Loading...
Resolution 2025-117Resolution No. 2025-117 A RESOLUTION OF THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS APPROVING CHANGE ORDERS WHEREAS, the United City of Yorkville, Kendall County, Illinois (the "City") is a duly organized and validly existing non -home rule municipality created in accordance with the Constitution of the State of Illinois of 1970 and the laws of the State; and, WHEREAS, the City has undertaken a water system renewal initiative in preparation for its transition to Lake Michigan water and in order to proceed with the renewal system it is necessary to replace all deteriorated water mains (the "Water Main Replacement Program") in the City; and WHEREAS, it has been determined that the Water Main Replacement Program should in incorporated into its WIFIA loan program and therefore the City is required to make several submittals as hereinafter itemized (the "Change Orders") to comply with the requirements of the WIFIA loan program; and WHEREAS, the City is prepared to submit the Change Orders for Contracts A and B as required because it has been determined to be in the best interest of the City to include all costs to be incurred in connection with its Watermain Replacement Program in the WIFIA loan program. NOW, THEREFORE, BE IT RESOLVED by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois, as follows: Section 1. The foregoing preambles are hereby incorporated in this Resolution as the findings of the Corporate Authorities. Section 2. The Corporate Authorities hereby approve and authorize the following Change Orders to be included in the application for the WIFIA loan program: Contract A — Conley Excavating, Inc. • Change Order No. 1 — Construction Contract — Exhibit A • Change Order No. 1 — Design Engineering Agreement (EEI) — Exhibit B • Change Order No. 1 — Construction Engineering Agreement (EEI) — Exhibit C Resolution No. 2025-117 Page I Contract B -- Winninger Excavating, Inc. a Change Order No. 2 — Construction Contract — Exhibit D a Change Order No. 1 — Design Engineering Agreement (EEI) — Exhibit E • Change Order No. 1 —Construction Engineering Agreement (EEI) —Exhibit F Section 3. That this Resolution shall be in full force and effect upon its passage and approval as provided by law. Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this 28"' day of October, A.D. 2025. '7(YTY CLERK KEN KOCH AYE DAN TRANSIER AYE ARDEN 3OE PLOCHER AYE CRAIG SOLING AYE CHRIS FUNKHOUSER AYE MATT MAREK AYE RUSTY CORNEILS AYE RUSTY HYETT AYE APPROVED by me, as Mayor of the United City of Yorkville, Kendall County, Illinois thA06day of 0 C-� b,Y , A.D. 2025. MAYOR Attest: cj) A 1:4TY CLERK Resolution No. 2025-117 Page 2 CHANGE ORDER Order No. 1 (Davis -Bacon Rates) Date: October 7, 2025 _. Agreement date: Aril 23 2024 NAME OF PROJECT: 2024 Water Main Improvements —Contract A OWNER: United City of Yorkville CONTRACTOR: Conley Excavating Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: The attached Davis -Bacon wage rates were included in the contract documents. Change of CONTRACT PRICE: Original CONTRACT PRICE: $2 312,286.15 Current CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $2,312.286.15 The CONTRACT PRICE due to this CHANGE ORDER will be (increased) d) (decreased) by: $0.00 The new CONTRACT PRICE including this CHANGE ORDER will be: $2,312,286,15 Change to CONTRACT TIME: The CONTRACT TIME will be (increased) (decreased) by 0 calendar days. The date for substantial completion for all work except restoration The date for completion for all worm will be Justification The intent is to meet the WIFIA funding requirements. Approvals Required Requested by: united Ully of YorKv[Iie Recommended by: ( � Enaineerin.a Enterprises, Inc. Accepted by: Conte Excavatin Inc. To: Bart Olson Change Order Number: 1 City Administrator Change Order Date: 1019/25 United City of Yorkville 651 Prairie Pointe Drive Project Name: 2024 Water Main Improvements - Contract A Project Number: Y02314 Description of Work / Scope Change 1 Reason for Change The 2024 Water Main Improvements projects were not originally intended to be funded by WIFIA. The attached documents are being included in the Design Engineering Agreement in order to meet WIFIA requirements. This change order does not affect the contract price for the project. Authorized by: Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, IL 60554 By: Date: Authorized by Owner/ClientlAgent: JB. Date: 52 Wheeler Road • Sugar Grove, IL 60554 • Tel: 630.466.6700 • Fax: 630.466.6701 - wvvweeiweb.com To: Bart Olson Change Order Number: 1 City Administrator Change Order Date: 1019125 United City of Yorkville 651 Prairie Pointe Drive Project Name: 2024 Water Main Improvements - Contract A Project Number: YO2314 Description of Work 1 Scope Change 1 Reason for Change The 2024 Water Main Improvements projects were not originally intended to be funded by WIFIA. The attached documents are being included in the Construction Engineering Agreement in order to meet WIFIA requirements. This change order does not affect the contract price for the project. Authorized by: Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, IL 60554 By: Date: Authorized by Owner/Client/Agent: Date: io1 � 2� 52 Wheeler Road • Sugar Grove, 1L 60554 - Tel: 630.466.6700 • Fax: 630.466.6701 - wwrw.eeiweb.com J CHANGE ORDER Order No_ 2 Davis -Bacon Rates Date: October 7 2025 Agreement Date: Februa 15 2024 NAME OF PROJECT: 2024 Water Main Improvements — Contract B OWNER: United City_ of Yorkville CONTRACTOR:�Winninger Excavating, Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: The attached Davis -Bacon wage rates were included in the contract documents. Change of CONTRACT PRICE: Original CONTRACT PRICE: $2,719,45425 Current CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $2,573,812.40 The CONTRACT PRICE due to this CHANGE ORDER will be (O^eaed) (decreased) by: 0.00 The new CONTRACT PRICE including this CHANGE ORDER will be: 2 573 812.40 Change to CONTRACT TIME: The CONTRACT TIME will be (increased) (decreased) by 0 calendar days. The date for substantial completion for all work except restoration The date for completion for all work will be Justification The intent is to meet the WIFIA fund" Approvals Required Requested by: Recommended by: Accepted by: irements. United Ci of Yorkvili Engineering Enterprises, In Winninaer Excavating, In To: Bart Olson Change Order Number: 1 City Administrator Change Order Date: 1019125 United City of Yorkville 651 Prairie Pointe Drive Project Name: 2024 Water Main Improvements - Contract B Project Number: Y02315 Description of Work 1 Scope Change 1 Reason for Chan e The 2024 Water Main Improvements projects were not originally intended to be funded by WIFIA. The attached documents are being included in the Construction Engineering Agreement in order to meet WIFIA requirements. This change order does not affect the contract price for the project. Authorized by: Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, IL 60554 By: Date: ��/ ��/�✓ Authorized by Owner/Client/Agent: By: Date: t4] a To: Bart Olson Change Order Number: 1 City Administrator Change Order Date: 1019125 United City of Yorkville 651 Prairie Pointe Drive Project Name: 2024 Water Main Improvements - Contract B Project Number: Y02315 Description of Work I Scope Change 1 Reason for Change The 2024 Water Main Improvements projects were not originally intended to be funded by WIFIA. The attached documents are being included in the Design Engineering Agreement in order to meet WIFIA requirements. This change order does not affect the contract price for the project. Authorized by: Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, IL 60554 Date: Authorized by Owner/Client]Agent: 52 Wheeler Road • Sugar Grove, IL 60554 • Tel: 630.466.6700 • Fax: 630.466.6701 • www.eeiweb.com