Plan Council Minutes 2006 01-26-06 Plan Council - -
January 26, 2006 C(
Attendees:
John Crois, City Administrator John Whitehouse, EEI
Travis Miller, Comm. Dev. Director Anna Kurtzman, Zoning official
Mike Schoppe, Schoppe Design Scott Sleezer, Dir. of Parks
Joe Wywrot, City Engineer Bill Dunn, EEI
Sgt. Ron Diederich, Police Dept.
Guests:
Dan Harper, Kendall Creek Dev. Phil Stuepfert, Smith Engineering
David Knott, Kendall Creek Dev. Jim Olguin, GSRNH
David Schultz, Smith Engineering Dan Kramer, Attorney
John Martin, Huck, Bouman Dwayne Konicek
Wayne Konicek Mike Konicek
Mike Brandenburg, Tanglewood Bob Nelson, Tanglewood
Rodger Brown, Inland Michael Mondus, Spaceco, Inc.
Gary Weber, Weber & Assoc. Scott Guerard, Wyndham Deerpoint
The Dec. 22 minutes were approved with corrections.
Hudson Lakes —Preliminary plan
Anna Kurtzman stated lot 178 is not at the end of the cul-de-sac, and
the developer will look at rotation of lots 178-182 to bring the width into
compliance. (EEI comment #16)
John Whitehouse needs additional information including the traffic
study, and ADT analysis, a field tile study, and a copy of the NRI. Street
names are approved and will be added to the plan. Prestwick's revised plan
shows a new route for sanitary and pump station location, which this will be
a tributary to. We want to avoid Aux Sable creek pump station temporary
solutions, and look for final solutions for wastewater collection.
In the city's park development standards, the basin size requirement is
two acres. These specifications are applicable to all basins in the city. Any
deviations proposed should be addressed in the annexation agreement.
Jim Olguin stated the school district does not have a designated site
plan for the middle school and they are asking for an additional 10 + acres.
At issue is whether all facilities will fit on the site. The north of Penman Rd.
has been reconfigured to accommodate traffic, minimizing the access to this
1
major collector. These changes should be incorporated in the preliminary
plat for plan council review.
Mike Schoppe is proposing that the developer show a secondary
maintenance road access through the middle school site. The developer will
show frontage (one-half of the lots width) along the south side of the 10 acre
site on the preliminary plan, to allow for parking. The school district and the
park district may agree on a trail. Scott Sleezer would like to have front
funding for the development of the Raintree/Prestwick site.
Joe Wywrot suggested the two cul-de-sacs on the northeast side be
connected for ease of snow removal. The police would prefer a T
intersection at the cul-de-sac, but Mr. Schoppe suggested only 7 lots are
serviced and traffic should not be a problem.
On the preliminary plat, Astor should be changed to Tremont Street.
Joe suggested the developer shorten the northern most cul-de-sac, reducing
the pavement and right of way area, and retaining the same number of lots.
Setback lines should be noted on the preliminary plat, so there is no question
at final plat, which are side, front or rear yards.
All ponds are being proposed as wet. The developer will look at
additional buffer at the rear of the yards. There will be a sidewalk on one
side of Penman and bike path on the south side.
This will be on the agenda at the March 9t' plan council.
White Pines Farm - Preliminary PUD
The developer stated the B-3 will be commercial straight zoning, and
the PUD R-2 zoning. Mike Schoppe stated there will need to be a zoning
plat, with legal descriptions for the two parcels.
The North/South 450' park dimension is in the city standards, and
gives the City flexibility to place soccer or ball fields. The developer may
eliminate the 90 degree parking spaces and allow for the 450' width. Bob
Nelson proposed the park site be relocated to the seven acres green space
along Ashe. The vision for this site could include a tower, additional
detention, or a church site. Scott Sleezer suggested this park site be
discussed at the Park Board, and Bob Nelson proposed V2 land and V2 cash.
Additional proposals should be noted on the concept plan.
Mr. Schoppe suggested the developer may need to address why
additional changes to the street changes were not incorporated. (Comment
#4). The City is proposing both the north /south street and east/west
entrances as boulevards. Bob Nelson stated the east west avenue was
..._ 2
designed as a gateway to the park. He will show additional trees along the
north south route.
The developer reduced townhouse number and increases the number
of single family units, but may need to address the density.
Typically there would be a 5' sidewalk along both Galena and Ashe,
and the city okayed a 10' foot asphalt trail in lieu of this. The 13.4 acre basin
should be separated with a trail. The City is asking for sidewalk around the
park site and directly to the east of the site, connecting to the easterly
subdivision (close to the Com Ed easement). The City will consider land
cash for trail, and negotiate with the developer and park district. The county
will own Ashe Road, with the regional trail along the east side of Eldamain
Rd.
On the preliminary plan, the right of way dedication on the SE stub is
shown. East of there Schultz owns a sliver of land, (which should be shown
on the preliminary plat) and there is 400 feet that is Com Ed's easement.
Potentially there is will be street extension across Com Ed at the north end
into Pulte, a trail connection in the middle, and a street connection at the
south end.
There is sufficient frontage along Beecher for two entrances and one
along Galena, if the county approves. The developer will propose a trail
serving both properties along the north side of the Com Ed property.
A preliminary PUD plan with detailed typical lot information and
building setbacks needs to be submitted.
John Whitehouse stated the developer's current separation along
Galena road is 1300 feet and the developer may need a variance from the
Kendall Co. board, to determine traffic patterns and entrances. The City
needs concurrence for access along Baseline, which should be addressed by
John Wyeth and Mr. Eichelberger from Sugar Grove. Before City Council
approves and annexation, the city would need to see county variance
granted.
At T intersections, sidewalks should be provided on the top of the T
side of the street for cross walks facilitations.
The west branch of Rob Roy Creek serves this area, and timing needs
to be considered. The developer should contact YBSD, as the only easement
currently being sought is across the Bennett property. Bob Nelson has heard
no action regarding the FPA amendment and will contact John Frerich at
Douche. Water main comes along Galena to the E. Beecher Rd. at Del
Webb, and another coming westerly from Bailey Meadows through Pulte
property on the north.
3
An alternative storm water discharge is proposed along Galena Rd. to
the ditch. The city is proposing a drainage pipe flowing from Galena to the
Schultz property swale, across the street from Aurora Blacktop. This change
is proposed due to the continuous volume flow along the Galena Rd. ditch.
The HOA will have ownership of the southeastern trail.
This will be on the plan council agenda on March 9th.
Bailey Meadows —Revised Preliminary Plan
The developer is asking for additional acreage, in conjunction with a
1:1 compensatory storage ratio. Relocating the access to comply with
IDOT's standard, they are requesting two additional commercial lots. Lot
133 initially showed a Nicor pressure reducing statement, which now will be
built on the east side of Rt. 47
Currently the commercial property is zoned B-3, so setbacks for the
out lots could be included in the amended annexation agreement. In straight
zoning, all property is under one ownership, with individual property
leasees.
Proposed by the City was 1) enlarging Lot 202, then re-subdivision of
this lot, when the Schramm strip usage is determined and Rt. 47 accesses are
finalized. Or 2) the commercial area can be zoned a PUD with out lots; 3)
build with leases with unplatted lots; or 4) subdivide with public streets all
on the frontage roads.
John Whitehouse stated the water main loops come up from the south
across Com Ed. Because of Del Webb proposal to the south, stubbed streets
are not proposed to continue from Com Ed to Bailey Meadows, Wainwright
Lane and Clarence Lane stubs to the south should be eliminating at final
platting, subject to an agreement with Del Webb. Wainwright south of
Bedford could be included as a park extension and could be a 60' wide
parking, with lot narrowing or realignments.
Scott Sleezer stated that a bike path is desirable on the south edge of
the property but no agreement with Com Ed right of way has been secured.
The City can discuss the trail options with Com Ed, or it could be developed
an on street trail.
Mike Schoppe discussed the school site proposed in Pulte, west of Lot
190. If Potter Street extends to the west, that would enable additional
parking for school activities. Scott Sleezer does not want the school and park
site divided by a street. The city will determine road extensions and parking
lot at residential final plat.
4
John Whitehouse stated a setback issue from Rob Roy Creek to the
commercial area needs to be resolved. In addition,justification for the
compensatory storage ratio should be presented to the City.
Mike Schoppe recommended that lot 205 be owned by the City. The
proposed bike trail has been moved by the developer, to the west of the
commercial area. Scott Sleezer will advise the City staff where the trail
should cross, so this plan can be approved. The 30' just east of the
commercial lots is to the center line of the creek to the west, so no trail could
be placed in this property.
Mike Schoppe recommended the trails end easement be moved to the
east, made a lot, and owned by the city, for usage for signage and parking.
This easement will connect to the trail to the west. Anna Kurtzman will
check the setbacks.
The city is asking for a cross section showing the area along Rob Roy
Creek showing grading, vegetation and the proposed storm sewer for IDNR
recommendations. A second cross section should be prepared lot 208, from
the parking setback to the edge of pavement on Route 47. These will be
incorporated on the preliminary engineering plans.
A cross section of the trail will be given to the park board.
The access to the trailhead is shown through the commercial area.
There is a blanket easement over the storm water management area. Mike
Schoppe suggested the trailhead be moved to the right
This will be on the March 9 agenda for plan council.
Caledonia Unit 1 Final Plat
The owner of this property has changed. The boundary of the plat is
smaller. The petitioner will be submitting separate units. The original final
plat has been approved. The proposed portion of the original plat shows no
changes, but it is just a different document. Staff acknowledges this Unit 1
is consistent with the final plat that was previously approved.
There will be a memo prepared by staff stating that this Unit 1 plat
was previously approved for Caledonia. This will be on the agenda for the
Feb. 9 Plan Commission.
Minutes submitted by Annette Williams
5