Loading...
HomeMy WebLinkAboutCity Council Packet 2025 10-28-25 - supplemental packet 2 Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: If new information is available at the time of the meeting, then a discussion will be held. Reviewed By: Legal Finance Engineer City Administrator Community Development Purchasing Police Public Works Parks and Recreation Agenda Item Number Mayor’s Report #8 Tracking Number CC 2025-08 Public Works and Parks Department Facility Update City Council – October 28, 2025 None Informational Please see the attached Construction Contingency Adjustment Log. Bart Olson Administration Name Department Supplemental Information – distributed 10/24/25 NO. DATE ISSUED DESCRIPTION ADJUSTMENT TOTAL UPDATED CONTINGENCY DATE RETURNED COMMENTS ORIGINAL CONTRUCTION CONTINGENCY $ 1,249,598.00 Per plan changes dated 3/25/25, increase diameter of Structures 10 & 27 from 5' to 6'. $ (2,252.80) RCW Markup $ (214.02) Per City request, change 2" water service from Type K copper to Pex with tracer wire. $ 3,998.50 RCW Markup $ - Time spent locating existing water main as it was not shown accurately on the Drawings. Work also included relocating the topsoil pile due to new water main connection. Add 40' of 8" DI and (2) 45 bends for new connection location. Change casting on Catch Basin 26 from Type 1 as noted to a Type 11 curb unit. $ (7,337.75) RCW Markup $ (697.09) Revise storm water drainage system per Revision 5. Work included the addition of 16' of 36" RCP, (1) 36" FES, rip rap and connection to STR 27. $ (10,898.00) RCW Markup $ (1,035.31) Per response to RFI 2, provide ventilation in elevator shaft through roof. $ (10,291.50) RCW Markup $ (977.69) Provide an additional 256.5 CY of undercutting at trench excavations as directed by the Testing Company. This proposal is based on a unit cost of $190/CY and the cost to increase the bond. Please note that the original allowance only covered the first 275 CY of undercuts. $ (49,350.00) RCW Markup $ (4,688.25) Provide utility public walk. $ (1,990.00) RCW Markup $ (189.05) Provide 2-1/2" O.D. line posts at 8' O.C. in lieu of 2" O.D. posts at 10' O.C. Provide 3" O.D. terminal posts in lieu of 2-1/2" O.D. posts. These changes are necessary to meet performance expectations and avoid potential issues such as post deflection, concrete footing failure, or overall system compromise under wind load. $ (10,717.35) RCW Markup $ (1,018.15) Provide 8" thick apron with rebar reinforcement between building and asphalt pavement. $ (16,100.00) RCW Markup $ (1,529.50) Berm up excess spoils around the site. $ (39,600.00) RCW Markup $ (3,762.00) NO. DATE ISSUED DESCRIPTION ADJUSTMENT TOTAL UPDATED CONTINGENCY DATE RETURNED COMMENTS ORIGINAL OWNER'S CONTINGENCY $ 499,839.00 Per RFI-006, provide Yorkville Mix (4,500 psi with fibers) in exterior concrete walks and aprons only. $ (11,400.00) RCW Markup $ (1,083.00) Provide new window in the PW Director's Office 109. $ (10,045.00) RCW Markup $ (954.28) NO. DATE ISSUED DESCRIPTION ADJUSTMENT TOTAL UPDATED CONTINGENCY DATE RETURNED COMMENTS ORIGINAL RISK RESERVE CONTINGENCY $ 750,000.00 $ (12,075.00) $ (1,147.13)Approved at 10/02/25 OAC Meeting.RRA 01 10/2/2025 Cost impact by tariffs on the Elevator Work Scope. $ (13,222.13) $ 736,777.87 10/2/2025 CA 10 10/2/2025 $ (17,629.50) $ 1,134,310.04 10/02/25 Approved at 10/02/25 OAC Meeting. CA 09* (Out of Sequence) 10/2/2025 $ (11,735.50) $ 1,151,939.54 10/02/25 Approved at 10/02/25 OAC Meeting. OCTOBER 2025 AUGUST 2025 CA 07 8/7/2025 $ (2,179.05) $ 1,163,675.04 $ 487,356.00 6/26/2025 CA 08 9/24/2025 08/07/25CA 06 7/24/2025 October 2025 $ (54,038.25) $ 1,165,854.09 $ (43,362.00) 08/07/25 4/17/2025 CA 02 CA 04 5/15/2025 $ (11,933.31) $ 1,231,161.53 5/15/2025 $ 1,243,094.84 5/1/2025 JULY 2025 APRIL 2025 CA 01 4/17/2025 $ (2,466.82) $ 1,247,131.18 MAY 2025 4/17/2025 $ 3,998.50 $ 1,251,129.68 4/17/2025 CA 03 5/1/2025 $ (8,034.84) JULY 2025 CA 05 6/18/2025 $ (11,269.19) $ 1,090,948.04 10/10/25 Approved via email on 10/10/25. S&K: 6,600 CY at $6.00 / CY $ 1,219,892.34 6/26/25 OA 02 9/17/2025 $ (10,999.28) $ 476,356.73 9/23/2025 County Prestress & Precast: $6,630 Madden Glass: $2,655 LJ Morse: $760 OA 01 6/25/2025 $ (12,483.00) Yorkville Public Works Construction Contingency Adjustment Log Yorkville Public Works Owner Contingency Adjustment Log Yorkville Public Works Risk Reserve Adjustment Log