Public Works Packet 2020 09-15-20
AGENDA
PUBLIC WORKS COMMITTEE MEETING
Tuesday, September 15, 2020
6:00 p.m.
City Hall Conference Room
800 Game Farm Road, Yorkville, IL
Citizen Comments:
Minutes for Correction/Approval: July 21, 2020
New Business:
1. PW 2020-48 Water Department Reports for April – August 2020
2. PW 2020-49 Cedarhurst of Yorkville Bond Release
3. PW 2020-50 2020 Striping Program – Bid Award
4. PW 2020-51 2020 Road to Better Roads Program – Change in Plans and Final Payment Estimate
5. PW 2020-52 ITEP Applications
6. PW 2020-53 Proposed Road to Better Roads Program and Rebuild Illinois Program
7. PW 2020-54 Cannonball Trail Curve Speed Limit
Old Business:
Additional Business:
2019/2020 City Council Goals – Public Works Committee
Goal Priority Staff
“Municipal Building Needs & Planning” 2 Bart Olson, Rob Fredrickson, Eric Dhuse,
James Jensen, Tim Evans & Erin Willrett
“Road to Better Roads Funding” 3 Bart Olson, Rob Fredrickson & Eric Dhuse
“Water Planning” 6 Eric Dhuse & Brad Sanderson
“School Safety (Exterior & Traffic)” 8 (tie) Eric Dhuse & James Jensen
“Quiet Zones” 14 (tie) Eric Dhuse, Erin Willrett & Brad Sanderson
“Route 47 Crossings” 19 Eric Dhuse & Brad Sanderson
United City of Yorkville
800 Game Farm Road
Yorkville, Illinois 60560
Telephone: 630-553-4350
www.yorkville.il.us
UNITED CITY OF YORKVILLE
WORKSHEET
PUBLIC WORKS COMMITTEE
Tuesday, September 15, 2020
6:00 PM
CITY HALL CONFERENCE ROOM
---------------------------------------------------------------------------------------------------------------------------------------
CITIZEN COMMENTS:
---------------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------------
MINUTES FOR CORRECTION/APPROVAL:
---------------------------------------------------------------------------------------------------------------------------------------
1. July 21, 2020
□ Approved __________
□ As presented
□ With corrections
---------------------------------------------------------------------------------------------------------------------------------------
NEW BUSINESS:
---------------------------------------------------------------------------------------------------------------------------------------
1. PW 2020-48 Water Department Reports for April – August 2020
□ Moved forward to CC __________
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
2. PW 2020-49 Cedarhurst of Yorkville Bond Release
□ Moved forward to CC __________
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
3. PW 2020-50 2020 Striping Program – Bid Award
□ Moved forward to CC __________
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
4. PW 2020-51 2020 Road to Better Roads Program – Change in Plans and Final Payment Estimate
□ Moved forward to CC __________
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
5. PW 2020-52 ITEP Applications
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
6. PW 2020-53 Proposed Road to Better Roads Program and Rebuild Illinois Program
□ Moved forward to CC __________
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
7. PW 2020-54 Cannonball Trail Curve Speed Limit
□ Moved forward to CC __________
□ Approved by Committee __________
□ Bring back to Committee __________
□ Informational Item
□ Notes ___________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------------------------
ADDITIONAL BUSINESS:
---------------------------------------------------------------------------------------------------------------------------------------
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
Minutes
Tracking Number
Minutes of the Public Works Committee – July 21, 2020
Public Works Committee – September 15, 2020
Majority
Committee Approval
Minute Taker
Name Department
Page 1 of 3
DRAFT
UNITED CITY OF YORKVILLE
PUBLIC WORKS COMMITTEE
Tuesday, July 21, 2020, 6:00pm
Yorkville City Hall, Conference Room
800 Game Farm Road
This meeting was held in accordance with Public Act 101-0640 and Gubernatorial Disaster
Proclamation issued by Governor Pritzker pursuant to the powers vested in the Governor under the
Illinois Emergency Management Agency Act. Due to the current Covid-19 pandemic, the City of
Yorkville is encouraging social distancing by allowing remote attendance at this meeting.
IN ATTENDANCE:
Committee Members
Vice-Chairman Ken Koch/remote attendance
Alderman Chris Funkhouser/remote attendance
Alderman Seaver Tarulis/remote attendance
Absent: Alderman Joe Plocher
Other City Officials
City Administrator Bart Olson/in-person attendance
Public Works Director Eric Dhuse/remote attendance
Engineer Brad Sanderson, EEI/remote attendance
Other Guests: None
The meeting was called to order at 6:00pm by Vice-Chairman Ken Koch.
Citizen Comments: None
Previous Meeting Minutes: June 16, 2020
The minutes were approved as presented on a voice vote.
New Business:
1. PW 2020-40 Capital Improvement Summary
Mr. Sanderson said this is the quarterly update. He reviewed the water treatment plant work, Roads to
Better Road program which will be completed by the end of August and the Mill Road project which is
waiting for one final agreement from the railroad. The striping program will be discussed later on the
agenda.
Page 2 of 3
2. PW 2020-41 Quarterly Bond and Letter of Credit Reduction Summary
There was no activity this quarter according to Mr. Sanderson, though he expects that to increase by the
end of the year. He said there are approximately 20-25 letters of credit pending.
3. PW 2020-42 Kendall Marketplace – Plat of Abrogation
The developers of Kendall Marketplace commercial area wish to abandon the public utility easements.
They have received approvals from the utilities and the city supports the removal according to Mr.
Sanderson and he recommended moving ahead with this plat. Committee members approved and it
moves forward to City Council.
4. PW 2020-43 MFT Resolution for 2020 Striping Program
Mr. Sanderson said there is a reduced budget from $65,000 to $25,000, for the striping and the program
uses MFT funds. The targeted area is around Menards. The striping is done with urethane paint since
it is more durable and the work will be contracted out since the city does not have the equipment for
this process, said Mr. Dhuse. He said thermoplastic is not used since it is scraped up by snowplows
and does not last. The committee recommended approval.
5. PW 2020-44 Beaver Street Booster Pump Station
a. Engineering Agreement
b. Recommendation for Improvements
Mr. Olson gave an overview of this project. The project was originally planned to be a standby electric
generator for the Raintree water treatment plant. City Council approved a design contract, however,
the process was stopped and an alternative solution has been chosen that will be within budget. A
design contract with EEI must be approved so the job can go out for bid. The action item is the
engineering contract for $47,762 and Mr. Olson said the city recommends approval of the agreement
with EEI. Mr. Olson turned the discussion over to Mr. Sanderson and Mr. Dhuse.
Mr. Dhuse detailed the history of this project and said it had been cost-prohibitive in the past. He said
to move water from north to south, Beaver Street was the only problem area in the event of a power
outage. By putting in a generator there, it would allow water to still be moved if there was a large
disaster. The cost of this solution would be about $500,000. It is expected the job would be bid out in
November or December and completed by end of FY.
Alderman Koch asked if the city has a truck with a portable generating system. Mr. Dhuse said the city
does not have a truck, but has a contract with CAT. They also discussed scenarios if multiple wells
malfunctioned. This item moves forward to the City Council.
6. PW 2020-45 Wyland National Mayor's Challenge for Water Conservation
Mr. Olson said the city has participated the past two years and the Challenge is now more of a public
information campaign. Residents can participate via a website, by committing to water conservation
efforts. At the end of the Challenge, Yorkville will be compared to other towns nationwide and has
ranked highly in the past few years. There are no individual prizes this year. Recognition of
individuals was suggested, however, Mr. Olson said individual data is not provided. The committee
recommended participation in this Challenge.
Page 3 of 3
7. PW 2020-46 Rebuild Illinois Grants Program Applications
The City Council has previously approved going forward with infrastructure for the Eldamain
extension and east alley infrastructure replacement projects. Staff reviewed these applications and
determined they might not make the cut for the Rebuild Illinois program, but staff time and engineer
time already expended would warrant moving these projects forward.
A Public Hearing will be held on it July 28th for the east alley project. The cost estimate is just under
$1 million, making it eligible for an application for a 100% rebuild grant under the Rebuild Illinois
program, with no local match needed. Alderman Koch asked if Rowdys would then be allowed a
permanent deck off the back of their business. The goal is to allow a deck at some location in the back.
Mr. Olson then discussed the Eldamain project. The cost to run utilities to Eldamain is $5 million. The
maximum grant award is $2 million and the city would have to fund $3 million to complete this
project. There is a point penalty for no local match for this project. As part of the grant application, it
requires a City Council vote and statement on how the city will pay for the deficit. He asked the
committee their opinion about a verbal commitment now and later in writing and a commitment to fund
$3 million, knowing the city could back out at later time. Alderman Funkhouser said he would like to
see the city move forward with this and said this area will not develop without utilities. Mr. Olson
noted that Eldamain Rd. was looked at last year as a possible location for a data center which recently
was awarded to DeKalb. Alderman Tarulis said he would like more information before making a
decision. Mr. Koch asked if the city could do recapture and pay off a bond sooner. This matter will
move to City Council for discussion and a Public Hearing will also be held on this project.
8. PW 2020-47 Sewer Ordinance Update
This update revised the ordinance language, rather than procedural changes, said Mr. Olson. The
committee was OK with moving this forward to the full Council.
Old Business: None
Additional Business:
There was no further business and the meeting was adjourned at 6:37pm.
Minutes respectfully transcribed by
Marlys Young, Minute Taker/remote attendance
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #1
Tracking Number
PW 2020-48
Monthly Water Reports April – August 2020
Public Works Committee – September 15, 2020
Positive
Approval
Monthly water reports as required by IEPA
Eric Dhuse Public Works
Name Department
United City of Yorkville
WATER DEPARTMENT REPORT
__ April 2020 _
MONTH / YEAR
WELLS
NO WELL DEPTH
(FEET)
PUMP DEPTH
(FEET)
WATER ABOVE PUMP
(FEET)
THIS MONTH’S PUMPAGE
(GALLONS)
4 1386 664 384 13,227,000
7 1527 1125 430 8,254,100
8 1384 840 456 16,443,000
9 1368 861 509 8,361,000
TOTAL TREATED 46,285,100
CURRENT MONTH’S PUMPAGE IS 1,452,600 GALLONS LESS THAN LAST MONTH
_ _1,443,900 GALLONS LESS THAN LAST YEAR
DAILY AVERAGE PUMPED: _ 1,596,038___GALLONS
DAILY MAXIMUM PUMPED: __ 2,511,000__ GALLONS
DAILY AVERAGE PER CAPITA USE: ___ 77.72 __ GALLONS
WATER TREATMENT:
CHLORINE: 1,048 LBS. FED CALCULATED CONCENTRATION: ___2.93__ MG/L
FLUORIDE: _ 0 LBS. FED MEASURED CONCENTRATION: _____.93 __ MG/L
POLYPHOSPHATE: 1140_ LBS. FED CALCULATED CONCENTRATION: ___0.99___ MG/L
WATER QUALITY:
BACTERIOLOGICAL SAMPLES ANALYZED BY ILLINOIS ENVIRONMENTAL PROTECTION AGENCY:
__23 SATISFACTORY _____ UNSATISFACTORY (EXPLAIN)
___________________________________________________________________________________________
FLOURIDE: __ 3 __ SAMPLE(S) TAKEN CONCENTRATION: _ 0.80 MG/L
MAINTENANCE:
NUMBER OF METERS REPLACED: __0 NUMBER OF LEAKS OR BREAKS REPAIRED: __ ___
MXU’S: __39 BATTERIES REPLACED: _
NEW CUSTOMERS:
RESIDENTIAL: __14 COMMERCIAL: ____ _ _ INDUSTRIAL/GOVERNMENTAL: ___ ___
COMMENTS:
United City of Yorkville
WATER DEPARTMENT REPORT
__ May 2020 _
MONTH / YEAR
WELLS
NO WELL DEPTH
(FEET)
PUMP DEPTH
(FEET)
WATER ABOVE PUMP
(FEET)
THIS MONTH’S PUMPAGE
(GALLONS)
4 1386 664 384 18,335,000
7 1527 1125 430 10,546,300
8 1384 840 447 11,828,000
9 1368 861 278 13,038,000
TOTAL TREATED 53,747,300
CURRENT MONTH’S PUMPAGE IS 5,108,000 GALLONS MORE THAN LAST MONTH
_ _2,444,000 GALLONS MORE THAN LAST YEAR
DAILY AVERAGE PUMPED: _ 1,733,784___GALLONS
DAILY MAXIMUM PUMPED: __ 2,368,000__ GALLONS
DAILY AVERAGE PER CAPITA USE: ___ 80.30 __ GALLONS
WATER TREATMENT:
CHLORINE: 1,180 LBS. FED CALCULATED CONCENTRATION: ___2.84__ MG/L
FLUORIDE: _ 0 LBS. FED MEASURED CONCENTRATION: _____.70 __ MG/L
POLYPHOSPHATE: 1059_ LBS. FED CALCULATED CONCENTRATION: ___0.89___ MG/L
WATER QUALITY:
BACTERIOLOGICAL SAMPLES ANALYZED BY ILLINOIS ENVIRONMENTAL PROTECTION AGENCY:
__23 SATISFACTORY _____ UNSATISFACTORY (EXPLAIN)
___________________________________________________________________________________________
FLOURIDE: __ 3 __ SAMPLE(S) TAKEN CONCENTRATION: _ 0.80 MG/L
MAINTENANCE:
NUMBER OF METERS REPLACED: __1 GOV NUMBER OF LEAKS OR BREAKS REPAIRED: __ ___
MXU’S: __37 BATTERIES REPLACED: _
NEW CUSTOMERS:
RESIDENTIAL: __15 COMMERCIAL: ____ _ _ INDUSTRIAL/GOVERNMENTAL: ___ ___
COMMENTS:
United City of Yorkville
WATER DEPARTMENT REPORT
__ June 2020 _
MONTH / YEAR
WELLS
NO WELL DEPTH
(FEET)
PUMP DEPTH
(FEET)
WATER ABOVE PUMP
(FEET)
THIS MONTH’S PUMPAGE
(GALLONS)
4 1386 664 384 24,635,000
7 1527 1125 430 12,739,500
8 1384 840 447 12,190,000
9 1368 861 278 20,024,000
TOTAL TREATED 69,588,500
CURRENT MONTH’S PUMPAGE IS 15,841,200 GALLONS MORE THAN LAST MONTH
_ _18,568,500 GALLONS MORE THAN LAST YEAR
DAILY AVERAGE PUMPED: _ 2,319,617___GALLONS
DAILY MAXIMUM PUMPED: __ 3,148__ GALLONS
DAILY AVERAGE PER CAPITA USE: ___ 107.20 __ GALLONS
WATER TREATMENT:
CHLORINE: 1,698 LBS. FED CALCULATED CONCENTRATION: ___3.17__ MG/L
FLUORIDE: _ 0 LBS. FED MEASURED CONCENTRATION: _____.72 __ MG/L
POLYPHOSPHATE: 1579_ LBS. FED CALCULATED CONCENTRATION: ___1.03___ MG/L
WATER QUALITY:
BACTERIOLOGICAL SAMPLES ANALYZED BY ILLINOIS ENVIRONMENTAL PROTECTION AGENCY:
__23 SATISFACTORY _____ UNSATISFACTORY (EXPLAIN)
___________________________________________________________________________________________
FLOURIDE: __ 5 __ SAMPLE(S) TAKEN CONCENTRATION: _ 0.80 MG/L
MAINTENANCE:
NUMBER OF METERS REPLACED: __1 NUMBER OF LEAKS OR BREAKS REPAIRED: __ ___
MXU’S: __46 BATTERIES REPLACED: _
NEW CUSTOMERS:
RESIDENTIAL: __7 COMMERCIAL: ____ _ _ INDUSTRIAL/GOVERNMENTAL: ___ ___
COMMENTS:
United City of Yorkville
WATER DEPARTMENT REPORT
__ July 2020 _
MONTH / YEAR
WELLS
NO WELL DEPTH
(FEET)
PUMP DEPTH
(FEET)
WATER ABOVE PUMP
(FEET)
THIS MONTH’S PUMPAGE
(GALLONS)
4 1386 664 384 27,304,000
7 1527 1125 430 12,731,000
8 1384 840 447 14,575,000
9 1368 861 278 16,614,000
TOTAL TREATED 71,224,000
CURRENT MONTH’S PUMPAGE IS 1,635,500 GALLONS MORE THAN LAST MONTH
_ _10,437,000 GALLONS MORE THAN LAST YEAR
DAILY AVERAGE PUMPED: _ 2,297,548___GALLONS
DAILY MAXIMUM PUMPED: __ 3,187__ GALLONS
DAILY AVERAGE PER CAPITA USE: ___ 105.78 __ GALLONS
WATER TREATMENT:
CHLORINE: 1,861 LBS. FED CALCULATED CONCENTRATION: ___3.4__ MG/L
FLUORIDE: _ 0 LBS. FED MEASURED CONCENTRATION: _____.82 __ MG/L
POLYPHOSPHATE: 1667_ LBS. FED CALCULATED CONCENTRATION: ___1.07___ MG/L
WATER QUALITY:
BACTERIOLOGICAL SAMPLES ANALYZED BY ILLINOIS ENVIRONMENTAL PROTECTION AGENCY:
__23 SATISFACTORY _____ UNSATISFACTORY (EXPLAIN)
___________________________________________________________________________________________
FLOURIDE: __ 10 __ SAMPLE(S) TAKEN CONCENTRATION: _ 0.82 MG/L
MAINTENANCE:
NUMBER OF METERS REPLACED: __ NUMBER OF LEAKS OR BREAKS REPAIRED: __ ___
MXU’S: __12 BATTERIES REPLACED: _
NEW CUSTOMERS:
RESIDENTIAL: __16 COMMERCIAL: ____ 1_ _ INDUSTRIAL/GOVERNMENTAL: ___ ___
COMMENTS:
United City of Yorkville
WATER DEPARTMENT REPORT
__ August 2020 _
MONTH / YEAR
WELLS
NO WELL DEPTH
(FEET)
PUMP DEPTH
(FEET)
WATER ABOVE PUMP
(FEET)
THIS MONTH’S PUMPAGE
(GALLONS)
4 1386 664 384 30,305,000
7 1527 1125 430 13,084,800
8 1384 840 447 23,254,000
9 1368 861 278 11,916,000
TOTAL TREATED 78,559,800
CURRENT MONTH’S PUMPAGE IS 7,335,800 GALLONS MORE THAN LAST MONTH
_ _16,130,700 GALLONS MORE THAN LAST YEAR
DAILY AVERAGE PUMPED: _ 2,534,187___GALLONS
DAILY MAXIMUM PUMPED: __ 3,318__ GALLONS
DAILY AVERAGE PER CAPITA USE: ___ 116.63 __ GALLONS
WATER TREATMENT:
CHLORINE: 2,048 LBS. FED CALCULATED CONCENTRATION: ___3.4__ MG/L
FLUORIDE: _ 0 LBS. FED MEASURED CONCENTRATION: _____.75 __ MG/L
POLYPHOSPHATE: 1779_ LBS. FED CALCULATED CONCENTRATION: ___1.03___ MG/L
WATER QUALITY:
BACTERIOLOGICAL SAMPLES ANALYZED BY ILLINOIS ENVIRONMENTAL PROTECTION AGENCY:
__23 SATISFACTORY _____ UNSATISFACTORY (EXPLAIN)
___________________________________________________________________________________________
FLOURIDE: __ 16 __ SAMPLE(S) TAKEN CONCENTRATION: _ 0.75 MG/L
MAINTENANCE:
NUMBER OF METERS REPLACED: __5 NUMBER OF LEAKS OR BREAKS REPAIRED: __ ___
MXU’S: __22 BATTERIES REPLACED: _
NEW CUSTOMERS:
RESIDENTIAL: __21 COMMERCIAL: ____ 1_ _ INDUSTRIAL/GOVERNMENTAL: ___ ___
COMMENTS:
The usage for this month is historically high, the long dry spell we had and extra flushing for the Kendall Market
Place Residential construction that occurred as well was a contributor.
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #2
Tracking Number
PW 2020-49
Cedarhurst of Yorkville Bond Release
Public Works Committee – September 15, 2020
Majority
Consideration of Approval
Recommendation to release remaining performance security
Brad Sanderson Engineering
Name Department
The developer has completed the remaining punchlist items from the one-year warranty period
and we are now recommending a full release of their remaining performance security. The value
of the remaining security is $3,778.00.
The public improvements were accepted on July 23, 2019.
Please let us know if you have any questions.
Memorandum
To: Bart Olson, City Administrator
From: Brad Sanderson, EEI
CC: Eric Dhuse, Director of Public Works
Krysti Barksdale-Noble, Community Dev. Dir.
Lisa Pickering, City Clerk
Date: August 14, 2020
Subject: Cedarhurst of Yorkville
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #3
Tracking Number
PW 2020-50
2020 Striping Program
Public Works Committee – September 15, 2020
Majority
Consideration of Contract Award
Recommendation of Award
Brad Sanderson Engineering
Name Department
Bids will be received on September 11th at 10:00 am. Bid results will be provided at the
Committee meeting.
If you have any questions or require additional information, please let us know.
Memorandum
To: Bart Olson, City Administrator
From: Brad Sanderson, EEI
CC: Eric Dhuse, Director of Public Works
Rob Fredrickson, Finance Director
Lisa Pickering, City Clerk
Date: September 8, 2020
Subject: 2020 Striping Program
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #4
Tracking Number
PW 2020-51
2020 Road to Better Roads Program
Public Works Committee – September 15, 2020
Majority
Recommendation to Approve Request for Change in Plans
and Final Payment Estimate
Brad Sanderson Engineering
Name Department
Approval of Request for Change in Plans and Final Payment Estimate
The 2020 Roads to Better Roads Program was awarded to Geneva Construction Co. P.O. Box
998 Aurora, Illinois 60507 at total awarded value of $737,441.07. The project is now complete
and accepted. The project came in $82,137.89 under budget for a Final Construction Cost of
$655,303.19. Due to the use of Motor Fuel Tax Funds, the Request for Change in Plans and
Engineer’s Final Payment Estimate need to be approved by IDOT before final payment can be
made.
We recommend City Approval of the Request for Change in Plans and Engineer’s Final Payment
Estimate.
If you have any questions or require additional information, please let us know.
Memorandum
To: Bart Olson, City Administrator
From: Brad Sanderson, EEI
CC: Eric Dhuse, Director of Public Works
Rob Fredrickson, Finance Director
Lisa Pickering, City Clerk
Date: September 15, 2020
Subject: 2020 Roads to Better Roads Program
o+9:1
Illinois Department Request for Approval of Change of Plans o '
of Transportation
Local Public Agency County Route Section Number
United City of Yorkville Kendall N/A 20-00000-00-GM
Request Number Contractor
1 Final Geneva Construction Co.
Address City State Zip Code
P.O. Box 998 Aurora IL 60507
Date
06/26/20
I recommend that this Deduction be made from the above contract.
The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the unit prices.
Unit of
Addition (A)
Item Description
Measure Quantity Unit Price or Deduction Total Addition Total Deduction
D)
SUPPLEMENTAL WATERING UNIT 10 0.010 D 0.00 0.10
BITUMINOUS MATERIALS
LB 12037.0 0.010 D 0.00 120.37TACKCOAT)
HOT MIX ASPHALT SURFACE
SQ YD 4.2 10.000 D 0.00 42.00REMOVAL - BUTT JOINT
HOT MIX ASPHALT BINDER
TON 203.4 69.500 D 0.00 $14,136.30COURSE, IL- 9.5, N50
HOT MIX ASPHALT SURFACE
TON 22.2 69.500 D 0.00 $1,542.90COURSE, MIX "D", N50
PORTLAND CEMENT
SQ FT 189.4 6.500 A 1,231.10 0.00CONCRETESIDEWALK5INCH
DETECTABLE WARNINGS SQ FT 2.0 25.000 D 0.00 50.00
SIDEWALK REMOVAL SQ FT 49.4 1.150 A 56.81 0.00
HOT MIX ASPHALT SURFACE
SQ YD 349.4 2.250 A 786.15 0.00REMOVAL, 3"
CLASS D PATCHES, TYPE I, 3
SQ YD 200.5 29.000 D 0.00 $5,814.50INCH
CLASS D PATCHES, TYPE II, 3
SQ YD 202.6 29.000 D 0.00 $5,875.40INCH
CLASS D PATCHES, TYPE III, 3
SQ YD 719.2 24.000 D 0.00 $17,260.80INCH
CLASS D PATCHES, TYPE IV, 3
SQ YD 1750.4 21.000 D 0.00 $36,758.40INCH
MANHOLES TO BE ADJUSTED EA 1 510.000 D 0.00 510.00
INLETS TO BE ADJUSTED EA 2 280.000 A 560.00 0.00
THERMOPLASTIC PAVEMENT
MARKING - LETTERS AND SQ FT 117 4.000 D 0.00 468.00
SYMBOLS
THERMOPLASTIC PAVEMENT
FOOT 2625.5 0.400 A 1,050.20 0.00MARKING - LINE 4"
THERMOPLASTIC PAVEMENT
FOOT 730 2.120 A 1,547.60 0.00MARKING - LINE 6"
Printed 09/09/20 Page 1 of 2 BLR 13210(Rev.02/06/20)
Unit of
Addition(A)
Item Description
Measure Quantity Unit Price or Deduction Total Addition Total Deduction
D)
THERMOPLASTIC PAVEMENT
FOOT 10 8.000 D 0.00 80.00MARKING - LINE 24"
SODDING, SPECIAL SQ YD 58 15.250 A 884.50 0.00
HOT-MIX ASPHALT SURFACE
REMOVAL, VARIABLE DEPTH
SQ YD 115.5 2.250 D 0.00 259.88
SANITARY MANHOLES TO BE
EA 0 1,215.000 0.00 0.00ADJUSTED
ROUTING AND SEALING
FOOT 515 0.400 D 0.00 206.00CRACKS
WHEEL STOP REMOVAL AND
EA 0 35.000 0.00 0.00RESET
HOT-MIX ASPHALT DRIVEWAY
REMOVAL AND REPLACEMENT SQ YD 5 98.000 D 0.00 490.00
COMBINATION CONCRETE
CURB AND GUTTER REMOVAL FOOT 153.1 32.500 D 0.00 $4,975.75
AND REPLACEMENT
RAILROAD PROTECTIVE
LSUM 0 3,500.000 0.00 0.00LIABILITYINSURANCE
TIME AND MATERIALS NO. 1 LSUM 336.15 1.000 A 336.15 0.00
Total Changes $6,452.51 $88,590.40
Add Row
Total Net Change 82,137.89)
Amount of Original Contract 737,441.07
Amount of Previous Change Orders 0.00
Amount of adjusted/final contract 655,303.18
Total net deduction to date 82,137.89) which is -11.14% of the contract price.
State fully the nature and reason for the change
When the net increase or decrease in the cost of the contract is$10,000.00 or more, or the time of completion is increased or decreased
by 30 days or more, one of the following statements must be checked:
The Local Public Agency has determined that the circumstances which necessitate this change were not reasonably
foreseeable at the time the contract was signed.
O The Local Public Agency has determined that the change is germane to the original contract is signed.
The Local Public Agency has determined that this change is in the best interest of the Local Public Agency and is
authorized by law.
Prepared By Title of Preparer
Nadia L Schweisthal Senior Project Engineer
Submitted/Approved
Local Public Agency Date
BY:
Title: Mayor
For a Road District project County Engineer signature required.
County Engineer/Superintendent of Highways Date
Printed 09/09/20 Page 2 of 2 BLR 13210(Rev.02/06/20)
Instructions for BLR 13210
Form Instructions are not to be submitted with the form.
This form shall be used for any contract, day labor construction, or contract maintenance projects to document any differences between
plan quantities and completed quantities. Refer to Chapter 13 of the Bureau of Local Roads and Streets Manual for more information.
For signature requirements, refer to Chapter 2, Section 3.05(b)of the BLRS Manual.
When filling out this form electronically, once a field is initially completed, fields requiring the same information will be auto-populated.
An agreed unit price letter must be submitted as an attachment to this form for any new pay items. For any force account work a copy of
the billing(s)must also be attached to this form when submitted.
Local Public Agency Insert the name of the Local Public Agency(LPA).
County Insert the name of the County where the LPA is located.
Route Insert the name of the route on which the project is located.
Section Number Insert the section number for this project without dashes,they are automatically inserted.
Request No. Insert the number applicable to the number of times this form has been submitted for this
section.
Final Check the box if this is the final request for approval of change in plans for this contract.
Contractor Name Insert the name of the contractor.
Contractor Address Insert the address of the contractor.
Date Insert the date of the request.
Addition, Extension, Deduction Insert addition, extension,deduction as it applies to the total of the request for change in
plans being submitted.
Item Description Insert the description of the item for the change request submittal.
Unit of Measure Insert the unit of measure for the item listed to the left.
Quantity Insert the quantity of the change for the item listed to the left.
Unit Price Insert the unit price for the item listed to the left.
Addition or Deduction Insert"A"if the item listed to the left if an increase to the original contract, insert"D" if the
item listed to the left is a decrease to the original contract.
Total Addition This is the sum of all additions listed.
Total Deduction This is the sum of all deductions listed.
Total Changes This is the difference between the sum of all additions listed and the sum of all deductions
listed.
Total Net Change This is automatically calculated. It is the difference between the total additions and total
deductions.
Amount of Original Contract Insert the amount of the original contract.
Amount of Previous Change Orders Insert the total amount of previous change orders if applicable.
Amount of adjusted/final contract This is the amount of the original contract with all additions and deductions taken into
account.
addition,deduction Insert the addition if the amount of adjusted/final contract if more than the awarded contract.
If the adjusted/final contract is less than the original award insert deduction. The amount of
the total changes to date to this contract, and the percentages of the changes to the original
contract calculated from the original contract price and the total changes.
Statement Insert a statement regarding the change(s)to the contract, stating the fully the nature and
reason for the change.
Net Increase/Decrease When the net increase or decrease in the cost of the contract is$10,000 or more, or the time
of completion is increased or decreased by 30 days or more, check one or more of the
statements following.
Prepared by Insert the name of the preparer.
Title of the Preparer Insert the title of the preparer.
Local Public Agency The LPA shall sign and date here.
Title Insert the title of the person signing above.
County Engineer For County and Road District Projects and County Engineer shall sign and date here.
Regional Engineer Upon approval the IDOT Regional Engineer shall sign and date here.
A minimum of three(3)signed originals must be submitted to the District Office. Follow the Regional Engineer's approval, distribution will
be as follows:
District File
Local Public Agency
Engineer
Printed 09/09/20 BLR 13210(Rev.02/06/20)
UNITED CITY OF YORKVILLE
2020 MFT (ROADS TO BETTER ROADS PROGRAM)
SECTION 20‐00000‐00‐GM
BLR 13210 SUPPLEMENT
EXPLANATION OF PAY ITEM CHANGES IN EXCESS OF $10,000
PAGE 1
HOT‐MIX ASPHALT BINDER COURSE, IL‐9.5., N50
203.4 TON DEDUCTION AT $69.50/TON = $14,136.3
This item was decreased due to binder course thickness being an average of 1.44”. This change reflects
actual delivered tonnages.
CLASS D PATCHES, TYPE III, 3‐INCH
719.2 SQ YD DEDUCTION AT $24.00/SQ YD = $17,260.80
The patching required was less than originally planned.
CLASS D PATCHES, TYPE IV, 3‐INCH
1750.4 SQ YD DEDUCTION AT $21.00/SQ YD = $36,758.40
The patching required was less than originally planned.
COMBINATION CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT
381.20 FEET ADDITION AT $35.00/FOOT = $13,342.00
Additional work was required on some streets to correct drainage issues
TIME AND MATERIALS NO. 1 (ATTACHED) – RECONSTRUCTION OF INLET ON MCHUGH ROAD
$336.15
Inlet structure required reconstruction.
Route
County
Local Agency
Section
Various Local Roads
Kendall
United City of Yorkville
20 – 00000 – 00 - GM
Engineer’s Final Payment Estimate
Estimate No. 4 and Final Date of Completion 7/10/2020
Payable To: Name GENEVA CONSTRUCTION CO.
Address P.O. BOX 998 , AURORA, IL 60507
Items Awarded* Added Deducted Completed
Quantity Values Quantity Quantity Quantity Unit Price Values
Totals from previous page
SUPPLEMENTAL WATERING 10.00 0.10 0.00 10.00 0.01
BITUMINOUS MATERIALS (TACK 26,787.00 267.87 0.00 12,037.00 14,750.00 0.01 147.50
HMA SURFACE REMOVAL - BUTT 132.00 1,320.00 0.00 4.20 127.80 10.00 1,278.00
HMA BINDER COURSE, IL- 9.5, 3,425.00 238,037.50 0.00 203.40 3,221.60 69.50 223,901.20
HMA SURFACE COURSE, MIX "D", 3,425.00 238,037.50 0.00 22.20 3,402.80 69.50 236,494.60
PCC SIDEWALK 5 INCH 2,270.00 14,755.00 189.40 0.00 2,459.40 6.50 15,986.10
DETECTABLE WARNINGS 220.00 5,500.00 0.00 2.00 218.00 25.00 5,450.00
SIDEWALK REMOVAL 2,830.00 3,254.50 49.40 0.00 2,879.40 1.15 3,311.31
HMA SURFACE REMOVAL, 3" 4,998.00 11,245.50 349.40 0.00 5,347.40 2.25 12,031.65
CLASS D PATCHES, TYPE I, 3 216.00 6,264.00 0.00 200.50 15.50 29.00 449.50
CLASS D PATCHES, TYPE II, 3 221.00 6,409.00 0.00 202.60 18.40 29.00 533.60
CLASS D PATCHES, TYPE III, 3 743.00 17,832.00 0.00 719.20 23.80 24.00 571.20
CLASS D PATCHES, TYPE IV, 3 1,851.00 38,871.00 0.00 1,750.40 100.60 21.00 2,112.60
MANHOLES TO BE ADJUSTED 1.00 510.00 0.00 1.00 510.00
INLETS TO BE ADJUSTED 15.00 4,200.00 2.00 0.00 17.00 280.00 4,760.00
THPL PVMNT MARK - LET & SYM 320.00 1,280.00 0.00 117.00 203.00 4.00 812.00
THPL PVMNT MARK - LINE 4" 6,520.00 2,608.00 2,625.50 0.00 9,145.50 0.40 3,658.20
THPL PVMNT MARK - LINE 6" 1,040.00 2,204.80 730.00 0.00 1,770.00 2.12 3,752.40
THPL PVMNT MARK - LINE 24" 40.00 320.00 0.00 10.00 30.00 8.00 240.00
SODDING, SPECIAL 526.00 8,021.50 58.00 0.00 584.00 15.25 8,906.00
HMA SURFACE REMOVAL, 34,682.00 78,034.50 0.00 115.50 34,566.50 2.25 77,774.63
SANITARY MANHOLES TO BE 1.00 1,215.00 0.00 0.00 1.00 1,215.00 1,215.00
ROUTING AND SEALING CRACKS 24,612.00 9,844.80 0.00 515.00 24,097.00 0.40 9,638.80
WHEEL STOP REMOVAL AND 12.00 420.00 0.00 0.00 12.00 35.00 420.00
HMA DRIVEWAY REMOVAL AND 7.00 686.00 0.00 5.00 2.00 98.00 196.00
CC&G REM & REPLACE 1,317.00 42,802.50 0.00 153.10 1,163.90 32.50 37,826.75
RAILROAD PROTECTIVE 1.00 3,500.00 0.00 0.00 1.00 3,500.00 3,500.00
Total Awarded Values $737,441.07 Total Completed Values $654,967.04
Page of BLR 13231 (Rev. 1/06)
Printed on 9/3/2020 8:00:52 AM
Section Number: 20 - 00000 - 00 - GM Total Brought Forward $654,967.04
Miscellaneous Extras and Credits Values
TIME AND MATERIALS NO. 1 336.15
Total Miscellaneous Extras and Credits $ 336.15
Total Value of Completed Work $655,303.19
Miscellaneous Debits Values
Total Miscellaneous Debits
Net Cost of Section $655,303.19
Previous Payments $622,538.03
Net Amount Due $32,765.15
Signed:
Resident Engineer/Consultant Date
Signed:
Local Agency Date
Approved:
Regional Engineer Date
Page of BLR 13231 (Rev. 1/06)
Printed on 9/3/2020 8:00:52 AM
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #5
Tracking Number
PW 2020-52
Potential 2021 ITEP Project Applications
Public Works Committee, September 15, 2020
N/A
N/A
Discussion Only
Erin Willrett Administration
Name Department
Discussion on the potential 2021 ITEP Project Applications
Overview
The Illinois Transportation Enhancement Program (ITEP) is a competitive grant reimbursement
program. It is a federally funded program that requires local matching funds from an eligible project
sponsor. The program focuses on providing alternate modes of transportation where the scope of
transportation projects goes beyond the traditional accommodations for cars, trucks and transit. Typical
projects include bicycle/pedestrian trails and streetscape projects.
IDOT’s next ITEP application period began on August 21, 2020 and ends on November 2, 2020.
The announcement of selected projects should occur in Spring 2021.
Funding
Applicants may apply for up to $2,000,000 maximum per project in federal ITEP funds.
Approximately $105,600,000.00 will be awarded this cycle.
Federal funds will provide reimbursement up to 50 percent for right-of-way and easement
acquisition costs, and up to 80 percent for preliminary engineering, utility relocations, construction
engineering, and construction costs. The required 20 percent or 50 percent local match is the
responsibility of the project sponsor.
Utilizing federal funds for right-of-way and easement acquisition costs and preliminary
engineering costs will lengthen the time required for the project significantly as these activities require
federal authorization before proceeding.
Project Evaluation and Review Criteria
All ITEP projects must be selected through a competitive process. In order to comply with
federal guidelines, IDOT has developed a numerically-based scoring process.
The review criteria for ITEP projects are listed as:
Eligibility
Strength of transportation relationship
Project meets category intent
Public benefits and accessibility
Project support / local commitment
Connectivity to existing facilities / Linkage
Prior sponsor investment
Project sponsor capacity, readiness and past performance
Memorandum
To: Public Works Committee
From: Erin Willrett, Assistant City Administrator
CC: Bart Olson, City Administrator
Date: September 15, 2020
Subject: Potential 2021 ITEP Project Applications
Project readiness
Status of Phase I Engineering, extra points will be given for completion
Status of Land Acquisition, extra points will be given for the completion
Application completeness/Information provided
Inclusion in a local, state or regional plan
Cost effectiveness
Planning and coordination
Potential Projects
Staff has identified four potential projects which we have investigated further. The projects are
as follows:
Fox Road Sidewalk/Multi Use Path
Vegetation Management - Route 34 Corridor
East Hydraulic Street Project – Creation of a one-way street
River Walk Project – Extend the river trail west underneath the IL Route 47 bridge.
Further detail about each project is provided on the following pages.
Recommendation
Staff would like to request feedback from the committee as well as the City Council on the 4
potential projects. Staff would then proceed with the applications and move forward with the resolution
of support and joint work with the County for the Fox Road application prior to the November 2, 2020
deadline.
Fox Road Multi-Use Path
Project Perimeters (Logical Termini):
Rivers Edge Subdivision to Hoover Forest Preserve Entrance
Existing Supportive Plans that references project:
Kane/Kendall Council of Mayors 2017 Bicycle Planning Map
Yorkville Trail Map (no date listed)
Yorkville Integrated Transportation Plan (2009)
Yorkville Comprehensive Plan (2016)
Easement or Land Acquisition Required:
Easement would need to be acquired along the length of the project.
Brief Description:
This path would provide a safe route for cyclists and pedestrians to travel to and from the downtown
area to City and County subdivisions without walking/biking on Fox Road that would eventually lead to
Hoover Forest Preserve. This would also give pedestrians and cyclists a safe alternative to an on-street
option. This would be the first leg of a very important regional trail. Hoover Forest Preserve is a
regional destination. It is the home course for the Yorkville Foxes boys and girls cross country teams, a
county wide outdoor education center and meeting center. In addition, the preserve has 400+ acres to
explore along the Fox River.
Benefits:
Over 911 homes would be directly connected to this trail, through neighborhood streets. This trail
would allow residents of the River’s Edge subdivision, White Oak, and Fox Glen, which contain over
330 homes, new access to the regional trail network. In the opposite direction, this trail would provide
direct trail access to Hoover Forest Preserve’s trail system for the majority of the City.
Concern:
ROW and land acquisition is a timely and costly process.
Summary:
Staff has been in discussion with the County Engineer, Fran Klaas on this project and a future
jurisdictional transfer for some time now. The County is in favor of partnering on this project and
sharing the 20% split. Since multi-jurisdictional projects should score higher than single-jurisdiction
projects, staff is working to create an IGA with Kendall County along with a Resolution of Support to
engage on this project.
Vegetation Management – Route 34 Corridor
Project Perimeters (Logical Termini):
City Limits from west – east along Route 34.
Existing Supportive Plans that references project:
Yorkville Integrated Transportation Plan (2009)
Yorkville Comprehensive Plan (2016)
Easement or Land Acquisition Required:
None.
Brief Description:
The proposed project is part of a new category that has been added to the program’s project categories –
Vegetation Management in Rights-of-Ways. The project would consist of a planting of low grow/no
mow seed on the islands and plantings of a prairie seed mixture on the area between the trails and right-
of-way property line.
Benefits:
This would allow for a self-sustaining area where mowing would not be required on the newly acquired
area. It would also provide a natural environment where prairie has typically thrived.
Concern:
This would require an educational component for the general public. Why we are not mowing the
islands may have some concern for motorists. However, we can control the plantings of what species
we choose for the center islands. We can also educate the benefits of prairie along the edges of the
trails.
East Hydraulic Street Project – Creation of a One-Way
Street
Project Perimeters (Logical Termini):
Beginning at the corner of IL Route 47 east approximately 1,600 feet to the edge of Rivers Edge Park.
Existing Supportive Plans that references project:
Yorkville Comprehensive Plan (2016)
Downtown Overlay District Plan (2019)
Streetscape Master Plan (2019)
Easement or Land Acquisition Required:
None
Brief Description:
Streetscape in the downtown beautifies and improves the visual character of the corridor and downtown,
simplifies maintenance and contributes to an overall sense of place for Yorkville. Creating a one-way
street will aid in traffic flow and will allow ease of use of the River front area when events take place.
Benefits:
Streetscape design along this highly traveled arterial roadway can create a safe built environment for
pedestrians and spur economic activity for the nearby business community as a result of the
improvements.
Concern:
This has a limited regional benefit. The other concern is what railroad treatment would be necessary
because ITEP would require a Federal process.
Riverwalk Project – Extension of Existing Riverfront Tail
to the West
Project Perimeters (Logical Termini):
Beginning at the existing path which is approximately 400’ east of the IL Route 47 bridge west
approximately 1,000 feet to the Parks and Recreation Building.
Existing Supportive Plans that references project:
Yorkville Comprehensive Plan (2016)
Downtown Overlay District Plan (2019)
Streetscape Master Plan (2019)
Easement or Land Acquisition Required:
Easement would need to be acquired along the length of the project.
Brief Description:
This project would extend the existing river front trail to the west underneath the IL Route 47 bridge.
Benefits:
Trail access, especially riverfront trail access would be widely used in this area. This would also
provide connectivity east and west of IL Route 47. IL Route 47 is an impediment to bicycle and
pedestrian traffic. The railroad crossing near the bridge and the street does create an additional barrier to
the flow of non-vehicle traffic.
Concern:
This has a limited regional benefit by not connecting to a larger regional trail network.
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #6
Tracking Number
PW 2020-53
Proposed RTBR and Rebuild Illinois Plan
Public Works Committee – September 15, 2020
Majority
Approval of Plan
Consideration of Plan
Brad Sanderson Engineering
Name Department
Background
Over the past several years, the City has selected streets for its upcoming RTBR program in
September. The timing allows us to move forward with the design in the fall and to receive IDOT
approvals in early winter. We are then able to take advantage of bidding in February/March, which
has historically been a prime bidding environment.
The proposed 2021 RTBR program will be presented below under the discussion section.
In addition, this year the City is receiving $1.25 M spread over six payments of Illinois Rebuild Funds.
Two payments have been received to date and the last four will be received by 2022. The funds are a
result of the State of Illinois Capital Bill that was approved. These funds are to be identified for
projects by May of 2021 and 100% expended by July 1, 2025. Furthermore, these funds are to be
generally used for transportation related work and are to be “bondable”. Bondable meaning that a 13-
year life needs to be proven during the design stage.
Discussion - RTBR
The City updated its five-year Pavement Management Plan in the Fall of 2018. The approved plan is
attached (Attachment #1) for your reference.
The programs in 2019 and 2020 have followed the approved plan and are noted in the attached updated
Paving History Map (Attachment #2).
The proposed 2021 RTBR plan is attached for your consideration (Attachment #3). Please note
several streets were added as they have prematurely experienced failure and are in the need of
immediate attention. All of the added streets were paved in 2007 when there was a period of poor
materials that were used (experienced in other communities also). It is also planned to fund the
resurfacing of Elizabeth Street with Water funds as we are replacing the water main within the limits
of the street.
Discussion - Rebuild Illinois Funds
We are recommending utilizing the funds to supplement to the RTBR program. As noted in the
pavement management studies, the City should be spending greater than $2.0M per year to maintain its
streets.
The 13-year design life requirement will result in a thicker (4-5”) mill and overlay project than the
standard RTBR project (3”). Therefore, we were selective on the streets that we are recommending.
Staff is recommending that these funds be used in the Fox Hill Development as shown in Attachment
#4 for the following reasons:
Memorandum
To: Bart Olson, City Administrator
From: Brad Sanderson, EEI
Eric Dhuse, Director of Public Works
CC: Lisa Pickering, City Clerk
Rob Fredrickson, Finance Director
Date: September 9, 2020
Subject: Roads to Better Roads / Rebuild Illinois Program
The original pavement was constructed in the early 1990’s and many of the streets were
planned to be resurfaced in the five-year RTBR program.
The original pavement structure was less than what is currently required. Only 3” of pavement
was placed on all of the streets as that was the approved cross section at the time. Current
standards call for 4” on local streets and 6” on collector streets. Diehl, Sycamore and John
Streets would all be considered collector streets. By adding pavement thickness, it will extend
the useful life.
By grouping the improvements all in one area, the City will benefit by seeing lower unit prices.
Discussion – RTBR Program (2022 and 2023)
We have updated the proposed 2022 and 2023 programs (Attachment #5) to account for the removal of
the Fox Hill streets that are proposed to be funded out of the Illinois Rebuild money. These programs
will be reviewed in subsequent fall timeframes for approval by the City Council.
Action Requested:
1. General concurrence from City Council on the proposed 2021 RTBR program.
2. General concurrence from City Council on the proposed Rebuild Illinois Program.
3. General concurrence from the City Council on the proposed long-term RTBR program (2022
and 2023). Note that this will be re-reviewed in the fall of 2021.
Engineering Enterprises, Inc.
Memo
To: Bart Olson – City Administrator
From: Brad Sanderson, P.E.
Date: October 10, 2018
Re: Pavement Management Study Update 2018
EEI Job #: YO1815
Background
In April of 2018, the United City of Yorkville contracted with Infrastructure Management Services (IMS) to
perform pavement evaluations on all City owned and maintained streets. The purpose of this evaluation was
to update the City’s existing Pavement Management System, determine the overall condition of the City’s
streets and to finalize a new five (5)-year plan for the City’s annual street rehabilitation program.
The inspection performed by IMS included the following:
Automated inspection of the entire roadway surface using a laser profile machine
Electronic analysis and measurement of roadway characteristics
Falling Weight deflectometer testing to assess the underlying soils and base of each roadway
Complete GIS integration to City’s existing shapefiles
The laser profile machine is used to determine the surface rank and the falling weight deflectometer is used
to determine the dynamic and deflection rank for each roadway. These three scores combine to form an
overall pavement rank between 10-100. The results of these inspections are entered into the PavePro
Manager Software, which yields a database of all City maintained streets. The ranking of each roadway
within the system enables the City to develop a strategy for roadway maintenance activities based on
prioritization by need and cost. This data is then analyzed in the PavePro Manager software as well as
engineering judgement to determine an updated five (5)-year rehabilitation plan.
Mr. Bart Olson
October 10, 2018
Page 2
G:\Public\Yorkville\2018\YO1815-C Pavement Management Update\Docs\October 2018 PW\EEI Memo.doc
Summary of Results
A summary of the paving work that has occurred in the City since the last report is summarized below:
Funding Source Number of Miles
Subdivision Completion (Developer) 24.2
RTBR 12.0
Federal Grants 2.8
Bonds (Countryside) 3.4
Other Funding (Comed, Kendall Co.) 4.0
Total: 46.4
A comparison of the City’s roadway condition rankings from the original study to 2018 is summarized below:
2012 2018
Number of Miles 107 113.5
Unaccepted Miles 25 7.5
Overall Rank 82 87
The completion of over 24 miles of subdivision paving has caused the City’s overall rank to be inflated. For
a summary of the conditions per category, please see the attached bar graphs.
Currently the City is budgeting approximately $700,000 of funds per year to spend on street rehabilitation.
Spending that amount over the next five (5) years will decrease the City’s overall pavement rank from 87 to
82.
An overall pavement rank of 82 is a reasonable target. It should be noted that if you maintain that same
funding level for 10 years the overall pavement rank goes from 87 to 76. The reason for this is that the City
currently has over 26 miles of roadways that currently ranked in the fair or worse category and they are
projected to require maintenance within the next 10 years. For the City to maintain an overall rank of 80 the
average expenditure for the next 10 years would have to be approximately $1.5 million per year.
Attached to this memo is the proposed five (5)-year plan for the City. The proposed plan does not include
the following roadways:
Mill Road (This project is planned to be addressed with developer funds.)
Baseline Road (This roadway is one of the lower ranked streets with the City. This road will have to
be addressed at some point soon.)
Corneils Road (This roadway may be addressed via an agreement with Comed.)
Currently, we are asking for general concurrence on the proposed plan. As with past years, we plan to
present a new plan every fall for concurrence prior to proceeding with the preparation of a bid package. If
the plan is acceptable, we will bring forth a Professional Services Agreement for the FY20 work to the
November series of meetings. As with recent programs, we are recommending that design work begin in
the fall so that bidding can take place in February/March, which has historically been a prime bidding
environment.
PROPOSED 5 YEAR RTBR PROGRAM
United City of Yorkville
October 2018
STREET FROM TO STRATEGY LENGTH DEFLECTION
CONDITION
DYNAMIC
CONDITION
SURFACE
CONDITION
CURRENT
RANK COST
E. PARK STREET MCHUGH ROAD LIBERTY STREET VARIABLE DEPTH
MILL, OVERLAY 3"1,484 100 63 43 67 $108,800
ELM STREET FREEMONT STREET MCHUGH ROAD VARIABLE DEPTH
MILL, OVERLAY 3"1,126 100 58 44 65 $76,200
JACKSON STREET FREEMONT STREET MARTIN AVENUE GRIND 3",
OVERLAY 3"1,129 100 54 40 62 $78,100
KENNEDY ROAD IL ROUTE 47 660' EAST OF PRAIRIE MEADOWS GRIND 2",
OVERLAY 2"4,086 97 98 49 81 $345,700
MCHUGH ROAD CITY LIMIT MARTIN AVENUE VARIABLE DEPTH
MILL, OVERLAY 3"187 100 100 69 91 $15,800
MCHUGH ROAD CITY LIMIT FARMSTEAD DRIVE VARIABLE DEPTH
MILL, OVERLAY 3"649 100 90 60 84 $51,400
SANDERS COURT E MAIN STREET NORTH END GRIND 2",
OVERLAY 2"626 100 41 57 63 $40,100
N/A N/A N/A N/A N/A $25,000
$741,100
ALTERNATIVE STREETS
BASELINE ROAD CITY LIMIT CITY LIMIT GRIND 4",
OVERLAY 4"5,750 100 63 40 61 $470,600
BASELINE ROAD IL ROUTE 47 CITY LIMIT GRIND 3",
OVERLAY 3"1,484 100 90 45 78 $99,200
CORNEILS ROAD ELDAMAIN ROAD CITY LIMITS GRIND 1",
OVERLAY 3"3,300 100 69 64 77 $185,200
$755,000
2019 (FY20) STREET REHABILITATION LIST
TOTAL:
MISCELLANEOUS CITY WIDE CRACK SEALING/STRIPING
TOTAL:
PROPOSED 5 YEAR RTBR PROGRAM
United City of Yorkville
October 2018
STREET FROM TO STRATEGY LENGTH DEFLECTION
CONDITION
DYNAMIC
CONDITION
SURFACE
CONDITION
CURRENT
RANK COST
MCHUGH ROAD KENNEDY ROAD E. COUNTRYSIDE PARKWAY GRIND 2",
OVERLAY 2"3,014 100 94 67 88 $223,000
RIVER BIRCH DRIVE EAST END WEST END GRIND 2.5",
OVERLAY 2.5"1,702 100 84 62 82 $107,800
RIVER BIRCH LANE WHITE OAK WAY RIVER BIRCH DRIVE GRIND 2.5",
OVERLAY 2.5"407 100 84 60 82 $25,800
SPRUCE COURT WHITE OAK WAY SOUTH END GRIND 2.5",
OVERLAY 2.5"653 100 64 61 74 $41,400
WHITE OAK WAY CHESTNUT LANE SOUTH END GRIND 2.5",
OVERLAY 2.5"4,320 100 80 61 80 $273,700
WING ROAD IL ROUTE 71 IL ROUTE 126 GRIND 4",
OVERLAY 4"1,129 100 92 57 84 $38,600
N/A N/A N/A N/A N/A $25,000
$735,300
2020 (FY21) STREET REHABILITATION LIST
TOTAL:
MISCELLANEOUS CITY WIDE CRACK SEALING/STRIPING
PROPOSED 5 YEAR RTBR PROGRAM
United City of Yorkville
October 2018
STREET FROM TO STRATEGY LENGTH DEFLECTION
CONDITION
DYNAMIC
CONDITION
SURFACE
CONDITION
CURRENT
RANK COST
BEAVER STREET IL ROUTE 47 DEER STREET GRIND 2.5",
OVERLAY 2.5"1,463 100 94 55 83 $103,800
COLONIAL PARKWAY IL ROUTE 47 IL ROUTE 126 GRIND 2.5",
OVERLAY 2.5"1,540 100 65 60 74 $118,800
ELIZABETH STREET S. MAIN STREET WEST END OVERLAY 2.5"1,250 100 68 56 74 $63,900
FIR COURT NORWAY CIRCLE NORTH END GRIND 2",
OVERLAY 2"374 100 80 59 80 $22,800
GREEN BRIAR ROAD WALSH DRIVE IL ROUTE 47 GRIND 2.5",
OVERLAY 2.5"2,084 85 83 62 78 $212,200
NORWAY CIRCLE WHITE OAK WAY WHITE OAK WAY GRIND 2",
OVERLAY 2"2,064 100 81 69 84 $124,700
NORWAY COURT NORWAY CIRCLE SOUTH END GRIND 2",
OVERLAY 2"312 100 88 61 83 $18,800
STATE STREET W. HYDRAULIC AVENUE W. RIDGE STREET GRIND 2.5",
OVERLAY 2.5"886 100 90 48 79 $57,000
W VAN EMMON STREET S. MAIN STREET MORGAN STREET GRIND 2.5",
OVERLAY 2.5"932 100 92 54 83 $48,400
N/A N/A N/A N/A N/A $25,000
$795,400
2021 (FY22) STREET REHABILITATION LIST
TOTAL:
MISCELLANEOUS CITY WIDE CRACK SEALING/STRIPING
PROPOSED 5 YEAR RTBR PROGRAM
United City of Yorkville
October 2018
STREET FROM TO STRATEGY LENGTH DEFLECTION
CONDITION
DYNAMIC
CONDITION
SURFACE
CONDITION
CURRENT
RANK COST
CANNONBALL TRAIL US ROUTE 34 JOHN STREET VARIABLE DEPTH
MILL, OVERLAY 3"643 100 88 52 80 $59,900
COTTONWOOD COURT COTTONWOOD TRAIL WEST END GRIND 2.5",
OVERLAY 2.5"239 100 67 77 82 $15,800
COTTONWOOD TRAIL JOHN STREET JOHN STREET GRIND 2.5",
OVERLAY 2.5"2,261 100 80 64 82 $149,100
CYPRESS LANE DIEHL FARM ROAD WEST END GRIND 2.5",
OVERLAY 2.5"407 100 78 72 84 $26,800
DIEHL FARM ROAD JOHN STREET US ROUTE 34 GRIND 2.5",
OVERLAY 2.5"918 100 84 61 82 $51,500
KING STREET W. RIVER STREET W. SOMONAUK STREET VARIABLE DEPTH
MILL, OVERLAY 3"1,315 100 84 56 80 $97,600
SEQUOIA CIRCLE EAST END SYCAMORE ROAD GRIND 2.5",
OVERLAY 2.5"292 100 73 71 82 $19,200
STONERIDGE CIRCLE COTTONWOOD TRAIL EAST END GRIND 2.5",
OVERLAY 2.5"197 100 76 66 81 $13,000
STONERIDGE COURT COTTONWOOD TRAIL SOUTH END GRIND 2.5",
OVERLAY 2.5"348 100 88 68 86 $22,900
SYCAMORE ROAD US ROUTE 34 JOHN STREET GRIND 2.5",
OVERLAY 2.5"788 100 78 41 71 $45,600
SYCAMORE ROAD JOHN STREET SOUTH END GRIND 2.5",
OVERLAY 2.5"883 100 74 62 76 $63,000
W. MAIN STREET IL ROUTE 47 WEST END GRIND 2.5",
OVERLAY 2.5"1,092 100 86 66 85 $74,700
N/A N/A N/A N/A N/A $25,000
$664,100
2022 (FY23) STREET REHABILITATION LIST
TOTAL:
MISCELLANEOUS CITY WIDE CRACK SEALING/STRIPING
PROPOSED 5 YEAR RTBR PROGRAM
United City of Yorkville
October 2018
STREET FROM TO STRATEGY LENGTH DEFLECTION
CONDITION
DYNAMIC
CONDITION
SURFACE
CONDITION
CURRENT
RANK COST
ADAMS STREET W. RIDGE STREET W. HYDRAULIC AVENUE GRIND 2.5",
OVERLAY 2.5"827 100 80 64 82 $57,200
E. BARBERRY CIRCLE WALSH DRIVE WALSH DRIVE GRIND 2.5",
OVERLAY 2.5"1,625 100 89 69 87 $118,200
HEUSTIS STREET E FOX STREET E. HYDRAULIC AVENUE GRIND 2.5",
OVERLAY 2.5"1,214 100 92 68 88 $99,800
ILLINI COURT ILLINI DRIVE SOUTH END GRIND 2.5",
OVERLAY 2.5"292 100 63 61 74 $19,600
ILLINI DRIVE WALTER STREET MILL STREET GRIND 2.5",
OVERLAY 2.5"843 100 70 70 80 $64,800
MILL STREET E FOX STREET E. VAN EMMON STREET GRIND 2.5",
OVERLAY 2.5"869 100 99 62 88 $58,300
MORGAN STREET W. HYDRAULIC AVENUE W. FOX STREET GRIND 2.5",
OVERLAY 2.5"1,303 100 90 55 82 $94,800
W. BARBERRY CIRCLE WALSH DRIVE WALSH DRIVE GRIND 2.5",
OVERLAY 2.5"1,930 100 84 60 82 $140,400
N/A N/A N/A N/A N/A $25,000
$678,100
2023 (FY24) STREET REHABILITATION LIST
MISCELLANEOUS CITY WIDE CRACK SEALING/STRIPING
TOTAL:
Illin o is R a ilw a y R R
B N S F R R
Rob Roy CreekRob Roy CreekF o x R i v e r Rob Roy CreekRob Roy CreekRob Roy CreekBlackberry CreekBlackberry CreekF o x R iv e r
Mid
dle A
u
x S
a
ble C
re
e
k Rob Roy CreekBlackberry C reek
B la ck b erry C reek
Fox RiverB l a c k b e r r y C r e e k
Blackberry Creek
Fox RiverBig Rock CreekB ig R o ck C reekBlackberry CreekM organ C reekMiddle Aux Sable Creek
F o x R iv e r Fox RiverBridgeF o x
Galena
Ri ver
Veterans
AmentEldamainCorneils
Kennedy
AshleyMill
MinklerLegion
Baseline
Van Emmon
BlockSpring DicksonConcord
HighpointMain
Cannonball
FieldsGordon
Popl
arTuma
ImmanuelMcHughPavillionTroon
Faxon
MitchelG
ra
n
d
e
SundownAsheSchoolhouseBeecherJohn
Bristol Ridge
Klatt
Budd
Gates
Foli PrescottKellerPenmanCenter
Country
Ho f f man
Hilltop
Schaefer
Park
St a g e c o a c h
Tuscany
AudreyJeterAdam
Alice
Reservation RickardSomonauk
Bertram
Bristol Bay
Erica EdwardMcLel
lanA
l
a
n
D
a
l
e
Countryside
BenjaminKristenWrenFoster
Parkside
Orange
LisbonWillowStateOmahaTeriKendall
US Route #34 SimonDeerAldenGame FarmManchester
Berrywood
Heartland
Hayden
FreemontLillianRosenwinkelBoombah
Carey
Oak Creek
Walnut Lakewood CreekMapleRiverside
Au
t
u
m
n
Cre
e
k
Ha mp t o n
Or c h idCrimsonSumac
Elm
Andrew
KingMatlockBig Bend
For
dHillsideAvalon
HartfieldLibertyWackerBa r b e r r y
Ke l l y
S
utto
n
P
a
r
k
w
a
y
HeustisFairfieldWashington
C
ountry Hills
Julie
Ra
i
n
t
r
e
e
Coral
Cummins
Patterson
RonhillWestWestern
CoachWinding CreekIsabelOld GloryJackson
Lilac PatronUS Route 34
Margaret
RavineStacyRyanRiva RidgeWi
n
g
Fairhaven
BristolSecretariat
Blackberry Shore
BruellMarketviewBeaver
Brian
Green Briar WhitekirkRiley
MayOsbronPrairie CrossingCarly
F o x t a il
Lynn
C a lie n d o
JusticeRobertKi n g s mi llQui nsey
MorganPratt El
denJenna
Sunset
Dobbins
Highview NorthlandGrape VineLaurenChurchWhite RoseWalsh
Mc Mu r t r ie JasonWat er par k
HomesteadMa d e lin e
AdrianBl u e s t e m
Lewis
Fai r f ax RebeccaKate
Grace RoodVenetian
Pleasure
Colonial
NawakwaMadison
DanielleDillon
Savoy
Woodview PlumThunder GulchJacob
CryderBurrSycamoreHunt
Twi nl eafCaledonia
ColtonHighland
High RidgePecos
IdentaOak
Purcell LarkspurBanburyLeisure
Whi
te OakSeeley
IroquoisRedbud
PrairieS
h
a
u
n
a
Landmark
BaileyTitus
Cypress
SearlBlaine EmilyAlexisHeather
Ri
chmondCanyon
Schmidt
West
onS ie nna
Bernadette
Ponderosa Far
mWindett RidgeS la t e
Mi l l Br o o k
H
a
n
b
ury
Timber CreekClearwater
Edythe
C h a r le s
Olive
Thomas
M
unson
Rose HillCrossHillcrest
Conover
Kent shi r eCrooked CreekWi
ndhamHaz el t i ne
L
e
g
n
e
r
Wolf MillraceWhirlaway
Holly
Fox Gl en
Elizabeth
Anna Maria
G
e
n
e
v
a
BoomerBadgerAcornGarden ArtesianCottonwood
Cla
rid
g
e
BirchwoodRiver WoodH
id
e
a
wa
y
North
Gr eenf iel d
Blake GardinerR
o
y
al O
a
k
s LehmanE
m
e
r
a
l
d
Har r i s
Aster
No r wa y
Deere Crossing GroveGildaTausPlymouth
Ru b y EllsworthBarrett
Squire
EvergreenArrowhead
Lexington
Wild IndigoHuntington
Timber RidgeTanglewood TrailsAspenGaylord
Ly
m
an
Gawne
Frances
Nathan
Astor
Boyer
Y
or
k
ville
CranstonBisselCommercial
American BradyWarblerLong GrovePensacola
Bonnie HearthstoneBurnettJuanita
S
a
g
e
L
e
n
o
x
Deerpath
Prairie Grass ConstitutionMidnght
Redhor
seTallgrass
TremontGeorgeanna MarketplaceT
h
orn
hill
Wythe
Oaklawn
W Kendal l Dr
M
o
ntclaire
Cl ov e r
D
e
erp
ointWooden BridgeRena
RidgePinewood
Illini
OlsenHubbardGarritano Lyncl
iffHobbsIndependence MonarchosDivisionFreedomHarrison
Christy ColumbiaCol
eWalter
Preston
LongviewBr ooksi de
CatalpaMui
rfi
el
dDeamesCo n s e r v a t i o n CallanderShetland
Country View
Timbalier
Wood SageMartinStrawberry
S
ara
v
a
n
o
s Sir BartonGillespie
Vi
l
l
age Vi
ewWilsonBirch
Red Tail
HickoryBuchanan
WoodworthMapl
e Ri
dgeDolph
Prairie Pointe
WorsleySummerwindRiver Birch
Lakevie
w
Hydraulic
An d r e a
WoodlandAuburnColumbineP i n e Half MoonPat
r
i
ci
aChestnutFir CardinalPope
OakwoodCornellCe n t r a l KylaDydyna
Naden
Me a d o wl a r kSprucePalmerAmanda
Cl
a
r
e
mo
n
t
Et helJul
i
usWestwind DoverCedar
Cody
CoralberryGains
BellColony
Ke n d a l l Ci r
R
e
h
b
e
h
n
JohnsonMulhern
Bat or
B la c k b e r r y
Denise
Bluejay
Evans
Meadowview
Laurel
River Oaks
PhelpsN
orton
SavannaDrayton DunbarPowers
Wint er t hur
Jeremy PatriotF
ar
m
ste
a
d
Regal Oak
Appletree CobaltAllegianceShoegerCandleberryOwen
Silver City
David
WellsRodak QuantockBig RockAar on TimberBuckthor n
Ke t ch u mPrairie CrossingWillowSunsetSt a geco ach
Dolph
M
organ
Bri stol
MitchelCr ims o n
Beecher
HartfieldEmerald
LisbonBaileyAndrewMainMillRebecca
St agecoach
Oak
Highpoint FairfaxF o x
Canyon
MainW
aln
ut
Hydraulic
Rebecca
ColeAshleyBeecherRidge
Center McHughJohn
Di c k s o n
ParkP a r k
Faxon MainConcordFaxon
S
c
h
o
ol
h
o
u
s
e
St a g e c o a c h
Rose Hill
Penman
Park
JeterSchmidtPROPOSED 5 YEAR PLAN
DATE:
PROJECT NO.:
FILE:
BY:
OCTOBER 2018
YO1815-C
YO1815 5-YEAR PLAN.MXD
CJO
PAVEMENT MANAGEMENT
SYSTEM UPDATE 2018
UNITED CITY OF YORKVILLE, ILLINOIS
Engineering Enterprises, Inc.
52 Wheeler Road
Sugar Grove, Illinois 60554
(630) 466-6700
www.eeiweb.com
PATH:H:\GIS\PUBLIC\YORKVILLE\2018\YO1815
United City of Yorkville
800 Game Farm Road
Yorkville, IL 60560
NORTH
°
Legend
Year of Improvement
2019
2020
2021
2022
2023
Illin o is R a ilw a y R R
B N S F R R
Rob Roy CreekRob Roy CreekF o x R i v e r Rob Roy CreekRob Roy CreekRob Roy CreekBlackberry CreekBlackberry CreekF o x R i v e r
Mid
dle A
u
x S
a
ble
C
re
e
k Rob Roy CreekBlackberry C reek
B la ck b e rry C reek
Fox RiverB l a c k b e r r y C r e e k
Blackberry Creek
Fox RiverBig Rock CreekB ig R ock C reek Blackberry CreekM organ C reekMiddle Aux Sable Creek
F o x R iv e r Fox RiverBridgeGalena
F o x
Veterans
Ament
RiverEldamain Corneils
Ke n n e d y
Mill
AshleyMinklerLegion
Baseline
Van Emmon
Concord
BlockSpring DicksonHighpointMain
Cannonball
FieldsGordon
Popl
arTu
ma
ImmanuelPa
v
illi
o
n
Troon
SundownG
ra
n
d
eAshe
SchoolhouseFaxon BeecherJohnKlatt
Bristol Ridge
CountryGates
Foli
Tuscany
PenmanKellerPrescottCenter
Hilltop
Park
R
eservat
ion
McHugh
Budd AudreyJeterAdam
Alice
Ho f f man RickardSchaefer
St a g e c o a c h
Somonauk
Bertram
Bristol Bay
Erica EdwardMcLel
l
anA
la
n
D
ale
Countryside
LisbonBenjaminKristenWrenFoster
Parkside
Orange WillowStateBerrywood
MitchelTeriOmahaKendall SimonDeerAldenGame FarmManchester
Heartland
Ha y d e n
FreemontL
illia
nRosenwinkel
Oak CreekBoombahCarey
Walnut
MapleRiverside
US Route #34
Or chi d Lakewood CreekAutumn Creek
Ha mp t o n CrimsonSumac
Elm
KingAndrew MatlockFor
dBig Bend
US Route 34
Providence
HillsideAvalon
HartfieldLibertyWackerKe l l y
Bar
ber
r
ySutton
Parkway
HeustisFairfieldWashington
Country Hills
Julie
R
a
i
n
t
r
e
e
Coral
Cummins
Patterson
RonhillWestWestern
CoachWinding CreekIsabelOld GloryJackson
Lilac PatronRavineMargaret StacyRyanWi
n
g Riva RidgeBristolFairhaven
Secretariat
Blackberry Shore
BruellBeaver MarketviewBrian
Green Briar
Whitekirk
Riley
MayOsbronCarly
Prairie CrossingF o x t a i lLynnCaliendo
JusticeRobertKi n g s mi llQui nsey
MorganPratt El
denJenna
SunsetDobbins
Highview NorthlandLaurenGrape VineChurchTallgrass
Walsh White RoseMcMurtrie JasonWat er par k
Homestead
AdrianMad e line
Lewis
B lu e s t e m
FairfaxBaileyK a t e RebeccaGraceHolly
RoodVenetian
Pleasure
Colonial
Madison
NawakwaDanielleDillon
Savoy
PlumWoodview Thunder GulchJacob
BurrCryderHunt
SycamoreTwi nl eafCaledonia
ColtonHighland
High RidgeOak
Pecos
I
dent
aPurcell LarkspurBanburyLeisure
Whi
te OakSeeley
Redbud
IroquoisShauna
Landmark
Titus
Cypress GriffinSearlBlaine EmilyAlexisHeather
RichmondCanyonSchmidtWest
onSi e n n a
Bernadette
Ponderosa FarmSl a t e
Windett RidgeMi ll B r o o k
H
a
n
b
ury
Clearwater
Timber CreekC h a r le s
Olive ThomasPine Ridge
M
unson
Rose HillCrossHillcrest
Conover
KentshireCrooked CreekWi
ndhamHaz el t i ne
Wolf
L
e
g
n
er MillraceL a v e n d e r
Whirlaway
Fox Gl en
Elizabeth
Anna Maria
G
e
n
e
v
a
BadgerAcornGarden ArtesianCla
r
id
g
e
Cottonwood
BirchwoodNorth
H
id
e
a
wa
y
CotswoldGreenf iel dGardiner Royal Oaks LehmanE
m
erald
AsterNo r way
Li nden
Deere Crossing GroveSouth
Gilda
Taus
Ru b y EllsworthBarrett
Squi r e
EvergreenArrowhead
Lexington
Wild IndigoHuntington
Timber RidgeTanglewood TrailsAspenGaylord
Lyman
Gawne
Frances
Astor
Boyer
Y
o
r
k
ville BisselCranston
Mayf i el d
Shadow Creek BradyAmerican
Commercial
WarblerLong GroveBonnie
Pensacola
G
olde
nr
o
d BurnettJuanita
Sage
Chally
Deerpath
River Wood
Prairie Grass ConstitutionTremontJonathanGeorgeanna MarketplaceC a n a r y He
n
n
i
n
g
T
h
orn
hill
Wythe
Oaklawn
W Kendal l Dr
Cl ov e r
D
e
erp
ointWooden BridgeRena
Ridge
IlliniPinewoodOlsen KathleenGarritanoInge
m
unson HobbsLyncl
i
ffDivisionMonarchosIndependence Prai
ri
e RoseFreedomHarrison
Christy
Col
eColumbiaWalter
Preston
LongviewMui
r
f
i
el
dBr ooksi de
Honeysuckle
Deames
Hawk HollowC o n s e r v a t io n
C
all
a
n
d
e
r
Shetland
Country Vie
wMartin
Wood Sage
Strawberry
S u n n y D e llS
ara
v
a
n
o
s Sir BartonGillespie
Vi
l
l
age Vi
ewWilsonBirch
Red Tail
HickoryBuchanan
WoodworthDolph HillsboroPrairie Pointe
WorsleySummerwindRiver Birch
Hydraulic
A n d r e a
WoodlandAuburnP i n e
ColumbinePat
r
i
ci
aBrighton Oaks CardinalPo p e
OakwoodCe n t r a l
Ti mb e r Vi e w KylaTowerDydyna
Naden
SprucePalmerAmanda
Et helJul
i
usCl
a
r
e
mo
n
tWestwind DoverCedar
Cody
Coral
berryGains
BellColony
Ke n d a l l C i r
R
e
h
b
e
h
n
JohnsonMulhern
MeadowwoodIndian CliffsBat or
Tomasik
Evans
Laurel
River Oaks
PhelpsWinchesterNorton
SavannaDrayton
Powers
Wint er t hur PatriotFl i nt Cr ee
Regal Oak
Appletree CobaltAllegianceShoegerCandleberryOwen
Silver City
AustinWellsLakewood SpringsQuantockBig RockMerl
otMaddenAar on TimberBuckt hor n
Mapl e
John
Bri stol
WillowStateFaxon
St a g e c o a c h
Highpoint HartfieldCenter AndrewCrimson
St a g e c o a ch
Wa
l
n
u
t
Oa k
LisbonC
o
n
c
o
r
d
F a i r f a x
F o x
PenmanSchmidtHydraulicCole Rebecca
MainAshleyMillRi v e r Wo o d
Di c k s o n
Beecher River WoodPark
S
c
h
o
ol
h
o
u
s
e
RidgeMitchel CanyonMc
HughParkSchoolhouse
Emerald
Faxon
BeecherJeterPrairie CrossingP a r k
McHughMorganSt agecoach MainDATE:
PROJECT NO.:
FILE:
BY:
OCTOBER 2018
YO1815-C
YO1815 CURRENT SURFACE RANK.MXD
CJO
PAVEMENT MANAGEMENT
SYSTEM UPDATE 2018
UNITED CITY OF YORKVILLE, ILLINOIS
Engineering Enterprises, Inc.
52 Wheeler Road
Sugar Grove, Illinois 60554
(630) 466-6700
www.eeiweb.com
PATH:H:\GIS\PUBLIC\YORKVILLE\2018\YO1815
United City of Yorkville
800 Game Farm Road
Yorkville, IL 60560
NORTH
°
Legend
Current Overall Condition
Gravel Road
Binder Only
10-39 Very Poor
40-59 Poor
60-69 Fair
70-79 Good
80-89 Very Good
90-100 Excellent
H
ollen
back Creek
Hol
l
enback CreekSleepy HollowWalker
HelmarHollenbackStagecoach
Walker
CURRENT OVERALL CONDITION
(BASE AND SURFACE)
Illin o is R a ilw a y R R
B N S F R R
Rob Roy CreekRob Roy CreekF o x R i v e r Rob Roy CreekRob Roy CreekRob Roy CreekBlackberry CreekBlackberry CreekF o x R i v e r
Mid
dle A
u
x S
a
ble
C
ree
k Rob Roy CreekBlackberry C reek
B la ck b e rry C reek
Fox RiverB l a c k b e r r y C r e e k
Blackberry Creek
Fox RiverBig Rock CreekB ig R ock C reekBlackberry CreekM organ C reekMiddle Aux Sable Cree
F o x R iv e r Fox RiverBridgeF o x
Galena
River
Veterans
AmentEldamainCorneils
Ke n n e d y
AshleyMill
MinklerLegion
Baseline
Van Emmon
BlockConcord
Spring DicksonHighpointMain
Cannonball
FieldsGordon
Popl
arTuma
ImmanuelPav
illi
onFaxon
Troon
MitchelG
ra
n
d
e
SundownBudd AsheSchoolhouseBeecherJohnKlatt
Bristol Ridge
Gates
Hoffman
Foli
Schaefer PrescottKellerCenter
St a g e c o a c h
PenmanHilltop
Park
McHugh
CountryTuscany
AudreyJeterAdam
Alice RickardSomonauk
Bertram
R
eservation
Bristol Bay
Erica EdwardMcLel
l
anA
la
n
D
ale
Countryside
BenjaminKristenWrenFoster
Parkside
Orange WillowLisbonStateUS Route #34
TeriOmahaKendall SimonDeerAldenGame FarmManchester
Heartland
Ha y d e n
FreemontLillia
nRosenwinkel Berrywood
BoombahCarey
Walnut Lakewood CreekMapleRiverside
Or chi d
Autumn Creek
H a mp t o n CrimsonSumac
Elm
KingAndrew MatlockFor
dBig Bend
Oak Creek
Providence
HillsideAvalon
HartfieldLibertyWackerKe l l y
Bar
ber
r
ySutton
Parkway
HeustisFairfieldWashington
Country Hills
Julie
R
a
i
n
t
r
e
e
Coral
Cummins
Patterson
RonhillWestWestern
CoachWinding CreekIsabelOld GloryJackson
Lilac PatronRavineMargaret StacyRyanWi
n
g Riva RidgeBristolFairhaven
Secretariat
Blackberry Shore
BruellBeaver MarketviewBrian
Green Briar
Whitekirk
Riley
MayUS Route 34
OsbronCarly
Prairie CrossingC a lie n d o
JusticeRobertKi n g s mi llQui nsey
MorganPratt
L y n n
El
denJenna
SunsetDobbins
Highview NorthlandLaurenGrape VineChurchWalsh White RoseMcMurtrie JasonWat er par k
Homestead
AdrianMa d e lin e
Lewis
B lu e s t e m
FairfaxKa t e RebeccaGraceRoodVenetian
Pleasure
Colonial
Madison
NawakwaDanielleDillon
Savoy
PlumWoodview Thunder GulchJacob
BurrCryderEi leen
Hunt
SycamoreTwi nl eafCaledonia
ColtonHighland
High RidgeOak
Pecos
I
dent
aPurcell
BaileyLarkspurBanburyLeisure
Whi
te OakSeeley
Redbud
IroquoisLandmark
Titus
Cypress
SearlBlaine EmilyAlexisHeather
RichmondCanyonSchmidtWest
onS ie n n a
Bernadette
Ponderosa
Oakmont
FarmS la t e
Windett RidgeMi ll B r o o k
H
a
n
b
ur
y
Clearwater
Timber CreekC h a r le s
Olive ThomasM
unson
Rose HillCrossHillcrest
Conover
KentshireCrooked CreekWi
ndhamHaz el t i ne
Wolf
L
e
g
n
er
F o x t a ilMillraceL a v e n d e r
Whirlaway
Fox Gl en
Elizabeth
Anna Maria
G
e
n
e
v
a
Shauna
BadgerAcornGarden ArtesianC
l
a
rid
g
e
Cottonwood
BirchwoodNorth
H
id
e
a
wa
y
CotswoldGr eenf iel d
Blake GardinerRoyal Oa
ks
E
m
erald
AsterHarris River WoodNo r way Pine RidgeLi nden
Deere Crossing GroveSouth
Gilda
Taus
Ru b y EllsworthBarrett
Squi r e
EvergreenArrowhead
Lexington
Wild IndigoHuntington
Timber RidgeTanglewood TrailsAspenGaylord
Lyman
Gawne
Frances
Astor
Boyer
Y
or
k
ville BisselCranston
Shadow Creek BradyAmerican
Commercial
WarblerLong GroveBonnie
Pensacola
G
oldenrod BurnettJuanita
Sage KathleenChally
Deerpath
Prairie Grass ConstitutionTremontJonathanGeorgeanna MarketplaceC a n a r y He
n
n
i
n
g
T
h
orn
hill
Wythe
Oaklawn
W Kendal l Dr
Cl ov e r
D
e
erp
oi
n
tWooden BridgeRena
Ridge
IlliniPinewoodOlsenGarritano
Inge
m
unson HobbsLyncl
i
ffDivisionMonarchosIndependence Prai
ri
e RoseFreedomHarrison
Christy
Col
eColumbiaWalter
Preston
LongviewMui
r
f
i
el
dBr ooksi de
Honeysuckle
Deames
Hawk HollowC o n s e r v a t io n
C
all
a
n
d
e
r
Shetland
Country Vie
wMartin
Wood Sage
Strawberry
S u n n y D e ll
S
ara
v
a
n
o
s Sir BartonGillespie
Vi
l
l
age Vi
ewWilsonBirch
Red Tail
HickoryBuchanan
WoodworthDolph HillsboroPrairie Pointe
WorsleySummerwindRiver Birch
Hydraulic
A n d r e a
WoodlandAuburnP i n e
ColumbinePat
r
i
ci
aBrighton Oaks CardinalPo p e
OakwoodCe n t r a l
Ti mb e r Vi e w
TowerDydyna
Naden
VeronicaSprucePalmerAmanda
Et helJul
i
usCl
a
r
e
mo
n
tWestwind DoverCedar
Cody
Coral
berryGains
BellColony
Ke n d a l l Ci r
R
e
h
b
e
h
n
JohnsonMulhern Indian CliffsBat or
Tomasik
Evans
Laurel
River Oaks
PhelpsWinchesterN
orton
SavannaDrayton
Powers
Wint er t hur PatriotFl i nt Cr ee
Regal Oak
Appletree CobaltAllegianceShoegerCandleberryOwen
Silver City
Austin
Cotter WellsQuantockBig RockMaddenAar on TimberBuck t hor n
Schoolhouse MorganWillowColeDi c k s o n
Emerald
Beecher ParkAndrewMainF a i r f a x
Rebecca McHughOa k JeterCypr ess
Faxon
Canyon
MainHydraulic
Crimson
Rebecca
JohnPenman
S t a g e c o a ch
F o x MillCenter
P a r k
HighpointMitchelAshley Mapl e
HartfieldS
c
h
o
ol
h
o
u
s
eBeecher Park
Bri stol
St a g e c o a c h
St agecoach Prairie CrossingMcHughWa
l
n
u
t BaileyFaxon
SchmidtRidge
CURRENT SURFACE CONDITION
DATE:
PROJECT NO.:
FILE:
BY:
OCTOBER 2018
YO1815-C
YO1815 CURRENT SURFACE RANK.MXD
CJO
PAVEMENT MANAGEMENT
SYSTEM UPDATE 2018
UNITED CITY OF YORKVILLE, ILLINOIS
Engineering Enterprises, Inc.
52 Wheeler Road
Sugar Grove, Illinois 60554
(630) 466-6700
www.eeiweb.com
PATH:H:\GIS\PUBLIC\YORKVILLE\2018\YO1815
United City of Yorkville
800 Game Farm Road
Yorkville, IL 60560
NORTH
°
Legend
SURFACE CONDITION
Gravel Road
Binder Only
10-39 Very Poor
40-59 Poor
60-69 Fair
70-79 Good
80-89 Very Good
90-100 Excellent
H
ollen
back Creek
Hol
l
enback CreekSleepy HollowWalker
HelmarHollenbackStagecoach
Walker
Illin o is R a ilw a y R R
B N S F R R
Rob Roy CreekRob Roy CreekF o x R i v e r Rob Roy CreekRob Roy CreekRob Roy CreekBlackberry CreekBlackberry CreekF o x R i v e r
Mid
dle A
u
x S
a
ble
C
ree
k Rob Roy CreekBlackberry C reek
B la ck b erry C reek
Fox RiverB l a c k b e r r y C r e e k
Blackberry Creek
Fox RiverBig Rock CreekB ig R ock C reekBlackberry CreekM organ C reekMiddle Aux Sable Creek
F o x R iv e r Fox RiverBridgeGalena
F o x
Veterans
Ament
Ri verEldamain Corneils
Mill
Kennedy
AshleyMinklerLegion
Baseline
Van Emmon
Concord
BlockSpring DicksonHighpointMain
Cannonball
FieldsGordon
Popl
arTu
ma
McHughImmanuelPav
illi
o
nTroon
SundownG
ra
n
d
eAshe
SchoolhouseBeecherFaxon
Country
John
Bristol Ridge
Klatt
Gates
Foli
TuscanyPrescott
KellerCenter
Reservation
Hilltop
Park
PenmanAudreyJeterBudd
Adam
Alice RickardHof f ma n
Schaefer
Somonauk
St a g e c o a c h
Bertram
Bristol Bay
Erica EdwardMcLellanA
la
n
D
ale
Countryside
BenjaminKristenWrenFoster
Parkside
Orange WillowBerrywood
StateOmahaTeriMitchelKendall SimonDeerLisbonAldenGame FarmManchester
Heartland
Hayden
FreemontLillianRosenwinkel
Oak CreekBoombahCareyLakewood CreekWalnut
MapleRiverside
Au
t
u
m
n
Cre
e
k
Ha mp t o n OrchidCrimsonUS Route #34
Sumac
US Route 34
Elm
Andrew
KingMatlockBig Bend
For
dProvidence
HillsideAvalon
HartfieldLibertyWackerB a r b e r r y
Ke l l y
Sutton
Parkway
HeustisFairfieldWashington
C
ountry Hills
Julie
Ra
i
n
t
r
e
e
Coral
Cummins
Patterson
RonhillWestWestern
CoachWinding CreekIsabelOld GloryJackson
Lilac PatronMargaret
RavineStacyRyanRiva RidgeWi
n
g
Fairhaven
BristolSecretariat
Blackberry Shore
BruellMarketviewBeaver
Brian
Green Briar
Whitekirk
Riley
MayOsbronPrairie CrossingCarly
F o x t a i l
Lynn
C a lie n d o
JusticeRobertKi n g s mi llQui nsey
MorganPratt El
denJenna
SunsetDobbins
Highview NorthlandTallgrassGrape VineLaurenChurchWhite RoseWalsh
Mc Mu r t r ie JasonWat er par k
Homestead
Ma d e line
AdrianBl u e s t e m
Lewis
FairfaxBaileyRebeccaKa t e
GraceHolly
RoodVenetian
Pleasure
Colonial
NawakwaMadison GriffinDanielleDillon
Savoy
Woodview PlumThunder GulchJacob
CryderBurrSycamoreHunt
Twi nl eafCaledonia
ColtonHighland
High RidgePecos
I
dent
aOak
Purcell LarkspurBanburyLeisure
Whi
t
e OakSeeley
IroquoisRedbud
PrairieShauna
Landmark
Titus
Cypress
SearlBlaine EmilyAlexisHeather
Ri
chmondCanyonSchmidtWest
onSi enna
Bernadette
Ponderosa Far
mWindett RidgeSl a t e
Mi ll Br o o k
H
a
n
b
ury
Timber CreekClearwater
Ch a r le s
Olive ThomasPine Ridge
M
unson
Rose HillCrossHillcrest
Conover
Kent shi r eCrooked CreekWin
dhamHaz el t i ne
L
e
g
n
e
r
Wolf MillraceWhirlaway
Fox Gl en
Elizabeth
Anna Maria
G
e
n
e
v
a
BoomerBadgerAcornGarden ArtesianCottonwood
Cla
rid
g
e
BirchwoodRoxburyH
id
e
a
wa
y
CotswoldNorth
Gr eenf iel dGardiner Royal Oaks LehmanE
m
e
r
a
l
d
AsterNo r wa y
Deere Crossing GroveSouth
Gilda
T
a
u
s
Ru b y EllsworthBarrett
Squi r e
EvergreenArrowhead
Lexington
Wild IndigoHuntington
Timber RidgeTanglewood TrailsAspenGaylord
Lyman
Gawne
Frances
Astor
Boyer
Y
or
k
ville
CranstonBissel
Shadow Creek
Commercial
American BradyWarblerLong GrovePensacola
Bonnie HearthstoneBurnettS
a
g
e
L
e
n
o
x
Chally
Deerpath HeatherwoodNeola
River Wood
Prairie Grass ConstitutionWilliam
Midnght
TremontJonathanGeorgeanna MarketplaceCanaryHe
n
n
i
n
g
T
hornhill
Wythe
Oaklawn
W Kendal l Dr
M
o
ntclaire
Cl ov e r
D
e
erp
ointWooden BridgeRena
RidgePinewood
Illini
Olsen
Kathleen
HubbardGarritanoIn
g
e
mu
n
s
o
n
Wi n t e rbe rry LyncliffHobbsIndependence MonarchosDivisionPrai
ri
e RoseFreedomHarrison
Christy ColumbiaCol
eWalter
Preston
LongviewBr ooksi de
CatalpaMui
rf
i
el
dDeames
Hawk HollowC o n s e r v a t i o n
C
all
a
n
d
e
r
Shetland Count
r
y Vi
ewWood Sage
Martin
Strawberry
S u n n y De llS
ara
v
a
n
o
s Sir BartonGillespie
Vi
l
l
age Vi
ewWilsonBirch
Re
d Tail
HickoryBuchanan
WoodworthDolph HillsboroPrairie Pointe
WorsleySummerwindRiver Birch
Lakeview
Hydraulic
JenniferA n d r e a
WoodlandAuburnColumbineP in e Pat
r
i
ci
aBrighton Oaks
Fir CardinalPo p e
SandersOakwoodTi mb e r Vi e w
CornellCe n t r a l
TowerDydyna
Naden
Me a d o wl a r kSprucePalmerAmanda
Cl
a
r
e
mo
n
t
Et helJul
i
usWestwind DoverCedar
Cody
Coral
berryGains
BellColony
Ke n d a l l Ci r
R
e
h
b
e
h
n
JohnsonMulhern Indian CliffsBat or
Blackberry
Tomasik
Evans
Meadowview
Laurel
River Oaks
PhelpsWinchesterNorton
SavannaDrayton
Powers
Wint er t hur PatriotF
ar
m
ste
a
d
Fli nt Cr ee
Regal Oak
Appletree CobaltAllegianceShoegerMurfield CandleberryOwen
Silver City
AustinWellsLakewood SpringsQuantockBig RockMerl
otMaddenAar on TimberSt AnnesBuckthor n
Sheridan
AshleyF o x
Faxon
FairfaxHartfieldWillowRiver WoodMitchelFaxon
MainPrairie CrossingMainCanyon
BeecherDi c k s o n
Hydraulic
LisbonRebecca
St agecoach
JohnSchmidt
Rebecca McHughP a r k
Emerald
OakMartin
Highpoint
Ridge
Cr ims o n
S t a g e c o a c h Wa
l
n
u
t
Center
C
o
n
c
o
r
d
JeterParkS
c
h
o
ol
h
o
u
s
e
Bri stol
MillConcord
Ri v e r Woo d
Schoolhouse
Beecher
St a geco a ch
Mapl e
M
organ
Park
PenmanState AndrewMainColePAVING HISTORY 2012-2018
DATE:
PROJECT NO.:
FILE:
BY:
OCTOBER 2018
YO1815-C
YO1815 PAVING HISTORY 2012-2018.MXD
CJO
PAVEMENT MANAGEMENT
SYSTEM UPDATE 2018
UNITED CITY OF YORKVILLE, ILLINOIS
Engineering Enterprises, Inc.
52 Wheeler Road
Sugar Grove, Illinois 60554
(630) 466-6700
www.eeiweb.com
PATH:H:\GIS\PUBLIC\YORKVILLE\2018\YO1815
United City of Yorkville
800 Game Farm Road
Yorkville, IL 60560
NORTH
°
Legend
Year of Improvement
2012
2013
2014
2015
2016
2017
2018
IMS Infrastructure
Management Services
Page: 1
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
ABERDEEN CT WHITEKIRK LN NORTH END 91 80 100 87 Flexible0001-001
91 80 100 87Average:
Std. Dev. 0 0 0 0
ADAMS ST W RIDGE ST W MADISON ST 82 81 100 64 Flexible0002-001
ADAMS ST W MADISON ST W VAN EMMON ST 84 88 100 63 Flexible0002-002
ADAMS ST W VAN EMMON ST W HYDRAULIC AVE 86 91 100 65 Flexible0002-003
84 87 100 64Average:
Std. Dev. 2 5 0 1
ADRIAN ST BLAINE ST W DOLPH ST 91 85 100 83 Flexible0003-001
91 85 100 83Average:
Std. Dev. 0 0 0 0
ADRIAN ST W DOLPH ST W ORANGE ST 91 82 100 87 Flexible0003-002
ADRIAN ST W ORANGE ST W WASHINGTON ST 91 80 100 87 Flexible0003-003
91 81 100 87Average:
Std. Dev. 0 0 0 0
ALAN DALE LN RED TAIL CT DENISE CT 87 85 100 72 Flexible0004-001
ALAN DALE LN DENISE CT YELLOWSTONE LN 83 85 100 64 Flexible0004-002
ALAN DALE LN YELLOWSTONE LN ALICE AVE 84 90 100 61 Flexible0004-003
85 86 100 67Average:
Std. Dev. 2 2 0 6
ALAN DALE LN ALICE AVE SUMAC DR 92 88 100 82 Flexible0004-004
ALAN DALE LN SUMAC DR REDBUD DR 94 87 100 88 Flexible0004-005
ALAN DALE LN REDBUD DR DS@660N REDBUD
DR
90 79 100 87 Flexible0004-006
92 83 100 86Average:
Std. Dev. 3 5 0 2
ALAN DALE LN DS@660N REDBUD
DR
HONEYSUCKLE LN 95 87 100 90 Flexible0004-007
ALAN DALE LN HONEYSUCKLE LN TWINLEAF TRL 93 85 100 89 Flexible0004-008
ALAN DALE LN TWINLEAF TRL WINTERBERRY DR 93 85 100 89 Flexible0004-009
ALAN DALE LN WINTERBERRY DR FAXON RD 93 85 100 89 Flexible0004-010
ALAN DALE LN FAXON RD DS@660N FAXON RD 93 84 100 88 Flexible0004-011
ALAN DALE LN DS@660N FAXON RD MCMURTRIE WAY 95 91 100 86 Flexible0004-012
93 85 100 89Average:
Std. Dev. 1 2 0 1
ALDEN AVE OLD GLORY DR HENNING LN 84 80 100 70 Flexible0005-001
ALDEN AVE HENNING LN AMOS AVE 82 79 100 65 Flexible0005-002
ALDEN AVE AMOS AVE ROOD ST 82 84 100 61 Flexible0005-003
ALDEN AVE ROOD ST MCLELLAN BLVD 76 77 100 53 Flexible0005-004
82 81 100 64Average:
Std. Dev. 2 3 0 7
Page: 1Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 2
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
ALICE AVE CANNONBALL TRL DS@660W
CANNONBALL TRL
80 91 100 50 Flexible0006-001
ALICE AVE DS@660W
CANNONBALL TRL
ALAN DALE LN 80 100 100 39 Flexible0006-002
ALICE AVE ALAN DALE LN DS@660W ALAN DALE
LN
85 85 100 67 Flexible0006-003
ALICE AVE DS@660W ALAN
DALE LN
FAXON RD 87 91 100 66 Flexible0006-004
83 91 100 58Average:
Std. Dev. 4 4 0 11
ALLEGIANCE
CROSSING
MILL RD SEELEY ST 83 84 100 63 Flexible0007-001
83 84 100 63Average:
Std. Dev. 0 0 0 0
AMERICAN WAY GRANDE TRL DS@660S GRANDE
TRL
75 84 100 43 Flexible0008-001
AMERICAN WAY DS@660S GRANDE
TRL
SOUTH END 76 88 100 41 Flexible0008-002
75 85 100 42Average:
Std. Dev. 0 0 0 0
AMOS AVE ALDEN AVE OLD GLORY DR 76 61 100 68 Flexible0009-001
76 61 100 68Average:
Std. Dev. 0 0 0 0
ANDERSON CT W KENDALL DR NORTH END 96 93 100 87 Flexible0010-001
96 93 100 87Average:
Std. Dev. 0 0 0 0
ANDREA CT OVERLOOK CT EAST END 90 91 100 75 Flexible0011-001
90 91 100 75Average:
Std. Dev. 0 0 0 0
APPLETREE CT N BRIDGE ST WEST END 80 61 100 80 Flexible0012-001
80 61 100 80Average:
Std. Dev. 0 0 0 0
ARROWHEAD DR HEARTLAND DR WACKER DR 87 90 100 69 Flexible0013-001
ARROWHEAD DR WACKER DR STILLWATER CT 85 84 100 70 Flexible0013-002
ARROWHEAD DR STILLWATER CT HOMESTEAD DR 87 85 100 74 Flexible0013-003
87 87 100 71Average:
Std. Dev. 1 3 0 3
ASHLEY RD SCHOOLHOUSE RD DS@660S
SCHOOLHOUSE RD
92 97 100 74 Flexible0014-001
ASHLEY RD DS@660S
SCHOOLHOUSE RD
DS@1320S
SCHOOLHOUSE RD
88 90 100 71 Flexible0014-002
Page: 2Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 3
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
ASHLEY RD DS@1320S
SCHOOLHOUSE RD
DS@1980S
SCHOOLHOUSE RD
92 94 100 77 Flexible0014-003
ASHLEY RD DS@1980S
SCHOOLHOUSE RD
CITY LIMIT 94 100 100 75 Flexible0014-004
91 95 100 74Average:
Std. Dev. 2 4 0 3
ASPEN LN JOHN ST DS@660W JOHN ST 83 77 100 70 Flexible0016-001
ASPEN LN DS@660W JOHN ST DS@1320W JOHN ST 82 72 100 73 Flexible0016-002
ASPEN LN DS@1320W JOHN ST JOHN ST 78 69 100 67 Flexible0016-003
81 73 100 70Average:
Std. Dev. 2 4 0 3
ASTER DR WALSH CIR DS@660S WALSH CIR 81 67 100 76 Flexible0017-001
ASTER DR DS@660S WALSH CIR WALSH CIR 81 75 100 68 Flexible0017-002
81 69 100 74Average:
Std. Dev. 0 0 0 0
AUBURN DR E SPRING ST OMAHA DR 90 87 100 78 Flexible0018-001
90 87 100 78Average:
Std. Dev. 0 0 0 0
AUTUMN CREEK
BLVD
VETERANS PKWY LAVENDER WAY 97 100 100 84 Flexible0019-001
97 100 100 84Average:
Std. Dev. 0 0 0 0
AUTUMN CREEK
BLVD
LAVENDER WAY SIENNA DR 93 93 100 80 Flexible0019-002
AUTUMN CREEK
BLVD
SIENNA DR ORCHID ST 92 100 100 70 Flexible0019-003
AUTUMN CREEK
BLVD
ORCHID ST CORAL DR 87 93 100 65 Flexible0019-004
AUTUMN CREEK
BLVD
CORAL DR CRIMSON LN 89 91 100 71 Flexible0019-005
AUTUMN CREEK
BLVD
CRIMSON LN DS@660N CRIMSON
LN
92 97 100 73 Flexible0019-006
91 95 100 72Average:
Std. Dev. 2 3 0 4
AUTUMN CREEK
BLVD
DS@660N CRIMSON
LN
DS@1320N CRIMSON
LN
90 85 100 81 Flexible0019-007
AUTUMN CREEK
BLVD
DS@1320N CRIMSON
LN
PRAIRE GRASS LN 96 91 100 89 Flexible0019-008
AUTUMN CREEK
BLVD
PRAIRE GRASS LN DS@660N PRAIRE
GRASS LN
96 91 100 90 Flexible0019-009
AUTUMN CREEK
BLVD
DS@660N PRAIRE
GRASS LN
KENNEDY RD 100 99 100 91 Flexible0019-010
Page: 3Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 4
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
94 90 100 87Average:
Std. Dev. 4 5 0 6
BADGER ST WOLF ST DS@660N WOLF ST 89 88 100 74 Flexible0020-001
89 88 100 74Average:
Std. Dev. 0 0 0 0
BADGER ST DS@660N WOLF ST BEAVER ST 88 92 100 69 Flexible0021-001
88 92 100 69Average:
Std. Dev. 0 0 0 0
BAILEY RD MILL RD BERESFORD DR 72 58 100 61 Flexible0022-001
BAILEY RD BERESFORD DR BISSEL DR 72 71 100 48 Flexible0022-002
BAILEY RD BISSEL DR KENNEDY RD 75 79 100 48 Flexible0022-003
73 73 100 50Average:
Std. Dev. 2 7 0 4
BALTRUSOL CT KINGSMILL ST WEST END 92 94 100 76 Flexible0023-001
92 94 100 76Average:
Std. Dev. 0 0 0 0
BANBURY AVE KINGSMILL ST DS@660N KINGSMILL
ST
93 99 100 74 Flexible0024-001
BANBURY AVE DS@660N KINGSMILL
ST
HAZENLTINE WAY 91 94 100 74 Flexible0024-002
92 97 100 74Average:
Std. Dev. 0 0 0 0
BARBERRY CIR E WALSH DR DS@660S WALSH DR 86 85 100 70 Flexible0127-001
BARBERRY CIR E DS@660S WALSH DR DS@1320S WALSH
DR
87 93 100 64 Flexible0127-002
BARBERRY CIR E DS@1320S WALSH
DR
WALSH DR 89 87 100 75 Flexible0127-003
87 89 100 69Average:
Std. Dev. 1 5 0 5
BARBERRY CIR W WALSH DR DS@660S WALSH DR 80 77 100 63 Flexible0374-001
BARBERRY CIR W DS@660S WALSH DR DS@1320S WALSH
DR
82 83 100 61 Flexible0374-002
BARBERRY CIR W DS@1320S WALSH
DR
WALSH DR 84 94 100 56 Flexible0374-003
82 84 100 60Average:
Std. Dev. 2 8 0 4
BASELINE RD N BRIDGE ST DS@660W N BRIDGE
ST
78 92 100 44 Flexible0025-001
BASELINE RD DS@660W N BRIDGE
ST
DS@1320W N BRIDGE
ST
77 87 100 46 Flexible0025-002
BASELINE RD DS@1320W N BRIDGE CITY LIMIT 80 92 100 47 Flexible0025-003
Page: 4Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 5
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
ST
78 90 100 45Average:
Std. Dev. 1 3 0 1
BASELINE RD CITY LIMIT DS@660W CITY LIMIT 80 96 100 45 Flexible0026-001
BASELINE RD DS@660W CITY LIMIT DS@1320W CITY
LIMIT
72 66 100 54 Flexible0026-002
BASELINE RD DS@1320W CITY
LIMIT
DS@1980W CITY
LIMIT
80 100 100 41 Flexible0026-003
BASELINE RD DS@1980W CITY
LIMIT
DS@2640W CITY
LIMIT
61 63 100 29 Flexible0026-004
BASELINE RD DS@2640W CITY
LIMIT
DS@3300W CITY
LIMIT
54 44 100 29 Flexible0026-005
69 74 100 40Average:
Std. Dev.12 24 0 11
BASELINE RD DS@3300W CITY
LIMIT
DS@3960W CITY
LIMIT
57 44 100 37 Flexible0026-006
BASELINE RD DS@3960W CITY
LIMIT
DS@4620W CITY
LIMIT
58 44 100 41 Flexible0026-007
BASELINE RD DS@4620W CITY
LIMIT
DS@5280W CITY
LIMIT
58 44 100 39 Flexible0026-008
BASELINE RD DS@5280W CITY
LIMIT
CITY LIMIT 60 44 100 46 Flexible0026-009
58 44 100 40Average:
Std. Dev. 1 0 0 3
BATOR ST BENJAMIN ST EAST END 91 88 100 80 Flexible0445-001
91 88 100 80Average:
Std. Dev. 0 0 0 0
BEAVER ST S BRIDGE ST DS@660E S BRIDGE
ST
91 100 100 68 Flexible0027-001
BEAVER ST DS@660E S BRIDGE
ST
BADGER ST 88 91 100 70 Flexible0027-002
BEAVER ST BADGER ST DEER ST 74 88 100 37 Flexible0027-003
83 94 100 55Average:
Std. Dev.11 8 0 21
BEECHER RD CITY LIMIT DS@660S CITY LIMIT 80 59 100 82 Flexible0028-001
BEECHER RD DS@660S CITY LIMIT CITY LIMIT 93 94 100 78 Flexible0028-002
BEECHER RD CITY LIMIT CORNEILS RD 91 88 100 81 Flexible0028-003
88 80 100 80Average:
Std. Dev. 9 24 0 3
BEECHER RD CORNEILS RD DS@660S CORNEILS
RD
93 86 100 87 Flexible0028-004
BEECHER RD DS@660S CORNEILS
RD
DS@1320S CORNEILS
RD
93 82 100 91 Flexible0028-005
BEECHER RD DS@1320S CORNEILS CITY LIMIT 88 69 100 91 Flexible0028-006
Page: 5Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 6
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
RD
92 81 100 90Average:
Std. Dev. 2 7 0 3
BEECHER RD JOHN ST DS@660N JOHN ST 89 91 100 72 Flexible0029-001
BEECHER RD DS@660N JOHN ST JOHN ST 85 87 100 66 Flexible0029-001
BEECHER RD DS@660N JOHN ST VETERANS PKWY 93 94 100 80 Flexible0029-002
BEECHER RD VETERANS PKWY DS@660N JOHN ST 93 100 100 73 Flexible0029-002
89 92 100 72Average:
Std. Dev. 4 5 0 5
BEECHER RD N VETERANS PKWY DS@660N VETERANS
PKWY
95 100 100 78 Flexible0262-001
BEECHER RD N DS@660N VETERANS
PKWY
VETERANS PKWY 95 100 100 79 Flexible0262-001
BEECHER RD N DS@660N VETERANS
PKWY
DS@1320N
VETERANS PKWY
94 100 100 75 Flexible0262-002
BEECHER RD N DS@1320N
VETERANS PKWY
DS@660N VETERANS
PKWY
91 94 100 75 Flexible0262-002
BEECHER RD N DS@1320N
VETERANS PKWY
GILLESPIE LN 93 96 100 78 Flexible0262-003
BEECHER RD N GILLESPIE LN DS@1320N
VETERANS PKWY
92 93 100 78 Flexible0262-003
93 97 100 77Average:
Std. Dev. 2 3 0 2
BEECHER ST W STATE ST S MAIN ST 97 100 100 83 Flexible0375-001
97 100 100 83Average:
Std. Dev. 0 0 0 0
BEHRENS ST JOHNSON ST OAKWOOD ST 89 76 100 87 Flexible0030-001
89 76 100 87Average:
Std. Dev. 0 0 0 0
BELL ST E FOX ST NORTH END 77 93 100 39 Flexible0031-001
77 93 100 39Average:
Std. Dev. 0 0 0 0
BENJAMIN ST VANEMMON ST E DS@660S
VANEMMON ST E
91 84 100 83 Flexible0440-001
BENJAMIN ST DS@660S
VANEMMON ST E
BUHMASTER CT 91 80 100 88 Flexible0440-002
BENJAMIN ST BUHMASTER CT TOMASK CT 93 88 100 84 Flexible0440-003
BENJAMIN ST TOMASK CT RODAK ST 94 90 100 86 Flexible0440-004
BENJAMIN ST RODAK ST DS@660S RODAK ST 93 86 100 86 Flexible0440-005
BENJAMIN ST DS@660S RODAK ST DYDYNA CT 93 86 100 87 Flexible0440-006
BENJAMIN ST DYDYNA CT BATOR CT 93 90 100 84 Flexible0440-007
BENJAMIN ST BATOR CT SOUTH END 89 84 100 78 Flexible0440-008
Page: 6Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 7
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
92 86 100 85Average:
Std. Dev. 1 2 0 3
BERESFORD DR BIG ROCK BLVD BISSEL DR 74 85 100 41 Flexible0032-001
BERESFORD DR BISSEL DR BAILEY RD 76 84 100 46 Flexible0032-002
75 85 100 43Average:
Std. Dev. 0 0 0 0
BERRYWOOD LN MATLOCK DR DS@660E MATLOCK
DR
78 79 100 55 Flexible0033-001
BERRYWOOD LN DS@660E MATLOCK
DR
LEHMAN CROSSING 83 87 100 60 Flexible0033-002
BERRYWOOD LN LEHMAN CROSSING SEELEY ST 77 81 100 51 Flexible0033-003
BERRYWOOD LN SEELEY ST DS@660E SEELEY ST 75 80 100 47 Flexible0033-004
BERRYWOOD LN DS@660E SEELEY ST SEELEY ST 74 79 100 46 Flexible0033-005
BERRYWOOD LN SEELEY ST CITY LIMIT 75 84 100 43 Flexible0033-006
77 81 100 51Average:
Std. Dev. 3 3 0 6
BERTRAM DR WEST END WINCHESTER LN 88 94 100 66 Flexible0034-001
BERTRAM DR WINCHESTER LN DS@660E
WINCHESTER LN
83 82 100 66 Flexible0034-002
BERTRAM DR DS@660E
WINCHESTER LN
MARQUETTE ST 83 79 100 70 Flexible0034-003
BERTRAM DR MARQUETTE ST ROSENWINKEL ST 85 84 100 68 Flexible0034-004
BERTRAM DR ROSENWINKEL ST TAMPA DR 88 84 100 76 Flexible0034-005
BERTRAM DR TAMPA DR GARDINER AVE 86 81 100 74 Flexible0034-006
BERTRAM DR GARDINER AVE HARRISON ST 83 75 100 72 Flexible0034-007
BERTRAM DR HARRISON ST SARASOTA AVE 84 77 100 73 Flexible0034-008
BERTRAM DR SARASOTA AVE DS@660E SARASOTA
AVE
91 88 100 79 Flexible0034-009
BERTRAM DR DS@660E SARASOTA
AVE
GARDINER AVE 96 100 100 81 Flexible0034-010
BERTRAM DR GARDINER AVE BRISTOL BAY DR 88 80 100 80 Flexible0034-011
86 83 100 73Average:
Std. Dev. 4 5 0 7
BIG ROCK BLVD MILL RD BERESFORD DR 83 90 100 57 Flexible0035-001
83 90 100 57Average:
Std. Dev. 0 0 0 0
BIRCHWOOD DR SPRING ST DS@660N SPRING ST 87 84 100 73 Flexible0036-001
87 84 100 73Average:
Std. Dev. 0 0 0 0
BIRCHWOOD DR DS@660N SPRING ST BLUEJAY DR 85 81 100 72 Flexible0037-001
85 81 100 72Average:
Std. Dev. 0 0 0 0
BIRCHWOOD DR BLUEJAY DR E SPRING ST 84 77 100 74 Flexible0038-001
Page: 7Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 8
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
84 77 100 74Average:
Std. Dev. 0 0 0 0
BISCAYNE LN PENSACOLA ST SOUTH END 90 85 100 80 Flexible0039-001
90 85 100 80Average:
Std. Dev. 0 0 0 0
BISSEL DR BERESFORD DR DS@440S
BERESFORD DR
80 84 100 55 Flexible0040-001
80 84 100 55Average:
Std. Dev. 0 0 0 0
BISSEL DR DS@440S
BERESFORD DR
BAILEY RD 82 85 100 60 Flexible0041-001
82 85 100 60Average:
Std. Dev. 0 0 0 0
BLACKBERRY CT W BLACKBERRY LN SOUTH END 94 93 100 83 Flexible0042-001
94 93 100 83Average:
Std. Dev. 0 0 0 0
BLACKBERRY LN E EAST END W BLACKBERRY LN 92 85 100 85 Flexible0128-001
92 85 100 85Average:
Std. Dev. 0 0 0 0
BLACKBERRY LN W CENTER PKWY BLACKBERRY CT 91 86 100 83 Flexible0376-001
BLACKBERRY LN W BLACKBERRY CT WEST END 93 88 100 85 Flexible0376-002
92 87 100 84Average:
Std. Dev. 0 0 0 0
BLACKBERRY SHORE
LN
WEST END DS@660E WEST END 93 85 100 88 Flexible0043-001
BLACKBERRY SHORE
LN
DS@660E WEST END DS@1320E WEST
END
92 80 100 91 Flexible0043-002
BLACKBERRY SHORE
LN
DS@1320E WEST
END
HIGH RIDGE LN 93 82 100 91 Flexible0043-003
BLACKBERRY SHORE
LN
HIGH RIDGE LN DS@660E HIGH
RIDGE LN
97 93 100 90 Flexible0043-004
BLACKBERRY SHORE
LN
DS@660E HIGH
RIDGE LN
DS@1320E HIGH
RIDGE LN
93 84 100 90 Flexible0043-005
BLACKBERRY SHORE
LN
DS@1320E HIGH
RIDGE LN
NORTHLAND LN 94 87 100 88 Flexible0043-006
94 85 100 90Average:
Std. Dev. 2 6 0 1
BLACKBERRY SHORE
LN
NORTHLAND LN EDWARD LN 90 93 100 72 Flexible0043-007
BLACKBERRY SHORE
LN
EDWARD LN CANNONBALL TRL 95 100 100 77 Flexible0043-008
Page: 8Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 9
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
92 95 100 74Average:
Std. Dev. 0 0 0 0
BLACKHAWK BLVD E MILL BROOK CIR GALENA RD 90 94 100 73 Flexible0044-001
90 94 100 73Average:
Std. Dev. 0 0 0 0
BLAINE ST STATE ST ADRIAN ST 92 86 100 85 Flexible0045-001
BLAINE ST ADRIAN ST MORGAN ST 92 84 100 86 Flexible0045-002
BLAINE ST MORGAN ST WEST END 89 77 100 85 Flexible0045-003
91 82 100 85Average:
Std. Dev. 2 5 0 1
BLUEBIRD LN HAMPTON LN CANARY AVE 82 80 100 66 Flexible0047-001
BLUEBIRD LN CANARY AVE PRAIRIE CROSSING
DR
84 88 100 63 Flexible0047-002
83 83 100 65Average:
Std. Dev. 0 0 0 0
BLUEJAY DR TAUS CIR BIRCHWOOD DR 93 96 100 78 Flexible0048-001
93 96 100 78Average:
Std. Dev. 0 0 0 0
BLUESTEM DR HAYDEN DR SWITCHGRASS LN 85 83 100 71 Flexible0049-001
BLUESTEM DR SWITCHGRASS LN PRAIRIE MEADOWS
DR
87 88 100 69 Flexible0049-002
BLUESTEM DR PRAIRIE MEADOWS
DR
PRAIRIE ROSE LN 84 87 100 63 Flexible0049-003
BLUESTEM DR PRAIRIE ROSE LN WILD INDIGO LN 85 87 100 65 Flexible0049-004
BLUESTEM DR WILD INDIGO LN MCHUGH RD 89 96 100 67 Flexible0049-005
86 88 100 67Average:
Std. Dev. 2 5 0 3
BOOMER LN CANNONBALL TRL FAIRHAVEN DR 91 96 100 71 Flexible0050-001
BOOMER LN FAIRHAVEN DR SWANSON LN 83 82 100 65 Flexible0050-002
88 91 100 69Average:
Std. Dev. 0 0 0 0
BOOMER LN SWANSON LN SOUTH END 82 73 100 73 Flexible0050-003
82 73 100 73Average:
Std. Dev. 0 0 0 0
BRADY ST CROOKER DR SHOEGER DR 83 87 100 63 Flexible0051-001
83 87 100 63Average:
Std. Dev. 0 0 0 0
BRISTOL AVE E SOMONAUK ST E PARK ST 91 82 100 85 Flexible0053-001
BRISTOL AVE E PARK ST DS@660N E PARK ST 97 96 100 87 Flexible0053-002
Page: 9Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 10
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
BRISTOL AVE DS@660N E PARK ST JACKSON ST 100 100 100 90 Flexible0053-003
BRISTOL AVE JACKSON ST NORTH END 95 90 100 87 Flexible0053-004
95 91 100 87Average:
Std. Dev. 3 8 0 1
BRISTOL BAY DR CITY LIMIT DS@660W CITY LIMIT 90 88 100 78 Flexible0054-001
BRISTOL BAY DR DS@660W CITY LIMIT BERTRAM DR 87 87 100 72 Flexible0054-002
BRISTOL BAY DR BERTRAM DR PLYMOUTH AVE 88 91 100 69 Flexible0054-003
BRISTOL BAY DR PLYMOUTH AVE DS@660W
PLYMOUTH AVE
87 85 100 72 Flexible0054-004
BRISTOL BAY DR DS@660W
PLYMOUTH AVE
ROSENWINKEL ST 85 85 100 69 Flexible0054-005
BRISTOL BAY DR ROSENWINKEL ST BURNETT ST 85 85 100 68 Flexible0054-006
BRISTOL BAY DR BURNETT ST HALF MOON DR 86 87 100 69 Flexible0054-007
BRISTOL BAY DR HALF MOON DR GARRITANO ST 83 79 100 69 Flexible0054-008
BRISTOL BAY DR GARRITANO ST WEST END 85 81 100 72 Flexible0054-009
86 85 100 71Average:
Std. Dev. 3 4 0 4
BRISTOL RIDGE RD E VETERANS PKWY OAKLAWN AVE 97 100 100 84 Flexible0055-001
BRISTOL RIDGE RD OAKLAWN AVE DS@660N OAKLAWN
AVE
90 100 100 66 Flexible0055-002
94 100 100 76Average:
Std. Dev. 0 0 0 0
BRISTOL RIDGE RD DS@660N OAKLAWN
AVE
LINDEN AVE 90 100 100 65 Flexible0056-001
BRISTOL RIDGE RD LINDEN AVE DS@660N LINDEN
AVE
90 100 100 66 Flexible0056-002
90 100 100 66Average:
Std. Dev. 0 0 0 0
BRISTOL RIDGE RD DS@660N LINDEN
AVE
SUNSET AVE 90 100 100 66 Flexible0057-001
BRISTOL RIDGE RD SUNSET AVE DS@660N SUNSET
AVE
90 100 100 66 Flexible0057-002
BRISTOL RIDGE RD DS@660N SUNSET
AVE
KENNEDY RD 92 100 100 70 Flexible0057-003
91 100 100 68Average:
Std. Dev. 1 0 0 2
BRISTOL RIDGE RD KENNEDY RD DS@660N KENNEDY
RD
90 100 100 65 Flexible0057-004
BRISTOL RIDGE RD DS@660N KENNEDY
RD
BRIDGE NEAR CITY
LIMIT
85 100 100 52 Flexible0057-005
88 100 100 60Average:
Std. Dev. 0 0 0 0
BRUELL ST E SPRING ST DS@660S E SPRING
ST
92 82 100 88 Flexible0058-001
Page: 10Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 11
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
BRUELL ST DS@660S E SPRING
ST
E MAIN ST 92 90 100 80 Flexible0058-002
92 83 100 87Average:
Std. Dev. 0 0 0 0
BRUELL ST E MAIN ST WOODDALE DR 77 70 100 63 Flexible0058-003
77 70 100 63Average:
Std. Dev. 0 0 0 0
BUCKTHORN CT WALSH DR WEST END 89 97 100 65 Flexible0059-001
89 97 100 65Average:
Std. Dev. 0 0 0 0
BUDD RD W HIGHPOINT RD STAGECOACH TRAIL 92 94 100 77 Flexible0060-002
92 94 100 77Average:
Std. Dev. 0 0 0 0
BUHRMASTER CT BENJAMIN ST EAST END 91 86 100 82 Flexible0443-001
91 86 100 82Average:
Std. Dev. 0 0 0 0
BURNETT ST BRISTOL BAY DR MARQUETTE ST 81 72 100 70 Flexible0061-001
BURNETT ST MARQUETTE ST DS@660S
MARQUETTE ST
81 66 100 76 Flexible0061-002
BURNETT ST DS@660S
MARQUETTE ST
MARQUETTE ST 82 71 100 75 Flexible0061-003
81 68 100 75Average:
Std. Dev. 1 3 0 3
BURNING BUSH DR WALSH DR CORALBERRY CT 86 92 100 63 Flexible0062-001
BURNING BUSH DR CORALBERRY CT WEST END 87 93 100 65 Flexible0062-002
86 92 100 63Average:
Std. Dev. 0 0 0 0
BURR CT BURR ST EAST END 79 69 100 69 Flexible0063-001
79 69 100 69Average:
Std. Dev. 0 0 0 0
BURR ST LYMAN LOOP DS@660N LYMAN
LOOP
85 74 100 79 Flexible0064-001
BURR ST DS@660N LYMAN
LOOP
BURR CT 84 75 100 76 Flexible0064-002
BURR ST BURR CT GRANDE TRL 79 81 100 57 Flexible0064-003
82 77 100 70Average:
Std. Dev. 4 5 0 14
CALEDONIA DR CORNEILS RD RYAN CT 92 92 100 79 Flexible0065-001
Page: 11Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 12
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
92 92 100 79Average:
Std. Dev. 0 0 0 0
CALEDONIA DR WHEATON AVE RYAN DR 96 96 100 85 Flexible0066-001
CALEDONIA DR RYAN DR PINEWOOD DR 98 100 100 86 Flexible0066-002
CALEDONIA DR PINEWOOD DR LAUREN DR 98 97 100 90 Flexible0066-003
97 98 100 87Average:
Std. Dev. 1 2 0 3
CALLANDER TRL WHITEKIRK LN DS@660E WHITEKIRK
LN
92 85 100 85 Flexible0067-001
CALLANDER TRL DS@660E WHITEKIRK
LN
WHITEKIRK LN 94 90 100 85 Flexible0067-002
93 88 100 85Average:
Std. Dev. 0 0 0 0
CANARY AVE BLUEBIRD LN HAMPTON LN 89 85 100 79 Flexible0068-001
89 85 100 79Average:
Std. Dev. 0 0 0 0
CANDLEBERRY CT CANDLEBERRY LN WEST END 96 93 100 89 Flexible0069-001
96 93 100 89Average:
Std. Dev. 0 0 0 0
CANDLEBERRY LN STAGECOUCH TRAIL MEADOW ROSE LN 91 82 100 85 Flexible0070-001
CANDLEBERRY LN MEADOW ROSE LN CANDLEBERRY CT 94 88 100 87 Flexible0070-002
CANDLEBERRY LN CANDLEBERRY CT NORTH END 91 78 100 91 Flexible0070-003
92 82 100 88Average:
Std. Dev. 1 4 0 4
CANNONBALL TRL N BRIDGE ST PATRICIA LN 97 100 100 83 Flexible0071-001
CANNONBALL TRL PATRICIA LN AMANDA LN 94 94 100 82 Flexible0071-002
95 96 100 82Average:
Std. Dev. 0 0 0 0
CANNONBALL TRL AMANDA LN DS@660S AMANDA
LN
98 100 100 87 Flexible0071-003
CANNONBALL TRL DS@660S AMANDA
LN
DS@1320S AMANDA
LN
97 94 100 89 Flexible0071-004
CANNONBALL TRL DS@1320S AMANDA
LN
ALICE AVE 97 100 100 85 Flexible0071-005
CANNONBALL TRL ALICE AVE NORTON LN 99 100 100 88 Flexible0071-006
CANNONBALL TRL NORTON LN DS@660S NORTON
LN
94 91 100 86 Flexible0071-007
CANNONBALL TRL DS@660S NORTON
LN
DS@1320S NORTON
LN
96 93 100 88 Flexible0071-008
97 96 100 87Average:
Std. Dev. 2 4 0 2
Page: 12Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 13
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
CANNONBALL TRL DS@1320S NORTON
LN
BLACKBERRY SHORE
LN
92 88 100 82 Flexible0071-009
92 88 100 82Average:
Std. Dev. 0 0 0 0
CANNONBALL TRL BLACKBERRY SHORE
LN
DS@660S
BLACKBERRY SHORE
90 96 100 69 Flexible0071-010
CANNONBALL TRL DS@660S
BLACKBERRY SHORE
HICKORY LN 90 96 100 70 Flexible0071-011
CANNONBALL TRL HICKORY LN DS@660S HICKORY
LN
90 96 100 69 Flexible0071-012
CANNONBALL TRL DS@660S HICKORY
LN
W VETERANS PKWY 91 94 100 75 Flexible0071-013
90 95 100 71Average:
Std. Dev. 1 1 0 4
CANNONBALL TRL W VETERANS PKWY JOHN ST 80 88 100 52 Flexible0071-014
80 88 100 52Average:
Std. Dev. 0 0 0 0
CANNONBALL TRL JOHN ST INDEPENDENCE CT 90 85 100 82 Flexible0071-015
CANNONBALL TRL INDEPENDENCE CT PATRICK CT 94 90 100 85 Flexible0071-016
CANNONBALL TRL PATRICK CT N CARLY CIR 94 90 100 85 Flexible0071-017
CANNONBALL TRL N CARLY CIR PURCELL ST 92 87 100 85 Flexible0071-018
CANNONBALL TRL PURCELL ST S CARLY CIR 94 91 100 84 Flexible0071-019
CANNONBALL TRL S CARLY CIR SOUTH END 89 88 100 75 Flexible0071-020
93 89 100 84Average:
Std. Dev. 2 2 0 2
CANYON TRAIL CT HIGH RIDGE LN WEST END 90 91 100 75 Flexible0072-001
90 91 100 75Average:
Std. Dev. 0 0 0 0
CANYON TRL WESTERN LN DS@660E WESTERN
LN
80 65 100 74 Flexible0073-001
CANYON TRL DS@660E WESTERN
LN
DS@1320E WESTERN
LN
85 80 100 74 Flexible0073-002
CANYON TRL DS@1320E WESTERN
LN
HIGH RIDGE LN 91 96 100 73 Flexible0073-003
83 75 100 74Average:
Std. Dev. 4 12 0 0
CARLY CIR N PURCELL ST DS@660E PURCELL
ST
93 88 100 85 Flexible0263-001
93 88 100 85Average:
Std. Dev. 0 0 0 0
CARLY CIR N DS@660E PURCELL
ST
DS@1320E PURCELL
ST
93 88 100 86 Flexible0263-002
CARLY CIR N DS@1320E PURCELL CANNONBALL TRL 92 85 100 85 Flexible0263-003
Page: 13Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 14
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
ST
93 87 100 86Average:
Std. Dev. 0 0 0 0
CARLY CIR S CANNONBALL TRL DS@660W
CANNONBALL TRL
92 84 100 86 Flexible0327-001
92 84 100 86Average:
Std. Dev. 0 0 0 0
CARLY CIR S DS@660W
CANNONBALL TRL
PURCELL ST 96 91 100 90 Flexible0327-002
96 91 100 90Average:
Std. Dev. 0 0 0 0
CARLY CT CARLY DR WEST END 91 82 100 86 Flexible0074-001
91 82 100 86Average:
Std. Dev. 0 0 0 0
CARLY DR CANNONBALL TRL CARLY CT 89 79 100 84 Flexible0075-001
CARLY DR CARLY CT SOUTH END 94 90 100 85 Flexible0075-002
91 83 100 84Average:
Std. Dev. 0 0 0 0
CAROLYN CT RENA LN EAST END 91 91 100 77 Flexible0076-001
91 91 100 77Average:
Std. Dev. 0 0 0 0
CARPENTER ST N BRIDGE ST MARKETVIEW DR 92 100 91 76 Rigid0077-001
92 100 91 76Average:
Std. Dev. 0 0 0 0
CATALPA TRL HONEYSUCKLE LN REDBUD DR 89 76 100 88 Flexible0078-001
89 76 100 88Average:
Std. Dev. 0 0 0 0
CAULFIELD PT KENTSHIRE DR SOUTH END 95 94 100 83 Flexible0079-001
95 94 100 83Average:
Std. Dev. 0 0 0 0
CENTER PKWY W VETERANS PKWY HILLCREST AVE 86 74 100 81 Flexible0080-001
86 74 100 81Average:
Std. Dev. 0 0 0 0
CENTER PKWY W VETERANS PKWY W KENDALL DR 98 100 100 86 Flexible0080-002
CENTER PKWY W KENDALL DR W VETERANS PKWY 100 100 100 90 Flexible0080-002
CENTER PKWY W KENDALL DR W COUNTRYSIDE
PKWY
100 100 100 90 Flexible0080-003
CENTER PKWY W COUNTRYSIDE W KENDALL DR 99 100 100 89 Flexible0080-003
Page: 14Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 15
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
PKWY
99 100 100 89Average:
Std. Dev. 1 0 0 2
CENTER PKWY W COUNTRYSIDE
PKWY
W BLACKBERRY LN 98 100 100 86 Flexible0080-004
CENTER PKWY W BLACKBERRY LN STRAWBERRY LN 97 99 100 85 Flexible0080-005
CENTER PKWY STRAWBERRY LN NADEN CT 98 98 100 87 Flexible0080-006
CENTER PKWY NADEN CT W KENDALL DR 98 100 100 86 Flexible0080-007
98 99 100 86Average:
Std. Dev. 0 1 0 1
CENTER ST E LIBERTY ST COLTON ST 90 94 100 71 Flexible0129-001
90 94 100 71Average:
Std. Dev. 0 0 0 0
CENTER ST E COLTON ST BRIDGE RD 94 99 100 76 Flexible0129-002
94 99 100 76Average:
Std. Dev. 0 0 0 0
CENTER ST W WEST END WEST ST 76 62 100 67 Flexible0377-001
76 62 100 67Average:
Std. Dev. 0 0 0 0
CENTER ST W WEST ST KING ST 88 84 100 77 Flexible0377-002
CENTER ST W KING ST CHURCH ST 91 97 100 71 Flexible0377-003
CENTER ST W CHURCH ST E CENTER ST 87 93 100 65 Flexible0377-004
89 91 100 71Average:
Std. Dev. 2 7 0 6
CHESHIRE CT FAIRHAVEN DR WEST END 85 87 100 66 Flexible0081-001
85 87 100 66Average:
Std. Dev. 0 0 0 0
CHESTNUT CIR CHESTNUT CIR NORTH END 87 87 100 71 Flexible0082-001
87 87 100 71Average:
Std. Dev. 0 0 0 0
CHESTNUT CIR CHESTNUT LN CHESTNUT CIR 90 82 100 83 Flexible0083-001
CHESTNUT CIR CHESTNUT CIR CHESTNUT LN 84 71 100 79 Flexible0083-002
87 76 100 81Average:
Std. Dev. 0 0 0 0
CHESTNUT CT CHESTNUT LN SOUTH END 80 70 100 71 Flexible0084-001
80 70 100 71Average:
Std. Dev. 0 0 0 0
CHESTNUT LN JOHN ST CHESTNUT CIR 85 79 100 74 Flexible0085-001
Page: 15Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 16
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
CHESTNUT LN CHESTNUT CIR CHESTNUT CIR 91 87 100 81 Flexible0085-002
CHESTNUT LN CHESTNUT CIR SYCAMORE RD 84 76 100 75 Flexible0085-003
CHESTNUT LN SYCAMORE RD CHESTNUT CT 76 63 100 67 Flexible0085-004
CHESTNUT LN CHESTNUT CT JOHN ST 79 77 100 61 Flexible0085-005
82 76 100 70Average:
Std. Dev. 8 12 0 10
CHURCH ST W SOMONAUK ST W SPRING ST 99 100 100 89 Flexible0086-001
99 100 100 89Average:
Std. Dev. 0 0 0 0
CHURCH ST W SPRING ST W CENTER ST 98 100 100 87 Flexible0086-002
CHURCH ST W CENTER ST W MAIN ST 93 87 100 85 Flexible0086-003
CHURCH ST W MAIN ST W RIVER ST 85 76 100 78 Flexible0086-004
92 88 100 83Average:
Std. Dev. 6 12 0 5
CLAREMONT CT WINDETT RIDGE RD WEST END 90 91 100 75 Flexible0087-001
90 91 100 75Average:
Std. Dev. 0 0 0 0
CLEARWATER DR E SPRING ST DEERPATH DR 85 76 100 78 Flexible0088-001
CLEARWATER DR DEERPATH DR KATE DR 91 91 100 77 Flexible0088-002
CLEARWATER DR KATE DR OMAHA DR 82 71 100 74 Flexible0088-003
85 78 100 76Average:
Std. Dev. 4 9 0 2
CLOVER CT WEST END GREENFIELD TURN 85 82 100 70 Flexible0089-001
85 82 100 70Average:
Std. Dev. 0 0 0 0
COACH RD FAIRFIELD AVE WINDETT RIDGE RD 81 66 100 77 Flexible0090-004
81 66 100 77Average:
Std. Dev. 0 0 0 0
COBALT DR EMERALD LN NORTH END 90 94 100 72 Flexible0091-001
90 94 100 72Average:
Std. Dev. 0 0 0 0
CODY CT SOUTH END CANNONBALL TRL 90 84 100 81 Flexible0092-001
90 84 100 81Average:
Std. Dev. 0 0 0 0
COLONIAL PKWY S BRIDGE ST DS@660E S BRIDGE
ST
71 60 100 58 Flexible0093-001
COLONIAL PKWY DS@660E S BRIDGE
ST
DS@1320E S BRIDGE
ST
72 63 100 58 Flexible0093-002
COLONIAL PKWY DS@1320E S BRIDGE SCHOOLHOUSE RD 87 83 100 74 Flexible0093-003
Page: 16Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 17
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
ST
74 65 100 60Average:
Std. Dev. 5 7 0 5
COLTON ST E MAIN ST E CENTER ST 85 85 100 69 Flexible0094-001
COLTON ST E CENTER ST E SPRING ST 86 92 100 63 Flexible0094-002
COLTON ST E SPRING ST E SOMONAUK ST 88 93 100 68 Flexible0094-003
86 90 100 67Average:
Std. Dev. 2 4 0 3
COLUMBINE CT WALSH CIR NORTH END 85 88 100 65 Flexible0095-001
85 88 100 65Average:
Std. Dev. 0 0 0 0
COLUMBINE DR WALSH DR DS@660N WALSH DR 91 97 100 72 Flexible0096-001
COLUMBINE DR DS@660N WALSH DR COLUMBINE CT 85 93 100 60 Flexible0096-002
89 96 100 69Average:
Std. Dev. 0 0 0 0
COMMERCIAL DR WHEATON AVE DS@660W WHEATON
AVE
91 97 100 72 Flexible0097-001
COMMERCIAL DR DS@660W WHEATON
AVE
DS@1320W
WHEATON AVE
95 100 100 77 Flexible0097-002
COMMERCIAL DR DS@1320W
WHEATON AVE
EAST END 91 94 100 74 Flexible0097-003
93 98 100 74Average:
Std. Dev. 3 3 0 3
CONEFLOWER CT HAYDEN DR NORTH END 88 93 100 67 Flexible0098-001
88 93 100 67Average:
Std. Dev. 0 0 0 0
CONOVER CT N NORTH END S CONOVER CT 86 74 100 82 Flexible0264-001
86 74 100 82Average:
Std. Dev. 0 0 0 0
CONOVER CT S N CONOVER CT SOUTH END 85 69 100 84 Flexible0328-001
85 69 100 84Average:
Std. Dev. 0 0 0 0
CORAL DR AUTUMN CREEK
BLVD
DS@660N AUTUMN
CREEK BLVD
90 94 100 72 Flexible0099-001
CORAL DR DS@660N AUTUMN
CREEK BLVD
EMERALD LN 90 87 100 78 Flexible0099-002
CORAL DR EMERALD LN NORTH END 95 91 100 87 Flexible0099-003
91 91 100 76Average:
Std. Dev. 2 5 0 5
Page: 17Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 18
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
CORALBERRY CT BURNING BUSH DR NORTH END 90 94 100 71 Flexible0100-001
90 94 100 71Average:
Std. Dev. 0 0 0 0
CORNEILS RD ELDAMAIN RD DS@660E ELDAMAIN
RD
95 100 100 78 Flexible0101-001
CORNEILS RD DS@660E ELDAMAIN
RD
DS@1320E ELDAMAIN
RD
80 77 100 62 Flexible0101-002
CORNEILS RD DS@1320E ELDAMAIN
RD
DS@1980E ELDAMAIN
RD
69 57 100 54 Flexible0101-003
CORNEILS RD DS@1980E ELDAMAIN
RD
DS@2640E ELDAMAIN
RD
68 52 100 57 Flexible0101-004
CORNEILS RD DS@2640E ELDAMAIN
RD
CITY LIMIT 75 57 100 70 Flexible0101-005
77 69 100 64Average:
Std. Dev.11 20 0 10
CORNEILS RD CITY LIMIT BEECHER RD 94 94 100 81 Flexible0101-006
CORNEILS RD BEECHER RD DS@660E BEECHER
RD
93 86 100 88 Flexible0101-007
CORNEILS RD DS@660E BEECHER
RD
DS@1320E BEECHER
RD
88 73 100 87 Flexible0101-008
CORNEILS RD DS@1320E BEECHER
RD
DS@1980E BEECHER
RD
95 92 100 87 Flexible0101-009
CORNEILS RD DS@1980E BEECHER
RD
DS@2640E BEECHER
RD
97 100 100 84 Flexible0101-010
CORNEILS RD DS@2640E BEECHER
RD
DS@3300E BEECHER
RD
95 91 100 88 Flexible0101-011
CORNEILS RD DS@3300E BEECHER
RD
DS@3960E BEECHER
RD
100 100 100 91 Flexible0101-012
CORNEILS RD DS@3960E BEECHER
RD
CALEDONIA DR 99 100 100 89 Flexible0101-013
CORNEILS RD CALEDONIA DR DS@660E CALEDONIA
DR
93 86 100 87 Flexible0101-014
CORNEILS RD DS@660E CALEDONIA
DR
DS@1320E
CALEDONIA DR
99 100 100 88 Flexible0101-015
CORNEILS RD DS@1320E
CALEDONIA DR
DS@1980E
CALEDONIA DR
92 83 100 87 Flexible0101-016
CORNEILS RD DS@1980E
CALEDONIA DR
N BRIDGE ST 93 94 100 80 Flexible0101-017
95 91 100 87Average:
Std. Dev. 4 10 0 2
CORNEILS RD N BRIDGE ST DS@660E N BRIDGE
ST
85 90 100 62 Flexible0101-018
CORNEILS RD DS@660E N BRIDGE
ST
CITY LIMIT 87 100 100 57 Flexible0101-019
86 95 100 60Average:
Std. Dev. 0 0 0 0
CORNEILS RD CITY LIMIT CITY LIMIT 95 96 100 83 Flexible0101-021
Page: 18Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 19
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
95 96 100 83Average:
Std. Dev. 0 0 0 0
CORNEILS RD CITY LIMIT CITY LIMIT 87 75 100 84 Flexible0101-022
87 75 100 84Average:
Std. Dev. 0 0 0 0
CORNERSTONE DR WESTWIND DR WOOD SAGE AVE 94 85 100 90 Flexible0102-001
CORNERSTONE DR WOOD SAGE AVE WESTWIND DR 85 65 100 87 Flexible0102-002
CORNERSTONE DR WESTWIND DR GREEN BRIAR RD 96 96 100 84 Flexible0102-003
91 79 100 87Average:
Std. Dev. 7 17 0 3
COTTONWOOD CT COTTONWOOD TRL WEST END 82 67 100 77 Flexible0103-001
82 67 100 77Average:
Std. Dev. 0 0 0 0
COTTONWOOD TRL JOHN ST STONERIDGE CT 83 88 100 60 Flexible0104-001
COTTONWOOD TRL STONERIDGE CT STONERIDGE CIR 76 74 100 56 Flexible0104-002
COTTONWOOD TRL STONERIDGE CIR DIEHL FARM RD 80 79 100 62 Flexible0104-003
COTTONWOOD TRL DIEHL FARM RD DS@660W DIEHL
FARM RD
82 81 100 65 Flexible0104-004
COTTONWOOD TRL DS@660W DIEHL
FARM RD
COTTONWOOD CT 79 71 100 67 Flexible0104-005
COTTONWOOD TRL COTTONWOOD CT JOHN ST 85 80 100 73 Flexible0104-006
82 80 100 64Average:
Std. Dev. 2 5 0 5
COUNTRY HILLS DR TREMONT AVE RICHMOND AVE 84 69 100 81 Flexible0105-001
COUNTRY HILLS DR RICHMOND AVE PRAIRIE CROSSING
DR
89 78 100 86 Flexible0105-002
87 74 100 84Average:
Std. Dev. 0 0 0 0
COUNTRY HILLS DR PRAIRIE CROSSING
DR
PARKSIDE LN 88 86 100 75 Flexible0105-003
COUNTRY HILLS DR PARKSIDE LN HAMPTON LN 86 85 100 71 Flexible0105-004
COUNTRY HILLS DR HAMPTON LN GREENFIELD TURN 91 99 100 69 Flexible0105-005
COUNTRY HILLS DR GREENFIELD TURN HARVEST TRL 88 94 100 66 Flexible0105-006
COUNTRY HILLS DR HARVEST TRL DS@660N HARVEST
TRL
90 93 100 72 Flexible0105-007
COUNTRY HILLS DR DS@660N HARVEST
TRL
CLOVER CT 87 97 100 60 Flexible0105-008
COUNTRY HILLS DR CLOVER CT SRAGECOACH TRAIL 87 93 100 65 Flexible0105-009
89 93 100 68Average:
Std. Dev. 2 5 0 5
COUNTRYSIDE PKWY
E
E VETERANS PKWY DS@561W E
VETERANS PKWY
93 94 97 80 Rigid0130-001
COUNTRYSIDE PKWY DS@561W E E VETERANS PKWY 90 92 91 80 Rigid0130-001
Page: 19Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 20
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
E VETERANS PKWY
COUNTRYSIDE PKWY
E
DS@561W E
VETERANS PKWY
CRIMSON LN 96 98 100 82 Rigid0130-002
COUNTRYSIDE PKWY
E
CRIMSON LN DS@561W E
VETERANS PKWY
90 99 90 74 Rigid0130-002
COUNTRYSIDE PKWY
E
CRIMSON LN MCHUGH RD 93 92 100 81 Rigid0130-003
COUNTRYSIDE PKWY
E
MCHUGH RD CRIMSON LN 90 92 100 74 Rigid0130-003
92 95 97 78Average:
Std. Dev. 2 3 5 4
COUNTRYSIDE PKWY
E
MCHUGH RD DS@174W MCHUGH
RD
95 97 100 82 Rigid0130-004
COUNTRYSIDE PKWY
E
DS@174W MCHUGH
RD
MCHUGH RD 91 94 100 73 Rigid0130-004
COUNTRYSIDE PKWY
E
DS@174W MCHUGH
RD
DS@834W MCHUGH
RD
95 96 100 83 Rigid0130-005
COUNTRYSIDE PKWY
E
DS@834W MCHUGH
RD
DS@174W MCHUGH
RD
91 94 90 81 Rigid0130-005
93 95 96 81Average:
Std. Dev. 3 1 7 3
COUNTRYSIDE PKWY
E
DS@834W MCHUGH
RD
DS@1494W MCHUGH
RD
94 93 100 82 Rigid0131-001
COUNTRYSIDE PKWY
E
DS@1494W MCHUGH
RD
DS@834W MCHUGH
RD
95 97 99 81 Rigid0131-001
COUNTRYSIDE PKWY
E
DS@1494W MCHUGH
RD
MARKETVIEW DR 94 92 100 84 Rigid0131-002
COUNTRYSIDE PKWY
E
MARKETVIEW DR DS@1494W MCHUGH
RD
91 93 86 83 Rigid0131-002
COUNTRYSIDE PKWY
E
MARKETVIEW DR W COUNTRYSIDE
PKWY
70 55 69 80 Rigid0131-003
COUNTRYSIDE PKWY
E
W COUNTRYSIDE
PKWY
MARKETVIEW DR 95 99 100 79 Rigid0131-003
89 87 91 81Average:
Std. Dev.11 19 14 2
COUNTRYSIDE PKWY
W
W KENDALL DR CENTER PKWY 91 84 100 84 Flexible0378-001
91 84 100 84Average:
Std. Dev. 0 0 0 0
COUNTRYSIDE PKWY
W
CENTER PKWY PALMER CT 95 93 100 85 Flexible0378-002
COUNTRYSIDE PKWY
W
PALMER CT CENTER PKWY 98 100 100 87 Flexible0378-002
COUNTRYSIDE PKWY
W
PALMER CT E KENDALL DR 98 97 100 88 Flexible0378-003
COUNTRYSIDE PKWY
W
E KENDALL DR PALMER CT 98 96 100 90 Flexible0378-003
COUNTRYSIDE PKWY E KENDALL DR E COUNTRYSIDE 98 100 100 86 Flexible0378-004
Page: 20Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 21
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
W PKWY
COUNTRYSIDE PKWY
W
E COUNTRYSIDE
PKWY
E KENDALL DR 96 94 100 87 Flexible0378-004
97 97 100 87Average:
Std. Dev. 1 3 0 1
CRANSTON CIR GRANDE TRL HOBBS LN 94 90 100 86 Flexible0106-001
CRANSTON CIR HOBBS LN DS@660W HOBBS LN 98 99 100 87 Flexible0106-002
CRANSTON CIR DS@660W HOBBS LN DS@1320W HOBBS
LN
95 91 100 87 Flexible0106-003
CRANSTON CIR DS@1320W HOBBS
LN
GRANDE TRL 95 91 100 86 Flexible0106-004
96 93 100 87Average:
Std. Dev. 2 4 0 1
CRESTWOOD DR LAUREN DR WEST END 98 99 100 86 Flexible0107-001
98 99 100 86Average:
Std. Dev. 0 0 0 0
CRIMSON LN SOUTH END ORCHID ST 92 94 100 77 Flexible0108-001
CRIMSON LN ORCHID ST AUTUMN CREEK
BLVD
88 88 100 72 Flexible0108-002
CRIMSON LN AUTUMN CREEK
BLVD
DS@660N AUTUMN
CREEK BLVD
97 93 100 90 Flexible0108-003
CRIMSON LN DS@660N AUTUMN
CREEK BLVD
SAGE CT 97 93 100 90 Flexible0108-004
CRIMSON LN SAGE CT EMERALD LN 92 85 100 86 Flexible0108-005
93 90 100 83Average:
Std. Dev. 5 4 0 10
CRIMSON LN E COUNTRYSIDE
PKWY
PRAIRIE POINTE DR 89 90 100 74 Flexible0109-001
CRIMSON LN PRAIRIE POINTE DR NORTH END 95 90 100 87 Flexible0109-002
92 90 100 80Average:
Std. Dev. 0 0 0 0
CROOKED CREEK DR SOUTH END TRILLIUM CT 95 88 100 90 Flexible0110-001
CROOKED CREEK DR TRILLIUM CT CITY LIMIT 94 86 100 90 Flexible0110-002
95 87 100 90Average:
Std. Dev. 0 0 0 0
CROOKER DR WEST END BRADY ST 71 78 100 42 Flexible0111-001
CROOKER DR BRADY ST TUSCANY TRL 73 86 100 39 Flexible0111-002
72 82 100 40Average:
Std. Dev. 0 0 0 0
CRYDER CT CRYDER WAY EAST END 84 88 100 62 Flexible0112-001
Page: 21Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 22
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
84 88 100 62Average:
Std. Dev. 0 0 0 0
CRYDER WAY MCLELLAN BLVD DS@660N MCLELLAN
BLVD
77 75 100 57 Flexible0113-001
CRYDER WAY DS@660N MCLELLAN
BLVD
CRYDER CT 72 70 100 51 Flexible0113-002
CRYDER WAY CRYDER CT MCLELLAN BLVD 74 63 100 63 Flexible0113-003
74 70 100 56Average:
Std. Dev. 3 5 0 6
CYPRESS LN DIEHL FARM RD WEST END 84 78 100 72 Flexible0114-001
84 78 100 72Average:
Std. Dev. 0 0 0 0
DAKOTA DR HEARTLAND DR TUMA RD 90 93 100 72 Flexible0115-001
90 93 100 72Average:
Std. Dev. 0 0 0 0
DALTON AVE LANDMARK AVE FREEMONT ST 86 89 100 66 Flexible0116-001
86 89 100 66Average:
Std. Dev. 0 0 0 0
DEER ST BEAVER ST DS@660E BEAVER ST 87 94 100 65 Flexible0117-001
DEER ST DS@660E BEAVER ST WOLF ST 79 61 100 76 Flexible0117-002
DEER ST BEAVER ST SCHOOLHOUSE RD 85 93 100 60 Flexible0117-003
84 84 100 67Average:
Std. Dev. 4 18 0 8
DEERPATH DR E SPRING ST DS@660N E SPRING
ST
87 80 100 77 Flexible0118-001
DEERPATH DR DS@660N E SPRING
ST
CLEARWATER DR 89 87 100 77 Flexible0118-002
88 83 100 77Average:
Std. Dev. 0 0 0 0
DEERPOINT LN HAMPTON LN PARKSIDE LN 83 84 100 65 Flexible0119-001
DEERPOINT LN PARKSIDE LN PRAIRIE CROSSING
DR
85 81 100 71 Flexible0119-002
84 82 100 69Average:
Std. Dev. 0 0 0 0
DENISE CT ALAN DALE LN WEST END 89 88 100 75 Flexible0120-001
89 88 100 75Average:
Std. Dev. 0 0 0 0
DICKSON CT NORTH END E KENDALL DR 91 84 100 84 Flexible0121-001
DICKSON CT E KENDALL DR SOUTH END 91 82 100 86 Flexible0121-002
Page: 22Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 23
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
91 83 100 85Average:
Std. Dev. 0 0 0 0
DIEHL FARM RD JOHN ST CYPRESS LN 83 80 100 67 Flexible0122-001
DIEHL FARM RD CYPRESS LN COTTONWOOD TRL 83 84 100 65 Flexible0122-002
DIEHL FARM RD COTTONWOOD TRL W VETERANS PKWY 78 89 100 47 Flexible0122-003
82 84 100 61Average:
Std. Dev. 3 4 0 10
DOLPH ST W MORGAN ST WEST END 92 87 100 84 Flexible0379-001
92 87 100 84Average:
Std. Dev. 0 0 0 0
DOLPH ST W S MAIN ST STATE ST 93 89 100 84 Flexible0380-001
DOLPH ST W STATE ST ADRIAN ST 90 79 100 86 Flexible0380-002
92 84 100 85Average:
Std. Dev. 0 0 0 0
DOVER CT N NORTH END FAIRHAVEN DR 83 81 100 68 Flexible0123-001
83 81 100 68Average:
Std. Dev. 0 0 0 0
DOVER CT S FAIRHAVEN DR SOUTH END 78 68 100 68 Flexible0124-001
78 68 100 68Average:
Std. Dev. 0 0 0 0
DRAYTON CT WINDETT RIDGE RD WEST END 85 79 100 75 Flexible0125-001
85 79 100 75Average:
Std. Dev. 0 0 0 0
DUNBAR CT WHITEKIRK LN NORTH END 96 91 100 89 Flexible0126-001
96 91 100 89Average:
Std. Dev. 0 0 0 0
DYDYNA CT BENJAMIN ST EAST END 92 86 100 85 Flexible0442-001
92 86 100 85Average:
Std. Dev. 0 0 0 0
ELDEN DR WINTERBERRY DR GOLDENROD DR 93 90 100 83 Flexible0145-001
ELDEN DR GOLDENROD DR DS@660N
GOLDENROD DR
94 88 100 88 Flexible0145-002
ELDEN DR DS@660N
GOLDENROD DR
MCMURTRIE WAY 92 83 100 88 Flexible0145-003
93 86 100 87Average:
Std. Dev. 1 3 0 2
ELIZABETH ST S MAIN ST DS@660W S MAIN ST 76 73 100 56 Flexible0146-001
ELIZABETH ST DS@660W S MAIN ST WEST END 71 62 100 56 Flexible0146-002
Page: 23Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 24
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
74 68 100 56Average:
Std. Dev. 0 0 0 0
ELLSWORTH CT ELLSWORTH DR EAST END 92 91 100 80 Flexible0147-001
92 91 100 80Average:
Std. Dev. 0 0 0 0
ELLSWORTH DR GRANDE TRL ELLSWORTH CT 94 90 100 85 Flexible0148-001
ELLSWORTH DR ELLSWORTH CT DS@660S
ELLSWORTH CT
91 81 100 86 Flexible0148-002
ELLSWORTH DR DS@660S
ELLSWORTH CT
DS@1320S
ELLSWORTH CT
96 94 100 86 Flexible0148-003
ELLSWORTH DR DS@1320S
ELLSWORTH CT
GRANDE TRL 98 100 100 85 Flexible0148-004
94 90 100 86Average:
Std. Dev. 3 7 0 1
ELM ST FREEMONT ST DS@660E FREEMONT
ST
65 56 100 46 Flexible0149-001
ELM ST DS@660E FREEMONT
ST
MCHUGH RD 65 61 100 41 Flexible0149-002
65 58 100 44Average:
Std. Dev. 0 0 0 0
EMERALD LN KENNEDY RD MADDEN CT 87 90 100 69 Flexible0150-001
EMERALD LN MADDEN CT COBALT DR 89 93 100 70 Flexible0150-002
EMERALD LN COBALT DR CRIMSON LN 89 91 100 72 Flexible0150-003
EMERALD LN CRIMSON LN CORAL DR 84 88 100 63 Flexible0150-004
EMERALD LN CORAL DR ORCHID ST 85 79 100 74 Flexible0150-005
EMERALD LN ORCHID ST DS@660S ORCHID ST 83 82 100 67 Flexible0150-006
EMERALD LN DS@660S ORCHID ST SIENNA DR 85 84 100 69 Flexible0150-007
EMERALD LN SIENNA DR SOUTH END 85 87 100 66 Flexible0150-008
86 87 100 69Average:
Std. Dev. 3 5 0 3
EMERALD LN KENNEDY RD VIOLET CT 91 82 100 87 Flexible0432-001
EMERALD LN VIOLET CT RUBY DR 93 85 100 89 Flexible0432-002
EMERALD LN RUBY DR SLATE DR 96 90 100 91 Flexible0432-003
94 86 100 89Average:
Std. Dev. 2 4 0 2
ESSEX CT FAIRHAVEN DR NORTH END 84 80 100 71 Flexible0151-001
84 80 100 71Average:
Std. Dev. 0 0 0 0
EVERGREEN LN JOHN ST DS@660S JOHN ST 74 60 100 65 Flexible0152-001
EVERGREEN LN DS@660S JOHN ST DS@1320S JOHN ST 78 69 100 67 Flexible0152-002
EVERGREEN LN DS@1320S JOHN ST WILLOW WAY 80 72 100 68 Flexible0152-003
Page: 24Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 25
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
77 66 100 66Average:
Std. Dev. 3 6 0 2
FAIRFAX WAY S BRIDGE ST DS@660E S BRIDGE
ST
95 97 100 80 Flexible0153-001
FAIRFAX WAY DS@660E S BRIDGE
ST
PHELPS CT 95 91 100 86 Flexible0153-002
FAIRFAX WAY PHELPS CT DS@660E PHELPS CT 94 90 100 86 Flexible0153-003
FAIRFAX WAY DS@660E PHELPS CT KENTSHIRE DR 96 96 100 86 Flexible0153-004
FAIRFAX WAY KENTSHIRE DR SUTTON ST 94 88 100 87 Flexible0153-005
FAIRFAX WAY SUTTON ST WINDETT RIDGE RD 95 91 100 87 Flexible0153-006
FAIRFAX WAY WINDETT RIDGE RD DS@338E WINDETT
RIDGE RD
92 89 100 81 Flexible0153-007
95 92 100 85Average:
Std. Dev. 1 4 0 3
FAIRFAX WAY DS@338E WINDETT
RIDGE RD
FAIRFIELD AVE 87 73 100 85 Flexible0153-008
FAIRFAX WAY FAIRFIELD AVE HEARTHSTONE AVE 86 76 100 80 Flexible0153-009
FAIRFAX WAY HEARTHSTONE AVE RICHMOND AVE 86 74 100 82 Flexible0153-010
87 74 100 83Average:
Std. Dev. 1 1 0 3
FAIRFIELD AVE COACH RD FAIRFAX WAY 95 94 100 83 Flexible0154-001
95 94 100 83Average:
Std. Dev. 0 0 0 0
FAIRHAVEN DR BOOMER LN NEWBURY CT 91 91 100 76 Flexible0155-001
91 91 100 76Average:
Std. Dev. 0 0 0 0
FAIRHAVEN DR NEWBURY CT ESSEX CT 87 88 100 69 Flexible0155-002
FAIRHAVEN DR ESSEX CT DOVER CT S 83 79 100 70 Flexible0155-003
FAIRHAVEN DR DOVER CT S DS@660E DOVER CT
S
86 88 100 68 Flexible0155-004
FAIRHAVEN DR DS@660E DOVER CT
S
CHESHIRE CT 88 91 100 69 Flexible0155-005
FAIRHAVEN DR CHESHIRE CT CANNONBALL TRL 87 91 100 66 Flexible0155-006
86 87 100 69Average:
Std. Dev. 2 4 0 1
FARMSTEAD DR MCHUGH RD HEARTLAND DR 91 94 100 73 Flexible0156-001
91 94 100 73Average:
Std. Dev. 0 0 0 0
FAWN RIDGE CT EAST END COUNTRY HILLS DR 88 87 100 73 Flexible0157-001
88 87 100 73Average:
Std. Dev. 0 0 0 0
Page: 25Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 26
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
FAXON RD CITY LIMIT DS@660E CITY LIMIT 86 80 100 76 Flexible0158-001
FAXON RD DS@660E CITY LIMIT DS@1320E CITY LIMIT 84 71 100 79 Flexible0158-002
FAXON RD DS@1320E CITY LIMIT DS@1980E CITY LIMIT 83 74 100 73 Flexible0158-003
FAXON RD DS@1980E CITY LIMIT EDAMAIN RD 77 80 100 52 Flexible0158-004
83 76 100 72Average:
Std. Dev. 3 5 0 10
FAXON RD CITY LIMIT DS@660E CITY LIMIT 98 100 100 85 Flexible0159-001
FAXON RD DS@660E CITY LIMIT DS@1320E CITY LIMIT 96 88 100 93 Flexible0159-002
97 94 100 89Average:
Std. Dev. 0 0 0 0
FAXON RD DS@1320E CITY LIMIT HIGH RIDGE LN 95 98 100 79 Flexible0159-003
FAXON RD HIGH RIDGE LN ALICE AVE 87 94 100 64 Flexible0159-004
89 95 100 68Average:
Std. Dev. 0 0 0 0
FAXON RD ALICE AVE DS@660E ALICE AVE 80 84 100 55 Flexible0159-005
80 84 100 55Average:
Std. Dev. 0 0 0 0
FAXON RD DS@660E ALICE AVE DS@1320E ALICE AVE 87 85 100 72 Flexible0160-001
FAXON RD DS@1320E ALICE AVE DS@1980E ALICE AVE 80 73 100 66 Flexible0160-002
FAXON RD DS@1980E ALICE AVE ALAN DALE LN 88 93 100 68 Flexible0160-003
FAXON RD ALAN DALE LN DS@660E ALAN DALE
LN
87 86 100 73 Flexible0160-004
FAXON RD DS@660E ALAN DALE
LN
WINTERBERRY DR 88 88 100 72 Flexible0160-005
FAXON RD WINTERBERRY DR MCMURTRIE WAY 86 83 100 72 Flexible0160-006
FAXON RD MCMURTRIE WAY CITY LIMIT 93 90 100 83 Flexible0160-007
86 84 100 71Average:
Std. Dev. 4 7 0 4
FIR CT NORWAY CIR NORTH END 80 80 100 59 Flexible0161-001
80 80 100 59Average:
Std. Dev. 0 0 0 0
FITZHUGH TURN WINDETT RIDGE RD SOUTH END 94 93 100 82 Flexible0162-001
94 93 100 82Average:
Std. Dev. 0 0 0 0
FLINT CREEK LN POPLAR DR REDHORSE LN 90 85 100 80 Flexible0163-001
90 85 100 80Average:
Std. Dev. 0 0 0 0
FONTANA DR LONGVIEW DR WHEATON AVE 97 100 100 84 Flexible0164-001
Page: 26Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 27
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
97 100 100 84Average:
Std. Dev. 0 0 0 0
FOX ST E EAST END MILL ST 80 71 100 69 Flexible0132-001
80 71 100 69Average:
Std. Dev. 0 0 0 0
FOX ST E MILL ST HEUSTIS ST 84 80 100 71 Flexible0132-002
FOX ST E HEUSTIS ST BELL ST 83 70 100 78 Flexible0132-003
83 73 100 76Average:
Std. Dev. 0 0 0 0
FOX ST E BELL ST S BRIDGE ST 98 100 100 85 Flexible0132-004
98 100 100 85Average:
Std. Dev. 0 0 0 0
FOX ST W S BRIDGE ST S MAIN ST 96 100 100 82 Flexible0381-001
96 100 100 82Average:
Std. Dev. 0 0 0 0
FOX ST W S MAIN ST STATE ST 93 96 100 78 Flexible0381-002
FOX ST W STATE ST MORGAN ST 90 92 100 73 Flexible0381-003
FOX ST W MORGAN ST DS@660W MORGAN
ST
88 94 100 66 Flexible0381-004
90 94 100 71Average:
Std. Dev. 2 2 0 6
FOX ST W DS@660W MORGAN
ST
WHITE OAK WAY 97 100 100 84 Flexible0382-001
FOX ST W WHITE OAK WAY DS@660W WHITE
OAK WAY
97 98 100 85 Flexible0382-002
97 99 100 84Average:
Std. Dev. 0 0 0 0
FOX ST W DS@660W WHITE
OAK WAY
DS@1320W WHITE
OAK WAY
89 96 100 68 Flexible0382-003
FOX ST W DS@1320W WHITE
OAK WAY
DS@1980W WHITE
OAK WAY
87 92 100 65 Flexible0382-004
FOX ST W DS@1980W WHITE
OAK WAY
DS@2640W WHITE
OAK WAY
88 90 100 71 Flexible0382-005
88 93 100 68Average:
Std. Dev. 1 3 0 3
FOX ST W DS@2640W WHITE
OAK WAY
POPLAR DR 97 96 100 87 Flexible0383-001
97 96 100 87Average:
Std. Dev. 0 0 0 0
Page: 27Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 28
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
FREEDOM PL KENNEDY RD GRANDE TRL 91 97 100 71 Flexible0165-001
FREEDOM PL GRANDE TRL KENNEDY RD 86 88 100 68 Flexible0165-001
89 93 100 70Average:
Std. Dev. 0 0 0 0
FREEMONT ST SOUTH END E SPRING ST 89 77 100 86 Flexible0166-001
FREEMONT ST E SPRING ST E SOMONAUK ST 89 78 100 86 Flexible0166-002
FREEMONT ST E SOMONAUK ST E PARK ST 91 84 100 85 Flexible0166-003
FREEMONT ST E PARK ST ELM ST 88 72 100 89 Flexible0166-004
FREEMONT ST ELM ST JACKSON ST 89 74 100 89 Flexible0166-005
89 77 100 87Average:
Std. Dev. 1 4 0 2
FREEMONT ST JACKSON ST WALNUT ST 91 79 100 90 Flexible0166-006
91 79 100 90Average:
Std. Dev. 0 0 0 0
FREEMONT ST WALNUT ST DALTON AVE 86 84 100 72 Flexible0166-007
FREEMONT ST DALTON AVE LANDMARK AVE 88 93 100 68 Flexible0166-008
87 91 100 69Average:
Std. Dev. 0 0 0 0
GAME FARM RD VETERANS PKWY CITY LIMIT 98 100 100 86 Flexible0167-001
GAME FARM RD CITY LIMIT DS@660S CITY LIMIT 98 100 100 86 Flexible0167-002
GAME FARM RD DS@660S CITY LIMIT DS@1320S CITY LIMIT 98 100 100 86 Flexible0167-003
GAME FARM RD DS@1320S CITY LIMIT DS@1980S CITY LIMIT 98 100 100 86 Flexible0167-004
GAME FARM RD DS@1980S CITY LIMIT W SOMONAUK ST 97 100 100 83 Flexible0167-005
98 100 100 86Average:
Std. Dev. 0 0 0 1
GARDEN CIR GARDEN ST DS@660S GARDEN
ST
87 93 100 66 Flexible0168-001
GARDEN CIR DS@660S GARDEN
ST
DS@1320S GARDEN
ST
89 96 100 67 Flexible0168-002
GARDEN CIR DS@1320S GARDEN
ST
GARDEN ST 85 80 100 73 Flexible0168-003
88 92 100 68Average:
Std. Dev. 2 5 0 3
GARDEN ST S BRIDGE ST WOOD SAGE AVE 89 96 100 67 Flexible0169-001
GARDEN ST WOOD SAGE AVE GARDEN CIR 90 91 100 74 Flexible0169-002
89 95 100 68Average:
Std. Dev. 0 0 0 0
GARDINER AVE BERTRAM DR HARRISON ST 83 74 100 75 Flexible0170-001
GARDINER AVE HARRISON ST PIERPONT LN 83 73 100 74 Flexible0170-002
GARDINER AVE PIERPONT LN BERTRAM DR 82 74 100 70 Flexible0170-003
Page: 28Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 29
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
83 73 100 73Average:
Std. Dev. 0 1 0 2
GILLESPIE LN EAST END BEECHER RD 92 96 100 75 Flexible0172-001
92 96 100 75Average:
Std. Dev. 0 0 0 0
GLENEAGLES LN WHITEKIRK LN SHETLAND CT 93 85 100 88 Flexible0173-001
93 85 100 88Average:
Std. Dev. 0 0 0 0
GOLDENROD DR MCMURTRIE WAY DS@660S
MCMURTRIE WAY
89 76 100 88 Flexible0174-001
GOLDENROD DR DS@660S
MCMURTRIE WAY
ELDEN DR 93 85 100 89 Flexible0174-002
91 81 100 89Average:
Std. Dev. 0 0 0 0
GOLDFINCH AVE WREN RD HAWK HOLLOW DR 95 96 100 83 Flexible0175-001
GOLDFINCH AVE HAWK HOLLOW DR BLUEBERRY HILL 91 85 100 84 Flexible0175-002
GOLDFINCH AVE BLUEBERRY HILL HAWK HOLLOW DR 96 96 100 86 Flexible0175-003
94 93 100 84Average:
Std. Dev. 3 6 0 2
GRACE DR E SPRING ST DS@699E E SPRING
ST
89 88 100 74 Flexible0176-001
GRACE DR DS@699E E SPRING
ST
OMAHA DR 89 87 100 76 Flexible0176-002
89 87 100 75Average:
Std. Dev. 0 0 0 0
GRANDE TRAIL CT GRANDE TRL EAST END 91 85 100 82 Flexible0177-001
91 85 100 82Average:
Std. Dev. 0 0 0 0
GRANDE TRL SUNSET AVE SQUIRE CIR 78 86 100 49 Flexible0178-001
GRANDE TRL SQUIRE CIR PATRIOT CT 73 75 100 47 Flexible0178-002
GRANDE TRL PATRIOT CT SQUIRE CIR 72 79 100 42 Flexible0178-003
GRANDE TRL SQUIRE CIR MCLELLAN BLVD 78 88 100 46 Flexible0178-004
75 82 100 46Average:
Std. Dev. 3 6 0 3
GRANDE TRL MCLELLAN BLVD BURR ST 79 94 100 43 Flexible0178-005
GRANDE TRL BURR ST AMERICAN WAY 75 88 100 40 Flexible0178-006
77 92 100 42Average:
Std. Dev. 0 0 0 0
GRANDE TRL AMERICAN WAY CRANSTON CIR 95 100 100 79 Flexible0178-007
Page: 29Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 30
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
GRANDE TRL CRANSTON CIR HOBBS LN 98 100 100 85 Flexible0178-008
GRANDE TRL HOBBS LN GRANDE TRAIL CT 98 100 100 87 Flexible0178-009
GRANDE TRL GRANDE TRAIL CT CRANSTON CIR 98 100 100 87 Flexible0178-010
GRANDE TRL CRANSTON CIR ELLSWORTH DR 98 100 100 86 Flexible0178-011
GRANDE TRL ELLSWORTH DR HOLLENBACK CT 96 100 100 82 Flexible0178-012
GRANDE TRL HOLLENBACK CT ELLSWORTH DR 95 99 100 80 Flexible0178-013
GRANDE TRL ELLSWORTH DR JUSTICE DR 98 100 100 86 Flexible0178-014
97 100 100 84Average:
Std. Dev. 1 0 0 3
GRANDE TRL JUSTICE DR MCLELLAN BLVD 82 90 100 55 Flexible0178-015
GRANDE TRL MCLELLAN BLVD DS@660N MCLELLAN
BLVD
82 90 100 56 Flexible0178-016
GRANDE TRL DS@660N MCLELLAN
BLVD
CONSTITUTION WAY 81 88 100 55 Flexible0178-017
GRANDE TRL CONSTITUTION WAY FREEDOM PL 84 90 100 61 Flexible0178-018
GRANDE TRL FREEDOM PL DS@660N FREEDOM
PL
87 90 100 67 Flexible0178-019
GRANDE TRL DS@660N FREEDOM
PL
MATLOCK DR 80 82 100 59 Flexible0178-020
83 88 100 59Average:
Std. Dev. 3 4 0 5
GREEN BRIAR RD WALSH DR DS@660E WALSH DR 74 74 82 63 Flexible-G0179-001
GREEN BRIAR RD DS@660E WALSH DR WALSH DR 77 76 83 66 Flexible-G0179-001
GREEN BRIAR RD DS@660E WALSH DR CORNERSTONE DR 80 86 86 64 Flexible-G0179-002
GREEN BRIAR RD CORNERSTONE DR DS@660E WALSH DR 80 83 86 66 Flexible-G0179-002
GREEN BRIAR RD CORNERSTONE DR DS@660E
CORNERSTONE DR
78 88 86 56 Flexible-G0179-003
GREEN BRIAR RD DS@660E
CORNERSTONE DR
CORNERSTONE DR 74 79 82 56 Flexible-G0179-003
GREEN BRIAR RD DS@660E
CORNERSTONE DR
S BRIDGE ST 82 99 93 51 Flexible-G0179-004
GREEN BRIAR RD S BRIDGE ST DS@660E
CORNERSTONE DR
83 84 84 75 Flexible-G0179-004
78 83 85 62Average:
Std. Dev. 4 8 3 7
GREENFIELD TURN COUNTRY HILLS DR MEADOWLARK LN 87 94 100 65 Flexible0180-001
GREENFIELD TURN MEADOWLARK LN MEADOWLARK LN 89 97 100 66 Flexible0180-002
GREENFIELD TURN MEADOWLARK LN DS@660W
MEADOWLARK LN
87 92 100 67 Flexible0180-003
GREENFIELD TURN DS@660W
MEADOWLARK LN
SUNNY DELL CT 83 75 100 73 Flexible0180-004
GREENFIELD TURN SUNNY DELL CT DS@660W SUNNY
DELL CT
80 69 100 72 Flexible0180-005
GREENFIELD TURN DS@660W SUNNY
DELL CT
CLOVER CT 92 96 100 74 Flexible0180-006
86 87 100 69Average:
Std. Dev. 4 13 0 4
HALEY CT HOMESTEAD DR WEST END 82 69 100 77 Flexible0181-001
Page: 30Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 31
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
82 69 100 77Average:
Std. Dev. 0 0 0 0
HALF MOON DR WINCHESTER LN BRISTOL BAY DR 86 79 100 76 Flexible0182-001
86 79 100 76Average:
Std. Dev. 0 0 0 0
HAMPTON LN COUNTRY HILLS DR DS@660E COUNTRY
HILLS DR
88 87 100 73 Flexible0183-001
HAMPTON LN DS@660E COUNTRY
HILLS DR
DEERPOINT LN 88 88 100 72 Flexible0183-002
HAMPTON LN DEERPOINT LN INGEMUNSON LN 89 92 100 71 Flexible0183-003
HAMPTON LN INGEMUNSON LN BLUEBIRD LN 88 87 100 73 Flexible0183-004
HAMPTON LN BLUEBIRD LN DS@660E BLUEBIRD
LN
91 94 100 75 Flexible0183-005
HAMPTON LN DS@660E BLUEBIRD
LN
CANARY AVE 90 93 100 72 Flexible0183-006
HAMPTON LN CANARY AVE PRAIRIE CROSSING
DR
89 88 100 74 Flexible0183-007
89 90 100 73Average:
Std. Dev. 2 4 0 2
HARRISON ST GARDINER AVE BERTRAM DR 89 79 100 84 Flexible0184-001
89 79 100 84Average:
Std. Dev. 0 0 0 0
HARVEST TRL COUNTRY HILLS DR EAST END 91 96 100 72 Flexible0186-001
91 96 100 72Average:
Std. Dev. 0 0 0 0
HAWK HOLLOW DR PRAIRIE CROSSING
DR
GOLDFINCH AVE 95 99 100 78 Flexible0187-001
95 99 100 78Average:
Std. Dev. 0 0 0 0
HAWTHORNE CT WALSH DR WEST END 84 82 100 68 Flexible0188-001
84 82 100 68Average:
Std. Dev. 0 0 0 0
HAYDEN DR MCHUGH RD WILD INDIGO LN 92 97 100 74 Flexible0189-001
HAYDEN DR WILD INDIGO LN PRAIRIE CLOVER DR 86 90 100 66 Flexible0189-002
HAYDEN DR PRAIRIE CLOVER DR PRAIRIE ROSE LN 85 84 100 68 Flexible0189-003
HAYDEN DR PRAIRIE ROSE LN CONEFLOWER CT 85 86 100 66 Flexible0189-004
HAYDEN DR CONEFLOWER CT SWITCHGRASS LN 87 90 100 69 Flexible0189-005
HAYDEN DR SWITCHGRASS LN PRAIRE GRASS LN 84 78 100 73 Flexible0189-006
HAYDEN DR PRAIRE GRASS LN DS@660N PRAIRE
GRASS LN
88 86 100 74 Flexible0189-007
HAYDEN DR DS@660N PRAIRE
GRASS LN
BLUESTEM DR 83 77 100 72 Flexible0189-008
Page: 31Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 32
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
86 86 100 70Average:
Std. Dev. 2 6 0 4
HAZELTINE WAY KINGSMILL ST BANBURY AVE 92 100 100 70 Flexible0190-001
HAZELTINE WAY BANBURY AVE WESTON AVE 87 90 100 67 Flexible0190-002
HAZELTINE WAY WESTON AVE RAINTREE RD 93 99 100 73 Flexible0190-003
91 97 100 70Average:
Std. Dev. 3 5 0 2
HEARTHSTONE AVE FAIRFAX WAY MANCHESTER LN 86 73 100 83 Flexible0191-001
HEARTHSTONE AVE MANCHESTER LN DS@660N
MANCHESTER LN
94 90 100 85 Flexible0191-002
HEARTHSTONE AVE DS@660N
MANCHESTER LN
PARKSIDE LN 87 77 100 81 Flexible0191-003
90 82 100 83Average:
Std. Dev. 5 10 0 2
HEARTLAND DR HOMESTEAD DR DS@660W
HOMESTEAD DR
86 85 100 70 Flexible0192-001
HEARTLAND DR DS@660W
HOMESTEAD DR
DAKOTA DR 90 96 100 70 Flexible0192-002
HEARTLAND DR DAKOTA DR MISTWOOD CT 86 85 100 71 Flexible0192-003
HEARTLAND DR MISTWOOD CT DS@660W
MISTWOOD CT
89 90 100 72 Flexible0192-004
HEARTLAND DR DS@660W
MISTWOOD CT
DS@1320W
MISTWOOD CT
87 87 100 72 Flexible0192-005
HEARTLAND DR DS@1320W
MISTWOOD CT
FARMSTEAD DR 86 83 100 72 Flexible0192-006
HEARTLAND DR FARMSTEAD DR DS@660W
FARMSTEAD DR
87 88 100 71 Flexible0192-007
HEARTLAND DR DS@660W
FARMSTEAD DR
ARROWHEAD DR 89 91 100 73 Flexible0192-008
87 88 100 71Average:
Std. Dev. 1 3 0 1
HENNING LN ALDEN AVE ROOD ST 82 85 100 59 Flexible0193-001
HENNING LN ROOD ST CRYDER WAY 78 68 100 67 Flexible0193-002
80 76 100 63Average:
Std. Dev. 0 0 0 0
HERITAGE DR HEARTLAND DR MCHUGH RD 95 100 100 78 Flexible0194-001
95 100 100 78Average:
Std. Dev. 0 0 0 0
HEUSTIS ST E ORANGE ST E WASHINGTON ST 98 100 100 86 Flexible0195-001
HEUSTIS ST E WASHINGTON ST E FOX ST 97 100 100 84 Flexible0195-002
97 100 100 85Average:
Std. Dev. 0 0 0 0
HEUSTIS ST E FOX ST DS@660N E FOX ST 87 91 100 68 Flexible0195-003
Page: 32Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 33
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
HEUSTIS ST DS@660N E FOX ST E VAN EMMON ST 91 99 100 68 Flexible0195-004
HEUSTIS ST E VAN EMMON ST E HYDRAULIC AVE 88 91 100 69 Flexible0195-005
88 92 100 68Average:
Std. Dev. 2 3 0 1
HIGH RIDGE LN FAXON RD IROQOIS LN 94 99 100 76 Flexible0196-001
HIGH RIDGE LN IROQOIS LN CANYON TRAIL CT 92 94 100 76 Flexible0196-002
HIGH RIDGE LN CANYON TRAIL CT WHITE PLAINS LN 92 99 100 72 Flexible0196-003
HIGH RIDGE LN WHITE PLAINS LN WESTERN LN 92 96 100 75 Flexible0196-004
92 97 100 75Average:
Std. Dev. 1 2 0 2
HIGH RIDGE LN WESTERN LN BLACKBERRY SHORE
LN
93 90 100 83 Flexible0196-005
93 90 100 83Average:
Std. Dev. 0 0 0 0
HIGHPOINT RD W CITY LIMIT DS@660S CITY LIMIT 100 100 100 90 Flexible0384-001
HIGHPOINT RD W DS@660S CITY LIMIT DS@1320S CITY LIMIT 72 70 58 76 Flexible0384-002
HIGHPOINT RD W DS@1320S CITY LIMIT DS@1980S CITY LIMIT 78 88 78 61 Flexible0384-003
HIGHPOINT RD W DS@1980S CITY LIMIT DS@2640S CITY LIMIT 83 86 78 76 Flexible0384-004
HIGHPOINT RD W DS@2640S CITY LIMIT DS@3300S CITY LIMIT 86 84 100 72 Flexible0384-005
HIGHPOINT RD W DS@3300S CITY LIMIT BUDD RD 93 94 100 79 Flexible0384-006
HIGHPOINT RD W BUDD RD STAGECOACH TRAIL 85 85 88 76 Flexible0384-007
84 86 85 75Average:
Std. Dev. 8 9 16 8
HIGHPOINT RD W STAGECOACH TRAIL DS@660S
STAGECOACH TRAIL
88 89 100 72 Flexible0384-008
HIGHPOINT RD W DS@660S
STAGECOACH TRAIL
DS@1320S
STAGECOACH TRAIL
85 90 100 64 Flexible0384-009
HIGHPOINT RD W DS@1320S
STAGECOACH TRAIL
CITY LIMIT 93 97 100 75 Flexible0384-010
88 91 100 69Average:
Std. Dev. 3 3 0 6
HILLCREST AVE PRAIRIE LN CENTER PKWY 87 69 100 89 Flexible0197-001
HILLCREST AVE CENTER PKWY SUNSET AVE 81 55 100 87 Flexible0197-002
85 64 100 88Average:
Std. Dev. 0 0 0 0
HOBBS CT HOBBS LN SOUTH END 98 99 100 86 Flexible0198-001
98 99 100 86Average:
Std. Dev. 0 0 0 0
HOBBS LN GRANDE TRL HOBBS CT 95 91 100 86 Flexible0199-001
HOBBS LN HOBBS CT CRANSTON CIR 95 91 100 87 Flexible0199-002
Page: 33Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 34
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
95 91 100 87Average:
Std. Dev. 0 0 0 0
HOLLENBACK CT GRANDE TRL EAST END 94 93 100 83 Flexible0200-001
94 93 100 83Average:
Std. Dev. 0 0 0 0
HOMESTEAD DR ARROWHEAD DR HALEY CT 88 88 100 72 Flexible0201-001
HOMESTEAD DR HALEY CT OMAHA DR 91 96 100 72 Flexible0201-002
HOMESTEAD DR OMAHA DR DS@660W OMAHA DR 84 79 100 71 Flexible0201-003
HOMESTEAD DR DS@660W OMAHA DR WHEATLAND CT 85 79 100 73 Flexible0201-004
HOMESTEAD DR WHEATLAND CT DS@660W
WHEATLAND CT
90 96 100 70 Flexible0201-005
HOMESTEAD DR DS@660W
WHEATLAND CT
HEARTLAND DR 87 88 100 69 Flexible0201-006
88 89 100 71Average:
Std. Dev. 4 9 0 1
HONEYSUCKLE LN ALAN DALE LN CATALPA TRL 95 90 100 89 Flexible0202-001
HONEYSUCKLE LN CATALPA TRL SUMAC DR 93 82 100 90 Flexible0202-002
94 87 100 89Average:
Std. Dev. 0 0 0 0
HYDRAULIC AVE E MILL ST HEUSTIS ST 83 72 100 75 Flexible0133-001
HYDRAULIC AVE E HEUSTIS ST S BRIDGE ST 89 89 100 73 Flexible0133-002
87 84 100 74Average:
Std. Dev. 0 0 0 0
HYDRAULIC AVE W E HYDRAULIC AVE S MAIN ST 89 94 100 69 Flexible0385-001
HYDRAULIC AVE W S MAIN ST STATE ST 88 99 100 62 Flexible0385-002
HYDRAULIC AVE W STATE ST ADAMS ST 82 89 100 56 Flexible0385-003
HYDRAULIC AVE W ADAMS ST MORGAN ST 92 100 100 70 Flexible0385-004
88 96 100 65Average:
Std. Dev. 4 4 0 6
HYDRAULIC AVE W MORGAN ST WEST END 98 98 100 87 Flexible0385-005
98 98 100 87Average:
Std. Dev. 0 0 0 0
IDENTA RD STAGECOACH TRAIL DS@660W
STAGECOACH TRAIL
93 100 100 74 Flexible0203-001
IDENTA RD DS@660W
STAGECOACH TRAIL
CITY LIMIT 89 90 100 73 Flexible0203-002
91 96 100 74Average:
Std. Dev. 0 0 0 0
ILLINI CT ILLINI DR SOUTH END 74 63 100 61 Flexible0204-001
Page: 34Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 35
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
74 63 100 61Average:
Std. Dev. 0 0 0 0
ILLINI DR WALTER ST ILLINI CT 77 66 100 66 Flexible0205-001
ILLINI DR ILLINI CT MILL ST 83 74 100 73 Flexible0205-002
80 70 100 70Average:
Std. Dev. 0 0 0 0
INDEPENDENCE
BLVD
NORTH END JOHN ST 92 84 100 86 Flexible0206-001
INDEPENDENCE
BLVD
JOHN ST DS@660W JOHN ST 90 79 100 87 Flexible0206-002
INDEPENDENCE
BLVD
DS@660W JOHN ST CANNONBALL TRL 90 77 100 88 Flexible0206-003
90 78 100 88Average:
Std. Dev. 0 2 0 1
INDEPENDENCE CT CANNONBALL TRL WEST END 87 70 100 88 Flexible0207-001
87 70 100 88Average:
Std. Dev. 0 0 0 0
INGEMUNSON LN PRAIRIE CROSSING
DR
DS@660N PRAIRIE
CROSSING
89 95 100 69 Flexible0208-001
INGEMUNSON LN DS@660N PRAIRIE
CROSSING
HAMPTON LN 86 88 100 68 Flexible0208-002
88 93 100 69Average:
Std. Dev. 0 0 0 0
IROQOIS LN WESTERN LN WHITE PLAINS LN 91 93 100 75 Flexible0209-001
IROQOIS LN WHITE PLAINS LN DS@660N WHITE
PLAINS LN
90 88 100 78 Flexible0209-002
IROQOIS LN DS@660N WHITE
PLAINS LN
DS@1320N WHITE
PLAINS LN
91 94 100 74 Flexible0209-003
IROQOIS LN DS@1320N WHITE
PLAINS LN
HIGH RIDGE LN 90 91 100 75 Flexible0209-004
91 91 100 76Average:
Std. Dev. 1 3 0 2
JACKSON ST BRISTOL AVE DS@660E BRISTOL
AVE
97 96 100 88 Flexible0210-001
JACKSON ST DS@660E BRISTOL
AVE
FREEMONT ST 98 94 100 91 Flexible0210-002
97 96 100 89Average:
Std. Dev. 0 0 0 0
JACKSON ST FREEMONT ST DS@660E FREEMONT
ST
59 43 100 44 Flexible0210-003
JACKSON ST DS@660E FREEMONT
ST
MARTIN AVE 66 70 100 35 Flexible0210-004
Page: 35Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 36
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
62 54 100 40Average:
Std. Dev. 0 0 0 0
JOHN ST INDEPENDENCE
BLVD
DS@660W
INDEPENDENCE
BLVD
89 72 100 90 Flexible0212-001
JOHN ST DS@660W
INDEPENDENCE
BLVD
CANNONBALL TRL 85 63 100 89 Flexible0212-002
JOHN ST CANNONBALL TRL CORNELL LN 96 94 100 86 Flexible0212-003
91 78 100 88Average:
Std. Dev. 5 14 0 3
JOHN ST SOUTH END WILLOW WAY 88 80 100 81 Flexible0213-001
JOHN ST WILLOW WAY WILLOW WAY 83 71 100 77 Flexible0213-002
JOHN ST WILLOW WAY EVERGREEN LN 89 84 100 80 Flexible0213-003
JOHN ST EVERGREEN LN COTTONWOOD TRL 85 82 100 70 Flexible0213-004
JOHN ST COTTONWOOD TRL ASPEN LN 78 70 100 66 Flexible0213-005
JOHN ST ASPEN LN WHITE PINE CT 80 75 100 65 Flexible0213-006
JOHN ST WHITE PINE CT DIEHL FARM RD 85 81 100 72 Flexible0213-007
JOHN ST DIEHL FARM RD ASPEN LN 77 69 100 63 Flexible0213-008
JOHN ST ASPEN LN CHESTNUT LN 73 69 100 54 Flexible0213-009
83 76 100 71Average:
Std. Dev. 5 7 0 9
JOHN ST CHESTNUT LN SYCAMORE RD 80 75 100 64 Flexible0214-001
JOHN ST SYCAMORE RD CHESTNUT LN 83 74 100 75 Flexible0214-002
JOHN ST CHESTNUT LN EAST END 88 80 100 80 Flexible0214-003
83 75 100 71Average:
Std. Dev. 3 2 0 8
JOHNSON ST BEHRENS ST MAIN ST 87 70 100 88 Flexible0215-001
JOHNSON ST MAIN ST SOUTH END 88 83 100 77 Flexible0215-002
88 77 100 82Average:
Std. Dev. 0 0 0 0
KATE DR CLEARWATER DR DS@660W
CLEARWATER DR
87 83 100 74 Flexible0216-001
KATE DR DS@660W
CLEARWATER DR
OMAHA DR 89 86 100 77 Flexible0216-002
88 84 100 75Average:
Std. Dev. 0 0 0 0
KELLY AVE POPLAR DR KELLY CT 88 87 100 74 Flexible0217-001
KELLY AVE KELLY CT DS@660N KELLY CT 86 80 100 75 Flexible0217-002
KELLY AVE DS@660N KELLY CT POPLAR DR 86 81 100 75 Flexible0217-003
KELLY AVE POPLAR DR REDHORSE LN 88 84 100 77 Flexible0217-004
KELLY AVE REDHORSE LN EAST END 85 75 100 77 Flexible0217-005
Page: 36Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 37
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
87 82 100 76Average:
Std. Dev. 1 3 0 1
KELLY CT KELLY AVE SOUTH END 88 91 100 70 Flexible0218-001
88 91 100 70Average:
Std. Dev. 0 0 0 0
KENDALL DR E W COUNTRYSIDE
PKWY
MULHERN CT 97 100 100 84 Flexible0134-001
KENDALL DR E MULHERN CT DS@660S MULHERN
CT
92 87 100 84 Flexible0134-002
KENDALL DR E DS@660S MULHERN
CT
DICKSON CT 94 90 100 85 Flexible0134-003
KENDALL DR E DICKSON CT DS@660S DICKSON
CT
91 85 100 84 Flexible0134-004
KENDALL DR E DS@660S DICKSON
CT
CENTER PKWY 95 94 100 85 Flexible0134-005
93 90 100 84Average:
Std. Dev. 2 6 0 1
KENDALL DR W CENTER PKWY ANDERSON CT 96 93 100 87 Flexible0386-001
KENDALL DR W ANDERSON CT DS@672S ANDERSON
CT
96 93 100 87 Flexible0386-002
KENDALL DR W DS@672S ANDERSON
CT
STRAWBERRY LN 96 94 100 87 Flexible0386-003
KENDALL DR W STRAWBERRY LN DS@660S
STRAWBERRY LN
93 90 100 84 Flexible0386-004
KENDALL DR W DS@660S
STRAWBERRY LN
W BLACKBERRY LN 97 99 100 85 Flexible0386-005
KENDALL DR W W BLACKBERRY LN DS@660S W
BLACKBERRY LN
96 94 100 87 Flexible0386-006
KENDALL DR W DS@660S W
BLACKBERRY LN
W COUNTRYSIDE
PKWY
96 96 100 86 Flexible0386-007
KENDALL DR W W COUNTRYSIDE
PKWY
POWERS CT 97 100 100 84 Flexible0386-008
KENDALL DR W POWERS CT CENTER PKWY 98 100 100 86 Flexible0386-009
96 95 100 86Average:
Std. Dev. 2 4 0 1
KENNEDY RD CITY LIMIT EMERALD LN 92 100 100 74 Flexible0219-001
KENNEDY RD EMERALD LN DS@660E EMERALD
LN
88 96 100 68 Flexible0219-002
KENNEDY RD DS@660E EMERALD
LN
DS@1320E EMERALD
LN
79 83 61 82 Flexible0219-003
86 93 87 75Average:
Std. Dev. 7 9 23 7
KENNEDY RD DS@1320E EMERALD
LN
DS@1980E EMERALD
LN
96 99 100 84 Flexible0219-004
KENNEDY RD DS@1980E EMERALD
LN
DS@2640E EMERALD
LN
94 94 100 85 Flexible0219-005
Page: 37Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 38
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
KENNEDY RD DS@2640E EMERALD
LN
BRISTOL RIDGE RD 83 84 78 80 Flexible0219-006
93 95 97 84Average:
Std. Dev. 4 5 7 1
KENNEDY RD BRISTOL RIDGE RD DS@800E BRISTOL
RIDGE RD
95 100 100 82 Flexible0219-007
KENNEDY RD DS@800E BRISTOL
RIDGE RD
THEREAS AVE 93 91 98 86 Flexible0219-008
KENNEDY RD THEREAS AVE DS@660E THEREAS
AVE
96 99 100 85 Flexible0219-009
KENNEDY RD DS@660E THEREAS
AVE
DS@1320E THEREAS
AVE
97 100 100 86 Flexible0219-010
KENNEDY RD DS@1320E THEREAS
AVE
DS@1980E THEREAS
AVE
96 97 100 86 Flexible0219-011
KENNEDY RD DS@1980E THEREAS
AVE
FREEDOM PL 95 96 100 85 Flexible0219-012
KENNEDY RD FREEDOM PL DS@660E FREEDOM
PL
92 96 92 83 Flexible0219-013
KENNEDY RD DS@660E FREEDOM
PL
DS@1320E FREEDOM
PL
94 95 100 83 Flexible0219-014
KENNEDY RD DS@1320E FREEDOM
PL
BAILEY RD 96 100 100 84 Flexible0219-015
KENNEDY RD BAILEY RD MILL RD 95 98 100 84 Flexible0219-016
KENNEDY RD MILL RD MILL RD 97 100 100 86 Flexible0219-017
KENNEDY RD MILL RD GALENA RD 96 100 100 84 Flexible0219-018
95 98 99 84Average:
Std. Dev. 2 3 3 2
KENNEDY RD N BRIDGE ST W LEXINGTON CIR 85 94 100 61 Flexible0220-001
KENNEDY RD W LEXINGTON CIR MARKETVIEW DR 83 99 100 51 Flexible0220-002
KENNEDY RD MARKETVIEW DR DS@660E
MARKETVIEW DR
83 100 100 49 Flexible0220-003
KENNEDY RD DS@660E
MARKETVIEW DR
E LEXINGTON CIR 85 94 100 60 Flexible0220-004
KENNEDY RD E LEXINGTON CIR DS@660E E
LEXINGTON CIR
78 99 100 39 Flexible0220-005
KENNEDY RD DS@660E E
LEXINGTON CIR
MCHUGH RD 81 100 100 44 Flexible0220-006
KENNEDY RD MCHUGH RD DS@660E MCHUGH
RD
80 100 100 42 Flexible0220-007
KENNEDY RD DS@660E MCHUGH
RD
PRAIRIE MEADOWS
DR
83 100 100 49 Flexible0220-008
KENNEDY RD PRAIRIE MEADOWS
DR
DS@660E PRAIRIE
MEADOWS D
76 92 79 54 Flexible0220-009
81 98 97 49Average:
Std. Dev. 3 4 9 7
KENNEDY RD DS@660E PRAIRIE
MEADOWS D
CHRISTY LN 91 99 100 71 Flexible0220-010
KENNEDY RD CHRISTY LN DS@660E CHRISTY
LN
82 86 83 72 Flexible0220-011
KENNEDY RD DS@660E CHRISTY AUTUMN CREEK 92 100 100 74 Flexible0220-012
Page: 38Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 39
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
LN BLVD
KENNEDY RD AUTUMN CREEK
BLVD
CITY LIMIT 93 100 100 76 Flexible0220-013
89 95 94 73Average:
Std. Dev. 6 8 10 2
KENTSHIRE DR WINDETT RIDGE RD CAULFIELD PT 93 90 100 84 Flexible0221-001
KENTSHIRE DR CAULFIELD PT DS@660W CAULFIELD
PT
96 94 100 86 Flexible0221-002
95 93 100 85Average:
Std. Dev. 0 0 0 0
KENTSHIRE DR DS@660W CAULFIELD
PT
WILTON CT 89 82 100 81 Flexible0222-001
KENTSHIRE DR WILTON CT FAIRFAX WAY 93 90 100 84 Flexible0222-002
92 88 100 83Average:
Std. Dev. 0 0 0 0
KING ST W RIVER ST W MAIN ST 72 70 100 50 Flexible0223-001
KING ST W MAIN ST W CENTER ST 77 91 100 41 Flexible0223-002
KING ST W CENTER ST W SOMONAUK ST 88 88 100 72 Flexible0223-003
80 84 100 56Average:
Std. Dev. 8 10 0 17
KINGSMILL CT KINGSMILL ST NORTH END 89 85 100 77 Flexible0224-001
89 85 100 77Average:
Std. Dev. 0 0 0 0
KINGSMILL ST RAINTREE RD WESTON AVE 93 97 100 75 Flexible0225-001
KINGSMILL ST WESTON AVE BANBURY AVE 90 99 100 66 Flexible0225-002
KINGSMILL ST BANBURY AVE BALTRUSOL CT 85 85 100 68 Flexible0225-003
88 92 100 69Average:
Std. Dev. 4 9 0 4
KINGSMILL ST BANBURY AVE BALTRUSOL CT 96 98 100 82 Flexible0226-001
KINGSMILL ST BALTRUSOL CT VILLAGE VIEW DR 92 91 100 79 Flexible0226-002
KINGSMILL ST VILLAGE VIEW DR HAZELTINE WAY 87 79 100 79 Flexible0226-003
91 89 100 79Average:
Std. Dev. 3 7 0 1
LANDMARK AVE N BRIDGE ST DALTON AVE 95 100 100 77 Flexible0227-001
LANDMARK AVE DALTON AVE FREEMONT ST 83 80 100 67 Flexible0227-002
LANDMARK AVE FREEMONT ST DS@660E FREEMONT
ST
91 92 100 75 Flexible0227-003
LANDMARK AVE DS@660E FREEMONT
ST
MARKETPLACE DR 91 100 100 68 Flexible0227-004
91 94 100 74Average:
Std. Dev. 4 7 0 4
Page: 39Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 40
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
LAUREN DR NORTH END CALEDONIA DR 98 100 100 86 Flexible0228-001
LAUREN DR CALEDONIA DR CRESTWOOD DR 98 100 100 86 Flexible0228-002
LAUREN DR CRESTWOOD DR SHADOW WOOD DR 99 100 100 89 Flexible0228-003
99 100 100 88Average:
Std. Dev. 1 0 0 2
LAVENDER WAY AUTUMN CREEK
BLVD
SIENNA DR 90 87 100 78 Flexible0231-001
LAVENDER WAY SIENNA DR DS@660N SIENNA DR 86 76 100 80 Flexible0231-002
LAVENDER WAY DS@660N SIENNA DR ORCHID ST 89 83 100 81 Flexible0231-003
88 82 100 79Average:
Std. Dev. 3 7 0 1
LEHMAN CROSSING BERRYWOOD LN NORTH END 82 78 100 68 Flexible0232-001
82 78 100 68Average:
Std. Dev. 0 0 0 0
LEISURE ST PRAIRIE LN DS@660E PRAIRIE LN 89 76 100 87 Flexible0233-001
89 76 100 87Average:
Std. Dev. 0 0 0 0
LEISURE ST DS@660E PRAIRIE LN SUNSET AVE 92 85 100 86 Flexible0234-001
92 85 100 86Average:
Std. Dev. 0 0 0 0
LIBERTY ST SOUTH END E MAIN ST 91 87 100 80 Flexible0235-001
LIBERTY ST E MAIN ST E CENTER ST 88 89 100 71 Flexible0235-002
LIBERTY ST E CENTER ST E SPRING ST 87 85 100 73 Flexible0235-003
LIBERTY ST E SPRING ST E SOMONAUK ST 85 76 100 76 Flexible0235-004
LIBERTY ST E SOMONAUK ST E PARK ST 79 59 100 79 Flexible0235-005
86 79 100 75Average:
Std. Dev. 4 13 0 4
LILAC CT SLATE DR NORTH END 89 76 100 88 Flexible0434-001
89 76 100 88Average:
Std. Dev. 0 0 0 0
LILAC WY EMERALD LN DS@660N EMERALD
LN
94 86 100 90 Flexible0433-001
LILAC WY DS@660N EMERALD
LN
SLATE DR 91 77 100 91 Flexible0433-002
93 83 100 90Average:
Std. Dev. 0 0 0 0
LONGVIEW DR CALEDONIA DR FONTANA DR 98 100 100 87 Flexible0236-001
LONGVIEW DR FONTANA DR SHADOW WOOD DR 95 93 100 85 Flexible0236-002
Page: 40Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 41
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
96 96 100 86Average:
Std. Dev. 0 0 0 0
LYMAN LOOP MCLELLAN BLVD BURR ST 94 90 100 86 Flexible0237-001
LYMAN LOOP BURR ST DS@312W BURR ST 95 91 100 86 Flexible0237-002
LYMAN LOOP DS@312W BURR ST DS@972W BURR ST 93 88 100 86 Flexible0237-003
LYMAN LOOP DS@972W BURR ST MCLELLAN BLVD 94 90 100 86 Flexible0237-004
94 90 100 86Average:
Std. Dev. 1 1 0 0
MADDEN CT EMERALD LN NORTH END 89 90 100 72 Flexible0238-001
89 90 100 72Average:
Std. Dev. 0 0 0 0
MADISON CT W MADISON ST WEST END 89 78 100 85 Flexible0239-001
89 78 100 85Average:
Std. Dev. 0 0 0 0
MADISON ST W WEST END MADISON CT 91 84 100 84 Flexible0387-001
MADISON ST W MADISON CT MORGAN ST 90 80 100 86 Flexible0387-002
90 81 100 86Average:
Std. Dev. 0 0 0 0
MADISON ST W MORGAN ST ADAMS ST 87 91 100 68 Flexible0387-003
MADISON ST W ADAMS ST STATE ST 88 90 100 71 Flexible0387-004
MADISON ST W STATE ST S MAIN ST 90 97 100 68 Flexible0387-005
88 93 100 69Average:
Std. Dev. 2 4 0 2
MADISON ST W S MAIN ST JEFFERSON ST 88 91 100 70 Flexible0387-006
88 91 100 70Average:
Std. Dev. 0 0 0 0
MAIN ST E JOHNSON ST OAKWOOD ST 98 100 100 85 Flexible0135-001
MAIN ST E OAKWOOD ST BRUELL ST 96 96 100 84 Flexible0135-002
MAIN ST E BRUELL ST WOODWORTH ST 77 70 100 63 Flexible0135-003
MAIN ST E WOODWORTH ST MCHUGH RD 73 61 100 61 Flexible0135-004
88 84 100 75Average:
Std. Dev.13 20 0 13
MAIN ST E MCHUGH RD WORSLEY ST 82 78 100 67 Flexible0136-001
MAIN ST E WORSLEY ST SANDERS CT 92 100 100 70 Flexible0136-002
MAIN ST E SANDERS CT DS@660W SANDERS
CT
82 78 100 66 Flexible0136-003
83 81 100 67Average:
Std. Dev. 3 7 0 2
MAIN ST E DS@660W SANDERS LIBERTY ST 80 70 100 70 Flexible0136-004
Page: 41Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 42
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
CT
MAIN ST E LIBERTY ST COLTON ST 80 81 100 59 Flexible0136-005
MAIN ST E COLTON ST W MAIN ST 82 86 100 60 Flexible0136-006
81 80 100 62Average:
Std. Dev. 1 6 0 5
MAIN ST S S BRIDGE ST ELIZABETH ST 96 100 96 83 Rigid0329-000
96 100 96 83Average:
Std. Dev. 0 0 0 0
MAIN ST S ELIZABETH ST PAVEMENT CHANGE 99 100 100 89 Flexible0329-001
MAIN ST S PAVEMENT CHANGE W BEECHER ST 98 96 100 90 Flexible0329-002
MAIN ST S W BEECHER ST W DOLPH ST 93 82 100 91 Flexible0329-003
MAIN ST S W DOLPH ST W ORANGE ST 95 88 100 90 Flexible0329-004
MAIN ST S W ORANGE ST W WASHINGTON ST 96 92 100 90 Flexible0329-005
MAIN ST S W WASHINGTON ST W FOX ST 92 80 100 91 Flexible0329-006
MAIN ST S W FOX ST W RIDGE ST 93 85 100 88 Flexible0329-007
MAIN ST S W RIDGE ST W MADISON ST 98 99 100 86 Flexible0329-008
MAIN ST S W MADISON ST W VAN EMMON ST 93 94 100 80 Flexible0329-009
MAIN ST S W VAN EMMON ST W HYDRAULIC AVE 87 77 100 80 Flexible0329-010
94 88 100 88Average:
Std. Dev. 3 8 0 4
MAIN ST W E MAIN ST CHURCH ST 82 74 100 71 Flexible0388-001
MAIN ST W CHURCH ST KING ST 90 99 100 67 Flexible0388-002
MAIN ST W KING ST WEST END 81 87 100 56 Flexible0388-003
85 86 100 66Average:
Std. Dev. 5 14 0 7
MARKETPLACE DR MCHUGH RD LANDMARK AVE 90 100 100 66 Flexible0241-001
MARKETPLACE DR LANDMARK AVE DS@660N LANDMARK
AVE
91 100 100 68 Flexible0241-002
MARKETPLACE DR DS@660N LANDMARK
AVE
E VETERANS PKWY 87 98 100 59 Flexible0241-003
90 100 100 65Average:
Std. Dev. 2 1 0 4
MARKETVIEW DR KENNEDY RD DS@660S KENNEDY
RD
92 93 94 81 Rigid0242-001
MARKETVIEW DR DS@660S KENNEDY
RD
CARPENTER ST 92 95 92 80 Rigid0242-002
MARKETVIEW DR CARPENTER ST MENARD DR 92 95 93 81 Rigid0242-003
MARKETVIEW DR MENARD DR DS@660S MENARD
DR
89 93 92 76 Rigid0242-004
MARKETVIEW DR DS@660S MENARD
DR
E COUNTRYSIDE
PKWY
89 96 87 76 Rigid0242-005
91 94 92 79Average:
Std. Dev. 2 1 1 3
MARQUETTE ST BERTRAM DR BURNETT ST 78 69 100 67 Flexible0243-001
Page: 42Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 43
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
MARQUETTE ST BURNETT ST DS@660N BURNETT
ST
90 87 100 79 Flexible0243-002
MARQUETTE ST DS@660N BURNETT
ST
BURNETT ST 83 74 100 74 Flexible0243-003
86 80 100 75Average:
Std. Dev. 6 10 0 6
MARTIN AVE JACKSON ST CITY LIMIT 87 88 100 71 Flexible0244-001
87 88 100 71Average:
Std. Dev. 0 0 0 0
MATLOCK DR BERRYWOOD LN GRANDE TRL 78 82 100 54 Flexible0245-001
78 82 100 54Average:
Std. Dev. 0 0 0 0
MCHUGH RD CITY LIMIT MARTIN AVE 91 100 100 69 Flexible0246-001
91 100 100 69Average:
Std. Dev. 0 0 0 0
MCHUGH RD MARTIN AVE ELM ST 94 98 100 77 Flexible0246-002
MCHUGH RD ELM ST E PARK ST 86 77 100 78 Flexible0246-003
MCHUGH RD E PARK ST E SOMONAUK ST 92 91 100 79 Flexible0246-004
91 88 100 78Average:
Std. Dev. 4 11 0 1
MCHUGH RD E SOMONAUK ST E SPRING ST 92 89 100 82 Flexible0246-005
MCHUGH RD E SPRING ST DS@660S E SPRING
ST
98 100 100 86 Flexible0246-006
MCHUGH RD DS@660S E SPRING
ST
E MAIN ST 93 86 100 86 Flexible0246-007
95 94 100 85Average:
Std. Dev. 4 8 0 2
MCHUGH RD KENNEDY RD BLUESTEM DR 93 99 100 74 Flexible0247-001
MCHUGH RD BLUESTEM DR DS@660S BLUESTEM
DR
90 96 100 69 Flexible0247-002
MCHUGH RD DS@660S BLUESTEM
DR
HAYDEN DR 90 96 100 70 Flexible0247-003
MCHUGH RD HAYDEN DR DS@660S HAYDEN
DR
83 90 100 59 Flexible0247-004
MCHUGH RD DS@660S HAYDEN
DR
PRAIRIE POINTE DR 89 91 100 71 Flexible0247-005
MCHUGH RD PRAIRIE POINTE DR E COUNTRYSIDE
PKWY
87 91 100 66 Flexible0247-006
88 94 100 67Average:
Std. Dev. 4 4 0 6
MCHUGH RD E COUNTRYSIDE
PKWY
DS@660S E
COUNTRYSIDE PKW
73 53 80 81 Rigid0247-007
MCHUGH RD DS@660S E DS@1320S E 90 92 90 79 Rigid0247-008
Page: 43Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 44
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
COUNTRYSIDE PKW COUNTRYSIDE PK
MCHUGH RD DS@1320S E
COUNTRYSIDE PK
E VETERANS PKWY 84 77 83 83 Rigid0247-009
82 73 85 81Average:
Std. Dev.10 23 6 2
MCHUGH RD E VETERANS PKWY FARMSTEAD DR 63 43 70 74 Rigid0247-010
63 43 70 74Average:
Std. Dev. 0 0 0 0
MCHUGH RD FARMSTEAD DR CITY LIMIT 80 88 100 51 Flexible0247-011
MCHUGH RD CITY LIMIT MARKETPLACE DR 90 100 100 66 Flexible0247-012
MCHUGH RD MARKETPLACE DR HERITAGE DR 86 96 100 59 Flexible0247-013
MCHUGH RD HERITAGE DR CITY LIMIT 82 85 100 60 Flexible0247-014
84 90 100 60Average:
Std. Dev. 3 8 0 2
MCLELLAN BLVD GRANDE TRL CONSTITUTION WAY 84 87 100 63 Flexible0248-001
MCLELLAN BLVD CONSTITUTION WAY CRYDER WAY 85 90 100 62 Flexible0248-002
MCLELLAN BLVD CRYDER WAY ALDEN AVE 87 90 100 68 Flexible0248-003
MCLELLAN BLVD ALDEN AVE DS@660S ALDEN AVE 85 91 100 63 Flexible0248-004
MCLELLAN BLVD DS@660S ALDEN AVE CRYDER WAY 76 81 100 50 Flexible0248-005
MCLELLAN BLVD CRYDER WAY GRANDE TRL 79 88 100 49 Flexible0248-006
82 88 100 58Average:
Std. Dev. 4 4 0 8
MCLELLAN BLVD GRANDE TRL DS@660S GRANDE
TRL
77 71 100 62 Flexible0248-007
MCLELLAN BLVD DS@660S GRANDE
TRL
LYMAN LOOP 83 75 100 72 Flexible0248-008
79 72 100 65Average:
Std. Dev. 0 0 0 0
MCMURTRIE CT ALAN DALE LN WEST END 97 94 100 89 Flexible0249-001
97 94 100 89Average:
Std. Dev. 0 0 0 0
MCMURTRIE WAY ALAN DALE LN GOLDENROD DR 98 94 100 91 Flexible0250-001
MCMURTRIE WAY GOLDENROD DR ELDEN DR 95 88 100 90 Flexible0250-002
MCMURTRIE WAY ELDEN DR DS@660E ELDEN DR 96 91 100 90 Flexible0250-003
MCMURTRIE WAY DS@660E ELDEN DR DS@1320E ELDEN DR 94 87 100 89 Flexible0250-004
MCMURTRIE WAY DS@1320E ELDEN DR FAXON RD 95 88 100 90 Flexible0250-005
95 89 100 90Average:
Std. Dev. 1 3 0 1
MEADOW ROSE LN CANDLEBERRY LN EAST END 95 88 100 90 Flexible0251-001
95 88 100 90Average:
Std. Dev. 0 0 0 0
Page: 44Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 45
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
MEADOWLARK CT MEADOWLARK LN WEST END 81 66 100 76 Flexible0252-001
81 66 100 76Average:
Std. Dev. 0 0 0 0
MEADOWLARK LN GREENFIELD TURN MEADOWLARK CT 82 71 100 75 Flexible0253-001
MEADOWLARK LN MEADOWLARK CT DS@660N
MEADOWLARK CT
89 90 100 74 Flexible0253-002
MEADOWLARK LN DS@660N
MEADOWLARK CT
GREENFIELD TURN 90 96 100 69 Flexible0253-003
88 87 100 73Average:
Std. Dev. 3 10 0 3
MEADOWVIEW LN YELLOWSTONE LN NORTON LN 84 87 100 63 Flexible0254-001
MEADOWVIEW LN NORTON LN RED TAIL LN 79 74 100 64 Flexible0254-002
81 80 100 64Average:
Std. Dev. 0 0 0 0
MENARD DR MARKETVIEW DR N BRIDGE ST 78 73 75 78 Rigid0255-001
78 73 75 78Average:
Std. Dev. 0 0 0 0
MIDNIGHT PL OLIVE LN AUTUMN CREEK
BLVD
95 91 100 88 Flexible0451-001
95 91 100 88Average:
Std. Dev. 0 0 0 0
MILL BROOK CIR E PRESTON DR OWEN CT 77 71 100 62 Flexible0137-001
MILL BROOK CIR E OWEN CT GAINS CT 77 72 100 61 Flexible0137-002
MILL BROOK CIR E GAINS CT SHERIDAN CT 90 90 100 78 Flexible0137-003
80 76 100 66Average:
Std. Dev. 6 9 0 8
MILL BROOK CIR E SHERIDAN CT KETCHUM CT 94 91 100 86 Flexible0137-004
MILL BROOK CIR E KETCHUM CT SILVER SPRING CT 91 85 100 86 Flexible0137-005
93 88 100 86Average:
Std. Dev. 0 0 0 0
MILL BROOK CIR E SILVER SPRING CT BLACKHAWK BLVD 93 91 100 84 Flexible0137-006
MILL BROOK CIR E BLACKHAWK BLVD WEST END 92 91 100 81 Flexible0137-007
93 91 100 84Average:
Std. Dev. 0 0 0 0
MILL RD KENNEDY RD DS@660E KENNEDY
RD
76 88 100 43 Flexible0256-001
MILL RD DS@660E KENNEDY
RD
BIG ROCK BLVD 64 79 68 42 Flexible0256-002
MILL RD BIG ROCK BLVD DS@660E BIG ROCK
BLVD
79 98 89 49 Flexible0256-003
MILL RD DS@660E BIG ROCK DS@1320E BIG ROCK 52 73 43 33 Flexible0256-004
Page: 45Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 46
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
BLVD BLVD
MILL RD DS@1320E BIG ROCK
BLVD
TUSCANY TRL 58 71 48 47 Flexible0256-005
MILL RD TUSCANY TRL DS@660E TUSCANY
TRL
71 86 79 47 Flexible0256-006
MILL RD DS@660E TUSCANY
TRL
DS@1320E TUSCANY
TRL
58 71 41 51 Flexible0256-007
MILL RD DS@1320E TUSCANY
TRL
ALLEGIANCE
CROSSING
84 90 100 63 Flexible0256-008
68 83 72 46Average:
Std. Dev.11 10 23 8
MILL ST SCHOOLHOUSE RD ILLINI DR 79 69 68 89 Flexible0257-001
MILL ST ILLINI DR WALTER ST 91 82 97 88 Flexible0257-002
MILL ST WALTER ST OLSEN ST 93 83 99 90 Flexible0257-003
MILL ST OLSEN ST E ORANGE ST 94 90 100 86 Flexible0257-004
MILL ST E ORANGE ST E WASHINGTON ST 95 91 100 88 Flexible0257-005
MILL ST E WASHINGTON ST E FOX ST 98 99 100 87 Flexible0257-006
91 85 92 88Average:
Std. Dev. 8 12 16 1
MILL ST E FOX ST E RIDGE ST 90 100 100 65 Flexible0257-007
MILL ST E RIDGE ST E VAN EMMON ST 87 99 100 59 Flexible0257-008
88 99 100 62Average:
Std. Dev. 0 0 0 0
MILL ST E VAN EMMON ST E HYDRAULIC AVE 89 92 100 71 Flexible0257-009
89 92 100 71Average:
Std. Dev. 0 0 0 0
MISTWOOD CT HEARTLAND DR SOUTH END 92 97 100 74 Flexible0258-001
92 97 100 74Average:
Std. Dev. 0 0 0 0
MONTROSE CT WREN RD EAST END 93 90 100 84 Flexible0259-001
93 90 100 84Average:
Std. Dev. 0 0 0 0
MORGAN ST W HYDRAULIC AVE W HYDRAULIC AVE 84 94 100 56 Flexible0260-001
MORGAN ST W HYDRAULIC AVE W VAN EMMON ST 88 90 100 70 Flexible0260-002
MORGAN ST W VAN EMMON ST W MADISON ST 86 97 100 58 Flexible0260-003
MORGAN ST W MADISON ST W RIDGE ST 76 87 100 42 Flexible0260-004
MORGAN ST W RIDGE ST W FOX ST 80 86 100 54 Flexible0260-005
82 90 100 55Average:
Std. Dev. 5 5 0 9
MORGAN ST W FOX ST W WASHINGTON ST 90 80 100 85 Flexible0260-006
MORGAN ST W WASHINGTON ST W WASHINGTON ST 85 68 100 86 Flexible0260-007
MORGAN ST W WASHINGTON ST W DOLPH ST 94 90 100 86 Flexible0260-008
MORGAN ST W DOLPH ST BLAINE ST 94 90 100 85 Flexible0260-009
Page: 46Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 47
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
92 86 100 85Average:
Std. Dev. 3 7 0 1
MULHERN CT E KENDALL DR EAST END 93 91 100 83 Flexible0261-001
93 91 100 83Average:
Std. Dev. 0 0 0 0
NADEN CT CENTER PKWY EAST END 92 85 100 86 Flexible0265-001
92 85 100 86Average:
Std. Dev. 0 0 0 0
NEWBURY CT FAIRHAVEN DR NORTH END 83 75 100 73 Flexible0266-001
83 75 100 73Average:
Std. Dev. 0 0 0 0
NORTHLAND LN BLACKBERRY SHORE
LN
DS@660N
BLACKBERRY SHORE
89 84 100 78 Flexible0267-001
NORTHLAND LN DS@660N
BLACKBERRY SHORE
WESTERN LN 83 75 100 73 Flexible0267-002
NORTHLAND LN WESTERN LN DS@660N WESTERN
LN
79 71 100 66 Flexible0267-003
NORTHLAND LN DS@660N WESTERN
LN
YELLOWSTONE LN 86 86 100 69 Flexible0267-004
84 79 100 72Average:
Std. Dev. 6 8 0 7
NORTON LN MEADOWVIEW LN CANNONBALL TRL 87 88 100 71 Flexible0268-001
87 88 100 71Average:
Std. Dev. 0 0 0 0
NORWAY CIR WHITE OAK WAY DS@660N WHITE OAK
WAY
89 88 100 75 Flexible0269-001
NORWAY CIR DS@660N WHITE OAK
WAY
NORWAY CT 86 82 100 73 Flexible0269-002
NORWAY CIR NORWAY CT DS@660N NORWAY
CT
83 78 100 69 Flexible0269-003
NORWAY CIR DS@660N NORWAY
CT
FIR CT 79 78 100 59 Flexible0269-004
NORWAY CIR FIR CT WHITE OAK WAY 76 73 100 58 Flexible0269-005
84 81 100 69Average:
Std. Dev. 5 7 0 7
NORWAY CT NORWAY CIR SOUTH END 83 88 100 61 Flexible0270-001
83 88 100 61Average:
Std. Dev. 0 0 0 0
OAK ST CANNONBALL TRL WEST END 87 84 100 74 Flexible0271-001
Page: 47Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 48
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
87 84 100 74Average:
Std. Dev. 0 0 0 0
OAKWOOD ST SOUTH END E MAIN ST 92 84 100 86 Flexible0272-001
OAKWOOD ST E MAIN ST BEHRENS ST 94 88 100 87 Flexible0272-002
93 86 100 87Average:
Std. Dev. 0 0 0 0
OLD GLORY CT OLD GLORY DR NORTH END 78 74 100 62 Flexible0273-001
78 74 100 62Average:
Std. Dev. 0 0 0 0
OLD GLORY DR CRYDER WAY DS@660S CRYDER
WAY
79 81 100 57 Flexible0274-001
79 81 100 57Average:
Std. Dev. 0 0 0 0
OLD GLORY DR DS@660S CRYDER
WAY
AMOS AVE 80 78 100 62 Flexible0275-001
OLD GLORY DR AMOS AVE DS@660S AMOS AVE 80 80 100 60 Flexible0275-002
OLD GLORY DR DS@660S AMOS AVE OLD GLORY CT 77 79 100 54 Flexible0275-003
OLD GLORY DR OLD GLORY CT ALDEN AVE 74 78 100 48 Flexible0275-004
OLD GLORY DR ALDEN AVE SUNSET AVE 68 70 100 40 Flexible0275-005
77 77 100 55Average:
Std. Dev. 5 4 0 9
OLIVE LN PRAIRE GRASS LN MIDNIGHT PL 93 86 100 87 Flexible0450-001
OLIVE LN MIDNIGHT PL NORTH END 93 86 100 86 Flexible0450-002
93 86 100 86Average:
Std. Dev. 0 0 0 0
OLSEN ST MILL ST EAST END 84 80 100 70 Flexible0276-001
84 80 100 70Average:
Std. Dev. 0 0 0 0
OMAHA DR CLEARWATER DR HOMESTEAD DR 92 93 100 78 Flexible0277-001
92 93 100 78Average:
Std. Dev. 0 0 0 0
OMAHA DR CLEARWATER DR KATE DR 89 88 100 75 Flexible0278-001
OMAHA DR KATE DR REDWOOD DR 89 85 100 77 Flexible0278-002
OMAHA DR REDWOOD DR GRACE DR 87 78 100 79 Flexible0278-003
OMAHA DR GRACE DR AUBURN DR 90 88 100 77 Flexible0278-004
OMAHA DR AUBURN DR E SPRING ST 91 91 100 77 Flexible0278-005
89 86 100 77Average:
Std. Dev. 1 5 0 1
ORANGE ST E W ORANGE ST HEUSTIS ST 89 94 100 70 Flexible0138-001
Page: 48Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 49
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
ORANGE ST E HEUSTIS ST MILL ST 84 81 100 70 Flexible0138-002
87 90 100 70Average:
Std. Dev. 0 0 0 0
ORANGE ST E MILL ST EAST END 71 58 100 58 Flexible0138-003
71 58 100 58Average:
Std. Dev. 0 0 0 0
ORANGE ST W ADRIAN ST STATE ST 81 59 100 84 Flexible0389-001
ORANGE ST W STATE ST S MAIN ST 85 72 100 80 Flexible0389-002
ORANGE ST W S MAIN ST S BRIDGE ST 88 86 100 75 Flexible0389-003
85 72 100 80Average:
Std. Dev. 4 14 0 5
ORCHID ST EMERALD LN LAVENDER WAY 89 94 100 69 Flexible0279-001
ORCHID ST LAVENDER WAY AUTUMN CREEK
BLVD
94 100 100 75 Flexible0279-002
ORCHID ST AUTUMN CREEK
BLVD
DS@660W AUTUMN
CREEK BLVD
89 85 100 77 Flexible0279-003
ORCHID ST DS@660W AUTUMN
CREEK BLVD
CRIMSON LN 91 90 100 78 Flexible0279-004
91 93 100 75Average:
Std. Dev. 3 8 0 3
OVERLOOK CT CANNONBALL TRL ANDREA CT 89 90 100 74 Flexible0280-001
OVERLOOK CT ANDREA CT SOUTH END 83 73 100 76 Flexible0280-002
85 79 100 75Average:
Std. Dev. 0 0 0 0
PALMER CT W COUNTRYSIDE
PKWY
NORTH END 94 90 100 86 Flexible0281-001
94 90 100 86Average:
Std. Dev. 0 0 0 0
PARK ST E MCHUGH RD DS@660W MCHUGH
RD
67 63 100 43 Flexible0139-001
PARK ST E DS@660W MCHUGH
RD
FREEMONT ST 64 60 100 40 Flexible0139-002
PARK ST E FREEMONT ST LIBERTY ST 68 64 100 46 Flexible0139-003
67 63 100 43Average:
Std. Dev. 1 1 0 3
PARK ST E LIBERTY ST BRISTOL AVE 78 94 100 42 Flexible0139-004
PARK ST E BRISTOL AVE N BRIDGE ST 83 73 100 75 Flexible0139-005
81 81 100 62Average:
Std. Dev. 0 0 0 0
PARKSIDE LN DEERPOINT LN DS@728W
DEERPOINT LN
85 85 100 69 Flexible0285-001
Page: 49Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 50
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
PARKSIDE LN DS@728W
DEERPOINT LN
COUNTRY HILLS DR 95 100 100 77 Flexible0285-002
PARKSIDE LN COUNTRY HILLS DR HEARTHSTONE AVE 89 93 100 71 Flexible0285-003
PARKSIDE LN HEARTHSTONE AVE HATFIELD AVE 92 100 100 71 Flexible0285-004
PARKSIDE LN HATFIELD AVE DS@660W HATFIELD
AVE
89 90 100 74 Flexible0285-005
PARKSIDE LN DS@660W HATFIELD
AVE
RAINTREE RD 89 88 100 74 Flexible0285-006
90 92 100 73Average:
Std. Dev. 4 6 0 3
PARKSIDE LN RAINTREE RD WARBLER LN 91 100 100 67 Flexible0285-007
PARKSIDE LN WARBLER LN COACH RD 93 94 100 78 Flexible0285-008
92 97 100 73Average:
Std. Dev. 0 0 0 0
PATRICK CT CANNONBALL TRL WEST END 95 90 100 87 Flexible0286-001
95 90 100 87Average:
Std. Dev. 0 0 0 0
PATRIOT CT GRANDE TRL SOUTH END 83 69 100 79 Flexible0287-001
83 69 100 79Average:
Std. Dev. 0 0 0 0
PAVILLION RD FOX RD DS@660N FOX RD 96 93 100 89 Flexible0288-001
PAVILLION RD DS@660N FOX RD DS@1320N FOX RD 99 99 100 90 Flexible0288-002
PAVILLION RD DS@1320N FOX RD DS@1980N FOX RD 99 98 100 90 Flexible0288-003
PAVILLION RD DS@1980N FOX RD SOUTH CITY LIMIT 96 92 100 89 Flexible0288-004
98 96 100 90Average:
Std. Dev. 2 4 0 1
PAVILLION RD IL RT 71 DS@660N IL RT 71 95 90 100 88 Flexible0289-001
95 90 100 88Average:
Std. Dev. 0 0 0 0
PAVILLION RD DS@660N IL RT 71 NORTH CITY LIMIT 94 91 100 85 Flexible0290-001
94 91 100 85Average:
Std. Dev. 0 0 0 0
PENMAN RD SOUTH END PRESTWICK LN 95 88 100 89 Flexible0291-001
PENMAN RD PRESTWICK LN DS@660N
PRESTWICK LN
98 100 100 87 Flexible0291-002
PENMAN RD DS@660N
PRESTWICK LN
SCHOOLHOUSE RD 98 100 100 87 Flexible0291-003
97 97 100 87Average:
Std. Dev. 2 5 0 1
PENSACOLA ST TAMPA DR BISCAYNE LN 88 85 100 75 Flexible0292-001
PENSACOLA ST BISCAYNE LN PLEASANT CT 88 84 100 76 Flexible0292-002
Page: 50Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 51
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
PENSACOLA ST PLEASANT CT SARASOTA AVE 89 86 100 76 Flexible0292-003
88 85 100 76Average:
Std. Dev. 1 1 0 1
PHELPS CT FAIRFAX WAY WEST END 93 93 100 80 Flexible0293-001
93 93 100 80Average:
Std. Dev. 0 0 0 0
PIERPONT LN ROSENWINKEL ST GARDINER AVE 87 87 100 71 Flexible0294-001
87 87 100 71Average:
Std. Dev. 0 0 0 0
PINEWOOD DR SHADOW WOOD DR DS@660N SHADOW
WOOD DR
99 100 100 88 Flexible0295-001
PINEWOOD DR DS@660N SHADOW
WOOD DR
CALEDONIA DR 98 99 100 87 Flexible0295-002
99 100 100 88Average:
Std. Dev. 0 0 0 0
PLEASANT CT PENSACOLA ST SOUTH END 88 85 100 75 Flexible0296-001
88 85 100 75Average:
Std. Dev. 0 0 0 0
PLYMOUTH AVE ROSENWINKEL ST TIMBALIER ST 86 81 100 75 Flexible0297-001
PLYMOUTH AVE TIMBALIER ST DS@660E TIMBALIER
ST
85 77 100 75 Flexible0297-002
PLYMOUTH AVE DS@660E TIMBALIER
ST
TIMBALIER ST 87 83 100 75 Flexible0297-003
PLYMOUTH AVE TIMBALIER ST BRISTOL BAY DR 89 83 100 80 Flexible0297-004
86 80 100 76Average:
Std. Dev. 2 4 0 2
POPLAR DR WEST FOX ST KELLY AVE 89 91 100 72 Flexible0298-001
POPLAR DR KELLY AVE FLINT CREEK LN 93 99 100 75 Flexible0298-002
POPLAR DR FLINT CREEK LN KELLY AVE 92 96 100 74 Flexible0298-003
POPLAR DR KELLY AVE AARON LN 87 88 100 71 Flexible0298-004
POPLAR DR AARON LN WINDHAM CIR 88 88 100 73 Flexible0298-005
POPLAR DR WINDHAM CIR TYLER CREEK CT 85 84 100 68 Flexible0298-006
POPLAR DR TYLER CREEK CT SHARON LN 91 90 100 77 Flexible0298-007
POPLAR DR SHARON LN STONY CREEK LN 86 88 100 67 Flexible0298-008
POPLAR DR STONY CREEK LN WINDHAM CIR 87 88 100 69 Flexible0298-009
89 91 100 73Average:
Std. Dev. 3 5 0 3
POWERS CT W KENDALL DR NORTH END 94 97 100 79 Flexible0299-001
94 97 100 79Average:
Std. Dev. 0 0 0 0
PRAIRE GRASS LN AUTUMN CREEK DS@660S AUTUMN 87 77 100 82 Flexible0300-001
Page: 51Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 52
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
BLVD CREEK BLVD
PRAIRE GRASS LN DS@660S AUTUMN
CREEK BLVD
OLIVE LN 88 77 100 83 Flexible0300-002
PRAIRE GRASS LN OLIVE LN HAYDEN DR 85 85 100 69 Flexible0300-003
86 81 100 76Average:
Std. Dev. 1 6 0 9
PRAIRIE CLOVER DR HAYDEN DR EAST END 92 97 100 74 Flexible0301-001
92 97 100 74Average:
Std. Dev. 0 0 0 0
PRAIRIE CROSSING
DR
COUNTRY HILLS DR TREMONT AVE 91 95 100 72 Flexible0302-001
PRAIRIE CROSSING
DR
TREMONT AVE DS@660N TREMONT
AVE
93 99 100 73 Flexible0302-002
PRAIRIE CROSSING
DR
DS@660N TREMONT
AVE
DEERPOINT LN 87 84 100 75 Flexible0302-003
PRAIRIE CROSSING
DR
DEERPOINT LN INGEMUNSON LN 86 84 100 72 Flexible0302-004
PRAIRIE CROSSING
DR
INGEMUNSON LN HAWK HOLLOW DR 93 100 100 74 Flexible0302-005
PRAIRIE CROSSING
DR
HAWK HOLLOW DR HAMPTON LN 95 100 100 77 Flexible0302-006
PRAIRIE CROSSING
DR
HAMPTON LN WREN RD 93 99 100 73 Flexible0302-007
PRAIRIE CROSSING
DR
WREN RD EAST END 93 100 100 73 Flexible0302-008
91 95 100 74Average:
Std. Dev. 4 8 0 2
PRAIRIE LN LEISURE ST HILLCREST AVE 98 98 100 89 Flexible0303-001
98 98 100 89Average:
Std. Dev. 0 0 0 0
PRAIRIE MEADOWS
DR
KENNEDY RD BLUESTEM DR 83 81 100 68 Flexible0304-001
83 81 100 68Average:
Std. Dev. 0 0 0 0
PRAIRIE POINTE DR MCHUGH RD CRIMSON LN 85 86 100 66 Flexible0449-001
85 86 100 66Average:
Std. Dev. 0 0 0 0
PRAIRIE ROSE LN BLUESTEM DR DS@660N BLUESTEM
DR
87 87 100 71 Flexible0305-001
PRAIRIE ROSE LN DS@660N BLUESTEM
DR
HAYDEN DR 86 85 100 71 Flexible0305-002
87 86 100 71Average:
Std. Dev. 0 0 0 0
Page: 52Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 53
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
PRESTON DR TUSCANY LN E MILL BROOK CIR 89 93 100 71 Flexible0306-001
89 93 100 71Average:
Std. Dev. 0 0 0 0
PRESTON DR TUSCANY TAIL HAVENHILL CT 72 76 100 45 Flexible0307-001
PRESTON DR HAVENHILL CT EVANS CT 67 65 100 43 Flexible0307-002
PRESTON DR EVANS CT PRESTON CT 74 81 100 46 Flexible0307-003
PRESTON DR PRESTON CT EAST END 80 87 100 55 Flexible0307-004
72 75 100 47Average:
Std. Dev. 6 11 0 6
PRESTWICK LN PENMAN RD SHETLAND LN 94 90 100 86 Flexible0308-001
PRESTWICK LN SHETLAND LN WHITEKIRK LN 99 98 100 90 Flexible0308-002
97 95 100 88Average:
Std. Dev. 0 0 0 0
PURCELL ST CANNONBALL TRL DS@660W
CANNONBALL TRL
92 85 100 86 Flexible0309-001
92 85 100 86Average:
Std. Dev. 0 0 0 0
PURCELL ST DS@660W
CANNONBALL TRL
N CARLY CIR 96 90 100 90 Flexible0309-002
PURCELL ST N CARLY CIR WEST END 92 84 100 87 Flexible0309-003
95 89 100 89Average:
Std. Dev. 0 0 0 0
RAINTREE RD STAGECOACH TRAIL HAZELTINE WAY 95 100 100 78 Flexible0310-001
RAINTREE RD HAZELTINE WAY SUNNY DELL DR 93 100 100 73 Flexible0310-002
RAINTREE RD SUNNY DELL DR DS@660S SUNNY
DELL DR
95 100 100 79 Flexible0310-003
RAINTREE RD DS@660S SUNNY
DELL DR
KINGSMILL ST 92 96 100 75 Flexible0310-004
RAINTREE RD KINGSMILL ST PARKSIDE LN 93 99 100 75 Flexible0310-005
94 99 100 77Average:
Std. Dev. 1 1 0 2
RED TAIL CT ALAN DALE LN WEST END 84 78 100 73 Flexible0311-001
84 78 100 73Average:
Std. Dev. 0 0 0 0
RED TAIL LN RED TAIL CT MEADOWVIEW LN 79 75 100 63 Flexible0312-001
79 75 100 63Average:
Std. Dev. 0 0 0 0
REDBUD DR ALAN DALE LN DS@660E ALAN DALE
LN
93 85 100 88 Flexible0313-001
REDBUD DR DS@660E ALAN DALE
LN
CATALPA TRL 88 74 100 87 Flexible0313-002
Page: 53Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 54
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
REDBUD DR CATALPA TRL SUMAC DR 85 68 100 86 Flexible0313-003
90 78 100 87Average:
Std. Dev. 4 9 0 1
REDHORSE LN KELLY AVE FLINT CREEK LN 91 91 100 78 Flexible0314-001
REDHORSE LN FLINT CREEK LN SOUTH END 85 78 100 75 Flexible0314-002
89 86 100 77Average:
Std. Dev. 0 0 0 0
REDWOOD DR OMAHA DR TAUS CIR 89 86 100 76 Flexible0315-001
89 86 100 76Average:
Std. Dev. 0 0 0 0
RENA LN ELDAMAIN RD CAROLYN CT 92 99 100 72 Flexible0316-001
RENA LN CAROLYN CT NORTH END 97 93 100 90 Flexible0316-002
94 96 100 81Average:
Std. Dev. 0 0 0 0
RICHMOND AVE FAIRFAX WAY COUNTRY HILLS DR 83 68 100 80 Flexible0317-004
83 68 100 80Average:
Std. Dev. 0 0 0 0
RIDGE ST CITY LIMIT MAIN ST 97 93 100 90 Flexible0318-001
97 93 100 90Average:
Std. Dev. 0 0 0 0
RIDGE ST E MILL ST EAST END 88 75 100 85 Flexible0140-001
88 75 100 85Average:
Std. Dev. 0 0 0 0
RIDGE ST W S MAIN ST STATE ST 88 84 100 77 Flexible0390-002
RIDGE ST W STATE ST STATE ST 92 83 100 87 Flexible0390-003
RIDGE ST W STATE ST ADAMS ST 97 97 100 87 Flexible0390-004
RIDGE ST W ADAMS ST MORGAN ST 90 77 100 88 Flexible0390-005
RIDGE ST W MORGAN ST WEST END 91 82 100 86 Flexible0390-006
91 82 100 85Average:
Std. Dev. 2 4 0 4
RIVER BIRCH DR EAST END RIVER BIRCH LN 83 82 100 65 Flexible0319-001
RIVER BIRCH DR RIVER BIRCH LN WEST END 82 85 100 59 Flexible0319-002
82 84 100 62Average:
Std. Dev. 0 0 0 0
RIVER BIRCH LN WHITE OAK WAY RIVER BIRCH DR 82 84 100 60 Flexible0320-001
82 84 100 60Average:
Std. Dev. 0 0 0 0
RIVER ST W CITY LIMIT KING ST 95 97 100 82 Flexible0391-001
Page: 54Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 55
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
95 97 100 82Average:
Std. Dev. 0 0 0 0
RIVER ST W KING ST CHURCH ST 87 76 100 82 Flexible0391-002
RIVER ST W CHURCH ST S BRIDGE ST 98 97 100 88 Flexible0391-003
92 86 100 85Average:
Std. Dev. 0 0 0 0
RODAK CT BENJAMIN ST EAST END 89 82 100 80 Flexible0441-001
89 82 100 80Average:
Std. Dev. 0 0 0 0
ROOD ST ALDEN AVE DS@660S ALDEN AVE 83 72 100 76 Flexible0321-001
83 72 100 76Average:
Std. Dev. 0 0 0 0
ROOD ST DS@660S ALDEN AVE HENNING LN 85 75 100 78 Flexible0322-001
85 75 100 78Average:
Std. Dev. 0 0 0 0
ROSENWINKEL ST GALENA RD DS@660N GALENA
RD
87 90 100 69 Flexible0323-001
ROSENWINKEL ST DS@660N GALENA
RD
DS@1320N GALENA
RD
91 100 100 68 Flexible0323-002
ROSENWINKEL ST DS@1320N GALENA
RD
BERTRAM DR 91 100 100 68 Flexible0323-003
ROSENWINKEL ST BERTRAM DR PIERPONT LN 82 79 100 67 Flexible0323-004
ROSENWINKEL ST PIERPONT LN BRISTOL BAY DR 85 84 100 70 Flexible0323-005
ROSENWINKEL ST BRISTOL BAY DR PLYMOUTH AVE 87 87 100 71 Flexible0323-006
ROSENWINKEL ST PLYMOUTH AVE NORTH END 90 91 100 74 Flexible0323-007
88 91 100 69Average:
Std. Dev. 3 8 0 1
ROSENWINKEL ST N BRIDGE ST DS@660E N BRIDGE
ST
95 97 100 82 Flexible0324-001
ROSENWINKEL ST DS@660E N BRIDGE
ST
DS@1320E N BRIDGE
ST
93 93 100 81 Flexible0324-002
ROSENWINKEL ST DS@1320E N BRIDGE
ST
EAST END 94 91 100 84 Flexible0324-003
94 94 100 82Average:
Std. Dev. 1 3 0 2
RUBY DR EMERALD LN EAST END 95 88 100 91 Flexible0437-001
95 88 100 91Average:
Std. Dev. 0 0 0 0
RYAN CT EAST END CALEDONIA DR 96 100 100 81 Flexible0325-001
Page: 55Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 56
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
96 100 100 81Average:
Std. Dev. 0 0 0 0
RYAN DR CALEDONIA DR DS@660S CALEDONIA
DR
94 95 100 81 Flexible0326-001
RYAN DR DS@660S CALEDONIA
DR
CALEDONIA DR 96 100 100 81 Flexible0326-002
95 98 100 81Average:
Std. Dev. 0 0 0 0
SAGE CT CRIMSON LN WEST END 94 90 100 86 Flexible0330-001
94 90 100 86Average:
Std. Dev. 0 0 0 0
SANDERS CT E MAIN ST NORTH END 63 41 100 57 Flexible0331-001
63 41 100 57Average:
Std. Dev. 0 0 0 0
SARASOTA AVE BERTRAM DR PENSACOLA ST 88 73 100 87 Flexible0332-001
88 73 100 87Average:
Std. Dev. 0 0 0 0
SEELEY ST ALLEGIANCE
CROSSING
BERRYWOOD LN 78 76 100 59 Flexible0334NEW-001
78 76 100 59Average:
Std. Dev. 0 0 0 0
SEQUOIA CIR EAST END SYCAMORE RD 82 73 100 71 Flexible0335-001
82 73 100 71Average:
Std. Dev. 0 0 0 0
SHADOW WOOD DR WEST END LAUREN DR 98 100 100 87 Flexible0336-001
SHADOW WOOD DR LAUREN DR PINEWOOD DR 96 97 100 84 Flexible0336-002
SHADOW WOOD DR PINEWOOD DR LONGVIEW DR 98 100 100 85 Flexible0336-003
SHADOW WOOD DR LONGVIEW DR WHEATON AVE 98 100 100 87 Flexible0336-004
97 99 100 85Average:
Std. Dev. 1 2 0 2
SHETLAND CT NORTH END SHETLAND LN 97 97 100 87 Flexible0337-001
97 97 100 87Average:
Std. Dev. 0 0 0 0
SHETLAND LN SHETLAND CT PRESTWICK LN 95 94 100 85 Flexible0338-001
95 94 100 85Average:
Std. Dev. 0 0 0 0
SHOEGER CT SHOEGER DR NORTH END 73 67 100 56 Flexible0339-001
Page: 56Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 57
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
73 67 100 56Average:
Std. Dev. 0 0 0 0
SHOEGER DR WEST END SHOEGER CT 83 80 100 69 Flexible0340-001
SHOEGER DR SHOEGER CT BRADY ST 72 75 100 46 Flexible0340-002
SHOEGER DR BRADY ST PRESTON DR 72 88 100 33 Flexible0340-003
75 80 100 48Average:
Std. Dev. 6 7 0 16
SIENNA DR EMERALD LN LAVENDER WAY 84 82 100 69 Flexible0341-001
SIENNA DR LAVENDER WAY AUTUMN CREEK
BLVD
90 93 100 72 Flexible0341-002
88 89 100 71Average:
Std. Dev. 0 0 0 0
SLATE CT EMERALD LN EAST END 96 93 100 89 Flexible0436-001
96 93 100 89Average:
Std. Dev. 0 0 0 0
SLATE DR LILAC WY EMERALD LN 89 73 100 90 Flexible0435-001
89 73 100 90Average:
Std. Dev. 0 0 0 0
SOMONAUK ST E MCHUGH RD DS@660W MCHUGH
RD
96 94 100 87 Flexible0141-001
SOMONAUK ST E DS@660W MCHUGH
RD
FREEMONT ST 97 97 100 87 Flexible0141-002
SOMONAUK ST E FREEMONT ST LIBERTY ST 93 88 100 86 Flexible0141-003
SOMONAUK ST E LIBERTY ST BRISTOL AVE 98 100 100 85 Flexible0141-004
SOMONAUK ST E BRISTOL AVE COLTON ST 96 98 100 84 Flexible0141-005
SOMONAUK ST E COLTON ST W SOMONAUK ST 93 91 100 82 Flexible0141-006
95 94 100 85Average:
Std. Dev. 2 5 0 2
SOMONAUK ST W E SOMONAUK ST TOWER LN 95 100 100 78 Flexible0392-001
SOMONAUK ST W TOWER LN CHURCH ST 96 100 100 82 Flexible0392-002
SOMONAUK ST W CHURCH ST KING ST 98 100 100 86 Flexible0392-003
SOMONAUK ST W KING ST WEST ST 98 100 100 85 Flexible0392-004
97 100 100 83Average:
Std. Dev. 2 0 0 4
SOMONAUK ST W WEST ST DS@660W WEST ST 92 85 100 85 Flexible0392-005
SOMONAUK ST W DS@660W WEST ST WEST END 87 74 100 85 Flexible0392-006
92 85 100 85Average:
Std. Dev. 0 0 0 0
SPICEBUSH CT WALSH DR EAST END 91 89 100 78 Flexible0342-001
Page: 57Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 58
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
91 89 100 78Average:
Std. Dev. 0 0 0 0
SPRING ST E BRIDGE RD COLTON ST 93 88 100 86 Flexible0142-001
SPRING ST E COLTON ST LIBERTY ST 97 96 100 88 Flexible0142-002
SPRING ST E LIBERTY ST FREEMONT ST 95 88 100 89 Flexible0142-003
SPRING ST E FREEMONT ST DS@660E FREEMONT
ST
96 90 100 90 Flexible0142-004
SPRING ST E DS@660E FREEMONT
ST
MCHUGH RD 95 88 100 91 Flexible0142-005
95 90 100 89Average:
Std. Dev. 2 4 0 2
SPRING ST E MCHUGH RD WOODWORTH ST 99 100 100 88 Flexible0142-006
SPRING ST E WOODWORTH ST BRUELL ST 99 100 100 88 Flexible0142-007
SPRING ST E BRUELL ST WACKER DR 95 91 100 88 Flexible0142-008
SPRING ST E WACKER DR TERI LN 99 96 100 92 Flexible0142-009
SPRING ST E TERI LN QUINSEY RD 95 91 100 87 Flexible0142-010
98 96 100 89Average:
Std. Dev. 2 4 0 3
SPRING ST E QUINSEY RD OMAHA DR 95 97 100 81 Flexible0142-011
SPRING ST E OMAHA DR AUBURN DR 90 87 100 79 Flexible0142-012
SPRING ST E AUBURN DR GRACE DR 91 91 100 76 Flexible0142-013
SPRING ST E GRACE DR BIRCHWOOD DR 86 81 100 74 Flexible0142-014
SPRING ST E BIRCHWOOD DR DS@660E
BIRCHWOOD DR
88 84 100 77 Flexible0142-015
SPRING ST E DS@660E
BIRCHWOOD DR
DS@1320E
BIRCHWOOD DR
90 88 100 78 Flexible0142-016
SPRING ST E DS@1320E
BIRCHWOOD DR
BIRCHWOOD DR 87 81 100 78 Flexible0142-017
SPRING ST E BIRCHWOOD DR DEERPATH DR 89 87 100 76 Flexible0142-018
SPRING ST E DEERPATH DR CLEARWATER DR 90 88 100 77 Flexible0142-019
SPRING ST E CLEARWATER DR TUMA RD 85 76 100 76 Flexible0142-020
89 86 100 77Average:
Std. Dev. 2 4 0 2
SPRING ST W N BRIDGE ST PAVEMENT CHANGE 89 84 100 78 Flexible0393-001
89 84 100 78Average:
Std. Dev. 0 0 0 0
SPRING ST W PAVEMENT CHANGE CHURCH ST 93 84 100 88 Flexible0393-002
93 84 100 88Average:
Std. Dev. 0 0 0 0
SPRUCE CT WHITE OAK WAY SOUTH END 74 64 100 61 Flexible0343-001
74 64 100 61Average:
Std. Dev. 0 0 0 0
SQUIRE CIR GRANDE TRL DS@660W GRANDE 85 77 100 77 Flexible0344-001
Page: 58Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 59
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
TRL
SQUIRE CIR DS@660W GRANDE
TRL
DS@1320W GRANDE
TRL
85 71 100 81 Flexible0344-002
SQUIRE CIR DS@1320W GRANDE
TRL
GRANDE TRL 86 74 100 81 Flexible0344-003
85 74 100 80Average:
Std. Dev. 1 3 0 2
STATE ST W HYDRAULIC AVE W VAN EMMON ST 79 92 100 45 Flexible0345-001
STATE ST W VAN EMMON ST W MADISON ST 74 80 100 45 Flexible0345-002
STATE ST W MADISON ST W RIDGE ST 84 96 100 54 Flexible0345-003
79 90 100 48Average:
Std. Dev. 5 8 0 5
STATE ST W RIDGE ST W FOX ST 97 100 100 83 Flexible0345-004
STATE ST W FOX ST W WASHINGTON ST 98 100 100 85 Flexible0345-005
STATE ST W WASHINGTON ST W ORANGE ST 83 63 100 84 Flexible0345-006
STATE ST W ORANGE ST W DOLPH ST 91 82 100 86 Flexible0345-007
STATE ST W DOLPH ST W BEECHER ST 90 80 100 86 Flexible0345-008
STATE ST W BEECHER ST BLAINE ST 88 71 100 89 Flexible0345-009
92 84 100 85Average:
Std. Dev. 6 16 0 2
STILLWATER CT ARROWHEAD DR WEST END 85 77 100 75 Flexible0346-001
85 77 100 75Average:
Std. Dev. 0 0 0 0
STONERIDGE CIR COTTONWOOD TRL EAST END 81 76 100 66 Flexible0347-001
81 76 100 66Average:
Std. Dev. 0 0 0 0
STONERIDGE CT COTTONWOOD TRL SOUTH END 86 88 100 68 Flexible0348-001
86 88 100 68Average:
Std. Dev. 0 0 0 0
STONY CREEK LN POPLAR DR WINDHAM CIR 92 96 100 74 Flexible0349-001
92 96 100 74Average:
Std. Dev. 0 0 0 0
STRAWBERRY LN EAST END S CONOVER CT 96 96 100 86 Flexible0350-001
STRAWBERRY LN S CONOVER CT W KENDALL DR 97 97 100 86 Flexible0350-002
96 96 100 86Average:
Std. Dev. 0 0 0 0
SUMAC DR TWINLEAF TRL HONEYSUCKLE LN 90 78 100 88 Flexible0351-001
SUMAC DR HONEYSUCKLE LN DS@660S
HONEYSUCKLE LN
93 82 100 90 Flexible0351-002
SUMAC DR DS@660S
HONEYSUCKLE LN
REDBUD DR 91 80 100 88 Flexible0351-003
Page: 59Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 60
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
92 80 100 89Average:
Std. Dev. 2 2 0 1
SUMAC DR REDBUD DR DS@660S REDBUD
DR
94 88 100 88 Flexible0351-004
SUMAC DR DS@660S REDBUD
DR
ALAN DALE LN 89 73 100 90 Flexible0351-005
92 81 100 89Average:
Std. Dev. 0 0 0 0
SUNFLOWER CT WALSH DR EAST END 87 90 100 68 Flexible0352-001
87 90 100 68Average:
Std. Dev. 0 0 0 0
SUNNY DELL CT WEST END GREENFIELD TURN 87 90 100 67 Flexible0353-001
87 90 100 67Average:
Std. Dev. 0 0 0 0
SUNNY DELL LN GREENFIELD TURN RAINTREE RD 83 84 100 64 Flexible0354-001
83 84 100 64Average:
Std. Dev. 0 0 0 0
SUNSET AVE HILLCREST AVE LEISURE ST 99 99 100 89 Flexible0355-001
SUNSET AVE LEISURE ST PLEASURE DR 97 97 100 87 Flexible0355-002
SUNSET AVE PLEASURE DR GEORGEANNA ST 96 96 100 86 Flexible0355-003
SUNSET AVE GEORGEANNA ST SOUTH END 89 76 100 87 Flexible0355-004
95 91 100 87Average:
Std. Dev. 5 12 0 1
SUNSET AVE BRISTOL RIDGE RD GRANDE TRL 88 100 100 60 Flexible0356-001
SUNSET AVE GRANDE TRL BRISTOL RIDGE RD 89 100 100 64 Flexible0356-001
89 100 100 62Average:
Std. Dev. 0 0 0 0
SUTTON ST SOUTH END FAIRFAX WAY 93 90 100 82 Flexible0357-001
SUTTON ST FAIRFAX WAY WAVERLY CIR 89 90 100 74 Flexible0357-002
SUTTON ST WAVERLY CIR DS@660N WAVERLY
CIR
82 77 100 69 Flexible0357-003
SUTTON ST DS@660N WAVERLY
CIR
DS@1320N WAVERLY
CIR
86 85 100 70 Flexible0357-004
SUTTON ST DS@1320N WAVERLY
CIR
WINDETT RIDGE RD 87 82 100 77 Flexible0357-005
86 84 100 73Average:
Std. Dev. 4 6 0 5
SWITCHGRASS LN BLUESTEM DR DS@660S BLUESTEM
DR
85 83 100 71 Flexible0358-001
SWITCHGRASS LN DS@660S BLUESTEM
DR
HAYDEN DR 85 83 100 71 Flexible0358-002
Page: 60Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 61
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
85 83 100 71Average:
Std. Dev. 0 0 0 0
SYCAMORE RD W VETERANS PKWY DS@660S W
VETERANS PKWY
72 78 100 43 Flexible0359-001
SYCAMORE RD DS@660S W
VETERANS PKWY
JOHN ST 71 78 100 38 Flexible0359-002
72 78 100 42Average:
Std. Dev. 0 0 0 0
SYCAMORE RD JOHN ST SEQUOIA CIR 75 72 100 55 Flexible0359-003
SYCAMORE RD SEQUOIA CIR COTTONWOOD TRL 79 77 100 61 Flexible0359-004
SYCAMORE RD COTTONWOOD TRL CITY LIMIT 78 71 100 64 Flexible0359-005
77 74 100 59Average:
Std. Dev. 2 3 0 4
TAMPA DR BERTRAM DR PENSACOLA ST 94 100 100 76 Flexible0360-001
94 100 100 76Average:
Std. Dev. 0 0 0 0
TAUS CIR REDWOOD DR BLUEJAY DR 89 85 100 77 Flexible0361-001
TAUS CIR BLUEJAY DR DS@660E BLUEJAY
DR
89 84 100 78 Flexible0361-002
TAUS CIR DS@660E BLUEJAY
DR
REDWOOD DR 91 88 100 79 Flexible0361-003
90 85 100 78Average:
Std. Dev. 1 2 0 1
TERI LN NORTH END DS@660N SOUTH
END
86 66 100 90 Flexible0362-001
TERI LN DS@660N SOUTH
END
E SPRING ST 91 76 100 91 Flexible0362-002
89 71 100 91Average:
Std. Dev. 0 0 0 0
TIMBALIER ST PLYMOUTH AVE DS@660N PLYMOUTH
AVE
82 72 100 72 Flexible0363-001
TIMBALIER ST DS@660N PLYMOUTH
AVE
PLYMOUTH AVE 78 63 100 71 Flexible0363-002
81 69 100 72Average:
Std. Dev. 0 0 0 0
TITUS DR AUTUMN CREEK
BLVD
DS@660S AUTUMN
CREEK BLVD
98 99 100 88 Flexible0452-001
TITUS DR DS@660S AUTUMN
CREEK BLVD
AUTUMN CREEK
BLVD
95 91 100 87 Flexible0452-002
96 95 100 87Average:
Std. Dev. 0 0 0 0
Page: 61Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 62
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
TOMASK CT BENJAMIN ST NORTH END 88 80 100 80 Flexible0444-001
88 80 100 80Average:
Std. Dev. 0 0 0 0
TOWER LN W SOMONAUK ST NORTH END 88 77 100 83 Flexible0365-001
88 77 100 83Average:
Std. Dev. 0 0 0 0
TREMONT AVE PRAIRIE CROSSING
DR
COUNTRY HILLS DR 90 79 100 87 Flexible0366-001
TREMONT AVE COUNTRY HILLS DR SOUTH END 89 71 100 91 Flexible0366-002
90 77 100 88Average:
Std. Dev. 0 0 0 0
TRILLIUM CT CROOKED CREEK DR EAST END 99 97 100 91 Flexible0367-001
99 97 100 91Average:
Std. Dev. 0 0 0 0
TUSCANY TRL MILL RD SHOEGER DR 74 85 100 41 Flexible0370-001
TUSCANY TRL SHOEGER DR CROOKER DR 76 100 100 31 Flexible0370-002
TUSCANY TRL CROOKER DR PRESTON DR 68 77 100 35 Flexible0370-003
TUSCANY TRL PRESTON DR DS@660N PRESTON
DR
70 72 100 45 Flexible0370-004
TUSCANY TRL DS@660N PRESTON
DR
DS@1320N PRESTON
DR
79 93 100 46 Flexible0370-005
TUSCANY TRL DS@1320N PRESTON
DR
CITY LIMIT 73 80 100 44 Flexible0370-006
73 86 100 40Average:
Std. Dev. 4 12 0 7
TWINLEAF TRL ALAN DALE LN DS@660E ALAN DALE
LN
93 87 100 87 Flexible0371-001
TWINLEAF TRL DS@660E ALAN DALE
LN
SUMAC DR 91 78 100 89 Flexible0371-002
TWINLEAF TRL SUMAC DR DS@660E SUMAC DR 92 82 100 88 Flexible0371-003
TWINLEAF TRL DS@660E SUMAC DR FAXON RD 95 88 100 89 Flexible0371-004
93 84 100 88Average:
Std. Dev. 1 4 0 1
TYLER CREEK CT POPLAR DR NORTH END 87 83 100 74 Flexible0372-001
87 83 100 74Average:
Std. Dev. 0 0 0 0
VAN EMMON ST E CITY LIMIT BENJAMIN ST 97 96 100 87 Flexible0143-001
VAN EMMON ST E BENJAMIN ST DS@660W BENJAMIN
ST
90 96 100 69 Flexible0143-002
VAN EMMON ST E DS@660W BENJAMIN
ST
DS@1320W
BENJAMIN ST
95 100 100 79 Flexible0143-003
VAN EMMON ST E DS@1320W
BENJAMIN ST
MILL ST 94 100 100 75 Flexible0143-004
Page: 62Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 63
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
VAN EMMON ST E MILL ST HEUSTIS ST 93 100 100 74 Flexible0143-005
93 98 100 76Average:
Std. Dev. 3 2 0 7
VAN EMMON ST E HEUSTIS ST S BRIDGE ST 88 100 100 61 Flexible0143-006
88 100 100 61Average:
Std. Dev. 0 0 0 0
VAN EMMON ST W S BRIDGE ST PAVEMENT CHANGE 94 99 100 77 Rigid0394-000
94 99 100 77Average:
Std. Dev. 0 0 0 0
VAN EMMON ST W PAVEMENT CHANGE S MAIN ST 95 100 100 77 Flexible0394-001
95 100 100 77Average:
Std. Dev. 0 0 0 0
VAN EMMON ST W S MAIN ST STATE ST 74 78 100 46 Flexible0394-002
VAN EMMON ST W STATE ST ADAMS ST 87 99 100 58 Flexible0394-003
VAN EMMON ST W ADAMS ST MORGAN ST 88 100 100 60 Flexible0394-004
83 92 100 54Average:
Std. Dev. 8 13 0 8
VILLAGE VIEW DR STAGECOACH TRAIL MURFIELD DR 90 90 100 75 Flexible0373-001
VILLAGE VIEW DR MURFIELD DR ST JOSEPH'S WAY 88 86 100 75 Flexible0373-002
VILLAGE VIEW DR ST JOSEPH'S WAY KINGSMILL ST 85 85 100 67 Flexible0373-003
87 86 100 72Average:
Std. Dev. 2 2 0 5
VIOLET CT EMERALD LN EAST END 94 87 100 88 Flexible0438-001
94 87 100 88Average:
Std. Dev. 0 0 0 0
WACKER DR CITY LIMIT ARROWHEAD DR 92 91 100 80 Flexible0396-001
92 91 100 80Average:
Std. Dev. 0 0 0 0
WALNUT ST N BRIDGE ST DS@660E N BRIDGE
ST
98 98 100 88 Flexible0397-001
WALNUT ST DS@660E N BRIDGE
ST
FREEMONT ST 93 86 100 86 Flexible0397-002
97 95 100 88Average:
Std. Dev. 0 0 0 0
WALNUT ST FREEMONT ST DS@660E FREEMONT
ST
89 90 100 72 Flexible0397-003
WALNUT ST DS@660E FREEMONT
ST
CITY LIMIT 88 86 100 74 Flexible0397-004
Page: 63Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 64
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
89 89 100 72Average:
Std. Dev. 0 0 0 0
WALSH CIR WALSH DR COLUMBINE CT 74 59 100 65 Flexible0398-001
WALSH CIR COLUMBINE CT ASTER DR 86 83 100 73 Flexible0398-002
81 73 100 70Average:
Std. Dev. 0 0 0 0
WALSH CIR COLUMBINE CT ASTER DR 81 67 100 75 Flexible0399-001
WALSH CIR ASTER DR ASTER DR 85 73 100 79 Flexible0399-002
WALSH CIR ASTER DR ASTER DR 88 94 100 66 Flexible0399-003
WALSH CIR ASTER DR WALSH DR 82 78 100 68 Flexible0399-004
84 75 100 75Average:
Std. Dev. 3 9 0 6
WALSH CT WALSH DR WEST END 79 70 100 67 Flexible0400-001
79 70 100 67Average:
Std. Dev. 0 0 0 0
WALSH DR STAGECOACH TRAIL WALSH CIR 92 97 100 74 Flexible0401-001
WALSH DR WALSH CIR STAGECOACH TRAIL 93 100 100 74 Flexible0401-001
WALSH DR WALSH CIR COLUMBINE DR 87 91 100 66 Flexible0401-002
WALSH DR COLUMBINE DR WALSH CIR 85 86 100 68 Flexible0401-003
WALSH DR WALSH CIR SUNFLOWER CT 77 73 100 60 Flexible0401-004
WALSH DR SUNFLOWER CT GREEN BRIAR RD 79 75 100 63 Flexible0401-005
87 90 100 69Average:
Std. Dev. 6 10 0 6
WALSH DR GREEN BRIAR RD WALSH CT 95 93 100 86 Flexible0401-006
WALSH DR WALSH CT W BARBERRY CIR 87 66 100 91 Flexible0401-007
WALSH DR W BARBERRY CIR HAWTHORNE CT 96 91 100 90 Flexible0401-008
WALSH DR HAWTHORNE CT BUCKTHORN CT 99 96 100 92 Flexible0401-009
WALSH DR BUCKTHORN CT W BARBERRY CIR 99 96 100 92 Flexible0401-010
96 90 100 91Average:
Std. Dev. 5 12 0 2
WALSH DR W BARBERRY CIR BURNING BUSH DR 96 91 100 91 Flexible0401-011
WALSH DR BURNING BUSH DR SPICEBUSH CT 98 96 100 89 Flexible0401-012
WALSH DR SPICEBUSH CT E BARBERRY CIR 98 94 100 92 Flexible0401-013
WALSH DR E BARBERRY CIR NORTH END 96 93 100 89 Flexible0401-014
97 93 100 91Average:
Std. Dev. 1 2 0 1
WALTER ST MILL ST ILLINI DR 87 88 100 69 Flexible0402-001
87 88 100 69Average:
Std. Dev. 0 0 0 0
WARBLER LN COACH RD DS@660N PARKSIDE
LN
88 73 100 87 Flexible0403-001
Page: 64Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 65
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
88 73 100 87Average:
Std. Dev. 0 0 0 0
WARBLER LN DS@660N PARKSIDE
LN
PARKSIDE LN 89 71 100 91 Flexible0404-001
89 71 100 91Average:
Std. Dev. 0 0 0 0
WASHINGTON ST E S BRIDGE ST HEUSTIS ST 93 90 100 83 Flexible0144-001
WASHINGTON ST E HEUSTIS ST MILL ST 90 81 100 85 Flexible0144-002
92 87 100 84Average:
Std. Dev. 0 0 0 0
WASHINGTON ST E MILL ST EAST END 84 80 100 70 Flexible0144-003
84 80 100 70Average:
Std. Dev. 0 0 0 0
WASHINGTON ST W MORGAN ST WEST END 90 82 100 83 Flexible0395-001
90 82 100 83Average:
Std. Dev. 0 0 0 0
WASHINGTON ST W MORGAN ST ADRIAN ST 83 63 100 86 Flexible0395-002
WASHINGTON ST W ADRIAN ST STATE ST 94 86 100 89 Flexible0395-003
WASHINGTON ST W STATE ST S MAIN ST 93 86 100 86 Flexible0395-004
WASHINGTON ST W S MAIN ST S BRIDGE ST 94 90 100 85 Flexible0395-005
91 82 100 86Average:
Std. Dev. 5 11 0 2
WAVERLY CIR SUTTON ST SOUTH END 87 89 100 69 Flexible0405-001
87 89 100 69Average:
Std. Dev. 0 0 0 0
WEST ST W CENTER ST W SOMONAUK ST 88 73 100 88 Flexible0406-001
88 73 100 88Average:
Std. Dev. 0 0 0 0
WESTERN LN NORTHLAND LN CANYON TRL 88 84 100 77 Flexible0407-001
WESTERN LN CANYON TRL DS@660W CANYON
TRL
91 93 100 75 Flexible0407-002
WESTERN LN DS@660W CANYON
TRL
HIGH RIDGE LN 89 89 100 75 Flexible0407-003
WESTERN LN HIGH RIDGE LN IROQOIS LN 87 81 100 77 Flexible0407-004
89 87 100 76Average:
Std. Dev. 2 7 0 1
WESTON AVE KINGSMILL ST DS@660S KINGSMILL
ST
87 91 100 67 Flexible0408-001
WESTON AVE DS@660S KINGSMILL HAZELTINE WAY 88 90 100 71 Flexible0408-002
Page: 65Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 66
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
ST
87 91 100 69Average:
Std. Dev. 0 0 0 0
WESTWIND DR CORNERSTONE DR DS@660W
CORNERSTONE DR
88 73 100 87 Flexible0409-001
WESTWIND DR DS@660W
CORNERSTONE DR
CORNERSTONE DR 96 93 100 87 Flexible0409-002
90 78 100 87Average:
Std. Dev. 0 0 0 0
WHEATLAND CT HOMESTEAD DR NORTH END 84 81 100 70 Flexible0410-001
84 81 100 70Average:
Std. Dev. 0 0 0 0
WHEATON AVE CALEDONIA DR JONATHAN DR 94 91 100 85 Flexible0411-001
WHEATON AVE JONATHAN DR FONTANA DR 98 99 100 86 Flexible0411-002
WHEATON AVE FONTANA DR SHADOW WOOD DR 95 97 100 82 Flexible0411-003
WHEATON AVE SHADOW WOOD DR DS@315S SHADOW
WOOD DR
95 100 100 79 Flexible0411-004
95 97 100 83Average:
Std. Dev. 2 4 0 3
WHEATON AVE DS@315S SHADOW
WOOD DR
DS@975S SHADOW
WOOD DR
93 99 100 74 Flexible0411-005
WHEATON AVE DS@975S SHADOW
WOOD DR
DS@1635S SHADOW
WOOD DR
80 86 100 53 Flexible0411-006
WHEATON AVE DS@1635S SHADOW
WOOD DR
COMMERCIAL DR 87 100 100 59 Flexible0411-007
WHEATON AVE COMMERCIAL DR N BRIDGE RD 82 99 100 47 Flexible0411-008
85 96 100 58Average:
Std. Dev. 6 7 0 13
WHITE OAK WAY W FOX ST NORWAY CIR 95 91 100 86 Flexible0412-001
95 91 100 86Average:
Std. Dev. 0 0 0 0
WHITE OAK WAY NORWAY CIR DS@660E NORWAY
CIR
84 87 100 64 Flexible0412-002
WHITE OAK WAY DS@660E NORWAY
CIR
NORWAY CIR 83 87 100 62 Flexible0412-003
WHITE OAK WAY NORWAY CIR DS@660E NORWAY
CIR
82 77 100 68 Flexible0412-004
WHITE OAK WAY DS@660E NORWAY
CIR
RIVER BIRCH LN 82 81 100 65 Flexible0412-005
WHITE OAK WAY RIVER BIRCH LN SPRUCE CT 74 62 100 62 Flexible0412-006
WHITE OAK WAY SPRUCE CT DS@660E SPRUCE CT 74 73 100 53 Flexible0412-007
WHITE OAK WAY DS@660E SPRUCE CT DS@1320E SPRUCE
CT
82 85 100 60 Flexible0412-008
WHITE OAK WAY DS@1320E SPRUCE NORWAY CIR 81 84 100 58 Flexible0412-009
Page: 66Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 67
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
CT
80 80 100 61Average:
Std. Dev. 4 7 0 6
WHITE PINE CT JOHN ST SOUTH END 88 85 100 75 Flexible0413-001
88 85 100 75Average:
Std. Dev. 0 0 0 0
WHITE PLAINS LN HIGH RIDGE LN IROQOIS LN 94 100 100 76 Flexible0414-001
WHITE PLAINS LN IROQOIS LN WEST END 91 91 100 77 Flexible0414-002
93 98 100 76Average:
Std. Dev. 0 0 0 0
WHITEKIRK LN PRESTWICK LN CALLANDER TRL 92 84 100 86 Flexible0415-001
WHITEKIRK LN CALLANDER TRL GLENEAGLES LN 94 87 100 88 Flexible0415-002
WHITEKIRK LN GLENEAGLES LN DUNBAR CT 96 94 100 88 Flexible0415-003
WHITEKIRK LN DUNBAR CT CALLANDER TRL 92 84 100 86 Flexible0415-004
WHITEKIRK LN CALLANDER TRL ABERDEEN CT 93 85 100 89 Flexible0415-005
94 87 100 88Average:
Std. Dev. 2 5 0 1
WHITEKIRK LN ABERDEEN CT DS@660S ABERDEEN
CT
97 94 100 90 Flexible0415-006
97 94 100 90Average:
Std. Dev. 0 0 0 0
WILD INDIGO LN BLUESTEM DR DS@660S BLUESTEM
DR
90 93 100 72 Flexible0416-001
WILD INDIGO LN DS@660S BLUESTEM
DR
HAYDEN DR 89 94 100 70 Flexible0416-002
90 93 100 71Average:
Std. Dev. 0 0 0 0
WILLOW WAY JOHN ST DS@660N JOHN ST 81 73 100 69 Flexible0417-001
WILLOW WAY DS@660N JOHN ST DS@1320N JOHN ST 78 67 100 69 Flexible0417-002
WILLOW WAY DS@1320N JOHN ST EVERGREEN LN 76 58 100 71 Flexible0417-003
79 68 100 69Average:
Std. Dev. 2 6 0 1
WILTON CT KENTSHIRE DR EAST END 94 93 100 83 Flexible0418-001
94 93 100 83Average:
Std. Dev. 0 0 0 0
WINDETT RIDGE RD S BRIDGE ST WYTHE PL 92 96 100 75 Flexible0419-001
WINDETT RIDGE RD WYTHE PL CLAREMONT CT 91 92 100 75 Flexible0419-002
WINDETT RIDGE RD CLAREMONT CT SUTTON ST 88 94 100 67 Flexible0419-003
WINDETT RIDGE RD SUTTON ST DRAYTON CT 90 94 100 72 Flexible0419-004
WINDETT RIDGE RD DRAYTON CT WINTERTHUR GRN 88 86 100 75 Flexible0419-005
WINDETT RIDGE RD WINTERTHUR GRN COACH RD 89 89 100 75 Flexible0419-006
Page: 67Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 68
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
WINDETT RIDGE RD COACH RD FAIRFAX WAY 94 87 100 88 Flexible0419-007
WINDETT RIDGE RD FAIRFAX WAY DS@660E FAIRFAX
WAY
95 91 100 86 Flexible0419-008
WINDETT RIDGE RD DS@660E FAIRFAX
WAY
FITZHUGH TURN 97 97 100 87 Flexible0419-009
WINDETT RIDGE RD FITZHUGH TURN KENTSHIRE DR 93 85 100 88 Flexible0419-010
92 91 100 79Average:
Std. Dev. 3 4 0 8
WINDHAM CIR POPLAR DR WINDHAM CT 89 93 100 69 Flexible0420-001
WINDHAM CIR WINDHAM CT STONY CREEK LN 89 90 100 73 Flexible0420-002
WINDHAM CIR STONY CREEK LN DS@660W STONY
CREEK LN
89 91 100 71 Flexible0420-003
WINDHAM CIR DS@660W STONY
CREEK LN
POPLAR DR 88 85 100 76 Flexible0420-004
89 91 100 71Average:
Std. Dev. 0 2 0 2
WINDHAM CT WINDHAM CIR NORTH END 84 87 100 63 Flexible0421-001
84 87 100 63Average:
Std. Dev. 0 0 0 0
WING RD STAGECOACH TRAIL DS@660S
STAGECOACH TRAIL
82 94 100 50 Flexible0422-001
WING RD DS@660S
STAGECOACH TRAIL
CITY LIMIT 87 90 100 67 Flexible0422-002
84 92 100 57Average:
Std. Dev. 0 0 0 0
WINTERBERRY DR ALAN DALE LN DS@660N ALAN DALE
LN
91 81 100 88 Flexible0423-001
WINTERBERRY DR DS@660N ALAN DALE
LN
FAXON RD 92 83 100 88 Flexible0423-002
91 82 100 88Average:
Std. Dev. 0 0 0 0
WINTERTHUR GRN WINDETT RIDGE RD SOUTH END 88 85 100 75 Flexible0424-001
88 85 100 75Average:
Std. Dev. 0 0 0 0
WOLF ST DEER ST BADGER ST 89 87 100 75 Flexible0425-001
89 87 100 75Average:
Std. Dev. 0 0 0 0
WOOD SAGE AVE CORNERSTONE DR DS@660S
CORNERSTONE DR
86 77 100 78 Flexible0426-001
WOOD SAGE AVE DS@660S
CORNERSTONE DR
GARDEN ST 89 79 100 84 Flexible0426-002
Page: 68Overview Pavement Condition Report
IMS Infrastructure
Management Services
Page: 69
Street From To
Overview Pavement Condition Report
Pavement Dynamic Deflect Surface
Con. #Con. #Con. #Con. #
Pvmt
TypeZone
October 10, 2018
Yorkville, IL 2018
St-Blk
#
87 78 100 80Average:
Std. Dev. 0 0 0 0
WOODWORTH ST E SPRING ST DS@660N E SPRING
ST
93 87 100 85 Flexible0427-001
WOODWORTH ST DS@660N E SPRING
ST
E MAIN ST 95 90 100 87 Flexible0427-002
94 88 100 86Average:
Std. Dev. 0 0 0 0
WORSLEY ST E MAIN ST SOUTH END 76 85 100 45 Flexible0428-001
76 85 100 45Average:
Std. Dev. 0 0 0 0
WREN RD PRAIRIE CROSSING
DR
GOLDFINCH AVE 92 96 100 75 Flexible0429-001
WREN RD GOLDFINCH AVE DS@660S
GOLDFINCH AVE
97 100 100 83 Flexible0429-002
96 99 100 81Average:
Std. Dev. 0 0 0 0
WREN RD DS@660S
GOLDFINCH AVE
MONTROSE CT 89 78 100 86 Flexible0429-003
WREN RD MONTROSE CT PENMAN RD 91 82 100 86 Flexible0429-004
90 80 100 86Average:
Std. Dev. 0 0 0 0
WYTHE PL WINDETT RIDGE RD SOUTH END 89 93 100 71 Flexible0430-001
89 93 100 71Average:
Std. Dev. 0 0 0 0
YELLOWSTONE LN NORTHLAND LN ALAN DALE LN 81 71 100 71 Flexible0431-001
YELLOWSTONE LN ALAN DALE LN MEADOWVIEW LN 79 71 100 66 Flexible0431-002
80 71 100 69Average:
Std. Dev. 0 0 0 0
Page: 69Overview Pavement Condition Report
Illin o is R a ilw a y R R
B N S F R R
Rob Roy CreekRob Roy CreekF o x R i v e r Rob Roy CreekRob Roy CreekRob Roy CreekBlackberry CreekBlackberry CreekF o x R i v e r
Mid
dle A
u
x S
a
ble
C
ree
k Rob Roy CreekBlackberry C reek
B la ck b erry C reek
Fox RiverB l a c k b e r r y C r e e k
Blackberry Creek
Fox RiverBig Rock CreekeekBlackberry CreekM organ C reekMiddle Aux Sable Creek
F o x R iv e r Fox RiverBridgeGalena
F o x
Ament
VeteransEldamain
Ri ver
Corneils
Mill
MinklerAshleyKennedy
Legion
Van Emmon
Concord
BlockSpring
HighpointDicksonMain
Cannonball
Fields
Popl
arImmanuelTu
ma GordonMcHughPa
v
illi
o
nSundownTroon
G
ra
n
d
e
CountryAshe
SchoolhouseBeecherJohn
Tuscany
Bristol Ridge
Reservation
PenmanGates
Foli
Center
Hilltop
Faxon
Park PrescottKlatt
Baseline
AudreyJeterAdam
Alice RickardSomonauk
Bertram
Bristol Bay
Erica
LisbonEdwardMcLellanA
la
n
D
ale
Countryside
BenjaminKristenWrenFoster
Parkside
Orange
Hof f ma n WillowSchaefer
St a g e c o a c h
Berrywood
StateOmahaTeriBudd
Kendall SimonDeerAldenGame FarmUS Route 34
Manchester
Heartland
Hayden
FreemontLillianRosenwinkel
Oak CreekBoombahWalnut
MapleRiverside
Au
t
u
m
n
Cree
k
Ha mp t o n OrchidCrimsonKellerSumac
Elm
Andrew
KingMatlockBig Bend
For
dLakewood CreekProvidence
HillsideAvalon
HartfieldLibertyWackerBa r b e r r y
Mitchel
Ke l l y
Sutton
Parkway
HeustisFairfieldWashington
C
ountry Hills
Carey
Julie
Ra
i
n
t
r
e
e MayfieldCoral
Cummins
Patterson
RonhillWestWestern
CoachUS Route #34
Winding CreekIsabelOld GloryJackson
Lilac RebeccaPatronMargaret
RavineStacyRyanRiva RidgeWi
n
g
Fairhaven
BristolSecretariat
Blackberry Shore
BruellMarketviewBeaver
Green Briar
Whitekirk
Riley
MayOsbronPrairie CrossingCarly
F o x t a i l
Lynn
C a lie n d o
JusticeRobertKi n g s mi llQui nsey
MorganPratt El
denWilliam
SunsetJenna
Dobbins
Highview NorthlandTallgrassGrape VineLaurenChurchWhite RoseWalsh
Mc Mu r t r ie JasonWat er par k
Homestead
Ma d e line
AdrianBl u e s t e m
FairfaxBaileyKa t e
GraceHolly
RoodVenetian
Pleasure
Colonial
NawakwaMadison
DanielleDillon
Savoy
Woodview PlumThunder GulchJacob
CryderBurrSycamoreHunt
Twi nl eafCaledonia
ColtonHighland
High RidgeChadPecos
I
dent
aOak
Purcell LarkspurBrianBanburyLewis
Leisure
Whi
t
e OakSeeley
IroquoisRedbud
PrairieShauna
Landmark
Titus
Cypress
SearlBlaine EmilyAlexisHeather
Ri
chmondCanyonSchmidtWest
onSi enna
Bernadette
Ponderosa
Oakmont
Far
mWindett RidgeSl a t e
Mi ll B r o o k
H
a
n
b
ury
Timber CreekClearwater
Ch a r le s
Olive ThomasPine RidgeRoxbury
Rose HillCrossHillcrest
Conover
Kent shi r eCrooked CreekWi
ndhamHaz el t i ne
L
e
g
n
e
r
Wolf MillraceWhirlaway
Fox Gl en
Elizabeth
Anna Maria
G
e
n
e
v
a
BoomerBadgerAcornGarden ArtesianCottonwood
Cla
rid
g
e
BirchwoodH
id
e
a
wa
y
CotswoldNorth
Gr eenf iel dGardiner Royal Oaks LehmanE
m
e
r
a
l
d
AsterNo r wa y
Deere Crossing GroveSouth
Gilda
T
a
u
s GriffinRu b y EllsworthBarrett
Squi r e
EvergreenArrowhead
Lexington
Wild IndigoHuntington
Timber RidgeTanglewood TrailsAspenGaylord
Lyman
Gawne
Astor
Y
o
r
k
ville
CranstonBissel
Shadow Creek
Commercial
American BradyWarblerLong GrovePensacola
Bonnie HearthstoneBurnettS
a
g
e
Chally
Deerpath HeatherwoodNeola
River Wood
Prairie Grass ConstitutionMidnght
TremontJonathanGeorgeanna MarketplaceCanaryHe
n
n
i
n
g
T
hornhill
Wythe
Oaklawn
W Kendal l Dr
Cl ov e r
D
e
erp
ointWooden BridgeRena
RidgePinewood
Illini
OlsenGarritano
I
n
g
e
mu
n
s
o
n
Wi n t e rbe r r y Lyncl
iffHobbsIndependence MonarchosDivisionPrai
ri
e RoseFreedomHarrison
Christy ColumbiaCol
eHubbardWalter
Preston
LongviewBr ooksi de
CatalpaMui
rf
i
el
dDeames
Hawk HollowC o n s e r v a t io n
C
alla
n
d
e
r
Shetland Count
r
y Vi
ewWood Sage
Martin
M
u
nso
n
Strawberry
S u n n y De llS
ara
v
a
n
o
s Sir BartonGillespie
Vi
l
l
age Vi
ewWilsonBirch
Red Tail
HickoryBuchanan
WoodworthGallant Fox
Dolph HillsboroPrairie Pointe
WorsleyRiver Birch
Lakeview
Hydraulic
JenniferAn d r e a
WoodlandAuburnColumbineP in e Pat
r
i
ci
aBrighton Oaks
Fir CardinalSandersOakwoodTi mb e r Vi e w
CornellC e n t r a l
TowerDydyna
Naden
Me a d o wl a r kSprucePalmerAmanda
Cl
a
r
e
mo
n
t
Et helJul
i
usWestwind DoverCedar
Cody
Coral
berryGains
BellColony
Ke n d a l l Ci r
R
e
h
b
e
h
n
JohnsonMulhern Indian CliffsBat or
Blackberry
Tomasik
Meadowview
Laurel
River Oaks
PhelpsWinchesterNorton
SavannaDrayton
Powers
Wint er t hur PatriotF
ar
m
ste
a
d
Fli nt Cree
Regal Oak
Appletree CobaltAllegianceShoegerMurfield CandleberryOwen
Silver City
AustinWells QuantockBig RockMerl
otMaddenAar on TimberSt AnnesBuckt hor n
Sheridan
Beecher
Bri stol
AshleyRebeccaPenman
St a ge c o a ch
Di c k s o n
S
c
h
o
ol
h
o
u
s
e AndrewFairfaxM
organ River WoodFaxon
Hydraulic
Wa
l
n
u
t
Faxon
Lewis
Center
F o x
Canyon
MainCr ims o n
Emerald
OakMartin
RebeccaSchmidt MillRidge
Highpoint HartfieldPark
WillowColeMapl e
C
o
n
c
o
r
d
ParkSchoolhouseMain Concord
Ri v e r Woo d
BeecherJohn
S t a g e c o a c h
P a r k JeterPrairie CrossingSt agecoach McHughPreston
PAVING HISTORY 2012-2020
DATE:
PROJECT NO.:
FILE:
BY:
MAY 2020
YO1815-C
YO1815 PAVING HISTORY 2012-2020.MXD
CJO
PAVEMENT MANAGEMENT
SYSTEM UPDATE 2020
UNITED CITY OF YORKVILLE, ILLINOIS
Engineering Enterprises, Inc.
52 Wheeler Road
Sugar Grove, Illinois 60554
(630) 466-6700
www.eeiweb.com
PATH:H:\GIS\PUBLIC\YORKVILLE\2018\YO1815
United City of Yorkville
800 Game Farm Road
Yorkville, IL 60560
NORTH
°
Legend
Year of Improvement
2012
2013
2014
2015
2016
2017
2018
2019
2020
RTBR PROGRAM UPDATE
United City of Yorkville
SEPTEMBER 2020
ATTACHMENT #3
PROPOSED RTBR PROGRAM FUNDING
STREET FROM TO STRATEGY LENGTH DEFLECTION
CONDITION
DYNAMIC
CONDITION
SURFACE
CONDITION
CURRENT
RANK COST
ADAMS STREET W RIDGE STREET W HYDRAULIC AVENUE VARIABLE GRIND,
OVERLAY 3"827 100 87 64 82 51,500$
BEAVER STREET IL ROUTE 47 DEER STREET VARIABLE GRIND,
OVERLAY 3"1,463 100 94 55 76 103,300$
COLONIAL PARKWAY IL ROUTE 47 IL ROUTE 126 VARIABLE GRIND,
OVERLAY 3"1,540 100 65 60 67 116,500$
MORGAN STREET W HYDRAULIC AVENUE W FOX STREET VARIABLE GRIND,
OVERLAY 3"1,303 100 90 55 79 85,400$
STATE STREET W HYDRAULIC AVENUE W RIDGE STREET VARIABLE GRIND,
OVERLAY 3"886 100 90 48 75 56,300$
W VAN EMMON STREET S MAIN STREET MORGAN STREET VARIABLE GRIND,
OVERLAY 3"932 100 92 54 78 47,700$
HEUSTIS STREET E FOX STREET E HYDRAULIC AVENUE VARIABLE GRIND,
OVERLAY 3"1,214 100 92 68 85 90,000$
MILL STREET E FOX STREET E VAN EMMON STREET VARIABLE GRIND,
OVERLAY 3"869 100 99 62 86 52,600$
W HYDRAULIC AVENUE IL ROUTE 47 MORGAN STREET VARIABLE GRIND,
OVERLAY 3"1,310 100 96 65 84 86,200$
W MADISON STREET MORGAN STREET S MAIN STREET VARIABLE GRIND,
OVERLAY 3"929 100 93 69 85 57,600$
N/A N/A N/A N/A N/A 60,000$
807,100$
PROPOSED CITY-WIDE CAPITAL FUNDING
GREEN BRIAR ROAD WALSH DRIVE IL ROUTE 47 VARIABLE GRIND,
OVERLAY 3"2,084 85 83 62 73 211,300$
211,300$
PROPOSED WATER FUND
ELIZABETH STREET S MAIN STREET WEST END VARIABLE GRIND,
OVERLAY 3"1,250 100 68 56 71 69,400$
69,400$
Roadways Added
2021 (FY22) STREET REHABILITATION LIST
TOTAL:
MISCELLANEOUS CITY WIDE CRACK SEALING/STRIPING
TOTAL:
TOTAL:
Chestnut
CirRena LnStoneridgeCirChestnut CtC o t t o n w o o d C t
John StJohn St
Sycamore RdChestnut Ln
S e q u o i aCirWhitePine CtStoneridge CtDi
e
h
l
F
a
r
m Rd
CarolynCtC y p r e s sLn
ChestnutCirEldamain RdCottonwood Trl
Willow WayEvergreen LnAspen Ln
W Veterans Pkwy
W Veterans Pkwy
Legend
Fox Hill Subdivision Boundary
Project Limits
WalshEngineering Enterprises, Inc.52 Wheeler RoadSugar Grove, Illinois 60554(630) 466-6700
ATTACHMENT #4ILLINOIS REBUILD FUNDS-LOCATION MAPwww.eeiweb.com
DATE:
PROJECT NO.:
FILE:
PATH:
BY:
SEPTEMBER 2020
YO2025
YO2025_Fox Hill Project .MXD
H:\GIS\PUBLIC\YORKVILLE\2020\
MJT
United City of Yorkville800 Game Farm RoadYorkville, IL 60560630-553-4350 ³
FOX HILL SUBDIVISION BOUNDARY
ATTACHMENT #4
REBUILD ILLINOIS FUNDS
STREET FROM TO LENGTH AREA SURFACE RANK COST
SYCAMORE ROAD US ROUTE 34 SOUTH END 1,480 5,430 42 200,910.00$
DIEHL FARM ROAD US ROUTE 34 JOHN STREET 710 2,940 61 108,780.00$
COTTONWOOD TRAIL JOHN STREET JOHN STREET 2,261 6,280 64 232,360.00$
JOHN STREET SOUTH END EAST END 4,900 17,970 71 664,890.00$
SUB-TOTAL 1,206,940.00$
EVERGREEN LANE JOHN STREET WILLOW WAY 1,723 4,790 66 177,230.00$
STONERIDGE CIRCLE COTTONWOOD TRAIL EAST END 197 550 66 20,350.00$
STONERIDGE COURT COTTONWOOD TRAIL SOUTH END 348 970 68 35,890.00$
WILLOW WAY JOHN STREET EVERGREEN LANE 1,556 4,330 69 160,210.00$
ASPEN LANE JOHN STREET JOHN STREET 1,875 5,210 70 192,770.00$
CHESTNUT LANE JOHN STREET JOHN STREET 2,271 6,310 70 233,470.00$
CHESTNUT CIRCLE CHESTNUT CIRCLE NORTH END 236 660 71 24,420.00$
CHESTNUT COURT CHESTNUT LANE SOUTH END 190 530 71 19,610.00$
SEQUOIA CIRCLE EAST END SYCAMORE ROAD 292 810 71 29,970.00$
CYPRESS LANE DIEHL FARM ROAD WEST END 410 1,140 72 42,180.00$
WHITE PINE COURT JOHN STREET SOUTH END 335 940 75 34,780.00$
COTTONWOOD COURT COTTONWOOD TRAIL WEST END 239 670 77 24,790.00$
CHESTNUT CIRCLE CHESTNUT LANE CHESTNUT LANE 731 2,030 81 75,110.00$
TOTALS:19,754 61,560 2,277,720.00$
Denotes Selected Streets
FOX HILL SUBDIVISION COST ESTIMATE
REBUILD ILLINOIS FUNDS
RTBR PROGRAM UPDATE
United City of Yorkville
SEPTEMBER 2020
ATTACHMENT #5
PROPOSED RTBR PROGRAM FUNDING
STREET FROM TO STRATEGY LENGTH DEFLECTION
CONDITION
DYNAMIC
CONDITION
SURFACE
CONDITION
CURRENT
RANK COST
ASPEN LANE JOHN STREET JOHN STREET VARIABLE DEPTH
MILL, OVERLAY 3"1875 100 73 70 79 121,400$
BOOMBAH BOULEVARD IL ROUTE 47 SHADOW WOOD DRIVE VARIABLE DEPTH
MILL, OVERLAY 3"2382 100 96 58 81 172,700$
CANNONBALL TRAIL US ROUTE 34 JOHN STREET VARIABLE DEPTH
MILL, OVERLAY 3"643 100 88 52 79 83,200$
CHESTNUT CIRCLE CHESTNUT CIRCLE NORTH END VARIABLE DEPTH
MILL, OVERLAY 3"236 100 87 71 85 15,300$
CHESTNUT CIRCLE CHESTNUT LANE CHESTNUT LANE VARIABLE DEPTH
MILL, OVERLAY 3"731 100 76 81 85 47,300$
CHESTNUT COURT CHESTNUT LANE SOUTH END VARIABLE DEPTH
MILL, OVERLAY 3"190 100 70 71 79 12,300$
CHESTNUT LANE JOHN STREET JOHN STREET VARIABLE DEPTH
MILL, OVERLAY 3"2,271 100 76 70 76 147,000$
COTTONWOOD COURT COTTONWOOD TRAIL WEST END VARIABLE DEPTH
MILL, OVERLAY 3"239 100 67 77 81 15,500$
CYPRESS LANE DIEHL FARM ROAD WEST END VARIABLE DEPTH
MILL, OVERLAY 3"410 100 78 72 83 26,500$
EVERGREEN LANE JOHN STREET WILLOW WAY VARIABLE DEPTH
MILL, OVERLAY 3"1,723 100 66 66 73 111,500$
SEQUOIA CIRCLE EAST END SYCAMORE ROAD VARIABLE DEPTH
MILL, OVERLAY 3"292 100 73 71 81 18,900$
STONERIDGE CIRCLE COTTONWOOD TRAIL EAST END VARIABLE DEPTH
MILL, OVERLAY 3"197 100 76 66 80 12,800$
STONERIDGE COURT COTTONWOOD TRAIL SOUTH END VARIABLE DEPTH
MILL, OVERLAY 3"348 100 88 68 84 22,500$
WHITE PINE COURT JOHN STREET SOUTH END VARIABLE DEPTH
MILL, OVERLAY 3"335 100 85 75 86 21,700$
WILLOW WAY JOHN STREET EVERGREEN LANE VARIABLE DEPTH
MILL, OVERLAY 3"1,556 100 68 69 76 100,700$
N/A N/A N/A N/A N/A 50,000$
979,300$
2022 (FY23) STREET REHABILITATION LIST
TOTAL:
MISCELLANEOUS CITY WIDE CRACK SEALING/STRIPING
RTBR PROGRAM UPDATE
United City of Yorkville
SEPTEMBER 2020
ATTACHMENT #5
PROPOSED RTBR PROGRAM FUNDING
STREET FROM TO STRATEGY LENGTH DEFLECTION
CONDITION
DYNAMIC
CONDITION
SURFACE
CONDITION
CURRENT
RANK COST
BUCKTHORNE COURT WALSH DRIVE WEST END VARIABLE DEPTH
MILL, OVERLAY 3"374 100 97 65 87 25,700$
BURNING BUSH DRIVE WALSH DRIVE WEST END VARIABLE DEPTH
MILL, OVERLAY 3"767 100 92 63 84 51,900$
CORAL BERRY COURT BURNING BUSH DRIVE NORTH END VARIABLE DEPTH
MILL, OVERLAY 3"692 100 94 71 87 47,500$
E. BARBERRY CIRCLE WALSH DRIVE WALSH DRIVE VARIABLE DEPTH
MILL, OVERLAY 3"1,625 100 89 69 85 111,600$
W. BARBERRY CIRCLE WALSH DRIVE WALSH DRIVE VARIABLE DEPTH
MILL, OVERLAY 3"1,930 100 84 60 80 132,500$
HAWTHORNE COURT WALSH DRIVE WEST END VARIABLE DEPTH
MILL, OVERLAY 3"312 100 82 68 83 21,400$
KING STREET W. RIVER STREET W. SOMONAUK STREET VARIABLE DEPTH
MILL, OVERLAY 3"1,315 100 84 56 73 87,900$
SPICEBUSH COURT WALSH DRIVE EAST END VARIABLE DEPTH
MILL, OVERLAY 3"266 100 89 78 88 18,300$
SUNFLOWER COURT WALSH DRIVE EAST END VARIABLE DEPTH
MILL, OVERLAY 3"344 100 90 68 85 23,600$
WALSH COURT WALSH DRIVE WEST END VARIABLE DEPTH
MILL, OVERLAY 3"292 100 70 67 78 35,100$
WALSH DRIVE IL ROUTE 71 GREEN BRIAR ROAD VARIABLE DEPTH
MILL, OVERLAY 3"843 100 90 69 83 234,500$
W MAIN STREET IL ROUTE 47 WEST END VARIABLE DEPTH
MILL, OVERLAY 3"1,092 100 86 66 82 71,800$
E. MAIN STREET SANDERS CT BRUELL STREET
VARIABLE DEPTH
MILL, OVERLAY
3"
3,025 100 74 64 74 87,100$
N/A N/A N/A N/A N/A 50,000$
998,900$
NOTE - PROPOSED WATER MAIN REPLACEMENT PROJECT WILL ADDRESS FROM IL ROUTE 47 TO SANDERS COURT IN 2023
2023 (FY24) STREET REHABILITATION LIST
MISCELLANEOUS CITY WIDE CRACK SEALING/STRIPING
TOTAL:
Illin o is R a ilw a y R R
B N S F R R
Rob Roy CreekRob Roy CreekF o x R i v e r Rob Roy CreekRob Roy CreekRob Roy CreekBlackberry CreekBlackberry CreekF o x R i v e r
Mid
dle A
u
x S
a
ble C
re
e
k Rob Roy CreekBlackb erry C reek
B la c k b erry C re e k
Fox RiverB l a c k b e r r y C r e e k
Blackberry Creek
Fox RiverBig Rock CreekB ig R ock C reekBlackberry CreekM organ C reekMiddle Aux Sable Creek
F o x R iv e r Fox RiverBridgeGalena
F o x
River
Veterans
AmentEldamainCorneils AshleyKennedy
Mill
MinklerLegion
Van Emmon
Concord
BlockSpring DicksonHighpointMain
Cannonball
Baseline
Fields
Popl
arGordonTu
ma
ImmanuelPavillionTroon
G
ra
n
d
e
Faxon
SundownAsheSchoolhouseBeecherJohn
Bristol Ridge
Klatt
Budd
Mitchel
PenmanGates
Country
FoliKeller Center
Hilltop
Park
McHugh PrescottHof f ma n
Tuscany
Schaefer
St a g e c o a c h
Reservation
AudreyJeterAdam
Alice RickardSomonauk
Bertram
Bristol Bay
Erica EdwardLisbonMcLell
anA
l
a
n
D
a
l
e
Countryside
BenjaminKristenWrenFoster
Parkside
Orange WillowStateOmahaTeriKendall
BerrywoodSimon
DeerAldenGame FarmManchester
US Route #34
Heartland
Hayden
FreemontLillianRosenwinkel
Oak CreekBoombahCarey
Walnut
MapleRiverside
Au
t
u
m
n
Cree
k
Ha mp t o n
Or c h idCrimsonSumac Lakewood CreekElm
Andrew
KingMatlockBig Bend
For
dHillsideAvalon
HartfieldLibertyWackerB a r b e r r y
Kel l y
S
utto
n
P
a
r
k
wa
y
HeustisFairfieldWashington
C
ountry Hills
Julie
Ra
i
n
t
r
e
e
Coral
Cummins
Patterson
RonhillWestWestern
CoachUS Route 34
Winding CreekIsabelOld GloryJackson
Lilac PatronMargaret
RavineStacyRyanRiva RidgeWi
n
g
Fairhaven
BristolSecretariat
Blackberry Shore
BruellMarketviewBeaver BrianGreen Briar WhitekirkRiley
MayOsbronPrairie CrossingCarly
F o x t a i l
Lynn
C a lie n d o
JusticeRobertKi n g s mi llQui nsey
MorganCryderPratt El
denSunset
Dobbins
Highview NorthlandJenna
Grape VineLaurenChurchWhite RoseWalsh
Mc Mu r t r ie JasonWat er par k
HomesteadMa d e lin e
AdrianBlue s t e m
Lewis
Fai rf ax RebeccaKate
Grace RoodVenetian
Pleasure
Colonial
NawakwaMadison
DanielleDillon
Savoy
Woodview PlumThunder GulchJacob
BurrSycamoreHunt
Twi nl eafCaledonia
ColtonHolly
Highland
High RidgePecos
IdentaOak
Purcell LarkspurBanburyLeisure
Whi
te OakSeeley
IroquoisRedbud
PrairieShauna
Landmark
Titus
Cypress
SearlBaileyBlaine EmilyAlexisHeather
Ri
chmondCanyon
Schmidt
West
onSi e nna
Bernadette
Ponderosa Far
mWindett RidgeSl a t e
Mi ll B r o o k
H
a
n
b
ury
Timber CreekClearwater
Edythe
Ch a r le s
Olive
Thomas
M
unson
Rose HillCrossHillcrest
Conover
Kent s hi r eCrooked CreekWin
dhamHaz el t i ne
L
e
g
n
e
r
Wolf MillraceWhirlaway
Fox Gl en
Elizabeth
Anna Maria
G
e
n
e
v
a
BoomerBadgerAcornRiver WoodGarden ArtesianCottonwood
Cla
rid
g
e
BirchwoodH
id
e
a
wa
y
North
Gr eenf iel d
Blake GardinerR
o
y
al
O
a
k
s LehmanE
m
e
r
a
l
d
Aster
N o r wa y
Deere Crossing GroveGildaTausPlymouth
Ru b y EllsworthTallgrass
Barrett
Squire
EvergreenArrowhead
Lexington
Wild IndigoHuntington
Timber RidgeTanglewood TrailsAspenGaylord
Ly
m
an
Gawne
Frances
Nathan
Astor
Boyer
Y
or
k
ville
CranstonBisselCommercial
American BradyWarblerLong GrovePensacola
Bonnie HearthstoneBurnettJuanita
S
a
g
e
L
e
n
o
x
Deerpath
Prairie Grass ConstitutionMidnght
Redhor
seTremontGeorgeanna MarketplaceT
h
orn
hill
Wythe
Oaklawn
W Kendal l Dr
M
o
ntclaire
Cl ov e r
D
e
erp
ointWooden BridgeHarris
Rena
RidgePinewood
Illini
OlsenHubbardGarritano Lyncl
iffHobbsIndependence MonarchosDivisionFreedomHarrison
Christy ColumbiaCol
eWalter
Preston
LongviewBr ooksi de
CatalpaMui
rfi
el
dDeamesC o n s e r v a t i o n CallanderShetland
Country View
Timbalier
Wood SageMartinStrawberry
S
ara
v
a
n
o
s Sir BartonGillespie
Vi
l
l
age Vi
ewWilsonBirch
Red Tail
HickoryBuchanan
WoodworthMapl
e Ri
dgeDolph
Prairie Pointe
WorsleySummerwindRiver Birch
Lakevie
w
Hydraulic
An d r e a
WoodlandAuburnColumbineP in e Half MoonPat
r
i
ci
aChestnutFir CardinalPope
OakwoodCornellCe n t r a l
Dydyna
Naden
Me a d o wl a r kSprucePalmerAmanda
Cl
a
r
e
mo
n
t
Et helJul
i
usWestwind DoverCedar
Cody
CoralberryGains
BellColony
Ke n d a l l C i r
R
e
h
b
e
h
n
JohnsonMulhern
Bat or
B la c k b e r r y
Denise
Bluejay
Evans
Meadowview
Laurel
River Oaks
PhelpsN
orton
SavannaDrayton DunbarPowers
Wint er t hur RoxburyJeremy PatriotRegal Oak
Appletree CobaltAllegianceShoegerCandleberryOwen
Silver City
David
WellsRodak QuantockBig RockAar on TimberBuckthor n
Ke t c h u m
John
St a g e c o a ch
Dolph SunsetBeecherAndrewPenman
Emerald
WillowHartfieldMainMillRebecca
St agecoach
Bri stol
Oak
LisbonHighpoint FairfaxF o x
Canyon
MainHydraulic
Rebecca
ColeAshleyDi c k s o n
Ridge
Park
Faxon
Center ConcordMcHughParkS
c
h
o
ol
h
o
u
s
e
Beecher
S t a g e c o a c h
W
aln
ut Prairie CrossingRose Hill
P a r k
McHughM
organJeterCrimsonBaileyFaxonSchmidt
PROPOSED 5 YEAR PLAN
DATE:
PROJECT NO.:
FILE:
BY:
SEPTEMBER 2020
YO1815-C
YO1815 5-YEAR PLAN 9-4-2019.MXD
CJO
PAVEMENT MANAGEMENT
SYSTEM UPDATE 2020
UNITED CITY OF YORKVILLE, ILLINOIS
Engineering Enterprises, Inc.
52 Wheeler Road
Sugar Grove, Illinois 60554
(630) 466-6700
www.eeiweb.com
PATH:H:\GIS\PUBLIC\YORKVILLE\2018\YO1815
United City of Yorkville
800 Game Farm Road
Yorkville, IL 60560
NORTH
°
Legend
Year of Improvement
2019
2020
2021
2022
2023
STREET FROM TO COST COMMENTS STREET FROM TO COST COMMENTS
BOOMBAH BOULEVARD IL ROUTE 47 SHADOW WOOD DRIVE 203,100.00$ ASPEN LANE JOHN STREET JOHN STREET 121,400$ ADDED - FOX HILL
CANNONBALL TRAIL US ROUTE 34 JOHN STREET 59,900$ BOOMBAH BOULEVARD IL ROUTE 47 SHADOW WOOD DRIVE 172,700$ NO CHANGE
COTTONWOOD COURT COTTONWOOD TRAIL WEST END 15,800$ CANNONBALL TRAIL US ROUTE 34 JOHN STREET 83,200$ NO CHANGE
COTTONWOOD TRAIL JOHN STREET JOHN STREET 149,100$ REBUILD ILLINOIS CHESTNUT CIRCLE CHESTNUT CIRCLE NORTH END 15,300$ ADDED - FOX HILL
CYPRESS LANE DIEHL FARM ROAD WEST END 26,800$ CHESTNUT CIRCLE CHESTNUT LANE CHESTNUT LANE 47,300$ ADDED - FOX HILL
DIEHL FARM ROAD JOHN STREET US ROUTE 34 51,500$ REBUILD ILLINOIS CHESTNUT COURT CHESTNUT LANE SOUTH END 12,300$ ADDED - FOX HILL
SEQUOIA CIRCLE EAST END SYCAMORE ROAD 19,200$ CHESTNUT LANE JOHN STREET JOHN STREET 147,000$ ADDED - FOX HILL
STONERIDGE CIRCLE COTTONWOOD TRAIL EAST END 13,000$ COTTONWOOD COURT COTTONWOOD TRAIL WEST END 15,500$ NO CHANGE
STONERIDGE COURT COTTONWOOD TRAIL SOUTH END 22,900$ CYPRESS LANE DIEHL FARM ROAD WEST END 26,500$ NO CHANGE
SYCAMORE ROAD US ROUTE 34 JOHN STREET 45,600$ REBUILD ILLINOIS EVERGREEN LANE JOHN STREET WILLOW WAY 111,500$ ADDED - FOX HILL
SYCAMORE ROAD JOHN STREET SOUTH END 63,000$ REBUILD ILLINOIS SEQUOIA CIRCLE EAST END SYCAMORE ROAD 18,900$ NO CHANGE
W. MAIN STREET IL ROUTE 47 WEST END 74,700$ MOVED TO 2023 STONERIDGE CIRCLE COTTONWOOD TRAIL EAST END 12,800$ NO CHANGE
100,000$ STONERIDGE COURT COTTONWOOD TRAIL SOUTH END 22,500$ NO CHANGE
844,600$ WHITE PINE COURT JOHN STREET SOUTH END 21,700$ ADDED - FOX HILL
WILLOW WAY JOHN STREET EVERGREEN LANE 100,700$ ADDED - FOX HILL
50,000$
979,300$
SUMMARY OF CHANGES
- REBUILD ILLINOIS STREETS IN FOX HILL REMOVED
- REMAINDER OF FOX HILL STREETS ADD TO COMPLETE SUBDIVISION
- W. MAIN STREET PUSHED TO 2023
STREET FROM TO COST COMMENTS STREET FROM TO COST COMMENTS
BUCKTHORNE COURT WALSH DRIVE WEST END 27,200$ BUCKTHORNE COURT WALSH DRIVE WEST END 25,700$ NO CHANGE
BURNING BUSH DRIVE WALSH DRIVE WEST END 54,900$ BURNING BUSH DRIVE WALSH DRIVE WEST END 51,900$ NO CHANGE
CORAL BERRY COURT BURNING BUSH DRIVE NORTH END 50,400$ CORAL BERRY COURT BURNING BUSH DRIVE NORTH END 47,500$ NO CHANGE
E. BARBERRY CIRCLE WALSH DRIVE WALSH DRIVE 118,200$ E. BARBERRY CIRCLE WALSH DRIVE WALSH DRIVE 111,600$ NO CHANGE
W. BARBERRY CIRCLE WALSH DRIVE WALSH DRIVE 140,400$ W. BARBERRY CIRCLE WALSH DRIVE WALSH DRIVE 132,500$ NO CHANGE
HAWTHORNE COURT WALSH DRIVE WEST END 22,700$ HAWTHORNE COURT WALSH DRIVE WEST END 21,400$ NO CHANGE
KING STREET W. RIVER STREET W. SOMONAUK STREET 101,200$ KING STREET W. RIVER STREET W. SOMONAUK STREET 87,900$ NO CHANGE
SPICEBUSH COURT WALSH DRIVE EAST END 19,300$ SPICEBUSH COURT WALSH DRIVE EAST END 18,300$ NO CHANGE
HEUSTIS STREET E FOX STREET E. HYDRAULIC AVENUE 99,800$ MOVED TO 2021 SUNFLOWER COURT WALSH DRIVE EAST END 23,600$ NO CHANGE
MILL STREET E FOX STREET E. VAN EMMON STREET 58,300$ MOVED TO 2021 WALSH COURT WALSH DRIVE WEST END 35,100$ ADDED
ILLINI COURT ILLINI DRIVE SOUTH END 19,600$ REMOVED WALSH DRIVE IL ROUTE 71 GREEN BRIAR ROAD 234,500$ ADDED
ILLINI DRIVE WALTER STREET MILL STREET 64,800$ REMOVED W MAIN STREET IL ROUTE 47 WEST END 71,800$ MOVED FROM 2022
75,000$ E. MAIN STREET SANDERS CT BRUELL STREET 87,100$ ADDED
TOTAL:851,800$ 50,000$
TOTAL:998,900$
NOTE - PROPOSED WATER MAIN REPLACEMENT PROJECT WILL ADDRESS FROM IL ROUTE 47 TO SANDERS COURT IN 2023
SUMMARY OF CHANGES
- HEUSTIS AND MILL ADDED TO 2021
- WALSH DRIVE AND WALSH COURT ADDED
- W. MAIN STREET ADDED
- E. MAIN STREET ADDED WITH PLANNED WATER MAIN PROJECT
2023 (FY24) STREET REHABILITATION LIST
MISCELLANEOUS CITY WIDE CRACK SEALING/STRIPING
MISCELLANEOUS CITY WIDE CRACK SEALING/STRIPING
2022 AND 2023 RTBR COMPARITIVE - PLAN CHANGES
PROPOSED PLAN
2023 (FY24) STREET REHABILITATION LIST
TOTAL:
APPROVED PLAN - 2018
2022 (FY23) STREET REHABILITATION LIST 2022 (FY23) STREET REHABILITATION LIST
TOTAL:
MISCELLANEOUS CITY WIDE CRACK SEALING/STRIPING
MISCELLANEOUS CITY WIDE CRACK SEALING/STRIPING
Have a question or comment about this agenda item?
Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville,
tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council
Agenda Item Summary Memo
Title:
Meeting and Date:
Synopsis:
Council Action Previously Taken:
Date of Action: Action Taken:
Item Number:
Type of Vote Required:
Council Action Requested:
Submitted by:
Agenda Item Notes:
Reviewed By:
Legal
Finance
Engineer
City Administrator
Human Resources
Community Development
Police
Public Works
Parks and Recreation
Agenda Item Number
New Business #7
Tracking Number
PW 2020-54
Cannonball Trail Curve Speed Limit
Public Works Committee – September 15, 2020
Informational
Brad Sanderson Engineering
Name Department
Engineering Enterprises, Inc.
Memo
To: Bart Olson City Administrator From: Colleen Jaltuch, P.E., LEED AP BD&C Date: August 11, 2020
Re: Speed Study at Cannonball Trail Curve EEI Job #: YO2027-C EEI has analyzed traffic speed data provided by the City from July 2020 and also from 2019 to further investigate the safety of the curve along Cannonball Trail, located about ¼ mile west of IL 47. The curve itself has a radius of 350 feet and is along a two-lane rural section of Cannonball Trail. Vehicle crashes at this location continues to be a concern to residents. The Police Department has noted that, since August 1, 2018 (last 24 months), there have been seven crashes at the location. None of them involved medical transport of any passengers to the hospital. Six of the crashes were single vehicle, and one was a head-on. In all seven crashes, the at fault unit was east bound on Cannonball. In five of the seven crashes, the ComEd utility pole was struck. Three of the crashes occurred on January 7, 2019, and two of them occurred on August 26, 2019. As there have been recent resident complaints, the Police Department conducted spot speed studies in July 2020 for a total of 372 cars. To analyze the data, an 85th percentile speed must be calculated. This is the speed that 85 percent of the vehicles are travelling below during free-flow conditions. This is considered to be the safe speed for the roadway and is used in setting or adjusting speed limits. Based on the data collected in 2020, the 85th percentile speed is 42 mph. The City also collected extensive speed data between February 18 and June 30, 2019 via speed signs. One speed sign was located on an approach to the curve; the other speed sign was located within the curve. The data was collected over periods of roughly a month and each period included speed data for over 100,000 vehicles. Based on the data collected outside the curve in 2019, the average 85th percentile speed is 45 mph. The range of 85th percentile speeds during this time was 43 mph – 47 mph. The posted speed limit is 45 mph. Based on the data collected within the curve in 2019, the average 85th percentile speed is 39 mph. The range of 85th-percentile speeds during this time was 37 mph – 40 mph. The posted advisory speed is 25 mph.
Engineering Enterprises, Inc.
Memo
Upon review of the data collected, it is our recommendation that the speed limit remain as posted and not be reduced. The 85th percentile speed is used to set a safe speed to minimize crashes and to promote uniform traffic flow. pc: Eric Dhuse, Director of Public Works Jim Jensen, Chief of Police BPS - EEI
Engineering Enterprises, Inc.
Memo
To: Bart Olson, City Administrator
From: Colleen Jaltuch, P.E., LEED AP BD&C
Date: January 8, 2019
Re: Cannonball Trail Safety Analysis – Estimate for Safety Improvements
EEI Job #: YO1857-C
Based on the Safety Analysis completed and described in the memo dated December 11, 2018, the City has
requested a rough plan and cost estimate for safety improvements on Cannonball Trail between Amanda Lane
and Alice Avenue. The enclosed plan sheets and cost estimate describe work to include addition of 3’ paved
shoulders with rumble strips milled into them and addition of 2 chevron signs to accompany the ones that are
existing.
The estimated total cost for the improvements is $59,685.00. Please contact me if you have any questions or
would like further information.
JOB NO:YO1857-C
PREPARED BY:C. Jaltuch
DATE:January 7, 2019
PROJECT TITLE: Cannonball Trail Safety Analysis
ITEM UNIT
NO.UNIT QUANTITY PRICE AMOUNT
1 SY 543.0 45.00$ 24,435.00$
2 SY 543 10.00$ 5,430.00$
3 FT 1,630.0 1.50$ 2,445.00$
4 EA 2 750.00$ 1,500.00$
5 SY 725 15.00$ 10,875.00$
6 L SUM 1 5,000.00$ 5,000.00$
7 L SUM 1 10,000.00$ 10,000.00$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
20 -$
21 -$
22 -$
23 -$
24 -$
25 -$
26 -$
27 -$
28 -$
29 -$
30 -$
31 -$
32 -$
33 -$
34 -$
59,685.00$
Traffic Control and Protection, Special
Shoulder Rumble Strips (8")
Chevron Signs w/ Telescoping Steel Posts
Engineer's Opinion of Probable Construction Cost
ITEM
HMA Shoulders, 8"
Mobilization
Subbase Granular Material, Type B, 4"
Restoration
TOTAL ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
\\MILKYWAY\EEI_Storage\Docs\Public\Yorkville\2018\YO1857-C Cannonball Trail Safety Analysis\Eng\Engineer's Opinion of Probable Construction Cost
12 (300) R
Sideroad
Edge of pavement
Rumble strip
Sideroad/Entrance
(100)
4
pavement
Edge of
7 (178) max.
6 (152) min.
(200)
8
(300)
12(200)8(100)4 Variespavement
Edge of
1
See Section A-A.1
shoulder
Edge of paved
1-1-12 New standard.
unless otherwise shown.
All dimensions are in inches (millimeters)
and at mailbox turnouts.
Omit shoulder rumble strips across structures
A B
B
STANDARD 642006
A
STRIPS, 8 in.
SHOULDER RUMBLE
PLAN
SECTION A-A
SECTION B-B
GENERAL NOTES
TYPICAL APPLICATION AT AN INTERSECTION OR ENTRANCE (11.1 ± 1.6) 161 ± 167(11.1 ± 1.6) 161 ± 167Illinois Department of Transportation
January 1,2012
ENGINEER OF POLICY AND PROCEDURES
APPROVED January 1,2012
ENGINEER OF DESIGN AND ENVIRONMENT ISSUED1-1-12PASSED
DATE REVISIONS
Rumble strip over 48' (14.6 m) span 12' (3.6 m) gap Rumble strip over 48' (14.6 m) span
To: Eric Dhuse
From: Colleen Jaltuch, P.E., LEED AP BD&C
Date: December 11, 2018
Re: Cannonball Trail Safety Analysis
EEI Job #: YO1857-C
EEI has analyzed the safety of the curve along Cannonball Trail, located about ¼ mile west of IL 47. The curve
itself has a radius of 350 feet and is along a two-lane rural section of Cannonball Trail. This curve is shown on
the attached exhibit.
Over the past five years, there have been seven
reported crashes to the City along the curve and at
the intersection of Cannonball Trail and Alice
Avenue. Of these, one involved an injury and six
involved property-damage only. The injury crash
occurred on Alice Avenue. Of the six property
damage crashes, four of these were due to
roadway departure. One of these four roadway
departures were due to wet pavement and one
was due to icy pavement. Anecdotally, there
probably have been more undocumented roadway
departure issues.
There are several improvements that can be made
to improve the safety of the roadway at the curve
and mitigate crashes. I have listed them in order of
least cost to greatest cost options.
1. Addition of Shoulder Rumble Strips
Shoulder rumble strips are a relatively low-cost option for prevention of single vehicle, run-off-road fatal
and injury crashes. Per NCHRP Report 641, Guidance for the Design and Application of Shoulder and
Centerline Rumble Strips, shoulder rumble strips result in a 13% - 51% reduction in these types of
crashes.
Westbound along Cannonball Trail at 350’-radius curve
approximately ¼ mile west of IL 47.
Shoulder rumble strips can be milled into or be raised elements on the existing paved shoulder. Rumble
strips alert drivers through vibration and sound that they have left the travel lane. While this would not
help drivers in icy roadway conditions, shoulder rumble strips are effective on dry and on wet
pavement.
2. Roadside Safety Improvements
Many crashes at curves result from departure from roadway. Therefore, it makes sense to look at
roadside safety also. According to the Fatality Analysis Reporting System (FARS), 27% of all fatal
crashes occur at curves and 80% of all fatal crashes at curves are roadway departure crashes.
Increasing the clear zone (the
unobstructed, traversable area beyond
the edge of the travel lane for the
recovery of errant vehicles) is one
option. However, along the inside of the
curve, this would involve relocation of
Com Ed power poles and lines, among
other roadside obstructions. Along the
outside of the curve, there is a roadside
ditch as well as power poles and trees
and other obstructions.
Widening the paved shoulder to help
give the driver more area to regain
control of their vehicle and flattening the
side slope also are roadside safety
improvements to increase the clear zone
that could be considered. Widening the shoulders or flattening the ditch foreslopes would increase the
clear zone area.
Another roadside safety option is the addition of guardrail on the outside of the curve. The guardrail
would stop the errant vehicle from leaving the roadway. However, there are two entrances on the
center of the outside of the curve that would make the addition of effective guardrail difficult. The areas
where the guardrail would have to gap to accommodate the entrances would be unprotected.
Power poles, signs, trees, and other roadside obstructions.
3. Addition of High Friction Surface Treatment (HFST) and Enhanced Delineation
High friction surface treatment (HFST) and enhanced delineation are proven methods for improving
safety at horizontal curves. According to the Crash Mitigation Factor (CMF) Clearinghouse, chevron
signs provide a 25% reduction in nighttime crashes and a 16% reduction in non-intersection fatal and
injury cases and HFST provide a 52% reduction in wet road crashes and a 24% reduction in curve
crashes.
High friction surface treatment is an engineered high-friction aggregate placed over a thermosetting
polymer resin binder. This treatment increases the ability of a road surface to provide pavement friction
to vehicles in critical braking or cornering maneuvers. This is especially useful at horizontal curves that
are sharp, have deficient superelevation, and/or where driving speeds exceed the curve advisory
speed.
There are four chevron signs on the outside of the curve. Additional chevrons can be added in advance
of the curve to further delineate the curve. This would be especially beneficial for night-time drivers.
4. Resurface and Adjust Cross-Slope (Superelevation) for a Higher Design Speed
The posted speed limit on Cannonball Trail is 45 mph. Ahead of the curve, however, there is an
advisory speed limit posting of 25 mph. If the pavement were milled and resurfaced and the cross
slope adjusted so the superelevation rate is for a higher design speed, this would increase the
pavement friction and result in a reduction in vehicle departure crashes. The resurfacing can be a
higher friction hot-mix asphalt or a HFST as discussed in option 3. But, this pavement was last
resurfaced in 2014 and the superelevation was, at the time, designed for a 45-mph design speed
(Radius 350’, Superelevation 3.6%).
5. Realign Road to Correct Curve
The most-costly (and least practical and feasible) option is to realign the roadway between IL 47 and
Alice Avenue to increase the radius of the curve. As there are several residences on the inside of the
curve that would require complete relocations, this option was not explored further.
Based on this limited analysis, EEI recommends widening the paved shoulders to 3’ hot-mix asphalt through
the curve as well as adding shoulder rumble strips. We also recommend adding additional chevrons to further
delineate the curve. If the City like to follow this recommendation or choose another option(s) to pursue, then
we can further evaluate and provide a detailed cost estimate.
Please let me know if you have any questions or need further information.
Cannonball Traffic Crash Data
Date Direction of Travel Primary
Cause
Secondary
Cause
Unit 1
Age
10/08/2018 Northeast 27
Exceeding
Speeds for
Safe
Conditions
99
N/A
35
11/24/2018 Northeast 27
Exceeding
Speeds for
Safe
Conditions
15
Driving Skills
52
01/07/2019 Northeast 28
Failing to
Reduce
Speed
11
Weather
27
01/07/2019 Northeast 28
Failing to
Reduce
Speed
99
N/A
20
01/07/2019 Northeast 27
Exceeding
Speeds for
Safe
Conditions
12
Road
Engineering/
Surface
16
08/26/2019 Northeast Not Listed Not Listed 21
08/26/2019 Northeast 28
Failing to
Reduce
Speed
15
Driving Skills
16