Loading...
HomeMy WebLinkAboutResolution 2026-037Resolution No. 2026-37 RESOLUTION OF THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS APPROVING AN AMENDMENT TO AN ENGINEERING AGREEMENT WITH ENGINEERING ENTERPRISES, INC. WHEREAS, the United City of Yorkville, Kendall County, Illinois (the "City') is a duly organized and validly existing non -home rule municipality created in accordance with the Constitution of the State of Illinois of 1970 and the laws of this State; and, WHEREAS, the City had previously entered into a Design Engineering Agreement in the amount of $258,234 (the "Agreement") with Engineering Enterprises, Inc. ("EEI") for a project commonly known as the Yorkville Northwest Elevated Water Storage Tank project (the "Project"); and WHEREAS, certain changes have occurred to the allocation of costs under the Agreement, as described in the Change Order attached hereto as Exhibit A; and WHEREAS, while no change to the final engineering cost contemplated by the Agreement has occurred, the Agreement must be amended to reflect the change in cost allocation pursuant to Exhibit A; and WHEREAS, the Mayor and City Council find that the amendment to the Agreement should be approved, all as hereinafter provided. NOW, THEREFORE, BE IT RESOLVED by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois, as follows: Section 1. That the Amendment to the Design Engineering Agreement between Engineering Enterprises, Inc., and the United City of Yorkville for the Yorkville Northwest Elevated Water Storage Tank project, as described in the Change Order attached hereto and made Resolution No. 2026-37 Page I a part hereof by reference, is hereby approved and the Mayor is hereby authorized to execute said Agreement on behalf of the United City of Yorkville. Section 2. That this Resolution shall be in full force and effect upon its passage and approval as provided by law. Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this 28" day of April, A.D. 2026. WA btjw�� ITY CLERK KEN KOCH AYE DAN TRANSIER AYE ARDEN JOE PLOCHER AYE CRAIG SOLING AYE CHRIS FUNKHOUSER AYE MATT MAREK AYE RUSTY CORNEILS AYE RUSTY HYETT AYE APPROVED by me, as Mayor of the United City of Yorkville, Kendall County, Illinois this day of A.D. 2026. Attest: 0I Y CLERK MAYOR Resolution No. 2026-37 Page 2 To: Bart Olson City Administrator United City of Yorkville 651 Prairie Pointe Drive Description of Work 1 Scope Change 1 Reason for Change Change Order Number: 1 Change Order Date: 4/28/26 Project Name: Northwest Elevated Water Storage Tank — Design Engineering Project Number: YO2418 The City is receiving IEPA Loan funding for this project, including reimbursement for design engineering previously completed. The design engineering contract was fixed fee in the amount of $258,234, including EEI's professional services and expenses which include direct expenses and subconsultant expenses. While additional engineering work was required by EEI to complete design, total expenses, including direct expenses and subconsultant expenses, were less than originally budgeted. Although there was no cost change to the overall fixed fee design contract as a result of the difference in final breakdown between EEI's fees and expenses, a zero -cost contract amendment to reflect the final breakdown is necessary in order for the City to receive reimbursement from the IEPA for full design engineering costs. The enclosed amended design engineering level of effort and associated costs reflects the final breakdown for design engineering between EEI's professional fees and direct expenses including subconsultant expenses. This is a zero -cost change order to the City and does not affect the contract price for the project. Authorized by: Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, IL 60554 Authorized by Owner/Client/Agent: By: ( By: .—JW Date: `( ������ Date: 0 V FR14L DESIO are 60%Cam fete CroWn sands ecifications 16 16 16 48 9,184.00 Coordinate with Landsoa eArchitet 1 t 4 6 1,034.0Pre are 95%Com lete Bravan ands scifica0ons 4 40 8 40 40 132 2424400 Pre are Basis o1 Desi n for EWSi tar 3 EPA Permit Public Water Su lies 4 4 8 180400 ?re are, Coordinate, and Suh—IEPA Permit licaaons Public Water Su lies 1 4 6 11 2,089,00Pre L20Pre are 95% En Tneer's O inion of Probable Construcfion Cost 1 2 1 12 16 2.677.00 SCADA Inte ration and Desi n 2 4 4 8 18 3.466.00 Com lete Plans and S edhcatiions to 100% 4 2 4 2 8 12 32 6.01&00Prepare T00%Englneers Opinion of Probable Construction Cost 1 i 2 1 2 7 1,443.00 Final Design Phase Subtotal:j III 18 1 771 321 77 72 278 52,159.g0 EEISTAFF PIC Principal In Charge SPM Senior Project Manager PM Project Manager SPE 2 Senior Project Engineer II PE Project Engineer SPT2 Senior Project Techniclaa ll SPT1 Senior Project TechniclanI ST Senior Technician ADMIN Adminstrative Assistant Printing = $ 67.28 Vehicle ChargeslMileage- $ - ElectricallSCAOA= $ 16,477.50 Geotechnical and CCDD= $ 41,375.00 Archaeological Survey= $ 2,333.50 Title Commitment= $ 1,233.00 Landscape Architect= 5 4.012.50 DIRECT EXPENSES= $ $5,498,781 ;�• EEI Labor Ex enses= $ 192.735.22 TOTAL LABOR EXPENSES $102,735.22