UNITED CITY OF YORKVILLE
PUBLIC WORKS COMMITTEE
Tuesday, February 17, 2026, 6:00pm
Yorkville City Hall, East Conference Room #337
651 Prairie Pointe Drive, Yorkville, IL
IN ATTENDANCE:
Committee Members
Chairman Craig Soling Alderman Rusty Corneils
Alderman Joe Plocher Alderman Dan Transier
Other City Officials
City Administrator Bart Olson, via Zoom Assistant City Administrator Erin Willrett
Engineer Brad Sanderson, EEI Public Works Director Eric Dhuse
Assistant Public Works Director John Sleezer
Other Guests: None
The meeting was called to order at 6:00pm by Chairman Craig Soling.
Citizen Comments: None
Previous Meeting Minutes: January 20, 2026
The minutes were approved as presented.
New Business:
1. PW 2026-18 Snow Operations Report
Mr. Dhuse reported that 2,450 tons of salt have been used this year, more than the last 2 years combined. He
noted the number of tons at the county building and the shop and any remaining salt will be moved to the salt
dome.
2. PW 2026-19 Kendall Marketplace Townhomes – Phase 1 Acceptance
Mr. Sanderson said the punchlist work has been completed for Phase 1 and he recommended acceptance. A one-
year guarantee bond will be required. Work on Phase 2 and 3 has just been finished and that will be on next
month's agenda. This will move to the consent agenda.
3. PW 2026-20 Grande Reserve Unit 6 – Bond Release
All punchlist work has been completed for Unit 6 and Mr. Sanderson recommended release of the maintenance
bond. He noted a couple of the lots have separate bonds and those will be released when the sidewalk work is
complete. This also moves to the consent agenda.
4. PW 2026-21 North Receiving Station – Change Order No. 1
Mr. Sanderson said there were 2 components to the Change Order. One is for credit on different valves.
Some modifications to the water main were made and when construction started, there was a bit of an increase.
In addition, the ComEd service was done by the contractor rather than the city and was added to the Change
Order. Overall, $228,000 is recommended for deduction from the contract. This moves to the regular agenda.
Page 2 of 2
5. PW 2026-22 Faxon Road Reconstruction – Design Engineering Agreement Amendment –
Change Order No. 1
Mr. Dhuse said this item and item 6 are related to the Cyrus 1 project on Faxon and Beecher. There has been
year-long negotiations with residents on the south side of Faxon regarding a re-design for the north side of the
road. It can be done, but will take substantial effort over the original design. Cyrus 1 has approved this, but no
work will begin until the payment is received. The increase is $47,680. This item will move to the regular
agenda.
6. PW 2026-23 Beecher Road Reconstruction – Design Engineering Agreement Amendment -
Change Order No. 1
This is for the east side purchase of Beecher Rd. that Cyrus 1 made and extends the Beecher reconstruction by
1,500 feet, requiring the plans to be changed. The cost is $76,322 and will also be paid for by Cyrus 1. This
moves to the regular agenda.
7. PW 2026-24 2026 Water Main Improvements – Contract Award
Mr. Sanderson said many bids were received for this project which includes water main and road work. The
total bid came in at $5.2 million, higher than anticipated and Winninger Excavating was the low bidder.
Additional water main work had been requested by Public Works and the contract cost will need to be reduced
to accommodate this additional work. He recommends awarding the full amount and doing a Change Order
later to remove about $500,000 of work. The recommended area to be removed is around the Adrian, Blaine and
State St. area. Water main replacement will be done near there in 2028 and those streets will be included then.
The Change Order will be brought forward in March or April. This item moves to the regular agenda.
8. PW 2026-25 Resolution Approving an Engineering Agreement with Engineering Enterprises, Inc.
(2026 Water Main Improvements – Construction Engineering)
Mr. Dhuse said this item is a companion to item #7. He said $425,000 is budgeted which includes payment to
Engineering Enterprises for $397,830 and $21,665 for direct expenses. This moves to the regular agenda.
9. PW 2026-26 Fox Hill, Sunflower Estates and Cannonball Estates SSA Maintenance
This is informational and Public Works will go out to bid for a 3-year contract. This year the Public Works crew
finished the trail sealing, saving the residents substantial money. The RFP will be brought to committee in April.
10. PW 2026-27 Leaf Disposal RFP
It has been 3 years since this had been bid and a substantial increase is expected, said Mr. Dhuse. He said they
have built 3 cages on the trucks from an idea from Mr. Sleezer, allowing the trucks to keep moving. Alderman
Corneils asked where the leaves are taken for disposal--they are taken to a farm east of Oswego.
11. PW 2026-28 Boombah Boulevard and Commercial Drive Traffic Control Study - Discussion
Mr. Olson said an analysis was done in 2025 following a likely resident complaint. The t-intersection is
unsignalized, however, the analysis does not warrant a sign at this time. He said if the committee so desires,
this matter would be forwarded to the City Council. It will be moved forward to the regular agenda for Mr.
Olson to present.
Old Business: None
Additional Business:
Alderman Transier received an email from a citizen concerned about one of his trees being trimmed by the city
at Greenbriar and Walsh. Mr. Dhuse said Property Standards called the citizen following a study the city did.
Mr. Dhuse will speak with him. A stop sign was also suggested by another resident, near the end of Greenbriar
An analysis was done and a stop sign is warranted if the tree branch is still impeding sight. Incomplete stops
may also contribute to the problem at this intersection.
There was no further business and the meeting adjourned at 6:20pm.
Minutes respectfully transcribed by Marlys Young, Minute Taker