Loading...
Ordinance 2018-36 UNITED CITY OF YORKVILLE KENDALL COUNTY, ILLINOIS ORDINANCE NO.2018-36 AN ORDINANCE DETERMINING THE PREVAILING RATE OF WAGES FOR THE UNITED CITY OF YORKVILLE,ILLINOIS Passed by the City Council of the United City of Yorkville,Kendall County,Illinois This 26 h day of June,2018 Published in pamphlet form by the authority of the Mayor and City Council of the United City of Yorkville,Kendall County,Illinois on July 5,2018. Ordinance No.2018-36 AN ORDINANCE DETERMINING THE PREVAILING RATE OF WAGES FOR THE UNITED CITY OF YORKVILLE,ILLINOIS WHEREAS,the State of Illinois has enacted"An ACT regulating wages of laborers, mechanics, and other workers employed in any public works by the State, County, City or any public body or any political subdivision or by anyone under contract for public works,"approved June 26, 1941, as amended,being Chapter 820 ILCS 130/1-12 Illinois Compiled Statutes; and WHEREAS, the aforesaid Act requires that the United City of Yorkville investigate and ascertain the prevailing rate of wages as defined in said Act for laborers,mechanics, and other workers in the locality of said City employed in performing construction of public works, for said City. NOW THEREFORE, BE IT ORDAINED by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois, as follows: Section 1. As required by"An Act regulating wages of laborers, mechanics and other workers employed in any public works by the State, County, City or any public body or any political subdivision or by anyone under contract for public works" approved June 26, 1941, as amended,the general prevailing rate of wages in the locality for laborers,mechanics, and other workers engaged in the construction of public works coming under the jurisdiction of this City is hereby ascertained to be the same as the prevailing rate of wages for construction work in the Kendall County area as determined by the Department of Labor of the State of Illinois as of September 1,2017, a copy of that determination being attached hereto as Exhibit"A"and incorporated herein by reference. As required by said Act, any and all revisions of the prevailing rate of wages by the Department of Labor of the State of Illinois shall supersede and apply to any and all public works undertaken by the United City of Yorkville. The definition of any terms appearing in this Ordinance which are also used in the aforesaid Act shall be the same as in said Act. Section 2. Nothing herein shall be construed to apply said general prevailing rate of wages as herein ascertained to any work or employment except public works of this City to the extent required by the aforesaid Act. Section 3. The City Clerk shall publicly post or keep available for inspection by any interested party in the main office of this City this determination of such prevailing rate of wage. Section 4. The City Clerk shall mail a copy of this determination to any employer, and to any association of employers and to any person or association of employees who have filed or file their names and addresses,requesting copies of any determination stating the particular rates and the particular class of workers whose wages will be affected by such rates. Ordinance No.2018-36 Page 2 Section S. The City shall promptly file a copy of this Ordinance with the Department of Labor of the State of Illinois. Section 6. The City Clerk shall cause a notice to be published on the City's website containing a hyperlink to the prevailing wage schedule for Kendall County as published on the official website of the Department of Labor of the State of Illinois. Such publication shall constitute notice that this is the determination of the City and is effective. PASSED by the City Council of the United City of Yorkville, Kendall County, Illinois, this 2661 day of June,A.D. 2018. D EPU TI,' City Clerk CARLO COLOSIMO Ue KEN KOCH Ue JACKIE MILSCHEWSKI Ve ARDEN JOE PLOCHER absent CHRIS FUNKHOUSER afe JOEL FRIEDERS Ue SEAVER TARULIS Ue ALEX HERNANDEZ Ue APPROVED by me, as Mayor of the United City of Yorkville, Kendall County, Illinois, this J day of J U -Y , A.D. 2018. Mayor Ordinance No.2018-36 Page 3 Exhibit A Prevailing Wage rates for Kendall County effective Sept. 1, 2017 Trade Title Region Type Class Base Fore- M-F OSA OSH H/W Pension Vacation Training Wage man OT Wage ASBESTOS ABT-GEN ALL ALL 41.20 42.20 1.5 1.5 2 13.77 13.20 0.00 0.50 ASBESTOS ABT-MEC ALL BLD 37.46 39.96 1.5 1.5 2 11.62 11.06 0.00 0.72 BOILERMAKER ALL BLD 48.49 52.86 2 2 2 6.97 19.61 0.00 0.90 BRICK MASON ALL BLD 45.38 49.92 1.5 1.5 2 10.45 16.68 0.00 0.90 CARPENTER ALL ALL 46.35 48.35 1.5 1.5 2 11.79 18.88 0.00 0.63 CEMENT MASON ALL ALL 44.84 46.84 2 1.5 2 10.00 21.01 0.00 0.50 CERAMIC TILE FNSHER ALL BLD 38,5,6 38.56 1.5 1.5 2 10.65 11.18 0.00 0.68 COMMUNICATION TECH ALL BLD 40.15 42.55 1.5 1.5 2 11.51 11.24 0.00 1.41 ELECTRIC PWR EQMT OP ALL ALL 37.89 51.48 1.5 1.5 2 5.00 11.75 0.00 0.38 ELECTRIC PWR EQMT OP ALL HWY 41.45 56.38 1.5 1.5 2 5.50 12.87 0.00 0.73 ELECTRIC PWR GRNDMAN ALL ALL 29.30 51.48 1.5 1.5 2 5.00 9.09 0.00 0.29 ELECTRIC PWR GRNDMAN ALL HWY 32.00 56.38 1.5 1.5 2 5.50 9.92 0.00 0.66 ELECTRIC PWR LINEMAN ALL ALL 45.36 51.48 1.5 1.5 2 5.00 14.06 0.00 0.45 ELECTRIC PWR LINEMAN ALL HWY 49.67 56.38 1.5 1.5 2 5.50 15.40 0.00 0.88 ELECTRIC PWR TRK DRV ALL ALL 30.34 51.48 1.5 1.5 2 5.00 9.40 0.00 0.30 ELECTRIC PWR TRK DRV ALL HWY 33.14 56.38 1.5 1.5 2 5.50 10.29 0.00 0.59 ELECTRICIAN ALL BLD 47.72 51.97 1.5 1.5 2 14.81 13.36 0.00 1.67 ELEVATOR CONSTRUCTOR ALL BLD 51.94 58.43 2 2 2 14.43 14.96 4.16 0.90 FENCE ERECTOR ALL ALL 45.56 49.20 2 2 2 11.02 21.51 0.00 0.70 GLAZIER ALL BLD 42.45 43.95 1.5 1.5 2 14.04 20.14 0.00 0.94 HT/FROST INSULATOR ALL BLD 50.50 53.00 1.5 1.5 2 12.12 12.96 0.00 0.72 IRON WORKER ALL ALL 45.61 49.25 2 2 2 11.52 22.65 0.00 0.81 LABORER ALL ALL 41.20 41.95 1.5 1.5 2 13.77 13.20 0.00 0.50 LATHER ALL ALL 46.35 48.35 1.5 1.5 2 11.79 18.88 0.00 0.63 MACHINIST ALL BLD 47.56 50.06 1.5 1.5 2 7.05 8.95 1.85 1.47 MARBLE FINISHERS ALL ALL 33.95 33.95 1.5 1.5 2 10.45 15.52 0.00 0.47 MARBLE MASON ALL BLD 44.63 49.09 1.5 1.5 2 10.45 16.28 0.00 0.59 MATERIAL TESTER I ALL ALL 31.20 31.20 1.5 1.5 2 13.77 13.20 0.00 0.50 MATERIALS TESTER II ALL ALL 36.20 36.20 1.5 1.5 2 13.77 13.20 0.00 0.50 MILLWRIGHT ALL ALL 46.35 48.35 1.5 1.5 2 11.79 18.88 0.00 0.63 OPERATING ENGINEER ALL BLD 1 50.10 54.10 2 2 2 18.80 14.35 2.00 1.30 OPERATING ENGINEER ALL BLD 2 48.80 54.10 2 2 2 18.80 14.35 2.00 1.30 OPERATING ENGINEER ALL BLD 3 46.25 54.10 2 2 2 18.80 14.35 2.00 1.30 OPERATING ENGINEER ALL BLD 4 44.50 54.10 2 2 2 18.80 14.35 2.00 1.30 OPERATING ENGINEER ALL BLD 5 53.85 54.10 2 2 2 18.80 14.35 2.00 1.30 OPERATING ENGINEER ALL BLD 6 51.10 54.10 2 2 2 18.80 14.35 2.00 1.30 OPERATING ENGINEER ALL BLD 7 53.10 54.10 2 2 2 18.80 14.35 2.00 1.30 OPERATING ENGINEER ALL FLT 38.00 38.00 1.5 1.5 2 18.05 13.60 1.90 1.30 OPERATING ENGINEER ALL HWY 1 48.30 52.30 1.5 1.5 2 18.80 14.35 2.00 1.30 OPERATING ENGINEER ALL HWY 2 47.75 52.30 1.5 1.5 2 18.80 14.35 2.00 1.30 OPERATING ENGINEER ALL HWY 3 45.70 52.30 1.5 1.5 2 18.80 14.35 2.00 1.30 OPERATING ENGINEER ALL HWY 4 44.30 52.30 1.5 1.5 2 18.80 14.35 2.00 1.30 OPERATING ENGINEER ALL HWY 5 43.10 52.30 1.5 1.5 2 18.80 14.35 2.00 1.30 OPERATING ENGINEER ALL HWY 6 51.30 52.30 1.5 1.5 2 18.80 14.35 2.00 1.30 OPERATING ENGINEER ALL HWY 7 49.30 52.30 1.5 1.5 2 18.80 14.35 2.00 1.30 ORNAMNTL IRON ALL ALL 45.56 49.20 2 2 2 11.02 21.51 0.00 0.70 WORKER PAINTER ALL ALL 44.18 46.18 1.5 1.5 1.5 10.30 8.20 0.00 1.35 PAINTER SIGNS ALL BLD 37.45 42.05 1.5 1.5 2 2.60 3.18 0.00 0.00 PILEDRIVER ALL ALL 46.35 48.35 1.5 1.5 2 11.79 18.88 0.00 0.63 PIPEFITTER ALL BLD 47.50 50.50 1.5 1.5 2 10.05 17.85 0.00 2.12 PLASTERER ALL BLD 42.75 45.31 1.5 1.5 2 14.00 15.71 0.00 0.89 PLUMBER ALL BLD 49.25 52.20 1.5 1.5 2 14.34 13.35 0.00 1.28 ROOFER ALL BLD 42.30 45.30 1.5 1.5 2 9.08 12.14 0.00 0.58 SHEETMETAL WORKER ALL BLD 45.77 47.77 1.5 1.5 2 10.65 14.10 0.00 0.82 SPRINKLER FITTER ALL BLD 47.20 49.20 1.5 1.5 2 12.25 11.55 0.00 0.55 STEEL ERECTOR ALL ALL 45.06 48.66 2 2 2 10.52 20.76 0.00 0.70 STONE MASON ALL BLD 45.38 49.92 1.5 1.5 2 10.45 16.68 0.00 0.90 TERRAZZO FINISHER ALL BLD 40.54 40.54 1.5 1.5 2 10.65 12.76 0.00 0.73 TERRAZZO MASON ALL BLD 44.38 47.88 1.5 1.5 2 10.65 14.15 0.00 0.82 TILE MASON ALL BLD 45.49 49.49 1.5 1.5 2 10.65 13.88 0.00 0.86 TRUCK DRIVER ALL ALL 1 37.91 38.46 1.5 1.5 2 8.10 7.97 0.00 0.15 TRUCK DRIVER ALL ALL 2 38.06 38.46 1.5 1.5 2 8.10 7.97 0.00 0.15 TRUCK DRIVER ALL ALL 3 38.26 38.46 1.5 1.5 2 8.10 7.97 0.00 0.15 TRUCK DRIVER ALL ALL 4 38.46 38.46 1.5 1.5 2 8.10 7.97 0.00 0.15 TUCKPOINTER ALL BLD 45.42 46.42 1.5 1.5 2 8.32 15.42 0.00 0.80 Legend M-F OT Unless otherwise noted,OT pay is required for any hour greater than 8 worked each day, Mon through Fri. The number listed is the multiple of the base wage. OSA Overtime pay required for every hour worked on Saturdays OSH Overtime pay required for every hour worked on Sundays and Holidays H/W Health/Welfare benefit Explanations KENDALL COUNTY The following list is considered as those days for which holiday rates of wages for work performed apply: New Years Day, Memorial Day, Fourth of July, Labor Day,Thanksgiving Day,Christmas Day and Veterans Day in some classifications/counties. Generally, any of these holidays which fall on a Sunday is celebrated on the following Monday. This then makes work performed on that Monday payable at the appropriate overtime rate for holiday pay. Common practice in a given local may alter certain days of celebration. If in doubt, please check with IDOL. EXPLANATION OF CLASSES ASBESTOS-GENERAL-removal of asbestos material/mold and hazardous materials from any place in a building, including mechanical systems where those mechanical systems are to be removed. This includes the removal of asbestos materials/mold and hazardous materials from ductwork or pipes in a building when the building is to be demolished at the time or at some close future date. ASBESTOS-MECHANICAL-removal of asbestos material from mechanical systems,such as pipes, ducts,and boilers,where the mechanical systems are to remain. CERAMIC TILE FINISHER The grouting,cleaning,and polishing of all classes of tile,whether for interior or exterior purposes,all burned,glazed or unglazed products;all composition materials,granite tiles,warning detectable tiles,cement tiles,epoxy composite materials,pavers,glass, mosaics,fiberglass,and all substitute materials,for tile made in tile-like units;all mixtures in tile like form of cement, metals,and other materials that are for and intended for use as a finished floor surface,stair treads, promenade roofs,walks,walls,ceilings,swimming pools,and all other places where tile is to form a finished interior or exterior. The mixing of all setting mortars including but not limited to thin-set mortars,epoxies,wall mud,and any other sand and cement mixtures or adhesives when used in the preparation, installation, repair,or maintenance of tile and/or similar materials.The handling and unloading of all sand,cement, lime,tile,fixtures,equipment, adhesives,or any other materials to be used in the preparation, installation,repair,or maintenance of tile and/or similar materials. Ceramic Tile Finishers shall fill all joints and voids regardless of method on all tile work,particularly and especially after installation of said tile work. Application of any and all protective coverings to all types of tile installations including, but not be limited to,all soap compounds, paper products,tapes,and all polyethylene coverings, plywood,masonite, cardboard,and any new type of products that may be used to protect the installations, Blastrac equipment,and all floor scarifying equipment used in preparing floors to receive tile. The clean up and removal of all waste and materials. All demolition of existing tile floors and walls to be re-tiled. COMMUNICATIONS TECHNICIAN Construction,installation,maintenance and removal of telecommunication facilities(voice,sound,data and video),telephone,security,and data inside wire,interconnect,terminal equipment,central offices, PABX and equipment, micro waves,V-SAT, bypass,CAN,WAN (wide area network), LAN(local area networks),and ISDN (integrated system digital network),pulling of wire in raceways,but not the installation of raceways. MARBLE FINISHER Loading and unloading trucks,distribution of all materials(all stone,sand,etc.),stocking of floors with material,performing all rigging for heavy work,the handling of all material that may be needed for the installation of such materials, building of scaffolding,polishing if needed,patching, waxing of material if damaged,pointing up,caulking,grouting and cleaning of marble, holding water on diamond or Carborundum blade or saw for setters cutting, use of tub saw or any other saw needed for preparation of material,drilling of holes for wires that anchor material set by setters,mixing up of molding plaster for installation of material, mixing up thin set for the installation of material,mixing up of sand to cement for the installation of material and such other work as may be required in helping a Marble Setter in the handling of all material in the erection or installation of interior marble,slate,travertine,art marble,serpentine,alberene stone, blue stone,granite and other stones(meaning as to stone any foreign or domestic materials as are specified and used in building interiors and exteriors and customarily known as stone in the trade),carrara,sanionyx,vitrolite and similar opaque glass and the laying of all marble tile,terrazzo tile,slate tile and precast tile,steps, risers treads, base,or any other materials that may be used as substitutes for any of the aforementioned materials and which are used on interior and exterior which are installed in a similar manner. MATERIAL TESTER I: Hand coring and drilling for testing of materials;field inspection of uncured concrete and asphalt. MATERIAL TESTER II: Field inspection of welds,structural steel,fireproofing,masonry,soil,facade, reinforcing steel,formwork,cured concrete, and concrete and asphalt batch plants;adjusting proportions of bituminous mixtures. OPERATING ENGINEER-BUILDING Class 1.Asphalt Plant;Asphalt Spreader;Autograde; Backhoes with Caisson Attachment; Batch Plant; Benoto(requires Two Engineers); Boiler and Throttle Valve;Caisson Rigs;Central Redi-Mix Plant; Combination Back Hoe Front End-loader Machine;Compressor and Throttle Valve; Concrete Breaker(Truck Mounted);Concrete Conveyor;Concrete Conveyor(Truck Mounted);Concrete Paver Over 27E cu.ft;Concrete Paver 27E cu.ft.and Under:Concrete Placer;Concrete Placing Boom; Concrete Pump(Truck Mounted);Concrete Tower;Cranes,All; Cranes, Hammerhead;Cranes, (GCI and similar Type);Creter Crane;Spider Crane;Crusher,Stone,etc.; Derricks,All; Derricks,Traveling; Formless Curb and Gutter Machine;Grader, Elevating;Grouting Machines; Heavy Duty Self-Propelled Transporter or Prime Mover; Highlift Shovels or Front Endloader 2-1/4 yd.and over; Hoists, Elevators,outside type rack and pinion and similar machines; Hoists,One,Two and Three Drum; Hoists, Two Tugger One Floor, Hydraulic Backhoes; Hydraulic Boom Trucks; Hydro Vac(and similar equipment); Locomotives,All; Motor Patrol; Lubrication Technician; Manipulators; Pile Drivers and Skid Rig; Post Hole Digger;Pre-Stress Machine;Pump Cretes Dual Ram; Pump Cretes: Squeeze Cretes-Screw Type Pumps;Gypsum Bulker and Pump; Raised and Blind Hole Drill; Roto Mill Grinder;Scoops-Tractor Drawn;Slip-Form Paver;Straddle Buggies;Operation of Tie Back Machine;Tournapull;Tractor with Boom and Side Boom;Trenching Machines. Class 2. Boilers; Broom,All Power Propelled; Bulldozers;Concrete Mixer(Two Bag and Over);Conveyor, Portable; Forklift Trucks; Highlift Shovels or Front Endloaders under 2-1/4 yd.; Hoists,Automatic; Hoists, Inside Elevators;Hoists,Sewer Dragging Machine; Hoists,Tugger Single Drum; Laser Screed; Rock Drill(Self-Propelled); Rock Drill(Truck Mounted); Rollers,All;Steam Generators;Tractors,All;Tractor Drawn Vibratory Roller; Winch Trucks with"A" Frame. Class 3.Air Compressor;Combination Small Equipment Operator; Generators; Heaters, Mechanical; Hoists, Inside Elevators(remodeling or renovation work); Hydraulic Power Units(Pile Driving, Extracting,and Drilling); Pumps,over 3" (1 to 3 not to exceed a total of 300 ft.); Low Boys; Pumps,Well Points;Welding Machines(2 through 5);Winches,4 Small Electric Drill Winches. Class 4. Bobcats and/or other Skid Steer Loaders;Oilers;and Brick Forklift. Class 5.Assistant Craft Foreman. Class 6.Gradall. Class 7. Mechanics;Welder. OPERATING ENGINEERS-HIGHWAY CONSTRUCTION Class 1.Asphalt Plant;Asphalt Heater and Planer Combination;Asphalt Heater Scarfire;Asphalt Spreader;Autograder/GOMACO or other similar type machines:ABG Paver; Backhoes with Caisson Attachment; Ballast Regulator; Belt Loader; Caisson Rigs;Car Dumper;Central Redi-Mix Plant; Combination Backhoe Front Endloader Machine, (1 cu.yd. Backhoe Bucket or over or with attachments);Concrete Breaker(Truck Mounted); Concrete Conveyor;Concrete Paver over 27E cu.ft.;Concrete Placer;Concrete Tube Float;Cranes,all attachments;Cranes,Tower Cranes of all types:Creter Crane:Spider Crane;Crusher,Stone,etc.; Derricks,All; Derrick Boats; Derricks,Traveling; Dredges; Elevators,Outside type Rack& Pinion and Similar Machines; Formless Curb and Gutter Machine;Grader,Elevating;Grader, Motor Grader, Motor Patrol,Auto Patrol,Form Grader, Pull Grader,Subgrader; Guard Rail Post Driver Truck Mounted; Hoists,One,Two and Three Drum; Heavy Duty Self-Propelled Transporter or Prime Mover; Hydraulic Backhoes; Backhoes with shear attachments up to 40'of boom reach; Lubrication Technician; Manipulators; Mucking Machine; Pile Drivers and Skid Rig; Pre-Stress Machine; Pump Cretes Dual Ram; Rock Drill-Crawler or Skid Rig; Rock Drill-Truck Mounted; Rock/Track Tamper; Roto Mill Grinder;Slip-Form Paver;Snow Melters;Soil Test Drill Rig(Truck Mounted);Straddle Buggies; Hydraulic Telescoping Form (Tunnel);Operation of Tieback Machine; Tractor Drawn Belt Loader;Tractor Drawn Belt Loader(with attached pusher-two engineers);Tractor with Boom;Tractaire with Attachments;Traffic Barrier Transfer Machine;Trenching;Truck Mounted Concrete Pump with Boom; Raised or Blind Hole Drills(Tunnel Shaft); Underground Boring and/or Mining Machines 5 ft. in diameter and over tunnel,etc; Underground Boring and/or Mining Machines under S ft. in diameter;Wheel Excavator;Widener(APSCO). Class 2. Batch Plant; Bituminous Mixer; Boiler and Throttle Valve; Bulldozers;Car Loader Trailing Conveyors;Combination Backhoe Front Endloader Machine(Less than 1 cu.yd. Backhoe Bucket or over or with attachments);Compressor and Throttle Valve;Compressor,Common Receiver(3);Concrete Breaker or Hydro Hammer;Concrete Grinding Machine;Concrete Mixer or Paver 7S Series to and including 27 cu.ft.; Concrete Spreader;Concrete Curing Machine, Burlap Machine, Belting Machine and Sealing Machine;Concrete Wheel Saw;Conveyor Muck Cars (Haglund or Similar Type);Drills,All;Finishing Machine-Concrete; Highlift Shovels or Front Endloader; Hoist-Sewer Dragging Machine; Hydraulic Boom Trucks(All Attachments); Hydro-Blaster; Hydro Excavating(excluding hose work); Laser Screed;All Locomotives, Dinky;Off-Road Hauling Units(including articulating) Non Self-Loading Ejection Dump; Pump Cretes:Squeeze Cretes-Screw Type Pumps,Gypsum Bulker and Pump; Roller,Asphalt;Rotary Snow Plows; Rototiller,Seaman,etc.,self-propelled;Self-Propelled Compactor;Spreader-Chip-Stone,etc.; Scraper-Single/Twin Engine/Push and Pull;Scraper-Prime Mover in Tandem(Regardless of Size);Tractors pulling attachments,Sheeps Foot, Disc,Compactor,etc.;Tug Boats. Class 3. Boilers; Brooms,All Power Propelled;Cement Supply Tender; Compressor,Common Receiver(2);Concrete Mixer(Two Bag and Over); Conveyor, Portable; Farm-Type Tractors Used for Mowing,Seeding,etc.; Forklift Trucks; Grouting Machine; Hoists,Automatic; Hoists,All Elevators; Hoists,Tugger Single Drum;Jeep Diggers; Low Boys; Pipe Jacking Machines;Post-Hole Digger;Power Saw,Concrete Power Driven; Pug Mills; Rollers,other than Asphalt;Seed and Straw Blower;Steam Generators;Stump Machine;Winch Trucks with"A" Frame;Work Boats; Tamper-Form-Motor Driven. Class 4.Air Compressor;Combination-Small Equipment Operator; Directional Boring Machine;Generators; Heaters, Mechanical; Hydraulic Power Unit(Pile Driving, Extracting,or Drilling); Light Plants,All (1 through 5); Pumps,over 3" (1 to 3 not to exceed a total of 300 ft.); Pumps, Well Points;Vacuum Trucks(excluding hose work);Welding Machines(2 through 5);Winches,4 Small Electric Drill Winches. Class 5.SkidSteer Loader(all); Brick Forklifts;Oilers. Class 6. Field Mechanics and Field Welders Class 7. Dowell Machine with Air Compressor;Gradall and machines of like nature. OPERATING ENGINEERS-FLOATING Diver. Diver Wet Tender, Diver Tender,ROV Pilot, ROV Tender TRUCK DRIVER-BUILDING, HEAVY AND HIGHWAY CONSTRUCTION Class 1. Two or three Axle Trucks. A-frame Truck when used for transportation purposes;Air Compressors and Welding Machines, including those pulled by cars, pick-up trucks and tractors;Ambulances Batch Gate Lockers; Batch Hopperman;Car and Truck Washers;Carry-ails; Fork Lifts and Hoisters; Helpers; Mechanics Helpers and Greasers;Oil Distributors 2-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Power Mower Tractors;Self-propelled Chip Spreader;Skipman;Slurry Trucks,2-man operation;Slurry Truck Conveyor Operation,2 or 3 man; Teamsters; Unskilled Dumpman;and Truck Drivers hauling warning lights, barricades,and portable toilets on the job site. Class 2. Four axle trucks; Dump Crets and Adgetors under 7 yards; Dumpsters,Track Trucks, Euclids, Hug Bottom Dump Turnapulis or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yeards; Ready- mix Plant Hopper Operator,and Winch Trucks, 2 Axles. Class 3. Five axle trucks; Dump Crets and Adgetors 7 yards and over; Dumpsters,Track Trucks, Euclids, Hug Bottom Dump Turnatrailers or turnapulls when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit;Oil Distributors,1-man operation; Pole Trailer,over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;Slurry trucks, 1-man operation;Winch trucks,3 axles or more; Mechanic--Truck Welder and Truck Painter. Class 4. Six axle trucks; Dual-purpose vehicles,such as mounted crane trucks with hoist and accessories; Foreman; Master Mechanic;Self- loading equipment like P.B.and trucks with scoops on the front. TERRAZZO FINISHER The handling of sand,cement, marble chips,and all other materials that may be used by the Mosaic Terrazzo Mechanic,and the mixing, grinding,grouting,cleaning and sealing of all Marble,Mosaic,and Terrazzo work,floors,base,stairs,and wainscoting by hand or machine,and in addition,assisting and aiding Marble, Masonic,and Terrazzo Mechanics. Other Classifications of Work: For definitions of classifications not otherwise set out,the Department generally has on file such definitions which are available.If a task to be performed is not subject to one of the classifications of pay set out,the Department will upon being contacted state which neighboring county has such a classification and provide such rate,such rate being deemed to exist by reference in this document. If no neighboring county rate applies to the task,the Department shall undertake a special determination,such special determination being then deemed to have existed under this determination. If a project requires these,or any classification not listed,please contact IDOL at 217-782-1710 for wage rates or clarifications. LANDSCAPING Landscaping work falls under the existing classifications for laborer,operating engineer and truck driver. The work performed by landscape plantsman and landscape laborer is covered by the existing classification of laborer. The work performed by landscape operators(regardless of equipment used or its size)is covered by the classifications of operating engineer. The work performed by landscape truck drivers(regardless of size of truck driven)is covered by the classifications of truck driver. MATERIAL TESTER&MATERIAL TESTER/INSPECTOR I AND II Notwithstanding the difference in the classification title,the classification entitled "Material Tester I" involves the same job duties as the classification entitled "Material Tester/Inspector I". Likewise,the classification entitled "Material Tester II" involves the same job duties as the classification entitled "Material Tester/Inspector II".