Loading...
HomeMy WebLinkAboutResolution 2026-063Resolution No. 2026-63 A RESOLUTION OF THE UNITED CITY OF YORKVILLE, KENDALL COUNTY, ILLINOIS, APPROVING A CHANGE ORDER RELATING TO WATER METER REPLACEMENT WHEREAS, the United City of Yorkville, Kendall County, Illinois (the "City") is a duly organized and validly existing non home rule municipality of the State of Illinois within the meaning of Article VII, Section 10 of the 1970 Illinois Constitution; and WHEREAS, the City entered into an agreement with Core and Main to replace 3,928 water meters as a part of a City-wide water meter replacement program (the "Project"); and, WHEREAS, in preparing a master list of water meters to be replaced, the method used to determine the total number missed 325 water meters resulting in an increase of $67,000 to the original contract price of $1,830,389.10; and, WHEREAS, the City has investigated the cause of the incorrect count of water meters to be replaced and the need for an additional 325 water meters, and has determined that it is in the best interest of the City to proceed with the Project and authorize payment of the additional cost of $67,000. NOW, THEREFORE, BE IT RESOLVED by the Mayor and City Council of the United City of Yorkville, Kendall County, Illinois, as follows: Section 1. That the foregoing preambles are hereby adopted as if fully restated in this Section 1. Section 2. That the payment of the increase of $67,000 to the total cost of the Project to replace an additional 325 water meters is hereby approved. Section 3. That this Resolution shall be in full force and effect from and after its passage and approval as provided by law. Resolution No. 2026-63 Page 1 Passed by the City Council of the United City of Yorkville, Kendall County, Illinois this 28th day of July, A.D. 2026. a"� n�� C Y CLERK ' v KEN KOCH AYE DAN TRANSIER AYE ARDEN JOE PLOCHER AYE CRAIG SOLING AYE CHRIS FUNKHOUSER AYE MATT MAREK AYE RUSTY CORNEILS AYE RUSTY HYETT AYE APPROVED by me, as Mayor of the United City of Yorkville, dall County, Illinois this q day of {�S` , A.D. 2026. MAYOR Attest: Y CLERK Resolution No. 2026-63 Page 2 EE FIE : 6629 Irene Road, Belvidere IL_, 61 WEI Subject. Yorkville 2026 Phase 2 Quotation for Sensus Meters Product Nevin Water Meters 518" Sensus iPERL Water Meter 314"S Sensus RERL Water Meter 314" Sensus PERIL Water Meter (9"LL) 1" Sensus iPERL Water Meter 314"S Sensus Ally Water Meter (7 112"LL) 1" Sensus Ally Water Meter (7 112"LL) Section Total: Newt 112" - Z' OMNI R2Water Meters 1 1/2" Sensus OMNI R2 Water Meter With Integral Strainer, AMR Output 2" Sensus OMNI R2 Water Meter With Integral Strainer, AMR Output Section Total: New 1 112" - 6" OMNI C2 Water Meters 1 1/2" Sensus OMNI C2 Water Meter with Integral Strainer, AMR Output Pulse Output and Test Outlet 2" Sensus OMNI C2 Water Meter with Integral Strainer, AMR Output Pulse Output and Test Outlet 3" Sensus OMNI C2 Water Meter with Integral Strainer, AMR Output Pulse Output and Test Outlet 4" Sensus OMNI C2 Water Meter with Integral Strainer, AMR Output Pulse Output and Test Outlet 6" Sensus OMNI C2 Water Meter with Integral Strainer, AMR Output Pulse Output and Test Outlet Section Total Labor Installation of 518" Meter Installation of 314" Meter Installation of 1" Meter Installation of 1-112" Meter Installation of 2" Meter Installation of 3" Meter Installation of 4" Meter Installation of 6" Meter Installation of New Wire Installation of Ground Strap 5I8"-l" Correct Hard Plumbing Smartpoint only (outside sets) Installation of 314" Ball Valve (includes valve) Installation of 1" Ball valve (includes valve) Reprogram Meter and Smaltpoint Only (Sensus Professional Services) Section Total $trn"obit's 51 OM Single Port wired Smartp6rits Section Total: Quantity 0 3372 0 427 0 0 3799 0 0 0 27 77 15 7 3 129 0 3340 427 27 77 15 7 3 0 0 0 0 0 0 1 3928 3928 Date: July 31, 2025 Village: Yorkville Attn: Jon Bauer Unit Price $130,00 ea $130.00 ea $152.00 ea $205.00 ea $425.00 ea $505.00 ea $465.00 ea $650.00 ea $1,250.00 $1,440.00 $1,825.00 $2, 840, 00 $4,910.00 $170.00 ea $170.00 ea $170.00 ea $395.00 ea $405.00 ea $900.00 ea $1,175.00 ea $4,200.00 ea $90.00 ea $55.00 ea $265.00 ea $125.00 ea $250,00 ea $285.00 ea $10,000,00 lump sum $130.00 ea Extension So.00 $438, 360.00 $0.00 $87,535.00 $0.00 $0.00 $525,895.00 $0.00 $0 00 $0.00 ea $33.750.00 ea $110,880.00 ea $27,375.00 ea $19,880.00 ea $14,730.00 $206,615.00 $0.00 $567,800.00 $72, 590.00 $10, 665.00 $31,185.00 $13, 500.00 $8,225.00 $12,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $10, 000.00 $726,565.00 $510,640 00 $510,640.00 Internal U- only Meter Accessories 22 Guage 3-Conductor Meter Wire (500' Spool) 3 $60.00 ea $180,00 518"-1" Ground Clamps 7598 $4.25 ea $32,291.50 #4 Solid Copper Ground Wire (200' Spool) 5 $325.00 ea $1,625.00 Touch Pad 0 $8.00 ea $0.00 314" Meter Gaskets 6744 $0.12 ea $809.28 1" Meter Gaskets 854 $0.14 ea $119.56 1 112" Meter Gaskets 54 $125 ea $67.50 2" Meter Gaskets 154 $1.50 ea $231,00 3" Meter Gaskets wl Bolts & Nuts 30 $15.54 ea $466.20 4" Meter Gaskets w/ Bolts & Nuts 14 $20.51 ea $287 14 6" Meter Gaskets wl Bolts & nuts 6 $27.82 ea $166.92 A23-NL 518"X314" to 314" Adaptor 0 $20.00 ea $0-00 Section Total: $36,244.10 Sensus Ana(ytics, SaaS integration and Hosting Fees. Annual Sensus Analytics SA/RNI Hosting Fee 6.5K Services Year'26 1 $26,645.00 annual $26.645.00 Annual Sensus Analytics SA/RNI Hosting Fee 9K Services Year'27 0 $32,595.00 annual $0-00 Annual Sensus Analytics SAIRNI Hosting Fee 9K Services Year'28 0 $33,573.00 annual $0.00 Annual Sensus Analytics SAIRNI Hosting Fee 9K Services Year `29 0 $34,580.00 annual $0.00 Section Total. $26,645.00 Extended Warranties, Training, Management Fee Annual Infrastructure Maintenance Agreement (Year 2 per M400 TGB) 2 $2,200.00 annual $4,400.00 Section Total. $4,400.00 Subtotal: $1,830,3139.10 NOTE: * Final project pricing shall be determined by actual meter quantities supplied and installed. * Final Pricing subject to volatile market conditions. * Pricing does not include Payment/Performance Bond. " Installation pricing are for'Labor Only" to replace motor with same lay length meter. * Additional plumbinglpit set pricing determined case by case basis. * Labor assumes no responsibility on ground wire sizing Prices are good until December 31, 2026. Delivery can be made from stock to within twelve (12) weeks from receipt of your purchase order. Our terms of payment are net thirty (30) days. Sincerely, Steve eoopa Steve Cooper Territory Manager �mernat Vse only