Loading...
Public Works Packet 2020 01-21-20 AGENDA PUBLIC WORKS COMMITTEE MEETING Tuesday, January 21, 2020 6:00 p.m. City Hall Conference Room 800 Game Farm Road, Yorkville, IL Citizen Comments: Minutes for Correction/Approval: November 19, 2019 New Business: 1. PW 2020-01 Snow Operations Report 2. PW 2020-02 Water Department Reports for October, November, and December 2019 3. PW 2020-03 Capital Improvement Projects Update 4. PW 2020-04 Quarterly Bond and Letter of Credit Reduction Summary 5. PW 2020-05 2019 Road to Better Roads Program – Request for Change in Plans and Engineer’s Final Payment Estimate 6. PW 2020-06 MFT Resolution for 2020 Road to Better Roads Program 7. PW 2020-07 Raintree Village – Stop Sign – Bluebird Lane at Prairie Crossing Drive 8. PW 2020-08 Purchase of Two Truck Dump Bodies and Salt Spreaders 9. PW 2020-09 Oxcart Truck Permitting System and Overweight Permitting Fees Discussion Old Business: Additional Business: 2019/2020 City Council Goals – Public Works Committee Goal Priority Staff “Municipal Building Needs & Planning” 2 Bart Olson, Rob Fredrickson, Eric Dhuse, James Jensen, Tim Evans & Erin Willrett “Road to Better Roads Funding” 3 Bart Olson, Rob Fredrickson & Eric Dhuse “Water Planning” 6 Eric Dhuse & Brad Sanderson “School Safety (Exterior & Traffic)” 8 (tie) Eric Dhuse & James Jensen “Quiet Zones” 14 (tie) Eric Dhuse, Erin Willrett & Brad Sanderson “Route 47 Crossings” 19 Eric Dhuse & Brad Sanderson United City of Yorkville 800 Game Farm Road Yorkville, Illinois 60560 Telephone: 630-553-4350 www.yorkville.il.us UNITED CITY OF YORKVILLE WORKSHEET PUBLIC WORKS COMMITTEE Tuesday, January 21, 2020 6:00 PM CITY HALL CONFERENCE ROOM --------------------------------------------------------------------------------------------------------------------------------------- CITIZEN COMMENTS: --------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------- MINUTES FOR CORRECTION/APPROVAL: --------------------------------------------------------------------------------------------------------------------------------------- 1. November 19, 2019 □ Approved __________ □ As presented □ With corrections --------------------------------------------------------------------------------------------------------------------------------------- NEW BUSINESS: --------------------------------------------------------------------------------------------------------------------------------------- 1. PW 2020-01 Snow Operations Report □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 2. PW 2020-02 Water Department Reports for October, November, and December 2019 □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 3. PW 2020-03 Capital Improvement Projects Update □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 4. PW 2020-04 Quarterly Bond and Letter of Credit Reduction Summary □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 5. PW 2020-05 2019 Road to Better Roads Program – Request for Change in Plans and Engineer’s Final Payment Estimate □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 6. PW 2020-06 MFT Resolution for 2020 Road to Better Roads Program □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 7. PW 2020-07 Raintree Village – Stop Sign – Bluebird Lane at Prairie Crossing Drive □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 8. PW 2020-08 Purchase of Two Truck Dump Bodies and Salt Spreaders □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 9. PW 2020-09 Oxcart Truck Permitting System and Overweight Permitting Fees Discussion □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- ADDITIONAL BUSINESS: --------------------------------------------------------------------------------------------------------------------------------------- Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Human Resources Community Development Police Public Works Parks and Recreation Agenda Item Number Minutes Tracking Number Minutes of the Public Works Committee – November 19, 2019 Public Works Committee – January 21, 2020 Majority Committee Approval Minute Taker Name Department Page 1 of 2 DRAFT UNITED CITY OF YORKVILLE PUBLIC WORKS COMMITTEE Tuesday, November 19, 2019, 6:00pm Yorkville City Hall, Conference Room 800 Game Farm Road IN ATTENDANCE: Committee Members Vice-Chairman Ken Koch Alderman Seaver Tarulis Alderman Chris Funkhouser Alderman Joe Plocher Other City Officials Assistant City Administrator Erin Willrett Public Works Director Eric Dhuse Engineer Brad Sanderson, EEI Other Guests: Katie Finlon, Kendall County Record The meeting was called to order at 6:00pm by Chairman Joe Plocher. Citizen Comments: None Minutes for Correction/Approval: October 15, 2019 The minutes were approved as presented. New Business: 1. PW 2019-71 Snow Operations Report Mr. Dhuse said 60 tons of salt were used already since the early snow and that pure salt is being used since the brineholders are not installed in all the trucks yet. He said some trucks are still equipped for leaf hauling. 2. PW 2019-72 East Orange Street Water Main Improvements – Change Order No. 1 Mr. Sanderson said this project is nearly complete with just two punchlist/restoration items to finish in the spring. This is a balancing change order and he added that some additional pavement work had been authorized by the City without a formal change order. This is an increase of $55,020.42, however, less than the amount authorized by the Council. The committee was OK with this action and it moves forward to City Council. Page 2 of 2 3. PW 2019-73 Purchase of New Truck This is a budgeted truck purchase for the Sewer Department and the truck is already outfitted with tools. The previous utility truck was given to the Water Department. The Committee approved this purchase. 4. PW 2019-74 Raintree Village Subdivision Units 4, 5, and 6 – Stop Sign Analysis Since some construction has resumed here, Mr. Sanderson said the engineers looked at the need for stop signs and made some recommendations based on standard criteria. Some signs had also been proposed in the original plans. Old Business: None Additional Business: Ms. Willrett added that the Kendall County TAP grant will be available again and applications are due in December. This discussion will be brought back to the December Public Works meeting. There was no further business and the meeting was adjourned at 6:08pm. Minutes respectfully transcribed by Marlys Young, Minute Taker Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Human Resources Community Development Police Public Works Parks and Recreation Agenda Item Number New Business #1 Tracking Number PW 2020-01 December and January Snow report Public Works Committee – January 21, 2020 None, informational item None Update on salting and plowing for December 2019 and January 2020 Eric Dhuse Public Works Name Department Summary Below are the salt and brine usage data tables for the months of December 2019, and January 2020 as completed on January 13, 2020. Background At this time, we have been fortunate that we have had relatively small events that we have been able to take care of with a plowing pass in each direction and salting. We are very thankful for this and hope that this trend continues. With the weather conditions, we were only able to perform anti-icing operations for one event. During this time, we brined approximately 126 lane miles of roadway with 4800 gallons of brine for an average of 38 gal/mile. Now that we have had time to go through the trucks and get them ready for winter, we have had relatively good luck. Truck 9 was down for two weeks with a radiator leak, and truck 11 was down this last event due to a blown brine pump. Both trucks were up and running for our last event we had on January 11th. We are still working with a Sourcewell vendor to try and get two dump bodies replaced along with the salt spreaders and hydraulic system that are needed to power them. With these upgrades, we are switching to hydraulic brine pumps that will give us the capabilities to increase our brine rates if necessary. Recommendation I would ask that this be placed on the January 21, 2020 public works committee agenda as an informational item for discussion. Memorandum To: Public Works Committee From: Eric Dhuse, Director of Public Works CC: Bart Olson, Administrator Date: January 6, 2020 Subject: Snow Report 12/12/2019 12/13/2019 Recorder ED Total Miles Average Lbs of Tons of Lbs of Gallons of Gal Brine/ Salt Brine  Route Truck ID Driven MPH Salt Used Salt Used Salt/Mi. Brine Used Ton Salt Miles Miles 1 9 0 0.00 0 0.00 0 0.00 0.00 2 27 257 8.20 39960 19.98 326 0 0.00 122.50 0.00 3 4 13 43 6.90 10136 5.07 331 33 53.00 30.60 53.00 5 23 36 4.80 9588 4.79 369 112 113.00 28.60 113.00 6 10 38 5.30 10542 5.27 258 0 0.00 34.50 0.00 7 28 54 8.00 8918 4.46 310 41 18.50 28.80 74.00 8 22 0 0.00 0 0.00 110 24.60 0.00 109.00 9 11 44 13.90 10435 5.22 307 147 0.00 34.00 0.00 471 5.89 89579 45 316.85 443 29.87 279 349 Avg. Avg. Avg. Out with Mechanical Problems 12/16/2019 12/17/2019 Recorder ED Total Miles Average Lbs of Tons of Lbs of Gallons of Gal Brine/ Salt Brine  Route Truck ID Driven MPH Salt Used Salt Used Salt/Mi. Brine Used Ton Salt Miles Miles 1 9 0 0.00 0 0.00 0 0.00 0.00 2 27 45 11.30 15227 7.61 485 164 21.54 31.40 0.00 3 4 13 50 11.20 16107 8.05 496 33 4.10 32.50 0.00 5 23 53 11.80 17322 8.66 399 112 12.93 35.20 0.00 6 10 36 11.00 14057 7.03 273 0 0.00 28.10 0.00 7 28 48 5.80 7671 3.84 335 41 10.69 26.80 0.00 8 22 46 4.80 8968 4.48 660 110 24.53 24.90 0.00 9 11 44 4.80 16441 8.22 501 147 17.88 32.80 0.00 321 7.59 95793 48 449.86 607 13.10 212 0 Avg. Avg. Avg. Out with Mechanical Problems Snow Event Date Date of Recording No Data Available.  Route driven by small trucks with no recording capabilities. EVENT TOTALS Snow Operations Salt and Brine Data 2019‐2020 Snow Event Date Date of Recording No Data Available.  Route driven by small trucks with no recording capabilities. EVENT TOTALS Snow Operations Salt and Brine Data 2019‐2020 12/31/2019 1/2/2020 Recorder ED Total Miles Average Lbs of Tons of Lbs of Gallons of Gal Brine/ Salt Brine  Route Truck ID Driven MPH Salt Used Salt Used Salt/Mi. Brine Used Ton Salt Miles Miles 1 9 187 11.20 18477 9.24 279 110 11.91 66.30 57.50 2 27 37 13.70 12268 6.13 433 101 16.47 28.30 28.30 3 4 13 50 10.00 13701 6.85 399 73 10.66 34.30 34.30 5 23 66 14.50 12813 6.41 347 75 11.71 32.70 30.90 6 10 30 11.20 11344 5.67 707 47 8.29 27.70 26.80 7 28 107 13.20 19573 9.79 210 34 3.47 64.70 48.50 8 22 187 11.80 13559 6.78 249 122 18.00 60.00 28.30 9 11 105 10.00 14916 7.46 298 31 4.16 50.00 24.50 769 11.95 116651 58 365.20 593 10.58 364 279 Avg. Avg. Avg. Out with Mechanical Problems ** #22 Anti ice operations 12/30.  Brined 126 lane miles with 4800 gallons = 38.1 gal/mi.   1/4/2020 1/6/2020 Recorder ED Total Miles Average Lbs of Tons of Lbs of Gallons of Gal Brine/ Salt Brine  Route Truck ID Driven MPH Salt Used Salt Used Salt/Mi. Brine Used Ton Salt Miles Miles 1 9 45 5.50 10072 5.04 403 42 8.34 25.00 25.00 2 27 43 16.00 12314 6.16 410 154 25.01 30.00 30.00 3 4 13 43 16.00 14297 7.15 397 101 14.13 36.00 36.00 5 23 45 19.00 10954 5.48 319 119 21.73 29.00 29.00 6 10 32 16.00 9239 4.62 477 48 10.39 23.00 23.00 7 28 40 16.00 10962 5.48 333 72 13.14 29.00 29.00 8 22 46 18.00 9643 4.82 0 115 23.85 24.00 24.00 9 11 0 0.00 0 0.00 0 0.00 0.00 294 13.31 77481 39 334.03 651 16.66 196 196 Avg. Avg. Avg. Out with Mechanical Problems Snow Operations Salt and Brine Data 2019‐2020 Snow Event Date Date of Recording No Data Available.  Route driven by small trucks with no recording capabilities. EVENT TOTALS Snow Operations Salt and Brine Data 2019‐2020 Snow Event Date Date of Recording No Data Available.  Route driven by small trucks with no recording capabilities. EVENT TOTALS 1/11/2020 1/13/2020 Recorder ED Total Miles Average Lbs of Tons of Lbs of Gallons of Gal Brine/ Salt Brine  Route Truck ID Driven MPH Salt Used Salt Used Salt/Mi. Brine Used Ton Salt Miles Miles 1 9 82 10.70 20925 10.46 450 82 7.84 46.50 23.00 2 27 78 16.60 26066 13.03 457 124 9.51 57.00 32.00 3 3, 14 30.00 12.00 8000.00 4.00 400 0.00 0.00 20.00 0.00 4 13 89 18.30 27124 13.56 445 25 1.84 61.00 32.00 5 23 82 12.00 25789 12.89 437 140 10.86 59.00 59.00 6 10 64 13.00 26429 13.21 448 61 4.62 59.00 30.00 7 28 61 15.00 13030 6.52 420 32 4.91 31.00 16.00 8 22 83 14.00 18498 9.25 430 110 11.89 43.00 23.00 9 11 79 14.00 23980 11.99 452 125 10.43 53.00 26.00 618 14.20 181841 91 442.50 699 7.74 410 241 Avg. Avg. Avg. Out with Mechanical Problems Date of Recording EVENT TOTALS Snow Operations Salt and Brine Data 2019‐2020 Snow Event Date Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Human Resources Community Development Police Public Works Parks and Recreation Agenda Item Number New Business #2 Tracking Number PW 2020-02 Water Department Reports for October, November, and December 2019 Public Works Committee – January 21, 2020 Positive Approval Required monthly water reports Eric Dhuse Public Works Name Department United City of Yorkville WATER DEPARTMENT REPORT __ October 2019 _ MONTH / YEAR WELLS NO WELL DEPTH (FEET) PUMP DEPTH (FEET) WATER ABOVE PUMP (FEET) THIS MONTH’S PUMPAGE (GALLONS) 4 1386 664 384 18,033,000 7 1527 1125 430 7,686,000 8 1384 840 456 1,140,000 9 1368 861 509 23,987,000 TOTAL TREATED 50,846,000 CURRENT MONTH’S PUMPAGE IS 4,356,000 GALLONS LESS THAN LAST MONTH _ _3,493,000 _ GALLONS MORE THAN LAST YEAR DAILY AVERAGE PUMPED: _ 1,640,194___GALLONS DAILY MAXIMUM PUMPED: __ 2,070,000__ GALLONS DAILY AVERAGE PER CAPITA USE: ___ 77.69 __ GALLONS WATER TREATMENT: CHLORINE: 1,262 LBS. FED CALCULATED CONCENTRATION: ___3.31__ MG/L FLUORIDE: _ 105 LBS. FED MEASURED CONCENTRATION: _____.78 __ MG/L POLYPHOSPHATE: 1,155_LBS. FED CALCULATED CONCENTRATION: ___1.06___ MG/L WATER QUALITY: BACTERIOLOGICAL SAMPLES ANALYZED BY ILLINOIS ENVIRONMENTAL PROTECTION AGENCY: __23 SATISFACTORY _____ UNSATISFACTORY (EXPLAIN) ___________________________________________________________________________________________ FLOURIDE: __ 13 __ SAMPLE(S) TAKEN CONCENTRATION: _ 0.78 MG/L MAINTENANCE: NUMBER OF METERS REPLACED: __6 NUMBER OF LEAKS OR BREAKS REPAIRED: __ 1___ MXU’S: __9 BATTERIES REPLACED: _ NEW CUSTOMERS: RESIDENTIAL: __21 COMMERCIAL: ____1 _ _ INDUSTRIAL/GOVERNMENTAL: ___ ___ COMMENTS: United City of Yorkville WATER DEPARTMENT REPORT __ November 2019 _ MONTH / YEAR WELLS NO WELL DEPTH (FEET) PUMP DEPTH (FEET) WATER ABOVE PUMP (FEET) THIS MONTH’S PUMPAGE (GALLONS) 4 1386 664 384 11,696,000 7 1527 1125 430 7,558,000 8 1384 840 456 10,317,000 9 1368 861 509 14,662,000 TOTAL TREATED 44,233,100 CURRENT MONTH’S PUMPAGE IS 6,612,900 GALLONS LESS THAN LAST MONTH _ _735,000 _ GALLONS MORE THAN LAST YEAR DAILY AVERAGE PUMPED: _ 1,474,437___GALLONS DAILY MAXIMUM PUMPED: __ 1,859,000__ GALLONS DAILY AVERAGE PER CAPITA USE: ___ 71.37 __ GALLONS WATER TREATMENT: CHLORINE: 1,078 LBS. FED CALCULATED CONCENTRATION: ___3.18__ MG/L FLUORIDE: _ 55 LBS. FED MEASURED CONCENTRATION: _____.82 __ MG/L POLYPHOSPHATE: 1203_ LBS. FED CALCULATED CONCENTRATION: ___1.06___ MG/L WATER QUALITY: BACTERIOLOGICAL SAMPLES ANALYZED BY ILLINOIS ENVIRONMENTAL PROTECTION AGENCY: __23 SATISFACTORY _____ UNSATISFACTORY (EXPLAIN) ___________________________________________________________________________________________ FLOURIDE: __ 4 __ SAMPLE(S) TAKEN CONCENTRATION: _ 0.78 MG/L MAINTENANCE: NUMBER OF METERS REPLACED: __5 NUMBER OF LEAKS OR BREAKS REPAIRED: __ 1___ MXU’S: __3 BATTERIES REPLACED: _ NEW CUSTOMERS: RESIDENTIAL: __19 COMMERCIAL: ____ _ _ INDUSTRIAL/GOVERNMENTAL: ___ ___ COMMENTS: United City of Yorkville WATER DEPARTMENT REPORT __ December 2019 _ MONTH / YEAR WELLS NO WELL DEPTH (FEET) PUMP DEPTH (FEET) WATER ABOVE PUMP (FEET) THIS MONTH’S PUMPAGE (GALLONS) 4 1386 664 384 10,067,000 7 1527 1125 430 7,673,400 8 1384 840 456 14,270,000 9 1368 861 509 12,978,000 TOTAL TREATED 44,988,400 CURRENT MONTH’S PUMPAGE IS 755,300 GALLONS MORE THAN LAST MONTH _ _705,600 _ GALLONS LESS THAN LAST YEAR DAILY AVERAGE PUMPED: _ 1,451,239___GALLONS DAILY MAXIMUM PUMPED: __ 2,001,000__ GALLONS DAILY AVERAGE PER CAPITA USE: ___ 69.07 __ GALLONS WATER TREATMENT: CHLORINE: 1,117 LBS. FED CALCULATED CONCENTRATION: ___3.29__ MG/L FLUORIDE: _ 0 LBS. FED MEASURED CONCENTRATION: _____.81 __ MG/L POLYPHOSPHATE: 1063_ LBS. FED CALCULATED CONCENTRATION: ___1.10___ MG/L WATER QUALITY: BACTERIOLOGICAL SAMPLES ANALYZED BY ILLINOIS ENVIRONMENTAL PROTECTION AGENCY: __23 SATISFACTORY _____ UNSATISFACTORY (EXPLAIN) ___________________________________________________________________________________________ FLOURIDE: __ 3 __ SAMPLE(S) TAKEN CONCENTRATION: _ 0.81 MG/L MAINTENANCE: NUMBER OF METERS REPLACED: __1 NUMBER OF LEAKS OR BREAKS REPAIRED: __ ___ MXU’S: __5 BATTERIES REPLACED: _ NEW CUSTOMERS: RESIDENTIAL: __17 COMMERCIAL: ____ _ _ INDUSTRIAL/GOVERNMENTAL: ___ ___ COMMENTS: Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Human Resources Community Development Police Public Works Agenda Item Number New Business #3 Tracking Number PW 2020-03 Capital Project Update Public Works Committee – January 21, 2020 None Status Update Brad Sanderson Engineering Name Department The purpose of this memo is to update the Public Works Committee as to the status of the several projects. A summary on the status of the projects is provided below: Construction Projects 2019 RTBR The project is substantially complete. The contractor will be completing the remaining punchlist items. Rt 71 Water main and Sanitary Sewer Relocation The water main and sanitary sewer are fully complete. East Orange Street Water Main Improvements The project is substantially complete. The contractor will be completing the remaining punchlist items in the spring. Church Street Sanitary Sewer Improvements The project is fully complete. Planning/Design Projects Mill Road Reconstruction Final design is approximately 95% complete. ROW acquisition is complete. Comed will begin relocating power poles in January. A draft railroad agreement has been provided to City Staff. Funding is pending the developer. 2020 RTBR Design Engineering has begun. We are anticipating a March 2020 letting. Elizabeth Street Water Main Replacement Design Engineering has begun. We are anticipating a March 2020 letting. Well No. 7 Generator Design Engineering has begun. We are anticipating receiving the IEPA Construction Permit in January 2020, with letting shortly thereafter. Water Treatment Plans 8/9 Media Replacement Design Engineering has begun. We are anticipating a January 2020 letting. Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Krysti Barksdale-Noble, Community Dev. Dir. Lisa Pickering, City Clerk Date: December 20, 2019 Subject: Capital Improvement Projects Update Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Human Resources Community Development Police Public Works Parks and Recreation Agenda Item Number New Business #4 Tracking Number PW 2020-04 Bond/LOC Reduction Summary – December 31, 2019 Public Works Committee – January 21, 2020 Informational Informational Brad Sanderson Engineering Name Department Please see the attached reduction summary through December 31, 2019. If you have any questions, please let me know. Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Krysti Barksdale-Noble, Community Dev. Dir. Lisa Pickering, City Clerk Date: December 31, 2019 Subject: 2019 Bond/LOC Reduction Summary – To Date 31-Dec-19 2019 Bond and Letter of Credit Reduction Report Date Development/Project Engineer Concurrence City Administrator Concurrence Mayor Concurrence Reduction Final Release Reduction Value Remaining Balance 2/26/2019 Windett Ridge - Unit 1 X X X 66,478.00$ -$ 3/7/2019 Kendall Marketplace - Residential X X X 267,271.60$ 115,980.40$ 3/28/2019 Heartland Meadows X X X 71,711.75$ 326,754.00$ 6/19/2019 Blackberry Woods - Phase B (#159)X X X 111,159.84$ -$ 6/19/2019 Blackberry Woods - Phase B (#222)X X X 159,993.38$ -$ 7/23/2019 Cedarhurst X X X 199,418.00$ 3,778.00$ 8/20/2019 Casey's X X X 7,603.80$ -$ 8/27/2019 Grande Reserve Unit 2 X X X 124,225.41$ -$ 8/27/2019 Grande Reserve Unit 5 X X X 109,456.65$ -$ 9/17/2019 Restore Church X X X X 26,572.00$ -$ 9/17/2019 Restore Church X X X 133,308.00$ 25,200.00$ 11/4/2019 Raging Waves X X X 12,645.00$ -$ 11/4/2019 Raging Waves X X X 21,510.00$ -$ 12/18/2019 Pt of Lot 4 - Kendall Crossing (Hacienda Real)X X X 4,296.00$ -$ Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Human Resources Community Development Police Public Works Parks and Recreation Agenda Item Number New Business #5 Tracking Number PW 2020-05 2019 Road to Better Roads Program Public Works Committee – January 21, 2020 Majority Recommendation to Approve Request for Change in Plans And Final Payment Estimate Brad Sanderson Engineering Name Department Approval of Request for Change in Plans and Final Payment Estimate The 2019 Roads to Better Roads Program was awarded to D Construction Co., 1488 S. Broadway Street, Coal City, IL 60416 at total awarded value of $624,997.07. The project is now complete and accepted. The project came in $71,517.33 under budget for a Final Construction Cost of $553,479.75. Due to the use of Motor Fuel Tax Funds, the Request for Change in Plans and Engineer’s Final Payment Estimate need to be approved by IDOT before final payment can be made. We recommend City Approval of the Request for Change in Plans and Engineer’s Final Payment Estimate. If you have any questions or require additional information, please let us know. Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Krysti Barksdale-Noble, Community Dev. Dir. Lisa Pickering, City Clerk Date: December 20, 2019 Subject: 2019 Roads to Better Roads Program UNITED CITY OF YORKVILLE 2019 MFT (ROADS TO BETTER ROADS PROGRAM) SECTION 19-00000-00-GM BLR 13210 SUPPLEMENT EXPLANATION OF PAY ITEM CHANGES IN EXCESS OF $10,000 PAGE 1 OF 2 LEVELING BINDER (MACHINE METHOD), N50 388.80 TON DEDUCTION AT $63.00/TON = $24,494.40 This item was decreased due to level binder on McHugh Road being removed from the scope of the project. This change reflects actual delivered tonnages. HOT MIX ASPHALT SURFACE COURSE MIX “D”, N50 305.30 TON ADDITIONAL AT $63.00/TON = $19,233.90 Several streets included in the project called for a variable depth HMA Surface Removal for 1.5-inch to 2.5-inch. While doing the removal, the existing pavement was found to be +/-3” thick. The existing 1/2” was in poor condition and was not stable enough to support construction traffic or provide a stable base for subsequent paving operations. Additional existing HMA was removed which led to an increase in the amount of HMA surface course delivered to the project. This change reflects actual delivered tonnages. CLASS D PATCHES, TYPE I, 2-INCH 868.10 SQ YD DEDUCTION AT $25.00/SQ YD = $21,702.50 The patching required was less than originally planned. CLASS D PATCHES, TYPE II, 2-INCH 774.70 SQ YD DEDUCTION AT $23.00/SQ YD = $17,818.10 The patching required was less than originally planned. CLASS D PATCHES, TYPE III, 2-INCH 823.80 SQ YD DEDUCTION AT $22.00/SQ YD = $18,123.60 The patching required was less than originally planned. CLASS D PATCHES, TYPE IV, 2-INCH 1391.90 SQ YD DEDUCTION AT $20.00/SQ YD = $27,838.00 The patching required was less than originally planned. COMBINATION CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT 381.20 FEET ADDITION AT $35.00/FOOT = $13,342.00 Additional work was required on some streets to correct drainage issues UNITED CITY OF YORKVILLE 2019 MFT (ROADS TO BETTER ROADS PROGRAM) SECTION 19-00000-00-GM BLR 13210 SUPPLEMENT EXPLANATION OF PAY ITEM CHANGES IN EXCESS OF $10,000 PAGE 2 OF 2 AUP 1 (ATTACHED) – HMA CLASS D PATCH, 6-INCH 105 SQ YD ADDITION AT $60.00/SQ YD = $6,300.00. A thicker patch was required in some areas due to existing field conditions. The Contractor agreed to preform patching at 6” under a separate Agreed Unit Price. This change reflects the actual field measurements. Route County Local Agency Section Various Local Roads Kendall City of Yorkville 19 - 00000 - 00 - GM Engineer’s Final Payment Estimate Estimate No. 3 and Final Date of Completion 10/17/2019 Payable To: Name D Construction Inc. Address 1488 South Broadway, Coal City, IL 60416 Items Awarded* Added Deducted Completed Quantity Values Quantity Quantity Quantity Unit Price Values Totals from previous page BITUMINOIS MATLS (TACK COAT) 3,015.00 30.15 16,818.00 0.00 19,833.00 0.01 198.33 HMA SURF REM - BUTT JOINT 615.00 6,150.00 0.00 0.00 615.00 10.00 6,150.00 LVL BND (MACHINE MTHD) N50 2,253.00 141,939.00 0.00 388.80 1,864.20 63.00 117,444.60 HMA SURFACE COURSE "D" N50 3,378.00 212,814.00 305.30 0.00 3,683.30 63.00 232,047.90 PCC SIDEWALK, 5 INCH 2,567.00 16,043.75 334.00 0.00 2,901.00 6.25 18,131.25 DETECTABLE WARNINGS 168.00 4,200.00 0.00 7.00 161.00 25.00 4,025.00 HMA SURFACE REM, VARIABLE 40,175.00 58,253.75 2,231.50 0.00 42,406.50 1.45 61,489.43 SIDEWALK REMOVAL 2,937.00 5,874.00 412.70 0.00 3,349.70 2.00 6,699.40 CLASS D PATCHES, TY 1, 2 INCH 875.00 21,875.00 0.00 868.10 6.90 25.00 172.50 CLASS D PATCHES, TY 2, 2 INCH 875.00 20,125.00 0.00 774.70 100.30 23.00 2,306.90 CLASS D PATCHES, TY 3, 2 INCH 875.00 19,250.00 0.00 823.80 51.20 22.00 1,126.40 CLASS D PATCHES, TY 4, 2 INCH 1,744.00 34,880.00 0.00 1,391.90 352.10 20.00 7,042.00 MANHOLES TO BE ADJUSTED 3.00 1,200.00 0.00 2.00 1.00 400.00 400.00 MH TO BE ADJ W/ NEW FR & LID 10.00 5,500.00 2.00 0.00 12.00 550.00 6,600.00 SAN MH TO BE ADJUSTED 1.00 550.00 0.00 0.00 1.00 550.00 550.00 SAN MH TO BE ADJ W/ NEW F&L 1.00 700.00 0.00 0.00 1.00 700.00 700.00 INL TO BE ADJUSTED 29.00 10,150.00 0.00 12.00 17.00 350.00 5,950.00 THPL PVMNT MARK - LET & SYM 464.00 2,296.80 124.00 0.00 588.00 4.95 2,910.60 THPL PVMNT MARK - 4 INCH 20,527.00 10,674.04 0.00 5,472.00 15,055.00 0.52 7,828.60 THPL PVMNT MARK - 6 INCH 452.00 619.24 1,814.00 0.00 2,266.00 1.37 3,104.42 THPL PVMNT MARK - 12 INCH 960.00 2,640.00 0.00 745.00 215.00 2.75 591.25 THPL PVMNT MARK - 24 INCH 98.00 539.00 162.00 0.00 260.00 5.50 1,430.00 RAISED REFL PVMT MRKR REM 210.00 1,470.00 0.00 22.00 188.00 7.00 1,316.00 SODDING, SPECIAL 462.00 6,930.00 40.00 0.00 502.00 15.00 7,530.00 SUPPLEMENTAL WATERING 10.00 10.00 0.00 5.00 5.00 1.00 5.00 ROUTING & SEALING CRACKS 18,438.00 7,928.34 0.00 919.00 17,519.00 0.43 7,533.17 BRICK DRIVEWAY REM & REPL 36.00 1,800.00 0.00 36.00 50.00 COMB CC&G REM & REPL 873.00 30,555.00 381.20 0.00 1,254.20 35.00 43,897.00 Total Awarded Values $624,997.07 Total Completed Values $547,179.75 Page 1 of 2 BLR 13231 (Rev. 1/06) Printed on 12/20/2019 8:05:41 AM Section Number: 19 - 00000 - 00 - GM Total Brought Forward $547,179.75 Miscellaneous Extras and Credits Values HMA PATCH, 6 INCH 6,300.00 Total Miscellaneous Extras and Credits 6,300.00 Total Value of Completed Work 553,479.75 Miscellaneous Debits Values Total Miscellaneous Debits Net Cost of Section $553,479.75 Previous Payments $525,805.76 Net Amount Due $27,673.99 Signed: Resident Engineer/Consultant Date Signed: Local Agency Date Approved: Regional Engineer Date Page 2 of 2 BLR 13231 (Rev. 1/06) Printed on 12/20/2019 8:05:41 AM Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Human Resources Community Development Police Public Works Parks and Recreation Agenda Item Number New Business #6 Tracking Number PW 2020-06 2020 Road to Better Roads Program Public Works Committee – January 21, 2020 Majority Consideration of Approval MFT Resolution Consideration Brad Sanderson Engineering Name Department In accordance with the planned FY21 budget and Roads to Better Roads Program, we are proceeding with design of the 2020 program. The proposed improvements will include hot-mix asphalt removal and replacement, sidewalk removal and replacement, curb and gutter removal and replacement, and pavement markings on McHugh Road and in White Oak Estates subdivision, The current cost estimate for the project is $760,909.20. The budgeted MFT portion of the Roads to Better Roads Program is $754,000. Note that adjustments will made to the program as necessary after bids are received to match the budgeted funds. Since MFT funds are being utilized to fund the project, IDOT requires the passing of a Resolution to appropriate the funds. Accordingly, please see the attached Resolution for Maintenance Under the Illinois Highway Code in the amount of $754,000. Staff is seeking approval of the resolution from the City Council. If you have any questions or require additional information, please let us know. Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Lisa Pickering, City Clerk Rob Fredrickson, Finance Director Date: January 8, 2020 Subject: 2020 Roads to Better Roads Program BLR 14220 (Rev. 02/08/19) Resolution for Maintenance Under the Illinois Highway Code Printed 01/07/20 Resolution Type Original Section Number 20-00000-00-GM BE IT RESOLVED, by the Governing Body Type Council of the Local Public Agency Type City of Name of Local Public Agency Yorkville Illinois that there is hereby appropriated the sum of Dollarsseven hundred fifty four thousand and 00/100 () $754,000.00 of Motor Fuel Tax funds for the purpose of maintaining streets and highways under the applicable provisions of Illinois Highway Code from Beginning Date 05/01/20 to Ending Date 04/30/21 Resolution Number . BE IT FURTHER RESOLVED, that only those operations as listed and described on the approved Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this resolution, are eligible for maintenance with Motor Fuel Tax funds during the period as specified above. BE IT FURTHER RESOLVED, that Local Public Agency Type City of Name of Local Public Agency Yorkville shall submit within three months after the end of the maintenance period as stated above, to the Department of Transportation, on forms available from the Department, a certified statement showing expenditures and the balances remaining in the funds authorized for expenditure by the Department under this appropriation, and BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit four (4) ceritified originals of this resolution to the district office of the Department of Transportation. I Name of Clerk Lisa Pickering Local Public Agency Type City Clerk in and for said Local Public Agency Type City of Name of Local Public Agency Yorkville in the State of Illinois, and keeper of the records and files thereof, as provided by statute, do hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the Governing Body Type Council of Name of Local Public Agency Yorkville at a meeting held on Date 01/28/20 IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this . Day 28 day of Month, Year January, 2020 . (SEAL) Clerk Signature APPROVED Regional Engineer Department of Transportation Date BLR 14222 (Rev. 10/18/19) Local Public Agency General Maintenance Page 1 of 1Printed 01/08/20 Estimate of Maintenance Costs Submittal Type Original Maintenance Period Local Public Agency City of Yorkville County Kendall Section Number 20-00000-00-GM Beginning 05/01/20 Ending 04/30/21 Maintenance Items Maintenance Operation Maint Eng Category Insp. Req. Material Categories/ Point of Delivery or Work Performed by an Outside Contractor Unit Quantity Unit Cost Cost Total Maintenance Operation Cost RESURFACING IV Yes $760,909.20 Total Operation Cost $760,909.20 Estimate of Maintenance Costs Summary Maintenance MFT Funds Other Funds Estimated Costs Local Public Agency Labor Local Public Agency Equipment Materials/Contracts(Non Bid Items) Materials/Deliver & Install/Request for Quotations (Bid Items) Formal Contract (Bid Items) $754,000.00 $6,909.20 $760,909.20 Maintenance Total $754,000.00 $6,909.20 $760,909.20 Estimated Maintenance Eng Costs Summary Maintenance Engineering MFT Funds Other Funds Total Est Costs Maintenance Engineering Material Testing Advertising Bridge Inspection Engineering Maintenance Engineering Total Total Estimated Maintenance $754,000.00 $6,909.20 $760,909.20 Remarks SUBMITTED Local Public Agency Official Date Title Mayor County Engineer/Superintendent of Highways Date APPROVED Regional Engineer Department of Transportation Date Project Route Section County For a total distance of Shoulders $1,500.00 $2,678.70 $1,584.00 $229,475.00 $229,475.00 $15,890.00 $5,500.00 $5,660.00 $12,495.00 $7,560.00 $7,735.00 $24,519.00 $59,232.00 $650.00 $5,250.00 $1,600.00 $4,564.00 $1,560.00 $200.00 $10,520.00 $60,693.50 $950.00 $12,306.00 $1,200.00 Estimate of Cost Quantity Unit Price Code Number Unit of Measure 22 11 12 POUND SQ YD TON Location of Improvement: 12385 Feet Net improvement of 26787 132 3425 3425 2270 220 2830 4998 216 $150.00 Maximum Grade % 13 14 17 6 7 8 9 10 10UNIT SUPPLEMENTAL WATERING Average Haul 1 2 3 4 5 THERMOPLASTIC PAVEMENT MARKING - LINE 24" 23 BITUMINOUS MATERIALS (TACK COAT) HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT 20 21 SODDING, SPECIAL HOT-MIX ASPHALT SURFACE REMOVAL, VARIABLE DEPTH SANITARY MANHOLES TO BE ADJUSTED ROUTING AND SEALING CRACKS HOT-MIX ASPHALT BINDER COURSE, IL- 9.5, N50 HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH DETECTABLE WARNINGS SIDEWALK REMOVAL SQ FT SQ YD MANHOLES TO BE ADJUSTED THERMOPLASTIC PAVEMENT MARKING - LINE 4" THERMOPLASTIC PAVEMENT MARKING - LINE 6" WHEEL STOP REMOVAL AND RESET FOOT HOT-MIX ASPHALT SURFACE REMOVAL, 3" CLASS D PATCHES, TYPE I, 3 INCH CLASS D PATCHES, TYPE II, 3 INCH CLASS D PATCHES, TYPE III, 3 INCH EACH EACH FOOT SQ YD SQ YD EACH FOOT SQ YD SQ YD SQ YD SQ YD 15 16 INLETS TO BE ADJUSTED THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS EACH SQ FT 15 320 $350.00 $5.00 24 12 $100.00 18 19 1 6520 1040 $5.00 $20.00 $1.75 $950.00 $0.50 Total CostItem CLASS D PATCHES, TYPE IV, 3 INCH $0.10 $12.00 $67.00 $67.00 $7.00 $25.00 $2.00 $2.50 Yorkville 2020 Road Program Various Local Roads 19-00000-00-GM Kendall SQ FT SQ FT TON Type Width Thickness Various locations within the United City of Yorkville, Kendall County (see Location Map) $35.00 1851 $35.00 $33.00 FOOT $32.00 $650.00 $0.70 $1.50 34682 1 24612 40 526 221 743 Printed 1/8/2020 BDE 213 (Rev. 04/01/10) $700.00 $47,412.00 $10,000.00 $760,909.20 Made by , Checked by Regional Engineer NLS CJO RAILROAD PROTECTIVE LIABILITY INSURANCE 25 26 SQ YD Date Date 11/19/2019 1/7/2020 TOTAL ESTIMATED COST OF WORK INCLUDING ALL LABOR, MATERIALS AND PROFITS. 27 1 $10,000.00 $100.00 $36.00 COMBINATION CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT 7 1317 HOT-MIX ASPHALT DRIVEWAY REMOVAL AND REPLACEMENT Examined L SUM FOOT Printed 1/8/2020 BDE 213 (Rev. 04/01/10) ()- ()-()-()-()-()- ()- ()-()-()-()-(()- ()-()-()-()-()- ()- ()-()-()-()-(W Madison St Morgan StNorwayCirW Ridge St W F o x S tW F o x S tW Washington St W Main St State StMorgan StFir Ct W Orange StMadison CtAdrian StW River St State StAdams StS Main StWhite Oak WayWhite Oak WayW VanEmmon St W Hydraulic Ave Whi t eOak WayS Main StS Main StW Dolph St W Center St RiverBirch LnW Dolph StSpruce CtWest StKing StW W a s h in g to n S tW Hydraulic Ave River Birch Dr Norway Ci rRive r Rd Legend 2020 Road Program ()- ()- ()-Hayden DrPrairie Clover DrMcHugh RdB lu est e m D rE LexingtonCirCrim son LnConef l ower Ct McHugh RdSwitchgrass LnK e n n e d y R d Prairie Pointe DrPrairie Rose LnWild Indigo LnE Countryside Pkwy .WalshEngineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 2020 RTBR PROGRAM LOCATION MAP www.eeiweb.com DATE: PROJECT NO.: FILE: PATH: BY: SEPTEMBER 2019 YO1926 YO1926_2020 Road Program .MXD H:\GIS\PUBLIC\YORKVILLE\2018\ MJT United City of Yorkville 800 Game Farm Road Yorkville, IL 60560 630-553-4350 ³ PARKING LANE Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Human Resources Community Development Police Public Works Parks and Recreation Agenda Item Number New Business #7 Tracking Number PW 2020-07 Raintree Village – Stop Sign – Bluebird Lane at Prairie Crossing Drive Public Works Committee – January 21, 2020 Majority Brad Sanderson Engineering Name Department Approval This memo is in follow-up to the November 26th Council approval of signage within Raintree Village Units 4, 5 and 6. During review of nearby intersections by Public Works, it was discovered that there was not a stop sign at Bluebird Lane and Prairie Crossing Drive. A stop sign is recommended at Bluebird Lane for the following reasons: o Prairie Crossing Drive is a collector road for the unit, therefore this intersection is a less important road with a main road where the normal right-of-way rule would not be expected to be complied. o The traffic volume is above 2,000 units per day on Prairie Crossing Drive. If you have any questions, please let me know. Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Krysti Barksdale-Noble, Community Dev. Dir. Lisa Pickering, City Clerk Date: January 15, 2020 Subject: Raintree Village - Stop Sign Analysis Ordinance No. 2020-____ Page 1 Ordinance No. 2020-_____ ORDINANCE OF THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS AMENDING THE TRAFFIC SCHEDULE AND INDEX WHEREAS, the United City of Yorkville, Kendall County, Illinois, has designated certain intersections within the City as stop intersections and has identified the corner for placement of stop signs at such intersections; and, WHEREAS, after extensive investigation and study of traffic patterns, it has been determined that additional intersections should be designated as stop intersections; and, WHEREAS, the additional stop intersections, as hereinafter set forth, have been determined to be in conformance with the current Manual on Uniform Traffic Control Devices. NOW THEREFORE BE IT ORDAINED by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois, that the traffic schedule and index regarding stop-sign control is hereby amended by revising the following: Section I. The Traffic Schedule and Index regarding Stop-Sign Control is hereby amended by adding the following as a One-Way Stop Intersection: 1) Bluebird Lane to Stop for Prairie Crossing Drive Section II. This Ordinance shall be in full force and effect from and after its passage and approval as provided by law. Passed by the City Council of the United City of Yorkville, Kendall County, Illinois, this ____ day of _______________________, A.D. 2020. ________________________________ City Clerk Ordinance No. 2020-____ Page 2 KEN KOCH ________ DAN TRANSIER ________ JACKIE MILSCHEWSKI ________ ARDEN JOE PLOCHER ________ CHRIS FUNKHOUSER ________ JOEL FRIEDERS ________ SEAVER TARULIS ________ JASON PETERSON ________ APPROVED by me, as Mayor of the United City of Yorkville, Kendall County, Illinois, this _____ day of _______________________, A.D. 2020. ________________________________ Mayor Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Human Resources Community Development Police Public Works Parks and Recreation Agenda Item Number New Business #8 Tracking Number PW 2020-08 Purchase of truck bodies and salt spreaders Public Works Committee – January 21, 2020 Positive Approval Proposed rehabilitation of two large dump trucks to improve the reliability of our fleet. Eric Dhuse Public Works Name Department Summary In an effort to reduce costs and improve the existing fleet, public works has been investigating the possibility of rehabbing two trucks to extend their useful life and provide reliability in our fleet. We have been working with Purchasing Manager Parker to obtain quotes from the purchasing cooperative, Sourcewell. We have worked with Sourcewell previously with the purchase of the utility truck in November 2019. Sourcewell contracts with a variety of vendors that will work together to provide the equipment needed for government needs. Sourcewell selects these vendors through a competitive bidding process similar to the process in our purchasing code. I have attached two quotes totaling $99,369.17 that will fit our needs and be a cost-effective solution to creating more reliability in our fleet for years to come. Background During the July 16, 2019 meeting of the Public Works committee we discussed the possibility of rehabbing 2 existing trucks along with the purchase of one new truck to add to our fleet. At that time, it was stated that we had a $91,000 surplus in the PW Capital budget account that was not earmarked for any purchase. It was thought to use that money towards the rehab of the trucks instead of using it towards the purchase of the new truck. A budget amendment of an amount not to exceed $225,000 was approved on July 23, 2019 (minutes attached) where the purchase of the new truck was approved but split between two fiscal years. The first fiscal year (FY20) was $100,000 of the budget amendment, and the second payment of $105,000 will be in the upcoming FY21 budget. The other portion of the budget amendment was for the rehabilitation of the dump trucks that are quoted in this packet. The timing on the rehabilitation of these trucks would not be completed until FY21, the ordering and fabrication of the parts takes 180-210 days and the delivery of the completed unit is 60-90 days after that. We would not ship these trucks to the vendors until summer of 2020 and we would have them back sometime in fall. The trucks we have chosen to rehab are as follows: Y23 – 2006 International single axle dump truck with 32,904 miles. This truck has been a fairly reliable truck that will benefit greatly from the rehab. This truck was chosen because we can take the least amount of money and make this truck into the best shape possible. This truck has very low miles, no known mechanical issues, and a solid cab, and a plow and plow frame that are in good shape. The estimated cost of this rehab is $47,126.17. Below is an easy to read break down of what this truck will receive if approved:  Sandblast, prime and paint chassis frame, tanks, hoist, pintle hitch, and wheels.  Stainless steel dump body with cab shield, ladder, shovel holders, and coal chute door on the tailgate. Memorandum To: Public Works Committee From: Eric Dhuse, Director of Public Works CC: Bart Olson, Administrator Date: January 9, 2020 Subject: Truck Body Replacements  Pre wet tank assembly – two (2) 100-gallon tanks built into the side of the body with stainless steel fittings and plumbed to our specifications for our brine system.  LED light bar and all new lights on the body  Rear fenders and mud flaps  New pintle hitch – this truck did not have a pintle hitch before, we added it to have a back up truck for our leaf vac, or to use with an additional leaf vac.  Salt spreader – stainless steel. Y9 – 2008 International tandem axle dump truck with 59,500 miles. This truck has been one of our work horses since we bought it new. This truck was chosen to be able to retain 3 reliable tandem axle dump trucks in the fleet. We rehabbed the other, older, tandem axle this year, and have a 2016 tandem axle as our third large truck. The estimate for this truck is $52,243.00 Below is an easy to read break down of what this truck will receive if approved:  Sandblast, prime and paint chassis frame, tanks, hoist, pintle hitch, and wheels.  Stainless steel dump body with cab shield, ladder, shovel holders, and coal chute door on the tailgate.  Pre wet tank assembly mounted between the cab and box. Two (2) 120-gallon tanks mounted on stainless steel brackets and straps.  Refurbish existing plow hitch. Currently damaged and bent.  LED light bar and all new lights on the body  Rear fenders and mud flaps  Replace pintle hitch – For pulling large trailers.  Salt spreader – stainless steel. If the city were still able to follow the replacement program that was in place before the recession, both of these trucks would have been traded in at this point since the useful life for our large dump trucks is 10 years. After ten years, the wear and tear of hard use leads to greater possibilities of catastrophic mechanical failure, rust and body damage from the hard use, and the obsolescence of technology that is in and added to the truck. By updating the body, sandblasting and painting the chassis, adding new spreaders, and adding a new pre-wet system and LED lighting, we will increase the useful life by at least 5 years barring any unforeseen catastrophic failures. By increasing the useful life by 5 years, it will allow us to increase the reliability of our fleet and replace the trucks that need it most while reducing costs. Recommendation 1. To approve the contract with Lindco Equipment Sales, Inc. of 2168 East 88th Dr., Merrillville, IN 46410 in the amount of $47,126.17 for the repair and rehabilitation of truck Y23, a 2006 International single axle dump truck. 2. To approve the contract with PB Loader Corp. of 5778 W. Barstow, Fresno, CA 93722 in the amount of $52,243.00 for the repair and rehabilitation of truck Y9, a 2008 International tandem axle dump truck. I would ask that this be placed on the January 21, 2020 public works committee meeting for discussion. Page 1 of 3 APPROVED 8/20/19 UNITED CITY OF YORKVILLE PUBLIC WORKS COMMITTEE Tuesday, July 16, 2019, 6:00pm Yorkville City Hall, Conference Room 800 Game Farm Road IN ATTENDANCE: Committee Members Chairman Joe Plocher Alderman Jackie Milschewski Alderman Ken Koch Alderman Seaver Tarulis Other City Officials City Administrator Bart Olson Public Works Director Eric Dhuse Assistant City Administrator Erin Willrett Engineer Brad Sanderson, EEI Other Guests: Katie Finlon, Kendall County Record The meeting was called to order at 6:00pm by Chairman Joe Plocher. Citizen Comments: None Previous Meeting Minutes: June 18, 2019 The minutes were approved as presented. New Business: 1. PW 2019-45 Water Department Reports for April, May and June 2019 Mr. Dhuse said these were normal reports for the IEPA and that the average daily per capita usage has risen in the warmer weather. This moves to the City Council. 2. PW 2019-46 Capital Improvement Summary Mr. Sanderson said this is the quarterly update. Some Rt. 71 construction started this week according to Mr. Dhuse, with the real construction starting very soon. Social media comments have questioned why all the road projects in the area are occurring simultaneously. Mr. Olson commented that the state planned to do all three at the same time. 3. PW 2019-47 Quarterly Bond and Letter of Credit Reduction Summary These are routine quarterly reports. No further discussion. 4. PW 2019-48 Cedarhurst Living – Acceptance of Public Improvements The punchlist is done and Mr. Sanderson recommended acceptance of the water main and sidewalk along with a letter of credit reduction. This moves to the City Council. 5. PW 2019-49 Re-Piping of Water Main and Demolition of Well #3 Building – Change Order No. 1 Page 2 of 3 Mr. Sanderson reported a contract was awarded a year ago to Performance Pipeline. This is the balancing change order reflecting a decrease of over $14,000. He recommended approval and the final payment will be made. 6. PW 2019-50 Mill Road Intergovernmental Agreement The County Board has approved the draft agreement for Mill Road improvements, said Mr. Olson. They recommend a full overlay for Mill Rd. from Kennedy Rd. to the city limits near Oswego. The agreement gives the city the ability to re-bid or modify the scope if a roundabout is desired. The County is doing all engineering work at no cost to the city. The project should be done in the next few months. Alderman Koch asked how much is being saved since the County is doing the engineering. It is being done in-house and will save the city about $5,000 to $10,000. This moves to the City Council. 7. PW 2019-51 Heustis Street Stop Sign Alderman Milschewski stated that vehicles are not stopping at the Heustis/VanEmmon stop signs even with the blinking lights. She asked about rumble strips/grooves in the pavement, however, they are usually reserved for higher traffic areas. She also noted that motorcyclists have also blocked the intersection to allow other cyclists to all proceed at one time. Alderman Koch said a photo flash gets drivers' attention and an empty squad car was also suggested. This matter will be forwarded to the Chief of Police. Old Business: 1. PW 2018-102 East Alley Parking Lot - Update Mr. Olson said the easement draft has been started, but the city is waiting for further information. A 1996 recorded document was found by an EEI surveyor and suggests the area on which the easement would be located, might require the developer to turn it over to the city. The document labeled the area as an access and a formal dedication may be needed. This will move to the August 13th City Council meeting. 2. PW 2019-27 Crosswalk at Route 47 and Main Street There is no IDOT update at this time, however, their latest response was “no” to the crosswalk request. Mr. Sanderson suggested writing a letter to IDOT as the next step. 3. PW 2019-28 Plow Trucks – Purchase Authorization and FY 20 Budget Amendment Mr. Olson said there is a $91,000 surplus in the FY 19 Public Works capital fund that has to be used. One idea is to repair two trucks to gain an additional 3-5 years of use and also authorize the purchase of one new plow truck. He discussed possible payment arrangements and will discuss further with the Finance Director. He said the idea will be revisited after the final 2019 FY numbers are available. Mr. Olson said the $91,000 overage was a result of impact fees and commitments from Raintree and Grande Reserve. Mr. Dhuse was in agreement with rehabbing trucks and said it will take 10-12 months to receive the new truck. The committee was OK with the recommendations. 4. PW 2019-41 Chemical Feed Systems – NSF Information This is information relating to the discussion last month. The City Council approved this item already. Additional Business: Page 3 of 3 Alderman Koch asked if there was follow-up information on the Windett Ridge street lights. Mr. Dhuse replied that the construction manager has turned them over to the land group for repair. As a follow-up to a discussion last month, Alderman Tarulis reported that people are parking over the newly striped parking areas on McHugh Road. Mr. Dhuse will work on signs and police enforcement. There was no further business and the meeting was adjourned at 6:31pm. Minutes respectfully transcribed by Marlys Young, Minute Taker MINUTES OF THE REGULAR MEETING OF THE CITY COUNCIL OF THE UNITED CITY OF YORKVILLE,KENDALL COUNTY,ILLINOIS, HELD IN THE CITY COUNCIL CHAMBERS, 800 GAME FARM ROAD ON TUESDAY,JULY 23,2019 Mayor Purcell called the meeting to order at 7:00 p.m. and led the Council in the Pledge of Allegiance. ROLL CALL n City Clerk Pickering called the roll. Ward I Koch Present Transier Present Ward 11 Milschewski Present Plocher Absent Ward III Funkhouser Present Frieders Present Ward IV Tarulis Present Peterson Absent Staff present: City Administrator Olson,City Clerk Pickering,Chief of Police Hart,Deputy Chief of Police Pfizenmaier,Community Development Director Barksdale-Noble,Finance Director Fredrickson, Parks and Recreation Director Evans,Assistant City Administrator Willrett,Building Code Official Ratos,Facilities Manager Raasch,Attorney Orr,and EEI Engineer Morrison. QUORUM A quorum was established. AMENDMENTS TO THE AGENDA None. PRESENTATIONS Deb Horaz was unable to attend the meeting so this presentation will be rescheduled for a future meeting. PUBLIC HEARINGS None. CITIZEN COMMENTS ON AGENDA ITEMS None. CONSENT AGENDA None. MINUTES FOR APPROVAL Mayor Purcell entertained a motion to approve the minutes of the regular City Council meetings of June 25,2019 and July 9,2019 as presented. So moved by Alderman Milschewski; seconded by Alderman Funkhouser. Motion unanimously approved by a viva voce vote. BILLS FOR PAYMENT Mayor Purcell entertained a motion to approve the bill list in the amount of$16,033.88 (vendors—FY 19); $1,318,570.93 (vendors—FY 20); $333,027.12 (payroll period ending 7/12/19);for total of 1,667,631.93. So moved by Alderman Milschewski; seconded by Alderman Tarulis. Motion approved by a roll call vote. Ayes-6 Nays-0 Funkhouser-aye,Tarulis-aye,Transier-aye, Frieders-aye,Koch-aye,Milschewski-aye REPORTS MAYOR'S REPORT Appointment to Library Board CC 2019-42) Mayor Purcell entertained a motion to approve the appointment of Julie Brendich to the Library Board to a term ending May 2021. So moved by Alderman Transier; seconded by Alderman Koch. Motion unanimously approved by a viva voce vote. The Minutes of the Reaular Meeting of the City Council—July 23,2019—Paae 2 of 5 Appointment to Unified Development Ordinance(UDO)Advisory Committee CC 2019-43) Mayor Purcell entertained a motion to approve the appointment of Reagan Goins to the Unified Development Ordinance Advisory Committee. So moved by Alderman Tarulis; seconded by Alderman Funkhouser. Motion unanimously approved by a viva voce vote. Comments from Mayor Purcell General Obligation Bond Rating for City Mayor Purcell reported that Fitch Ratings upgraded the city's general obligation bond rating from AA-to an AA rating on July 22d. Upgraded bond ratings allow the city to borrow money at a lower interest rate. Reasons cited by Fitch for the upgraded bond rating are the city's improved financial resilience and the city's solid revenue growth prospects due to continued population growth. Sale of 111 W.Madison (Old Jail) Mayor Purcell said the council would not be taking action this evening on the sale of the Old Jail. He said that City Administrator Olson has been negotiating with the McKnight group. He hopes the negotiations will be completed and ready to be discussed at the August 61 Economic Development Committee meeting. River Fest Festival Mayor Purcell mentioned that River Fest was held on July 12'and 13`'and had a great turnout. He thanked staff for doing such a great job. Appointment of Chief of Police Mayor Purcell said that he has selected Yorkville resident Jim Jensen to be appointed to the position of Chief of Police. This appointment will be voted on at the August 131 City Council meeting. PUBLIC WORKS COMMITTEE REPORT Plow Trucks n Purchase Authorization Ordinance 2019-35 Ordinance Authorizing a Second Amendment to the Annual Budget for the Fiscal Year Commencing on May 1,2019 and Ending on April 30,2020 PW 2019-28) Mayor Purcell entertained a motion to approve to approve a sole source purchase authorization for a new plow truck from Peterbilt, for delivery in FY 21 and payment in FY 20 and FY 21 in an amount not to exceed$225,000 and to approve an Ordinance Authorizing the Second Amendment to the Annual Budget for the Fiscal Year Commencing on May 1,2019 and Ending on April 30,2020 and authorize the Mayor and City Clerk to execute. So moved by Alderman Milschewski; seconded by Alderman Koch. Motion approved by a roll call vote. Ayes-6 Nays-0 Frieders-aye,Koch-aye,Milschewski-aye, Funkhouser-aye,Tarulis-aye,Transier-aye Water Department Reports for April,May,and June 2019 PW 2019-45) Mayor Purcell entertained a motion to approve the Water Department Reports for April, May,and June 2019. So moved by Alderman Milschewski; seconded by Alderman Koch. Motion unanimously approved by a viva voce vote. Cedarhurst Living—Acceptance of Public Improvements PW 2019-48) Mayor Purcell entertained a motion to accept the public improvements of water main and sidewalk as described in the Bill of Sale for ownership and maintenance by the City and authorize the release of the existing security upon receipt of a maintenance guarantee in the amount of$3,778.00, subject to verification that the developer has no outstanding debt owed to the City for this project and subject to receipt of a signed Bill of Sale. So moved by Alderman Milschewski; seconded by Alderman Tarulis. Motion approved by a roll call vote. Ayes-6 Nays-0 Koch-aye,Milschewski-aye,Funkhouser-aye, Tarulis-aye,Transier-aye,Frieders-aye The Minutes of ht e ReEular Meeting of the City Council July 23,2019—Paye 3 of 5 Re-Piping of Water Main and Demolition of Well#3 Building—Change Order No. 1 PW 2019-49) Mayor Purcell entertained a motion to approve the Re-Piping of Water Main and Demolition of Well#3 Building—Change Order No. 1 and authorize the Mayor to execute. So moved by Alderman Milschewski; seconded by Alderman Transier. Motion approved by a roll call vote. Ayes-6 Nays-0 Koch-aye,Milschewski-aye,Funkhouser-aye, Tarulis-aye, Transier-aye,Frieders-aye n Resolution 2019-20 Approving an Intergovernmental Agreement Between Kendall County and the United City of Yorkville,Illinois Relating to the Asphalt Surfacing of Mill Road PW 2019-50) Mayor Purcell entertained a motion to approve a Resolution Approving an Intergovernmental Agreement between Kendall County and the City Relating to the Asphalt Surfacing of Mill Road and authorize the Mayor and City Clerk to execute. So moved by Alderman Milschewski; seconded by Alderman Funkhouser. Motion approved by a roll call vote. Ayes-6 Nays-0 Milschewski-aye,Funkhouser-aye,Tarulis-aye, Transier-aye,Frieders-aye, Koch-aye ECONOMIC DEVELOPMENT COMMITTEE REPORT No report. PUBLIC SAFETY COMMITTEE REPORT Ordinance 2019-36 Amending Title 3,Chapter 13 of the Code of Ordinances(Resale Dealers) PS 2018-18) Alderman Tarulis made a motion to approve an Ordinance Amending Title 3,Chapter 13 of the Code of Ordinance(Resale Dealers)and authorize the Mayor and City Clerk to execute; seconded by Alderman Milschewski. Motion approved by a roll call vote. Ayes-6 Nays-0 Funkhouser-aye,Tarulis-aye, Transier-aye, Frieders-aye,Koch-aye,Milschewski-aye Ordinance 2019-37 Amending the Yorkville City Code Liquor Control Change of General Manager Fee) PS 2019-12) Alderman Tarulis made a motion to approve an Ordinance Amending the Yorkville City Code Liquor Control(Change of General Manager Fee)and authorize the Mayor and City Clerk to execute; seconded by Alderman Koch. Motion approved by a roll call vote. Ayes-6 Nays-0 Tarulis-aye, Transier-aye,Frieders-aye, Koch-aye,Milschewski-aye,Funkhouser-aye ADMINISTRATION COMMITTEE REPORT No report. PARK BOARD No report. PLANNING AND ZONING COMMISSION Ordinance 2019-38 Approving the Rezoning of the R-1 Single-Family Suburban Residence District of the Property Located at the Southwest and Southeast Corners n of the Intersection of East Van Emmon Street and Benjamin Street PZC 2019-15 and EDC 2019-52) Mayor Purcell entertained a motion to approve an Ordinance Approving the Rezoning of the R-1 Single- Family Suburban Residence District of the Property Located at the Southwest and Southeast Corners of the Intersection of East Van Emmon Street and Benjamin Street. So moved by Alderman Milschewski; seconded by Alderman Funkhouser. Motion approved by a roll call vote. Ayes-6 Nays-0 Transier-aye,Frieders-aye,Koch-aye, Milschewski-aye,Funkhouser-aye,Tarulis-aye The Minutes of the Reaular Meeting of the City Council—July 23,2019—Page 4 of 5 Ordinance 2019-39 Approving the Rezoning of the R-2 Single-Family Traditional Residence District and the Granting of Variances for the Property Located at 701 N.Bridge Street PZC 2019-17 and EDC 2019-53) Mayor Purcell entertained a motion to approve an Ordinance Approving the Rezoning of the R-2 Single- Family Traditional Residence District and the Granting of Variances for the Property Located at 701 N. Bridge Street. So moved by Alderman Transier; seconded by Alderman Koch. Motion approved by a roll call vote. Ayes-5 Nays-1 Frieders-aye,Koch-aye,Milschewski-aye, Funkhouser-nay,Tarulis-aye,Transier-aye Ordinance 2019-40 Amending Section 10-3-5-B: Location and Section 10-3-5-C: Time of Construction Regarding Accessory Buildings and Structures of the Yorkville Zoning Ordinance and Section 10-3-3-A: Contiguous Parcels to Permit Accessory Buildings and Structures to be Built on Contiguous Lots Under Single Ownership PZC 2019-18 and EDC 2019-58) Mayor Purcell entertained a motion to approve an Ordinance Amending Section 10-3-5-B: Location and Section 10-3-5-C: Time of Construction Regarding Accessory Buildings and Structures of the Yorkville Zoning Ordinance and Section 10-3-3-A: Contiguous Parcels to Permit Accessory Buildings and Structures to be Built on Contiguous Lots Under Single Ownership. So moved by Alderman Koch; seconded by Alderman Transier. Motion approved by a roll call vote. Ayes-4 Nays-2 Frieders-aye,Koch-aye,Milschewski-aye, Funkhouser-nay,Tarulis-nay, Transier-aye CITY COUNCIL REPORT No report. CITY CLERK'S REPORT n No report. COMMUNITY&LIAISON REPORT No report. STAFF REPORT No report. ADDITIONAL BUSINESS None. CITIZEN COMMENTS Todd Milliron,Kendall County resident, spoke regarding Riley County,Kansas which has a countywide police department. He said the Kendall County Courthouse building currently has extra space that is not being used by the county and he suggested the city might want to speak with Kendall County to see if the city's police department could use some of that extra space. Lisa Wolancevich,Yorkville resident,mentioned that many vehicles and trucks do not follow the posted speed limit on Route 47,especially in the downtown area. She said that during the recent River Fest Festival she witnessed a semi-truck run a red light at a high rate of speed at the intersection of Route 47 and Van Emmon during the festival. There were many pedestrians present in the downtown area at the time due to the festival. She also mentioned that on her way to City Hall this evening, she witnessed a motorcycle almost hit a woman and child who were crossing the street at the crosswalk located at the intersection of Route 47 and Main Street. She asked if extra patrols and more flashing signs could be added to the downtown area to try to get traffic to slow down so that no one gets hurt. n EXECUTIVE SESSION Mayor Purcell entertained a motion to go into executive session for personnel and litigation. So moved by Alderman Milschewski; seconded by Alderman Funkhouser. Motion approved by a roll call vote. Ayes-6 Nays-0 Koch-aye,Milschewski-aye,Funkhouser-aye, Tarulis-aye,Transier-aye,Frieders-aye The City Council entered executive session at 7:49 p.m. The City Council returned to regular session at 8:24 p.m. The Minutes of the Regular Meetine of the City Council—July 23,2019—Page 5 of 5 PLANNING AND ZONING COMMISSION(cont'd) Ordinance 2019-40 Amending Section 10-3-5-B: Location and Section 10-3-5-C: Time of Construction Regarding Accessory Buildings and Structures of the Yorkville Zoning Ordinance and Section 10-3-3-A: Contiguous Parcels to Permit Accessory Buildings and Structures to be Built on Contiguous Lots Under Single Ownership PZC 2019-18 and EDC 2019-58) Mayor Purcell said that a re-vote was needed on Planning and Zoning Commission Agenda Item#3 — PZC 2019-18 and EDC 2019-58. He stated that the vote earlier in the meeting consisted of four ayes and 2 nays and it was thought to be approved with four affirmative votes. City Administrator Olson said that five affirmative votes are needed for this item to pass. Mayor Purcell entertained a motion to approve an Ordinance Amending Section 10-3-5-B: Location and Section 10-3-5-C: Time of Construction Regarding Accessory Buildings and Structures of the Yorkville Zoning Ordinance and Section 10-3-3-A: Contiguous Parcels to Permit Accessory Buildings and Structures to be Built on Contiguous Lots Under Single Ownership. So moved by Alderman Koch; seconded by Alderman Transier. Motion approved by a roll call vote. Ayes-5 Nays-1 Frieders-aye,Koch-aye,Milschewski-aye, Funkhouser-nay,Tarulis-aye, Transier-aye ADJOURNMENT Mayor Purcell adjourned the meeting at 8:27 p.m. Minutes submitted by: It Lisa Pickering, n City Clerk, City of Yorkville,Illinois REGULAR CITY COUNCIL MEETING July 23, 2019 PLEASE PRINT NAME:' SUBDIVISION OR BUSINESS: A J 'wA g E' y.,s a-.S CtRv` 13 o ct 1 QUOTATION Quant it y Item Number De scription SOUR CE WE LL QU OTE FOR SINGLE AXLE TRUCK REFURB IS HM ENT __________________________________________________________________ SOUR CE WE LL MEMBER: Un it ed City of York vi lle 800 Ga me Far m Road York vi lle,IL 60560 -0901 SOUR CE WE LL MEMBER ID : 992 59 __________________________________________________________________ SOUR CE WE LL CO NTRA CT HOLD ER : Swen son P rodu ct s 127 Walnut St re et Linde nwoo d,IL 61049 SOUR CE WE LL CO NTRA CT NUMBER: 080 818-S WS __________________________________________________________________ *Purchas e o rder to be made out to Lindc o Equ ip me nt Sales, Inc. *Or der t o b e f ulfilled by Lind co Equipment Sales, I nc. __________________________________________________________________ REFURBISHING SIN GLE AXLE P LOW TR UCK : __________________________________________________________________ REMOVAL OF EXISTING BODY: 6.00 INSTALL AT ION Lindc o Installation La bor Hou rs t o remov e e xist ing body , hoist and all wiring . __________________________________________________________________ REMOVE LI GHT BAR : 4.00 INSTALL AT ION Lindc o Installation La bor Hou rs t o drop hea d liner , re mo ve l ight ba r,remove wiri ng,seal holes in roo f Quo te Nu mb er:190 409B Quo te Da te:Jan 7,202 0 Sales Rep Quot ed To: City of York vi lle 610 Tower Lane York vi lle,IL 60560 US A Good Thru 2/6/20 Customer ID Payme nt Te rms Page: York vi lle-01 Ne t 30 Day s 123 18 1 TOTAL Cont in ue d Sales Tax Co ntinu ed Subt ot al Co ntinu ed 216 8 E as t 88t h Dr iv e Merr illv ille,IN 464 10 US A Voice: Fax : (2 19)79 5-144 8 (2 19)73 6-089 2 25%Res tock Fee on All Cance ll ed an d R et urned Or ders Equipment Sales, Inc. QUOTATION Quant it y Item Number De scription and reinstall h ead liner in c ab. __________________________________________________________________ NEW DUM P BODY: 1.00 APB38-10464 6-Y ork Swen son A PB 38 deg slop ed,10 ' x 7', 9 yd dump body,fr ont telescop ic hoist less hyd,3/16"AR 400 floor,7 g auge 201 2B SS bal., 46"si des , 46"TG,1/2 CS , DIMENSTIONS: * 10'long * 96"wide O.D.at to p * 46"high sides * 46"high tailgate MATERIAL: * 7 gauge "201 2B" s tainles s s teel sides,ends an d a ll add-ons * 3/16"AR40 0 floor CO NS TR UCTION: * Dogh ouse in front wall * 38 degr ee sloped sides f rom to p to f lo or * One piece s ides * Boxed t op rail * No side bo ard poc ke ts * Heav y dut y rear corne r post with apron * 7 gauge "201 2B" s tainles s s teel full leng th bod y f end ers ab ove t ires on each s id e TAILG AT E: * Six panel tailgate * Doub le ac ting tailgate * Stainles s st eel tailgate chains * Air tailgate Quo te Nu mb er:190 409B Quo te Da te:Jan 7,202 0 Sales Rep Quot ed To: City of York vi lle 610 Tower Lane York vi lle,IL 60560 US A Good Thru 2/6/20 Customer ID Payme nt Te rms Page: York vi lle-01 Ne t 30 Day s 123 18 2 TOTAL Cont in ue d Sales Tax Co ntinu ed Subt ot al Co ntinu ed 216 8 E as t 88t h Dr iv e Merr illv ille,IN 464 10 US A Voice: Fax : (2 19)79 5-144 8 (2 19)73 6-089 2 25%Res tock Fee on All Cance ll ed an d R et urned Or ders Equipment Sales, Inc. QUOTATION Quant it y Item Number De scription * All tailga te linkage,rods , pins an d h ardw are,upper & lower are st ainless st eel UN DE RS TRUC TU RE : * Cro ss me mb erles s * 3/16""201 2B" long sill s CO AL DO OR: 1.00 * Sliding coal d oor with driver side han dle * Cent er moun ted OVAL CUT OUTS: * Three (3 ) oval cu t out s i n each r ear c orner post CAB SHIELD: * Lindco 1 /2 cab shield const ruc ted of "201 2B" s tainles s s teel * Enclos ed cab shield w ith thre e (3) se aled access panels on top * Six (6) ov als in fro nt of cab s hield * Six (6) ov als in r ear of cab s hield * One (1)oval in each s id e o f ca b s hield LADD ER & GRA B HA ND LE * Full he ig ht, fold up ladd er on driver side t owa rd front * Grab ha ndle on driver si de t owar d front * Cons truc ted of "201 2B" stainless st eel HO IS T: * Mailhot t elescopic ho is t * Trunnion moun ted * 18 tons ca pacity * Doub le ac ting (pow er up-p ower down) * Nitrat ed cylinde r sleev es * Hoist cr adle Quo te Nu mb er:190 409B Quo te Da te:Jan 7,202 0 Sales Rep Quot ed To: City of York vi lle 610 Tower Lane York vi lle,IL 60560 US A Good Thru 2/6/20 Customer ID Payme nt Te rms Page: York vi lle-01 Ne t 30 Day s 123 18 3 TOTAL Cont in ue d Sales Tax Co ntinu ed Subt ot al Co ntinu ed 216 8 E as t 88t h Dr iv e Merr illv ille,IN 464 10 US A Voice: Fax : (2 19)79 5-144 8 (2 19)73 6-089 2 25%Res tock Fee on All Cance ll ed an d R et urned Or ders Equipment Sales, Inc. QUOTATION Quant it y Item Number De scription * HD re ar hinge assembly * Frame mounted body pr op 2.00 8-049 304W /FJX-10 8"Mid-State 1/2"x9 ' 304 S/S Line with f ittings 6.00 A2-12 .7-A PCI HD Se ri es Clamps for 1/2"tu bing 1.00 Ho ses & Fittings Us ing existi ng Crys teel RC 750 on truc k PRE-WET T ANK ASSEMBLY: * 100 gallon poly/baf fled tank s moun ted on each side for a t otal of 200 gallons of pre -we t l iquid capac it y. * Tanks are f act or y ins talled and plumbed * All mount ing hardw are will be stainles s st eel * 2"bu lk hea d f ill kit fact or y i ns talled * V-box flush kit,installed by Lindco LI GHT KIT: * LED IC C ligh ts and harne ss __________________________________________________________________ SHOVEL HOLDERS : 2.00 SH675 SS Buyer s St ainless S teel Shov el Holder * One (1)mounte d o n e ach s id e o f body __________________________________________________________________ REAR MUD F LAPS AN D 1/4 FEND ER S: 1.00 MD24 36 Du raGua rd 3/8"HD 24" x 36 " Guar d Mud Flap - Black - wi th Lindco Equipmen t S ales, Inc . Logo & Merr illville,IN molde d b lu e/white into f la p (price per pair) 2.00 MFW 2375-SS Lindc o Mud Flap Bolting Plat e-Stainless Steel (Each ) 2.00 MFBH2375 A-SS Lindc o Mud Flap 90 Degre e Mou nting Plate-Sta in le ss Steel (Ea ch) * Mounted behind re ar whe els Quo te Nu mb er:190 409B Quo te Da te:Jan 7,202 0 Sales Rep Quot ed To: City of York vi lle 610 Tower Lane York vi lle,IL 60560 US A Good Thru 2/6/20 Customer ID Payme nt Te rms Page: York vi lle-01 Ne t 30 Day s 123 18 4 TOTAL Cont in ue d Sales Tax Co ntinu ed Subt ot al Co ntinu ed 216 8 E as t 88t h Dr iv e Merr illv ille,IN 464 10 US A Voice: Fax : (2 19)79 5-144 8 (2 19)73 6-089 2 25%Res tock Fee on All Cance ll ed an d R et urned Or ders Equipment Sales, Inc. QUOTATION Quant it y Item Number De scription * Swing st yl e flap br ack et s 1.00 MIN1400 BF Minimizer M IN 1400 Qua rt er Fender Kit Black with Flange Mount * Mounted in front of rear wheels __________________________________________________________________ ELECTRICAL AN D LIG HTIN G ITEMS: JUNC TI ON BOX: 1.00 PH-3 10 Phoenix 10-P ole Junc tion Box * Mounted at rear on bac k s id e o f rea r hinge for all aux . lighting. BACK UP AL AR M: 1.00 510 Ecco back -u p a la rm, 97 dB , 12 VDC . BODY UP LI GHT AND S WI TCH: 1.00 SWM 43C Prec o Switc h,water res istant , 5 amp rat ing,360 degre e mov ement , can be wired open or c lo sed, maded of AB S pla st ic, adjustable mounting bracket. 1.00 800 85 Imperial LED Ind ic at or Light AIR TAILGATE AI R V AL VE CONTROL: 1.00 320 178 Velvac 4 w ay va lv e solen oid f or air tailgate. * Mounted in rese rvo ir PINTLE HO OK LIGHTS: 1.00 603 21 Grote license l amp w/st ainles s st eel bra ck et . 1.00 562 1720 Buyer s S/S ID Light Ba r w/9 LEDs REAR COR NER POST LIG HTIN G: 2.00 KTLED W2238-24A UBLights 6" ova l,st rob e,amber , c la ss 1 LE D.Includes grommet & pigtail. * Mounted in top ov als on eac h rear corne r post 2.00 LE D22 38-10 R UBLights 6" Ova l S /T /T,class 1 LED.Includes grommet & pigtail. * Mounted in center ov al o n e ach re ar cor ner pos t 2.00 MTKTL2 238-2 4C UBLights 6" ova l b ac k up,cl as s 1 LED.Includes gr ommet &pigtail. Quo te Nu mb er:190 409B Quo te Da te:Jan 7,202 0 Sales Rep Quot ed To: City of York vi lle 610 Tower Lane York vi lle,IL 60560 US A Good Thru 2/6/20 Customer ID Payme nt Te rms Page: York vi lle-01 Ne t 30 Day s 123 18 5 TOTAL Cont in ue d Sales Tax Co ntinu ed Subt ot al Co ntinu ed 216 8 E as t 88t h Dr iv e Merr illv ille,IN 464 10 US A Voice: Fax : (2 19)79 5-144 8 (2 19)73 6-089 2 25%Res tock Fee on All Cance ll ed an d R et urned Or ders Equipment Sales, Inc. QUOTATION Quant it y Item Number De scription * Mounted in lower ov als on each rear corne r post CAB SHIELD STR OBES : 14.00 KTLED W2238-24A UBLights 6" ova l,st rob e,amber , c la ss 1 LE D.Includes grommet & pigtail. * Six (6) m ounted in front of cab shield* Mounted in bottom ovals on each side * Six (6) m ounted in rear of cab shield * One (1)mounte d in eac h si de of cab s hield * Stainles s st eel piping dow n front of cab shield and under body fo r cab shield wiring ru ns t o r ear. SPREADER LIGHTS: 2.00 MW L-19 Maxxima LED clear w ork light * Mounted one each side of dump body __________________________________________________________________ PRE-WET H YDRAULIC S: ** Quote is based on having pr e-w et manifold alread y o n t ru ck . ** Quote is based on having controller alre ady set up for pre-wet functions . 1.00 LI SC SG0607005 6-3 Ce rt if ied Power prew et, valv e instack w/flow mete r with stainless brac ke t 1.00 LI SC SG0609002 8 Ce rt if ied Power prew et plumbing kit, behind cab, 1 line,2 nozzles 1.00 LI SC SG0609001 3 Ce rt if ied Power prew et quic k re le ase k it w/1/2"hos e. 1.00 Cirus/Cer ti fied Power ha rnes s k it 75.00 Misc.Lindc o in trough stainles s st eel spr ay bar 4.00 8-049 304W /FJX-72 "Mid-State 1/2"x6 ' 304 S/S Line with f ittings 8.00 A2-12 .7-A PCI HD Se ri es Clamps for 1/2"tu bing 1.00 Ho ses & Fittings __________________________________________________________________ SALT SPREADER: Inst all Swens on SADS tailgat e sp reade r w/18"poly spinner , direct drive , 6" auger,st ainless st eel const ru ct ion,no pa in t,si des of sp reade r 8"or high er. Quo te Nu mb er:190 409B Quo te Da te:Jan 7,202 0 Sales Rep Quot ed To: City of York vi lle 610 Tower Lane York vi lle,IL 60560 US A Good Thru 2/6/20 Customer ID Payme nt Te rms Page: York vi lle-01 Ne t 30 Day s 123 18 6 TOTAL Cont in ue d Sales Tax Co ntinu ed Subt ot al Co ntinu ed 216 8 E as t 88t h Dr iv e Merr illv ille,IN 464 10 US A Voice: Fax : (2 19)79 5-144 8 (2 19)73 6-089 2 25%Res tock Fee on All Cance ll ed an d R et urned Or ders Equipment Sales, Inc. QUOTATION Quant it y Item Number De scription 278 .00 Misc.Cu st om stainless steel full height "York vi lle Style"remova ble tailgate sp il l shields (Pair) 267 .00 Ho ses , F ittings, adapt ors an d q uick coupler s f or spr eader shor t hos e kit __________________________________________________________________ PINTLE HI TCH: 2.00 INSTALL AT ION Lindc o Installation La bor Hou rs t o Cut existing pintle h it ch off of t ruc k an d p repar e frame for new pintle hitch 1.00 5/8"thick Lindco cus to m p int le plate 2.00 B46 Buyer s 3/4"dr op for ged D-ri ng w/we ld br ack et 4-1/2"x 4-1/2"O.D. 1.00 PH30 Buyer s 30 to n r igid mou nt pintle hook 1.00 054 002 Velvac 7-W ay Bla de Type Soc ket (M ale /Tr uck Si de) __________________________________________________________________ PLOW HI TC H: * NO PLOW HITCH RE PA IRS ON SINGLE AX LE RE FURB ISH TRU CK . __________________________________________________________________ SANDBLASTING AND P AI NTING:: 1.00 SANDBLAST FRAME&TAN KSandblas t,Prime & Paint ch ass is fr ame and tanks . Any rep airs ar e e xt ra! 1.00 PAINT-WHEELS Sand,Pr ep,Prime Where nee ded and Paint Black Wh eels 1.00 PAINT HOIST & SU BF RAPrime Wh ere need ed and Paint Hoist & Subf ra me to black 1.00 PAINT PINTLE HI TCH Paint Pintle Hitch 1.00 PAINT PLOW HITC H Paint Plow Hi tch,Incl uding lift arm, side plates,bumper and lift cyl inde r black __________________________________________________________________ MISCELL AN EOUS MATERIAL/FREIGH T/LABOR: 840 .58 Misc.Miscellaneous Ma terial -inc ludes an y o r all o f the following : wiring, elec trical connec tors, tie dow ns, clamps, nut, bolts,washers , s teel, oil,gre ase,etc. 135 0.00 FREIGHT FREIGHT 120 .00 INSTALL AT ION Lindc o Installation La bor Hou rs Quo te Nu mb er:190 409B Quo te Da te:Jan 7,202 0 Sales Rep Quot ed To: City of York vi lle 610 Tower Lane York vi lle,IL 60560 US A Good Thru 2/6/20 Customer ID Payme nt Te rms Page: York vi lle-01 Ne t 30 Day s 123 18 7 TOTAL Cont in ue d Sales Tax Co ntinu ed Subt ot al Co ntinu ed 216 8 E as t 88t h Dr iv e Merr illv ille,IN 464 10 US A Voice: Fax : (2 19)79 5-144 8 (2 19)73 6-089 2 25%Res tock Fee on All Cance ll ed an d R et urned Or ders Equipment Sales, Inc. QUOTATION Quant it y Item Number De scription __________________________________________________________________ DELI VERY NOTES: * Unit would not go into pr oducti on at Lindco till app rox im at ely 180-210 day s af ter rece iv ing your pur cha se ord er. * Allow 60-90 days to complet e u nit, once it is put into produ ct ion. Quo te Nu mb er:190 409B Quo te Da te:Jan 7,202 0 Sales Rep Quot ed To: City of York vi lle 610 Tower Lane York vi lle,IL 60560 US A Good Thru 2/6/20 Customer ID Payme nt Te rms Page: York vi lle-01 Ne t 30 Day s 123 18 8 TOTAL 47,126 .17 Sales Tax Subt ot al 47,126 .17 216 8 E as t 88t h Dr iv e Merr illv ille,IN 464 10 US A Voice: Fax : (2 19)79 5-144 8 (2 19)73 6-089 2 25%Res tock Fee on All Cance ll ed an d R et urned Or ders Equipment Sales, Inc.   PB Loader Corporation 5778 W. Barstow • Fresno, California 93722-5024 • Telephone (559) 277-7370 • Fax (559) 277-7375 Toll free 800-350-8521 • Web www.pbloader.com    QUOTATION UNITIED CITY OF YORKVILLE DATE: 12/31/2019 800 GAME FARM ROAD TERMS: NET 30 YORKVILLE, IL 60560-0901 F.O.B: FRESNO SOURCEWELL MEMBERSHIP ID# 99259 MFG PRODUCT: SEE NOTES INSTALL: SEE NOTES QTY PART NO. DESCRIPTION PRICE EXTENSION 11'-6" DUMP BODY WITH PRE-WET ASSEMBLY & SANDER PB LOADER SOURCEWELL CONTRACT NO. 052417-PBL SOURCEWELL CONTRACT LISTED ITEMS 1 PBLDB-05 $26,804.00 1 3% SOURCEWELL MEMBER DISCOUNT ($805.00) NON-SOURCEWELL LISTEM ITEM 1LOT $26,244.00 TOTAL NET PRICE:$52,243.00 NOTES: NO. 10172 PB LOADER SUPPORT BODY, 10 FT 5-6 YARD, 1821 CLASS 50 NTEA HOIST, 10 GAUGE STEEL BALANCE, 24" SIDES, 30" FRONT AND REAR, 12" SPREADER APRON, 1/4 CABSHIELD, LED LIGHTS, WIRING HARNESS & BACKUP ALARM, PUMP, CONTROLS, TANK, VALVE, MUD FLAPS, STEEL MUDGUARDS, HOT SHIFT PTO, AIR TAILGATE, PAINT BLACK, INSTALLATION 1. TOTAL INCLUDES FREIGHT. LOCAL SALES TAX NOT INCLUDED. 2. PURCHASE ORDER TO BE MADE OUT TO PB LOADER CORPORATION. ORDER WILL BE FULFILLED BY LINDCO. 3. PRODUCTION IS 180 TO 210 DAYS AFTER RECEIPT OF PURCHASE ORDER. DELIVERY OF COMPLETE UNIT IS APPROXIMATELY 60-90 DAYS AFTER PRODUCTION. 4. QUOTE IS BASED ON HAVING A PRE-WET MANIFOLD CURRENTLY AVAILABLE ON END USER'S TRUCK, AND AN EXISTING CONTROLLER SET UP FOR PRE- WET FUNCTIONS. 5. ADDITIONAL CHARGES WILL APPLY IF ANY REPAIRS TO THE CHASSIS FRAME RAIL OR TANKS IS REQUIRED. ADDITIONAL ITEMS AND CHANGES TO BODY: - REFURBISHING OF CUSTOMER EXISTING TANDEM AXLE PLOW TRUCK - REMOVE EXISTING BODY AND LIGHT BAR - INCREASE BODY LENGTH TO 11'-6" - CHANGE SIDE & TAILGATE HEIGHT TO 48" - CHANGE FRONT HEIGHT TO 58" - CROSS-MEMBERLESS BODY UNDERSTRUCTURE AND 3/16" 201 2B SS LONG SILLS - CHANGE MATERIAL TO 1/4" AR400 FLOOR - CHANGE SIDES, FRONT & TAILGATE MATERIAL TO 7 GA. 201 2B STAINLESS STEEL - SINGLE HORIZONTAL BRACE TO SIDES OF BODY - DOUBLE ACTING TAILGATE WITH 6-PANEL DESIGN (ONE HORIZ. AND TWO VERT. BRACES) - STAINLESS STEEL TAILGATE SPREADER CHAINS - CENTER MOUNTED PULL-DOWN STYLE COAL CHUTE - 1/2 CAB SHIELD CONSTRUCTED OF 201 2B STAINLESS STEEL (ILO 1/4 CAB SHIELD OF STEEL) WITH THREE (3) SEALED ACCESS PANELS ON TOP, SIX (6) OVAL CUT-OUTS IN FRONT, SIX (6) OVAL CUT-OUTS IN REAR AND ONE (1) OVAL IN EACH SIDE - TREAD GRIP WALK-RAIL WITH FOLD-UP LADDER AND GRAB HANDLES DRIVER SIDE FRONT (ALL 201 SS 2B STAINLESS STEEL) - TELESCOPIC HOIST (ILO UNDERBODY TYPE LISTED ABOVE) , MAILHOT COMPLETE WITH NITRIDED CYLINDER SLEEVES, HOIST CRADLE, FRAME MOUNTED BODY PROPS - HYDRUALIC LINES AND HOSES, 1/2" 304 SS WITH PCI HD SERIES CLAMPS - LED LIGHT KIT - TWO (2) SHOVEL STAINLESS STEEL SHOVEL HOLDERS, ONE EACH SIDE OF BODY - MUD FLAPS, DURAGUARD 3/8" HD 24" X 36" MUD FLAPS W/SWING STYLE FLAP BRACKETS & LINDCO EQUIPMENT SALES LOGO, MTD BEHIND REAR TANDEM WHEELS - FENDERS, MINIMIZER MIN1400 QUARTER FENDER KIT W/ BLACK FLANGE MOUNTED IN FRONT OF REAR WHEELS - JUNCTION BOX, PHOENIX 10-POLE MOUNTED REAR FOR AUXILIARY LIGHTING - BACKUP ALARM, ECCO 97 DB, 12 VDC - PRECO BODY UP SWITCH WITH IMPERIAL BODY UP LIGHT IN CAB - AIR TAILGATE WITH VELVAC 4-WAY SOLENOID VALVE, MTD IN RESERVOIR - REAR CORNER POST LIGHTING * UBLIGHTS 6" OVAL, STROBE, AMBER, CLASS 1 LED, MOUNTED IN TOP OVALS ON EACH REAR CORNER POST * UBLIGHTS 6" OVAL S/T/T, CLASS 1 LED MOUNTED IN CENTER OVAL ON EACH REAR CORNER POST * UBLIGHTS 6" OVAL BACK UP, CLASS 1 LED MOUNTED IN LOWER OVALS ON EACH REAR CORNER POST - CAB SHIELD STROBES, UBLIGHTS 6" OVAL, STROBE, AMBER, CLASS 1 LED * SIX (6) MOUNTED IN FRONT OF CAB SHIELD* MOUNTED IN BOTTOM OVALS ON EACH SIDE * SIX (6) MOUNTED IN REAR OF CAB SHIELD * ONE (1) MOUNTED IN EACH SIDE OF CAB SHIELD * STAINLESS STEEL PIPING FOR WIRING - SPREADER LIGHTS, MAXXIMA LED CLEAR, ONE EACH MOUNTED EACH SIDE OF BODY - PRE-WET TANK ASSEMBLY MOUNTED BEHIND CAB * TWO (2) 120 GAL. TANKS * SS MOUNTING FRAME * HOLD-DOWN STRAPS * MOUNTING HARDWARE * SWENSON 1-1/2" FEMALE QUICK FILL KIT * SWENSON V-BOX FLUSH KIT - PRE-WET HYDRAULICS (SEE NOTE 3) * CERTIFIED POWER PREWET, VALVE INSTACK W/FLOW METER WITH STAINLESS BRACKET * CERTIFIED POWER PREWET PLUMBING KIT, BEHIND CAB, 1 LINE, 2 NOZZLES * CERTIFIED POWER PREWET QUICK RELEASE KIT W/ 1/2" HOSE. * CIRUS/CERTIFIED POWER HARNESS KIT * LINDCO IN TROUGH STAINLESS STEEL SPRAY BAR * HOSES & FITTINGS - SALT SPREADER * SWENSON SADS TAILGATE SPREADER W/18" POLY SPINNER, DIRECT DRIVE, 6" AUGER, STAINLESS STEEL CONSTRUCTION (NO PAINT) * SIDES OF SPREADER 8" OR HIGHER. * CUSTOM STAINLESS-STEEL FULL HEIGHT "YORKVILLE STYLE" REMOVABLE TAILGATE SPILL SHIELDS (PAIR) * HOSES, FITTINGS, ADAPTORS AND QUICK COUPLERS FOR SPREADER SHORT HOSE KIT - PINTLE HITCH: * CUT EXISTING PINTLE HITCH OFF OF TRUCK AND PREPARE FRAME FOR NEW PINTLE HITCH * 5/8" THICK LINDCO CUSTOM PINTLE PLATE * BUYERS 3/4" DROP FORGED D-RING W/WELD BRACKET 4-1/2" X 4-1/2" O.D. * BUYERS 30 TON RIGID MOUNT PINTLE HOOK * VELVAC 7-WAY BLADE TYPE SOCKET (MALE / TRUCK SIDE) - REFURBISH EXISTING PLOW HITCH * REINFORCE AND STRAIGHTEN PLOW HITCH WHERE NEEDED * MISCELLANEOUS MATERIAL ( WIRING, ELECTRICAL CONNECTORS, TIE DOWNS, CLAMPS, NUT, BOLTS, WASHERS, STEEL, OIL, GREASE, ETC.) - SANDBLAST & PAINTING * SANDBLAST, PRIME & PAINT CHASSIS FRAME AND TANKS (SEE NOTE 4) * SAND, PREP, PRIME WHERE NEEDED AND PAINT BLACK WHEELS * PRIME WHERE NEEDED AND PAINT HOIST & SUBFRAME TO BLACK * PAINT PINTLE HITCH * PAINT PLOW HITCH, INCLUDING LIFT ARM, SIDE PLATES, BUMPER AND LIFT CYLINDER BLACK - INSTALLATION & FREIGHT Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Human Resources Community Development Police Public Works Parks and Recreation Agenda Item Number New Business #9 Tracking Number PW 2020-09 Oxcart Permitting System & Overweight Permitting Fees Public Works Committee – January 21, 2020 N/A Majority Approval See Attached Memo Eric Dhuse Public Works Name Department Summary Discussion regarding the utilization of the Oxcart Permitting System and the implementation of an Overweight/Oversize Truck Permitting fee schedule Background As part of the goal setting process for the United City of Yorkville the council identified Automation and Technology as the number one goal for 2020. To assist in processing overweight truck permit requests that come into the City, staff began researching an on-line truck permitting system used by multiple cities in and around Kendall County called Oxcart. The Oxcart Permitting System is a private company that contracts directly with the trucking companies to provide on-line permit applications for both municipal and state roadways. The permitting process is as follows:  Trucking company completes an on-line permit application with Oxcart  Oxcart will process the permit and overweight/size information  The city will receive a permit request for approval via email  Once approval is given Oxcart processes and issues all permits. There are several advantages to utilizing the Oxcart Permitting System.  Oxcart is free to the City. There is no monthly or annual membership fee to the City  Oxcart will oversee and manage the approval process saving staff time  Oxcart will issues local and state permits to the trucking companies eliminating City involvement  Oxcart will manage processing and payment of all associated fees based on our fee schedule.  Oxcart will collect and pay the city for all permit fees Below is a step by step description of the process.  Trucking company gets on Oxcart’s website and enters the information on the route they would like to use to move the load. As the last step of this process, the trucking company enters their credit card information to preauthorize the card.  The route charges are calculated, and all entities are informed of the permit application.  All entities either approve or deny the permit.  If the permit it approved, the credit card is charged, and the applicant can view/print the permit immediately. If the permit is denied, the preauthorization is cleared, and the process starts over.  By the 10th of each month, the city will receive a statement detailing how many permits were issued in the previous month, and dollar amount associated with those permits. The money is then electronically transferred to our bank account.  As a side note, the carrier is charged a fee of $5-15 per permit depending on the routing. Memorandum To: Public Works Committee From: Eric Dhuse, Public Works Director Jim Jensen, Police Chief CC: Bart Olson, Administrator Date: January 15, 2020 Subject: Oxcart Permitting System & Overweight Permitting Fees Currently, the United City of Yorkville has no fee schedules associated with truck permitting. Refer to Exhibit A (Comparative Overweight/Permitting Information) for details on associated fees area wide. Recommendation At this time staff has two (2) recommendations: 1). Approve the use of the Oxcart Permitting System 2). Approve the implementation of a permitting fee schedule as provided (Exhibit B) Attachments Exhibit A: Comparative Overweight/Permitting Information Exhibit B: Permit Fee Schedule City Management Permit Time Permitting  Program Fee Information Permits Per  Year Aurora Police 5 Minutes Oxcart 7 Day:  $50 Unknown 14 Day:  $80 Quarterly:  $150 Annual:  $450 North Aurora Police 10 Minutes Oxcart Fee amount determined by weight 96 Fee amount single, round trip, multiple trips Under 88,000lbs:  $50, $75, $150 88,000‐100,000lbs:  $75, $100, $175 100,000‐120,000lbs:  $100, $125, $225 120,001‐150,000lbs:  $125, $150, $300 150,000+lbs:  $125, $150, $300 Sugar Grove Police 10 Minutes Oxcart 7 Day Single Trip:  $50 72 14 Day Round Trip:  $75 30 Day Multiple Trip:  $150 Oswego Police & PW 5‐10 Minutes Oxcart 7 Day:  $50 100 14 Day:  $80 120 Day:  $150 Naperville Engineering 15 Minutes Oxcart Fee amount per mile 645 Fee amount per axle St. Charles Unknown 15 Minutes Oxcart Fee amount based on Height 150 Fee amount based on Width Fee amount single, round trip, multiple trips Minooka Unknown 10 Minutes Oxcart 7 Day Single Trip:  $30 192 14 Day Round Trip:  $50 30 Day Round Trip:  $75   Plainfield Unknown 10 Minutes Oxcart Single Trip Permits Valid 5 days 650 Round Trip Permits Valid 10 Days 100,000lbs:  Single $75  Roundtrip $150 120,000lbs:  Single $100  Roundtrip $200 150,000lbs:  Single $125  Roundtrip $250 150,000+lbs:  Single $150  Roundtrip $300 Oversize Only:  Single $50  Roundtrip $100 Kendall County Highway Dept 5 Minutes Oxcart Permit fees vary depending on weight, axle 1,500 Overweight/Permitting Comparison Information Proposed fees for oversize/overweight permits  Single trip permit valid for 7 days from date of issuance  Round trip permit valid for 14 days from date of issuance  Maximum of 20,000 lbs./axle Oversize Only Single trip - $50 Round trip - $100 100,000 lbs. Single trip – $50 Round trip - $100 150,000 lbs. Single trip - $75 Round trip - $150 +150,000 lbs. Single trip - $100 Round trip - $200 90 day unlimited permit - $500 180 day unlimited permit - $750 Annual unlimited permit - $1000 United City of Yorkville Public Works Department 800 Game Farm Rd. Yorkville, IL 60560 Phone – 630-553-4370 Fax – 630-553-4377