Loading...
Resolution 2010-22 �a o• as ���InolS Department Resolution for Maintenance of Streets and Highways by Municipality of Transportation Under the Illinois Highway Code BE IT RESOLVED, by the City Council of the (Council or President and Board of Trustees) United City of Yorkville , Illinois, that there is hereby (City, Town or Village) (Name) appropriated the sum of $55,000.00 of Motor Fuel Tax funds for the purpose of maintaining streets and highways under the applicable provisions of the Illinois Highway Code from May 1, 2010 (Date) to April 30, 2011 (Date) BE IT FURTHER RESOLVED, that only those streets, highways, and operations as listed and described on the approved Municipal Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this resolution, are eligible for maintenance with Motor Fuel Tax funds during the period.as specified above. BE IT FURTHER RESOLVED, that the Clerk shall, as soon a practicable after the close of the period as given above, submit to the Department of Transportation, on forms furnished by said Department , a certified statement showing expenditures from and balances remaining in the account(s) for this period; and BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this resolution to the district office of the Department of Transportation, at Ottawa , Illinois. Jacquelyn Milschewski Clerk in and for the United City (City, Town or Village) of Yorkville County of Kendall hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the City Council at a meeting on (Council or President and Board of Trustees) Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this day of (SEAL) _ _ „ p City Clerk (City, Town or Village) 1 1 Approved � Date Department of Transportation � G Reg, al Engin�Or Printed 8/9/2010 BLR 14230 (Rev. 11/06) RECRF"i 03 LOCAL ROADS AUG 2 5 1 cr rb-D mi (WE I L�,H.. ,, , . I -� CRT OPE W% R A,DTO SEC FIB �F{ER 1 Illinois Department Municipal Estimate of of Transportation Maintenance Costs Section Number 10-00000-00-GM reriod from May 1, 2010 to April 30, 2011 Municipality Yorkville Estimated Cost of Maintenance Operations Maintenance For Group I, II, or III (Material, Eauipment or Labor) Operation Group Unit Operation (No. — Description) (i,u,ui,iv) Item Unit Quantity Price Cost Cost Aggregate Base Repair IV Aggregate Base Repair TON 90 35.00 3150.00 3150.00 Geotechnical Fabric for IV Geotechnical Fabric for SY 146 2.00 292.00 292.00✓ Ground Stabilization Ground Stabilization Class D Patches, IV Class D Patches, SY 733 60.00 43,980.00 43,980.00 Type IV, 6" Type IV, 6" Aggregate Shoulder IV Aggregate Shoulder TON 12 20.00 240.00 240.00 Thermoplastic Pavement IV Thermoplastic Pavement FT 1152 2.00 2304.00 2304.00 Marking, Line, 4" Marking, Line, 4" i I Total Day Labor Costs $49,966.00 Total Estimated Maintenance Operation Cost $49,966.00 Preliminary Engineering 0.00 Engineering Inspection 0.00 Material Testing 0.00 Total Estimated Engineering Cost 0.00 Total Estimated Maintenance Cost $49,966.00 Submitted: 08/06/10 Approved: 4 6- s //o Date Date °v: 0 City Engineer f M icipal Offic' Title R @gional EAine r Submit Four (4) Copies to Regional Engineer Page 1 of 1 BLR 14231 (Rev. 2/23/06) Printed on 8/6/2010 3:50:02 PM