Loading...
Resolution 2019-23 Resolution No. 2019-23 A RESOLUTION OF THE UNITED CITY OF YORKVILLE,KENDALL COUNTY, ILLINOIS,AUTHORIZING THE EXECUTION OF A CONTRACT WITH LITE CONSTRUCTION,MONTGOMERY,IL,FOR THE CONSTRUCTION OF THE PUBLIC WORKS MATERIALS STORAGE SHED IN THE AMOUNT NOT TO EXCEED $249,700. WHEREAS, the United City of Yorkville, Kendall County, Illinois (the "City") is a duly organized and validly existing municipality of the State of Illinois pursuant to the 1970 Illinois Constitution and the Illinois Municipal Code, as from time to time amended (the "Municipal Code") (65 ILCS 5/65-1-1-2, et seq.); and, WHEREAS, it is in the best interest of the City to enter into a contract with Lite Construction, Montgomery, Illinois, for construction of the Public Works Materials Storage Shed substantially in the form attached hereto marked as"Exhibit B". NOW,THEREFORE,BE IT RESOLVED,by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois, as follows: Section 1. That the City is hereby committed to meet all of the requirements as set forth in"Exhibit B". Section 2. That the Mayor and City Clerk are hereby authorized and directed to execute the contract, Resolution of Authorization and to undertake any and all actions as may be required to implement the terms of the contract. Resolution No.2019-23 Page 1 Section 3. That this Resolution shall be in full force and effect from and after its passage and approval as provided by law. Passed by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois this 27th day of August, 2019. KEN KOCH AYE DAN TRANSIER AYE JACKIE MILSCHEWSKI AYE ARDEN JOE PLOCHER AYE CHRIS FUNKHOUSER AYE JOEL FRIEDERS AYE SEAVER TARULIS AYE JASON PETERSON AYE Mayor - Attest: City Clerk Resolution No.2019-23 Page 2 Exhibit B UNITED CITY OF YORKVILLE 800 GAME FARM ROAD YORKVILLE,ILLINOIS 60560 CONTRACT THIS CONTRACT made this 04#1 day of , 2019,by and between the United City of Yorkville, an Illinois municipal corporation hereinafter called the "Owner" and L.1 Tom- (��jQA , '1G, located at �'I 6► Lg�[@ , 1�7d1a.�ar,�?ry xL hereinafter called the"Contractor". WITNESSETH: WHEREAS, the Owner has heretofore solicited Bid Proposals for all labor and materials necessary to complete the work specified in the Invitation To Bid the Construction of the Public Works Materials Storage Shed; WHEREAS,the Owner has found that the Contractor is the lowest responsible bidder for said work and has awarded the Contractor this contract for said work. NOW,THEREFORE, for and in consideration of their mutual promises and agreements, the parties hereto do hereby agree as follows: 1. The Contractor agrees to furnish all materials, supplies, tools, equipment, labor and other services necessary to commence and complete the Snow Removal Services proposal in accordance with the conditions and prices stated in the Invitation to Bid, Instructions to Contractors—General Conditions,Special Conditions,Insurance Requirements,Specifications and Plans, Bid Proposal, and Detail Exception Sheet all of which are made a part hereof and herein called the".Contract Documents". 2. The Owner will pay the Contractor in the amounts, manner and at times as set forth in the Contract Documents. IN WITNESS WHEREOF,the parties hereto have executed,or caused to be executed by their duly authorized officials,this Contract as of the day and year first above written: OWNER: UNITED ITY OF YORKVILLE By: Mayor Attest: CO CTOR: City Clerk By: nature A0,11f I tt st: Print ame and Title W Riess X4'6 11 EST • • INVITATION TO BID THE CONSTRUCTION OF THE PUBLIC WORKS MATERIALS STORAGE SHED Deadline: Friday, August 2, 2019 at 9:00 a.m. TABLE OF CONTENTS LegalNotice ..........................................................................................................................3 Instructions To Bidders - General Conditions ......................................................................4 SpecialConditions ................................................................................................................12 InsuranceRequirements ........................................................................................................1 5 General Special Provisions ...................................................................................................18 Bid Sheet DetailException Sheet ..........................................................................................................38 EquipmentList ......................................................................................................................39 SubcontractorListing ............................................................................................................40 References .............................................................................................................................42 Contract .................................................................................................................................44 Exhibit A - ExhibitB ...............................................................................................................................50 Exhibit C ExhibitD ...............................................................................................................................104 UNITED CITY OF YORKVILLE, ILLINOIS LEGAL NOTICE INVITATION FOR BID The United City of Yorkville, Illinois will accept sealed bids for the Construction of the Public Works Material Storage Shed. Sealed bids will be received at the address listed below until Friday, August 2, 2019 at 9:00 a.m. local time. Bids will be publicly opened and read aloud at the date and time stated above. Proposals not physically received by the date and time listed above will be returned, unopened to the firm. Emailed or faxed bids will not be accepted. All proposals should be addressed to: United City of Yorkville Re: (vendor name) Invitation to Bid— Material Storage Shed Attention: Carri Parker, Purchasing Manager 800 Game Farm Road Yorkville, IL 60560 Proposal packets are available online at http://www.yorkviIle.il.us. The link can be found under the Business Tab-Bids & RFPs. Additional packets may be picked up at the United City of Yorkville City Hall, 800 Game Farm Road, Yorkville, IL 60560. Please contact the Purchasing Manager to schedule a time to pick up the packet. Bidders are advised of the following requirements of this contract: 1. Applicability of Illinois Prevailing Wage Act, 2. 10% bid security with the bid submittal, 3. performance bond on award of contract, and 4. labor and material payment bond on award of contract. Any questions regarding this Legal Notice or actual bid specifications shall be directed to Carri Parker, Purchasing Manager in writing at cparker4yorkville.il.us not less than ten (10) business days prior to the scheduled bid opening date. The bidder shall at all times observe and conform to all laws, ordinances, and regulations of the Federal, State, and City which may in any manner affect the preparation of bids or the performance of the contract. Carri Parker Purchasing Manager UNITED CITY OF YORKVILLE, ILLINOIS INSTRUCTIONS TO BIDDERS - GENERAL CONDITIONS These Instructions to Bidders and General Conditions apply to all bids requested and accepted by the City and become a part of the contract unless otherwise specified. Bidders or their authorized representatives are expected to fully inform themselves as to the conditions, requirements, and specifications before submitting bids. The City assumes that submission of a bid means that the Bidder has familiarized himself with all conditions and intends to comply with them unless noted otherwise. 1. Forms — All bids must be submitted on the forms provided, complete with all blank spaces filled in and properly signed in ink in the proper spaces and submitted in a sealed envelope. All bid forms may be obtained from the United City of Yorkville City Hall, 800 Game Farm Road, Yorkville, IL 60560. Please contact the Purchasing Manager to schedule a time to pick up the packet. When completed deliver to the United City of Yorkville City Hall, Attn. Cam Parker, Purchasing Manager, 800 Game Farm Road, Yorkville, IL 60560 prior to the bid opening date and time. Bids must be identified as such on the outside of the sealed envelope by marking the envelope "SEALED BID" and with the following information: Company's name, address, item bid, date and time of opening. Bidders may attach separate sheets for the purpose of explanation, exception, or alternative proposal and to cover required unit prices. 2. Submittal of Bid — Bids must be submitted to the attention of the Cam Parker, Purchasing Manager at the above address no later than Friday, August 2, 2019 at 9:00 a.m. local time. Bids arriving after the specified time will not be accepted. Mailed bids which are delivered after the specified hour will not be accepted regardless of postmarked time on the envelope. Bidders should carefully consider all bid delivery options and select a method that will successfully deliver their bid by the required time and date. 3. Examination of Bid Forms, Specifications, and Site —The bidder shall carefully examine the bid forms which may include the invitation to bid, instruction to bidders, general conditions, special conditions, plans, specifications, bid form, bond, contract, and any addenda to them, and sites of the proposed work (when known) before submitting the bid. The bidder shall verify all measurements relative to the work, shall be responsible for the correctness of same. The bidder will examine the site and the premises and satisfy themselves as to the existing conditions under which the bidder will be obligated to operate. Failure of the bidder to notify the City, in writing, of any condition(s) or measurement(s) making it impossible to carry out the work as shown and specified, will be construed as meaning no such conditions exist and no additional moneys will be added to the contract. The successful bidder must notify all utility companies that are a part of J.U.L.I.E. of the responsibility of each utility company to locate its utilities. The submission of the bid shall be considered conclusive evidence that the bidder has investigated and is satisfied as to all conditions to be encountered in performing the work. and is fully informed as to character, quality, quantities, and costs of work to be performed and materials to be furnished, and as to the requirements of the bid forms. If the bid is accepted, the bidder will be responsible for all errors in his proposal resulting from his failure or neglect to comply with these instructions, and the City shall not be responsible for any charge for extra work or change in anticipated profits resulting from such failure or neglect. 4. Scope of Work — The bidder shall supply at required supervision, skilled labor, transpiration, new materials, apparatus, and tools necessary for the entire and proper completion of the work. The bidder shall supply, maintain and remove all equipment for the performance of the work and be responsible for the safe, proper and lawful construction, maintenance and use of the same. This work shall be completed to the satisfaction of the City. The bidder shall provide adequate protection of the job site to protect the general public and adjacent property. The City is not responsible for site safety. The bidder is solely and exclusively responsible for construction means, methods, technologies and site safety. 5. Interpretation of Bid Documents — Questions regarding bid documents, discrepancies, omissions, or intent of the specifications or plans shall be submitted in writing to the Purchasing manager at cparkerna,yorkville.il.us at least ten (10) working days prior to opening of bids to provide time for issuing and forwarding an addendum. Any interpretations of the Contract Documents will be made only by addendum duly issued or delivered by the City to each person receiving a set of bid documents. The City will not be responsible for any other explanations for interpretations of the Contract Documents. Letters, requested interpretations, clarifications, and/or explanations shall be so noted on the outside of the envelope and on the first page of the letter with the words, INTERPRETATION REQUEST. Letters not property marked will not be considered as a formal request. Any letter received within ten working days of the bid date will be returned unopened. 6. Bid Guarantee — Unless specifically waived, each bid shall be accompanied by a bid security in an amount of ten percent (10%) or such other percentage as stated in the supplementary conditions of the full amount of the bid in the form of a certified or bank cashier's check or bid bond. In a reasonable time after the bid opening, bid deposits of all except the three lowest responsible bidders will be released. The remaining deposits will be released after the successful bidder has entered into the contract and furnished the required insurance and bonds. The bid deposit shall become the property of the City if the successful bidder within fourteen (14) days from awarding the contract refuses or is unable to comply with the contract requirements, not as a penalty, but as liquidated damages. 7. Receiving Bids — Bids received prior to the time of opening will be securely kept, unopened. The Purchasing manager, whose duty it is to open them will decide when the specified time has arrived, and no bid received thereafter will be considered. No responsibility will be attached to the Purchasing manager or the City for the premature or nonopening of a bid not properly addressed and identified, except as otherwise provided by law. 8. Late and Fax Bids — Bids arriving after the specified time, whether sent by mail, courier, or in person, will not be accepted and will be refused and returned unopened. It is the bidder's responsibility for timely delivery regardless of the methods used. Mailed bids which are delivered after the specified hour will not be accepted regardless of postmarked time on the envelope. Facsimile machine transmitted bids will not be accepted, nor will the City transmit bid documents to prospective bidders by way of a facsimile machine. 9. Completeness — All information required by the Invitation to Bid must be supplied to constitute a responsive bid. The Bidder's submittal shall include the completed Bid Sheet found in the contract documents. The City will strictly hold the bidder to the terms of the bid. The bid must be executed by a person having the legal right and authority to bind the bidder. 10. Error in Bids — When an error is made in extending total prices, the unit bid price and/or written words shall govern. Otherwise, the bidder is not relieved from errors in bid preparation. Erasures in bids must be explained over signature of bidder. 11. Withdrawal of Bids — A written request for the withdrawal of a bid or any part thereof may be granted if the request is received by the Purchasing manager prior to the specified time of opening. After the opening, the bidder cannot withdraw or cancel his bid for a period of forty-five (45) calendar days, or such longer time as stated in the bid documents. 12. Bidder Interested in More than One Bid — Unless otherwise specified, if more than one bid is offered by any one party, by or in the name of his or their agent, partner, or other persons, all such bids may be rejected. A party who has quoted prices on work, materials, or supplies to other bidders is not thereby disqualified from quoting prices to other bidders or from submitting a bid directly for the work, materials, or supplies. 13. Bidder's Qualifications — No award will be made to any bidder who cannot satisfy to the City that they have sufficient ability and experience in this class of work, as well as sufficient capital and equipment to do the job and complete the work successfully within the time named (i.e. responsible). The City's decision or judgment on these matters shall be final and binding. The City may make such investigations as it deems necessary. The bidder shall furnish to the City all information and data the City may request for the purpose of investigation. 14. Bid Award for All or Part— Unless otherwise specified, bids shall be submitted for all of the work or items for which bids are requested. The City reserves the right to make award on all items, or any of the items, according to the best interests of the City. 15. Samples — Samples or drawings requested shall be delivered and removed at no cost to the City. The City shall not be responsible for damage to samples. Samples shall be removed by the bidder within thirty (30) days after notification. Samples must be submitted prior to the time set for the opening of bids. 16. Equipment or Materials — Each bidder shall submit catalogs, descriptive literature, and detailed drawings necessary to fully describe those features or the material or work not covered in the specifications. The parts and materials bids must be of current date (latest model) and meet specifications. This provision excludes surplus, remanufactured, and used products except as an alternate bid. The brand name and/or manufacturer of each item proposed must be clearly- stated in the bid. Guarantee and/or warranty information must be included with this bid. 17. Toxic Substance— Prior to delivery of any material which is caustic, corrosive, flammable or dangerous to handle, the supplier shall provide written directions as to methods of handling such products, as well as the antidote or neutralizing material required for its first aid (Material Safety Data Sheet). 18. Delivery — Where applicable all materials shipped to the City must be shipped F.O.B. delivered, designated location, Yorkville, Illinois. If delivery is made by truck, arrangements must be made in advance by the bidder, with concurrence by the City. for receipt of the materials. The materials must be delivered where directed. Truck deliveries will be accepted at the Public Works Facility between 7:00 AM and 3:30 PM and at all other City locations 8:00 AM and 4:00 PM, weekdays only. 19. Estimated Bid Ouantities — On "Estimated Quantities", the City may purchase more or less than the estimates. The Contractor shall not be required to deliver more than ten (10) percent in excess of the estimated quantity of each item, unless otherwise agreed upon. 20. Trade Names — Alternative Bid — When an item is identified in the specifications by a manufacturer's or trade name or catalog number, the bidder shall bid upon the item so identified. If the specifications state "or equal" bids on other items will be considered, provided the bidder clearly identifies in his proposal the item to be furnished, together with any descriptive matter which will indicate the character of the item. Bidders desiring to bid on items which deviate from these specifications, but which they believe are equivalent, are requested to submit alternate bids. However, ALTERNATE BIDS MUST BE CLEARLY INDICATED AS SUCH AND DEVIATIONS FROM THE APPLICABLE SPECIFICATIONS PLAINLY NOTED. The bid must be accompanied by complete specifications for the items offered. Bidders wishing to submit a secondary bid must submit it as an alternate bid. The City shall be the sole and final judge unequivocally as to whether any substitute from the specifications is of equivalent or better quality. 21. Price — Unit prices shall be shown for each unit on which there is a bid as well as the aggregate price and shall include all packing, crating, freight and shipping charges, and cost of unloading at the destination unless otherwise stated in the bid. Unit prices shall not include any local, state, or federal taxes. The City is exempt, by law, from paying State and City Retailer's Occupation Tax, State Service Occupation and Use Tax and Federal Excise Tax. The City will supply the successful bidder with its tax exemption number. Cash discounts will not be considered in determining overall price but may be used in an overall evaluation. 22. Consideration of Bid — No bid will be accepted from or contract awarded to any person, firm or corporation that is in arrears or is in default to the City upon any debt or contract, or that is a defaulter, as surety or otherwise, upon any obligation to the City or had failed to perform faithfully any previous contract with the City. The bidder, if requested, shall present within 48 hours evidence satisfactory to the City of performance ability and possession of necessary facilities, pecuniary recourses and adequate insurance to comply with the terms of these specifications and contract documents. 23. Award or Resection —The City reserves the right to reject and/or award any and all bids or parts thereof and to waive formalities and technicalities according to the best interests of the City. Any bid submitted will be binding for forty-five (45) days subsequent to the date of the bid opening. A contract will be awarded to the lowest responsible bidder complying with the conditions of the contract documents only when it is in the best interest of the City to accept the bid. The City shall be the sole judge of compliance with the specifications and reserves the right to accept or reject any and/or all bids or parts thereof. 24. Execution of Contract — The successful bidder shall, within fourteen (14) days after notification of the award: (a) enter into a contract in writing with the City covering all matters and things as are set forth in the specifications and his bid and (b) carry insurance acceptable to the City, covering public liability, property damage, and workmen's compensation. After the acceptance and award of the bid and upon receipt of a written purchase order executed by the proper officials of the City, this Instruction to Bidders, including the specifications, will constitute part of the legal contract between the United City of Yorkville and the successful bidder. 25. Performance and Labor and Material Payment Bonds — Unless specifically waived or amended in the Special Conditions, the successful bidder shall furnish at the time of execution of the contract a performance bond for the full amount of the contract acceptable in form and surety to the City to guarantee the completion of any work to be performed by the contractor under the contract Unless specifically waived or amended in the Special Conditions, the successful bidder shall furnish at the time of execution of the contract a bond for the full amount of the contract acceptable in form and surety to the City conditioned upon the faithful performance and completion of the contract, payment of material used in such work, and for all labor performed in such work including by subcontractors. In the event that the bidder fails to furnish the bonds within 14 days after notification of the award, then the bid guarantee shall be retained by the City as liquidated damages and not as a penalty. It is agreed that the sum is a fair estimate of the amount of damages that the City will sustain due to the bidder's failure to furnish the bonds. 26. Compliance with All Laws — All work under the contract must be executed in accordance with all applicable federal, state, and local laws, ordinances, rules, and regulations which may in any manner affect the preparation of the bid or performance of the contract. 27. Prevailing Wage — Not less than the prevailing rate of wages as established by the City shall be paid by the Contractor and each subcontractor to its laborers, workers, and mechanics constructing public works under this contract as determined by the Illinois Department of Labor pursuant to the Prevailing Wage Act (820 ILCS 130/0.01 et seq.). It shall be the responsibility of the Contractor to monitor the prevailing wage rates for any increase in rates during the contract and adjust wage rates accordingly. The current prevailing wage rates are available on the Illinois Department of Labor web site at www.state.ii.us/agency/ido1. The Contractor and its subcontractors shall comply with Section 5 of the Act that requires the Contractor and its subcontractors to submit to the City monthly certified payroll records along with a statement affirming that such records are true and accurate, that the wages paid to each worker are not less than the required prevailing rate and that the Contractor or subcontractor is aware that filing records it knows to be false is a Class B misdemeanor. Each month's certified payroll(s) must be filed with the City before the end of the next month or prior to payment by the City for work that includes that payroll. 28. Compliance with the Substance Abuse Prevention on Public Works Projects Act—The Contractor and its Subcontractors shall comply with the Substance Abuse Prevention on Public Works projects Act (820 ILCS 265/1 et seq.) and prior to commencing work on a "public works" project (as defined in the Prevailing Wage Act) file with the City its program to comply with the Act or file that portion of its collective bargaining agreement that deals with the matters covered by the Act. 29. Equal Employment Opportunity — During the performance of the contract and/or supplying of materials, equipment, and suppliers, bidder must be in full compliance with all provisions of the Acts of the General Assembly of the State of Illinois relating to employment, including equal opportunity requirements. 30. Contract Alterations — No amendment of a contract shall be valid unless made in writing and signed by the City Manager or his authorized agent. 31. Notices—All notices required by the contract shall be given in writing. 32. Nonassignability —The Contractor shall not assign the contract, or any part thereof, to any other person, firm, or corporation without the previous written consent of the City Manager. Such assignment shall not relieve the Contractor from his obligations or change the terms of the contract. 33. Default — The City may terminate a contract by written notice of default to the Contractor if: • fails to make delivery of the materials or perform the services within the time specified in the proposal, or • fails to make progress so as to endanger performance of the contract, or • fails to provide or maintain in full force and effect, the liability and indemnification coverages or performance bond as required. If the City terminates the contract, the City may procure supplies or services similar to those so terminated, and the Contractor shall be liable to the City for any excess costs for similar supplies and services, unless the Contractor provides acceptable evidence that failure to perform the contract was due to causes beyond the control and without the fault or negligence of the Contractor. 34. Inspection — The City shall have a right to inspect, by its authorized representative, any material, components, or workmanship as herein specified. Materials, components, or workmanship that has been rejected by the authorized representative as not in accordance with the terms of the specifications shall be replaced by the Contractor at no cost to the City. 35. Supplementary Conditions — Wherever special conditions are written into the specifications or supplementary conditions which are in conflict with conditions stated in these Instructions to Bidder, the conditions stated in the specifications or supplementary conditions shall take precedence. 36. Permits and Licenses — The successful bidder and their subcontractor(s) shall obtain, at their own expense, all permits and licenses which may be required to complete the contract. Fees for all City permits, and licenses shall be waived. 37. Bidder's Certification — - In compliance with the Illinois State Law that requires each bidder to file a certification regarding bid rigging and bid rotating and that it is not delinquent in its taxes, the bidder shall file with its bid the attached Bid Proposal Certification. 38. Chante Orders — After the contract award, changes in or additions to the work and/or a change in the amount of money to be paid to the bidder must be the result of an approved change order first ordered by the Director of the lead department and approved by the City Administrator and/or City Board. 39. Time of Completion — The successful bidder shall completely perform its bid in strict accordance with its terms and conditions within the number of consecutive calendar days after notification of award of the contract as stated in the bid proposal. 40. Payment — Payment will be made within thirty (30) days after acceptance of the job by the City after the completion of the work as covered within the contract documents. 41. Guarantees and Warranties — All guarantees and warranties required shall be furnished by the successful bidder and shall be delivered to the City before final payment on the contract is issued. 42. Waiver of Lien — where applicable a waiver of lien and contractor's affidavit must be submitted by the successful bidder, verifying that all subcontractors and material invoices have been paid prior to the City approving final payment. 43. Bid Schedule— Selection Process Steps Estimated Date(s) Release of Invitation to Bid (ITB) Friday, July 5, 2019 Pre-Bid Meeting(Optional) Monday, July 15, 2019 Final Date for Contractors to Submit Questions Friday, July 26, 2019 at 12:00 p.m. Addenda posted Tuesday, July 30, 2019 at 12:00 p.m. Proposals Due Friday, August 2, 2019 at 9:00 a.m. Public Works Committee Contract Approval Tuesday, August 20, 2019 City Council Contract Approval Tuesday, August 27, 2019 Pre-Construction Meeting (mandatory) Wednesday, September 4, 2019 Not to proceed Monday, September 9, 2019 Project Completion Deadline November 1, 2019 UNITED CITY OF YORKVILLE, ILLINOIS SPECIAL CONDITIONS 1. Bidders Qualifications. If requested, the interested Bidder must provide a detailed statement regarding the business and technical organization of the Bidder that is available for the work that is contemplated. Information pertaining to financial resources, experiences of personnel, previously completed projects, plant facilities, and other data may also be required to satisfy the City that the Bidder is equipped and prepared to fulfill the Contract should the Contract be awarded to him. The competency and responsibility of Bidders and of their proposed subcontractors will be considered in making awards. If requested by the City, the Bidder shall include a complete list of all equipment and manpower available to perform the work intended on the Plans and Specifications. The list of equipment and manpower must prove to the City that the Bidder is well qualified and able to perform the work, and it shall be taken into consideration in awarding the Contract. The list shall be included with the sealed bid package. The City may make such investigations as it deems necessary, and the Bidder shall furnish to the City under oath, if so required, all such information and data for this purpose as the City may request. A responsible Bidder is one who meets all of the following requirements: • Have adequate financial resources or the ability to secure such resources. • Have the necessary experience, organization, and technical qualifications, and has or can acquire, the necessary equipment to perform the proposed Contract. • Is able to comply with the required performance schedule or completion date, taking into account all existing commitments. • Has a satisfactory record of performance, integrity,judgment, and skills. • Is qualified and eligible to receive an award under all applicable laws and regulations. If the Bidder possesses a current Illinois Department of Transportation "Certificate of Eligibility" with an amount for the work specified at least equal to the minimum amount of qualification indicated on the Legal Notice, he may choose to provide the City a copy of the certificate in lieu of providing the above-mentioned Bidders Qualification requirements. 2. Basis of Payment. The Contractor shall submit with each payment request the Contractor's Partial Waiver of Lien for the full amount of the requested payment. Beginning with the second payment request, and with each succeeding payment request, the Contractor shall submit partial waivers of lien for each subcontractor and supplier showing that the amount paid to date to each is at least equivalent to the total value of that subcontractor's work, less retainage, included on the previous payment request. The Contractor's request for final payment shall include the Contractor's Final Waiver of Lien which shall be for the full amount of his Contract, including any change orders thereto, and Final Waivers of Lien from all subcontractors and suppliers for which Final Waivers of Lien have not previously been submitted. 3. Project Acceptance Procedures. All final pay item quantities shall be agreed upon between the City and the Contractor, and a final invoice shall be submitted by the Contractor, complete with all required waivers of lien and surety. Approval of the final pay estimate by the Director of Public Works shall constitute acceptance of the project by the United City of Yorkville, and written notice of such action shall be given to the Contractor. The date of approval of the final pay estimate shall be the Date of Acceptance and shall also be the date of the Start of Guarantee. Prior to the required Date(s) of Substantial Completion, a partial project acceptance may be granted in accordance with the foregoing procedure for entire project acceptance, with the exception that the pay estimate for the quantities of items included in the partial project acceptance shall not be the final pay estimate for the entire project. In the case of the City's acceptance of any portion of the work as may be required because of the inclusion of a Date of Substantial Completion requirement, or for other reasons as may be agreed to by the United City of Yorkville, such partial acceptance action shall not constitute acceptance of any other portion of the project not noted in the written notice of partial acceptance which shall be provided to the Contractor by the Director of Public Works. 4. General Guarantee. Neither the final certificate of payment nor any provision in the Contractor Documents, nor partial or entire occupancy of the premises by the City, shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects in the work and pay for any damage to other work resulting therefrom, which shall appear within a period of one (1) year from the date of final acceptance of the work unless a longer period is specified. The United City of Yorkville will give notice of observed defects with reasonable promptness. The Contractor shall guarantee all materials and workmanship as defined by the Performance Bond, Labor and Material Payment Bond, and Maintenance Bond requirements. Unless otherwise amended in writing by the Director of Public Works, the date of the Start of any Guarantees, Warranties and Maintenance Bonds shall be coincident with the Date of Acceptance of the entire project. 5. Maintenance Bond. The Maintenance Bond shall be in a penal sum of twenty percent (20%) of the final Contract amount for a period of one (1) year after the date of acceptance of the entire project. The Contractor may elect to reduce the Performance Bond, and the Labor and Material Bond to twenty percent (20%) of the final Contract amount in lieu of a separate Maintenance Bond. Such bond shall guarantee the work against defective workmanship and materials for a period of not less than one (1)year following acceptance of work. 6. Termination of*Contract. The United City of Yorkville reserves the right to terminate the whole or any part of this Contract, upon written notice to the Contractor, in the event that sufficient funds to complete the Contract are not appropriated by the Board of Trustees of the United City of Yorkville. The United City of Yorkville further reserves the right to terminate the whole or any part of this Contract, upon written notice to the Contractor, in the event of default by the Contractor. Default is defined as failure of the Contractor to perform any of the provisions of this Contract, or failure to make sufficient progress so as to endanger performance of this Contract in accordance with its terms. In the event of default and termination, the United City of Yorkville may procure, upon such terms and in such manner as the United City of Yorkville may deem appropriate, supplies or services similar to those so terminated. The Contractor shall be liable for any excess costs for such similar supplies or service unless acceptable evidence is submitted to the United City of Yorkville that failure to perform the Contract was due to causes beyond the control and without the fault or negligence of the Contractor. 7. Notification of Work. The Contractor shall notify the City's Director of Public Works 48 hours prior to commencement of work and 24 hours prior to each inspection at 630.878.7102. 8. Cleaning. During construction, the Contractor and his subcontractors shall remove from the premises, rubbish, waste material, and accumulations, and shall keep the premises clean. The Contractor shall keep the premises clean during construction to the satisfaction of the Director of Public Works. 9. Restoration. The calculation of quantities and limits of Restoration which will be allowed for payment will be in accordance with the "Standard Specifications." Restoration, fill sand, stone, etc., required outside of the limits as indicated in the Contract Documents will be considered incidental to the Contract. The Contractor shall at all times maintain all equipment and materials within the limits of restoration as specified. 10. Removal and Replacement. All removal and replacement items will be marked and measured for payment prior to removal by the Contractor. Any removal beyond these lines will be replaced to the satisfaction of the Director Public Works with no additional compensation. 11. BusinessiResident Notification. The Contractor shall not close any street or private driveway without the consent of the Director of Public Works, and the proper notification of the affected business/resident. 12. Use of Fire Hydrants. No fire hydrants shall be used to obtain water for non-emergency use. Contact the City's Director of Public Works at 630.878.7102 for access. UNITED CITY OF YORKVILLE, ILLINOIS INSURANCE REQUIREMENTS Contractor shall procure and maintain, for the duration of the contract, insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors. I. Minimum Scone Of Insurance Coverage shall be at least as broad as: A. Insurance Services Office Commercial General Liability Occurrence Form CG 0001 with the City named as additional insured; on a form at least as broad as the endorsement in paragraph 10 including ISO Additional Insured Endorsement CG 2026, CG 2010. B. Owners and Contractors Protective Liability (OCP) policy is required with the City as insured (for contracts with subcontractors and projects that are inherently dangerous). C. Insurance Service Office Business Auto Liability Coverage Form Number CA 0001, Symbol 01 "Any Auto." D. Workers' Compensation as required by the Worker's Compensation Act of the State of Illinois and Employers' Liability insurance. E. Builder Risk Property Coverage with City as loss payee. H. Minimum Limits Of Insurance Contractor shall maintain limits no less than if required under above scope: A. Commercial General Liability: $1,000,000 combined single limit per occurrence for bodily injury, personal injury, and property damage. The general aggregate shall be twice the required occurrence limit. Minimum General Aggregate shall be no less than $2,000,000 or a project/contract specific aggregate of$1,000,000. B. Owners and Contractors Protective Liability (OCP): $1,000,000 combined single limit per occurrence for bodily injury and property damage. C. Businesses Automobile Liability: $1,000,000 combined single limit per accident for bodily injury and property damage. D. Workers' Compensation and Employers' Liability: Workers' Compensation coverage with statutory limits and Employers' Liability limits of$1,000,000 per accident. E. Builder's Risk shall insure against "All Risk" of physical damage, including water damage (flood and hydrostatic pressure not excluded), on a completed value, replacement cost basis. (Protection against loss of materials during construction, renovation, or repair of a structure.) F. Umbrella Excess Insurance: $3,000,000. "Following form" of the underlying and excess policies including listing the City as an additional insured. III. Deductibles And Self-Insured Retentions Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officials, agents, employees, and volunteers; or the Contractor shall procure a bond guaranteeing payment of losses and related investigation, claim administration, and defense expenses. IV. Other Insurance Provisions The policies are to contain, or be endorsed to contain, the following provisions: A. General Liability and Automobile Liability Coverages I. The City, its officials, agents, employees, volunteers and Engineering Enterprises, Inc. are to be covered as additional insureds as respects: liability arising out of the Contractor's work, including activities performed by or on behalf of the Contractor; products and completed operations of the Contractor; premises owned, leased, or used by the Contractor; or automobiles owned, leased, hired, or borrowed by the Contractor. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officials, agents, employees, volunteers and Engineering Enterprises, Inc. 2. The Contractor's insurance coverage shall be primary as respects the City, its officials, agents, employees, and volunteers. Any insurance or self-insurance maintained by the City, its officials, agents, employees, and volunteers shall be excess of Contractor's insurance and shall not contribute with it. 3. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officials, agents, employees, and volunteers. 4. The Contractor's insurance shall contain a Severability of Interests/Cross Liability clause or language stating that Contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 5. If any commercial general liability insurance is being provided under an excess or umbrella liability policy that does not "follow form," then the Contractor shall be required to name the City, its officials, agents, employees, and volunteers as additional insureds. 6. All general liability coverages shall be provided on an occurrence policy form. Claims-made general liability policies will not be accepted. B. All Coverages Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, cancelled, reduced in coverage, or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. V. Acceptability Of Insurers Insurance is to be placed with insurers with a Best's rating of no less than A-, VII, and licensed to do business in the State of Illinois. VI. Verification Of Coverasie Contractor shall furnish the City with certificates of insurance naming the City, its officials, agents, employees, volunteers and Engineering Enterprises, Inc. as additional insureds, and with original endorsements affecting coverage required by this clause. The certificates and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificates and endorsements are to be received and approved by the City before any work commences. Other additional insured endorsements may be utilized, if they provide a scope of coverage at least as broad as the coverage stated in paragraph 10, such as ISO Additional Insured Endorsements CG 2026 or CG 2010. The City reserves the right to request full certified copies of the insurance policies and endorsements. VII. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein. VII1. Assumption Of Liability The contractor assumes liability for all injury to or death of any person or persons including employees of the contractor, any subcontractor, any supplier, or any other person and assumes liability for all damage to property sustained by any person or persons occasioned by or in any way arising out of any work performed pursuant to this agreement. IX. Indemnity/Hold Harmless Provision To the fullest extent permitted by law, the Contractor hereby agrees to defend, indemnify, and hold harmless the City, its officials, agents, and employees, against all injuries, deaths, loss, damages, claims, patent claims, suits, liabilities,judgments, cost, and expenses, which may in anywise accrue against the City, its officials, agents, and employees, arising in whole or in part or in consequence of the performance of this work by the Contractor, its employees, or subcontractors, or which may anywise result therefore, except that arising out of the sole legal cause of the City, its agents, or employees, the Contractor shall, at its own expense, appear, defend, and pay all charges of attorneys and all costs and other expenses arising therefore or incurred in connections therewith, and, if any judgment shall be rendered against the City, its officials, agents, and employees, in any such action, the Contractor shall, at its own expense, satisfy and discharge the same. Contractor expressly understands and agrees that any performance bond or insurance policies required by this contract, or otherwise provided by the Contractor, shall in no way limit the responsibility to indemnify, keep, and save harmless and defend the City, its officials, agents, and employees as herein provided. X. Additional Insured Endorsement The "WHO IS AN INSURED" section of the policy/coverage document shall be amended to include as an insured, the City, but only with respect to liability arising out of your work. For purpose of this endorsement, "arising out of your work" shall mean: (1) Liability the Additional Insured may incur resulting from the actions of a contractor it hires, (2) Liability the Additional Insured may incur for negligence in the supervision of the Named Insured Contractors work, (3) Liability the Additional Insured may incur for failure to maintain safe worksite conditions, and (4) Liability the Additional Insured may incur due to joint negligence of the Named Insured Contractor and the Additional Insured. GENERAL SPECIAL PROVISIONS X1. Location of improvements The Public Works Materials Storage Shed will be located at 610 Tower Lane, United City of Yorkville, Kendall County, Illinois. The project limits are defined in the plans. XII. Description of improvements This project consists of completing improvements in accordance with the United City of Yorkville Public Works Storage Facility Plans and all applicable specifications. These improvements include but are not limited to pavement and concrete slab removal, installation of new concrete pavement, concrete footings, concrete walls, construction of a 30'x80', 5-bay wood-frame and metal-sided material storage building and other ancillary work necessary to complete this contract. XIII. Subcontractor approval Prior to awarding the contract to the lowest qualified bidder, the selected general contractor must submit a list of all subcontractors and material suppliers for approval by the City. The City reserves the right to reject any subcontractor or material supplier for any reason. This same requirement applies to any subcontractor or material supplier being substituted for another after construction has started. XIV. Construction observation Prior to the installation of any material, construction observation and any required testing shall be coordinated with Engineering Enterprises, Inc. (EEI). The Engineer will require a minimum of 48 hours notice prior to the scheduling of any such work items and a minimum of 24 hours notice prior to the cancellation of any proposed work items that have been scheduled for observation. The contact for EEI shall be provided at the pre-construction conference. XV. Control of work and prosecution and progress It is the intent of the United City of Yorkville that the project be constructed in an orderly and timely manner. The Contractor shall take special note of the provisions of Article 105.05, Article 108.01 and Article 108.02 of the Standard Specifications, which shall be adhered to. The work on this project shall be completed by November 1, 2019. No extensions will be permitted in accordance with Article 108.08(b) of the "Standard Specifications for Road and Bridge Construction", adopted April 1, 2016. Should the Contractor fail to complete the work by November 1, 2019, he/she will be held liable to the United City of Yorkville pursuant to amounts specified in the Supplemental Specification for Section 108 "Prosecution and Progress." XVI. Pre-bid site visit All bidders are encouraged to visit the site prior to preparation of bid. Submission of the bid is acknowledgement that the Bidder is aware of and accepting of existing conditions prior to the installation of the improvements. XVII. Pre-construction conference Following the award of the Contract, the Contractor will be required to attend a Preconstruction Conference prior to beginning work. At that time, the Contractor will be required to furnish as a minimum, but not limited to: Written progress schedule, Names of Project Manager and Field Superintendent, names of Sub Contractors and material suppliers, name of person responsible for traffic control installation and maintenance, and name of the contact person and emergency phone numbers of the Contractor's representative for contact after construction hours. A Preconstruction Conference Notice will be sent to the Contractor to notify him/her of the complete listing of items to be furnished at the meeting, as well as the time and location of the meeting and the required personnel. XVIII. Construction debris The following shall be added to the third paragraph of Article 202.03 of the Standard Specifications: -The Contractor shall not conduct any generation, transportation, or recycling of construction or demolition debris, clean or general or uncontaminated soil generated during construction, remodeling, repair, and demolition of utilities structures, and roads that is not commingled with any waste, without the maintenance of documentation identifying the hauler, generator. place of origin of the debris or soil, the weight or volume of'the debris or soil, and the location, owner, and operator of the facility where the debris or soil was transferred, disposed, recycled, or treated. This documentation must be maintained by the Contractor for 3 years. " XIX. Construction restrictions All engines and engine driven equipment used in relation to this project shall be equipped with an adequate muffler in constant operation and properly maintained to prevent excessive noise. Construction shall not be permitted between the hours of 8:00 p.m. to 7:00 a.m. during standard weekdays (excluding holidays). These hours shall be amended to 5:00 p.m. to 7:00 a.m. on Saturdays and no work on Sundays or Holidays. Any requested variations to these hours shall be approved by the City in writing, in advance of any operations outside of the hours detailed above. XX. Uncontaminated soil disposal Any excavated material that meets the requirements of disposal at a CCDD facility and not needed for backfill or embankment shall be removed and disposed of off the site at a location or locations provided by the Contractor. The cost of removal, transportation and disposal of the excavated material ("uncontaminated soil") is considered incidental to the pay item requiring excavation. A signed LPC-663 form with supporting documentation is attached. Any additional testing or documentation beyond what is provided with the LPC-663 and preliminary analysis that is necessary to dispose of the material shall be the Contractor's responsibility. The LPC-663 was completed in 2015 and attached to the form is a cover letter stating that there have been no changes to the site since the original LPC-663 form was completed. Fox Ridge Stone in Oswego, IL has indicated that they will accept the material based on this documentation. If the Contractor chooses to dispose of the material at a permitted CCDD facility, the Contractor shall coordinate with said facility or facilities prior to bidding to determine if the information provided with the LPC-663 is adequate. The Engineer should be informed immediately of any deficiencies. XXI. Location of existing utilities Existing public and private utilities are shown on the plans according to information obtained from utility companies, municipalities, and surveys. The Contractor shall familiarize himself/herself with the location of all utilities and structures that may be found in the vicinity of the construction and assume responsibility for all utilities whether shown or not and must realize that the actual locations and/or elevations of the utilities may be different than indicated. It is understood and agreed that the Contractor has considered in his/her bid all of the permanent and temporary utility appurtenances in their present or relocated positions and that no additional compensation will be allowed for any delays, inconvenience or damage. It is also suggested that the Contractor call the concerned utility companies for further information. Contractor shall bring to the attention of the Engineer any potential conflicts after receiving all necessary JULIE information. In areas where JULIE locates reveal potential conflicts, the Contractor shall field verify the depth of these utility crossings. In any such area, the Engineer will verify if potential adjustments to the proposed utility installations will be required. All overhead utilities and associated poles shall be temporarily supported when working nearby. Should any damages occur due to the Contractor's negligence, repairs shall be made by the Contractor at his/her expense in a manner acceptable to the Engineer. XXIL Protection of existing drainage facilities During construction, if the contractor encounters or otherwise becomes aware of any sewer, underdrains or field drains within the right-of-way other than those shown on the plans; he shall so inform the Engineer. The Engineer shall direct the work necessary to maintain or to replace the facilities in service and to protect them from damage during construction if to be maintained. Existing facilities to be maintained that are damaged because of non-compliance with this provision shall be replaced at the Contractor's own expense. XMtt. Cooneration between contractors Other contracts and/or contractors may simultaneously be in process and working within or adjacent to the subject project improvement site limits and the Contractor shall take special note of the applicable provisions of Section 105 and of particular, Article 105.08 of the Standard Specifications which shall be adhered to. XXIV. Incidental work All work shown on the Plans, described in the applicable specifications or in these Special Provisions and not covered by a pay item, will be considered as included in the cost of the Contract. XXV. Notification to utilities The Contractor shall notify all utility companies including the local electrical, telephone, gas and the United City of Yorkville, a minimum of 72 hours prior to beginning any construction. The Contractor shall then have the responsibility to determine from the public utility companies the locations of underground pipes, conduits or cables adjoining or crossing the construction area. XXVI. Keeping roads open to traffic All roads shall remain open during construction. All work associated with this shall be included in the cost of the Contract. XXVII. Maintenance of roadways, drives and parking areas The Contractor shall be responsible for repair of any damage to existing roadways, drives and parking areas within the project limits. There will be no additional payment for any repairs necessary due to the Contractor's operations. XXVIII. Working environment It is the sole responsibility of the Contractor, not the Owner or Owner's representative, to ensure a safe working environment and to comply with all applicable OSHA, or other, safety requirements. XXIX. N/lobilization This contract contains no provisions for mobilization. Therefore, article 671 of the Standard Specifications is deleted. XXX. Construction staking and marking Construction staking and marking, establishing the location, alignment, elevation and grade of the work, shall conform to article 105.09 of the Standard Specifications. Requests for control information must be made 72 hours prior to the date needed. Construction staking will be discussed at the preconstruction meeting prior to commencement of work, at which meeting the proper contact information will be provided. The costs for construction staking are the responsibility of the Contractor. This will not be paid for separately but shall be considered incidental to the cost of the project. This special provision shall take precedence over any other references to construction layout in the plans or specifications. XXXI. Submittals Shop drawings, cut sheets and or mix designs shall be submitted for the following items: • Concrete Mix Design • Quality Control Plan • Pre-Engineered Post Frame Building System XXXII. Retention Ten percent(10%) retention will be held on the project until all construction items have been satisfactorily completed. Retention will be reduced to 0%once all punch list items are completed (as determined by the City Engineer). XXXI11. Pay item special provisions A. Concrete Slab and Pavement Removal This work shall consist of saw cutting, removing and off-site disposal of the existing concrete slab or hot-mix asphalt pavement as required for the construction of the proposed material storage shed. This work shall also consist of excavation of any material measured down to a depth of 10 inches below the proposed concrete slab finished grade, per the grades indicated on the drawings. The excavated material is to be disposed of off-site. Once subgrade is achieved the subgrade shall be proof rolled prior to aggregate base course installation. This work will be paid for at the contract unit price per square yard for CONCRETE SLAB REMOVAL or PAVEMENT REMOVAL which price shall include the excavation and disposal of material. B. Aggregate Base Course, 4" This work shall consist of furnishing and placing new aggregate base course prior to concrete slab construction operations in the areas designated on the plans and in accordance with Sections 202 and 311 of the Standard Specifications. All aggregate base course placed shall be mechanically compacted in maximum one-foot lifts. This work will be paid for at the contract unit price per square yard for AGGREGATE BASE COURSE, 4" which price shall include the excavation and disposal of any unsuitable material. C. Cast-In-Place Concrete This work shall consist of excavation, furnishing and placing concrete, backfilling and compacting fill material above and adjacent to the footing and concrete walls as shown on the plans and in accordance with the applicable parts of Divisions 400 and 500 of the Standard Specifications, American Concrete Institute (ACI) 318 and ACI 301, latest editions, the "Foundation Plan Sections & Notes" detail in the plans, and with these Special Provisions. The notes and details in the plans shall supersede any Standards and Provisions referenced herein. A delivery ticket shall be required for each load of concrete delivered to the site and must be presented at the time of the concrete pour. The information recorded on each delivery ticket shall be in accordance with Sections 109 and 1020 of the Standard Specifications. All concrete shall be mixed with Sika Fibermesh 650 synthetic fibers or an approved equal conforming to ASTM C 1116 Type III and ACI 318. All exposed areas of concrete shall be treated with W.R. Meadows Pentreat 244-40 Water Repellent Sealer or approved equal. The Contractor shall comply with the requirements of the [DOT Recurring Special Provisions for Check Sheet #24 Special Provision for Quality Control of Concrete Mixtures at the Plant and Check Sheet#25 Special for Quality Control/Quality Assurance of Concrete Mixtures. The excavation, concrete, associated reinforcement, including reinforcement bars and synthetic fibers, sealer and backfill shall not be measured separately but shall be included in the Lump Sum price. This work will be paid for at the contract unit price per Lump Sum for CAST-IN-PLACE CONCRETE which price shall include excavation, furnishing, placing, and reinforcing the concrete and backfilling and compacting the fill material as shown in the plans and on Contractor shop drawings to be submitted to the architect for review prior to fabrication. Any excavated material used on site will not be paid for separately. D. Pre-Engineered Post Frame Building S, stems General The metal building systems included in this section were designed around Wick Buildings. If another manufacturer is submitted other than Wick Buildings, Contractor to prepare and submit to the Engineer for approval as part of his bid, a detailed list of all exceptions to the following specifications and engineering plans of the building proposed to be furnished and installed. Such changes, if approved, shall be accomplished at no additional cost to the Owner and time extensions associated with the changes will not be approved by the Engineer. The Contractor will reimburse the Owner and Engineer for review or redesign services associated with re-approval. The Contractor shall assume the cost of, and responsibility for, satisfactorily accomplishing the necessary changes corresponding to the dimensions and characteristics of the building submitted by the Contractor and approved by the Engineer. 1. This Section Includes the following: A. Factory fabricated Pre-Engineered wall column. B. Factory fabricated Pre-Engineered roof rafters. C. Factory fabricated Pre-Engineered siding panels and metal roofing. D. Factory fabricated Pre-Engineered building system accessories including, but not limited to, doors and windows. E. Prefinished metal trim items. F. Prefinished ridge vents and soffits. G. Prefinished gutter and downspouts. 2. Reference Standards: A. Preservative Treated Lumber i. American Wood Preservers Association(AWPA) ii. Treated item shall comply with AWPA standard C15 minimum. iii. Treated items shall bear the quality mark with appropriate specification information, along with and stamped by the participating mill or agency involved. B. Framing Lumber i. Lumber grading rules and wood species a. National Design Specifications for Wood Construction, current edition. b. Northeastern Lumber Manufacturer's Association, Inc. (NELMA). c. Southern Pine Inspection Bureau(SPIB): Southern Pine. d. West Coast Lumber Inspection Bureau(WCLIB): Douglas Fir. e. Western Wood Products Association (WWPA): Douglas Fir and Ponderosa Pine. C. Wood LVL Rafters i. Contractor must submit manufacturer's descriptive literature indicating material composition, thickness, dimensions, loading and fabrication details. ii. LVL rafters shall be qualified to ASTM D5456 by APA -The Engineered Wood Association. iii. LVL rafters shall be pressure bonded, lap jointed wood veneers, with grain of veneers running parallel in the long direction. iv. LVL rafters shall be designed by the contractor or manufacturer in accordance with the applicable building codes. All rafter designs must be accompanied by complete and accurate shop drawings and contain the following information: a. Slope or depth, span and spacing of the rafter. b. Heel bearing height. c. Design loading. d. Adjustments to lumber and fastener design values for conditions of use. e. Fastener type, thickness of gauge, and size. f. Lumber size, species and grade for each member. 3. System Description: A. Clear span frame —coordinate with drawings. B. Primary framing —wood roof rafters and columns. C. Secondary framing—purlins, girts, bracing and other items as required. D. Wall and roof systems—preformed metal panels. 4. Design Requirements: A. Coordinate building loads. Refer to design load tables on plans. B. Building Code: IBC, International Building Code C. Including unbalanced roof loads required by the most current version of ASCE-7 5. Submittals: A. Supply four (4) sets of the following bearing a Professional Engineering Seal registered in the State of Illinois: i. Complete detailed shop and erection drawings indicating size and location of each building component and part. Certify that specified roof and wind load requirements are met. ii. Rafter engineering calculations and design calculation should include the following: a. Bending moments and axial forces for each member. b. Basic plate design values. c. Design analysis for each joint indicating that proper plates have been used. d. Successful bidder shall provide written proof of a third-party inspection program in force for the rafter manufacturer used on project. iii. Standard color chart supplied by Manufacturer for the owner/engineer to choose from. iv. Brochures/details/samples of specialty accessory products used or specified on this project. 6. Quality Assurance: A. Building package by a Pre-engineered building Manufacturer with 50 years of doing business. B. Building Manufacturer must own manufacturing facilities. C. Exterior fastened steel panel shall be roll-formed in Manufacturer's manufacturing facility. D. Columns shall be factory fabricated by Manufacturer, in their manufacturing facility. They shall not be manufactured or assembled on-site. E. Rafters shall be factory fabricated by Manufacturer, not the contractor. F. Building package shall be supplied by a pre-engineered building Manufacturer, with fully staffed engineering department. All structural components shall be supplied by a source with one warranty. G. All building packages shall be delivered by the Manufacturer's trucks and personnel. H. Package (shell) erection shall be supervised by Manufacturer's representative builder or Manufacturer employed field superintendent. 7. Qualifications: A. Structural components shall be designed under direct supervision of a Professional Engineer employed by the Manufacturer. B. An adequate number of skilled work people shall be employed who are thoroughly trained and experienced in the necessary skills. They will be completely familiar with the specified requirements and methods for proper performance of work. 8. Regulatory Requirements: A. All applicable building codes and/or ordinances covering this work shall be the responsibility of the contractor. B. Work together with regulatory agencies or authorities to provide data as requested. C. Panels shall not be stored such that they are in contact with any other material that could create staining or discoloration. 9. Environmental Requirements: A. Material packaging for minimum natural resource waste on project. B. Building delivery package materials must be reused in the building system, i.e., metal panel cribbing 2x's used as part of secondary framing systems (nonstructural.) 10. Delivery, Storage and Handling: A. Prefabricated components, i.e., rafters, columns, steel sheathing and other items, shall be delivered and stored so they will not be damaged or deformed. B. Roofing and siding panels will be stored so water will drain freely. C. Panels shall not be stored such that they are in contact with any other material that could create staining or discoloration. 11. Warranty: Contractor to warrant to the original owner, commencing on the date of its substantial completion and subject to limitations, exclusions and conditions set forth herein, as follows: FOR FIFTY (50) YEARS Free of Charge, Contractor will replace or repair, at its option, treated structural posts that fail because of insect damage or because of decay that occurs under normal conditions and proper use. FOR FORTY (40) YEARS Free of Charge, Contractor will replace or refinish, at its option, painted steel roofing or siding panels if the paint peels, cracks, checks, flakes, or blisters to an extent that is apparent by ordinary outdoor visual observation when exposed to normal weather and atmospheric conditions. Damage or loss resulting from exposure to atmospheric pollutants, including but not limited to animal waste or other corrosive conditions, is excluded under this warranty. FOR THIRTY(30) YEARS Free of Charge, Contractor will replace or refinish, at its option, painted steel rooting or siding panels should the color change or chalk more than the specifications shown in the following table: Vertical Installation Non-Vertical Installation Chalk (ASTM D-4214) 8 6 Color Change (ASTM D-2244) 5 7 FOR TWENTY (20) YEARS Free of Charge, Contractor will replace or repair, at its option, acrylic coated GalvalumeIRD steel roofing or siding panels should they rupture, perforate, or fail structurally when exposed to normal weather and atmospheric conditions. Damage or loss resulting from exposure to atmospheric pollutants, including but not limited to animal waste or other corrosive conditions, is excluded under this warranty. FOR SEVEN (7) YEARS Free of Charge, Contractor will repair leaks in steel roofing panels that result from defects in material or workmanship except those leaks occurring where the building is connected to an adjacent structure. FOR FIVE (5) YEARS Free of Charge, Contractor will replace or repair, at its option, those portions of the structural framework, including roofing and siding panels, damaged by wind or snow loads that do not exceed design specifications. Free of Charge, Contractor will replace or repair, at its option, sliding doors damaged by wind or snow so long as the door is in a locked-open or locked-closed position when the damage occurs. Free of Charge, Contractor will replace or repair, at its option, painted steel or acrylic coated steel roofing or siding panels perforated by hail. FOR ONE (1) YEAR Free of Charge, Contractor will repair any other defects in materials or workmanship. Products 12. Building System Manufacturers: A. Wick Buildings, 800-356-9682 WickBuildings.com i. Mazomanie, Wisconsin B. Other Systems— Pre-approved Acceptable: i. Approved equals meeting specification requirement sections 2,6,9,11.13 and 14. ii. Must be approved 7 days prior to submission of the bid. a. Lester b. Morton 13. Materials— Framing: A. Sill Plate i. 2"x8" #I or better Southern Yellow Pine(SYP). ii. This member shall be pressure treated with a wood preservative to a net retention as specified by the American Wood Preservers Association (AWPA) for ground contact conditions. Treatment shall be Osmose MicroPro copper Azol (MCA) with 15 pounds of preservative per cubic foot of wood. Member shall be Kiln dried to a maximum of 19% moisture content. The preservative shall penetrate 100%of the sapwood. B. Columns i. Full Length Laminated Column Factory fabricated from minimum 3 ply 2"x6" 2400 MSR Southern Yellow Pine (SYP). Columns shall be full-length (unspliced) nail laminated plys up through 20' with middle ply to have short truss support block. Columns over 20' length shall be spliced (a minimum of 3' length) with reinforced metal truss plates pressed in place over splice on the outside laminate. Refer to Section B, Reference Standards/ 3. Wood rafters/ letter c. referencing LVL construction. a. Columns shall be pressure treated. This is in accordance with the "American Wood Preserves Association'*(AWPA) standards latest edition, with a wood preservative to a net retention of.60 pounds per cubic foot of CCA Type — C formulation. C. Wood Rafters i. Rafters shall be constructed of surfaced lumber, smooth and free of all cracks and checks. ii. Plates: Connector plates shall be fabricated from ASTM A 653 SS, 20-gauge Grade 40, or 18-gauge, Grade 80, steel sheets galvanized with G-60 coating. iii. Design and fabricate rafters and connections to withstand designated snow and wind loads and all dead loads. iv. Fabricate rafters in plant, using mechanical or hydraulic fixtures as required to bring members into contact. Install plates in accordance with Manufacturer's instruction. D. Baseboards i. 2"x8"#1 or better Southern Yellow Pine (SYP). ii. This member shall be pressure treated with a wood preservative to a net retention as specified by the American Wood Preservers Association (AWPA) for ground contact conditions. Treatment shall be Osmose MicroPro copper Azol (MCA) with 15 pounds of preservative per cubic foot of wood. Member shall be Kiln dried to a maximum of 19% moisture content. The preservative shall penetrate 100% of the sapwood. iii. This treated member shall be attached to columns with a minimum of 3 hot dipped galvanized nails (ASTM A153). E. Wall Girts i. 2"x6" 1650 MSR Spruce Pine Fir (SPF) as required by design at appropriate spacings. F. Purlins and Truss Ties i. 2"x4" 1650 MSR or better Spruce Pine Fir (SPF) as required by design dependent upon roof loading specification. G. Wind Bracing i. Provide -'T'd" 2"x6"/2"x4" 1650 MSR or better Spruce Pine Fir (SPF) from endwall column to first rafter back. ii. Provide 2"x4" 1650 MSR diagonal in roofline bracing as required by design. H. Framing Around Openings i. Provide 2"x6"/2"x4" 1650 MSR or better Spruce Pine Fir(SPF) around personnel doors and windows. ii. Provide 2"x6"/2"x4" 1650 MSR or better Spruce Pine Fir (SPF) around overhead door openings. I. Headers i. Provide built-up Machine Stress Rated(MSR) or better wood headers per building manufacturer as required to meet proper loading. J. Incidental framing i. Provide 1650 MSR or better 2"x4" Spruce Pine Fir(SPF). K. Bent Anchor Bolts: ASTM F 1554, Grade 36. i. Nuts: ASTM A 563 heavy hex carbon steel. ii. Washers: ASTM F 436 hardened carbon steel. iii. Finish: Hot-dip zinc coating, ASTM A 153/A 153M, Class C. L. Column Anchor. i. The building manufacturer will provide the bolt and bracket design for anchoring their building to the columns. The building manufacturer will supply stamped engineering to support their calculation for bolts and brackets. 14. Materials— Prefinished Materials: A. Roofing Panel Options i. Exposed Fastened Steel Panels a. All roofing panels shall be 29-gauge (.015 minimum thickness) steel with a G- 90 galvanized zinc coating. Panels shall be a minimum structural strength ASTM A446 grade E, 82,000 PSI tensile strength. All panels shall include a zinc phosphate pre-treatment, and then covered with a total of 1.5 mil thick paint system. Paint system shall consist of a corrosion-resistant prime coat and an architectural finish coat of Ceram-A-Star 1050. b. All metal roof shall be fastened with minimum of 1" color-matched EPDM washered #9 screw fasteners placed in the flat of the steel next to all major ribs along every row of girts and purlins. All fasteners shall be color-matched to wall and roof panels and trim. B. Sidewall Siding i. Exposed Fastened Steel Panels a. All siding panels shall be 29-gauge (.015 minimum thickness) steel with a G- 90 galvanized zinc coating. Panels shall be a minimum structural strength ASTM A446 grade E, 82,000 PSI tensile strength. All panels shall include a zinc phosphate pre-treatment, and then covered with a total of 1.5 mil thick paint system. Paint system shall consist of a corrosion-resistant prime coat and an architectural finish coat of Ceram-A-Star1050. b. All metal sidewall panels shall be fastened with minimum of 1" color-matched EPDM washered #9 screw fasteners placed in the flat of the steel next to all major ribs along every row of girts and purlins. All fasteners shall be color- matched to wall and roof panels and trim. C. Metal Trim Items i. Trim: Roofing and siding panels shall be trimmed using painted trim with the same paint product specifications as the roofing and siding panels. Standard trim to be placed at all corners, ridge line, rake (intersection of roof and endwall), eave (intersection of roof and sidewall) and base (bottom of sidewall and endwall steel.) All standard trims, overhang fascias, track covers, slide door jambs and trims to be available in building panel covers. Overhead door trims and slide door jamb trims shall be one piece up to 16'. All other trims shall be a minimum of 12' in length to eliminate splices. ii. Fasteners: All framing lumber shall be fastened with l Od, 16d and 60d ring shank nails. All machine bolts used shall be a minimum grade 1, A307. All metal roof and sidewall panels shall be fastened with minimum of 1" color-matched EPDM washered #9 screw fasteners placed in the flat of the steel next to all major ribs along every row of girts and purlins. All fasteners shall be color-matched to wall and roof panels and trim. D. Gutter and Downspouts i. If shown and specified on drawings, provide 5" style "K" gutter. Material shall be the same specification as trim. ii. Silicone sealant shall be used at laps to maintain leak prevention and to relieve stress due to thermal movement. iii. Provide 3 'x4" downspouts with appropriate elbows and connector bands. iv. Gutter shall be attached with screw fasteners and internal brackets of a maximum of 3' on center. Exposed nail heads are unacceptable. 15. Materials—Other: A. Closure Strips i. Closed cell foam premolded to match configuration of panels. B. Sealant i. Silicone sealant shall be used. Execution 16. Examination: A. Verify that site conditions meet Manufacturer's requirements and design requirements for this region. i. Verify that mechanical and electrical utilities are in correct position. 17. Erection— Framing—General: A. Erect framing in accordance with Manufacturer's established construction procedures. B. Make all components and building plumb, square, straight and true to lines. C. Provide adequate temporary bracing to assure structure remains plumb and square. D. Altering of structural members will not be permitted. 18. Erection Framing: A. Columns i. Position column over fastener on top of the concrete wall in accordance with the building manufactured recommendations. B. Baseboards i. Install 2"x8" treated plank, at grade, using Manufacturer recommended fasteners. C. Wall Girts i. Install 2"x6" girts at centers called for on plan. ii. Install 2"x6" overhang nailer, if required, at the top. D. Rafters i. Set rafters in place in the center member of the column using lifting methods as approved by the Manufacturer and use hangers as accessories as recommended by the manufacturer. ii. Brace rafters as recommended by Manufacturer. E. Purlins i. Install 2"x4"' purlins at 24" on center and attach to rafters in accordance with rafter manufacturer recommendations. F. Truss Ties i. Install 2"x4"truss ties at location recommended by Manufacturer. ii. Truss ties shall run from endwall to endwall. G. Incidental Framing i. Install 2"x4" or 2"x6" blocking as required according to building Manufacturers recommendations. 19. Erection— Prefinished Metals, General: A. In accordance with Manufacturer's established construction procedures, install prefinished metal parts. B. All components made to be plumb, square, straight and true to lines. C. Care shall be taken when cutting prefinished materials to ensure cuttings do not remain on finished surface. D. Fasteners shall be properly installed. Do not under- or overdrive. E. Components shall be properly installed to assure freedom from rattles. 20. Erection— Prefinished Metals: A. Roofing Panels. i. Panels shall be installed perpendicular to supports aligned straight with end fascias. ii. Panels shall be fastened to purlins with 1" EPDM washered #9 screw- fasteners. B. Siding Panels i. Panels shall be installed perpendicular to supports aligned level and plumb. Attach to wall girts and purlins with 1" EPDM washered#9 screw fasteners. C. Trim Items i. Trim items shall be installed at the base, at any wainscot transition, corners, top of steel siding, fascias, gables and ridge using appropriate 1" screw fasteners. D. Ridges i. Use screw fasteners to install applicable vent option. ii. Insure that the minimum Manufacturer's clear throat opening is maintained. E. Gutters and Downspouts i. Gutters shall be installed with concealed gutter brackets, with screw fasteners 36" on center. ii. Silicone sealant and silicone rubber gaskets shall be used at laps to maintain leak prevention and to relieve stress due to thermal movement. F. Strips i. Closed cell foam filler strips shall be provided at the top and bottom of the roofing panels. 21. Tolerances/Quality Assurance: A. Framing Members. i. Shall follow- and adhere to the NFBA document "Accepted Practices for Post- frame Construction Framing Tolerances." B. Siding and Roofing i. Shall be installed in their"True Position." This work will be measured and paid for at the contract price for Lump Sum for PRE- ENGINEERED POST FRAME BUILDING SYSTEMS. No additional compensation will be provided for additional materials required, labor, or warranties listed herein. E. Bollard This work shall consist of installation of bollards at the locations shown on the plans complete in place. This work will be paid for at the contract unit price per each for BOLLARD which price shall include but is not limited to all excavation, concrete base, cement filled steel post, paint, disposal of excess material and all material, equipment and labor necessary to complete this work. F. Restoration The Contractor shall restore all areas disturbed during construction of the improvements or as part of any of his or her activities to a condition equal to or better than the original condition. This work shall include the stripping, stockpiling, and replacement of topsoil as specified on the plans. Topsoil shall be defined as friable clay loam surface soil found in a depth of not less than six inches. Satisfactory topsoil is free of subsoil, clay lumps, stones and other objects, and without weeds, roots and other objectionable material. Topsoil stripping and stockpiling shall be completed as follows: 1. Strip topsoil to whatever depths encountered in a manner to prevent intermingling with underlying subsoil or other objectionable material. a. Remove heavy growths of grass from areas before stripping. b. Where existing trees are indicated to remain, leave existing topsoil in place within drip lines to prevent damage to root system. 2. Stockpile topsoil in temporary construction easement as directed by Engineer. Construct storage piles to provide free drainage of surface water. Cover storage piles, if required, to prevent wind erosion. 3. Topsoil stockpiles are to remain separated from excavated material stockpiles throughout construction. Topsoil replacement shall be completed as follows: 1. Preparation of subsoil a. Prepare sub-soil to eliminate uneven areas and low spots. Maintain lines, levels, profiles and contours. Make changes in grade gradual. Blend slopes into level areas. b. Remove foreign materials, weeds and undesirable plants and their roots. Remove contaminated sub-soil. 2. Placing topsoil a. Spread topsoil to the depth that existed prior to disturbance. Chisel plow to a depth of 18 inches and rake topsoil until smooth. b. Place topsoil during dry weather and on dry unfrozen sub-grade. c. Remove vegetable matter and foreign non-organic material from topsoil while spreading. d. Grade topsoil to eliminate rough, low or soft areas, and to ensure positive drainage. All ditches, parkways, and other grassed areas disturbed during construction shall be restored to their original shape, contour and condition. Seeding, including finish grade preparation of seedbed, fertilizer and planting shall be as set forth in Section 250 of the Standard Specifications. All disturbed areas must be covered with mulch hydraulically per method 3 as described in Section 251 of the Standard Specifications. The seeding mixture used shall be Class IA (lawn mixture salt tolerant). Topsoil (six-inch(6") minimum thickness) shall be provided. The Contractor shall be responsible for maintaining all restored areas until such a time as the City accepts these areas. This acceptance will be granted after the Contractor has both fulfilled the minimum required maintenance items and has established a stand of grass (where required) which meets the acceptance standards set forth in these Special Provisions. Acceptance of seeded areas will be determined by inspection by the City and Engineer. In order for an area to be accepted, it shall conform the following: 1. Grass shall display a reasonably uniform distribution of grass plants 2. Grass shall display vigorous growth and be green and healthy in appearance. Areas having bare spots larger than one (1) square foot will not be accepted. In this situation, the bare spots must be re-seeded in accordance with seeding and maintenance specifications. The Contractor shall have a representative on the job at all time when work is being performed. Additional areas damaged by machinery, construction equipment, Contractor negligence or over- excavation beyond the limits shown on the plans shall be repaired in accordance with this Special Provision, at the Contractor's expense. Unless otherwise listed for payment separately, all work under the general heading RESTORATION will be paid for at the contract unit price per square yard for which price shall be payment in full for restoring the areas disturbed. G. Water Required for Restoration Water necessary for the restoration of the disturbed areas will be provided by the City free of charge. Water can be obtained at 610 Tower Lane. H. Erosion Control Erosion control measures shall be required as stated on the Plans or as deemed necessary by the Engineer and shall be in compliance with the most recent revisions to the Illinois Urban Manual. It should be noted that inlet protection is required at all open grate inlets tributary to disturbed areas and shall be periodically monitored for silt build up and should be emptied once the baskets are over half full. All areas disturbed during construction shall be seeded as soon as possible after final grading. The Contractor will be responsible for cleaning the pavement, drainage structures, swales, storm sewers and culverts prior to final acceptance and at such times during construction as necessary to maintain drainage and protect adjacent property. All costs related to erosion control not paid for separately shall be incidental to the contract. I. Non-Special, Non-Hazardous Soil Waste Disposal—Type 1 Any excess excavated material that does not meet the requirements for disposal at a CCDD facility and not needed for backfill or embankment shall be removed and disposed of at a permitted receiving facility (i.e. landfill) provided by the Contractor or other approved location. The cost of removal, transportation and disposal of the non-special, non-hazardous soil will be paid for at the contract unit price per ton for NONSPECIAL, NON-HAZARDOUS SOIL WASTE DISPOSAL—TYPE 1. Documentation from the permitted receiving facility indicating date, time, weight, driver, truck number, etc. shall be provided to the Engineer as requirement for payment for this work item. Based on the information provided in the LPC-663, it is not anticipated that any contaminated material will be encountered; however, if any material is rejected from the CCDD facility it shall be brought back to the site or other location as determined by the Engineer. At that time, the Engineer will determine the level of testing required for necessary disposal of NON-SPECIAL, NON-HAZARDOUS SOIL WASTE DISPOSAL — TYPE 1. All testing shall be paid for by the United City of Yorkville. Any cost to the contractor for additional hauling, dumping, airing out soil, reloading, etc. shall be considered in the unit price per ton for NON-SPECIAL, NON-HAZARDOUS SOIL WASTE DISPOSAL—TYPE 1. J. Allowance When additional work not indicated in the contract drawing is requested in writing by the Engineer during construction, this additional work shall be measured and paid for as described in Articles 104.02 and 109.04 of the Standard Specifications. Payment for all additional work shall be made from the ALLOWANCE - ITEMS ORDERED BY THE ENGINEER pay item which shall be measured in units. A unit shall be valued at one dollar. BID SHEET Note: The Contractor must complete all portions of this Bid Sheet The undersigned, having examined the specifications, and all conditions affecting the specified project,offer to furnish all services, labor, and incidentals specified for the price below. The undersigned Bidder certifies that they are not barred from bidding on this contract as a result of a conviction for the violation of state laws prohibiting bid rigging or bid rotating (720 ILCS 5/33E-1, et seq.) and is not delinquent in any taxes to the Illinois Department of Revenue (65 ILCS 5/11-42.2-1). It is understood that the City reserves the right to reject any and all bids and to waive any irregularities and that the prices contained herein will remain valid for a period of not less than forty-five (45)days. I (We)propose to complete the following project as more fully described in the specifications for the following: Bidding Company Name: Lite Construction, Inc Our firm has not altered any of the written texts within this document. Only those areas requiring input by the respondent have been changed or completed. If it is the Contractor's intention to utilize a subcontractor(s) to fulfill the requirements of the Contract, the City must be advised of the subcontractor's company name, address, telephone and fax numbers, and a contact person's name at the time of bid submittal. YES NO Will you be utilizing a subcontractor? X If yes,hive you included all required Information with your bid submittal? X OR NO BID—Keep our company on your Contractors List Signature Date NO BID—Remove our company from Your Contractors List Signature Date EXHIBIT C BID SHEET CONTINUED (Revised 7-26-2019) ITEM PRICING NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL CONCRETESLAB I REMOVAL, 6" SY 252 $ 0,50 $,;?hq . 2 HMA REMOVAL, 5" SY 116 $ PERIMETER EROSION 3 BARRIER LF 95 $ $3ga,Qo 4 INLET PROTECTOR EACH 1 $ .QD $'V. AGGREGATE BASE 5 COURSE,4" SY 303 6 CAST-IN-PLACE CONCRETE LS 1 $ $ ( q J J PRE-ENGINEERED POST 7 FRAME BUILDING SYSTEM LS 1 $%w $ g BOLLARD EACH 6 $ 06 $ , 9 RESTORATION, CA-6, 6" SY 50 $ g�60 $ oy• RESTORATION, HMA, SC, 10 MIX"D", IL9.5,N50, 6" (2 LIFTS) TON 14 $32`•�� $ � NON-SPECIAL,NON- v 11 HAZARDOUS SOIL WASTE TON 25 $ ,10 $a375' DISPOSAL—TYPE 1 12 ALLOWANCE UNIT 10,000 $1.00 $10,000 TOTAL BID (Printe Name of Contractor) S' ature o Autho izedesentative Date BID SHEET CONTINUED The undersigned contractor; A. Certifies that it is not barred from bidding or contracting with the City as a result of a violation of either Paragraph 33E-3 (Bid rigging) or 33E-4 (Bid rotating) of Act 5, Chapter 720 of the Illinois Complied Statutes regarding criminal interference with public contracting, and B. Swears under oath that it is not delinquent in the payment of any tax administered by the Illinois Department of Revenue as required by Chapter 65,Act 5,paragraph 11-42.1 of the r Illinois Complied Statutes, and C. States that is has a written sexual harassment policy as required by the Illinois Human Rights Act(775 ILCS 5/2-105(A) (4) a copy of which shall be provided to the City upon request, and D. Agrees to comply with the requirements of the Illinois Human Rights Act regarding Equal Employment Opportunities as required by Section 2-105 of the Illinois Human Rights Act (775 ILCS 5/2-105)and agrees to comply with the EQUAL EMPLOYMENT OPPORTUNITY CLAUSE in Appendix A, Section 750,Part 750, Chapter X, Subtitle B of Title 44 of the Illinois Administrative Code incorporated herein by reference, and D. Agrees to comply with the civil rights standards set forth in Title VII of the Civil Rights Act as mandated in Executive Order No. 11246,U.S.C.A. Section 2000e n.114 (September 24, 1965), and E. Agrees to comply with the Substance Abuse Prevention on Public Works Projects Act (820 ILCS 265/1 et seq.) if this Project is a "public work" within the meaning of the Illinois Prevailing Wage Act (820 ILCS 130/.01 et seq.) and prohibit substance abuse while performing such work and has a substance abuse prevention program, and F. Agrees to provide a drug free workplace pursuant to the Drug Free Workplace Act (30 ILCS 580/1 et seq.) (25 or more employees under a contract of more than $5,000 or for individuals only when greater than $5,000), and G. Agrees to comply with the Employment of Illinois Workers on Public Works Act (30 ILCS 570/0.01 et seq.) and employ Illinois laborers if at the time of this contract is executed or if during the term of this contract there is excessive unemployment in Illinois as defined in the Act. Lite Construction, Inc 8/2/19 Contractor's Firm Name Date ///- !��: James E Campbell President S' ed Name and Title Print Name and Title 711 S. Lake St. Montgomery IL 60538 Street Address City State Zip 630/896/7220 630/896/1304 Phone Number Fax Number timc@liteconstruction.com Email Address i l DETAIL EXCEPTION SHEET Any exception must be clearly noted on this sheet. Failure to do so may be reason for rejection of the bid. It is not our intention to prohibit any potential bidder from bidding by virtue of the specifications, but to describe the material(s)and service(s)actually required. The City reserves the right to accept or reject any or all exceptions. Bidder's exceptions are: a t_ EQUIPMENT LIST Name Make Model Year. Use If additional sheets are needed, please make copies. SUBCONTRACTOR LISTING Provide the name, contact information, and value of work for each and every subcontractor which will be employed on this project. Subcontractor No. 1 A bunY ' Business Name I I V7 I Address City, S te, Zip Code (.M- S��r Ce I DCS ,&0 Telephone Number Value of Work Subcontracted .4 v (;!�v I I Nature of Work Subcontracted Subcontractor No.2 Business Name Address City, State,Zip Code Telephone Number Value of Work Subcontracted Nature of Work Subcontracted Subcontractor No. 3 Business Name Address City, State,Zip Code Telephone Number Value of Work Subcontracted Nature of Work Subcontracted If additional sheets are needed,please make copies. REFERENCES General Information, the list below current business references for whom you have performed work similar to that required by this proposal. Reference No. 1 � A-3cs Business Name Address City, State,Zip Code Contact Person Telephone Number Dates of Service Reference No. 2 Business Name (-C %M RHO bkUk=-L &574�- Address City, State,Zip Code �(IM- � 13�1 ,512.3 J- 7617 Contact Person Telephone Number Dates of Service Reference No. 3 -�a v t I Busi ss Name 1a Address rty, tate,Zip Code E Contact Person Telephone Number a)]<-. Dates of Service If additional sheets are needed,please make copies. Construction of the Materials Storage Shed ITB — � ' ADDENDUM #1 July 9, 2019 1. IMPORTANT INSTRUCTIONS TO BIDDERS This addendum must be read, signed and dated by the bidder and included with the bid documents submitted by the bidder on or before the bid closing date and time. Failure to include this addendum with the bid documents may result in bid rejection. Bidder will carefully note the inclusion of this addendum on the bid form. 2. ATTACHMENTS TO THIS ADDENDUM: 3. CHANGES: 4. ADDITIONS: 5. DELETIONS: 6. SCHEDULE: a. An optional pre-bid meeting has been scheduled for July 15, 2019 at 2:00 pm at 610 Tower Lane,Yorkville. 7. CLARIFICATIONS: a. Drawings of the building can be found on page 45 of the bid packet. 8. ACKNOWLEDGMENT The Bidder acknowledges receipt of this Addendum and understands its content to the Bid Documents. 9. SIGNATURE AND DATE / 0 Au horized Signature C/l/ Date s r Public Works Materials Storage Shed ITB — ADDENDUM #2 .M July 30, 2019 1. IMPORTANT INSTRUCTIONS TO BIDDERS This addendum must be read, signed and dated by the bidder and included with the bid documents submitted by the bidder on or before the bid closing date and time. Failure to include this addendum with the bid documents may result in bid rejection. Bidder will carefully note the inclusion of this addendum on the bid form. 2. ATTACHMENTS TO THIS ADDENDUM: a. Exhibit A: Clarifications b. Exhibit B: Revised Plans c. Exhibit C: Revised Bid Sheet 3. CHANGES: 4. ADDITIONS: S. DELETIONS: 6. SCHEDULE: 7. CLARIFICATIONS: 8. ACKNOWLEDGMENT The Bidder acknowledges receipt of this Addendum and understands its content to the Bid Documents. 9. SIGNATURE AND DATE c3 Authorized Signature Date BID'BOND TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA Hartford, Connecticut 06183 CONTRACTOR: SURETY: (Name, legal status and address) (Name, legal status and principal place of business) Lite Construction,Inc. Travelers Casualty and Surety Company of America 711 S.Lake Street One Tower Square Montgomery,IL 60538 Hartford,CT 06183 OWNER: (Name, legal status and address) United City of Yorkville 800 Game Farm Road Torkville,IL 60560 BOND AMOUNT: Ten Percent of Accompanying Bid (10%of Bid) PROJECT: Public Works Material Storage Shed (Name, location or address, and Principal number, if any) The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves,their heirs,executors,administrators,successors and assigns,jointly and severally,as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents,or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either(1)enters into a contract with the Owner in accordance with the terms of such bid,and gives such bond or bonds as may be specified in the bidding or Contract Documents,with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof-, or(2)pays to the Owner the difference,not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect.The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid.Waiver of notice by the Surety shall not apply to any extension exceeding sixty(60)days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty(60)days. If this Bond is issued in connection with a subcontractor's bid to a Contractor,the term Contractor in this 1Qmti►h #dA*erred to be %Subcontractor and the term Owner shall be deemed to be Contractor. ,�� lC r/i When this Bond has been furnished to comply with a statutory or other legal requirement in the locatio>t f the Pro ect� prbn in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and pIDr ons to st> statutory or other legal requirement shall be deemed incorporated herein.When so furnished,the inteqJ 61tliat o�d I bei`" construed as a statutory bond and not as a common law bond. Signed and sealed this 2nd day of August 2019 �.�1 0�.F lolk Lite Construction,Inc. ��is •• •x.01.11 1: (P ncipal) tT t I I %%% (Seal) am -"100 (Witness) (Title) Travelers Casualtv and Surety o rica (Sure i ess) (Title)David Kotula, Attorney-k-flct The Company executing this bond vouches that this document conforms to American Institute of Architects Document A310,Z09 Edition Travelers Casualty and Surety Company of America TRAVELERS St. Casualty and Surety Company St Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS:That Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company,and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"),and that the Companies do hereby make,constitute and appoint DAVID KOTULA of CHICAGO Illinois their true and lawful Attomey-in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF,the Companies have caused this instrument to be signed,and their corporate seals to be hereto affixed,this 3rd day of February, 2017. d 1 wwnaio, State of Connecticut By: _ City of Hartford ss. Robert L.Raney,Se or Vice President On this the 3rd day of February,2017,before me personally appeared Robert L Raney,who acknowledged himself to be the Senior Vice President of Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company,and St.Paul Fire and Marine Insurance Company,and that he,as such,being authorized so to do,executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duty authorized officer. In Witness Whereof,I hereunto set my hand and official seal. a My Commission expires the 30th day of June,2021 !nW;A. e. AO"LL* ! —M C.Tetreault,Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company, and St.Paul Fire and Marine Insurance Company,which resolutions are now in full force and effect,reading as follows: RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Companys seal bonds, recognizances,contracts of indemnity,and other writings obligatory in the nature of a bond,recognizance,or conditional undertaking,and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the pourer given him or her,and it is FURTHER RESOLVED,that the Chairman,the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary;and it is FURTHER RESOLVED,that any bond, recognizance,contract of indemnity,or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when(a)signed by the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President, any Second Vice President,the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;or(b)duly executed(under seal,if required)by one or more Attomeys4n-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority;and it is FURTHER RESOLVED,that the signature of each of the following officers:President,any Executive Vice President,any Senior Vice President,any Vice President,any Assistant Vice President,any Secretary,any Assistant Secretary,and the seal of the Company may be affixed by facsimile to any Pourer of Attorney or to any certificate relating thereto appointing Resident Vice Presidents,Resident Assistant Secretaries or Attomeys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof,and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. 1, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company,and St.Paul Fire and Marine Insurance Company,do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by-said Companies,which remains in full force and effect. Dated this 2nd day of August ,2019 aw am Gam' Kevin E.Hughes,Asst tant Secretary To verify the aatrenhW*of tds Power ofAftorney,please ca//to at 1-800-421 3880. Pieria refer to the above-named AM&rmy in-Fact and the details of b*bond to which the power is oft~. Acknowledgement of Corporate Surety STATE OF ILLINOIS ) } SS COUNTY OF WILL ) On this 2nd day of August 2019 , before me personally appeared David A.Kotula ,to me known,who,being by me duly sworn, did depose and say:that _he_resides at Chicago,IL that_he_is/are the Attorney-in-fact of Travelers Casually and Surety Company of America ,the corporation described in and which executed and annexed instrument; that_he_know(s)the corporate seal of said corporation;that the seal affixed to said instrument is such corporate seal;that it was so affixed by the order of the Board of Directors of said corporation;that_he_signed the same name(s)thereto by like order;and that the liabilities of said corporation do not exceed its assets as ascertained in the manner provided by law. F"��OFFICIAL SERI_ BFRANDIEC- TAT IN OF (Notary Public in and for the Above County and State) NOTARY PUBLIC-STATE OF ILLINOIS MY COMMISSION EXPIRES:03/31/22 My Commission Expires 03/31/22 #AIA Document A305 — 1986 ctor`s Quatirication Statement W�Vw ndersigned cetti5es under oath that the information provided herein is true and .v cxently complete%. as not to be misleading. ADDITIONS AND DELETIONS: The author of this document has MrrrE City of Yorkville added Information needed for Its ay also ames Farm Rd Yorkville IL 60560 have evisedtteauthormeorigi u ' RES ' have revised the text tN the Original h, AIA standard form.An AddX=and ^' D#Wbw Repertthat notes added M struction, Inc Information as well as revisions to the standard form text is available Abell from the author and should be i" reviewed.A vertical line in the left t` ake St. Montgomery IL 60538 margin of this document indicates where the author has added • tl , necessary liformation and whore the author has added to or deleted from the original AIA text. This document has Important legal uncoseq n Utz encs.consultation with an ':: = •. ': attorney Is encouraged with respect to its completion or modification. This form is approved and recommended by the American ` Y ` aate�:- Public Works Material Storage Shed lnanwteofArohltects(AIA)andTha Associated General Contractors of orateh Classification of Work): America(AGO)for use in evaluating &V the-qualflic0ons of contractors. No' , X endorsement of the subm� party kp par , � orvedfic allon.of the Information Is matte by AIA or AGC. - Al a 1H. has your organization been in business as a Contractor? 28yrs � . .- Haw your organization been in business under its present business name? 28yrs s tnder what other or former names has your organization operated? N/A §1.3 i f your organization is a corporation,answer the following: §1.3.1 Date of incorporation: 1980 §1.3.2 State of incorporation:Illinois AIA DoeumeM A305T"—1956•Copyright @ 1984,19N,1979 and 1886 by The American Imt hrte of kchkacls.AN tights reserved-WARNiVi This AIA` Do cunt is protected by Us.Copyright Law and 6Kermtiond Treaties.UnautharInd reproduction or distribution of this Al Document or any portion of It may result in Severe civil end orhatnal penaftles,and will be prosecuted to the nWdnum extent peas>bra under the law.This document was produced by AiA software at 14:49:48 on 10/2112009 under ordcu No.1 X175 1 which e)#Ms on 9of7MO9.and la not for reads. (2632444057) User Noma; §1.3.3 President's carne• James E Campbell 1.3.4 Vice-president's name(s) Tim Campbell §1.3.5 Secretatys name: Tammi Campbell 1.3.6 Treasurer's name: Tammi Campbell 1f your organize' is a partnership.answer the following: Date 'on: 'dk whip(if applicable). a general partner(s) k' l vidually owned answer the following: on is other than those listed above,describe it and name the principals: s �} upries in which your organization is legally qualified to do business,and tubers,if applicable. I Contractors Association Yt? on's partnership or trade name is filed. ;r v r es of organization normally performs with its own fomes. . vp yer d saver to any of the questions below is yes,please attach details.) 4 §3 H on ever failed to complete any work awarded to it? any judgments,claims,arbitration proceedings or suits pending or outstanding against tion or its officers? NO Your organization filed any law suits or requested arbitration with regard to construction " r tracts within the last five years? �.t �.:. ... NO §3.3 Within the lest five years,has any officer or principal of your organization ever been an offcrz or principal of another organization when it failed to complete a construction contract? (If the answer is yes,please attach detailsNO AIA D000mant AMIX—1tJ88.Copyright O 1MX.19%.1979 and 1986 by The American Instlhas of Archunts. Aa hta►starved.W • Document Is protected by U.B.Copyright tart and Internaftnm•rr�as,Unauthorlmd a ARNMG.TMs Ale portion of 1t,may result 1n were"and QrI0/hral Penaltlet.and MAN be proaacmad to�or of this AIA Document,or any 2 was Produced by AIA software at 14:43:48 at 1021!2006 under No.tooasm7a 1 whk tr possible Under the Jar.This deattm User Notes: 91ph a on 101712009,and Is not for ruin. nt (2632444087) separate h}teet,list major construction projects your organization has in progress,91"bg the name of er,atchitea contract amount;percent complete and scheduled completion date. See Attached : §3 :f State w vs mm of workin progress mcd under contract; 4 Million ti ont theiriajorprojects your organization has completedin the pastfiveyears,gcvang she _e of et,contract amount,date of completion and percentageof the cost of the-work fo es. - - -' see Attached t .5 •uuai amount of construction wcffkpezformed dating the pastfive years;'. 9 Million construction expedatceand presentcomsnitments ofthekey nd vidnals of your tc p; checl - H r . arrts rah Watson 630-420 3553 Call Sarah for info dei Jason Penman 630-466-4841 call Jason for info - amu of. ,�ttal ety company of America 2 hu' :��, .apeiv ile It_60563 Nam_ of agent; - 4 _ Kotula Group 220 N.Green St.Chicago IC 60607 § 1=IAtAN�._ . Finan;i.�i Attach a financial statement,pr audited,including your organization's latest balance shee §� t � eferablY- e statement sbc)w ng the folioW ngitems: See Attached ntAssets(e.g.,cash,joiutventuce accoutrts,aecounts•receitra6le,notesseceivable,acetued me,deposits,materaals inventory and prepaid expenses) = jgeiFixedAssets; Other Assets, lnshwtp-of n 0a9olghtG964. and1leho tribution of1V Ale DOCOMOnt,ornny AtAUonumen1A35j� Cp 1sttnsttoaatsUnaaedCep odcoodit s14%This en i Documenttsproectbl � s -toss orionofIt, 'may retrtsevere cv1landcno , P0 , dlsuoresat' pa soit012eunda oltep (psmit4o67) Ilse Notes: CDtret URb2ilities(e g.,accounts payable,notes payable,accrued expenses,provision for income taxes,advances,accrued salaries and accruedpayroll takes);. i 0titer•11*11iGes(P-9.,capital,capital stock,authorised and outstanding shazeiprarvalnes,earned g surplus and retained earnings). 5.1.2 Name and address of firmpreparing attached fnairM statement,and date thereat- Weber& crates 630-897-4500 31,- Lak urora IL 60506 s t3te'attao ed financial statement for theidantical Qrgar izationnanted on page one? a heseladonship and Financial responsibility of dmorgaW=don vthose fimaucial t sled(e g.,parent4ubsidiary). o ose{iinancialstatementisattached act e.sguaratitorofthe contractforconstrito1614 CONS �`V L, YkN: SRA n 'ted atSrfln`s Aug. 2019 _ f Lite nstructon,Inc. %,trf� .• ra•ent �� l 1111 t t .qr - orn de— " i� ys that the information provided herein is tnte and sufficiently complete so g_ scribed an me da of 4 1 g Official Seal Brittani Hall otarr ary State of Illinois r Y Commission Expires 07/27/2022 o". 'scion 7/27/22 .x AIAliocurnentA3olSTg-99es.copyrlght 09964,'1969,7978andis86byTheAmericantiisUWteclAuhtects.Allrlghlaressivada WAANIUMTh1sAU4 Document Is protected by U.5.Copyright Lawand tnternallonal Ttrealies.Unauthorized repradudton or dlsidburkm of this AIA Documon4 otagy portion of it,may result insevere clylland criminal psnelties,and will be prosecuted Who Wodmuas extent posslbieunder thelaW.7th document vrasproduced byAtA solbyare atid:43:48 on 10/gt/2oDB undero(derNo.90oo3Be175 i:vthich expires on7o/l/2M,andis nattorresala, User Notes: 126324490871 Job Reference List Name East Aurora High School Phase 6 Year Construction 4/2018-9/2018 Cost 2,487,881.00 Owner East Aurora CUSD#131 Location 417 Fifth St.Aurora IL 60505 Owner's Contact Ken Waltz-630-299-5550' Architect Cordogan Clark Architects-Mark Spangler 630-746=7210 Name St.Charles Secure Bldg.Entrances Year Construction 6/2018-9/2018 Cost 762,612.00 Owner Community unit School District 303 Location 201 S.7th St.St.Charles IL 60174 Owner's Contact John Baird-630-957-8434 Architect ATS&R-Mark Hayes-612-599-8517 Name East Aurora HS Phase 2&5 Year Construction 10/2016-8/2017 Cost 8,532,417.00 Owner East Aurora CUSD#131 Location 417 Fifth St.Aurora IL 60505 Owner's Contact Ken Waltz-630-299-5550 Architect Cordogan Clark Architects_Mark Spangler 630-746-7210 Name West Aurora Schools Additions/Geo-Installation Year Construction 1/2016-11/2016 Cost 7,875,862.00 Owner West Aurora School District 129 Location 1877 Downer Place Aurora IL 60506 Owner's Contact Pat Dacy 630-301-5022 Architect StudioGC Architect-Craig M.847-952-3404 Name Will State's Attorney Phase 2 Year Construction 2/2016-10/2016 Cost 1,571,981.00 Owner Will County Location 158 N.Scott St.Joliet IL 60432 Owner's Contact Mike Miglorini 815-740-4715 Architect Andrew R Partak Architect 815-478-.5604 Name Fox Metro Water Bldg.J&P-1 Year Construction 11/2015-5/2016 Cost 1,459,739.00 Owner Fox Metro Water Reclamation District Location 682 Rt.31 Oswego IL 60543 Owner's Contact Neal 630-892-4378 Architect Walter E Deuchler Assoc. Lee M. 630-897-4651 Name Naperville Science/Jefferson School Reno. Year Construction 4/2015-8/2015 Cost 1,366,661.00 Owner Naperville CUSD 203 Location Naperville Illinois Owner's Contact Steve Mathis 630-240-6300 Architect Wight&Company Jim Smiley 630-739-6977 Name West Chicago High School Year Construction 3/2015-9/2015 Cost 1,912,900.00 Owner Community Unit School District 94 Location West Chicago Owner's Contact Gordon Cole 630-876-6333 Architect DLA Architects William 847-742-4063 Name Yorkville High School Additions Year Construction 7/2013-9/2015 Cost 9,700,800.00 Owner Yorkville CUSD 115 Location Yorkville Illinois Owner's Contact Brian DeBolt 630-878-1262 Architect Concept 3-Andrew 630-833-6090 Name Will County Recorders&Coroners Office Reno. Year Construction 9/2014-12/2014 Cost 1,369,343.00 Owner Will County Recorders&Coroners Office Reno. Location Joilet Illinois Owner's Contact Mike Miglorioni 815-405-0395 Architect Cordogan Clark Assoc. Rick 630-896-4678 Name Oswego High School Additions Year Construction 3/2012-8/2013 Cost 7,530,853.00 Owner Oswego CUSD 308 Location Oswego Illinois Owner's Contact Pat Dacy 630-327-1814 Architect Kluber Inc Clayton 630.406-1213 Name Fred Rodgers Magnet Academy Year Construction 10/2012-7/2013 Cost 2,436,824.00 Owner East Aurora School District 131 Location Aurora IL Owner's Contact Marty Feltes 630-554-9683 Architect Cordogan Clark Chuck 630-896-4678