Loading...
Library 2004 01-12-04 APPROVED BY THE COMMITTEE)MRD ON: Yorkville Public Library Board of Trustees January 12, 2UU4 7:30 pm Members present: Marianne Wilkinson, Russ Walter, Kelly Murray, Gail Gaebler, Carol LaChanc.e, Sandy Lindblom, and Marilyn Vorderer. Members not present: Jo Ann Gryder and Joseph Gruber, Director Michelle Pfister and City Council Liaison Richard Sticka were also in attendance. Recognition of Visitors: Rick McCarthy from BCA. Mayor Art Prochaska stopped by to wish all a Happy New Year. Amendments to the Agenda: none Minutes: Gail Gaebler moved to approve the minute9 ao corrected. Carol LaChance seconded the motion, The motion carried unanimously. Correspondence: none Public Comment; none Report of Treasurer: Russ Walter moved to approve the bill list, including payroll from November and December, which amounted to $31,630.55. Marilyn Vorderer seconded the motion. A roll call vote was taken. The tuutiuu carried unanimously. Carol LaChanee moved to approve the proposed revised city budget. Gail Gaebler seconded the motion. A role call vote was taken. All present voted no. The motion did not carry. Russ Walter will speak to financial Director Tracy Pleckham about several changes that were made to the budget, including a reduction in salaries. Tracy was asked to change the development fees and this was carried out as requested. Report of Librarian: Total circulation was up by 112 at 3966. 34 new cards were issued. 129 items were added to the collection. Santa visited the library (40 attended). Dcth Grambro volunteered to read fur open �tury time. Small World Pre School donated $50. The Class of 1940 donated $129 (to be used for U. pdating the World Book Encyclopedias). Carol Leitheit gave a $10 memorial for Charlotte Smythe. Many donated in memory of Joan Koehler: Lorene Frieders, $15; Plano High School Class of 1952, $70; Beth Granibro, $25; 50 t Club, $25; Carole and Ken Dachsteiner, $10; Frances Thurow, $10. z0 39vd -ldA EaeeEss it:st eeeaieeiz.e The financial advisor from Ehlers & Associates has received the information that he requested from Michelle Pfister. City Council Liaison/llutnan Resource: none Standing Committees: none Untinished Business: !o Ann Gryder told Michelle Pfister that she inquired about and di.ecovered that Plano Library received money from Dennis Hastcrt's office £or their library addition because they are far enough along in their planning process. New Business: After completing the schematic design for the library addition and submitting it to the professional cost estimator, Rick McCarthy from BCA presented the project estimate to the library board. The New Construction Allowance was estimated at $5,465,086 before a 10% contingency and 4.42% inflation estimate were added. The Estimated Project Cost was $8,307,455. 1t will cost $147 per square foot for new construction and $5.1 per square foot to remodel the existing library. Approximately $300,000 can be caved if die existing library is not remodeled until a Pater date. Rick McCarthy assured the board that the professional cost estimator is conservative and trustworthy. It was noted that the plan provides the minimum service level required by the Stn.te. for the estimated population twenty years from now. Richard Sticka remarked that the bond amount would be the project cost ($8.3 million). BCA is pursuing the traffic study, Rick McCarthy will present the project estimate to the City Council oil January 27, 2004, BCA will require a new contract in order proceed to the design development stage. Adjournment: The meeting adjourned at 9:00 pm. Minutes submitted by Kelly Murray. CO 39dd -1dh EZ80CSS LUST 600�JCB/Z0 .