Resolution 2023-12Resolution No. 2023-12 A RESOLUTION APPROVING CHANGE ORDERS RELATING TO 651 PRAIRIE POINTE DRIVE, YORKVILLE, ILLINOIS (Twelfth Set of Change Orders) WHEREAS, the United City of Yorkville, Kendall County, Illinois (the "City") is a duly organized and validly existing non -home rule municipality created in accordance with the Constitution of the State of Illinois of 1970 and the laws of the State; and, WHEREAS, the City has acquired the building and property commonly known as 651 Prairie Pointe Drive (the "New City Hall") for the purpose of rehabilitating the building and repurposing it as the new Yorkville City Hall and the headquarters of the Yorkville Police Department (the "Project"); and, WHEREAS, the City issued a Request for Proposals to construct the Project and after review and evaluation of submittals from several firms, the City entered into a contract with Lite Construction of Montgomery, Illinois (the "Contract"); and, WHEREAS, the Contract, as approved by the City with Lite Construction, provided a line item for unforeseen contingencies due to the fact that the New City Hall was constructed in 2007 and change orders were guaranteed to come as demolition of existing walls and ceilings occurred; and, WHEREAS, Lite Construction has submitted two (2) change orders to the original Contract, as itemized on the list attached hereto, modifications to the original work design as mandated to conform to current code standards resulting in an additional costs totaling $13,465; and, WHEREAS, the City has reviewed the change orders as submitted by Lite Construction and acknowledges that the work covered by these change orders was unforeseen but is necessary Resolution No. 2023-12 Page 1 and in the best interest of the City; therefore, the City is prepared to approve the Change Order as hereinafter provided. NOW, THEREFORE, BE IT RESOLVED by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois, as follows: 1. Section 1. The foregoing preambles are hereby adopted as if fully restated in this Section Section 2. That the change orders as itemized on the list attached hereto as submitted by Lite Construction resulting in total additional costs of $13,465 are hereby approved. Section 3. That this Resolution shall be in full force and effect upon its passage and approval as provided by law. Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this 251" day of April, A.D. 2023. KEN KOCH AYE ARDEN JOE PLOCHER AYE CHRIS FUNKHOUSER AYE SEAVER TARULIS AYE ITV CLERK DAN TRANSIER AYE CRAIG SOLING AYE MATT MAREK AYE RUSTY CORNEILS AYE APPROVED by me, as Mayor of the United City of Yorkville,, endall County, Illinois this 01 day of 1 , A.D. 2023. �- MAYOR Attest: C TY CLERK Resolution No. 2023-12 Page 2 LITE CONSTRUCTION L 711 South Lake Street P.O. Box 135 54 MONTGOMERY, IL 60538 Number (630) 896-7220 PHONE 1 DA012/23 Fax (630) 896-1304 TO Cordogan Clark & Associates JOB NV40EIIfVCI r 11101ti e ty Hall Police Facility 960 Ridgeway..Ave ........................................................... Aurora, IL 60506 21-364 ....... . ..... JOB NUMBER JOB PHONE EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT We hereby agree to mate the change(s) specified below: ... ....... .. ........ PR 043 for exit signs Valley, Electric - .......... $1,538.00 LCI Mark up $154.00 Total..._ .......... .... .... .. .... - ...... .... ...... .-S.I.J.692I 0-0 ...... ........ .. ... .. ................. . ......... . ................. .... ..... .. ... ... .... .......... .......... . ........... ....... .......... ........... .......... .. - ................ . .. ... .. ..... .. .... .... ..... .................... ................ . ...... ............ .. .............................. . .. .... ........ ... . - NOTE; This Change Order becomes part of and in conformance with the existing contract WEE AQPar--E hereby to make the change(s) specified above at this price 0 $ DATE PREVIOUS CONTRACT AMOUNT $ AUTHORIZED SIGNAT E 11::� A7 I r !�_ A I ) I REVISED CONTRACT TOTAL $ ACCEPTED — TlYe above prices and specifications of Date of acceptance this Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless Signature otherwise stipulated. PROPOSED CHANGE ORDER Valley Electrical Contractors CCN # 10179-42 Po Box 461 CCN Date 4/11/2023 Oswego, IL 60543 Date: 4/11/2023 Telephone: 630-554-6200 Project Name: Yorkville City Hall and Police Station Fax: 630-554-5543 Project Number: 10179 Page Number: 1 Client Address: Lite Construction Contact: Tim Campbell 711 S. Lake St Montgomery, IL 60538 Telephone: 630-896-7220 Contact: Tim Campbell Work Description We reserve the right to correct this quote for errors and omissions. This change order is for demoing an existing exit sign then furnishing and installing 2 new ones per PR043. Itemized Breakdown Description Qty EX1 - Single Face 1 EX1 - Double Face 1 1/2" EMT 20 1/2" EMT DC SS CONN 4 1/2" EMT DC SS CPLG 4 1/2" MINRLAC W/BOLT 0-B 4 #12 THHN 70 42-1/8" SQ BOX 3/4" KO 2 4" SQ BLANK COVER 2 3/C #14 6' FIXTURE WHIP 2 Totals 110 Summary General Materials 113.67 LIGHTING FIXTURES 663.32 Material Overhead (@ 10.000 %) 77.70 Material Markup (@ 5.000 %) 42.73 Material Total 897.42 JOURNEYMAN (4.68 Hrs @ $137.00) 641.16 Final Adjustment -0.58 Final Amount $1,538.00 ORIGINAL Document G709 - 20 1 8 Proposal Request PROJECT: (name and address) City Hall & Police Facility Renovation 651 Prairie Point Dr. Yorkville, IL OWNER: (name and address) United City of Yorkville 800 Game Farm Rd. Yorkville, IL CONTRACT INFORMATION: Contract For: General Construction Date: March 8, 2022 ARCHITECT: (name and address) Cordogan Clark & Associates 960 Ridgeway Ave. Aurora, IL Architect's Project Number: 21-364 Proposal Request Number: 043 Proposal Request Date: 04/10/2023 CONTRACTOR: (name and address) Lite Construction, Inc. 711 S. Lake St. Montgomery, IL The Owner requests an itemized proposal for changes to the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein. The Contractor shall submit this proposal within Five (5) days or notify the Architect in writing of the anticipated date of submission. (Insert a detailed description of the proposed modifications to the Contract Documents and, if applicable, attach or reference specific exhibits) The following items were requested by City of Yorkville building inspector per email 03/13/2023. In Open Office 332 near door 329, remove existing electrical sign and replace with EX1 type directional arrow exit sign, pointing toward door 326. In Break -Out 325, provide EX1 type directional arrow exit sign, visible from adjacent corridors and pointing toward door S301. Refer to attached sketch for locations. Provide all wiring and conduit required to complete scope of work. THIS IS NOT A CHANGE ORDER, A CONSTRUCTION CHANGE DIRECTIVE, OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE PROPOSED MODIFICATIONS. REQUESTED BY THE ARCHITECT: Lauren Kiley Architectural Designer PRINTED NAME AND TITLE AIA Document G709 — 2018. Copyright 01993, 2001 and 2018. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 09:15:08 CT on 04/10/2023 under Order No.3104237387 which expires on 09/10/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA51) L00 )ISV £ti0 ad ANS 00EL'646'ZL6 9L96'969'069 OL909 SIONI-III `OJHOIHO 90909 SIONIIINHoand NOILOOHl5N00 • SNIMNISN3 • 3801O311HOUV £ZOZ/06/60 31V(l 133211S 9113M H12iON 9LL 3nN3AH l.VM3E)"' 096 N"`jV+�YJJ fl: Nty/'JdOA AOG trK-2 a39vynN103rONd NOliVAON36l ll-IlOdd 3OMd (INV �1VH Ail3 u' J � 0 R O N CLL LL Yf \ CJ o L Aso LITE CONSTRUCTION U 2- t � 711 South Lake Street P.O. Box 135 55 MONTGOMERY, IL 60538 Number (630) 896-7220 PHONE DA4tl2 23 Fax (630) 896.1304 TO Cordogan Clark & Associates EOC JOB N �o/r`kvt� e10 ity Hall Police Facility 960...Ridgeway..A.ve... ..... . Aurora, IL 60506 21-364 JOB NUMBER JOB PHONE EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT We hereby agree to make the change(s) specified below: _. _. ......... ..... ............ .. ................ ................ ...,......._ Temporary AV system for the Council Chambers _..... _._ ............. ....... .­ ......... .................... ................. _.._................... ........ ......_... .......__ .................. .__.............. Val.ley_Electric .__ . _ $...I0,702 00 ........................... LCI Mark up $1,071.00 Total._._ __ . _.._.. __ ......._.......... _ _....... _ _. __ _. ............ _.__ ......_....__..__.......... $11;773.00.1._.__ .......... __ .._ ...... _... __... _......... _. ................ _ ........... ....... ........... _... ... ._ ............. .......... ._. _..... .......... _ _ .._ ..._ .. .._._ ......... ..... ....... ....._ __.... ..__ .._... _ _..._............. ......... .. __ ......._. _ ............. __..__ .... ................... ... .........._........ NOTE: This Change Order becomes part of and in conformance with the existing contract. CE AGIPRE hereby io make ihe changes) specified above at This price DATE .' Z PREVIOUS CONTRACT AMOUNT $ AUTHORIZED SIGNATURE I T R) REVISED CONTRACT TOTAL $ i ACCEPTED — The above prices and specifications of 2 this Change Order are satisfactory and are hereby Date of acceptance t 2-�- accepted. Ali work to be performed under same terns and conditions as specified in original contract unless Signature othennvise stipulated. (OWNER) �� PROPOSED CHANGE ORDER Valley Electrical Contractors CCN # 10179-43 Po Box 461 CCN Date 4/12/2023 Oswego, IL 60543 Date: 4/12/2023 Telephone: 630-554-6200 Project Name: Yorkville City Hall and Police Station Fax: 630-554-5543 Project Number: 10179 Page Number: 1 Client Address: Lite Construction Contact: Tim Campbell 711 S. Lake St Montgomery, IL 60538 Telephone: 630-896-7220 Contact: Tim Campbell Work Description We reserve the right to correct this quote for errors and omissions. This change order is the cost for the temporary AV system in the council chambers and multiple rooms. Itemized Breakdown Summary AV Rack - ACG ($9,266.30 + 0.000 % + 10.000 % + 5.000 %) 10,702.58 Subtotal 10,702.58 Final Amount $10,702.58 ORIGINAL