Loading...
Plan Council Minutes 2007 02-08-07 � APPROVED Plan Council alaaJE 7 Feb.8,2007 Attendees: Joe Wywrot, City Engineer Eric Dhuse,Pub. Works Director John Crois, Interim City Administrator Anna Kurtzman,Zoning Coordinator Charles Wunder,Urban Planner Tim Fairfield,BKFD Guests: Boyd Ingemunson,Attorney Phillipe Moreau, Walter Deuchler Assoc. Ralph Pfister,YBSD The meeting was called to order by Joe Wywrot at 9:30am. The Jan. 25`h minutes were approved as noted. YBSD—Annexation Ms.Kurtzman concurred with the petitioner that the property west of Blackberry Creek is to be annexed and the zoning should be consistent with that of the current YBSD plan.This will be A-1 zoning with special use for the treatment plat. Joe Wywrot stated that the legal description and the map would be sufficient for annexation,noting where the property is physically contiguous. Joe Wywrot stated,with this annexation,the bridge will become the City's property, and will need to be replaced at the City's expense. The right of way dedication is needed on River Road. The City should prepare the plat of dedication, so when the plant is expanded the right of line will already be determined. The City will hire a consultant to recommend the right of way, particularly at the bridge. The right of way will be symmetrical from the center line of the road. The A-1 zoning special use right of way is 100 feet from the established right of way. The petitioner is restricted on the river side of the property because of the flood plain. The petitioner will apply for a setback variance from the right of way when the site plan for the new plant is designed. Mr.Pfister stated,hopefully, construction on the plant will begin in 18-24 months. Phillipe Moreau will send his typographical information to Joe Wywrot. The annexation request will move forward to the March 14 Plan Commission Minutes submitted by Annette Williams