Loading...
Resolution 2025-022 Resolution No. 2025-22 A RESOLUTION OF THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS, APPROVING AN INTERGOVERNMENTAL AGREEMENT BETWEEN THE UNITED CITY OF YORKVILLE AND THE STATE OF ILLINOIS WHEREAS, the United City of Yorkville, Kendall County, Illinois (the "City') is a duly organized and validly existing municipality of the State of Illinois pursuant to the 1970 Illinois Constitution and the Illinois Municipal Code, as from time to time amended (the "Municipal Code') (65 ILCS 5/65-1-1-2, etseq.); and WHEREAS, the State of Illinois, acting through its Department of Transportation (the "State"), has authority to improve and construct public highways and roadways throughout the state; and WHEREAS, the Constitution of the State of Illinois of 1970, Article VII, Section 10, and the Intergovernmental Cooperation Act, 5 ILCS 220/1 et seq., (collectively, the "Authority") authorize units of local government to contract or otherwise associate amongst themselves to obtain or share services and to exercise, combine, or transfer any power or function in any manner not prohibited by law; and WHEREAS, the State is desirous of improving approximately 11,900 lineal feet of FAP Route 326, IL 47/US 30 from Waterpark Way to Jericho Road, identified as STATE Job No.: C- 91-396-20, Contract Number 62M71, STATE Section No. 2020-198-W&T (the "Project"); and WHEREAS, the City has requested that the State include in the Project along Bristol Bay Drive extension, combination lighting at IL 47 and Waterpark Way, watermain relocation and emergency vehicle pre-emption equipment; and WHEREAS, the State has agreed to the City's request, and agrees to undertake the requested improvements, subject to terms and conditions as set forth in an Intergovernmental Resolution No.2025-22 Page 1 Agreement by and between the State of Illinois, acting through its Department of Transportation, and the United City of Yorkville of the State of Illinois, attached hereto. NOW, THEREFORE, BE IT RESOLVED by the Mayor and the City Council of the United City of Yorkville, Kendall County, Illinois, as follows: Section 1. The recitals set forth above are incorporated into this Resolution as if fully restated herein. Section 2. That the Intergovernmental Agreement by and between the State of Illinois, acting through its Department of Transportation, and the United City of Yorkville of the State of Illinois, attached hereto and made a part hereof by reference, is hereby approved, and the Mayor and City Clerk are hereby authorized to execute said Agreement. Section 3. That this Resolution shall be in full force and effect from and after its passage and approval as provided by law. Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this I I`h day of February, A.D. 2025. n i TY CLERK KEN KOCH AYE DAN TRANSIER AYE ARDEN JOE PLOCHER AYE CRAIG SOLING AYE CHRIS FUNKHOUSER AYE MATT MAREK AYE SEAVER TARULIS AYE RUSTY CORNEILS AYE Resolution No. 2025-22 Page 2 APPROVED by me, as Mayor of the United City of Yorkville, Kendall County, Illinois this Itdayof A.D. 2025. r MAYOR Attest: ,_94TY CLERK Resolution No. 2025-22 Page 3 proposed 10' shared use path and sidewalk improvements and all other work necessary to complete the improvement in accordance with the approved plans and specifications; and WHEREAS, the CITY has requested that the STATE include in its contract roadway work along Bristol Bay Drive extension, combination lighting at IL 47 and Waterpark Way, watermain relocation and emergency vehicle pre-emption equipment, and WHEREAS, the STATE has agreed to the CITY's request, and WHEREAS, the CITY is desirous of said improvement in that same will be of immediate benefit to the CITY residents and permanent in nature. NOW, THEREFORE, in consideration of the mutual covenants contained herein, the parties hereto agree as follows: 1. The STATE agrees to make the surveys, obtain all necessary rights of way, prepare plans and specifications, receive bids and award the contract, furnish engineering inspection during construction and cause the improvement to be built in accordance with the approved plans, specifications and contract. 2. The STATE agrees to pay for all right of way, construction, and engineering cost subject to partial reimbursement by the CITY, as hereinafter stipulated. 3. It is mutually agreed by and between the parties hereto that the estimated cost and cost proration for this improvement is as shown on Exhibit A attached hereto and made a part hereof. 4. The CITY has passed a resolution appropriating sufficient funds to pay its share of the cost for this improvement, a copy of which is attached hereto as Exhibit B and made a part hereof. 5. The CITY agrees to pass a supplemental resolution to provide necessary funds for its share of the cost of this improvement if the amount appropriated in Exhibit B proves to be insufficient to cover said cost. 6. The CITY further agrees that, upon award of the contract for this improvement, the CITY will pay to the STATE, in a lump sum from any funds allotted to the CITY, an amount equal to 33% of its obligation incurred under this AGREEMENT. On or before July 31, 2026, the CITY will pay its second installment to the STATE, in a lump sum from any funds allotted to the CITY, an amount equal to $33% of its obligation incurred under this AGREEMENT. Upon receipt of a final invoice the CITY will pay to the STATE the remainder of the obligation (including any non-participating costs on FA Projects) in a lump sum, upon completion of the project, based upon final costs. 7. The CITY has adopted a resolution, will send a letter, or sign the Plan Approval page, which is part of this document, prior to the STATE advertising for the work to be performed hereunder, approving the plans and specifications as prepared. 8. The CITY agrees not to permit driveway entrance openings to be made in the curb, as constructed, or the construction of additional entrances, private or commercial, along IL 47/US 30 without the consent of the STATE. 9. The CITY shall exercise its franchise rights to cause private utilities to be relocated, if required, at no expense to the STATE. 10. The CITY agrees to cause its utilities installed on right of way after said right of way was acquired by the STATE or installed within the limits of a roadway after the said roadway's jurisdiction was assumed by the STATE, to be relocated and/or adjusted, if required, at no expense to the STATE. 11. All CITY owned utilities, on STATE right of way within the limits of this improvement, which are to be relocated/adjusted under the terms of this Agreement, will be relocated/adjusted in accordance with the applicable portions of the "Accommodation of Utilities of Right of Way of the Illinois State Highway System." (92 III. Adm. Code 530). 12. The CITY agrees to obtain from the STATE an approved permit for any CITY owned utility relocated/adjusted as part of this improvement and shall abide by all conditions set forth therein. 13. Upon final field inspection of the improvement and so long as ►L 47/US 30 is used as a STATE Highway, the STATE agrees to maintain or cause to be maintained the through traffic lanes, the left-turn lanes and right turn lanes, and the curb and gutter or stabilized shoulders and ditches adjacent to those traffic lanes and turn lanes. 14. Upon final field inspection of the improvement, the CITY agrees to maintain or cause to be maintained those portions of the improvement which are not maintained by the STATE from Waterpark Way to the United City of Yorkville limits at Baseline Road as shown on Exhibit D attached hereto, including the proposed double cell box culvert 14' x 11' box culvert that is 112'-5 3/4" in length along Baseline Road over Rob Roy Creek (SN 045-8306) including the wingwalls, the Bristol Bay Drive roadway extension, the shared use path from Waterpark Way to Baseline Road, sidewalk, grass medians, combination highway lighting at the intersections of IL 47 at Waterpark Way and IL 47 at Galena Road, including furnishing the electrical energy thereof, new and existing sidewalks, crosswalk, and stop line markings, mowing the ditches and parkways beyond the curb and gutter adjacent to the traffic lanes, CITY owned utilities including watermain and including appurtenances thereto and shall maintain the storm sewers and appurtenances by performing those functions necessary to keep the sewer in a serviceable condition including cleaning sewer lines, inlets, manholes, and catch basins. The maintenance, repair and/or reconstruction of storm sewers constructed as part of this improvement beyond the aforedescribed responsibilities shall be that of the STATE. 15. The CITY further agrees to continue its existing maintenance responsibilities on all side road approaches under its jurisdiction within the limits of the improvement, including all left and right turn lanes on said side road approaches, up to the through edge of pavement of IL 47 as shown on Exhibit D attached hereto. Drainage facilities, if any, at the aforementioned side roads located within the STATE right-of-way shall be the joint maintenance responsibility of the STATE and the CITY unless there is an agreement specifying different responsibilities. The CITY agrees to inspect stopline markings, symbols, special pavement treatments, crosswalks and replace as necessary to ensure proper motorist and pedestrian guidance. 16. Upon acceptance by the STATE of the new traffic signal and lighting work included herein the financial responsibility for maintenance and energy charges for the operation of the traffic signal at the intersection(s) listed below shall be proportioned as follows: Intersection Maintenance Energy IL 47 at Galena Road STATE Share (District 3) 50% 50% CITY Share 50% 50% IL 47 at Waterpark Way STATE Share (District 3) 67% 67% CITY Share 33% 33% IL 47 at US 30/Baseline Road STATE Share (District 1) 100% 100% CITY Share 0% 0% And shall continue as outlined in the Traffic Signal Master Agreement executed between the STATE (District 3) and the CITY on January 24, 2022, and remains in full enforcement for IL 47 at Galena Road and IL 47 at Waterpark Way. It is mutually agreed that the actual traffic signal maintenance at IL 47 at US 30/Baseline Road will be performed by the STATE (District 1) either with its own forces or through an ongoing contractual agreement. 17. It is mutually agreed that the maintenance of the traffic signals, the EMERGENCY VEHICLE PRE-EMPTION system and highway lighting on combination poles shall be in accordance with the Traffic Signal Master Agreement executed between the STATE and the CITY on January 24, 2022, for the intersections of IL 47 at Galena Road and IL 47 at Waterpark Way. 18. For the traffic signal at IL 47 at US 30/13aseline Road, the STATE's Electrical Maintenance Contractor will inspect, make note, and keep inventory of the CITY Owned "EMERGENCY VEHICLE PRE-EMPTION" system to support the maintenance of the "EMERGENCY VEHICLE PRE-EMPTION" system. Inspection of the "EMERGENCY VEHICLE PRE-EMPTION" system shall include the phase selector, field wiring, optical detectors, and cabinet appurtenances. When repair is necessary, the STATE's electrical contractor shall notify the CITY that their"EMERGENCY VEHICLE PRE-EMPTION" system is in need of maintenance repairs. When approved by the CITY, maintenance of their "EMERGENCY VEHICLE PRE-EMPTION" system is then performed accordingly. The STATE's electrical contractor shall invoice the CITY directly for all maintenance costs of the "EMERGENCY VEHICLE PRE-EMPTION" system. The CITY may require end users of the emitters within its jurisdiction to enter into separate agreements with the STATE's electrical contractor to have the emergency vehicle emitters tested in accordance with the recommendation of the Manufacturer of such equipment. 19. It is mutually agreed, if, in the future, the STATE adopts a roadway or traffic signal improvement passing through the traffic signal included herein which requires modernization or reconstruction to said traffic signal then the CITY agrees to be financially responsible for its proportionate share in accordance with STATE policy to modernize or reconstruct said installation and will be responsible for all costs to relocate or reconstruct the Emergency Preemption equipment in conjunction with the STATE's proposed improvement. 20. Under penalties of perjury, the CITY certifies that its correct Federal Tax Identification number is �3 U_(-e ut'tc' t(,"Cf and it is doing business as a GOVERNMENTAL ENTITY, whose mailing address is: United City of Yorkville 651 Prairie Pointe Drive Yorkville, IL 60560 REMAINDER OF PAGE INTENTIONALLY LEFT BLANK SEE NEXT PAGE FOR SIGNATURES Obligations of the STATE and the CITY will cease immediately without penalty or further payment being required if, in any fiscal year, the Illinois General Assembly or Federal funding source fails to appropriate or otherwise make available funds for this contract. This AGREEMENT and the covenants contained herein shall be null and void in the event the contract covering the construction work contemplated herein is not awarded within the three years subsequent to execution of the agreement. This Agreement shall be binding upon and to the benefit of the parties hereto, their successors and assigns. UNIT I YORKVILLE By: ignature) Attest: By: 1 0 QU I-C C t I (Print or Type) ,�,F Clerk Title: 1A C.,k 10 C Date: (SEAL) STATE OF ILLINOIS DEPARTMENT OF TRANSPORTATION Trisha Thompson, P.E. k_ ' Region Two Engineer Date: Job No.:C-91-396-20 Agreement No.:JN-125-013 March 1, 2025 PLAN APPROVAL WHEREAS, in order to facilitate the improvement of FAP Route 326, IL 47/ US 30, State Section No: 2020-198-W&T, Contract No. 62M71, the CITY agrees to that portion of the plans and specifications relative to the CITY's financial and maintenance obligations described herein, prior to the STATE's advertising for the aforedescribed proposed improvement. Approved '~ Title KA 1 r Date Exhibit B FUNDING RESOLUTION WHEREAS, the UNITED CITY OF YORKVILLE (CITY) has entered into an AGREEMENT with the STATE OF ILLINOIS (STATE) for the improvement of IL 47/ US 30 from Waterpark Way to Jericho Road, known as Contract No. 62M71, STATE Section No.: 2020-198- W&T; and WHEREAS, in compliance with the aforementioned AGREEMENT, it is necessary for the CITY to appropriate sufficient funds to pay its share of the cost of said improvement. NOW THEREFORE, BE IT RESOLVED, by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois that there is hereby appropriated the sum of One Hundred Eighty-Seven Thousand and Ninety-Five Dollars ($187,095) or so much thereof as may be necessary, from any money now or hereinafter allotted to the CITY, to pay its share of the cost of this improvement as provided in the AGREEMENT; and BE IT FURTHER RESOLVED, that upon award of the contract for this improvement, the CITY will pay to the STATE in a lump sum from any funds allotted to the CITY, an amount equal to 80% of its obligation incurred under this AGREEMENT, and, upon completion of the project, will pay to said STATE the remainder of its obligation, based on final costs; and BE IT FURTHER RESOLVED that the CITY agrees to pass a supplemental resolution to provide any necessary funds for its share of the cost of this improvement if the amount appropriated herein proves to be insufficient, to cover said cost. STATE OF ILLINOIS (COUNTIES OF KANE AND KENDALL) I, TL' { }' �C� CITY Clerk in and for the UNITED CITY of YORKVILLE, hereby certify the foregoing to be a true perfect and complete copy of the resolution adopted by the CITY Board at a meeting on q)�(,.jC!r1 r_j (1__, 20 25 A.D. IN TESTIMONY WHEREOF, I have hereunto set my hand seal this day of . 2Q� A.D. r eel CITY Clerk (SEAL) EXHIBIT A ESTIMATE OF COST Contract 62M71 FEDERAL STATE KENDALL COUNTY KANE COUNTY CITY OF YORKVILLE TOTAL Type of Work $ % $ % $ % $ % $ % $ All roadway work excluding the following. $28,779,360 80 $7,194,840 20% $35,974,200 P&C Engineering 15% $4,316,904 80% $1,079,226 1 20% $5,396,130 ROADWAY WORK Bristol Bay Extension $109,500 100% $109,500 P&C Engineering(15%) $16,425 100% $16,425 TRAFFIC SIGNALS IL 47 at Galena Road r$336,96080% $42,120 10% $42,120 10% $421,200P&C Engineering(15%) 80% $6,318 10% $6,318 10% $63.180Emergency Vehicle Pre-emption System $6400 100% $6,400E ui mentP&C Engineering(15%) $960 100% $960IL 47 at Jericho Road 80% $42.670 10% $42,670 10% $426,700 P&C Engineering(15%) $51,204 80% $6,401 10% $6,401 10% $64,005 IL 47 at Water ark Way $269,760 80% j $44,949 13.3% $22,491 6.7% $337,200 P&C Engineering(15%) $40.464 80% $6,742 13.3% $3,374 6.7% $50,580 Emergency Vehicle Pre-emption System $6,400 100% $6,400 Equipment P&C Engineering(15%) $960 100% $960 IL 47 at US30/Baseline Road $386.640 80% $96,660 20% $483,300 P&C Engineering(15%) $57,996 80% $14,499 20% $72.495 Emergency Vehicle Pre-emption System $8,600 100% S8,600 E ui ment P&C Engineering(15%) 1 $1,290 100% $1,290 STREET LIGHTING IL 47 at Galena Road-Combination $11.800 100% $11,800 Lighting P&C Engineering(15%) $1,770 100% $1,770 IL 47 at Waterpark Way-Combination $7.300 100% $7,300 Li htin P&C Engineering(15%) $1.095 100% $1,095 IL 47 at US 30/Baseline Road-Full $353.920 80% $88,480 20% $442,400 Intersection Lighting _ P&C Engineering(15%) $53,088 80% $13,272 20% -_ $66,360 UTILITY ADJUSTMENTS _ Fire Hydrants to be Adjusted $2,000 100% $2,000 P&C Engineering(15%) $300 100% $300 Watermain $1,084,000 100% $1.084,000 P&C Engineering(15%) $162,600 100% $162,600 TOTAL $35,038,200 $9,882,777 $62,008 $49,071 $187,095 $ 45,219,150 NOTE.Local participation shall be predicated upon the percentages shown above for the specified work. Local Agency cost shall be determined by multiplying the final quantities times contract unit price plus the percentage shown for construction and/or preliminary engineering unless otherwise noted. 220 230 240 250 260 270 280 290 300 100 105 90 100 110 100 100 300 310 320 330 340 350 1000 1010 1020 1030 95 100 90 100 110"21122'-5 "81111'-2"43110'-4 92'-11" IL ROUTE 47 BERTRAM DRIVEGALENA ROADBRISTOL BAY DRIVEUS ROUTE 30BASELINE ROADJERICHO ROADSTAR LANER O B R O Y C REE K ROB ROY CREEKTEMP EASEPR ROWEX ROW12'12'10'12'12'10' 32' IL ROUTE 47 EX. IL ROUTE 47 12'12'12'12' 32' IL ROUTE 47 PR ROWTEMP EASEEX ROW3 1 2 2 1 3 54 2 1 2 2 1 2 54 66 6 6 1 PROPOSED PAVEMENT 2 3 PROPOSED SHOULDER 4 5 6 PROPOSED CURB AND GUTTER PROPOSED MEDIAN PROPOSED SHARED-USE PATH PROPOSED TOPSOIL AND SEEDING A A A A 2.0%4.0% 2.0%1.5% 1.5%2.0%4.0% 2.0% 4.0%4.0% 4.0%4.0%1:41:31:4 1:4 1:4B B TYPICAL SHOULDER SECTION A-A TYPICAL CURB SECTION B-B TYPICAL SECTION LEGEND SEE BELOWMATCH LINESEE ABOVEMATCH LINE0 1200 2400 3600 SCALE IN FEET 62M71 62G40 LEGEND EXTENSION BRISTOL BAY DRIVE AGENCY: YORKVILLE STA 348+53 TO 349+00 SHARED-USE PATH AGENCY: SUGAR GROVE STA 322+00 TO 348+53 SHARED-USE PATH AGENCY: KANE COUNTY EX. IL ROUTE 47225+00349+00UNITED CITY OF YORKVILLE (EVP) UNITED CITY OF YORKVILLE (COMBINATION LIGHTING) UNITED CITY OF YORKVILLE (SIGNAL MODERNIZATION, E LEG) AGENCY: STA 234+64 TO 322+00 SHARED-USE PATH UNITED CITY OF YORKVILLE AGENCY: STA 234+64 TO 322+00 SHARED-USE PATH UNITED CITY OF YORKVILLE AGENCY: 102+75 BOX CULVERT PROPOSED SN 047-3180 AGENCY: KENDALL COUNTY UNITED CITY OF YORKVILLE (EVP) UNITED CITY OF YORKVILLE (COMBINATION LIGHTING) UNITED CITY OF YORKVILLE (SIGNAL MODERNIZATION, E AND W LEGS) AGENCY: REIMBURSIBLE 100% IDOT COST STA 250+00 TO STA 278+00 (WATER MAIN RELOCATION) UNITED CITY OF YORKVILLE AGENCY: REIMBURSIBLE 100% IDOT COST STA 250+00 TO STA 278+00 (WATER MAIN RELOCATION) UNITED CITY OF YORKVILLE AGENCY:91+25108+90101+25 103+40 UNITED CITY OF YORKVILLE SUGAR GROVE TOWNSHIP VILLAGE OF SUGAR GROVE KANE COUNTY KENDALL COUNTY UNITED CITY OF YORKVILLE 998+75 1026+86 (EVP) UNITED CITY OF YORKVILLE (SIGNAL MODERNIZATION, W LEG) UNITED CITY OF YORKVILLE AGENCY: 91+00108+55KANE COUNTY (EVP) E AND W LEGS) (SIGNAL MODERNIZATION, KANE COUNTY AGENCY: 97+55 US ROUTE 30 IL ROUTE 47 / CORPORATE LIMITS STA 348+53 VILLAGE OF SUGAR GROVE BOX CULVERT SN 045-8305 PROPOSED AGENCY: IDOT TO STA 323+96 FROM STA 322+48 RETAINING WALL PROPOSED SN 045-9200 AGENCY: IDOTGALENA ROADI L ROUTE 47STEEL PLATE BEAM GUARDRAIL STRONG POST GUARDRAIL AND AGENCY: KENDALL COUNTY STEEL PLATE BEAM GUARDRAIL AGENCY: IDOT STEEL PLATE BEAM GUARDRAIL STRONG POST GUARDRAIL AND AGENCY: KENDALL COUNTY GUARDRAIL MAINTENANCE GALENA ROAD CULVERT GALENA ROAD TO US 30/BASELINE ROAD LANDSCAPED MEDIAN (TYP.) AGENCY: UNITED CITY OF YORKVILLE WAYWATERPARK SOUTH LIMIT TO GALENA ROAD LANDSCAPED MEDIAN (TYP.) AGENCY: UNITED CITY OF YORKVILLE 5' SIDEWALK OF YORKVILLE AGENCY: UNITED CITY EXHIBIT D - 62M71: IL ROUTE 47 FROM WATERPARK WAY TO JERICHO ROAD MAINTENANCE EXHIBIT PAGE 1 OF 2 GALENA ROAD TO US 30/BASELINE ROAD LANDSCAPED MEDIAN (TYP.) AGENCY: UNITED CITY OF YORKVILLE (LIMIT OF KENDALL COUNTY MAINTENANCE) STRONG POST GUARDRAIL ATTACHED TO CULVERT AND BARRIER WALL BOX CULVERT, GUARDRAIL PROPOSED SN 045-8306 UNITED CITY OF YORKVILLE AGENCY: 340 350 360 370 380 390 400 410 100 420 430 440 450 460 470 100 105 95 100 100 105 95 100 105IL ROUTE 47JERICHO ROADBNSF BRIDGE OVER IL 47 PROPOSED SN 045-8307 TEMP EASEPR ROWEX ROW12'12'10'12'12'10' 32' IL ROUTE 47 SHOOFLY PROPOSED RAILROAD 12'12'12'12' 32' IL ROUTE 47 PR ROWTEMP EASEEX ROW3 1 2 2 1 3 54 2 1 2 2 1 2 54 66 6 6 1 PROPOSED PAVEMENT 2 3 PROPOSED SHOULDER 4 5 6 PROPOSED CURB AND GUTTER PROPOSED MEDIAN PROPOSED SHARED-USE PATH PROPOSED TOPSOIL AND SEEDING A A 2.0%4.0% 2.0%1.5% 1.5%2.0%4.0% 2.0% 4.0%4.0% 4.0%4.0%1:41:31:4 1:4 1:4B B TYPICAL SHOULDER SECTION A-A TYPICAL CURB SECTION B-B TYPICAL SECTION LEGENDROADROLLING OAKS SEE BELOWMATCH LINESEE ABOVEMATCH LINE0 1200 2400 3600 SCALE IN FEET LEGEND STA 348+53 TO 467+52 SHARED-USE PATH AGENCY: SUGAR GROVE IL ROUTE 47 STA 348+53 TO 467+52 SHARED-USE PATH AGENCY: SUGAR GROVE MAIN STREETW P R AI RIE S T R E E T E PRAIRIE STREETCHELSEA AVENUECROSS STREETVILLAGE OF SUGAR GROVE KANE COUNTY STA 421+20 TO STA 463+70 SANITARY RELOCATION VILLAGE OF SUGAR GROVE STA 419+50 TO MAIN STREET WATER MAIN RELOCATION VILLAGE OF SUGAR GROVE STA 419+50 TO MAIN STREET WATER MAIN RELOCATION VILLAGE OF SUGAR GROVE STA 421+20 TO STA 463+70 SANITARY RELOCATION VILLAGE OF SUGAR GROVE 62M71 62G40349+00CORPORATE LIMITS STA 348+53 VILLAGE OF SUGAR GROVE 5' SIDEWALK VILLAGE OF SUGAR GROVE AGENCY: 93+60 103+00 105+32 92+70 BNSF CROSSING MAIN STREET AT VILLAGE OF SUGAR GROVE (EVP) E & W LEGS) (SIGNAL MODERNIZATION, VILLAGE OF SUGAR GROVE AGENCY: 5' SIDEWALK SUGAR GROVE VILLAGE OF AGENCY: 105+74 TO 460+00 STA 455+75 NOISE WALL PROPOSED 467+52EXHIBIT D - 62G40: IL ROUTE 47 FROM JERICHO ROAD TO CROSS STREET MAINTENANCE EXHIBIT PAGE 2 OF 2 JERICHO ROAD TO CROSS STREET LANDSCAPED MEDIAN (TYP.) AGENCY: VILLAGE OF SUGAR GROVE JERICHO ROAD TO CROSS STREET LANDSCAPED MEDIAN (TYP.) AGENCY: VILLAGE OF SUGAR GROVE