Resolution 2025-089Resolution No. 2025-89 A RESOLUTION OF THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS APPROVING A CHANGE ORDER RELATING TO THE BLUESTEM WATER MAIN REPLACEMENT PROJECT WHEREAS, the United City of Yorkville (the "City") is a duly organized and validly existing non home -rule municipality created in accordance with the Constitution of the State of Illinois of 1970 and the laws of the State; and WHEREAS, the City has approved a contract in the amount of $465,646.09 with Winninger Excavating, Inc. ("Winninger"), for a project commonly known as the Bluestem Water Main Replacement Project; and WHEREAS, the City had previously approved a Change Order increasing the value of this Project by $177,037.25, to $642,683.34; and WHEREAS, the price of the Project has since increased in the amount of $100,000.00 (the "Change Order") due to an unforeseen increase in the amount of 8" water main that needs to be upsized to 12" water main; and WHEREAS, all change orders increasing or decreasing the cost of a public contract by at least $25,000 must meet the required findings that circumstances necessitating the change were not reasonably foreseeable at the time the contract was signed; or the change is germane to the original contract as signed; or the Change Order is in the best interest of the City as required by Section 33E-9 of the Illinois Criminal Code (720 ILCS 5/33E-9); and WHEREAS, it has been recommended to the Mayor and City Council (the "Corporate Authorities") that a Change Order increasing the total contract price to the amount of $742,683.34 was not reasonably foreseeable at the time the contract was signed, as set forth in the proposal from Winninger. NOW, THEREFORE, BE IT RESOLVED by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois: Section 1. The foregoing recitals are hereby incorporated in this Resolution as the findings of the Corporate Authorities. Section 2. The Corporate Authorities hereby find and declare that Change Order No. 2 to the Bluestem Water Main Replacement Project contract with Winninger Excavating, Inc., Resolution No. 2025-89 Page 1 which results in a total increase of $100,000.00, is hereby approved, and the City Administrator is authorized to execute the Change Order as hereinabove identified. Section 3. That this resolution shall be in full force and effect from and after its passage and approval according to law. Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this 121h day of August, A.D. 2025. TY CLERK KEN KOCH AYE DAN TRANSIER ABSENT ARDEN JOE PLOCHER AYE CRAIG SOLING NAY CHRIS FUNKHOUSER AYE MATT MAREK AYE RUSTY CORNEILS ABSENT RUSTY HYETT AYE tPPROVED by me, as Mayor of the United City of Yorkville, Kendall County, Illinois this � day of A.D. 2025. Attest: C TY CLERK 17 MAYOR Resolution No. 2025-89 Page 2 Legend ACTUAL LOCATION 12-INCH WATER MAIN ENDS ADDITIONAL SCOPE OF WORK REFLECTED IN CHANGE ORDER 12-INCH LOCATION WATER MAIN PER RECORDS ADDITIONAL PROPOSED WATER MAIN PROPOSED WATER MAIN 0 VALVE $ HYDRANT Kenn edX 3" WATER MAIN AND SMALLER 4" WATER MAIN 6" WATER MAN 8" WATER MAIN 10" WATER MAIN 12" WATER MAIN 16" WATER MAIN UNKNOWN WATER MAIN S , I< fw 1 3 PROPOSED ROUTE 1; OF NEW WATER MAIN 1 = 100 50 0 Feetl 11 Engineering Enterprises, In 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 www.eeiweb.com CHANGE ORDER Order No. 2 Date: August 12 2025 Agreement Date: 3/31/2025 NAME OF PROJECT: Bluestem Water Main Improvements OWNER: United City of Yorkville CONTRACTOR: Winnin er Excavating Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: 1. Addition of water main along McHugh Road to Bluestem Drive $ 100,000.00 Chancre of CONTRACT PRICE: Original CONTRACT PRICE: $ 465,646.09 Current CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $ 642,683.34 The CONTRACT PRICE due to this CHANGE ORDER will be (increased)(desFeased) by. $_100,000.00 The new CONTRACT PRICE including this CHANGE ORDER will be: $_742,683.34 Justification: During the design of the project it was believed that the 12-inch water main on McHugh Road ran to Bluestem Drive but instead it ends approximately 175 feet north. This conclusion was based off the record drawings of the Prairie Meadows subdivision as well as the GIS utility atlas system. However, during the construction of the project, it was discovered that the water main at the designated tie in point is actually 8-inch and that the 12-inch water main begins north of the designated tie in point. Change to CONTRACT TIME: The contract time Reque by: Recommended b Accepted by: dawsllNetCachelContent.OdooklSPUWONUIZ. Y02420 Change Order 2_PWSigned.doe