Loading...
Resolution 2025-034Resolution No. 2025-34 A RESOLUTION OF THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS APPROVING AN AMENDMENT TO AIA DOCUMENT A133-2019 EXHIBIT A (GUARANTEED MAXIMUM PRICE AMENDMENT) FOR THE CITY'S NEW PUBLIC WORKS FACILITY WHEREAS, the United City of Yorkville, Kendall County, Illinois (the "City') is a non - home rule municipality duly organized and validly existing in accordance with the Constitution of the State of Illinois of 1970 and the laws of this State; and, WHEREAS, on October 15, 2024, the City entered into AIA Document A133-2019 with R.C. Wegman Construction Company of Aurora, Illinois, ("Wegman"), said document being a standard AIA form of agreement (the "Agreement"), whereby Wegman was to serve as the Construction Manager to provide for the construction administration, management services, supervision, workers and materials as required for the construction of the Yorkville Public Works and Park Facility (the "Project") to be constructed at 306 Boombah Boulevard, Yorkville, Illinois; and WHEREAS, pursuant to Section 3.2.6 of the Agreement, the City and the Construction Manager agreed to enter into an amendment to the Agreement (the "Amendment") to establish a "Guaranteed Maximum Price" for the Project being the sum of the Construction Manager's fee plus the Cost of the Work, as such terms are defined in Article 6 of the Agreement; and WHEREAS, the Construction Manager has now provided the City, for its review, an itemized statement of the Guaranteed Maximum Price organized by trade categories and including, allowances, contingencies, alternatives and the Construction Manager's fee, all as required by the Agreement and forth in the Amendment and all Exhibits to the Amendment to ascertain the Guaranteed Maximum Price; and Resolution No. 2025-34 Page 1 WHEREAS, the City staff has closely reviewed the Amendment and each Exhibit attached thereto and now recommends approval of the Amendment including all Exhibits as hereinafter provided. NOW, THEREFORE, BE IT RESOLVED by the Mayor and City Council ofthe United City of Yorkville, Kendall County, Illinois, as follows: Section 1. The AIA Document A133-2019 Exhibit A, Guaranteed Maximum Price Amendment, by and between the United City of Yorkville and R.C. Wegman Construction Company of Aurora, Illinois in the form attached hereto and made a part hereof is hereby approved. Section 2. The Mayor and City Clerk are hereby authorized to execute said Amendment. Section 3. The City Administrator, City Engineer and City Public Works Director are hereby authorized to work with R.C. Wegrnan Construction Company as the Construction Monager to implement the terms of said Amendment. Section 4. That this Resolution shall be in full force and effect from and after its passage and approval according to law. Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this 25" day of March, A.D. 2025. C TY CLERK KEN KOCH AYE DAN TRANSIER AYE ARDEN JOE PLOCHER AYE CRAIG SOLING AYE CHRIS FUNKHOUSER AYE MATT MAREK AYE SEAVER TARULIS AYE RUSTY CORNEILS AYE Resolution No. 2025-34 Page 2 APPROVED by me, as Mayor of the United City of Yorkville, Kendall County, Illinois this 6day of NJ C1 4',11 — , A.D. 2025. Attest: C Y CLERK Resolution No. 2025-34 Page 3 �1 owAIADocument Al - 2019 Exhibit A o•seo Guaranteed Maximum Price Amendment This Amendment dated the Seventeentb day of March in the year Two Thousand Twenty -Five, is incorporated into the accompanying AIA Document A133T"r-2019 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a ADDITIONS AND DELETIONS: Guaranteed Maximum Price dated the Fifteenth day of October in the year Two The author of this document may Thousand Twenty -Four (the "Agreement") have revised the text of the original (In words, indicate day, month, and year.) AIA standard form. An Additions and deletions Report that notes for the following PROJECT: revisions to the standard form text (Name and address or location) is available from the author and should be reviewed. A vertical line Yorkville Public Works and Parks Facility in the left margin of this document 3128 Boombah Blvd, Yorkville, IL 60560 (Final address to be 306 Boombah Blvd) indicates where the author has added to or deleted from the THE OWNER: original AIA text. (Name, legal status, and address) This document has important legal consequences. Consultation with United City of Yorkville an attorney is encouraged with 65I Prairie Point Drive respect to its completion or Yorkville, IL 60560 modification. (630)553-8537 AiA Document A203 T11-2017, THE CONSTRUCTION MANAGER: General Conditions of the Contract (Name, legal stators, and address) for Construction, is adopted in this document by reference. Do not use R.C. Wegman Construction Company with other general conditions 750 Morton Avenue unless this document is modified. Aurora, IL 60506 (630)844-3000 TABLE OF ARTICLES A.1 GUARANTEED MAXIMUM PRICE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION A.3 INFORMATION UPON WHICH AMENDMENT IS BASED A.4 CONSTRUCTION MANAGER'S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS ARTICLE A.1 GUARANTEED MAXIMUM PRICE § A.1.1 Guaranteed Maximum Price Pursuant to Section 3.2.6 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price. As agreed by the Owner and Construction Manager, the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed. The Contract Sum consists of the Construction Manager's Fee plus the Cost of the Work, as that term is defined in Article 6 of the Agreement. § A.1,1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Twenty -Nine Million Nine Hundred and Fourteen Thousand Eight Hundred Seventy- AIA Document A133 —2019 Exhibit A. Copyright© 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AlA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:35:14 1 CDT on 03/17/2025 under Subscription No.20240076874 which expires on 11/07/2025, is not for resale, is licensed for one -tune use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com, User Notes: (67d83e11003fe025cl709de) One Dollars and Zero Cents (S 29,914,871.00 ), subject to additions and deductions by Change Order as provided in the Contract Documents. § A.1.1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories, including allowances; the Construction Manager's contingency; alternates; the Construction Manager's Fee; and other items that comprise the Guaranteed Maximum Price as defined in Section 3.2.1 of the Agreement. (Provide itemized statement below or reference an attachment.) See attached Exhibit D - Schedule of Values § A.1.1.3 The Construction Manager's Fee is set forth in Section 6.1.2 of the Agreement. § A.1.1.4 The method of adjustment of the Construction Manager's Fee for changes in the Work is set forth in Section 6.1.3 of the Agreement. § A.1.1.5 Alternates § A.1.1.5.1 Alternates, if any, included in the Guaranteed Maximum Price: See attached Exhibit E - Bid Form Alternates and Voluntary Alternates Item Price § A.1.1.5.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Exhibit A. Upon acceptance, the Owner shall issue a Modification to the Agreement. (Insert below each alternate and the conditions that must he met for the Owner to accept the alternate.) See attached Exhibit E - Bid Form Alternates and Voluntary Alternates Item Price Conditions for Acceptance § A.1.1.6 Unit prices, if any: (Identify the item and state the unitprice and quantity limitations, if any, to which the unit price will be applicable.) .see attached Exhibit F - Unit Prices Item Units and Limitations Price per Unit ($0,00) ARTICLE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § A.2.1 The date of commencement of the Work shall be: (Check one of the following boxes.) [ X ] The date of execution of this Amendment. [ ] Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) If a date of commencement of the Work is not selected, then the date of commencement shall be the date of execution of this Amendment. § A.2.2 Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allotted in the Contract Documents for Substantial Completion of the Work. The Contract Time shall be measured from the date of commencement of the Work. § A.2.3 Substantial Completion All Document A133 — 2019 Exhibit A. Copyright ©1991, 2003, 2009, and 2019, All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:35:14 2 CDT on 03/17/2025 under Subscription No.20240076874 which expires on 11/07/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents' Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (67d83e11003fe(325c1709de) § A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Construction Manager shall achieve Substantial Completion of the entire Work: (Check one of the following boxes and complete the necessary information.) [ ] Not later than ( ) calendar days from the date of commencement of the Work, [ X ] By the following date: August 15, 2026 § A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are to be completed prior to Substantial Completion of the entire Work, the Construction Manager shall achieve Substantial Completion of such portions by the following dates: Portion of Work Substantial Completion Date § A.2.3.3 If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated damages, if any, shall be assessed as set forth in Section 6.1.6 of the Agreement. ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED § A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract Documents and the following: § A.3.1.1 The following Supplementary and other Conditions of the Contract: Document Title Date Pages § A.3.1.2 The following Specifications: (Either list the Specifications here, or refer to an exhibit attached to this Amendment.) Exhibit A - Drawings, Specifications, and Addenda Section Title Date Pages § A.3.1.3 The following Drawings: (Either list the Drawings here, or refer to an exhibit attached to this Amendment.) Exhibit A - Drawings, Specifications, and Addenda - Number Title Date § A.3.1.4 The Sustainability Plan, if any: (If the Owner identified a Sustainable Objective in the Owner's Criteria, identify the document or documents that comprise the Sustainability Plan by title, date and number of pages, and include other identifying information. The Sustainability Plan identifies and describes the Sustainable Objective; the targeted Sustainable Measures; implementation strategies selected to achieve the Sustainable Measures; the Owner's and Construction Manager's roles and responsibilities associated with achieving the Sustainable Measures; the specific details about design reviews, testing or metrics to verify achievement of each Sustainable Measure; and the Sustainability Documentation required for the Project, as those terms are defined in Exhibit C to the Agreement.) Title Other identifying information: Date Pages § A.3.1.5 Allowances, if any, included in the Guaranteed Maximum Price (Identify each allowance) AIA Document A133 — 2019 Exhibit A. Copyright© 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Archltects; "American institute of Architects," "AIA;' the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. Thfs document was produced at 10:35:14 3 CDT on 03117/2025 under Subscription No.20240076874 which expires on 1110712025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.cwm. User Notes: (67d83e11a003fe025c1709de) See attached Exhibit B - Allowances and Contingencies Item Price § A.3.1.6 Assumptions and clarifications, if any, upon which the Guaranteed Maximum Price is based: (Idenlif y each assumption and clarification) See attached Exhibit C - Assumptions and Clarifications § A.3.1.7 The Guaranteed Maximum Price is based upon the following other documents and information: (Gist anv other documents or information here, or refer to an eihibh attached to this Amendment) ARTICLE AA CONSTRUCTION MANAGER'S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS § AAA The Construction Manager shall retain the consultants, contractors, design professionals, and suppliers, identified below: (List name, discipline, address, and other irijo•nnatio .) See attached Exhibit D - Schedule of Values This Amendment to the Agreement entered into as of the clay and year first written above. OWNER (Signature) BY: Bart Olson, City Administrator, United City of Yorkville (Printed name and title) 00A 4"myaln4h_ CONSTRUCTION MAr (Signature) BY: Colette Rozanski, President, R.C. Wegman Construction Company (Printed ncune and title) AIA Document A133 — 2019 Exhibit A. Copyright @ 1991, 2003, 2009, and 2019. All rights reserved. 'The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:35:14 4 CDT on 03/17/2025 under Subscription No.20240076874 which expires on 11/07/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents" Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (67d83el la003fe0250709de) Additions and Deletions Report for AIA® Document A 13Y - 2019 Exhibit A This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the original AIA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the originat AIA text. Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 10:35:14 CDT on 03/17/2025. Changes to original AIA text PAGE 2 See attached Exhibit E - Bid Form Alternates and Voluntary Alternates § A.1.1.5.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Exhibit A. Upon acceptance, the Owner shall issue a Modification to the Agreement. (Insert below each alternate and the conditions that mast be met far the Owner to accept the alternate) See attached Exhibit E - Bid Form Alternates and Voluntary Alternates § A.1.1.6 Unit prices, if any: (Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable) See attached Exhibit F- Unit Prices PAGE 3 Portion of Work Substantial Completion Date PAGE 4 § A.3.1.5 Allowances, if any, included in the Guaranteed Maximum Price: (Identifv each allowance) See attached Exhibit B -Allowances and Contin ems Variable Information PAGE 1 This Amendment dated the Seventeenth day of March in the year Two Thousand Twenty -Five , is incorporated into the accompanying AIA Document A133Tm-2019, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the Fifteenth day of October in the year Two Thousand Twenty -Four (the "Agreement") Additions and Deletions Report for AIA Document A133 - 2019 Exhibit A. Copyright O 1991, 2003, 2009, and 2019. All rights reserved. `The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:35:14 CDT on 0311712025 under Subscription No.20240076874 which expires on 11/07/2025, is not for resale, is licensed for one- time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiscontracts.com. User Notes: (87d83e11a003fe0250709de) (In words, indicate day, month, and year.) Yorkville Public Works and Parks Facility 3128 Boombah Blvd, Yorkville, IL 60560 United City of Yorkville 651 Prairie Point Drive Yorkville, IL 60560 (630) 553-8537 R.C. Wegman Construction Company 750 Motion Avenue Aurora,, IL 60506 (630)844-3000 PAGE 2 § A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Twenty -Nine Million Nine Hundred and Fourteen "Thousand Eight hundred Seventy -One Dollars and Zero Cents (S 29,914,871.00 ), subject to additions and deductions by Change Order as provided in the Contract Documents. See attached Exhibit D - Schedule of Values [ x ] The date of execution of this Amendment. [ ] Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) PAGE 3 [ ] Not later than O calendar days from the date of commencement of the Work. [X ] By the following date: August 15, 2026 Exhibit A - Drawings, Specifications, and Addenda Exhibit A - Drawings, Specifications, and Addenda PAGE 4 See attached Exhibit C - Assumptions and Clarifications See attached Exhibit D - Schedule of Values Additions and Deletions Report for AIA Document A133 — 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This 2 document was produced at 1C:35:14 CDT on 03117/2025 under Subscription No.20240076674 which expires on 1110712025, is not for resale, is licensed for one- time use only, and may only be used in accordance with the ASA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (67d83e11a003fe025c1709de) Certification of Document's Authenticity AIA° Document D409TM —2003 1, , hereby certify, to the best of my knowledge, information and belief, that I created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 10:35:14 CDT on 03/17/2025 under Order No. 20240076874 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AIA" Document A 133T4f - 2019 Exhibit A, Guaranteed Maximum Price Amendment, other than those additions and deletions shown in the associated Additions and Deletions Report. (4&7 n sign 0 2/11 / god- E)'- (Dnt d) AIA Document D401 —2003. Copyright ©1992 and 2003. All rights reserved. "The American Institute of Architects," "American Institute of Architects; "AIA," the AIA Logo, and 'AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:35:14 CDT on 03/17/2025 under Order No.20240076874 which expires on 11/07/2025, Is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents° Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (67d83e11a003fe025c1709de) EXHIBIT A - Drawings, Specifications and Addenda 3/17/2QZ5 Description # of Pages Drawings: PUBLIC WORKS AND PARKS DEPARTMENT FACILITY, prepared by Kluber Architects, dated 01/31/2025 226 Specifications: PROJECT MANUAL, VOLUME 1, prepared by R.C. Wegman Construction Company, dated 02/03/2025 285 PROJECT MANUAL, VOLUME 2, prepared by Kluber Architects, dated 01/31/2025 1172 Addenda: Addendum 91, prepared by R.C. Wegman Construction Company, dated 02/12/2025 57 Addendum #2, prepared by R.C. Wegman Construction Company, dated 02/17/202S 72 Addendum #3, prepared by R.C. Wegman Construction Company, dated 02/21/202S 142 Addendum #4, prepared by R.C. Wegman Construction Company, dated 02/21/2025 40 EXHIBIT B - Allowances and Contingencies 3/17/2025 Allowance: Survey and As -Built $30,000 Allowance: Materials Testing (for Owner' Testing Agent: Rubino) $100,000 Allowance: Construction Fence $30,000 Allowance: Office Trailer $30,000 Allowance: Dumpsters $40,000 Allowance: Temporary Sanitary Units $20,000 Allowance: Builder's Risk Insurance $40,000 Allowance: Site Security Cameras and Monitoring $8,600 Allowance: Commissioning (CERX Solutions) $35,000 Allowance: IT (InterDev) $265,000 Allowance: Security and Access Control (Scientel Solutions) $285,800 Allowance: AV $100,000 Construction Contingency 5% $1,249,598 Owner's Contingency 2% $499 839 Risk Reserve Contingency (— $3,000,000 potential foreign materials exposure, 25% price impact) $750,000 (100% of unused Allowance and Contingency Funds are returned to City of Yorkville atthe conclusion of the project.} EXHIBIT C - Assumptions and Clarifications 3/17/2025 Permit Fees and Review Permit Fees are excluded from GMP. Added scope or cost of work resulting from permit comments from Authorities Having Jurisdiction are not included in the GMP. Winter conditions are not anticipated, and are not included in GMP. If winter conditions are required, they shall be paid out of Winter Conditions the Construction Contingency, after approval from owner. Temporary Power Temporary ComEd power consumption during construction is excluded from GMP and shall be paid direct by owner. Utility Connection Fees All utility connection fees (ComEd, Nicor, Xfinity, AT&T, etc.) are excluded from GMP and shall be paid direct by Owner. FF&E All furniture, fixtures, and equipment (that are not indicated in the drawings) are excluded from GMP. 0 W a v �n n❑ C o a m; ur mi bo eM{ a Or p od ni o ^ �,.� ocn r i P oo P oo v m a^ aw4 a U 6 m U}MMMMMMMMMMMM�/}MMMMM�NtN+}MV}M�h +h M MMMMM ry +/NMMMMMM M ry Vf Vi z z 3 p P q w U J m ti J Z 7 Q — LD c z m+ a a � a � t 5 a it W r G a Go � M 2 > � � � U M a a Q O O O O O O O O J M M M M M M M Q V P O - ppp 40'1 O n V p� m P � u1 0 O M O P O a P� 0 0 N N N�^ 0 0 0 D ^ O M P i+l W p rMi1 N pp m M r N N N ^ O r N N �I al ^ m ti l0 YI CO 00 • ?� N 00 V' N H al �p 1p O (•3 D] M O N �P N n U U ri N ry m °� N '^ N 0. 3° N C.Y � ti � L� o� N x❑� yo 4 E� is 'rt a E LL m❑ m '� v c "' c o oe 'v C m o D a D w o 0 w 2 a a V N O a Q V ..-�, -+ ate lVl L L 2 N ¢ � o b 0 E c o a E a U Q - O VO Y75.a x N L o_ E m v at o m� _� v c n 1° o ❑ a o v> p�=p v u u o o m r a E m c LL LL o vai 9 °' en Y '¢ :+' 4y c u u c c u u c c u ai m v ai ai ai Q.� u a a N i y c a c c a o 0 0 0 0 o a a o 0 0 0 �' o v u o_ ✓`� v o> l7 s 0¢ l7 q LL ut ut a s LL a>> LL a v 2 w m- w Q in Q 2 4 0 0 0 g q q q q¢ u p o u v C7 - o o m u 0 iw g C7 4 m a a m g m u❑ w a ry m �a ¢ m u m M M O O O O W O 0 o al a0 a1 ry N N N m m N M 4 0 [] O O 0 0 0 K1 m EXHIBIT E - Bid Form Alternates and Voluntary Alternates 3/17/2025 BID FORM ALTERNATES INCLUDED IN GMP: ALTERNATE #1- CARPORT CANOPY 03A Concrete (Eagle Concrete) $23,500 05 Structural Steel (McKinney Steel & Sales} $111,300 07 Roofing (J.L. Adler Roofing ) $149,700 09A Gypsum Board Systems {Burks Brothers Drywall) $56,000 09F Painting (Smith Painting Servcies) $21,000 21 Fire Protection (Nelson Fire Protection) $29,905 22 Plumbing (JB Contracting) $14,300 26 Electrical and Low -Voltage (AWF) $18,300 32A Asphalt (Accu-Paving) $2,000 TOTAL ADDITIONAL SUBCOSTS ADDED TO GMP FOR ALTERNATE #1 $426,005 ALTERNATE #2 - CURBS 32A Asphalt (Accu-Paving) $146,390 TOTAL ADDITIONAL SUBCOSTS ADDED TO GMP FOR ALTERNATE #2 $146,390 VOLUNTARY ALTERNATES INCLUDED IN GMP: KONE Elevator: include an Allowance for (2) days of operator standby time (straight 3P-14 time) to move and position the cab so other trades can perform work within the $3,200 elevator shaft. JAWF: Generator sound attenuation enclosure: 76 dba sound level @ 23' in lieu of 70 13P-26-$111,000 dba sound level @23'. EXHIBIT F - Unit Prices 3/17/2025 UNIT PRICES PROVIDED ON BID FORM: Unit Price #1- Unsuitable Soils w/ CA-1 Provide cost per Cubic Yard to provide additional excavation and removal of unsuitable soil and/or ubstable base, and provide compacted CA-1 structural stone backfill in its place. S&K Excavating $65.00 per CY J&S Construction $72.00 per CY Eagle Concrete $86.00 per CY Unit Price #2 - Unsuitable Soils w/ CA-6 Provide cost per Cubic Yard to provide additional excavation and removal of unsuitable soil and/or ubstable base, and provide compacted CA-6 structural stone backfill in its place. S&K Excavating $41 per CY J&S Construction $70.00 per CY Eagle Concrete $72.00 per CY Unit Price #3 - Unsuitable Soils w/ Lean Concrete Provide cost per Cubic Yard to provide additional excavation, haul away of unsuitable soil, and provide lean concrete (2,000 PSI) in its place. Eagle Concrete $190.00 per CY [Unit Price #4 - Handle Additional Spoils (Unit Price for 31-Earthwork Contractor) Provide cost per Cubic Yard to increase or decrease quantity for spoils left by other trades that are handled by the 31-Earthwork Contractor (that are either placed and compacted for site balancing, or that are hauled to the final stockpile.) S&K Excavating IS3.50 per CY