Loading...
HomeMy WebLinkAboutCity Council Packet 2026 03-10-26 supplemental packet 2 (Project Cardinal) Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/gov_officials.php Supplemental Information – distributed 3/6/26 Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: The supplemental packet include the development and recapture agreements. All previously presented packet material can be found at: https://www.yorkville.il.us/Archive.aspx?ADID=6658. Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number Planning and Zoning Commission #2 Tracking Number PZC 2025-08 & EDC 2025-50 Project Cardinal – Pioneer (Data Center) City Council – March 10, 2026 CC – 11/10/25 PUD and Annexation Agreement passed and a discussion took place. PZC 2025-08 & EDC 2025-50 Please see the attached memos and additional documents. Krysti J. Barksdale-Noble, AICP Community Development Name Department Majority Approval Ordinance No. 2026-____ Page 1 Ordinance No. 2026-________ AN ORDINANCE OF THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS, APPROVING A UTILITY AND INFRASTRUCTURE AGREEMENT AND A DEVELOPMENT AGREEMENT BY AND BETWEEN THE UNITED CITY OF YORKVILLE AND PIONEER DEVELOPMENT LLC (Project Cardinal) WHEREAS, the United City of Yorkville, Kendall County, Illinois (the “City”) is a duly organized and validly existing non-home-rule municipality created in accordance with the Constitution of the State of Illinois of 1970 and the laws of the State; and WHEREAS, Pioneer Development, LLC, an Illinois limited liability company (“Developer”), has entered a contract for the purchase of approximately 1,037 acres of property, located just south of Baseline Road, west of North Bridge Street (State Route 47), and east of Ashe Road (“Subject Property”) for the purpose of developing a data center campus (the “Project”); and WHEREAS, in order to proceed with the Project, substantial infrastructure improvements are required including an extension to the City’s water system, an extension to the City’s sanitary sewer system, the construction of improvements to the City’s and Kendall County’s roadway systems and other public improvements as detailed in the Utility and Infrastructure Agreement in the form attached hereto; and WHEREAS, in order to proceed with the Project, it has also been determined that the City and other governmental units shall be impacted by the development and operation of this Project and therefore certain commitments have been made by the Developer to cover such impacts, all as set forth in the Development Agreement in the form attached hereto. WHEREAS, the City is prepared to proceed with the Project and enter into the Utility and Infrastructure Agreement and the Development Agreement as it believes the commitments made Ordinance No. 2026-____ Page 2 by the Developer in each of these Agreements shall serve to assist the City to address all potential impacts of this Project. NOW, THEREFORE, BE IT ORDAINED by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois, as follows: Section 1. The above recitals are incorporated herein and made a part of this Ordinance. Section 2. The Utility and Infrastructure Agreement by and between the United City of Yorkville and Pioneer Development LLC is hereby approved and the Mayor and City Clerk authorized to execute. Section 3. The Development Agreement by and between the United City of Yorkville and Pioneer Development LLC is hereby approved and the Mayor and City Clerk are authorized to execute. Section 4. That this Ordinance shall be in full force and effect upon its passage, approval and publication as provided by law. [Remainder of page intentionally blank. Roll call vote follows.] Ordinance No. 2026-____ Page 3 Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this ____ day of __________________, A.D. 2026. ______________________________ CITY CLERK KEN KOCH _________ DAN TRANSIER _________ ARDEN JOE PLOCHER _________ CRAIG SOLING _________ CHRIS FUNKHOUSER _________ MATT MAREK _________ RUSTY CORNEILS _________ RUSTY HYETT _________ APPROVED by me, as Mayor of the United City of Yorkville, Kendall County, Illinois this ____ day of __________________, A.D. 2026. ______________________________ MAYOR Attest: ______________________________ CITY CLERK Ordinance No. 2026-____ Page 4 1 1627713470.5 DEVELOPMENT AGREEMENT BY AND BETWEEN THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS AND PIONEER DEVELOPMENT, LLC (Project Cardinal) THIS DEVELOPMENT AGREEMENT (the “Agreement”) is made and entered as of the ____ day of ________________ 2026 (the “Effective Date”), by and between the United City of Yorkville, Kendall County, Illinois (the “City”) and Pioneer Development, LLC, an Illinois limited liability company (“Developer”), each a “Party”. ARTICLE 1: RECITALS. 1.1 The City is a duly organized and validly existing non-home rule municipality created in accordance with the Constitution of the State of Illinois of 1970 and the laws of the State. 1.2 Developer is the contract purchaser of real property consisting of approximately 1,037 acres (the “Property”), 307 acres of which have not been annexed to the City (the “Unannexed Property”), all of which is located west of North Bridge Street (Illinois State Route 47), east of Ashe Road, and directly south of East Baseline Road (collectively the “Development Site”), legally described in Exhibit A attached hereto, which Developer intends to develop as a secure data center campus (the “Project”). 1.3 In furtherance of its intent to undertake the Project, the Developer submitted an application to the City requesting annexation, rezoning and a special use planned unit development at the Development Site which the City has reviewed and found to be complete and consistent with the City’s purpose and intent of the planned unit development and policies for industrial development within the City. 1.4 The Developer acknowledges that the Development Site is located within the jurisdiction of several governmental units which shall be impacted by its development of the Project and therefore is prepared to commit to the payment of the impact fee as hereinafter set forth to offset any financial hardship which may result from its development of the Development Site. 1.5 The Developer further acknowledges that the development of the Project will require unique City resources for plan approvals, permit applications, construction supervision and the monitoring of the Project throughout the operation of the Development Site as a data center and therefore is prepared to pay all review fees, permit fees and such other impact fees in the amounts when due as hereinafter set forth. ARTICLE 2: DEVELOPER OBLIGATIONS. 2.1 The Developer agrees to pay all plan review fees at the time of submittal of an application for approval of a Final Plan of the Development Site and all development and permit fees at the time of application for each building permit and any other fees as may be due and payable pursuant to the Yorkville Unified Development Ordinance and the Yorkville City Code . 2.2 In addition to the fees referenced in Section 2.1 of this Agreement, the Developer agrees to pay the City the sum of $51,000,000 (the “Impact Fee”) in full satisfaction of any and all impact fees the City has determined and deemed necessary to cover all of its costs in connection with the construction and continuing monitoring of the operation of a data center at the Development Site as well as the impacts on other taxing districts as follows: 2 1627713470.5 2.2.1 $15,000,000 upon its closing on the purchase of the Property (the “Closing”); the recordation of the PUD Agreement between the Developer and the City prescribing the terms and conditions of development of the Development Site (the “PUD Agreement”); the recordation of the Annexation Agreement between the Parties which sets forth the conditions of annexation of the Unannexed Property (the “Annexation Agreement”); the recording of the Rezoning/PUD Ordinance and filing with the County Clerk of the Ordinance annexing the Unannexed Property; 2.2.2 $11 ,000,000 paid prior to the first to occur of issuance of the first vertical building permit for Phase 1 (as defined in the PUD Agreement) of the Project, or a year after Closing; 2.2.3 $12,000,000 paid prior to the first to occur of issuance of the first vertical building permit for Phase 2 of the Project, or 2 years after Closing; and 2.2.4 $13,000,000 paid prior to the first to occur of issuance of the first vertical building permit for Phase 3 of the Project, or 3 years after Closing. 2.3 Upon Closing, the Developer agrees to convey to the City the property legally described in Exhibit B attached hereto for use as a public park. 2.4 The Developer shall secure its payment obligations set forth in Sections 2.2.1, 2.2.2, 2.2.3 and 2.3.4 with a Bond or a Letter of Credit at Developer’s option (the “Surety”). The Surety shall be in a form and drawn upon an institution reasonably acceptable to the City. The Surety shall be posted upon execution of this agreement, and provide for the right of the City to draw upon the Surety to draw upon failure to pay within five (5) business days of the date due the amounts set forth in 2.2.1, 2.2.2, 2.2.3, and 2.2.4 upon the sole direction of the City. The Surety shall be reduced proportionally as payments are made. 2.5 Each payment of the Impact Fee shall be distributed to the taxing districts by the City in the amounts and solely for the uses as listed on Exhibit C attached hereto and made a part hereof. No other Impact Fees may be imposed on the Subject Property. Notwithstanding the foregoing, the developer acknowledges its obligations to pay all Development Fees as herein after defined. ARTICLE 3: CITY OBLIGATIONS 3.1 The City shall diligently, timely, and in good faith review, process, and act upon all applications, submissions, plans, permits, approvals, and other materials submitted by the Developer in connection with the Project. The City shall use commercially reasonable efforts to avoid unnecessary delays and shall promptly notify the Developer of any deficiencies or additional information required to complete such reviews. The City shall cooperate with the Developer and its consultants throughout permitting and inspection processes, including coordinating among City departments and agencies as reasonably necessary to facilitate efficient review. Nothing in this Section obligates the City to approve any application that does not satisfy applicable laws, regulations, or standards, but the City shall not unreasonably withhold, condition, or delay any approval for which the Developer has met all applicable requirements. 3 1627713470.5 3.2 Equal Treatment. The City acknowledges that Developer is making a substantial up-front investment in the Subject Property in consideration of the rights herein granted to construct multiple buildings on the Subject Property over a twenty (20) year period. While the City will not freeze permit fees or building codes applicable to the Subject Property, the City hereby agrees not to impose new fees, requirements, or code provisions which would uniquely burden (i.e. not generally applicable to other commercial users) Developer’s intended development, use, and operation of the Subject Property or the development, use and operation of data centers in general. 3.3 The City agrees to support the Developer’s applications and filings to County, State, or Federal agencies, or public utilities and grid operators (such as ComEd, PJM, or FERC) for infrastructure to interconnect, condition, stabilize, or augment utility service to serve the Project. For purposes of this Section, "support" means that the City shall not oppose, protest, or seek to delay such applications, filings, or submissions. 'Utility service' includes infrastructure necessary for the Project’s operational needs, including connections to external supply networks and facility integration, provided such infrastructure complies with applicable codes and safety standards. ARTICLE 4: REPRESENTATIONS. 4.1 The execution, delivery, and performance of this Agreement by the Developer, the consummation of the transactions contemplated hereby, and the fulfillment of or compliance with the terms and conditions of this Agreement shall not conflict with or result in a violation or breach of any of the terms, conditions, or provisions of any disclosure statement made, or to be made, on behalf of the Developer, or any restriction, document, agreement, or instrument to which the Developer, or any of its partners or venturers, is now a party or by which the Developer, or any of its partners or venturers, is bound, or constitute a default under any of the foregoing. 4.2 The Developer further warrants, except for that certain currently pending Kendall County, Illinois Case Number 2025 CH 000028, there are no actions at law or similar proceedings either pending or, to the best of the Developer’s knowledge, threatened against the Developer that would materially or adversely affect the ability of the Developer to proceed with the acquisition of the Development Site and the construction of the Project. ARTICLE 5: NOTICES. All notices and other communications in connection with this Agreement shall be in writing and shall be deemed delivered to the addressee thereof (a) when delivered in person on a business day at the address set forth below, or (b) on the third business day after being deposited in any main or branch United States post office, for delivery by properly addressed, postage prepaid, certified or registered mail, returned receipt requested, at the address set forth below, or (c) by email transmission, when transmitted to email address set forth below, when actually received provided that any email transmission shall be accompanied by a delivery of a written notice via first class mail to the address below. Notices and communications to Developer shall be addressed to, and delivered at, the following addresses: Pioneer Development, LLC 30 N. Gould Street, #38989 Sheridan, Wyoming 82801 Attn: Matt McCarron matt@cirrusfarms.com David J. Silverman Mahoney, Silverman & Cross, LLC 822 Infantry Drive, Suite 100 Joliet, Illinois 60435 dsilverman@msclawfirm.com 4 1627713470.5 Notices and communications to the City shall be addressed to and delivered at these addresses: United City of Yorkville 651 Prairie Pointe Yorkville, IL 60560 Attn: City Administrator bolson@yorkville.il.us With a copy to: Ottosen DiNolfo Hasenbalg & Castaldo, Ltd. 2441 Warrenville Road, Suite 310 Lisle, IL 60532 Attn: Attorney Kathleen Field Orr kfo@ottosenlaw.com By notice complying with the requirements of this Section, each party shall have the right to change the address or addresses, or both, for all future notices and communications to such party, but no notice of a change of address or addresses shall be effective until actually received. ARTICLE 6: TERM & ASSIGNMENT. 6.1 This Agreement shall commence upon the Effective Date and terminate upon issuance of the final certificate of occupancy for the final building in the Project. 6.2 After recordation of the covenants and restrictions as required by Section 3.15 of the PUD agreement, the Developer may assign this Agreement, in whole or in part, to (i) any entity that is directly or indirectly controlled by, controlling, or under common control with Developer, including any special‑purpose entity or subsidiary formed for ownership, financing, or development of the Project; or (ii) any institutional investor, investment fund, asset manager, or other qualified transferee that acquires an interest in the Project or in Developer (each, a “Permitted Transferee”). Developer shall provide the City with written notice of any such assignment promptly following the effective date of the assignment. Any Permitted Transferee shall assume in writing all obligations of Developer arising from and after the effective date of the assignment, and upon approval of such assumption by the City, the Developer shall be released from obligations accruing after the assignment date. Upon an assignment of this Agreement, all amounts due pursuant to Sections 2.2.1, 2.2.2, 2.2.3, and 2.2.4 shall be immediately due and payable unless the Permitted Transferee posts a replacement Surety in compliance with Section 2.4. ARTICLE 7: IN GENERAL. 7.1 No modification, addition, deletion, revision, alteration, or other change to this Agreement shall be effective unless and until the change is reduced to writing and executed and delivered by the City and the Developer. No waiver by any party of any term or condition of this Agreement shall be deemed or construed as a waiver of any other term or condition of this Agreement, nor shall waiver of any breach be deemed to constitute a waiver of any subsequent breach whether of the same or different provisions of this Agreement. 7.2 This Agreement is to be executed in two or more counterparts, each of which shall be deemed an original but all of which shall constitute the same instrument. 7.3 Neither the City nor Developer, nor any successor in interest to either of them, shall be considered in breach of or in default of its obligations under this Agreement in the event of any delay 5 1627713470.5 caused by nationally recognized pandemic or epidemic, governmental restrictions, takings, and limitations arising subsequent, war, state or national emergency, government mandated closures, damage or destruction by fire or other casualty, strike, shortage of material, unusually adverse weather conditions such as, by way of illustration and not limitation, severe rain storms or below-freezing temperatures of abnormal degree or for an abnormal duration, tornadoes or cyclones, delays caused by Commonwealth Edison, the Illinois Commerce Commission, the Illinois Power Agency or PJM and other events or conditions beyond the reasonable control of the Party affected which in fact interferes with the ability of such Party to discharge its obligations hereunder. 7.4 In the event of a foreclosure, deed-in-lieu of foreclosure, or other exercise of remedies by any lender holding a security interest in the Project (“Lender”), the City shall recognize the Lender or its designee, purchaser, or successor as the Developer under this Agreement; provided however, the Lender gives written notice to the City that it shall assume the Developer’s rights and obligations. Upon such notice, the City shall allow the Lender a reasonable period, as agreed by the City, to cure any existing Developer defaults that are capable of cure and shall not terminate this Agreement during the agreed upon cure period. The City shall cooperate in good faith with the Lender to the orderly transfer, continuation and performance of this Agreement on the condition that the Lender or its transferee assumes, in writing, all of the Developer’s obligations under this Agreement and demonstrates to the City that such transferee has similar experience and the financial capability as the Developer to perform the Developer’s obligations under this Agreement. 7.5 Within thirty (30) days of Developer’s request (or its successors and/or assigns), the City shall deliver to Developer an estoppel certificate certifying either that the Developer is in compliance with this Agreement or to the extent a default has occurred which has not otherwise been cured, stating in detail the nature of the default. 6 1627713470.5 IN WITNESS WHEREOF, the Parties have executed this Agreement as of the dates set forth below their respective signatures, to be effective as of the date first written above. United City of Yorkville, Kendall County, Illinois Attest: By: By: Mayor City Clerk Date: , 2026 Pioneer Development, LLC By: Date: , 2026 1 EXHIBIT A LEGAL DESCRIPTION PINS BY OWNER Galena & 47TH LLC, MPLIV10 LLC PIN: 02-05-300-003 CITY OF YORKVILLE PIN: 02-04-300-032 CITY OF YORKVILLE PIN: 02-04-300-024 CITY OF YORKVILLE PIN: 02-05-400-021 CITY OF YORKVILLE PIN: 02-09-100-031 CITY OF YORKVILLE PIN: 02-09-100-030 CITY OF YORKVILLE Sanjay & Sameer Gupta PIN: 02-04-100-015 CITY OF YORKVILLE PIN: 02-05-200-007 UNINCORPORATED The Konicek Family Limited Partnership PIN: 02-06-100-022 UNINCORPORATED DALE L. KONICEK, LLC PIN: 02-06-200-002 CITY OF YORKVILLE PIN: 02-05-400-022 CITY OF YORKVILLE PIN: 02-05-200-006 CITY OF YORKVILLE PIN: 02-04-100-016 CITY OF YORKVILLE PIN: 02-06-400-008 UNINCORPORATED PIN: 02-06-200-003 UNINCORPORATED PIN: 02-05-100-003 UNINCORPORATED PIN: 02-05-100-005 UNINCORPORATED PIN: 02-05-400-009 CITY OF YORKVILLE PIN: 02-04-300-018 CITY OF YORKVILLE PIN: 02-04-300-017 CITY OF YORKVILLE LEGAL DESCRIPTION OWNER: Sanjay & Sameer Gupta PARCEL 1: THAT PART OF LOT 2 OF THE NORTHEAST QUARTER OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT OF THE GOVERNMENT SURVEY OF SAID SECTION 5 DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEAST CORNER OF SAID LOT 2; THENCE WEST 40 CHAINS (RECORD), 2652.01 FEET (MEASURED) TO THE SOUTHWEST CORNER OF SAID LOT 2; THENCE NORTH 38 1/2 LINKS (RECORD), 24.51 FEET (MEASURED) TO THE SOUTH BANK OF A DITCH; THENCE SOUTH 89 DEGREES 30 MINUTES EAST (RECORD), NORTH 88 DEGREES 05 MINUTES 41 SECONDS EAST (MEASURED), 2593.76 FEET (MEASURED) TO THE POINT OF BEGINNING; THENCE NORTH 01 DEGREES 54 MINUTES 03 SECONDS WEST, 232.55 FEET TO A POINT ON A NON-TANGENT CURVE; THENCE NORTHEASTERLY 68.93 FEET ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 533.00 FEET AND WHOSE CHORD BEARS NORTH 59 DEGREES 57 MINUTES 33 SECONDS EAST, 68.88 FEET TO A POINT ON THE EAST LINE OF SAID LOT 2; THENCE SOUTH 01 DEGREES 16 MINUTES 25 SECONDS EAST ALONG SAID EAST LINE, 265.04 2 FEET TO THE SOUTHEAST CORNER OF SAID LOT 2; THENCE SOUTH 88 DEGREES 05 MINUTES 41 SECONDS WEST, 57.84 FEET TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. PARCEL 2: THAT PART OF LOT 2 OF THE NORTHWEST QUARTER OF SECTION 4, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT OF THE GOVERNMENT SURVEY OF SAID SECTION 4 DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF SAID SECTION; THENCE SOUTH ON THE SECTION LINE 26.80 CHAINS; THENCE EAST PARALLEL WITH THE NORTH LINE OF SAID SECTION, 14.30 CHAINS; THENCE IN A NORTHEASTERLY DIRECTION TO A POINT ON THE NORTH LINE OF SAID SECTION, 20.67 CHAINS EAST OF THE POINT OF BEGINNING; THENCE WEST ALONG THE SECTION LINE TO THE POINT OF BEGINNING; EXCEPTING THEREFROM THAT PART OF LOT 2 LYING WESTERLY OF THE FOLLOWING DESCRIBED LINE; BEGINNING AT THE SOUTHWEST CORNER OF SAID LOT 2; THENCE NORTH 01 DEGREES 16 MINUTES 25 SECONDS WEST, ALONG THE WEST LINE OF SAID LOT 2, A DISTANCE OF 265.04 FEET TO A POINT ON A NON-TANGENT CURVE; THENCE NORTHEASTERLY 531.35 FEET ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 533.00 FEET AND WHOSE CHORD BEARS NORTH 27 DEGREES 41 MINUTES 44 SECONDS EAST, 509.62 FEET TO A POINT OF TANGENCY, THENCE NORTH 00 DEGREES 51 MINUTES 49 SECONDS WEST 150.53 FEET, THENCE NORTH 89 DEGREES 08 MINUTES 11 SECONDS EAST, PERPENDICULAR TO THE LAST DESCRIBED LINE, 110.00 FEET; THENCE NORTH 00 DEGREES 51 MINUTES 49 SECONDS WEST PERPENDICULAR TO THE LAST DESCRIBED LINE, 912.39 FEET TO A POINT ON THE NORTH LINE OF SAID LOT 2, SAID POINT BEING 364.44 FEET EAST OF THE NORTHWEST CORNER OF SAID SECTION 4 (AS MEASURED ALONG SAID NORTH LINE) AND SAID POINT ALSO BEING THE POINT OF TERMINUS; IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. OWNER: Galena & 47th LLC and MPLIV10LLC PARCEL 1: THAT PART OF THE SOUTHWEST QUARTER OF SECTION 4 AND THE NORTHWEST QUARTER OF SECTION 9, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF SAID SOUTHWEST QUARTER; THENCE SOUTH 01 DEGREE 19 MINUTES 09 SECONDS EAST ALONG THE EAST LINE OF SAID SOUTHWEST QUARTER, 990.0 FEET (15 CH.) TO THE NORTHEAST CORNER OF LANDS DESCRIBED IN BOOK 163 AT PAGE 473; THENCE SOUTH 01 DEGREE 19 MINUTES 09 SECONDS EAST ALONG SAID EAST LINE, 1.84 FEET TO A POINT ON THE SOUTHERLY LINE OF LANDS DESCRIBED IN BOOK 152 AT PAGE 392; THENCE SOUTH 87 DEGREES 52 MINUTES 56 SECONDS WEST ALONG SAID SOUTHERLY LINE AND THE WESTERLY EXTENSION THEREOF, 1722.34 FEET TO ITS INTERSECTION WITH THE WESTERLY LINE OF THE RIGHT-OF-WAY OF ILLINOIS ROUTE 47 AS RECORDED IN DOCUMENT 907257 FOR A POINT OF BEGINNING; THENCE SOUTH 00 DEGREES 09 MINUTES 41 SECONDS EAST ALONG SAID WESTERLY LINE, 128.76 FEET; THENCE NORTH 89 DEGREES 50 MINUTES 19 SECONDS EAST ALONG SAID WESTERLY LINE, 10.0 FEET; THENCE SOUTH 00 DEGREES 09 MINUTES 41 SECONDS EAST ALONG SAID WESTERLY LINE, 787.46 FEET; THENCE SOUTHERLY ALONG SAID WESTERLY LINE, BEING A CIRCULAR CURVE HAVING A RADIUS OF 1596.42 FEET CONCAVE TO THE WEST, THE CHORD OF WHICH BEARS SOUTH 13 DEGREES 43 MINUTES 37 SECONDS WEST, 773.94 FEET TO ITS INTERSECTION WITH THE SOUTH LINE OF SAID SOUTHWEST QUARTER, SAID POINT BEARING NORTH 87 DEGREES 56 MINUTES 55 SECONDS EAST, 719.99 FEET FROM THE SOUTHWEST CORNER OF SAID SOUTHWEST QUARTER; THENCE CONTINUING SOUTHERLY ALONG SAID WESTERLY LINE, BEING A CIRCULAR CURVE HAVING A RADIUS OF 1596.42 FEET CONCAVE TO THE WEST, 3 THE CHORD OF WHICH BEARS SOUTH 31 DEGREES 17 MINUTES 50 SECONDS WEST, 205.17 FEET; THENCE SOUTH 34 DEGREES 58 MINUTES 45 SECONDS WEST ALONG SAID WESTERLY LINE, 88.42 FEET TO THE CENTER LINE OF THE CHICAGO-GALENA ROAD; THENCE NORTH 74 DEGREES 20 MINUTES 53 SECONDS WEST, 41.71 FEET TO AN EASTERLY LINE OF SAID LANDS DESCRIBED IN BOOK 152 AT PAGE 392; THENCE NORTH 29 DEGREES 07 MINUTES 39 SECONDS EAST ALONG SAID EASTERLY LINE, 267.87 FEET TO SAID SOUTH LINE OF SAID SOUTHWEST QUARTER; THENCE NORTH 87 DEGREES 56 MINUTES 55 SECONDS EAST ALONG SAID SOUTH LINE, 9.74 FEET TO A POINT ON THE WESTERLY LINE OF SAID LANDS DESCRIBED IN BOOK 163 AT PAGE 473; THENCE NORTH 27 DEGREES 39 MINUTES 29 SECONDS EAST ALONG SAID WESTERLY LINE, 366.26 FEET; THENCE NORTH 00 DEGREES 54 MINUTES 29 SECONDS EAST ALONG SAID WESTERLY LINE, 756.55 FEET; THENCE DEPARTING FROM SAID WESTERLY LINE NORTH 02 DEGREES 12 MINUTES 23 SECONDS EAST, 581.48 FEET TO A POINT OF THE SOUTHERLY LINE OF SAID LANDS DESCRIBED IN BOOK 163 AT PAGE 473; THENCE NORTH 87 DEGREES 52 MINUTES 56 SECONDS EAST ALONG SAID SOUTHERLY LINE, 22.15 FEET TO THE POINT OF BEGINNING IN KENDALL COUNTY, ILLINOIS. PARCEL 2: THAT PART OF THE SOUTHEAST 1/4 OF SECTION 5, THAT PART OF THE SOUTHWEST 1/4 OF SECTION 4, THAT PART OF THE NORTHEAST 1/4 OF SECTION 8 AND THAT PART OF THE NORTHWEST 1/4 OF SECTION 9, ALL IN TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE IRON ROD MONUMENTING THE SOUTHEAST CORNER OF SECTION 5; THENCE NORTH 01 DEGREE 15 MINUTES 55 SECONDS WEST ALONG THE EAST LINE OF THE SOUTHEAST 1/4 OF SAID SECTION 5, A DISTANCE OF 1,550.82 FEET; THENCE NORTH 88 DEGREES 44 MINUTES 05 SECONDS EAST 409.15 FEET PERPENDICULAR TO THE LAST DESCRIBED COURSE TO THE POINT OF BEGINNING; THENCE NORTH 90 DEGREES 00 MINUTES 00 SECONDS EAST 221.96 FEET; THENCE NORTH 37 DEGREES 44 MINUTES 29 SECONDS EAST 115.96 FEET; THENCE SOUTH 89 DEGREES 12 MINUTES 43 SECONDS EAST 196.55 FEET TO THE CENTERLINE OF THE ROB ROY DITCH; THENCE SOUTH 02 DEGREES 13 MINUTES 10 SECONDS WEST 1,336.52 FEET ALONG SAID CENTERLINE; THENCE SOUTH 29 DEGREES 12 MINUTES 38 SECONDS WEST 600.81 FEET TO THE CENTERLINE OF GALENA ROAD AS NOW ESTABLISHED; THENCE NORTH 73 DEGREES 55 MINUTES 29 SECONDS WEST ALONG SAID CENTERLINE 677.76 FEET; THENCE NORTH 02 DEGREES 56 MINUTES 50 SECONDS WEST 348.47 FEET; THENCE NORTH 16 DEGREES 11 MINUTES 58 SECONDS EAST 599.13 FEET; THENCE NORTH 28 DEGREES 26 MINUTES 55 SECONDS EAST 750.54 FEET TO THE POINT OF BEGINNING, ALL IN KENDALL COUNTY, ILLINOIS. PARCEL 3: THAT PART OF THE WEST HALF OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEAST CORNER OF THE SOUTHWEST QUARTER OF SAID SECTION 5; THENCE NORTHERLY ALONG THE EAST LINE OF SAID SOUTHWEST QUARTER 642.93 FEET TO A POINT WHICH IS 162.00 FEET SOUTHERLY OF THE ORIGINAL CENTER LINE OF GALENA ROAD; THENCE WESTERLY ALONG A LINE WHICH FORMS AN ANGLE OF 102 DEGREES 56 MINUTES 02 SECONDS WITH THE LAST DESCRIBED COURSE, MEASURED CLOCKWISE THEREFROM, 100.00 FEET TO A POINT WHICH IS 169.50 FEET, AS MEASURED PARALLEL WITH SAID EAST LINE SOUTHERLY OF SAID ORIGINAL CENTER LINE TO THE POINT OF BEGINNING; THENCE NORTHERLY PARALLEL WITH SAID EAST LINE, 14.66 FEET TO THE PRESENT CENTER LINE OF GALENA ROAD AS DEPICTED ON A PLAT RECORDED JUNE 5, 1964 AS DOCUMENT NUMBER 145193; THENCE WESTERLY ALONG SAID PRESENT CENTER LINE, 1675.69 FEET TO A POINT OF CURVATURE; THENCE WESTERLY ALONG SAID PRESENT CENTER LINE BEING ALONG A TANGENTIAL 4 CURVE TO THE RIGHT HAVING A RADIUS OF 42,975.00 FEET, 933.19 FEET; THENCE WESTERLY, ALONG SAID PRESENT CENTER LINE, 64.12 FEET TO THE WEST LINE OF SAID SOUTHWEST QUARTER; THENCE NORTHERLY ALONG SAID WEST LINE, 957.16 FEET TO THE NORTHWEST CORNER OF SAID SOUTHWEST QUARTER; THENCE NORTHERLY ALONG THE WEST LINE OF THE NORTHWEST QUARTER OF SAID SECTION 5, 920.88 FEET TO A POINT WHICH IS 2,316.00 FEET SOUTHERLY OF THE NORTHWEST CORNER OF SAID NORTHWEST QUARTER; THENCE EASTERLY, 2,651.03 FEET TO A POINT ON THE EAST LINE OF SAID WEST HALF WHICH IS 2,326.70 FEET SOUTHERLY OF THE NORTHEAST CORNER OF SAID NORTHWEST QUARTER; THENCE SOUTHERLY ALONG THE EAST LINE OF SAID WEST HALF, 2,686.96 FEET TO SAID ORIGINAL CENTER LINE; THENCE WESTERLY ALONG SAID ORIGINAL CENTER LINE, 101.94 FEET TO THE POINT OF BEGINNING, IN BRISTOL TOWNSHIP, KENDALL COUNTY, ILLINOIS. OWNER: Dale L. Konicek, LLC TRACT 1: THAT PART OF THE EAST HALF OF SECTION 5 AND THAT PART OF THE WEST HALF OF SECTION 4, ALL IN TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE IRON PIPE MONUMENT THE SOUTHEAST CORNER OF SAID SECTION 5; THENCE NORTH 01 DEGREE 15 MINUTES 55 SECONDS WEST ALONG THE EAST LINE OF THE SOUTHEAST 1/4 OF SAID SECTION 5, A DISTANCE OF 1730.13 FEET TO THE POINT OF BEGINNING; THENCE NORTH 89 DEGREES 27 MINUTES 29 SECONDS WEST 362.35 FEET; THENCE NORTH 00 DEGREES 32 MINUTES 31 SECONDS EAST 2025.23 FEET TO THE SOUTHERLY LINE OF COMMONWEALTH EDISON COMPANY PROPERTY DESCRIBED IN DOCUMENT 73-2720; THENCE NORTH 87 DEGREES 56 MINUTES 31 SECONDS EAST ALONG SAID SOUTHERLY LINE 1,222.89 FEET TO THE CENTERLINE OF ROB ROY DITCH; THENCE SOUTH 03 DEGREES 43 MINUTES 10 SECONDS EAST ALONG SAID CENTERLINE 577.07 FEET; THENCE SOUTH 01 DEGREE 49 MINUTES 41 SECONDS WEST ALONG SAID CENTERLINE 298.55 FEET; THENCE NORTH 89 DEGREES 00 MINUTES 53 SECONDS EAST 15.64 FEET TO THE WESTERLY RIGHT-OF-WAY LINE OF ILLINOIS ROUTE 47 PER DOCUMENT 907256 AND 907257; (THE NEXT 5 CALLS ARE ALONG SAID WESTERLY RIGHT-OF-WAY LINE OF ILLINOIS ROUTE 47 PER DOCUMENT 907256 AND 907257) THENCE SOUTH 00 DEGREES 09 MINUTES 46 SECONDS EAST 170.64 FEET; THENCE NORTH 89 DEGREES 50 MINUTES 14 SECONDS EAST 10.00 FEET; THENCE SOUTH 00 DEGREES 09 MINUTES 46 SECONDS EAST 1,000.00 FEET; THENCE SOUTH 89 DEGREES 50 MINUTES 14 SECONDS WEST 10.00 FEET; THENCE SOUTH 00 DEGREES 09 MINUTES 46 SECONDS EAST 36.62 FEET; THENCE NORTH 89 DEGREES 27 MINUTES 29 SECONDS WEST 925.95 FEET TO THE POINT OF BEGINNING, ALL IN KENDALL COUNTY, ILLINOIS. TRACT 2: THAT PART OF THE NORTHWEST QUARTER OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST, LYING NORTHERLY OF A LINE EXTENDING EASTERLY FROM A POINT ON THE WEST LINE OF SAID NORTHWEST QUARTER, 2316 FEET SOUTH OF THE NORTHWEST CORNER OF SAID SECTION 5, TO A POINT ON THE NORTH AND SOUTH CENTERLINE OF SAID SECTION, 2326.7 FEET SOUTH OF THE NORTHWEST CORNER OF SAID SECTION AND LYING SOUTHERLY OF THE COMMONWEALTH EDISON COMPANY RIGHT OF WAY LINE PURSUANT TO DOCUMENT 73-2720, IN KENDALL COUNTY, ILLINOIS. ALSO; THAT PART OF THE NORTHEAST QUARTER OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF SAID SECTION 6, THENCE SOUTH ON THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 2460.05 FEET TO THE INTERSECTION WITH THE MOST 5 SOUTHERLY LINE OF PROPERTY CONVEYED TO LASALLE NATIONAL BANK, AS TRUSTEE UNDER TRUST AGREEMENT DATED JULY 15, 1966 AND KNOWN AS TRUST NUMBER 35339, BY A DEED DATED JANUARY 31, 1972 AND RECORDED JANUARY 31, 1972 AS DOCUMENT 72-467 TO THE POINT OF BEGINNING, THENCE WESTERLY ALONG THE SOUTHERLY LINE OF SAID PROPERTY CONVEYED TO LASALLE NATIONAL BANK, AS TRUSTEE UNDER TRUST NUMBER 35339, WHICH FORMS AN ANGLE OF 89 DEGREES 57 MINUTES 27 SECONDS TO THE LEFT WITH THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 812.66 FEET, THENCE NORTH 90 DEGREES 25 MINUTES 49 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE, A DISTANCE OF 366.94 FEET, THENCE EASTERLY 88 DEGREES 43 MINUTES 04 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE, A DISTANCE OF 809.73 FEET TO THE EAST LINE OF SAID SECTION 6, THENCE SOUTH ALONG THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 378.96 FEET TO THE POINT OF BEGINNING, IN KENDALL COUNTY, ILLINOIS. ALSO; THAT PART OF THE NORTHEAST QUARTER OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF SAID SECTION 6, THENCE SOUTH ON THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 2474.60 FEET FOR THE POINT OF BEGINNING OF THE TRACT HEREIN DESCRIBED, THENCE WESTERLY ON A LINE WHICH FORMS AN ANGLE OF 90 DEGREES 57 MINUTES 19 SECONDS TO THE RIGHT WITH THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 812.66 FEET, THENCE NORTH ALONG A LINE 89 DEGREES 31 MINUTES 03 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED LINE, A DISTANCE OF 1.61 FEET TO THE INTERSECTION WITH THE MOST SOUTHERLY LINE OF THE PROPERTY CONVEYED TO LASALLE NATIONAL BANK, AS TRUSTEE UNDER TRUST AGREEMENT DATED JULY 15, 1966 AND KNOWN AS TRUST NUMBER 35339 BY DEED DATED JANUARY 31, 1972 AND RECORDED JANUARY 31, 1972 AS DOCUMENT 72-467, THENCE EASTERLY ON THE SOUTHERLY LINE OF SAID PROPERTY CONVEYED TO THE LASALLE NATIONAL BANK, A DISTANCE OF 812.66 FEET TO A POINT ON THE EAST LINE OF SAID SECTION 6, THENCE SOUTHERLY ON SAID EAST LINE, 13.55 FEET TO THE POINT OF BEGINNING, IN KENDALL COUNTY, ILLINOIS. TRACT 3: LOT 2 OF THE NORTHEAST 1/4 OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT OF THE GOVERNMENT SURVEY OF SAID SECTION 5 (EXCEPT THAT PART DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHEAST CORNER OF SAID LOT 2, THENCE WEST 40 CHAINS TO THE SOUTHWEST CORNER OF SAID LOT, THENCE NORTH 38 1/2 LINKS TO THE SOUTH BANK OF DITCH, THENCE SOUTH 89 DEGREES 30 MINUTES 00 SECONDS EAST 40 CHAINS TO THE POINT OF BEGINNING AND EXCEPTING THEREFROM THAT PART OF THE NORTHEAST 1/4 OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE NORTH LINE OF SAID NORTHEAST 1/4, 1961.60 FEET EAST OF THE NORTHWEST CORNER OF SAID NORTHEAST 1/4, THENCE EAST ALONG SAID NORTH LINE 667.0 FEET, THENCE SOUTH AT RIGHT ANGLES TO SAID NORTH LINE, 396.0 FEET, THENCE WEST AT RIGHT ANGLES TO THE LAST DESCRIBED COURSE, 667.0 FEET, THENCE NORTH AT RIGHT ANGLES TO THE LAST DESCRIBED COURSE, 396.0 FEET TO THE POINT OF BEGINNING, AND ALSO EXCEPTING THAT PART OF LOT 2 OF THE NORTHEAST QUARTER OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT OF THE GOVERNMENT SURVEY OF SAID SECTION 5 DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEAST CORNER OF SAID LOT 2, THENCE WEST 40 CHAINS (RECORD), 2652.01 FEET (MEASURED) TO THE SOUTHWEST CORNER OF SAID LOT 2, THENCE NORTH 38 1/2 LINKS (RECORD), 25.41 FEET (MEASURED) TO THE SOUTH 6 BANK OF A DITCH, THENCE SOUTH 89 DEGREES 30 MINUTES 00 SECONDS EAST (RECORD), NORTH 88 DEGREES 05 MINUTES 41 SECONDS EAST (MEASURED), 2593.76 FEET (MEASURED) TO THE POINT OF BEGINNING, THENCE NORTH 01 DEGREES 54 MINUTES 03 SECONDS WEST, 232.55 FEET TO A POINT ON A NON-TANGENT CURVE, THENCE NORTHEASTERLY 68.93 FEET ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 533.00 FEET AND WHOSE CHORD BEARS NORTH 59 DEGREES 57 MINUTES 33 SECONDS EAST, 68.88 FEET TO A POINT ON THE EAST LINE OF SAID LOT 2, THENCE SOUTH 01 DEGREES 16 MINUTES 25 SECONDS EAST ALONG SAID EAST LINE, 265.04 FEET TO THE SOUTHEAST CORNER OF SAID LOT 2, THENCE SOUTH 88 DEGREES 05 MINUTES 41 SECONDS WEST, 57.84 FEET TO THE POINT OF BEGINNING) IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. TRACT 4: THAT PART OF LOT 2 OF THE NORTHWEST 1/4 OF SECTION 4, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT OF THE GOVERNMENT SURVEY OF SAID SECTION 4, LYING WESTERLY OF THE FOLLOWING DESCRIBED LINE BEGINNING AT THE SOUTHWEST CORNER OF SAID LOT 2, THENCE NORTH 01 DEGREES 16 MINUTES 25 SECONDS WEST, ALONG THE WEST LINE OF SAID LOT 2, A DISTANCE OF 265.04 FEET TO A POINT ON A NON-TANGENT CURVE, THENCE NORTHEASTERLY 531.35 FEET ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 533.00 FEET AND WHOSE CHORD BEARS NORTH 27 DEGREES 41 MINUTES 44 SECONDS EAST, 509.62 FEET TO A POINT OF TANGENCY, THENCE NORTH 00 DEGREES 51 MINUTES 49 SECONDS WEST 150.53 FEET, THENCE NORTH 89 DEGREES 08 MINUTES 11 SECONDS EAST, PERPENDICULAR TO THE LAST DESCRIBED LINE, 110.00 FEET, THENCE NORTH 00 DEGREES 51 MINUTES 49 SECONDS WEST PERPENDICULAR TO THE LAST DESCRIBED LINE, 912.39 FEET TO A POINT ON THE NORTH LINE OF SAID LOT 2, SAID POINT BEING 364.44 FEET EAST OF THE NORTHWEST CORNER OF SAID SECTION 4 (AS MEASURED ALONG SAID NORTH LINE) AND SAID POINT ALSO BEING THE POINT OF TERMINUS, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. TRACT 5: PARCEL 1: THAT PART OF THE WEST 1/2 OF SECTION 4, PART OF SECTION 5, PART OF THE NORTHEAST 1/4 OF SECTION 8 AND PART OF THE NORTHWEST 1/4 OF SECTION 9, ALL IN TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: BEGINNING AT THE POINT OF INTERSECTION OF THE CENTER LINE OF GALENA ROAD AS NOW ESTABLISHED ACROSS SAID SECTION 5 WITH THE WEST LINE OF THE EAST 1/2 OF SAID SECTION 5; THENCE NORTH 00 DEGREES 02 MINUTES 49 SECONDS WEST ALONG SAID WEST LINE, 2673.13 FEET TO A POINT 2327.34 FEET SOUTH OF THE NORTHEAST CORNER OF THE NORTHWEST 1/4 OF SAID SECTION 5; THENCE NORTH 89 DEGREES 36 MINUTES 30 SECONDS WEST 1323.10 FEET; THENCE NORTH 00 DEGREES 02 MINUTES 30 SECONDS EAST 2325.56 FEET TO THE NORTH LINE OF SAID SECTION 5; THENCE SOUTH 89 DEGREES 41 MINUTES 06 SECONDS EAST ALONG SAID NORTH LINE 1319.49 FEET TO THE NORTHWEST CORNER OF THE NORTHEAST 1/4 OF SAID SECTION 5; THENCE SOUTH 00 DEGREES 02 MINUTES 49 SECONDS EAST ALONG THE WEST LINE OF SAID NORTHEAST 1/4 1828.36 FEET; THENCE NORTH 89 DEGREES 08 MINUTES EAST 3596.80 FEET TO THE CENTER LINE OF ROB ROY DITCH; THENCE SOUTH 00 DEGREES 22 MINUTES 03 SECONDS EAST ALONG SAID CENTER LINE 781.86 FEET; THENCE SOUTH 02 DEGREES 43 MINUTES 14 SECONDS WEST ALONG SAID CENTER LINE 300.01 FEET; THENCE SOUTH 89 DEGREES 40 MINUTES EAST 291.15 FEET; THENCE SOUTH 00 DEGREES 56 MINUTES 40 SECONDS WEST 240.28 FEET; THENCE NORTH 89 DEGREES 14 MINUTES 01 SECONDS EAST 1428.51 FEET TO THE EAST LINE OF THE WEST 1/2 OF SAID SECTION 4; THENCE SOUTH 00 DEGREES 02 MINUTES 57 SECONDS EAST ALONG SAID EAST 7 LINE 991.84 FEET; THENCE SOUTH 89 DEGREES 09 MINUTES 08 SECONDS WEST 1745.17 FEET TO THE CENTER LINE OF SAID ROB ROY DITCH; THENCE SOUTH 03 DEGREES 28 MINUTES 51 SECONDS WEST ALONG SAID CENTER LINE 1373.75 FEET; THENCE SOUTH 30 DEGREES 24 MINUTES 07 SECONDS WEST ALONG SAID CENTER LINE 600.81 FEET TO THE CENTER LINE OF SAID GALENA ROAD; THENCE NORTH 72 DEGREES 44 MINUTES WEST ALONG SAID CENTER LINE, 3318.05 FEET TO THE POINT OF BEGINNING, EXCEPTING THEREFROM THAT PART OF THE NORTHWEST 1/4 OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN LYING SOUTH OF A LINE EXTENDING EASTERLY FROM A POINT ON SAID WEST LINE OF THE NORTHWEST 1/4 WHICH POINT IS 1876.07 FEET SOUTH OF THE NORTHWEST CORNER OF SAID SECTION 5 TO A POINT ON THE NORTH AND SOUTH CENTER LINE OF SAID SECTION 5 WHICH POINT IS 1828.85 FEET SOUTH OF SAID NORTH QUARTER CORNER, AND EXCEPT A STRIP OF LAND 205.00 FEET WIDE IN THE NORTHEAST 1/4 OF SECTION 5 AND THE NORTHWEST 1/4 OF SECTION 4, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, BOUNDED AND DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHWEST CORNER OF THE NORTHEAST 1/4 OF SAID SECTION 5; THENCE SOUTH ALONG THE NORTH AND SOUTH CENTER LINE OF SAID SECTION 5, A DISTANCE OF 1828.85 FEET TO THE NORTH LINE OF PROPERTY CONVEYED TO THE LASALLE NATIONAL BANK, AS TRUSTEE UNDER TRUST AGREEMENT DATED FEBRUARY 10, 1967, KNOWN AS TRUST NO. 35913 RECORDED AS DOCUMENT NO. 154368 IN BOOK 152, PAGE 392 AS SAID NORTH LINE IS MONUMENTED AND OCCUPIED, HEREINAFTER REFERRED TO AS LINE "B", FOR THE POINT OR BEGINNING; THENCE EAST ALONG SAID LINE "B", A DISTANCE OF 3596.80 FEET TO THE CENTER LINE OF ROB ROY DITCH; THENCE SOUTHERLY ALONG THE CENTER LINE OF ROB ROY DITCH FORMING AN ANGLE OF 90 DEGREES 29 MINUTES 57 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE, A DISTANCE OF 205.00 FEET TO THE INTERSECTION WITH A LINE 205.00 FEET PERPENDICULARLY DISTANT SOUTH OF AND PARALLEL WITH THE AFORESAID LINE "B"; THENCE WEST ALONG THE LAST DESCRIBED PARALLEL LINE A DISTANCE OF 3598.47 FEET TO THE NORTH AND SOUTH CENTER LINE OF SAID SECTION 5; THENCE NORTH ALONG SAID NORTH AND SOUTH CENTER LINE 205.02 FEET TO THE POINT OF BEGINNING, AND ALSO EXCEPT THAT PART OF THE WEST HALF OF SAID SECTION 4 LYING EAST OF THE WEST RIGHT OF WAY LINE OF ILLINOIS ROUTE 47, IN KENDALL COUNTY, ILLINOIS. AND ALSO EXCEPTING: THAT PART OF THE SOUTHEAST 1/4 OF SECTION 5, THAT PART OF THE SOUTHWEST 1/4 OF SECTION 4, THAT PART OF THE NORTHEAST 1/4 OF SECTION 8 AND THAT PART OF THE NORTHWEST 1/4 OF SECTION 9, ALL IN TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE IRON ROD MONUMENTING THE SOUTHEAST CORNER OF SECTION 5; THENCE NORTH 01 DEGREES 15 MINUTES 55 SECONDS WEST ALONG THE EAST LINE OF THE SOUTHEAST 1/4 OF SAID SECTION 5, A DISTANCE 1,550.82 FEET; THENCE NORTH 88 DEGREES 44 MINUTES 05 SECONDS EAST 409.15 FEET PERPENDICULAR TO THE LAST DESCRIBED COURSE TO THE POINT OF BEGINNING; THENCE NORTH 90 DEGREES 00 MINUTES 00 SECONDS EAST 221.96 FEET; THENCE NORTH 37 DEGREES 44 MINUTES 29 SECONDS EAST 115.96 FEET; THENCE SOUTH 89 DEGREES 12 MINUTES 43 SECONDS EAST 196.55 FEET TO THE CENTERLINE OF THE ROB ROY DITCH; THENCE SOUTH 02 DEGREES 13 MINUTES 10 SECONDS WEST 1336.52 FEET ALONG SAID CENTERLINE; THENCE SOUTH 29 DEGREES 12 MINUTES 38 SECONDS WEST 600.81 FEET TO THE CENTERLINE OF GALENA ROAD AS NOW ESTABLISHED; THENCE NORTH 73 DEGREES 55 MINUTES 29 SECONDS WEST ALONG SAID CENTERLINE 677.76 FEET, THENCE NORTH 02 DEGREES 56 MINUTES 50 SECONDS WEST 348.47 FEET; THENCE NORTH 16 DEGREES 11 MINUTES 58 SECONDS EAST 599.13 FEET; THENCE NORTH 28 DEGREES 25 MINUTES 55 SECONDS EAST 750.54 FEET TO THE POINT OF BEGINNING, ALL IN KENDALL COUNTY, ILLINOIS, 8 AND ALSO EXCEPTING, THAT PART CONVEYED BY WARRANTY DEED RECORDED AUGUST 30, 2007 AS DOCUMENT 200700026496, DESCRIBED AS FOLLOWS: THAT PART OF THE EAST HALF OF SECTION 5 AND THAT PART OF THE WEST HALF OF SECTION 4, ALL IN TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE IRON PIPE MONUMENTING THE SOUTHEAST CORNER OF SAID SECTION 5; THENCE NORTH 01 DEGREES 15 MINUTES 55 SECONDS WEST ALONG THE EAST LINE OF THE SOUTHEAST 1/4 OF SAID SECTION 5, A DISTANCE OF 1730.13 FEET TO THE POINT OF BEGINNING; THENCE NORTH 89 DEGREES 27 MINUTES 29 SECONDS WEST 362.35 FEET; THENCE NORTH 00 DEGREES 32 MINUTES 31 SECONDS EAST 2026.23 FEET TO THE SOUTHERLY LINE OF COMMONWEALTH EDISON COMPANY PROPERTY DESCRIBED IN DOCUMENT 73-2720; THENCE NORTH 87 DEGREES 56 MINUTES 31 SECONDS EAST ALONG SAID SOUTHERLY LINE 1,222.89 FEET TO THE CENTERLINE OF ROB ROY DITCH; THENCE SOUTH 03 DEGREES 43 MINUTES 10 SECONDS EAST ALONG SAID CENTERLINE 577.07 FEET; THENCE SOUTH 01 DEGREES 49 MINUTES 41 SECONDS WEST ALONG SAID CENTERLINE 298.55 FEET; THENCE NORTH 89 DEGREES 00 MINUTES 53 SECONDS EAST 15.64 FEET TO THE WESTERLY RIGHT-OF-WAY LINE OF ILLINOIS ROUTE 47 PER DOCUMENT 907256 AND 907257; (THE NEXT 5 CALLS ARE ALONG SAID WESTERLY RIGHT OF WAY LINE OF ILLINOIS ROUTE 47 PER DOCUMENT 907256 AND 907257) THENCE SOUTH 00 DEGREES 09 MINUTES 46 SECONDS EAST 170.64 FEET; THENCE NORTH 89 DEGREES 50 MINUTES 14 SECONDS EAST 10.00 FEET; THENCE SOUTH 00 DEGREES 09 MINUTES 48 SECONDS EAST, 1,000.00 FEET; THENCE SOUTH 89 DEGREES 50 MINUTES 14 SECONDS WEST 10.00 FEET; THENCE SOUTH 00 DEGREES 09 MINUTES 46 SECONDS EAST 38.62 FEET; THENCE NORTH 89 DEGREES 27 MINUTES 29 SECONDS WEST 925.95 FEET TO THE POINT OF BEGINNING, ALL IN KENDALL COUNTY, ILLINOIS. PARCEL 2: THAT PART OF THE NORTHWEST 1/4 OF SECTION 5 AND NORTHEAST 1/4 OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF SECTION 5; THENCE EAST ALONG THE SECTION LINE 1331.4 FEET; THENCE SOUTHERLY ALONG A LINE FORMING AN ANGLE OF 90 DEGREES 07 MINUTES 00 SECONDS MEASURED FROM WEST TO SOUTH FROM THE SECTION LINE, 2321.5 FEET; THENCE WESTERLY ALONG A LINE FORMING AN ANGLE OF 89 DEGREES 33 MINUTES 00 SECONDS, MEASURED FROM NORTH TO WEST FROM THE LAST DESCRIBED COURSE, 1328.7 FEET TO THE WEST LINE OF SECTION 5; THENCE SOUTHERLY ALONG THE SECTION LINE, FORMING AN ANGLE OF 89 DEGREES 27 MINUTES 00 SECONDS MEASURED FROM EAST TO SOUTH FROM THE LAST DESCRIBED COURSE, 146.4 FEET; THENCE WESTERLY ALONG A LINE FORMING AN ANGLE OF 89 DEGREES 58 MINUTES 00 SECONDS, MEASURED FROM NORTH TO WEST FROM THE SECTION LINE, 1553 FEET; THENCE NORTHERLY ALONG A LINE FORMING AN ANGLE OF 89 DEGREES 33 MINUTES 00 SECONDS, MEASURED FROM EAST TO NORTH FROM THE LAST DESCRIBED COURSE, 2461.1 FEET TO THE NORTH LINE OF SECTION 6; THENCE EASTERLY ALONG SAID NORTH LINE 1534 FEET TO THE POINT OF BEGINNING, EXCEPTING THEREFROM THAT PART OF THE NORTHEAST 1/4 OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, LYING SOUTH AND WEST OF THE FOLLOWING DESCRIBED LINE: BEGINNING AT A POINT 1876.07 FEET SOUTH OF THE NORTHEAST CORNER OF SAID SECTION 6, SAID POINT BEING ON THE NORTH LINE OF THE LAND CONVEYED TO COMMONWEALTH EDISON COMPANY BY DOCUMENT NO. R73-2841 (TRACT 1); THENCE WEST ALONG SAID NORTH LINE 1133.17 TO A POINT OF INTERSECTION WITH A LINE 415.0 FEET PERPENDICULARLY DISTANT EAST OF AND PARALLEL WITH THE EAST LINE OF THE LAND CONVEYED TO EARL P. AND EMMA V. KONICEK BY DEED RECORDED AS DOCUMENT NO. 136414 IN BOOK 126, PAGE 41; THENCE NORTH ON SAID 9 PARALLEL LINE, ALSO BEING THE EAST LINE OF THE LAND CONVEYED TO SAID COMMONWEALTH EDISON COMPANY BY DOCUMENT NO. R73-2841, 1897.19 FEET TO THE NORTH LINE OF SAID SECTION 6 AND THE POINT OF TERMINATION; AND ALSO EXCEPT THAT PART OF THE NORTHWEST 1/4 OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN LYING SOUTHERLY OF A LINE EXTENDED EASTERLY FROM A POINT ON THE WEST LINE OF SAID NORTHWEST 1/4 OF SECTION 5 WHICH POINT IS 1876.07 FEET SOUTH OF THE NORTHWEST CORNER OF SAID SECTION 5 TO A POINT ON THE NORTH AND SOUTH CENTER LINE OF SECTION 5, WHICH POINT IS 1828.85 FEET SOUTH OF THE NORTH QUARTER CORNER OF SAID SECTION 5, ALL IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. TRACT 6: PART OF THE EAST 1/2 OF SECTION 6; TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEAST CORNER OF SAID SECTION; THENCE NORTHERLY ALONG THE EASTERLY LINE OF SAID SECTION 6, A DISTANCE OF 3407.85 FEET TO THE SOUTH LINE OF PROPERTY CONVEYED TO SUSAN SCHMIDT BY WARRANTY DEED RECORDED DECEMBER 18, 1929 IN BOOK 80, PAGES 334 AND 335; THENCE WEST ALONG THE SOUTH LINE OF PROPERTY CONVEYED TO SUSAN SCHMIDT A DISTANCE OF 1552.74 FEET TO THE EAST LINE OF PROPERTY CONVEYED TO EARL P KONICEK AND WIFE BY WARRANTY DEED DATED DECEMBER 4, 1961 RECORDED AS DOCUMENT 136414, THENCE SOUTH ALONG THE EAST LINE OF PROPERTY CONVEYED TO EARL P. KONICEK AND WIFE 1240.82 FEET TO THE CENTER LINE OF GALENA ROAD, FOR THE POINT OF BEGINNING; THENCE CONTINUING SOUTH ALONG THE PROLONGATION OF THE LAST DESCRIBED COURSE A DISTANCE 919.13 FEET TO AN ANGLE POINT WHICH IS 1312.43 FEET PERPENDICULARLY DISTANCE NORTH OF SAID SOUTH LINE OF SAID SECTION 6; THENCE SOUTHWESTERLY ALONG A LINE FORMING AN ANGLE OF 26 DEGREES 45 MINUTES 35 SECOND TO THE RIGHT WITH A PROLONGATION OF THE LAST DESCRIBED COURSE A DISTANCE OF 332.08 FEET TO THE NORTH LINE OF PARCEL TWO OF PROPERTY CONVEYED TO CHICAGO TITLE AND TRUST COMPANY, AS TRUSTEE UNDER TRUST NUMBER 45553 BY CONSERVATORS DEED RECORDED SEPTEMBER 17, 1973 AS DOCUMENT 73-4671; THENCE WESTERLY ALONG SAID NORTHERLY LINE FORMING AN ANGLE OF 62 DEGREES 01 MINUTES 01 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE, A DISTANCE 646.8 FEET TO THE CENTER LINE OF BEECHER ROAD; THENCE NORTHEASTERLY ALONG SAID CENTER LINE 1362.40 FEET TO THE CENTER LINE OF GALENA ROAD; THENCE SOUTHEASTERLY ALONG SAID CENTER LINE 460.52 FEET TO THE POINT OF BEGINNING; IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS, ALSO, THAT PART OF THE EAST 1/2 OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: BEGINNING AT THE INTERSECTION OF THE CENTER LINE OF GALENA ROAD WITH THE EAST LINE OF SAID SECTION; THENCE NORTH 70 DEGREES 55 MINUTES WEST ALONG SAID CENTER LINE 276 FEET; THENCE SOUTH PARALLEL TO THE EAST LINE OF SAID SECTION 8, 200 FEET; THENCE SOUTH 70 DEGREES 55 MINUTES EAST 270 FEET TO THE EAST LINE OF SAID SECTION; THENCE SOUTH ALONG THE EAST LINE OF SAID SECTION 1456.6 FEET TO THE SOUTHEAST CORNER OF SAID SECTION; THENCE WEST ALONG THE SOUTH LINE OF SAID SECTION 470.51 FEET TO THE EASTERLY LINE OF PARCEL TWO OF THE PROPERTY CONVEYED TO CHICAGO TITLE AND TRUST COMPANY TRUSTEE UNDER TRUST NUMBER 45553 BY CONSERVATORS DEED RECORDED SEPTEMBER 17, 1973 AS DOCUMENT R73-4671; THENCE NORTHERLY ALONG SAID EASTERLY LINE 1006.52 FEET TO THE NORTHEASTERLY CORNER OF SAID PARCEL; THENCE WESTERLY ALONG THE NORTH LINE OF SAID PARCEL TWO 388.83 FEET TO THE INTERSECTION OF SAID NORTH LINE WITH THE EASTERLY LINE 10 OF THE PROPERTY DESCRIBED IN PARCEL ONE OF SAID DOCUMENT 73-4671; THENCE NORTHEASTERLY ALONG SAID EASTERLY LINE OF PARCEL ONE A DISTANCE OF 115.02 FEET TO AN ANGLE POINT ON SAID EASTERLY LINE OF PARCEL ONE WHICH IS 1112.06 FEET PERPENDICULARLY DISTANCE NORTH OF THE SOUTH LINE OF SAID SECTION; THENCE NORTH ALONG A LINE FORMING AN ANGLE 26 DEGREES 45 MINUTES 38 SECOND TO THE LEFT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE A DISTANCE OF 2329.35 FEET TO THE SOUTH LINE OF PROPERTY CONVEYED TO DIANE R. KAPCHINSKI BY TRUSTEES DEED RECORDED JUNE 14, 1973 AS DOCUMENT 73-28243; THENCE EAST ALONG THE SOUTH LINE OF PROPERTY CONVEYED TO DIANE R. KAPCHINSKI 812.68 FEET TO THE EAST LIEN OF SAID SECTION 6; THENCE SOUTHERLY ALONG THE EAST LINE OF SAID SECTION 6, 1319.90 FEET TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS, EXCEPT THE LEGAL DESCRIPTION INCLUDED IN THE WARRANTY DEED RECORDED AUGUST 24, 2020 AS DOCUMENT 202000016040. OWNER: The Konicek Family Limited Partnership A PART OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN AND PART OF SECTION 1, TOWNSHIP 37 NORTH, RANGE 6 EAST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHWEST CORNER OF SAID SECTION 6, THENCE EAST 19.508 CHAINS (1,287.528 FEET) TO AN IRON STAKE FOR PLACE OF BEGINNING, THENCE EAST ON THE NORTH LINE OF SAID SECTION 6, 44.599 CHAINS (2,943.534 FEET), THENCE SOUTH 16 MINUTES WEST 56.242 CHAINS (3,711.972 FEET) TO THE CENTER OF THE HIGHWAY, THENCE NORTH 73 DEGREES 58 MINUTES WEST 3.473 CHAINS (229.218 FEET) ALONG THE CENTER OF THE HIGHWAY, THENCE NORTH 79 DEGREES 37 MINUTES WEST 52.777 CHAINS (3,483.282 FEET) ALONG THE CENTER OF THE HIGHWAY, THENCE NORTH 79 DEGREES 16 MINUTES WEST 8.03 CHAINS (529.98 FEET) ALONG THE CENTER OF THE HIGHWAY TO AN IRON STAKE, THENCE NORTH 18 DEGREES 05 MINUTES EAST 10.258 CHAINS (677.028 FEET) TO AN IRON STAKE, THENCE NORTH 72 DEGREES 01 MINUTE WEST 6.632 CHAINS (437.712 FEET) TO AN IRON STAKE, THENCE NORTH 27 DEGREES 51 MINUTES EAST 11.60 CHAINS (765.6 FEET) TO AN IRON STAKE, THENCE NORTH 89 DEGREES 25 MINUTES EAST 11.535 CHAINS (761.31 FEET) TO THE CENTER OF THE HIGHWAY, THENCE NORTH 12 DEGREES 40 MINUTES EAST TO THE PLACE OF THE BEGINNING, SITUATED IN KENDALL COUNTY, ILLINOIS, EXCEPTING THEREFROM RIGHT OF WAY DEDICATED FOR ASHE ROAD AND GALENA ROAD AND ALSO; EXCEPTING, THAT PART OF THE NORTHWEST QUARTER OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHWEST CORNER OF SAID SECTION 6; THENCE EAST ALONG THE NORTH LINE OF SAID SECTION 6, A DISTANCE OF 19.508 CHAINS (1287.53 FEET); THENCE SOUTH 12 DEGREES 40 MINUTES WEST, 22.655 CHAINS (1495.23 FEET); THENCE SOUTH 89 DEGREES 25 MINUTES WEST, 11.535 CHAINS (761.31 FEET); THENCE SOUTH 27 DEGREES 50 MINUTES 42 SECONDS WEST, 765.57 FEET; THENCE SOUTH 72 DEGREES 01 MINUTES EAST, 437.71 FEET; THENCE SOUTH 18 DEGREES 05 MINUTES WEST, 637.63 FEET TO THE NORTHERLY RIGHT OF WAY LINE OF GALENA ROAD; THENCE SOUTH 77 DEGREES 03 MINUTES 31 SECONDS EAST ALONG SAID NORTHERLY RIGHT OF WAY LINE OF GALENA ROAD, 187.93 FEET FOR THE POINT OF BEGINNING; THENCE CONTINUING SOUTH 77 DEGREES 03 MINUTES 31 SECONDS EAST ALONG SAID RIGHT OF WAY LINE 136.30 FEET TO A POINT OF CURVE; THENCE CONTINUING EASTERLY ALONG SAID RIGHT OF WAY, BEING A CURVE TO THE LEFT, HAVING A RADIUS OF 14,285.00 FEET AND CHORD BEARING SOUTH 78 DEGREES 06 MINUTES 11 SECONDS EAST, 189.98 FEET TO A POINT OF BEND IN SAID RIGHT OF WAY; THENCE NORTH 14 DEGREES 08 MINUTES 51 SECONDS EAST ALONG SAID RIGHT OF WAY, 11 20.02 FEET TO A POINT OF BEND; THENCE EASTERLY ALONG SAID RIGHT OF WAY, BEING A CURVE TO THE LEFT, HAVING A RADIUS OF 14,265.00 FEET AND CHORD BEARING SOUTH 79 DEGREES 23 MINUTES 57 SECONDS EAST, A DISTANCE OF 453.85 FEET TO A POINT OF TANGENT; THENCE SOUTH 80 DEGREES 18 MINUTES 38 SECONDS EAST ALONG SAID RIGHT OF WAY, 29.82 FEET; THENCE NORTH 10 DEGREES 46 MINUTES 28 SECONDS EAST, 528.48 FEET; THENCE NORTH 79 DEGREES 13 MINUTES 32 SECONDS WEST, 810.97 FEET; THENCE SOUTH 10 DEGREES 46 MINUTES 28 SECONDS WEST, 541.53 FEET TO THE POINT OF BEGINNING, IN BRISTOL TOWNSHIP, KENDALL COUNTY, ILLINOIS, ALSO EXCEPTING, THAT PART OF THE NORTHWEST QUARTER OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN BEING DESCRIBED BY COMMENCING AT THE NORTHWEST CORNER OF SAID SECTION 6; THENCE EAST ALONG THE NORTH LINE OF SAID SECTION 6, A DISTANCE OF 19.508 CHAINS (1287.53 FEET) TO THE NORTHEAST CORNER OF EQUESTRIAN ESTATES AT LEGACY FARMS; THENCE SOUTH 12 DEGREES 40 MINUTES WEST ALONG THE EASTERLY LINE OF SAID SUBDIVISION AND SAID EAST LINE EXTENDED SOUTHERLY, 22.655 CHAINS (1495.23 FEET); THENCE NORTH 89 DEGREES 25 MINUTES EAST, 29.67 FEET TO A POINT ON THE WESTERLY RIGHT OF WAY LINE OF ASHE ROAD AS RELOCATED FOR THE POINT OF BEGINNING; THENCE SOUTH 89 DEGREES 25 MINUTES 00 SECONDS WEST ALONG THE LAST DESCRIBED COURSE, A DISTANCE OF 618.59 FEET; THENCE SOUTH 00 DEGREES 35 MINUTES EAST, AT RIGHT ANGLES TO THE LAST DESCRIBED COURSE, A DISTANCE OF 355.09 FEET; THENCE NORTH 89 DEGREES 25 MINUTES EAST, A DISTANCE OF 683.60 TO A POINT ON THE WESTERLY RIGHT OF WAY LINE OF ASHE ROAD; THENCE NORTHERLY ALONG SAID RIGHT OF WAY LINE, ALONG A CURVE TO THE RIGHT HAVING A RADIUS OF 1482.39 FEET, WHOSE CHORD BEARS NORTH 10 DEGREES 57 MINUTES 30 SECONDS WEST, 360.99 FEET TO THE POINT OF BEGINNING IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. EXHIBIT B LEGAL DESCRIPTION THAT PART OF THE NORTH ½ OF SECTION 4, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: BEGINNING AT THE CENTER OF SAID SECTION 4; THENCE SOUTH 89 DEGREES 16 MINUTES 28 SECONDDS WEST ALONG THE HALF SECTION LINE, 1428.37 FEET; THENCE NORTH 0 DEGREES 56 MINUTES 40 SECONDS EAST, 232.35 FEET; THENCE NORTH 89 DEGREES 40 MINUTESS WEST, 291.15 FEET TO THE CENTER LINE OF ROB ROY DITCH; THENCE NORTH 2 DEGREES 43 MINUTES 14 SECONDS EAST ALONG THE CENTER LINE OF SAID DITCH, 300.01 FEET; THENCE NORTH 0 DEGREES 22 MINUTES 03 SECONDS WEST ALONG SAID CENTER LINE, 781.86 FEET; THENCE NORTH 14 DEGREES 48 MINUTES 03 SECONDS EAST ALONG SAID CENTER LINE, 370.27 FEET; THENCE NORTH 13 DEGREES 29 MINUTE 16 SECONDS EAST ALONG SAID CENTER 1431.20 FEET TO THE NORTH LINE OF SAID SECTION 4; THENCE SOUTH 89 DEGREES 39 MINUTES EAST ALONG SAID NORTH LINE, 2595.78 FEET TO THE EAST LINE OF THE WEST ½ OF THE NORTHEAST ¼ OF SAID SECTION 4; THENCE SOUTH 0 DEGREES 03 MINUTES 50 SECONS EAST ALONG SAID EAST LINE, 3014.12 FEET TO THE SOUTH LINE OF THE NORTH ½ OF SAID SECTION 4; THENCE SOUTH 89 DEGREES 16 MINUTES 28 SECONDS WEST ALONG SAID SOUTH LINE, 1324.92 FEET TO THE POINT OF BEGINNING (EXCEPT THAT PART CONVEYED TO COMMONWEALTH EDISON COMPANY BY THE DEED RECORDED FEBRUARY 5, 1973 AS DOCUMENT #73-532 AND EXCEPT THAT PART FALLING WITHIN ILLINOIS ROUTE 47 AND U.S.ROUTE 30 AND THAT PART FALLING TO THE WEST OF ILLINOIS ROUTE 47), (ALSO EXCEPT THAT PART LYING NORTH OF SAID COMMONWEALTH EDISON COMPANY LAND DESCRIBED IN DEED DOCUMENT 73-532), IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. 1 1627713435.5 UTILITY AND INFRASTRUCTURE AGREEMENT BY AND BETWEEN THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS AND PIONEER DEVELOPMENT, LLC (Project Cardinal) THIS UTILITY AND INFRASTRUCTURE AGREEMENT (the "Agreement"), is made and entered as of the ____ day of ____________ 2026 (the "Effective Date"), by and between the United City of Yorkville, Kendall County, Illinois (the “City”) and Pioneer Development, LLC, an Illinois limited liability company (“Developer”), each a “Party”. RECITALS: 1.1. The City is a duly organized and validly existing non-home rule municipality created in accordance with the Constitution of the State of Illinois of 1970 and the laws of the State. 1.2 Developer is the purchaser of real property consisting of approximately 1,037 acres located west of North Bridge Street (Illinois State Route 47), east of Ashe Road, and directly south of Baseline Road (the “Development Site”), legally described in Exhibit A attached hereto, which Developer intends to develop as a secure data center campus (the “Project”). 1.3 In order to service the proposed Project at the Development Site, substantial infrastructure improvements are required including an extension to the City’s water system; an extension to the sewer system operated by the Yorkville Bristol Sanitary Sewer District (“YBSD”) and the City of Yorkville; construction of improvements to the roadway systems of the City and Kendall County; and, other public improvements such as a shared use path (collectively the “Infrastructure Project”). 1.4 The Developer agrees that the City shall be responsible for the design, including preparation of specifications, for each component of the Instructure Project, the administration, construction inspection and oversight of the Infrastructure Project with all costs incurred by the City for these services to be paid by the Developer. The Developer shall be responsible for the construction of the Infrastructure Project and the payment of all costs in connection therewith. 1.5 The Developer further agrees to pay all costs incurred in connection with that portion of the Infrastructure Project owned or controlled by the YBSD or Kendall County and to enter an agreement with Kendall County and with the YBSD on or before the Effective Date of this Agreement itemizing all of such improvements to such portion of the Infrastructure Project and providing for the payment thereof. 1.6 Attached as Exhibit B to this Agreement is a list of the estimated cost for each component of the Infrastructure Project as listed in Section 2.1 for a total of $33,006,980 (the “Estimated Infrastructure Budget”). The Developer hereby agrees that this Estimated Infrastructure Budget is solely an estimate, which may be increased or decreased upon receipt and approval of all contracts for each of the components and any change orders thereafter and is not intended to impose any limits on the total cost of the Infrastructure Project. 2 1627713435.5 ARTICLE 2: DEVELOPER OBLIGATIONS 2.1 The Developer agrees to construct the Infrastructure Project at its sole cost in accordance with the design and specifications prepared by the City, which includes the following components: A. Water Service improvements as detailed in Section 3.1; B. Sanitary Sewer Service improvements as required by YBSD and the City and detailed in Section 3.2; C. Roadway improvements on roadways under the jurisdiction of the City and roadway improvements under the jurisdiction of the County as detailed in Section 3.3; D. Acquisition of all easements and right of way required to construct any of the foregoing. 2.2 In addition to the costs of the Infrastructure Project, the City shall conduct ongoing traffic monitoring for the Development Site during construction and for a period of one year following the issuance of the final certificate of occupancy to determine compliance with the traffic estimates pursuant to the traffic study as set forth in 3.3. Developer shall be responsible for the costs of such monitoring. If monitoring identifies material, Project‑related traffic impacts that exceed those disclosed in the Project’s approved traffic study, Developer and the City shall meet and confer in good faith to determine whether reasonable, proportionate measures are appropriate to address such impacts. No additional mitigation, fees, or improvements shall be required unless (i) the monitoring demonstrates a material, project‑attributable impact, and (ii) any such measures are consistent with applicable law and proportionate to the impact identified. 2.3 Developer shall be responsible for the design and construction of the public shared uses path as specified in Section 3.4. ARTICLE 3: 3.1 Water Service to the Development Site. Water Service shall be designed by the City and constructed by the Developer at its sole cost and reviewed, approved and accepted (as applicable) by the City Engineer and shall include: (A) A 16” water main (on-site) to be constructed around the perimeter of the Development Site in an easement and connected to the existing system located in the Bristol Bay subdivision as shown in Exhibit C attached hereto; 3 1627713435.5 (B) A 16” water main (off-site) connecting to the City’s Northwest Elevated Water Storage Tank located along the Eldamain Road, subject to a recapture by the Developer from all properties benefitted from the construction of this water main of the cost of the water main based on linear frontage of benefitted properties after it has been completed and accepted by the City pursuant to a recapture agreement in the form attached hereto as Exhibit D (the “Recapture Agreement #1”) . (C) The acquisition of all required easements; (D) A water connection fee for each building in the amount of $255,600; (E) Penalties for water usage at the Development Site which exceeds 1.7 times the average daily use ratio as provided in Article 4; and (F) All costs which may be incurred by the City in connection with any changes required to be made to the City’s water system due to water usage at the Development Site exceeding all water usage estimates as of the Effective Date of this Agreement. The Developer agrees, at its sole cost and expense, to design and construct all on-site water mains to serve individual buildings which shall be privately owned and maintained. The City shall require the Developer to convey to the City a 15’ utility easement for use in case of an emergency. All private water mains shall be looped per City standards. The City shall require the installation of backflow preventer devices which meet City standards and meters at all private water meter connections to the City’s water main. The Developer shall own all on-site water mains and be solely responsible for all maintenance, repair or replacement. The estimated costs of items (A) through (F) are itemized on Exhibit E attached hereto. 3.2 Sanitary Service to the Development Site. All improvements to the sanitary sewer system to service the Development Site, not provided by YSBD, which shall be a part of the City’s sanitary sewer shall be designed by the City and constructed by the Developer at its sole cost and shall be reviewed, approved and accepted (as applicable) by the City Engineer. The estimated cost of this component include: (A) A 16’ sanitary sewer to be constructed in an Easement as shown on Exhibit F and estimated costs in Exhibit F1; and (B) The acquisition of all required easements and rights-of-way necessary for this sewer service.– 4 1627713435.5 The Developer agrees, at its sole cost and expense, to design and construct all on-site sanitary sewers to serve the individual buildings and to extend public sanitary to property boundaries in accordance with City Code. 3.3 Roadway Improvements, as illustrated in Exhibit G1. All roadway improvements deemed necessary by the City for the construction of the Project shall be designed by the City and constructed by the Developer at its sole cost and reviewed, approved and accepted (as applicable) by the City Engineer including: (A) Ashe Road Resurfacing as detailed on Exhibit G attached hereto at an estimated cost of $1,269,880 and costs of any right-of-way acquisition, temporary or permanent easement acquisition, and public and private utility relocation. Substantial completion of this resurfacing shall be in 2028, it being understood that a detailed schedule for this resurfacing shall be prepared by the City Engineer within thirty (30) days of the Effective Date of this Agreement; (B) Baseline Road Reconstruction as detailed on Exhibit H attached hereto at an estimated cost of $7,756,890 and costs of any right-of-way acquisition, temporary construction easement or private or public utility relocations; such improvements to include left and right turn lanes to be installed pursuant to an approved traffic study prepared by Burns and McDonnell. Completion of this reconstruction shall be substantially completed in 2027, but in any event prior to the issuance of any building permits for vertical construction in phase 1, it being understood that a detailed schedule for this reconstruction shall be prepared by the City Engineer within thirty (30) days if the Effective Date of this Agreement. In the event an alternate route to the Development other than Baseline Road is constructed by the Developer and approved by the City, approval for which shall not be unreasonably withheld, a building permit may be issued for vertical construction; provided however, the Developer shall submit a construction traffic management plan with each application of a building permit as a part of the permitting process, for approval by City staff, which shall not be unreasonably withheld. Failure to substantially comply with the approved traffic management plan, after receipt of notice and an opportunity to cure, shall result in a withholding of any additional building permits until cured. The City shall use reasonable efforts to assist the Developer in gaining compliance with the traffic management plan. (C) Baseline Road and Ashe Road Intersection Improvements as detailed on Exhibit I attached hereto at an estimated cost of $2,092,760 and costs of any right-of-way acquisition, temporary construction easement or private or public utility relocations; such improvements to include left and right turn lanes to be installed pursuant to an approved traffic study prepared by Burns and McDonnell. Completion of these intersection improvements shall be in 2028 and the installation of the signals and equipment shall be in 2029, it 5 1627713435.5 being understood that a detailed schedule shall be prepared by the City Engineer within thirty (30) days of the Effective Date of this Agreement; (C) Any costs in addition to those costs listed above which may be incurred for the acquisition of rights-of-way, temporary and permanent easement acquisitions, and public or private utility relocations; and (D) Reconstruction of Galena Road, which is under the jurisdiction of Kendall County, shall be designed and constructed by Kendall County or the Developer as agreed to by the County and the Developer, such road improvements to include the widening of Galena Road to three lanes from Eldamain Road to Rt 47 pursuant to the approved traffic study by Burns and McDonnell. The cost of such reconstruction shall be shared by the Developer and Prologis, L.P. in accordance with the linear feet of the reconstructed roadway. It is anticipated that the Developer shall be responsible for 85% of the cost and Prologis L.P. shall be responsible for 15% of the cost to be reflected in a recapture agreement with the right of recapture to the Developer or Prologis L.P, whichever directs the County to proceed with the reconstruction in the form attached hereto as Exhibit J (the “Recapture Agreement #2”). It is anticipated to be substantially completed in 2028, subject to a detailed schedule prepared by Kendall County. The City shall take all reasonable steps to support the Developer in obtaining permits from Kendall County and the Kendall County Highway Engineer. The Developer shall submit a construction traffic management plan with an application for each building permit which plan shall be a part of the building permit process. Failure to comply with the approved management plan shall result in a denial of any additional building permits. It is understood and agreed that the City Engineer and the City work with the Developer to establish timelines to bid all roadway projects and commence construction in accordance with the proposed timelines and to complete the construction of each of the aforesaid improvements prior to the issuance of building permits for vertical construction for each phase of the Project, subject to “Force Majeure Delays “as defined in Section 6.3. 3.4 Developer shall construct a “Shared Use Path” that is ten (10) feet in width around the perimeter of the Development Site as illustrated on the Proposed Path Location map, attached hereto as Exhibit K. The Shared Use Path shall be completed and available for use on or before the issuance of the first certificate of occupancy for a building at the Development Site, subject to temporary closure as required for allow for future construction phases. The Shared Use Path shall be constructed per City standards and shall be laid out in a meandering and organic route. Upon completion of construction, the Developer shall grant to the City a permanent easement for public access and maintenance of the Shared Use Path by the City. The Developer shall be responsible for the maintenance of all landscaping, lawns, and natural features surrounding the Shared Use Path. 6 1627713435.5 3.5 Notwithstanding anything to the contrary in the PUD Agreement between the Developer and the City (including, without limitation, Sections 2.17 and 4.5) or the Annexation Agreement, Developer is hereby authorized to install, operate, and maintain solid oxide energy servers and integral operational equipment (collectively, "Energy Systems") as the Project’s primary or backup power source and all in accordance with the approved Site Plan. For all zoning and permitting purposes, such Energy Systems shall constitute approved utility infrastructure. To ensure municipal revenue neutrality, Developer shall remit an annual payment to the City equivalent to the Municipal Electricity Tax that would have been collected had the kilowatt-hours actually generated by the Energy Systems been purchased directly from the local utility provider. Developer shall maintain a metering system to accurately record generation, permit City audits of such records upon reasonable written notice, and remit payments of amounts equal to the Municipal Electricity Tax that would have been collected if such energy had been purchased from the local utility provider on a quarterly basis. If Developer fails to remit a required payment and such failure remains uncured for thirty (30) days following written notice from the City, the City shall have the right to suspend Developer's authorization to operate the applicable Energy Systems until all outstanding amounts are paid in full. This payment obligation applies solely during periods of active generation and shall immediately cease upon the idling or decommissioning of the Energy Systems 3.6 Developer shall use only Hydrotreated Vegetable Oil (HVO) or Biodiesel for on- site backup generation, strictly limited to maintenance and testing. However, during a grid emergency declared by ComEd, PJM, FERC, or a similar authority, the Developer may use standard diesel or similar fuel if HVO or Biodiesel is commercially unavailable. ARTICLE 4: CITY OBLIGATIONS 4.1 Water Allocation. The City acknowledges that the provision of adequate amounts of potable water is essential for the development of the Project. The City will provide water for use at Development Site in accordance with the following table and by the applicable Delivery Date (the "Water Allocation"): (Average Day) (Maximum Day) Water 42,000 gallons per day 71,400 gallons per day The City shall charge for water and sewer services based on actual usage in accordance with the then-existing tariff rates charged to industrial customers for similar water and sewer services. Water usage shall be monitored concurrently with the City’s utility billing cycles; provided however, in the event the usage exceeds the average daily estimates of each utility billing cycle, or if any one day exceeds 1.7 times the daily use ratio established by the City’s water provider, the City shall impose a penalty equal to two times the then-existing volumetric water rate on either (a) the difference between the observed average day and the estimated average day for the entire billing cycle or (b) the difference between the observed maximum day usage and the estimated 7 1627713435.5 maximum day usage, whichever is less, until compliance with the water allocation standards are met or further improvements to the water service system are completed at the sole cost of the Developer. The Infrastructure Project will provide water and sewer services at the Project site boundary. 4.2 Right-of-way and Easement Acquisition. The City shall secure any roadway dedications, temporary construction easements and exclusive permanent easements during final design of each component of the Infrastructure Project at the sole cost of the Developer in accordance with Section 4.4. 4.3 The City acknowledges that the Sanitary Sewer improvements described in Section 3.2 will provide capacity, access and other direct benefits to properties beyond the Project (the “Shared Improvements”). To ensure equitable cost allocation, the City shall enter into a recapture agreement with other property owners or developers to be responsible for their proportionate share of the costs of the Shared Improvements, to the extent permitted by applicable law(the “Recapture Agreement #3”) The form of Recapture Agreement #3 is attached hereto as Exhibit L. 4.4 Easement and Right of Way Acquisition. In the event the City notifies the Developer that after exercising commercially reasonable efforts that the City is unable to obtain any Easement or Right of Way necessary to complete any of the Improvements contemplated by this Agreement or to route any utility infrastructure required to serve the Project then the City confer with the Developer to determine if the Developer desires to instruct the City to increase its offer for the Easement or the Right Of Way or shall commence the eminent domain proceedings necessary for such acquisition, pursuant to its typical and customary processes for eminent domain. The Developer shall reimburse the City for all of its costs and expenses incurred with the eminent domain process. These costs and expenses shall include but not be limited to the costs of attorneys, appraisers, expert witnesses and awards. 4.5 The City shall not unreasonably withhold, condition, or delay granting the Developer the necessary non-exclusive licenses, franchises, or right-of-way use agreements to install, operate, and maintain infrastructure serving the Project across, over, or under adjacent City- controlled rights-of-way at Developer’s designated points of entry, subject only to the Developer’s compliance with uniformly applied municipal permitting requirements and adopted fee schedules. ARTICLE 5: OVERSIGHT RIGHTS OF THE CITY AND REIMBURSEMENT FOR COSTS 5.1 The Developer agrees to advise the City Engineer of the name of any contractor chosen to construct any portion of the Infrastructure Project for the purpose of informing the Developer of past experiences and difficulties, if any, with such a contractor. 5.2 The Developer shall reimburse the City for all reasonable and documented costs incurred by the City in connection with the design, administration, and construction inspection and oversight of the Infrastructure Project (“Oversight Costs”). The City shall invoice the Developer for an estimated cost of such Oversight Costs from time to time as incurred. The Developer shall pay each invoice issued by the City within thirty (30) days after the Developer’s receipt of the 8 1627713435.5 invoice. Work will commence upon receipt of payment of the invoice. At the completion of each of the components of the Infrastructure Project, the parties agree to determine any amounts due from the Developer or any refunds due from the City to the Developer. Any invoice not paid within such thirty (30) day period shall accrue a late payment charge equal to 1.5% per month (or the maximum rate permitted by law, if less), calculated from the date payment was due until the date payment is received in full. 5.3 In addition to all other remedies provided for in this Agreement, the City may suspend review, inspection, or other Infrastructure Project-related services if any invoice remains unpaid for more than sixty (60) days, without liability to the Developer, until all outstanding amounts, including applicable late charges, are paid in full provided the City delivers written notice to the Developer specifying the amount due at least fifteen (15) days prior to such suspension. Notwithstanding the foregoing, the City shall not suspend its review, inspection or services as necessary to protect public interests. ARTICLE 6: IN GENERAL 6.1 The term of this Agreement shall commence upon the execution of this Agreement by the parties and shall terminate on the twentieth (20th) anniversary of the Effective Date. 6.2 In the event of a default, the non-defaulting party shall give no less than ten (10) business days’ notice to the defaulting party. No default under this Agreement shall entitle any Party to terminate, cancel or otherwise rescind this Agreement; provided, however, this limitation shall not affect any other rights or remedies the Parties may have by reason of any default under this Agreement. 6.3 Neither the City nor Developer, nor any successor in interest to either of them, shall be considered in breach of or in default of its obligations under this Agreement in the event of any delay caused by nationally recognized pandemic or epidemic, governmental restrictions, takings, and limitations arising subsequent, war, state or national emergency, government mandated closures, damage or destruction by fire or other casualty, strike, shortage of material, unusually adverse weather conditions such as, by way of illustration and not limitation, severe rain storms or below-freezing temperatures of abnormal degree or for an abnormal duration, tornadoes or cyclones, delays caused by Commonwealth Edison, the Illinois Commerce Commission, the Illinois Power Agency, PJM, the Federal Energy Regulatory Commission (each, a “Third-Party Regulator”) and other events or conditions beyond the reasonable control of the Party affected which in fact interferes with the ability of such Party to discharge its obligations hereunder (in each case, a “Force Majeure Delay”). In each case where a Party hereto believes its performance of any specific obligation, duty or covenant is delayed or impaired by reason of an event of Force Majeure Delay, the Party claiming the benefit of this Section 6.3 shall notify the other Party of the nature of the event claimed to constitute Force Majeure Delay and, specifically, the obligation, duty or covenant which it believes is delayed or impaired by reason of the designated event. If a Party is claiming a Force Majeure Delay due to the acts or omissions of a Third-Party Regulator, the Party shall advise the City of the date the Party was informed of the delay, the reason for the delay, demonstrate that it has used reasonable efforts to avoid or mitigate the delay, including seeking alternative means of performance, that the delay results directly from the Third-Party 9 1627713435.5 Regulator’s inability to perform despite such efforts and the estimated date performance shall resume. Notification shall be provided in accordance with Section 6.9. Performance of the obligation, duty or covenant impaired by reason of the designated event shall be tolled for that period of time reasonably necessary to remove or otherwise cure the impediment to performance and the Party relying on the event of Force Majeure Delay shall be obligated to pursue such remedy or cure with reasonable diligence given the nature of the impairment, to the extent the same may be reasonably cured. In no case shall an event of Force Majeure Delay toll the performance of any obligation, duty or covenant not directly implicated in the claimed event of Force Majeure Delay. Further, nothing herein shall be deemed to preclude the right of the Party entitled, by the terms of this Agreement, to receive the performance of any obligation, duty or covenant to challenge the validity of a claimed event of Force Majeure Delay. 6.4 This Agreement shall be binding upon and inure to the benefit of the successor of either party hereto and any successor legal entity (governmental or otherwise) that may assume and perform the duties of either party hereto. Notwithstanding the foregoing, this Agreement shall not be assigned by a party hereto without the prior written consent of the other party to this Agreement, approval of which shall not be unreasonably withheld, provided that such successors demonstrate financial capability and operational experience. 6.5 In the event of any violation or threatened violation of any of the provisions of this Agreement by a Party, such Party shall have the right to apply to a court of competent jurisdiction for an injunction against such violation or threatened violation, and/or for a decree of specific performance. 6.6 The invalidity of any provisions of this Agreement shall not impair the validity of any other provisions. If any provision of this Agreement is determined by a court of competent jurisdiction to be unenforceable that provision shall be deemed severed from this Agreement or as otherwise modified by the court. 6.7 This Agreement may only be amended, modified or terminated by a written instrument signed by the parties. 6.8 This Agreement shall be interpreted and construed in accordance with the laws of the State of Illinois. 6.9 Any notice, request, demand, waiver, consent, approval or other communication that is required or permitted under the terms of this Agreement (a “Notice”) shall be in writing and shall be delivered by personal delivery, via overnight carrier or e-mail transmission or via registered or certified mail, return receipt requested, first class postage prepaid. If Notice is delivered by personal delivery or via overnight carrier, Notice shall be deemed given on the date that actual delivery is made. If Notice is delivered via e-mail transmission, Notice shall be deemed given on the date that the Notice is transmitted and written confirmation of such transmission is obtained. If Notice is delivered via mail, Notice shall be deemed given on the earlier of (a) the actual day of delivery or (b) the third day after the date of mailing. All Notices shall be addressed to the intended recipient as set forth below: 10 1627713435.5 To the City: United City of Yorkville 651 Prairie Pointe Yorkville, Illinois 60560 Attention: City Administrator bolson@yorkville.il.us With a Copy to: Ottosen DiNolfo Hasenbalg & Castaldo, Ltd. 2441 Warrenville Road, Suite 310 Lisle, Illinois 60532 Attn: Kathleen Field Orr kfo@ottosenlaw.com To Developer: With a copy to: 6.10 This Agreement may be executed in multiple counterparts, each of which shall be deemed to be and shall constitute one and the same instrument. 6.11 No party will be liable to the other party, FOR ANY INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES (INCLUDING WITHOUT LIMITATION, DAMAGES RESULTING FROM LOSS OF PROFITS, INTERRUPTION OR LOSS OF BUSINESS, LOST GOODWILL, LOST REVENUE AND LOST OPPORTUNITY) ARISING OUT OF ANY OF THE TERMS OR CONDITIONS OF THIS AGREEMENT. 6.12 In the event of any litigation involving this Agreement, the non-prevailing party in such litigation will pay to the prevailing party the attorneys’ fees and costs incurred by the prevailing party in connection with such litigation. [SIGNATURE PAGE TO FOLLOW] 11 1627713435.5 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their duly authorized officers on the Effective Date. United City of Yorkville Attest: By: By: Mayor Date: , 2026 Pioneer Development, LLC By: Date: , 2026 1627713435.5 SCHEDULE OF EXHIBITS Exhibit A Legal Description of the Development Exhibit B Infrastructure Projects Cost Estimate Exhibit C Proposed Water Main Improvements Exhibit D Recapture Agreement #1 Exhibit E Water Service Cost Estimate Exhibit F Sanitary Sewer Map Exhibit F1 Sanitary Sewer Cost Estimate Exhibit G1 Transportation Improvement Map Exhibit G Ashe Road Cost Estimate Exhibit H Baseline Road Reconstruction Cost Estimate Exhibit I Baseline and Ashe Road Intersection Improvements Cost Estimate Exhibit J Recapture Agreement #2 Exhibit K Shared Use Path Map Exhibit L Recapture Agreement #3 Other informational exhibits: Proposed Infrastructure Schedules for roadway, water, and sewer 1 EXHIBIT A LEGAL DESCRIPTION PINS BY OWNER Galena & 47TH LLC, MPLIV10 LLC PIN: 02-05-300-003 CITY OF YORKVILLE PIN: 02-04-300-032 CITY OF YORKVILLE PIN: 02-04-300-024 CITY OF YORKVILLE PIN: 02-05-400-021 CITY OF YORKVILLE PIN: 02-09-100-031 CITY OF YORKVILLE PIN: 02-09-100-030 CITY OF YORKVILLE Sanjay & Sameer Gupta PIN: 02-04-100-015 CITY OF YORKVILLE PIN: 02-05-200-007 UNINCORPORATED The Konicek Family Limited Partnership PIN: 02-06-100-022 UNINCORPORATED DALE L. KONICEK, LLC PIN: 02-06-200-002 CITY OF YORKVILLE PIN: 02-05-400-022 CITY OF YORKVILLE PIN: 02-05-200-006 CITY OF YORKVILLE PIN: 02-04-100-016 CITY OF YORKVILLE PIN: 02-06-400-008 UNINCORPORATED PIN: 02-06-200-003 UNINCORPORATED PIN: 02-05-100-003 UNINCORPORATED PIN: 02-05-100-005 UNINCORPORATED PIN: 02-05-400-009 CITY OF YORKVILLE PIN: 02-04-300-018 CITY OF YORKVILLE PIN: 02-04-300-017 CITY OF YORKVILLE LEGAL DESCRIPTION OWNER: Sanjay & Sameer Gupta PARCEL 1: THAT PART OF LOT 2 OF THE NORTHEAST QUARTER OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT OF THE GOVERNMENT SURVEY OF SAID SECTION 5 DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEAST CORNER OF SAID LOT 2; THENCE WEST 40 CHAINS (RECORD), 2652.01 FEET (MEASURED) TO THE SOUTHWEST CORNER OF SAID LOT 2; THENCE NORTH 38 1/2 LINKS (RECORD), 24.51 FEET (MEASURED) TO THE SOUTH BANK OF A DITCH; THENCE SOUTH 89 DEGREES 30 MINUTES EAST (RECORD), NORTH 88 DEGREES 05 MINUTES 41 SECONDS EAST (MEASURED), 2593.76 FEET (MEASURED) TO THE POINT OF BEGINNING; THENCE NORTH 01 DEGREES 54 MINUTES 03 SECONDS WEST, 232.55 FEET TO A POINT ON A NON-TANGENT CURVE; THENCE NORTHEASTERLY 68.93 FEET ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 533.00 FEET AND WHOSE CHORD BEARS NORTH 59 DEGREES 57 MINUTES 33 SECONDS EAST, 68.88 FEET TO A POINT ON THE EAST LINE OF SAID LOT 2; THENCE SOUTH 01 DEGREES 16 MINUTES 25 SECONDS EAST ALONG SAID EAST LINE, 265.04 2 FEET TO THE SOUTHEAST CORNER OF SAID LOT 2; THENCE SOUTH 88 DEGREES 05 MINUTES 41 SECONDS WEST, 57.84 FEET TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. PARCEL 2: THAT PART OF LOT 2 OF THE NORTHWEST QUARTER OF SECTION 4, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT OF THE GOVERNMENT SURVEY OF SAID SECTION 4 DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF SAID SECTION; THENCE SOUTH ON THE SECTION LINE 26.80 CHAINS; THENCE EAST PARALLEL WITH THE NORTH LINE OF SAID SECTION, 14.30 CHAINS; THENCE IN A NORTHEASTERLY DIRECTION TO A POINT ON THE NORTH LINE OF SAID SECTION, 20.67 CHAINS EAST OF THE POINT OF BEGINNING; THENCE WEST ALONG THE SECTION LINE TO THE POINT OF BEGINNING; EXCEPTING THEREFROM THAT PART OF LOT 2 LYING WESTERLY OF THE FOLLOWING DESCRIBED LINE; BEGINNING AT THE SOUTHWEST CORNER OF SAID LOT 2; THENCE NORTH 01 DEGREES 16 MINUTES 25 SECONDS WEST, ALONG THE WEST LINE OF SAID LOT 2, A DISTANCE OF 265.04 FEET TO A POINT ON A NON-TANGENT CURVE; THENCE NORTHEASTERLY 531.35 FEET ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 533.00 FEET AND WHOSE CHORD BEARS NORTH 27 DEGREES 41 MINUTES 44 SECONDS EAST, 509.62 FEET TO A POINT OF TANGENCY, THENCE NORTH 00 DEGREES 51 MINUTES 49 SECONDS WEST 150.53 FEET, THENCE NORTH 89 DEGREES 08 MINUTES 11 SECONDS EAST, PERPENDICULAR TO THE LAST DESCRIBED LINE, 110.00 FEET; THENCE NORTH 00 DEGREES 51 MINUTES 49 SECONDS WEST PERPENDICULAR TO THE LAST DESCRIBED LINE, 912.39 FEET TO A POINT ON THE NORTH LINE OF SAID LOT 2, SAID POINT BEING 364.44 FEET EAST OF THE NORTHWEST CORNER OF SAID SECTION 4 (AS MEASURED ALONG SAID NORTH LINE) AND SAID POINT ALSO BEING THE POINT OF TERMINUS; IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. OWNER: Galena & 47th LLC and MPLIV10LLC PARCEL 1: THAT PART OF THE SOUTHWEST QUARTER OF SECTION 4 AND THE NORTHWEST QUARTER OF SECTION 9, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF SAID SOUTHWEST QUARTER; THENCE SOUTH 01 DEGREE 19 MINUTES 09 SECONDS EAST ALONG THE EAST LINE OF SAID SOUTHWEST QUARTER, 990.0 FEET (15 CH.) TO THE NORTHEAST CORNER OF LANDS DESCRIBED IN BOOK 163 AT PAGE 473; THENCE SOUTH 01 DEGREE 19 MINUTES 09 SECONDS EAST ALONG SAID EAST LINE, 1.84 FEET TO A POINT ON THE SOUTHERLY LINE OF LANDS DESCRIBED IN BOOK 152 AT PAGE 392; THENCE SOUTH 87 DEGREES 52 MINUTES 56 SECONDS WEST ALONG SAID SOUTHERLY LINE AND THE WESTERLY EXTENSION THEREOF, 1722.34 FEET TO ITS INTERSECTION WITH THE WESTERLY LINE OF THE RIGHT-OF-WAY OF ILLINOIS ROUTE 47 AS RECORDED IN DOCUMENT 907257 FOR A POINT OF BEGINNING; THENCE SOUTH 00 DEGREES 09 MINUTES 41 SECONDS EAST ALONG SAID WESTERLY LINE, 128.76 FEET; THENCE NORTH 89 DEGREES 50 MINUTES 19 SECONDS EAST ALONG SAID WESTERLY LINE, 10.0 FEET; THENCE SOUTH 00 DEGREES 09 MINUTES 41 SECONDS EAST ALONG SAID WESTERLY LINE, 787.46 FEET; THENCE SOUTHERLY ALONG SAID WESTERLY LINE, BEING A CIRCULAR CURVE HAVING A RADIUS OF 1596.42 FEET CONCAVE TO THE WEST, THE CHORD OF WHICH BEARS SOUTH 13 DEGREES 43 MINUTES 37 SECONDS WEST, 773.94 FEET TO ITS INTERSECTION WITH THE SOUTH LINE OF SAID SOUTHWEST QUARTER, SAID POINT BEARING NORTH 87 DEGREES 56 MINUTES 55 SECONDS EAST, 719.99 FEET FROM THE SOUTHWEST CORNER OF SAID SOUTHWEST QUARTER; THENCE CONTINUING SOUTHERLY ALONG SAID WESTERLY LINE, BEING A CIRCULAR CURVE HAVING A RADIUS OF 1596.42 FEET CONCAVE TO THE WEST, 3 THE CHORD OF WHICH BEARS SOUTH 31 DEGREES 17 MINUTES 50 SECONDS WEST, 205.17 FEET; THENCE SOUTH 34 DEGREES 58 MINUTES 45 SECONDS WEST ALONG SAID WESTERLY LINE, 88.42 FEET TO THE CENTER LINE OF THE CHICAGO-GALENA ROAD; THENCE NORTH 74 DEGREES 20 MINUTES 53 SECONDS WEST, 41.71 FEET TO AN EASTERLY LINE OF SAID LANDS DESCRIBED IN BOOK 152 AT PAGE 392; THENCE NORTH 29 DEGREES 07 MINUTES 39 SECONDS EAST ALONG SAID EASTERLY LINE, 267.87 FEET TO SAID SOUTH LINE OF SAID SOUTHWEST QUARTER; THENCE NORTH 87 DEGREES 56 MINUTES 55 SECONDS EAST ALONG SAID SOUTH LINE, 9.74 FEET TO A POINT ON THE WESTERLY LINE OF SAID LANDS DESCRIBED IN BOOK 163 AT PAGE 473; THENCE NORTH 27 DEGREES 39 MINUTES 29 SECONDS EAST ALONG SAID WESTERLY LINE, 366.26 FEET; THENCE NORTH 00 DEGREES 54 MINUTES 29 SECONDS EAST ALONG SAID WESTERLY LINE, 756.55 FEET; THENCE DEPARTING FROM SAID WESTERLY LINE NORTH 02 DEGREES 12 MINUTES 23 SECONDS EAST, 581.48 FEET TO A POINT OF THE SOUTHERLY LINE OF SAID LANDS DESCRIBED IN BOOK 163 AT PAGE 473; THENCE NORTH 87 DEGREES 52 MINUTES 56 SECONDS EAST ALONG SAID SOUTHERLY LINE, 22.15 FEET TO THE POINT OF BEGINNING IN KENDALL COUNTY, ILLINOIS. PARCEL 2: THAT PART OF THE SOUTHEAST 1/4 OF SECTION 5, THAT PART OF THE SOUTHWEST 1/4 OF SECTION 4, THAT PART OF THE NORTHEAST 1/4 OF SECTION 8 AND THAT PART OF THE NORTHWEST 1/4 OF SECTION 9, ALL IN TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE IRON ROD MONUMENTING THE SOUTHEAST CORNER OF SECTION 5; THENCE NORTH 01 DEGREE 15 MINUTES 55 SECONDS WEST ALONG THE EAST LINE OF THE SOUTHEAST 1/4 OF SAID SECTION 5, A DISTANCE OF 1,550.82 FEET; THENCE NORTH 88 DEGREES 44 MINUTES 05 SECONDS EAST 409.15 FEET PERPENDICULAR TO THE LAST DESCRIBED COURSE TO THE POINT OF BEGINNING; THENCE NORTH 90 DEGREES 00 MINUTES 00 SECONDS EAST 221.96 FEET; THENCE NORTH 37 DEGREES 44 MINUTES 29 SECONDS EAST 115.96 FEET; THENCE SOUTH 89 DEGREES 12 MINUTES 43 SECONDS EAST 196.55 FEET TO THE CENTERLINE OF THE ROB ROY DITCH; THENCE SOUTH 02 DEGREES 13 MINUTES 10 SECONDS WEST 1,336.52 FEET ALONG SAID CENTERLINE; THENCE SOUTH 29 DEGREES 12 MINUTES 38 SECONDS WEST 600.81 FEET TO THE CENTERLINE OF GALENA ROAD AS NOW ESTABLISHED; THENCE NORTH 73 DEGREES 55 MINUTES 29 SECONDS WEST ALONG SAID CENTERLINE 677.76 FEET; THENCE NORTH 02 DEGREES 56 MINUTES 50 SECONDS WEST 348.47 FEET; THENCE NORTH 16 DEGREES 11 MINUTES 58 SECONDS EAST 599.13 FEET; THENCE NORTH 28 DEGREES 26 MINUTES 55 SECONDS EAST 750.54 FEET TO THE POINT OF BEGINNING, ALL IN KENDALL COUNTY, ILLINOIS. PARCEL 3: THAT PART OF THE WEST HALF OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEAST CORNER OF THE SOUTHWEST QUARTER OF SAID SECTION 5; THENCE NORTHERLY ALONG THE EAST LINE OF SAID SOUTHWEST QUARTER 642.93 FEET TO A POINT WHICH IS 162.00 FEET SOUTHERLY OF THE ORIGINAL CENTER LINE OF GALENA ROAD; THENCE WESTERLY ALONG A LINE WHICH FORMS AN ANGLE OF 102 DEGREES 56 MINUTES 02 SECONDS WITH THE LAST DESCRIBED COURSE, MEASURED CLOCKWISE THEREFROM, 100.00 FEET TO A POINT WHICH IS 169.50 FEET, AS MEASURED PARALLEL WITH SAID EAST LINE SOUTHERLY OF SAID ORIGINAL CENTER LINE TO THE POINT OF BEGINNING; THENCE NORTHERLY PARALLEL WITH SAID EAST LINE, 14.66 FEET TO THE PRESENT CENTER LINE OF GALENA ROAD AS DEPICTED ON A PLAT RECORDED JUNE 5, 1964 AS DOCUMENT NUMBER 145193; THENCE WESTERLY ALONG SAID PRESENT CENTER LINE, 1675.69 FEET TO A POINT OF CURVATURE; THENCE WESTERLY ALONG SAID PRESENT CENTER LINE BEING ALONG A TANGENTIAL 4 CURVE TO THE RIGHT HAVING A RADIUS OF 42,975.00 FEET, 933.19 FEET; THENCE WESTERLY, ALONG SAID PRESENT CENTER LINE, 64.12 FEET TO THE WEST LINE OF SAID SOUTHWEST QUARTER; THENCE NORTHERLY ALONG SAID WEST LINE, 957.16 FEET TO THE NORTHWEST CORNER OF SAID SOUTHWEST QUARTER; THENCE NORTHERLY ALONG THE WEST LINE OF THE NORTHWEST QUARTER OF SAID SECTION 5, 920.88 FEET TO A POINT WHICH IS 2,316.00 FEET SOUTHERLY OF THE NORTHWEST CORNER OF SAID NORTHWEST QUARTER; THENCE EASTERLY, 2,651.03 FEET TO A POINT ON THE EAST LINE OF SAID WEST HALF WHICH IS 2,326.70 FEET SOUTHERLY OF THE NORTHEAST CORNER OF SAID NORTHWEST QUARTER; THENCE SOUTHERLY ALONG THE EAST LINE OF SAID WEST HALF, 2,686.96 FEET TO SAID ORIGINAL CENTER LINE; THENCE WESTERLY ALONG SAID ORIGINAL CENTER LINE, 101.94 FEET TO THE POINT OF BEGINNING, IN BRISTOL TOWNSHIP, KENDALL COUNTY, ILLINOIS. OWNER: Dale L. Konicek, LLC TRACT 1: THAT PART OF THE EAST HALF OF SECTION 5 AND THAT PART OF THE WEST HALF OF SECTION 4, ALL IN TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE IRON PIPE MONUMENT THE SOUTHEAST CORNER OF SAID SECTION 5; THENCE NORTH 01 DEGREE 15 MINUTES 55 SECONDS WEST ALONG THE EAST LINE OF THE SOUTHEAST 1/4 OF SAID SECTION 5, A DISTANCE OF 1730.13 FEET TO THE POINT OF BEGINNING; THENCE NORTH 89 DEGREES 27 MINUTES 29 SECONDS WEST 362.35 FEET; THENCE NORTH 00 DEGREES 32 MINUTES 31 SECONDS EAST 2025.23 FEET TO THE SOUTHERLY LINE OF COMMONWEALTH EDISON COMPANY PROPERTY DESCRIBED IN DOCUMENT 73-2720; THENCE NORTH 87 DEGREES 56 MINUTES 31 SECONDS EAST ALONG SAID SOUTHERLY LINE 1,222.89 FEET TO THE CENTERLINE OF ROB ROY DITCH; THENCE SOUTH 03 DEGREES 43 MINUTES 10 SECONDS EAST ALONG SAID CENTERLINE 577.07 FEET; THENCE SOUTH 01 DEGREE 49 MINUTES 41 SECONDS WEST ALONG SAID CENTERLINE 298.55 FEET; THENCE NORTH 89 DEGREES 00 MINUTES 53 SECONDS EAST 15.64 FEET TO THE WESTERLY RIGHT-OF-WAY LINE OF ILLINOIS ROUTE 47 PER DOCUMENT 907256 AND 907257; (THE NEXT 5 CALLS ARE ALONG SAID WESTERLY RIGHT-OF-WAY LINE OF ILLINOIS ROUTE 47 PER DOCUMENT 907256 AND 907257) THENCE SOUTH 00 DEGREES 09 MINUTES 46 SECONDS EAST 170.64 FEET; THENCE NORTH 89 DEGREES 50 MINUTES 14 SECONDS EAST 10.00 FEET; THENCE SOUTH 00 DEGREES 09 MINUTES 46 SECONDS EAST 1,000.00 FEET; THENCE SOUTH 89 DEGREES 50 MINUTES 14 SECONDS WEST 10.00 FEET; THENCE SOUTH 00 DEGREES 09 MINUTES 46 SECONDS EAST 36.62 FEET; THENCE NORTH 89 DEGREES 27 MINUTES 29 SECONDS WEST 925.95 FEET TO THE POINT OF BEGINNING, ALL IN KENDALL COUNTY, ILLINOIS. TRACT 2: THAT PART OF THE NORTHWEST QUARTER OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST, LYING NORTHERLY OF A LINE EXTENDING EASTERLY FROM A POINT ON THE WEST LINE OF SAID NORTHWEST QUARTER, 2316 FEET SOUTH OF THE NORTHWEST CORNER OF SAID SECTION 5, TO A POINT ON THE NORTH AND SOUTH CENTERLINE OF SAID SECTION, 2326.7 FEET SOUTH OF THE NORTHWEST CORNER OF SAID SECTION AND LYING SOUTHERLY OF THE COMMONWEALTH EDISON COMPANY RIGHT OF WAY LINE PURSUANT TO DOCUMENT 73-2720, IN KENDALL COUNTY, ILLINOIS. ALSO; THAT PART OF THE NORTHEAST QUARTER OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF SAID SECTION 6, THENCE SOUTH ON THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 2460.05 FEET TO THE INTERSECTION WITH THE MOST 5 SOUTHERLY LINE OF PROPERTY CONVEYED TO LASALLE NATIONAL BANK, AS TRUSTEE UNDER TRUST AGREEMENT DATED JULY 15, 1966 AND KNOWN AS TRUST NUMBER 35339, BY A DEED DATED JANUARY 31, 1972 AND RECORDED JANUARY 31, 1972 AS DOCUMENT 72-467 TO THE POINT OF BEGINNING, THENCE WESTERLY ALONG THE SOUTHERLY LINE OF SAID PROPERTY CONVEYED TO LASALLE NATIONAL BANK, AS TRUSTEE UNDER TRUST NUMBER 35339, WHICH FORMS AN ANGLE OF 89 DEGREES 57 MINUTES 27 SECONDS TO THE LEFT WITH THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 812.66 FEET, THENCE NORTH 90 DEGREES 25 MINUTES 49 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE, A DISTANCE OF 366.94 FEET, THENCE EASTERLY 88 DEGREES 43 MINUTES 04 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE, A DISTANCE OF 809.73 FEET TO THE EAST LINE OF SAID SECTION 6, THENCE SOUTH ALONG THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 378.96 FEET TO THE POINT OF BEGINNING, IN KENDALL COUNTY, ILLINOIS. ALSO; THAT PART OF THE NORTHEAST QUARTER OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF SAID SECTION 6, THENCE SOUTH ON THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 2474.60 FEET FOR THE POINT OF BEGINNING OF THE TRACT HEREIN DESCRIBED, THENCE WESTERLY ON A LINE WHICH FORMS AN ANGLE OF 90 DEGREES 57 MINUTES 19 SECONDS TO THE RIGHT WITH THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 812.66 FEET, THENCE NORTH ALONG A LINE 89 DEGREES 31 MINUTES 03 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED LINE, A DISTANCE OF 1.61 FEET TO THE INTERSECTION WITH THE MOST SOUTHERLY LINE OF THE PROPERTY CONVEYED TO LASALLE NATIONAL BANK, AS TRUSTEE UNDER TRUST AGREEMENT DATED JULY 15, 1966 AND KNOWN AS TRUST NUMBER 35339 BY DEED DATED JANUARY 31, 1972 AND RECORDED JANUARY 31, 1972 AS DOCUMENT 72-467, THENCE EASTERLY ON THE SOUTHERLY LINE OF SAID PROPERTY CONVEYED TO THE LASALLE NATIONAL BANK, A DISTANCE OF 812.66 FEET TO A POINT ON THE EAST LINE OF SAID SECTION 6, THENCE SOUTHERLY ON SAID EAST LINE, 13.55 FEET TO THE POINT OF BEGINNING, IN KENDALL COUNTY, ILLINOIS. TRACT 3: LOT 2 OF THE NORTHEAST 1/4 OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT OF THE GOVERNMENT SURVEY OF SAID SECTION 5 (EXCEPT THAT PART DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHEAST CORNER OF SAID LOT 2, THENCE WEST 40 CHAINS TO THE SOUTHWEST CORNER OF SAID LOT, THENCE NORTH 38 1/2 LINKS TO THE SOUTH BANK OF DITCH, THENCE SOUTH 89 DEGREES 30 MINUTES 00 SECONDS EAST 40 CHAINS TO THE POINT OF BEGINNING AND EXCEPTING THEREFROM THAT PART OF THE NORTHEAST 1/4 OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE NORTH LINE OF SAID NORTHEAST 1/4, 1961.60 FEET EAST OF THE NORTHWEST CORNER OF SAID NORTHEAST 1/4, THENCE EAST ALONG SAID NORTH LINE 667.0 FEET, THENCE SOUTH AT RIGHT ANGLES TO SAID NORTH LINE, 396.0 FEET, THENCE WEST AT RIGHT ANGLES TO THE LAST DESCRIBED COURSE, 667.0 FEET, THENCE NORTH AT RIGHT ANGLES TO THE LAST DESCRIBED COURSE, 396.0 FEET TO THE POINT OF BEGINNING, AND ALSO EXCEPTING THAT PART OF LOT 2 OF THE NORTHEAST QUARTER OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT OF THE GOVERNMENT SURVEY OF SAID SECTION 5 DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEAST CORNER OF SAID LOT 2, THENCE WEST 40 CHAINS (RECORD), 2652.01 FEET (MEASURED) TO THE SOUTHWEST CORNER OF SAID LOT 2, THENCE NORTH 38 1/2 LINKS (RECORD), 25.41 FEET (MEASURED) TO THE SOUTH 6 BANK OF A DITCH, THENCE SOUTH 89 DEGREES 30 MINUTES 00 SECONDS EAST (RECORD), NORTH 88 DEGREES 05 MINUTES 41 SECONDS EAST (MEASURED), 2593.76 FEET (MEASURED) TO THE POINT OF BEGINNING, THENCE NORTH 01 DEGREES 54 MINUTES 03 SECONDS WEST, 232.55 FEET TO A POINT ON A NON-TANGENT CURVE, THENCE NORTHEASTERLY 68.93 FEET ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 533.00 FEET AND WHOSE CHORD BEARS NORTH 59 DEGREES 57 MINUTES 33 SECONDS EAST, 68.88 FEET TO A POINT ON THE EAST LINE OF SAID LOT 2, THENCE SOUTH 01 DEGREES 16 MINUTES 25 SECONDS EAST ALONG SAID EAST LINE, 265.04 FEET TO THE SOUTHEAST CORNER OF SAID LOT 2, THENCE SOUTH 88 DEGREES 05 MINUTES 41 SECONDS WEST, 57.84 FEET TO THE POINT OF BEGINNING) IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. TRACT 4: THAT PART OF LOT 2 OF THE NORTHWEST 1/4 OF SECTION 4, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT OF THE GOVERNMENT SURVEY OF SAID SECTION 4, LYING WESTERLY OF THE FOLLOWING DESCRIBED LINE BEGINNING AT THE SOUTHWEST CORNER OF SAID LOT 2, THENCE NORTH 01 DEGREES 16 MINUTES 25 SECONDS WEST, ALONG THE WEST LINE OF SAID LOT 2, A DISTANCE OF 265.04 FEET TO A POINT ON A NON-TANGENT CURVE, THENCE NORTHEASTERLY 531.35 FEET ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 533.00 FEET AND WHOSE CHORD BEARS NORTH 27 DEGREES 41 MINUTES 44 SECONDS EAST, 509.62 FEET TO A POINT OF TANGENCY, THENCE NORTH 00 DEGREES 51 MINUTES 49 SECONDS WEST 150.53 FEET, THENCE NORTH 89 DEGREES 08 MINUTES 11 SECONDS EAST, PERPENDICULAR TO THE LAST DESCRIBED LINE, 110.00 FEET, THENCE NORTH 00 DEGREES 51 MINUTES 49 SECONDS WEST PERPENDICULAR TO THE LAST DESCRIBED LINE, 912.39 FEET TO A POINT ON THE NORTH LINE OF SAID LOT 2, SAID POINT BEING 364.44 FEET EAST OF THE NORTHWEST CORNER OF SAID SECTION 4 (AS MEASURED ALONG SAID NORTH LINE) AND SAID POINT ALSO BEING THE POINT OF TERMINUS, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. TRACT 5: PARCEL 1: THAT PART OF THE WEST 1/2 OF SECTION 4, PART OF SECTION 5, PART OF THE NORTHEAST 1/4 OF SECTION 8 AND PART OF THE NORTHWEST 1/4 OF SECTION 9, ALL IN TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: BEGINNING AT THE POINT OF INTERSECTION OF THE CENTER LINE OF GALENA ROAD AS NOW ESTABLISHED ACROSS SAID SECTION 5 WITH THE WEST LINE OF THE EAST 1/2 OF SAID SECTION 5; THENCE NORTH 00 DEGREES 02 MINUTES 49 SECONDS WEST ALONG SAID WEST LINE, 2673.13 FEET TO A POINT 2327.34 FEET SOUTH OF THE NORTHEAST CORNER OF THE NORTHWEST 1/4 OF SAID SECTION 5; THENCE NORTH 89 DEGREES 36 MINUTES 30 SECONDS WEST 1323.10 FEET; THENCE NORTH 00 DEGREES 02 MINUTES 30 SECONDS EAST 2325.56 FEET TO THE NORTH LINE OF SAID SECTION 5; THENCE SOUTH 89 DEGREES 41 MINUTES 06 SECONDS EAST ALONG SAID NORTH LINE 1319.49 FEET TO THE NORTHWEST CORNER OF THE NORTHEAST 1/4 OF SAID SECTION 5; THENCE SOUTH 00 DEGREES 02 MINUTES 49 SECONDS EAST ALONG THE WEST LINE OF SAID NORTHEAST 1/4 1828.36 FEET; THENCE NORTH 89 DEGREES 08 MINUTES EAST 3596.80 FEET TO THE CENTER LINE OF ROB ROY DITCH; THENCE SOUTH 00 DEGREES 22 MINUTES 03 SECONDS EAST ALONG SAID CENTER LINE 781.86 FEET; THENCE SOUTH 02 DEGREES 43 MINUTES 14 SECONDS WEST ALONG SAID CENTER LINE 300.01 FEET; THENCE SOUTH 89 DEGREES 40 MINUTES EAST 291.15 FEET; THENCE SOUTH 00 DEGREES 56 MINUTES 40 SECONDS WEST 240.28 FEET; THENCE NORTH 89 DEGREES 14 MINUTES 01 SECONDS EAST 1428.51 FEET TO THE EAST LINE OF THE WEST 1/2 OF SAID SECTION 4; THENCE SOUTH 00 DEGREES 02 MINUTES 57 SECONDS EAST ALONG SAID EAST 7 LINE 991.84 FEET; THENCE SOUTH 89 DEGREES 09 MINUTES 08 SECONDS WEST 1745.17 FEET TO THE CENTER LINE OF SAID ROB ROY DITCH; THENCE SOUTH 03 DEGREES 28 MINUTES 51 SECONDS WEST ALONG SAID CENTER LINE 1373.75 FEET; THENCE SOUTH 30 DEGREES 24 MINUTES 07 SECONDS WEST ALONG SAID CENTER LINE 600.81 FEET TO THE CENTER LINE OF SAID GALENA ROAD; THENCE NORTH 72 DEGREES 44 MINUTES WEST ALONG SAID CENTER LINE, 3318.05 FEET TO THE POINT OF BEGINNING, EXCEPTING THEREFROM THAT PART OF THE NORTHWEST 1/4 OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN LYING SOUTH OF A LINE EXTENDING EASTERLY FROM A POINT ON SAID WEST LINE OF THE NORTHWEST 1/4 WHICH POINT IS 1876.07 FEET SOUTH OF THE NORTHWEST CORNER OF SAID SECTION 5 TO A POINT ON THE NORTH AND SOUTH CENTER LINE OF SAID SECTION 5 WHICH POINT IS 1828.85 FEET SOUTH OF SAID NORTH QUARTER CORNER, AND EXCEPT A STRIP OF LAND 205.00 FEET WIDE IN THE NORTHEAST 1/4 OF SECTION 5 AND THE NORTHWEST 1/4 OF SECTION 4, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, BOUNDED AND DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHWEST CORNER OF THE NORTHEAST 1/4 OF SAID SECTION 5; THENCE SOUTH ALONG THE NORTH AND SOUTH CENTER LINE OF SAID SECTION 5, A DISTANCE OF 1828.85 FEET TO THE NORTH LINE OF PROPERTY CONVEYED TO THE LASALLE NATIONAL BANK, AS TRUSTEE UNDER TRUST AGREEMENT DATED FEBRUARY 10, 1967, KNOWN AS TRUST NO. 35913 RECORDED AS DOCUMENT NO. 154368 IN BOOK 152, PAGE 392 AS SAID NORTH LINE IS MONUMENTED AND OCCUPIED, HEREINAFTER REFERRED TO AS LINE "B", FOR THE POINT OR BEGINNING; THENCE EAST ALONG SAID LINE "B", A DISTANCE OF 3596.80 FEET TO THE CENTER LINE OF ROB ROY DITCH; THENCE SOUTHERLY ALONG THE CENTER LINE OF ROB ROY DITCH FORMING AN ANGLE OF 90 DEGREES 29 MINUTES 57 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE, A DISTANCE OF 205.00 FEET TO THE INTERSECTION WITH A LINE 205.00 FEET PERPENDICULARLY DISTANT SOUTH OF AND PARALLEL WITH THE AFORESAID LINE "B"; THENCE WEST ALONG THE LAST DESCRIBED PARALLEL LINE A DISTANCE OF 3598.47 FEET TO THE NORTH AND SOUTH CENTER LINE OF SAID SECTION 5; THENCE NORTH ALONG SAID NORTH AND SOUTH CENTER LINE 205.02 FEET TO THE POINT OF BEGINNING, AND ALSO EXCEPT THAT PART OF THE WEST HALF OF SAID SECTION 4 LYING EAST OF THE WEST RIGHT OF WAY LINE OF ILLINOIS ROUTE 47, IN KENDALL COUNTY, ILLINOIS. AND ALSO EXCEPTING: THAT PART OF THE SOUTHEAST 1/4 OF SECTION 5, THAT PART OF THE SOUTHWEST 1/4 OF SECTION 4, THAT PART OF THE NORTHEAST 1/4 OF SECTION 8 AND THAT PART OF THE NORTHWEST 1/4 OF SECTION 9, ALL IN TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE IRON ROD MONUMENTING THE SOUTHEAST CORNER OF SECTION 5; THENCE NORTH 01 DEGREES 15 MINUTES 55 SECONDS WEST ALONG THE EAST LINE OF THE SOUTHEAST 1/4 OF SAID SECTION 5, A DISTANCE 1,550.82 FEET; THENCE NORTH 88 DEGREES 44 MINUTES 05 SECONDS EAST 409.15 FEET PERPENDICULAR TO THE LAST DESCRIBED COURSE TO THE POINT OF BEGINNING; THENCE NORTH 90 DEGREES 00 MINUTES 00 SECONDS EAST 221.96 FEET; THENCE NORTH 37 DEGREES 44 MINUTES 29 SECONDS EAST 115.96 FEET; THENCE SOUTH 89 DEGREES 12 MINUTES 43 SECONDS EAST 196.55 FEET TO THE CENTERLINE OF THE ROB ROY DITCH; THENCE SOUTH 02 DEGREES 13 MINUTES 10 SECONDS WEST 1336.52 FEET ALONG SAID CENTERLINE; THENCE SOUTH 29 DEGREES 12 MINUTES 38 SECONDS WEST 600.81 FEET TO THE CENTERLINE OF GALENA ROAD AS NOW ESTABLISHED; THENCE NORTH 73 DEGREES 55 MINUTES 29 SECONDS WEST ALONG SAID CENTERLINE 677.76 FEET, THENCE NORTH 02 DEGREES 56 MINUTES 50 SECONDS WEST 348.47 FEET; THENCE NORTH 16 DEGREES 11 MINUTES 58 SECONDS EAST 599.13 FEET; THENCE NORTH 28 DEGREES 25 MINUTES 55 SECONDS EAST 750.54 FEET TO THE POINT OF BEGINNING, ALL IN KENDALL COUNTY, ILLINOIS, 8 AND ALSO EXCEPTING, THAT PART CONVEYED BY WARRANTY DEED RECORDED AUGUST 30, 2007 AS DOCUMENT 200700026496, DESCRIBED AS FOLLOWS: THAT PART OF THE EAST HALF OF SECTION 5 AND THAT PART OF THE WEST HALF OF SECTION 4, ALL IN TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE IRON PIPE MONUMENTING THE SOUTHEAST CORNER OF SAID SECTION 5; THENCE NORTH 01 DEGREES 15 MINUTES 55 SECONDS WEST ALONG THE EAST LINE OF THE SOUTHEAST 1/4 OF SAID SECTION 5, A DISTANCE OF 1730.13 FEET TO THE POINT OF BEGINNING; THENCE NORTH 89 DEGREES 27 MINUTES 29 SECONDS WEST 362.35 FEET; THENCE NORTH 00 DEGREES 32 MINUTES 31 SECONDS EAST 2026.23 FEET TO THE SOUTHERLY LINE OF COMMONWEALTH EDISON COMPANY PROPERTY DESCRIBED IN DOCUMENT 73-2720; THENCE NORTH 87 DEGREES 56 MINUTES 31 SECONDS EAST ALONG SAID SOUTHERLY LINE 1,222.89 FEET TO THE CENTERLINE OF ROB ROY DITCH; THENCE SOUTH 03 DEGREES 43 MINUTES 10 SECONDS EAST ALONG SAID CENTERLINE 577.07 FEET; THENCE SOUTH 01 DEGREES 49 MINUTES 41 SECONDS WEST ALONG SAID CENTERLINE 298.55 FEET; THENCE NORTH 89 DEGREES 00 MINUTES 53 SECONDS EAST 15.64 FEET TO THE WESTERLY RIGHT-OF-WAY LINE OF ILLINOIS ROUTE 47 PER DOCUMENT 907256 AND 907257; (THE NEXT 5 CALLS ARE ALONG SAID WESTERLY RIGHT OF WAY LINE OF ILLINOIS ROUTE 47 PER DOCUMENT 907256 AND 907257) THENCE SOUTH 00 DEGREES 09 MINUTES 46 SECONDS EAST 170.64 FEET; THENCE NORTH 89 DEGREES 50 MINUTES 14 SECONDS EAST 10.00 FEET; THENCE SOUTH 00 DEGREES 09 MINUTES 48 SECONDS EAST, 1,000.00 FEET; THENCE SOUTH 89 DEGREES 50 MINUTES 14 SECONDS WEST 10.00 FEET; THENCE SOUTH 00 DEGREES 09 MINUTES 46 SECONDS EAST 38.62 FEET; THENCE NORTH 89 DEGREES 27 MINUTES 29 SECONDS WEST 925.95 FEET TO THE POINT OF BEGINNING, ALL IN KENDALL COUNTY, ILLINOIS. PARCEL 2: THAT PART OF THE NORTHWEST 1/4 OF SECTION 5 AND NORTHEAST 1/4 OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF SECTION 5; THENCE EAST ALONG THE SECTION LINE 1331.4 FEET; THENCE SOUTHERLY ALONG A LINE FORMING AN ANGLE OF 90 DEGREES 07 MINUTES 00 SECONDS MEASURED FROM WEST TO SOUTH FROM THE SECTION LINE, 2321.5 FEET; THENCE WESTERLY ALONG A LINE FORMING AN ANGLE OF 89 DEGREES 33 MINUTES 00 SECONDS, MEASURED FROM NORTH TO WEST FROM THE LAST DESCRIBED COURSE, 1328.7 FEET TO THE WEST LINE OF SECTION 5; THENCE SOUTHERLY ALONG THE SECTION LINE, FORMING AN ANGLE OF 89 DEGREES 27 MINUTES 00 SECONDS MEASURED FROM EAST TO SOUTH FROM THE LAST DESCRIBED COURSE, 146.4 FEET; THENCE WESTERLY ALONG A LINE FORMING AN ANGLE OF 89 DEGREES 58 MINUTES 00 SECONDS, MEASURED FROM NORTH TO WEST FROM THE SECTION LINE, 1553 FEET; THENCE NORTHERLY ALONG A LINE FORMING AN ANGLE OF 89 DEGREES 33 MINUTES 00 SECONDS, MEASURED FROM EAST TO NORTH FROM THE LAST DESCRIBED COURSE, 2461.1 FEET TO THE NORTH LINE OF SECTION 6; THENCE EASTERLY ALONG SAID NORTH LINE 1534 FEET TO THE POINT OF BEGINNING, EXCEPTING THEREFROM THAT PART OF THE NORTHEAST 1/4 OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, LYING SOUTH AND WEST OF THE FOLLOWING DESCRIBED LINE: BEGINNING AT A POINT 1876.07 FEET SOUTH OF THE NORTHEAST CORNER OF SAID SECTION 6, SAID POINT BEING ON THE NORTH LINE OF THE LAND CONVEYED TO COMMONWEALTH EDISON COMPANY BY DOCUMENT NO. R73-2841 (TRACT 1); THENCE WEST ALONG SAID NORTH LINE 1133.17 TO A POINT OF INTERSECTION WITH A LINE 415.0 FEET PERPENDICULARLY DISTANT EAST OF AND PARALLEL WITH THE EAST LINE OF THE LAND CONVEYED TO EARL P. AND EMMA V. KONICEK BY DEED RECORDED AS DOCUMENT NO. 136414 IN BOOK 126, PAGE 41; THENCE NORTH ON SAID 9 PARALLEL LINE, ALSO BEING THE EAST LINE OF THE LAND CONVEYED TO SAID COMMONWEALTH EDISON COMPANY BY DOCUMENT NO. R73-2841, 1897.19 FEET TO THE NORTH LINE OF SAID SECTION 6 AND THE POINT OF TERMINATION; AND ALSO EXCEPT THAT PART OF THE NORTHWEST 1/4 OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN LYING SOUTHERLY OF A LINE EXTENDED EASTERLY FROM A POINT ON THE WEST LINE OF SAID NORTHWEST 1/4 OF SECTION 5 WHICH POINT IS 1876.07 FEET SOUTH OF THE NORTHWEST CORNER OF SAID SECTION 5 TO A POINT ON THE NORTH AND SOUTH CENTER LINE OF SECTION 5, WHICH POINT IS 1828.85 FEET SOUTH OF THE NORTH QUARTER CORNER OF SAID SECTION 5, ALL IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. TRACT 6: PART OF THE EAST 1/2 OF SECTION 6; TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEAST CORNER OF SAID SECTION; THENCE NORTHERLY ALONG THE EASTERLY LINE OF SAID SECTION 6, A DISTANCE OF 3407.85 FEET TO THE SOUTH LINE OF PROPERTY CONVEYED TO SUSAN SCHMIDT BY WARRANTY DEED RECORDED DECEMBER 18, 1929 IN BOOK 80, PAGES 334 AND 335; THENCE WEST ALONG THE SOUTH LINE OF PROPERTY CONVEYED TO SUSAN SCHMIDT A DISTANCE OF 1552.74 FEET TO THE EAST LINE OF PROPERTY CONVEYED TO EARL P KONICEK AND WIFE BY WARRANTY DEED DATED DECEMBER 4, 1961 RECORDED AS DOCUMENT 136414, THENCE SOUTH ALONG THE EAST LINE OF PROPERTY CONVEYED TO EARL P. KONICEK AND WIFE 1240.82 FEET TO THE CENTER LINE OF GALENA ROAD, FOR THE POINT OF BEGINNING; THENCE CONTINUING SOUTH ALONG THE PROLONGATION OF THE LAST DESCRIBED COURSE A DISTANCE 919.13 FEET TO AN ANGLE POINT WHICH IS 1312.43 FEET PERPENDICULARLY DISTANCE NORTH OF SAID SOUTH LINE OF SAID SECTION 6; THENCE SOUTHWESTERLY ALONG A LINE FORMING AN ANGLE OF 26 DEGREES 45 MINUTES 35 SECOND TO THE RIGHT WITH A PROLONGATION OF THE LAST DESCRIBED COURSE A DISTANCE OF 332.08 FEET TO THE NORTH LINE OF PARCEL TWO OF PROPERTY CONVEYED TO CHICAGO TITLE AND TRUST COMPANY, AS TRUSTEE UNDER TRUST NUMBER 45553 BY CONSERVATORS DEED RECORDED SEPTEMBER 17, 1973 AS DOCUMENT 73-4671; THENCE WESTERLY ALONG SAID NORTHERLY LINE FORMING AN ANGLE OF 62 DEGREES 01 MINUTES 01 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE, A DISTANCE 646.8 FEET TO THE CENTER LINE OF BEECHER ROAD; THENCE NORTHEASTERLY ALONG SAID CENTER LINE 1362.40 FEET TO THE CENTER LINE OF GALENA ROAD; THENCE SOUTHEASTERLY ALONG SAID CENTER LINE 460.52 FEET TO THE POINT OF BEGINNING; IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS, ALSO, THAT PART OF THE EAST 1/2 OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: BEGINNING AT THE INTERSECTION OF THE CENTER LINE OF GALENA ROAD WITH THE EAST LINE OF SAID SECTION; THENCE NORTH 70 DEGREES 55 MINUTES WEST ALONG SAID CENTER LINE 276 FEET; THENCE SOUTH PARALLEL TO THE EAST LINE OF SAID SECTION 8, 200 FEET; THENCE SOUTH 70 DEGREES 55 MINUTES EAST 270 FEET TO THE EAST LINE OF SAID SECTION; THENCE SOUTH ALONG THE EAST LINE OF SAID SECTION 1456.6 FEET TO THE SOUTHEAST CORNER OF SAID SECTION; THENCE WEST ALONG THE SOUTH LINE OF SAID SECTION 470.51 FEET TO THE EASTERLY LINE OF PARCEL TWO OF THE PROPERTY CONVEYED TO CHICAGO TITLE AND TRUST COMPANY TRUSTEE UNDER TRUST NUMBER 45553 BY CONSERVATORS DEED RECORDED SEPTEMBER 17, 1973 AS DOCUMENT R73-4671; THENCE NORTHERLY ALONG SAID EASTERLY LINE 1006.52 FEET TO THE NORTHEASTERLY CORNER OF SAID PARCEL; THENCE WESTERLY ALONG THE NORTH LINE OF SAID PARCEL TWO 388.83 FEET TO THE INTERSECTION OF SAID NORTH LINE WITH THE EASTERLY LINE 10 OF THE PROPERTY DESCRIBED IN PARCEL ONE OF SAID DOCUMENT 73-4671; THENCE NORTHEASTERLY ALONG SAID EASTERLY LINE OF PARCEL ONE A DISTANCE OF 115.02 FEET TO AN ANGLE POINT ON SAID EASTERLY LINE OF PARCEL ONE WHICH IS 1112.06 FEET PERPENDICULARLY DISTANCE NORTH OF THE SOUTH LINE OF SAID SECTION; THENCE NORTH ALONG A LINE FORMING AN ANGLE 26 DEGREES 45 MINUTES 38 SECOND TO THE LEFT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE A DISTANCE OF 2329.35 FEET TO THE SOUTH LINE OF PROPERTY CONVEYED TO DIANE R. KAPCHINSKI BY TRUSTEES DEED RECORDED JUNE 14, 1973 AS DOCUMENT 73-28243; THENCE EAST ALONG THE SOUTH LINE OF PROPERTY CONVEYED TO DIANE R. KAPCHINSKI 812.68 FEET TO THE EAST LIEN OF SAID SECTION 6; THENCE SOUTHERLY ALONG THE EAST LINE OF SAID SECTION 6, 1319.90 FEET TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS, EXCEPT THE LEGAL DESCRIPTION INCLUDED IN THE WARRANTY DEED RECORDED AUGUST 24, 2020 AS DOCUMENT 202000016040. OWNER: The Konicek Family Limited Partnership A PART OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN AND PART OF SECTION 1, TOWNSHIP 37 NORTH, RANGE 6 EAST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHWEST CORNER OF SAID SECTION 6, THENCE EAST 19.508 CHAINS (1,287.528 FEET) TO AN IRON STAKE FOR PLACE OF BEGINNING, THENCE EAST ON THE NORTH LINE OF SAID SECTION 6, 44.599 CHAINS (2,943.534 FEET), THENCE SOUTH 16 MINUTES WEST 56.242 CHAINS (3,711.972 FEET) TO THE CENTER OF THE HIGHWAY, THENCE NORTH 73 DEGREES 58 MINUTES WEST 3.473 CHAINS (229.218 FEET) ALONG THE CENTER OF THE HIGHWAY, THENCE NORTH 79 DEGREES 37 MINUTES WEST 52.777 CHAINS (3,483.282 FEET) ALONG THE CENTER OF THE HIGHWAY, THENCE NORTH 79 DEGREES 16 MINUTES WEST 8.03 CHAINS (529.98 FEET) ALONG THE CENTER OF THE HIGHWAY TO AN IRON STAKE, THENCE NORTH 18 DEGREES 05 MINUTES EAST 10.258 CHAINS (677.028 FEET) TO AN IRON STAKE, THENCE NORTH 72 DEGREES 01 MINUTE WEST 6.632 CHAINS (437.712 FEET) TO AN IRON STAKE, THENCE NORTH 27 DEGREES 51 MINUTES EAST 11.60 CHAINS (765.6 FEET) TO AN IRON STAKE, THENCE NORTH 89 DEGREES 25 MINUTES EAST 11.535 CHAINS (761.31 FEET) TO THE CENTER OF THE HIGHWAY, THENCE NORTH 12 DEGREES 40 MINUTES EAST TO THE PLACE OF THE BEGINNING, SITUATED IN KENDALL COUNTY, ILLINOIS, EXCEPTING THEREFROM RIGHT OF WAY DEDICATED FOR ASHE ROAD AND GALENA ROAD AND ALSO; EXCEPTING, THAT PART OF THE NORTHWEST QUARTER OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHWEST CORNER OF SAID SECTION 6; THENCE EAST ALONG THE NORTH LINE OF SAID SECTION 6, A DISTANCE OF 19.508 CHAINS (1287.53 FEET); THENCE SOUTH 12 DEGREES 40 MINUTES WEST, 22.655 CHAINS (1495.23 FEET); THENCE SOUTH 89 DEGREES 25 MINUTES WEST, 11.535 CHAINS (761.31 FEET); THENCE SOUTH 27 DEGREES 50 MINUTES 42 SECONDS WEST, 765.57 FEET; THENCE SOUTH 72 DEGREES 01 MINUTES EAST, 437.71 FEET; THENCE SOUTH 18 DEGREES 05 MINUTES WEST, 637.63 FEET TO THE NORTHERLY RIGHT OF WAY LINE OF GALENA ROAD; THENCE SOUTH 77 DEGREES 03 MINUTES 31 SECONDS EAST ALONG SAID NORTHERLY RIGHT OF WAY LINE OF GALENA ROAD, 187.93 FEET FOR THE POINT OF BEGINNING; THENCE CONTINUING SOUTH 77 DEGREES 03 MINUTES 31 SECONDS EAST ALONG SAID RIGHT OF WAY LINE 136.30 FEET TO A POINT OF CURVE; THENCE CONTINUING EASTERLY ALONG SAID RIGHT OF WAY, BEING A CURVE TO THE LEFT, HAVING A RADIUS OF 14,285.00 FEET AND CHORD BEARING SOUTH 78 DEGREES 06 MINUTES 11 SECONDS EAST, 189.98 FEET TO A POINT OF BEND IN SAID RIGHT OF WAY; THENCE NORTH 14 DEGREES 08 MINUTES 51 SECONDS EAST ALONG SAID RIGHT OF WAY, 11 20.02 FEET TO A POINT OF BEND; THENCE EASTERLY ALONG SAID RIGHT OF WAY, BEING A CURVE TO THE LEFT, HAVING A RADIUS OF 14,265.00 FEET AND CHORD BEARING SOUTH 79 DEGREES 23 MINUTES 57 SECONDS EAST, A DISTANCE OF 453.85 FEET TO A POINT OF TANGENT; THENCE SOUTH 80 DEGREES 18 MINUTES 38 SECONDS EAST ALONG SAID RIGHT OF WAY, 29.82 FEET; THENCE NORTH 10 DEGREES 46 MINUTES 28 SECONDS EAST, 528.48 FEET; THENCE NORTH 79 DEGREES 13 MINUTES 32 SECONDS WEST, 810.97 FEET; THENCE SOUTH 10 DEGREES 46 MINUTES 28 SECONDS WEST, 541.53 FEET TO THE POINT OF BEGINNING, IN BRISTOL TOWNSHIP, KENDALL COUNTY, ILLINOIS, ALSO EXCEPTING, THAT PART OF THE NORTHWEST QUARTER OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN BEING DESCRIBED BY COMMENCING AT THE NORTHWEST CORNER OF SAID SECTION 6; THENCE EAST ALONG THE NORTH LINE OF SAID SECTION 6, A DISTANCE OF 19.508 CHAINS (1287.53 FEET) TO THE NORTHEAST CORNER OF EQUESTRIAN ESTATES AT LEGACY FARMS; THENCE SOUTH 12 DEGREES 40 MINUTES WEST ALONG THE EASTERLY LINE OF SAID SUBDIVISION AND SAID EAST LINE EXTENDED SOUTHERLY, 22.655 CHAINS (1495.23 FEET); THENCE NORTH 89 DEGREES 25 MINUTES EAST, 29.67 FEET TO A POINT ON THE WESTERLY RIGHT OF WAY LINE OF ASHE ROAD AS RELOCATED FOR THE POINT OF BEGINNING; THENCE SOUTH 89 DEGREES 25 MINUTES 00 SECONDS WEST ALONG THE LAST DESCRIBED COURSE, A DISTANCE OF 618.59 FEET; THENCE SOUTH 00 DEGREES 35 MINUTES EAST, AT RIGHT ANGLES TO THE LAST DESCRIBED COURSE, A DISTANCE OF 355.09 FEET; THENCE NORTH 89 DEGREES 25 MINUTES EAST, A DISTANCE OF 683.60 TO A POINT ON THE WESTERLY RIGHT OF WAY LINE OF ASHE ROAD; THENCE NORTHERLY ALONG SAID RIGHT OF WAY LINE, ALONG A CURVE TO THE RIGHT HAVING A RADIUS OF 1482.39 FEET, WHOSE CHORD BEARS NORTH 10 DEGREES 57 MINUTES 30 SECONDS WEST, 360.99 FEET TO THE POINT OF BEGINNING IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. Water Infrastructure Project Estimated Cost On-site 16" Water Main Improvements 11,671,100.00$ Off-site 16" Water Main Improvements 3,504,000.00$ Sub-total 15,175,100.00$ Wastewater Infrastructure Project Estimated Cost Corneils/Eldamain Interceptor Sewer 6,712,350.00$ Sub-total 6,712,350.00$ Transportation Infrastructure Project Estimated Cost Ashe Road Resurfacing 1,269,880.00$ Baseline Road Reconstruction 7,756,890.00$ Ashe Road and Baseline Road Intersection Improvements 2,092,760.00$ Sub-total 11,119,530.00$ Total Infrastructure Budget 33,006,980.00$ Project Steel Project Cardinal ComED 0 3,000 6,000 Feet Proposed Water Main On-Site By Project Cardinal Proposed Water Main On-Site By Project Steel Proposed Water Main Off-Site By Project Cardinal ComED Limits Project Cardinal Development Project Steel Development Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 / www.eeiweb.con EXHIBIT C WATER MAIN IMPROVEMENTS DATE: MARCH 2026United City of Yorkville 651 Prairie Pointe Drive Yorkville, IL 60560 (630) 553-4350 www.yorkville.il.us LOCATION MAPCONSULTING ENGINEERS NO.DATE REVISIONS PROJECT NO.: YO2451 PATH: H:/GIS/PUBLIC/YORKVILLE/2024/ YO2451- CARDINAL_STEEL_WATER MAIN IMPROVEMENTSFILE: . PROPOSED NORTHWEST EWST BY CITY PROPOSED OFF-SITE 16" WATER MAIN PROJECT CARDINAL PROPOSED ON-SITE 16" WATER MAIN PROJECT CARDINAL PROPOSED ON-SITE 16" WATER MAIN PROJECT STEEL CONNECT TO EXISTING 16" WATER MAIN CONNECT TO PROPOSED 16" WATER MAIN CONNECT TO EXISTING 16" WATER MAIN NOTE: TYPICAL PERMANENT EASEMENT REQUIRED FOR WATERMAIN IS 20' 1 RECAPTURE AGREEMENT #1 THIS RECAPTURE AGREEMENT #1 ( “Recapture Agreement”) is made and entered as of the ____ day of ________________ 2026, by and between the United City of Yorkville, Kendall County, Illinois (the “City”) and Pioneer Development, LLC, an Illinois limited liability company (“Pioneer”). RECITALS. A. Pioneer is the purchaser of approximately 1,037 acres located west of North Bridge Street, east of Ashe Road and south of Baseline Road which Pioneer intends to develop as a data center campus (the “Development Site”). B. In order to service the Development Site, substantial infrastructure improvements are required including the extension of the City’s Water System with the construction of a 16” water main from the City’s Northwest Elevated Storage Tank located along Eldamain Road to Galena Road (the “16” Water Main Extension”). C. The City has agreed to construct, and Pioneer has agreed to pay all expenses to design and construct the 16” Water Main Extension, as depicted on Exhibit A, including all costs incurred by the City to acquire all required temporary construction easements and permanent easements (collectively, the “Project”). D. Pioneer desires to recover its hard and soft costs associated with the administration, design, engineering, construction, and oversight of the Project (collectively the “Recapture Costs”) to provide water service from the City to properties along the route as depicted and as identified by parcel numbers on Exhibit A attached hereto which properties could connect to and benefit from the 16” Water Main Extension (the “Benefitted Properties”). E. Pioneer is desirous of entering into this Agreement to provide for the fair and equitable recapture from owners of the Benefitted Properties a portion of its costs to provide Pioneer and the Benefitted Properties with an available water source, subject to the terms and conditions set forth in this Agreement. NOW, THEREFORE, in consideration of the foregoing recitals and the mutual covenants hereinafter set forth, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged by the parties hereto, the parties hereby agree as follows: Section 1. Recapture Costs. Pioneer shall be entitled to recover its Recapture Costs pursuant to this Recapture Agreement. It is understood and agreed that within thirty (30) days of completion of the construction of the 16” Water Main Extension, and acceptance by the City, an itemized list of the actual costs shall be submitted to Pioneer and shall be appended hereto as Exhibit B (the “Final Project Costs”). Section 2. Benefitted Properties. Each Benefitted Property is eligible to connect to the 16” Water Main Extension upon satisfaction of the conditions hereinafter set forth. Any time any one of the Benefitted Properties is subdivided into two or more parcels, all of such parcels shall be deemed to be added to the list of Benefitted Properties and a share of the Recapture Costs as allocated in Section 4 shall be revised to reflect each subdivision during the term of this Agreement. Section 3. Condition Precedent to Connect. A Benefitted Property shall not be eligible to connect to the 16” Water Main Extension unless the Owner of the Benefitted Property has either annexed to the City or entered into a pre-annexation agreement with the City. 2 Section 4. Recapture Cost Allocation. The City has established that the methodology to determine the proportionate share of Recapture Costs to be allocated to each Benefitted Property shall be based upon the linear frontage of the Benefitted Property along Eldamain Road as listed on Exhibit A. Once Final Project Costs are known and certified, a cost per linear foot shall be established and referred to herein as the Recapture Allocation. Section 5. Collection of Recapture Costs. The City shall assess against a Benefitted Property, or any portion thereof, the Recapture Allocation as allocated to such Benefitted Property. At such time as a Benefitted Property owner applies to the City for issuance of a permit for connection to the 16” Water Main Extension, the City shall: (i) collect from such Benefitted Owner, or its agents or representative, the applicable Recapture Allocation owed hereunder by such Benefitted Property; or (ii) waive the applicable Recapture Allocation in the event the owner of the Benefitted Property has paid its allocated share directly to Pioneer. No Benefitted Property shall be issued a connection permit to the 16” Water Main Extension until such Benefitted Property has fully paid the share of the Recapture Allocation owed by such Benefitted Property or the City has waived the owner’s obligation to pay the allocated Recapture Costs as provided in Section 5 (ii). Section 6. Obligation of the City. Upon annexation of any Benefitted Property to the City, its officers, employees and agents shall make all reasonable efforts to collect the Recapture Allocation as calculated, for each Benefitted Property payable to the City. Section 7. City’s Collection of other Fees and Charges. Nothing contained in this Agreement shall limit or in any way affect the rights of the City to collect other fees and charges pursuant to City ordinances, resolutions, motions and policies. The Recapture Allocation to be paid by a Benefitted Property is in addition to such other City fees and charges. Section 8. Term. This Agreement shall commence on the date stated above and remain in full force and effect for a period of twenty (20) years from the date Exhibit B is appended and this Recapture Agreement #1 is recorded (the “Term ”), In the event no Benefitted Property or a subdivided portion of a Benefitted Property has connected to the 16” Water Main Extension within twenty (20) years after expiration of the Term, this Recapture Agreement #1, and each and every duty and undertaking set forth herein pertaining to such Benefitted Property, shall become null and void and of no further force and effect as to such Benefitted Property. Notwithstanding the Term of this Agreement, upon receipt by Pioneer of payment of the certified Recapture Allocation in full, this Recapture Agreement #1 shall immediately terminate and all rights of recapture of Recapture Allocation on the part of Pioneer shall cease. Section 9. Lein. This Agreement shall be recorded against the Benefitted Properties upon completion of the 16” Water Main Extension and acceptance by the City and Exhibit B with the actual costs of the 16” Water Main Extension attached. The recordation by the City of this Agreement against the Benefitted Properties shall create and constitute a lien against each Benefitted Property, and each subdivided lot hereafter contained therein, in the amount of the Recapture Allocation, applicable hereunder to such Benefitted Property. 3 Section 10. Miscellaneous Provisions. A. Agreement: This Recapture Agreement #1 may be amended upon the mutual consent of the parties hereto from time to time by written instrument and conformity with all applicable statutory and ordinance requirements and without the consent of any other person or corporation owning all or any portion of the Benefitted Properties. B. Binding Effect: Except as otherwise herein provided, this Recapture Agreement shall inure to the benefit of and be binding upon the successors and assigns of the owner of a Benefitted Property. C. Enforcement: Each party to this Recapture Agreement #1, and their respective successors and assigns, may either in law or in equity, by suit, action, mandamus, or other proceeding to enforce and compel performance of this Recapture Agreement. D. Recordation: A true and correct copy of this Recapture Agreement #1 shall be recorded with the Kendall County’s Recorder’s Office by the City at the cost and expense of Pioneer. This Recapture Agreement #1 shall constitute a covenant running with the land and shall be binding upon the Benefitted Properties in accordance with the terms and provisions set forth herein. E. Notices: Any notice required or desired to be given under this Recapture Agreement, unless expressly provided to the contrary herein, shall be in writing and shall be deemed to have been given on the date of personal delivery, on the date of confirmed telefacsimile transmission provided a hard copy of such notice is deposited in the U.S. mail addressed to the recipient within twenty-four hours following the telefacsimile transmission, or on the date when deposited in the U.S. Mail, registered or certified mail, postage prepaid, return receipt requested, and addressed as follows: Notices and communications to Developer shall be addressed to, and delivered at, the following addresses: Pioneer Development, LLC 30 N. Gould Street, #38989 Sheridan, Wyoming 82801 Attn: Matt McCarron Mahoney, Silverman & Cross, LLC 822 Infantry Drive, Suite 100 Joliet, Illinois 60435 Attn: David J. Silverman Notices and communications to the City shall be addressed to and delivered at these addresses: United City of Yorkville 651 Prairie Pointe Yorkville, IL 60560 Attn: City Administrator With a copy to: Ottosen DiNolfo Hasenbalg & Castaldo, Ltd. 2441 Warrenville Road, Suite 310 Lisle, IL 60532 Attn: Attorney Kathleen Field Orr F. Severability: The invalidity or unenforceability of any of the provisions hereof, or any charge imposed as to any portion of the Benefitted Properties, shall not affect the validity or enforceability of the remainder of this Recapture Agreement or the charges imposed hereunder. G. Complete Agreement: This Recapture Agreement contains all the terms and conditions agreed upon by the parties hereto and no other prior agreement, regarding the subject matter of this 4 Agreement shall be deemed to exist to bind the parties. This shall be governed by the laws of the State of Illinois. H. Captions and Paragraph Headings: Captions and paragraph headings incorporated herein are for convenience only and are not part of this Recapture Agreement, and further shall not be used to construe the terms hereof. I. Recitals and Attachments: The recitals set forth at the beginning of this Recapture Agreement #1 and the exhibits attached hereto are hereby incorporated herein and made a part of the substance hereof. J. Enforceability: This Recapture Agreement #1 shall be enforceable in the Circuit Court of Kendall County by any of the parties hereto by an appropriate action of law or in equity to secure the performance of the covenants herein contained. IN WITNESS WHEREOF, the Parties have executed this Recapture Agreement #1 as of the dates set forth below their respective signatures, to be effective as of the date first written above. United City of Yorkville, Kendall County, Illinois Attest: By: By: Mayor City Clerk Date: , 2026 Pioneer Development, LLC Attest: By: By: Its Manager Date: , 2026 TampaBertramJeterGarritano Rosenwi nkelBurnettMarquetteBarrett Galena Willoughby PierpontHalfMoonBristolBay BeecherBridgeW a t e r p a rkAsheBaseline BeecherEldamainProject Steel Project Cardinal ComED 0 2,200 Feet Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 / www.eeiweb.con EXHIBIT A WATER MAIN RECAPTURE DATE: MARCH 2026United City of Yorkville 651 Prairie Pointe Dr. Yorkville, IL 60560 //www.yorkville.il.us PROJECT CARDINALCONSULTING ENGINEERS NO.DATE REVISIONS PROJECT NO.: YO2451 PATH: H:/GIS/PUBLIC/YORKVILLE/2024/ FILE: . F E D C B A YO2451_Exhibit A Potential Recapture Water Main PROPOSED OFF-SITE 16" WATER MAIN PROJECT CARDINAL PROPOSED ON-SITE 16" WATER MAIN PROJECT STEEL PROPOSED ON-SITE 16" WATER MAIN PROJECT CARDINAL Legend PROPOSED ELEVATED WATER STORAGE TANK PROPOSED WATER MAIN ON-SITE BY PROJECT CARDINAL PROPOSED WATER MAIN ON-SITE BY PROJECT STEEL PROPOSED WATER MAIN OFF-SITE BY PROJECT CARDINAL COMED LIMITS PROJECT CARDINAL DEVELOPMENT PROJECT STEEL DEVELOPMENT EXISTING WATER MAIN PROPOSED NORTHWEST EWST BY CITY G Property Frontage PIN A YORKVILLE NEXUS III LLC 950 FT 02-07-300-005 B YORKVILLE NEXUS III LLC 475 FT 02-07-100-014 C ELDAMAIN RENTAL 2 LLC 200 FT 02-07-100-006 D ELDAMAIN RENTAL 1 LLC 550 FT 02-07-100-013 E YORKVILLE NEXUS III LLC 975 FT 02-07-100-014 F YORKVILLE NEXUS III LLC 1,000 FT 02-07-100-002 G ROSENWINKEL FAMILY TRUST 3,400 FT 02-06-300-011 PRELIMINARY COST ESTIMATE JOB NO:YO2451 DESIGNED:AMN/BPS DATE:December 8, 2025 PROJECT TITLE:Project Cardinal - On-site 16" Water Main ITEM UNIT NO.UNIT QUANTITY PRICE AMOUNT 1 TREE REMOVAL UNIT 35 40.00$ 1,400.00$ 2 EACH 2 9,000.00$ 18,000.00$ 3 FOOT 31,000 200.00$ 6,200,000.00$ 4 WATER MAIN PROTECTION, 36-INCH PVC FOOT 70 260.00$ 18,200.00$ 5 EACH 31 12,000.00$ 372,000.00$ 6 2-INCH AIR RELEASE VALVE IN DOGHOUSE VAULT EACH 5 25,000.00$ 125,000.00$ 7 EACH 62 10,000.00$ 620,000.00$ 8 POUND 9,000 5.00$ 45,000.00$ 9 LSUM 1 65,000.00$ 65,000.00$ 10 EACH 10 1,500.00$ 15,000.00$ 11 FOOT 31,300 5.00$ 156,500.00$ 12 FOOT 100 200.00$ 20,000.00$ 13 TON 600 40.00$ 24,000.00$ 14 CUYD 600 50.00$ 30,000.00$ 15 LSUM 1 265,000.00$ 265,000.00$ 16 LSUM 1 150,000.00$ 150,000.00$ 17 UNIT 150,000 1.00$ 150,000.00$ SUBTOTAL 8,275,100.00$ CONTINGENCY (20%)1,656,000.00$ TOTAL 9,931,100.00$ PERMITTING 150,000.00$ DESIGN ENGINEERING 795,000.00$ CONSTRUCTION ENGINEERING 795,000.00$ 11,671,100.00$ 52 Wheeler Road, Sugar Grove, IL 60554 Tel: 630.466.6700 Fax: 630.466.6701 www.eeiweb.com CONNECTION TO EXISTING WATER MAIN, 16-INCH WATER MAIN, D.I.P., CLASS 52, WITH POLYETHYLENE WRAP, 16-INCH BUTTERFLY VALVE AND VALVE VAULT, 16-INCH FIRE HYDRANT ASSEMBLY, WITH AUXILIARY VALVE, 6-INCH MJ DUCTILE IRON FITTINGS WATER MAIN TESTING - PRESSURE AND DISINFECTION STABILIZED CONSTRUCTION ENTRANCE PERIMETER EROSION BARRIER DRAIN TILE REPLACEMENT NON-SPECIAL, NON-HAZARDOUS SOIL WASTE DISPOSAL TOTAL PRELIMINARY COST ESTIMATE FOUNDATION MATERIAL RESTORATION TRAFFIC CONTROL AND PROTECTION ALLOWANCE - ITEMS ORDERED BY THE ENGINEER G:\Public\Yorkville\2024\YO2451-DR Pioneer Development- Project Cardinal\Water Main Estimates\Project Cardinal Water Main PCE PRELIMINARY COST ESTIMATE JOB NO:YO2451 DESIGNED:AMN/BPS DATE:December 8, 2025 PROJECT TITLE:Project Cardinal - Off-site Water Main ITEM UNIT NO.UNIT QUANTITY PRICE AMOUNT 1 EACH 2 200.00$ 400.00$ 2 EACH 1 9,000.00$ 9,000.00$ 3 FOOT 7,700 200.00$ 1,540,000.00$ 4 FOOT 85 220.00$ 18,700.00$ 5 FOOT 85 1,000.00$ 85,000.00$ 6 EACH 8 12,000.00$ 96,000.00$ 7 2-INCH AIR RELEASE VALVE IN DOGHOUSE VAULT EACH 3 25,000.00$ 75,000.00$ 8 EACH 16 10,000.00$ 160,000.00$ 9 POUND 5,000 5.00$ 25,000.00$ 10 LSUM 1 15,000.00$ 15,000.00$ 11 SQYD 50 100.00$ 5,000.00$ 12 SQYD 25 40.00$ 1,000.00$ 13 STORM SEWER REMOVAL AND REPLACEMENT, 12" CMP FOOT 20 70.00$ 1,400.00$ 14 EACH 3 1,500.00$ 4,500.00$ 15 FOOT 8,000 5.00$ 40,000.00$ 16 FOOT 200 60.00$ 12,000.00$ 17 TON 400 40.00$ 16,000.00$ 18 CUYD 100 50.00$ 5,000.00$ 19 EACH 5 200.00$ 1,000.00$ 20 LSUM 1 65,000.00$ 65,000.00$ 21 EACH 2 500.00$ 1,000.00$ 22 EACH 5 400.00$ 2,000.00$ 23 LSUM 1 85,000.00$ 85,000.00$ 24 UNIT 100,000 1.00$ 100,000.00$ SUBTOTAL 2,363,000.00$ CONTINGENCY (20%)473,000.00$ TOTAL 2,836,000.00$ DESIGN ENGINEERING 284,000.00$ CONSTRUCTION ENGINEERING 284,000.00$ EASEMENT ACQUISITION 100,000.00$ 3,504,000.00$ 52 Wheeler Road, Sugar Grove, IL 60554 Tel: 630.466.6700 Fax: 630.466.6701 www.eeiweb.com WATER MAIN TESTING - PRESSURE AND DISINFECTION WATER MAIN, D.I.P., CLASS 52, WITH POLYETHYLENE WRAP, 16-INCH DUCTILE IRON FITTINGS TREE ROOT PRUNING STEEL CASING PIPE, 30-INCH (.3" WALL THICKNESS) BORED AND JACKED BUTTERFLY VALVE AND VALVE VAULT, 16-INCH WATER MAIN, D.I.P., CLASS 52, WITH POLYETHYLENE WRAP, 16-INCH HDSS RESTRAINED FIRE HYDRANT ASSEMBLY, WITH AUXILIARY VALVE, 6-INCH MJ ITEM CONNECTION TO EXISTING WATER MAIN, 16-INCH HMA DRIVEWAY REMOVAL AND REPLACEMENT AGGREGATE DRIVEWAY REMOVAL AND REPLACEMENT STABILIZED CONSTRUCTION ENTRANCE PERIMETER EROSION BARRIER TOTAL PRELIMINARY COST ESTIMATE DRAIN TILE REPLACEMENT MAILBOX TO BE REMOVED AND RESET NON-SPECIAL, NON-HAZARDOUS SOIL WASTE DISPOSAL RESTORATION SIGN TO BE REMOVED AND RESET TRAFFIC CONTROL AND PROTECTION ALLOWANCE - ITEMS ORDERED BY THE ENGINEER FOUNDATION MATERIAL INLET PROTECTION G:\Public\Yorkville\2024\YO2451-DR Pioneer Development- Project Cardinal\Water Main Estimates\Project Cardinal Water Main PCE BeecherSaraso taTampa Corneils Nathan JonathanRidgeGar r i tano BiscayneRyanCrestwood OakBu rn e t t Bertram Ma r q u e t t e PleasantPly m o u t h Barrett Shadow Wood CaledoniaGardiner Rosenwinke l LongviewCrossPlumHuntCharityWilloughby Pierpont Boombah Sears Foster Baseline Bristol BayC a m d e n WestNorthHarrisonGalena PinewoodHunterCannonballTimb a l i e r Portage PecosHenning Commer c i a l BridgeWaterpark Big BendEldamainRock CreekJeterAsheRock CreekBeecher Project Steel Project Cardinal ComED ComED ComED ComED Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 / www.eeiweb.con DATE: MARCH 2026United City of Yorkville 800 Game Farm Road Yorkville, IL 60560 (630) 553-4350 www.yorkville.il.us UNITED CITY OF YORKVILLE KENDALL COUNTY, ILLINOIS CONSULTING ENGINEERS NO.DATE REVISIONS PROJECT NO.: YO2508 PATH: H:/GIS/PUBLIC/YORKVILLE/2025/ FILE: . 3,000 0 3,0001,500 Feet YO2508_Project Steel_YSBD-Sanitary PROJECT CARDINAL Legend PROPOSED SANITARY SEWER EXISTING CITY SANITARY SEWER YBSD EXISTING SEWER PROPOSED 24" SANITARY SEWER PROPOSED 16" SANITARY SEWER CONNECT TO EXISTING EXHIBIT F SANITARY SEWER IMPROVEMENTS CONNECT TO EXISTING PRELIMINARY COST ESTIMATE JOB NO: DESIGNED: DATE: PROJECT TITLE: ITEM UNIT NO.UNIT QUANTITY PRICE AMOUNT 1 FOOT 11,750 300.00$ 3,525,000.00$ 2 EACH 30 12,000.00$ 360,000.00$ 3 FOOT 410 350.00$ 143,500.00$ 4 EACH 1 6,500.00$ 6,500.00$ 5 FOOT 11,750 5.00$ 58,750.00$ 6 EACH 30 600.00$ 18,000.00$ 7 LSUM 1 150,000.00$ 150,000.00$ 8 LSUM 1 40,000.00$ 40,000.00$ 9 EACH 4 4,000.00$ 16,000.00$ 10 FOOT 150 750.00$ 112,500.00$ 11 EACH 4 750.00$ 3,000.00$ 12 TON 50 55.00$ 2,750.00$ 13 CU YD 300 50.00$ 15,000.00$ 14 CU YD 75 50.00$ 3,750.00$ 15 FOOT 23,500 3.00$ 70,500.00$ 16 FOOT 100 100.00$ 10,000.00$ 17 SQYD 200 200.00$ 40,000.00$ 18 UNIT 50,000 1.00$ 50,000.00$ CONSTRUCTION COST 4,625,250.00$ 925,100.00$ 5,550,350.00$ LEGAL SURVEYING AND EASEMENT ACQUISITION 50,000.00$ 556,000.00$ 556,000.00$ TOTAL 6,712,350.00$ 52 Wheeler Road, Sugar Grove, IL 60554 Tel: 630.466.6700 Fax: 630.466.6701 www.eeiweb.com SELECTED GRANULAR BACKFILL TRAFFIC CONTROL AND PROTECTION YO2508 ADH / KDW MARCH 2,2026 CORNEILS/ELDAMAIN INTERCEPTOR SEWER RESTORATION ADDITIONAL DEPTH OF MANHOLE CONNECT TO EXISTING SANITARY MANHOLE ITEM SANITARY SEWER, PVC C900, DR-18, 16-INCH SANITARY MANHOLE VACUUM TESTING TYPE A SANITARY MANHOLE, 5' DIA., TYPE 1 FRAME AND CLOSED LID DEFLECTION TESTING SANITARY SEWER HMA DRIVEWAY REMOVAL AND REPLACEMENT STABILIZED CONSTRUCTION ENTRANCE STEEL CASING PIPE, BORE AND JACK, 30-INCH EXPLORATORY EXCAVATION PERIMETER EROSION BARRIER DRAIN TILE REPAIR NON-SPECIAL, NON-HAZARDOUS SOIL WASTE DISPOSAL FOUNDATION MATERIAL CONTINGENCY (20%) DESIGN ENGINEERING CONSTRUCTION ENGINEERING TOTAL CONSTRUCTION COST ALLOWANCE - ITEMS ORDERED BY THE ENGINEER Project Cardinal ROUTE 47ROUTE 47MIGHELL RDASHE RDELDAMAIN RDGALE N A R D E. BEECHER RDW. BEECHER RDBASELINE RD 0 2,000 4,000 Feet Project Cardinal Development Ashe Rd Improvements Baseline Rd Improvements Galena Rd Improvements Proposed Project Cardinal Entry Points Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 / www.eeiweb.con EXHIBIT G1 TRANSPORTATION IMPROVEMENTS DATE: DECEMBER 2025United City of Yorkville 651 Prairie Pointe Drive Yorkville, IL 60560 (630) 553-4350 www.yorkville.il.us LOCATION MAPCONSULTING ENGINEERS NO.DATE REVISIONS PROJECT NO.: YO2451 PATH: H:/GIS/PUBLIC/YORKVILLE/2024/ YO2451_PROJECT CARDINAL ROADWAY EXHIBITSFILE: . ROAD TO BE RECONSTRUCTED ROAD TO BE RESURFACED ROAD TO BE WIDENED TO 3-LANE W/TURN LANES INTERSECTION IMPROVEMENTS W/ TRAFFIC SIGNAL PRELIMINARY COST ESTIMATE JOB NO: DESIGNED: DATE: PROJECT TITLE: ITEM UNIT NO.UNIT QUANTITY PRICE AMOUNT 1 SY 180 25.00$ 4,500.00$ 2 SY 11,150 6.00$ 66,900.00$ 3 LB 8,700 0.20$ 1,740.00$ 4 TON 2,575 90.00$ 231,750.00$ 5 TON 1,290 100.00$ 129,000.00$ 6 SY 1,225 20.00$ 24,500.00$ 7 FOOT 13,500 1.00$ 13,500.00$ 8 FOOT 570 2.00$ 1,140.00$ 9 FOOT 100 6.00$ 600.00$ 10 FOOT 65 10.00$ 650.00$ 11 FOOT 240 40.00$ 9,600.00$ 12 FOOT 240 150.00$ 36,000.00$ 13 CY 860 35.00$ 30,100.00$ 14 CY 860 35.00$ 30,100.00$ 15 SY 11,560 10.00$ 115,600.00$ 16 FOOT 6,500 10.00$ 65,000.00$ 17 EACH 3 400.00$ 1,200.00$ 18 L SUM 1 40,000.00$ 40,000.00$ 19 L SUM 1 80,000.00$ 80,000.00$ SUBTOTAL 881,880.00$ CONTINGENCY (20%)176,000.00$ TOTAL 1,057,880.00$ DESIGN ENGINEERING 106,000.00$ CONSTRUCTION ENGINEERING 106,000.00$ 1,269,880.00$ 52 Wheeler Road, Sugar Grove, IL 60554 Tel: 630.466.6700 Fax: 630.466.6701 www.eeiweb.com YO2451 JHS/CJO/BPS December 8, 2025 Ashe Road Resurfacing HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50 ITEM HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT BITUMINOUS MATERIALS (PRIME/TACK COAT) HOT-MIX ASPHALT SURFACE REMOVAL, 6" GRADING AND SHAPING DITCHES THERMOPLASTIC PAVEMENT MARKING - LINE 4" TOTAL PRELIMINARY COST ESTIMATE THERMOPLASTIC PAVEMENT MARKING - LINE 24" PIPE CULVERT REMOVAL SIGN PANEL ASSEMBLY REMOVAL AND REPLACEMENT TRAFFIC CONTROL AND PROTECTION MOBILIZATION HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N50 AGGREGATE SHOULDERS, TYPE B, 3" PIPE CULVERTS, CLASS C, TYPE 1, 12" AGGREGATE SUBGRADE IMPROVEMENT RESTORATION THERMOPLASTIC PAVEMENT MARKING - LINE 12" THERMOPLASTIC PAVEMENT MARKING - LINE 6" REMOVAL AND DISPOSAL OF UNSUITABLE MATERIALS G:\Public\Yorkville\2024\YO2451-DR Pioneer Development- Project Cardinal\Roadway Cost Estimates\Project Cardinal Roadway PCE PRELIMINARY COST ESTIMATE JOB NO: DESIGNED: DATE: PROJECT TITLE: ITEM UNIT NO.UNIT QUANTITY PRICE AMOUNT 1 SY 40 25.00$ 1,000.00$ 2 CY 24,000 40.00$ 960,000.00$ 3 SY 36,270 2.00$ 72,540.00$ 4 SY 36,270 22.00$ 797,940.00$ 5 SY 27,200 30.00$ 816,000.00$ 6 LB 13,300 0.20$ 2,660.00$ 7 TON 3,920 90.00$ 352,800.00$ 8 TON 2,385 100.00$ 238,500.00$ 9 SY 4,540 20.00$ 90,800.00$ 10 SY 4,540 60.00$ 272,400.00$ 11 FOOT 30,210 1.00$ 30,210.00$ 12 FOOT 33 10.00$ 330.00$ 13 FOOT 314 40.00$ 12,560.00$ 14 FOOT 314 100.00$ 31,400.00$ 15 CY 2,800 40.00$ 112,000.00$ 16 SY 56,700 8.00$ 453,600.00$ 17 FOOT 20,400 10.00$ 204,000.00$ 18 EACH 6 400.00$ 2,400.00$ 19 EACH 3 750.00$ 2,250.00$ 20 L SUM 1 137,500.00$ 137,500.00$ 21 L SUM 1 275,000.00$ 275,000.00$ SUBTOTAL 4,865,890.00$ CONTINGENCY (20%)973,000.00$ TOTAL 5,838,890.00$ DESIGN ENGINEERING 584,000.00$ CONSTRUCTION ENGINEERING 584,000.00$ ROW ACQUISITION 750,000.00$ 7,756,890.00$ 52 Wheeler Road, Sugar Grove, IL 60554 Tel: 630.466.6700 Fax: 630.466.6701 www.eeiweb.com TOTAL PRELIMINARY COST ESTIMATE PIPE CULVERT REMOVAL PIPE CULVERTS, CLASS C, TYPE 1, 12" AGGREGATE SUBGRADE IMPROVEMENT RESTORATION GRADING AND SHAPING DITCHES HOT-MIX ASPHALT SHOULDERS, 9" THERMOPLASTIC PAVEMENT MARKING - LINE 4" SIGN PANEL ASSEMBLY REMOVAL AND REPLACEMENT RELOCATE EXISTING MAILBOX MOBILIZATION HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT TRAFFIC CONTROL AND PROTECTION YO2451 JHS/CJO/BPS December 8, 2025 Baseline Road Reconstruction ITEM THERMOPLASTIC PAVEMENT MARKING - LINE 24" EARTH EXCAVATION GEOTECHNICAL FABRIC FOR GROUND STABILIZATION AGGREGATE SUBGRADE IMPROVEMENT, 12" HOT-MIX ASPHALT BASE COURSE, 5" BITUMINOUS MATERIALS (PRIME/TACK COAT) HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50 HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N50 AGGREGATE SHOULDERS, TYPE B, 9" G:\Public\Yorkville\2024\YO2451-DR Pioneer Development- Project Cardinal\Roadway Cost Estimates\Project Cardinal Roadway PCE PRELIMINARY COST ESTIMATE JOB NO: DESIGNED: DATE: PROJECT TITLE: ITEM UNIT NO.UNIT QUANTITY PRICE AMOUNT 1 CY 4,620 40.00$ 184,800.00$ 2 SY 6,930 2.00$ 13,860.00$ 3 SY 6,930 22.00$ 152,460.00$ 4 SY 5,540 30.00$ 166,200.00$ 5 LB 2,500 0.20$ 500.00$ 6 TON 800 90.00$ 72,000.00$ 7 TON 480 100.00$ 48,000.00$ 8 SY 670 20.00$ 13,400.00$ 9 SY 670 60.00$ 40,200.00$ 10 FOOT 6,000 1.00$ 6,000.00$ 11 FOOT 600 4.00$ 2,400.00$ 12 FOOT 90 10.00$ 900.00$ 13 CY 580 40.00$ 23,200.00$ 14 SY 8,330 8.00$ 66,640.00$ 15 FOOT 3,000 10.00$ 30,000.00$ 16 EACH 8 400.00$ 3,200.00$ 17 L SUM 1 500,000.00$ 500,000.00$ 18 L SUM 1 20,000.00$ 20,000.00$ 19 L SUM 1 40,000.00$ 40,000.00$ SUBTOTAL 1,383,760.00$ CONTINGENCY (20%)277,000.00$ TOTAL 1,660,760.00$ DESIGN ENGINEERING 166,000.00$ CONSTRUCTION ENGINEERING 166,000.00$ ROW ACQUISITION 100,000.00$ 2,092,760.00$ 52 Wheeler Road, Sugar Grove, IL 60554 Tel: 630.466.6700 Fax: 630.466.6701 www.eeiweb.com HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50 YO2451 JHS/CJO/BPS December 8, 2025 Baseline Road & Ashe Road Intersection Improvements ITEM EARTH EXCAVATION GEOTECHNICAL FABRIC FOR GROUND STABILIZATION AGGREGATE SUBGRADE IMPROVEMENT, 12" HOT-MIX ASPHALT BASE COURSE, 5" BITUMINOUS MATERIALS (PRIME/TACK COAT) HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N50 AGGREGATE SHOULDERS, TYPE B, 9" HOT-MIX ASPHALT SHOULDERS, 9" THERMOPLASTIC PAVEMENT MARKING - LINE 4" THERMOPLASTIC PAVEMENT MARKING - LINE 24" TRAFFIC SIGNAL TRAFFIC CONTROL AND PROTECTION MOBILIZATION TOTAL PRELIMINARY COST ESTIMATE THERMOPLASTIC PAVEMENT MARKING - LINE 12" AGGREGATE SUBGRADE IMPROVEMENT RESTORATION GRADING AND SHAPING DITCHES SIGN PANEL ASSEMBLY G:\Public\Yorkville\2024\YO2451-DR Pioneer Development- Project Cardinal\Roadway Cost Estimates\Project Cardinal Roadway PCE 1 RECAPTURE AGREEMENT #2 THIS RECAPTURE AGREEMENT #2 (“Recapture Agreement”) is made and entered as of the ____ day of ________________ 2026, by and between the United City of Yorkville, Kendall County, Illinois (the “City”) and Pioneer Development, LLC, an Illinois limited liability company (“Pioneer”). RECITALS. A. Pioneer is the purchaser of approximately 1,037 acres located west of North Bridge Street, east of Ashe Road and south of Baseline Road which Pioneer intends to develop as a data center campus (the “Development Site”). B. In order to service the Development Site, substantial infrastructure improvements are required including the reconstruction of Galena Road, which roadway is under the jurisdiction of Kendall County, to include the widening of Galena Road to three lanes from Eldamain Road to Route 47 (the “Galena Road Project”) as depicted on Exhibit A. Kendall County shall design and construct the Galena Road Project, on the condition that the total cost of the Galena Road Project be paid by Pioneer and Prologis L.P., both of which shall be benefitted from the Galena Road Project. C. The City has reviewed the Galena Road Project with Pioneer and Prologis L.P., and all agree Prologis L.P. shall be responsible for 15% and Pioneer shall be responsible for 85% of the total cost of the Galena Road Project. D. Pioneer is prepared to direct Kendall County to proceed with the Galena Road Project and desires to recapture 15% of the total costs of the Galena Road Project from Prologis L.P., its successors and assigns, subject to the terms and conditions hereinafter provided. NOW, THEREFORE, in consideration of the foregoing recitals and the mutual covenants hereinafter set forth, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged by the City and Pioneer hereby agree as follows: Section 1. Recapture Costs. An estimate of the costs to construct the Project shall be received from Kendall County (the “Recapture Costs”). It is understood and agreed that within thirty (30) days of completion of the construction Galena Road Project an itemized list of the actual costs shall be submitted to Pioneer and shall be appended hereto as Exhibit B (the “Final Project Costs”). Pioneer shall deliver to the City acknowledgement of payment in full of the Final Project Costs to Kendall County. Section 2. Collection of Final Project Costs. At such time as Prologis L.P. or its successors or assigns, apply to the City for issuance of a building permit, the City shall: (i) collect from Prologis L.P. or its agents, representative, successors and assigns, 15 % of the Final Project Costs; or (ii) waive the collection of 15% of the Final Project Costs in the event Prologis L.P. has paid its allocated share directly to Pioneer. Section 3. City’s Collection of other Fees and Charges. Nothing contained in this Agreement shall limit or in any way affect the rights of the City to collect other fees and charges pursuant to City ordinances, resolutions, motions and policies from Pioneer or Prologis L.P. Section 4. Term. This Agreement shall commence on the date stated above and remain in full force and effect for a period of twenty (20) years from the date Exhibit B is appended and this Recapture 2 Agreement #2 is recorded (the “Term”). Notwithstanding the Term of this Agreement, upon receipt by Pioneer of payment in full of 15% of the Final Project Costs in full, this Recapture Agreement #2 shall immediately terminate and all rights of recapture of 15% of the Final Project Costs on the part of Pioneer shall cease. Section 5. Lien. This Agreement shall be recorded against the property of Prologis L.P. upon completion of the Galena Road Project, and the Final Projects Costs are appended to this Recapture Agreement as Exhibit B. Section 6. Miscellaneous Provisions. A. Agreement: This Recapture Agreement #2 may be amended upon the mutual consent of the parties hereto from time to time by written instrument and conformity with all applicable statutory and ordinance requirements and without the consent of Prologis L.P. B. Binding Effect: Except as otherwise herein provided, this Recapture Agreement shall inure to the benefit of and be binding upon the successors and assigns Prologis. C. Enforcement: Each party to this Recapture Agreement #2, and their respective successors and assigns, may either in law or in equity, by suit, action, mandamus, or other proceeding to enforce and compel performance of this Recapture Agreement. D. Recordation: A true and correct copy of this Recapture Agreement #2 shall be recorded with the Kendall County’s Recorder’s Office by the City at the cost and expense of Pioneer. This Recapture Agreement #2 shall constitute a covenant running with the land and shall be binding upon the parties and the successors and assigns of Prologis L.P. in accordance with the terms and provisions set forth herein. E. Notices: Any notice required or desired to be given under this Recapture Agreement, unless expressly provided to the contrary herein, shall be in writing and shall be deemed to have been given on the date of personal delivery, on the date of confirmed telefacsimile transmission provided a hard copy of such notice is deposited in the U.S. mail addressed to the recipient within twenty-four hours following the telefacsimile transmission, or on the date when deposited in the U.S. Mail, registered or certified mail, postage prepaid, return receipt requested, and addressed as follows: Notices and communications to Pioneer shall be addressed to, and delivered at, the following addresses: Pioneer Development, LLC 30 N. Gould Street, #38989 Sheridan, Wyoming 82801 Attn: Matt McCarron Mahoney, Silverman & Cross, LLC 822 Infantry Drive, Suite 100 Joliet, Illinois 60435 Attn: David J. Silverman Notices and communications to the City shall be addressed to and delivered at these addresses: United City of Yorkville 651 Prairie Pointe Yorkville, IL 60560 Attn: City Administrator With a copy to: Ottosen DiNolfo Hasenbalg & Castaldo, Ltd. 2441 Warrenville Road, Suite 310 Lisle, IL 60532 Attn: Attorney Kathleen Field Orr 3 F. Severability: The invalidity or unenforceability of any of the provisions hereof shall not affect the validity or enforceability of the remainder of this Recapture Agreement or the charges imposed hereunder. G. Complete Agreement: This Recapture Agreement contains all the terms and conditions agreed upon by the parties hereto regarding the subject matter of this Recapture Agreement shall be deemed to exist to bind the parties. This shall be governed by the laws of the State of Illinois. H. Captions and Paragraph Headings: Captions and paragraph headings incorporated herein are for convenience only and are not part of this Recapture Agreement and further shall not be used to construe the terms hereof. I. Recitals and Attachments: The recitals set forth at the beginning of this Recapture Agreement and the exhibits attached hereto are hereby incorporated herein and made a part of the substance hereof. J. Enforceability: This Recapture Agreement shall be enforceable in the Circuit Court of Kendall County by any of the parties hereto by an appropriate action of law or in equity to secure the performance of the covenants herein contained. K. Corrections and Revisions: In the event that Prologis does not own the property benefitted by the Galena Road Project, the Parties will revise this Recapture Agreement to accurately reflect the ownership of the property benefitted by the Galena Road Project. IN WITNESS WHEREOF, the Parties have executed this Agreement as of the dates set forth below their respective signatures, to be effective as of the date first written above. United City of Yorkville, Kendall County, Illinois Attest: By: By: Mayor City Clerk Date: , 2026 Pioneer Development, LLC Attest: By: By: Its Manager 4 Date: , 2026 N. BRIDGEE. BEECHERGALENA BASELINEASHE W. BEECHERELDAMAINProject Cardinal Project Steel 0 2,000 4,000 Feet 100 % Funded By Project Cardinal 50/50 Funded By Project Steel & Project Cardinal Project Cardinal Development Project Steel Development Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 / www.eeiweb.con EXHIBIT A DATE: NOVEMBER 2025United City of Yorkville 651 Prairie Pointe Drive Yorkville, IL 60560 (630) 553-4350 www.yorkville.il.us GALENA ROAD IMPROVEMENTS CONSULTING ENGINEERS NO.DATE REVISIONS PROJECT NO.: YO2508 PATH: H:/GIS/PUBLIC/YORKVILLE/2025/ YO2508_GALENA RD IMPROVEMENTSFILE: . 100% FUNDED BY PROJECT CARDINAL 50/50 SPLIT FUNDING BY PROJECT STEEL & PROJECT CARDINAL N. BRIDGEE. BEECHERB E R T R A M GALEN A BASELINEASHE JETERW. BEECHERELDAMAINProject Cardinal 0 2,000 4,000 Feet Proposed Shared-Use Path Project Cardinal Development Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 / www.eeiweb.con EXHIBIT K PROPOSED PATH LOCATIONS DATE: MARCH 2026United City of Yorkville 651 Prairie Pointe Drive Yorkville, IL 60560 (630) 553-4350 www.yorkville.il.us LOCATION MAPCONSULTING ENGINEERS NO.DATE REVISIONS PROJECT NO.: YO2451 PATH: H:/GIS/PUBLIC/YORKVILLE/2024/ YO2451_PROJECT CARDINAL ROADWAY EXHIBITSFILE: . PROPOSED 10' SHARED-USE PATH 1 RECAPTURE AGREEMENT #3 THIS RECAPTURE AGREEMENT #3 (“Recapture Agreement”) is made and entered as of the ____ day of ________________ 2026, by and between the United City of Yorkville, Kendall County, Illinois (the “City”) and Pioneer Development, LLC, an Illinois limited liability company (“Pioneer”). RECITALS. A. Pioneer is the purchaser of approximately 1,037 acres located west of North Bridge Street, east of Ashe Road and south of Baseline Road which Pioneer intends to develop as a data center campus (the “Development Site”). B. In order to service the Development Site, substantial infrastructure improvements are required including an extension of the City’s sewer system to serve the Development Site in an easement along Eldamain Road as depicted on Exhibit A (the “Sanitary Sewer Extension”). C. The City has agreed to construct, and Pioneer has agreed to pay all expenses to design and construct the Sanitary Sewer Extension, as depicted on Exhibit A, including all costs incurred by the City to acquire all required temporary construction easements and permanent easements (collectively, the “Project”). D. Pioneer desires to recover its hard and soft costs associated with the administration, design, engineering, construction, and oversight of the Project (collectively the “Recapture Costs”) to provide sanitary sewer service from the City to properties along the route as depicted and as identified by parcel numbers on Exhibit A attached hereto which properties could connect to and benefit from the Sanitary Sewer Extension (the “Benefitted Properties”). E. Pioneer is desirous of entering into this Recapture Agreement to provide for the fair and equitable recapture from owners of the Benefitted Properties a portion of its costs to provide Pioneer and the Benefitted Properties with a sanitary sewer service subject to the terms and conditions set forth in this Agreement. NOW, THEREFORE, in consideration of the foregoing recitals and the mutual covenants hereinafter set forth, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged by the parties hereto, the parties hereby agree as follows: Section 1. Recapture Costs. Pioneer shall be entitled to recover its Recapture Costs pursuant to this Recapture Agreement. It is understood and agreed that within thirty (30) days of completion of the construction of the Sanitary Sewer Extension, and acceptance by the City, an itemized list of the actual costs shall be submitted to Pioneer and shall be appended hereto as Exhibit B (the “Final Project Costs”). Section 2. Benefitted Properties. Each Benefitted Property is eligible to connect Sanitary Sewer Extension upon satisfaction of the conditions hereinafter set forth. Any time any one of the Benefitted Properties is subdivided into two or more parcels, all of such parcels shall be deemed to be added to the list of Benefitted Properties and a share of the Final Project Costs as allocated in Section 4 shall be revised to reflect each subdivision during the term of this Agreement. Section 3. Condition Precedent to Connect. A Benefitted Property shall not be eligible to connect to the Sanitary Sewer Extension unless the Owner of the Benefitted Property has either annexed to the City or entered into a pre-annexation agreement with the City. 2 Section 4. Final Project Cost Allocation. The City has established that the methodology to determine the proportionate share of Final Project Costs to be allocated to each Benefitted Property which shall be based upon the proposed usage of sanitary sewer services of each of the Benefitted Properties. Section 5. Collection of Recapture Costs. The City shall assess against a Benefitted Property, or any portion thereof, a potion the Final Project Costs as allocated to such Benefitted Property determined as determined by the methodology stated in Section 4. At such time as a Benefitted Property owner applies to the City for issuance of a building permit and connection to the Sanitary Sewer Extension, the City shall: (i) collect from such Benefitted Owner, or its agents or representative, the applicable allocated portion of the Final Project Costs owed hereunder by such Benefitted Property; or (ii) waive the applicable portion of the Final Project Costs in the event the owner of the Benefitted Property has paid its allocated share directly to Pioneer. No Benefitted Property shall be issued a connection to the Sanitary Sewer Extension until such Benefitted Property has fully paid the share of the Final Project Costs owed by such Benefitted Property or the City has waived the owner’s obligation to pay the allocated Final Project Costs as provided in Section 5 (ii). Section 6. Obligation of the City. Upon annexation of any Benefitted Property to the City, its officers, employees and agents shall make all reasonable efforts to collect the portion of the Final Project Costs as calculated for each Benefitted Property payable to the City. Section 7. City’s Collection of other Fees and Charges. Nothing contained in this Recapture Agreement shall limit or in any way affect the rights of the City to collect other fees and charges pursuant to City ordinances, resolutions, motions and policies. The portion of the Final Project Costs to be paid by a Benefitted Property is in addition to such other City fees and charges. Section 8. Term. This Recapture Agreement shall commence on the date stated above and remain in full force and effect for a period of twenty (20) years from the date Exhibit D is appended and this Recapture Agreement #3 is recorded (the “Term”), In the event no Benefitted Property or a subdivided portion of a Benefitted Property has connected to the Sanitary Sewer Extension within twenty (20) years after expiration of the Term, this Recapture Agreement, and each and every duty and undertaking set forth herein pertaining to such Benefitted Property, shall become null and void and of no further force and effect as to such Benefitted Property. Notwithstanding the Term of this Agreement, upon receipt by Pioneer of payment in full of the certified Final Project Costs, this Recapture Agreement shall immediately terminate and all rights of recapture of Final Project Costs on the part of Pioneer shall cease. Section 9. Lein. This Recapture Agreement shall be recorded against the Benefitted Properties upon completion of the Sanitary Sewer Extension and acceptance by the City and Exhibit D with the Final Projects Costs is appended. The recordation by the City of this Recapture Agreement against the Benefitted Properties shall create and constitute a lien against each Benefitted Property, and each subdivided lot hereafter contained therein, in the amount of the Final Project Cost applicable hereunder to such Benefitted Property. Section 10. Miscellaneous Provisions. A. Agreement: This Recapture Agreement may be amended upon the mutual consent of the parties hereto from time to time by written instrument and conformity with all applicable statutory and ordinance requirements and without the consent of any other person or corporation owning all or any portion of the Benefitted Properties. 3 B. Binding Effect: Except as otherwise herein provided, this Recapture Agreement shall inure to the benefit of and be binding upon the successors and assigns of the owner of a Benefitted Property. C. Enforcement: Each party to this Recapture Agreement and their respective successors and assigns, may either in law or in equity, by suit, action, mandamus, or other proceeding to enforce and compel performance of this Recapture Agreement. D. Recordation: A true and correct copy of this Recapture Agreement shall be recorded with the Kendall County’s Recorder’s Office by the City at the cost and expense of Pioneer. This Recapture Agreement #1 shall constitute a covenant running with the land and shall be binding upon the Benefitted Properties in accordance with the terms and provisions set forth herein. E. Notices: Any notice required or desired to be given under this Recapture Agreement, unless expressly provided to the contrary herein, shall be in writing and shall be deemed to have been given on the date of personal delivery, on the date of confirmed telefacsimile transmission provided a hard copy of such notice is deposited in the U.S. mail addressed to the recipient within twenty-four hours following the telefacsimile transmission, or on the date when deposited in the U.S. Mail, registered or certified mail, postage prepaid, return receipt requested, and addressed as follows: Notices and communications to Developer shall be addressed to, and delivered at, the following addresses: Pioneer Development, LLC 30 N. Gould Street, #38989 Sheridan, Wyoming 82801 Attn: Matt McCarron Mahoney, Silverman & Cross, LLC 822 Infantry Drive, Suite 100 Joliet, Illinois 60435 Attn: David J. Silverman Notices and communications to the City shall be addressed to and delivered at these addresses: United City of Yorkville 651 Prairie Pointe Yorkville, IL 60560 Attn: City Administrator With a copy to: Ottosen DiNolfo Hasenbalg & Castaldo, Ltd. 2441 Warrenville Road, Suite 310 Lisle, IL 60532 Attn: Attorney Kathleen Field Orr F. Severability: The invalidity or unenforceability of any of the provisions hereof, or any charge imposed as to any portion of the Benefitted Properties, shall not affect the validity or enforceability of the remainder of this Recapture Agreement or the charges imposed hereunder. G. Complete Agreement: This Recapture Agreement contains all the terms and conditions agreed upon by the parties hereto and no other prior agreement, regarding the subject matter of this Agreement shall be deemed to exist to bind the parties. This shall be governed by the laws of the State of Illinois. H. Captions and Paragraph Headings: Captions and paragraph headings incorporated herein are for convenience only and are not part of this Recapture Agreement, and further shall not be used to construe the terms hereof. 4 I. Recitals and Attachments: The recitals set forth at the beginning of this Recapture Agreement and the exhibits attached hereto are hereby incorporated herein and made a part of the substance hereof. J. Enforceability: This Recapture Agreement shall be enforceable in the Circuit Court of Kendall County by any of the parties hereto by an appropriate action of law or in equity to secure the performance of the covenants herein contained. IN WITNESS WHEREOF, the Parties have executed this Recapture Agreement #1 as of the dates set forth below their respective signatures, to be effective as of the date first written above. United City of Yorkville, Kendall County, Illinois Attest: By: By: Mayor City Clerk Date: , 2026 Pioneer Development, LLC Attest: By: By: Its Manager Date: , 2026 TampaBertramJeterGarritano Rosenwi nkelBurnettMarquetteBarrett Galena Willoughby PierpontHalfMoonBristolBay BeecherBridgeW a t e r p a rkAsheBaseline BeecherEldamainProject Steel Project Cardinal ComED 0 2,200 Feet Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 / www.eeiweb.con EXHIBIT A SANITARY SEWER RECAPTURE DATE: MARCH 2026United City of Yorkville 651 Prairie Pointe Dr. Yorkville, IL 60560 //www.yorkville.il.us PROJECT CARDINALCONSULTING ENGINEERS NO.DATE REVISIONS PROJECT NO.: YO2451 PATH: H:/GIS/PUBLIC/YORKVILLE/2024/ FILE: . F E D C B A YO2451_Exhibit A Potential Recapture Sanitary Legend COMED LIMITS PROJECT CARDINAL DEVELOPMENT PROJECT STEEL DEVELOPMENT EXISTING CITY SANITARY SEWER YBSD EXISTING SEWER PROPOSED SANITARY SEWER G H I J PROPOSED 16" SANITARY SEWER CONNECT TO EXISTING Property Frontage PIN A YORKVILLE NEXUS III LLC 950 FT 02-07-300-005 B YORKVILLE NEXUS III LLC 475 FT 02-07-100-014 C ELDAMAIN RENTAL 2 LLC 200 FT 02-07-100-006 D ELDAMAIN RENTAL 1 LLC 550 FT 02-07-100-013 E YORKVILLE NEXUS III LLC 975 FT 02-07-100-014 F YORKVILLE NEXUS III LLC 600 FT 02-07-100-002 G ZAVALA CELIA DEL SAGRARIO 250 FT 02-06-300-012 H LATHAM-SCHLEINING 925 FT 02-06-300-009 I ROSENWINKEL FAMILY TRUST 1,800 FT 02-06-300-011 J KONICEK FAMILY 3,250 FT 02-06-100-022 ESTIMATED SCHEDULE - PROJECT CARDINAL WATER MAIN AND SANITARY SEWER CLIENT PROJECT NUMBER United City of Yorkville YO2451 PROJECT TITLE DATE PREPARED BY Project Cardinal ADH/KDW MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Water Main - Offsite Water Main - Onsite 16" Sanitary Sewer 52 Wheeler Road Sugar Grove, IL 60554 Tel: 630.466.6700 Fax: 630.466.6701 www.eeiweb.com TASK NO.TASK DESCRIPTION BIDDING AND CONTRACTING FINAL DESIGN TOPOGRAPHIC SURVEY EASEMENT ACQUISITION BIDDING AND CONTRACTING EASEMENT ACQUISITION REGULATORY AGENCY COORDINATION AND PERMITTING PRELIMINARY DESIGN PRELIMINARY DESIGN PRELIMINARY DESIGN REGULATORY AGENCY COORDINATION AND PERMITTING REGULATORY AGENCY COORDINATION AND PERMITTING BIDDING AND CONTRACTING 3/2/26 CONSTRUCTION FINAL DESIGN TOPOGRAPHIC SURVEY FINAL DESIGN TOPOGRAPHIC SURVEY CONSTRUCTION 2026 CONSTRUCTION 20282027 EASEMENT ACQUISITION ESTIMATED SCHEDULE - ROADWAY INFRASTRUCTURE CLIENT PROJECT NUMBER United City of Yorkville YO2451 PROJECT TITLE DATE PREPARED BY Project Cardinal JHS/CJO MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC GALENA ROAD - KENDALL COUNTY BASELINE ROAD - CITY BASELINE ROAD AND ASHE ROAD INTERSECTION - CITY ASHE ROAD - CITY 52 Wheeler Road Sugar Grove, IL 60554 Tel: 630.466.6700 Fax: 630.466.6701 www.eeiweb.com BIDDING AND CONTRACTING 2/26/26 CONSTRUCTION FINAL DESIGN UTILITY COORDINATION / RELOCATION FINAL DESIGN UTILITY COORDINATION / RELOCATION CONSTRUCTION 2026 CONSTRUCTION 20282027 CONSTRUCTION TASK NO.TASK DESCRIPTION BIDDING AND CONTRACTING FINAL DESIGN UTILITY COORDINATION / RELOCATION LAND ACQUISITION BIDDING AND CONTRACTING LAND ACQUISITION Ordinance No. 2026-____ Page 1 Ordinance No. 2026-_____ AN ORDINANCE OF THE UNITED CITY OF YORKVILLE, ILLINOIS ANNEXING CERTAIN TERRITORY LOCATED AT THE SOUTHWEST CORNER OF BASELINE ROAD AND NORTH BRIDGE STREET (Project Cardinal) WHEREAS, the United City of Yorkville (the “City”) is a duly organized and validly existing non-home rule municipality created in accordance with the Constitution of the State of Illinois of 1970 and the laws of the State; and WHEREAS, a duly executed PETITION FOR ANNEXATION (the “Petition”) signed by Pioneer Development, LLC, (“Pioneer”), has been filed with the City requesting that certain territory comprising approximately 305 acres legally described on the Plat of Annexation attached hereto as Exhibit A (the “Territory”), be annexed to the City; and WHEREAS, there the electors residing within the Territory who have joined in the Petition; and WHEREAS, the Territory is not within the corporate boundaries of any municipality, and is contiguous to the City; and WHEREAS, legal notices regarding the intention of the City to annex the territory have been sent to all persons and public bodies required to receive such notice by state statute including the Trustees of the Bristol Kendall Fire Protection District; and WHEREAS, Pioneer has negotiated an Annexation Agreement with the City regarding the rezoning of the Territory as a planned unit development to be developed as data center campus and the parties have also entered into several agreements in addition to the Annexation Agreement relating to the future development of the Territory and approximately 732 acres adjacent to the Territory (collectively the “Development Site”) which agreements provide for all obligations of Pioneer in connection with its proposed development; and Ordinance No. 2026-____ Page 2 WHEREAS, it is understood and agreed that it is in the best interests of the City that the Territory be annexed but only upon Pioneer acquiring title to the Development Site. NOW, THEREFORE, BE IT ORDAINED by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois, as follows: Section 1. That the Territory legally described and depicted in the Plat of Annexation, attached hereto as Exhibit A, is annexed immediately upon Pioneer acquiring title to the Development Site. Section 2. That the City Clerk is hereby directed within 30 days of Pioneer acquiring title to the Development Site to cause a certified copy of this Ordinance to be recorded with the Office of the Kendall County Recorder and with the Kendall County Clerk, together with the Plat of Annexation appended to this Ordinance. Section 3. That this Ordinance shall be in full force and effect from and after its passage, approval, and publication in the manner provided by law. Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this ____ day of __________________, A.D. 2026. ______________________________ CITY CLERK KEN KOCH _________ DAN TRANSIER _________ ARDEN JOE PLOCHER _________ CRAIG SOLING _________ CHRIS FUNKHOUSER _________ MATT MAREK _________ RUSTY CORNEILS _________ RUSTY HYETT _________ Ordinance No. 2026-____ Page 3 APPROVED by me, as Mayor of the United City of Yorkville, Kendall County, Illinois this ____ day of __________________, A.D. 2026. ______________________________ MAYOR Attest: ______________________________ CITY CLERK 6 5 5 4 GAL E N A R O A D GALENA R O A D ELDAMAIN ROADASHE ROADBASELINE ROAD 02-06-400-008 02-05-100-003 02-06-400-001 02-06-100-022 02-05-200-007 02-06-200-003 02-05-100-005 BEECHER ROAD6 SUGA R G R O V E, IL.MARK G SCHE L L ER035-003581 PROFESSIONAL LAND SURVEYOR STATE OF ILLINOIS PAGE 1 OF 1 PLAT OF ANNEXATION Engineering Enterprises, Inc. PLAT OF ANNEXATION UNITED CITY OF YORKVILLE 651 PRAIRIE POINT DRIVE YORKVILLE , IL 60560 TO THE UNITED CITY OF YORKVILLE KENDALL COUNTY, ILLINOIS 02-05-200-007 THAT PART OF LOT 2 OF THE NORTHEAST QUARTER OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT OF THE GOVERNMENT SURVEY OF SAID SECTION 5 DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEAST CORNER OF SAID LOT 2; THENCE WEST 40 CHAINS (RECORD), 2652.01 FEET (MEASURED) TO THE SOUTHWEST CORNER OF SAID LOT 2; THENCE NORTH 38 1/2 LINKS (RECORD), 24.51 FEET (MEASURED) TO THE SOUTH BANK OF A DITCH; THENCE SOUTH 89 DEGREES 30 MINUTES EAST (RECORD), NORTH 88 DEGREES 05 MINUTES 41 SECONDS EAST (MEASURED), 2593.76 FEET (MEASURED) TO THE POINT OF BEGINNING; THENCE NORTH 01 DEGREES 54 MINUTES 03 SECONDS WEST, 232.55 FEET TO A POINT ON A NON-TANGENT CURVE; THENCE NORTHEASTERLY 68.93 FEET ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 533.00 FEET AND WHOSE CHORD BEARS NORTH 59 DEGREES 57 MINUTES 33 SECONDS EAST, 68.88 FEET TO A POINT ON THE EAST LINE OF SAID LOT 2; THENCE SOUTH 01 DEGREES 16 MINUTES 25 SECONDS EAST ALONG SAID EAST LINE, 265.04 FEET TO THE SOUTHEAST CORNER OF SAID LOT 2; THENCE SOUTH 88 DEGREES 05 MINUTES 41 SECONDS WEST, 57.84 FEET TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. 02-05-100-003 & 02-05-100-005 THAT PART OF THE NORTHWEST QUARTER OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST, LYING NORTHERLY OF A LINE EXTENDING EASTERLY FROM A POINT ON THE WEST LINE OF SAID NORTHWEST QUARTER, 2316 FEET SOUTH OF THE NORTHWEST CORNER OF SAID SECTION 5, TO A POINT ON THE NORTH AND SOUTH CENTERLINE OF SAID SECTION, 2326.7 FEET SOUTH OF THE NORTHWEST CORNER OF SAID SECTION AND LYING SOUTHERLY OF THE COMMONWEALTH EDISON COMPANY RIGHT OF WAY LINE PURSUANT TO DOCUMENT 73-2720, IN KENDALL COUNTY, ILLINOIS. 02-06-200-003 THAT PART OF THE NORTHEAST QUARTER OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF SAID SECTION 6, THENCE SOUTH ON THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 2460.05 FEET TO THE INTERSECTION WITH THE MOST SOUTHERLY LINE OF PROPERTY CONVEYED TO LASALLE NATIONAL BANK, AS TRUSTEE UNDER TRUST AGREEMENT DATED JULY 15, 1966 AND KNOWN AS TRUST NUMBER 35339, BY A DEED DATED JANUARY 31, 1972 AND RECORDED JANUARY 31, 1972 AS DOCUMENT 72-467 TO THE POINT OF BEGINNING, THENCE WESTERLY ALONG THE SOUTHERLY LINE OF SAID PROPERTY CONVEYED TO LASALLE NATIONAL BANK, AS TRUSTEE UNDER TRUST NUMBER 35339, WHICH FORMS AN ANGLE OF 89 DEGREES 57 MINUTES 27 SECONDS TO THE LEFT WITH THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 812.66 FEET, THENCE NORTH 90 DEGREES 25 MINUTES 49 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE, A DISTANCE OF 366.94 FEET, THENCE EASTERLY 88 DEGREES 43 MINUTES 04 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE, A DISTANCE OF 809.73 FEET TO THE EAST LINE OF SAID SECTION 6, THENCE SOUTH ALONG THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 378.96 FEET TO THE POINT OF BEGINNING, IN KENDALL COUNTY, ILLINOIS. AND ALSO THAT PART OF THE NORTHEAST QUARTER OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF SAID SECTION 6, THENCE SOUTH ON THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 2474.60 FEET FOR THE POINT OF BEGINNING OF THE TRACT HEREIN DESCRIBED, THENCE WESTERLY ON A LINE WHICH FORMS AN ANGLE OF 90 DEGREES 57 MINUTES 19 SECONDS TO THE RIGHT WITH THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 812.66 FEET, THENCE NORTH ALONG A LINE 89 DEGREES 31 MINUTES 03 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED LINE, A DISTANCE OF 1.61 FEET TO THE INTERSECTION WITH THE MOST SOUTHERLY LINE OF THE PROPERTY CONVEYED TO LASALLE NATIONAL BANK, AS TRUSTEE UNDER TRUST AGREEMENT DATED JULY 15, 1966 AND KNOWN AS TRUST NUMBER 35339 BY DEED DATED JANUARY 31, 1972 AND RECORDED JANUARY 31, 1972 AS DOCUMENT 72-467, THENCE EASTERLY ON THE SOUTHERLY LINE OF SAID PROPERTY CONVEYED TO THE LASALLE NATIONAL BANK, A DISTANCE OF 812.66 FEET TO A POINT ON THE EAST LINE OF SAID SECTION 6, THENCE SOUTHERLY ON SAID EAST LINE, 13.55 FEET TO THE POINT OF BEGINNING, IN KENDALL COUNTY, ILLINOIS. 02-06-400-001 PART OF THE EAST 1/2 OF SECTION 6; TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEAST CORNER OF SAID SECTION; THENCE NORTHERLY ALONG THE EASTERLY LINE OF SAID SECTION 6, A DISTANCE OF 3407.85 FEET TO THE SOUTH LINE OF PROPERTY CONVEYED TO SUSAN SCHMIDT BY WARRANTY DEED RECORDED DECEMBER 18, 1929 IN BOOK 80, PAGES 334 AND 335; THENCE WEST ALONG THE SOUTH LINE OF PROPERTY CONVEYED TO SUSAN SCHMIDT A DISTANCE OF 1552.74 FEET TO THE EAST LINE OF PROPERTY CONVEYED TO EARL P KONICEK AND WIFE BY WARRANTY DEED DATED DECEMBER 4, 1961 RECORDED AS DOCUMENT 136414, THENCE SOUTH ALONG THE EAST LINE OF PROPERTY CONVEYED TO EARL P. KONICEK AND WIFE 1240.82 FEET TO THE CENTER LINE OF GALENA ROAD, FOR THE POINT OF BEGINNING; THENCE CONTINUING SOUTH ALONG THE PROLONGATION OF THE LAST DESCRIBED COURSE A DISTANCE 919.13 FEET TO AN ANGLE POINT WHICH IS 1312.43 FEET PERPENDICULARLY DISTANCE NORTH OF SAID SOUTH LINE OF SAID SECTION 6; THENCE SOUTHWESTERLY ALONG A LINE FORMING AN ANGLE OF 26 DEGREES 45 MINUTES 35 SECOND TO THE RIGHT WITH A PROLONGATION OF THE LAST DESCRIBED COURSE A DISTANCE OF 332.08 FEET TO THE NORTH LINE OF PARCEL TWO OF PROPERTY CONVEYED TO CHICAGO TITLE AND TRUST COMPANY, AS TRUSTEE UNDER TRUST NUMBER 45553 BY CONSERVATORS DEED RECORDED SEPTEMBER 17, 1973 AS DOCUMENT 73-4671; THENCE WESTERLY ALONG SAID NORTHERLY LINE FORMING AN ANGLE OF 62 DEGREES 01 MINUTES 01 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE, A DISTANCE 646.8 FEET TO THE CENTER LINE OF BEECHER ROAD; THENCE NORTHEASTERLY ALONG SAID CENTER LINE 1362.40 FEET TO THE CENTER LINE OF GALENA ROAD; THENCE SOUTHEASTERLY ALONG SAID CENTER LINE 460.52 FEET TO THE POINT OF BEGINNING; IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS, 02-06-400-008 THAT PART OF THE EAST 1/2 OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: BEGINNING AT THE INTERSECTION OF THE CENTER LINE OF GALENA ROAD WITH THE EAST LINE OF SAID SECTION; THENCE NORTH 70 DEGREES 55 MINUTES WEST ALONG SAID CENTER LINE 276 FEET; THENCE SOUTH PARALLEL TO THE EAST LINE OF SAID SECTION 8, 200 FEET; THENCE SOUTH 70 DEGREES 55 MINUTES EAST 270 FEET TO THE EAST LINE OF SAID SECTION; THENCE SOUTH ALONG THE EAST LINE OF SAID SECTION 1456.6 FEET TO THE SOUTHEAST CORNER OF SAID SECTION; THENCE WEST ALONG THE SOUTH LINE OF SAID SECTION 470.51 FEET TO THE EASTERLY LINE OF PARCEL TWO OF THE PROPERTY CONVEYED TO CHICAGO TITLE AND TRUST COMPANY TRUSTEE UNDER TRUST NUMBER 45553 BY CONSERVATORS DEED RECORDED SEPTEMBER 17, 1973 AS DOCUMENT R73-4671; THENCE NORTHERLY ALONG SAID EASTERLY LINE 1006.52 FEET TO THE NORTHEASTERLY CORNER OF SAID PARCEL; THENCE WESTERLY ALONG THE NORTH LINE OF SAID PARCEL TWO 388.83 FEET TO THE INTERSECTION OF SAID NORTH LINE WITH THE EASTERLY LINE OF THE PROPERTY DESCRIBED IN PARCEL ONE OF SAID DOCUMENT 73-4671; THENCE NORTHEASTERLY ALONG SAID EASTERLY LINE OF PARCEL ONE A DISTANCE OF 115.02 FEET TO AN ANGLE POINT ON SAID EASTERLY LINE OF PARCEL ONE WHICH IS 1112.06 FEET PERPENDICULARLY DISTANCE NORTH OF THE SOUTH LINE OF SAID SECTION; THENCE NORTH ALONG A LINE FORMING AN ANGLE 26 DEGREES 45 MINUTES 38 SECOND TO THE LEFT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE A DISTANCE OF 2329.35 FEET TO THE SOUTH LINE OF PROPERTY CONVEYED TO DIANE R. KAPCHINSKI BY TRUSTEES DEED RECORDED JUNE 14, 1973 AS DOCUMENT 73-28243; THENCE EAST ALONG THE SOUTH LINE OF PROPERTY CONVEYED TO DIANE R. KAPCHINSKI 812.68 FEET TO THE EAST LIEN OF SAID SECTION 6; THENCE SOUTHERLY ALONG THE EAST LINE OF SAID SECTION 6, 1319.90 FEET TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS, EXCEPT THE LEGAL DESCRIPTION INCLUDED IN THE WARRANTY DEED RECORDED AUGUST 24, 2020 AS DOCUMENT 202000016040. 02-06-100-022 A PART OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN AND PART OF SECTION 1, TOWNSHIP 37 NORTH, RANGE 6 EAST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHWEST CORNER OF SAID SECTION 6, THENCE EAST 19.508 CHAINS (1,287.528 FEET) TO AN IRON STAKE FOR PLACE OF BEGINNING, THENCE EAST ON THE NORTH LINE OF SAID SECTION 6, 44.599 CHAINS (2,943.534 FEET), THENCE SOUTH 16 MINUTES WEST 56.242 CHAINS (3,711.972 FEET) TO THE CENTER OF THE HIGHWAY, THENCE NORTH 73 DEGREES 58 MINUTES WEST 3.473 CHAINS (229.218 FEET) ALONG THE CENTER OF THE HIGHWAY, THENCE NORTH 79 DEGREES 37 MINUTES WEST 52.777 CHAINS (3,483.282 FEET) ALONG THE CENTER OF THE HIGHWAY, THENCE NORTH 79 DEGREES 16 MINUTES WEST 8.03 CHAINS (529.98 FEET) ALONG THE CENTER OF THE HIGHWAY TO AN IRON STAKE, THENCE NORTH 18 DEGREES 05 MINUTES EAST 10.258 CHAINS (677.028 FEET) TO AN IRON STAKE, THENCE NORTH 72 DEGREES 01 MINUTE WEST 6.632 CHAINS (437.712 FEET) TO AN IRON STAKE, THENCE NORTH 27 DEGREES 51 MINUTES EAST 11.60 CHAINS (765.6 FEET) TO AN IRON STAKE, THENCE NORTH 89 DEGREES 25 MINUTES EAST 11.535 CHAINS (761.31 FEET) TO THE CENTER OF THE HIGHWAY, THENCE NORTH 12 DEGREES 40 MINUTES EAST TO THE PLACE OF THE BEGINNING, SITUATED IN KENDALL COUNTY, ILLINOIS, EXCEPTING THEREFROM THAT PART LYING WESTERLY OF THE WEST LINE OF ASHE ROAD CONVEYED BY DOCUMENT 200200024565. Ordinance No. 2025-____ Page 1 Ordinance No. 2026-_____ AN ORDINANCE OF THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS, APPROVING THE REZONING TO THE M-2 GENERAL MANUFACTURING ZONING DISTRICT OF CERTAIN TERRITORY LOCATED AT THE SOUTHWEST CORNER OF BASELINE ROAD AND NORTH BRIDGE STREET (STATE ROUTE 47) (Project Cardinal) WHEREAS, the United City of Yorkville, Kendall County, Illinois (the “City”) is a duly organized and validly existing non-home-rule municipality created in accordance with the Constitution of the State of Illinois of 1970 and the laws of the State; and WHEREAS, Pioneer Development, LLC, an Illinois limited liability company (“Applicant”), is the contract purchaser of approximately 1,037 acres of property, located just south of Baseline Road, west of North Bridge Street (State Route 47), and east of Ashe Road (“Subject Property”) within the corporate limits of the City, legally described in Exhibit A and as shown on Exhibit B attached hereto and made a part hereof; and WHEREAS, the Applicant desires to rezone the Subject Property, which is currently classified as a mix of R-2 Single-Family Traditional Residence District, R-3 Multi-Family Attached Residence District, and B-3 General Business District into the M-2 General Manufacturing Zoning District; and WHEREAS, the Planning and Zoning Commission convened and held a public hearing on July 9, 2025, to consider the rezoning after publication of notice and notice to property owners within five hundred (500) feet of the Subject Property; and WHEREAS, the Planning and Zoning Commission reviewed the standards set forth in Section 10-8-12 of the City’s Unified Development Ordinance and made findings of fact and recommended approval of the rezoning to the Mayor and City Council (“Corporate Authorities”); and Ordinance No. 2025-____ Page 2 WHEREAS, the Planning and Zoning Commission recommend rezoning to M-2 General Manufacturing District, so long as the use of the Subject Property is restricted to M-2 uses that align with other surrounding property uses; and WHEREAS, the Corporate Authorities have received and considered the recommendation of the Planning and Zoning Commission. NOW, THEREFORE, BE IT ORDAINED by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois, as follows: Section 1. The above recitals are incorporated herein and made a part of this Ordinance. Section 2. The Planning and Zoning Commission recommended approval of this rezoning request after making the following Findings of Fact: i. Due to recent trends in rezoning and development in the area, the proposed rezoning is consistent with the Comprehensive Plan and the purposes of the City’s Unified Development Ordinance UDO. ii. Existing zoning classifications in the area of the Subject Property are primarily residential and agricultural. The rezoning is compatible with the existing and planned uses and zoning of nearby properties, as other properties in the immediate area have also requested M-2 zoning from the City for the purpose of developing data centers. iii. The subject property is suitable for the purposes of the M-2 zoning district, as has been vacant in its current zoning designation for an extended period. Additionally, the Subject Property’s size allows for a data center development with buffering on the outer border to protect uses within surrounding properties. Ordinance No. 2025-____ Page 3 iv. The proposed rezoning will result in an individual parcel zoned in one zoning district that is not shared by any adjacent parcels. v. The property meets the minimum frontage and area requirements of the M-2 zoning district as specified in Section 10-3-9(A) of the UDO. vi. There is a community need for the proposed use, as a data center will not only meet the increasing demand for data centers in the Chicagoland area, but will also provide local infrastructure enhancements and expansion of public utilities. vii. The property has been vacant as a blend of agricultural, residential and commercial uses for an extended period. Section 3. Upon Pioneer acquiring title to the Subject Property, that the Corporate Authorities hereby rezone the Subject Property, legally described in the attached Exhibit A, with Property Index Numbers 02-05-300-003, 02-04-300-032, 02-04-300-024, 02-05-400-021, 02-09- 100-031, 02-09-100-030, 02-04-100-015, 02-05-200-007, 02-06-100-022, 02-06-200-002, 02-05- 400-022, 02-05-200-006, 02-04-100-016, 02-06-400-008, 02-06-200-003, 02-05-100-003, 02-05- 100-005, 02-05-400-009, 02-04-300-018, 02-04-300-017, 02-06-400-001, 02-05-200-004, 02-05- 200-001, into the M-2 General Manufacturing Zoning District. Section 4. That this Ordinance shall be in full force and effect upon its passage, approval and publication as provided by law. [Remainder of page intentionally blank. Roll call vote follows.] Ordinance No. 2025-____ Page 4 Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this ____ day of __________________, A.D. 2025. ______________________________ CITY CLERK KEN KOCH _________ DAN TRANSIER _________ ARDEN JOE PLOCHER _________ CRAIG SOLING _________ CHRIS FUNKHOUSER _________ MATT MAREK _________ RUSTY CORNEILS _________ RUSTY HYETT _________ APPROVED by me, as Mayor of the United City of Yorkville, Kendall County, Illinois this ____ day of __________________, A.D. 2026. ______________________________ MAYOR Attest: ______________________________ CITY CLERK 6 5 5 4 GAL E N A R O A D GALENA R O A D ELDAMAIN ROADASHE ROADBASELINE ROAD 02-06-400-008 02-05-100-003 02-06-400-001 02-06-100-022 02-05-200-007 02-06-200-003 02-05-100-005 BEECHER ROAD6 SUGA R G R O V E, IL.MARK G SCHE L L ER035-003581 PROFESSIONAL LAND SURVEYOR STATE OF ILLINOIS PAGE 1 OF 1 PLAT OF ANNEXATION Engineering Enterprises, Inc. PLAT OF ANNEXATION UNITED CITY OF YORKVILLE 651 PRAIRIE POINT DRIVE YORKVILLE , IL 60560 TO THE UNITED CITY OF YORKVILLE KENDALL COUNTY, ILLINOIS 02-05-200-007 THAT PART OF LOT 2 OF THE NORTHEAST QUARTER OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT OF THE GOVERNMENT SURVEY OF SAID SECTION 5 DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEAST CORNER OF SAID LOT 2; THENCE WEST 40 CHAINS (RECORD), 2652.01 FEET (MEASURED) TO THE SOUTHWEST CORNER OF SAID LOT 2; THENCE NORTH 38 1/2 LINKS (RECORD), 24.51 FEET (MEASURED) TO THE SOUTH BANK OF A DITCH; THENCE SOUTH 89 DEGREES 30 MINUTES EAST (RECORD), NORTH 88 DEGREES 05 MINUTES 41 SECONDS EAST (MEASURED), 2593.76 FEET (MEASURED) TO THE POINT OF BEGINNING; THENCE NORTH 01 DEGREES 54 MINUTES 03 SECONDS WEST, 232.55 FEET TO A POINT ON A NON-TANGENT CURVE; THENCE NORTHEASTERLY 68.93 FEET ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 533.00 FEET AND WHOSE CHORD BEARS NORTH 59 DEGREES 57 MINUTES 33 SECONDS EAST, 68.88 FEET TO A POINT ON THE EAST LINE OF SAID LOT 2; THENCE SOUTH 01 DEGREES 16 MINUTES 25 SECONDS EAST ALONG SAID EAST LINE, 265.04 FEET TO THE SOUTHEAST CORNER OF SAID LOT 2; THENCE SOUTH 88 DEGREES 05 MINUTES 41 SECONDS WEST, 57.84 FEET TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS. 02-05-100-003 & 02-05-100-005 THAT PART OF THE NORTHWEST QUARTER OF SECTION 5, TOWNSHIP 37 NORTH, RANGE 7 EAST, LYING NORTHERLY OF A LINE EXTENDING EASTERLY FROM A POINT ON THE WEST LINE OF SAID NORTHWEST QUARTER, 2316 FEET SOUTH OF THE NORTHWEST CORNER OF SAID SECTION 5, TO A POINT ON THE NORTH AND SOUTH CENTERLINE OF SAID SECTION, 2326.7 FEET SOUTH OF THE NORTHWEST CORNER OF SAID SECTION AND LYING SOUTHERLY OF THE COMMONWEALTH EDISON COMPANY RIGHT OF WAY LINE PURSUANT TO DOCUMENT 73-2720, IN KENDALL COUNTY, ILLINOIS. 02-06-200-003 THAT PART OF THE NORTHEAST QUARTER OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF SAID SECTION 6, THENCE SOUTH ON THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 2460.05 FEET TO THE INTERSECTION WITH THE MOST SOUTHERLY LINE OF PROPERTY CONVEYED TO LASALLE NATIONAL BANK, AS TRUSTEE UNDER TRUST AGREEMENT DATED JULY 15, 1966 AND KNOWN AS TRUST NUMBER 35339, BY A DEED DATED JANUARY 31, 1972 AND RECORDED JANUARY 31, 1972 AS DOCUMENT 72-467 TO THE POINT OF BEGINNING, THENCE WESTERLY ALONG THE SOUTHERLY LINE OF SAID PROPERTY CONVEYED TO LASALLE NATIONAL BANK, AS TRUSTEE UNDER TRUST NUMBER 35339, WHICH FORMS AN ANGLE OF 89 DEGREES 57 MINUTES 27 SECONDS TO THE LEFT WITH THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 812.66 FEET, THENCE NORTH 90 DEGREES 25 MINUTES 49 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE, A DISTANCE OF 366.94 FEET, THENCE EASTERLY 88 DEGREES 43 MINUTES 04 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE, A DISTANCE OF 809.73 FEET TO THE EAST LINE OF SAID SECTION 6, THENCE SOUTH ALONG THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 378.96 FEET TO THE POINT OF BEGINNING, IN KENDALL COUNTY, ILLINOIS. AND ALSO THAT PART OF THE NORTHEAST QUARTER OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF SAID SECTION 6, THENCE SOUTH ON THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 2474.60 FEET FOR THE POINT OF BEGINNING OF THE TRACT HEREIN DESCRIBED, THENCE WESTERLY ON A LINE WHICH FORMS AN ANGLE OF 90 DEGREES 57 MINUTES 19 SECONDS TO THE RIGHT WITH THE EAST LINE OF SAID SECTION 6, A DISTANCE OF 812.66 FEET, THENCE NORTH ALONG A LINE 89 DEGREES 31 MINUTES 03 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED LINE, A DISTANCE OF 1.61 FEET TO THE INTERSECTION WITH THE MOST SOUTHERLY LINE OF THE PROPERTY CONVEYED TO LASALLE NATIONAL BANK, AS TRUSTEE UNDER TRUST AGREEMENT DATED JULY 15, 1966 AND KNOWN AS TRUST NUMBER 35339 BY DEED DATED JANUARY 31, 1972 AND RECORDED JANUARY 31, 1972 AS DOCUMENT 72-467, THENCE EASTERLY ON THE SOUTHERLY LINE OF SAID PROPERTY CONVEYED TO THE LASALLE NATIONAL BANK, A DISTANCE OF 812.66 FEET TO A POINT ON THE EAST LINE OF SAID SECTION 6, THENCE SOUTHERLY ON SAID EAST LINE, 13.55 FEET TO THE POINT OF BEGINNING, IN KENDALL COUNTY, ILLINOIS. 02-06-400-001 PART OF THE EAST 1/2 OF SECTION 6; TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHEAST CORNER OF SAID SECTION; THENCE NORTHERLY ALONG THE EASTERLY LINE OF SAID SECTION 6, A DISTANCE OF 3407.85 FEET TO THE SOUTH LINE OF PROPERTY CONVEYED TO SUSAN SCHMIDT BY WARRANTY DEED RECORDED DECEMBER 18, 1929 IN BOOK 80, PAGES 334 AND 335; THENCE WEST ALONG THE SOUTH LINE OF PROPERTY CONVEYED TO SUSAN SCHMIDT A DISTANCE OF 1552.74 FEET TO THE EAST LINE OF PROPERTY CONVEYED TO EARL P KONICEK AND WIFE BY WARRANTY DEED DATED DECEMBER 4, 1961 RECORDED AS DOCUMENT 136414, THENCE SOUTH ALONG THE EAST LINE OF PROPERTY CONVEYED TO EARL P. KONICEK AND WIFE 1240.82 FEET TO THE CENTER LINE OF GALENA ROAD, FOR THE POINT OF BEGINNING; THENCE CONTINUING SOUTH ALONG THE PROLONGATION OF THE LAST DESCRIBED COURSE A DISTANCE 919.13 FEET TO AN ANGLE POINT WHICH IS 1312.43 FEET PERPENDICULARLY DISTANCE NORTH OF SAID SOUTH LINE OF SAID SECTION 6; THENCE SOUTHWESTERLY ALONG A LINE FORMING AN ANGLE OF 26 DEGREES 45 MINUTES 35 SECOND TO THE RIGHT WITH A PROLONGATION OF THE LAST DESCRIBED COURSE A DISTANCE OF 332.08 FEET TO THE NORTH LINE OF PARCEL TWO OF PROPERTY CONVEYED TO CHICAGO TITLE AND TRUST COMPANY, AS TRUSTEE UNDER TRUST NUMBER 45553 BY CONSERVATORS DEED RECORDED SEPTEMBER 17, 1973 AS DOCUMENT 73-4671; THENCE WESTERLY ALONG SAID NORTHERLY LINE FORMING AN ANGLE OF 62 DEGREES 01 MINUTES 01 SECONDS TO THE RIGHT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE, A DISTANCE 646.8 FEET TO THE CENTER LINE OF BEECHER ROAD; THENCE NORTHEASTERLY ALONG SAID CENTER LINE 1362.40 FEET TO THE CENTER LINE OF GALENA ROAD; THENCE SOUTHEASTERLY ALONG SAID CENTER LINE 460.52 FEET TO THE POINT OF BEGINNING; IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS, 02-06-400-008 THAT PART OF THE EAST 1/2 OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7, EAST OF THE THIRD PRINCIPAL MERIDIAN, DESCRIBED AS FOLLOWS: BEGINNING AT THE INTERSECTION OF THE CENTER LINE OF GALENA ROAD WITH THE EAST LINE OF SAID SECTION; THENCE NORTH 70 DEGREES 55 MINUTES WEST ALONG SAID CENTER LINE 276 FEET; THENCE SOUTH PARALLEL TO THE EAST LINE OF SAID SECTION 8, 200 FEET; THENCE SOUTH 70 DEGREES 55 MINUTES EAST 270 FEET TO THE EAST LINE OF SAID SECTION; THENCE SOUTH ALONG THE EAST LINE OF SAID SECTION 1456.6 FEET TO THE SOUTHEAST CORNER OF SAID SECTION; THENCE WEST ALONG THE SOUTH LINE OF SAID SECTION 470.51 FEET TO THE EASTERLY LINE OF PARCEL TWO OF THE PROPERTY CONVEYED TO CHICAGO TITLE AND TRUST COMPANY TRUSTEE UNDER TRUST NUMBER 45553 BY CONSERVATORS DEED RECORDED SEPTEMBER 17, 1973 AS DOCUMENT R73-4671; THENCE NORTHERLY ALONG SAID EASTERLY LINE 1006.52 FEET TO THE NORTHEASTERLY CORNER OF SAID PARCEL; THENCE WESTERLY ALONG THE NORTH LINE OF SAID PARCEL TWO 388.83 FEET TO THE INTERSECTION OF SAID NORTH LINE WITH THE EASTERLY LINE OF THE PROPERTY DESCRIBED IN PARCEL ONE OF SAID DOCUMENT 73-4671; THENCE NORTHEASTERLY ALONG SAID EASTERLY LINE OF PARCEL ONE A DISTANCE OF 115.02 FEET TO AN ANGLE POINT ON SAID EASTERLY LINE OF PARCEL ONE WHICH IS 1112.06 FEET PERPENDICULARLY DISTANCE NORTH OF THE SOUTH LINE OF SAID SECTION; THENCE NORTH ALONG A LINE FORMING AN ANGLE 26 DEGREES 45 MINUTES 38 SECOND TO THE LEFT WITH THE PROLONGATION OF THE LAST DESCRIBED COURSE A DISTANCE OF 2329.35 FEET TO THE SOUTH LINE OF PROPERTY CONVEYED TO DIANE R. KAPCHINSKI BY TRUSTEES DEED RECORDED JUNE 14, 1973 AS DOCUMENT 73-28243; THENCE EAST ALONG THE SOUTH LINE OF PROPERTY CONVEYED TO DIANE R. KAPCHINSKI 812.68 FEET TO THE EAST LIEN OF SAID SECTION 6; THENCE SOUTHERLY ALONG THE EAST LINE OF SAID SECTION 6, 1319.90 FEET TO THE POINT OF BEGINNING, IN THE TOWNSHIP OF BRISTOL, KENDALL COUNTY, ILLINOIS, EXCEPT THE LEGAL DESCRIPTION INCLUDED IN THE WARRANTY DEED RECORDED AUGUST 24, 2020 AS DOCUMENT 202000016040. 02-06-100-022 A PART OF SECTION 6, TOWNSHIP 37 NORTH, RANGE 7 EAST OF THE THIRD PRINCIPAL MERIDIAN AND PART OF SECTION 1, TOWNSHIP 37 NORTH, RANGE 6 EAST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHWEST CORNER OF SAID SECTION 6, THENCE EAST 19.508 CHAINS (1,287.528 FEET) TO AN IRON STAKE FOR PLACE OF BEGINNING, THENCE EAST ON THE NORTH LINE OF SAID SECTION 6, 44.599 CHAINS (2,943.534 FEET), THENCE SOUTH 16 MINUTES WEST 56.242 CHAINS (3,711.972 FEET) TO THE CENTER OF THE HIGHWAY, THENCE NORTH 73 DEGREES 58 MINUTES WEST 3.473 CHAINS (229.218 FEET) ALONG THE CENTER OF THE HIGHWAY, THENCE NORTH 79 DEGREES 37 MINUTES WEST 52.777 CHAINS (3,483.282 FEET) ALONG THE CENTER OF THE HIGHWAY, THENCE NORTH 79 DEGREES 16 MINUTES WEST 8.03 CHAINS (529.98 FEET) ALONG THE CENTER OF THE HIGHWAY TO AN IRON STAKE, THENCE NORTH 18 DEGREES 05 MINUTES EAST 10.258 CHAINS (677.028 FEET) TO AN IRON STAKE, THENCE NORTH 72 DEGREES 01 MINUTE WEST 6.632 CHAINS (437.712 FEET) TO AN IRON STAKE, THENCE NORTH 27 DEGREES 51 MINUTES EAST 11.60 CHAINS (765.6 FEET) TO AN IRON STAKE, THENCE NORTH 89 DEGREES 25 MINUTES EAST 11.535 CHAINS (761.31 FEET) TO THE CENTER OF THE HIGHWAY, THENCE NORTH 12 DEGREES 40 MINUTES EAST TO THE PLACE OF THE BEGINNING, SITUATED IN KENDALL COUNTY, ILLINOIS, EXCEPTING THEREFROM THAT PART LYING WESTERLY OF THE WEST LINE OF ASHE ROAD CONVEYED BY DOCUMENT 200200024565. 3$5.,1*63$&(667250:$7(50$1$*(0(17%$6,167250:$7(50$1$*(0(17%$6,167250:$7(50$1$*(0(17%$6,167250:$7(50$1$*(0(17%$6,1%8,/',1*6725<'$7$&(17(587,/,7<6:,7&+<$5'&86720(568%67$7,21&86720(568%67$7,21%$6(/,1(52$'5287(*$/(1$52$'$6+(5 2 $ '6(&85,7<)(1&(6(&85,7<)(1&(6(&85,7<)(1&(327(17,$/:$7(587,/,7<(;3$16,21$5($)76(7%$&.)76(7%$&.)76(7%$&.52%52<&5((.87,/,7<&255,'25)8785(87,/,7<&255,'253$5.,1*63$&(6%8,/',1*6725<'$7$&(17(53$5.,1*63$&(63$5.,1*63$&(6%8,/',1*6725<'$7$&(17(53$5.,1*63$&(63$5.,1*63$&(63$5.,1*63$&(63$5.,1*63$&(63$5.,1*63$&(63$5.,1*63$&(63$5.,1*63$&(63$5.,1*63$&(63$5.,1*63$&(63$5.,1*63$&(6%8,/',1*6725<'$7$&(17(5%8,/',1*6725<'$7$&(17(5%8,/',1*6725<'$7$&(17(5%8,/',1*6725<'$7$&(17(5%8,/',1*6725<'$7$&(17(5%8,/',1*6725<'$7$&(17(5%8,/',1*6725<'$7$&(17(5%8,/',1*6725<'$7$&(17(5%8,/',1*6725<'$7$&(17(5%8,/',1*6725<'$7$&(17(5%8,/',1*6725<'$7$&(17(55(6,'(1&(',675,&75(6,'(1&(',675,&767250:$7(50$1$*(0(17%$6,1'5$,1$*(&+$11(/'5$,1$*(&+$11(/'5$,1$*(&+$11(/7<3('75$16,7,21=21(6((/$1'6&$3('5$:,1*6)25'(7$,/6)7522)723(48,30(175(675,&7,21=21()7522)723(48,30(175(675,&7,21=21()7522)723(48,30(175(675,&7,21=21(3$5.,1*63$&(6  3+$6(3+$6(3+$6(352-(&7&$5',1$/35(/,0,1$5<127)25&216758&7,216,7(3/$1$3/$10$;,080)$51$1$0$;,080/27&29(5$*( 6)  6) 0,1,080/276,=(1$1$&29(5$*($&&(66,%/(3$5.,1*63$&(6 3$5.,1*63$&(65(48,5('3529,'(''$7$&(17(53$5.,1*5$7,2 63$&(63(56)3$5.,1* 6(7%$&.6$33/<21/<727+(3(5,0(7(52)7+(3523(57<,17+((9(177+$77+(3523(57<,65(68%',9,'('7+(5(6+$//%(126(7%$&.6$33/,&$%/(72,17(51$//27/,1(65($5)7)76,'(0,12)/27'(37+0$;)7)7)5217)7)76(7%$&.6%8,/',1*+(,*+7)7 )75(48,5('3529,'('727$/6,7($5($6) $&5(6 7$5*(7=21(&/$660*(1(5$/0$18)$&785,1*6,7('$7$727$/ 6) 6) 1$1$3 %8,/',1* 6) 6) )7)73 %8,/',1* 6) 6) )7)73 %8,/',1* 6) 6) )7)73 %8,/',1* 6) 6) )7)73 %8,/',1* 6) 6) )7)73 %8,/',1* 6) 6) )7)73 %8,/',1* 6) 6) )7)73 %8,/',1* 6) 6) )7)73 %8,/',1* 6) 6) )7)73 %8,/',1* 6) 6) )7)73 %8,/',1* 6) 6) )7)73 %8,/',1* 6) 6) )7)73 %8,/',1* 6) 6) )7)73 %8,/',1* 6) 6) )7)73+$6(%8,/',1*180%(5)22735,17$5($727$/)/225$5($+(,*+7 7232)%8,/',1* +(,*+7 7232)(48,30(17 %8,/',1*$5($6    EXHIBIT A WATER PLANNING FOR DATA CENTER DEVELOPMENTS PROGRESS MEETING MARCH 6, 2026 1 1. Background 2. Population and Water Use 3. Needs Assessment 4. Water Model Analysis 5. Recommendations 6. Connection Fee Agenda 2 BACKGROUND 3 Goals: • Determine the storage and supply needs under the following scenarios: Under Lake Michigan supply conditions Under emergency conditions when City operates on wells • Update and verify the model (steady-state and extended period simulation model) • Determine water main size and general available flows/static pressures for new developments under the following two (2) scenarios: Under Lake Michigan supply conditions Under emergency conditions when City operates on wells 4 Goals: • Analyze water quality/age • Evaluate strengths and capacity of the existing distribution system • Develop master plan exhibit for water works system improvements, conceptual cost estimates, and implementation plan • Evaluate backup water well options • Prepare summary report • Connection fee analysis 5 Study Area: • Focus is in the North Pressure Zone due to potential data center developments 6 POPULATION AND WATER USE 7 Population Projections: City's Residential Development Population ProjectionsIDNR Submittal Population Comparison Difference Population % Increase Projected Population Estimated # of Permits (Based on 3 PE/unit) % Increase Based on 5-year CMAP Projection Total Population for Yorkville Lake Michigan Allocation PopulationYear 021,53321,53321,5332020 -5325.01%22,6115377.48%23,1432021 -1,4763.48%23,3975777.48%24,8732022 -2,1994.86%24,5336207.48%26,7322023 -3,3943.27%25,3366667.48%28,7302024 -4,8792.62%25,9997167.48%30,87830,8782025 -4,5572.53%26,6571121.09%31,2142026 -4,2012.61%27,3531131.09%31,5542027 -3,8472.55%28,0501141.09%31,8972028 -3,4982.48%28,7461161.09%32,2442029 -3,1522.42%29,4431171.09%32,59532,5952030 -2,822 2.45% 30,1651311.20%32,9872031 -2,47830,9051321.20%33,3832032 -2,12231,6631341.20%33,7852033 -1,75232,4391351.20%34,1912034 -1,36833,2341371.20%34,60234,6022035 -1,07034,0491721.49%35,1192036 -76034,8841751.49%35,6442037 -43835,7391781.49%36,1772038 -10336,6151801.49%36,7182039 24637,5131831.49%37,26737,2672040 38238,4332612.10%38,0512041 52439,3752672.10%38,8512042 67240,3402722.10%39,6682043 827 41,3292782.10%40,5022044 98842,3422842.10%41,35441,3542045 81143,3804052.94%42,5692046 62544,4444172.94%43,8192047 42745,5344292.94%45,1072048 21846,6504422.94%46,4322049 047,7964552.94%47,79647,7962050 •IDNR Submittal population based on Census •2023 Residential Development Inventory Projections are only provided through 2030. The remaining projections for this analysis are based on a straightline population increase of 2.45% from 2030 to 2050. 8 Population Projections: • Consistent with Lake Michigan Permit Submittal 0 10,000 20,000 30,000 40,000 50,000 60,000 2020 2025 2030 2035 2040 2045 2050Population Year Lake Michigan Allocation Population City's Residential Development Population Projections Projected Population 9 Projected Developments 10 Projected Water Use – Data Center Assumptions: • Average day water use estimates received from developers for Cyrus One, Project Cardinal, Project Steel. •MDD:ADD Cyrus One = 2.49 (per Development Agreement) All others = 1.7 (per DWC Agreement) • The ratio of average day demand (GPD) per building square foot from Project Cardinal (0.0024 GPD/SF) was used to estimate average day demand for GD-Hagemann, GD-Meyer, GD-50 acre site, GD-Kelaka/Daniels/Hamman. DENOTES SPECIFIC WATER USE ESTIMATES RECEIVED 8/29/2025 FROM DEVELOPERS FOR CYRUS ONE, PROJECT CARDINAL, AND PROJECT STEEL. 11 PROJECTED AVERAGE DAY (GPD) PROJECTED MAXIMUM DAY (GPD) ADD Estimated by Developer/ Project Cardinal MDD Estimated by Developer/ Project Cardinal DATA CENTERS CYRUS ONE CHI 11 3,448,800 9,228 23,004 2.49 PIONEER / PROJECT CARDINAL 17,313,002 42,000 71,400 1.70 PROLOGIS / PROJECT STEEL 13,647,600 23,198 39,437 1.70 GREEN DOOR - HAGEMANN 1,941,588 4,710 8,007 1.70 GREEN DOOR - MEYER 1,500,000 3,639 6,186 1.70 GREEN DOOR - 50 ACRE SITE 500,000 1,213 2,062 1.70 CYRUS ONE CHI 12 DEVELOPMENT 739,161 2,307 3,922 1.70 GREEN DOOR - KELAKA / DANIELS / HAMMAN 5,000,000 12,130 20,620 1.70 TOTALS 44,090,151 98,425 174,639 MAXIMUM ADDITIONAL SUPPLY ABOVE IDNR ALLOCATION6 1,764,706 3,000,000 1.70 DEVELOPMENT TOTAL BUILDING SQUARE FOOTAGE MDD:ADD4 PROJECTED AVERAGE DAY (GPD) PROJECTED MAXIMUM DAY (GPD) ADD Estimated by Developer/ Project Cardinal MDD Estimated by Developer/ Project Cardinal DATA CENTERS CYRUS ONE CHI 11 3,448,800 9,228 23,004 2.49 PIONEER / PROJECT CARDINAL 17,313,002 42,000 71,400 1.70 PROLOGIS / PROJECT STEEL 13,647,600 23,198 39,437 1.70 GREEN DOOR - HAGEMANN 1,941,588 4,710 8,007 1.70 GREEN DOOR - MEYER 1,500,000 3,639 6,186 1.70 GREEN DOOR - 50 ACRE SITE 500,000 1,213 2,062 1.70 CYRUS ONE CHI 12 DEVELOPMENT 739,161 2,307 3,922 1.70 GREEN DOOR - KELAKA / DANIELS / HAMMAN 5,000,000 12,130 20,620 1.70 TOTALS 44,090,151 98,425 174,639 MAXIMUM ADDITIONAL SUPPLY ABOVE IDNR ALLOCATION6 1,764,706 3,000,000 1.70 DEVELOPMENT TOTAL BUILDING SQUARE FOOTAGE MDD:ADD4 Historical and Projected Water Use 12 3.660 MGD 3.566 MGD 6.566 MGD 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 2027 2028 2029 2030 2035 2040 2045 2050MGDProjected Average Day Demand Relative to IDNR Allocation Projected ADD (City + Data Centers) Projected ADD (City minus Data Centers) IDNR Allocation (ADD)IDNR + Additional 3.0 MGD Surplus/Deficit Relative to IDNR Allocation Projected ADD (City + Data Centers) IDNR + Additional 3.0 MGD IDNR Allocation (ADD)Year 1.9312027 0.4501.9895.4392.4392028 0.3862.0505.4362.4362029 0.3232.1095.4322.4322030 0.1482.4335.5812.5812035 0.0092.7715.7802.7802040 -0.0573.1426.0853.0852045 -0.0943.6606.5663.5662050 NEEDS ASSESSMENT 13 Needs Assessment – Whole System 14 CALENDAR YEAR TEST PARAMETERS 205020452040203520302029202820272024 LAKE MICHIGAN SUPPLY GPM708GPM1,068GPM1,326GPM1,560GPM2,585GPM2,626GPM2,668Ultimate Source Capacity11.0 GPM1,983GPM2,343GPM2,601GPM2,835GPM3,860GPM3,901GPM3,943Reliable Source Capacity22.0 GPM-65GPM-40GPM6GPM102GPM224GPM268GPM312Current IDNR Allocation - Avg Day 33.0 GPM-112GPM-68GPM10GPM174GPM381GPM454GPM531Current IDNR Allocation - Max Day 44.0 EMERGENCY BACKUP WELLS GPM708GPM1,068GPM1,326GPM1,560GPM2,585GPM2,626GPM2,668GPM1,770GPM1,109Ultimate Source Capacity55.0 GPM2,975GPM3,514GPM3,901GPM4,253GPM5,791GPM5,852GPM5,915GPM1,905GPM1,264Reliable Source Capacity66.0 STORAGE GAL1,723,880GAL1,961,522GAL2,171,362GAL2,331,616GAL2,518,790GAL2,546,655GAL2,827,992GAL2,140,437GAL1,199,333Peak Hour Storage77.0 GAL4,274,361GAL4,360,944GAL4,428,083GAL4,498,788GAL4,572,072GAL4,589,181GAL5,006,847GAL5,018,582GAL3,299,625Fire Flow88.0 GAL8,441,944GAL8,142,737GAL7,995,257GAL7,994,597GAL8,065,980GAL8,130,602GAL8,597,629GAL4,965,250GAL3,378,977Emergency Supply99.0 GAL9,951,944GAL9,652,737GAL9,505,257GAL9,504,597GAL9,575,980GAL9,640,602GAL10,207,629GAL6,275,250GAL4,288,97710 State Standards - Avg. Day 1010.0 GAL229,888GAL1,265,475GAL2,008,514GAL2,683,194GAL3,331,960GAL3,449,204GAL4,071,257DWC Storage Requirement1111.0 Needs Assessment – North Pressure Zone 15 CALENDAR YEAR TEST PARAMETERS 205020452040203520302029202820272024 EMERGENCY BACKUP WELLS GPM100GPM216GPM302GPM372GPM478GPM491GPM507GPM124GPM174Ultimate Source Capacity3.0 GPM2,062GPM2,237GPM2,365GPM2,471GPM2,630GPM2,649GPM2,674GPM886GPM960Reliable Source Capacity4.0 STORAGE GAL1,336,047GAL1,431,104GAL1,515,899GAL1,606,091GAL1,705,260GAL1,721,984GAL1,740,572GAL1,757,296GAL781,333Peak Hour Storage5.0 GAL2,929,856GAL2,965,503GAL2,997,237GAL3,029,575GAL3,064,020GAL3,069,926GAL3,076,390GAL3,082,296GAL1,491,250Fire Flow6.0 GAL3,743,436GAL3,911,183GAL4,034,207GAL4,136,174GAL4,288,892GAL4,307,322GAL4,330,682GAL4,357,170GAL2,798,949Emergency Supply7.0 GAL4,643,436GAL4,811,183GAL4,934,207GAL5,036,174GAL5,188,892GAL5,207,322GAL5,230,682GAL5,257,170GAL3,298,94910 State Standards - Avg. Day8.0 Needs Assessment – North Central Pressure Zone 16 CALENDAR YEAR TEST PARAMETERS 205020452040203520302029202820272024 EMERGENCY BACKUP WELLS GPM-1,180GPM-954GPM-750GPM-526GPM266GPM279GPM493GPM158GPM204Ultimate Source Capacity3.0 GPM143GPM481GPM788GPM1,124GPM398GPM419GPM739GPM237GPM305Reliable Source Capacity4.0 GAL545,746GAL729,918GAL896,636GAL1,080,086GAL1,914,637GAL1,925,746GAL1,936,838GAL1,947,947GAL969,733Peak Hour Storage5.0 GAL2,811,655GAL2,880,719GAL2,943,239GAL3,012,032GAL3,279,989GAL3,284,155GAL3,324,314GAL3,328,480GAL1,736,650Fire Flow6.0 GAL485,154GAL810,164GAL1,104,372GAL1,427,031GAL2,926,533GAL2,946,136GAL2,965,711GAL2,985,314GAL1,423,761Emergency Supply7.0 GAL1,445,154GAL1,770,164GAL2,064,372GAL2,387,031GAL3,886,533GAL3,906,136GAL3,925,711GAL3,945,314GAL1,983,76110 State Standards - Avg. Day8.0 Needs Assessment – South and South Central Pressure Zones CALENDAR YEAR TEST PARAMETERS 205020452040203520302029202820272024 EMERGENCY BACKUP WELLS GPM595GPM659GPM716GPM763GPM805GPM813GPM873GPM670GPM697Ultimate Source Capacity3.0 GPM893GPM989GPM1,073GPM1,145GPM1,208GPM1,220GPM1,875GPM455GPM495Reliable Source Capacity4.0 STORAGE GAL948,585GAL1,000,866GAL1,047,031GAL1,085,760GAL1,120,185GAL1,126,702GAL1,383,210GAL668,599GAL681,380Peak Hour Storage5.0 GAL879,726GAL899,332GAL916,644GAL931,167GAL944,077GAL946,520GAL1,723,961GAL980,599GAL985,393Fire Flow6.0 GAL1,472,827GAL1,565,088GAL1,646,556GAL1,714,902GAL1,775,652GAL1,787,152GAL2,198,636GAL1,010,137GAL1,032,692Emergency Supply7.0 GAL2,022,827GAL2,115,088GAL2,196,556GAL2,264,902GAL2,325,652GAL2,337,152GAL2,848,636GAL1,360,137GAL1,382,69210 State Standards - Avg. Day8.0 17 WATER MODEL ANALYSIS 18 Water Main Capacity Testing 19 Steady-State Model Verification 20 Extended Period Simulation Model Verification Tanks and Pumps 21 DISTRIBUTION SYSTEM EVALUATION • Pressures Generally 40 to 80 psi MDD + Fire Flow > 20 psi Peak Hour Demand Min. 35 to 40 psi Maximum per IL Plumbing Code = 80 psi • Velocities < 5 fps • Headlosses <16” Diameter < 6 ft / 1,000 ft > 16” Diameter < 2 ft / 1,000 ft • Water Age < 7±days (indicator of chlorine) 22 Water Works System Improvement Plan – Whole System • Pressures are adequate • Velocities are adequate • Headlosses are acceptable • Available Fire Flows > 3,500 gpm in future build- out areas • Water age is challenging 23 Water Works System Improvement Plan – North Pressure Zone • Pressures are adequate • Velocities are adequate • Headlosses are acceptable • Available Fire Flows > 3,500 gpm in future build- out areas • Water age is challenging • Confirmed 16” Water Main Loop to service Project Cardinal and Project Steel 24 RECOMMENDATIONS 25 North Pressure Zone - Other Observations • North and South Receiving stations have capacity for data centers built into the design • Additional capacity available in DWC pipeline = 3 MG • Storage and back-up well capacity impacts 26 3.660 MGD 3.566 MGD 6.566 MGD 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 2027 2028 2029 2030 2035 2040 2045 2050MGDProjected Average Day Demand Relative to IDNR Allocation Projected ADD (City + Data Centers) Projected ADD (City minus Data Centers) IDNR Allocation (ADD)IDNR + Additional 3.0 MGD Recommendations – Whole System IMMEDIATE (1 - 3 Years) • PRVs need to be tied to SCADA with status (open/close), flows, pressure settings • Mixing systems should be installed in the NW EWST and South Standpipe • Chlorine booster stations will be needed to address water age (Locations to be determined under separate study) • South Central (SC) EWST should be taken off-line immediately once the South Standpipe is on-line Insert image of choice. Fill white space. 27 NEAR FUTURE (3 - 10 Years) • Construct 1 MG EWST in future in the North Central Zone due to operational challenges Recommendations – Whole System • Water main loops to address criticality • Supply Additional Lake Michigan Supply (Allocation from both IDNR and DWC) 28 Recommendations – Whole System FUTURE (10+ Years) • River crossing improvements (Future) 29 Recommendations – Specific to Data Center Developments NEAR FUTURE (3 - 10 Years) • No significant improvements were identified for this period FUTURE (10+ Years) • Potentially new back-up well Insert image of choice. Fill white space. 30 Back-up Well Siting = Future Emergency Well 31 CONNECTION FEE 32 Connection Fees • Connection fee – Means of development to pay for capacity of the water system – traditionally water supply and capacity. • Supply includes: DWC Transmission Main DWC Buy-In Costs (Capacity of Existing DWC System) Delivery and Receiving Stations Additional Transmission Main Capacity Back-up Wells 33 Connection Fee 34 Total Connection Fee Connection Fee per Building Total # of Buildings Average Day Demand (GPD) Acres (Site Total)Development $3,578,400$255,6001442,0001037Project Cardinal $1,976,504 $109,806 1823,198557Project Steel $5,554,9043265,1981594Total QUESTIONS OR COMMENTS? We’re here to help any way we can! 35 Well Capacity Cost Per (GPM)P.E. Serveda P.E. 1,000 1 Deep 8,470 $9,905,000 $1,170 a Based on Reliable Source Capacity (Well operating 18 hours per day to meet the Maximum Day Demand). a Max:Avg Day Ratio = 1.7 a 75 gpcd was assumed based on 2nd LMAA Submittal Total Project Cost Per P.E. Served Cost P.E. 47,796 $165,690,000 $3,467 47,796 $8,856,000 $185 47,796 $7,678,000 $161 47,796 $7,987,000 $167 $190,211,000 $3,980 Total Project Cost Per P.E. Served Cost P.E. (1/3) 23,530 $31,000,000 $440 Note - 1/3 of Extra Transmission Capacity Needed for 2050 Projections Total Project Cost Per P.E. Served Cost P.E. 13,330 $10,652,000 $800 FEE SUMMARY FEE PER P.E. SUPPLY - BACK-UP EMERGENCY WELL $1,170 SUPPLY - DWC/LAKE MICHIGAN $3,980 SUPPLY - DWC EXTRA MAIN CAPACITY $440 STORAGE $800 TOTAL COST $6,390 Improvement Elevated Water Storage Tank (2.0 MG) LAKE MICHIGAN CONNECTION COSTS - ADDITIONAL SUPPLY Improvement DWC TRANSMISSION MAIN - EXTRA CAPACITY DWC Buy-In Costs North Delivery Station and Receiving Station South Delivery Station and Receiving Station WATER STORAGE COSTS - STORAGE DWC Transmission Mains Water Works System Improvements Per P.E. Water System Connection Fee Analysis United City of Yorkville 2/17/2026 1 P.E. = 75 gpd based on 2nd LMAA Submittal (for all supply, treatment, and storage improvements) BACK-UP EMERGENCY WELLS COSTS - SUPPLY Total Project Cost LAKE MICHIGAN CONNECTION COSTS - SUPPLY Improvement