center 6.6 612418 Window, Aluminum Double-Glazed Large, Replace 30 15 15 6 EA $870.45 $5,223 $5,223 $5,223
Beecher Community Center 6.6 612420 Window, Aluminum Double-Glazed Small, Replace 30 15 15 29 EA $584.21 $16,942 $16,942 $16,942
Beecher Community Center 6.6 612414 Exterior Door, Fully-Glazed Aluminum-Framed Swinging Motor-Operated, Replace 30 20 10 2 EA $10,194.36 $20,389 $20,389 $20,389
Beecher Community Center 6.6 612413 Exterior Door, Fully-Glazed Aluminum-Framed Swinging, Replace 30 20 10 5 EA $2,106.57 $10,533 $10,533 $10,533
Beecher Community Center 6.7 612425 Pedestrian Pavement, Sidewalk, Clay Brick/Masonry Pavers, Replace 30 20 10 75 SF $34.11 $2,558 $2,558 $2,558
Beecher Community Center 7.1 612487 Air Handler, Exterior, 10,001 to 16,000 CFM, Replace 15 12 3 1 EA $70,713.29 $70,713 $70,713 $70,713 $141,427
Beecher Community Center 7.1 612483 Air Handler, Exterior, 4,001 to 6,000 CFM, Replace 15 12 3 1 EA $27,804.57 $27,805 $27,805 $27,805 $55,609
Beecher Community Center 7.1 612482 Air Handler, Exterior, 8,001 to 10,000 CFM, Replace 15 12 3 1 EA $45,895.13 $45,895 $45,895 $45,895 $91,790
Beecher Community Center 7.1 612490 Exhaust Fan, Centrifugal, 1,500 CFM, Replace 15 12 3 1 EA $2,664.18 $2,664 $2,664 $2,664 $5,328
Beecher Community Center 7.1 612488 Exhaust Fan, Centrifugal, 2,500 CFM, Replace 15 12 3 1 EA $3,072.78 $3,073 $3,073 $3,073 $6,146
Beecher Community Center 7.1 612489 Exhaust Fan, Centrifugal, 2,000 CFM, Replace 15 12 3 1 EA $2,664.18 $2,664 $2,664 $2,664 $5,328
Beecher Community Center 7.2 612475 Toilet, Tankless (Water Closet), Replace 20 10 10 5 EA $842.97 $4,215 $4,215 $4,215
Beecher Community Center 7.2 612476 Urinal, Vitreous China, Replace 20 10 10 2 EA $1,193.44 $2,387 $2,387 $2,387
Beecher Community Center 7.2 612468 Lavatory, Vitreous China, Replace 20 10 10 6 EA $572.66 $3,436 $3,436 $3,436
Beecher Community Center 7.2 612478 Service Sink, Porcelain Enamel, Cast Iron, Replace 20 10 10 1 EA $1,360.33 $1,360 $1,360 $1,360
Beecher Community Center 7.2 612462 Sink, Stainless Steel, Replace 20 10 10 2 EA $1,054.05 $2,108 $2,108 $2,108
Beecher Community Center 7.2 612481 Drinking Fountain, Refrigerated, Replace 10 5 5 1 EA $1,257.51 $1,258 $1,258 $1,258 $2,515
Beecher Community Center 7.2 612452 Backflow Preventer, 2", Replace 15 15 0 1 EA $2,603.17 $2,603 $2,603 $2,603 $5,206
Beecher Community Center 7.2 612477 Water Heater, Gas, Residential, 50 GAL, Replace 10 4 6 1 EA $2,349.48 $2,349 $2,349 $2,349 $4,699
Beecher Community Center 7.2 612469 ADA, Restroom, Lavatory Pipe Wraps, Install 0 0 0 6 EA $75.90 $455 $455 $455
Beecher Community Center 7.4 612448 Distribution Panel, 208 Y, 120 V, 100 Amp, Replace 30 20 10 1 EA $5,079.93 $5,080 $5,080 $5,080
Beecher Community Center 7.4 612461 Distribution Panel, 208 Y, 120 V, 100 Amp, Replace 30 20 10 1 EA $5,079.93 $5,080 $5,080 $5,080
Beecher Community Center 7.4 612441 Main Distribution Panel, 208 Y, 120 V, 800 Amp, Replace 30 20 10 1 EA $13,423.81 $13,424 $13,424 $13,424
Beecher Community Center 7.4 612442 Distribution Panel, 208 Y, 120 V, 225 Amp, Replace 30 20 10 1 EA $7,951.00 $7,951 $7,951 $7,951
Beecher Community Center 7.4 612421 Metal Halide Lighting Fixture, 250 W, Replace 20 10 10 3 EA $748.18 $2,245 $2,245 $2,245
Beecher Community Center 7.4 612449 Lighting System, Interior, Upgrade 25 15 10 9423 SF $9.24 $87,087 $87,087 $87,087
Beecher Community Center 7.6 612450 Backflow Preventer, 6", Replace 15 5 10 1 EA $9,344.53 $9,345 $9,345 $9,345
Beecher Community Center 7.6 612433 Sprinkler Heads (per SF), Replace 20 17 3 9423 SF $1.33 $12,531 $12,531 $12,531
Beecher Community Center 7.6 612480 Fire Extinguisher, Replace 15 0 15 3 EA $356.54 $1,070 $1,070 $1,070
Beecher Community Center 7.6 612457 Fire Suppression System, Wet Chemical, Replace 15 12 3 1 EA $3,488.87 $3,489 $3,489 $3,489 $6,978
Beecher Community Center 7.6 612440 Fire Alarm System, Office Building, Upgrade 20 34 0 9423 SF $2.36 $22,234 $22,234 $22,234
Beecher Community Center 7.6 612434 Fire Alarm Control Panel, Addressable, Replace 15 34 0 1 EA $20,297.59 $20,298 $20,298 $20,298 $40,595
Beecher Community Center 7.6 612430 Emergency/Exit Combo, Replace 10 7 3 2 EA $687.51 $1,375 $1,375 $1,375 $2,750
Beecher Community Center 7.6 612427 Exit Lighting Fixture, Backlit, Replace 10 7 3 6 EA $405.01 $2,430 $2,430 $2,430 $4,860
Location Name
EMG
Renamed
Item
Number
ID Cost Description Lifespan
(EUL)EAge RUL QuantityUnit Unit Cost Subtotal 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
Deficiency
Repair
Estimate
Beecher Community Center 8.1 612455 Interior Door, Wood Solid-Core, Replace 20 10 10 20 EA $1,423.11 $28,462 $28,462 $28,462
Beecher Community Center 8.1 612456 Interior Door, Fire 90-Minutes and Over, Replace 20 10 10 3 EA $1,649.06 $4,947 $4,947 $4,947
Beecher Community Center 8.1 612454 Interior Door, Fully-Glazed Aluminum-Framed Swinging, Replace 30 15 15 1 EA $2,106.57 $2,107 $2,107 $2,107
Beecher Community Center 8.1 612470 Toilet Partitions, Metal Overhead-Braced, Replace 20 10 10 5 EA $850.00 $4,250 $4,250 $4,250
Beecher Community Center 8.1 612311 Interior Wall Finish, Concrete/Masonry, Prep & Paint 8 4 4 4947 SF $1.45 $7,178 $7,178 $7,178 $14,356
Beecher Community Center 8.1 612312 Interior Wall Finish, Gypsum Board/Plaster/Metal, Prep & Paint 8 4 4 707 SF $1.42 $1,006 $1,006 $1,006 $2,012
Beecher Community Center 8.1 612320 Interior Wall Finish, Acoustical Tile (ACT) Fabric-Faced, Replace 20 10 10 707 SF $13.33 $9,424 $9,424 $9,424
Beecher Community Center 8.1 612327 Interior Floor Finish, Vinyl Tile (VCT), Replace 15 12 3 2827 SF $4.80 $13,571 $13,571 $13,571 $27,143
Beecher Community Center 8.1 612404 Interior Floor Finish, Quarry Tile, Replace 50 34 16 942 SF $15.19 $14,307 $14,307 $14,307
Beecher Community Center 8.1 612321 Interior Floor Finish, Carpet Standard-Commercial Medium-Traffic, Replace 10 7 3 5654 SF $7.26 $41,027 $41,027 $41,027 $82,054
Beecher Community Center 8.1 612409 Interior Ceiling Finish, Gypsum Board/Plaster, Prep & Paint 10 6 4 471 SF $1.94 $912 $912 $912 $1,824
Beecher Community Center 8.1 612406 Interior Ceiling Finish, Acoustical Tile (ACT), Replace 20 18 2 942 SF $3.11 $2,931 $2,931 $2,931
Beecher Community Center 8.1 612408 Interior Ceiling Finish, Acoustical Tile (ACT), Replace 20 5 15 754 SF $3.11 $2,346 $2,346 $2,346
Beecher Community Center 8.1 612431 Kitchen Cabinet, Base and Wall Section, Wood, Replace 20 15 5 80 LF $467.63 $37,411 $37,411 $37,411
Beecher Community Center 8.1 612432 Kitchen Counter, Plastic Laminate, Postformed, Replace 10 5 5 80 LF $43.90 $3,512 $3,512 $3,512 $7,023
Beecher Community Center 8.2 612459 Commercial Kitchen, Exhaust Hood, Replace 15 12 3 1 EA $7,571.72 $7,572 $7,572 $7,572 $15,143
Beecher Community Center 8.2 612460 Commercial Kitchen, Range/Oven, 6-Burner w/ Griddle, Replace 15 5 10 1 EA $9,288.00 $9,288 $9,288 $9,288
Totals, Unescalated $46,159 $119,962 $147,787 $234,809 $9,096 $85,150 $54,398 $0 $0 $0 $266,017 $0 $8,184 $44,832 $912 $62,178 $16,656 $0 $177,446 $0 $1,273,587
Totals, Escalated (3.0% inflation, compounded annually)$46,159 $123,560 $156,787 $256,582 $10,238 $98,712 $64,954 $0 $0 $0 $357,505 $0 $11,669 $65,838 $1,380 $96,871 $26,728 $0 $302,090 $0 $1,619,074
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
TABLE OF CONTENTS
1. Executive Summary ............................................................................................................................. 1
1.1. Property Information and General Physical Condition ................................................................ 1
1.2. Facility Condition Index (FCI) ...................................................................................................... 2
1.3. Special Issues and Follow-Up Recommendations ...................................................................... 3
1.4. Opinions of Probable Cost .......................................................................................................... 3
1.4.1. Methodology ................................................................................................................................ 4
1.4.2. Immediate Repairs ...................................................................................................................... 4
1.4.3. Replacement Reserves ............................................................................................................... 4
2. Purpose and Scope .............................................................................................................................. 5
2.1. Purpose ....................................................................................................................................... 5
2.2. Scope .......................................................................................................................................... 6
2.3. Personnel Interviewed ................................................................................................................. 6
2.4. Documentation Reviewed ........................................................................................................... 7
2.5. Pre-Survey Questionnaire ........................................................................................................... 7
2.6. Weather Conditions ..................................................................................................................... 7
3. Accessibility and Property Research ................................................................................................. 8
3.1. ADA Accessibility ........................................................................................................................ 8
3.2. Municipal Information, Flood Zone and Seismic Zone ................................................................ 8
4. Existing Building Assessment ............................................................................................................ 9
4.1. Unit or Space Types .................................................................................................................... 9
4.2. Inaccessible Areas or Key Spaces Not Observed ...................................................................... 9
5. Site Improvements ............................................................................................................................. 10
5.1. Utilities ....................................................................................................................................... 10
5.2. Parking, Paving, and Sidewalks ................................................................................................ 10
5.3. Drainage Systems and Erosion Control .................................................................................... 11
5.4. Topography and Landscaping ................................................................................................... 12
5.5. General Site Improvements ....................................................................................................... 12
6. Building Architectural and Structural Systems ............................................................................... 14
6.1. Foundations ............................................................................................................................... 14
6.2. Superstructure ........................................................................................................................... 14
6.3. Roofing ...................................................................................................................................... 14
6.4. Exterior Walls ............................................................................................................................ 15
6.5. Exterior and Interior Stairs ......................................................................................................... 16
6.6. Exterior Windows and Doors ..................................................................................................... 16
6.7. Patio, Terrace, and Balcony ...................................................................................................... 16
7. Building Mechanical and Plumbing Systems .................................................................................. 18
7.1. Building Heating, Ventilating, and Air Conditioning (HVAC) ..................................................... 18
7.2. Building Plumbing and Domestic Hot Water ............................................................................. 18
7.3. Building Gas Distribution ........................................................................................................... 19
7.4. Building Electrical ...................................................................................................................... 20
7.5. Building Elevators and Conveying Systems .............................................................................. 20
7.6. Fire Protection and Security Systems ....................................................................................... 20
7.7. Life Support Systems ................................................................................................................ 21
8. Interior Spaces .................................................................................................................................... 22
8.1. Interior Finishes ......................................................................................................................... 22
8.2. Commercial Kitchen & Laundry Equipment .............................................................................. 23
9. Other Structures ................................................................................................................................. 24
10. Certification ......................................................................................................................................... 25
11. Appendices ......................................................................................................................................... 26
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
1
www.EMGcorp.com p 800.733.0660
1. Executive Summary
1.1. Property Information and General Physical Condition
The property information is summarized in the table below. More detailed descriptions may be found in the various sections of the
report and in the Appendices.
Property Information
Address: 908 Game Farm Road, Yorkville, Kendall, Illinois 60560
Year Constructed/Renovated: 1982
Current Occupants: Village of Yorkville
Percent Utilization: 100%
Management Point of Contact:
City of Yorkville, Mr. Peter Ratos
630.553.8574 phone
pratos@yorkville.il.us email
Property Type: Municipal
Site Area: 2.55 acres
Building Area: 9,423 SF
Number of Buildings: 1
Number of Stories: 1
Parking Type and Number of
Spaces: 94 spaces in open lots
Building Construction: Conventional wood frame structure on concrete slab
Roof Construction: Gabled roofs with asphalt shingles
Exterior Finishes: Brick veneer and metal siding
Heating, Ventilation and Air
Conditioning: Central system air handlers
Fire and Life/Safety:
Fire sprinklers, hydrants, smoke detectors, alarms, strobes,
extinguishers, pull stations, alarm panel, exit signs, and emergency
battery powered lights.
Dates of Visit: May 22, 2017 to May 23, 2017
On-Site Point of Contact (POC): Erin Willret
Assessment and Report
Prepared by: Paul Prusa
Reviewed by:
Al Diefert
Technical Report Reviewer
For
Andrew Hupp
Program Manager
ahupp@emgcorp.com
800.733.0660 x6623
Systemic Condition Summary
Site Fair HVAC Fair
Structure Good Plumbing Fair
Roof Fair Electrical Fair
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
2
www.EMGcorp.com p 800.733.0660
Systemic Condition Summary
Vertical Envelope Fair Elevators --
Interiors Fair Fire Fair
The following bullet points highlight the most significant short term and modernization recommendations:
Full replacement of concrete sidewalks
Mill and overlay of asphalt parking lot
Modernization of the fire alarm system
ADA accessibility upgrades
Generally, the property appears to have been constructed within industry standards in force at the time of construction. The property
appears to have been well maintained since it was first occupied and is in fair overall condition.
According to property management personnel, the property has had a limited capital improvement expenditure program over the past
three years, primarily consisting of painting and sidewalk repairs. Supporting documentation was not provided in support of these
claims but some of the work is evident.
1.2. Facility Condition Index (FCI)
One of the major goals of the FCA is to calculate the FCI, which gives an indication of a building’s overall condition. Two FCI ratios are
calculated and presented, the Current Year and Ten-Year. The Current Year FCI is the ratio of Immediate Repair Costs to the building’s
Current Replacement Value. Similarly, the Ten-Year FCI is the ratio of anticipated Capital Reserve Needs over the next ten years to
the Current Replacement Value.
Fci Condition
Rating Definition Percentage
Value
Good In new or well-maintained condition, with no visual evidence
of wear, soiling or other deficiencies. 0% to 5%
Fair Subjected to wear and soiling but is still in a serviceable and
functioning condition. > than 5% to 10%
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
3
www.EMGcorp.com p 800.733.0660
Fci Condition
Rating Definition Percentage
Value
Poor Subjected to hard or long-term wear. Nearing the end of its
useful or serviceable life. > than 10% to 60%
Very Poor Has reached the end of its useful or serviceable life. Renewal
is now necessary. > than 60%
The graphs above and tables below represent summary-level findings for the FCA. The deficiencies identified in this assessment can
be combined with potential new construction requirements to develop an overall strategy that can serve as the basis for a portfolio-wide
capital improvement funding strategy. Key findings from the assessment include:
Key Finding Metric
Current Year Facility Condition Index (FCI) FCI = (IR)/(CRV) 2.6% Good
10-Year Facility Condition Index (FCI) FCI = (RR)/(CRV) 61.8% Very Poor
Current Replacement Value (CRV) 9,423 SF * 183.24 / SF = $1,726,643
Year 0 (Current Year) - Immediate Repairs (IR) $46,159
Years 1-10 – Replacement Reserves (RR) $1,068,339
Total Capital Needs $1,114,498
The major issues contributing to the Immediate Repair Costs and the Current Year FCI ratio are summarized below:
Full replacement of concrete sidewalks
Mill and overlay of asphalt parking lot
Modernization of the fire alarm system
Further detail on the specific costs that make up the Immediate Repair Costs can be found in the cost tables at the beginning of this
report.
1.3. Special Issues and Follow-Up Recommendations
As part of the FCA, a limited assessment of accessible areas of the building(s) was performed to determine the presence of fungal
growth, conditions conducive to fungal growth, and/or evidence of moisture. Property personnel were interviewed concerning any
known or suspected fungal growth, elevated relative humidity, water intrusion, or mildew-like odors. Sampling is not a part of this
assessment.
There are no visual indications of the presence of fungal growth, conditions conducive to fungal growth, or evidence of moisture in
representative readily accessible areas of the property.
1.4. Opinions of Probable Cost
Cost estimates are attached at the front of this report (following the cover page).
These estimates are based on Invoice or Bid Document/s provided either by the Owner/facility and construction costs developed by
construction resources such as R.S. Means and Marshall & Swift, EMG’s experience with past costs for similar properties, city cost
indexes, and assumptions regarding future economic conditions.
Opinions of probable costs should only be construed as preliminary, order of magnitude budgets. Actual costs most probably will vary
from the consultant’s opinions of probable costs depending on such matters as type and design of suggested remedy, quality of
materials and installation, manufacturer and type of equipment or system selected, field conditions, whether a physical deficiency is
repaired or replaced in whole, phasing of the work (if applicable), quality of contractor, quality of project management exercised, market
conditions, and whether competitive pricing is solicited, etc. ASTM E2018-08 recognizes that certain opinions of probable costs cannot
be developed within the scope of this guide without further study. Opinions of probable cost for further study should be included in the
FCA.
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
4
www.EMGcorp.com p 800.733.0660
1.4.1. Methodology
Based upon site observations, research, and judgment, along with referencing Expected Useful Life (EUL) tables from various industry
sources, EMG opines as to when a system or component will most probably necessitate replacement. Accurate historical replacement
records, if provided, are typically the best source of information. Exposure to the elements, initial quality and installation, extent of use,
the quality and amount of preventive maintenance exercised, etc., are all factors that impact the effective age of a system or
component. As a result, a system or component may have an effective age that is greater or less than its actual chronological age.
The Remaining Useful Life (RUL) of a component or system equals the EUL less its effective age. Projections of Remaining Useful Life
(RUL) are based on continued use of the Property similar to the reported past use. Significant changes in occupants and/or usage may
affect the service life of some systems or components.
Where quantities could not be derived from an actual take-off, lump sum costs or allowances are used. Estimated costs are based on
professional judgment and the probable or actual extent of the observed defect, inclusive of the cost to design, procure, construct and
manage the corrections.
1.4.2. Immediate Repairs
Immediate repairs are opinions of probable costs that require immediate action as a result of: (1) material existing or potential unsafe
conditions, (2) material building or fire code violations, or (3) conditions that, if not addressed, have the potential to result in, or
contribute to, critical element or system failure within one year or will most probably result in a significant escalation of its remedial cost.
1.4.3. Replacement Reserves
Replacement Reserves are for recurring probable expenditures, which are not classified as operation or maintenance expenses. The
replacement reserves should be budgeted for in advance on an annual basis. Replacement Reserves are reasonably predictable both
in terms of frequency and cost. However, Replacement Reserves may also include components or systems that have an
indeterminable life but, nonetheless, have a potential for failure within an estimated time period.
Replacement Reserves exclude systems or components that are estimated to expire after the reserve term and are not considered
material to the structural and mechanical integrity of the subject property. Furthermore, systems and components that are not deemed
to have a material effect on the use of the Property are also excluded. Costs that are caused by acts of God, accidents, or other
occurrences that are typically covered by insurance, rather than reserved for, are also excluded.
Replacement costs are solicited from ownership/property management, EMG’s discussions with service companies, manufacturers'
representatives, and previous experience in preparing such schedules for other similar facilities. Costs for work performed by the
ownership’s or property management’s maintenance staff are also considered.
EMG’s reserve methodology involves identification and quantification of those systems or components requiring capital reserve funds
within the assessment period. The assessment period is defined as the effective age plus the reserve term. Additional information
concerning system’s or component’s respective replacement costs (in today's dollars), typical expected useful lives, and remaining
useful lives were estimated so that a funding schedule could be prepared. The Replacement Reserves Schedule presupposes that all
required remedial work has been performed or that monies for remediation have been budgeted for items defined in the Immediate
Repair Cost Estimate.
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
5
www.EMGcorp.com p 800.733.0660
2. Purpose and Scope
2.1. Purpose
EMG was retained by the client to render an opinion as to the Property’s current general physical condition on the day of the site visit.
Based on the observations, interviews and document review outlined below, this report identifies significant deferred maintenance
issues, existing deficiencies, and material code violations of record at municipal offices, which affect the Property’s use. Opinions are
rendered as to its structural integrity, building system condition and the Property’s overall condition. The report also notes building
systems or components that have realized or exceeded their typical expected useful lives.
CONDITIONS:
The physical condition of building systems and related components are typically defined as being in one of five conditions: Excellent,
Good, Fair, Poor, Failed or a combination thereof. For the purposes of this report, the following definitions are used:
Excellent = New or very close to new; component or system typically has been installed within the past year, sound and
performing its function. Eventual repair or replacement will be required when the component or system either
reaches the end of its useful life or fails in service.
Good = Satisfactory as-is. Component or system is sound and performing its function, typically within the first third of its
lifecycle. However, it may show minor signs of normal wear and tear. Repair or replacement will be required
when the component or system either reaches the end of its useful life or fails in service.
Fair = Showing signs of wear and use but still satisfactory as-is, typically near the median of its estimated useful life.
Component or system is performing adequately at this time but may exhibit some signs of wear, deferred
maintenance, or evidence of previous repairs. Repair or replacement will be required due to the component or
system’s condition and/or its estimated remaining useful life.
Poor = Component or system is significantly aged, flawed, functioning intermittently or unreliably; displays obvious
signs of deferred maintenance; shows evidence of previous repair or workmanship not in compliance with
commonly accepted standards; has become obsolete; or exhibits an inherent deficiency. The present condition
could contribute to or cause the deterioration of contiguous elements or systems. Either full component
replacement is needed or repairs are required to restore to good condition, prevent premature failure, and/or
prolong useful life.
Failed
= Component or system has ceased functioning or performing as intended. Replacement, repair, or other
significant corrective action is recommended or required.
Not Applicable
= Assigning a condition does not apply or make logical sense, most commonly due to the item in question not
being present.
FORMAT OF THE BODY OF THE REPORT:
Throughout sections 5 through 9 of this report, each report section will typically contain three subsections organized in the following
sequence:
A descriptive table (and/or narrative), which identifies the components assessed, their condition, and other key data points.
A simple bulleted list of Anticipated Lifecycle Replacements, which lists components and assets typically in Excellent, Good, or Fair
condition at the time of the assessment but that will require replacement or some other attention once aged past their estimated
useful life. These listed components are typically included in the associated inventory database with costs identified and budgeted
beyond the first several years.
A bulleted cluster of Actions/Comments, which include more detailed narratives describing deficiencies, recommended repairs, and
short term replacements. The assets and components associated with these bullets are/were typically problematic and in Poor or
Failed condition at the time of the assessment, with corresponding costs included within the first few years.
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
6
www.EMGcorp.com p 800.733.0660
PLAN TYPES:
Each line item in the cost database is assigned a Plan Type, which is the primary reason or rationale for the recommended
replacement, repair, or other corrective action. This is the “why” part of the equation. A cost or line item may commonly have more
than one applicable Plan Type; however, only one Plan Type will be assigned based on the “best” fit, typically the one with the greatest
significance. The following Plan Types are listed in general weighted order of importance:
Safety = An observed or reported unsafe condition that if left unaddressed could result in an injury; a system
or component that presents a potential liability risk.
Performance/Integrity = Component or system has failed, is almost failing, performs unreliably, does not perform as
intended, and/or poses a risk to overall system stability.
Accessibility = Does not meet ADA, UFAS, and/or other handicap accessibility requirements.
Environmental = Improvements to air or water quality, including removal of hazardous materials from the building or
site.
Modernization/Adaptation
= Conditions, systems, or spaces that need to be upgraded in appearance or function to meet current
standards, facility usage, or client/occupant needs.
Lifecycle/Renewal
= Any component or system in which future repair or replacement is anticipated beyond the next
several years and/or is of minimal substantial early-term consequence.
2.2. Scope
The standard scope of the Facility Condition Assessment includes the following:
Visit the Property to evaluate the general condition of the building and site improvements, review available construction documents in
order to familiarize ourselves with, and be able to comment on, the in-place construction systems, life safety, mechanical, electrical,
and plumbing systems, and the general built environment.
Identify those components that are exhibiting deferred maintenance issues and provide cost estimates for Immediate Costs and
Replacement Reserves based on observed conditions, maintenance history and industry standard useful life estimates. This will
include the review of documented capital improvements completed within the last five-year period and work currently contracted for, if
applicable.
Provide a full description of the Property with descriptions of in-place systems and commentary on observed conditions.
Provide a general statement of the subject Property’s compliance to Title III of the Americans with Disabilities Act. This will not
constitute a full ADA survey, but will help identify exposure to issues and the need for further review.
Perform a limited assessment of accessible areas of the building(s) for the presence of fungal growth, conditions conducive to fungal
growth, and/or evidence of moisture. EMG will also interview Project personnel regarding the presence of any known or suspected
fungal growth, elevated relative humidity, water intrusion, or mildew-like odors. Potentially affected areas will be photographed.
Sampling will not be considered in routine assessments.
List the current utility service providers.
Review maintenance records and procedures with the in-place maintenance personnel.
Observe a representative sample of the interior spaces/units, including vacant spaces/units, in order to gain a clear understanding of
the property’s overall condition. Other areas to be observed include the exterior of the property, the roofs, interior common areas,
and the significant mechanical, electrical and elevator equipment rooms.
Provide an Executive Summary at the beginning of this report.
2.3. Personnel Interviewed
The management and building engineer were interviewed for specific information relating to the physical property, available
maintenance procedures, historical performance of key building systems and components, available drawings and other
documentation. The following personnel from the facility and government agencies were interviewed in the process of conducting the
FCA:
Name and Title Organization Phone Number
Erin Willret City of Yorkville 630.553.8574
The FCA was performed without the assistance of an onsite Point of Contact (POC).
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
7
www.EMGcorp.com p 800.733.0660
2.4. Documentation Reviewed
Prior to the FCA, relevant documentation was requested that could aid in the knowledge of the subject property’s physical
improvements, extent and type of use, and/or assist in identifying material discrepancies between reported information and observed
conditions. The review of submitted documents does not include comment on the accuracy of such documents or their preparation,
methodology, or protocol. The Documentation Request Form is provided in Appendix E.
Although Appendix E provides a summary of the documents requested or obtained, the following list provides more specific details
about some of the documents that were reviewed or obtained during the site visit.
No documents were available
2.5. Pre-Survey Questionnaire
A Pre-Survey Questionnaire was sent to the POC prior to the site visit. The questionnaire is included in Appendix E.
2.6. Weather Conditions
May 22, 2017: Clear, with temperatures in the 80s (°F) and light winds.
May 23, 2017: Raining, with temperatures in the 70s (°F) and light winds.
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
8
www.EMGcorp.com p 800.733.0660
3. Accessibility and Property Research
3.1. ADA Accessibility
Generally, Title III of the Americans with Disabilities Act (ADA) prohibits discrimination by entities to access and use of “areas of public
accommodations” and “commercial facilities” on the basis of disability. Regardless of its age, these areas and facilities must be
maintained and operated to comply with the Americans with Disabilities Act Accessibility Guidelines (ADAAG).
Buildings completed and occupied after January 26, 1992 are required to comply fully with the ADAAG. Existing facilities constructed
prior to this date are held to the lesser standard of compliance to the extent allowed by structural feasibility and the financial resources
available. As an alternative, a reasonable accommodation pertaining to the deficiency must be made.
During the FCA, a limited visual observation for ADA accessibility compliance was conducted. The scope of the visual observation was
limited to those areas set forth in EMG’s Abbreviated Accessibility Checklist provided in Appendix D of this report. It is understood by
the Client that the limited observations described herein does not comprise a full ADA Compliance Survey, and that such a survey is
beyond the scope of EMG’s undertaking. Only a representative sample of areas was observed and, other than as shown on the
Abbreviated Accessibility Checklist, actual measurements were not taken to verify compliance.
At an office property, the areas considered as a public accommodation besides the site itself and parking, are the exterior accessible
route, the interior accessible route up to the tenant lease lines and the interior common areas, including the common area restrooms.
The facility does not appear to be accessible with Title III of the Americans with Disabilities Act. Elements as defined by the ADAAG
that are not accessible as stated within the priorities of Title III, are as follows:
Parking
Adequate number of designated parking stalls and signage for vans are not provided.
Restrooms
Wrap drain pipes below lavatory with insulation; protect against contact with hot, sharp, or abrasive surfaces.
Add pull station alarm in unisex bathroom.
A full ADA Compliance Survey may reveal additional aspects of the property that are not in compliance.
Corrections of these conditions should be addressed from a liability standpoint, but are not necessarily code violations. The Americans
with Disabilities Act Accessibility Guidelines concern civil rights issues as they pertain to the disabled and are not a construction code,
although many local jurisdictions have adopted the Guidelines as such. The cost to address the achievable items noted above is
included in the cost tables.
3.2. Municipal Information, Flood Zone and Seismic Zone
Not applicable.
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
9
www.EMGcorp.com p 800.733.0660
4. Existing Building Assessment
4.1. Unit or Space Types
All 9,423 square feet of the building are occupied by a single occupant, City of Yorkville. The spaces are a combination of offices,
recreation rooms, kitchen, supporting restrooms, mechanical, and other utility spaces.
4.2. Inaccessible Areas or Key Spaces Not Observed
The interior spaces were observed in order to gain a clear understanding of the property’s overall condition. Other areas accessed
included the site within the property boundaries, exterior of the property and the roof. All areas of the property were available for
observation during the site visit.
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
10
www.EMGcorp.com p 800.733.0660
5. Site Improvements
5.1. Utilities
The following table identifies the utility suppliers and the condition and adequacy of the services.
Site Utilities
Utility Supplier Condition and Adequacy
Sanitary sewer City of Yorkville Good
Storm sewer City of Yorkville Good
Domestic water City of Yorkville Good
Electric service Commonwealth Edison Good
Natural gas service Nicor Gas Good
Actions/Comments:
According to the POC, the utilities provided are adequate for the property. There are no unique, onsite utility systems such as
emergency electrical generators, septic systems, water or waste water treatment plants, or propane gas tanks.
5.2. Parking, Paving, and Sidewalks
Item Description
Main Ingress and Egress Game Farm Road
Access from West
Additional Entrances Library Parking Lot
Additional Access from South
Paving and Flatwork
Item Material Last Work Done Condition
Entrance Driveway Apron Asphalt Less than 5 years Good
Parking Lot Asphalt More than 20 years Poor
Drive Aisles Asphalt More than 20 years Poor
Service Aisles None -- --
Sidewalks Concrete More than 20 years Poor
Curbs Concrete More than 20 years Poor
Site Stairs None -- --
Pedestrian Ramps None -- --
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
11
www.EMGcorp.com p 800.733.0660
Parking Count
Open Lot Carport Private Garage Subterranean
Garage
Freestanding Parking
Structure
94 -- -- -- --
Total Number of ADA Compliant Spaces 4
Number of ADA Compliant Spaces for Vans 0
Total Parking Spaces 94
Parking Ratio (Spaces/Apartments) --
Method of Obtaining Parking Count Physical count
Exterior Stairs
Location Material Handrails Condition
None -- -- --
Anticipated Lifecycle Replacements:
Asphalt seal coating
Asphalt pavement
Sidewalks
Curbs
Actions/Comments:
The asphalt pavement exhibits significant areas of failure and deterioration, such as alligator cracking, transverse cracking and heavy
overall surface wear. All of the paving must be overlaid with new asphalt paving in order to maintain the integrity of the overall
pavement system. Milling is recommended as part of the overall repair work.
The concrete sidewalks and curbs have significant areas of cracking concrete curbs and sidewalks. These areas occur throughout
the property. The damaged areas of concrete curbs and sidewalks require replacement.
5.3. Drainage Systems and Erosion Control
Drainage System and Erosion Control
System Exists At Site Condition
Surface Flow ☐ --
Inlets ☒ Good
Swales ☐ --
Detention pond ☐ --
Lagoons ☐ --
Ponds ☐ --
Underground Piping ☒ Good
Pits ☐ --
Municipal System ☒ Good
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
12
www.EMGcorp.com p 800.733.0660
Drainage System and Erosion Control
System Exists At Site Condition
Dry Well ☐ --
Anticipated Lifecycle Replacements:
No components of significance
Actions/Comments:
There is no evidence of storm water runoff from adjacent properties. The storm water system appears to provide adequate runoff
capacity. There is no evidence of major ponding or erosion.
5.4. Topography and Landscaping
Item Description
Site Topography Generally flat
Landscaping
Trees Grass Flower
Beds Planters
Drought
Tolerant
Plants
Decorative
Stone None
☒ ☒ ☒ ☐ ☒ ☒ ☐
Landscaping
Condition Good
Irrigation
Automatic
Underground Drip Hand Watering None
☐ ☐ ☐ ☒
Irrigation Condition --
Retaining Walls
Type Location Condition
Stone masonry Around light poles Poor
Anticipated Lifecycle Replacements:
Stone retaining walls
Actions/Comments:
The retaining walls appear problematic. The stones have been removed and are damaged. Damaged portions of the retaining walls
must be replaced.
5.5. General Site Improvements
Property Signage
Property Signage Monument
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
13
www.EMGcorp.com p 800.733.0660
Property Signage
Street Address Displayed? Yes
Site and Building Lighting
Site Lighting
None Pole Mounted Bollard Lights Ground
Mounted
Parking Lot
Pole Type
☐ ☒ ☐ ☐ ☐
Fair
Building Lighting
None Wall Mounted Recessed Soffit
☐ ☒ ☐
Fair
Site Fencing
Type Location Condition
None -- --
REFUSE DISPOSAL
Refuse Disposal Individual garbage bins
Dumpster Locations Mounting Enclosure Contracted? Condition
-- None None Yes --
Other Site Amenities
Description Location Condition
Playground Equipment None -- --
Tennis Courts None -- --
Basketball Court None -- --
Swimming Pool None -- --
Anticipated Lifecycle Replacements:
Signage
Exterior lighting
Actions/Comments:
No significant actions are identified at the present time. On-going periodic maintenance is highly recommended. Future lifecycle
replacements of the components listed above will be required.
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
14
www.EMGcorp.com p 800.733.0660
6. Building Architectural and Structural Systems
6.1. Foundations
Building Foundation
Item Description Condition
Foundation Concrete spread footings Good
Basement and Crawl Space None --
Anticipated Lifecycle Replacements:
No components of significance
Actions/Comments:
The foundation systems are concealed. There are no significant signs of settlement, deflection, or movement.
6.2. Superstructure
Building Superstructure
Item Description Condition
Framing / Load-Bearing Walls Conventional wood/metal studs Good
Ground Floor Concrete slab Good
Upper Floor Framing -- --
Upper Floor Decking -- --
Roof Framing Heavy lumber beams Good
Roof Decking Plywood or OSB Good
Anticipated Lifecycle Replacements:
No components of significance
Actions/Comments:
The superstructure is exposed in some locations, which allows for limited observation. Walls and floors appear to be plumb, level,
and stable. There are no significant signs of deflection or movement.
6.3. Roofing
Primary Roof
Type / Geometry Multiple Gable Roofs Finish Asphalt shingles
Maintenance Outside Contractor Roof Age Approximately 15 Yrs
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
15
www.EMGcorp.com p 800.733.0660
Primary Roof
Flashing Sheet metal Warranties No
Parapet Copings None Roof Drains Gutters and downspouts
Fascia None Insulation Fiberglass batts
Soffits Concealed Soffits Skylights No
Attics Wood joists with plywood
sheathing Ponding No
Ventilation Source-1 Ridge Vents Leaks Observed No
Ventilation Source-2 Soffit Vents Roof Condition Poor
Anticipated Lifecycle Replacements:
Asphalt shingles
Roof flashings (included as part of overall replacement)
Actions/Comments:
The roof finishes appear to be more than 15 years old. Information regarding roof warranties or bonds was not available.
There are no active roof leaks observed. There is no evidence of active roof leaks. Roof leaks appear to have occurred in the past.
The leaks have since been repaired, and no active roof leaks are evident.
Roof drainage appears to be adequate. Clearing and minor repair of drain system components should be performed regularly as part
of the property management’s routine maintenance and operations program.
The attics are not accessible and it could not be determined if there is moisture, water intrusion, or excessive daylight in the attics.
6.4. Exterior Walls
Building Exterior Walls
Type Location Condition
Primary Finish Brick veneer Fair
Secondary Finish Metal siding Fair
Accented with -- --
Soffits Concealed Fair
Building sealants (caulking) are located between dissimilar materials, at joints, and around window and door openings.
Anticipated Lifecycle Replacements:
Metal siding
Masonry re-pointing
Actions/Comments:
No significant actions are identified at the present time. On-going periodic maintenance, including patching repairs, graffiti removal,
and re-caulking, is highly recommended. Future lifecycle replacements of the components listed above will be required.
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
16
www.EMGcorp.com p 800.733.0660
6.5. Exterior and Interior Stairs
Not applicable. There are no exterior or interior stairs.
6.6. Exterior Windows and Doors
Building Windows
Window Framing Glazing Location Window
Screen Condition
Aluminum framed, fixed Double glaze Exterior walls ☐ Fair
Aluminum framed, operable Double glaze Exterior walls ☐ Fair
Aluminum framed, fixed,
sidelight Single glaze Exterior doors ☐ Poor
Building Doors
Main Entrance Doors Door Type Condition
Fully glazed, metal framed Fair
Secondary Entrance Doors Fully glazed, metal framed Fair
Service Doors -- --
Overhead Doors -- --
Anticipated Lifecycle Replacements:
Windows
Exterior fully glazed doors
Actions/Comments:
The sidelight windows are antiquated, energy-inefficient units with single-pane glazing. Window replacement is recommended.
6.7. Patio, Terrace, and Balcony
Building Patio, Terrace and Balcony
Type Description Location Condition
Ground Floor Patio Brick pavers Right side Fair
Upper Balcony Structure -- -- --
Balcony Decks -- -- --
Balcony Deck Toppings -- -- --
Balcony Guardrails -- -- --
Anticipated Lifecycle Replacements:
Brick pavers
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
17
www.EMGcorp.com p 800.733.0660
Actions/Comments:
No significant actions are identified at the present time. On-going periodic maintenance is highly recommended. Future lifecycle
replacements of the components listed above will be required.
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
18
www.EMGcorp.com p 800.733.0660
7. Building Mechanical and Plumbing Systems
See the Mechanical Equipment List in the Appendices for the quantity, manufacturer’s name, model number, capacity and year of
manufacturer of the major mechanical equipment, if available.
7.1. Building Heating, Ventilating, and Air Conditioning (HVAC)
Distribution System
Air Distribution System Constant volume
Quantity and Capacity of Air Handlers 3 air handlers ranging from approximately 5,000 to 11,000
CFM
Location of Air Handlers Rooftop, penthouse
Large Spaces the Larger Dedicated AHU’s Serve Recreation Room, Kitchen
Age of Air Handlers All units appear to be original 1982 equipment
Air Handler Condition Fair
Controls and Ventilation
HVAC Control System Individual non-programmable thermostats/controls
HVAC Control System Condition Fair
Building Ventilation Roof top exhaust fans
Ventilation System Condition Fair
Anticipated Lifecycle Replacements:
Air handling units
Rooftop exhaust fans
Actions/Comments:
The HVAC systems are maintained by the in-house maintenance staff. Records of the installation, maintenance, upgrades, and
replacement of the HVAC equipment at the property have been maintained since the property was first occupied.
Approximately all of the HVAC equipment is original.
The HVAC equipment appears to be functioning adequately overall. The engineering staff was interviewed about the historical and
recent performance of the equipment and systems. No chronic problems were reported and an overall sense of satisfaction with the
systems was conveyed. However, due to the inevitable failure of parts and components over time, some of the equipment will
require replacement. A budgetary cost for this work is included.
7.2. Building Plumbing and Domestic Hot Water
Building Plumbing System
Type Description Condition
Water Supply Piping Copper Fair
Waste/Sewer Piping Cast iron Fair
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
19
www.EMGcorp.com p 800.733.0660
Building Plumbing System
Type Description Condition
Vent Piping Cast iron and PVC Fair
Water Meter Location Fire Sprinkler Room
Domestic Water Heaters or Boilers
Components Water Heater
Fuel Natural gas
Quantity and Input Capacity 1 unit at 40,000 BTUH
Storage Capacity 50 gallons
Boiler or Water Heater Condition Good
Supplementary Storage Tanks? No
Storage Tank Quantity and Volume --
Quantity of Storage Tanks --
Storage Tank Condition --
Domestic Hot Water Circulation Pumps (3 HP and over) No
Adequacy of Hot Water Adequate
Adequacy of Water Pressure Adequate
Plumbing Fixtures
Water Closets Commercial grade
Toilet (Water Closet) Flush Rating 1.6 GPF
Common Area Faucet Nominal Flow Rate 2.0 GPM
Condition Fair
Anticipated Lifecycle Replacements:
Water heaters
Toilets
Urinals
Sinks
Lavatories
Actions/Comments:
The plumbing systems appear to be well maintained and functioning adequately. The water pressure appears to be sufficient. No
significant repair actions or short term replacement costs are required. Routine and periodic maintenance is recommended. Future
lifecycle replacements of the components or systems listed above will be required.
7.3. Building Gas Distribution
Gas service is supplied from the gas main on the adjacent public street. The gas meter and regulator location could not be determined.
The gas distribution piping within the building is malleable steel (black iron).
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
20
www.EMGcorp.com p 800.733.0660
Anticipated Lifecycle Replacements:
No components of significance
Actions/Comments:
The pressure and quantity of gas appear to be adequate.
Only limited observation of the gas distribution piping can be made due to hidden conditions.
7.4. Building Electrical
Building Electrical Systems
Electrical Lines Underground Transformer Pad-mounted
Main Service Size 800 Amps Volts 120/208 Volt, three-phase
Meter and Panel Location Front of building Branch Wiring Copper
Conduit Metallic Step-Down
Transformers? No
Security / Surveillance
System? No Building Intercom
System? No
Lighting Fixtures T-12
Main Distribution Condition Fair
Secondary Panel and
Transformer Condition Fair
Lighting Condition Fair
Anticipated Lifecycle Replacements:
Circuit breaker panels
Interior light fixtures
Actions/Comments:
The onsite electrical systems up to the meters are owned and maintained by the respective utility company.
The electrical service and capacity appear to be adequate for the property’s demands.
The panels are mostly original 1982 components. The electrical service is reportedly adequate for the facility’s needs. However, due
to the age of the panels and increasing difficulty of obtaining replacement parts over time, lifecycle replacements are recommended
per above.
7.5. Building Elevators and Conveying Systems
Not applicable. There are no elevators or conveying systems.
7.6. Fire Protection and Security Systems
Item Description
Type Wet pipe
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
21
www.EMGcorp.com p 800.733.0660
Item Description
Type Wet pipe
Fire Alarm System
Central Alarm Panel ☒ Battery-Operated Smoke
Detectors ☐ Alarm Horns ☒
Annunciator Panels ☐ Hard-Wired Smoke
Detectors ☒ Strobe Light Alarms ☒
Pull Stations ☒ Emergency Battery-Pack
Lighting ☒ Illuminated EXIT Signs ☒
Alarm System
Condition Poor
Sprinkler System
None ☐ Standpipes ☐ Backflow Preventer ☒
Hose Cabinets ☐ Fire Pumps ☐ Siamese Connections ☒
Suppression
Condition Fair
Central Alarm Panel
System
Location of Alarm Panel Installation Date of Alarm Panel
Fire Alarm Room 1982
Fire Extinguishers
Last Service Date Servicing Current?
02/2017 Yes
Hydrant Location Rear of building
Siamese Location Rear Elevation
Special Systems Kitchen Suppression System ☒Computer Room Suppression System ☐
Anticipated Lifecycle Replacements:
Central alarm panel
Alarm devices and system
Sprinkler heads
Actions/Comments:
The fire alarm systems appear somewhat antiquated and not up to current standards. A lack of strobes and audio alarms was
present in the restrooms. Due to the age of the components and apparent shortcomings, a full modernization project is
recommended. A budgetary cost is included.
The central alarm panel appears to be original and of the relay style. Based on its age and because replacement parts and
components for this type of equipment may be obsolete, the alarm panel requires replacement.
7.7. Life Support Systems
Not applicable.
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
22
www.EMGcorp.com p 800.733.0660
8. Interior Spaces
8.1. Interior Finishes
The facility is used as a senior community center for the City of Yorkville.
The most significant interior spaces include recreation spaces, offices, kitchen, and main entrance lobby. Supporting areas include
hallways, restrooms, mechanical penthouse, and utility closet.
The following table generally describes the locations and typical conditions of the interior finishes within the facility:
Typical Floor Finishes
Floor Finish Locations General Condition
Vinyl tile Recreation rooms Fair
Carpet Offices, recreation rooms Fair
Quarry tile Lobby, restrooms, kitchen Fair
Typical Wall Finishes
Wall Finish Locations General Condition
Painted CMU Offices, restrooms, utility closets Fair
Exposed CMU/masonry Lobby, recreation rooms, kitchen, recreation
rooms, offices Fair
Painted drywall Offices Fair
Fabric panels Recreation room Fair
Typical Ceiling Finishes
Ceiling Finish Locations General Condition
Suspended T-bar (Acoustic) Lobby, kitchen, restrooms Fair
Painted drywall Offices, recreation rooms Fair
Exposed structure Recreation rooms, offices Fair
Interior Doors
Item Type Condition
Interior Doors Solid core wood Fair
Door Framing Metal Fair
Fire Doors Yes Fair
Anticipated Lifecycle Replacements:
Carpet
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
23
www.EMGcorp.com p 800.733.0660
Vinyl tile
Quarry tile
Interior paint
Suspended acoustic ceiling tile
Interior doors
Actions/Comments:
It appears that the interior finishes are original.
No significant actions are identified at the present time. On-going periodic maintenance is highly recommended. Future lifecycle
replacements of the components listed above will be required.
8.2. Commercial Kitchen & Laundry Equipment
The kitchen area has a variety of commercial kitchen appliances, fixtures, and equipment. The equipment is owned and maintained in-
house and by the tenants. The tenants are responsible for any necessary replacement costs of their equipment only.
The kitchen includes the following major appliances, fixtures, and equipment:
Commercial Kitchen
Appliance Comment Condition
Refrigerators (tenant owned) Up-right Good
Freezers (tenant owned) Up-right Good
Ranges Gas Fair
Ovens Gas Fair
Griddles / Grills Gas Fair
Fryers ☐ --
Hood Exhaust ducted to exterior Fair
Dishwasher ☐ --
Microwave ☐ --
Ice Machines ☐ --
Steam Tables ☐ --
Work Tables ☒ Good
Shelving ☐ --
Anticipated Lifecycle Replacements:
Cooking Range /Oven/Grill
Actions/Comments:
No significant actions are identified at the present time. On-going periodic maintenance is highly recommended. Future lifecycle
replacements of the components listed above will be required.
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
24
www.EMGcorp.com p 800.733.0660
9. Other Structures
Not applicable. There are no major accessory structures.
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
25
www.EMGcorp.com p 800.733.0660
10. Certification
City of Yorkville retained EMG to perform this Facility Condition Assessment in connection with its continued operation of Beecher
Community Center, 908 Game Farm Road, Yorkville, Illinois, the “Property”. It is our understanding that the primary interest of City of
Yorkville is to locate and evaluate materials and building system defects that might significantly affect the value of the property and to
determine if the present Property has conditions that will have a significant impact on its continued operations.
The conclusions and recommendations presented in this report are based on the brief review of the plans and records made available
to our Project Manager during the site visit, interviews of available property management personnel and maintenance contractors
familiar with the Property, appropriate inquiry of municipal authorities, our Project Manager’s walk-through observations during the site
visit, and our experience with similar properties.
No testing, exploratory probing, dismantling or operating of equipment or in depth studies were performed unless specifically required
under Section 2 of this report. This assessment did not include engineering calculations to determine the adequacy of the Property’s
original design or existing systems. Although walk-through observations were performed, not all areas were observed (See Section 4.2
for areas observed). There may be defects in the Property, which were in areas not observed or readily accessible, may not have been
visible, or were not disclosed by management personnel when questioned. The report describes property conditions at the time that
the observations and research were conducted.
This report has been prepared on behalf of and exclusively for the use of City of Yorkville for the purpose stated within Section 2 of this
report. The report, or any excerpt thereof, shall not be used by any party other than City of Yorkville or for any other purpose than that
specifically stated in our agreement or within Section 2 of this report without the express written consent of EMG.
Any reuse or distribution of this report without such consent shall be at City of Yorkville and the recipient’s sole risk, without liability to
EMG.
Prepared by: Paul Prusa P.E., LEED AP,
Project Manager
Reviewed by:
Al Diefert
Technical Report Reviewer
For
Andrew Hupp
Program Manager
ahupp@emgcorp.com
800.733.0660 x6623
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
26
www.EMGcorp.com p 800.733.0660
11. Appendices
Appendix A: Photographic Record
Appendix B: Site Plan
Appendix C: Supporting Documentation
Appendix D: EMG Accessibility Checklist
Appendix E: Pre-Survey Questionnaire
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
Appendix A:
Photographic Record
Beecher Community Center EMG PROJECT NO: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
#1: FRONT ELEVATION
#2: RIGHT ELEVATION
#3: LEFT ELEVATION
#4: REAR ELEVATION
#5: SIDEWALK
#6: DETERIORATING SIDEWALK
AND REPAIRED CRACKS
Beecher Community Center EMG PROJECT NO: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
#7: PARKING LOTS, ASPHALT
PAVEMENT
#8:
SIGNIFICANT CRACKING AND
DETERIORATION OF PARKING
LOT
#9: HIGH PRESSURE SODIUM
LIGHTING FIXTURE
#10: FLAGPOLE
#11: POLE LIGHT
#12: SIGNAGE
Beecher Community Center EMG PROJECT NO: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
#13: ROOF, ASPHALT SHINGLE
#14: EXTERIOR WALL, ALUMINUM
SIDING
#15:
EXTERIOR DOOR, FULLY-
GLAZED ALUMINUM-FRAMED
SWINGING
#16: WINDOW, ALUMINUM DOUBLE-
GLAZED OPERABLE
#17: WINDOW, ALUMINUM DOUBLE-
GLAZED FIXED
#18:
PEDESTRIAN PAVEMENT,
SIDEWALK, CLAY
BRICK/MASONRY PAVERS
Beecher Community Center EMG PROJECT NO: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
#19: EXHAUST FAN
#20: AIR HANDLER
#21: WATER HEATER
#22: SINK, MULTI-COMPARTMENT
#23: LAVATORY
#24: SINK, STAINLESS STEEL
Beecher Community Center EMG PROJECT NO: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
#25: DRINKING FOUNTAIN,
REFRIGERATED
#26: TOILET, TANKLESS (WATER
CLOSET)
#27: SERVICE SINK
#28: LIGHTING
#29: MAIN DISTRIBUTION PANEL
#30: METAL HALIDE LIGHTING
FIXTURE
Beecher Community Center EMG PROJECT NO: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
#31: EMERGENCY/EXIT LIGHT
COMBO
#32: FIRE EXTINGUISHER
#33: BACKFLOW PREVENTER, FIRE
#34: FIRE ALARM CONTROL PANEL,
ADDRESSABLE
#35: FIRE ALARM DEVICES
#36: SPRINKLER HEAD
Beecher Community Center EMG PROJECT NO: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
#37: FIRE SUPPRESSION SYSTEM,
WET CHEMICAL
#38: VINYL TILE (VCT)
#39: CARPET
#40: TOILET PARTITIONS
#41:
INTERIOR WALL FINISH,
ACOUSTICAL TILE (ACT)
FABRIC-FACED
#42: INTERIOR CEILING FINISH,
GYPSUM BOARD/PLASTER
Beecher Community Center EMG PROJECT NO: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
#43: INTERIOR WALL FINISH,
CONCRETE/MASONRY
#44: QUARRY TILE
#45: INTERIOR CEILING FINISH,
ACOUSTICAL TILE (ACT)
#46: WATER STAINED ACOUSTICAL
TILES
#47: INTERIOR WALL FINISH
#48:
INTERIOR DOOR, FULLY-
GLAZED ALUMINUM-FRAMED
SWINGING
Beecher Community Center EMG PROJECT NO: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
#49: INTERIOR DOOR, WOOD SOLID-
CORE
#50: INTERIOR DOOR, FIRE 90-
MINUTES AND OVER
#51: KITCHEN CABINET
#52:
COMMERCIAL KITCHEN,
RANGE/OVEN, 6-BURNER WITH
GRIDDLE
#53: COMMERCIAL KITCHEN,
EXHAUST HOOD
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
Appendix B:
Site Plan
Site Plan
Project Name:
Beecher Community Center
Project Number:
122700.17R000-005.322
Source:
Google Maps
On-Site Date:
May 23, 2017
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
Appendix C:
EMG Accessibility Checklist
Page 1 of 4
Date Completed: June 7, 2017
Property Name: Beecher Community Center
EMG Project Number: 122700.17R000-005.322
Building History Yes No Unk Comments
1
Has an ADA survey previously been
completed for this property? X
2
Have any ADA improvements been made
to the property? X
3
Does a Transition Plan / Barrier Removal
Plan exist for the property? X
4
Has building ownership or management
received any ADA related complaints that
have not been resolved?
X
5
Is any litigation pending related to ADA
issues? X
Parking Yes No NA Comments
1
Are there sufficient accessible parking
spaces with respect to the total number of
reported spaces?
X However no spaces are designated for vans.
2
Are there sufficient van-accessible parking
spaces available? X
3
Are accessible spaces marked with the
International Symbol of Accessibility? Are
there signs reading “Van Accessible” at van
spaces?
X No designated van spaces.
4
Is there at least one accessible route
provided within the boundary of the site
from public transportation stops, accessible
parking spaces, passenger loading zones,
if provided, and public streets and
sidewalks?
X
5
Do curbs on the accessible route have
depressed, ramped curb cuts at drives,
paths, and drop-offs?
X
6
If required does signage exist directing you
to accessible parking and an accessible
building entrance?
X
Ramps Yes No NA Comments
1*
Do all ramps along accessible path of
travel appear to meet slope requirements?
( 1:12 or less) X
2
Are ramps that appear longer than 6 ft
complete with railings on both sides? X
3
Does the width between railings appear at
least 36 inches? X
Page 2 of 4
Ramps (cont.) Yes No NA Comments
4
Is there a level landing for approximately
every 30 ft horizontal length of ramp, at the
top and at the bottom of ramps and
switchbacks?
X
Entrances/Exits Yes No NA Comments
1
Do all required accessible entrance
doorways appear at least 32 inches wide
and not a revolving door? X
2
If the main entrance is inaccessible, are
there alternate accessible entrances? X
3
Is the door hardware easy to operate
(lever/push type hardware, no twisting
required and not higher than approximately
48 inches above the floor)?
X
Paths of Travel Yes No NA Comments
1
Are all paths of travel free of obstruction
and wide enough for a wheelchair (appear
at least 36 inches wide)? X
2
Are wheelchair-accessible facilities (toilet
rooms, exits, etc.) identified with signage? X
3
Is there a path of travel that does not
require the use of stairs? X
Elevators Yes No NA Comments
1
Do the call buttons have visual and audible
signals to indicate when a call is registered
and answered when car arrives? X
2
Are there visual and audible signals inside
cars indicating floor change? X
3
Are there standard raised and Braille
marking on both jambs of each hoist way
entrance as well as all cab/call buttons? X
4
Do elevator doors have a reopening device
that will stop and reopen a car door if an
object or a person obstructs the door? X
5
Are elevator controls low enough to be
reached from a wheelchair (appears to be
between 15 and 48 inches)? X
6
If a two-way emergency communication
system is provided within the elevator cab,
is it usable without voice communication? X
Page 3 of 4
Toilet Rooms Yes No NA Comments
1
Are common area public restrooms located
on an accessible route? X
2
Are pull handles push/pull or lever type?
X
3
Are there audible and visual fire alarm
devices in the toilet rooms? X
4
Are toilet room access doors wheelchair-
accessible (appear to be at least 32 inches
wide)? X
5
Are public restrooms large enough to
accommodate a wheelchair turnaround
(appear to have 60” turning diameter)? X
6
In unisex toilet rooms, are there safety
alarms with pull cords? X
7
Are toilet stall doors wheelchair accessible
(appear to be at least 32” wide)? X
8
Are grab bars provided in toilet stalls?
X
9
Are sinks provided with clearance for a
wheelchair to roll under (appear to have
29” clearance)? X
10
Are sink handles operable with one hand
without grasping, pinching or twisting? X
11
Are exposed pipes under sink sufficiently
insulated against contact? X
Guest Rooms Yes No NA Comments
1
How many total accessible sleeping rooms
does the property management report to
have? Provide specific number in
comment field.
Are there sufficient reported accessible
sleeping rooms with respect to the total
number of reported guestrooms? See
attached hot sheet.
X
Page 4 of 4
Guest Rooms (cont.) Yes No NA Comments
2
How many of the accessible sleeping
rooms per property management have roll-
in showers? Provide specific number in
comment field.
Are there sufficient reported accessible
rooms with roll-in showers with respect to
the total number of reported accessible
guestrooms? See attached hot sheet.
X
3
How many assistive listening kits and/or
rooms with communication features are
available per property management?
Provide specific number in comment
field.
Are there sufficient reported assistive
listening devices with respect to the total
number of rooms? See attached hot sheet.
X
Pools Yes No NA Comments
1 Are public access pools provided? If the
answer is no, please disregard this section. X
2
How many accessible access points are
provided to each pool/spa? Provide
number in comment field.
Is at least one fixed lift or sloped entry to
the pool provided?
X
Play Area Yes No NA Comments
1
Has the play area been reviewed for
accessibility? All public playgrounds are
subject to ADAAG standards.
X
Exercise Equipment Yes No NA Comments
1
Does there appear to be adequate clear
floor space around the
machines/equipment (30” by 48”
minimum)?
X
*Based on visual observation only. The slope was not confirmed through measurements.
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
Appendix D:
Pre-Survey Questionnaire
PROPERTY CONDITION ASSESSMENT : PRE-SURVEY QUESTIONNAIRE
Name of Person Completing Questionnaire:N/A - Not returned to EMG
Association with Property:
Length of Assocation with Property:
Date Completed:
Phone Number:
Property Name:
EMG Project Number:
Inspections Date Last
Inspected
List any Outstanding Repairs Required
1 Elevators
2 HVAC, Mechanical,
Electric, Plumbing
3 Life-Safety/Fire
4 Roofs
Question Response
5 List any major capital improvement within
the last three years.
6 List any major capital expenditures
planned for the next year.
7 What is the age of the roof(s)?
8 What building systems (HVAC, roof,
interior/exterior finishes, paving, etc.) are
the responsibilities of the tenant to
maintain and replace?
Question Yes No Unk N/A Comments
9
Are there any unresolved building, fire, or
zoning code issues?
10 Are there any "down" or unusable units?
11
Are there any problems with erosion,
stormwater drainage or areas of paving that
do not drain?
12
Is the property served by a private water
well?
13
Is the property served by a private septic
system or other waste treatment systems?
14
Are there any problems with foundations or
structures?
15
Is there any water infiltration in basements or
crawl spaces?
16 Are there any wall, or window leaks?
17 Are there any roof leaks?
18 Is the roofing covered by a warranty or bond?
19 Are there any poorly insulated areas?
20
Is Fire Retardant Treated (FRT) plywood
used?
PROPERTY CONDITION ASSESSMENT : PRE-SURVEY QUESTIONNAIRE
Question Yes No Unk N/A Comments
21
Is exterior insulation and finish system (EIFS)
or a synthetic stucco finish used?
22
Are there any problems with the utilities, such
as inadequate capacities?
23
Are there any problems with the landscape
irrigation systems?
24
Has a termite/wood boring insect inspection
been performed within the last year?
25
Do any of the HVAC systems use R-11, 12,
or 22 refrigerants?
26
Has any part of the property ever contained
visible suspect mold growth?
27
Is there a mold Operations and Maintenance
Plan?
28
Have there been indoor air quality or mold
related complaints from tenants?
29 Is polybutylene piping used?
30
Are there any plumbing leaks or water
pressure problems?
31
Are there any leaks or pressure problems
with natural gas service?
32
Does any part of the electrical system use
aluminum wiring?
33
Do Residential units have a less than
60-Amp service?
34
Do Commercial units have less than
200-Amp service?
35
Are there any recalled fire sprinkler heads
(Star, GEM, Central, Omega)?
36
Is there any pending litigation concerning the
property?
37
Has the management previously completed
an ADA review?
38
Have any ADA improvements been made to
the property?
39
Does a Barrier Removal Plan exist for the
property?
40
Has the Barrier Removal Plan been approved
by an arms-length third party?
41
Has building ownership or management
received any ADA related complaints?
42
Does elevator equipment require upgrades to
meet ADA standards?
43 Are there any problems with exterior lighting?
44
Are there any other significant
issues/hazards with the property?
PROPERTY CONDITION ASSESSMENT : PRE-SURVEY QUESTIONNAIRE
Question Yes No Unk N/A Comments
45
Are there any unresolved construction
defects at the property?
Comments
BEECHER COMMUNITY CENTER EMG PROJECT NO.: 122700.17R000-005.322
www.EMGcorp.com p 800.733.0660
On the day of the site visit, provide EMG's Field Observer access to all of the available documents listed below.
Provide copies if possible.
INFORMATION REQUIRED
1. All available construction documents (blueprints) for
the original construction of the building or for any tenant
improvement work or other recent construction work.
2. A site plan, preferably 8 1/2" X 11", which depicts the
arrangement of buildings, roads, parking stalls, and other
site features.
3. For commercial properties, provide a tenant list which
identifies the names of each tenant, vacant tenant units,
the floor area of each tenant space, and the gross and
net leasable area of the building(s).
4. For apartment properties, provide a summary of the
apartment unit types and apartment unit type quantities,
including the floor area of each apartment unit as
measured in square feet.
5. For hotel or nursing home properties, provide a
summary of the room types and room type quantities.
6. Copies of Certificates of Occupancy, building permits,
fire or health department inspection reports, elevator
inspection certificates, roof or HVAC warranties, or any
other similar, relevant documents.
7. The names of the local utility companies which serve
the property, including the water, sewer, electric, gas,
and phone companies.
8. The company name, phone number, and contact
person of all outside vendors who serve the property,
such as mechanical contractors, roof contractors, fire
sprinkler or fire extinguisher testing contractors, and
elevator contractors.
9. A summary of recent (over the last 5 years) capital
improvement work which describes the scope of the
work and the estimated cost of the improvements.
Executed contracts or proposals for improvements.
Historical costs for repairs, improvements, and
replacements.
10. Records of system and material ages (roof, MEP,
paving, finishes, furnishings).
11. Any brochures or marketing information.
12. Appraisal, either current or previously prepared.
13. Current occupancy percentage and typical turnover
rate records (for commercial and apartment properties).
14. Previous reports pertaining to the physical condition
of property.
15. ADA survey and status of improvements
implemented.
16. Current / pending litigation related to property
condition.
Your timely compliance with this request is greatly appreciated.
Prepared for:
United City of Yorkville
800 Game Farm Road
Yorkville, Illinois 60560
FACILITY CONDITION ASSESSMENT
Public Works Garage (Frame Building)
185 Wolf Street
Yorkville, Illinois 60560
PREPARED BY: EMG CONTACT:
EMG Andrew Hupp
10461 Mill Run Circle, Suite 1100 Senior Engineering Consultant
Owings Mills, Maryland 21117 800.733.0660 x6632
800.733.0660 arhupp@emgcorp.com
www.EMGcorp.com
EMG Project Number: Date of Report: On Site Date:
122700.17R000-041.322 July 18, 2017 June 26, 2017
FACILITY CONDITION ASSESSMENT
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
TABLE OF CONTENTS
1. Executive Summary ............................................................................................................................. 1
1.1. Property Information and General Physical Condition ................................................................ 1
1.2. Facility Condition Index (FCI) ...................................................................................................... 2
1.3. Special Issues and Follow-Up Recommendations ...................................................................... 3
1.4. Opinions of Probable Cost .......................................................................................................... 3
1.4.1. Methodology ................................................................................................................................ 4
1.4.2. Immediate Repairs ...................................................................................................................... 4
1.4.3. Replacement Reserves ............................................................................................................... 4
2. Purpose and Scope .............................................................................................................................. 5
2.1. Purpose ....................................................................................................................................... 5
2.2. Scope .......................................................................................................................................... 6
2.3. Personnel Interviewed ................................................................................................................. 6
2.4. Documentation Reviewed ........................................................................................................... 7
2.5. Pre-Survey Questionnaire ........................................................................................................... 7
2.6. Weather Conditions ..................................................................................................................... 7
3. Accessibility and Property Research ................................................................................................. 8
3.1. ADA Accessibility ........................................................................................................................ 8
3.2. Municipal Information, Flood Zone and Seismic Zone ................................................................ 8
4. Existing Building Assessment ............................................................................................................ 9
4.1. Unit or Space Types .................................................................................................................... 9
4.2. Inaccessible Areas or Key Spaces Not Observed ...................................................................... 9
5. Site Improvements ............................................................................................................................. 10
5.1. Utilities ....................................................................................................................................... 10
5.2. Parking, Paving, and Sidewalks ................................................................................................ 10
5.3. Drainage Systems and Erosion Control .................................................................................... 11
5.4. Topography and Landscaping ................................................................................................... 12
5.5. General Site Improvements ....................................................................................................... 12
6. Building Architectural and Structural Systems ............................................................................... 14
6.1. Foundations ............................................................................................................................... 14
6.2. Superstructure ........................................................................................................................... 14
6.3. Roofing ...................................................................................................................................... 14
6.4. Exterior Walls ............................................................................................................................ 15
6.5. Exterior and Interior Stairs ......................................................................................................... 16
6.6. Exterior Windows and Doors ..................................................................................................... 16
6.7. Patio, Terrace, and Balcony ...................................................................................................... 17
7. Building Mechanical and Plumbing Systems .................................................................................. 18
7.1. Building Heating, Ventilating, and Air Conditioning (HVAC) ..................................................... 18
7.2. Building Plumbing and Domestic Hot Water ............................................................................. 19
7.3. Building Gas Distribution ........................................................................................................... 20
7.4. Building Electrical ...................................................................................................................... 20
7.5. Building Elevators and Conveying Systems .............................................................................. 21
7.6. Fire Protection and Security Systems ....................................................................................... 21
7.7. Life Support Systems ................................................................................................................ 22
8. Interior Spaces .................................................................................................................................... 23
8.1. Interior Finishes ......................................................................................................................... 23
8.2. Commercial Kitchen & Laundry Equipment .............................................................................. 24
9. Other Structures ................................................................................................................................. 25
10. Certification ......................................................................................................................................... 26
11. Appendices ......................................................................................................................................... 27
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
1
www.EMGcorp.com p 800.733.0660
1. Executive Summary
1.1. Property Information and General Physical Condition
The property information is summarized in the table below. More detailed descriptions may be found in the various sections of the
report and in the Appendices.
Property Information
Address: 185 Wolf Street, Yorkville, IL 60560
Year Constructed/Renovated: 2008
Current Occupants: City of Yorkville
Percent Utilization: 100%
Management Point of Contact:
City of Yorkville, Mr. Peter Ratos
630.553.8574 phone
pratos@yorkville.il.us email
Property Type: Office, Garage
Site Area: 2.4 acres
Building Area: 10,600 SF
Number of Buildings: 1
Number of Stories: 1
Parking Type and Number of
Spaces: 32 spaces in open lots.
Building Construction: Steel frame with concrete-topped metal decks.
Roof Construction: Sloped roofing with metal finish.
Exterior Finishes: Metal Siding
Heating, Ventilation & Air
Conditioning: Condensing unit, Furnace, Ceiling Fans, and Unit Heaters.
Fire and Life/Safety: Smoke detectors, strobes, extinguishers, exit signs, and carbon
monoxide detectors.
Dates of Visit: June 26, 2017
On-Site Point of Contact (POC): Tony Hule
Assessment and Report
Prepared by: Tammy Prusa
Reviewed by:
Al Diefert
Technical Report Reviewer
For
Andrew Hupp
Program Manager
arhupp@emgcorp.com
800.733.0660 x6632
Systemic Condition Summary
Site Fair HVAC Good
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
2
www.EMGcorp.com p 800.733.0660
Systemic Condition Summary
Structure Good Plumbing Fair
Roof Good Electrical Good
Vertical Envelope Good Elevators --
Interiors Fair Fire --
The following bullet points highlight the most significant short term and modernization recommendations:
Installation of a complete Fire Alarm System
Installation of a complete Sprinkler System
Generally, the property appears to have been constructed within industry standards in force at the time of construction. The property
appears to have been well maintained since it was first occupied and is in fair overall condition.
The property has had no major capital improvements. The property is less than 9 years old and has not required any major capital
improvements.
1.2. F acility Condition Index (FCI)
One of the major goals of the FCA is to calculate the FCI, which gives an indication of a building’s overall condition. Two FCI ratios are
calculated and presented, the Current Year and Ten-Year. The Current Year FCI is the ratio of Immediate Repair Costs to the building’s
Current Replacement Value. Similarly, the Ten-Year FCI is the ratio of anticipated Capital Reserve Needs over the next ten years to
the Current Replacement Value.
Fci Condition
Rating Definition Percentage
Value
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
3
www.EMGcorp.com p 800.733.0660
Good In new or well-maintained condition, with no visual evidence
of wear, soiling or other deficiencies. 0% to 5%
Fair Subjected to wear and soiling but is still in a serviceable and
functioning condition. > than 5% to 10%
Poor Subjected to hard or long-term wear. Nearing the end of its
useful or serviceable life. > than 10% to 60%
Very Poor Has reached the end of its useful or serviceable life. Renewal
is now necessary. > than 60%
The graphs above and tables below represent summary-level findings for the FCA. The deficiencies identified in this assessment can
be combined with potential new construction requirements to develop an overall strategy that can serve as the basis for a portfolio-wide
capital improvement funding strategy. Key findings from the assessment include:
Key Finding Metric
Current Year Facility Condition Index (FCI) FCI = (IR)/(CRV) 5.9% Fair
10-Year Facility Condition Index (FCI) FCI = (RR)/(CRV) 2.8% Good
Current Replacement Value (CRV) 10,600 SF * 183.24 / SF = $1,832,371
Year 0 (Current Year) - Immediate Repairs (IR) $109,797
Years 1-10 – Replacement Reserves (RR) $53,136
Total Capital Needs $162,933
The major issues contributing to the Immediate Repair Costs and the Current Year FCI ratio are summarized below:
Installation of a complete Fire Alarm System
Installation of a complete Sprinkler System
Further detail on the specific costs that make up the Immediate Repair Costs can be found in the cost tables at the beginning of this
report.
1.3. Special Issues and Follow-Up Recommendations
As part of the FCA, a limited assessment of accessible areas of the building(s) was performed to determine the presence of fungal
growth, conditions conducive to fungal growth, and/or evidence of moisture. Property personnel were interviewed concerning any
known or suspected fungal growth, elevated relative humidity, water intrusion, or mildew-like odors. Sampling is not a part of this
assessment.
There are no visual indications of the presence of fungal growth, conditions conducive to fungal growth, or evidence of moisture in
representative readily accessible areas of the property.
1.4. Opinions of Probable Cost
Cost estimates are attached at the front of this report (following the cover page).
These estimates are based on Invoice or Bid Document/s provided either by the Owner/facility and construction costs developed by
construction resources such as R.S. Means and Marshall & Swift, EMG’s experience with past costs for similar properties, city cost
indexes, and assumptions regarding future economic conditions.
Opinions of probable costs should only be construed as preliminary, order of magnitude budgets. Actual costs most probably will vary
from the consultant’s opinions of probable costs depending on such matters as type and design of suggested remedy, quality of
materials and installation, manufacturer and type of equipment or system selected, field conditions, whether a physical deficiency is
repaired or replaced in whole, phasing of the work (if applicable), quality of contractor, quality of project management exercised, market
conditions, and whether competitive pricing is solicited, etc. ASTM E2018-08 recognizes that certain opinions of probable costs cannot
be developed within the scope of this guide without further study. Opinions of probable cost for further study should be included in the
FCA.
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
4
www.EMGcorp.com p 800.733.0660
1.4.1. Methodology
Based upon site observations, research, and judgment, along with referencing Expected Useful Life (EUL) tables from various industry
sources, EMG opines as to when a system or component will most probably necessitate replacement. Accurate historical replacement
records, if provided, are typically the best source of information. Exposure to the elements, initial quality and installation, extent of use,
the quality and amount of preventive maintenance exercised, etc., are all factors that impact the effective age of a system or
component. As a result, a system or component may have an effective age that is greater or less than its actual chronological age.
The Remaining Useful Life (RUL) of a component or system equals the EUL less its effective age. Projections of Remaining Useful Life
(RUL) are based on continued use of the Property similar to the reported past use. Significant changes in occupants and/or usage may
affect the service life of some systems or components.
Where quantities could not be derived from an actual take-off, lump sum costs or allowances are used. Estimated costs are based on
professional judgment and the probable or actual extent of the observed defect, inclusive of the cost to design, procure, construct and
manage the corrections.
1.4.2. Immediate Repairs
Immediate repairs are opinions of probable costs that require immediate action as a result of: (1) material existing or potential unsafe
conditions, (2) material building or fire code violations, or (3) conditions that, if not addressed, have the potential to result in, or
contribute to, critical element or system failure within one year or will most probably result in a significant escalation of its remedial cost.
1.4.3. Replacement Reserves
Replacement Reserves are for recurring probable expenditures, which are not classified as operation or maintenance expenses. The
replacement reserves should be budgeted for in advance on an annual basis. Replacement Reserves are reasonably predictable both
in terms of frequency and cost. However, Replacement Reserves may also include components or systems that have an
indeterminable life but, nonetheless, have a potential for failure within an estimated time period.
Replacement Reserves exclude systems or components that are estimated to expire after the reserve term and are not considered
material to the structural and mechanical integrity of the subject property. Furthermore, systems and components that are not deemed
to have a material effect on the use of the Property are also excluded. Costs that are caused by acts of God, accidents, or other
occurrences that are typically covered by insurance, rather than reserved for, are also excluded.
Replacement costs are solicited from ownership/property management, EMG’s discussions with service companies, manufacturers'
representatives, and previous experience in preparing such schedules for other similar facilities. Costs for work performed by the
ownership’s or property management’s maintenance staff are also considered.
EMG’s reserve methodology involves identification and quantification of those systems or components requiring capital reserve funds
within the assessment period. The assessment period is defined as the effective age plus the reserve term. Additional information
concerning system’s or component’s respective replacement costs (in today's dollars), typical expected useful lives, and remaining
useful lives were estimated so that a funding schedule could be prepared. The Replacement Reserves Schedule presupposes that all
required remedial work has been performed or that monies for remediation have been budgeted for items defined in the Immediate
Repair Cost Estimate.
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
5
www.EMGcorp.com p 800.733.0660
2. Purpose and Scope
2.1. Purpose
EMG was retained by the client to render an opinion as to the Property’s current general physical condition on the day of the site visit.
Based on the observations, interviews and document review outlined below, this report identifies significant deferred maintenance
issues, existing deficiencies, and material code violations of record at municipal offices, which affect the Property’s use. Opinions are
rendered as to its structural integrity, building system condition and the Property’s overall condition. The report also notes building
systems or components that have realized or exceeded their typical expected useful lives.
CONDITIONS:
The physical condition of building systems and related components are typically defined as being in one of five conditions: Excellent,
Good, Fair, Poor, Failed or a combination thereof. For the purposes of this report, the following definitions are used:
Excellent = New or very close to new; component or system typically has been installed within the past year, sound and
performing its function. Eventual repair or replacement will be required when the component or system either
reaches the end of its useful life or fails in service.
Good = Satisfactory as-is. Component or system is sound and performing its function, typically within the first third
of its lifecycle. However, it may show minor signs of normal wear and tear. Repair or replacement will be
required when the component or system either reaches the end of its useful life or fails in service.
Fair = Showing signs of wear and use but still satisfactory as-is, typically near the median of its estimated useful
life. Component or system is performing adequately at this time but may exhibit some signs of wear,
deferred maintenance, or evidence of previous repairs. Repair or replacement will be required due to the
component or system’s condition and/or its estimated remaining useful life.
Poor = Component or system is significantly aged, flawed, functioning intermittently or unreliably; displays obvious
signs of deferred maintenance; shows evidence of previous repair or workmanship not in compliance with
commonly accepted standards; has become obsolete; or exhibits an inherent deficiency. The present
condition could contribute to or cause the deterioration of contiguous elements or systems. Either full
component replacement is needed or repairs are required to restore to good condition, prevent premature
failure, and/or prolong useful life.
Failed
= Component or system has ceased functioning or performing as intended. Replacement, repair, or other
significant corrective action is recommended or required.
Not Applicable
= Assigning a condition does not apply or make logical sense, most commonly due to the item in question not
being present.
FORMAT OF THE BODY OF THE REPORT:
Throughout sections 5 through 9 of this report, each report section will typically contain three subsections organized in the following
sequence:
A descriptive table (and/or narrative), which identifies the components assessed, their condition, and other key data points.
A simple bulleted list of Anticipated Lifecycle Replacements, which lists components and assets typically in Excellent, Good, or Fair
condition at the time of the assessment but that will require replacement or some other attention once aged past their estimated
useful life. These listed components are typically included in the associated inventory database with costs identified and budgeted
beyond the first several years.
A bulleted cluster of Actions/Comments, which include more detailed narratives describing deficiencies, recommended repairs, and
short term replacements. The assets and components associated with these bullets are/were typically problematic and in Poor or
Failed condition at the time of the assessment, with corresponding costs included within the first few years.
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
6
www.EMGcorp.com p 800.733.0660
PLAN TYPES:
Each line item in the cost database is assigned a Plan Type, which is the primary reason or rationale for the recommended
replacement, repair, or other corrective action. This is the “why” part of the equation. A cost or line item may commonly have more
than one applicable Plan Type; however, only one Plan Type will be assigned based on the “best” fit, typically the one with the greatest
significance. The following Plan Types are listed in general weighted order of importance:
Safety = An observed or reported unsafe condition that if left unaddressed could result in an injury; a system or
component that presents a potential liability risk.
Performance/Integrity = Component or system has failed, is almost failing, performs unreliably, does not perform as intended,
and/or poses a risk to overall system stability.
Accessibility = Does not meet ADA, UFAS, and/or other handicap accessibility requirements.
Environmental = Improvements to air or water quality, including removal of hazardous materials from the building or
site.
Modernization/Adaptation
= Conditions, systems, or spaces that need to be upgraded in appearance or function to meet current
standards, facility usage, or client/occupant needs.
Lifecycle/Renewal
= Any component or system in which future repair or replacement is anticipated beyond the next several
years and/or is of minimal substantial early-term consequence.
2.2. Scope
The standard scope of the Facility Condition Assessment includes the following:
Visit the Property to evaluate the general condition of the building and site improvements, review available construction documents in
order to familiarize ourselves with, and be able to comment on, the in-place construction systems, life safety, mechanical, electrical,
and plumbing systems, and the general built environment.
Identify those components that are exhibiting deferred maintenance issues and provide cost estimates for Immediate Costs and
Replacement Reserves based on observed conditions, maintenance history and industry standard useful life estimates. This will
include the review of documented capital improvements completed within the last five-year period and work currently contracted for, if
applicable.
Provide a full description of the Property with descriptions of in-place systems and commentary on observed conditions.
Provide a general statement of the subject Property’s compliance to Title III of the Americans with Disabilities Act. This will not
constitute a full ADA survey, but will help identify exposure to issues and the need for further review.
Perform a limited assessment of accessible areas of the building(s) for the presence of fungal growth, conditions conducive to fungal
growth, and/or evidence of moisture. EMG will also interview Project personnel regarding the presence of any known or suspected
fungal growth, elevated relative humidity, water intrusion, or mildew-like odors. Potentially affected areas will be photographed.
Sampling will not be considered in routine assessments.
List the current utility service providers.
Review maintenance records and procedures with the in-place maintenance personnel.
Observe a representative sample of the interior spaces/units, including vacant spaces/units, in order to gain a clear understanding of
the property’s overall condition. Other areas to be observed include the exterior of the property, the roofs, interior common areas,
and the significant mechanical, electrical and elevator equipment rooms.
Provide recommendations for additional studies, if required, with related budgetary information.
Provide an Executive Summary at the beginning of this report.
2.3. Personnel Interviewed
The management were interviewed for specific information relating to the physical property, available maintenance procedures,
historical performance of key building systems and components, available drawings and other documentation. The following personnel
from the facility and government agencies were interviewed in the process of conducting the FCA:
Name and Title Organization Phone Number
Tony Hule City of Yorkville (630) 885-3569
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
7
www.EMGcorp.com p 800.733.0660
The FCA was performed with the assistance of Tony Hule, City of Yorkville, the onsite Point of Contact (POC), who was cooperative
and provided information that appeared to be accurate based upon subsequent site observations. The onsite contact is completely
knowledgeable about the subject property and answered most questions posed during the interview process. The POC’s management
involvement at the property has been for the past 14 years.
2.4. Documentation Reviewed
Prior to the FCA, relevant documentation was requested that could aid in the knowledge of the subject property’s physical
improvements, extent and type of use, and/or assist in identifying material discrepancies between reported information and observed
conditions. The review of submitted documents does not include comment on the accuracy of such documents or their preparation,
methodology, or protocol. The Documentation Request Form is provided in Appendix E.
Although Appendix E provides a summary of the documents requested or obtained, the following list provides more specific details
about some of the documents that were reviewed or obtained during the site visit.
No documents available.
2.5. Pre-Survey Questionnaire
A Pre-Survey Questionnaire was sent to the POC prior to the site visit, and was not returned. The questionnaire is included in Appendix
E.
2.6. Weather Conditions
June 26, 2017: Clear, with temperatures in the 70s (°F) and light winds.
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
8
www.EMGcorp.com p 800.733.0660
3. Accessibility and Property Research
3.1. ADA Accessibility
Generally, Title III of the Americans with Disabilities Act (ADA) prohibits discrimination by entities to access and use of “areas of public
accommodations” and “commercial facilities” on the basis of disability. Regardless of its age, these areas and facilities must be
maintained and operated to comply with the Americans with Disabilities Act Accessibility Guidelines (ADAAG).
Buildings completed and occupied after January 26, 1992 are required to comply fully with the ADAAG. Existing facilities constructed
prior to this date are held to the lesser standard of compliance to the extent allowed by structural feasibility and the financial resources
available. As an alternative, a reasonable accommodation pertaining to the deficiency must be made.
During the FCA, a limited visual observation for ADA accessibility compliance was conducted. The scope of the visual observation was
limited to those areas set forth in EMG’s Abbreviated Accessibility Checklist provided in Appendix D of this report. It is understood by
the Client that the limited observations described herein does not comprise a full ADA Compliance Survey, and that such a survey is
beyond the scope of EMG’s undertaking. Only a representative sample of areas was observed and, other than as shown on the
Abbreviated Accessibility Checklist, actual measurements were not taken to verify compliance.
At a Garage/Office property, the areas considered as a public accommodation besides the site itself and parking, are the exterior
accessible route, the interior accessible route up to the tenant lease lines and the interior common areas, including the common area
restrooms.
The facility does not appear to be accessible with Title III of the Americans with Disabilities Act. Elements as defined by the ADAAG
that are not accessible as stated within the priorities of Title III, are as follows:
Parking
Adequate number of designated parking stalls and signage for vans are not provided.
Ramps
Existing exterior ramps and stairs are not equipped with the required handrails (each side).
Restrooms
Install grab bars in accessible stalls at 36” above the floor.
A full ADA Compliance Survey may reveal some aspects of the property that are not in compliance.
Corrections of these conditions should be addressed from a liability standpoint, but are not necessarily code violations. The Americans
with Disabilities Act Accessibility Guidelines concern civil rights issues as they pertain to the disabled and are not a construction code,
although many local jurisdictions have adopted the Guidelines as such. The cost to address the achievable items noted above is
included in the cost tables.
3.2. Municipal Information, Flood Zone and Seismic Zone
Not applicable
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
9
www.EMGcorp.com p 800.733.0660
4. Existing Building Assessment
4.1. Unit or Space Types
All 10,600 square feet of the building are occupied by a single occupant, City of Yorkville. The spaces are mostly a combination of
offices, supporting restrooms, garages.
4.2. Inaccessible Areas or Key Spaces Not Observed
The interior spaces were observed in order to gain a clear understanding of the property’s overall condition. Other areas accessed
included the site within the property boundaries, exterior of the property and the roof. All areas of the property were available for
observation during the site visit.
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
10
www.EMGcorp.com p 800.733.0660
5. Site Improvements
5.1. Utilities
The following table identifies the utility suppliers and the condition and adequacy of the services.
Site Utilities
Utility Supplier Condition and Adequacy
Sanitary sewer City of Yorkville Good
Storm sewer Yorkville Department of Public Works Good
Domestic water City of Yorkville Good
Electric service ComEd Good
Natural gas service Nicor Good
Actions/Comments:
According to the POC, the utilities provided are adequate for the property. There are no unique, onsite utility systems such as
emergency electrical generators, septic systems, water or waste water treatment plants, or propane gas tanks.
5.2. Parking, Paving, and Sidewalks
Item Description
Main Ingress and Egress Wolf Street
Access from North
Additional Entrances N/A
Additional Access from N/A
Paving and Flatwork
Item Material Last Work Done Condition
Entrance Driveway Apron Asphalt 2008 Fair
Parking Lot Asphalt 2008 Fair
Drive Aisles None -- --
Service Aisles None -- --
Sidewalks Concrete 2008 Good
Curbs Concrete 2008 Fair
Site Stairs None -- --
Pedestrian Ramps None -- --
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
11
www.EMGcorp.com p 800.733.0660
Parking Count
Open Lot Carport Private Garage Subterranean
Garage
Freestanding Parking
Structure
23 -- -- -- -
Total Number of ADA Compliant Spaces 1
Number of ADA Compliant Spaces for Vans 0
Total Parking Spaces 23
Parking Ratio (Spaces/Apartments) --
Method of Obtaining Parking Count Physical count
Exterior Stairs
Location Material Handrails Condition
None -- -- --
Anticipated Lifecycle Replacements:
Asphalt seal coating
Asphalt pavement
Actions/Comments:
No significant actions are identified at the present time. On-going periodic maintenance is highly recommended. Future lifecycle
replacements of the components listed above will be required.
5.3. Drainage Systems and Erosion Control
Drainage System and Erosion Control
System Exists At Site Condition
Surface Flow ☒ Good
Inlets ☐ --
Swales ☐ --
Detention pond ☐ --
Lagoons ☐ --
Ponds ☐ --
Underground Piping ☐ --
Pits ☐ --
Municipal System ☐ --
Dry Well ☐ --
Anticipated Lifecycle Replacements:
No components of significance
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
12
www.EMGcorp.com p 800.733.0660
Actions/Comments:
There is no evidence of storm water runoff from adjacent properties. The storm water system appears to provide adequate runoff
capacity. There is no evidence of major ponding or erosion.
5.4. Topography and Landscaping
Item Description
Site Topography Generally flat.
Landscaping
Trees Grass Flower
Beds Planters
Drought
Tolerant
Plants
Decorative
Stone None
☒ ☒ ☐ ☐ ☐ ☐ ☐
Landscaping
Condition Good
Irrigation
Automatic
Underground Drip Hand Watering None
☐ ☐ ☐ ☒
Irrigation Condition --
Retaining Walls
Type Location Condition
None -- --
Anticipated Lifecycle Replacements:
No components of significance
Actions/Comments:
The topography and adjacent uses do not appear to present conditions detrimental to the property. There are no significant areas of
erosion.
5.5. General Site Improvements
Property Signage
Property Signage Post mounted wood
Street Address Displayed? Yes
Site and Building Lighting
Site Lighting
None Pole Mounted Bollard Lights Ground
Mounted
Parking Lot
Pole Type
☒ ☐ ☐ ☐ ☐
Choose an item.
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
13
www.EMGcorp.com p 800.733.0660
Site and Building Lighting
Building Lighting
None Wall Mounted Recessed Soffit
☐ ☒ ☐
Fair
Site Fencing
Type Location Condition
None -- --
REFUSE DISPOSAL
Refuse Disposal Common area dumpsters
Dumpster Locations Mounting Enclosure Contracted? Condition
South part of Front Elevation Asphalt
paving None No Fair
Other Site Amenities
Description Location Condition
Playground Equipment None -- --
Tennis Courts None -- --
Basketball Court None -- --
Swimming Pool None -- --
Anticipated Lifecycle Replacements:
Exterior lighting
Actions/Comments:
No significant actions are identified at the present time. On-going periodic maintenance is highly recommended. Future lifecycle
replacements of the components listed above will be required.
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
14
www.EMGcorp.com p 800.733.0660
6. Building Architectural and Structural Systems
6.1. Foundations
Building Foundation
Item Description Condition
Foundation Slab on grade with integral footings Good
Basement and Crawl Space None --
Anticipated Lifecycle Replacements:
No components of significance
Actions/Comments:
There are no significant signs of settlement, deflection, or movement.
6.2. Superstructure
Building Superstructure
Item Description Condition
Framing / Load-Bearing Walls Steel columns and beams Good
Ground Floor Concrete slab Good
Upper Floor Framing Wood joists Good
Upper Floor Decking Plywood or OSB Fair
Roof Framing Steel beams or girders Good
Roof Decking Metal decking Fair
Anticipated Lifecycle Replacements:
No components of significance
Actions/Comments:
The superstructure is exposed in some locations, which allows for limited observation. Walls and floors appear to be plumb, level,
and stable. There are no significant signs of deflection or movement.
6.3. Roofing
Primary Roof
Type / Geometry Gable Roof Finish Metal
Maintenance Outside Contractor Roof Age 9 Yrs
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
15
www.EMGcorp.com p 800.733.0660
Primary Roof
Flashing Sheet Metal Warranties None
Parapet Copings None Roof Drains Gutters and downspouts
Fascia Metal Panel Insulation Fiberglass batts
Soffits None Skylights No
Attics Steel beams Ponding No
Ventilation Source-1 Ridge Vents Leaks Observed No
Ventilation Source-2 -- Roof Condition Good
Anticipated Lifecycle Replacements:
No components of significance
Actions/Comments:
The roof finishes are original. Information regarding roof warranties or bonds was not available. The roofs are maintained by an
outside contractor.
There is no evidence of active roof leaks.
There is no evidence of roof deck or insulation deterioration. The roof substrate and insulation should be inspected during any future
roof repair or replacement work.
Roof drainage appears to be adequate. Clearing and minor repair of drain system components should be performed regularly as part
of the property management’s routine maintenance and operations program.
The attics are not accessible and it could not be determined if there is moisture, water intrusion, or excessive daylight in the attics.
6.4. Exterior Walls
Building Exterior Walls
Type Location Condition
Primary Finish Metal siding Good
Secondary Finish Painted CMU Good
Accented with -- --
Soffits Not Applicable --
Building sealants (caulking) are located between dissimilar materials, at joints, and around window and door openings.
Anticipated Lifecycle Replacements:
No components of significance
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
16
www.EMGcorp.com p 800.733.0660
Actions/Comments:
The metal siding has isolated areas of damaged siding along the top side of Garage No. 5. The damaged siding must be repaired.
The cost for this work is relatively insignificant and the work can be performed as part of the property managements’ routine
maintenance program.
6.5. Exterior and Interior Stairs
Building Exterior and Interior Stairs
Type Description Riser Handrail Balusters Condition
Building Exterior Stairs None -- -- -- --
Building Interior Stairs Wood-framed Closed Wood Wood Good
Anticipated Lifecycle Replacements:
No components of significance
Actions/Comments:
No significant actions are identified at the present time. On-going periodic maintenance is highly recommended.
6.6. Exterior Windows and Doors
Building Windows
Window Framing Glazing Location Window
Screen Condition
Aluminum framed, operable Double glaze Front Elevation of Building ☐ Good
Building Doors
Main Entrance Doors Door Type Condition
Metal, insulated Fair
Secondary Entrance Doors Metal, insulated Fair
Service Doors Metal, hollow Fair
Overhead Doors Aluminium Good
Anticipated Lifecycle Replacements:
Exterior Metal doors
Actions/Comments:
No significant actions are identified at the present time. On-going periodic maintenance is highly recommended.
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
17
www.EMGcorp.com p 800.733.0660
6.7. Patio, Terrace, and Balcony
Not applicable. There are no patios, terraces, or balconies.
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
18
www.EMGcorp.com p 800.733.0660
7. Building Mechanical and Plumbing Systems
See the Mechanical Equipment List in the Appendices for the quantity, manufacturer’s name, model number, capacity and year of
manufacturer of the major mechanical equipment, if available.
7.1. Building Heating, Ventilating, and Air Conditioning (HVAC)
Individual Units
Primary Components Split system furnaces and condensing units
Cooling (if separate from above) performed via components above
Quantity and Capacity Ranges 1 unit ranging from 5 tons/BTUH
Total Heating or Cooling Capacity 5 tons/BTUH
Heating Fuel Electric
Location of Equipment Interior Garage
Space Served by System Entire building
Age Ranges All units dated 2014
Primary Component Condition Good
Supplemental Components
Supplemental Component #1 Suspended unit heaters
Location / Space Served by Suspended Unit Heaters Above Office in Garage
Suspended Unit Heater Condition Good
Supplemental Component #2 Ceiling Fans
Location / Space Served by Ceiling Fans Throughout Building
Ceiling Fans Condition Fair
Supplemental Component #3 Engine Exhaust Removal
Location / Space Served by Engine Exhaust Removal Ceiling of Garage
Engine Exhaust Removal Condition Good
Controls and Ventilation
HVAC Control System Individual programmable thermostats/controls
HVAC Control System Condition Good
Building Ventilation Engine Exhaust Removal
Ventilation System Condition Good
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
19
www.EMGcorp.com p 800.733.0660
Anticipated Lifecycle Replacements:
Engine Exhaust Removal Fans
Suspended Unit Heaters
Electric Furnace
Ceiling Fans
Condensing Unit
Actions/Comments:
The HVAC systems are maintained by an outside contractor. Records of the installation, maintenance, upgrades, and replacement
of the HVAC equipment at the property have been maintained since the property was first occupied.
The HVAC equipment appears to vary in age. The property is relatively new and has not required any major HVAC equipment
replacements.
The HVAC equipment appears to be functioning adequately overall. No chronic problems were reported and an overall sense of
satisfaction with the systems was conveyed. However, due to the inevitable failure of parts and components over time, some of the
equipment will require replacement.
7.2. Building Plumbing and Domestic Hot Water
Building Plumbing System
Type Description Condition
Water Supply Piping Copper Fair
Waste/Sewer Piping Cast iron Fair
Vent Piping Cast iron Fair
Water Meter Location Right Elevation of Building
Domestic Water Heaters or Boilers
Components Water Heaters
Fuel Electric
Quantity and Input Capacity 1 unit
Storage Capacity 50 gallons
Boiler or Water Heater Condition Fair
Supplementary Storage Tanks? No
Storage Tank Quantity & Volume --
Quantity of Storage Tanks --
Storage Tank Condition --
Domestic Hot Water Circulation Pumps (3 HP and over) No
Adequacy of Hot Water Adequate
Adequacy of Water Pressure Adequate
Plumbing Fixtures
Water Closets Residential grade
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
20
www.EMGcorp.com p 800.733.0660
Plumbing Fixtures
Toilet (Water Closet) Flush Rating 1.6 GPF
Common Area Faucet Nominal Flow Rate 2.0 GPM
Condition Fair
Anticipated Lifecycle Replacements:
Water Heater
Backflow Preventer
Water Closets
Sinks
Lavatory
Bathroom Vanity
Actions/Comments:
The plumbing systems appear to be well maintained and functioning adequately. The water pressure appears to be sufficient. No
significant repair actions or short-term replacement costs are required. Routine and periodic maintenance is recommended. Future
lifecycle replacements of the components or systems listed above will be required.
7.3. Building Gas Distribution
Not applicable. The property is not supplied with natural gas.
7.4. Building Electrical
Building Electrical Systems
Electrical Lines Underground Transformer Pad-mounted
Main Service Size 800 Amps Volts 120/240 Volt, single-phase
Meter & Panel Location
North Elevation of
Building Branch Wiring Copper
Conduit Metallic Step-Down
Transformers? No
Security / Surveillance
System? No Building Intercom
System? No
Lighting Fixtures T-12
Main Distribution Condition Good
Secondary Panel and
Transformer Condition Good
Lighting Condition Fair
Anticipated Lifecycle Replacements:
Distribution Panels
Interior Lighting System
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
21
www.EMGcorp.com p 800.733.0660
Actions/Comments:
The onsite electrical systems up to the meters are owned and maintained by the respective utility company.
The electrical service and capacity appear to be adequate for the property’s demands.
The panels are mostly original 2008 components. The electrical service is reportedly adequate for the facility’s needs. However, due
to the age of the panels and increasing difficulty of obtaining replacement parts over time, lifecycle replacements are recommended
per above.
7.5. Building Elevators and Conveying Systems
Not applicable. There are no elevators or conveying systems.
7.6. Fire Protection and Security Systems
Item Description
Type None
Fire Alarm System
Central Alarm Panel ☐ Battery-Operated Smoke
Detectors ☒ Alarm Horns ☐
Annunciator Panels ☐ Hard-Wired Smoke
Detectors ☐ Strobe Light Alarms ☐
Pull Stations ☐ Emergency Battery-Pack
Lighting ☒ Illuminated EXIT Signs ☒
Alarm System
Condition --
Sprinkler System
None ☐ Standpipes ☐ Backflow Preventer ☒
Hose Cabinets ☐ Fire Pumps ☐ Siamese Connections ☐
Suppression
Condition --
Central Alarm Panel
System
Location of Alarm Panel Installation Date of Alarm Panel
-- --
Fire Extinguishers
Last Service Date Servicing Current?
2016 No
Hydrant Location None
Siamese Location --
Special Systems Kitchen Suppression System ☐ Computer Room Suppression System ☐
Anticipated Lifecycle Replacements:
No components of significance
Actions/Comments:
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
22
www.EMGcorp.com p 800.733.0660
The vast majority of the building is not protected by fire suppression. Due to its construction date, the facility is most likely
“grandfathered” by code and the installation of fire sprinklers not required until major renovations are performed. Regardless of when
or if installation of facility-wide fire suppression is required by the governing municipality, EMG recommends a retrofit be performed.
As part of the major recommended short-term renovations, a facility-wide fire suppression retrofit is recommended. A budgetary cost
is included.
The fire alarm systems appear somewhat antiquated and not up to current standards. Due to the age of the components and
apparent shortcomings, a full modernization project is recommended. As part of the major recommended short-term renovations, a
facility-wide fire alarm modernization is recommended. A budgetary cost is included.
7.7. Life Support Systems
Not Applicable
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
23
www.EMGcorp.com p 800.733.0660
8. I nterior Spaces
8.1. I nterior Finishes
The facility is used as an Office Building and Garage for the City of Yorkville.
The most significant interior spaces include offices, and garage. Supporting areas include hallways, stairs, administrative offices,
restrooms, employee break rooms and garages.
The following table generally describes the locations and typical conditions of the interior finishes within the facility:
Typical Floor Finishes
Floor Finish Locations General Condition
Concrete Offices, Garage, Restrooms Good
Typical Wall Finishes
Wall Finish Locations General Condition
Painted drywall Office and Restroom Fair
Steel Garage Good
Typical Ceiling Finishes
Ceiling Finish Locations General Condition
Painted drywall Office and Restroom Fair
Metal Garage Good
Interior Doors
Item Type Condition
Interior Doors Hollow core Wood Fair
Door Framing Wood Fair
Fire Doors No --
Anticipated Lifecycle Replacements:
Wood Hollow-Core
Wood Hollow-Core Door w/Glass
Interior paint
Actions/Comments:
It appears that the interior finishes are original.
No significant actions are identified at the present time. On-going periodic maintenance is highly recommended. Future lifecycle
replacements of the components listed above will be required.
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
24
www.EMGcorp.com p 800.733.0660
8.2. Commercial Kitchen & Laundry Equipment
Not applicable. There are no commercial kitchens or laundry onsite.
The Office kitchen includes the following residential appliances, fixtures, and equipment:
Commercial Kitchen
Appliance Comment Condition
Refrigerators Up-right Fair
Freezers -- --
Ranges -- --
Ovens -- --
Griddles / Grills -- --
Fryers -- --
Hood -- --
Dishwasher -- --
Microwave ☒ Fair
Ice Machines ☐ --
Steam Tables ☐ --
Work Tables ☐ --
Shelving ☐ --
Commercial Laundry
Equipment Comment Condition
Commercial Washing Machines ☐ --
Commercial Dryers ☐ --
Residential Washers ☒ Fair
Residential Dryers ☒ Fair
Anticipated Lifecycle Replacements:
Refrigerator
Kitchen Cabinet
Residential Washer/Dryer
Actions/Comments:
No significant actions are identified at the present time. On-going periodic maintenance is highly recommended.
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
25
www.EMGcorp.com p 800.733.0660
9. Other Structures
Not applicable. There are no major accessory structures.
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
26
www.EMGcorp.com p 800.733.0660
10. Certification
City of Yorkville retained EMG to perform this Facility Condition Assessment in connection with its continued operation of Public Works
Garage (Frame Building), 185 Wolf Street, Yorkville, IL 60560, the “Property”. It is our understanding that the primary interest of
ClientN is to locate and evaluate materials and building system defects that might significantly affect the value of the property and to
determine if the present Property has conditions that will have a significant impact on its continued operations.
The conclusions and recommendations presented in this report are based on the brief review of the plans and records made available
to our Project Manager during the site visit, interviews of available property management personnel and maintenance contractors
familiar with the Property, appropriate inquiry of municipal authorities, our Project Manager’s walk-through observations during the site
visit, and our experience with similar properties.
No testing, exploratory probing, dismantling or operating of equipment or in-depth studies were performed unless specifically required
under Section 2 of this report. This assessment did not include engineering calculations to determine the adequacy of the Property’s
original design or existing systems. Although walk-through observations were performed, not all areas were observed (See Section 4.2
for areas observed). There may be defects in the Property, which were in areas not observed or readily accessible, may not have been
visible, or were not disclosed by management personnel when questioned. The report describes property conditions at the time that
the observations and research were conducted.
This report has been prepared on behalf of and exclusively for the use of City of Yorkville for the purpose stated within Section 2 of this
report. The report, or any excerpt thereof, shall not be used by any party other than City of Yorkville or for any other purpose than that
specifically stated in our agreement or within Section 2 of this report without the express written consent of EMG.
Any reuse or distribution of this report without such consent shall be at City of Yorkville and the recipient’s sole risk, without liability to
EMG.
Prepared by: Tammy Prusa
Project Manager
Reviewed by:
Al Diefert
Technical Report Reviewer
For
Andrew Hupp
Program Manager
arhupp@emgcorp.com
800.733.0660 x6632
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
27
www.EMGcorp.com p 800.733.0660
11. Appendices
Appendix A: Photographic Record
Appendix B: Site Plan
Appendix C: EMG Accessibility Checklist
Appendix D: Pre-Survey Questionnaire
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
Appendix A:
Photographic Record
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
#1: FRONT ELEVATION
#2: LEFT ELEVATION
#3: REAR ELEVATION
#4: RIGHT ELEVATION
#5: SIDEWALK, CONCRETE
#6: ASPHALT PAVEMENT
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
#7: FOUNDATIONS, CONCRETE
SLAB-ON-GRADE
#8: ROOF, METAL
#9: EXTERIOR WALL, ALUMINUM
SIDING
#10: INTERIOR STAIR/RAMP RAILS,
WOOD
#11: WINDOW, ALUMINUM DOUBLE-
GLAZED
#12: OVERHEAD DOOR, ALUMINUM
ROLL-UP
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
#13: EXTERIOR DOOR, STEEL W/
GLASS
#14: EXTERIOR DOOR, STEEL
#15: DAMAGE TO OVERHEAD DOOR
NO. 5.
#16: RESIDENTIAL FIXTURES,
CEILING FAN
#17: EXHAUST FAN, CENTRIFUGAL
#18: UNIT HEATER, NATURAL GAS
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
#19: FURNACE, ELECTRIC
#20: CONDENSING UNIT/HEAT PUMP,
SPLIT SYSTEM
#21: UNIT HEATER, NATURAL GAS
#22: WATER HEATER, ELECTRIC,
RESIDENTIAL
#23: BACKFLOW PREVENTER
#24: LAVATORY, VITREOUS CHINA
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
#25: TOILET, FLUSH TANK
#26: SINK, PLASTIC
#27: RESIDENTIAL APPLIANCES,
CLOTHES WASHER
#28: SINK, STAINLESS STEEL
#29:
BATHROOM VANITY CABINET,
WOOD, WITH CULTURED
MARBLE SINK TOP
#30: INCANDESCENT LIGHTING
FIXTURE, BASIC
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
#31: DISTRIBUTION PANEL #1
#32: DISTRIBUTION PANEL #2
#33: DISTRIBUTION PANEL #3
#34: LIGHTING SYSTEM, INTERIOR,
OFFICE BUILDING
#35: DISTRIBUTION PANEL #4
#36: DISTRIBUTION PANEL #5
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
#37: HIGH PRESSURE SODIUM
LIGHTING FIXTURE
#38: EXIT LIGHTING FIXTURE, LED
#39: FIRE EXTINGUISHER
#40:
INTERIOR WALL FINISH,
GYPSUM
BOARD/PLASTER/METAL
#41: INTERIOR WINDOW
#42: INTERIOR WALL FINISH, STEEL
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
#43: INTERIOR DOOR, WOOD SOLID-
CORE W/ GLASS
#44: INTERIOR DOOR, WOOD
HOLLOW-CORE
#45: INTERIOR CEILING FINISH,
METAL
#46: INTERIOR CEILING FINISH,
GYPSUM BOARD/PLASTER
#47: KITCHEN CABINET, BASE AND
WALL SECTION, WOOD
#48: RESIDENTIAL APPLIANCES,
REFRIGERATOR
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
#49: RESIDENTIAL APPLIANCES,
CLOTHES DRYER
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
Appendix B:
Site Plan
Site Plan
Project Name:
Public Works Garage (Frame Building)
Project Number:
122700.17R000-041.322
Source:
Google Earth
On-Site Date:
June 26, 2017
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
Appendix C:
EMG Accessibility Checklist
Page 1 of 4
Date Completed: June 26, 2017
Property Name: Public Works Garage (Frame Building)
EMG Project Number: 122700.17R000-041.322
Building History Yes No Unk Comments
1
Has an ADA survey previously been
completed for this property? X
2
Have any ADA improvements been made
to the property? X
3
Does a Transition Plan / Barrier Removal
Plan exist for the property? X
4
Has building ownership or management
received any ADA related complaints that
have not been resolved?
X
5
Is any litigation pending related to ADA
issues? X
Parking Yes No NA Comments
1
Are there sufficient accessible parking
spaces with respect to the total number of
reported spaces?
X
2
Are there sufficient van-accessible parking
spaces available? X
3
Are accessible spaces marked with the
International Symbol of Accessibility? Are
there signs reading “Van Accessible” at van
spaces?
X
4
Is there at least one accessible route
provided within the boundary of the site
from public transportation stops, accessible
parking spaces, passenger loading zones,
if provided, and public streets and
sidewalks?
X
5
Do curbs on the accessible route have
depressed, ramped curb cuts at drives,
paths, and drop-offs?
X
6
If required does signage exist directing you
to accessible parking and an accessible
building entrance?
X
Ramps Yes No NA Comments
1*
Do all ramps along accessible path of
travel appear to meet slope requirements?
( 1:12 or less) X
2
Are ramps that appear longer than 6 ft
complete with railings on both sides? X
Page 2 of 4
Ramps (cont.) Yes No NA Comments
3
Does the width between railings appear at
least 36 inches? X
4
Is there a level landing for approximately
every 30 ft horizontal length of ramp, at the
top and at the bottom of ramps and
switchbacks?
X
Entrances/Exits Yes No NA Comments
1
Do all required accessible entrance
doorways appear at least 32 inches wide
and not a revolving door? X
2
If the main entrance is inaccessible, are
there alternate accessible entrances? X
3
Is the door hardware easy to operate
(lever/push type hardware, no twisting
required and not higher than approximately
48 inches above the floor)?
X
Paths of Travel Yes No NA Comments
1
Are all paths of travel free of obstruction
and wide enough for a wheelchair (appear
at least 36 inches wide)? X
2
Are wheelchair-accessible facilities (toilet
rooms, exits, etc.) identified with signage? X
3
Is there a path of travel that does not
require the use of stairs? X
Elevators Yes No NA Comments
1
Do the call buttons have visual and audible
signals to indicate when a call is registered
and answered when car arrives? X
2
Are there visual and audible signals inside
cars indicating floor change? X
3
Are there standard raised and Braille
marking on both jambs of each hoist way
entrance as well as all cab/call buttons? X
4
Do elevator doors have a reopening device
that will stop and reopen a car door if an
object or a person obstructs the door? X
5
Are elevator controls low enough to be
reached from a wheelchair (appears to be
between 15 and 48 inches)? X
6
If a two-way emergency communication
system is provided within the elevator cab,
is it usable without voice communication? X
Page 3 of 4
Toilet Rooms Yes No NA Comments
1
Are common area public restrooms located
on an accessible route? X
2
Are pull handles push/pull or lever type?
X
3
Are there audible and visual fire alarm
devices in the toilet rooms? X
4
Are toilet room access doors wheelchair-
accessible (appear to be at least 32 inches
wide)? X
5
Are public restrooms large enough to
accommodate a wheelchair turnaround
(appear to have 60” turning diameter)? X
6
In unisex toilet rooms, are there safety
alarms with pull cords? X
7
Are toilet stall doors wheelchair accessible
(appear to be at least 32” wide)? X
8
Are grab bars provided in toilet stalls?
X
9
Are sinks provided with clearance for a
wheelchair to roll under (appear to have
29” clearance)? X
10
Are sink handles operable with one hand
without grasping, pinching or twisting? X
11
Are exposed pipes under sink sufficiently
insulated against contact? X
Guest Rooms Yes No NA Comments
1
How many total accessible sleeping rooms
does the property management report to
have? Provide specific number in
comment field.
Are there sufficient reported accessible
sleeping rooms with respect to the total
number of reported guestrooms? See
attached hot sheet.
X
Page 4 of 4
Guest Rooms Yes No NA Comments
2
How many of the accessible sleeping
rooms per property management have roll-
in showers? Provide specific number in
comment field.
Are there sufficient reported accessible
rooms with roll-in showers with respect to
the total number of reported accessible
guestrooms? See attached hot sheet.
X
3
How many assistive listening kits and/or
rooms with communication features are
available per property management?
Provide specific number in comment
field.
Are there sufficient reported assistive
listening devices with respect to the total
number of rooms? See attached hot sheet.
X
Pools Yes No NA Comments
1 Are public access pools provided? If the
answer is no, please disregard this section. X
2
How many accessible access points are
provided to each pool/spa? Provide
number in comment field.
Is at least one fixed lift or sloped entry to
the pool provided?
X
Play Area Yes No NA Comments
1
Has the play area been reviewed for
accessibility? All public playgrounds are
subject to ADAAG standards.
X
Exercise Equipment Yes No NA Comments
1
Does there appear to be adequate clear
floor space around the
machines/equipment (30” by 48”
minimum)?
X
*Based on visual observation only. The slope was not confirmed through measurements.
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
Appendix D:
Pre-Survey Questionnaire
PP RR EE --SS UU RR VV EE YY QQ UU EE SS TT II OO NN NN AA II RR EE
This questionnaire must be completed by the property owner, the owner's designated representative, or someone knowledgeable about
the subject property. The completed form must be presented to EMG's Field Observer on the day of the site visit. If the form is
not completed, EMG’s Project Manager will require additional time during the on-site visit with such a knowledgeable person in order to
complete the questionnaire. During the site visit, EMG's Field Observer may ask for details associated with selected questions. This
questionnaire will be utilized as an exhibit in EMG's final Physical Needs Assessment.
Name of person completing questionnaire:
Association with property:
Length of association with property:
Date Completed:
Phone Number:
Property Name:
Property Address
Year Built
# of Buildings/Stories
# of Units
Acres
Directions: Please answer all questions to the best of your knowledge and in good faith. Please provide additional details in the
Comments column, or backup documentation for any Yes responses.
INSPECTIONS DATE OF LAST
REPAIR/REPLACEMENT
LIST ANY OUTSTANDING REPAIRS REQUIRED
1
Elevators
How many?
Type of elevator traction or hydraulic
How old is the current elevator(s)?
2
HVAC
Describe the existing HVAC system (what type of system).
How old is the current system?
3
Mechanical
Systems
Describe current mechanical systems
Give ages of each component and type
4
Electrical
system
How old is the current electrical system?
5
Plumbing
System
Describe the existing plumbing system (what type of piping for
domestic water distribution system, sewer main, storm water).
How old are the current plumbing system components?
6
Life-Safety/Fire
Systems
What systems are currently in place?
How old are they?
INSPECTIONS DATE OF LAST
REPAIR/REPLACEMENT
LIST ANY OUTSTANDING REPAIRS REQUIRED
7
Roofs
What type of roof is on the building(s), What type of decking?
How old is it/are they?
8
Foundation,
Structure
What type of foundation? (slab on grade, piers, concrete foundation
walls, footings)
What type of structure (wood frame, concrete, steel)
QUESTION RESPONSE
9
List any major capital improvement within the
last three years.
10
List any major capital expenditures planned for
the next year.
11
Are any building systems (HVAC, roof,
interior/exterior finishes, paving, etc.) the
responsibilities of the tenant to maintain and
replace?
Mark the column corresponding to the appropriate response. Please provide additional details in the
Comments column, or backup documentation for any Yes responses. Note: NA indicates “Not Applicable”,
Unk indicates “Unknown”
QUESTION RESPONSE COMMENTS
Y N NA Unk
12 Are there any unresolved building,
fire, or zoning code issues?
13 Are there any "down" or unusable
units?
14 Are there any problems with
erosion, stormwater drainage or
areas of paving that do not drain?
15 Is the property served by a private
water well? If so, please give age of current well.
16 Is the property served by a private
septic system or other waste
treatment systems?
If so, please give age.
Mark the column corresponding to the appropriate response. Please provide additional details in the
Comments column, or backup documentation for any Yes responses. Note: NA indicates “Not Applicable”,
Unk indicates “Unknown”
QUESTION RESPONSE COMMENTS
Y N NA Unk
17 Are there any problems with
foundations or structures?
18 Is there any water infiltration in
basements or crawl spaces?
19 Are there any wall, or window
leaks?
20 Are there any roof leaks?
21 Is the roofing covered by a
warranty or bond?
22 Are there any poorly insulated
areas?
23 Is Fire Retardant Treated (FRT)
plywood used?
24 Is exterior insulation and finish
system (EIFS) or a synthetic
stucco finish used?
25 Are there any problems with the
utilities, such as inadequate
capacities?
26 Are there any problems with the
landscape irrigation systems?
27 Has a termite/wood boring insect
inspection been performed within
the last year?
28 Do any of the HVAC systems use
R-11, 12, or 22 refrigerants?
29 Has any part of the property ever
contained visible suspect mold
growth?
30 Is there a mold Operations and
Maintenance Plan?
31 Have there been indoor air quality
or mold related complaints from
tenants?
32 Is polybutylene piping used?
33 Are there any plumbing leaks or
water pressure problems?
34 Are there any leaks or pressure
problems with natural gas service?
Mark the column corresponding to the appropriate response. Please provide additional details in the
Comments column, or backup documentation for any Yes responses. Note: NA indicates “Not Applicable”,
Unk indicates “Unknown”
QUESTION RESPONSE COMMENTS
Y N NA Unk
35 Does any part of the electrical
system use aluminum wiring?
36 Do Residential units have a less
than 60-Amp service?
37 Do Commercial units have less
than 200-Amp service?
38 Are there any recalled fire sprinkler
heads (Star, GEM, Central,
Omega)?
39 Is there any pending litigation
concerning the property?
40 If built before 1978, has there been
previous asbestos testing
completed
41 Does the property have an
Asbestos Operations &
Maintenance Program in place?
42 If built before 1978, has there been
previous comprehensive Lead-
Based Paint testing completed?
43 If built before 1960, has there been
a previous Lead Based Paint Risk
Assessment completed?
44 Does the property have a Lead-
Based Paint Operations &
Maintenance Program in place?
45 Has the management previously
completed an ADA review?
46 Have any ADA improvements
been made to the property?
47 Does a Barrier Removal Plan exist
for the property?
48 Has the Barrier Removal Plan
been approved by an arms-length
third party?
49 Has building ownership or
management received any ADA
related complaints?
50 Does elevator equipment require
upgrades to meet ADA standards?
51 Are there any problems with
exterior lighting?
Mark the column corresponding to the appropriate response. Please provide additional details in the
Comments column, or backup documentation for any Yes responses. Note: NA indicates “Not Applicable”,
Unk indicates “Unknown”
QUESTION RESPONSE COMMENTS
Y N NA Unk
52 Are there any other significant
issues/hazards with the property?
53 Are there any unresolved
construction defects at the
property?
Please provide EMG with any previous reports completed for the property, including equipment testing, structural
assessments, mechanical assessments, plumbing assessments, sewer line scoping, roof scans, electrical testing, etc.
PUBLIC WORKS GARAGE (FRAME BUILDING) EMG PROJECT NO.: 122700.17R000-041.322
www.EMGcorp.com p 800.733.0660
On the day of the site visit, provide EMG's Field Observer access to all of the available documents listed below.
Provide copies if possible.
INFORMATION REQUIRED
1. All available construction documents (blueprints) for
the original construction of the building or for any tenant
improvement work or other recent construction work.
2. A site plan, preferably 8 1/2" X 11", which depicts the
arrangement of buildings, roads, parking stalls, and other
site features.
3. For commercial properties, provide a tenant list which
identifies the names of each tenant, vacant tenant units,
the floor area of each tenant space, and the gross and
net leasable area of the building(s).
4. For apartment properties, provide a summary of the
apartment unit types and apartment unit type quantities,
including the floor area of each apartment unit as
measured in square feet.
5. For hotel or nursing home properties, provide a
summary of the room types and room type quantities.
6. Copies of Certificates of Occupancy, building permits,
fire or health department inspection reports, elevator
inspection certificates, roof or HVAC warranties, or any
other similar, relevant documents.
7. The names of the local utility companies which serve
the property, including the water, sewer, electric, gas,
and phone companies.
8. The company name, phone number, and contact
person of all outside vendors who serve the property,
such as mechanical contractors, roof contractors, fire
sprinkler or fire extinguisher testing contractors, and
elevator contractors.
9. A summary of recent (over the last 5 years) capital
improvement work which describes the scope of the
work and the estimated cost of the improvements.
Executed contracts or proposals for improvements.
Historical costs for repairs, improvements, and
replacements.
10. Records of system & material ages (roof, MEP,
paving, finishes, furnishings).
11. Any brochures or marketing information.
12. Appraisal, either current or previously prepared.
13. Current occupancy percentage and typical turnover
rate records (for commercial and apartment properties).
14. Previous reports pertaining to the physical condition
of property.
15. ADA survey and status of improvements
implemented.
16. Current / pending litigation related to property
condition.
Your timely compliance with this request is greatly appreciated.