HomeMy WebLinkAboutResolution 2026-042Resolution No. 2026-42 A RESOLUTION OF THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS APPROVING A CHANGE ORDER RELATED TO THE YORKVILLE NORTH RECEIVING STATION PROJECT WHEREAS, the United City of Yorkville (the "City") is a duly organized and validly existing non home -rule municipality created in accordance with the Constitution of the State of Illinois of 1970 and the laws of the State; and WHEREAS, the City has approved a contract in the amount of $6,786,500 ("Original Contract Amount") with Whittaker Construction and Excavating, Inc. ("Whittaker"), for a project commonly known as the Yorkville North Receiving Station Project (the "Project"); and WHEREAS, the Mayor and City Council ("Corporate Authorities") had previously approved a change order that decreased the Original Contract Amount in the amount of $227,995.23, to a total cost of $6,558,504.77 ("Revised Contract Amount"); and WHEREAS, the price of the contract has since increased from the Revised Contract Amount in the amount of $141,680.60 (the "Second Change Order") due to various changes, including a change in the HVAC equipment required to complete the Project, the cost of an additional component needed to complete the connection between existing and proposed piping at the Project, and modifications to the building's foundation, required due to soil and groundwater conditions that have been encountered during construction of the Project; and WHEREAS, the total contract price after approval of the Second Change Order would be $86,314.63 less than the Original Contract Amount; and WHEREAS, all change orders increasing or decreasing the cost of a public contract by at least $25,000 must meet the required findings that circumstances necessitating the change were not reasonably foreseeable at the time the contract was signed; or the change is germane to the Resolution No. 2026-42 Page 1 original contract as signed; or the Change Order is in the best interest of the City as required by Section 33E-9 of the Illinois Criminal Code (720 ILCS 5/33E-9); and WHEREAS, it has been recommended to the Corporate Authorities that the Second Change Order increasing the total contract price to the amount of $ 6,700,185.37 is in the best interest of the City. NOW, THEREFORE, BE IT RESOLVED by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois: Section 1. The foregoing recitals are hereby incorporated in this Resolution as the findings of the Corporate Authorities. Section 2. The Corporate Authorities hereby find and declare that the Second Change Order to the contract with Whittaker to complete the Project, which results in an increase of $141,680.60 from. the Revised Contract Amount, is in the best interests of the City and is hereby approved, and the City Administrator is authorized to execute the Change Order as hereinabove identified. Section 3. That this resolution shall be in full force and effect from and after its passage and approval according to law. [Remainder ofpage intentionally blank. Roll call vote follows.] Resolution No. 2026-42 Page 2 Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this 281h day of April, A.D. 2026. v VC CLERK KEN KOCH AYE DAN TRANSIER AYE ARDEN JOE PLOCHER AYE CRAIG SOLING AYE CHRIS FUNKHOUSER AYE MATT MAREK AYE RUSTY CORNEILS AYE RUSTY HYETT AYE APPROVED by me, as Mayor of the United City of Yorkville, Kendall County, Illinois this 113t� day of M , A.D. 2026. Attest: F I INr =g CITYCLERIK f r MAYOR--y' Resolution No. 2026-42 Page 3 CHANGE ORDER Order No. 2 Date: April 28, 2026 Agreement Date: July 17 2025 NAME OF PROJECT: North Receiving Station OWNER: United City of Yorkville CONTRACTOR: Whittaker Construction & Excavating, Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: PCO #4 MAC Modifications — Dampers]: The mechanical dampers were all specified as galvanized steel for the application in the Receiving Station. During submittal review after discussion with the City, it was proposed by the Contractor and the City requested aluminum dampers in the chemical feed room, and it was determined to include additional protective finished coating for these components in addition to the manufacturer's standard coating. Both of these are to provide additional corrosion protection and resistance, and help improve the useful life of the equipment. The proposed change order (PCO) includes the cost for making these changes for the associated equipment. (Add: $1,539.06) PCO #5 (Site Pipinq Modifications): Adjustments were made during construction to the overall site piping phasing plan and layout, for modifications to the existing site piping necessary for construction of the improvements after award of the project. One of the modifications required included installing an additional 16-inch sleeve with stainless steel bolts that was necessary to connect proposed water main to existing at a tee connection, because of the configuration of the existing water main and proximity of the bell of the existing piping to the new connection. (Add: $2,264.56) PCO #6 (Receivinq Station Foundation Modifications): After excavation for the foundation of the new Receiving Station Building, soil and groundwater conditions were different than anticipated and designed for in the original structural design based on the initial geotechnical investigation. This led to concerns with the ability of the lower -level foundation and walls, as designed, to prevent groundwater infiltration and function as intended for the building. The design for the foundation was modified including updated drawings and details to incorporate the following modifications that were determined to be required to provide the City with the optimal foundation to function as intended- 1 , Thicker concrete foundation slab (increase from 6" to 12" slab) 2. Overexcavation and backfill for the foundation (122 total cubic yards (CY), 50 CY of which was included in the base contract 3. Installing rebar in the foundation slab instead of wire wound fabric originally intended 4. Adding membrane waterproofing on the exterior of the foundation walls in lieu of waterproof admixture originally included in the concrete 5. Additional contractor time, material, and equipment for the lower -level redesign CO-01 CHANGE ORDER NO. C-02 Page 2 6. Two -month time extension for procuring additional materials and modified construction of the foundation The PCO includes the contractor's additional labor, equipment, and materials associated with the above modifications that were determined to be required for the foundation, and include credits for the items associated with construction of the original foundation design. (Add: $196,880.00) PCO #7 (Credit for Eliminating Orthophosphate Chemical Feed System): The City currently treats finished water at its existing well water treatment plants with corrosion control. The City's Optimal Corrosion Control Treatment (OCCT) Study, required by the IEPA for switching the City's water source, was in progress at the time of design and bidding for this project. It was assumed that a similar corrosion control treatment using an Orthophosphate Chemical Feed System, which is what the City of Chicago currently utilizes for corrosion control in its distribution system and in the water that DuPage Water Commission (DWC) delivers to its customers, would be required. The system, if required, would have allowed for the City to add additional corrosion control at the Receiving Station, to supplement/boost the level being delivered by DWC before entering the City's distribution system. These components were included in the Receiving Station. The testing and analysis of the City's OCCT Study was completed at the end of 2025, and the final report submitted to IEPA in early 2026, and the results indicated that the corrosion control treatment provided through the delivered water/DWC was adequate to maintain effective corrosion control throughout the City's distribution system. The City does not need to add and maintain an additional supplementary corrosion control chemical feed system, and after discussions with Staff, it was determined to eliminate the Orthophosphate Feed System and associated equipment and appurtenances from the project. (Credit: $59,003.02) Change of CONTRACT PRICE: Original CONTRACT PRICE: $ 6,786,500.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER(S) $ 6,558,504.77 The CONTRACT PRICE due to this CHANGE ORDER will be increased (deGrea6ed) by: $ 141,680.60 The new CONTRACT PRICE including this CHANGE ORDER will be $ 6,700,185.37 Change to CONTRACT TIME: The CONTRACT TIME will be increased/decreased by 60 calendar days. The date for completion of all work will be June 16, 2027 (Date.) (continued) CO-02 CHANGE ORDER NO. C-02 Page 3 Approvals Required: To be effective this order must be approved by the agency if it changes the scope or objective of the PROJECT, or as may otherwise be required by the SUPPLEMENTAL GENERAL CONDITIONS. Requested by: aS-M Whrt� Whittaker Construction & Excavating, Inc. Recommended by: �- Gf)ax�ke-)f, Engineering Enterprises, Inc. Accepted by: Approved by: United City of Yorkville linois Environmental Protection (continued) CO-03