Loading...
Resolution 2025-047 Resolution No. 2025-47 A RESOLUTION OF THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS APPROVING A CONTRACT TO REPLACE A WATER MAIN ON EAST VAN EMMON STREET, IN AN AMOUNT NOT TO EXCEED $88,950 WHEREAS, the United City of Yorkville (the "City") is a duly organized and validly existing non home-rule municipality created in accordance with the Constitution of the State of Illinois of 1970 and the laws of the State; and WHEREAS, the City's Code of Ordinances provides that the City may approve contracts for supplies and equipment that have not been competitively bid by a two-thirds affirmative vote of the City Council; and WHEREAS, the City plans to resurface East Van Emmon Street this, with work set to begin in April of 2025 (the "Resurfacing Project"); and WHEREAS, a water main along East Van Emmon Street must be relocated and replaced prior to the start of the Resurfacing Project; and WHEREAS,the City received quotes from three different firms to replace the water main; and WHEREAS, D Construction Inc., 1488 S. Broadway, Coal City, IL 60416, has provided a quote to complete the water main replacement, attached hereto as Exhibit A, in the amount of $88,950 (the "Quote"); and WHEREAS, D Construction, Inc. has been hired by the City to complete the Resurfacing Project, and City staff find the Quote to be reasonable; and WHEREAS, the Mayor and City Council have determined that it is in the best interests of the health and safety of the City and its residents to waive the competitive bidding requirement and to authorize and approve a contract with D. Construction, Inc. to replace the water main, in an Resolution No.2025-47 Page 1 amount not to exceed $88,950, in accordance with the provisions of the Quote. NOW,THEREFORE,BE IT RESOLVED by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois: Section 1. The foregoing recitals are hereby incorporated in this Resolution as the findings of the Corporate Authorities. Section 2. The Corporate Authorities hereby waive the competitive bidding requirement pursuant to the City's Code of Ordinances, and the City Administrator is hereby authorized and directed to contract with D Construction Inc., 1488 S. Broadway, Coal City, IL 60416 for the replacement of the water main along East Van Emmon in accordance with the provisions of the Quote. Section 3. That this resolution shall be in full force and effect from and after its passage and approval according to law. [Remainder of page intentionally blank; roll call vote to follow] Resolution No. 2025-47 Page 2 Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this 81h day of April, A.D. 2025. 4C Y CLERK KEN KOCH AYE DAN TRANSIER AYE ARDEN JOE PLOCHER PRESENT CRAIG SOLING NAY CHRIS FUNKHOUSER AYE MATT MAREK AYE SEAVER TARULIS AYE RUSTY CORNEILS AYE (�APPROVED by me, as Mayor of the United City of Yorkville, Kendall County, Illinois this - I dray of , A.D. 2025. MAYOR Attest: I V CLERK Resolution No. 2025-47 Page 3 SUMMARY OF QUOTES VAN EMMON WATER MAIN CONNECTION UNITED CITY OF YORKVILLE BID TABULATION Conley Excavating&Construction D Construction Winninger Excavating BIDS RECD 3/14/2025 1555 Gramercy PI 1488 S Broadway St 8845 Schoger Dr Morris,IL-60450 Coal City,IL-60416 Naperville,IL-60564 ITEM UNIT UNIT UNIT NOO DESCRIPTION UNIT QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 1 CONNECTION TO EXISTING WATER MAIN,12-INCH EACH 1 $ 8,515.00 $ 8,515.00 $ 3,500.00 $ 3,500.00 $ 7,000.00 $ 7,000.00 2 CONNECTION TO EXISTING WATER MAIN,6-INCH EACH 2 $ 3,085.00 $ 6,170.00 $ 2,500.00 $ 5,000.00 $ 5,000.00 $ 10,000.00 3 WATER MAIN,D.I.P,CLASS 52,WITH POLYETHYLENE WRAP,8-INCH FOOT 60 $ 209.00 $ 12,540.00 $ 250.00 $ 15,000.00 $ 320.00 $ 19,200.00 4 WATER MAIN,D.I.P,CLASS 52,WITH POLYETHYLENE WRAP,6-INCH FOOT 35 $ 203.00 $ 7,105.00 $ 230.00 $ 8,050.00 $ 310.00 $ 10,850.00 5 DUCTILE IRON FITTINGS POUND 510 $ 0.01 $ 5.10 $ 20.00 $ 10,200.00 $ 0.01 $ 5.10 6 FIRE HYDRANT ASSEMBLY,WITH AUXILIARY VALVE,6-INCH MJ(PRESSURE CONNECTION) EACH 1 $ 14,750.00 $ 14,750.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 7 GATE VALVE(RESILIENT SEAT)IN 60"VAULT,8-INCH EACH 1 $ 8,230.00 $ 8,230.00 $ 9,000.00 $ 9,000.00 $ 7,000.00 $ 7,000.00 8 GATE VALVE(RESILIENT SEAT)IN 48"VAULT,6-INCH EACH 1 $ 7,460.00 $ 7,460.00 $ 7,000.00 $ 7,000.00 $ 5,400.00 $ 5,400.00 9 VALVE VAULT TO BE ABANDONED EACH 2 $ 800.00 $ 1,600.00 $ 1,500.00 $ 3,000.00 $ 750.00 $ 1,500.00 10 FIRE HYDRANT TO BE REMOVED EACH 1 $ 800.00 $ 800.00 $ 2,500.00 $ 2,500.00 $ 750.00 $ 750.00 11 NON-SPECIAL,NON-HAZARDOUS SOIL WASTE DISPOSAL TONS 5 $ 50.00 $ 250.00 $ 200.00 $ 1,000.00 $ 25.00 $ 125.00 12 TEMPORARY HMA PATCHING,2" SQYD 70 $ 50.00 $ 3,500.00 $ 60.00 $ 4,200.00 $ 25.00 $ 1,750.00 13 WATER MAIN TESTING-PRESSURE AND DISINFECTION LSUM 1 $ 1,000.00 $ 1,000.00 $ 3,500.00 $ 3,500.00 $ 14 TRAFFIC CONTROL AND PROTECTION LSUM 1 $ 9,000.00 $ 9,000.00 $ 5,000.00 $ 5,000.00 $ 26,000.00 $ 26,000.00 TOTAL $ 80,925.10 $ 88,950.00 $ 101,580.10 ABOVE/BELOW ENGINEERS ESTIMATE ENGINEERING ENTERPRISES,INC. 52 WHEELER ROAD,SUGAR GROVE,ILLINOIS