The meeting was called to order at 6:00pm by Committee Chairman Russ Walter and roll was called.
Roll Call: Russ Walter-present, Darren Crawford-present, Ryan Forristall-present
Others Present:
Library Director Elisa Topper
Recognition of Visitors: none
Public Comment: None
Chairman Walter added another item to the agenda which was to repair the bottom of the flagpole and
lights. Ms. Topper commented that it had been examined and she will follow-up with the city.
Old Business:
RJ O'Neil References/Maintenance Contract
Ms. Topper was able to neogitate a lower rate of $125 per hour and water heater maintenance was also
added to the agreement. One reference was obtained and O'Neil forwarded recommendations from the
Aurora and DeKalb libraries. Having one company do all maintenance is important to predict
equipment lifespans and to avoid having to pay for high-cost repairs, said Mr. Forristall. The
committee recommended a 1-year contract with RJ O'Neil for now.
Digital Sign Electrical Work
There is an issue with lack of electrical power for the new digital sign. When Game Farm Rd. was
redone, the library was asked to change the driveway location. There was a buried cable beneath the
drive which may have been damaged thus causing the current lack of power. A company familiar with
Aurora Sign will provide a repair quote. The committee discussed the outside lights being on a timer,
the shifting of the driveway when road repairs were done, the circuits and whether the sign and parking
lot lights are controlled by a timer. Ms. Topper will email Mr. Dhuse and copy the committee and this
issue may need to be discussed at a future meeting.
Painting/Siding Repairs
There is paint left over for the small area in need of repainting. Repairs are also needed on the siding
on the front of the building where water has seeped in most likely due to gutter issues. The Sherwin
Williams paint is guaranteed for 25 years and a warranty should have been provided at the job
conclusion. Ms. Topper will contact the painter and also obtain quotes for snow bars. The snow
triangles pulled paint off causing rust and they need to be removed and another remedy is needed over
the front door. Mr. Walter said the roof work could be done when snow bars are installed, but the other
repair work should move forward.
The committee discussed purchasing magnetic screens to prevent cottonwood seeds from clogging the
chiller which would save $900 per year in cleaning. There is a one-week turnaround time.
Page 2 of 2
Removal of Trees
Removal of the trees along Game Farm Rd. was discussed since they contribute to clogging the gutters
and chiller and cause mold to grow on the side of the building. The cost would be about $1,000 per
tree. Trimming those trees is another option. Removal of the small pines and shrubs near the air
conditioner was also suggested. Gutter covers/screens would also help. Ice builds up near the book
drop due to plugged gutters, thereby causing hazards for patrons and there are a couple leaks over the
main door. The committee will recommend to the Board that the 3 trees and nearby shrubs be
removed and the brick cleaned. The large trees should be trimmed from the bottom instead of being
removed. Snow bars were also discussed and gutter covers can be ordered upon Board approval.
Ms. Topper also noted that football players from the high school recently spread mulch and she credited
the Parks Department and football coach for coordinating.
Snow Removal/Sidewalks
Ms. Topper said the staff has done snow removal in the past, especially on Sunday. She spoke with
Bart Olson who said the city is considering a contract for snow removal for the downtown and would
include the library, however, it is tabled now. Ms. Topper said perhaps the library should hire its own
snow removal similar to the Beecher Center. Mr. Crawford asked if it could be a conflict with the city
or a possible liability. Mr. Crawford suggested getting competitive quotes. For liability reasons,
Director Topper will ask Mr. Olson if an independent person/firm can do library plowing.
Ms. Topper noted she is electronically sending the agenda packets to the library liaison.
Adjournment:
There was no further business and the meeting adjourned at 6:53pm