HomeMy WebLinkAboutPublic Works Committee Packet 2026 04-21-26 AGENDA PUBLIC WORKS COMMITTEE MEETING Tuesday, April 21, 2026 6:00 p.m. East Conference Room #337 651 Prairie Pointe Drive, Yorkville, IL Citizen Comments: Minutes for Correction/Approval: February 17, 2026 New Business: 1. PW 2026-29 Snow Operations Report 2. PW 2026-30 Capital Improvement Project Updates 3. PW 2026-31 Quarterly Bond and Letter of Credit Reduction Summary 4. PW 2026-32 Grande Reserve Unit 26 – Acceptance 5. PW 2026-33 Grande Reserve Unit 27 – Acceptance 6. PW 2026-34 Kendall Marketplace Phases 2 and 3 – Acceptance 7. PW 2026-35 Quiet Zone Update 8. PW 2026-36 2026 Road to Better Roads Program – MFT Contract Award 9. PW 2026-37 2026 Road to Better Roads Program – Construction Engineering Agreement 10. PW 2026-38 2026 Local Road Program – Change Order No. 1 11. PW 2026-39 2026 Water Main Replacement – Project Update 12. PW 2026-40 Northwest Elevated Water Storage Tank – Design Engineering Agreement – Change Order No. 1 13. PW 2026-41 North Receiving Station – Design Engineering Agreement – Change Order No. 1 14. PW 2026-42 North Receiving Station – Change Order No. 2 15. PW 2026-43 Fox Hill and Sunflower SSA Mowing and Maintenance – Bid Award 16. PW 2026-44 Parks and Public Works New Building Outfitting Old Business: Additional Business: United City of Yorkville 651 Prairie Pointe Drive Yorkville, Illinois 60560 Telephone: 630-553-4350 www.yorkville.il.us UNITED CITY OF YORKVILLE WORKSHEET PUBLIC WORKS COMMITTEE Tuesday, April 21, 2026 6:00 PM CITY HALL CONFERENCE ROOM --------------------------------------------------------------------------------------------------------------------------------------- CITIZEN COMMENTS: --------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------- MINUTES FOR CORRECTION/APPROVAL: --------------------------------------------------------------------------------------------------------------------------------------- 1. February 17, 2026 □ Approved __________ □ As presented □ With corrections --------------------------------------------------------------------------------------------------------------------------------------- NEW BUSINESS: --------------------------------------------------------------------------------------------------------------------------------------- 1. PW 2026-29 Snow Operations Report □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 2. PW 2026-30 Capital Improvement Project Updates □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 3. PW 2026-31 Quarterly Bond and Letter of Credit Reduction Summary □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 4. PW 2026-32 Grande Reserve Unit 26 – Acceptance □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 5. PW 2026-33 Grande Reserve Unit 27 – Acceptance □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 6. PW 2026-34 Kendall Marketplace Phases 2 and 3 – Acceptance □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 7. PW 2026-35 Quiet Zone Update □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 8. PW 2026-36 2026 Road to Better Roads Program – MFT Contract Award □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 9. PW 2026-37 2026 Road to Better Roads Program – Construction Engineering Agreement □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 10. PW 2026-38 2026 Local Road Program – Change Order No. 1 □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 11. PW 2026-39 2026 Water Main Replacement – Project Update □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 12. PW 2026-40 Northwest Elevated Water Storage Tank – Design Engineering Agreement – Change Order No. 1 □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 13. PW 2026-41 North Receiving Station – Design Engineering Agreement – Change Order No. 1 □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 14. PW 2026-42 North Receiving Station – Change Order No. 2 □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 15. PW 2026-43 Fox Hill and Sunflower SSA Mowing and Maintenance – Bid Award □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- 16. PW 2026-44 Parks and Public Works New Building Outfitting □ Moved forward to CC __________ □ Approved by Committee __________ □ Bring back to Committee __________ □ Informational Item □ Notes ___________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ --------------------------------------------------------------------------------------------------------------------------------------- ADDITIONAL BUSINESS: --------------------------------------------------------------------------------------------------------------------------------------- Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number Minutes Tracking Number Minutes of the Public Works Committee – February 17, 2026 Public Works Committee – April 21, 2026 Majority Committee Approval Minute Taker Name Department DRAFT Page 1 of 2 UNITED CITY OF YORKVILLE PUBLIC WORKS COMMITTEE Tuesday, February 17, 2026, 6:00pm Yorkville City Hall, East Conference Room #337 651 Prairie Pointe Drive, Yorkville, IL IN ATTENDANCE: Committee Members Chairman Craig Soling Alderman Rusty Corneils Alderman Joe Plocher Alderman Dan Transier Other City Officials City Administrator Bart Olson, via Zoom Assistant City Administrator Erin Willrett Engineer Brad Sanderson, EEI Public Works Director Eric Dhuse Assistant Public Works Director John Sleezer Other Guests: None The meeting was called to order at 6:00pm by Chairman Craig Soling. Citizen Comments: None Previous Meeting Minutes: January 20, 2026 The minutes were approved as presented. New Business: 1. PW 2026-18 Snow Operations Report Mr. Dhuse reported that 2,450 tons of salt have been used this year, more than the last 2 years combined. He noted the number of tons at the county building and the shop and any remaining salt will be moved to the salt dome. 2. PW 2026-19 Kendall Marketplace Townhomes – Phase 1 Acceptance Mr. Sanderson said the punchlist work has been completed for Phase 1 and he recommended acceptance. A one- year guarantee bond will be required. Work on Phase 2 and 3 has just been finished and that will be on next month's agenda. This will move to the consent agenda. 3. PW 2026-20 Grande Reserve Unit 6 – Bond Release All punchlist work has been completed for Unit 6 and Mr. Sanderson recommended release of the maintenance bond. He noted a couple of the lots have separate bonds and those will be released when the sidewalk work is complete. This also moves to the consent agenda. 4. PW 2026-21 North Receiving Station – Change Order No. 1 Mr. Sanderson said there were 2 components to the Change Order. One is for credit on different valves. Some modifications to the water main were made and when construction started, there was a bit of an increase. In addition, the ComEd service was done by the contractor rather than the city and was added to the Change Order. Overall, $228,000 is recommended for deduction from the contract. This moves to the regular agenda. Page 2 of 2 5. PW 2026-22 Faxon Road Reconstruction – Design Engineering Agreement Amendment – Change Order No. 1 Mr. Dhuse said this item and item 6 are related to the Cyrus 1 project on Faxon and Beecher. There has been year-long negotiations with residents on the south side of Faxon regarding a re-design for the north side of the road. It can be done, but will take substantial effort over the original design. Cyrus 1 has approved this, but no work will begin until the payment is received. The increase is $47,680. This item will move to the regular agenda. 6. PW 2026-23 Beecher Road Reconstruction – Design Engineering Agreement Amendment - Change Order No. 1 This is for the east side purchase of Beecher Rd. that Cyrus 1 made and extends the Beecher reconstruction by 1,500 feet, requiring the plans to be changed. The cost is $76,322 and will also be paid for by Cyrus 1. This moves to the regular agenda. 7. PW 2026-24 2026 Water Main Improvements – Contract Award Mr. Sanderson said many bids were received for this project which includes water main and road work. The total bid came in at $5.2 million, higher than anticipated and Winninger Excavating was the low bidder. Additional water main work had been requested by Public Works and the contract cost will need to be reduced to accommodate this additional work. He recommends awarding the full amount and doing a Change Order later to remove about $500,000 of work. The recommended area to be removed is around the Adrian, Blaine and State St. area. Water main replacement will be done near there in 2028 and those streets will be included then. The Change Order will be brought forward in March or April. This item moves to the regular agenda. 8. PW 2026-25 Resolution Approving an Engineering Agreement with Engineering Enterprises, Inc. (2026 Water Main Improvements – Construction Engineering) Mr. Dhuse said this item is a companion to item #7. He said $425,000 is budgeted which includes payment to Engineering Enterprises for $397,830 and $21,665 for direct expenses. This moves to the regular agenda. 9. PW 2026-26 Fox Hill, Sunflower Estates and Cannonball Estates SSA Maintenance This is informational and Public Works will go out to bid for a 3-year contract. This year the Public Works crew finished the trail sealing, saving the residents substantial money. The RFP will be brought to committee in April. 10. PW 2026-27 Leaf Disposal RFP It has been 3 years since this had been bid and a substantial increase is expected, said Mr. Dhuse. He said they have built 3 cages on the trucks from an idea from Mr. Sleezer, allowing the trucks to keep moving. Alderman Corneils asked where the leaves are taken for disposal--they are taken to a farm east of Oswego. 11. PW 2026-28 Boombah Boulevard and Commercial Drive Traffic Control Study - Discussion Mr. Olson said an analysis was done in 2025 following a likely resident complaint. The t-intersection is unsignalized, however, the analysis does not warrant a sign at this time. He said if the committee so desires, this matter would be forwarded to the City Council. It will be moved forward to the regular agenda for Mr. Olson to present. Old Business: None Additional Business: Alderman Transier received an email from a citizen concerned about one of his trees being trimmed by the city at Greenbriar and Walsh. Mr. Dhuse said Property Standards called the citizen following a study the city did. Mr. Dhuse will speak with him. A stop sign was also suggested by another resident, near the end of Greenbriar An analysis was done and a stop sign is warranted if the tree branch is still impeding sight. Incomplete stops may also contribute to the problem at this intersection. There was no further business and the meeting adjourned at 6:20pm. Minutes respectfully transcribed by Marlys Young, Minute Taker Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #1 Tracking Number PW 2026-29 Snow Operations Report Public Works Committee – April 21, 2026 None Informational Final snow report of the 2025-2026 season. Eric Dhuse Public Works Name Department Summary April 1, 2026, Final snow report for winter 25-26 Background We have completed another successful winter operation applying 2,683 tons of salt pre-wet with 15,498 gallons of brine at a cost $193,334 covering 18,182 miles (296 lbs. per mile). Up from last year use of 1,700 tons of salt at$134,674 covering 6,210 miles (546 lbs. per mile). The use of brine has allowed us to use less salt to achieve better results. Pre-wetting our salt, saves on average 30% of salt usage. This year that’s over 1,149 tons this year alone or $81,866 savings. This also helped us build a surplus of salt from prior years. This was very important part of our operation this year. When other towns were running very low on salt and having to announce service cutbacks, we held to our standard. Having a reliable fleet was the key to another successful winter operation. Having no major break down, again is a key component to keeping up with winter weather. In addition, the trackless machine was instrumental in snow removal without this piece of equipment we would have never been able to clean the bridge walks. Lastly, I would like to thank our entire staff. Everyone worked long hours to ensure our roads were safe for the motoring public. Recommendation This is an informational item. Memorandum To: Public Works Committee From: John Sleezer, Assistant Director of Public Works CC: Bart Olson, City Administrator CC: Eric Dhuse, Director of Public Works Date: March 24, 2026 Subject: Snow Report 4/1/2026 Recorder Matt S 12/15 GPT Total Miles Average Salt Lbs of Lbs of Brine Gallons of Gal Brine/ Tons of Truck ID Rte # Driven MPH Miles Salt Used Salt/Mi. Miles Brine Used Ton Salt Salt Used Y-11 9S 960.3 6.6 346.3 170303 491.8 284.1 1820 16.4 111.00 Y-18 7N 2587.9 10.2 1528.9 828945 542.2 813.0 2678 6.5 414.47 Y-27 6N 2261 8.3 1301.6 665462 511.3 444.1 1127 3.4 332.73 Y-28 9S 1050 7.9 433.0 219407 506.7 104.0 620 5.7 109.70 Y-30 5N 2837.6 7.9 1371.2 740456 540.0 725.2 2183 5.9 370.23 Sub-total 9696.8 8.2 4981.0 2624573 526.9 2370.4 8428 6.3 1338.14 Truck ID Rte# Weight App. Distance AppSalt/per Mi. Gallons App Brine Dist. Gal/tons Total Miles Tons used Y-32 4N 491756.6 883.4 556.66 1351.7 320 5.5 1256 245.88 Y-34 util. 20425 28.1 726.87 10.21 Y-36 1N 60117 165.7 362.81 249.7 75 1.3 1485 185.64 Y-37 10S 375168.1 753.0 498.23 1115.0 312 5.9 1513 187.58 Y-38 2N 530812.3 1009.0 526.08 1342.7 386 5.1 1686 265.41 Y-39 3N 423712.5 710.0 596.78 1599.2 385 7.5 1287 211.86 Y-40 8S 476022 810.1 587.61 1417.8 403 6.0 1259 238.01 sub-total 2378013.5 4359.3 545.50 7076.1 1881 5.3 8486 1344.59 TruckID Rte# Loads Tons / Load Salt/per Mi. Total Miles Tons used Y-3 util. 2.5 #DIV/0! 0.00 Y-6 util. 3.0 #DIV/0! 0.00 Y-14 util. 3.0 #DIV/0! 0.00 Y-19 util. 2.5 #DIV/0! 0.00 Total Miles Average Salt (on) Lbs of Lbs of Brine (on) Gallons of Gal Brine/ Tons of Driven MPH Miles Salt Used Salt/Mi. Miles Brine Used Ton Salt Salt Used Totals 18182.5 8.2 9340.30 5002586.5 536 4251.4 15504.1 5.8 2682.72 ALL TRUCK DATA Snow Operations Salt and Brine Data Brine SettingSalt settingDate TRUCK ON NEW FORCE AMERICA CONTROLS TRUCKS ON OLD CIRRUS CONTROLS 1 TON V-BOX ESTIMATED SALT USAGE Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #2 Tracking Number PW 2026-30 Capital Improvement Project Updates Public Works Committee – April 21, 2026 None Informational Status Update Brad Sanderson Engineering Name Department The purpose of this memo is to update the Public Works Committee as to the status of several projects. A summary of the status of the projects is provided below: Construction Projects Well 10 The site / electrical work is underway. All work is to be completed by the end of June. The well will then be operational. Well No. 7 Electrical Improvements All work is to be completed by May. 2025 Water Main Replacement Construction is underway. The underground work is approximately 95% complete. Concrete and paving work has begun. Work is expected to be completed by June. East Alley Water Main Replacement This work is substantially complete. LM – North Receiving Station Construction has begun. This work will continue into fall 2027. LM – Northwest Elevated Water Storage Tank Construction has begun. Steel erection is continuing. This work will continue into 2027. LM – Bluestem Water Main Improvements This work is substantially complete. Restoration clean-up is beginning this week. LM – South Receiving Station Standpipe Construction has begun. Steel erection is continuing. This work will continue into 2027. LM – South Receiving Station Construction is set to begin soon. LM – Rt 126 Water Main Improvements Construction is underway. The underground work is approximately 90% complete. Work is expected to be completed in May. Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Krysti Barksdale-Noble, Community Dev. Dir. Jori Contrino, City Clerk Date: April 8, 2026 Subject: Capital Improvement Projects Update 2025 Local Road Program This work is substantially complete. Punchlist work should be completed soon. 2025 RTBR This work is substantially complete. Punchlist work should be completed soon. 2026 Local Road Program This work is scheduled to begin in late April. 2026 RTBR-MFT The contract should be awarded in April. 2026 Water Main Replacement This contract has been awarded. We are expecting work to begin in July. Planning/Design Projects WIFIA Loan Application We are targeting a closing soon. Rt 47 Water Main Replacement – Water Park Way to Jericho Design engineering is complete. The project will be bid as a part of the Rt 47 work. Rt 47 Water Main Replacement – Kennedy to Water Park Way Design engineering is underway. Rt 47 Water Main Replacement – Caton Farm to Rt 71 Design engineering is underway. E. Hydraulic Improvements (ITEP) – Phase I Design engineering is underway. Kennedy Road Improvements – Phase I Design engineering is underway Bertram Drive Improvements Design engineering is complete. Kennedy / Freedom Place Intersection Improvements Land acquisition is in process. Faxon and Beecher Road Reconstructions The roadways are being redesigned. Land acquisition is in process. Whispering Meadows Storm Sewer Design engineering is underway. Quiet Zones Work is in progress. An update will be provided at the meeting. Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #3 Tracking Number PW 2026-31 Bond/LOC Reduction Summary Through March 31, 2026 Public Works Committee – April 21, 2026 None Informational Brad Sanderson Engineering Name Department Please see the attached reduction summary through March 31, 2026. If you have any questions, please let me know. Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Krysti Barksdale-Noble, Community Dev. Dir. Jori Behland, City Clerk Date: April 8, 2026 Subject: 2026 Bond/LOC Reduction Summary 31-Mar-26 2026 Bond and Letter of Credit Reduction Report Date Development/Project Engineer Concurrence City Administrator Concurrence Mayor Concurrence Reduction Final Release Reduction Value Remaining Balance 2/20/2026 Grande Reserve - Unit 26 X X X 131,137.00$ 589,685.07$ 2/20/2026 Grande Reserve - Unit 27 X X X 479,416.72$ 469,321.20$ Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #4 Tracking Number PW 2026-32 Grande Reserve Unit 26 – Acceptance Public Works Committee – April 21, 2026 Majority Consideration of Approval Subdivision Acceptance Consideration Brad Sanderson Engineering Name Department The developer has requested that the City accept the public improvements for ownership and maintenance. All work related to the public improvements (except for sidewalk and parkway trees noted below), including punch list work has been completed. We recommend that the public improvements (water main, sanitary sewer, storm sewer, paving, sidewalk, street lighting and parkway trees) as described in the attached Bill of Sale be accepted for ownership and maintenance by the City. There are currently 10 (out of 90 total) incomplete lots within the unit that still need sidewalk installed and parkway trees planted. The builder continues to sell lots and construction is scheduled for several homes so we anticipate that a majority of this work will be completed prior to the one-year maintenance period expiring. As required by City Code, the developer will be responsible to provide a performance guarantee to cover the one-year maintenance period. This period starts after the City formally accepts the improvements. In this case, coverage of 120% of the remaining sidewalk and parkway trees is also required. Original EOPC Value $1,870,296.50 10% of Original EOPC $187,029.65 EOPC of Remaining Sidewalk and Trees x 120% $61,360.00 Required Value (10% of Original + Remaining) $248,389.65 Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Krysti Barksdale-Noble, Community Dev. Dir. Jori Contrino, City Clerk Rob Fredrickson, Finance Director Date: April 8, 2026 Subject: Grande Reserve – Unit 26 1 BILL OF SALE Seller, _______________, in consideration of One and 00/100th Dollar ($1.00), receipt hereby acknowledged, does hereby sell, assign, transfer and convey to the Buyer, the United City of Yorkville, an Illinois municipal corporation, at 651 Prairie Pointe Drive, Yorkville, Illinois 60560, the following personal property to wit described in Exhibit A attached hereto for the development know as Grande Reserve – Unit 26 and generally shown on Exhibit B. Seller hereby represents and warrants to Buyer that Seller is the absolute owner of said property, that said property is free and clear of all liens, charges and encumbrances, and that Seller has full right, power, and authority to sell said property and to make this Bill of Sale. IN WITNESS WHEREOF, Seller has signed and sealed this Bill of Sale at ___________________________________, this _____ day of _______________, 20__. _______________________ Signature of Seller Name: Title: Subscribed and Sworn to before me this _____ day of _____________, 20__. _______________________ Notary Public EXHIBIT A GRANDE RESERVE - UNIT 26 UNITED CITY OF YORKVILLE UNIT QUANTITIY UNIT QUANTITY FOOT 1,716 FOOT 2,090 FOOT 1,261 FOOT 620 EACH 0 FOOT 585 EACH 11 FOOT 552 EACH 9 FOOT 687 FOOT 325 FOOT 450 EACH 1 FOOT 53 FOOT 4,410 EACH 12 EACH 12 FOOT 660 EACH 3 EACH 1 FOOT 2,231 FOOT 466 FOOT 663 FOOT 145 FOOT 170 FOOT 645 FOOT 353 FOOT 103 EACH 1 EACH 0 EACH 20 EACH 21 EACH 12 EACH 10 EACH 9 SQ YD 10 FOOT 575 EACH 3 EACH 0 FOOT 50 EACH 0 EACH 58 SQ FT 25951 EACH 15 4' DIAMETER MANHOLE - 12'-16' TRENCH BACKFILL - MAINS 0'-12' DEPTH TRENCH BACKFILL - MAINS 12'-16' DEPTH CONNECTION TO EXISTING MANHOLE 6'-0" DIAMETER MANHOLE UTILITIES SANITARY SEWER CONSTRUCTION 8" PVC SANITARY SEWER - 0'-12' DEPTH 8" PVC SANITARY SEWER - 12'-16' DEPTH 4' DIAMETER MANHOLE - 0'-8' ROADWAY WEST MILLBROOK CIRCLE KELLOG COURT SUTHERLAND COURT STREET LIGHTING STREET LIGHT 25' STANDARD, COMPLETE INCLUDING 24" RCP STORM SEWER PIPE HATCH COURT 27" RCP STORM SEWER PIPE 4' DIAMETER MANHOLE - 8'-12' PCC SIDEWALK - 5" WITH SUBBASE RIP RAP W/ FABRIC DRY CONNECTION 12" RCP STORM SEWER PIPE 5'-0" DIAMETER MANHOLE 6" DI WATER MAIN 8" DI WATER MAIN 8" VALVE AND BOX FIRE HYDRANT AND AUXILIARY VALVE TRENCH BACKFILL - MAINS 36" RCP STORM SEWER PIPE FLARED END SECTION W/ GRATE 18" FLARED END SECTION W/ GRATE 30" 2'-0" DIAMETER INLET 4'-0" DIAMETER CATCH BASIN 4'-0" DIAMETER MANHOLE NICKERSON COURT SIDEWALK INLET FILTER RCP FES TO BE REMOVED 15" RCP STORM SEWER PIPE 18" RCP STORM SEWER PIPE 21" RCP STORM SEWER PIPE 30" RCP STORM SEWER PIPE STORM SEWER TO BE REMOVED TRENCH BACKFILL CONNECTION TO EXISTING STRUCTURE MANHOLE TO BE REMOVED WATER MAIN CONSTRUCTION STORM SEWER CONSTRUCTION PRESSURE CONNECTION MILLBROOKMAGNOLIA RELIANCEMILBROOK BURGUNDY S H O E G E R TUSCANYTUSCANY CRO O K E R POTTERGALENAGALENA OWENMILLBROOKRO Y A L STORY BROOK HIGHLANDGOULD CURTIS KETCH U M S H E R I D A N PRESTON ELLORY SHOEGERGAINS HATCH NICKERSONSUTHERLAND KELLOGG WI L L OW BASSWOODCONCORDGRAPE VINEGRAPE VINECYPRESS BRADYBROOKSIDEBIG GROVEHIGHLAND Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 / www.eeiweb.con LOCATION MAP DATE:APRIL 2026United City of Yorkville 651 Prairie Pointe Drive Yorkville, IL 60560 (630) 553-4350 http://www.yorkville.il.us UNIT 26 GRANDE RESERVE CONSULTING ENGINEERS NO.DATE REVISIONS PROJECT NO.: YO1920 PATH: H:/GIS/PUBLIC/YORKVILLE/2019/ FILE: fffää N O R T H Legend Unit 26 Boundary H:\GIS\Public\Yorkville\2019\YO1920\YO1920_GRANDE RES UNIT 26-27 ACCEPTED\YO1920_GRANDE RES UNIT 26-27 ACCEPTED.aprx 600 0 600300 Feet Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #5 Tracking Number PW 2026-33 Grande Reserve Unit 27 – Acceptance Public Works Committee – April 21, 2026 Majority Consideration of Approval Subdivision Acceptance Consideration Brad Sanderson Engineering Name Department The developer has requested that the City accept the public improvements for ownership and maintenance. All work related to the public improvements (except for sidewalk and parkway trees noted below), including punch list work has been completed. We recommend that the public improvements (water main, sanitary sewer, storm sewer, paving, sidewalk, street lighting and parkway trees) as described in the attached Bill of Sale be accepted for ownership and maintenance by the City. There are currently 11 (out of 80 total) incomplete lots within the unit that still need sidewalk installed and parkway trees planted. The builder continues to sell lots and construction is scheduled for several homes so we anticipate that a majority of this work will be completed prior to the one-year maintenance period expiring. As required by City Code, the developer will be responsible to provide a performance guarantee to cover the one-year maintenance period. This period starts after the City formally accepts the improvements. In this case, coverage of 120% of the remaining sidewalk and parkway trees is also required. Original EOPC Value $2,259,106.00 10% of Original EOPC $225,910.60 EOPC of Remaining Sidewalk and Trees x 120% $51,978.00 Required Value (10% of Original + Remaining) $277,888.60 Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Krysti Barksdale-Noble, Community Dev. Dir. Jori Contrino, City Clerk Rob Fredrickson, Finance Director Date: April 8, 2026 Subject: Grande Reserve – Unit 27 1 BILL OF SALE Seller, _______________, in consideration of One and 00/100th Dollar ($1.00), receipt hereby acknowledged, does hereby sell, assign, transfer and convey to the Buyer, the United City of Yorkville, an Illinois municipal corporation, at 651 Prairie Pointe Drive, Yorkville, Illinois 60560, the following personal property to wit described in Exhibit A attached hereto for the development know as Grande Reserve – Unit 27 and generally shown on Exhibit B. Seller hereby represents and warrants to Buyer that Seller is the absolute owner of said property, that said property is free and clear of all liens, charges and encumbrances, and that Seller has full right, power, and authority to sell said property and to make this Bill of Sale. IN WITNESS WHEREOF, Seller has signed and sealed this Bill of Sale at ___________________________________, this _____ day of _______________, 20__. _______________________ Signature of Seller Name: Title: Subscribed and Sworn to before me this _____ day of _____________, 20__. _______________________ Notary Public EXHIBIT A GRANDE RESERVE - UNIT 27 UNITED CITY OF YORKVILLE UNIT QUANTITIY UNIT QUANTITY FOOT 3,758 FOOT 1,380 EACH 9 FOOT 523 EACH 11 FOOT 475 FOOT 1,010 FOOT 460 EACH 1 FOOT 1,230 FOOT 435 FOOT 57 FOOT 5,182 EACH 15 EACH 15 FOOT 980 EACH 2 FOOT 2,527 FOOT 824 FOOT 932 FOOT 543 FOOT 561 FOOT 278 FOOT 104 EACH 30 EACH 22 EACH 21 EACH 1 EACH 20 EACH 4 FOOT 610 EACH 3 EACH 123 SQ FT 35455 EACH 17 PCC SIDEWALK - 5" WITH SUBBASE UTILITIES SANITARY SEWER CONSTRUCTION 8" PVC SANITARY SEWER - 0'-12' DEPTH 4' DIAMETER MANHOLE - 0'-8' 4' DIAMETER MANHOLE - 8'-12' CONNECTION TO EXISTING MANHOLE 6" DI WATER MAIN 8" DI WATER MAIN 36" RCP STORM SEWER PIPE 2'-0" DIAMETER INLET ROADWAY WEST MILLBROOK CIRCLE ELLORY COURT GOULD COURT STREET LIGHTING STREET LIGHT 25' STANDARD, COMPLETE INCLUDING 24" RCP STORM SEWER PIPE CURTIS COURT 30" RCP STORM SEWER PIPE TRENCH BACKFILL - MAINS 0'-12' DEPTH DRY CONNECTION 12" RCP STORM SEWER PIPE INLET FILTER 8" VALVE AND BOX FIRE HYDRANT AND AUXILIARY VALVE TRENCH BACKFILL - MAINS 4'-0" DIAMETER CATCH BASIN 4'-0" DIAMETER MANHOLE 5'-0" DIAMETER MANHOLE 5'-0" DIAMETER CATCH BASIN 6'-0" DIAMETER MANHOLE TRENCH BACKFILL BIG GROVE CIRCLE ROYAL COURT SIDEWALK 15" RCP STORM SEWER PIPE 18" RCP STORM SEWER PIPE 21" RCP STORM SEWER PIPE CONNECTION TO EXISTING STRUCTURE WATER MAIN CONSTRUCTION STORM SEWER CONSTRUCTION TUSCANYTUSCANY CONCORDMAGNOLIA RELIANCEMILBROOK BURGUNDY POTTER CRO O K E R OWEN RO Y A L STORY BROOK HIGHLANDMERLOTGOULD CURTIS KETCH U M GALENAGALEN A S H E R I D A N PRESTON ELLORY GAINS HATCH GRAPE VINEGRAPE VINEGRAPE VINE NICKERSONSUTHERLAND BLACKHAWKKELLOGG BASSWOODWI L L OW MILLB R O O K MILLBROOKSILVER SPRINGSCYPRESS BROOKSIDEBIG GROVEHIGHLAND Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 / www.eeiweb.con LOCATION MAP DATE:APRIL 2026United City of Yorkville 651 Prairie Pointe Drive Yorkville, IL 60560 (630) 553-4350 http://www.yorkville.il.us UNIT 27 GRANDE RESERVE CONSULTING ENGINEERS NO.DATE REVISIONS PROJECT NO.: YO1920 PATH: H:/GIS/PUBLIC/YORKVILLE/2019/ FILE: fffää N O R T H Legend Unit 27 Boundary H:\GIS\Public\Yorkville\2019\YO1920\YO1920_GRANDE RES UNIT 26-27 ACCEPTED\YO1920_GRANDE RES UNIT 26-27 ACCEPTED.aprx 600 0 600300 Feet Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #6 Tracking Number PW 2026-34 Kendall Marketplace Townhomes Phase 2 and 3 – Acceptance Public Works Committee – April 21, 2026 Majority Consideration of Approval Subdivision Acceptance Consideration Brad Sanderson Engineering Name Department The developer has requested that the City accept the public improvements for ownership and maintenance. All work related to the public improvements including punch list work, has been completed. There is no public sidewalk on this project. We recommend that the public improvements (water main, sanitary sewer and storm sewer) as described in the attached Bill of Sale be accepted for ownership and maintenance by the City. As required by City Code, the developer will be responsible for providing a performance guarantee to cover the one-year maintenance period. This period starts after the City formally accepts the improvements. Original EOPC Value $487,738.50 10% of Original EOPC $48,773.85 Required Value (10% of Original) $48,773.85 Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Krysti Barksdale-Noble, Community Dev. Dir. Jori Contrino, City Clerk Rob Fredrickson, Finance Director Date: March 5, 2026 Subject: Kendall Marketplace Townhomes – Phase 2&3 1 BILL OF SALE Seller, _______________, in consideration of One and 00/100th Dollar ($1.00), receipt hereby acknowledged, does hereby sell, assign, transfer and convey to the Buyer, the United City of Yorkville, an Illinois municipal corporation, at 651 Prairie Pointe Drive, Yorkville, Illinois 60560, the following personal property to wit described in Exhibit A attached hereto for the development know as Kendall Marketplace Townhomes – Phases 2&3 and generally shown on Exhibit B. Seller hereby represents and warrants to Buyer that Seller is the absolute owner of said property, that said property is free and clear of all liens, charges and encumbrances, and that Seller has full right, power, and authority to sell said property and to make this Bill of Sale. IN WITNESS WHEREOF, Seller has signed and sealed this Bill of Sale at ___________________________________, this _____ day of _______________, 20__. _______________________ Signature of Seller Name: Title: Subscribed and Sworn to before me this _____ day of _____________, 20__. _______________________ Notary Public EXHIBIT A KENDALL MARKETPLACE TOWNHOMES - PHASE 2 AND 3 UNITED CITY OF YORKVILLE UNIT QUANTITIY CU YD 530 FOOT 430 FOOT 129 FOOT 232 EACH 4 EACH 3 LSUM 1 CU YD 835 FOOT 1,869 EACH 6 EACH 5 EACH 5 LSUM 1 CU YD 350 EACH 3 EACH 3 EACH 5 EACH 2 EACH 3 EACH 1 EACH 3 FOOT 311 FOOT 396 FOOT 111 FOOT 222 FOOT 164 FOOT 1,204 UTILITIES SANITARY SEWER CONSTRUCTION MANHOLES, TYPE A, 4'-DIA, TYPE 1 FRAME, CLOSED LID MANHOLES, TYPE A, 5'-DIA, TYPE 1 FRAME, CLOSED LID CONNECTION TO EXISTING MANHOLE STORM SEWERS, CLASS A, TYPE 2, 30" STORM SEWER CONSTRUCTION TRENCH BACKFILL FIRE HYDRANT WITH AUXILIARY VALVE AND BOX CONNECTION TO EXISTING WATER MAIN STUB WATER MAIN TESTING AND DISINFECTION TELEVISING AND TESTING TRENCH BACKFILL MANHOLES, TYPE A, 5'-DIAMETER, R-2502 STORM SEWERS, CLASS A, TYPE 2, 12" STORM SEWERS, CLASS A, TYPE 2, 15" STORM SEWERS, CLASS A, TYPE 2, 18" INLETS, TYPE A, 2'-DIAMETER, FRAME AND GRATE CATCH BASINS, TYPE C, 2'-DIAMETER, R-2502 CATCH BASINS, TYPE A, 4'-DIAMETER, R-2502 MANHOLES, TYPE A, 6'-DIA, TYPE 1 FRAME, CLOSED LID STORM SEWERS, CLASS A, TYPE 2, 27" VIDEO TAPING STORM SEWERS (ASBUILT-RECORD) WATER MAIN CONSTRUCTION WATER MAIN, 8" DI 8" VALVE AND VALVE BOX TRENCH BACKFILL 8-INCH SDR 26, PVC, SANITARY SEWER 8-INCH SDR 21, PVC, SANITARY SEWER 8-INCH DR 18, PVC, SANITARY SEWER SANITARY MANHOLE, 4' DIA. HIGH RIDGECANNONBALLVETERANS WHITE PLAINS YELLOWSTONE IROQUOIS BEECHERBLACKBERRY SHOR E CANYON TRAI L IROQUOISWESTERN GILLESPIEN O R T H L A N D ERICA ISABELCANYON EDWARD Kendall County GIS, Kendall County, Illinois Engineering Enterprises 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6756 KENDALL MARKETPLACE PHASE 2 ACCEPTANCE www.eeiweb.com DATE: PROJECT NO.: FILE: PATH: BY: JANUARY 2026 YO2002 YO2002 KM ACCEPTANCE DOC H:\GIS\PUBLIC\YORKVILLE\2020\ MJT ³United City of Yorkville 651 Prairie Pointe Dr. Yorkville, IL 60560 LEGEND PHASE BOUNDARY 600 0 600300 Feet HIGH RIDGECANNONBALLVETERANS WHITE PLAINS YELLOWSTONE IROQUOIS BEECHERBLACKBERRY SHOR E CANYON TRAI L IROQUOISWESTERN GILLESPIEN O R T H L A N D ERICA ISABELCANYON EDWARD Kendall County GIS, Kendall County, Illinois Engineering Enterprises 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6756 KENDALL MARKETPLACE PHASE 3 ACCEPTANCE www.eeiweb.com DATE: PROJECT NO.: FILE: PATH: BY: JANUARY 2026 YO2002 YO2002 KM ACCEPTANCE DOC H:\GIS\PUBLIC\YORKVILLE\2020\ MJT ³United City of Yorkville 651 Prairie Pointe Dr. Yorkville, IL 60560 LEGEND PHASE BOUNDARY 600 0 600300 Feet Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #7 Tracking Number PW 2026-35 Quiet Zone Update Public Works Committee – April 21, 2026 None Informational Downtown and Burlington Northern Santa Fe Quiet Zone Update. Brad Sanderson Engineering Name Department QUIET ZONE UPDATE United City of Yorkville 1.Quiet Zone Requirements 2.BNSF Quiet Zone –Kennedy 3.BNSF Quiet Zone –Mill Road 4.BNSF Quiet Zone –Beecher Road 5.Downtown Quiet Zone 6.Questions Agenda QUIET ZONE REQUIREMENTS •Quiet Zone Risk Index Must Be Less Than or Equal to Risk Index with Horns •Requires Additional Safety Measures Such As: •Delineators •Non-Traversable Medians •One-Way Streets •Crossing Closures •Quad Gates QUIET ZONE REQUIREMENTS (continued) •Minimum Length is ½ Mile •Any Crossings Within a ½ Mile Must Be Included in the Proposed Quiet Zone Even if They Are Outside Your Jurisdiction •Each Crossing Must Have at Minimum the Following Warning Systems: •Flashing Lights •Gates •Constant Warning Time Detection (CWT) •On-Site Diagnostic Meeting Review with FRA, Railroad, ICC and IDOT •Provide Notice of Intent (NOI) To FRA, Railroad, ICC & IDOT •Installation of Proposed Safety Measures •Notice of Establishment (NOE) BNSF Quiet Zone BNSF Quiet Zone –Kennedy Road •Existing Conditions •Constant Warning Time, Gates & Lights •Pedestrian Crossing was Reviewed By the Diagnostic Team •Proposed Improvements •100’ of Delineators on Each Side of the Crossing •Update Pavement Striping to Latest MUTCD Standards •Add No Train Horn Signs •Widen Escape Area on N. Side •Estimated Cost = $20K/crossing BNSF Quiet Zone –Mill Road •Existing Conditions •Constant Warning Time, Gates & Lights •ComEd Entrance •Proposed Improvements •110’ of Delineators on the N. Side & 145’ of Delineators on the S. Side •Update Pavement Striping to Latest MUTCD Standards •Add No Train Horn Signs •Relocate ComEd Entrance At Least 60’ from the Gate Arm •Estimated Cost = $25K/crossing Submit Notice of Intent –Early May 60 Day Comment Period –May-July Quiet Zone Established – August/September Next Steps –BNSF Quiet Zone (Mill & Kennedy) 1 2 4 Submit Notice of Establishment – July 3 BNSF Quiet Zone –Beecher Road •Existing Conditions •Constant Warning Time, Gates & Lights •Roadway is only 16’ Wide at Railroad Crossing •Proposed Improvements •100’ of Delineators on Each Side of the Crossing •Update Pavement Striping to Latest MUTCD Standards •Add No Train Horn Signs •Widen Road to 24’ Wide & Widen Railroad Crossing & Install New Gates •Estimated Cost = TBD Determine Estimated Cost for Improvements Determine Funding Possibilities Construction to Widen the Roadway Next Steps –BNSF Quiet Zone (Beecher) 1 2 4 Coordinate with BNSF Railroad for Crossing Improvements 3 Downtown Quiet Zone Downtown Quiet Zone •Hoover Forest Preserve •CWT, Gates & Lights •Poplar Drive •CWT, Gates & Lights •River Birch Lane •Lights, No Gates or CWT •Morgan Street •No Warning Devices •Adams Street •No Warning Devices •State Street •No Warning Devices •Main Street •No Warning Devices •West Alley •No Warning Devices •IL Route 47 •CWT, Gates & Lights •East Alley •No Warning Devices •Heustis Street •No Warning Devices •Mill Street •No Warning Devices Downtown Quiet Zone •Warning Device Costs •$700K for New Crossing Surface, Gates, Lights and CWT •CWT Will Require Drainage Improvement To Function Correctly •Hydraulic Avenue Considerations •Edge of Pavement Must Be Shifted 10’ North To Allow Room for Gate Mechanisms •Private Crossings •Not required to be included in the Quiet Zone •Trains may still blow their horn at a private crossing. Noise impact to be reviewed Public Information Meeting To Discuss Preliminary Quiet Zone Options and Possible Road Closures Review Noise Impacts of Private Crossing Horns Investigate Grants and Funding Opportunities Next Steps –Downtown Quiet Zone 1 2 4 Engage Railroad To Discuss Agreements and Project Implementation for Crossing Improvements 3 Review Needed Improvements on W. Hydraulic Avenue 5 QUESTIONS ORCOMMENTS? Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #8 Tracking Number PW 2026-36 2026 Road to Better Roads Program – MFT Contract Award Public Works Committee – April 21, 2026 Majority Consideration of Contract Award Please see the attached memo. Brad Sanderson Engineering Name Department Bids were received, opened and tabulated for work to be done on the 2026 Road to Better Roads Program – MFT at 10:00 a.m., March 24, 2026. Representatives from the City, the contractors bidding the project and our firm were in attendance. A tabulation of the bids and the engineer’s estimate is attached for your information and record. We recommend the acceptance of the bid and approval of award be made to the low bidder, D. Construction, Inc. 1488 S Broadway Coal City, IL 60416 in the total amount of $1,302,563.04. If you have any questions or require additional information, please let us know. Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Jori Contrino, City Clerk Rob Fredrickson, Finance Director Date: March 24, 2026 Subject: 2026 Road to Better Roads Program - MFT Page 1 of 1 BID TABULATION ENGINEER'S ESTIMATE BUILDERS PAVING, LLC BIDS RECEIVED 10:00 A.M. 03/24/26 52 Wheeler Road 4401 Roosevelt Road Sugar Grove, IL 60554 Hillside, IL 60162 TOTAL BID $1,470,000.00 $1,428,555.00 BID BOND N/A X SIGNED BID N/A X D. CONSTRUCTION, INC.EVERLAST BLACKTOP 1488 S Broadway 2560 Fox Field Road Suite 180 Coal City, IL 60416 St. Charles, IL 60174 TOTAL BID $1,302,563.04 $1,612,698.15 BID BOND X X SIGNED BID X X BID SUMMARY 2026 ROAD PROGRAM (MFT) SECTION NO. 26-00000-00-GM UNITED CITY OF YORKVILLE ENGINEERING ENTERPRISES, INC. 52 WHEELER ROAD, SUGAR GROVE, ILLINOIS BID TABULATION BID TABULATION ENGINEER'S ESTIMATE BIDS RECD 3/24/2026 52 Wheeler Road Sugar Grove, IL 60554 ITEM NO.DESCRIPTION 1 GEOTECHNICAL FABRIC FOR GROUND STABILIZATION SQ YD 1,360 2.00$ 2,720.00$ 1.00$ 1,360.00$ 3.00$ 4,080.00$ 2.50$ 3,400.00$ 2 REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL CU YD 460 30.00$ 13,800.00$ 35.00$ 16,100.00$ 58.00$ 26,680.00$ 35.00$ 16,100.00$ 3 AGGREGATE SUBGRADE IMPROVEMENT CU YD 460 50.00$ 23,000.00$ 35.00$ 16,100.00$ 45.00$ 20,700.00$ 35.00$ 16,100.00$ 4 PREPARATION OF BASE SQ YD 17,395 1.50$ 26,092.50$ 1.15$ 20,004.25$ 1.75$ 30,441.25$ 1.00$ 17,395.00$ 5 PARTIAL DEPTH PATCHING (SPECIAL)SQ YD 597 30.00$ 17,910.00$ 33.25$ 19,850.25$ 45.00$ 26,865.00$ 35.00$ 20,895.00$ 6 HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT SQ YD 129 0.01$ 1.29$ 25.00$ 3,225.00$ 25.00$ 3,225.00$ 20.00$ 2,580.00$ 7 HOT-MIX ASPHALT SURFACE REMOVAL, 2"SQ YD 8,485 1.90$ 16,121.50$ 3.20$ 27,152.00$ 2.40$ 20,364.00$ 2.00$ 16,970.00$ 8 HOT-MIX ASPHALT SURFACE REMOVAL, 4.5"SQ YD 17,395 3.75$ 65,231.25$ 4.75$ 82,626.25$ 4.75$ 82,626.25$ 4.50$ 78,277.50$ 9 HOT-MIX ASPHALT SURFACE REMOVAL, VARIABLE DEPTH SQ YD 15,410 2.05$ 31,590.50$ 3.25$ 50,082.50$ 2.36$ 36,367.60$ 2.75$ 42,377.50$ 10 BITUMINOUS MATERIALS (TACK COAT)POUND 25,985 0.01$ 259.85$ 0.01$ 259.85$ 0.01$ 259.85$ 0.10$ 2,598.50$ 11 HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50 TON 3,020 68.50$ 206,870.00$ 80.00$ 241,600.00$ 88.94$ 268,598.80$ 80.00$ 241,600.00$ 12 HOT-MIX ASPHALT BINDER COURSE, IL-9.5, N50 TON 1,340 71.50$ 95,810.00$ 82.00$ 109,880.00$ 88.94$ 119,179.60$ 83.00$ 111,220.00$ 13 HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N50 TON 3,820 71.50$ 273,130.00$ 84.00$ 320,880.00$ 92.24$ 352,356.80$ 83.00$ 317,060.00$ 14 COMBINATION CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT FOOT 1,794 40.70$ 73,015.80$ 38.75$ 69,517.50$ 40.00$ 71,760.00$ 42.00$ 75,348.00$ 15 SIDEWALK REMOVAL SQ FT 12,625 1.65$ 20,831.25$ 1.00$ 12,625.00$ 2.00$ 25,250.00$ 2.00$ 25,250.00$ 16 PORTLAND CEMENT CONCRETE SIDEWALK, 5 INCH SQ FT 11,950 9.90$ 118,305.00$ 10.15$ 121,292.50$ 9.50$ 113,525.00$ 10.00$ 119,500.00$ 17 DETECTABLE WARNINGS SQ FT 620 27.50$ 17,050.00$ 28.00$ 17,360.00$ 40.00$ 24,800.00$ 35.00$ 21,700.00$ 18 DOMESTIC WATER SERVICE BOXES TO BE ADJUSTED EACH 2 220.00$ 440.00$ 150.00$ 300.00$ 1,400.00$ 2,800.00$ 300.00$ 600.00$ 19 MANHOLES TO BE ADJUSTED EACH 1 880.00$ 880.00$ 780.00$ 780.00$ 2,200.00$ 2,200.00$ 1,000.00$ 1,000.00$ 20 MANHOLES TO BE RECONSTRUCTED EACH 1 1,430.00$ 1,430.00$ 1,000.00$ 1,000.00$ 6,000.00$ 6,000.00$ 2,000.00$ 2,000.00$ 21 INLETS TO BE ADJUSTED EACH 45 495.00$ 22,275.00$ 430.00$ 19,350.00$ 800.00$ 36,000.00$ 575.00$ 25,875.00$ 22 INLETS TO BE ADJUSTED (SPECIAL)EACH 1 1,430.00$ 1,430.00$ 985.00$ 985.00$ 1,200.00$ 1,200.00$ 575.00$ 575.00$ 23 INLETS TO BE RECONSTRUCTED EACH 1 1,430.00$ 1,430.00$ 800.00$ 800.00$ 4,000.00$ 4,000.00$ 1,500.00$ 1,500.00$ 24 TYPE 1 FRAME, OPEN LID EACH 6 550.00$ 3,300.00$ 450.00$ 2,700.00$ 550.00$ 3,300.00$ 575.00$ 3,450.00$ 25 TYPE 1 FRAME, CLOSED LID EACH 1 550.00$ 550.00$ 450.00$ 450.00$ 800.00$ 800.00$ 575.00$ 575.00$ 26 TYPE 3 FRAME AND GRATE EACH 1 550.00$ 550.00$ 650.00$ 650.00$ 800.00$ 800.00$ 650.00$ 650.00$ 27 TYPE 10 FRAME AND GRATE EACH 4 550.00$ 2,200.00$ 650.00$ 2,600.00$ 1,000.00$ 4,000.00$ 750.00$ 3,000.00$ 28 SANITARY MANHOLES TO BE ADJUSTED EACH 3 1,100.00$ 3,300.00$ 1,400.00$ 4,200.00$ 2,200.00$ 6,600.00$ 1,700.00$ 5,100.00$ 29 THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS SQ FT 138 11.00$ 1,518.00$ 9.00$ 1,242.00$ 11.00$ 1,518.00$ 10.00$ 1,380.00$ 30 THERMOPLASTIC PAVEMENT MARKING - LINE 4"FOOT 280 2.42$ 677.60$ 1.35$ 378.00$ 2.40$ 672.00$ 2.00$ 560.00$ 2026 ROAD PROGRAM (MFT) UNITED CITY OF YORKVILLE Hillside, IL 60162 St Charles, IL 60174 BUILDERS PAVING, LLC EVERLAST BLACKTOP 4401 Roosevelt Road 2560 Fox Field Road Suite 180 D CONSTRUCTION, INC. 1488 S. Broadway Coal City, IL 60416 SECTION NO. 26-00000-00-GM UNIT PRICEUNITQUANTITY AMOUNT UNIT PRICE AMOUNT AMOUNT AMOUNTUNIT PRICE UNIT PRICE ENGINEERING ENTERPRISES, INC. 52 WHEELER ROAD, SUGAR GROVE, ILLINOIS BID TABULATION BID TABULATION ENGINEER'S ESTIMATE BIDS RECD 3/24/2026 52 Wheeler Road Sugar Grove, IL 60554 ITEM NO.DESCRIPTION 2026 ROAD PROGRAM (MFT) UNITED CITY OF YORKVILLE Hillside, IL 60162 St Charles, IL 60174 BUILDERS PAVING, LLC EVERLAST BLACKTOP 4401 Roosevelt Road 2560 Fox Field Road Suite 180 D CONSTRUCTION, INC. 1488 S. Broadway Coal City, IL 60416 SECTION NO. 26-00000-00-GM UNIT PRICEUNITQUANTITY AMOUNT UNIT PRICE AMOUNT AMOUNT AMOUNTUNIT PRICE UNIT PRICE 31 THERMOPLASTIC PAVEMENT MARKING - LINE 6"FOOT 88 6.05$ 532.40$ 1.85$ 162.80$ 6.50$ 572.00$ 6.00$ 528.00$ 32 THERMOPLASTIC PAVEMENT MARKING - LINE 12"FOOT 120 11.55$ 1,386.00$ 3.60$ 432.00$ 11.50$ 1,380.00$ 10.00$ 1,200.00$ 33 THERMOPLASTIC PAVEMENT MARKING - LINE 24"FOOT 65 20.90$ 1,358.50$ 7.25$ 471.25$ 22.00$ 1,430.00$ 15.00$ 975.00$ 34 SIGN PANEL - TYPE 1 SQ FT 43 27.50$ 1,182.50$ 20.50$ 881.50$ 35.00$ 1,505.00$ 28.00$ 1,204.00$ 35 TELESCOPING STEEL SIGN SUPPORT FOOT 48 16.50$ 792.00$ 15.00$ 720.00$ 22.00$ 1,056.00$ 30.00$ 1,440.00$ 36 HOT-MIX ASPHALT DRIVEWAY REMOVAL AND REPLACEMENT SQ YD 209 40.00$ 8,360.00$ 60.00$ 12,540.00$ 36.00$ 7,524.00$ 50.00$ 10,450.00$ 37 PORTLAND CEMENT CONCRETE DRIVEWAY REMOVAL AND REPLACEMENT SQ YD 20 77.00$ 1,540.00$ 90.00$ 1,800.00$ 135.00$ 2,700.00$ 85.00$ 1,700.00$ 38 REMOVAL AND REINSTALL BRICK PAVERS SQ FT 125 18.70$ 2,337.50$ 18.00$ 2,250.00$ 15.00$ 1,875.00$ 35.00$ 4,375.00$ 39 CLASS B PATCHES, 8 INCH SQ YD 750 110.00$ 82,500.00$ 107.50$ 80,625.00$ 115.00$ 86,250.00$ 130.00$ 97,500.00$ 40 CLASS B PATCHES, 8.5 INCH SQ YD 450 115.00$ 51,750.00$ 115.00$ 51,750.00$ 121.00$ 54,450.00$ 135.00$ 60,750.00$ 41 SODDING, SPECIAL SQ YD 1,240 19.53$ 24,217.20$ 18.00$ 22,320.00$ 12.00$ 14,880.00$ 24.00$ 29,760.00$ 42 SUPPLEMENTAL WATERING UNIT 20 27.50$ 550.00$ 50.00$ 1,000.00$ 125.00$ 2,500.00$ 80.00$ 1,600.00$ 43 TRAFFIC CONTROL AND PROTECTION, (SPECIAL)L SUM 1 27,583.00$ 27,583.00$ 42,291.85$ 42,291.85$ 60,000.00$ 60,000.00$ 30,227.10$ 30,227.10$ 44 RAILROAD PROTECTIVE LIABILITY INSURANCE L SUM 1 5,000.00$ 5,000.00$ 2,000.00$ 2,000.00$ 10,000.00$ 10,000.00$ 3,500.00$ 3,500.00$ 45 CRACK ROUTING FOOT 48,000 0.06$ 2,880.00$ 0.02$ 960.00$ 0.01$ 480.00$ 0.01$ 480.00$ 46 CRACK FILLING POUND 16,000 1.85$ 29,600.00$ 1.60$ 25,600.00$ 2.48$ 39,680.00$ 1.90$ 30,400.00$ 47 ROUTING AND SEALING CRACKS FOOT 26,770 0.72$ 19,274.40$ 0.65$ 17,400.50$ 1.10$ 29,447.00$ 0.72$ 19,274.40$ TOTAL (Items 1 - 47)1,302,563.04$ 1,428,555.00$ 1,612,698.15$ 1,470,000.00$ % BELOW/ABOVE ENGINEER'S ESTIMATE -11.4%-2.8%9.7% The highlighted cell contained an error and has been corrected with the right value. ENGINEERING ENTERPRISES, INC. 52 WHEELER ROAD, SUGAR GROVE, ILLINOIS FOX RIVER MCHUGHMAIN SPRING TUMAVAN EMMON MILLPOPLARJOHN VETERANS CANNONBALLBRIDGEERICA STAGEC O A C H PARK ROUTE 34CENTERKENNEDY COUNTRYSIDE BEECHEREDWARDSC H O O L H O U S E OMAHASTATEPARKSIDETERIMORGANORANGE SOMONAUKGAME FARMKEND A L L DEERHAYDENTIMBER OAKELM KINGFREEMONTHAMPT O N HEA R T L A N D WALNUT ROUTE 71 HEUSTISFORDWACKERLIBERTYQUINSEY GILLESPIE WASHINGTON WING RAINTREEISABEL ROUTE 1 2 6BARBERRYWESTERN KELLY C O U N T R Y H I L L S JACKSON MAPLESUNSETBEAVER MARKETVIEWCOLTONMADISON BLACKBERRY SHOR E KATE C A R L Y KINGS MILLBRISTOL HOMES T E A D BRUELLPRAIRIE CROSSINGBLUESTEMADRIANWALSHCHURCHGRACEGREENBRIAR IDE N T ASYCAMOREPLEASUREWHITE OAK LEISURE COLONIAL LANDMARKNORTHLAND BLAINE PRAIRIERI V E R S I D E CANYON WESTONPURCELL WINDHAM BANBURYHAZELTIN E ELIZABETH CROOKED CREEKCLEAR W A T E R TA U S ACORNWOLF GARDEN CONOVER ADAMSILLINI HILLCREST BADGERNORW A Y BIRCHWOODCOACH O L I V E RIVER BIRCH J A M E S T O W N ASTERWILD INDIGOLEXINGTONROUTE 47HIGH RIDGEASHARROWH E A D D E E R P A T HCHESTNUT RIDGE MU I R F I E L D GAWNE WARBLERFOXBO R O LOTUS RIDGETREMONTCANARYWESTWINDSO R INGEMUNSON HEARTHSTONEREDHORSEOLSEN INDEPENDENCE DE ER PO IN TWOODEN BRIDGEMARKETPLACEGEORGEANNA GOLDFINCHOAKPRAIRIE GRASSB L U E B I R DPRAIR IE ROSE CLOVER CEDAR WOOD SAGEMARTIN GREENFIELD TURNRED T A I L WALTER PINE VILLAGE V IEW WHITE PLAINS BIRCH SUNNY D E L L DAKOTAS AR A VANO SHICKORYMEADOWVIEW DICKSON STRAWBER R Y DOLPH PRAIRIE POINTE WOODWORTHYOR K V I L L EALAN DALEAUBURNBEHRENS NADEN HYDRAULIC CHERRYWOODLANDHOOVERSANDERSBELLCRIMSONHAWK HOLLOWPALMERWESTWIND C O D Y FIR MENARD CORNE R S T O N E BURNING B U S H JOHNSONDUNKINSPRUCEMEAD O WL A R K ALDER FAWN RIDGE MULHERN CONEFLOWERCONCORDB L U E J A Y GLEN NELSONPOWERSF A RM S T E AD BLACK B E R R Y ALEXANDRAAPPLETREE HALEY CANDLEBERRYWELLSJUNIPERCORNELL BUCKTHO R N SUNFLOWER HERITAG E TYLER CREEKJEFFERSONSHARON ROUTE 7 1 FOX PINEWESTCENTER JOHN HYDRAU L I C VETERANS MAINSCH O O L H O U S E RO U T E 1 2 6 HYDRAULIC ROUTE 3 4 WASHIN G T O N PARKSOMONAUK ROUTE 47STAGECOACH PARK BRIDGEMAINSTATEROUTE 71 VETERANS MAPLE BEECHER WALNUTRIDGE B R I D G E DOLPH DATE: PROJECT NO.: FILE: BY: JANUARY 2026 YO2523 MJT 2026 MFT ROAD PROGRAM UNITED CITY OF YORKVILLE, ILLINOIS Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 www.eeiweb.com PATH:H:\GIS\PUBLIC\YORKVILLE\2022\YO2523 United City of Yorkville 651 Prairie Pointe Dr. Yorkville, IL 60560 N O R T H ° YO2523_2026 MFT Road Program RESURFACING CONCRETE PATCHING04,0002,000 US Feet EXHIBIT 1 - LOCATION MAP Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #9 Tracking Number PW 2026-37 2026 Road to Better Roads – Construction Engineering Agreement Public Works Committee – April 21, 2026 Majority Approval Please see the attached memo. Eric Dhuse Public Works Name Department Summary A proposed PSA from EEI to perform construction engineering on the 2026 RTBR program. This program utilizes MFT funds and is separate from the Local Roads paving project. Background This is our annual MFT paving program. We separate this out from the Local Roads program because we do not have enough funds in MFT to complete all the paving we have programmed. This year the focus areas are resurfacing in River’s Edge and Cornerstone subdivisions along with the continuation of concrete repairs on E. Countryside Parkway, Market View, Menard, and Carpenter St. EEI is proposing an hourly rate PSA for the construction engineering services in the estimated amount of $109,574. The services provided for this compensation include, but are not limited to, construction layout and observation, monitor adherence to plans and specs, making sure the contractor stays on schedule, answering questions or concerns in the field, prepare and verify pay estimates, perform punch lists, and close out the project. At this time, there is $125,000 budgeted in the proposed FY27 budget for this item. Recommendation Staff recommends approval of this contract. Memorandum To: Public Works Committee From: Eric Dhuse, Director of Public Works CC: Bart Olson, City Administrator Date: April 8, 2026 Subject: 2026 RTBR Construction Engineering Agreement UNITED CITY OF YORKVILLE 2026 ROAD TO BETTER ROADS PROGRAM PAGE 1 2026 Road to Better Roads Program United City of Yorkville Professional Services Agreement – Construction Engineering THIS AGREEMENT, by and between the United City of Yorkville, hereinafter referred to as the "City" or “OWNER” and Engineering Enterprises, Inc. hereinafter referred to as the "Contractor" or “ENGINEER” agrees as follows: A. Services: ENGINEER agrees to furnish to the City the following services: The ENGINEER shall provide any and all necessary engineering services to the City as indicated on the Scope of Services (Attachment B). Construction Engineering for all roadways indicated on Attachment E will be provided. Engineering will be in accordance with all City and Illinois Department of Transportation requirements. B. Term: Services will be provided beginning on the date of execution of this agreement and continuing, until terminated by either party upon 7 days written notice to the non-terminating party or upon completion of the Services. Upon termination the Contractor shall be compensated for all work performed for the City prior to termination. C. Compensation and maximum amounts due to Contractor: ENGINEER shall receive as compensation for all work and services to be performed herein, an amount based on the Estimated Level of Effort and Associated Cost included in Attachment C. Construction Engineering will be paid for as an Hourly Rate in the amount of $109,574.00. The hourly rates for this project are shown in the attached 2026 Standard Schedule of Charges (Attachment F). All payments will be made according to the Illinois State Prompt Payment Act and not less than once every thirty days. D. Changes in Rates of Compensation: In the event that this contract is designated in Section B thereof as an Ongoing Contract, ENGINEER, on or before February 1st of any given year, shall provide written notice of any change in the rates specified in Section C hereof (or on any attachments hereto) and said changes shall only be effective on and after May 1st of that same year. E. Ownership of Records and Documents: Contractor agrees that all books and records and other recorded information developed specifically in connection with this agreement shall remain the property of the City. Contractor agrees to keep such information confidential and not to disclose or disseminate the information to third parties without the consent of the City. This confidentiality shall not apply UNITED CITY OF YORKVILLE 2026 ROAD TO BETTER ROADS PROGRAM PAGE 2 to material or information, which would otherwise be subject to public disclosure through the freedom of information act or if already previously disclosed by a third party. Upon termination of this agreement, Contractor agrees to return all such materials to the City. The City agrees not to modify any original documents produced by Contractor without contractors consent. Modifications of any signed duplicate original document not authorized by ENGINEER will be at OWNER’s sole risk and without legal liability to the ENGINEER. Use of any incomplete, unsigned document will, likewise, be at the OWNER’s sole risk and without legal liability to the ENGINEER. F. Governing Law: This contract shall be governed and construed in accordance with the laws of the State of Illinois. Venue shall be in Kendall County, Illinois. G. Independent Contractor: Contractor shall have sole control over the manner and means of providing the work and services performed under this agreement. The City’s relationship to the Contractor under this agreement shall be that of an independent contractor. Contractor will not be considered an employee to the City for any purpose. H. Certifications: Employment Status: The Contractor certifies that if any of its personnel are an employee of the State of Illinois, they have permission from their employer to perform the service. Anti-Bribery: The Contractor certifies it is not barred under 30 Illinois Compiled Statutes 500/50-5(a) - (d) from contracting as a result of a conviction for or admission of bribery or attempted bribery of an officer or employee of the State of Illinois or any other state. Loan Default: If the Contractor is an individual, the Contractor certifies that he/she is not in default for a period of six months or more in an amount of $600 or more on the repayment of any educational loan guaranteed by the Illinois State Scholarship Commission made by an Illinois institution of higher education or any other loan made from public funds for the purpose of financing higher education (5 ILCS 385/3). Felony Certification: The Contractor certifies that it is not barred pursuant to 30 Illinois Compiled Statutes 500/50-10 from conducting business with the State of Illinois or any agency as a result of being convicted of a felony. Barred from Contracting: The Contractor certifies that it has not been barred from contracting as a result of a conviction for bid-rigging or bid rotating under 720 Illinois Compiled Statutes 5/33E or similar law of another state. Drug Free Workplace: The Contractor certifies that it is in compliance with the Drug Free Workplace Act (30 Illinois Compiled Statutes 580) as of the effective date of this contract. UNITED CITY OF YORKVILLE 2026 ROAD TO BETTER ROADS PROGRAM PAGE 3 The Drug Free Workplace Act requires, in part, that Contractors, with 25 or more employees certify and agree to take steps to ensure a drug free workplace by informing employees of the dangers of drug abuse, of the availability of any treatment or assistance program, of prohibited activities and of sanctions that will be imposed for violations; and that individuals with contracts certify that they will not engage in the manufacture, distribution, dispensation, possession, or use of a controlled substance in the performance of the contract. Non-Discrimination, Certification, and Equal Employment Opportunity: The Contractor agrees to comply with applicable provisions of the Illinois Human Rights Act (775 Illinois Compiled Statutes 5), the U.S. Civil Rights Act, the Americans with Disabilities Act, Section 504 of the U.S. Rehabilitation Act and the rules applicable to each. The equal opportunity clause of Section 750.10 of the Illinois Department of Human Rights Rules is specifically incorporated herein. The Contractor shall comply with Executive Order 11246, entitled Equal Employment Opportunity, as amended by Executive Order 11375, and as supplemented by U.S. Department of Labor regulations (41 C.F.R. Chapter 60). The Contractor agrees to incorporate this clause into all subcontracts under this Contract. International Boycott: The Contractor certifies that neither it nor any substantially owned affiliated company is participating or shall participate in an international boycott in violation of the provisions of the U.S. Export Administration Act of 1979 or the regulations of the U.S. Department of Commerce promulgated under that Act (30 ILCS 582). Record Retention and Audits: If 30 Illinois Compiled Statutes 500/20-65 requires the Contractor (and any subcontractors) to maintain, for a period of 3 years after the later of the date of completion of this Contract or the date of final payment under the Contract, all books and records relating to the performance of the Contract and necessary to support amounts charged to the Village under the Contract. The Contract and all books and records related to the Contract shall be available for review and audit by the Village and the Illinois Auditor General. If this Contract is funded from contract/grant funds provided by the U.S. Government, the Contract, books, and records shall be available for review and audit by the Comptroller General of the U.S. and/or the Inspector General of the federal sponsoring agency. The Contractor agrees to cooperate fully with any audit and to provide full access to all relevant materials. United States Resident Certification: (This certification must be included in all contracts involving personal services by non-resident aliens and foreign entities in accordance with requirements imposed by the Internal Revenue Services for withholding and reporting federal income taxes.) The Contractor certifies that he/she is a: x United States Citizen ___ Resident Alien ___ Non-Resident Alien The Internal Revenue Service requires that taxes be withheld on payments made to non resident aliens for the performance of personal services at the rate of 30%. Tax Payer Certification : Under penalties of perjury, the Contractor certifies that its Federal Tax Payer Identification Number or Social Security Number is (provided separately) and is doing business as a (check one): ___ Individual ___ Real Estate Agent ___ Sole Proprietorship ___ Government Entity ___ Partnership ___ Tax Exempt Organization UNITED CITY OF YORKVILLE 2026 ROAD TO BETTER ROADS PROGRAM PAGE 4 (IRC 501(a) only) x Corporation ___ Not for Profit Corporation ___ Trust or Estate ___ Medical and Health Care Services Provider Corp. I. Indemnification: Contractor shall indemnify and hold harmless the City and City’s agents, servants, and employees against all loss, damage, and expense which it may sustain or for which it will become liable on account of injury to or death of persons, or on account of damage to or destruction of property resulting from the performance of work under this agreement by Contractor or its Subcontractors, or due to or arising in any manner from the wrongful act or negligence of Contractor or its Subcontractors of any employee of any of them. In the event that the either party shall bring any suit, cause of action or counterclaim against the other party, the non-prevailing party shall pay to the prevailing party the cost and expenses incurred to answer and/or defend such action, including reasonable attorney fees and court costs. In no event shall the either party indemnify any other party for the consequences of that party’s negligence, including failure to follow the ENGINEER’s recommendations. J. Insurance: The Engineer agrees that it has either attached a copy of all required insurance certificates or that said insurance is not required due to the nature and extent of the types of services rendered hereunder. (Not applicable as having been previously supplied) K. Additional Terms or Modification: The terms of this agreement shall be further modified as provided on the attached Exhibits. Except for those terms included on the Exhibits, no additional terms are included as a part of this agreement. All prior understandings and agreements between the parties are merged into this agreement, and this agreement may not be modified orally or in any manner other than by an agreement in writing signed by both parties. In the event that any provisions of this agreement shall be held to be invalid or unenforceable, the remaining provisions shall be valid and binding on the parties. The list of attachments are as follows: Attachment A: Standard Terms and Conditions Attachment B: Scope of Services Attachment C: Estimated Level of Effort and Associated Cost Attachment D: Estimated Project Schedule Attachment E: Location Map Attachment F: 2026 Standard Schedule of Charges UNITED CITY OF YORKVILLE 2026 ROAD TO BETTER ROADS PROGRAM PAGE 5 L. Notices: All notices required to be given under the terms of this agreement shall be given mail, addressed to the parties as follows: For the City: For the Contractor: City Administrator and City Clerk Engineering Enterprises, Inc. United City of Yorkville 52 Wheeler Road 651 Prairie Pointe Drive Sugar Grove Illinois 60554 Yorkville, IL 60560 Either of the parties may designate in writing from time to time substitute addresses or persons in connection with required notices. Agreed to this ___day of _________, 2026. United City of Yorkville: Engineering Enterprises, Inc.: _________________________________ ________________________________ John Purcell Bradley. P. Sanderson, PE Mayor Chief Operating Officer/President _________________________________ ________________________________ Jori Contrino Christopher J. Ott, PE. City Clerk Project Manager ENGINEERING ENTERPRISES, INC. ATTACHMENT A - MARCH 2026 PAGE 1 STANDARD TERMS AND CONDITIONS Agreement: These Standard Terms and Conditions, together with the Professional Services Agreement, constitute the entire integrated agreement between the OWNER and Engineering Enterprises, Inc. (EEI) (hereinafter “Agreement”), and take precedence over any other provisions between the Parties. These terms may be amended, but only if both parties consent in writing. However, to the extent that the Scope of Work differs from the Standard Terms and Conditions, the Scope of Work document controls. Standard of Care: In providing services under this Agreement, the ENGINEER will endeavor to perform in a matter consistent with that degree of care and skill ordinarily exercised by members of the same profession currently practicing under same circumstances in the same locality. ENGINEER makes no other warranties, express or implied, written or oral under this Agreement or otherwise, in connection with ENGINEER’S service. Construction Engineering and Inspection: The ENGINEER shall not supervise, direct, control, or have authority over any contractor work, nor have authority over or be responsible for the means, methods, techniques sequences, or procedures of construction selected or used by any contractor, or the safety precautions and programs incident thereto, for security or safety of the site, nor for any failure of a contractor to comply with laws and regulations applicable to such contractor’s furnishing and performing of its work. The ENGINEER neither guarantees the performance of any contractor nor assumes responsibility for contractor’s failure to furnish and perform the work in accordance with the contract documents. The ENGINEER is not responsible for the acts or omissions of any contractor, subcontractor, or supplies, or any of their agents or employees or any other person at the site or otherwise furnishing or performing any work. Shop drawing and submittal review by the ENGINEER shall apply to only the items in the submissions and only for the purpose of assessing if upon installation or incorporation in the project work they are generally consistent with the construction documents.  OWNER agrees that the contractor is solely responsible for the submissions and for compliance with the construction documents.  OWNER further agrees that the ENGINEER’S review and action in relation to these submissions shall not constitute the provision of means, methods, techniques, sequencing or procedures of construction or extend or safety programs or precautions.  The ENGINEER’S consideration of a component does not constitute acceptance of the assembled items. The ENGINEER’S site observation during construction shall be at the times agreed upon in the Project Scope.  Through standard, reasonable means the ENGINEER will become generally familiar with observable completed work.  If the ENGINEER observes completed work that is inconsistent with the construction documents, that information shall be communicated to the contractor and OWNER for them to address. Opinion of Probable Construction Costs: ENGINEER’S opinion of probable construction costs represents ENGINEER’S best and reasonable judgment as a professional engineer. OWNER acknowledges that ENGINEER has no control over construction costs of contractor’s methods of determining pricing, or over competitive bidding by contractors, or of market conditions or changes thereto. ENGINEER cannot and does not guarantee that proposals, bids or actual construction costs will not vary from ENGINEER’S opinion of probable construction costs. Copies of Documents & Electronic Compatibility: Copies of Documents that may be relied upon by OWNER are limited to the printed copies (also known as hard copies) that are signed or sealed by the ENGINEER. Files in electronic media format of text, data, graphics, or of other types that are furnished by ENGINEER to OWNER are only for convenience of OWNER. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. When transferring documents in electronic media format, ENGINEER makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by ENGINEER at the beginning of the project. Changed Conditions: If, during the term of this Agreement, circumstances or conditions that were not originally contemplated by or known to the ENGINEER are revealed, to the extent that they affect the scope of services, compensation, schedule, allocation of risks, or other material terms of this Agreement, the ENGINEER may call for renegotiation of appropriate portions of this Agreement. The ENGINEER shall notify the OWNER of the changed conditions necessitating renegotiation, and the ENGINEER and the OWNER shall promptly and in good faith enter into renegotiation of this Agreement to address the changed conditions. If terms cannot be agreed to, the parties agree that either party has the absolute right to terminate this Agreement, in accordance with the termination provision hereof. Hazardous Conditions: OWNER represents to ENGINEER that to the best of its knowledge no Hazardous Conditions (environmental or otherwise) exist on the project site. If a Hazardous Condition is encountered or alleged, ENGINEER shall have the obligation to notify OWNER and, to the extent of applicable Laws and Regulations, appropriate governmental officials. It is acknowledged by both parties that ENGINEER's scope of services does not include any services related to a Hazardous Condition. In the event ENGINEER or any other party encounters a Hazardous Condition, ENGINEER may, at its option and without liability for consequential or any other damages, suspend performance of services on the portion of the project affected thereby until OWNER: (i) retains appropriate specialist consultant(s) or contractor(s) to identify and, as appropriate, abate, remediate, or remove the Hazardous Condition; and (ii) warrants that the project site is in full compliance with applicable Laws and Regulations. ENGINEER agrees to cooperate with the OWNER, as necessary, to remediate a Hazardous Condition, but same may result in additional costs to the OWNER. ENGINEERING ENTERPRISES, INC. ATTACHMENT A - MARCH 2026 PAGE 2 Consequential Damages: Notwithstanding any other provision of this Agreement, and to the fullest extent permitted by law, neither the OWNER nor the ENGINEER, their respective officers, directors, partners, employees, contractors, or subcontractors shall be liable to the other or shall make any claim for any incidental, indirect, or consequential damages arising out of or connected in any way to the Project or to this Agreement. This mutual waiver of consequential damages shall include, but is not limited to, loss of use, loss of profit, loss of business, loss of income, loss of reputation, or any other consequential damages that either party may have incurred from any cause of action including negligence, strict liability, breach of contract, and breach of strict or implied warranty. Both the OWNER and the ENGINEER shall require similar waivers of consequential damages protecting all the entities or persons named herein in all contracts and subcontracts with others involved in this project. Termination: This Agreement may be terminated for convenience, without cause, upon fourteen (14) days written notice of either party. In the event of termination, the ENGINEER shall prepare a final invoice and be due compensation as set forth in the Professional Services Agreement for all costs incurred through the date of termination. Either party may terminate this Agreement for cause upon giving the other party not less than seven (7) calendar days’ written notice for the following reasons: (a) Substantial failure by the other party to comply with or perform in accordance with the terms of the Agreement and through no fault of the terminating party; (b) Assignment of the Agreement or transfer of the project without the prior written consent of the other party; (c) Suspension of the project or the ENGINEER’S services by the OWNER for a period of greater than ninety (90) calendar days, consecutive or in the aggregate. (d) Material changes in the conditions under which this Agreement was entered into, the scope of services or the nature of the project, and the failure of the parties to reach agreement on the compensation and schedule adjustments necessitated by such changes. Payment of Invoices: Invoices are due and payable within 30 days of receipt unless otherwise agreed to in writing. Third Party Beneficiaries: Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of a third party against either the OWNER or the ENGINEER. The ENGINEER’S services under this Agreement are being performed solely and exclusively for the OWNER’S benefit, and no other party or entity shall have any claim against the ENGINEER because of this Agreement or the performance or nonperformance of services hereunder. The OWNER and ENGINEER agree to require a similar provision in all contracts with contractors, subcontractors, vendors and other entities involved in this Project to carry out the intent of this provision. Force Majeure: Each Party shall be excused from the performance of its obligations under this Agreement to the extent that such performance is prevented by force majeure (defined below) and the nonperforming party promptly provides notice of such prevention to the other party. Such excuse shall be continued so long as the condition constituting force majeure continues. The party affected by such force majeure also shall notify the other party of the anticipated duration of such force majeure, any actions being taken to avoid or minimize its effect after such occurrence, and shall take reasonable efforts to remove the condition constituting such force majeure. For purposes of this Agreement, “force majeure” shall include conditions beyond the control of the parties, including an act of God, acts of terrorism, voluntary or involuntary compliance with any regulation, law or order of any government, war, acts of war (whether war be declared or not), labor strike or lock-out, civil commotion, epidemic, failure or default of public utilities or common carriers, destruction of production facilities or materials by fire, earthquake, storm or like catastrophe. The payment of invoices due and owing hereunder shall in no event be delayed by the payer because of a force majeure affecting the payer. Additional Terms or Modification: All prior understandings and agreements between the parties are merged into this Agreement, and this Agreement may not be modified orally or in any manner other than by an Agreement in writing signed by both parties. In the event that any provisions of this Agreement shall be held to be invalid or unenforceable, the remaining provisions shall be valid and binding on the parties. Assignment: Neither party to this Agreement shall transfer or assign any rights or duties under or interest in this Agreement without the prior written consent of the other party. Subcontracting normally contemplated by the ENGINEER shall not be considered an assignment for purposes of this Agreement. Waiver: A party’s waiver of, or the failure or delay in enforcing any provision of this Agreement shall not constitute a waiver of the provision, nor shall it affect the enforceability of that provision or of the remainder of this Agreement. Attorney’s Fees: In the event of any action or proceeding brought by either party against the other under this Agreement, the prevailing party shall be entitled to recover from the other all costs and expenses including without limitation the reasonable fees of its attorneys in such action or proceeding, including costs of appeal, if any, in such amount as the Court may adjudge reasonable. Fiduciary Duty: Nothing in this Agreement is intended to create, nor shall it be construed to create, a fiduciary duty owed to either party to the other party. EEI makes no warranty, express or implied, as to its professional services rendered. Headings: The headings used in this Agreement are inserted only as a matter of convenience only, and in no way define, limit, enlarge, modify, explain or define the text thereof nor affect the construction or interpretation of this Agreement. UNITED CITY OF YORKVILLE, IL 2026 ROAD TO BETTER ROADS PROGRAM PAGE 1 2026 Road to Better Roads Program United City of Yorkville, IL Professional Services Agreement – Construction Engineering Attachment B – Scope of Services Construction Engineering:  Attend the Pre-Construction Meeting with the Contractor and City Staff  Provide construction layout for the proposed improvements  Provide resident engineering for periodic on-site observation  Daily documentation of work tasks and calculation of installed pay items  Monitor adherence to specifications.  Monitor adherence to construction schedule and make recommendations when appropriate.  Monitor traffic control on a regular basis.  Gather material inspection and coordinate any required testing on behalf of the City.  Provide guidance to the contractor when questions arise during construction.  Prepare/verify pay estimates.  Gather and review waivers of lien.  Provide information to residents as required.  Perform punch list inspections, provide follow up inspections and recommend acceptance when appropriate  Communicate activities with City weekly, or as required based on onsite activities.  Prepare necessary IDOT closeout paperwork o BLR 13230 – Engineer’s Final Payment Estimate o BLR 13210 – Request for Approval of Change in Plans o BLR 14222 – Municipal Maintenance Expenditure Statement ATTACHMENT C: ESTIMATED LEVEL OF EFFORT AND ASSOCIATED COSTPROFESSIONAL ENGINEERING SERVICES CLIENT PROJECT NUMBERUnited City of YorkvilleYO2523-PPROJECT TITLEDATE PREPARED BY2026 Road to Better Roads Program - Construction EngineeringROLE PIC PM SPE 1 PE SPT 1 ST ADMINPERSONRATE $268 $228 $203 $184 $179 $153 $79CONSTRUCTION ENGINEERING3.12 10 6 6 2 26 5,296$ 3.24 8 16 28 5,480$ 3.32 8 60 400 2 472 88,298$ Construction Engineering Subtotal: 4 22 74 422 - - 4 526 99,074$ 4 22 74 422 - - 4 526 99,074 EEI STAFFDIRECT EXPENSESPIC Principal In ChargePrinting/Scanning = -$ PM Project ManagerVehicle Charges ($90/Day) = 4,500$ SPE 1 Senior Project Engineer IRubino (Material Testing) = 6,000$ PE Project EngineerDIRECT EXPENSES = 10,500$ SPT 1 Senior Project Technician IST Senior TechnicianLABOR SUMMARYADMIN Adminstrative AssistantEEI Labor Expenses = 99,074$ TOTAL LABOR EXPENSES99,074$ TOTAL COSTS 109,574$ 52 Wheeler Road, Sugar Grove, IL 60554 Tel: 630.466.6700 Fax: 630.466.6701 www.eeiweb.comPROJECT TOTAL:CTI3/26/26COSTTASK NO.TASK DESCRIPTIONHOURSConstruction AdministrationConstruction LayoutObservation and Documentation ATTACHMENT D: ESTIMATED SCHEDULECLIENT PROJECT NUMBERUnited City of Yorkville YO2523-PPROJECT TITLEDATE PREPARED BY2026 Road to Better Roads Program - Construction Engineering CTIAPR MAY JUN JUL AUG SEP OCTCONSTRUCTION ENGINEERING3.13.23.3 52 Wheeler Road, Sugar Grove, IL 60554 Tel: 630.466.6700 Fax: 630.466.6701 www.eeiweb.comObservation and DocumentationConstruction LayoutTASK NO.TASK DESCRIPTION3/26/262026Contract Administration FOX RIVER MCHUGHMAIN SPRING TUMAVAN EMMON MILLPOPLARJOHN VETERANS CANNONBALLBRIDGEERICA STAGEC O A C H PARK ROUTE 34CENTERKENNEDY COUNTRYSIDE BEECHEREDWARDSC H O O L H O U S E OMAHASTATEPARKSIDETERIMORGANORANGE SOMONAUKGAME FARMKEND A L L DEERHAYDENTIMBER OAK ELM KINGFREEMONTHAMPT O N HEA R T L A N D WALNUT ROUTE 7 1 HEUSTISFORDWACKERLIBERTYQUINSEY GILLESPIE WASHINGTON WING RAINTREEISABEL ROUTE 1 2 6BARBERRYWESTERN KELLY C O U N T R Y H I L L S JACKSON MAPLESUNSETBEAVER MARKETVIEWCOLTONMADISON BLACKBERRY S H O R E KATE C A R L Y KINGS MILLBRISTOL HOMES T E A D BRUELLPRAIRIE CROSSINGBLUESTEMADRIANWALSHCHURCHGRACEGREENBRIAR IDE N T ASYCAMOREPLEASUREWHITE OAK LEISURE COLONIAL LANDMARKNORTHLAND BLAINE PRAIRIERI V E R S I D E CANYON WESTONPURCELL WINDHAM BANBURYHAZELTIN E ELIZABETH CROOKED CREEK CLEAR W A T E R TA U S ACORNWOLF GARDEN CONOVER ADAMSILLINI HILLCREST BADGERNORW A Y BIRCHWOODCOACH O L I V E RIVER BIRCH J A M E S T O W N ASTERWILD INDIGOLEXINGTONROUTE 47HIGH RIDGEASHARROWH E A D D E E R P A T HCHESTNUT RIDGE MU I R F I E L D GAWNE WARBLERFOXBO R O LOTUS RIDGETREMONTCANARYWESTWINDSO R INGEMUNSON HEARTHSTONEREDHORSEOLSEN INDEPENDENCE DE ER PO IN TWOODEN BRIDGEMARKETPLACEGEORGEANNA GOLDFINCHOAKPRAIRIE GRASS B L U E B I R DPRAIR IE ROSE CLOVER CEDAR WOOD SAGEMARTIN GREENFIELD TURN RED T A I L WALTER PINE VILLAGE V IEW WHITE P L A I N S BIRCH SUNNY D E L L DAKOTAS AR A VANO SHICKORYMEADOWVIEW DICKSON STRAWBER R Y DOLPH PRAIRIE POINTE WOODWORTHYOR K V I L L EALAN DALEAUBURNBEHRENS NADEN HYDRAULIC CHERRYWOODLANDHOOVERSANDERSBELLCRIMSONHAWK HOLLOWPALMERWESTWIND C O D Y FIR MENARD CORNE R S T O N E BURNING B U S H JOHNSONDUNKINSPRUCEMEAD O WL A R K ALDER FAWN RIDGE MULHERN CONEFLOWERCONCORDB L U E J A Y GLEN NELSONPOWERSF A RM S T E AD BLACK B E R R Y ALEXANDRAAPPLETREE HALEY CANDLEBERRYWELLSJUNIPERCORNELL BUCKTHO R N SUNFLOWER HERITAG E TYLER CREEKJEFFERSONSHARON ROUTE 7 1 FOX PINEWESTCENTER JOHN HYDRAU L I C VETERANS MAINSCH O O L H O U S E RO U T E 1 2 6 HYDRAULIC ROUTE 3 4 WASHIN G T O N PARKSOMONAUK ROUTE 47STAGECOACH PARK BRIDGEMAINSTATEROUTE 7 1 VETERANS MAPLE BEECHER WALNUTRIDGE B R I D G E DOLPH DATE: PROJECT NO.: FILE: BY: JANUARY 2026 YO2523 MJT 2026 MFT ROAD PROGRAM UNITED CITY OF YORKVILLE, ILLINOIS Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 www.eeiweb.com PATH:H:\GIS\PUBLIC\YORKVILLE\2022\YO2523 United City of Yorkville 651 Prairie Pointe Dr. Yorkville, IL 60560 N O R T H ° YO2523_2026 MFT Road Program RESURFACING CONCRETE PATCHING04,0002,000 US Feet ATTACHMENT E - LOCATION MAP EEEENNNNNGGGGGIIINNNNNEEEEEEEERRRRRIIINNNNNGGGGG EEEEENNNNNTTTTTEEEERRRRRPPPPPRRRRRIIIISSSSSEEEESSSSS,,,,, IIIINNNNNCCCCC..... 5252525252 WWWWWheheheheheeleleleleererererer RRRRRoaoaoaoaoad,d,d,d,d,SSSSSugugugugugararararar GGGGGrororororoveveveveve,,,,,ILILILL 6666605050505055454545454 PhPhPhPhPh:::::63636363630.0.0.0.0.46464646466.6.6.6.6.67676767670000000000 •••••FxFxFxFxFx:::::63636363630.0.0.0.0 46464646466.6.6.6.6.67676767670101010101 wwwwwwwwwww.w.w.w.w.eeeeeeeeeeiwiwiwiwiwebebebebeb.c.c.c.c.comomomomom OOOOOUUUUUTTTSSSSSTTTTTAAAAANNNNNDDDDDINNNNNGGGGG SSSSSEEEEERRRRRVVVVVIIIIICCCCCEEEEE ••••• EEEEEVVVVVEEEERRRRRYYYYY CCCCCLLLLIIIIEEEENNNNNTTT ••••• EEEEEVVVVVEEEERRRRRYYYYY DDDDDAAAAAYYYYY EMPLOYEE DESIGNATION CLASSIFICATION HOURLY RATE Senior Principal E-4 $268.00 Principal E-3 $262.00 Senior Project Manager E-2 $254.00 Project Manager E-1 $228.00 Senior Project Engineer/Surveyor II P-6 $218.00 Senior Project Engineer/Surveyor I P-5 $203.00 Project Engineer/Surveyor P-4 $184.00 Senior Engineer/Surveyor P-3 $169.00 Engineer/Surveyor P-2 $153.00 Associate Engineer/Surveyor P-1 $139.00 Senior Project Technician II T-6 $191.00 Senior Project Technician I T-5 $179.00 Project Technician T-4 $167.00 Senior Technician T-3 $153.00 Technician T-2 $138.00 Associate Technician T-1 $120.00 Engineering/Land Surveying Intern I-1 $ 89.00 Director of Marketing and Business Development M-4 $141.00 Marketing Coordinator M-2 $105.00 Executive Administrative Assistant A-4 $ 84.00 Administrative Assistant A-3 $ 79.00 VEHICLES. DRONE, EXPERT TESTIMONY, REPROGRAPHICS AND DIRECT COSTS* Vehicle for Construction Observation $ 20.00 ^ Unmanned Aircraft System / Unmanned Aerial Vehicle / Drone $245.00 Expert Testimony $300.00 In-House Scanning and Reproduction $0.25/Sq. Ft. (Black & White) $1.00/Sq. Ft. (Color) Reimbursable Expenses (Direct Costs) Cost Services by Others (Direct Costs) Cost + 10% *unless specified otherwise in agreement ^ per day charges capped at the current IDOT daily rate ATTACHMENT F STANDARD SCHEDULE OF CHARGES ~ JANUARY 1, 2026 Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #10 Tracking Number PW 2026-38 2026 Local Road Program – Change Order No. 1 Public Works Committee – April 21, 2026 Majority Consideration of Approval Please see the attached memo. Brad Sanderson Engineering Name Department The purpose of this memo is to present a plan for additional work for the above-referenced project. Background The United City of Yorkville and Builders Paving, LLC recently entered into an agreement for a contract value of $2,259,788.00 for the above-referenced project. The above-referenced project came in ($300,212) under budget. As a result, City Staff obtained a quote from Builders Paving, LLC to complete additional work. The proposed additional work is summarized as follows:  Resurfacing Church Street from W. River Street to W. Center Street  Widen the Turn Radius at Church Street and W. River Street Intersection  Sidewalk Extension on White Oak Way to Fox Road The estimated cost to complete the additional work is $140,047.45. Questions Presented: Should the City approve the additional street work and quote from Builders Paving, LLC? Discussion: Builders Paving has held their prices from the originally bid project work but has asked for a traffic control adjustment to incorporate additional traffic control associated with the extra work. There was also one new pay item that was requested to complete the necessary work at W. River Street and Church Street intersection. The unit price for the new item and the traffic control adjustment are reasonable. Action Required: Consideration of approval for Change Order No. 1 with Builders Paving LLC. Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Jori Contrino, City Clerk Rob Fredrickson, Finance Director Date: April 14, 2026 Subject: 2026 Local Road Program – Change Order No. 1 CHANGE ORDER Order No. 1 Date: April 28, 2026 Agreement Date: N/A NAME OF PROJECT: 2026 Local Road Program____________________________________ OWNER: United City of Yorkville CONTRACTOR: Builders Paving, LLC The following changes are hereby made to the CONTRACT DOCUMENTS: 1) Addition of Church Street Resurfacing & White Oak Way Sidewalk $140,047.45 Change of CONTRACT PRICE: Original CONTRACT PRICE: $ 2,259,788.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER(S) $ 2,259,788.00 The CONTRACT PRICE due to this CHANGE ORDER will be (increased)(decreased) by: $ _140,047.45 The new CONTRACT PRICE including this CHANGE ORDER will be $ 2,399,835.45 Justification: 1) Additional paving work on Church Street and sidewalk work on White Oak Way Change to CONTRACT TIME: The contract time is increased/decreased by 0 days. Requested by: _ __ Builders Paving, LLC. Recommended by: Engineering Enterprises, Inc. Accepted by: United City of Yorkville_ To: Contact:United City Of Yorkville Yorkville 2026 Road Program Additional StreetsProject Name:Bid Number:13126 Fax:Yorkville, IL 60560 Address:651 Prairie Pointe Drive Phone:(630) 553-4350 Project Location:Various Streets, Yorkville, IL Bid Date:3/3/2026 Addendum #:1 The following is a recap of our quantities and pricing for this project. Total PriceUnit PriceUnitItem DescriptionItem #Estimated Quantity 05 130.00 SY $30.00 $3,900.00Partial Depth Patch (SPL) {SY} 06 150.00 SY $30.00 $4,500.00HMA Surf Rem- BJ {SY} 07 1,630.00 SY $2.10 $3,423.00HMA Surf Rem VD TY 1- 1.875" Avg {SY} 09 950.00 SY $1.65 $1,567.50HMA Surf Rem 1.5" {SY} 12 1,750.00 LB $0.01 $17.50Bit Materials (Tack Coat) {LB} 14 175.00 TON $70.50 $12,337.50HMA BC IL 9.5 N50 {TN} 15 225.00 TON $70.50 $15,862.50HMA SC IL 9.5 Mix "D" N50 {TN} 17 430.00 FOOT $37.50 $16,125.00Comb C&G R&R 18 730.00 SF $1.25 $912.50Sidewalk Rem 19 2,720.00 SF $9.00 $24,480.00PCC Sidewalk 5" 20 64.00 SF $23.00 $1,472.00Detectable Warning 21 2.00 EACH $785.00 $1,570.00MH To Adj 23 1.00 EACH $435.00 $435.00Inlets To Adj 25 1.00 EACH $425.00 $425.00TY 1 Frame OL 28 1.00 EACH $1,650.00 $1,650.00Sanitary MH To Adj 30 1.00 EACH $350.00 $350.00Vavle Box To Adj 31 6.20 SF $5.50 $34.10THPL Pavt Mark L&S 32 615.00 FOOT $0.75 $461.25THPL Pavt Mark 4" 33 52.00 FOOT $1.30 $67.60THPL Pavt Mark 6" 35 14.00 FOOT $5.50 $77.00THPL Pavt Mark 24" 39 60.00 SY $40.00 $2,400.00HMA Driveway R&R {SY} 40 30.00 SY $3.00 $90.00PCC Driveway R&R 41 30.00 SF $18.00 $540.00Brick Paver R&R 45 1,325.00 SY $18.00 $23,850.00Sodding 48 1.00 LS $15,000.00 $15,000.00TCP SPL X 40.00 SY $212.50 $8,500.00Pavt Widening (Eath Ex, 12" Stone, 4" Pavt) Total Bid Price:$140,047.45 Notes: •Our pricing is based upon completing all work in the 2026 construction season, unless otherwise noted, and is based upon material and cartage rates in effect at the time of this proposal. Due to the volatility of the petroleum market, our proposal is subject to adjustment, based upon the market price and availability of raw materials and cartage rates at the time of installation. •All roadway and pavement construction to be installed per IDOT Standard Specifications for Road & Bridge Construction, latest edition. •This proposal is valid for a period of thirty (30) days from the date of issue and may be revised or rescinded thereafter, at our discretion, without prejudice. Payment Terms: This is a unit price proposal, with the completed cost of each item based upon the unit prices and quantities as measured in the field. Page 1 of 2 ACCEPTED: The above prices, specifications and conditions are satisfactory and are hereby accepted. Buyer: Signature: Date of Acceptance: CONFIRMED: Builders Paving, LLC Authorized Signature: Estimator:Chris Mentone (847) 419-9000 cmentone@builderspavingllc.com Page 2 of 2 FOX VAN EMMON MCHUGHMAIN SPRING ROUTE 34TUMARIVER MILLROUTE 12 6 STAGEC O A C H ROUTE 71CANNONBALLBRIDGEE X I T PARKCENTERVETERANS KENNEDY COUNTRYSIDE SCH O O L H O U S E OMAHAWRENJOHN PARKSIDESTATETERIMORGANORANGE SOMONAUKGAME FARMKEND A L L DEERHAYDENTIMBER OAKELM KINGFREEMONTHAMPT O N HEA R T L A N DEDWARDERIC A WALNUT ENT R A N C E HEUSTISWACKERLIBERTYRAVINEK I N G M O O R QUINSEY WASHINGTON WING RAINTREEBARBERRY C O U N T R Y H I L L S JACKSON MAPLESUNSETBEAVER MARKETVIEWCOLTONMADISON CREEK ORCHID KATE A U T UM N C R E E K KINGS MI L LBRISTOL PRAIRIE CROSSING HOMEST E A D BRUELLADRIANWALSH CHURCHGRACEGREENBRIAR IDE N T A BLUESTE M LAKE SIDE PENNMANPLEASURE WHITE OAK LEISURE COLONIAL WHITEKIRKSIENNALANDMARK BLAINE PRAIRIECREEK SIDECOACHWESTONBEARCRIMSONNORTHLANDBANBURYPONDEROSA HAZELTIN E ELIZABETH CROOKED CREEKCLEAR W A T E R TA U S ACORNWOLF GARDEN CONOVER ADAMSILLINI HILLCREST BADGERNORW A Y BIRCHWOODLAVENDERRIVER BIRCH FIELDSJA M E S T O W N ASTERWILD INDIGOWESTERN ASHARROWH E A D TIMBER VIE W DE E R P A T H TIMBER RIDGEHEARTHSTONERIDGE MU I R F I E L D HARTFIELDYOR K V I L L E GAWNE FISHWARBLERLEXINGTONFOXBO R O LOTUS RIDGETREMONTROUTE 47CANARYHILL T O P RI V E R S I D E GOLDFINCHCANYONWESTWINDSO R INGEMUN SON OLSEN INDEPENDENCE D E E R PO IN TWOODEN BRIDGEMARKETPLACEGEORGEANNA OAK CARLY RACOONE M E R A L D B L U E B I R DPRAIRIE ROSE O L I V E CLOVERWOOD SAGEHAWK HOLLOWSHETLANDMARTIN GREENFIELD TURNRED T A I L WALTER VILLAGE V IEW SUNNY D E L L DAKOTAS ARA V ANO S OVERHILLTIMBERHICKORYDICKSON STRAWBER R Y CIR C L E DOLPH PRAIRIE POINTE WOODWORTHAUBURNPINEBEHRENS NADEN HYDRAULIC CHERRYWOODLANDTEDDY BEAR SANDERSISABELCARDINALPALMERWESTWIND C O D Y SWIMMINGSHADOW CREEK FIR MENARD CENTRA L CORNER S T O N E NORTH R IVER BURNING B U S H JOHNSONDUNKINSPRUCEMEAD O WL A R K DENISE ALDER FAWN RIDGE MULHERN CONEFLOWERB L U E J A Y JEREMY C T APOWERS BEECHER NOR T O N F ARM S T EA D BLACK B E R R Y ALEXANDRAAPPLETREE HALEY CANDLEBERRYTR A I L S E N DWELLS JUNIPERCORNELL BUCKTHO R N SUNFLOWER MONTROSE HERITAG E JEFFERSONWESTMAINRIVERSIDE DOLPH HILLT O PMAIN WALNUTROUTE 3 4 FOX WASHIN G T O N FOX ROUTE 47HYDRAULIC CENTER SC H O O L H O U S E HYDRAU L I C ROUTE 71 ROUTE 7 1 B R I D G E RIDGE STAGECOACH ROUTE 71 CRIMSONBRIDGEVETERANS SOMONAUK BEAVER PARK PARKVETERANS STATER O U T E 4 7 RO U T E 1 2 6 LOCATION MAP DATE: PROJECT NO.: FILE: BY: APRIL 2026 YO2522 MJT 2026 LOCAL ROAD PROGRAM UNITED CITY OF YORKVILLE, ILLINOIS Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 www.eeiweb.com PATH:H:\GIS\PUBLIC\YORKVILLE\2025\YO2522 United City of Yorkville 651 Prairie Pointe Dr. Yorkville, IL 60560 N O R T H ° YO2522_2026 LOCAL ROAD PROGRAM ADDITIONAL RESURFACING RESURFACING 0 4,0002,000 US Feet CITYWIDE SIDEWALK REPAIR ADDITIONAL CITYWIDE SIDEWALK REPAIR Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #11 Tracking Number PW 2026-39 2026 Water Main Replacement – Project Update Public Works Committee – April 21, 2026 Majority Approval Please see the attached memo. Brad Sanderson Engineering Name Department This memo serves as an update from the last discussion with the Committee on February 17th. Since that time, the IEPA has confirmed that there are SRF funds available to cover the entire amount of the proposed project. Therefore, instead of reducing the overall contract price via change order as suggested in February to stay within the original requested loan amount ($5,310,283.00), staff is recommending increasing the loan amount to cover the entire amount. The new loan amount would then be $6,144,448.24. Annual debt service would be correspondingly adjusted from approximately $245,000 to $280,000 (please see attached update debt service schedule). Staff is recommending this as it is an opportunity to replace additional water main with the advantage of the low-interest loan. There are no guarantees that the City will obtain this type of loan in the future and costs continue to significantly rise in the water industry. If you have any questions or require additional information, please let us know. Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Jori Contrino, City Clerk Rob Fredrickson, Finance Director Date: April 13, 2026 Subject: 2026 Water Main Improvements - Update Preliminary, as of March 26, 2026 United City of Yorkville, Illinois IEPA L17-6790 Estimated $6,144,449 / 2.16% Debt Service Schedule Date Principal Coupon Interest Total P+I Fiscal Total 06/30/2027 - - - - - 12/30/2027 73,319.00 2.160% 66,360.05 139,679.05 - 04/30/2028 - - - - 139,679.05 06/30/2028 74,111.00 2.160% 65,568.20 139,679.20 - 12/30/2028 74,912.00 2.160% 64,767.81 139,679.81 - 04/30/2029 - - - - 279,359.01 06/30/2029 75,721.00 2.160% 63,958.76 139,679.76 - 12/30/2029 76,538.00 2.160% 63,140.97 139,678.97 - 04/30/2030 - - - - 279,358.73 06/30/2030 77,365.00 2.160% 62,314.36 139,679.36 - 12/30/2030 78,201.00 2.160% 61,478.82 139,679.82 - 04/30/2031 - - - - 279,359.18 06/30/2031 79,045.00 2.160% 60,634.25 139,679.25 - 12/30/2031 79,899.00 2.160% 59,780.56 139,679.56 - 04/30/2032 - - - - 279,358.81 06/30/2032 80,762.00 2.160% 58,917.65 139,679.65 - 12/30/2032 81,634.00 2.160% 58,045.42 139,679.42 - 04/30/2033 - - - - 279,359.07 06/30/2033 82,516.00 2.160% 57,163.77 139,679.77 - 12/30/2033 83,407.00 2.160% 56,272.60 139,679.60 - 04/30/2034 - - - - 279,359.37 06/30/2034 84,307.00 2.160% 55,371.81 139,678.81 - 12/30/2034 85,218.00 2.160% 54,461.29 139,679.29 - 04/30/2035 - - - - 279,358.10 06/30/2035 86,138.00 2.160% 53,540.94 139,678.94 - 12/30/2035 87,069.00 2.160% 52,610.64 139,679.64 - 04/30/2036 - - - - 279,358.58 06/30/2036 88,009.00 2.160% 51,670.30 139,679.30 - 12/30/2036 88,959.00 2.160% 50,719.80 139,678.80 - 04/30/2037 - - - - 279,358.10 06/30/2037 89,920.00 2.160% 49,759.05 139,679.05 - 12/30/2037 90,891.00 2.160% 48,787.91 139,678.91 - 04/30/2038 - - - - 279,357.96 06/30/2038 91,873.00 2.160% 47,806.29 139,679.29 - 12/30/2038 92,865.00 2.160% 46,814.06 139,679.06 - 04/30/2039 - - - - 279,358.35 06/30/2039 93,868.00 2.160% 45,811.12 139,679.12 - 12/30/2039 94,882.00 2.160% 44,797.34 139,679.34 - 04/30/2040 - - - - 279,358.46 06/30/2040 95,907.00 2.160% 43,772.62 139,679.62 - 12/30/2040 96,942.00 2.160% 42,736.82 139,678.82 - 04/30/2041 - - - - 279,358.44 06/30/2041 97,989.00 2.160% 41,689.85 139,678.85 - 12/30/2041 99,048.00 2.160% 40,631.57 139,679.57 - 04/30/2042 - - - - 279,358.42 06/30/2042 100,117.00 2.160% 39,561.85 139,678.85 - 12/30/2042 101,199.00 2.160% 38,480.58 139,679.58 - 04/30/2043 - - - - 279,358.43 06/30/2043 102,292.00 2.160% 37,387.63 139,679.63 - 12/30/2043 103,396.00 2.160% 36,282.88 139,678.88 - 04/30/2044 - - - - 279,358.51 06/30/2044 104,513.00 2.160% 35,166.20 139,679.20 - 12/30/2044 105,642.00 2.160% 34,037.46 139,679.46 - 04/30/2045 - - - - 279,358.66 06/30/2045 106,783.00 2.160% 32,896.53 139,679.53 - 12/30/2045 107,936.00 2.160% 31,743.27 139,679.27 - 04/30/2046 - - - - 279,358.80 06/30/2046 109,102.00 2.160% 30,577.56 139,679.56 - 12/30/2046 110,280.00 2.160% 29,399.26 139,679.26 - 04/30/2047 - - - - 279,358.82 06/30/2047 111,471.00 2.160% 28,208.24 139,679.24 - 12/30/2047 112,675.00 2.160% 27,004.35 139,679.35 - 04/30/2048 - - - - 279,358.59 06/30/2048 113,892.00 2.160% 25,787.46 139,679.46 - 12/30/2048 115,122.00 2.160% 24,557.43 139,679.43 - 04/30/2049 - - - - 279,358.89 06/30/2049 116,365.00 2.160% 23,314.11 139,679.11 - 12/30/2049 117,622.00 2.160% 22,057.37 139,679.37 - 04/30/2050 - - - - 279,358.48 06/30/2050 118,892.00 2.160% 20,787.05 139,679.05 - 12/30/2050 120,176.00 2.160% 19,503.02 139,679.02 - 04/30/2051 - - - - 279,358.07 06/30/2051 121,474.00 2.160% 18,205.12 139,679.12 - 12/30/2051 122,786.00 2.160% 16,893.20 139,679.20 - 04/30/2052 - - - - 279,358.32 06/30/2052 124,112.00 2.160% 15,567.11 139,679.11 - 12/30/2052 125,453.00 2.160% 14,226.70 139,679.70 - 04/30/2053 - - - - 279,358.81 06/30/2053 126,808.00 2.160% 12,871.81 139,679.81 - 12/30/2053 128,177.00 2.160% 11,502.28 139,679.28 - 04/30/2054 - - - - 279,359.09 06/30/2054 129,561.00 2.160% 10,117.97 139,678.97 - 12/30/2054 130,961.00 2.160% 8,718.71 139,679.71 - 04/30/2055 - - - - 279,358.68 06/30/2055 132,375.00 2.160% 7,304.33 139,679.33 - 12/30/2055 133,805.00 2.160% 5,874.68 139,679.68 - 04/30/2056 - - - - 279,359.01 06/30/2056 135,250.00 2.160% 4,429.59 139,679.59 - 12/30/2056 136,710.00 2.160% 2,968.89 139,678.89 - 04/30/2057 - - - - 279,358.48 06/30/2057 138,187.00 2.160% 1,492.42 139,679.42 - 04/30/2058 - - - - 139,679.42 Total $6,144,449.00 -$2,236,309.69 $8,380,758.69 - Yield Statistics Bond Year Dollars $103,532.86 Average Life 16.850 Years Average Coupon 2.1600000% Net Interest Cost (NIC)2.1600000% True Interest Cost (TIC)2.1600000% Bond Yield for Arbitrage Purposes 2.1600000% All Inclusive Cost (AIC)2.1600000% IRS Form 8038 Net Interest Cost 2.1600000% Weighted Average Maturity 16.850 Years IEPA L176790 PRLM v4 - up | SINGLE PURPOSE | 3/26/2026 | 2:35 PM Speer Financial, Inc. Page 1 BridgeFox Veterans Spring Main MillTum a River Van Emmon Park C e n t e r McHughCannonball Somonauk Countryside BenjaminTeriOrangeState OmahaKen d a l l Game FarmHear t l a n d FreemontHaydenElm Walnut KingJohn LibertyWackerEdwardHeustisWashington Sc h o o l h o u s e JacksonSunset BristolBruellKennedy MarketviewMorganQuinsey Kate ChurchAdrianGraceH o m e s t e a d Colonial Pleasure Madison ColtonLeisure W h i t e O a k Blaine Landmark Clear w a t e r WalshConover Hillcrest DeerElizabeth Birchw o o dTaus Norway CrimsonErica Arrowh e a d Wild IndigoGawne A cornNorthlandD e e r p a t h Illini Ridge Olsen Georgeanna W Kendall D r Walter OakMartin Strawberr y Fir WoodworthDickson Prairie Pointe Hydraulic TowerSandersOakwoodDydynaPalmerC o d y JohnsonMulhern BatorT om a s i kPowersBeecher Appletree WellsHaley Hydraulic McHughParkMainMcHughPark MorganRidge Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois 60554 (630) 466-6700 Legend Water Main Diameter 3" WATER MAIN AND SMALLER 4" WATER MAIN 6" WATER MAN 8" WATER MAIN 10" WATER MAIN 12" WATER MAIN 16" WATER MAIN UNKNOWN WATER MAIN 2026 Water Main Replacement Road Resurfacing Only www.eeiweb.com DATE: PROJECT NO.: FILE: PATH: BY: JANUARY 2026 YO2509 YO2509_2025 Water Main Replacement & Resurfacing.aprx H:\GIS\PUBLIC\YORKVILLE\2025\ MJT ³ 3,000 01,500 Feet LOCATION MAP 2026 WATER MAIN IMPROVEMENTS Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #12 Tracking Number PW 2026-40 Northwest Elevated Water Storage Tank – Design Engineering – Change Order No. 1 Public Works Committee – April 21, 2026 Majority Consideration of Approval Please see the attached memo. Brad Sanderson Engineering Name Department The purpose of this memo is to present Design Engineering Contract Amendment No. 1 for the above- referenced project. This is a zero-cost amendment and is necessary for the City’s IEPA Loan. Background: The United City of Yorkville entered into a loan agreement with the IEPA to receive a Low Interest Loan for the construction of the Yorkville Northwest Elevated Water Storage Tank (EWST) project, including construction costs and design and construction engineering. The total contract amount for Design Engineering was a fixed fee amount of $258,234. There is no cost change to this contract, but a contract amendment is required that reflects the final breakdown between professional engineering services by EEI and direct expenses and subconsultant expenses. The proposed contract amendment has been submitted in draft form to the IEPA who have given their verbal confirmation on the changes. Question Presented: Should the City approve Contract Amendment No. 1 for Design Engineering, which would be a zero-cost change from the original contract amount of $258,234? Discussion: The City is receiving IEPA Loan funding for this project, including reimbursement for design engineering previously completed. The design engineering contract was fixed fee in the amount of $258,234, including EEI’s professional services and expenses which include direct expenses and subconsultant expenses. While additional engineering work was required by EEI to complete design, total expenses, including direct expenses and subconsultant expenses, were less than originally budgeted. Although there was no cost change to the overall fixed fee design contract as a result of the difference in final breakdown between EEI’s fees and expenses, a zero-cost contract amendment to reflect the final breakdown is necessary in order for the City to receive reimbursement from the IEPA loan program for full design engineering costs. This is a zero-cost change order to the City and does not affect the contract price for the project, that will provide the necessary documentation for the IEPA to reimburse the City with the loan funding. Action Required: Consideration of approval of Contract Amendment No. 1 for Design Engineering, for a zero-cost change as described above and in the enclosed attachments. Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Erin Willrett, Assistant City Administrator Rob Fredrickson, Finance Director Jori Contrino, City Clerk Date: April 3, 2026 Subject: Yorkville Northwest Elevated Water Storage Tank To: Bart Olson Change Order Number: 1 City Administrator Change Order Date: 4/28/26 United City of Yorkville 651 Prairie Pointe Drive Project Name: Northwest Elevated Water Storage Tank – Design Engineering Project Number: YO2418 Description of Work / Scope Change / Reason for Change The City is receiving IEPA Loan funding for this project, including reimbursement for design engineering previously completed. The design engineering contract was fixed fee in the amount of $258,234, including EEI’s professional services and expenses which include direct expenses and subconsultant expenses. While additional engineering work was required by EEI to complete design, total expenses, including direct expenses and subconsultant expenses, were less than originally budgeted. Although there was no cost change to the overall fixed fee design contract as a result of the difference in final breakdown between EEI’s fees and expenses, a zero-cost contract amendment to reflect the final breakdown is necessary in order for the City to receive reimbursement from the IEPA for full design engineering costs. The enclosed amended design engineering level of effort and associated costs reflects the final breakdown for design engineering between EEI’s professional fees and direct expenses including subconsultant expenses. This is a zero-cost change order to the City and does not affect the contract price for the project. Authorized by: Authorized by Owner/Client/Agent: Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, IL 60554 By:_____________________________ By:____________________________ Date:___________________________ Date:___________________________ CHANGE ORDER ATTACHMENT C: ESTIMATED LEVEL OF EFFORT AND ASSOCIATED COST PROFESSIONAL ENGINEERING SERVICES CLIENT PROJECT NUMBER United City of Yorkville YO2418-P PROJECT TITLE DATE PREPARED BY Northwest Elevated Water Storage Tank (Spheroid) - Design Contract Amendment ROLE PIC QC/QA SPM PM SPE 2 PE SPT 2 SPT 1 ADMIN RATE $246 $241 $234 $210 $200 $168 $175 $164 $70 PROJECT FACILITATION & ADMINISTRATION 0.01 Project Management and Administration 2 12 14 3,012.00 0.02 On-going City Communication/Coordination/Updates 12 4 16 3,692.00 0.03 9 9 12 3 12 45 9,519.00 Project Facilitation & Administration Subtotal: 11 21 - 24 7 12 - - - 75 16,223.00 PRELIMINARY DESIGN PHASE 1.01 Confirm the Size of the EWST (2.0 MG) 1 4 5 1,210.00 1.02 Confirm the location of the EWST 4 2 2 8 1,886.00 1.03 Prepare Summary of Potential Bidders / Tank Erectors 1 2 2 4 9 1,733.00 1.04 Coordinate Soil Borings and Soils Report 1 1 4 4 10 1,823.00 1.05 Conduct Site Visits (2) - Pre and Post Design 6 6 6 18 3,714.00 1.06 Perform a JULIE Design Request 2 6 8 1,428.00 1.07 Prepare Draft Site Plan (Rough grading, Water Main, Storm Sewer/Drainage) 2 8 1 8 12 31 5,806.00 1.08 Prepare Preliminary Routing of Off-site Water Main (Approximately 1,500 feet) 2 8 8 12 30 5,606.00 1.09 - - 1 2 3 546.00 1 2 4 7 1,246.00 Stormwater Permitting (Assumes No Wetlands, No Floodplain)1 8 2 11 2,146.00 1 2 3 546.00 City Building Permit 1 1 2 378.00 Federal Aviation Administration 1 2 4 7 1,246.00 1.10 Electrical/ComEd Application and Initial Coordination 4 16 16 36 7,012.00 1.11 Facilitate Mixing System Discussions with Vendors 2 4 4 8 18 3,466.00 1.12 Facilitate Cathodic Protection Discussions with Vendors 2 4 4 4 14 2,794.00 1.13 Prepare/Review Coating Systems and Tank Optional Features with City Staff 2 4 4 4 14 2,794.00 1.14 Develop Tank Orientation/Tank Cross-Section Plans 2 6 12 20 3,650.00 1.15 Prepare Logo Renderings (3) and Facilitate Logo Discussion with City 1 4 4 4 24 37 6,658.00 1.16 Telecommunication Facility Location Coordination 4 24 28 4,736.00 1.17 Prepare 30% Complete Drawings and Specifications 4 8 8 12 32 6,212.00 1.18 2 2 492.00 Preliminary Design Phase Subtotal: 8 38 - 75 41 83 36 72 - 353 67,128.00 FINAL DESIGN PHASE 2.01 Prepare 60% Complete Drawings and Specifications 16 16 16 48 9,184.00 2.02 1 1 4 6 1,034.00 2.03 4 40 8 40 40 132 24,244.00 2.04 4 4 8 1,804.00 2.05 1 4 6 11 2,089.00 2.06 1 2 1 12 16 2,877.00 2.07 SCADA Integration and Design 2 4 4 8 18 3,466.00 2.08 Complete Plans and Specifications to 100% 4 2 4 2 8 12 32 6,018.00 2.09 1 1 2 1 2 7 1,443.00 Final Design Phase Subtotal: 5 15 - 77 32 77 - 72 - 278 52,159.00 BIDDING AND CONTRACTING PHASE 3.01 1 4 2 8 15 2,825.00 3.02 Respond to Bidder Inquiries/Prepare Addenda 6 12 6 20 44 8,463.22 3.03 4 4 280.00 3.04 Prepare IEPA - Notice of Intent 2 2 336.00 3.05 Prepare for and Attend Bid Opening 4 4 2 10 1,652.00 3.06 Assist City in Review of Bids and Prepare Bid Tabulation/Contract 1 4 2 7 1,053.00 3.07 2 2 492.00 Bidding and Contracting Phase Subtotal: 2 8 - 20 8 38 - - 8 84 15,101.22 FUNDING ASSISTANCE 4.01 Preparing and Coordinating Illinois PWSLP Loan Application 4 16 24 80 124 23,320.00 4.02 Coordinating WIFIA Loan 8 40 48 8,400.00 Funding Assistance Subtotal: 4 16 - 32 - 120 - - - 172 31,720.00 SURVEYING 5.01 Surveying (Topographic Survey, ALTA Survey, and Plat of Easement/Easement Exhibit) 31 18 49 10,404.00 Surveying Subtotal: - - 31 - - - 18 - - 49 10,404.00 30 98 31 228 88 330 54 144 8 1,011 192,735.22 EEI STAFF PIC Principal In Charge 67.28$ SPM Senior Project Manager Vehicle Charges/Mileage = -$ PM Project Manager Electrical/SCADA = 16,477.50$ SPE 2 Senior Project Engineer II 41,375.00$ PE Project Engineer 2,333.50$ SPT 2 Senior Project Technician II Title Commitment = 1,233.00$ SPT 1 Senior Project Technician I 4,012.50$ ST Senior Technician DIRECT EXPENSES = 65,498.78$ ADMIN Adminstrative Assistant 192,735.22$ 192,735.22$ 258,234.00$ 52 Wheeler Road, Sugar Grove, IL 60554 Tel: 630.466.6700 Fax: 630.466.6701 www.eeiweb.com Present Final Layout and Logo to City Council/PW Committee 7/9/24 MLP TASK NO.TASK DESCRIPTION HOURS COST Project Initiation & Progress Meetings (3 Total Meetings with City plus internal review meetings) Permits/Sign-offs IDNR - EcoCAT Sign-off SHPO/HARGIS - Historic Sign-off IDNR - Notice of Intent (NOI) Printing = Coordinate with Landscape Architect Prepare 95% Complete Drawings and Specifications Prepare Basis of Design for EWST for IEPA Permit (Public Water Supplies) Prepare, Coordinate, and Submit IEPA Permit Applications (Public Water Supplies) Prepare 95% Engineer's Opinion of Probable Construction Cost Prepare 100% Engineer's Opinion of Probable Construction Cost Prepare Final Bid Documents and Coordinate Advertise for Bid Maintain Bidders List, Coordinate Addenda and Distribution - Use Quest Attend City Council/PW Committee Meeting for Anticipated Contract Award PROJECT TOTAL: DIRECT EXPENSES TOTAL COSTS Geotechnical and CCDD = Archaeological Survey = Landscape Architect = LABOR SUMMARY EEI Labor Expenses = TOTAL LABOR EXPENSES Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #13 Tracking Number PW 2026-41 North Receiving Station – Design Engineering Agreement – Change Order No. 1 Public Works Committee – April 21, 2026 Majority Consideration of Approval Please see the attached memo. Brad Sanderson Engineering Name Department The purpose of this memo is to present Design Engineering Contract Amendment No. 1 for the above- referenced project. This is a zero-cost amendment and is necessary for the City’s IEPA Loan. Background: The United City of Yorkville entered into a loan agreement with the IEPA to receive a Low Interest Loan for the construction of the Yorkville North Receiving Station project, including construction costs and design and construction engineering. The total contract amount for Design Engineering was a fixed fee amount of $279,368. There is no cost change to this contract, but a contract amendment is required that reflects the final breakdown between professional engineering services by EEI and direct expenses and subconsultant expenses. The proposed contract amendment has been submitted in draft form to the IEPA who have given their verbal confirmation on the changes. Question Presented: Should the City approve Contract Amendment No. 1 for Design Engineering, which would be a zero-cost change from the original contract amount of $279,368? Discussion: The City is receiving IEPA Loan funding for this project, including reimbursement for design engineering previously completed. The design engineering contract was fixed fee in the amount of $279,368, including EEI’s professional services and expenses which include direct expenses and subconsultant expenses. While additional engineering work was required by EEI to complete design, total expenses, including direct expenses and subconsultant expenses, were less than originally budgeted. Although there was no cost change to the overall fixed fee design contract as a result of the difference in final breakdown between EEI’s fees and expenses, a zero-cost contract amendment to reflect the final breakdown is necessary in order for the City to receive reimbursement from the IEPA loan program for full design engineering costs. This is a zero-cost change order to the City and does not affect the contract price for the project, that will provide the necessary documentation for the IEPA to reimburse the City with the loan funding. Action Required: Consideration of approval of Contract Amendment No. 1 for Design Engineering, for a zero-cost change as described above and in the enclosed attachments. Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Erin Willrett, Assistant City Administrator Rob Fredrickson, Finance Director Jori Behland, City Clerk Date: April 3, 2026 Subject: Yorkville North Receiving Station To: Bart Olson Change Order Number: 1 City Administrator Change Order Date: 4/28/26 United City of Yorkville 651 Prairie Pointe Drive Project Name: North Receiving Station – Design Engineering Project Number: YO2415 Description of Work / Scope Change / Reason for Change The City is receiving IEPA Loan funding for this project, including reimbursement for design engineering previously completed. The design engineering contract was fixed fee in the amount of $279,368, including EEI’s professional services and expenses which include direct expenses and subconsultant expenses. While additional engineering work was required by EEI to complete design, total expenses, including direct expenses and subconsultant expenses, were less than originally budgeted. Although there was no cost change to the overall fixed fee design contract as a result of the difference in final breakdown between EEI’s fees and expenses, a zero-cost contract amendment to reflect the final breakdown is necessary in order for the City to receive reimbursement from the IEPA for full design engineering costs. The enclosed amended design engineering level of effort and associated costs reflects the final breakdown for design engineering between EEI’s professional fees and direct expenses including subconsultant expenses. This is a zero-cost change order to the City and does not affect the contract price for the project. Authorized by: Authorized by Owner/Client/Agent: Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, IL 60554 By:_____________________________ By:____________________________ Date:___________________________ Date:___________________________ CHANGE ORDER ATTACHMENT C: ESTIMATED LEVEL OF EFFORT AND ASSOCIATED COST PROFESSIONAL ENGINEERING SERVICES CLIENT PROJECT NUMBER United City of Yorkville YO2415-P PROJECT TITLE DATE PREPARED BY Lake Michigan North Receiving Station ROLE PIC SPM PM SPS 1 PE SPT 2 SPT 1 ST ADMIN RATE $246 $241 $210 $186 $168 $175 $164 $140 $70 DESIGN ENGINEERING - CONTRACT AMENDMENT 2.1 Project Management and Administration 6 16 22 4,836.00$ 2.2 Project Kickoff and Progress Review Meetings (3 Total Meetings with City plus Internal Meetings)16 16 20 32 84 17,368.00$ 2.3 Design and Project Manual Preparation for Permit Issue 8 24 60 200 80 4 376 67,352.00$ 2.4 Design and Project Manual Preparation for Bid Issue 4 16 40 88 72 4 224 40,112.00$ 2.5 Permitting Coordination 24 43 67 12,341.23$ 2.6 Bidding and Contracting 4 2 16 80 4 106 18,546.00$ 2.7 Illinois PWSLP Loan Application 4 16 32 75 127 24,160.00$ 2.8 WIFIA Loan Coordination 16 32 48 8,736.00$ 2.9 Surveying 12 9 4 25 4,866.00$ Design Engineering Subtotal:42 74 236 9 554 - 152 - 12 879 198,317.23$ 42 74 236 9 554 - 152 - 12 879 198,317.23$ EEI STAFF PIC Principal In Charge 346.44$ SPM Senior Project Manager Mileage =116.83$ PM Project Manager 7,725.00$ SPS 1 Senior Project Surveyor I 44,262.50$ PE Project Engineer Architectural =21,000.00$ SPT 2 Senior Project Technician II 7,600.00$ SPT 1 Senior Project Technician I DIRECT EXPENSES =81,050.77$ ST Senior Technician ADMIN Adminstrative Assistant 198,317.23$ 198,317.23$ 279,368.00$ 52 Wheeler Road, Sugar Grove, IL 60554 Tel: 630.466.6700 Fax: 630.466.6701 www.eeiweb.com LABOR SUMMARY EEI Labor Expenses = TOTAL LABOR EXPENSES TOTAL COSTS PROJECT TOTAL: DIRECT EXPENSES Printing = Geotechnical Engineering = MEP/SCADA Engineering = Structural Engineering = 3/30/26 CRW TASK NO.TASK DESCRIPTION HOURS COST Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #14 Tracking Number PW 2026-42 North Receiving Station – Change Order No. 2 Public Works Committee – April 21, 2026 Majority Consideration of Approval Please see the attached memo. Brad Sanderson Engineering Name Department The purpose of this memo is to present Change Order No. 2 for the above-referenced project. A Change Order, as defined by the General Conditions of the Contract Documents, is a written order to the Contractor authorizing an addition, deletion, or revision in the work within the general scope of the Contract Documents, or authorizing an adjustment in the Contract Price or Contract Time. Background: The United City of Yorkville entered into an agreement with Whittaker Construction and Excavating, Inc. for the construction of the Yorkville North Receiving Station project for a value of $6,786,500.00 for the above-referenced project. The contract value was previously reduced to $6,558,504.77 through Change Order No. 1 that included a net credit of $227,995.23 on the project. The project is being funded through an IEPA Low Interest Loan. Question Presented: Should the City approve Change Order No. 2, which would increase the contract amount by $141,680.60 to a total contract value of $6,700,185.37, for an overall current net deduct on the project of $86,314.63 from the original contract? Discussion: The enclosed change order document includes a detailed summary of the contract changes and each proposed change order (PCO) item. These items are necessary to proceed with construction of the improvements. PCO #4 includes the cost for modifications proposed by the Contractor and requested by the City for select HVAC equipment being furnished and installed on the project. PCO #5 includes an additional component required for the site piping due to conditions of existing water main uncovered during construction, that was necessary for completing the water main improvements and connecting between existing and proposed piping. PCO #6 includes modifications for the Receiving Station Building foundation that were required based on the soil and groundwater conditions encountered during construction. Upon excavating for the new foundation, groundwater conditions were found to be far worse than anticipated, raising concerns over subsequent hydrostatic pressures and the original structurally designed foundation. The hydrostatic pressures and buoyant forces could result in heaving of the lower-level and make it more prone to leaking. The design for the foundation was changed to incorporate the following modifications that were determined to be required and are recommended to provide the City with the optimal foundation to function as intended: Memorandum To: Bart Olson, City Administrator From: Brad Sanderson, EEI CC: Eric Dhuse, Director of Public Works Erin Willrett, Assistant City Administrator Rob Fredrickson, Finance Director Jori Contrino, City Clerk Date: April 14, 2026 Subject: North Receiving Station 1. Thicker concrete foundation slab (increase from 6” to 12” slab). 2. Subsequent over excavation and backfill for the foundation. 3. Installing rebar in the foundation slab instead of wire wound fabric as originally intended. 4. Adding membrane waterproofing on the exterior of the foundation walls in lieu of waterproof admixture originally included in the concrete. 5. Additional contractor time, material, and equipment for the lower-level redesign. 6. Two-month time extension for procuring additional materials and modified construction. PCO #7 includes a credit back to the City for eliminating the orthophosphate chemical feed system from the project. This system was initially assumed to be required for boosting corrosion control at the entry points to the City’s distribution system from DuPage Water Commission (DWC). The system and components were included in the original design and construction contract as the City’s Corrosion Control Treatment Study, required by the IEPA for the City’s Lake Michigan water source switchover, was in progress. The analysis portion of that study was completed at the end of 2025 and the final report submitted to IEPA in early 2026. The study determined that sufficient corrosion control is provided in the delivered water, and it was not necessary for the City to install and maintain its own supplementary system. After discussion with the City, this system and the associated equipment and components are being eliminated from the project. The above items are necessary to proceed with construction of the Receiving Station. The requested time extension will extend the contract completion from April 2027 to June 2027, which remains ahead of schedule for when the improvements need to be complete in place based on DWC’s schedule for completing their improvements to begin supplying Lake Michigan water to the City. The project is being funded through an IEPA Low Interest Loan, and the proposed change order has been submitted in draft form to the IEPA Loan Manager who has given their verbal confirmation on the changes. Action Required: Consideration of approval of Change Order No. 2 for an increase in the contract amount by $141,680.60 to a total contract value of $6,700,185.37, for an overall current net deduct on the project of $86,314.63 from the original contract. CO-01 CHANGE ORDER Order No. 2 Date: April 28, 2026 Agreement Date: July 17, 2025 NAME OF PROJECT: North Receiving Station OWNER: United City of Yorkville CONTRACTOR: Whittaker Construction & Excavating, Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: PCO #4 (HVAC Modifications – Dampers): The mechanical dampers were all specified as galvanized steel for the application in the Receiving Station. During submittal review after discussion with the City, it was proposed by the Contractor and the City requested aluminum dampers in the chemical feed room, and it was determined to include additional protective finished coating for these components in addition to the manufacturer’s standard coating. Both of these are to provide additional corrosion protection and resistance, and help improve the useful life of the equipment. The proposed change order (PCO) includes the cost for making these changes for the associated equipment. (Add: $1,539.06) PCO #5 (Site Piping Modifications): Adjustments were made during construction to the overall site piping phasing plan and layout, for modifications to the existing site piping necessary for construction of the improvements after award of the project. One of the modifications required included installing an additional 16-inch sleeve with stainless steel bolts that was necessary to connect proposed water main to existing at a tee connection, because of the configuration of the existing water main and proximity of the bell of the existing piping to the new connection. (Add: $2,264.56) PCO #6 (Receiving Station Foundation Modifications): After excavation for the foundation of the new Receiving Station Building, soil and groundwater conditions were different than anticipated and designed for in the original structural design based on the initial geotechnical investigation. This led to concerns with the ability of the lower-level foundation and walls, as designed, to prevent groundwater infiltration and function as intended for the building. The design for the foundation was modified including updated drawings and details to incorporate the following modifications that were determined to be required to provide the City with the optimal foundation to function as intended: 1. Thicker concrete foundation slab (increase from 6” to 12” slab) 2. Overexcavation and backfill for the foundation (122 total cubic yards (CY), 50 CY of which was included in the base contract 3. Installing rebar in the foundation slab instead of wire wound fabric originally intended 4. Adding membrane waterproofing on the exterior of the foundation walls in lieu of waterproof admixture originally included in the concrete 5. Additional contractor time, material, and equipment for the lower-level redesign CHANGE ORDER NO. C-02 Page 2 (continued) CO-02 6. Two-month time extension for procuring additional materials and modified construction of the foundation The PCO includes the contractor’s additional labor, equipment, and materials associated with the above modifications that were determined to be required for the foundation, and include credits for the items associated with construction of the original foundation design. (Add: $196,880.00) PCO #7 (Credit for Eliminating Orthophosphate Chemical Feed System): The City currently treats finished water at its existing well water treatment plants with corrosion control. The City’s Optimal Corrosion Control Treatment (OCCT) Study, required by the IEPA for switching the City’s water source, was in progress at the time of design and bidding for this project. It was assumed that a similar corrosion control treatment using an Orthophosphate Chemical Feed System, which is what the City of Chicago currently utilizes for corrosion control in its distribution system and in the water that DuPage Water Commission (DWC) delivers to its customers, would be required. The system, if required, would have allowed for the City to add additional corrosion control at the Receiving Station, to supplement/boost the level being delivered by DWC before entering the City’s distribution system. These components were included in the Receiving Station. The testing and analysis of the City’s OCCT Study was completed at the end of 2025, and the final report submitted to IEPA in early 2026, and the results indicated that the corrosion control treatment provided through the delivered water/DWC was adequate to maintain effective corrosion control throughout the City’s distribution system. The City does not need to add and maintain an additional supplementary corrosion control chemical feed system, and after discussions with Staff, it was determined to eliminate the Orthophosphate Feed System and associated equipment and appurtenances from the project. (Credit: $59,003.02) Change of CONTRACT PRICE: Original CONTRACT PRICE: $ 6,786,500.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER(S) $ 6,558,504.77 The CONTRACT PRICE due to this CHANGE ORDER will be increased (decreased) by: $ 141,680.60 The new CONTRACT PRICE including this CHANGE ORDER will be $ 6,700,185.37 Change to CONTRACT TIME: The CONTRACT TIME will be increased/decreased by 60 calendar days. The date for completion of all work will be June 16, 2027 CHANGE ORDER NO. C-02 Page 3 (continued) CO-03 Approvals Required: To be effective this order must be approved by the agency if it changes the scope or objective of the PROJECT, or as may otherwise be required by the SUPPLEMENTAL GENERAL CONDITIONS. Requested by: Whittaker Construction & Excavating, Inc. Recommended by: Engineering Enterprises, Inc. Accepted by: United City of Yorkville Approved by: Illinois Environmental Protection Agency Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #15 Tracking Number PW 2026-43 Fox Hill and Sunflower SSA Mowing and Maintenance – Bid Award Public Works Committee – April 21, 2026 Majority Approval Staff is proposing to award a 3 year contract to Cox Landscaping for the mowing and maintenance of the Fox Hill and Sunflower SSA areas Eric Dhuse Public Works Name Department Summary Results of the RFP fort the Fox Hill and Sunflower SSA Mowing and Maintenance areas Background The Fox Hill SSA was started in 2004 and the Sunflower Estates SSA was started in 2007. Since that time, the city has managed these subdivision open areas to maintain entry ways, boulevards, trails, and ponds. Below is a breakdown of each subdivisions work items that are contemplated each year before submitting the levy to the county. Fox Hill  Mowing – approximately 5 acres of turf grass, mainly adjacent to the trail system that runs throughout the single family portion only, of this development. Mowing also includes mechanical string trimming of all trees and the asphalt trail. We also provide fertilization and weed control for all turf grass areas. Trimming along private fences is NOT included in mowing, all fences are maintained privately. We have seen a dramatic increase in mowing and general maintenance costs over the last contract. The increase for mowing was 100% from the last contract.  Tree trimming – Fox Hill was constructed from the mid 90’s through the mid 00’s, so the trees are mature and need trimming from time to time. We have increased our trimming program as the trees have matured. We now also have trees that are dying and trees that have roots that are buckling the trail system. We are addressing them as needed.  General maintenance – this is for areas that may have grass die back, erosion, graffiti, or other items that are not specifically covered. We have our mowing contractor supply us with hourly wages in the contract, so the costs are known.  Sign Maintenance – There was an entry sign to the subdivision at the corner of Diehl Farm Rd. and Rt. 34 before the widening of Rt. 34 occurred. IDOT paid the city $23,000 for the right to remove the sign and widen the highway. This money is still in the account to replace the sign. We have finally found a location for the sign, and I actually though I had mad progress with a sign vendor, but I was wrong. Assistant Director Memorandum To: Public Works Committee From: Eric Dhuse, Director of Public Works CC: Bart Olson, City Administrator Date: April 7, 2026 Subject: Fox Hill and Sunflower SSA Maintenance Bid Award Sleezer is currently trying to find sign companies that are interested in working with us to build and install a sign.  Trail maintenance – Fox Hill had been constructed for quite some time before the city took over administration and maintenance of the common areas. When we took over, the trails needed work and have been patched and sealed three times under our supervision, including last year. PW performed the crack sealing and seal coating for the entire trail system last year, saving the residents money. Sunflower Estates  Mowing – approximately 5 acres of turf grass. The areas consist of the entrances and around the three storm water basins. This also mechanical string trimming of all landscape areas and sidewalk. Fertilization and weed control are also provided for all turf grass areas.  Tree trimming – Sunflower has many mature trees at both entrances and along the parkway of the north stormwater basin. These trees must be trimmed from time to time. We significantly altered the look of the south entrance last year by removing overgrown bushes and Mugo pines along with dead or dying trees. We then installed new trees on the eastern parkway to balance the look. We will continue to trim on an as needed basis.  General maintenance – this is for areas that may have grass die back, erosion, graffiti, or other items that are not specifically covered. Landscape plantings are also contemplated in this area. Sunflower has perennials near the entrance signs that need replacement from time to time. We have our mowing contractor supply us with hourly wages in the contract, so the costs are known.  Pond Maintenance – Sunflower has three stormwater basins. This has been the largest expense for this SSA area. Some years ago, it was decided to naturalize these basins to ensure proper function and to avoid dredging the pond bottoms due to silting. Instead of raising the levy to a very high amount, the city paid for the naturalization and the SSA area is repaying the city over time. This will increase the levy gradually instead of a sudden increase to the residents. To maintain these basins, it is necessary for us to perform a controlled burn in the early spring. From there, we will be able to assess the overall health of the area and decide if we need to add more plants or leave everything as it is.  Sign Maintenance – we contemplate any repairs, maintenance, or replacement of the entryway signs to the subdivision. Bid Results Although we advertised in the Beacon News and on our website, we only received 1 bid. Luckily, it was from the vendor that has the current contract, Cox Landscaping. Cox has won the bid twice before this bid as well. We have a good working relationship with them and have no problem recommending them for award of this contract. The mowing rates for the stayed the same as the last year of the current contract until the final year (28-29) when they increase from $60 to $65/acre. General Maintenance, Debris Removal, Labor, and Mulch all stayed the same for the first two years of the contract as well and only increase $5/hr or $5/yd in the last year of the proposed contract. I have attached the completed bid sheet along with the entire completed ITB for your review. Recommendation Staff recommends awarding the contract to Cox Landscaping. Sold To: United City of Yorkville - 119899 651 Prairie Pointe Drive Yorkville, IL 60560 Bill To: United City of Yorkville - 119899 651 Prairie Pointe Drive Yorkville, IL 60560 Certificate of Publication: Order Number: 43458 Purchase Order: Fox Hill & Sunflower SSA Mowing & Maintenance RFP State of Illinois - Kane Chicago Tribune Media Group does hereby certify that it is the publisher of the Aurora Beacon News Classified. The Aurora Beacon News Classified is a secular newspaper, has been continuously published Daily for more than fifty (50) weeks prior to the first publication of the attached notice, is published in the City of Aurora, Township of Aurora, State of Illinois, is of general circulation throughout that county and surrounding area, and is a newspaper as defined by 715 IL CS 5/5. This is to certify that a notice, a true copy of which is attached, was published 1 time(s) in the Aurora Beacon News Classified. The first publication of the notice was made in the newspaper, dated and published on 3/15/2026, and the last publication of the notice was made in the newspaper dated and published on 3/15/2026. This notice was also placed on a statewide public notice website as required by 715 ILCS 5/2. 1. PUBLICATION DATES: 15 Mar 2026. Aurora Beacon News Classified In witness, an authorized agent of The Chicago Tribune Media Group has signed this certificate executed in Chicago, Illinois on this 16 Mar 2026, by Chicago Tribune Company _________________________________________ Jeremy Gates Page 1 of 2 Page 2 of 2 Have a question or comment about this agenda item? Call us Monday-Friday, 8:00am to 4:30pm at 630-553-4350, email us at agendas@yorkville.il.us, post at www.facebook.com/CityofYorkville, tweet us at @CityofYorkville, and/or contact any of your elected officials at http://www.yorkville.il.us/320/City-Council Agenda Item Summary Memo Title: Meeting and Date: Synopsis: Council Action Previously Taken: Date of Action: Action Taken: Item Number: Type of Vote Required: Council Action Requested: Submitted by: Agenda Item Notes: Reviewed By: Legal Finance Engineer City Administrator Community Development Economic Development Police Public Works Parks and Recreation Agenda Item Number New Business #16 Tracking Number PW 2026-44 Outfitting of the New Public Works and Parks Building Public Works Committee – April 21, 2026 Supermajority (6 out of 9) Approval Please see the attached memo. Eric Dhuse Public Works Name Department Summary Staff is proposing to outfit the new Parks/PW shop with the following supplies and equipment. Background Now that we are entering the final stages of construction of the new facility, we are looking to purchase all of the equipment and supplies we will need to outfit it properly. We knew going into the project that we would have to purchase large amount of new and specialty equipment. Both Parks and PW have been “getting by” or “making do” for years due to space constraints and because we knew it would be better to get new things when we moved so they didn’t get damaged beforehand. Below is a list of the more expensive, specialty equipment with a brief description of why its needed.  Forklift – although the parks department has a forklift, it is not large enough or heavy duty enough to lift and set pallets on the mezzanine. The new unit will be able lift heavier loads and can lift them to the mezzanine.  Pallet Stacker – this is mainly for the records storage area. This unit is made to load and unload pallets from shelving. Until we can sort through all the records, this seems to be the best way to store them and access them.  Sign Making Equipment – with this equipment, we will be able to make our own signs. This will save us money in the long run and will cut down on the waiting time that we experience now. Unfortunately, the startup costs are going to be ~$70,000.  Welder Fume Vacuum – this is a large unit for the mechanics area. Currently, the street department and parks department have small units that they will be able to use in the individual shops for small projects.  Floor Cleaners – with a shop and interior of this size large, self-propelled floor cleaners are a must.  Tv and Mounts – this is for 20 TVs with mounts. We are buying and mounting ourselves to save money. The tv’s for the conference room and training room (4 units) are large screens with the capability of casting directly to the tv, just like city hall conference rooms. The smaller tv’s will also have that capability which will allow us to use them in meetings, or for large format plans, or for SCADA.  Underbody Truck Wash – this is a very expensive unit, but not nearly as expensive as it was going to be to integrate it into our wash bay. We also feel a portable unit will work better and can be serviced much easier than an integrated underbody wash system built Memorandum To: Public Works Committee From: Eric Dhuse, Director of Public Works CC: Bart Olson, City Administrator Date: April 7, 2026 Subject: Outfitting new Parks and PW Shop into the wash bay floor. Once we knew integrating one was too expensive, we looked to get a good system that we can place on the floor and still get the same results since cleaning the underbody is just as important, if not more important that the rest of the truck, to inhibit rust and rot of metal parts.  Brine Making and Filling Equipment – our brine making unit is 15 years old and parts are becoming harder to find. In addition, the filling station is new, and the two units don’t communicate well. There is also a 10,000 tank that will complete our setup. We would have purchased it years ago, but we simply don’t have the space at PW.  Exercise Equipment - includes tread mill, stationary bike, dumbbells, and free weights with racks to be able to perform many different exercises.  Mechanic Tools - Tire Mounter, Tire safety cage, diagnostic tool for trucks, large tool set, and toolboxes are all for the new mechanic shop. We have these in for placeholders, our thought is to hire the mechanic and let them decide which units to purchase. They will have far more experience than we do at those kinds of purchases.  Water Filling Station – Currently, we have an honor system at Tower Lane where trucks can fill up a tanker for $50 per load that is billed to them at the end of the season. We would like an automatic station that takes credit cards. This station would be right in front of the building along Boombah Blvd. and would be accessible even after hours. The unit we specified is built in Aurora and the cost was much less than the competition.  Decorating – This is a placeholder from Kluber for the mural in the long hallway between the admin offices and the training room/shop areas. This will also allow us to professionally frame some of our old blueprints and any other decorating we need. I don’t envision spending the full amount but wanted to be conservative at this time.  Scissor Lift – with the high ceilings in the main garage, this piece of equipment has become necessary for maintenance. Although we shouldn’t have to complete any maintenance (besides routine maintenance) in the new building in the first year, staff thought we should purchase the unit now, while we are outfitting the entire shop. The rest of the items are much lower priced, but just as important. The remaining items will generally fall into 3 categories: outfitting the Administration side, kitchen and locker room, or the individual department shops. A few items of note would be:  Kitchen and Locker Room Outfitting – this would include the full kitchen outfitting for almost 40 employees, placing furniture in the changing rooms, washer and dryer, and a boot drying rack.  Admin Outfitting – Smart boards, Owl recording device, plotter, office supplies, janitorial supplies, garbage cans, etc. This would cover what we need to get up and running and stock the shelves for the new building.  Department Shop Outfitting – most of the remaining list would be tools and equipment to outfit the Sign, Streets, Water/Sewer, and Parks shops. These would include hand tools, toolboxes, gas cabinets, bench grinders, vices, jacks and jack stands, etc. With this type of purchasing, we will have many vendors that exceed the $25,000 threshold for bidding. Although we did not formally put out RFP’s, we did use Sourcewell when we could, and researched the other purchases and compared prices. Staff has attached a spreadsheet detailing the purchases, vendors, cost, and total price to outfit the new building. The list of those vendors that are over the $25,000 threshold are: Safewash – underbody truck wash $122,710 Brown Equipment – Brine Unit and Tank $153,382 FCE – Floor Cleaners $117,123 Atlas – Forklift, Scissor Lift, Pallet Stacker $114,485 Airgas – Torches, Welder, Fume Vac, Cutter $36,701 Elemech – Bulk Water Station $48,500 Life Fitness – Exercise Equipment, Weights $40,924 IT Supply – Sign Printer, Plotter $31,845 Harbor Freight – Toolboxes, Misc. Equip. $25,530 Uline – Racking, Wall Organizers $52,948 Southwest Solutions – Wire Cage Extensions $43,000 All other vendors are under the threshold, even with multiple items being purchased. Some items near the bottom of the spreadsheet need further explanation.  Items 58-65 are budget estimates that will be bought from many different vendors closer to the time of move in.  Items 66-68 vary from department to department and will be purchased just before we move in, or even afterwards.  Items 69-72 are specialty tools that the mechanic will specify once hired. With the estimated cost being well over $25,000 theses items will come back for council approval at that time. Budget Impact In the original building budget, there was $1,621,613 in the FF&E (Fixtures, Furniture, and Equipment) budget. Since that time, we have taken furniture bids totaling $495,938 which leaves us with $1,125,675 in that budget. At this time, we estimate that outfitting the building will cost approximately $1,249,694. This includes items such as the plotter, sign making equipment, televisions, diagnostic tools, brine making equipment, sign blanks, nuts and bolts, and many other items that wouldn’t normally be included in and FF&E budget. The difference between the FF&E budget and the proposed purchases is $124,019. To fund the difference, staff recommends using contingency funds. To date, we have used $422,822 out of $2,499,437 of the contingency funds that were budgeted at the beginning of the project. Our contingency balance is currently $2,076,615. Unlike conventional purchases where staff would bring each purchase, or group of purchases forward for council approval, staff is asking for the council to grant authority to The Director of Public Works and the Director of Park and Recreation, with the approval of the City Administrator to make these purchases when needed to outfit the new building. Staff has researched these purchases and believes that the choices that were made were the right fit for our needs and competitively priced. Recommendation Staff is recommending approval of the purchase of the attached items. Project Account Number Amount Contractual $ Amount ComponentDescriptionFiscal YearVendorCompletedAmount% CompletedRemainingNotesFacility Analysis24-216-60-00-6030 PW & Parks Facility2022 Kluber, Inc. $19,950 $19,950 100.00% - Site Evaluation, Space Needs, Development Options and Costs - completed.Space Needs Analysis24-216-60-00-6030 PW & Parks Facility2023 Kluber, Inc. $17,600 $17,600 100.00% - Space Needs Analysis - completed.Land Acquisition 24-216-60-00-6030 PW & Parks Facility2023 Near North National Title $1,355,182 n/a - - Acquisition of Lot 4 - Yorkville Business Center - Boombah Boulevard - completed.Architectural Services24-216-60-00-6030 PW & Parks Facility2024 - 2026 Kluber, Inc. $1,778,250 $1,813,970 98.03% $35,720Architectural services for New Public Works & Parks Facility - including schematic design, design development, construction, procurement, interior design, coordination of owner's consultants, telecommunication/data design, security evaluation and planning, commissioning, FFE design, fuel station design, storage bin design and salt dome designPreliminary Design Engineering2024 - 2025 $67,671 $76,221 88.78% $8,550Preliminary Engineering services for New Public Works & Parks Facility - including project meetings, topographic and boundary survey, preliminary site geometry, grading, utilities, preliminary storm water report, and preliminary cost estimate. Preliminary soil borings were completed by Rubino. Preliminary landscape architecture was completed as part of final engineering task. - Project completed.Final Design Engineering 2025 $109,880 $107,465 102.25% -$2,415Final Engineering services for New Public Works & Parks Facility - including project meetings, final site design, grading, utilities, pavement design, final storm water report, final cost estimate, and permitting. Final soil borings were completed by Rubino. Preliminary and final landscape architecture was completed together as part of this task. - Project completed.Construction Engineering 2026 $166,139 $195,253 85.09% $29,114Work items will include, but are not limited to, attending meetings, reviewing engineering plans, assisting with pay estimates and change orders when needed, construction layout, construction observation, surveying, and preparation of record drawings. Construction Geotech work is being performed by Rubino. Estimated completion June 2026. Preconstruction Services 2025 $45,000 $45,000 100.00% - Construction 2025-2026 $21,029,446 $29,914,871 70.30% $8,885,425Furniture24-216-60-00-6030 PW & Parks Facility2026 Interiors for Business, Inc. $247,969 $495,939 50.00% $247,969Includes furniture for 11 offices, reception area, training/lunch room, cubicles for 40 employees, conference room and administrative assistant. Provides file cabinets, flat files, lateral files, and other storage needs for the entire office. Miscellaneous Costs24-216-60-00-6030 PW & Parks Facility2023 - 2025 Various $31,773 n/a - - Preliminary Engineering for Facility site locations; publication of purchase notices; crop damage reimbursement and tree removal.$24,868,859 $32,686,268 76.08% $7,817,410Contingency Budgeted RemainingCategoryContingencyUsedContingencyConstruction 1,249,598$ 387,265$ 862,333$ Owner's 499,839$ 23,482$ 476,357$ Risk Reserve 750,000$ 12,075$ 737,925$ Totals 2,499,437$ 422,822$ 2,076,615$ Public Works & Parks Facility Project Costs Summary (thru April 7, 2026)Totals thru April 7, 202624-216-60-00-6030 PW & Parks FacilityRC Wegman24-216-60-00-6030 PW & Parks FacilityEngineering Enterprises, Inc.Construction Manager responsible for the completion of the new Public Works and Parks Facility located on Boombah Boulevard. Preconstruction services have been completed. Equipment Sourcewell Bid Sole Source Estimate Main Garage Sign Elec./Fac. Streets Sewer/ Water Parks Mechanic Admin Shipping Est. Cost Vendor Total1 Underbody Truck Wash SAFEWASH X $118,710$4,000 $122,710 $122,7102 Brine Making Machine BROWN EQUIPMENT X $66,827$1,000 $67,8273 Brine Filling Station BROWN EQUIPMENT X $65,805$1,000 $66,8054 Water Tank (10,000 Gal) BROWN EQUIPMENT X $16,750$2,000 $18,750 $153,3825 Walk Behind Floor Cleaner FCE X$39,475 $1,000 $40,4756 Floor Cleaner FCE X $75,455$1,193 $76,648 $117,1237 Scissor Lift ATLAS X $33,500$1,000 $34,5008 Forklift (#8000) ATLAS X $65,495$500 $65,9959 Pallet Stacker (#2500) ATLAS X $14,250$100 $14,350 $114,84510 Fume Welder Vacuum AIRGAS X$20,439 $500 $20,93911 Welder AIRGAS X$6,693 $6,69312 Plasma Cutter AIRGAS X$4,469 $100 $4,56913 Cutting Torch AIRGAS$4,500 $4,500 $36,70114 Bulk Water Station ELEMECH X $47,500$1,000 $48,500 $48,50015 Exercise Equipment LIFE FITNESS X$38,924 $2,000 $40,924 $40,92416 Sign Printing Machine IT SUPPLY X $26,345 $500 $26,84517 Plotter IT SUPPLY X$5,000 $5,000 $31,84518 Mobile Workbench Toolbox HARBOR FREIGHT X $3,000 $3,000 $3,000 $3,000 $3,000 $9,000 $24,00019 12 Ton Jack Stands (4) HARBOR FREIGHT X$640 $50 $69020 Tripod Shop Stand HARBOR FREIGHT X$500 $50 $55021 6 Ton Jack Stands (3) HARBOR FREIGHT X $80 $80 $80 $50 $290 $25,53022 PVC Slat Wall Organizer ULINE X $2,000 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $200 $20,20023 Racking/Shelving ULINE X $5,000 $5,000 $5,687 $5,687 $5,687 $5,687 $32,748 $52,94824 Wire Cage Extention SOUTHWEST SOLUTIONS X $3,000 $10,000 $10,000 $10,000 $10,000 $43,000 $43,00025 Electric Range COSTCO X$980 $98026 Dishwasher COSTCO X$700 $70027 Washing Machine COSTCO X$750 $75028 TV and Mounts COSTCO X$15,990 $15,99029 Electric Dryer COSTCO X$750 $75030 Refrigerators RESTARUANT SUPPLY.COM$4,600 $200 $4,80031 Microwaves RESTARUANT SUPPLY.COM$3,588 $200 $3,78832 Ice Maker RESTARUANT SUPPLY.COM$2,999 $200 $3,19933 Freezer RESTARUANT SUPPLY.COM$1,800 $1,80034 Sign Blanks TCP X $10,000$10,00035 Sign Sheeting TCP X $6,000$6,00036 Rubber Parking Blocks TCP X $1,500$1,50037 Decorating (per Kluber) X$20,000 $20,00038 Yard Ramp YARD RAMP GUY X $16,282$5,000 $21,28239 Laminating Table SIGN OUTLET STORE X $14,800$14,80040 Smart Boards (2) DISPLAYS TO GO X$10,279 $200 $10,47941 Drill Press THE TOOL DEPOT X$5,095 $5,095 $400 $10,59042 Gas Cabinets X-6 JUST RIGHT X $1,502 $1,502 $1,502 $1,502 $1,502 $1,000 $8,51043 AED and CabinetX$10,000 $10,00044 Coaxial CableX$10,000 $10,00045 Bench Vices WILTON X $1,349 $1,349 $1,349 $1,349 $1,349 $500 $7,24546 Sand Blast Cabinet TOOLS AND EQUIPMENT X$4,488 $250 $4,73847 Mower Blade Sharpener SHARPENING SUPPLIES$2,145 $2,145 $100 $4,39048 Shop Gargabe Cans (50)X $2,000$2,00049 Bench Grinder NORTHERN TOOLX $649 $649 $649 $649 $649 $649 $200 $4,09450 Parts Washer NORTHERN TOOLX$2,388 $100 $2,488New Shop Equipment List 51 Pallet Jacks NORTHERN TOOLX $1,410$200 $1,61052 Drop Forge Anvil NORTHERN TOOLX$1,495 $200 $1,69553 Fork Truck Man Platform$2,500$2,50054 Owl THE OWL LAB X$2,000 $2,00055 4 Ton Jacks (7)X $270 $270 $270 $1,080 $1,89056 Fork Truck Hitch ACME TOOLS $800$100 $90057 Compressed Air Attachments ZORO AND VARIOUS X $450 $150 $150 $150 $150 $1,175 $1,200 $3,42558 Boot Drying RackX$1,000 $1,00059 Janitorial SuppiesX$5,000 $5,00060 Wash Bay ToolsX $2,500$2,50061 VaccumsX$3,000 $3,00062 Garbage Gondola (2)X $2,000$2,00063 Changing Room FurnitureX$1,500 $1,50064 Natural Gas GrillX$1,200 $1,20065 Kitchen SuppliesX$1,000 $1,00066 Hand Tools VARIES PER DEPARTMENTX $6,000 $6,000 $6,000 $6,000 $6,000 $30,000$60,00067 Assorted Bins (nuts, bolts, etc) VARIES PER DEPARTMENTX $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $30,00068 Workbenches VARIES PER DEPARTMENTX $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $30,00069 Diagnostic Tool for TrucksX$45,000$45,00070 Tire Mounter and BalancerX$30,000$30,00071 Large Tool SetX$25,000$25,00072 Tire Safety CageX$5,000 $5,000$1,224,601$25,093$1,249,694Sub TotalShipping (Est.)Grand totalMECHANIC WILL SPECIFY. WILL RETURN FOR APPROVAL THENMECHANIC WILL SPECIFY. WILL RETURN FOR APPROVAL THENMECHANIC WILL SPECIFY. WILL RETURN FOR APPROVAL THENMECHANIC WILL SPECIFY. WILL RETURN FOR APPROVAL THEN